2.03 JSA Change Rams 5 - 7 [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

ANALISA KESELAMATAN PEKERJAAN JOB SAFETY ANALYSIS



TANGGAL DATE



:



URAIAN PEKERJAAN JOB DESCRIPTION PENGAWAS SUPERVISOR



:



Change Variable Rams BOP 5” to 9 5/8”



:



Tool pusher



Nomo r Urut/ Seq No 1



2



3



PERSONIL YANG TERLIBAT PERSONNEL INVOLVED



LANGKAH-LANGKAH KERJA/ JOB STEPS (Urutan Kejadian/Sequence of Events)



:



PERSYARATAN PERSONIL PERSONNEL REQUIREMENTS BAHAYA YANG MUNGKIN TIMBUL/ POTENTIAL HAZARD



No. Dokumen/ Document No.



Rev.



JSA-EMR01-Drill-2.03



0



Driller, Floorman



:



Experience



PENGENDALIAN BAHAYA/ HAZARD CONTROL (Tes atau Prosedur/Test or Procedure)



PERALATAN PELINDUNG DIRI/TOOLS/EQUIP P.P.E.



TINDAKAN OLEH SIAPA/ACTION BY WHOM



PJSM. Prepare tools. Prepare safety body harness, anti fall arrestor, scaffolding. Ensure Rams ready to be installed. Have work platforms installed on UPR area. Men to have safety harness, dual lanyard and fall arresters.



Drop object, Falling in cellar.



Make sure the area is clear, Stay clear of drop area.



Safety shoes, safety glasses, Hard-Hat, gloves.



Drilling crew



Falling, Pinch point, Dropped Object.



Safety harness and fall arresters mandatory.



Safety harness. Fall arrester. Hard-hat, gloves, safety glass and boot.



Floorman/ Toolpusher.



Break out bonnet bolts with hammer wrench and hammer or impact wrench if available. Fully back out bonnet bolts.



Falling, struck by hammer, dropping tools.



Safety harness. Fall arrester. Hard-hat, glove’s safety glass and boot.



Floorman/ Toolpusher.



Safety harness. Fall arrester. Hard-hat, glove’s safety glass and boot.



Floorman/ Toolpusher.



Secure tools with lanyard. Harness, fall arrester, rope on hammer wrench so hand not near hammer wrench. Secure tools with lanyard. Proper tools: Sledge Hammer, hammer wrench, and Impact wrench.



4



Clear men from work platforms. Function UPR, 4- way valve to close position till ram bonnets open. Then put 4-way valve to “block Edisi/Edition : 1



Struck by or caught between moving equipment. Or when lifting rams.



Clear personnel from platforms when opening bonnets.. Correct body position. Clear signals to winch operator. Proper tools: Sledge Hammer,



Revisi/Revision : 0



Halaman/Page 1 of 3



ANALISA KESELAMATAN PEKERJAAN JOB SAFETY ANALYSIS



Nomo r Urut/ Seq No



LANGKAH-LANGKAH KERJA/ JOB STEPS (Urutan Kejadian/Sequence of Events)



BAHAYA YANG MUNGKIN TIMBUL/ POTENTIAL HAZARD



position”



Remove lifting eyes from “ rams and install onto ” rams. Inspect bonnet seals, replace if needed. Lift into place and install dual rams into position with winch. Remove winch and lifting eyes from rams, apply small amount of grease to ram and bonnet seals to prevent damage when closing bonnets. Ensure rams are seated level.



Edisi/Edition : 1



Rev.



JSA-EMR01-Drill-2.03



0



PERALATAN PELINDUNG DIRI/TOOLS/EQUIP P.P.E.



TINDAKAN OLEH SIAPA/ACTION BY WHOM



hammer wrench, and Impact wrench.



Men back to work platform and install lifting eyes to the rams. Remove from BOP with winch. 5



PENGENDALIAN BAHAYA/ HAZARD CONTROL (Tes atau Prosedur/Test or Procedure)



No. Dokumen/ Document No.



Struck by or caught between moving equipment when installing single 7” PR.



Correct body position, clear signals to winch operator.



Revisi/Revision : 0



Safety harness. Fall arrester. Hard-hat, glove’s safety glass and boot.



Halaman/Page 2 of 3



Floorman/ Toolpusher.



ANALISA KESELAMATAN PEKERJAAN JOB SAFETY ANALYSIS



Nomo r Urut/ Seq No 6



LANGKAH-LANGKAH KERJA/ JOB STEPS (Urutan Kejadian/Sequence of Events)



BAHAYA YANG MUNGKIN TIMBUL/ POTENTIAL HAZARD



Men to clear from work platforms, but monitor when closing bonnets. Slowly move UPR 4-way valve to open position, till rams retract to bonnet body and bonnets close completely. Leave 4-way valve in open position, wind in bonnet bolts and hammer up. Clear work area of tools.



Damage to rams or bonnets. Falling, struck by hammer.



PENGENDALIAN BAHAYA/ HAZARD CONTROL (Tes atau Prosedur/Test or Procedure) Only TP to operate accumulator controls. Correct body position. Safety line on hammer wrench.



No. Dokumen/ Document No.



Rev.



JSA-EMR01-Drill-2.03



0



PERALATAN PELINDUNG DIRI/TOOLS/EQUIP P.P.E. Safety harness. Fall arrester. Hard-hat, glove’s safety glass and boot.



SIGNED SUPERVISOR TANDA TANGAN PENGAWAS ________________ Supervisor



Edisi/Edition : 1



_______________ HSE



Revisi/Revision : 0



______________ Rig Superintendent



Halaman/Page 3 of 3



TINDAKAN OLEH SIAPA/ACTION BY WHOM Floorman/ Toolpusher.