URAIAN PEKERJAAN
NO.
1
VOLUME
Pemasangan Woven Geotextile (m2) Bahan : Geotextile 1.000 Sewa alat bantu 0.039
SATUAN
m2 Jam
HARGA
JUMLAH
7,500.00
290.13
100,000.00 75,000.00 85,000.00
1,823.00 6,150.00 1,555.50 9,818.63
PEMBULATAN
Upah : Mandor Buruh Tak Terampil Buruh Terampil
2
0.018 0.082 0.018
Pemasangan Non Woven Geotextile (m2) Bahan : Geotextile 1.000 Sewa alat bantu 0.039
hr hr hr
m2 Jam
7,500.00
290.13
100,000.00 75,000.00 85,000.00
1,823.00 6,150.00 1,555.50 9,818.63
9,815.00
Upah : Mandor Buruh Tak Terampil Buruh Terampil
3
Pemasangan Geomembran (m2) Bahan : Geomembran Sewa alat bantu
0.018 0.082 0.018
hr hr hr
1.000 0.039
m2 Jam
0.018 0.082 0.018
hr hr hr
7,500.00
290.13
100,000.00 75,000.00 85,000.00
1,823.00 6,150.00 1,555.50 9,818.63
9,815.00
Upah : Mandor Buruh Tak Terampil Buruh Terampil
9,815.00