PT. BARATA INDONESIA Jln. Veteran 241 Gresik - Indonesia Phone : 031 - 3990555 ; Fax : 031 - 3990666



ENGINEERING PT. VALE INDONESIA, Tbk



Costumer : Project



:



Order No



:



Document No. : BRT-ENG-PROC-FAB-001



CONTINUOUS IMPROVEMENT & SUSTANBILITY PROJECT



No. of Sheet



-



: 12 (include cover)



FABRICATION PROSEDURE CONTINUOUS IMPROVEMENT & SUSTAINBILITY PROJECT



0 REV



05-05-2018



All



FOR APPROVAL



DATE



PAGE



DESCRIPTION



MCH



RMA



ALD



PREP’D



CHECKED



REVIEWED



Daftar Isi



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 2 of 12



Table of Content



1. Umum



1. General



2. Item yang Berlaku



2. Applicable Item



3. Kode dan Standard



3. Code and Standard



4. Persyaratan Umum:



4. General Requirement :



 4.1 Identifikasi Material  4.2



Identifikasi



Penandaan



4.1 Material Identification dan



4.2 Marking and Transfer Identification



Pemindahan   4.3 Rencana Pemotongan



4.3 Cutting Plan



  4.4 Persiapan Cutting dan Edge



4.4 Cutting and Edge Preparation



5. Lentur dan Pembentukan



5. Bending and Forming



6. Proses Pengelasan



6. Welding Process



6.1 Pengelasan



6.1 Welding



6.2 WPS, PQR dan Kualifikasi Welder



6.2 WPS, PQR and Welder Qualification



6.3 Pengelasan Perbaikan.



6.3 Welding Repair.



7. Pemeriksaan Tidak Merusak



7. Non Destructive Examination (NDE)



7.1 Persyaratan Umum



7.1 General Requirement



7.2 UjiVisual



7.2 Visual Examination



7.3 Uji Cairan Penetrant



7.3 Liquid Penetrant Examination



7.4 Uji Ultrasonik



7.4 Radiography Examination



8. Lapisan Pelindung



8. Protective Painting



9. Pengujian & Perawatan



9. Testing & Treatment



10. Dokumentasi



10. Documentation



Fabrication Prosedure



1. Umum



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 3 of 12



1. Umum



Prosedur ini mencakup persyaratan minimum



untuk



fabrikasi



Continuous



This procedure covered to the minimum requirement for fabrication



Improvement & Sustainbility Project PT.



of



Continuous



Improvement



Vale Indonesia, yang dibuat oleh PT.



Sustainbility



Barata Indonesia.



Indonesia, which are fabricated by PT.



Project



PT.



& Vale



Barata Indonesia. 2. Item yang Berlaku



2. Applicable Item



Prosedur ini terutama harus diterapkan untuk



3.



membangun



(fabrikasi



dan



This procedure mainly shall be applied to construct (fabrication and assembling),



perakitan), Continuous Improvement &



of



Continuous



Improvement



Sustainbility Project.



Sustainbility Project.



Kode dan Standard



3. Code and Standard



Kontrak / Spesifikasi Pelanggan



Contract / Customer Specification



Gambar yang disetujui



Approved Drawing



Inspeksi & Rencana Uji yang disetujui



Approved Inspection & Test Plan



4. Lingkup Kerja fabrikasi HE PT. KMI 4.1 Identifikasi Material



4. General Requirement - Material Identification



Personil penandaan harus menugaskan



Marking personnel shall assign all



semua tanda identifikasi, yang terdiri dari



identification



spesifikasi material, nomor barang, nomor



consists of material spesification,



panas atau nomor pelat untuk semua



item number, heat number or plate



bagian tangki penyimpanan. Jika tanda-



number for all parts storage tank. If



tanda identifikasi material hilang karena



the



proses manufaktur berikutnya, penandaan



identification be lost because of



akan / akan dipindahkan oleh personel



next



penandaan.



marking



markings



of



which



material



manufacturing process, the shall



transferred personnel.



Fabrication Prosedure



marking,



by



/



will the



be



re



marking



&



Jika



kondisi



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 4 of 12



layanan



melarang



untuk



identifikasi



prohibit die stamping for material



material dan bila ditentukan oleh



identification and when so specified



pemilik



potongan



by owner or for the piece of material



material dengan ketebalan ¼ inci (6



under ¼ inch ( 6 mm ) in thickness,



mm),



the marking



stempel



mati atau



untuk



penandaan



harus ditandai



Where



Doc. No.



the



service



conditions



shall be marked with



dengan stell marker sehingga setiap



stell marker so that each piece of



bagian material akan diidentifikasi



material will be positively identified.



secara positif. . Pemeriksa mutu



The



bertanggung jawab untuk verifikasi



responsible for verification of the



transfer tanda pengenal material



material



yang dibuat oleh operator.



transfer which was made by the



quality



inspector



shall



identification



be



marking



shop personnel. 4.2 Identifikasi Penandaan dan



4.2



Pemindahan



Identification



Penandaan



identifikasi



material



Marking



The



marking



and



Transfer



of



material



harus dipindahkan jika pelat ada



identification should be transfered if



beberapa



segmen.



plate to cut any segments.



Indonesia



akan



(PT.



Barata



ditentukan



(PT.



Barata Indonesia will be specified



kondisinya).



condition).



Personil merking harus meletakkan



The marking personnel shall lay out



barang atau bagian yang akan



the item or part to be cut on the



dipotong pada bahan dan stamp



intended



yang dimaksudkan sesuai dengan



accordance with cutting plan and



rencana pemotongan dan gambar



aplicable drawing. All identification



yang dapat diaplikasikan. Semua



material and part shall be marked



bahan identifikasi dan bagian harus



completely and the quality inspector



ditandai sepenuhnya dan inspektur



shall be inspected before cutting to



kualitas harus diperiksa sebelum



be done.



material



and



pemotongan harus dilakukan.



4.3 Rencana Pemotongan Fabrication Prosedure



stamps



Rencana pemotongan pada material yang dibutuhkan, sehingga



itu



dibuat



menghindari



untuk



panduan



kesalahan



dalam



penggunaan bahan dan efisiensi bahan.



gambar



Rev. No Page



: :



0 5 of 12



parts, it is made for marking guide to avoid the mistakes to use a material



Cutting



and



Edge



Preparation



dapat



The edge preparation of weld joint



diaplikasikan. Persiapan bersama las dapat



shall be accordance with aplicable



dilakukan dengan machinning, grinding, dan



drawing. Weld joint preparation may be



thermal



made



cutting



yang



BRT-ENG-PROC-FAB-001



The cutting plan is lay out marking



4.4



Persiapan ujung sambungan las harus dengan



:



and the material eficiency.



4.4 Persiapan Pemotongan sesuai



Doc. No.



asalkan



permukaan



machinning,



grinding,



and



sambungan las yang dibuat harus seragam



thermal cutting provided the prepared



halus, bebas dari semua skala longgar dan



weld joint surface shall be uniformly



akumulasi



tanah



smooth, free of all loose scale and slag



kembali ke logam cerah. Jika pemanasan



accumulation and preferably ground



awal ditentukan untuk pengelasan, harus



back to bright metal finish. If preheating



juga



sebelum



is specified for welding it shall also



pemotongan termal. Sebelum pengelasan,



applied to the material prior to thermal



permukaan hingga 1 inci dari tepi alur las



cutting. Prior to welding, the surface up



untuk besi harus bersih dan bebas dari



to the 1 inch from the edge of



minyak, karat, kerak, terak, gemuk dan



welding groove for ferrous shall be



bahan



clean and free from oil, rust, scale,



terak



diterapkan



asing



dan



sebaiknya



pada



lainnya



bahan



yang



merugikan



pengelasan.



the



slag, grease and other foreign material which is detrimental to welding.



5. Bending dan Forming Plat atau pipa untuk tujuan lain mungkin dibengkokkan dengan jari-jari tikungan yang akan



menghasilkan



Plate or pipe for the other purpose



tikungan



may be bent with radius of bend which



bebas dari retakan. Bending adalah proses



will result in a bend surface free of



pertama



cracks. Bending is the first process in



dalam



permukaan



5. Bending and Forming.



shell



/



dinding



yang



dibengkokkan dengan radius sesuai dengan



shell



gambar yang berlaku sebelum membentuk



accordance



(rolling).



before forming (rolling).



4.3



Cutting Plan



Fabrication Prosedure



/



wall



is to



bent



with



applicable



radius drawing



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 6 of 12



Forming proses adalah proses untuk



Forming is process to form cylindrical



membentuk cangkang kerang / dinding



shell / wall plates and head plates



silinder dan plat dari plat baja dengan



from



radius sesuai dengan gambar yang



accordance to applicable drawing.



berlaku.



Form the shell / wall plates so that it



Bentuk cangkang kerang / dinding



steel



plate



with



will overlap approximately 1thk – 3 thk



sehingga akan tumpang tindih kira-kira



of plate on circumference.



1k - 3 thk keliling dari plat.



Lamination



Pemeriksaan



laminasi



radius



check



is



guaranteed



digunakan



before rolling / bending process. If



untuk menjamin sebelum proses rolling



any indication lamination defect found



/ bending. Jika ada indikasi kerusakan



after rolling / bending process (by



laminasi



visual



ditemukan



setelah



proses



rolling / bending (dengan uji visual),



test),



will



be



conducted



Ultrasonic Test.



akan dilakukan Uji Ultrasonik. 6. Proses Pengelasan



6. Welding Process



6.1 Pengelasan Semua



6.1 Welding



pengelasan



pengelasan



tack



sementara



menggunakan



dan akan



Spesifikasi



Prosedur



Pengelasan (WPS) dan tukang las yang berkualifikasi. Pengikatan



All



tack



weld



and



welding



of



temporary attachments shall use the Welding



Procedure



Specification



(WPS) and qualified welder. Temporary attachment used during



yang



fabrication shall be the same as the



harus



base material, this tack weld shall be



sama dengan bahan dasar, lasan paku



removed after welding and attachment



ini harus dilepas setelah pengelasan



is ground smooth and flushed with the



dan pemasangan digiling halus dan



surrounding surface.



digunakan



digelapkan



sementara selama



fabrikasi



dengan



permukaan



sekitarnya. Perbaikan



be made with the same procedure and pengelasan



tack



dan



pengelasan dapat dilakukan dengan prosedur



Repair of tack weld and welding may



yang



sama



dan



jenis



elektroda atau pengisi kawat yang sama yang digunakan untuk root pass.



Fabrication Prosedure



the same type of electrode or filler wire that be used for root pass.



6.2 WPS,



PQR



and



Welder



6.2 WPS,



Qualification



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 7 of 12



PQR



and



Welder



Qualification



Spesifikasi



prosedur



pengelasan



Welding



Procedure



Specification



atau Welding Prosedure Specification



(WPS) and Procedure Qualification



(WPS)



Kualifikasi



Record (PQR) shall conform to the



Prosedur atau Procedure Qualification



requirements of ASME Section IX



Record (PQR) harus sesuai dengan



Welding and Brazing Qualification and



yang di syaratkan oleh ASME Section



Specification



IX Welding and Brazing Qualification



Standard (AWS). Welder’s or welding



and Specification / American Welding



operator’s



Standard (AWS). Kualifikasi tukang las



certified by DISNAKER (See Qualified



atau



welder list).



dan



laporan



operator



las



harus



telah



bersertifikat oleh DISNAKER (Lihat daftar kualifikasi tukang las). Penggunaan



spesifikasi



The



/



American



Qualification



using



of



Welding



have



welding



been



procedure



specification (WPS) shall be shown on prosedur



welding map if required.



pengelasan atau Welding Procedure Specification (WPS) harus ditunjukkan dalam Welding Map, bila diperlukan. 6.3 Perbaikan Pengelasan Ketidak



terusan



6.3



tidak



dapat



Welding Repair



Unacceptability is unacceptable and



diterima dan harus benar-benar di



must



hilangkan



cutting, scraping, grinding or other



dengan



memotong,



be



completely



permissible



yang diijinkan (untuk jenis material



types of materials) for cleaning, metal



yang diperbaiki) untuk membersihkan,



sounds and excavated areas must be



bunyi logam dan area yang digali harus



at least visually and reliably clean total.



secara minimum visual dan di yakinin



Welding improvements should use



Perbaikan menggunakan



yang



harus



weld,



sama



procedures.



digunakan pada lasan yang asli, atau prosedur pengelasan yang di setujui lainnya.



Fabrication Prosedure



improved



the same WPS used in the original



pengelasan WPS



(for



by



mencingkil, gerinda atau metode lain



benar-benar bersih total.



methods



removed



or



other



approved



welding



Area yang telah diperbaiki harus diperiksa



ulang



dengan



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 8 of 12



The repaired area should be re-



metode



examined by the same inspection



inspeksi yang sama, dimana cacat



method, where the original defect has



yang asli telah terdeteksi.



been detected.



Hanya dua percobaan yang di perbolehkan tanpa persetujuan dari



Only two experiments are allowed without the owner's consent.



pemilik.



7. Non



Destructive



Examination



7. Non Destructive Examination (NDE)



(NDE)



7.1 General Requirements



7.1 Kebutuhan Umum Metode NDE, kriteria yang diterima



The NDE method, accepted criteria



dan kebutuhan umum tambahan harus



and additional general needs must



menurut dengan kode fabrikasi yang



comply with the applied fabrication



diterapkan dan spesifikasi ini.



codes and these specifications. Inpektur



Visual testing by Quality Control



pengendalian kualitas (QC). Semua



Instructor (QC). All other NDEs must be



NDE lainnya harus dilakukan oleh



performed by quality control inspectors



personel



(QC) personnel.



Pengujian



visual



oleh



inspektur



pengendalian



kualitas (QC). 7.2 Uji Visual



7.2 Visual Test



Prosedur pengujian akan menuruti



The test procedure will comply with



syarat dan metode spesifik yang ada di



the



dalam ASME Code, Section V, Article 9



contained in ASME Code, Section V,



dan spesifikasi ini.



Article 9 and this specification.



Permukaan dari semua pengelasan yang telah selesai



akan diperiksa



specific



terms



and



methods



The surface of all completed welding will be visually inspected.



secara visual. 7.3 Uji Cairan Penetran Prosedur pengujian akan menuruti



7.3 Penetrant Fluid Test The test procedure will comply with



syarat dan metode spesifik yang ada di



the



dalam ASME Code, Section V, Article 6



contained in the ASME Code, Section



dan spesifikasi ini.



V, Article 6 and these specifications.



Fabrication Prosedure



specific



terms



and



methods



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 9 of 12



Material dasar 1 inch pada tiap sisi



The 1 inch base material on each side



dari lasan juga termasuk di dalamnya



of the weld also includes welding



pengujian pengelasan.



testing.



7.4 Uji Ultrasonic



7.4 Ultrasonic Test



Prosedur pengujian akan menuruti



The test procedure will comply with



syarat dan metode spesifik yang ada



the



specific



terms



and



methods



didalam ASME Code, Section V, Article



contained in the ASME Code, Section



5 dan spesifikasi ini.



V, Article 5 and these specifications.



Material dasar 1 inch pada tiap sisi



The 1 inch base material on each side



dari lasan juga termasuk di dalamnya



of the weld also includes welding



pengujian pengelasan.



testing.



8. Lapisan Pelindung



8. Protective Coating



Semua permukaan peralatan yang



All equipment surface that require



membutuhkan pengecatan harus dicat



painting shall shop painted before



sebelum dikirim ke lokasi.



delivery to site.



Semua



permukaan,



bagian



dan



All surfaces, part and equipment as



peralatan sebagai baut, flens muka, dll,



bolt threads, flange faces, etc, Should



Harus dilindungi sebelum pengiriman.



be protected before shipment. Surface



Permukaan



membutuhkan



kerja



requiring field welding work (especially



pengelasan



lapangan



(terutama



surface of bevel), have to free from



permukaan bevel), harus bebas dari



priming before delivery to site. And the



priming sebelum pengiriman ke situs.



surface requiring insulated, may be pre



Dan permukaan yang membutuhkan



primer with the primer paint before



insulasi, dapat menjadi pra primer



delivery to site.



dengan cat primer sebelum dikirim ke lapangan.



All flux, welding spatter and arc



Semua fluks, pengelasan percikan



strike



shall



be



removed



and



the



dan pemogokan busur harus dilepas



affected area ground smooth with a



dan area yang terkena tanah akan



grinder. Rought weld, under cut, pin



digiling



penggiling.



holes, and other irregularities shall be



Pengelasan yang diperjuangkan, di



repaired, corrected and ground smooth.



bawah



halus luka,



penyimpangan



dengan lubang lainnya



pin,



dan harus



diperbaiki, dikoreksi dan digerinda rata.



Fabrication Prosedure



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 10 of 12



Tepi yang tajam, kecuali diperlukan



Sharp edges, unless required for



untuk tujuan tertentu harus dibulatkan.



specified purposed shall be rounded



Semua bahan abrasif, debu, skala, dll,



off. All spent abrasive material, dust,



harus dibuang dari semua permukaan



scale, etc, shall be removed from all



dengan menyikat atau meniup dengan



surface by brushing or blowing with



udara terkompresi yang bersih dan



clean,



kering



vacumming before the application of



dan



vacumming



sebelum



aplikasi cat.



dry



compressed



air



and



paint.



Sandblast dilakukan sebelum cat



Sandblast is done before primer



primer, sesuai dengan SSPC SP10.



painting, conform to SSPC SP10. Blast



Permukaan



cleaned surfaces shall be kept clean,



yang



dibersihkan



dari



ledakan harus dijaga bersih, bebas dari



free



of



moisture



and



other



kelembaban dan kontaminasi lain yang



contaminants which may be detrimental



dapat merusak aplikasi cat.



to the application of the paint.



Lapisan primer, sedang dan akhir



The primer, intermediate and finish



harus berbeda warna, dan pengecatan



coat shall be different colours, and



harus dilakukan jika kondisi cat sebagai



painting repair shall be conducted if the



berikut:



paint condition as follow :



- Ketebalan cat tidak mencapai nilai



- Paint thickness was not reaching the



yang dibutuhkan -



Setiap



value required kerusakan



penanganan,



selama



transportasi



dan



pembongkaran ke situs.



titik



during



handling,



transportation and unloading to the - And another defective of paint.



Untuk di atas, pelapisan ulang harus pada



damage



site.



- Dan cacat cat lainnya. dilakukan



- Any



For above, re coating shall be



kerusakan



done at the point of damage surface



permukaan dengan sejauh 50 mm titik



with extent to the 50 mm of the



kerusakan sebagai berikut:



damage point as the following :



- Periksa titik kerusakan.



- Check the damage point.



- Luas hingga 50 mm dari kerusakan



- Extent to the 50 mm of that damage.



itu.



- Cleaning those surfaces with power



- Membersihkan permukaan tersebut dengan sikat listrik.



Fabrication Prosedure



brush.



-



lapis ulang lagi dengan sikat pada permukaan itu pada waktu yang tepat



Doc. No.



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 11 of 12



- Re coating again with brush at those surfaces after suitable time. And details of the paint specifications



Dan detail dari spesifikasi cat dan prosedur harus tertera dalam “Prosedur Pengecatan”.



and procedures should be stated in the "Painting Procedure". If the internal parts use stainless steel



Bila bagian internal menggunakan



(eg internal pipes, distributors, etc.



stainless steel (contoh : internal pipa,



Except bolts) cleaning with pickling /



distributor,



acid method is required.



dll.



Kecuali



baut)



pembersihan dengan metode pickling / acid dibutuhkan.



9. Testing & Treatment



9. Pengujian & Perawatan



- Vacum Box



- Kotak Vacum



- Hydrostatic Test



- Tes hidrostatis



- Pad (Reinforcement) Soap Test



- Tes Sabun Pad (Penguatan)



- PWHT (If Any)



- PWHT (Jika Ada)



- NDE



- NDE



- Cleaning and Boxing up



- Pembersihan dan Tinju



- Painting



- Lukisan



- Leak Test between Shell to Annular



- Leak Test antara Shell ke plat Bawah Annular Harus



Bottom plate Shall be performed in accordance



dilakukan



sesuai



dengan



Prosedur dan Spesifikasi Proyek



with



the



related



Procedure



and



Project Specification.



terkait 10. Dokumentasi



10. Documentation



Pastikan bahwa semua Standar / Kode Proyek telah



yang &



Make



sure



that



all



required



of



diminta,



Spesifikasi



Standard / Code, Project Specification



Peraturan



Pemerintah



& Government Regulation have been



Catatan



fullfilled by Inspection Record, and



dipenuhi



oleh



Inspeksi, dan telah disetujui oleh



have been approved by Customer.



Pelanggan.



Flow Chart Fabrication Fabrication Prosedure



Fabrikasi shell



Marking Cutting



RAW MATERIAL



:



BRT-ENG-PROC-FAB-001



Rev. No Page



: :



0 12 of 12



Rolling Shell sesuai diameter



Shell assembly (tack weld) Fabrikasi Accessories



INSPEKSI MATERIAL



Doc. No.



Flange Fit up ( if any )



Final Dimention



Sandblast painting



Packing



Inspeksi dimensi



Marking Cutting



Delivery



Full weld Machining & Drilling



Assembly



Total Assembly



Note: All proses marking, Cutting, Fit-Up & Welding Include Inspection Dimension & visual



Fabrication Prosedure