19 0 172 KB
Form Daily Monitoring Rental Equipment Date : Shift : Record : Time Unit/ Minute Excavator 200 Compact Amman Dozer D85SS Whell loader DT 01 DT 02 DT 03 Water Truck
Time Unit/Minute Excavator 200 Compact Amman Dozer D85SS Whell loader DT 01 DT 02 DT 03 Water Truck
Unit
10
20
07.00 - 08.00 30 40
50
60
10
20
08.00-09.00 30 40
50
60
10
20
09.00-10.00 30 40
50
60
10
20
10.00-11.00 30 40
50
60
10
20
11.00-12.00 30 40
50
60
10
20
13.00-14.00 30 40
50
60
10
20
14.00-15.00 30 40
50
60
10
20
15.00-16.00 30 40
50
60
10
20
16.00-17.00 30 40
50
60
10
20
17.00-18.00 30 40
50
60
Awal
BD1
Hour Meter BD2 BD3
BD4
Akhir
07-08
08-09
15-16
16-17
Excavator 200 Compact Amman Dozer D85SS Whell loader DT 01 DT 02 DT 03 Water Truck KODE HSE Daywork Activity HSE-1 HSE-2 HSE-3 HSE-4 HSE-5 HSE-6 HSE-7 HSE-8 HSE-9 HSE-10 Rom Activity RA-1 Preparation Rom RA-2 Preparation Acces to Rom RA-3 Coal Loading Rom To Off-Taker RA-4 Selective Pack in Rom
Keterangan Hour Meter Awal :
HM awal unit beroperasi mengikuti HM unit/ Jam dunia
HourMeter Akhir :
HM Akhir Unit beroperai mengikuti HM unit/ Jam dunia
Hour Meter BD :
HM unit pada saat breakdown/rusak
Unit DT 01 DT 02 DT 03
RITASE COAL HAULING PIT TO ROM 09-10 10-11 11-12 12-13 13-14 14-15
Keterangan :
KETERANGAN Coal Getting Daywork Activity Pembuatan KPL/Finishing KPL CG-1 Coal Cleaning Perawatan KPL/Pengerukan KPL/Hauling Material KPL CG-2 Coal Getting/Coal Hauling Pit to ROM Stripping Soil/Sidecast Soil/Re-handle Soil/Stock SoilCG-3 Loading Bedding Coal Hauling Soil CG-4 Hauling Bedding Coal Spreading Soil CG-5 Perapihan Loading Point Pembuatan/ Finishing Saluran Ke KPL CG-6 Collecting/Loading Pack Perawatan Saluran Ke KPL CG-7 Hauling Pack From Pit Penyiraman air Geology Activity Hal Khusus HSE (Bencana,Evakuasi) G-1 Test Pit and Trenching Re-sloping/Re-contouring G-2 Sampling
Civil/General Works Activity CW-1 Pembuatan jalan/Finishing Jalan CW-2 Perawatan Jalan CW-3 Supporting/Pembangunan Infrastruktur CW-4 Loading/Hauling OB CW-5 Pembuatan/Finishing Parking Area CW-6 Pembuatan/Finishing Tanggul dan Drainase CW-7 Perawatan Tanggul dan Drainase CW-8 Loading/Hauling/Spreading Krokos
Comdev Activity CD-1 Supporting Comdev Activity
Dibuat Oleh : Time Keeper
Diperiksa Oleh Foreman Produksi
Diketahui Oleh Supervisor Produksi
Standby kegiatan No Fuel NF No Operator NO Rain Rn Brekdown BD Kabut Dst Makan M Perbaikan front kerja P-1 Pengisian Solar P-2
17-18