SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES Job No. : 99012 Doc No. : INSP 99012 999



INSPECTION & TEST PLAN FOR ELECTRICAL



Page : 1/23



8700 0004



Rev. 4



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



INSPECTION & TEST PLAN FOR ELECTRICAL



4



07/01/01



ISSUE OF APPROVED FINAL DOCUMENT



M. G. KIM



S. Y. KIM



S. K. AN



3



21/12/00



ISSUE OF APPROVED FINAL DOCUMENT



M. G. KIM



S. Y. KIM



S. K. AN



2



20/12/99



APPROVED FOR CONSTRUCTION



M. G. KIM



S. Y. KIM



Y. H. KIM



1



17/11/99



APPROVED FOR CONSTRUCTION



M. G. KIM



S. Y. KIM



Y. H. KIM



0



30/09/99



ISSUED FOR APPROVAL



M. G. KIM



S. Y. KIM



Y. H. KIM



REV.



DATE



DESCRIPTION



BY



REVIEWED



APPROVED



TOTAL SOUTH PARS SOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)



INSPECTION & TEST PLAN FOR ELECTRICAL



DOCUMENT TITLE



INSP 99012 999 8700 0004



4



IAFD



NONE



DOCUMENT No.



REV



STATUS



SCALE



2 CLASS



1/23 PAGE



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES Job No. : 99012 Doc No. : INSP 99012 999



INSPECTION & TEST PLAN FOR ELECTRICAL



Page : 2/23



8700 0004



Rev. 4



TABULATION OF REVISED PAGES PAGE



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44



Rev.1



Rev.2



Rev.3



X X X



X X X X X X X X X X X X X X X X X X X X X



X X



X X



X X X X X X X



X X



X



Rev.4



Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES PAGE



Rev.2 X X X X X



Rev.3



Rev.4



INSPECTION & TEST PLAN FOR ELECTRICAL



Job No. : 99012 Doc No. : INSP 99012 999



Page : 3/23



8700 0004



Rev. 4



CONTENTS A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------



PAGE 4



B. CABLE LADDER INSTALLATION ---------------------------------------------------------



PAGE 6



C. CABLE INSTALLATION ----------------------------------------------------------------------



PAGE 8



D. EQUIPMENT INSTALLATION --------------------------------------------------------------



PAGE 11



E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------



PAGE 18



F. HEAT TRACING INSTALLATION ---------------------------------------------------------



PAGE 20



G. CATHODIC PROTECTION INSTALLATION -------------------------------------------



PAGE 22



H. TELECOMMUNICATION INSTALLATION ---------------------------------------------



PAGE 23



NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK : Earthing and Lightning Installation



NO.



DESCRIPTION OF INSPECTION / TEST



A



EARTHING AND LIGHTNING INSTALLATION



1



Material Verification(Receiving Inspection)



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



RP 5561V 999 1630 029



QP 550 002



Verify the Material Type/Size/Quantity Check the Damage



PP 99012 999 0001 550



Review the Test Report



1.2



4



PAGE



4 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



-



SW



SW



-



SW



SW



-



R



R



Earthing Installation



RP 5561V 999 1620 001



Cable Type/Size



Related DWG



W



SW



SW



Location & Routing



SP-COM-511



W



SW



SW



Bolts and Nuts Tighting



Related STD : IEC 364



W



SW



SW



W



SW



SW



Compression Type Connection 1.1



INSP 99012 999 8700 0004



CPX26



REMARK



1.3 2 2.1 2.2 2.3 2.4



LEGEND :



R : Review



SW : Spot Witness



W : Witness H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK : Earthing and Lightning Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



PAGE



4 5 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



3



Test RP 5561V 999 1620 001



Continuity Test



TPX26



Earthing Resistance Test



W



SW



SW



H



W



W



3.1 3.2



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Cable Ladder Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 6 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



B



CABLE LADDER INSTALLATION



1



Material Verification(Receiving Inspection)



PP 99012 999 0001 550



Verify the Material Type/Size/Quantity



Related DWG



QP 550 002 -



SW



-



Check the Damage & Sharp Edge



-



SW



-



Review the Related Document



-



R



-



W



SW



SW



W



SW



W



W



SW



SW



Cable Ladder Installation



CPX30 Related DWG



Proper Type / Size Cable Ladder Location / Routing Cable Ladder Damage, Sharp Edge, Burr



RP 5561V 999 1630 007 RP 5561V 999 1620 001



1.1 1.2 1.3 2 2.1 2.1 2.3 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold



FORM NO. QP 545 002 2 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



DESCRIPTION OF INSPECTION / TEST



REPORTING FORMAT



4



PAGE



Cable Ladder Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



7 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



Support(Type/Size/Welding/Anchoring )



W



SW



W



Coating(touch up paint) on cut end & damage Portions



W



SW



W



Earthing / Bonding



W



SW



SW



Final Inspection



W



W



W



2.4 2.5 2.6 2.7 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold



REMARK



FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



DESCRIPTION OF INSPECTION / TEST



C



CABLE INSTALLATION



1



Material Verification(Receiving Inspection)



1.1



Verify the Material Type/Size/Quantity



1.2



Check the Cable Damage



1.3



Review the Related Test Record



2



REPORTING FORMAT



RP 5561V 999 1630 029



QP 550 002



PP 99012 999 0001 550



8 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



-



SW



-



-



SW



SW



-



R



-



W



SW



SW



W



SW



SW



W



SW



SW



SW



SW



SW



Cable Installation



2.1



Cable Type / Size / Routing



Related DWG



CPX08 (HV cable)



2.2



Cable Arrangement



RP 5561V 999 1630 007



CPX09(LV power/control)



2.3



Cable Damage



2.4



4



PAGE



Cable Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



Cable Pulling Tension



RP 5561V 999 1630 008



REMARK



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



2.5



DESCRIPTION OF INSPECTION / TEST



REPORTING FORMAT



4



PAGE



Cable Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



9 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



- Cable Trenches Preparation



W



W



W



- Cable Segregation



W



SW



W



- Sand Bedding and Depth



W



SW



SW



W



SW



SW



W



SW



SW



Gland , Fitting



W



SW



SW



ID Marker & Wire ID Marker



W



SW



SW



Cable Splicing( If required )



H



W



W



Cable Installation(In Cable Trenches)



RP 5561V 999 1630 029



Cable Termination Crimping Lug or Plug Size / Bolting Cable Bending Radius



CPX08 (HV cable) CPX09(LV power/control)



REMARK



3 3.1 3.2 3.3 3.4 3.5



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Cable Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 10 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



4



Cable Test SP-COM-511



4.1



Above 1000V Cable



TPX08 RP 5561V 999 1630 029



- Continuity Test



H



W



W



- Insulation Resistance Test



H



H



W



- High-Voltage Test



H



H



H



- Continuity Test



W



W



W



- Insulation Resistance Test



H



W



W



Up to 1000 V Cable



TPX09



4.2 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



DESCRIPTION OF INSPECTION / TEST



D



EQUIPMENT INSTALLATION



1



Equipment Verification(Receiving Inspection)



REPORTING FORMAT



RP 5561V 999 1630 007



QP 550 002



Verify the Equipment Type/Size/Quantity Check the Physical Damage



PP 99012 999 0001 550



Review the Related Document Generator Installation



Related DWG



Foundation/Level/Alignment



RP 5561V 999 1630 033



Anchor Bolt Setting



4



PAGE



Equipment Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



11 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



-



SW



-



-



SW



SW



-



R



-



W



W



-



H



W



-



W



W



-



CPX01



Vendor Spec Physical Damage/Loose Parts 1.1 1.2 1.3



REMARK



2 2.1 2.2 2.3



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Equipment Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 12 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



Earthing / Bonding



W



W



W



Cleaning



W



SW



SW



H



W



W



H



W



W



W



SW



SW



H



W



W



W



W



W



Electrical Test



SP-COM-511



TPX01



RP 5561V 999 1630 007



CPX02



Power Transformer Installation Location/Foundation/Level/Alignment Anchor Bolt Setting



RP 5561V 999 1630 021



Physical Damage/Loose Parts Vendor Spec Bushing joint / Seal 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Equipment Installation



NO.



DESCRIPTION OF INSPECTION / TEST



3.6 3.7 3.8



REPORTING FORMAT



4 13 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



Oil Level / No Leak



W



W



W



Tap change mechanism



W



SW



W



Earthing / Bonding



W



SW



W



TPX02



H



H



H



TPX03



W



W



W



Electrical Test



SP-COM-511



- HV Transformer



Vendor Spec



- LV Transformer 3.5



APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



REMARK



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Equipment Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 14 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



4.



Bus Duct Installation



Related DWG



Bus Duct Location / Routing



RP 5561V 999 1630 007



CPX07 W



SW



W



W



SW



SW



Bus Duct Level / Alignment



W



SW



SW



Bus Bar Connection(Bolt tighting)



H



W



W



Earthing / Bonding



W



SW



W



Cleaning



W



SW



SW



H



W



W



Support Type/Foundation/Welding/Anchoring Vendor Spec



Electrical Test



SP-COM-511



TPX07



4.1 4.2 4.3 4.4 4.5 4.6 4.7



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



5



REPORTING FORMAT



HV/LV SWITCHGEAR/MCC Installation



Related DWG



CPX04(HV)



Location / Level / Foundation



RP 5561V 999 1630 007



CPX05(LV)



DESCRIPTION OF INSPECTION / TEST



4



PAGE



Equipment Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



15 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



W



SW



W



W



SW



SW



H



SW



SW



H



W



SW



W



SW



SW



Earthing / Bonding



H



SW



W



Mechanical operation & CT’s data



W



W



W



TPX04(HV)



W



SW



SW



TPX05(LV)



H



H



H



Support /Welding/Anchoring/Bolting Alignment of Total Board Bus Bar Connection



RP 5561V 999 1630 022 RP 5561V 999 1630 023



Physical Damage Vendor Spec



Cleaning Electrical Test 5.1 5.2



SP-COM-511



REMARK



5.3 5.4 5.5 5.6 5.7 5.8 5.9



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Equipment Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 16 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



6



Battery/Charger/Inverter Installation



Related DWG



Location / Level / Foundation



RP 5561V 999 1630 007



CPX16/17 W



SW



W



W



SW



SW



W



W



W



W



W



W



W



SW



SW



W



SW



SW



Earthing / Bonding



W



SW



W



Cleaning



W



SW



SW



H



W



W



Support /Welding/Anchoring/Bolting Number of Cells Inter-connected Polarity of Interconnections between Cells



RP 5561V 999 1630 025 RP 5561V 999 1630 026



Bolts, Nuts Washer Assembly Tighting Vendor Spec Physical Damage SP-COM-511



Electrical Test 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8



TPX16/17



6.9



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Equipment Installation



NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 17 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



7



Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc)



Related DWG



CPX06/15/21/ 23/24/32



RP 5561V 999 1630 007



Name Plate



W



SW



SW



W



SW



SW



W



SW



SW



Bolts, Nuts Washer Assembly Tighting



W



SW



SW



MCB’s rating



W



SW



SW



Physical Damage



W



SW



SW



H



W



W



Location / Level / Foundation



RP 5561V 999 1630 008



Support /Welding/Anchoring/Bolting Vendor Spec



Electrical Test



SP-COM-511



7.1 7.2 7.3 7.4 7.5 7.6 7.7 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK : Lighting and Small Power Installation



NO.



DESCRIPTION OF INSPECTION / TEST



E



LIGHTING AND SMALL POWER INSTALLATION



1



Material Verification(Receiving Inspection)



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



RP 5561V 999 1640 001



QP 550 002



INSP 99012 999 8700 0004



4



PAGE



18 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



1.1



Verify the Material Type/Size/Quantity



-



SW



SW



1.2



Check the Physical Damage



-



SW



SW



1.3



Review the Related Document



-



R



-



W



W



W



W



SW



SW



2



Lighting and Small Power Installation



Related DWG



2.1



Lighting Distribution Board Installation



RP 5561V 999 1640 001



CPX 15



2.2



Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation



RP 5561V 999 1630 029



CPX18/19/25



LEGEND :



R : Review



SW : Spot Witness



W : Witness



REMARK



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK : Lighting and Small Power Installation



NO.



DESCRIPTION OF INSPECTION / TEST



- Cable / Wire installation



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



RP 5561V 999 1640 001



- Lighting Fixture / Power Socket / Welding Socket Installation - Final inspection



INSP 99012 999 8700 0004



4



PAGE



19 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



W



SW



SW



W



SW



SW



W



W



W



H



W



W



H



W



W



Test SP-COM-511 Continuity Test Insulation Resistance Test



TPX18/19/25 RP 5561V 999 1630 029 RP 5561V 999 1640 001



3



REMARK



3.1 3.2



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Heat Tracing Installation NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 20 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



F



HEAT TRACING INSTALLATION



1



Material Verification(Receiving Inspection)



RP 5561V 999 1630 007



QP 550 002



Verify the Material Type/Size/Quantity



-



SW



-



Check the Physical Damage



-



SW



SW



Review the Related Document



-



R



-



W



SW



SW



Vendor spec



Heat Tracing Installation



1.1



RP 5561V 999 1630 007



Heating Cable Installation - Cable Type / Size / Route - Cable Tie or Tape Binding



CPX22



Related DWG Vendor spec



1.2 1.3 2 2.1



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



NO.



DESCRIPTION OF INSPECTION / TEST



REPORTING FORMAT



Accessory(Junction Box, Thermostats, Sensor) Related DWG



4



PAGE



Heat Tracing Installation APPLICABLE SPEC. OR PROCEDURE



INSP 99012 999 8700 0004



21 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



W



SW



SW



H



W



W



H



W



W



REMARK



Vendor spec Test SP-COM-511 Insulation Resistance Test ( Before insulation )



2.2



TPX22 RP 5561V 999 1630 007



Insulation Resistance Test ( After insulation)



3 3.1 3.2 LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



DESCRIPTION OF INSPECTION / TEST



G



CATHODIC PROTECTION INSTALLATION



1



Material Verification(Receiving Inspection)



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



RP 5561V 999 1630 017, 1300 082



QP 550 002



Verify the Material Type/Size/Quantity Check the Physical Damage



Vendor spec



Review the Related Document



4



PAGE



Cathodic Protection Installation NO.



INSP 99012 999 8700 0004



22 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



-



SW



SW



-



SW



SW



-



R



-



W



SW



W



W



W



W



W



SW



W



W



W



W



Cathodic Protection Installation CPX33 Anode / Anode Cable Installation



RP 5561V 999 1630 007,1300 082



Cable connection/bonding Related DWG Test Box, Reference Electrode, etc Vendor spec Electrical test - Loop resistance for anode cable - Potential test for reference cell 1.1 1.2



SP-COM-511



TPX33



REMARK



1.3 2 2.1 2.2 2.3 3



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2



SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES



DISCIPLINE :



INSPECTION & TEST PLAN FOR SITE



SUBCON



ELECTRICAL



ITP No.



:



Rev. No.



DESCRIPTION OF WORK :



PAGE



Telecommunication Installation NO.



DESCRIPTION OF INSPECTION / TEST



APPLICABLE SPEC. OR PROCEDURE



REPORTING FORMAT



INSP 99012 999 8700 0004



4 23 OF 23



PARTICIPATION BY SUBCON



HDEC/ TPA



COMPANY



REMARK



H



TELECOMMUNICATION INSTALLATION Above item is separated from ITP for electrical. ITP for telecommunication will be issued later.



LEGEND :



R : Review



SW : Spot Witness



W : Witness



H : Hold FORM NO. QP 545 002 2