Form Fit-Up Welding Inspection Report [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

PT. Nusareka Prima Engineering Location Drawing Number Line Class No.



Joint No.



:____________________________ :____________________________ :____________________________ WPS No.



Spool No.



TYPE of WELD



FIT-UP WELDING INSPECTION REPORT PROJECT No. PROJECT NAME



Size Dia.



THK



MAT"L



Heat No.1 Heat No.2



CHECKED BY ROOT WELDER NPE CLIENT W1 W2



FIT UP DATE



WELD DATE



CHECKED BY CAPPING WELDER NPE CLIENT W1 W2



: : : WELD DATE



FINAL VISUAL CHECKED NPE CLIENT



A



NOTE DURING FIT UP JOINTS SHALL BE FREE FROM RUST PIPE INTERNAL CLEANLINESS CHECKED ONLY QUALIFIED WELDER WILL BE USED FILLER WIRE/ELECTRODA BATCH INTERPASS TEMPERATURE MAINTAINED



Date Report No. Prepared By



:______________________________ :______________________________ FIT UP GAP(mm) A B C D



QA/QC TEAM



:________________________ :________________________ :________________________ :________________________ :________________________



D



B



C



CHECKED BY NPE WELDING INSPECTOR NAME :____________________________ SIGNATURE :____________________________ DATE :____________________________



REVIEW & APPROVED BY: NAME :___________________________ SIGNATURE :___________________________ DATE :___________________________