Logging Equipment Head LEH-QT Maintenance SWI - FIT [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

Logging Equipment Head LEH-QT Maintenance SWI - FIT Reference: Version: Release Date:



InTouch Content ID 6586450 1.3 23-Sep-2016



EDMS UID:



1658506138



Produced: Owner: Author:



31-Oct-2016 15:23:03 HCS InTouch Brian Philpott



Private



Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



LEH-QT



LEH-QT FIT Maintenance Standard Work Instruction / Legal Information



Legal Information



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved. This work contains the confidential and proprietary trade secrets of Schlumberger and may not be copied or stored in an information retrieval system, transferred, used, distributed, translated or retransmitted in any form or by any means, electronic or mechanical, in whole or in part, without the express written permission of the copyright owner. Trademarks & Service marks Schlumberger, the Schlumberger logotype, and other words or symbols used to identify the products and services described herein are either trademarks, trade names or service marks of Schlumberger and its licensors, or are the property of their respective owners. These marks may not be copied, imitated or used, in whole or in part, without the express prior written permission of Schlumberger. In addition, covers, page headers, custom graphics, icons, and other design elements may be service marks, trademarks, and/or trade dress of Schlumberger, and may not be copied, imitated, or used, in whole or in part, without the express prior written permission of Schlumberger. A complete list of Schlumberger marks may be viewed at the Schlumberger Oilfield Services Marks page: http://markslist.slb.com



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



LEH-QT FIT Maintenance Standard Work Instruction / Document Control



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Document Control Owner:



HCS InTouch



Author:



Brian Philpott



Reviewer:



Scott Carson



Approver:



Spoorthy Prakash



Contact Information Name: LDAP Alias:



HCS InTouch intouch-hcs-wl-doc



Revision History Version Date



Description



Prepared by



1.3



23-Sep-2016 As per InTouch feedback 6906337, added step Author: T.Harrison 12 and graphic to Chapter 3



1.2



08-Apr-2016 Removed the checklist; Per InTouch ticket 6824693 corrected the link to the ECRI-E FIT SWI



1.1



15-Sep-2015 As per InTouch feedback 6713121, updated Author: B. Philpott, J. Singh illustration in step 2 of section 5: Lubricate and Reassemble (5 min).



1.0



17-Apr-2015 Initial release



Author: B. Philpott



Field Test



14-Dec-2014 Initial issue for Field Test.



Author: Brian Philpott



Author: Sahar Othman



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



iv



LEH-QT FIT Maintenance Standard Work Instruction / Table of Contents



iv



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Table of Contents 1



General Instructions



2



Summary for FIT



3



Perform Mechanical Checks (5 min)



4 4.1 4.2 4.3



_____________________________________________



1



_________________________________________________



3



______________________________



4



Perform Electrical Checks (5 min) ________________________________ Prepare the 31-pin Extender ____________________________________ Perform a conductor continuity check ___________________________ Perform an insulation resistance check __________________________



8 8 8 9



5



Lubricate and Reassemble (5 min)



6



Update the RITE Work Order (5 min)



______________________________



12



_____________________________



14



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



1



LEH-QT FIT Maintenance Standard Work Instruction / General Instructions



1



General Instructions



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



The following Standard Work Instruction is intended as a primary reference guide to the LEH-QT Maintenance FIT. For more details, refer to Heads Operations and Maintenance Manual (Intouch Content ID: 3012542).



Total Process Time: 20 minutes Note The total process time does NOT include the preparation time.



Legend



!



Note



Lubricate with specified oil



QHSE critical step



Lubricate with specified grease



Replace



Use specified threadlocking fluid



Inspect Clean Use specified handtool Torque Good example Bad example



Check with meter Process sequence Spill generated ESD protection required



Information Sources Description



InTouchSupport ID



Heads Maintenance manual



Intouch Content ID: 3012542



Logging Heads Reference page



Intouch Content ID: 3258451



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



1



2



LEH-QT FIT Maintenance Standard Work Instruction / General Instructions



Procedure Requirements Task Requirements and Information Proficiency:



Trained operator LEH-QT is attached to the wireline cable.



Equipment status



LEH-QT has been cleaned.



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



General Required Tools Description



Part No. B003984



C-spanner



H268423



Hammer



B015477



Punch Allen wrench set



T6005202



Ohmmeter



500 V Megger



B013366



Lubriplate grease



B021698



DC-111



H245349



31-pin Extender



Grease guns, self priming



Spare Parts Required Spares Part No.



Description



N/A



N/A



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



2



3



LEH-QT FIT Maintenance Standard Work Instruction / Summary for FIT



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



2



Summary for FIT



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



3



4



LEH-QT FIT Maintenance Standard Work Instruction / Perform Mechanical Checks



4



(5 min)



Perform Mechanical Checks (5 min)



3 Step



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



1.



Action



Figure



Wash the head clean to remove the mud deposited while pulling out of hole in the last descent. Verify mud deposits are removed from the thermometer housings and the fishing neck.



2.



Inspect the fishing neck for burrs or nicks that can cause damage to the cable armor.



nicks burrs



Replaced if damaged.



3.



Inspect the 2 coiled spring pins (B013813) in the fishing neck: - correct length - bent - position.



4.



Inspect the tightness of the 4 screws (100320987) in the fishing neck.



5.



Inspect the position of the snap ring (H329445) on the fishing neck.



Note Verify the opening in the snap ring is NOT positioned over the gap where the two halves of the fishing neck meet. This ensures equal coverage over both halves of the fishing neck.



tightness



Top half of finshing neck



Snap ring



Fishing neck halves mate up



Bottom half of fishing neck



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



snap ring gap



5



LEH-QT FIT Maintenance Standard Work Instruction / Perform Mechanical Checks



5



(5 min) Step 6.



Action



Figure



Inspect the grooved pin (B032902) in the outer housing (H701907).



Pin B032902



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



- verify the pin is installed - verify the alignment of the pin.



installed alignment



Outer housing H701907



7.



Inspect the coiled spring pin (B013394) in the fishing bell extension (H701908).



installed alignment Pin B013394



- verify the pin is installed - verify the alignment of the pin.



Outer housing H701907



8.



Inspect the three thermometer housings. - damage to the housings or pins - missing housing - bent / missing pins - loose pins.



Fishing bell extension H701908



Thermometer housing assembly H245662



Note If running thermometers/thermal strips, remove and replace the thermometers/thermal strips at this time. Retaining collar



Thermometer



Fishing bell extension H701908



Fishing bell H231884



Fishing bell



Note If running a weakpoint, verify the color of the band on the weakpoint by looking through the thermometer housing slot.



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



damage to housing damage to pins missing housings bent / missing pins loose pins



Retainer collar H245493



6



LEH-QT FIT Maintenance Standard Work Instruction / Perform Mechanical Checks



6



(5 min) Step 9.



Action Inspect the three spirol pins (B013394) holding the thermometer housings in the fishing bell.



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



- verify the pin is installed - verify the alignment of the pin.



Figure installed alignment Pins(3) B013394



Fishing bell H231884



10.



Inspect the 3 screws on the retainer collar for:



tightness damage



- tightness, - damage.



Screw H251222



Screws (2) H251223



If screws are damaged, replace them



Fishing bell H231884



11.



Retainer collar H245493



Inspect threaded ring (H222685).



Note Ensure the fishing bell (H231884) is properly made-up to the bell housing extension (H701310).



12.



Inspect and clean the grease fitting (A017129) in the bell housing extension (H701310).



Grease fitting A017129



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



Bell housing extension H701310



7



LEH-QT FIT Maintenance Standard Work Instruction / Perform Mechanical Checks



7



(5 min) Step 13.



Action



Figure



Inspect the two grooved pins (B033000) in the bell housing extension (H701310).



Pins (2) B033000



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



- verify the pin is installed - verify the alignment of the pin.



Fishing bell H231884



14.



installed alignment



Bell housing extension H701310



Inspect the set screw (B033748) on the bell housing extension. - verify screw is installed - tightness of screw.



Bell housing extension



Screw B033748 tightness damage



15.



Inspect the threads of the lower bulkhead (H701315). - clean - no galling.



Bell housing extension H701310



Lower bulkhead H701315



Threads



16.



Inspect the pins inside the lower contact assembly (H441577): - dirt inside and around the socket - damage to the socket - damage to the pins - bent or pushed in.



Bulkhead H701315



31-pin head H441578



Pins H222115



Lower Contact Assy. - dirt - socket damage - pin damage



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



8



LEH-QT FIT Maintenance Standard Work Instruction / Perform Electrical Checks (5 min)



Perform Electrical Checks (5 min)



4



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



This section is for electrical inspection of the the LEH-QT with a bulkhead to head adapter (H701416). If running and ECRD and an ECRI bulkhead (100082292), go to the electrical inspection section of the ECRI SWI 6632333.



Potential Severity: Serious Potential Loss: Personnel Hazard Category: Electrical



Electrical damage to the ECRI bulkhead can occur if improper continuity and insulation resistance checks are performed.



Prepare the 31-pin Extender



4.1 Step 1.



Action



Figure



Insert the 31-pin extender (H245349) into the downhole end of the LEH-QT. 31-pin extender H245349



2.



Set the toggle switch to “1 AND 4 DISCONNECT”.



Quality Note Using the proper extender (H245349) ensures that voltage is not applied to load cell lines 14, 15, 19 and 20.



4.2



Perform a conductor continuity check Check conductor continuity with a Simpson meter or equivalent for each conductor: 1 thru 7 and 10.



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



8



9



LEH-QT FIT Maintenance Standard Work Instruction / Perform Electrical Checks (5



9



min)



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Step



Action



1.



Set the Simpson meter on high scale 0–100.



2.



Put the CSS in the CIS position.



3.



Place the red lead in position number 1 on the 31-pin extender.



4.



Clip the black lead to mass (bulkhead - H701315).



5.



Short out line 1 to mass at the CIS.



Note The resistance should be equal to the resistance of the cable conductor line plus ground. If the continuity reading is not acceptable, troubleshoot the problem.



Note Troubleshooting consist of checking BCC connections and downhole hook-up wires. Refer to the LEH-QT SLS-1 SWI, InTouch 6586651. 6.



Repeat steps 1 through 5 for lines 2 thru 7 and 10. Remember to move the red lead to the next position on the 31-pin extender and short out the corresponding line at the CIS.



7.



4.3



Insert the black lead in position 28 and the red lead in position 29 of the 31-pin extender. Resistance should be less than 1 ohm.



Perform an insulation resistance check Potential Severity: Serious Potential Loss: Personnel Hazard Category: Electrical



There is a potential for electrical shock when performing the insulation resistance test.



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



10



LEH-QT FIT Maintenance Standard Work Instruction / Perform Electrical Checks (5 min) Bulkhead H701315



Black clipped to bulkhead



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Push to apply 500 VDC



Step



31-pin extender



Action



Figure



1.



Put the CSS in the CIS position.



2.



Place the positive lead (red) of the megger on position 1 in the 31-pin extender (H245349).



3.



Place the common lead (black) on the body of the bulkhead.



4.



Measure the IR. The insulation resistance should be greater than 500 Mohms. If the IR reading is not acceptable, troubleshoot the problem.



Note Troubleshooting consist of checking BCC connections and downhole hook-up wires. Refer to the LEH-QT SLS-1 SWI, InTouch 6586651. 5.



Repeat steps 2 through 4 for wires 2 thru 7, 28 to mass and 29 to mass.



Note Line 10 is connected to mass; therefore, it will be continuous. 6.



Check the insulation resistance between each conductor. Place the black lead in position one and the red lead in position 2 of the 31-pin extender.



Leave the black lead on a conductor, move the red lead to each of the remaining conductors



Take the measurement. The insulation resistance should be greater than 500 Mohms. Move the red lead to the next conductor.



7.



Repeat step 6 for the remaining lines. Black lead to position 2, red lead to positions 3 thru 7 Black lead to position 3, red lead to positions 4 thru 7 Black lead to position 4, red lead to positions 5 thru 7 Black lead to position 5, red lead to positions 6 thru 7 Black lead to position 6, red lead to positions 7



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



10



11



LEH-QT FIT Maintenance Standard Work Instruction / Perform Electrical Checks (5 min) Step



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



8.



9.



Action Discharge the voltage from the head hook-up wires by placing a wire on the bulkhead and then touching each of the ports in the 31–pin extender.



Figure



Ground on end to bulkhead



Remove the 31-pin extender (H245349).



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



Insert into each port of 31-pin extender



11



12



LEH-QT FIT Maintenance Standard Work Instruction / Lubricate and Reassemble (5



12



min)



Lubricate and Reassemble (5 min)



5 Step



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



1.



Action



Figure



Fill the fishing bell extension (H701908) with DC-111 using the grease gun with the beveled end.



DC-111



Fishing bell extension H701908



Outer housing H701907



2.



Fill the fishing bell (H231884) with DC-111 using the grease gun with the beveled end.



DC111



Fishing bell H231884



3.



Pump Lubriplate into the split threaded ring (H222685) using the grease gun with the beveled end.



Lubriplate



Fishing bell H231884 Split threaded ring H222685



4.



Fill the bell housing extension (H701310) with DC-111 using the grease gun with the female end.



Bell housing extension H701310



DC111



Fishing bell H231884



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



Bell housing extension H701310



13



LEH-QT FIT Maintenance Standard Work Instruction / Lubricate and Reassemble (5



13



min) Step



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



5.



Action



Figure



Apply Lubriplate to the threads of bulkhead (H701315).



Lubriplate threads



Bulkhead H701315



6.



If the LEH-QT is not being attached to the toolstring, lubricate the thread protector with Lubriplate and install onto the bulkhead.



Lubriplate



Bulkhead H701315



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



O-ring B012828



Thread protector H251929



14



LEH-QT FIT Maintenance Standard Work Instruction / Update the RITE Work Order (5 min)



Update the RITE Work Order (5 min)



6



HCS InTouch\Brian Philpott\InTouch Content ID 6586450\1.3\Release Date:23-Sep-2016\EDMS UID: 1658506138\Produced: 31-Oct-2016 15:23:03



Step



Action



1.



Update the RITE work order with all the information.



2.



Click on Edit when the procedure is completed.



3.



Click on Checklist and answer all checks one after the other.



4.



Fill in the Checklist Remarks.



5.



Add the part number and quantity for parts which were replaced.



6.



Fill in the time taken to complete the procedure.



7.



Change the work order detailed status to closed.



Private Copyright © 2016 Schlumberger, Unpublished Work. All rights reserved.



14