5 0 316 KB
DAFTAR KUANTITAS DAN HARGA KEGIATAN : PEKERJAAN : LOKASI : TANJUNG
NO
URAIAN PEKERJAAN
C
GAZEBO (3 Unit)
I 2 3
PEKERJAAN PERSIAPAN Pengukuran & Pemasangan Bowplank Papan Nama Proyek
VOLUME
SAT ANALISA
HARGA SAT
JML. HARGA
JML. SUB TOTAL
31,308,949.10
30.00 1.00
m' Ls
2
37,780.05 1,133,401.50 350,000.00 350,000.00 1,483,401.50
II 1 2 3 4
PEK. RANGKA BAWAH Tongkat Ulin 5/10 2 m + Sunduk Galam dia. 10 cm 2 m terpasang Sloof Ulin 5/7 (ukur) Gelagar 4/6 (ukur) Ulin
0.29 54.00 0.15 0.09
m3 btg m3 m3
3 3 3
8,681,447.50 10,000.00 8,681,447.50 8,681,447.50
2,484,630.27 540,000.00 1,312,634.86 750,077.06
III 1 2 3 4
PEK. TIANG , LANTAI PAPAN Lantai papan ulin 2/18 Pas. Tiang Ulin 5/10 (ukur) Pas. Pagar Pas. Suai Tiang
17.28 0.16 0.21 0.02
m2 m3 m3 m3
6 4
162,443.05 9,195,890.00 7,920,000.00 7,920,000.00
2,807,015.90 1,434,558.84 1,675,080.00 166,320.00
IV 1 2 3 4 5 6
PEK. RANGKA KAP ATAP Kudakuda Atap lanan 5/10 & Gording 5/10 Rangka Atap Lanan Atap Genteng Metal List Plank 2x2/20 Pemuung/Nok Atap Metal Ring Balk 5/7 (ukur) Lanan
V 1
PEKERJAAN PENGECATAN Cat dasar + Cat kilap pada tiang, pagar, listplank dan suai Tiang
5,087,342.20
6,082,974.74 0.20 55.37 55.37 27.48 12.90 0.10
m2 m2 m3 m3 m' m3
7 8 9 11 10 4
4,185,588.00 59,274.05 123,234.87 177,424.50 66,536.64 9,195,890.00
822,719.18 3,282,134.55 6,823,785.87 4,875,625.26 858,322.59 926,945.71 17,589,533.16
34.90
m2 ls
12
30,539.25 1,065,697.49 1,065,697.49
RENCANA ANGGARAN BIAYA KEGIATAN PEKERJAAN
: :
LOKASI
: TANJUNG
NO.
DIMENSI
URAIAN PEKERJAAN P
A I 1
REHABILITASI RUANG KELAS PEKERJAAN PERSIAPAN Pengukuran dan pemasangan Bouwplank
2.50
II 1
PEK. RANGKA BAWAH Pancang Galam dia 10-12 pjg 2 m
4.00
1
Tongkat Ulin 5/10 - 2m + Sunduk
2 3 4
L
T
2.5
Kuant itas
SATU AN
10
m'
0.05 0.05
9 9
18 3.6
m3 m3
Pancang Galam dia. 10 cm - 2m Sloof Ulin 5/7 (ukur)
2.00 2.40
0.05
0.07
18 6
36 14.4
Gelagar 4/6 (ukur) Ulin
2.40
0.04
0.06
5
12
btg m3 m3
III PEK. KOLOM DAN LANTAI PAPAN 1 Lantai papan ulin 2/18 2 Pas. Tiang Ulin 5/10 (ukur)
2.40 2.60
2.40 0.05
0.1
4
3 4
9.40 0.50
0.05 0.07
0.05 0.05
3 4
3.76
4.30
2.29
Kasau Reeng
4.30 3.00
0.04 0.03
0.06 0.05
4 5
17.2 15
Gording
3.00
0.04
0.06
4
12
Suai angin
2.50
0.04
0.06
2
5
tarik gantung kaki
2.40 0.74 1.74
0.05 0.04 0.04
0.1 0.06 0.06
1 1 2
skor
0.54
0.04
0.06
2
2.40
0.05
0.07
4
2.60 2.20 0.45 9.16
0.05 0.05 0.05 0.20
0.1 0.05 0.05
4 8 40
IV PEK. RANGKA KAP ATAP DAN PLAFOND 1 Penutup atap metal 2 3
Listplank 2/20 ulin Kasau 4/6 dan Reeng 3/5 kayu lanan
4
Gording 4/6 dan suai angin 4/6 kayu galam
5
Kuda-kuda Lanan
6 7
Pemuung Metal Ring Balk 5/7 (ukur) Lanan
V 1
PEKERJAAN PENGECATAN Cat kilap pada tiang, pagar dan listplank
tiang pagar ver hor listplank
10.00 m'
36.00 Btg
0.10 0.03
Pas. Pagar Pas. Suai Tiang
VOUME
m2
9
2.00 0.40
Tongkat Sunduk
LUAS
9.00 9.00
m2 m3 m3 m3
5.76
m2 m2 m2
18.46 9.16
m3
m3 m3 m3 m3
9.6
m' m3
4.30
m2 m2
3.12 3.08 3.60 1.83
m2 m2
11.63
ANGGARAN BIAYA
VOUME m3
0.09 0.01 0.10 0.05 0.03
0.05 0.07 0.01
0.04 0.02 0.06 0.03 0.01 0.04 0.01 0.00 0.01 0.00 0.02 0.03
ANALISA HARGA SATUAN KEGIATAN PEKERJAAN LOKASI
: : TANJUNG 0 Uraian Pekerjaan
A 1
B Pembersihan Lokasi
0.100 0.050
2
Pengukuran & pemasangan bowplank / m'
0.0120 0.0200 0.0070 0.1000 0.1000 0.0100 0.0050
M³ Kg Lbr OH OH OH OH
Kayu Balok Paku Kayu papan Pekerja Tukang kayu Kepala tukang Mandor
1,320,000.00 19,800.00 1,320,000.00 53,240.00 58,712.50 73,920.00 73,920.00
1.100 6.000 5.000 15.000 1.500 0.250
m3 Kg HO HO HO HO
Balok Ulin Klas 1 Paku ulin Pekerja Tukang kayu Kepala tukang Mandor
6,600,000.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
1.100 3.000 6.000 20.000 2.000 3.000
m3 Kg HO HO HO HO
Balok Ulin Klas 1 Paku ulin Pekerja Tukang kayu Kepala tukang Mandor
6,600,000.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
1.100 3.000 6.000 20.000 2.000 3.000
m3 Kg HO HO HO HO
Kayu lanan Paku Pekerja Tukang kayu Kepala tukang Mandor
2,750,000.00 19,800.00 53,240.00 58,712.50 73,920.00 73,920.00
0.020 0.100 0.09 0.18 0.018 0.0045
m3 Kg HO HO HO HO
Papan Ulin Klas 1 Paku ulin Pekerja Tukang kayu Kepala tukang Mandor
7,150,000.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
1.1000 0.8000 15.0000 4.0000 12.0000 1.2000 0.2000
M³ Kg Kg OH OH OH OH
Kayu lanan Paku Besi strip Pekerja Tukang kayu Kepala tukang Mandor
2,750,000.00 19,800.00 8,250.00 53,240.00 58,712.50 73,920.00 73,920.00
0.0160 0.1500 0.1000 0.1000 0.0100 0.0050
M³ Kg OH OH OH OH
Kayu lanan Paku Pekerja Tukang kayu Kepala tukang Mandor
2,750,000.00 19,800.00 53,240.00 58,712.50 73,920.00 73,920.00
1.0500 0.2000 0.2000 0.1000 0.0100 0.0010
m2 Kg OH OH OH OH
Genteng metal Paku genteng metal Pekerja Tukang kayu Kepala tukang Mandor
3
4
5
6
7
8
9
1 m3 Pasang rangka bawah ( Ulin )
1 m3 Pasang rangka badan ( Ulin )
1 m3 Pasang rangka badan ( lanan )
1 m2 Pasang lantai papan Ulin ( 2 cm )
Pemasangan konstruksi kuda-kuda kayu lanan /
Pek. rangka atap genteng metal / m2
Pasang atap genteng metal / m2
Analisa/ Satuan
Harga Satuan (Rp) D 53,240.00 73,920.00
No.
C Oh Pekerja Oh Mandor
96,250.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
Upah Kerja (Rp) E 5,324.000 3,696.000 9,020.000
Harga Bahan (Rp) F
Jumlah G
9,020.00 15,840.00 396.00 9,240.00
5,324.00 5,871.25 739.20 369.60 12,304.05
266,200.00 880,687.50 110,880.00 18,480.00 1,276,247.50
319,440.00 1,174,250.00 147,840.00 221,760.00 1,863,290.00
319,440.00 1,174,250.00 147,840.00 221,760.00 1,863,290.00
4,791.60 10,568.25 1,330.56 332.64 17,023.05
212,960.00 704,550.00 88,704.00 14,784.00 1,020,998.00
5,324.00 5,871.25 739.20 369.60 12,304.05
10,648.00 5,871.25 739.20 73.92 17,332.37
25,476.00 7,260,000.00 145,200.00
37,780.05
7,405,200.00 7,260,000.00 72,600.00
8,681,447.50
7,332,600.00 3,025,000.00 59,400.00
9,195,890.00
3,084,400.00 143,000.00 2,420.00
4,947,690.00
145,420.00 3,025,000.00 15,840.00 123,750.00
162,443.05
3,164,590.00 44,000.00 2,970.00
4,185,588.00
46,970.00 101,062.50 4,840.00
59,274.05
105,902.50
123,234.87
ANALISA HARGA SATUAN KEGIATAN PEKERJAAN LOKASI
: : TANJUNG 0
No.
Uraian Pekerjaan
Analisa/ Satuan
A
B
C
10
11
12
Pemasangan atap nok genteng metal / m'
1 m2 Memasang listplank 2/20 cm kayu Ulin
Pengecetan bidang kayu baru / m2 ( 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup)
Harga Satuan (Rp) D
1.1000 0.0500 0.2500 0.1500 0.0150 0.0130
Lbr Kg OH OH OH OH
Pemuung genteng metal Paku genteng metal Pekerja Tukang kayu Kepala tukang Mandor
37,400.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
0.022 0.050 0.100 0.200 0.020 0.005
m3 Kg HO HO HO HO
Papan Ulin Klas 1 Paku Ulin Pekerja Tukang kayu Kepala tukang Mandor
7,150,000.00 24,200.00 53,240.00 58,712.50 73,920.00 73,920.00
0.2000 0.1500 0.1700 0.2600 0.0700 0.0900 0.0060 0.0025
Kg Kg Kg Kg OH OH OH OH
Cat meni Plamir Cat dasar Cat penutup 2 kali Pekerja Tukang cat Kepala tukang Mandor
23,100.00 18,700.00 18,700.00 39,600.00 53,240.00 58,712.50 73,920.00 73,920.00
Upah Kerja (Rp) E
Harga Bahan (Rp) F
Jumlah G
41,140.00 1,210.00 13,310.00 8,806.88 1,108.80 960.96 24,186.64
5,324.00 11,742.50 1,478.40 369.60 18,914.50
3,726.80 5,284.13 443.52 184.80 9,639.25
42,350.00 157,300.00 1,210.00
66,536.64
158,510.00 4,620.00 2,805.00 3,179.00 10,296.00
177,424.50
20,900.00
30,539.25
HARGA BAHAN BANGUNAN TAHUN 2010 KABUPATEN TABALONG
No
URAIAN
SATUAN
HSU
1
2
3
4
M3 M3 M3 M3 M3 M3 M3 Kg M3 Bh Set M3 M3 Bj Zak Bj Kg Kg M3 Ltr Btg M3 M3 M3 M3 Lbr m2 lbr Kg Kg Kg M2 M2 M2 M' M' M' M2 bh bh Kg Lbr M' M' bh kg kg kg kg kg Ltr Lmbr
77,000.00 66,000.00 71,500.00 49,500.00 44,000.00 176,000.00 77,000.00 10,010.00 220,000.00 165,000.00 110,000.00 38,500.00 33,000.00 2,200.00 66,000.00 550.00 13,750.00 17,600.00 1,320,000.00 22,000.00 22,000.00 2,750,000.00 3,025,000.00 6,600,000.00 7,150,000.00 134,200.00 96,250.00 37,400.00 24,200.00 19,800.00 24,200.00 57,750.00 60,500.00 91,300.00 5,270.83 1,370.42 15,285.42 165,000.00 99,000.00 16,500.00 8,250.00 60,500.00 71,500.00 22,000.00 66,000.00 5,500.00 19,250.00 39,600.00 18,700.00 18,700.00 23,100.00 4,400.00
1 BAHAN BANGUNAN 1 Batu Kali / Gunung 2 Koral Beton 3 Pasir Urug 4 Pasir Pasang 5 Pasir Beton 6 Batu Belah 23 7 Sirtu 8 Aspal 9 Kayu Bakar 10 Tempat Memasak Aspal 11 Alat Bantu 12 Timbunan Pilihan 13 Timbunan Biasa 14 Batapress 15 Semen PC 50 Kg 16 Batu bata 17 Besi beton 18 Kawat Beton 19 Kayu Begisting 20 Minyak Begisting 21 Kayu Galam dia 8-10 cm pjg 4m 22 Balok Lanan 23 Papan Lanan 24 Balok Ulin Klas 1 25 Papan Ulin Klas 1 26 Plywood tbl 9mm 27 Genteng Metal tbl 0,3 mm 28 Pemuung Metal 29 Paku Genteng Metal 30 Paku Biasa 31 Paku Ulin 32 Keramik 20x20 33 Keramik 30x30 34 Keramik 40x40 35 Pipa PVC 2" 36 Pipa PVC 3/4" 37 Pipa PVC 4" 38 Kaca Rayben tbl 5mm 39 Kunci Tanam 40 Engsel Pintu 41 Besi Siku 42 Kalsiboard 3 mm 43 Kalsiplank 44 List Plafond Gipsum 45 Closed Jongkok 46 Semen Warna 47 Cat Tembok 48 Cat Kilap 49 Cat Dasar 50 Dempul 51 Minyak Cat 52 Amplas
1
2
3
4
NO
UPAH
SATUAN
HSU
Orang / hari Orang / hari Orang / hari Orang / hari Orang / hari Orang / hari Orang / hari
73,920.00 73,920.00 58,712.50 43,890.00 53,240.00 140,800.00 70,400.00
2 1 2 3 4 5 6 7
TENAGA KERJA Mandor Kepala Tukang Tukang Pembantu Tukang Pekerja Operator Pembantu Operator