6 0 705 KB
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
BAB IV PERHITUNGAN FLOOR DECK
Gambar 4.1 Keyplan floor deck
Gambar 4.2 Section floor deck 4.1 Data Perencanaan Berat sendiri beton bertulang
= 2.400 kg/m3
Berat urugan pasir
= 1600 kg/m2
Perhitungan Floor Deck
49
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai Berat sendiri floor deck tebal 0,75 mm
= 9,23 kg/m2
Berat spesi per 1 cm tebal
= 21 kg/m2/cm
Berat tegel per 1 cm tebal
= 24 kg/m2/cm
Berat pipa + ducting
= 10 kg/m2
Berat plafond + penggantung ( 11 kg/m2+ 7 kg/m2 ) = 18 kg/m2 4.2 Analisa Pembebanan a. Beban Mati Berat sendiri beton tebal 12 cm = 2.400 kg/m3 x 0,12 m
= 288 kg/m2
Berat sendiri floor deck ( tebal 0,75 mm ), s.k.s 3 m
= 9,23 kg/m2
Berat spesi tebal 2 cm = 2 cm x 21 kg/m2/cm
= 42
kg/m2
Berat urugan pasir 1600 x 0.03
= 48
kg/m2
Berat pipa + ducting
= 10
kg/m2
Berat plafond + penggantung
= 18
kg/m2
Berat tegel tebal 2 cm = 2 cm x 24 kg/m2/cm
= 48
kg/m2 +
qD
= 463,23 kg/m2
b. Beban Hidup (qL) Beban hidup lantai (Perkantoran) SNI 1727 – 2013 hal. 27 tabel 4-1 adalah 479 kg/m2 c. Beban maksismum yang digunakan Beban berguna yang dipakai dalam tabel floor deck adalah jumlah beban hidup dan beban-beban finishing lainya = 479 kg/m2 + 42 kg/m2 + 48 kg/m2 + 10 kg/m2 + 18 kg/m2 = 597 kg/m2 dipakai beban berguna 600 kg/m2
Perhitungan Floor Deck
50
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
Gambar 4.3 Brosur spesifikasi floordeck
4.3 Perhitungan Tebal Plat dan Tulangan Negatif a. Data Perhitungan Beban berguna (tabel brosur) = 600 kg/m2 Jarak antar balok rencana Tipe B1 (arah y)
= 500 cm
Tipe B1 (arah x)
= 500 cm
Jarak antar kuda-kuda
= 500 cm
Data floor deck dari brosur T (tebal floor deck)
= 0,75 mm
L
= 500 cm
Q maks
= 600 kg/m2
T (tebal pelat beton)
= 12 cm
Berat per luas
= 9,23 kg/m2
Berat per panjang
= 6 kg/m
Perhitungan Floor Deck
51
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
wr T
tb
Hr
Gambar 4.4 Section floor deck Bentang menerus tulangan negative (A) = 5,17 cm2/m = 517 mm2/m Tulangan rencana ф
= 10
Banyaknya tulangan tiap 1 meter
= As
mm As = 78,54 mm2
A
517 𝑚𝑚2
= 78.54 𝑚𝑚2 = 6,6 7 buah Jarak tulangan tarik
=
Maka dipakai tulangan tarik
1000 𝑚𝑚 7
= 143 mm 145 mm
= ф 10- 145 mm
4.4 Perhitungan Shear Connector (Stud Connector) a. Data Shear Connector (stud) yg dipakai d
= 20 mm
H
= tebal plat beton + tinggi balok WF = 120 mm + 400 mm = 520 mm
Asc = ¼ x x d2 = ¼ x 3,14 x (20 mm)2 = 314,16 mm2 Fu = 410 MPa (N/mm2) Fy = 250 MPa (N/mm2) L
= 5000 mm
S
= 5000 mm
Hr = 53 mm wr = 32 mm Hs = hr + selimut beton = 53 mm + 40 mm tb
= 93 mm
= 120 mm – 53 mm = 67 mm
Perhitungan Floor Deck
52
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
b. Data beton F’c
= 25 MPa (N/mm2)
Ec
= 4.700 x √fc′ = 4.700 x √25 MPa = 23.500 N/mm2
c. Kekuatan shear connector stud (1 buah stud) (1 buah stud) (SNI 1729-2015 Pasal I8.2 Hal. 104) = 0,5 x Asc x (fc’ x Ec)0,5
Qn
= 0,5 x 314,16 mm2 x (25 N/mm2 𝑥 23.500 N/mm2)0,5 = 120.399,26 N Asc x Fu
= 314,16 mm2 x 410 N/mm2 = 128.805,3 N
Maka, Qn Asc x Fu 120.399,26 N < 128.805,3 N
(OK)
d. Kontrol Koefisien Reduksi
rs
wr
hs
= 0,6 x ( hr ) x (hr − 1) 1 32 mm
93 mm
= 0,6 x (53 mm) x (53 mm − 1) 1 = 0,6 x 0,6 x (1,75 − 1) rs
1
= 0,27 < 1 (OK)
Maka, Qn = Qn x rs = 120.399,26 N x 0,27 = 32.917,99 N
Perhitungan Floor Deck
53
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
e. Gaya Geser Horizontal (Vn = c)
As (connector) = C1
= As x fy = 314,16 mm2 x 250 N/mm2 = 78.539,816 N = 0.85 x fc’ x Ac
C2
= 0.85 x 25 N/mm2 x (beff x tb)
Dimana, beff =
𝐿 4
=
5000 𝑚𝑚
= 1.250 mm
4
beff = 1.250 mm S = 5000 mm
(OK)
Maka, C2 = 0,85 x fc’x (beff x tb) = 0,85 x 25 N/mm2 x (5.000 mm x 67 mm) = 1.779.687,5 N C2 C1
Sehingga, Vn = C2 (gaya geser 1 conector) = 1.779.687,5 N
f. Menentukan Banyaknya Stud (N)
N=
Vn Qn
=
1.779.687,5 N 32.917,99 N
= 54,06
Jadi, jumlah connector = 54,06 buah 60 buah. 𝐿
dengan jarak bentang menerus = (𝑛/2) =
500 𝑐𝑚 (60/2)
= 16,67 Cm
Sehingga dipakai connector 2 baris dengan jarak 17 cm.
Perhitungan Floor Deck
54
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
tb hr
Balok WF 400.200.8.13
5.000 mm
Gambar 4.5 Perletakan Stud Connector
mutu E70xx 17 cm
Gambar 4.6 Detail pemasangan Stud Connector g. Control las Baja BJ 41
Fy = 250 MPa (N/mm2) = 2.500 kg/cm2 Fu = 410 MPa (N/mm2) = 4.100 kg/cm2
Fu las E70xx = 70 Ksi = 70 x 70,3 kg/cm3 Akibat Pu, maka Pu = fvp = = =
𝑄𝑛 𝑔
=
32.917,99 𝑘𝑔 9,8
= 3.358,98 kg
Pu x d2 x 0,25 3.358,98 kg 3,14 x (2𝑐𝑚)2 x 0,25 3.358,98 kg 3,14 cm2
= 1.069,20 kg/cm2 Fu = x 0,6 x F70xx = 0,75 x 0,6 x 70 x 70,3 kg/cm3 = 2.214,45 kg/cm3
Perhitungan Floor Deck
55
Perancangan Struktur Baja Gedung Perkantoran 4 Lantai
Te = =
fvp fu 1.069,20 𝑘𝑔/𝑐𝑚2 2.214,45 𝑘𝑔/𝑐𝑚3
= 0,48 cm a
= =
te 0,707 0,48 𝑐𝑚 0,707
= 0,68 cm
Perhitungan Floor Deck
56