22 0 40 KB
REKAPITULASI PENAWARAN BIAYA PERENCANAAN PENGADAAN KELENGKAPAN MASJID PEMKOT CIMAHI No. I II
Uraian
Total Harga (Rp)
Biaya Langsung Personel Biaya Langsung Non-Personel Sub - Total PPN 10 % Total
13,625,000 825,000 14,450,000 1,445,000 15,895,000
Dibulatkan Terbilang : Lima Belas Juta Delapan Ratus Sembilan Puluh Lima Ribu Rupiah
15,895,000
Bandung, 04 Maret 2019 PT. SISARTI BAKSYA ASASTA
Usup Hermana Soemantri, Dipl., Ing Direktur Utama
I. RINCIAN BIAYA LANGSUNG PERSONEL Nama Personel A. Tenaga Ahli 1 A. Sulaiman, ST, IAI 2 R. Fadli Kamal, ST B. Tenaga Pendukung 1 Ade Ridwan 2 Ikra Muhammad
Posisi
Orang Bulan
Remunerasi (Rp)
Jumlah (Rp)
Team Leader/ Koordinator Ahli Spil
0.5 0.5
17,000,000 7,000,000
8,500,000 3,500,000
Drafter Estimator
0.25 0.25
3,250,000 3,250,000 Total
812,500 812,500 13,625,000
II. RINCIAN BIAYA LANGSUNG NON-PERSONEL Jenis Biaya BIAYA KANTOR
BIAYA PERJALANAN DINAS BIAYA LAPORAN
Uraian Biaya Biaya Komunikasi Biaya Peralatan Kantor: - Computer Supplies - Drafting Supplies Biaya Kantor Lainnya: - ATK dan barang pakai habis BBM Kendaraan Bermotor Laporan Pendahuluan Laporan Akhir
Satuan
Volume
Biaya
Ls
1
100,000
Ls Ls
1 1
100,000 100,000
Ls LS Buku Buku
1 1 3 3
200,000 100,000 25,000 50,000 Total
Jumlah (Rp) 100,000 100,000 100,000 200,000 100,000 75,000 150,000 825,000