Document No:



48330 Lead 01



Revision: Revision Date:



0 01 Oct 2007



Installation, Operation & Maintenance Manual Volume 1 of 3 Site



Aramco - Khurais



Client



Foster Wheeler & Hyundai Engineering / Aramco



Item



Crude Shipping Pump



Saudi Aramco PO No



QDCI-M36-31-Q268-DA



Sulzer Ref. No



9901-48330



Pump Type



CD 20x24x22G / 1 Stage



Tag Nos



B36-G-0002A / B / C / D



Serial Nos



TBA



Crude Oil Shipping Pumps Equipment Hazardous Area Classification Class 1 Group. IIA Division 2



Sulzer Pumps (UK) Ltd. Manor Mill Lane Leeds, LS11 8BR Tel:



0113 2701244



Facsimile: 0113 2724400 / 2724404 e-mail: Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



[email protected]



Installation, Operation & Maintenance Manual Document No:



Table of Contents



48330 Lead 01



Revision:



0



Revision Date:



01 Oct 2007



Table of Contents Volume 1 of 3 1.



Leading Particulars



1.1



List of Equipment Supplied



1.2



Sulzer Drawings and Documents



1.3



Pump Unit Data



1.4



Equipment Data Sheets



1.5



Performance Curves and Test data



2.



Introduction and General Safety



2.1



Introduction



2.2



Environmental Considerations



2.3



Contact Information



2.4



General Safety



3.



Pump Manual



3.1



Pump -



Introduction



3.2



Pump -



Receiving



(Receiving 01-0)



3.3



Pump -



Installation



(Installation 01-4)



3.4



Pump -



Coupling Alignment



3.5



Pump -



Commissioning and Operation



3.6



Pump -



Maintenance



3.7



Pump -



Case / Rotating Element Assembly



(CD Casing 11-1)



3.8



Pump -



Drive Coupling



(Drive Cplg 03-2)



3.9



Pump -



Bearing Assemblies



3.10



Pump -



Mechanical Seals



(MSeal 01-3)



3.11



Pump -



Lubrication



(Lubric 03-1)



3.12



Pump -



Torque Tightening of Fasteners



3.13



Pump -



Field Mounting the Driver



(FieldMount 01-1)



3.14



Pump -



Troubleshooting



(CD Trouble 01-0)



3.15



Pump -



Replacement Parts



3.16



Pump -



Nitrogen Charged Storage Container - Charging and Purging Procedures



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



(48330 Lead 01-0)



(IntroSafety 01-3)



(CD Intro 01-1)



(Alignment 01-3) (CommOp 01-3) (Maintenance 01-2)



(Bearings 04-0)



(TorqVal 01-0)



(RepParts 01-0) (Purge 02-0)



Contents Page 1



Installation, Operation & Maintenance Manual Document No:



Table of Contents



48330 Lead 01



Revision:



0



Revision Date:



4.



5.



Mechanical Seal and Associated Equipment



01 Oct 2007



(MecSeal 01-0)







Burgmann - Operating Manual Mechanical Seal SHV8/165-E1







Burgmann - Mechanical Seal Drawing SHV8/165-E1







Burgmann - 06-ZY201S9/NW19-A2 Cyclone Separator - Operating Manual and Drawing



Drive Coupling



(DriveCplg 01-0)







Bibby - Installation, Operating and Maintenance Instructions for Bibby Turboflex Couplings Having Bolted Adaptors and Hubs







Bibby - 8HSU-30-305-56 Coupling Drawing 9109 Sht 1 (Motor to Gearbox)







Bibby - 8HS-22-230 (2LAH) Coupling Drawing 9110 Sht 1 (Gearbox to Pump)



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



Contents Page 2



Installation, Operation & Maintenance Manual Document No:



Table of Contents



48330 Lead 01



Revision:



0



Revision Date:



01 Oct 2007



Volume 2 of 3 6.



Drive Motor •



(DriveMotor 01-0)



ABB - User's Manual - Motor AMC 900M4A BSNV •



General ABB







Technical Specification







Drawings for the Motor







Circuit Diagrams







Machine Parts List







Installation and Maintenance Manual







Accessories and Instructions







Main Terminal Box



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



Contents Page 3



Installation, Operation & Maintenance Manual Document No:



Table of Contents



48330 Lead 01



Revision:



0



Revision Date:



01 Oct 2007



Volume 3 of 3 7.



8.



Instrumentation •



Minco - Explosionproof / Flameproof RTD Sensors - Product Information







Bently Nevada - 3300XL 8mm and 3300 5 mm Proximity Transducer System Manual







Bently Nevada - 31000, 32000 Proximity Probe Housings - Specifications and Ordering Information







Bently Nevada - 330500 Velomitor Sensor 330525 Velomitor XA Sensor 330530 Radiation Resistant Velomitor Sensor User’s Guide







Bently Nevada - 21128, CA21128, BA42608 Velocity Transducer Housings Specifications and Ordering Information







Rosemount (Emerson) - 3144P Temperature Transmitter - Quick Installation Guide



Lubricating Oil System •



9.



(Insts 01-0)



To Be Inserted When Available



Gearbox •



BHS - High Speed Parallel Shaft Gear Unit Manual I.



Operating Instructions



II. Drawings and Alignment Diagram IV. Spare Parts •



10.



BHS - Operating Instructions - Spare Parts Storage System



Hydraulic Assembly / Removal Equipment •



Tentec - Safety Data Sheet - Castrol Hyspin AWS 32







Tentec - 2122 Hand Pump 2275 Bar - Operating Instructions, Parts list & Service Manual







Tentec - 2065 Hand Pump 1600 Bar - Operating Instructions, Parts List and Service Manual







Tentec - Maintenance Guide







Tentec - Link Hose technical Specification



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



Contents Page 4



Installation, Operation & Maintenance Manual Document No:



Section 1



Leading Particulars



Revision:



0



Revision Date:



1.1



48330 Lead 01 01 Oct 2007



List of Equipment Supplied The following major items are supplied on Sulzer Order No. 9901-48330, Foster Wheeler & Hyundai Engineering / Aramco Order No. QDCI-M36-31-Q268-DA: •



4 Crude oil shipping pumpsets, each comprising: •



1 x Sulzer CD 20x24x22G / 1 stage pump, complete with two Burgmann SHV8/165-E1 cartridge mechanical seals with seal flushing to API Plans 31 / 61 / 65. Each seal has an associated Burgmann 06-ZY201S9/NW19-A2 cyclone separator (API Plan 31).







1 x ABB AMC900M4A BSNV, 13000 hp (9694 kW), 1787 rev/min electric motor, complete with: •



Minco RTDs to monitor DE and NDE journal bearing temperature and ‘u’, ‘v’, ‘w’ windings temperatures (3 per phase).







Bently Nevada CA24701 series proximity probes and 330180 drivers to monitor motor DE and NDE journal bearing ‘x’ and ‘y’ plane vibration, motor keyphasor







1 x BHS FD48-3 speed increasing gearbox, complete with Rosemount / Minco RTDs to monitor input and output shaft DE and NDE journal bearing temperatures and input shaft i/b and o/b thrust bearing temperatures.







1 x Baric lube oil system supplying pressurised lube oil to the pump, gearbox and drive motor.







1 x Bibby 8HSU-30-305-56 flexible spacer coupling (Motor to Gearbox).







1 x Bibby 8HS-22-230 (2LAH) flexible spacer coupling (Gearbox to Pump).







1 x Fabricated, multi-point mounting, heavy duty grouted base plate for pump, gearbox and drive motor.







Pumpset Instrumentation:











Minco AS7014 series RTDs to monitor pump DE and NDE journal bearing temperatures, pump i/b and o/b thrust bearing temperatures.







Rosemount 3144P series temperature transmitters to monitor pump DE and NDE journal bearing temperatures, pump i/b and o/b thrust bearing temperatures, motor DE and NDE journal bearing temperatures, gearbox input and output shaft DE and NDE journal bearing temperatures and input shaft i/b and o/b thrust bearing temperatures.







Bently Nevada 3300XL vibration probes in 32000 housings and 330180 drivers to monitor pump DE and NDE journal bearing ‘x’ and ‘y’ plane vibration, pump axial position ‘z’ plane, gearbox input and output shaft DE and NDE journal bearing ‘x’ and ‘y’ plane vibration, gearbox output shaft keyphasor.







Bently Nevada 330500 series Velomitors in CA21128 velocity transducer housings to monitor pump DE and NDE bearing housing vibration.



Special Tools and Equipment: •



Coupling assembly / withdrawal equipment







Hydraulic assembly / removal equipment:



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



Section 1 Page 1



Installation, Operation & Maintenance Manual Document No:



Section 1



Leading Particulars



48330 Lead 01



Revision:



0



Revision Date:



01 Oct 2007







1 x 0-40,000 lbf/in2 hydraulic hand pump with integral gauge calibrated in lbf/in2. Fitted with ¾” BSP female outlet suitable for SKF 227857 pressure pipe.







1 x 0-25,000 lbf/in2 hydraulic hand pump with integral gauge calibrated in lbf/in2. Fitted with QR female coupling.







1 x Hydraulic load cell, maximum load 64 tons at 20,000 lbf/in2 with 15 mm stroke and 40 mm clear hole. Fitted with QR male coupling.







1 x High pressure flexible 2m hose with QR male and female couplings at end.







1 x High pressure 2 m pipe G¼” G¾” SKF 227957.







1 x Air release plug G¼” SKF 233950.







1 x Wooden tool box.







6 X Jacking blocks with 6 x hex head dog point M16 x 70 screws and 12 x hex socket head M16 x x55 screws - bearing housing jacking.







Nitrogen purged pump rotor storage container



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



Section 1 Page 2



Installation, Operation & Maintenance Manual Document No:



Section 1



Leading Particulars



48330 Lead 01



Revision:



0



Revision Date:



1.2



01 Oct 2007



Sulzer Drawings and Documents The Sulzer drawings and documents listed below are included next as inserts to the manual.



Description



Sulzer Document Reference



General Arrangement



0-104.430.195



Equipment Arrangement



0-104.430.357



Longitudinal Section



1-104.421.869



P and I Diagram (3 Sheets)



1-104.430.193



Terminal Block Diagram (8 Sheets)



2-104.475.505



Instrument Schedule (12 Sheets)



4-104.475.504



Cause and Effect Diagram (4 Sheets)



4-104.476.099



Control System Description (9 Sheets)



4-104.476.133



Alignment Criteria and Tolerances Diagrams



to be inserted when available



Rotalign Pro Reports Name / Duty Plate Drawing



3-204.231.624



Arrangement of Coupling Hub Assembly and Withdrawal Drawing



1-104.430.383



Protection Packaging Procedure



40-930



Protection & Preservation Procedure



40-931 / 2



Operating Spare Parts List



E13803



CD 20x24x22G Rotor Assembly Transportation / Preservation Unit General Arrangement



5066-D-001



Bill of Materials General Arrangement Lifting Frame - SWL 82.5 / 27t



Manual No. 104.471.646 K:\In Work Manuals\48329, 30 CP CD Khurais\48330\48330 Lead 01-0.doc



5066-PL-003 F1474-1



Section 1 Page 3



Contract on 13.11.2007



Contract on 13.11.2007



Contract on 13.11.2007



Contract on 13.11.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



Contract on 01.10.2007



1



3



4



5



6



7



8



Contract on 15.11.2007



E1-104.430.193



Contract on 15.11.2007



Drawing No.



2



A



A



SPEED INCREASING GEARBOX B36-GG-0002A



TP3 1"



TP1 1"



1"



1"



(COUPLING GUARD)



MAIN DRIVE MOTOR B36-GM-0002A



(COUPLING)



B



3/4"



13.2kV 3PH 60Hz 13,000HP 1787RPM



B



(COUPLING GUARD)



CRUDE OIL SHIPPING PUMP B36-G-0002A



1"



1/2"



2"



2"



1/2"



(COUPLING)



NOTES



AB



1"



AB



4"



1"



2"



4"



8"



0.118" DIA.



AB



8"



4"



EMERGENCY SHUTDOWN SYSTEM (ESD, BY OTHERS)



2"



3"



2"



2"



1-1/2"



ZC



3"



3/4"



3/4"



3/4"



A



LIT 5601 A



LI 5600



FO 5605



4"



HH H



HH SET @ 9.2 in H SET @ 4.6 in



FF



TE 5604



A



LI 5601



HH H



TIT 5604



HH SET @ 9.2 in H SET @ 4.6 in



FO 5606



A



A



TE 5604



0.118" DIA.



AB



A



3"



3"



1"



2"



FG 5604



(LOCKED OPEN)



AA



A PRIMARY LOCATED SHARED DISPLAY AND CONTROL (DCS) INSTRUMENT (BY OTHERS)



A



H



ZC



C



A



AA



A TE 5603



AB



3/4"



LIT 5600



1"



TE 5603



TE 5602



1"



3"



AA



TE 5601 1"



1"



RACK MOUNTED INSTRUMENT (OR BACK OF PANEL, BY OTHERS)



2"



TE 5600



A



1"



1"



AA



3/4"



A



3/4"



A



TIT 5603



2"



A



TE 5602



3/4"



RETURN TO PUMP SUCTION



FF



TIT 5602



2"



AA



FF



TE 5601



2"



FIELD MOUNTED DISCRETE INSTRUMENT (BY SULZER)



FF



TIT 5601



8"



FF



TIT 5600



1"



H



INSTRUMENT SYMBOL KEY TE 5600



1"



(LOCKED OPEN)



A



A



3/4"



3/4"



FG 5603



H



TI 5604



FO 5603



3/4"



A



3/4"



1"



FG 5602



H : 158°F



3/4"



A



3/4" 1" 1"



A



FG 5601



0.394" DIA.



1"



A



FG 5600



A



TI 5603



A



FO 5602



3/4"



1"



A



TE-5600AA & TE-5600AB BECOME TE-5600DA & TE-5600DB FOR PUMP G-0002D. 4. TRANSMITTER KEY: H = 4-20mA/HART FF = FOUNDATION FIELDBUS



TP2



A



3/4"



H



TI 5602



0.217" DIA.



1"



TI 5601



TP4 A



H : 158°F



H



H



FO 5604



0.217" DIA.



FO 5601



0.165" DIA.



1"



H



TI 5600



A



H : 158°F



PI 5502 A



2"



FO 5600 H : 158°F



3/4"



A



1.457" DIA.



H : 158°F



3/4"



3/4"



2" 1"



TIT-5600A BECOMES TIT-5600D FOR PUMP G-0002D. 3. A SECOND SUFFIX LETTER IS USED TO UNIQUELY IDENTIFY INSTRUMENTS OF THE SAME TYPE WITH THE SAME SEQUENCE NUMBER i.e. TE-5600AA AND TE-5600AB FOR PUMP G-0002A. TE-5600AA & TE-5600AB BECOME TE-5600BA & TE-5600BB FOR PUMP G-0002B. TE-5600AA & TE-5600AB BECOME TE-5600CA & TE-5600CB FOR PUMP G-0002C.



PI 5501



3/4"



C



8"



2. ALL TAG NUMBERS HAVE THE FIRST SUFFIX LETTER CORRESPONDING TO THE RELEVANT PUMP SUFFIX LETTER i.e. TIT-5600A CORRESPONDS TO PUMP G-0002A. TIT-5600A BECOMES TIT-5600B FOR PUMP G-0002B. TIT-5600A BECOMES TIT-5600C FOR PUMP G-0002C.



2"



1. ALL TAG NUMBERS ARE PRECEDED BY B36.



1-1/2"



1-1/2"



D



D



TP5A



VIBRATION MONITORING SYSTEM (VMS, BY OTHERS)



TP8



LUBE OIL RETURN PI-34481 LUBE OIL SYSTEM



TP7



LUBE OIL SUPPLY PI-34481 LUBE OIL SYSTEM



ELECTRICAL SIGNAL



TP5B



CONNECTION TO PROCESS SERIAL LINK SULZER OTHERS



LIMIT OF SUPPLY



TERMINATION POINT SCHEDULE DESCRIPTION



TP 1 TP 2 TP 3 TP 4 TP 5A TP 5B TP 6 TP 7 TP 8



PUMP SUCTION PUMP DISCHARGE PUMP & SEAL SYSTEM VENT PUMP DRAIN PUMP DE SEAL LEAKAGE PUMP NDE SEAL LEAKAGE BASEPLATE DRAIN (NOT SHOWN) LUBE OIL SUPPLY LUBE OIL RETURN



SEAL OIL & LUBE OIL SYSTEMS b



C.Woolner



02.08.06



d



C.Woolner



17.05.07



f



C.Woolner



13.11.07



a



C.Woolner



18.07.06



c



C.Woolner



20.03.07



e



C.Woolner



10.10.07



SEP.PARTS LIST



ASSOCIATED DRAWINGS GENERAL ARRANGEMENT INSTRUMENT SCHEDULE TERMINAL BLOCK DIAGRAM CAUSE & EFFECT DIAGRAM LUBE SYSTEM P&I D.



: : : :



:



c



b



SIMILAR DRG.



a



.



SUBSTITUTE FOR



P & I DIAGRAM FOR CD 20x24x22G 1st CRUDE OIL SHIPPING ARAMCO - KHURAIS PUMPSETS B36-G-0002A/B/C/D REFER TO REVISION NOTES.



f



ALL 3 WINDING RTD's DETAILED AS CONNECTED DIRECTLY TO MCC (2 x USED, 1 x SPARE).



TAG NUMBERS CHANGED IN LINE WITH CLIENT COMMENTS, NOTES REVISED



e



REFER TO REVISION NOTES.



REFER TO REVISION NOTES.



d



REFER TO REVISION NOTES.



CAD - DRAWING



2



3



PART - No.



DRAWN CHECKED



5



6



7



13-06-06 C.Woolner 13-06-06 C.Woolner 13-06-06 T.Brennan



BAR - CODE



.



Sheet of



E 4



E



ORIGINAL SCALE



APPROVED



9901-48330



MACHINING REGULATIONS SEE DRAWING NORMS.



1



DESIGN GROUP



REPLACED BY



E0-104.430.195 E4-104.475.504 E2-104.475.505 E4-104.476.099 PI-34481



THIS DRAWING IS ENTRUSTED TO THE RECIPIENT PERSONALLY BUT THE COPYRIGHT REMAINS WITH US. IT MUST NOT BE COPIED , REPRODUCED OR IN ANY WAY COMMUNICATED OR MADE ACCESSIBLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT



YES/NO



8



01 03



Contract on 15.11.2007



Contract on 15.11.2007



E



TP No.



1 Drawing No.



2



3



4



5



6



7



8



E1-104.430.193



Contract on 15.11.2007



NOTE: SET POINTS ARE PROVISIONAL ONLY AND TO BE CONFIRMED AFTER H : 230°F TESTING. HH : 248°F H



TAH 5606



RUNNING



STOPPED



AVAILABLE



LAMP TEST



HAND/OFF/AUTO



START



STOP



XL 5600



XL 5601



XL 5602



HS 5601



HS 5602



HS 5603



HS 5604



HH



A



A



A



A



TAHH 5606 A



A



A



HH : 257°F H : 248°F



HH : 257°F H : 248°F



A



HH H



TI 5608



A



HH H



TI 5608



AA



CONTROL STATION



A



HH : 257°F H : 248°F



HH : 257°F H : 248°F HH H



TI 5609



AB



HH H



TI 5609



HH : 257°F H : 248°F



HH : 257°F H : 248°F



AA



HH H



TI 5610



AB



TI 5610



HH : 257°F H : 248°F HH H



AA



TI 5611



Contract on 15.11.2007



B36-LCS-0505A



HH : 257°F H : 248°F HH H



AB



TI 5611



HH H



AA



AB



A



*MOUNTED OFF-SKID*



ZC



ZC



ZC



ZC



ZC



ZC



ZC



ZC



MOTOR CONTROL CENTER (MCC)



H



H



TIT 5608 AA (SPARE)



HS 5600



TE 5606 A



TE 5606 AA



TE 5606 AB



(SPARE)



TE 5606 AC



TE 5606 AD



TE 5606 AE



AB



H



H



TIT 5609



TIT 5609 AA



H



TIT 5610 AB



H



TIT 5610 AA



H



TIT 5611 AB



TIT 5611 AA



AB



(SPARE)



TE 5606 AF



H



TIT 5608



TE 5606 AG



TE 5606 AH



HS 5605 AJ



TE 5608 AA



A



EMERGENCY STOP



EMERGENCY STOP



B36-ESB-0506A



B36-ESB-0507A



CONTROL STATION



TE 5608



TE 5608 AB



TE 5608 AC



TE 5609 AD



TE 5609 AA



TE 5609 AB



TE 5609 AC



TE 5610 AD



TE 5610 AA



TE 5610 AB



TE 5610



TE 5611



AC



AD



TE 5611 AA



TE 5611 AB



TE 5611 AC



AD



CONTROL STATION



U



*MOUNTED OFF-SKID*



B



V



W



*MOUNTED OFF-SKID*



B



TP1



MOTOR WINDINGS (COUPLING GUARD)



MAIN DRIVE MOTOR B36-GM-0002A



(COUPLING)



13.2kV 3PH 60Hz 13,000HP 1787RPM NOTES (COUPLING GUARD)



1. ALL TAG NUMBERS ARE PRECEDED BY B36. 2. ALL TAG NUMBERS HAVE THE FIRST SUFFIX LETTER CORRESPONDING TO THE RELEVANT PUMP SUFFIX LETTER i.e. TIT-5600A CORRESPONDS TO PUMP G-0002A. TIT-5600A BECOMES TIT-5600B FOR PUMP G-0002B. TIT-5600A BECOMES TIT-5600C FOR PUMP G-0002C.



C



TIT-5600A BECOMES TIT-5600D FOR PUMP G-0002D. 3. A SECOND SUFFIX LETTER IS USED TO UNIQUELY IDENTIFY INSTRUMENTS OF THE SAME TYPE WITH THE SAME SEQUENCE NUMBER i.e. TE-5600AA AND TE-5600AB FOR PUMP G-0002A. TE-5600AA & TE-5600AB BECOME TE-5600BA & TE-5600BB FOR PUMP G-0002B. TE-5600AA & TE-5600AB BECOME TE-5600CA & TE-5600CB FOR PUMP G-0002C. TE-5600AA & TE-5600AB BECOME TE-5600DA & TE-5600DB FOR PUMP G-0002D. 4. TRANSMITTER KEY: H = 4-20mA/HART FF = FOUNDATION FIELDBUS



MOTOR HEATER (120V 1PH 60Hz)



SPEED INCREASING GEARBOX B36-GG-0002A



MAIN TERMINAL BOX HEATER (120V 1PH 60Hz)



C



TP2 TE 5605



TE 5605 AA



TE 5607 AB



TE 5607 AA



H



INSTRUMENT SYMBOL KEY



CRUDE OIL SHIPPING PUMP B36-G-0002A



(COUPLING)



TE 5612 AB



AA



H



TIT 5605



TE 5612 AB



TE 5613 AD



TE 5613 AA



H



TIT 5612 A



TE 5612 AC



H



TIT 5607 A



TE 5612



AB



AD



AA



AB



AA



AB



AA



AB



AA



AB



H



TIT 5616 A



TE 5617



TE 5617



H



TIT 5615 A



TE 5616



TE 5616



H



TIT 5614 AB



TE 5615



TE 5615



H



TIT 5613 AA



TE 5614



TE 5614



H



TIT 5613 AB



TE 5613 AC



H



TIT 5612 AA



TE 5613



TIT 5617 A



A



FIELD MOUNTED DISCRETE INSTRUMENT (BY SULZER)



RACK MOUNTED INSTRUMENT (OR BACK OF PANEL, BY OTHERS)



PRIMARY LOCATED SHARED DISPLAY AND CONTROL (DCS) INSTRUMENT (BY OTHERS)



ZC



TI 5605



EMERGENCY SHUTDOWN SYSTEM (ESD, BY OTHERS)



D VIBRATION MONITORING SYSTEM (VMS, BY OTHERS)



HH : 212°F H : 194°F



ZC



HH H



TI 5607



A



HH : 212°F H : 194°F



NOTE: SET POINTS ARE PROVISIONAL ONLY AND TO BE CONFIRMED AFTER TESTING.



ZC



HH H



A



ZC



HH H



TI 5612 HH : 257°F H : 248°F



AA



TI 5612 HH : 257°F H : 248°F



ZC



HH H



AB



TI 5613 HH : 257°F H : 248°F



ZC



HH H



AA



TI 5613 HH : 257°F H : 248°F



ZC



HH H



TI 5614



AB



HH : 212°F H : 194°F



ZC



HH H



TI 5615



A



HH : 212°F H : 194°F



ZC



HH H



TI 5616



A



HH : 248°F H : 230°F



ZC



HH H



TI 5617



A



HH : 248°F H : 230°F



HH H



A



NOTE: SET POINTS ARE PROVISIONAL ONLY AND TO BE CONFIRMED AFTER TESTING.



D



ELECTRICAL SIGNAL CONNECTION TO PROCESS SERIAL LINK SULZER OTHERS



LIMIT OF SUPPLY



TERMINATION POINT SCHEDULE DESCRIPTION



TP 1 TP 2 TP 3 TP 4 TP 5A TP 5B TP 6 TP 7 TP 8



PUMP SUCTION PUMP DISCHARGE PUMP & SEAL SYSTEM VENT PUMP DRAIN PUMP DE SEAL LEAKAGE PUMP NDE SEAL LEAKAGE BASEPLATE DRAIN (NOT SHOWN) LUBE OIL SUPPLY LUBE OIL RETURN



TEMPERATURE MONITORING C.Woolner



02.08.06



d



C.Woolner



17.05.07



f



C.Woolner



13.11.07



a



C.Woolner



18.07.06



c



C.Woolner



20.03.07



e



C.Woolner



10.10.07



SEP.PARTS LIST



ASSOCIATED DRAWINGS GENERAL ARRANGEMENT INSTRUMENT SCHEDULE TERMINAL BLOCK DIAGRAM CAUSE & EFFECT DIAGRAM LUBE SYSTEM P&I D.



: : : : :



.



YES/NO



SUBSTITUTE FOR



P & I DIAGRAM FOR CD 20x24x22G 1st CRUDE OIL SHIPPING ARAMCO - KHURAIS PUMPSETS B36-G-0002A/B/C/D



c



REFER TO REVISION NOTES.



f



b



TAG NUMBERS CHANGED IN LINE WITH CLIENT COMMENTS, NOTES REVISED



a



REFER TO REVISION NOTES.



e



REFER TO REVISION NOTES. d



CAD - DRAWING



2



3



PART - No.



DRAWN CHECKED



4



5



6



7



13-06-06 C.Woolner 13-06-06 C.Woolner 13-06-06 T.Brennan



BAR - CODE



.



Sheet of



E



REFER TO REVISION NOTES.



E



ORIGINAL SCALE



APPROVED



9901-48330



ALL 3 WINDING RTD's DETAILED AS CONNECTED DIRECTLY TO MCC (2 x USED, 1 x SPARE).



MACHINING REGULATIONS SEE DRAWING NORMS.



1



DESIGN GROUP



REPLACED BY



E0-104.430.195 E4-104.475.504 E2-104.475.505 E4-104.476.099 PI-34481



THIS DRAWING IS ENTRUSTED TO THE RECIPIENT PERSONALLY BUT THE COPYRIGHT REMAINS WITH US. IT MUST NOT BE COPIED , REPRODUCED OR IN ANY WAY COMMUNICATED OR MADE ACCESSIBLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT SIMILAR DRG.



b



8



02 03



Contract on 15.11.2007



Contract on 15.11.2007



E



TP No.



1



3



4



5



6



7



8



Contract on 15.11.2007



E1-104.430.193



Contract on 15.11.2007



Drawing No.



2



A



A MOTOR KEYPHASOR



HH : 12.2 mils H : 8.4 mils



VMS



VMS



KT 5600



VXT 5600



HH : 12.2 mils H : 8.4 mils VMS HH H



HH H



VYT 5600



VXT 5601



HH : 6.45 mils H : 3.46 mils



HH : 6.45 mils H : 3.46 mils HH H



VMS



VYT 5601



VXT 5602 A



A



KE 5600



A



VXE 5600



A



A



VYE 5600



VXE 5601



A



A



VYE 5601 A



VXT 5603 A



VMS



VYT 5603 A



VZT 5600 A



HH : 4.92 mils H : 3.94 mils



HH H



A



HH H



VMS



VZT 5601



VXT 5606 A



HH : 4.92 mils H : 3.94 mils



A



HH H



VMS



VYT 5606



HH : ± 15.7 mils H : ± 11.8 mils



VMS



HH H



A



VXT 5607 A



VYT 5607 A



VZT 5602 A



VZT 5603 A



A



VXE 5607 A



VYE 5607 A



VZE 5602 A



VZE 5603 A



A



VXE 5602



VYE 5602 A



A



HH H



VMS



VYT 5602



HH : ± 17.71 mils H : ± 13.77 mils



VXE 5603 A



VYE 5603 A



VZE 5600 A



VZE 5601 A



VXE 5606 A



VYE 5606 A



A



B



B



TP1 (COUPLING GUARD)



MAIN DRIVE MOTOR B36-GM-0002A



(COUPLING)



13.2kV 3PH 60Hz 13,000HP 1787RPM NOTES (COUPLING GUARD)



1. ALL TAG NUMBERS ARE PRECEDED BY B36.



SPEED INCREASING GEARBOX B36-GG-0002A



2. ALL TAG NUMBERS HAVE THE FIRST SUFFIX LETTER CORRESPONDING TO THE RELEVANT PUMP SUFFIX LETTER i.e. TIT-5600A CORRESPONDS TO PUMP G-0002A. TIT-5600A BECOMES TIT-5600B FOR PUMP G-0002B. TIT-5600A BECOMES TIT-5600C FOR PUMP G-0002C.



C



TIT-5600A BECOMES TIT-5600D FOR PUMP G-0002D. 3. A SECOND SUFFIX LETTER IS USED TO UNIQUELY IDENTIFY INSTRUMENTS OF THE SAME TYPE WITH THE SAME SEQUENCE NUMBER i.e. TE-5600AA AND TE-5600AB FOR PUMP G-0002A. TE-5600AA & TE-5600AB BECOME TE-5600BA & TE-5600BB FOR PUMP G-0002B. TE-5600AA & TE-5600AB BECOME TE-5600CA & TE-5600CB FOR PUMP G-0002C.



CRUDE OIL SHIPPING PUMP B36-G-0002A



(COUPLING)



C



TP2 KE 5601



TE-5600AA & TE-5600AB BECOME TE-5600DA & TE-5600DB FOR PUMP G-0002D. 4. TRANSMITTER KEY: H = 4-20mA/HART FF = FOUNDATION FIELDBUS



VXE 5604 A



VYE 5604 A



VXE 5605 A



VYE 5605 A



VE 5600 A



VE 5601 A



A



VT 5600



INSTRUMENT SYMBOL KEY



KT 5601



A



VXT 5604



A



VYT 5604



A



VXT 5605



A



VYT 5605



VE 5602 A



VT 5601 A



A



HH H



HH H



VT 5602 A



A



FIELD MOUNTED DISCRETE INSTRUMENT (BY SULZER)



RACK MOUNTED INSTRUMENT (OR BACK OF PANEL, BY OTHERS)



HH H



VMS



VMS



GEARBOX KEYPHASOR



HH : 5.66 mils H : 3.03 mils



VMS



HH H



HH : 5.66 mils H : 3.03 mils



VMS



VMS



HH : 21 g H : 13 g (g PEAK)



HH H



VMS



HH : 0.43 in/s H : 0.28 in/s (in/s RMS)



HH : 0.43 in/s H : 0.28 in/s (in/s RMS)



PRIMARY LOCATED SHARED DISPLAY AND CONTROL (DCS) INSTRUMENT (BY OTHERS)



EMERGENCY SHUTDOWN SYSTEM (ESD, BY OTHERS)



D



D VIBRATION MONITORING SYSTEM (VMS, BY OTHERS)



ELECTRICAL SIGNAL CONNECTION TO PROCESS SERIAL LINK SULZER OTHERS



LIMIT OF SUPPLY



TERMINATION POINT SCHEDULE DESCRIPTION



TP 1 TP 2 TP 3 TP 4 TP 5A TP 5B TP 6 TP 7 TP 8



PUMP SUCTION PUMP DISCHARGE PUMP & SEAL SYSTEM VENT PUMP DRAIN PUMP DE SEAL LEAKAGE PUMP NDE SEAL LEAKAGE BASEPLATE DRAIN (NOT SHOWN) LUBE OIL SUPPLY LUBE OIL RETURN



VIBRATION MONITORING C.Woolner



02.08.06



d



C.Woolner



17.05.07



f



C.Woolner



13.11.07



a



C.Woolner



18.07.06



c



C.Woolner



20.03.07



e



C.Woolner



10.10.07



SEP.PARTS LIST



ASSOCIATED DRAWINGS GENERAL ARRANGEMENT INSTRUMENT SCHEDULE TERMINAL BLOCK DIAGRAM CAUSE & EFFECT DIAGRAM LUBE SYSTEM P&I D.



: : : : :



.



YES/NO



SUBSTITUTE FOR



P & I DIAGRAM FOR CD 20x24x22G 1st CRUDE OIL SHIPPING ARAMCO - KHURAIS PUMPSETS B36-G-0002A/B/C/D



c



REFER TO REVISION NOTES.



f



b



TAG NUMBERS CHANGED IN LINE WITH CLIENT COMMENTS, NOTES REVISED



a



REFER TO REVISION NOTES.



e



REFER TO REVISION NOTES. d



CAD - DRAWING



2



3



PART - No.



DRAWN CHECKED



4



5



6



7



13-06-06 C.Woolner 13-06-06 C.Woolner 13-06-06 T.Brennan



BAR - CODE



.



Sheet of



E



REFER TO REVISION NOTES.



E



ORIGINAL SCALE



APPROVED



9901-48330



ALL 3 WINDING RTD's DETAILED AS CONNECTED DIRECTLY TO MCC (2 x USED, 1 x SPARE).



MACHINING REGULATIONS SEE DRAWING NORMS.



1



DESIGN GROUP



REPLACED BY



E0-104.430.195 E4-104.475.504 E2-104.475.505 E4-104.476.099 PI-34481



THIS DRAWING IS ENTRUSTED TO THE RECIPIENT PERSONALLY BUT THE COPYRIGHT REMAINS WITH US. IT MUST NOT BE COPIED , REPRODUCED OR IN ANY WAY COMMUNICATED OR MADE ACCESSIBLE TO THIRD PARTIES WITHOUT OUR WRITTEN CONSENT SIMILAR DRG.



b



8



03 03



Contract on 15.11.2007



Contract on 15.11.2007



E



TP No.



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 10.10.2007



Contract on 15.11.2007



Contract on 15.11.2007



Aramco - Khurais Crude Oil Shipping Pumpsets B36-G-0002A/B/C/D Instrument Schedule SO : 9901-48330 Sulzer Doc No. : E4-104.475.504-Rev "d" Inst. Tag No.s



No.



Crude Oil Shipping



Page : 1 of 12 Date : 13/11/2007 Rev : 'd'



Note: All tag numbers are for Pumpste B36-G-0002A only, refer to P&ID E1-104.430.193 for tagging philosophy. Service Description



Device



Location



P&ID



Signal



IS/NIS



Type



Pump B36-G-0002A



I/O Type



Instrument Details Process Media



Process Conditions Instrument Calibration Normal



Max/Min Design



Range



Units



Set-Pnt.1



Set-Pnt.2



CRUDE OIL SHIPPING PUMP INSTRUMENTATION a



B36 TE



5614AA



Crude Oil Shipping Pump 'DE' Journal Bearing Temperature



Temperature Probe - RTD



Pump Bearing



104.430.193 Sht 2



PT100



NIS



RTD



Bearing Metal