ANALISA HARGA SATUAN No.



A.1



Uraian



Unit



Qt'y



Harga SatuanTotal Harga (Rp) (Rp)



1M3 Galian Tanah Pekerja : 1 Mandor 2 Pekerja



Org Org



0.025 0.75



100,000 80,000



2,500 60,000 62,500



Peralatan : 1 Alat Bantu



m2



1



2,500



2,500



Sub Total 1/4.A.1



1M3 Urungan Tanah Kembali Pekerja : 1/4 Analisa A.II



@



0.25



62,500



Sub Total A.18



1M3 Pasir Urug Pekerja : 1 Mandor 2 Pekerja



15,625



0.01 0.3



100,000 80,000



1,000 24,000 25,000



Material : 1 Pasir Urug



m3



1.2



70,000



84,000 84,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500 110,500



1M3 Timbunan Tanah Pekerja : 1 Mandor 2 Pekerja



Org Org



0.01 0.3



100,000 80,000



1,000 24,000 25,000



Material : 1 Tanah Timbun



m3



1.2



50,000



60,000 60,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Sub Total G.31.h



15,625 15,625



Org Org



Sub Total A.18.a



65,000



86,500



1M3 Pasangan Batu Kali 1 : 4 Material : 1 Batu Kali 2 Semen PC 3 Pasir Pasang



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Peralatan : 1 Alat Bantu



Bh Zak M3



1.2 3.87 0.49



165,500 48,000 85,000



198,600 185,760 41,650 426,010



Org Org Org Org



0.18 0.12 1.2 3.6



100,000 120,000 100,000 80,000



18,000 14,400 120,000 288,000 440,400



m2



1



1,500



1,500



Sub Total



867,910



G.32.h



1M2 Pasangan Batu Bata Material : 1 Batu Bata 2 Semen PC 3 pasir Pasang



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Peralatan : 1 Alat Bantu



Bh Zak M3



70 0.287 0.043



550 48,000 85,000



38,500 13,776 3,655 55,931



Org Org Org Org



0.015 0.01 0.1 0.32



100,000 120,000 100,000 80,000



1,500 1,200 10,000 25,600 38,300



m2



1



1,500



1,500



Sub Total G.50.q



1M2 Plesteran 1:4 t =15mm Material : 1 Semen PC 2 Pasir Pasang



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Peralatan : 1 Alat Bantu



Zak M3



0.13 0.02



48,000 85,000



6,240 1,700 7,940



Org Org Org Org



0.01 0.015 0.15 0.2



100,000 120,000 100,000 80,000



1,000 1,800 15,000 16,000 33,800



m2



1



1,500



1,500



Sub Total G.50.h



43,240



1M2 Plesteran 1:2 t =15mm Material : 1 Semen PC 2 Pasir Pasang



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Peralatan : 1 Alat Bantu



Zak M3



0.13 0.02



48,000 85,000



6,240 1,700 7,940



Org Org Org Org



0.015 0.015 0.15 0.3



100,000 120,000 100,000 80,000



1,500 1,800 15,000 24,000 42,300



m2



1



1,500



1,500



Sub Total Anl.Supl. V.a



95,731



51,740



Suplemen V untuk Beton Bertulang 1:2:3 Balok Induk 20 x 45 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total Tiap-tiap 1M3 Beton diperlukan 170 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.7 Kg



1,572,500



1,572,500



2,673,250



c. 1M3 Beton diperlukan 7 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.152 4



3,600,000 13,000



547,200 52,000 599,200



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 462,000



1,500



1,500



Untuk 7 M2 Peralatan : 1 Alat Bantu



7 m2



1



Total d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



1,062,700



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total Sub Total ( a+b+c+d)



Anl.Supl V.b



241,500 5,096,835



Suplemen V untuk Beton Bertulang 1:2:3 Balok 15 x 15 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total Tiap-tiap 1M3 Beton diperlukan 140 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.4 Kg



1,572,500



1,572,500



2,201,500



c. 1M3 Beton diperlukan 6 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.15 4



3,600,000 13,000



540,000 52,000 592,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 396,000



1,500



1,500



Untuk 6 M2 Peralatan : 1 Alat Bantu



d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



6 m2



1



Total



989,500



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total



241,500 Sub Total ( a+b+c+d)



Anl.Supl. V.c



4,551,885



Suplemen V untuk Beton Bertulang 1:2:3 Plat Lantai t = 10 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



upah Peralatan : 1 Alat Bantu



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



m2



Total Tiap-tiap 1M3 Beton diperlukan 147 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.47 Kg



1,572,500



1,572,500



2,311,575



c. 1M3 Beton diperlukan 5 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.1 4



3,600,000 13,000



360,000 52,000 412,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 330,000



1,500



1,500



Untuk 5 M2 Peralatan : 1 Alat Bantu



d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



5 m2



1



Total



743,500



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total



241,500 Sub Total ( a+b+c+d)



Anl.Supl v.d



4,415,960



Suplemen V Untuk Beton Bertulang 1:2:3 Kolom Uk.30 x 30 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total



1,572,500



Tiap-tiap 1M3 Beton diperlukan 170 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.7 Kg



1,572,500



2,673,250



c. 1M3 Beton diperlukan 7.5 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.15 4



3,600,000 13,000



540,000 52,000 592,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 495,000



1,500



1,500



Untuk 7.5 M2 Peralatan : 1 Alat Bantu



7.5 m2



1



Total d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Sub Total ( a+b+c+d)



241,500 5,122,635



Total



Anl.Supl v.e



1,088,500



Suplemen V Untuk Beton Bertulang 1:2:3 Kolom Praktis Uk.15 x 15 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total Tiap-tiap 1M3 Beton diperlukan140 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.4 Kg



1,572,500



1,572,500



2,201,500



3,600,000 13,000



540,000 52,000 592,000



c. 1M3 Beton diperlukan 6 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.15 4



Pekerja : 1 Tukang 2 Pekerja Untuk 6 M2 Peralatan : 1 Alat Bantu



d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



Anl.Supl v.f



Org Org



0.5 0.2



6 m2



1



100,000 80,000 66,000



50,000 16,000 66,000 396,000



1,500



1,500



Total



989,500



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total Sub Total ( a+b+c+d)



241,500 4,551,885



Suplemen V Untuk Beton Bertulang 1:2:3 Sloof 20 x 30 cm a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total Tiap-tiap 1M3 Beton diperlukan 190 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.9 Kg



1,572,500



1,572,500



2,987,750



c. 1M3 Beton diperlukan 5,7 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.15 4



3,600,000 13,000



540,000 52,000 592,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 376,200



1,500



1,500



Untuk 5,7 M2 Peralatan : 1 Alat Bantu



5.7 m2



1



Total



969,700



d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total



241,500 Sub Total ( a+b+c+d)



Anl.Supl v.g



5,318,335



Suplemen V Untuk Beton Bertulang 1:2:3 Pondasi Tapak a. 1M3 Beton Cor 1:2:3 Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



Zak M3 M3



6.8 0.83 0.54



48,000 199,500 85,000



326,400 165,585 45,900 537,885



Pekerja : 1 Tukang 2 Pekerja



Org Org



1 6



100,000 80,000



100,000 480,000 580,000



Peralatan : 1 Alat Bantu



m2



1



1,500



1,500



Total



1,119,385



b. Mengerjakan 100 Kg Besi .Memotong / Memasang Untuk Beton Bertulang Material : 1 Besi Beton 2 Kawat Beton



Kg Kg



110 2



8,500 13,000



935,000 26,000 961,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



5 9



100,000 80,000



0.5



1,220,000



500,000 720,000 1,220,000 610,000



1



1,500



1,500



upah Peralatan : 1 Alat Bantu



m2



Total Tiap-tiap 1M3 Beton diperlukan 118 Kg Besi Beton maka : 1 M3 Beton diperlukan 1.18 Kg



1,572,500



1,572,500



1,855,550



c. 1M3 Beton diperlukan 5,7 M2 Papan Bekisting 1M2 Upah Cetakan Beton : Material : 1 Kayu Bekisting 2 Paku



M3 Kg



0.15 4



3,600,000 13,000



540,000 52,000 592,000



Pekerja : 1 Tukang 2 Pekerja



Org Org



0.5 0.2



100,000 80,000 66,000



50,000 16,000 66,000 376,200



1,500



1,500



Untuk 5,7 M2 Peralatan : 1 Alat Bantu



d. 1M3 Membongkar Cetakan Pekerja : 1 Pekerja



Peralatan : 1 Alat Bantu



5.7 m2



1



Total



969,700



Org



3



80,000



240,000 240,000



m2



1



1,500



1,500



Total Sub Total ( a+b+c+d)



241,500 4,186,135



G.41



1M3 Beton Cor 1:3:5 t = 10 cm Material : 1 Semen PC 2 Batu Kerikil (A) 3 Pasir Pasang



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Peralatan : 1 Alat Bantu



Zak M3 M3



5.2955 1 0.5



48,000 199,500 85,000



254,184 199,500 42,500 496,184



Org Org Org Org



0.5 0.05 0.3 6



100,000 120,000 100,000 80,000



50,000 6,000 30,000 480,000 566,000



m2



1



1,500



1,500



Total G.72.a



1M2 Lantai Keramik Uk. 20 x 20 cm



1 2 3 4



Material : Keramik uk.20 x20 cm Semen PC semen Putih Pasir Pasang



Bh Zak M3 M3



25 0.1419 0.002 0.023



2,800 48,000 100,000 85,000



70,000 6,811 200 1,955 78,966



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Org Org Org Org



0.25 0.025 0.025 0.5



100,000 120,000 100,000 80,000



25,000 3,000 2,500 40,000 70,500



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Total G.72.b



150,966



1M2 Dinding Keramik Uk. 20 x 25 cm



1 2 3 4



Material : Keramik uk.20 x25 cm Semen PC semen Putih Pasir Pasang



Bh Zak M3 M3



20 0.1419 0.002 0.023



4,000 48,000 100,000 85,000



80,000 6,811 200 1,955 88,966



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Org Org Org Org



0.35 0.035 0.035 0.7



100,000 120,000 100,000 80,000



35,000 4,200 3,500 56,000 98,700



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Total G.72.c



1,063,684



189,166



1M2 Lantai Keramik Uk. 40 x 40 cm



1 2 3 4



Material : Keramik uk.40 x40 cm KW 1 Semen PC semen Putih Pasir Pasang



Bh Zak M3 M3



6.25 0.1419 0.002 0.023



16,000 48,000 100,000 85,000



100,000 6,811 200 1,955 108,966



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Org Org Org Org



0.25 0.025 0.025 0.5



100,000 120,000 100,000 80,000



25,000 3,000 2,500 40,000 70,500



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Total



180,966



G.72.d



1M2 Dinding Keramik Uk. 25 x 40 cm



1 2 3 4



Material : Keramik uk.25 x40cm Semen PC semen Putih Pasir Pasang



Bh Zak M3 M3



10 0.1419 0.002 0.023



9,000 48,000 45,000 85,000



90,000 6,811 90 1,955 98,856



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Org Org Org Org



0.35 0.035 0.035 0.7



100,000 120,000 100,000 80,000



35,000 4,200 3,500 56,000 98,700



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Total G.72.e



1M Plint Keramik Uk. 10 x 40 cm



1 2 3 4



Material : Keramik uk.40 x40 cm Semen PC semen Putih Pasir Pasang



m2 Zak M3 M3



0.23 0.035 0.003 0.003



100,000 11,300 100,000 85,000



23,000 396 300 255 23,951



1 2 3 4



Pekerja : Tukang Kepala tukang Mandor Pekerja



Org Org Org Org



0.03 0.003 0.003 0.06



100,000 120,000 100,000 80,000



3,000 360 300 4,800 8,460



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Total Anl.Taksir B.I



33,911



1 Unit : Kosen, Daun Pintu Type P1 ( 80 x 200 )



1 2 4 5



Material : Kayu Meranti Cat Kayu Kunci Engsel



M3 M2 Bh Psg



0.11665 4.715 1 3



9,800,000 50,000 150,000 45,000



1,143,170 235,750 150,000 135,000 1,663,920



1 2 2 3



Pekerja : Kepala Tukang Tukang Kayu Mandor Pekerja



Org Org Org Org



1.072 10.2 0.1175 2.373



120,000 100,000 100,000 80,000



128,640 1,020,000 11,750 189,840 1,350,230



m2



1



1,500



1,500



Peralatan : 1 Alat Bantu



Sub Total Anl.Taksir B.II



199,056



3,015,650



1 Unit Jendela NAKO Material : 1 Kaca Polos 5mm + Kerangka + Jerejak



1 2 2 3



Pekerja : Kepala Tukang Tukang Kayu Mandor Pekerja



Peralatan : 1 Alat Bantu Sub Total



Set



1



0 0



Org Org Org Org



0.0384 0.384 0.0064 0.096



120,000 100,000 100,000 80,000



4,608 38,400 640 7,680 51,328



m2



1



1,500



1,500 52,828



K.23.a



100 M2 mengecat



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Cat Pekerja



Upah untuk 1m2 = Cat Tembok : Material : 1 Cat Danashield ICI 2 Dempul 3 Kuas 4 Kertas Pasir Peralatan : 1 Alat Bantu



org org org org 0.01



0.05 0.3 6 5 x



100,000 120,000 100,000 80,000 1,041,000



Kg Kg Bh Lbr



0.425 0.15 0.01 0.2



25,000 10,000 20,000 2,000



10,625 1,500 200 400 12,725



Unit



1



1,000



1,000



Sub Total K.23.b



Material : Cat Kilat Dempul Kayu Kuas Tinner Kertas Pasir



Kg Kg Bh Lbr



0.425 0.15 0.01 0.15 0.2



50,000 20,000 20,000 15,000 2,000



21,250 3,000 200 2,250 400 27,100 10,410



Unit



1



1,000



1,000



Upah Peralatan : 1 Alat Bantu



Sub Total



Pekerja : Mandor Tukang Kepala Tukang Pekerja



org org org org



0.024 0.055 0.035 0.14



100,000 100,000 120,000 80,000



2,400 5,500 4,200 11,200 23,300



Material : 1 Lampu Downlight 4" + Accecories



Unit



1



130,000



130,000 130,000



Peralatan : 1 Alat Bantu



unit



1



1,500



1,500



Sub Total



154,800



1 Unit Titik Instalasi Cahaya & Stop Kontak + Upah



1 2 3 4



Pekerja : Mandor Tukang Kepala Tukang Pekerja



org org org org



0.022 0.025 0.02 0.1



100,000 100,000 120,000 80,000



2,200 2,500 2,400 8,000 15,100



1 2 3 4



Material : Istalasi Kabel NYM 2 x 2,5 mm2 Pipa Listrik Tee Doos Klem Pipa



M' M' Bh Bh



14 14 1 3



7,000 2,000 1,500 200



98,000 28,000 1,500 600 128,100



Llot



1



1,500



1,500 1,500



Peralatan : 1 Isolasi,Fisher & Obeng



Sub Total Anl.Taksir E.III



38,510



1 Unit Lampu Downlight 4" 18 Watt



1 2 3 4



Anl.TaksirE.II



24,135



Cat Kilat :



1 2 3 4 5



Anl.Taksir E.I



5,000 36,000 600,000 400,000 1,041,000 10,410



144,700



1 Unit Saklar Tunggal Pekerja : 1 Mandor 2 Kepala Tukang



org org



0.022 0.02



100,000 120,000



2,200 2,400



3 Tukang 4 Pekerja



org org



0.025 0.1057



100,000 80,000



2,500 8,456 15,556



Material : 1 Saklar Tunggal Panasonik 2 Plat Lobang Merk Panasonik 3 Inbow Doos Saklar Peralatan : 1 Fisher & Obeng



Bh Bh Bh



1 1 1



500 7,000 3,500



500 7,000 3,500 11,000



unit



1



1,500



1,500



Sub Total Anl.Taksir E.IV



1 Unit Saklar Ganda



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Material : 1 Saklar Ganda Merk Panasonik 2 Plat Lobang Merk Panasonik 3 Inbow Doos Saklar Peralatan : 1 Fisher & Obeng



org org org org



0.022 0.02 0.025 0.1057



100,000 120,000 100,000 80,000



2,200 2,400 2,500 8,456 15,556



Bh Bh Bh



1 1 1



35,000 7,000 3,500



35,000 7,000 3,500 45,500



unit



1



1,500



1,500



Sub Total Anl.Taksir E.V



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Material : 1 Saklar Triple Merk Panasonik 2 Plat Lobang Merk Panasonik 3 Inbow Doos Saklar Peralatan : 1 Fisher & Obeng



org org org org



0.022 0.02 0.025 0.1057



100,000 120,000 100,000 80,000



2,200 2,400 2,500 8,456 15,556



Bh Bh Bh



1 1 1



50,000 7,000 3,500



50,000 7,000 3,500 60,500



unit



1



1,500



1,500



Sub Total 1 Unit Stop Kontak Pekerja : 1 Mandor 2 Kepala Tukang 3 Tukang 4 Pekerja Material : 1 Stop Kontak Daya Merk Panasonik 2 Inbow Doos Peralatan : 1 Fisher & Obeng



0.022 0.02 0.025 0.1057



100,000 120,000 100,000 80,000



2,200 2,400 2,500 8,456 15,556



Bh Bh



1 1



25,000 3,500



25,000 3,500 28,500



unit



1



1,500



1,500 45,556



1 M2 Membongkar Dinding



1 2 3 4



Pekerja : Mandor Kepala Tukang Tukang Pekerja



Peralatan : 1 Alat Bantu



org org org org



0.01 0.06 0.06 0.2



100,000 120,000 100,000 80,000



1,000 7,200 6,000 16,000 30,200



unit



1



1,000



1,000



Sub Total Anl.Taksir A.I



77,556



org org org org



Sub Total Anl.L.11



62,556



1 Unit Saklar Triple



1 2 3 4



Anl.Taksir E.VI



28,056



1M2 Freme cailing concealed Pekerja : 1 Tukang



org



0.1



100,000



31,200



10,000



2 Pekerja



org



0.3



80,000



24,000 34,000



Material : 1 Furing channel 2 Baut Ramset



Lbr Bh



1.84 0.62



17,300 900



31,832 558 32,390



Peralatan : 1 Fisher & Obeng



unit



1



1,500



1,500



Sub Total Anl.Taksir A.II



67,890



1M2 Flat Gypsum Board 9 mm Pekerja : 1 Tukang 2 Pekerja



org org



0.1 0.3



100,000 80,000



10,000 24,000 34,000



Material : 1 Gypsum Board 9 mm 2 Freme cailing concealed Dempul Gypsum Screw Paper Tape Kertas Pasir



Lbr m2 Kg Bh Rol Lbr



0.35 1 0.19 11 0.02 0.07



54,000 67,890 11,300 500 62,800 2,000



18,900 67,890 2,147 5,500 1,256 140 95,833



Peralatan : 1 Fisher & Obeng



unit



1



1,500



1,500



Sub Total



131,333



DAFTAR HARGA SATUAN BAHAN & UPAH UPAH NO.



1 2 3 4



URAIAN



Pekerja Tukang Kepala Tukang Mandor



SATUAN HARGA SATUAN (Rp) Hari Hari Hari Hari



80,000 100,000 120,000 100,000



BAHAN NO.



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32



URAIAN



Tanah Timbun Batu Bata Semen PC Semen Putih Pasir Urug Pasir Pasang Kapur Batu Kali 10 - 15 cm Batu Kerikil (A) Baut Ramset Besi Beton Besi Strip Kawat Beton Kayu Meranti Batu Kayu Bekisting Keramik Uk. 20 x 20 cm Keramik Uk. 20 x 25 cm Keramik Uk. 25 x 40 cm Keramik Uk. 40 x 40 cm KW1 Paper Tape Paku Paku Seng Paku Skrup Dempul Gypsum Furing channel Gypsum Board 9 mm Kaca Nako 5 mm + Kerangka + Jerejak Ampelas Kain Kasa Cat Tembok Danashield Cat Kilat Kuas 4"



SATUAN HARGA SATUAN (Rp)



M3 Bh Zak Zak M3 M3 Kg M3 M3 Bh Kg Bh Kg M3 M3 Bh Bh Bh Bh Rol Kg Bh Kg Kg M' Lbr Unit lbr M' Kg Kg Bh



50,000 550 48,000 100,000 70,000 85,000 1,500 165,500 199,500 900 8,500 8,500 13,000 9,800,000 3,600,000 2,800 4,000 9,000 16,000 62,800 13,000 100 13,000 11,300 17,300 54,000 370,000 2,000 125 25,000 50,000 20,000



33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50



Dempul Tembok Tinner Dempul Kayu Lampu Downlight 4" Lem Perekat Screw Sakelar Sekunder Panasonik Sakelar Triple Panasonik Inbow doos Plat Lobang Merk Panasonik Stop kontak Daya Panasonik Inbow doos saklar Tee doos Klem pipa Kabel NYK 2 x 2,5 mm Pitting Engsel 4" Kunci Daun Pintu Luar



Kg Liter Kg unit Kg Bh Bh Bh Bh Bh Bh Bh Bh Bh M' Bh Bh. Bh.



10,000 15,000 20,000 130,000 30,000 500 35,000 50,000 1,500 7,000 25,000 3,500 1,500 200 3,500 20,000 45,000 150,000



Suplemen V untuk Beton Bertulang 1:2:3 Kolom & Sloof Uk.20 x 30 cm



Tiap-tiap 1M3 Beton diperlukan 130 Kg Besi Beton maka : 1.3



Suplemen V untuk Beton Bertulang 1:2:3 Kolom15 x 15 cm



Tiap-tiap 1M3 Beton diperlukan 225 Kg Besi Beton maka : 2.25



PAH



A SATUAN



esi Beton maka :



esi Beton maka :



RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN PEMBANGUNAN HOTEL NABASA LOKASI BALIGE URAIAN PEKERJAAN



NO. 1



2



ANALISA 3



VOLUME



SAT.



4



HARGA SATUAN



JUMLAH HARGA



(Rp) 5



(Rp) 6



PEKERJAAN PERSIAPAN / PENDAHULUAN :



A. 1 2 3 4



Pek.Mobilisasi-demobilisasi pekerja & peralatan Pembersihan Lokasi Gudang Los kerja dan bahan Perancah



5 Pek.Penyediaan Listrik & Air Kerja



LS. LS. LS. LS.



1 1 1 770



LS.



Set Set Unit Btg



3,000,000 3,000,000 2,500,000 25,000



3,000,000 3,000,000 2,500,000 19,250,000



1 Unit



1,200,000



1,200,000



sub. Total



28,950,000



PEKERJAAN TANAH/ TIMBUNAN/GALIAN/ URUGAN :



B. 1 2 4 5 7 8



Pengukuran dan Pas. Bouwplank Timbunan Tanah h = 126 cm Naik Dari Jalan Galian Pondasi Tapak ( Uk.100 x100 cm) h= 125 cm Galian Pondasi Menerus (Uk.50x50 cm) h = 60 cm Urungan tanah Galian Kembali Urungan Pasir



dihitung A.18.a A.1 A.1 1/4.A.1



129.5 192.55 17.5 30.735 0.895 0.7



m' m3 m3 m3 m3 m3



50,000 86,500 65,000 65,000 15,625



sub. Total



6,475,000 16,655,575 1,137,500 1,997,775 13,984



26,279,834



PEKERJAAN STRUKTUR LANTAI DASAR



C.



I. PEKERJAAN PONDASI & SLOOF 1 2 3 5 6 7 8 9 10 11 12 13



Pondasi Tangga BB. K 225 Pondasi Tapak ( Uk.100 x100 cm) h= 125 cm BB. K 225 Pondasi Bor Pile ( Diameter 25 cm) h= 5 m BB. K 225 Pondasi Menerus ( Uk.40x40cm) h 40 cm cor 1:3:5 Sloof (uk. 30x40cm) BB. K225 Sloof (uk. 15x20cm) BB. K225 Lantai kerja t =10 cm cor 1:3:5 Pondasi Tapak Batu Kali t =10 cm Pondasi Setempat & menerus Lantai kerja t =6 cm cor 1:3:5 di bawah keramik Pasir urug bawah pondasi tapak, t= 5 cm Pasir urug bawah Pondasi Menerus t= 5 cm Pasir urug di bawah Keramik t= 10 cm



Anl.Supl Anl.Supl Anl.Supl G.41 Anl.Supl



v.f v.f v.f v.f



G.41 G.31.h G.41 A.18 A.18 A.18



0.86 15 5.43 31 14.6 1.35 13.5 14 11.22 0.7 8.316 18.7



m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3



4,591,560 4,591,560 4,591,560 1,063,684 5,318,335 5,318,335 1,063,684 867,910 1,063,684 110,500 110,500 110,500 sub. Total



3,948,742 68,873,400 24,932,171 32,974,204 77,647,691 7,179,752 14,359,734 12,150,740 11,934,534 77,350 918,918 2,066,350 257,063,586



II. PEKERJAAN KOLOM 1 Kolom lantai dasar ( Uk.0.35x 0.35 cm ) BB. K 225 2 Kolom Praktis lantai dasar( Uk.15 x 15 cm ) BB. K 225



Anl.Supl v.f



6.85 m3 1.62 m3



4,591,560 4,591,560 sub. Total



31,452,186 7,438,327 38,890,513



III. PEKERJAAN PASANGAN/ PLESTERAN : 1 Pas. Dinding 1/2 bata camp. 1:4 sampai titik Nol 2 Pas. Dinding 1/2 bata camp. 1:4 Lantai dasar 3 Pas. Dinding 1/2 bata camp. 1:4 untuk Dinding Tembok Samping Tinggi 2 & 2,5 M 4 Pas. Dinding 1/2 bata camp. 1:4 untuk Tiang Depan & Belakang 5 Plesteran dinding camp. 1:4 Sampai Titik Nol 6 Plesteran dinding camp. 1:4 Lantai Dasar 7 Plesteran dinding camp. 1:4 Untuk Dinding Tembok Samping Tinggi 2 & 2,5 M 8 Acian dinding camp. 1:4 Untuk Tiang Depan & Belakang 9 Acian dinding camp. 1:4 Sampai Titik Nol 10 Plesteran dinding camp. 1:4 Lantai Dasar 11 Acian dinding camp. 1:4 Untuk Dinding Tembok Samping Tinggi 2 & 2,5 M 12 Acian dinding camp. 1:4 Untuk Tiang Depan & Belakang



0 0 0 0



22.95 m2 366 m2 100 m2



84,106 84,106 84,106



1,930,233 30,782,796 8,410,600



39 45.9 732 200



m2 m2 m2 m2



84,106 33,940 33,940 33,940



3,280,134 1,557,846 24,844,080 6,788,000



78 45.9 732 200



m2 m2 m2 m2



33,940 28,520 28,520 28,520



2,647,320 1,309,068 20,876,640 5,704,000



78 m2



28,520 sub. Total



2,224,560 110,355,277



IV. PEKERJAAN FINISHING LANTAI/ DINDING : 1 2 3 6 7 8 9



Lantai keramik K. Mandi Uk. 20x20 cm Lantai keramik Uk. 40x40 cm Keramik Dinding K. Mandi Uk. 20x25 cm t = 2 m Plint Keramik Uk.10 x 40 cm Anti Slip Tangga Dalam Anti Slip anak Tangga Luar Lantai Keramik Tangga Dalam Uk.30 x30 cm



G. 72 a 0 0 0 Dihitung Dihitung 0



9.8 177.2 16 140 216 72 11.4



m2 m2 m2 m' Bh Bh m2



78,966 108,966 88,966 300 15,000 15,000 1,955



sub. Total



773,869 19,308,811 1,423,459 42,000 3,240,000 1,080,000 22,287



25,890,426



V. PEKERJAAN KOZEN PINTU/ JENDELA & TERALI : 1 2 3 4 5



Kozen/pintu kaca double depan dan belakang Kozen/ pintu kamar mandi Kozen /Pintu kaca + Accecories Kaca depan untuk lobby hotel Handrail tangga stainless stell



dihitung dihitung dihitung dihitung



2 4 2 19.24 30



Unit Unit unit m2 m'



11,500,000 11,000,000 2,950,000 450,000 600,000



sub. Total VI. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18



PEKERJAAN SANITAIR : Closed Duduk Merk TOTO Kran air 1/2 " Kran panjang 1/2 " Pipa 1/2 " Pipa PVC AW 3 " Pipa PVC AW 4 " Elbow 1/2 " Elbow 3 " Elbow 4 " Tee 1/2 " Tee 3" Tee 4 " Sokket 1/2" Dop Stop 1/2 " Tempat sabun bathup Floor drain Septiptank Uk.( 2,5 x 1,5 x 1,5 )



dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung



2 3 3 135 123 75 15 9 9 6 9 6 6 2 3 3 2 3



bh bh bh m' m' m' bh bh bh bh bh bh bh bh bh unit bh Unit



23,000,000 44,000,000 5,900,000 8,658,000 18,000,000



99,558,000



1,750,000 60,000 290,000 14,000 27,000 25,000 5,000 8,000 10,000 6,500 10,000 12,500 5,000 15,000 45,000 650,000 35,000 3,000,000



3,500,000 180,000 870,000 1,890,000 3,321,000 1,875,000 75,000 72,000 90,000 39,000 90,000 75,000 30,000 30,000 135,000 1,950,000 70,000 9,000,000



sub. Total



23,292,000



24,135 24,135



8,833,410 4,440,840



sub. Total



13,274,250



VII. PEKERJAAN FINISHING CAT : 1 Cat dinding tembok 3 x cat 2 Cat Plafond 3 x cat



K.23 a K 23 a



366 m2 184 m2



VIII. PEKERJAAN PLAFOND 1 Pas. Plafond gypsum 9 mm + Furing 3 mm 2 Profil Gypsum 15 cm



0 dihitung



184 m2 25 m1



67,890 9,000



12,491,760 225,000



sub. Total



12,716,760



4,200



193,200



15,556 15,556 8,456 98,000 98,000 3,000,000



186,672 46,668 101,472 4,508,000 1,176,000 9,000,000



sub. Total



15,212,012



4,591,560 4,591,560 4,591,560 4,591,560 4,591,560



45,915,600 3,214,092 82,648,080 9,183,120 82,648,080



IX. PEKERJAAN MEKANIKAL/ELEKTRIKAL (ME) 1 Lampu Downlight 4 " ( Trim Horizontal 1 x 18 watt )



0



46 ttk



2 Saklar tunggal Merk Panasonik 3 Saklar Triple Merk Panasonik 4 kontak Merk Panasonik 5 Stop Instalasi Penerangan 6 Instalasi Stop kontak 7 Panel Box + accesories



0 0 0 0



12 ttk 3 12 ttk 46 ttk 12 ttk 3 unit



0 dihitung



PEKERJAAN STRUKTUR LANTAI I



D.



I. PEKERJAAN KOLOM & BALOK 1 2 3 4 5



Kolom ( Uk.35 x 60 cm ) BB. K 225 Kolom Praktis( Uk.15 x 15 cm ) BB. K 225 Balok Induk( Uk.30 x70 cm) BB. K 225 Balok Latei ( Uk.25 x45 cm) BB. K 225 Plat Lantai t = 10 cm BB.K 225



Anl.Supl Anl.Supl Anl.Supl 0 Anl.Supl



v.f v.f v.f v.f



10 0.7 18 2 18



m3 m3 m3 m3 m3



sub. Total



223,608,972



II. PEKERJAAN PASANGAN/ PLESTERAN : 1 Pas. Dinding 1/2 bata camp. 1:4 Lantai I 2 Plesteran dinding camp. 1:4 Lantai I



G.32.h G.50.q



3 Acian dinding camp. 1:4 Lantai I



472 m2 944 m2



95,731 43,240



45,185,032 40,818,560



944 m2



28,500 sub. Total



26,904,000 112,907,592



150,966 180,966 189,166 4,500 33,911 180,966 15,000



2,113,527 29,316,524 9,079,978 3,798,000 7,324,668 13,029,566 171,000



III. PEKERJAAN FINISHING LANTAI/ DINDING : 1 2 3 4 5 6 7



Lantai keramik K. Mandi Uk. 20x20 cm Lantai keramik Uk. 40x40 cm Keramik Dinding K. Mandi Uk. 20x25 cm t = 2 m Plint Keramik Uk.10 x 40 cm Anti Slip Tangga Dalam Anti Slip anak Tangga Luar Lantai Keramik Tangga Dalam Uk.30 x30 cm



G.72.a G.72.c G.72.b Dihitung G.72.e G.72.c Dihitung



14 162 48 844 216 72 11.4



m2 m2 m2 m' bh bh



sub. Total IV. PEKERJAAN KOZEN PINTU/ JENDELA 1 2 3 5 6 7 8 9 10



Kozen/pintu kaca double depan Kozen/ pintu kamar mandi Kozen /Pintu type P1 +Accecories Kozen /Jendela Kaca type J4 + Accecories Kozen /Jendela Kaca type J5 + Accecories Kozen /Jendela Kaca type J3 + Accecories Lubang Angin Kisi-kisi Kayu Handrail tangga stainless stell Handrail Balkon stainless stell



64,833,263



: dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung



1 8 8 3 9 12 10 30 16



Unit Unit unit unit unit unit unit m' m'



9,100,000 10,280,000 2,950,000 4,550,000



9,100,000 82,240,000 23,600,000 13,650,000



70,000 600,000 600,000



700,000 18,000,000 9,600,000



sub. Total



156,890,000



V. PEKERJAAN SANITAIR : 1 2 3 4



Closed duduk merk toto Lengkap Kran air 1/2 " Tempat sabun Floor drain



dihitung dihitung dihitung dihitung



8 8 8 8



unit bh bh bh



1,750,000 60,000 45,000 35,000



14,000,000 480,000 360,000 280,000



sub. Total



15,120,000



24,135 24,135



22,783,440 3,734,650



sub. Total



26,518,090



131,333 9,000



20,322,468 1,800,000



sub. Total



22,122,468



154,800 28,056 77,556 45,556 144,700 144,700



8,978,400 224,448 1,085,784 546,672 8,392,600 1,736,400



sub. Total



20,964,304



4,591,560 4,591,560 4,591,560 4,591,560 4,591,560



45,915,600 3,214,092 82,648,080 9,183,120 82,648,080



VI. PEKERJAAN FINISHING CAT : 1 Cat dinding tembok 3 x cat 2 Cat Plafond 3 x cat



K.23 a K 23 a



944 m2 154.74 m2



VII. PEKERJAAN PLAFOND 1 Pas. Plafond gypsum 9 mm + Furing 3 mm 2 Profil Gypsum 15 cm



Anl.Taksir A.II dihitung



154.74 m2 200 m1



VIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL (ME) 1 2 3 4 5 6



Lampu Downlight 4 " ( Trim Horizontal 1 x 18 watt ) Saklar tunggal Merk Panasonik Saklar Triple Merk Panasonik Stop kontak Merk Panasonik Instalasi Penerangan Instalasi Stop kontak



Anl.Taksir E.I Anl.Taksir E.III Anl.Taksir E.V Anl.Taksir E.VI Anl.TaksirE.II Anl.TaksirE.II



58 8 14 12 58 12



PEKERJAAN STRUKTUR LANTAI II



D.



I. PEKERJAAN KOLOM & BALOK 1 2 3 4 5



Kolom ( Uk.35 x 60 cm ) BB. K 225 Kolom Praktis( Uk.15 x 15 cm ) BB. K 225 Balok Induk( Uk.30 x70 cm) BB. K 225 Balok Latei ( Uk.25 x45 cm) BB. K 225 Plat Lantai t = 10 cm BB.K 225



Anl.Supl Anl.Supl Anl.Supl 0 Anl.Supl



v.f v.f v.f v.f



10 0.7 18 2 18



m3 m3 m3 m3 m3



sub. Total



223,608,972



95,731 43,240 28,500 sub. Total



45,185,032 40,818,560 26,904,000 112,907,592



150,966 180,966 189,166 4,500 33,911 180,966 15,000



2,113,527 29,316,524 9,079,978 3,798,000 7,324,668 13,029,566 171,000



II. PEKERJAAN PASANGAN/ PLESTERAN : 1 Pas. Dinding 1/2 bata camp. 1:4 Lantai I 2 Plesteran dinding camp. 1:4 Lantai I 3 Acian dinding camp. 1:4 Lantai I



0 0



472 m2 944 m2 944 m2



III. PEKERJAAN FINISHING LANTAI/ DINDING : 1 2 3 4 5 6 7



Lantai keramik K. Mandi Uk. 20x20 cm Lantai keramik Uk. 40x40 cm Keramik Dinding K. Mandi Uk. 20x25 cm t = 2 m Plint Keramik Uk.10 x 40 cm Anti Slip Tangga Dalam Anti Slip anak Tangga Luar Lantai Keramik Tangga Dalam Uk.30 x30 cm



IV. PEKERJAAN KOZEN PINTU/ JENDELA 1 2 3 5 6 7 8 9 10



0 0 0 Dihitung 0 0 Dihitung



14 162 48 844 216 72 11.4



m2 m2 m2 m' bh bh



sub. Total



64,833,263



11,800,000 15,000,000 2,950,000 390,000 4,550,000 70,000 600,000 600,000 730,000



11,800,000 120,000,000 23,600,000 1,170,000 40,950,000 840,000 6,000,000 18,000,000 11,680,000



:



Kozen/pintu kaca double depan Kozen/ pintu kamar mandi Kozen /Pintu type P1 +Accecories Kozen /Jendela Kaca type J4 + Accecories Kozen /Jendela Kaca type J5 + Accecories Kozen /Jendela Kaca type J3 + Accecories Lubang Angin Kisi-kisi Kayu Handrail tangga stainless stell Handrail Balkon stainless stell



dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung dihitung



1 8 8 3 9 12 10 30 16



Unit Unit unit unit unit unit unit m' m'



sub. Total



234,040,000



V. PEKERJAAN SANITAIR : 1 2 3 4



Closed duduk merk toto Lengkap Kran air 1/2 " Tempat sabun Floor drain



dihitung dihitung dihitung dihitung



8 8 8 8



unit bh bh bh



1,750,000 60,000 45,000 35,000



14,000,000 480,000 360,000 280,000



sub. Total



15,120,000



24,135 24,135



22,783,440 3,734,650



sub. Total



26,518,090



131,333 9,000



20,322,468 1,800,000



sub. Total



22,122,468



154,800 28,056 77,556 45,556 144,700 144,700



8,978,400 224,448 1,085,784 546,672 8,392,600 1,736,400



sub. Total



20,964,304



4,591,560 4,591,560 4,591,560 4,591,560 4,591,560



6,703,678 82,648,080 9,183,120 82,648,080 9,183,120



VI. PEKERJAAN FINISHING CAT : 1 Cat dinding tembok 3 x cat 2 Cat Plafond 3 x cat



K.23 a K 23 a



944 m2 154.74 m2



VII. PEKERJAAN PLAFOND 1 Pas. Plafond gypsum 9 mm + Furing 3 mm 2 Profil Gypsum 15 cm



0 dihitung



154.74 m2 200 m1



VIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL (ME) 1 2 3 4 5 6



Lampu Downlight 4 " ( Trim Horizontal 1 x 18 watt ) Saklar tunggal Merk Panasonik Saklar Triple Merk Panasonik Stop kontak Merk Panasonik Instalasi Penerangan Instalasi Stop kontak



0 0 0 0 0 0



58 8 14 12 58 12



PEKERJAAN STRUKTUR LANTAI III ( ATAP)



E. I. 2 3 4 5 5



PEKERJAAN KOLOM & BALOK Kolom Praktis( Uk.15 x 15 cm ) BB. K 225 Balok Induk( Uk.30 x70 cm) BB. K 225 Balok Latei ( Uk.25 x45 cm) BB. K 225 Plat Lantai t = 10 cm BB.K 225 Plat Atap Penutup Tangga t = 10 cm BB.K 225



Anl.Supl Anl.Supl 0 Anl.Supl Anl.Supl



v.f v.f v.f v.f



1.46 18 2 18 2



m3 m3 m3 m3 m3



sub. Total



190,366,078



II. PEKERJAAN PASANGAN/ PLESTERAN : 1 Pas. Dinding 1/2 bata camp. 1:4 Lantai I 2 Plesteran dinding camp. 1:4 Lantai I 3 Acian dinding camp. 1:4 Lantai I



0 0



117 m2 234 m2 234 m2



95,731 43,240 28,500 sub. Total



11,200,527 10,118,160 6,669,000 21,318,687



150,966 180,966 189,166 4,500 sub. Total



452,898 2,714,490 2,648,324 180,000 5,995,712



III. PEKERJAAN FINISHING LANTAI/ DINDING : 1 2 3 4



Lantai keramik K. Mandi Uk. 20x20 cm Lantai keramik Uk. 40x40 cm Keramik Dinding K. Mandi Uk. 20x25 cm t = 2 m Plint Keramik Uk.10 x 40 cm



0 0 0 Dihitung



3 15 14 40



m2 m2 m2 m'



III. PEKERJAAN KOZEN PINTU/ JENDELA



:



1 Kozen /Pintu type P1 +Accecories 2 Kozen/ pintu kamar mandi 3 Kozen /Jendela Kaca type J3 + Accecories



dihitung dihitung dihitung



4 unit 1 Unit 4 unit



2,950,000 15,000,000 70,000 sub. Total



11,800,000 15,000,000 280,000 27,080,000



IV. PEKERJAAN SANITAIR : 1 2 3 4



Closed duduk merk toto Lengkap Kran air 1/2 " Tempat sabun Floor drain



dihitung dihitung dihitung dihitung



1 1 1 1



unit bh bh bh



1,750,000 60,000 45,000 35,000 sub. Total



1,750,000 60,000 45,000 35,000 1,890,000



V. PEKERJAAN FINISHING CAT : 1 Cat dinding tembok 3 x cat 2 Cat Plafond 3 x cat



K.23 a K 23 a



234 m2 28 m2



15,556 15,556



3,640,104 435,568



sub. Total



4,075,672



131,333 9,000



3,677,324 477,000



sub. Total



4,154,324



75,000 62,556 28,056 144,700



600,000 250,224 28,056 144,700



VII. PEKERJAAN PLAFOND 1 Pas. Plafond gypsum 9 mm + Furing 3 mm 2 Profil Gypsum 15 cm



0 dihitung



28 m2 53 m1



V. PEKERJAAN MEKANIKAL/ELEKTRIKAL (ME) 1 2 3 4



Lampu XL 22 watt + Accecories Saklar ganda Saklar tunggal Instalasi Penerangan



dihitung Anl.Taksir E.IV 0 Anl.TaksirE.II



8 4 1 1



ttk ttk ttk ttk



sub. Total



JUMLAH



1,454,782,085



DIBULATKAN



1,454,782,000



Terbilang : # Satu Milyard Delapan Ratus Enam Puluh Tujuh Juta Seratus Sembilan Belas Ribu Rupiah # 978,789,201



REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBANGUNAN GUDANG 2 (DUA) LANTAI



A



PEKERJAAN PERSIAPAN / PENDAHULUAN



B



PEKERJAAN TANAH / GALIAN/ TIMBUNAN



C



PEKERJAAN STRUKTUR 1. PEKERJAAN PONDASI 2. PEKERJAAN KOLOM / SLOOF & BALOK



D



PEKERJAAN STRUKTUR PLAT LANTAI /ATAP



E



PEKERJAAN ARSITEKTUR 1. PEKERJAAN PASANGAN / PLESTERAN 2. PEKERJAAN FINISHING LANTAI / DINDING 3. PEKERJAAN KOSEN PINTU / JENDELA 4. PEKERJAAN SANITAIR 5. PEKERJAAN FINISHING CAT 6. PEKERJAAN PLAFON 7. PEKERJAAN AL COMPOSITE



F



PEKERJAAN ME



JUMLAH ..................... DIBULATKAN .............



Terbilang : # Dua Milliar Lima Ratus Tiga Belas Juta seratus Lima Ratus sembilan Belas Rib



Rp. Rp.



Rp. Rp. Rp.



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



Rp. Rp.



0 0



a Ratus sembilan Belas Ribu Rupiah #



REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN HOTEL NABASA BALIGE NO



URAIAN PEKERJAAN



I



PEKERJAAN PERSIAPAN



II



PEKERJAAN TANAH



III



SUB TOTAL (Rp)



TOTAL (Rp)