BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 1 of 5 By Chk Linda Wali



     



BOLT TIGHTENING PROCEDURE



  FOR  



  ANAEROBIC REACTOR PLAN PROJECT



DOC NO.: 201023/MEC-ARP/II/2020



Appr



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 2 of 5 By Chk Linda Wali



Appr



      Content of Table 1 Purpose ......................................................................................................................................



3



2 Scope ………………………………………………………………………………………………….



3



3 References.................................................................................................................................



3



4 Safety Precautition ...................................................................................................................



3



5 Equipment and Man Power ………………………………………………………………………… 5.1 Equipment .........................................................................................................................



3



5.2 Man Power ........................................................................................................................



3



6 Bolt Tightening ………………………………………………………………………………………. 6.1 Tightening Preparation .....................................................................................................



3



6.2 Recommended Bolt Tightening Procedure ......................................................................



4



6.3 Table for Bolt Tightening ..................................................................................................



5



7 Appendix ………………………………………………………………………………………………



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 3 of 5 By Chk Linda Wali



Appr



     



1. Purpose This procedure describes the requirement for bolt tightening for piping system. 2. Scope 2.1.



The procedure defines the method for bolt tightening using manual/hand torque wrench, hydraulic torque wrench and hydraulic stud bolt tensioner.



2.2.



Application of bolts tightening tool shall be done as per the following scope : Bolt Diameter < 2” : General torque wrench (Manual/hand Torque Wrench or Hydraulic torque wrench if applicable)



3. Reference 3.1. ASME B16.5 Pipe,Flange, and Fitting 3.2. ASME B16.47 Large Diameter Steel Flange 3.3. ASME B31.3 Proses Piping 3.4. Manufacture Recommended (Hi-Force) 4. SAFETY PRECAUTIONS Special attention shall be paid to this work as it utilizes high-pressure hydraulic oil (maximum 15,000 psi). Supervisor must be present at location to supervise the worker prior to bolt tightening activity. Tools and equipment should be inspected before use to ensure good working condition. The working area shall be roped off and warning notices shall be displayed. For high elevation or remote area work, adequate scaffolding shall be erected for safety. Operators shall handle components during placing or removing the bolt tightening equipment as per manufacturers recommendation. Operators shall also be equipped with safety glasses, hard hats, gloves and safety shoes. Additional safety equipment shall be worn as advised by the Project HSE Department



BOLT TIGHTENING PROCEDURE      



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 4 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 5 of 5 By Chk Linda Wali



Appr



      5



EQUIPMENT AND MAN POWER 5.1 Equipment a.



Hi-Force Including Accessories.



b.



Manual/Hand Torque Wrench



c.



Hand Tools



5.2 Manpower



6



a.



Mechanical Supervisor



b.



Safety man



c.



Mechanic/Helper



BOLT TIGHTTENING 6.1 Tightening Preparation a. Flanged joints shall be properly aligned before torquing and maximum allowable translation of flange centerline & faces should be specified. Maximum allowable run out’ between flange faces should also be specified. (To be noted as max values/tolerances according to the relevant spec’s). see Appendix for dimensional tolerance. b. Prior to tightening, all equipment shall be checked for any damage or imperfections. After cleaning, studs should be lubricated with an approved compound. c. The operator shall set the correct hydraulic pressure to achieved the required bolt torque for each stud bolt size according to appendix 1 (recommended tensioning pressure table). d. COMPANY reserves the right to witness the applied pressure for the torquing of the joint during reinstatement 6.2 Recommended Bolt Tightening Procedure a.



Install the gasket on the flange face and bring the flanges together until contacting the gasket.



b.



Install all bolts and studs, making sure they are free from dirt and grit and that the threads and under nut faces are well lubricated.



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 6 of 5 By Chk Linda Wali



Appr



      c.



Run up nuts finger tight



d.



Mark the proper tightening sequence on the studs with chalk as per diagram on Para 5.3 or as per recommended by the equipment manufacturer



e.



Determine the torque value for the studs or bolt to be tightened. 1. First tightening stage should be limited to a maximum of 30% of final torque setting 2. Second tightening stage should be limited to a maximum of 60% of final torque setting. 3. Third tightening stage should be carried out at the 100% torque setting.



Note : 1, 2 & 3 should be tightened using the diagonal bolt sequence shown in the Diagram f.



On the fourth and final tightening sequence change from diagonal tightening to adjacent bolt-to-bolt tightening using the 100% torque setting value



  6.3 Table for Bolt Tightening a. For 4 set Bolt Flange



BOLT TIGHTENING PROCEDURE      



b. For 8 set Bolt Flange c. For 12 set Bolt Flange d. For 16 set Bolt Flange



e. For 20 set Bolt Flange



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 7 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE      



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 8 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE       f.



For 24 set Bolt Flange



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 9 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE       g. For 28 set Bolt Flange



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 10 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE       h. For 32 set Bolt Flange



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 11 of 5 By Chk Linda Wali



Appr



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 12 of 5 By Chk Linda Wali



      7



APPENDIX



7.1



Recommended flange bolt torque for ANSI 150 RF



 



  Size ½” ¾” 1” 1 ½” 2” 3” 4” 6” 8” 10” 12” 14” 16” 18” 20” 24”



Bolt Size U-1/2 U-1/2 U-1/2 U-1/2 U-5/8 U-5/8 U-5/8 U-3/4 U-3/4 U-7/8 U-7/8 U-1 U-1 U-1 1/8 U-1 1/8 U-1 1/4



Min Torque 0.16 0.24 0.33 0.65 0.64 1.10 1.57 2.14 3.09 3.6 4.91 5.15 6.5 7.63 9.11 13.84



Max Torque 3.61 3.61 3.61 3.61 7.2 7.2 7.2 12.84 12.84 20.72 20.72 31.09 31.09 45.83 45.83 64.61



Bolting Torque (Kg.m) Adopted Step 1 Torque 2.0 1.0 2.0 1.0 2.0 1.0 2.0 1.0 5.0 1.0 5.0 2.0 5.0 3.0 8.0 3.0 8.0 4.0 11.0 5.0 12.0 6.0 17.0 6.0 18.0 8.0 26.0 9.0 27.0 10.0 39.0 15.0



Step 2 2.0 2.0 2.0 2.0 5.0 5.0 5.0 8.0 8.0 11.0 12.0 17.0 18.0 26.0 27.0 39.0



Appr



BOLT TIGHTENING PROCEDURE



Date : Feb 20, 2020 No. Rev. : 0 Page No. : 13 of 5 By Chk Linda Wali



      7.2



Recommended flange bolt torque for ANSI 300 RF  



  Size



Bolt Size



½” ¾” 1” 1 ½” 2” 3” 4” 6” 8” 10” 12” 14” 16” 18” 20” 24”



U-1/2 U-1/2 U-1/2 U-1/2 U-5/8 U-5/8 U-5/8 U-3/4 U-3/4 U-7/8 U-7/8 U-1 U-1 U-1 1/8 U-1 1/8 U-1 1/4



Min Torque 0.38 0.70 0.97 2.30 1.50 3.08 4.41 5.00 8.48 9.79 14.79 13.58 19.04 19.85 23.72 38.86



Max Torque 3.61 7.2 7.2 12.84 7.2 12.84 12.84 12.84 20.84 31.09 45.83 45.83 64.61 64.61 64.61 116.25



Bolting Torque (Kg.m) Adopted Step 1 Torque 2.0 1.0 4.0 1.0 4.0 2.0 8.0 3.0 5.0 3.0 8.0 4.0 9.0 5.0 10.0 6.0 15.0 10.0 22.0 11.0 30.0 16.0 30.0 15.0 32.0 20.0 32.0 21.0 33.0 25.0 76.0 40.0



Step 2 2.0 4.0



 



8.0 5.0 8.0 9.0 10.0 15.0 22.0 30.0 30.0 32.0 32.0 33.0 76.0



7.3 Recommended Flange bolt torque for ANSI 600 RF  



  Size ½” ¾” 1” 1 ½” 2” 3” 4” 6” 8” 10” 12” 14” 16” 18” 20” 24”



Bolt Size U-1/2 U-1/2 U-1/2 U-1/2 U-5/8 U-5/8 U-5/8 U-3/4 U-3/4 U-7/8 U-7/8 U-1 U-1 U-1 1/8 U-1 1/8 U-1 1/4



Min Torque 1.26 2.31 3.17 7.55 4.92 10.12 16.91 21.92 35.63 40.21 53.98 54.50 75.04 84.76 101.28 159.55



Max Torque 3.61 7.2 7.2 12.84 7.2 12.84 20.72 31.09 45.83 64.61 64.61 87.92 116.25 150.08 236.21 289.49



Bolting Torque (Kg.m) Adopted Step 1 Torque 3.0 2.0 6.0 3.0 6.0 4.0 12.0 8.0 6.0 6.0 12.0 11.0 19.0 17.0 30.0 23.0 44.0 36.0 60.0 41.0 80.0 55.0 100.0 56.0 120.0 76.0 120.0 86.0 200.0 102.0 250.0 160.0



Step 2 3.0 6.0 6.0 12.0 6.0 12.0 19.0 30.0 44.0 60.0 60.0 80.0 100.0 120.0 120.0 200.0