12 0 181 KB
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
FORMULATION
DATE OF EFFECTIVE
:
PRODUCT NAME : LINE
:
REASON FOR PERFORMING THE VALIDATION STUDY : Reason ( tick which ever is applicable) Department New product Modification in the manufacturing process. Change in Facility and / or location of manufacturing. Batch fail to meet product & process specifications.
Remarks
Number of batches studied: ________________ Batch numbers: 1. _______________ 2.. _______________ 3. _______________ Validation activity authorized By: _____________________________Date:_______________________ Validation Team: DEPARTMENT
VALIDATION TEAM
PRODUCTION QUALITY ASSURANCE QUALITY CONTROL REMARKS:
________________________________________________________________________
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
APPROVALS: DEPARTMENT
SIGN & DATE
PRODUCTION QUALITY ASSUARANCE QUALITY CONTROL PRODUCT DEVLOPMENT ENGINEERING 1.0 GENERAL: 1.1 INTRODUCTION: The process validation will be performed as prospective validation. The complete documentation for the validation comprises several independent documents, references to relevant documents will be given as part of this protocol, (see below). The results of the validation activities will be summarized in the validation report. 1.2 List of Documents for Validation: Validation protocol, Details of sampling for the validation batches, test parameters ( Product performance characteristics) with reference to test methods & Acceptance criteria. (acceptable Limit) Methods for recording / evaluating results including statistical analysis. Reference to relevant documents. 1.2.2 Batch manufacturing records. Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
Detailed manufacturing instructions for the production of the validation batches. 2.0 PERSSONEL RESPONSIBILITIES. SR ACTIVITY 1 Preparation of validation 2
protocol Approval of Validation
3
protocol Production of validation
4
Batches Testing of validation
RESPONSIBILITY
REMARKS
samples & Preparation of 5
validation report Approval of validation report.
3.0 PROCESS DESCIRPTION / FLOW SHEET The information given below provides a general description of the process. Detailed information for the manufacturing will be supplied separately in the batch manufacturing record. 1.0 DISPENSING OF MATERIAL 2.0 SHIFTING 3.0 GRANULATION (if required). 4.0 BLENDING 5.0 MIXING 6.0 FILLING 7.0 BLISTERING/ STRIPPING/COUNTING. 3.1 FORMULATION: BATCH SIZE: Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
SR
DATE OF EFFECTIVE
INGREDIENTS/EXCIPIENTS
SPECIFICATION
MG.CAPS.
PER BATCH
1 2 3 4 5 6 7 8 9 10 11 12 13 NOTE:
Prepared by
Checked by
Approved by
PER LOT
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
CAPSULE FLOW CHART R.M.DISPENSING
SHIFTING 1. MIXING TIME 2. SPEED
BLENDING
GRANULATION (IF REQUIRED) DRYING
1. MIXING TIME 2. SPEED
COMPECT (IF REQUIRED) MILLING (IF REQUIRED)
MIXING
FILLING
BULK ANALYSIS
1.0 WEIGHT VERIATION
QUARANTINE BLISTER/ STRIP PACKING/ COUNTING FINAL PACKING QUARANTINE
F.G.STORE Prepared by
FINISHED PRODUCT ANALYSIS
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
4.0 EQUIPMENT / FACTORY. A detailed list of equipment used for validation together with the cleaning status will be provided in the manufacturing documents. 4.1 LIST OF SOP’S , VALIDATION & QUALIFICATION REPORT USED AS REFERENCES= SR
ID. NUMBER
1. 2. 3.
TITLE
VERIFIED BY
Equipment cleaning procedure for Master sifter #20,#40 Equipment operating procedure for Master sifter #20,#40 Equipment cleaning procedure for Rapid mixer granulator. Equipment operating procedure for Rapid mixer granulator. Equipment cleaning procedure for Octagonal Blender. Equipment operating procedure for Octagonal blender. Equipment cleaning procedure for capsule filling machine. Equipment operating procedure for capsule filling machine. Equipment cleaning procedure for capsule polishing & Checking machine. Equipment operating procedure for capsule polishing & Checking machine. Equipment cleaning procedure for strip packing machine. Equipment operating procedure for strip packing machine. Equipment cleaning Procedure for Blister Packing machine. Equipment operating procedure for Blister Packing machine. Equipment cleaning procedure for Cap counting machine Equipment operating procedure for Cap counting machine Equipment cleaning procedure for Fluid Bed Dryer. Equipment operating procedure for Fluid Bed Dryer.
4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.
Prepared by
Checked by
Approved by
DATE
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
19.
DATE OF EFFECTIVE
Enter any other reference sop. 4.2 DETAILS OF EQUIPMENT TO BE USED. EQUIPMENT SIFTING : TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. BLENDER: TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. MIXER : TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. MILLING TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. DRYING TYPE : MODEL: Prepared by
Checked by
DETAILS
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
CAPACITY: MANUACTURER: TAG.NO.: M.O.C.
CAPSULE FILLING MACHINE:
CAPSULE POSISHING & CHECKING MACHINE
STRIP PACKING MACHINE:
BLISTER PACKING MACHINE:
Prepared by
TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: M.O.C. TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.: Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
CAPSULE COUNTING MACHINE
DATE OF EFFECTIVE
M.O.C. TYPE : MODEL: CAPACITY: MANUACTURER: TAG.NO.:
REMARKS:
4.3 IDENTIFICATION OF CRITICAL PROCESS VARIBLES/ PARAMETER. Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
4.3.1 PROBABLE CAUSES THAT MAY EFFECT FINAL PRODUCT: MATERIAL SIFTING
MIXING
AIR DRYING
POLISHING
LOAD SIZE ACTIVE
SPEED
MIXER EXCIPIENT
SPEED MIXER WEIGHT LEAK TEST
BLENDING
Prepared by
GRANULATION ( IF REQUIRED)
Checked by
FILLING
Approved by
STRIPING/ BLISTERING/COUNTING
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
CRITICAL PROCESS PARAMETERS (CPP’s) : SR CRITICAL PROCESS RESPONSE VARIABLE PARAMETER 1. Granulation 2.
BLENDING Sequence of excipient
Blend uniformity
addition Load blending vessel. 3.
4. 5.
Fixed weight as per label claim Weight uniformity Fixed , no variation of filling speed.
D.T. STRIPING/BLISTERING/COUNTING Leak test Leakage Bottle Sealing
Critical process variable (CPV): SR PROCESS / MACHINE SETTING VARIABLE (CONTROL VARIABLES) 1 Mixing Mixing time 2 Filling Speed, locking Prepared by
Fixed order of addition Fixed batch size Fixed, no variation of blending speed. Variation of blending time
Blending time FILLING Weight of capsule Locking length. Capsule filling speed
REMARKS
Checked by
No leakage
REMARKS
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
3
Stripping/ blistering
DATE OF EFFECTIVE
Leak test, speed.
Setting and conditions as mentioned in the batch manufacturing record to be
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
5.0 SAMPLING , TEST PARAMETERS, ACCEPTANCE CIRTERIA 5.1 Sampling Locations:
2
Side view:
1
3
Top view:
2
1
3 Sampling location in blender
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
5.3 SAMPLING STAGE/ TEST PARAMETER MIXING
SAMPLING
REMARKS
CAPSULE FILLING
( SIZE,LOCATION,TIME) After 20 min of mixing time N=3 samples at each interval Sample size: 1.0 – 1.5 g Draw the sample at interval of
Each sample comprises
Appearance
30 min. during Filling .
the amount for the
ASSAY
Weight of 20 caps.
N=____ sample
Weight variation
Sampling : at start,
Disintegration time
different tests required.
every two hours, immediately after the brake time , end of filling.. Sample size:_____
STAGE / TEST PARAMETER MIXING
EQUIPMENT ( SIZE , LOCATION TIME) Sampling thief:
ASSAY
ACCEPTANCE CRITERIA Assay 95 % to 105 % Rel. std. : < 3.0 %
CAPSULE FILLING Appearance
Visual inspection,
Weight of 20 caps.
Analytical balance
Weight variation
Analytical balance
Prepared by
Checked by
As specified in the BMR.
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
Disintegration time
DATE OF EFFECTIVE
DT apparatus with water at
NMT ____minutes.
37 + 10C, with discs. Assay:
___________
6.0 RECORDING OF DATA & DATA TREATMENT
DATA RECORDING SHEET NO. 1. For recording mixing assay observation & results 2. For recording blending observations & results. 3. For recording Drying observation & results. 4. For recording filling observations and results 5. For recording polishing observation and results 6. For recording blister / stripping/ counting observation and record. 7. For recording general utilities /equipment / method Analytical /results. 8. For recording analytical method validation. 9. For recording blister / stripping/counting observation and record. 10. For recording general utilities /equipment / method Analytical /results. 11. For recording analytical method validation. 6.1DATA RECORDING The data obtained from the various analysis & observations shall be recorded in the DATA RECORDING SHEET for first three commercial batches. DATA RECORDING SHEET #1 SIFTING: Equipment Name Identification no Sieves Integrity of the sieve MIXING : Equipment name
Prepared by
:_________________________ :_________________________
Date:___________________ : _________________________ (before): ___________________ (After)__________________ :_______________________
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
Identification no Capacity DRYING: Equipment Name Identification No
:_______________________
Date:____________________ : ______________________lt.
:_______________________ :_______________________
Date:___________________
Ingredients and sequence of material addition: ____________________ Total weight of ingredients : _______________kg/lot. Mixing time: 20 minutes Setting – Mixer: slow Granulator : OFF Procedure : As outlined in the batch manufacturing record. Plan : Samples to be drawn at of 20 minutes of mixing from 3 different locations FOR DRY MIXING RESULTS.
BATCH NO:
Sample no: 1 2 3 Average std.Dev. Range RSD LCL UCL POINTS Method of analysis adopted Ref No.: Anlyst: Date Meet acceptance criteria. YES ( ) NO ( ) CONCLUSIONS:_______________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ _______________________ CHECKED BY:_________________________
Prepared by
Checked by
DATE____________________
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
DATE RECORDING SHEET #2 BLENDING: Equipment name: OCTAGONAL BLENDER Identification no: _____________________________Date:_________________________ Capacity
:______________________lt.
Ingredients & sequence of material addition:__________ Procedure Plan
: as outlined in the batch manufacturing record.
: Samples to be drawn at intervals of 20 minutes of mixing from top , middle,
bottom and pool sample. Lubrication results
BATCH NO: ______________________
Sample no: 1 2 3 4( POOL) Average std.Dev. Range RSD LCL UCL Method of analysis adopted Ref No.: Anlyst: Date Acceptance criteria 95 % TO 105 % Meet acceptance criteria.
YES (
)
NO (
)
CONCLUSIONS:_________________________________________________________ ________________________________________________________________________ Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
________________________________________________________________________ __________________________________________ CHECKED BY:_________________________ DATE____________________
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
DATA RECORDING SHEET# 3 Equipment Name: Capsule filling machine Identification Name : ___________________________________ Date:____________________ Ejection side: Left /Right Sample no: B/M/E BATCH NO:
APPEARANCE WEIGHT OF 20 capsule WEIGHT VARIATION DISINTEGRATION TIME
Visual inspection Analytical balance Analytical balance DT apparatus with water at 37 + 20 C , with discs.
ASSAY
TEST
As specified in the B.M.R.
95 % TO 105 %
APPEARANCE
AV.WT. ( MG)
WT. Variation ( MG)
D.T (sec)
Sample qty. (Beginning sample) Middle sample End sample Avg. X X X S.D. X X X R.S.D. X X X complies *All the values are averages of he number of samples mentioned in the table
Prepared by
Checked by
Approved by
Assay ( %)
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
REMARKS: ________________________________________________________________________ ________________________________________________________________________ ____________________________
Checked By: _______________________________ Date:____________________________
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
DATA RECORDING SHEET # 4 Equipment Name : POLISHING & CHECKING MACHINE Identification no: ________________________________ Date:______________________ Speed:____________________
Sample no:
Average wt
Polishing
B M E
Acceptance criteria : _________________to____________________mg. Meets Acceptance criteria :
yes/ no
Conclusion: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ __________________________________________
Checked by ;___________________________Date_________________________ Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
DATA RECORDING SHEET # 5 Equipment Name : BLISTER/STRIP/SCORPIO COUNTING MACHINE Identification no: ________________________________ Date:______________________ Speed:____________________ Sample no:
Leak test
Coding
Acceptance criteria : _________________to____________________mg. Meets Acceptance criteria :
yes/ no
Conclusion: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ __________________________________________
Checked by ;___________________________Date_________________________
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
DATA RECORDING SHEET # 5 DATE:____________________ SR
NAME OF CRITICAL EQUIPMENT/UTILITIES
QUALIFICATION/ VALIDATION FILE REF.NO.
DATE OF QUALIFICATION / VALIDATION
1 Master sifter 2 Rapid mixer granulator 3 Double cone blender 4 Empty gelatin capsule feeder 5 Capsule filling machine 6 Empty capsule shorting machine 7 Empty capsule shorting machine 8 Strip packing machine UTILITIES: 1 AHU SYSTEM 2 WATER SYSTEM 3 COMPRESSED AIR 4 STEAM 5 LIGHTNING 6 DRAIN DATA RECORDING SHEET # 6 DATE:____________________ NAME OF PRODUCT: SR Parameters
Type of sample
1
Sample A(known amount of analysis.
Accuracy % Recovery of known amount.
Prepared by
Actual reading
Checked by
Observed reading
Analysis performed by
Analysis checked by
Approved by
Ref. Work sheet
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
2
3
4
DATE OF EFFECTIVE
90 % of A 110 % of A Precision Sample Repeatability A1 ( under same ( from condition ) Test one by same sample analyst at same point) time from same Sample homogenous A2 validated mass ( from but from second different sample sample plan point) ( by taking Sample sample of A3 different ( from quantity) third sample point) Reproducibility Sample under different A1 conditions. On ______ Test by different analyst on different days.
Sample A2 On ______
Linearity and range
Sample A3 On ______ 25 % of A
Prepared by
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
Response concentration curve on graph paper.
Prepared by
DATE OF EFFECTIVE
50 % of A 75 % of A 100 % of A 125 % of A
Checked by
Approved by
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
SR Parameters
Type of sample
5
Sample A1 15 min. degradation
6
Specificity/ selectivity( by larger communication of analytical method.) for identification of impurities assay of active component etc…Temp & humidity / degradation factored to main ingredients by 15 min, 30 min,45 min or known degraded products. Limit of detection ( LOD) & limit of quantitative (LOQ) Qualitative & Quantitative result
Actual reading
Observed Analysis Analysis reading performed checked by by
Sample A2 30 min. degradation
Sample A3 45 min. degradation
0.1 % of A 1% of A 5 % of A 10 % of A 20 % of A
7
Analysis Method A method (for non Method B pharmacopoeial
Prepared by
Checked by
Approved by
Ref. Work sheet
Company Name & Address PROCESS VALIDATION PROTOCOL (CAPSULE) PROTOCOL NO:
DATE OF EFFECTIVE
Method C to be performed by other public REMARKS: 1. Specifically / selectivity analysis(4) and Reproducibility (2B) also given raggedness and robustness. 2. Limit of Quantitative (5) also gives sensitivity of test procedure. Above procedure to be repeated over three batches to get minimum nine variables for each parameter.
Prepared by
Checked by
Approved by