16 0 526 KB
PEMERINTAH KABUPATEN BENGKALIS
BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI Jalan Pertanian No.
- Bengkalis
BILL OF QUANTITY (BQ)
KEGIATAN
:
PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS PEKERJAAN :
PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN LOKASI
:
JL. PERTANIAN NO.
—BENGKALIS
REKAPITULASI BILL OF QUANTITYY KEGIATAN
:
PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS
PEKERJAAN
:
PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN
LOKASI
:
KANTOR BPUAD JL. PERTANIAN NO.
NO
BENGKALIS
URAIAN KEGIATAN
JUMLAH HARGA
I
PEKERJAAN PERSIAPAN
4,000,000.000
II
PEKERJAAN PINTU GERBANG STAINLESS STEEL
III
PEKERJAAN PAGAR DEPAN
103,837,448.701
IV
PEKERJAAN PAGAR SAMPING
226,051,972.523
V
PEKERJAAN PAGAR BELAKANG
97,833,828.613
VI
PEKERJAAN LAIN-LAIN
23,485,600.000
500,000.000 JUMLAH Pajak Pertambahan Nilai (PPn) JUMLAH TOTAL DIBULATKAN
455,708,849.84 45,570,884.98 501,279,734.82 501,280,000.00
Terbilang :
Lima Ratus Satu Juta Dua Ratus Delapan Puluh Ribu Rupiah
MENGETAHUI/MENYETUJUI
PENGGUNA ANGGARAN KECAMATAN BENGKALIS
JA'AFAR ARIEF, S.Sos NIP. 010142954
BENGKALIS, 2013 PENAWAR PT. / CV. ………………….
NAMA JELAS JABATAN
PEMERINTAH KABUPATEN BENGKALIS BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI
KEGIATAN
:
PEKERJAAN
:
PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN
BILL OF QUANTITYY NO.
ITEM PEKERJAAN
I 1 2
SAT.
PEKERJAAN PERSIAPAN Pek. Papan Nama Proyek Pek. Pasangan Bouwplank
VOLUME
Bh Ls
1.00 1.00
HARGA SATUAN
500,000.00 3,500,000.00
500,000.00 3,500,000.00 4,000,000.00
JUMLAH PEKERJAAN I II
JUMLAH HARGA
PEKERJAAN PINTU GERBANG STAINLESS STEEL 1
Pek. Pintu Gerbang Depan Stainless Steel (2 unit)
M2
15.67
950,000.00
14,890,300.00
2
Pek. Pintu Gerbang Samping Stainles Steel (1 Unit)
M
2
3.22
900,000.00
2,895,300.00
3 4
Pek. Sclupture Di atas Kolom Pintu Gerbang Stainless Steel (4 unit) Pek. Pemasangan Pintu Gerbang dan Accessories JUMLAH PEKERJAAN II
M2 Ls
2.00 1.00
500,000.00 700,000.00
1,000,000.00 700,000.00 23,485,600.00
247,438.80
III a
PEKERJAAN PAGAR DEPAN PEKERJAAN PONDASI
1
Pek. Galian Tanah Pondasi
M
3
7.36
33,600.00
2
Pek. Lapisan Pasir di Bawah Pondasi
M3
1.23
214,400.00
263,149.20
3 4
Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi dan Pot Bunga Pek. Pasang Cerocok Dia 10-12 cm L = 6 M
3
2.36 246.00
930,900.00 24,300.00
2,194,247.66 5,977,800.00
5
Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3
M Btg M3
1.44
4,085,467.48
5,883,073.16
6
Pek. Pondasi Pelat Setempat Type P2 80.35.15 camp. 1:2:3
M3
0.42
4,956,949.19
2,081,918.66
7
Pek. Sloof S1 20/30 camp. 1:2:3
M3
2.35
4,069,034.94
9,570,370.17
8
Pek. Menimbun Bekas Galian
M3
2.21
16,100.00
35,569.33 26,253,566.98
SUB TOTAL a b
PEKERJAAN KOLOM, BALOK DAN PELAT
1
Pek. Kolom Beton Bertulang K1 13 x 56 Camp 1:2:3
M3
4.95
4,613,713.12
22,839,725.42
2
Pek. Balok Beton Bertulang 13 x 56 Camp 1:2:3
M3
0.73
4,613,713.12
3,358,783.15
3
Pek. Pelat Penutup Kolom 60x60 Beton Bertulang t= 7 cm Camp 1:2:3 SUB TOTAL b
M3
0.38
3,400,115.96
1,285,243.83 26,198,508.57
c
PEKERJAAN DINDING DAN PLESTER
1
Pek. Pasangan Dinding 1/2 Bata 1 : 4
M2
89.96
140,410.00
12,631,775.04
2
Pek. Plesteran Dinding 1 : 4 + Acian
M2
134.95
44,880.00
6,056,342.82
3 4 5
Pek. Pasangan Batu Tempel (Kolom) Pek. Pasangan Roaster Beton 20x20 Pek. Pasangan Roaster Beton 15x40
38.91 200.00 50.00
183,560.00 15,000.00 30,000.00
7,142,319.60 3,000,000.00 1,500,000.00
6
Pek. Profil pada Dinding dan Pot Bunga Tebal 10 Cm
M2 Bh Bh 1 M
187.57
40,000.00
7,502,800.00
7
Pek. Profil Kolom K1
M
1
42.00
40,000.00
1,680,000.00
8
Pek. Pas. Besi Pagar
M2
8.99
650,000.00
5,843,500.00 45,356,737.46
SUB TOTAL c d
PEKERJAAN PENGECATAN
1
Pek. Cat Air Dinding Setara Nippon Paint
M2
255.09
16,756.00
4,274,241.96
2
Pek. Cat Minyak Batu Alam dan Besi Railing Setara Nippon Paint SUB TOTAL d JUMLAH PEKERJAAN III
M2
56.89
30,838.35
1,754,393.73 6,028,635.69 103,837,448.70
465,158.40
IV a
PEKERJAAN PAGAR SAMPING PEKERJAAN PONDASI
1
Pek. Galian Tanah Pondasi
M3
13.84
33,600.00
2
Pek. Lapisan Pasir di Bawah Pondasi
M3
3.46
214,400.00
742,038.40
3 4
Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi Pek. Pasang Cerocok Dia 10-12 cm L = 6 M
3.46 663.00
930,900.00 24,300.00
3,221,844.90 16,110,900.00
5
Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3
M3 Btg M3
4.22
4,085,467.48
17,257,014.62
6
Pek. Pondasi Pelat Setempat Type P2 80.35.15 camp. 1:2:3
M3
0.42
4,956,949.19
2,081,918.66
7
Pek. Sloof S1 20/30 camp. 1:2:3
M3
7.78
4,069,034.94
31,665,229.87
8
Pek. Menimbun Bekas Galian
M3
4.15
16,100.00
66,866.52 71,610,971.37
SUB TOTAL a
NO.
ITEM PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
JUMLAH HARGA
b
PEKERJAAN KOLOM, BALOK DAN PELAT
1
Pek. Kolom Beton Bertulang K1 13 x 56 Camp 1:2:3
M3
3.64
4,613,713.12
16,793,915.75
2
Pek. Kolom Beton Bertulang K2 20 x 30 Camp 1:2:3
M3
6.20
3,454,611.24
21,401,316.62
3
Pek. Balok Beton Bertulang 13 x 56 Camp 1:2:3
M3
0.73
4,613,713.12
3,358,783.15
4
Pek. Pelat Penutup Kolom 60x60 Beton Bertulang t= 7 cm Camp 1:2:3
M3
0.38
3,400,115.96
1,285,243.83
5
Pek. Balok Atas Beton Bertulang 15 x 20 Camp 1:2:3
M3
2.61
5,143,797.56
13,425,311.63 56,264,570.99
SUB TOTAL b c
PEKERJAAN DINDING DAN PLESTER
1
Pek. Pasangan Dinding 1/2 Bata 1 : 4
M
2
250.90
140,410.00
35,228,869.00
2
Pek. Plesteran Dinding 1 : 4 + Acian
M2
439.08
44,880.00
19,705,686.00
3 4 5
Pek. Pasangan Batu Tempel (Kolom) Pek. Pasangan Roaster Beton 20x20 Pek. Pasangan Roaster Beton 15x40
2
25.94 200.00 211.00
183,560.00 15,000.00 30,000.00
4,761,546.40 3,000,000.00 6,330,000.00
6
Pek. Profil Dinding 10 cm
M Bh Bh M1
249.40
40,000.00
9,975,920.00
7
Pek. Profil Kolom K1
M1
52.80
40,000.00
2,112,000.00
8
Pek. Pas. Besi Pagar
M2
8.99
650,000.00
5,843,500.00 86,957,521.40
SUB TOTAL c d
PEKERJAAN PENGECATAN
1
Pek. Cat Air Dinding Setara Nippon Paint
M2
588.71
16,756.00
9,864,488.43
2
Pek. Cat Minyak Batu Alam dan Besi Railing Setara Nippon Paint SUB TOTAL d JUMLAH PEKERJAAN IV
M
2
43.92
30,838.35
1,354,420.33 11,218,908.76 226,051,972.52
430,348.80
V a
PEKERJAAN PAGAR BELAKANG PEKERJAAN PONDASI
1
Pek. Galian Tanah Pondasi
M3
12.81
33,600.00
2
Pek. Lapisan Pasir di Bawah Pondasi
M3
1.60
214,400.00
343,254.40
3 4
Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi Pek. Pasang Cerocok Dia 10-12 cm L = 6 M
M3 Btg
1.60 304.00
930,900.00 24,300.00
1,490,370.90 7,387,200.00
5
Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3
M3
2.11
4,085,467.48
8,628,507.31
6
Pek. Sloof S1 20/30 camp. 1:2:3
M3
3.62
4,069,034.94
14,721,768.40
7
Pek. Menimbun Bekas Galian
M3
3.84
16,100.00
61,862.64 33,063,312.45
SUB TOTAL a b
PEKERJAAN KOLOM DAN BALOK
1
Pek. Kolom Beton Bertulang K2 20 x 30 Camp 1:2:3
M3
3.89
4,613,713.12
17,965,798.88
2
Pek. Balok Atas Beton Bertulang 15/20 cm Camp 1:2:3
M3
1.81
3,400,115.96
6,150,809.77 17,965,798.88
SUB TOTAL b c
PEKERJAAN DINDING DAN PLESTER
1
Pek. Pasangan Dinding 1/2 Bata 1 : 4
M2
147.25
140,410.00
20,675,091.68
2 3
Pek. Plesteran Dinding 1 : 4 + Acian Pek. Pasangan Roaster Beton 15x40
M2 Bh
294.50 105.00
44,880.00 30,000.00
13,216,980.48 3,150,000.00
4
Pek. Profil Dinding 10 cm
M1
96.46
40,000.00
3,858,320.00 40,900,392.16
M2
352.37
16,756.00
5,904,325.12 5,904,325.12 97,833,828.61
Ls
1.00
500,000.00
JUMLAH PEKERJAAN VI
500,000.00 500,000.00
JUMLAH PEKERJAAN TOTAL
455,708,849.84
SUB TOTAL c d
PEKERJAAN PENGECATAN
1
Pek. Cat Air Dinding Setara Nippon Paint SUB TOTAL d JUMLAH PEKERJAAN V
VI 1
PEKERJAAN LAIN-LAIN Pek. Pembersihan Akhir
BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI DAFTAR HARGA SATUAN BAHAN DAN UPAH TAHUN ANGGARAN 2012
NO.
URAIAN
SATUAN
1
2
3
A.
HARGA SATUAN Rp. 4
UPAH TENAGA : Pekerja Tukang Gali Mandor Tukang cat / plitur / batu Kepala tukang cat / plitur / batu Tukang kayu Kepala tukang kayu Tukang Besi Kepala Tukang besi Tukang Listrik Kepala Tukang Listrik Tukang Las Tukang Instalasi
hari hari hari hari hari hari hari hari hari hari hari hari hari
70,000 70,000 140,000 100,000 120,000 115,000 120,000 100,000 120,000 115,000 120,000 100,000 100,000
37 38 39 40 41 42 51 56 57 61 68 69
BAHAN: Kelompok Material Alam : Air Tanah urug Tanah urug Pilihan Pasir urug Pasir batu (sirtu) Pasir pasang / Pasir Beton Batu Granit ex Tjg Balai Batu Tempel Palimanan Hijau Batu Tempel Palimanan Kuning Batu Candi Tempel 20/20, 5/20 Pasir bersih ( agregat halus ) Batu bata
liter m³ m³ m³ m³ m³ m³ m² m² m² m³ buah
25 104,000 240,000 160,000 350,000 270,000 380,000 138,000 138,000 130,000 240,000 1,100
83 84 85 86 88 89 93
Kelompok Kayu Kayu Balok Kelas I Kayu Balok Kelas II Kayu Papan Kelas I Kayu Papan Kelas II Papan Cetak ( Kelas II ) uk 2 x 20 x 400 Papan Bouwplank Kayu stoot ( Cerocok dia 6 - 8 cm ), pjg 6 m
1 2 3 4 5 6 7 8 9 12 13 14 16 B.
m³ m³ m³ m³ m³ m³ btg
3,000,000 2,500,000 3,000,000 2,500,000 1,800,000 1,800,000 11,000
1
2
95 96 97 105 110 114 115 116
Tripleks tebal 4 mm Tripleks tebal 3 mm uk. 120 x 240 cm Tripleks tebal 4 mm uk. 120 x 240 cm Multipleks 9 mm Plywood 4 mm Dolken / Cerocok Ø 5 Dolken / Cerocok Ø 12 List Profil Gypsum
117 118 120 124 125 126 127 128 141 143 144 145 153 154 171 172 173 177 178 179 180 181 182 183 184 185 186 187 188 189 199 200 201 218 219 221
Kelompok Besi / Baja : Rangka Kuda-kuda Baja Ringan Alumunium Foil Paku Biasa 1" - 5" Paku Beton Paku Seng / Payung Paku Halus Paku Gypsum Besi beton/baja tulangan beton Besi Strip ( tebal 5 mm, lebar 5 Cm ) Kawat beton (bindrad) Wiremesh M6 Ø6 mm - 150 mm Wiremesh M8 Ø8 mm - 150 mm Baja plat Baja baud - baud/ baud beugel Shower kualitas baik Kran air standar Kran air kualitas baik Kunci tanam 2 X Slaag Kunci tanam kwalitas baik Engsel pintu Nylon Engsel pintu kuningan Engsel jendela Nylon Engsel jendela kuningan Kait angin 6" Kait angin 8" Kait angin 10" Hak angin Hak angin kuningan Grendel Tarikan / Pegangan pintu Pintu PVC (lengkap; kusen + daun) Kosen Alumunium 4" Coklat Kosen Alumunium 4" Putih Railing stainless t = 0,9 m Gipsum Board 9mm + Rangka Furing Formite / penjaga jarak bekisting / spacer
3 lbr lbr lbr lbr lbr m' m' m'
m² m² kg kg kg kg kg kg kg kg m² m² kg kg buah buah buah buah buah buah buah buah buah psg psg psg buah buah buah buah unit m' m' m' m² buah
4 67,000 53,000 57,000 125,000 67,000 8,000 18,000 10,000
283,000 16,667 21,000 25,000 24,800 20,483 20,500 14,058 16,000 18,685 36,630 54,945 18,000 20,735 1,306,305 15,000 72,570 83,000 150,000 15,000 45,000 15,000 35,000 15,000 18,000 21,000 15,000 35,000 15,000 35,000 350,000 50,000 90,000 700,000 99,500 2,500
1
2
3
4
222 223 225 226
Mur Baut Panjang Mur Baut Pendek Pagar besi reling besi / tralis besi polos Pagar besi reling besi / tralis besi ulir
buah buah kg kg
20,735 20,000 25,000 30,000
234 235 236 238 240 243 244 245 246 259 293 294 295
Kelompok Penutup Lantai / Dinding : Keramik polos kw.1 ukuran 30 x 30 cm Keramik motif kw.1 ukuran 30 x 30 cm Keramik motif granit kw.1 ukuran 30 x 30 cm Keramik motif kw.1 ukuran 40 x 40 cm Keramik polos kw.1 ukuran 60 x 60 cm Keramik dinding polos kw.1 ukuran 20 x 25 cm Keramik dinding motif kw.1 uikuran 20 x 25 cm Keramik dinding polos kw 1 uk. 10 x 20 cm Keramik dinding polos kw 1 uk. 10 x 25 cm Kanstin Roster bata (10x20) Roster beton (20x20) Roster beton(15x40)
m² m² m² m² m² m² m² m² m² buah buah buah buah
80,000 85,000 95,000 95,000 95,000 89,530 99,530 79,530 89,530 45,000 12,250 15,000 30,000
324 325 326 327 328 329 330
Kelompok Atap : Genteng Metal Kualitas Baik setara Sakura Roof Bola-bola Genteng Metal Perabung Genteng Metal Atap Polikarbonat; lebar = 120 cm tebal Atap Polikarbonat; lebar = 120 cm tipis Fiberglass gelombang uk. 180 x 80 cm Fiberglass plat lebar 100 cm
m² m' m' m' m' lbr m'
99,492 73,609 78,800 264,000 154,000 49,400 35,750
331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346
Kelompok Cat / Minyak : Cat Minyak ( Kayu ). Cat Minyak ( besi ). Cat dasar ( meni kayu ) Cat dasar ( meni besi ) Cat Air setara Nippon Paint Plamur Kayu Plamur Tembok Flincote Minyak cat Minyak Terpentin Minyak Bekisting ( olie bekas ) Politur Dempul Amplas Batu kambang (batu apung) Sirlak/Vernis
kg kg kg kg kg kg kg kg kg kg ltr kg kg lbr kg ltr
35,000 35,000 7,255 7,255 20,000 7,500 7,500 20,000 8,000 10,500 2,000 28,000 14,930 6,000 13,000 25,000
2
1
3
4
347 348 375 376 377 378 379 380 381 382
Spirtus Teer Kuas cat Kuas cat 2" Kuas cat 3" Roll Cat Residu / Soligium Lem Kayu Lem Kuning Wood Filler
ltr kg buah buah buah buah ltr kg kg kg
11,000 5,000 7,500 4,500 7,500 12,025 5,000 17,875 34,800 33,500
383 384 385 386 394 395 402 403 416 419 423 424 425 426 427 428
Kelompok Cement, Kaca dan Lain-lain : Portland Cement ( PC ) 50 kg Portland Cement ( PC ) Cement warna Cement putih Kaca bening tebal 3 mm Kaca bening tebal 5 mm Glassblock Bak Mandi Fiberglass, volume 120 ltrr (sudut) Floordrain (saringan buangan air KM/WC) Wastafel Kw.1 pedes steel Geotextile Non Woven 400 gr Geotextile Non Woven 700 gr Polyester Single Layer 200 hf Plastik Alas Tiang Pancang ukuran 20 x 20 P=6 M Tiang Pancang ukuran 25 x 25 P=6 M
zak kg kg kg m² m² buah buah buah unit m² m² m² m² m' m'
70,000 1,400 3,000 2,935 80,000 130,000 20,000 250,000 20,000 425,000 22,500 26,500 450,000 7,255 268,000 342,130
Mengetahui, KEPALA DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN BENGKALIS
BENGKALIS, 2013 PENAWAR PT. / CV. ………………….
Ir. M. FAUZI NIP.
NAMA JELAS JABATAN
BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI
ANALISA HARGA SATUAN PEKERJAAN TAHUN ANGGARAN 2013 NO. 1 A. A.004
A.008
B. B.001
B.010
B.011
B.012
URAIAN
C. C.019
SAT.
3
4
HARGA SAT.
JUMLAH
Rp. 5
Rp. 6=(3x5) SNI 03-2835-2002
2 PEKERJAAN PERSIAPAN Mengerjakan 1 m' pengukuran dan pemasangan bouwplank Bahan Balok Kayu Kelas II - 5/7 Paku Biasa 2" - 5" Kayu Papan Kelas II - 3/20
0.0120 0.0200 0.0070
m³ kg m³
1,800,000.00 21,000.00 1,800,000.00 Jumlah (1)
21,600.00 420.00 12,600.00 34,620.00
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
0.1000 0.1000 0.0100 0.0050
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
Jumlah (1) + (2) Membersihkan 1 m² lapangan dan perataan Tenaga Pekerja Mandor
7,000.00 11,500.00 1,200.00 700.00 20,400.00 55,020.00
0.1000 0.0500
OH OH
70,000.00 140,000.00 Jumlah (2)
7,000.00 7,000.00 14,000.00 SNI
0.4000 0.0400
OH OH
70,000.00 140,000.00
28,000.00 5,600.00 33,600.00
0.1920 0.0190
OH OH
70,000.00 140,000.00
13,440.00 2,660.00 16,100.00
0.5000 0.0500
OH OH
70,000.00 140,000.00
35,000.00 7,000.00 42,000.00
1.2000
m³
160,000.00 Jumlah (1)
192,000.00 192,000.00
0.3000 0.0100
OH OH
70,000.00 140,000.00 Jumlah (2)
21,000.00 1,400.00 22,400.00 214,400.00
PEKERJAAN TANAH Menggali 1 m³ tanah biasa sedalam 1 meter Tenaga Pekerja Mandor Jumlah Mengurug kembali 1 m³ galian Tenaga Pekerja Mandor Jumlah Memadatkan 1 m³ tanah (per 20 cm) Tenaga Pekerja Mandor Jumlah Mengurug 1 m³ pasir urug Bahan Pasir Urug Tenaga Pekerja Mandor
B.018
KOEF.
Jumlah (1) + (2) Mengurug 1 m³ tanah dengan tanah urug Tenaga Beli Tanah + Angkut; Max. 10 km (tanah urug) Perataan Tanah Urug Jumlah PEKERJAAN PONDASI Memasang 1 btg Cerocok dia 6 -8 cm (pakai alat) Bahan Cerocok dia 12 - 15 cm
1.2000 0.0500
m³ m³
104,000.00 104,000.00
124,800.00 5,200.00 130,000.00 SNI 03-2836-2002
1.0000
btg
8,000.00 Jumlah (1)
8,000.00 8,000.00
Tenaga (Upah = 20% x bahan)
0.2000
8,000.00 Jumlah (2)
1,600.00 1,600.00 9,600.00
Jumlah (1) + (2)
NO. C.020
D. D.003
URAIAN Memasang 1 btg Cerocok dia 12 -15 cm (pakai alat) Bahan Cerocok dia 12 - 15 cm
1.0000
Tenaga (Upah = 35% x bahan)
0.3500
0.6500 0.2000 0.0200 0.0300
OH OH OH OH
0.3200 0.1000 0.0100 0.0150
OH OH OH OH
Jumlah (1) + (2) Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 4 PP Bahan Bata Merah 70.0000 buah Portland Cement (PC) 11.5000 kg Pasir Pasang (PP) 0.0430 m³ Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
E. E.002
btg
Jumlah (1) + (2) Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 2 PP Bahan Bata Merah 70.0000 buah Portland Cement (PC) 18.9500 kg Pasir Pasang (PP) 0.0380 m³ Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
D.011
SAT.
Jumlah (1) + (2) PEKERJAAN DINDING Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 3 PP Bahan Bata Merah 140.0000 buah Portland Cement (PC) 32.9500 kg Pasir Pasang (PP) 0.0910 m³ Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
D.009
KOEF.
Jumlah (1) + (2) PEKERJAAN PLESTERAN Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm Bahan Portland Cement (PC) Pasir Pasang (PP) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Jumlah (1) + (2)
HARGA SAT.
JUMLAH
Rp.
Rp.
18,000.00 Jumlah (1)
18,000.00 18,000.00
18,000.00 Jumlah (2)
6,300.00 6,300.00 24,300.00 SNI 03-2837-2002
1,100.00 1,400.00 270,000.00 Jumlah (1)
154,000.00 46,130.00 24,570.00 224,700.00
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
45,500.00 20,000.00 2,400.00 4,200.00 72,100.00 296,800.00
1,100.00 1,400.00 270,000.00 Jumlah (1)
77,000.00 26,530.00 10,260.00 113,790.00
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 10,000.00 1,200.00 2,100.00 35,700.00 149,490.00
1,100.00 1,400.00 270,000.00 Jumlah (1)
77,000.00 16,100.00 11,610.00 104,710.00
0.3200 0.1000 0.0100 0.0150
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 10,000.00 1,200.00 2,100.00 35,700.00 140,410.00 SNI 03-2837-2002
8.5200 0.0170
kg m³
1,400.00 270,000.00 Jumlah (1)
11,928.00 4,590.00 16,518.00
0.2000 0.1500 0.0150 0.0100
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
14,000.00 15,000.00 1,800.00 1,400.00 32,200.00 48,718.00
NO. E.004
URAIAN Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm Bahan Portland Cement (PC) Pasir Pasang (PP) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
E.026
Jumlah (1) + (2) Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm Bahan Portland Cement (PC) Pasir Pasang (PP) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
E.027
Jumlah (1) + (2) Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm Bahan Portland Cement (PC) Pasir Pasang (PP) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
E.028
Jumlah (1) + (2) Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm Bahan Portland Cement (PC) Pasir Pasang (PP) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
E.033
Jumlah (1) + (2) Memasang 1 m² acian Bahan Portland Cement (PC) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
5.2000 0.0200
kg m³
1,400.00 270,000.00 Jumlah (1)
7,280.00 5,400.00 12,680.00
0.2000 0.1500 0.0150 0.0100
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
14,000.00 15,000.00 1,800.00 1,400.00 32,200.00 44,880.00
9.3000 0.0180
kg m³
1,400.00 270,000.00 Jumlah (1)
13,020.00 4,860.00 17,880.00
0.2600 0.2000 0.0200 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
18,200.00 20,000.00 2,400.00 1,820.00 42,420.00 60,300.00
7.0700 0.0210
kg m³
1,400.00 270,000.00 Jumlah (1)
9,898.00 5,670.00 15,568.00
0.2600 0.2000 0.0200 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
18,200.00 20,000.00 2,400.00 1,820.00 42,420.00 57,988.00
0.5000 0.0020
kg m³
1,400.00 270,000.00 Jumlah (1)
700.00 540.00 1,240.00
0.5700 0.3800 0.0380 0.0030
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
39,900.00 38,000.00 4,560.00 420.00 82,880.00 84,120.00
3.2500
kg
1,400.00 Jumlah (1)
4,550.00 4,550.00
0.1500 0.1000 0.0100 0.0080
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
10,500.00 10,000.00 1,200.00 1,120.00 22,820.00 27,370.00
NO. F. F.002
URAIAN
PEKERJAAN KAYU Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Balok Kelas I Bahan Kayu Balok Kelas I 1.1000 Paku 10 cm 1.2500 Lem Kayu 1.0000
Rp. SNI 03-3434-2002
6.0000 18.0000 2.0000 0.3000
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
420,000.00 2,070,000.00 240,000.00 42,000.00 2,772,000.00 6,116,125.00 RSNI-T-13-2002
218.0000 0.5200 0.8700
kg m³ m³
1,400.00 270,000.00 380,000.00 Jumlah (1)
305,200.00 140,400.00 330,600.00 776,200.00
1.6500 0.2500 0.0250 0.0800
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
115,500.00 25,000.00 3,000.00 11,200.00 154,700.00 930,900.00
300.0000 0.5200 0.7800
kg m³ m³
1,400.00 270,000.00 380,000.00 Jumlah (1)
420,000.00 140,400.00 296,400.00 856,800.00
1.6500 0.2500 0.0250 0.0800
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
Jumlah (1) + (2) Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66 Bahan Portland Cement (PC) 326.0000 Pasir Beton (PB) 0.5429 Koral Beton (maksimum 30 mm) 0.7622 Air 215.0000
115,500.00 25,000.00 3,000.00 11,200.00 154,700.00 1,011,500.00
kg m³ m³ liter
1,400.00 270,000.00 380,000.00 25.00 Jumlah (1)
456,400.00 146,571.43 289,644.44 5,375.00 897,990.87
1.6500 0.2750 0.0280 0.0830
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
Jumlah (1) + (2) Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58 Bahan Portland Cement (PC) 371.0000 Pasir Beton (PB) 0.4986 Koral Beton (maksimum 30 mm) 0.7756 Air 215.0000
115,500.00 27,500.00 3,360.00 11,620.00 157,980.00 1,055,970.87
kg m³ m³ liter
1,400.00 270,000.00 380,000.00 25.00 Jumlah (1)
519,400.00 134,614.29 294,711.11 5,375.00 954,100.40
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
115,500.00 27,500.00 3,360.00 11,620.00 157,980.00 1,112,080.40
Jumlah (1) + (2) PEKERJAAN BETON Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR Bahan Portland Cement (PC) Pasir Beton (PB) Koral Beton (maksimum 30 mm)
Jumlah (1) + (2) Membuat 1 m³ beton 1 PC : 2 PB : 3 KR Bahan Portland Cement (PC) Pasir Beton (PB) Koral Beton (maksimum 30 mm)
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
G.017
JUMLAH
Rp.
3,300,000.00 26,250.00 17,875.00 3,344,125.00
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
G.015
HARGA SAT.
3,000,000.00 21,000.00 17,875.00 Jumlah (1)
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
G.005
SAT.
m³ kg kg
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G. G.001
KOEF.
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Jumlah (1) + (2)
1.6500 0.2750 0.0280 0.0830
NO. G.023
URAIAN Pembesian 10 kg dengan besi polos atau besi ulir Bahan Besi Beton (polos/ulir) Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor
G.025
Jumlah (1) + (2) Memasang 1 m² bekisting untuk pondasi Bahan Kayu Kelas II Paku 5 cm - 10 cm Minyak Bekisting Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.026
Jumlah (1) + (2) Memasang 1 m² bekisting untuk sloof Bahan Kayu Kelas II Paku 5 cm - 10 cm Minyak Bekisting Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.027
Jumlah (1) + (2) Memasang 1 m² bekisting untuk kolom Bahan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu Kelas II 5/7 Plywood tebal 9 mm Dolken Ø (8-10) cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.028
Jumlah (1) + (2) Memasang 1 m² bekisting untuk balok Bahan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu Kelas II 5/7 Plywood tebal 9 mm Dolken Ø (8-10) cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
10.5000 0.1500
kg kg
14,057.85 18,685.00 Jumlah (1)
147,607.46 2,802.75 150,410.21
0.0800 0.0400 0.0040 0.0040
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
5,600.00 4,000.00 480.00 560.00 10,640.00 161,050.21
0.0400 0.3000 0.1000
m³ kg liter
1,800,000.00 21,000.00 2,000.00 Jumlah (1)
72,000.00 6,300.00 200.00 78,500.00
0.3000 0.2600 0.0260 0.0050
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
21,000.00 29,900.00 3,120.00 700.00 54,720.00 133,220.00
0.0450 0.3000 0.1000
m³ kg liter
1,800,000.00 21,000.00 2,000.00 Jumlah (1)
81,000.00 6,300.00 200.00 87,500.00
0.3000 0.2600 0.0260 0.0050
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
21,000.00 29,900.00 3,120.00 700.00 54,720.00 142,220.00
0.0400 0.4000 0.2000 0.0150 0.3500 2.0000
m³ kg liter m³ lembar btg
1,800,000.00 21,000.00 2,000.00 1,800,000.00 170,000.00 8,000.00 Jumlah (1)
72,000.00 8,400.00 400.00 27,000.00 59,500.00 16,000.00 183,300.00
0.3000 0.3300 0.0330 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
21,000.00 37,950.00 3,960.00 840.00 63,750.00 247,050.00
0.0400 0.4000 0.2000 0.0180 0.3500 2.0000
m³ kg liter m³ lembar btg
1,800,000.00 21,000.00 2,000.00 1,800,000.00 170,000.00 8,000.00 Jumlah (1)
72,000.00 8,400.00 400.00 32,400.00 59,500.00 16,000.00 188,700.00
0.3200 0.3300 0.0330 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 37,950.00 3,960.00 840.00 65,150.00 253,850.00
NO. G.029
URAIAN Memasang 1 m² bekisting untuk lantai Bahan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu Kelas II 5/7 Plywood tebal 9 mm Dolken Ø (8-10) cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.030
Jumlah (1) + (2) Memasang 1 m² bekisting untuk dinding Bahan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu Kelas II 5/7 Plywood tebal 9 mm Dolken Ø (8-10) cm Formite/Penjaga jarak Bekisting/spacer Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.031
Jumlah (1) + (2) Memasang 1 m² bekisting untuk tangga Bahan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu Kelas II 5/7 Plywood tebal 9 mm Dolken Ø (8-10) cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
G.050
Jumlah (1) + (2) Pembesian 1 kg dengan besi beton U-24 Bahan Besi Beton U-24 Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
0.0400 0.4000 0.2000 0.0150 0.3500 6.0000
m³ kg liter m³ lembar btg
1,800,000.00 21,000.00 2,000.00 1,800,000.00 170,000.00 8,000.00 Jumlah (1)
72,000.00 8,400.00 400.00 27,000.00 59,500.00 48,000.00 215,300.00
0.3200 0.3300 0.0330 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 37,950.00 3,960.00 840.00 65,150.00 280,450.00
0.0300 0.4000 0.2000 0.0200 0.3500 3.0000 4.0000
m³ kg liter m³ lembar btg buah
1,800,000.00 21,000.00 2,000.00 1,800,000.00 170,000.00 8,000.00 2,500.00 Jumlah (1)
54,000.00 8,400.00 400.00 36,000.00 59,500.00 24,000.00 10,000.00 192,300.00
0.3200 0.3300 0.0330 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 37,950.00 3,960.00 840.00 65,150.00 257,450.00
0.0300 0.4000 0.1500 0.0150 0.3500 2.0000
m³ kg liter m³ lembar btg
1,800,000.00 21,000.00 2,000.00 1,800,000.00 170,000.00 8,000.00 Jumlah (1)
54,000.00 8,400.00 300.00 27,000.00 59,500.00 16,000.00 165,200.00
0.3200 0.3300 0.0330 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
22,400.00 37,950.00 3,960.00 840.00 65,150.00 230,350.00
1.0500 0.0150
kg kg
14,057.85 18,685.00 Jumlah (1)
14,760.75 280.28 15,041.02
0.0400 0.0150 0.0150 0.0075
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
2,800.00 1,500.00 1,800.00 1,050.00 7,150.00 22,191.02
NO. G.051
URAIAN Pembesian 1 kg dengan besi beton U-39 Bahan Besi Beton U-39 Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor
G.052
Jumlah (1) + (2) Memasang 1 m² bekisting dengan papan Bahan Papan Kayu Kelas II Paku 5 cm - 12 cm Minyak Bekisting Balok Kayu 5/7 Kayu Kelas II Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pekerja (bongkar cetakan)
G.053
Jumlah (1) + (2) Memasang 1 m² bekisting multipleks 9 mm Bahan Multipleks 9 mm Paku 5 cm - 12 cm Balok Kayu 5/7 Kayu Kelas II Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pekerja (bongkar cetakan)
G.054
Jumlah (1) + (2) Memasang 1 m² bekisting multipleks 12 mm Bahan Multipleks 12 mm Paku 5 cm - 12 cm Balok Kayu 5/7 Kayu Kelas II Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pekerja (bongkar cetakan)
G.055
Jumlah (1) + (2) Memasang 1 m² stootwerk Bahan Kayu Stoot (2x pakai) Paku 5 cm - 12 cm Papan Terentang (2x pakai) 75% Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
1.0500 0.0150
kg kg
14,057.85 18,685.00 Jumlah (1)
14,760.75 280.28 15,041.02
0.0400 0.0150 0.0150 0.0075
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
2,800.00 1,500.00 1,800.00 1,050.00 7,150.00 22,191.02
0.0240 0.3000 0.1000 0.0240
m³ kg liter m³
1,800,000.00 21,000.00 2,000.00 1,800,000.00 Jumlah (1)
43,200.00 6,300.00 200.00 43,200.00 92,900.00
0.3000 0.1500 0.1500 0.0500 0.1500
OH OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 70,000.00 Jumlah (2)
21,000.00 17,250.00 18,000.00 7,000.00 10,500.00 73,750.00 166,650.00
0.3470 0.4000 0.0170
lbr kg m³
125,000.00 21,000.00 1,800,000.00 Jumlah (1)
43,375.00 8,400.00 30,600.00 82,375.00
0.1200 0.1500 0.1500 0.0500 0.1200
OH OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 70,000.00 Jumlah (2)
8,400.00 17,250.00 18,000.00 7,000.00 8,400.00 59,050.00 141,425.00
0.3470 0.4000 0.0170
lbr kg m³
183,750.00 21,000.00 1,800,000.00 Jumlah (1)
63,761.25 8,400.00 30,600.00 102,761.25
0.1200 0.1500 0.1500 0.0500 0.1200
OH OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 70,000.00 Jumlah (2)
8,400.00 17,250.00 18,000.00 7,000.00 8,400.00 59,050.00 161,811.25
9.0000 0.5000 0.0160
bt kg m³
2,500.00 21,000.00 1,250,000.00 Jumlah (1)
22,500.00 10,500.00 20,000.00 53,000.00
0.1200 0.1500 0.1500 0.0500
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
8,400.00 17,250.00 18,000.00 7,000.00 50,650.00 103,650.00
NO. H. I. J. K. K.001
URAIAN PEKERJAAN PENUTUP ATAP PEKERJAAN LANGIT-LANGIT PEKERJAAN SANITASI PEKERJAAN BESI DAN ALUMUNIUM Memasang 1 kg rangka atap baja Bahan Besi Profil IWF Meni Besi Tenaga Pekerja Tukang Besi Kepala Tukang Mandor
K.002
Jumlah (1) + (2) Memasang 1 kg Besi Profil Bahan Besi Profil Tenaga Pekerja Tukang Besi Kepala Tukang Mandor
K.003
Jumlah (1) + (2) Mengerjakan 100 kg pekerjaan perakitan Bahan Solar Minyak Pelumas Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Sewa Alat
K.004
Jumlah (1) + (2) Mengerjakan 1 cm pengelasan dengan las listrik Bahan Kawat Las Listrik Solar Minyak Pelumas Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Sewa Alat
K.012
Jumlah (1) + (2) Memasang 1 m² terali besi Bahan Besi Strip 2 x 3 Tenaga Pekerja Tukang Las Kepala Tukang Mandor
L. M.
Jumlah (1) + (2) PEKERJAAN KUNCI DAN KACA PEKERJAAN PENUTUP LANTAI DAN DINDING
KOEF.
SAT.
HARGA SAT. Rp.
JUMLAH
Rp. SNI 03-3436-2002 SNI 03-2838-2002 SNI Revisi SNI T-16-2002
1.1000 0.0800
kg kg
14,300.00 7,255.00 Jumlah (1)
15,730.00 580.40 15,730.00
0.0600 0.0060 0.0060 0.0003
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
4,200.00 600.00 720.00 42.00 5,562.00 21,292.00
1.1500
kg
12,000.00 Jumlah (1)
13,800.00 13,800.00
0.0600 0.0600 0.0060 0.0030
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
4,200.00 6,000.00 720.00 420.00 11,340.00 25,140.00
1.0000 0.1000
ltr ltr
5,500.00 23,400.00 Jumlah (1)
5,500.00 2,340.00 7,840.00
0.1000 0.1000 0.0010 0.0050 0.0080
OH OH OH OH Jam
70,000.00 100,000.00 120,000.00 140,000.00 75,000.00 Jumlah (2)
7,000.00 10,000.00 120.00 700.00 600.00 18,420.00 26,260.00
0.04 0.0300 0.0040
kg ltr ltr
18,750.00 5,500.00 23,400.00 Jumlah (1)
750.00 165.00 93.60 1,008.60
0.0040 0.0020 0.0002 0.0002 0.0170
OH OH OH OH Jam
70,000.00 100,000.00 120,000.00 140,000.00 75,000.00 Jumlah (2)
280.00 200.00 24.00 28.00 1,275.00 1,807.00 2,815.60
11.5000
m'
16,000.00 Jumlah (1)
184,000.00 184,000.00
1.2000 1.2000 0.0120 0.0006
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
84,000.00 120,000.00 1,440.00 84.00 205,524.00 389,524.00 SNI SNI-Pt-T2000-C
NO. M.008
URAIAN Memasang 1 m' plint keramik ukuran 10 x 20 cm Bahan Plint Keramik Artistik Portland Cement (PC) Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
M.011
Jumlah (1) + (2) Memasang 1 m² dinding keramik ukuran 20 x 25 cm Bahan Keramik Portland Cement (PC) Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
M.013
Jumlah (1) + (2) Memasang 1 m² dinding batu tempel hitam/Batu Candi Bahan Batu Tempel Hitam/batu Candi Portland Cement (PC) Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
M.014
Jumlah (1) + (2) Memasang 1 m' plint kayu kelas II ukuran 2 x 10 cm Bahan Papan Kayu Bengkirai Paku Sekrup 5 cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
M.015
Jumlah (1) + (2) Memasang 1 m² lantai keramik ukuran 20 x 20 cm Bahan Ubin Keramik 20 x 20 cm Portland Cement (PC) Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
10.6000 1.1400 0.0030 0.0250
bh kg m³ kg
2,500.00 1,400.00 270,000.00 3,000.00 Jumlah (1)
26,500.00 1,596.00 810.00 75.00 28,981.00
0.0900 0.0900 0.0090 0.0050
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
6,300.00 9,000.00 1,080.00 700.00 17,080.00 46,061.00
20.0000 9.3000 0.0180 1.9400
bh kg m³ kg
4,476.50 1,400.00 270,000.00 3,000.00 Jumlah (1)
89,530.00 13,020.00 4,860.00 5,820.00 113,230.00
0.6000 0.4500 0.0450 0.0300
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
42,000.00 45,000.00 5,400.00 4,200.00 96,600.00 209,830.00
1.1000 9.3000 0.0180
m² kg m³
130,000.00 1,400.00 270,000.00 Jumlah (1)
143,000.00 13,020.00 4,860.00 160,880.00
0.1200 0.1200 0.0120 0.0060
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
8,400.00 12,000.00 1,440.00 840.00 22,680.00 183,560.00
0.0030 0.0500
m³ kg
5,700,000.00 21,000.00 Jumlah (1)
17,100.00 1,050.00 18,150.00
0.1200 0.1200 0.0120 0.0060
OH OH OH OH
70,000.00 115,000.00 120,000.00 140,000.00 Jumlah (2)
8,400.00 13,800.00 1,440.00 840.00 24,480.00 42,630.00
1.0000 10.4000 0.0450 1.5000
m² kg m³ kg
85,000.00 1,400.00 270,000.00 3,000.00 Jumlah (1)
85,000.00 14,560.00 12,150.00 4,500.00 116,210.00
0.2500 0.1200 0.0120 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 12,000.00 1,440.00 1,820.00 32,760.00 148,970.00
NO. M.016
URAIAN Memasang 1 m² lantai keramik ukuran 30 x 30 cm Bahan Ubin Keramik 30 x 30 cm Portland Cement (PC) Pasir Pasang Semen Warna
Rp.
85,680.00 14,000.00 12,150.00 4,500.00 116,330.00
0.2500 0.1200 0.0120 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 12,000.00 1,440.00 1,820.00 32,760.00 149,090.00
1.0080 9.8000 0.0450 1.3000
m² kg m³ kg
95,000.00 1,400.00 270,000.00 3,000.00 Jumlah (1)
95,760.00 13,720.00 12,150.00 3,900.00 125,530.00
0.2500 0.1200 0.0120 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 12,000.00 1,440.00 1,820.00 32,760.00 158,290.00
1.1160 9.6000 0.0450 1.3000
m² kg m³ kg
95,000.00 1,400.00 270,000.00 3,000.00 Jumlah (1)
106,020.00 13,440.00 12,150.00 3,900.00 135,510.00
0.2500 0.1200 0.0120 0.0130
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 12,000.00 1,440.00 1,820.00 32,760.00 168,270.00 SNI
0.0500 0.0500 0.0500
kg kg kg
14,930.00 8,000.00 13,000.00 Jumlah (1)
746.50 400.00 650.00 1,796.50
0.0400 0.0400 0.0040 0.0025
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
Jumlah (1) + (2) Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) Bahan Cat Meni 0.2000 Plamir 0.1500 Cat Dasar 0.1700 Cat Penutup 0.2600
2,800.00 4,000.00 480.00 350.00 7,630.00 9,426.50
kg kg kg kg
7,255.00 7,500.00 7,255.00 35,000.00 Jumlah (1)
1,451.00 1,125.00 1,233.35 9,100.00 11,458.35
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
4,900.00 900.00 720.00 350.00 6,870.00 18,328.35
Jumlah (1) + (2) Memasang 1 m² lantai keramik ukuran 40 x 40 cm Bahan Ubin Keramik 40 x 40 cm Portland Cement (PC) Pasir Pasang Semen Warna
Jumlah (1) + (2) Memasang 1 m² lantai keramik ukuran 60 x 60 cm Bahan Ubin Keramik 60 x 60 cm Portland Cement (PC) Pasir Pasang Semen Warna
Jumlah (1) + (2) PEKERJAAN PENGECATAN Mendempul dan Menggosok 1 m² kayu Bahan Dempul Jadi Minyak Cat Batu Apung Tenaga Pekerja Tukang Cat Kepala Tukang Mandor
N.003
JUMLAH
Rp.
85,000.00 1,400.00 270,000.00 3,000.00 Jumlah (1)
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
N. N.001
HARGA SAT.
m² kg m³ kg
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
M.018
SAT.
1.0080 10.0000 0.0450 1.5000
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
M.017
KOEF.
Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Jumlah (1) + (2)
0.0700 0.0090 0.0060 0.0025
NO. N.004
URAIAN
Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup) Bahan Cat Meni 0.2000 Plamir 0.1500 Cat Dasar 0.1700 Cat Penutup 0.3500
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
Jumlah (1) + (2) Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) Bahan Plamir 0.1000 Cat Dasar 0.1000 Cat Penutup 0.2600
4,900.00 10,500.00 480.00 350.00 16,230.00 30,838.35
kg kg kg
7,500.00 20,000.00 20,000.00 Jumlah (1)
750.00 2,000.00 5,200.00 7,950.00
0.0200 0.0630 0.0063 0.0025
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
1,400.00 6,300.00 756.00 350.00 8,806.00 16,756.00
0.1000 0.0100
kg bh
7,255.00 7,500.00 Jumlah (1)
725.50 75.00 800.50
0.0200 0.2000 0.0200 0.0100
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
1,400.00 20,000.00 2,400.00 1,400.00 25,200.00 26,000.50 HSPK
1.0100 0.1000
m² m³
150,000.00 160,000.00 Jumlah (1)
151,500.00 16,000.00 151,500.00
0.2500 0.5000 0.0500 0.0250
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 50,000.00 6,000.00 3,500.00 77,000.00 228,500.00
1.0100 0.1000
m² m³
150,000.00 160,000.00 Jumlah (1)
151,500.00 16,000.00 151,500.00
0.2500 0.5000 0.0500 0.0250
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
17,500.00 50,000.00 6,000.00 3,500.00 77,000.00 228,500.00
0.0120 0.0043 1.6700 1.0000
m³ m³ bh ls
24,500.00 41,230.00 35,000.00 10,000.00
294.00 177.29 58,450.00 10,000.00 68,921.29
Jumlah (1) + (2) Mengecat 1 m² permukaan baja dengan meni besi Bahan Meni Besi Kuas
Jumlah (1) + (2) PEKERJAAN PAVING, JALAN DAN LAIN-LAIN Memasang 1 m² paving block warna segi empat; tebal 8 cm Bahan Paving Segi Empat Warna; tebal 8 cm Pasir Urug
Jumlah (1) + (2) Memasang 1 m² paving block warna segi enam; tebal 8 cm Bahan Paving Segi Enam Warna; tebal 8 cm Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
O.008
Rp.
0.0700 0.1050 0.0040 0.0025
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
O.006
JUMLAH
Rp.
1,451.00 1,125.00 1,233.35 12,250.00 14,608.35
Tenaga Pekerja Tukang Cat Kepala Tukang Mandor
O. O.005
HARGA SAT.
7,255.00 7,500.00 7,255.00 35,000.00 Jumlah (1)
Tenaga Pekerja Tukang Cat Kepala Tukang Mandor
N.010
SAT.
kg kg kg kg
Tenaga Pekerja Tukang Cat Kepala Tukang Mandor
N.008
KOEF.
Jumlah (1) + (2) Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm Bahan Galian Tanah (B.001) Spesi 1 PC : 3 PP (E.003) Kansteen Beton Cetak 15 x 30 x 60 cm Upah Kerja Pasang Kansteen Jumlah
NO. O.009
URAIAN Memasang 1 m² Batu Koral Sikat Bahan Batu Koral Semen PC Semen Warna Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
P. P.001
Jumlah (1) + (2) PEKERJAAN LISTRIK Memasang 1 bh Fuse Box 3 Group Bahan Unit Panil Box Tenaga Tukang Listrik
P.002
Jumlah (1) + (2) Memasang 1 bh Stop Kontak Bahan Stop Kontak Tenaga Tukang Listrik
P.003
Jumlah (1) + (2) Memasang 1 bh Saklar Ganda Bahan Saklar Ganda Tenaga Tukang Listrik
P.004
Jumlah (1) + (2) Memasang 1 bh Saklar Tunggal Bahan Saklar Tunggal Tenaga Tukang Listrik
P.005
Jumlah (1) + (2) Memasang 1 bh Lampu TL 2 x 36 Watt Bahan Lampu TL 2 x 36 Watt Tenaga Tukang Listrik
P.006
Jumlah (1) + (2) Memasang 1 bh Lampu SL 18 Watt Bahan Lampu SL 18 Watt Tenaga Tukang Listrik
P.007
Jumlah (1) + (2) Memasang 1 bh Lampu Pijar 20 Watt Bahan Lampu Pijar 20 Watt Tenaga Tukang Listrik Jumlah (1) + (2)
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
1.0200 8.8000 0.3000 0.0120
m² kg kg m³
210,000.00 1,400.00 3,000.00 270,000.00 Jumlah (1)
214,200.00 12,320.00 900.00 3,240.00 230,660.00
0.0140 0.1440 0.0140 0.0014
OH OH OH OH
70,000.00 100,000.00 120,000.00 140,000.00 Jumlah (2)
980.00 14,400.00 1,680.00 196.00 17,256.00 247,916.00
1.0000
Unit
150,000.00 Jumlah (1)
150,000.00 150,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 161,500.00
1.0000
Unit
25,000.00 Jumlah (1)
25,000.00 25,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 36,500.00
1.0000
Unit
27,500.00 Jumlah (1)
27,500.00 27,500.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 39,000.00
1.0000
Unit
21,300.00 Jumlah (1)
21,300.00 21,300.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 32,800.00
1.0000
Unit
68,000.00 Jumlah (1)
68,000.00 68,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 79,500.00
1.0000
Unit
36,000.00 Jumlah (1)
36,000.00 36,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 47,500.00
1.0000
Unit
8,000.00 Jumlah (1)
8,000.00 8,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 19,500.00
NO. P.008
URAIAN Memasang 1 bh Lampu Baret 25 Watt Bahan Lampu Baret 25 Watt Tenaga Tukang Listrik
P.009
Jumlah (1) + (2) Memasang 1 bh Lampu Merkuri 250 watt Bahan Lampu Merkuri 250 watt Tenaga Tukang Listrik
P.010
Jumlah (1) + (2) Memasang 1 bh Sorot Artholite 1000 watt Bahan Sorot Artholite 1000 watt Tenaga Tukang Listrik
P.011
Jumlah (1) + (2) Memasang 1 bh Armature Artholite 2 x 40 watt Bahan Armature Artholite 2 x 40 watt Tenaga Tukang Listrik
P.012
Jumlah (1) + (2) Memasang 1 bh Armature Artholite 2 x 20 watt Bahan Armature Artholite 2 x 20 watt Tenaga Tukang Listrik
P.013
Jumlah (1) + (2) Memasang 1 bh Panel Bahan Panel 35 A Tenaga Tukang Listrik
KOEF.
SAT.
HARGA SAT.
JUMLAH
Rp.
Rp.
1.0000
Unit
36,000.00 Jumlah (1)
36,000.00 36,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 47,500.00
1.0000
Unit
750,000.00 Jumlah (1)
750,000.00 750,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 761,500.00
1.0000
Unit
7,500,000.00 Jumlah (1)
7,500,000.00 7,500,000.00
1.0000
OH
115,000.00 Jumlah (2)
115,000.00 115,000.00 7,615,000.00
1.0000
Unit
465,000.00 Jumlah (1)
465,000.00 465,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 476,500.00
1.0000
Unit
345,000.00 Jumlah (1)
345,000.00 345,000.00
0.1000
OH
115,000.00 Jumlah (2)
11,500.00 11,500.00 356,500.00
1.0000
Unit
3,000,000.00 Jumlah (1)
3,000,000.00 3,000,000.00
1.0000
OH
115,000.00 Jumlah (2)
115,000.00 115,000.00 3,115,000.00
Jumlah (1) + (2) BENGKALIS, 2013 PENAWAR PT. / CV. ………………….
NAMA JELAS JABATAN
PEMERINTAH KABUPATEN BENGKALIS BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI ANALISA HARGA SATUAN BETON BERTULANG
A. DATA - DATA HASIL ANALISA NO
NOMOR HASIL
URAIAN HASIL ANALISA
ANALISA
HARGA SATUAN
1 2 3 4 5 6 7 8 9 10 11
Hasil Analisa Pekerjaan Cor Beton Site Mix Camp. 1:2:3 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 Hasil Analisa Pekerjaan Cor Beton Site Mix K-250 Hasil Analisa Pekerjaan Cor Beton Site Mix K-300 Hasil Analisa Pekerjaan Pembesian 1 kg (Besi Polos / Besi Ulir) Hasil Analisa Pekerjaan 1 M2 Jaring Kawat Baja/Wiremesh Hasil Analisa Pekerjaan Bekisting untuk Pondasi Hasil Analisa Pekerjaan Bekisting untuk Sloof Hasil Analisa Pekerjaan Bekisting untuk Kolom Hasil Analisa Pekerjaan Bekisting untuk Balok
05 15 17 18 20 23 24 25 26 27 28
1,011,500.00 1,055,970.87 1,112,080.40 1,126,871.40 1,160,283.31 16,105.02 75,226.81 133,220.00 142,220.00 247,050.00 253,850.00
12 13 14 15 16 17
Hasil Analisa Pekerjaan Bekisting untuk Lantai Hasil Analisa Pekerjaan Bekisting untuk Dinding Hasil Analisa Pekerjaan Bekisting untuk Tangga Hasil Analisa Pekerjaan Jembatan untuk pengecoran beton Hasil Analisa Pekerjaan Begisting Papan Hasil Analisa Pekerjaan Begisting Multiplek 9 mm
29 30 31 32 52 53
280,450.00 257,450.00 230,350.00 81,950.00 166,650.00 141,425.00
18 19
Hasil Analisa Pekerjaan Begisting Multiplek 12 mm Hasil Analisa Pekerjaan Stoot Werk
54 55
161,811.25 103,650.00
B. PERHITUNGAN HARGA SATUAN BETON BERTULANG 1
PONDASI PLAT SETEMPAT P1 - 80 X 80 x 20 (Besi Polos / Besi Ulir =149.51 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Pondasi) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,011,500.00 = 1,011,500.00 149.51 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,407,867.48 5.00 m2 Bekisting untuk Pondasi @ 133,220.00 = 666,100.00 Jumlah 4,085,467.48
2
PONDASI PLAT SETEMPAT P2 - 45 X 45 X 15 (Besi Polos / Besi Ulir =177.03 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Pondasi) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,011,500.00 = 1,011,500.00 177.03 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,851,142.05 8.21 m2 Bekisting untuk Pondasi @ 133,220.00 = 1,094,307.14 Jumlah 4,956,949.19
3
SLOOF S1 - 20 X 30 (Besi Polos / Besi Ulir =95.29 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Sloof) 1.00 95.30 10.00
4
@ @ @
1,112,080.40 = 16,105.02 = 142,220.00 =
1,112,080.40 1,534,754.54 1,422,200.00 4,069,034.94
SLOOF S2 - 15 X 25 (Besi Polos / Besi Ulir =146.67 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Sloof) 1.00 146.67 13.33
5
m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Sloof Jumlah
m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Sloof Jumlah
@ @ @
1,112,080.40 = 16,105.02 = 142,220.00 =
1,112,080.40 2,362,200.41 1,896,266.67 5,370,547.47
KOLOM K1 - 13 X 56 (Besi Polos / Besi Ulir =94.7 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Kolom) 1.00 94.71 8.00
m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Kolom Jumlah
@ @ @
1,112,080.40 = 16,105.02 = 247,050.00 =
1,112,080.40 1,525,232.72 1,976,400.00 4,613,713.12
6
KOLOM K2 20 x 30 (Besi Polos / Besi Ulir =85.02 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Kolom ) 1.00 85.02 4.17
7
8
9
10
1,055,970.87 1,369,265.37 1,029,375.00 3,454,611.24
BALOK B2 - 15 x 20 (Besi Polos / Besi Ulir =109.33 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 109.34 kg Besi Polos / Besi Ulir @ 16,105.02 = 9.17 m2 Bekisting untuk Balok @ 253,850.00 = Jumlah
1,055,970.87 1,760,868.35 2,326,958.33 5,143,797.56
BALOK RB1 - 15 x 25 (Besi Polos / Besi Ulir =146.67 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 146.67 kg Besi Polos / Besi Ulir @ 16,105.02 = 8.67 m2 Bekisting untuk Balok @ 253,850.00 = Jumlah
1,055,970.87 2,362,200.41 2,200,033.33 5,618,204.61
BALOK RB2 - 15 x 20 (Besi Polos / Besi Ulir =109.33 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok) m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Balok Jumlah
@ @ @
1,055,970.87 = 16,105.02 = 253,850.00 =
1,055,970.87 1,760,868.35 2,326,958.33 5,143,797.56
BALOK BP1- 13 x 20 (Besi Polos / Besi Ulir =124.14 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok) m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Balok Jumlah
@ @ @
1,055,970.87 = 16,105.02 = 253,850.00 =
1,055,970.87 1,999,435.10 2,587,317.31 5,642,723.28
LISTPLANK BETON T= 8 CM (Besi Polos / Besi Ulir =12.5 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Dinding) 1.00 12.50 10.50
13
1,055,970.87 = 16,105.02 = 247,050.00 =
1,055,970.87 1,860,553.74 2,256,444.44 5,172,969.05
1.00 124.15 10.19
12
@ @ @
BALOK B1 - 20 x 30 (Besi Polos / Besi Ulir =115.52 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 115.53 kg Besi Polos / Besi Ulir @ 16,105.02 = 8.89 m2 Bekisting untuk Balok @ 253,850.00 = Jumlah
1.00 109.34 9.17
11
m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Kolom Jumlah
m3 Beton Site Mix camp. 1:2:3 kg Besi Polos / Besi Ulir m2 Bekisting untuk Dinding Jumlah
@ @ @
1,055,970.87 = 54,945.05 = 257,450.00 =
PLAT LANTAI T=12 CM (Besi Polos / Besi Ulir =93.3 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Lantai) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 93.30 kg Besi Polos / Besi Ulir @ 54,945.05 = 8.33 m2 Bekisting untuk Lantai @ 280,450.00 = Jumlah
1,055,970.87 686,813.19 2,703,225.00 4,446,009.06
1,055,970.87 5,126,521.09 2,337,083.33 8,519,575.30
14
PLAT LANTAI T=10 CM (Wiremesh M8-150 =10 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Lantai) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 10.00 m2 Wiremesh M8-150 @ 54,945.05 = 10.00 m2 Bekisting untuk Lantai @ 280,450.00 = Jumlah
1,055,970.87 549,450.55 2,804,500.00 4,409,921.42
15
LANTAI BETON BERTULANG T=8 CM (Besi Polos / Besi Ulir =37.42 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk pondasi) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87 37.43 kg Besi Polos / Besi Ulir @ 54,945.05 = 2,056,389.89 2.16 m2 Bekisting untuk pondasi @ 133,220.00 = 287,755.20 Jumlah 3,400,115.96
16
LANTAI BETON BERTULANG T=15 CM (Besi Polos / Besi Ulir =31.46 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk pondasi) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87 31.46 kg Besi Polos / Besi Ulir @ 54,945.05 = 1,728,789.38 2.30 m2 Bekisting untuk pondasi @ 133,220.00 = 306,406.00 Jumlah 3,091,166.25
17
DINDING PLAT, T=10 CM (Besi Polos / Besi Ulir =12.5 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Dinding) 1.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 12.50 m2 Besi Polos / Besi Ulir @ 54,945.05 = 10.50 m2 Bekisting untuk Dinding @ 257,450.00 = Jumlah
1,055,970.87 686,813.19 2,703,225.00 4,446,009.06
BENGKALIS, 2013 PENAWAR PT. / CV. ………………….
NAMA JELAS JABATAN
PEMERINTAH KABUPATEN BENGKALIS BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI
TIME SCHEDULE
PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN
TAHUN ANGGARAN 2013 No
URAIAN PEKERJAAN
JUMLAH
BOBOT (%)
A
B
C
D
BLN I 1
2
BLN II 3
4
5
6
7
8
9
JADWAL PELAKSNAAN BLN III 10 11 12
BLN IV 13
14
15
16
17
BLN V 18 19
PEMELIHARAAN 180 HK
KET
20
100 I
PEKERJAAN PERSIAPAN
II
PEKERJAAN PINTU GERBANG STAINLESS STEEL
III
4,000,000.00
0.8778
23,485,600.00
5.1536
PEKERJAAN PAGAR DEPAN
103,837,448.70
22.7859
IV
PEKERJAAN PAGAR SAMPING
226,051,972.52
49.6045
V
PEKERJAAN PAGAR BELAKANG
97,833,828.61
21.4685
VI
PEKERJAAN LAIN-LAIN
500,000.00
0.1097
455,708,849.84
100.00
0.88
90 1.29 1.90
1.29
1.29
80
1.29
70 60
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
1.90
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
3.31
1.79
1.79
1.79
1.79
1.79
1.79
1.79
1.79
1.79
50 40 1.79
1.79
1.79
30 20
TOTAL
0.11 0.88 0.88
1.90 2.78
5.21 7.98
5.21 13.19
5.21 18.39
5.21 23.60
5.21 28.81
5.21 34.01
6.99 41.01
6.99 48.00
6.99 55.00
6.99 61.99
8.28 70.27
6.38 76.66
6.38 83.04
6.38 89.43
5.10 94.52
1.79 96.31
1.79 98.10
1.90 100.00
BENGKALIS, 2013 PENAWAR PT. / CV. ………………….
NAMA JELAS JABATAN
10