4 0 45 KB
No
NAMA BARANG / BAHAN / TENAGA
SATUAN
HARGA SATUAN (Rp.)
1 2 3 4
UPAH Pekerja Tukang Kepala Tujang Mandor
OH OH OH OH
150,000 160,000 168,000 179,200
5 6 7 8
PERSIAPAN Papan Nama Pengukuran dan Bowplank Laporan dan As Built Drawing Keselamatan dan Kesehatan Kerja (K3)
LS LS LS LS
300,000 500,000 2,500,000 500,000
8 9 10 11 12 13 14 15 15
BAHAN Pasir Urug Abu Batu Pasir Pasang Pasir Beton Paving blok t = 6 cm Holywood Paving blok t = 8 cm Holywood Kansteen uk. 40 x 20 x 10 Cover U-Ditch 600x600 U-Ditch 600x600
m3 m3 m3 m3 m2 m2 BH BH
233,300 338,000 280,000 284,600 80,000 100,000 26,500 122,600 890,000
16
Box Culvert 600 x 600 Light Duty Beton Elemindo Perkasa
BH
1,393,200
17
Semen PC @50 kg (per zak) Dinamyx/Tigaroda/Gresik
Sak
63,400
Kg
1,400
BH m3 m3 m3
800 180,000 219,200 260,900
Unit/Hari
300,000
Unit/Hari
260,100
18 19 20 21 22
Semen PC @50 kg (per kg) Dinamyx/Tigaroda/Gresik Bata Merah Batu Belah Batu Belah Pondasi (Batu belah/ Kerakal) Batu pecah mesin 2/3 ALAT
15 18
Sewa Stemper (Alat Pemadat Paving Block) Molen (Concrete Mixer 0.35 m3)
HARGA TERKINI HARGA TERKINI HARGA TERKINI HARGA TERKINI
LS LS LS LS
SSH SSH SSH SSH AHSP Admin Holywood AHSP SSH SSH SSH SSH SSH SSH SSH SSH SSH
SSH SSH
PROGRAM KEGIATAN SUB KEGIATAN PEKERJAAN LOKASI SUMBER DANA
: : : : : :