5 0 138 KB
PONDOK PESANTREN TAHFIDZ FAHIMUL QUR’AN DESA SUNGAI ULAK KEC. NALO TANTAN KAB. MERANGIN PROV. JAMBI Alamat Jl, Swadaya Masyarakat Rt.013/Rw.001 Telp.085266502569 Kode Pos 37317
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBERI TUGAS KEJURUAN TAHUN ANGGARAN
NO.
: : : :
PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS KEMENTERIAN KETENAGAKERJAAN RI TEKNIK INFORMATIKA 2021
URAIAN PEKERJAAN
VOLUME SAT.
HARGA SATUAN ( Rp. )
JUMLAH HARGA ( Rp. )
A 1
PEKERJAAN PERSIAPAN Papan Proyek
1.00 unit 1.000.000
1.000,000
2
Pek. Laporan & Dokumentasi
1.00
5.000.000 5
5.000.000
ls
6.000.000
Sub Total A B
PEKERJAAN PONDASI & TANAH
1
Pek. Galian Tanah Pondasi
98.19
m
2
Pek. Urug Tanah Kembali
32.73
3.228.936
3 4
Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) Pek. Pasir Urug
19.55
m3 13,400 m3 183,900
- Bawah Pondasi
14.45
m3 110,000 m3 110,000
3.000.000
5
- Bawah Lantai Pek. Pondasi Tapak P1 (90x90x20) - Beton K-225 - Pembesian
6 7
15.06
2.92 443.67
- Bekisting
19.44
Pek. Pondasi Batu Belah P2 Pek. Sloof Beton S1 (15/30), S2 (15/25)
23.02
- Beton K-225 - Pembesian
4.35 735.09
- Bekisting
57.99
Sub Total B
m
3
3
kg
36,740
3
3.973.164
5.000.000
1,230,825
4,824.834
11,300
19.228.936
m2 770.000 3 730,825 m
m kg
3.558.834
16,.385.600 17.729.815
1,230,285
4.714.060
11,300
19,228,936
m2 117,052
5,973,164 106,838,283
C C.1 1
PEKERJAAN STRUKTUR STRUKTUR BETON Pek. Kolom Beton K1 (25/25) - Beton K-225 - Pembesian
2
6
- Beton K-175 - Pembesian
0.51 164.31
m kg
URAIAN PEKERJAAN - Bekisting Pek. Balok Beton B1,B2 (20/30)
- Bekisting Pek. Beton Balok Lintel BL (12/15), RB (12/15)
3
VOLUME SAT. 2 18.48 m
3
2.81 m 417.87 kg
1,124,383
1,214,334
11,316
12,192,814
HARGA JUMLAH SATUAN HARGA ( Rp. ) ( Rp. ) 295,290 9,504,352
1,230,825
8,098,647
11,316
19,510,542
2 37.44 m 295,290
3
1.74 m 375.98 kg
19,382,764
13,110,876
1,124,383
2,023,889
11,316
4,619,870
- Bekisting Pek. Ramp Beton T = 10 cm
2 37.85 m 295,290
10,234,751
- Beton K-175 - Pembesian
3 0.35 m 1,124,383 42.24 kg 11,316
7,793,534
- Bekisting Pek. Kolom Sopi Sopi 25/25) - Beton K-225 - Pembesian
7
27,213,926
m2 295,290
- Beton K-175 - Pembesian
5
8,505,001
102.60
- Beton K-225 - Pembesian
4
m3 1,230,825 kg 11,316
- Bekisting Pek. Kolom Praktis KP (11/11)
NO.
3
6.41 1,072.36
- Bekisting Pek. Balok B3 Sopi Sopi (15/20) - Beton K-175
19,877,988
2
295,290
4, 403,750
3
1,230,865
923,119
11,316
19,951,902
0.69 m
1.38 m 139.00 kg
2 22.05 m 295,290
8,941,088
3
2,079,408
1.38 m
1,124,383
- Pembesian
8
214.34
2
18.40 m
- Bekisting Pek. Plat Beton Topi Topi (10/60) - Beton K-225 - Pembesian
C.2
kg
8,405,602
295,290
6,782,665
3 0.92 m 1,230,825 176.99 kg 11,316
4,085,510
2
295,290
6,614,350
10.71 m
- Bekisting PEKERJAAN ATAP
11,316
8,064,265
Rangka Atap 1
L 40.40.4
261.54
kg
165,000
33,912,450
2
2 X L 50,50,5
996.55
kg
65,000
13,359,450
3
Kuda Kuda 2 x C 100.50.20.2,3
98.08
kg
85,000
6,273,000
4
Gording C 125.50.20.2,3
1,196.58
kg
65,000
9,100,000
5
L 50,50,5 dudukan gording
27.90
kg
1,000
900,000
6
Trekstang Ø12
56.96
kg
2,800
1,636,000
7
Ikatan angin Ø16
174.72
kg
5,100
3,350,000
8
Pelat sambung T 10mm
160.14
kg
25,000
6,375,000
9 10
Angkur Ø16 x 300 mm Bout M12 x 30 mm dudukan gording
48.00 148.00
2,250,000
10
Bout M12 x 30 mm dudukan gording
656.00
bh 35,000 bh 1,000 bh 350
11
Cat Sincromat Rangka baja Penutup
1
Atap Spandek t = 0.35 mm
2
Pasang Aluminium Foil, Glaswool, Roofmesh
3
Listplank GRC
4
Plashing/ban banan atap (plester, aci, waterprofing) Sub Total C
NO.
34.57 m2 120,000
2 212.16 m 65,000 140.00 m2 42,500
m' 245,000 6.00 m1 11,500
71.40
URAIAN PEKERJAAN PEKERJAAN PLAFOND
1
Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35
2 3
Plafond Calsiboard 4,5 mm + Rangka Lis Gipsum 5 cm
HARGA SATUAN ( Rp. )
2 136.87 m 97,000 2 61.60 m 68,000
116.65
m' 45,000
PEKERJAAN PASANGAN
1
Pasangan Dinding Bata
3,600,000
1,572,000 3,952,500 7,056,000 4,225,000
JUMLAH HARGA ( Rp. ) 16,239,530 6,625,080 8,268,250 31,132,860
Sub Total D E
980,000
100,041,400
VOLUME SAT.
D
1,500,000
2 280.59 m 66,440
18,658,501
3
555.94 m
2
Plester + Acian
3
Pasangan Rolaag Bata
4
Pekerjaan Lapis cor Beton t = 5 cm bawah lantai keramik
5
Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 100 cm
6 7
45,440
m' 381,840 3 7.53 m 460,045 3 2.78 m 115,104
48.80
14,401,800 3,146,436
115,104
4,434,812
2
875,100
8, 870,510
2
123,246
16,810,754
137.03 m
Pasangan Keramik Lantai 40/40 Polished
8,560,432
3
0.12 m
Pekerjaan Meja Beton Wastafel t = 8 cm
26,545,965
8
Pasangan Keramik Lantai 30/30 UnPolished (rabat)
50.44 m
9
Pasangan Keramik Lantai 20/20 Unpolished
15,389,792
10
Pasangan Plint Keramik Lantai 40/10 polished
11
Pasangan Keramik Bak & Meja Wastafel 20/20 Polished
12
Pasangan Keramik Dinding 30/60 Polished
m2 257,496 97.40 m' 156,780 2 1.58 m 48,168 2 5.24 m 1,464,989
13
Pasangan keramik dinding 40 x40 cm Kolom Entrace
4,273,188
14
Pek. Logo & Tulisan
15
Tali Air
16 17
List Profil Dinding Pasang Papan Nama (terpasang)
m2 618,750 1.00 ls 656,418 27.50 m1 618 27.90 m1 41,000 1.00 ls 1,200,000
18
Pasang Prasasti Granit (40/60)
8,691,563
8,691,563
3.22
5.12
1.00
ls
F
PEKERJAAN KUSEN PINTU & JENDELA Kusen/Pintu type P1
2
Kusen/Pintu type P2
3
Kusen/Pintu type P3 (Spandrel)
4
Kusen/Jendela type J1
5
Kusen/Jendela type J2
6
Kusen/Jendela type BV
7
Tralis Jendela type J1 (ukuran sesuai gbr juknis 2021) Sub Total F
G
PEKERJAAN PENGECATAN
1
Pek. Pengecatan Dinding Interior
2 3
Pek. Pengecatan Plafond
4
Pek. Pengecatan Listplank
4,593,031 6,001,905 476,611 6,991,760 1,200,000
1.00 unt 6,330,040 5.00 unt 4,174,360
6,330,040
1.00 unt 4,461,080 9.00 unt 3,909,000
4,461,080
4.00 unt 3,445,920 1.00 unt 3,404,520
13,013,280
9.00 unt 350,000
8,327,500
12,523,080 7,818,000 3,404,520 55,877,500
2
25,391
6,298,999
2
21,360
5,298,989
2
21,360
4,054,128
277.97 m 277.97 m
Pek. Pengecatan Dinding Exterior
4,691,563
158,315,234
Sub Total E
1
4,576,611
198.47 m
2 21.42 m 21,360
4,072,910, 19,725,026
Sub Total G H
PEKERJAAN PLUMBING & SANITAIR
1
Instalasi Pipa PVC AW 4"
16.00
m' 180,519
2,888,304
2
Instalasi Pipa PVC AW 2"
12.00
m' 103,218
1,238,616
3
Instalasi Pipa PVC AW 3/4"
20.00
m' 98,180
1,963,600
4
Instalasi Pipa PVC AW 1/2"
15.00
m' 79,323
1,189,845
NO.
URAIAN PEKERJAAN
VOLUME SAT.
HARGA SATUAN
JUMLAH HARGA
( Rp. )
( Rp. )
5
Septic Tank dan Rembesan
1.00 unit 4,407,413
6
Pemasangan Closed Jongkok
1.00
bh
627,947
627,947
7
Pemasangan Kran Air
2.00
bh
216,452
432,904
8
Pemasangan Wastafel + Kran
2.00
bh
875,074
1,750,148
9
Pemasangan Cermin Wastafel 140 x 100
1.00 unit 1,171,266 Sub Total H
4,407,413
1,171,266 15,670,043
I
PEKERJAAN LISTRIK
1
Penyambungan Daya Listrik
5,500.00
VA 1,000
5,500,000
2
Perijinan Sertifikat Layak Operasi (SLO)
5,500.00
VA 1,000
5,500,000
3
Panel Listrik
1.00 unt 467,280
4
Pek. Instalasi Kabel Feeder NYY 4x10 mm2
2.00
5
Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + conduit
6
Pek. Instalasi Power AC
7
Pemasangan Lampu TKI 2x36W
8
63.00 2.00
m'
1,506,600
467,280 3,013,200
ttk 241,760
5,956,160
ttk 1,800,000
3,600,000
13.00
bh
317,400
5,078,400
Pemasangan Lampu Baret Kotak 18/22W
8.00
bh
95,274
666,918
9
Pemasangan Lampu E27ESS 8 Watt + DL 4''
4.00
bh
2,908,080
8,724,240
10
Pemasangan Saklar Engkle
4.00
bh
105,360
526,800
11
Pemasangan Saklar Double
5.00
bh
118,440
473,760
12
Pemasangan Stop Kontak Single
8.00
bh
198,240
1,784,160
13
Pemasangan Stop Kontak Ganda
16.00
bh
228,660
3,658,560
14
Pemasangan Stop Kontak AC
2.00
bh
318,480
636,960
15
Pemasangan AC split wall 2 PK
2.00 unit 6,540,000
13,080,000
16
Grounding (max 2 Ohm)
1,850,000
1,850,000 60,516,468
1.00 Sub Total I TOTAL
lot
780,869,096