9 0 186 KB
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA BIAYA
No.
URAIAN
KODE
HP
KAPASITAS
HARGA ALAT
SEWA
KET.
ALAT/JAM (di luar PPN)
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38.
ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 FLAT BED TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRAILLER 15 TON ROCK DRILL BREAKER COLD MILLING VIBRATORY ROLLER 1 T.
File : 239193254.xls.ms_office
E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38
125.0 47.0 25.0 105.0 35.0 10.0 200.0 120.0 145.0 105.0 145.0 170.0 125.0 95.0 85.0 60.0 60.0 60.0 60.0 4.0 60.0 8.0 115.0 5.0 5.0 8.0 75.0 60.0 175.0 25.0 125.0 40.0 150.0 5.0 150.0 3.0 125 7.0
50.0 6.0 1,000.0 5,000.0 0.3 25.0 4.0 8.0 0.9 5.0 125.0 1.5 1.5 8.0 8.0 95.0 90.0 60.0 2.0 4,000.0 1.00 0.60 0.75 20.00 2.50 35.0 250.0 2,000.0 1,000.0 15.0 1.00
T/Jam Ton Liter 5,000.00 M3 Ton Ton Ton M3 M3 KVA M3 M3 Ton Ton Ton Ton T/Jam 2.00 Liter Ton Ton
M3 Ton Ton Ton Amp Meter Liter Ton
Ton
1,710,625,000 636,093,750 143,750,000 783,437,500 143,750,000 43,125,000 765,516,600 120,176,000 204,843,750 682,812,500 179,687,500 341,406,250 664,843,750 220,000,000 571,406,250 428,770,000 348,593,750 343,750,000 424,062,500 8,265,625 1,423,250,703 14,375,000 115,000,000 12,500,000 16,171,875 10,781,250 46,000,000 112,500,000 166,250,000 70,000,000 350,000,000 17,500,000 2,250,000,000 15,000,000 115,000,000 27,721,250 474,750,000 48,000,000
1,217,541.46 146,607.43 60,409.82 222,398.67 57,956.96 32,470.08 257,166.67 72,040.74 108,425.20 199,511.80 122,796.29 154,376.44 208,702.98 105,083.86 171,762.14 132,283.32 116,682.82 135,157.44 141,569.60 18,449.81 353,388.66 23,488.61 91,905.53 17,921.42 18,921.74 18,765.68 56,329.28 65,205.94 127,072.26 45,272.22 138,129.09 41,619.39 489,586.25 26,170.92 109,304.19 42,075.84 211,426.55 30,201.45
Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru
ANALIS E E155 E157 E154 E001 E301 E06 E07 E212 E221 E10 E11 E12 E010 E14 E052 E080 E081 E084 E082 E089 E031 E341 E182 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37
asphalt mixing plants asphalt finisher asphalt sprayer bulldozer air compressor concrete mixer crane truck dump truck excavator flat bed truck generator set motor grader track loader whell loader three whell roller tandem roller pneumatic tire roller vibratory roller concrete vibrator stone crusher water pump water tanker pedestrian roller plate temper jack hammer fulvi mixer concrete pump trailer pile diver hammer crane on truck velding set bore pile asphalt liquid mixer trailler cold milling (winget) rock drill breaker
URAIAN ANALISA ALAT No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Biaya Pasti per Jam C.
KODE
TRAILLER 15 TON 150.0 15.0 10.0 1,500.0 115,000,000 10.0 1,500.0 115,000,000
SATUAN
11,500,000
i x (1 + i)^A' (1 + i)^A' - 1
D
0.19171
( B' - C ) x D W'
E
13,228.23
Rupiah
F
153.33
Rupiah
G
13,381.57
Rupiah
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
39,375.00
Rupiah
2.
Pelumas
I
26,250.00
Rupiah
3.
Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W' Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
K
9,583.33
Rupiah
L M
14,285.71 19,285.71
Rupiah Rupiah
Biaya Operasi per Jam
P
108,779.76
Rupiah
T
122,161.33
Rupiah
4. 5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
File : 239193254.xls.ms_office
i U1 U2 Mb Ms Mp
KET.
E35 HP Ton Tahun Jam Rupiah Tahun Jam Rupiah
C
0.002 x B' W' =
Pw Cp A W B A' W' B'
KOEF.
14.00 % / Tahun 14,285.71 Rp./Jam 6,428.57 Rp./Jam 2,400.00 Liter 2,100.00 Liter 17,500.00 Liter
Alat Baru Alat Baru Alat Baru
URAIAN ANALISA ALAT No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
Biaya Pasti per Jam
C
47,475,000
i x (1 + i)^A' (1 + i)^A' - 1
D
0.29128
( B' - C ) x D W'
E
82,972.12
Rupiah
F
633.00
Rupiah
G
83,605.12
Rupiah
0.002 x B' W' =
SATUAN
COLD MILLING (WINGET) 125.0 HP 10.0 Tahun 1,500.0 Jam 474,750,000 Rupiah 5.0 Tahun 1,500.0 Jam 474,750,000 Rupiah
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal
KOEF.
Pw Cp A W B A' W' B'
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
2.
C.
KODE
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
32,812.50
Rupiah
2.
Pelumas
I
21,875.00
Rupiah
3.
Perawatan dan = (12,5 % - 17,5 %) x B' perbaikan W' Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
K
39,562.50
Rupiah
L M
14,285.71 19,285.71
Rupiah Rupiah
Biaya Operasi per Jam
P
127,821.43
Rupiah
T
211,426.55
Rupiah
4. 5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
URAIAN ANALISA ALAT File : 239193254.xls.ms_office
14.00 % / Tahun 14,285.71 Rp./Jam 6,428.57 Rp./Jam 2,400.00 Liter 2,100.00 Liter 17,500.00 Liter
KET.
E36
Alat Baru Alat Baru Alat Baru
No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
Biaya Pasti per Jam
C
2,772,125
i x (1 + i)^A' (1 + i)^A' - 1
D
0.29128
-
( B' - C ) x D W'
E
4,844.85
Rupiah
F
36.96
Rupiah
G
4,881.81
Rupiah
0.002 x B' W' =
SATUAN
ROCK DRILL BREAKER 3.0 HP 10.0 Tahun 1,500.0 Jam 27,721,250 Rupiah 5.0 Tahun 1,500.0 Jam 27,721,250 Rupiah
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal
KOEF.
Pw Cp A W B A' W' B'
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
2.
C.
KODE
(E+F)
Rupiah
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
787.50
Rupiah
2.
Pelumas
I
525.00
Rupiah
3.
Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W' Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
K
2,310.10
Rupiah
L M
14,285.71 19,285.71
Rupiah Rupiah
Biaya Operasi per Jam
P
37,194.03
Rupiah
T
42,075.84
Rupiah
4. 5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
File : 239193254.xls.ms_office
i U1 U2 Mb Ms Mp
14.00 % / Tahun 14,285.71 Rp./Jam 6,428.57 Rp./Jam 2,400.00 Liter 2,100.00 Liter 17,500.00 Liter
KET.
E37
Alat Baru Alat Baru Alat Baru
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office
File : 239193254.xls.ms_office