Daftar Harga Ruangan Icu [PDF]

  • Author / Uploaded
  • riki
  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

ICU UNIT KERJA



PENDAFTARAN



IGD



ICU



RAWAT INAP



UMUM EXISTING



KEGIATAN Kartu Admisi subtotal Pemeriksaan dr Umum Tindakan Kedokteran Jasa Tindakan Perawat Obat / BHP subtotal DPJP dr. Anestesi sewa alat a. Monitor/24 jam b. Syringe pump/ 24 jam c. Infuse pump/ 24 jam d. Ventilator/24 jam e. Inkubator/ 24 jam f. Bubble cpap/ 24 jam Tindakan Kedokteran a. Intubasi b. Ekstubasi c. Infuse pump d. Resusitasi Jantung Par Obat / BHP subtotal Konsul DPJP Visite DPJP Perawat Visite dr. Anestesi Perawat Visite dr. Umum Jasa Perawat Case Manager Ganti Balut( Jasa Perawat) Tindakan ( Jasa Perawat) Sewa Kamar Servis Medis Obat Ruangan



JUMLAH TINDAKAN HARGA SATUAN 1 7,000 1 163,000 1 1 1 1 1



21,620 2,000 3,000



1 1 1 1 1 1 1 1 1 1 1 1 1 1 1



1,503,000



1 1 1 1 1 5 5 3 1 1 1 1 1



73,500



526,400 225,600 100,000



700,000 412,936 700,000 700,000 700,000 700,000 700,000 700,000 700,000 4,867,936 92,000 3,000 92,000 3,000



160,000 25,000 129,200



JUMLAH 7,000 163,000 170,000 21,620 2,000 3,000 73,500 5,000 1,503,000 526,400 225,600 100,000 700,000 412,936 700,000 700,000 700,000 700,000 700,000 700,000 700,000 4,867,936 92,000 3,000 92,000 3,000 160,000 25,000 129,200



subtotal PENUNJANG



Radiologi



1



Laboratorium



1 subtotal TOTAL BPJS SELISIH



93,000



504,200 93,000 93,000 7,437,696



ANALISIS BIAYA PERAWATAN Pembayaran BPJS



ISTING



UMUM PLAN %



ANALISIS



HARGA SATUAN



JUMLAH



%



2.29%



-



0.00%



-



0.00% 0.00% 0.00% 0.00% 0.00% 0.00%



-



0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%



-



0.04% 0.00% 0.07% 20.21% 7.08% 3.03% 1.34% 0.00% 0.00% 9.41% 5.55% 9.41% 9.41% 9.41% 9.41% 9.41% 9.41% 9.41% 65.45% 0.00% 1.24% 0.04% 1.24% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 2.15% 0.34% 1.74%



ANALISIS



JASMED 41%



OBAT 5.55%



-



JASMED 0.00%



OBAT 0.00%



6.78% 0.00% 1.25% 1.25%



93,000



93,000 93,000 93,000 1,883,500 1,790,500



0.00%



4.94%



1,883,500 BPJS EXISTING HARGA SATUAN 7,000 163,000 21,620 2,000 3,000 73,500 414,370 166,125 71,196 101,709



JUMLAH 7,000 163,000 170,000 21,620 2,000 3,000 73,500 5,000 414,370 166,125 71,196 101,709 -



43,000



412,936 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000 3,272,336 43,000



43,000



43,000



412,936 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000 1,053,000



-



160,000 25,000 129,200



160,000 25,000 129,200



BPJS PLAN %



ANALISIS



HARGA SATUAN



JUMLAH -



9.03% 0.27% 22.00% 8.82% 3.78% 5.40% 0.00% 0.00% 21.92% 55.91% 55.91% 55.91% 55.91% 55.91% 55.91% 55.91% 173.74%



JASMED 40.00%



OBAT 21.92%



-



93,000



400,200 93,000 93,000 6,620,596 1,883,500 (4,737,096)



21.25%



4.94%



5,255,100 5,255,100



BPJS PLAN %



ANALISIS



0.00%



0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%



JASMED 0.00%



OBAT 0.00%



0.00%



0.00%



bhp



intubasi ett sesuai no spuit 10 cc selang suction handscoon jelly