RENCANA ANGGARAN BIAYA (RAB) TAMAN PENDIDIKAN AL-QUR’AN AL-HIKAMAH DUSUN BUNTEL DESA KERAS KECAMATAN DIWEK KABUPATEN JOMBANG TAHUN ANGGARAN 2023 Bidang : Sub Bidang : Kegiatan : Waktu : Pelaksanaan
Pelaksanaan Pembanguna Pekerjaan Umum Dan Penataan Ruang Pembangunan Taman Pendidikan Al-Qura’an TPQ AL-HIKMAH uk. 5 m x 11 m. 1 unit 30 (Tiga puluh hari kalender)
Rincian : Pendanaan NO. I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U R A I A N BAHAN
VOLUME
HARGA SATUAN (Rp)
JUMLAH (Rp)
Semen PC 50 Kg Semen Putih Pasir Beton Pasir Urug Batu Pecah 2/3 Cm Batako Uk. 7 x 15 x 30 Cm Keramik 20 x 20 cm Kayu Belian 9/9-400 Cm Kayu Belian 8/8-400 Cm Kayu Belian 4/8 - 400 Cm Kayu Klas I 8/8 - 400 Cm Kayu Klas I 5/10 - 400 Cm Kayu Klas II 8/12 - 400 Cm Kayu Klas II 6/12 - 400 Cm Kayu Klas II 5/10 - 400 Cm Kayu Klas II 5/7 - 400 Cm Kayu Klas II 4/6 - 400 Cm Kayu Klas II 2/3 - 400 Cm Papan Mall Klas III 2/18 4m Papan Klas I Ketam 2/15 -4m Alas Kayu Hutan 4/8 - 4 m Amplas Dempul Cat Tembok Cat Kilat/Cat Minyak Cat Dasar Thinner Residu/Terr Kawat Simpai Besi Plat Beugel Baut Bangunan Paku Campuran Paku Atap
50 1 14 7 3
Zak Kg M³ M³ M³
90,000 10,000 160,000 120,000 500,000
4,500,000.00 10,000.00 2,240,000.00 840,000.00 1,500,000.00
1000
Bh
2,800
2,800,000.00
12
Kotak 70,000
840,000.00
25 10 12 39 4 61
Btg Btg Btg Btg Btg Btg
205,000 215,000 103,000 81,000 75,000 157,000
5,125,000.00 2,150,000.00 1,236,000.00 3,159,000.00 300,000.00 9,577,000.00
18
Btg
150,000
2,700,000.00
8
Btg
66,000
528,000.00
65 65 50 9
Btg Btg Btg Kpg
32,000 24,000 15,000 21,000
2,080,000.00 1,560,000.00 750,000.00 189,000.00
30
Kpg
140,000
4,200,000.00
12
Btg
46,000
552,000.00
15 24 50 10 10 4 10 50 25 100 51 10
Lbr Kg Kg Kg Kg Ltr Ltr Kg Bh bh Kg Kg
5,000 15,000 30,000 75,000 25,000 27,000 28,000 20,000 20,000 5,000 22,000 25,000
75,000.00 360,000.00 1,500,000.00 750,000.00 250,000.00 108,000.00 280,000.00 1,000,000.00 500,000.00 500,000.00 1,122,000.00 250,000.00
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 51 52 53 54 55
Paku Triplek Kunci Pintu Engsel Pintu Engsel Jendela Slot Jendela Kait Angin Atap Seng Gelombang Warna Seng Polos BJLS 0.30 Pintu Panel Kayu Belian Pintu Panel Kayu Klas I Jendela Kaca Jungkit Ventilasi Triplek 3 mm Kloset Jongkok Kran Air Floordrain Pipa PVC 4" Pipa PVC 2" Pipa Galvanis 2" Lem Pralon Talang Air Fiber lengkap
5 2 5 10 10 32 100
Kg set set set set set Lbr
10,000 60,000 40,000 50,000 10,000 10,000 80,000
50,000.00 120,000.00 200,000.00 500,000.00 100,000.00 320,000.00 8,000,000.00
19 1 1 10 10 10 1 2 2 2 4 1 1 10
Lbr Bh Bh Bh Bh Bh Bh Bh Bh Btg Btg Btg Bh M1
60,000 1,500,000 1,000,000 350,000 250,000 47,000 259,000 20,000 35,000 190,000 85,000 350,000 10,000 17,000
1,140,000.00 1,500,000.00 1,000,000.00 3,500,000.00 2,500,000.00 470,000.00 259,000.00 40,000.00 70,000.00 380,000.00 340,000.00 350,000.00 10,000.00 170,000.00
74,550,000.00
II. 1 2 3
UPAH Pekerja Tukang Kepala Tukang
J U M L A H (Rp.) Total Anggaran
90 30 30
HOK HOK HOK
85,000.00 120,000.00 140,000.00
HOK
15,450,000.00
7,650,000.00 3,600,000.00 4,200,000.00
90,000,000.00