11 0 39 KB
DAFTAR
: HARGA SATUAN PEKERJAAN (UNIT PRICE)
NO.
URAIAN PEKERJAAN DAN ANALISA
I
SATUAN
HARGA SATUAN (Rp.)
UPAH (Rp.)
BAHAN (Rp.)
ALAT (Rp.)
JUMLAH (Rp.)
PEKERJAAN PLAFON 1
Pekerjaan Plafond PVC ex Shunda Plafond 1.0000
M2
Plafond PVC Type Drain Gloss White (PL. 06.061) 6mm x 20 cm
1.0000
Ls
Jasa Pasang termasuk rangka dan asesoris
1 M2 105,000.00
75,000.00
JUMLAH OVERHEAT DAN PROFIT (10%) JUMLAH TOTAL 2
Pekerjaan List Plafond PVC ex Shunda Plafond 1.0000
M'
List Plafond PVC Type Minimalis White (LS. 302) Lebar 3 cm
1.0000
Ls
Jasa Pasang termasuk asesoris (30% harga bahan) JUMLAH OVERHEAT DAN PROFIT (10%) JUMLAH TOTAL
105,000.00
75,000.00 -
-
105,000.00 75,000.00 180,000.00 18,000.00 198,000.00
1 M' 22,000.00
6,600.00
22,000.00
6,600.00 -
22,000.00 6,600.00
-
28,600.00 2,860.00 31,460.00
27