7 0 431 KB
Besi
untuk 1 m3 = 100 kg K Dia Bj B1 10 0.617 B2 10 0.617 B4 10 0.617 B5 10 0.617 B6 10 0.617 B7 10 0.617
Pcs 20 35 23 35 20 23
B8 B9 B10 B11 B12 B12 B8 B9
10 6 10 6 10 10 10 6
0.617 0.222 0.617 0.222 0.617 0.617 0.617 0.222
B8 B9 KOL PAGAR TEMBOK B10 B11 BALOK PAGAR TEMBOK B8 B9
10 6 10 6 10 6 10
PLAT
CURB
SLOF BRC KOL BRC POND BRC BALOK BRC
SLOF PAGAR TEMBOK
SLOF DIN KANTOR
B8
Panjang 7 4 7 4.6 3.8 4
Jumlah 140 140 161 161 76 92
4 155 8 13.8 5 7 4 155
31 0.44 2.76 0.74 1.76 1.36 31 0.44
124 68.2 154.56 71.484 147.84 114.24 124 68.2
0.617 0.222 0.617 0.222 0.617 0.222
4 325 4 11 4 325
65 0.64 2.2 0.64 65 0.54
260 208 167.2 133.76 260 175.5
0.617
4
136.5
546
KOL DIN KANTOR BALOK DIN KANTOR
B9 B10 B11 B8 B9
6 10 6 10 6
0.222 0.617 0.222 0.617 0.222
682.5 4 19.25 4 682.5
Panjang 30 9 4 54 1.98 0.9 2.8 54 130 2 65 273 3.85 136.5
Lebar 0.2 0.2 2.3 0.2 0.9 0.65 0.2 0.35 0.2 0.8 0.5 0.2 0.6 0.55
Jumlah
0.46 3.85 0.44 136.5 0.54
Bekisting PLAT CURB SLOF BRC KOL BRC POND BRC BALOK BRC SLOF TEMBOK KOL TEMBOK BALOK TEMBOK SLOF DIN KANTOR KOL DIN KANTOR BALOK DIN KANTOR
(dinding) (balok) (dinding) (balok)
54.6 97.02 75.075 226.695 0 0
3x pemakaian
313.95 646.8 59.29 546 368.55
Berat 86.38 86.38 99.337 99.337 46.892 56.764 0 76.508 15.1404 95.36352 15.869448 91.21728 70.48608 66.636 31.284 0 160.42 46.176 103.1624 29.69472 66.636 38.961 0 336.882
0 Rp
-
0 0 Rp
-
-0.1 -2.5
69.6969 399.0756 13.16238 66.636 81.8181 967.27098 967.27098
62600575.115756 ###
Rp16,513,129.26
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA
NO. MATA PEMBAYARA N 1 DIVISI 2 2.2.1
2.3.1
3.2.1
SAT. URAIAN
2
4.4.2
3
4
M¹ M²
-
Pekerjaan Tanah 1 Penggalian tanah biasa sedalam 1 m 2 Pengurugan kembali galian
M³ M³
7.68 -
Pekerjaan Pondasi 1 Pemasangan pondasi batu belah 1PC:4PP
M³
-
1 2 3 4 5 6 7
4.4.1
KUANTITA S
Pekerjaan Persiapan 1 Pengukuran dan pemasangan Bowplank 2 Pembersihan dan perataan lapangan 1 m²
4.1.1
4.2.1
PERKIRAA N
Pekerjaan Beton Pembuatan 1 m3 beton mutu fc 7,4 MPa (K100) Pembuatan 1 m3 beton mutu fc 19,3 MPa (K225) Pembesian 10 Kg dengan besi polos atau ulir Pemasangan 1 m2 bekisting untuk sloof Pemasangan 1 m2 bekisting untuk kolom Pemasangan 1 m2 bekisting untuk balok Pemasangan 1 m2 bekisting untuk pondasi
M³ M³ Kg M² M² M² M²
0.59 18.27 1,827.00 61.20 10.08 14.82 11.28
Pekerjaan Besi dan Allumunium 1 Pemasangan 1m2 rangka atap pelana baja canai dingin profil C75
M²
94.07
Pekerjaan Dinding Pasangan 1 Pemasangan dinding bata merah 1/2 batu campuran 1PC:4PP
M²
190.00
M²
414.00
M² M' M² M² M²
10.50 39.54 -
Pekerjaan Plesteran 1 Pemasangan plesteran 1PC:4PP tebal 15 mm
4.4.3 1 2 3 4 5
Pekerjaan Penutup Lantai dan Penutup Dinding Pemasangan 1 m2 lantai keramik 30x30 Pemasangan 1 m2 plint ubin Keramik 10x30 Pemasangan 1 m² dinding keramik 20x25 Pemasangan 1 m2 dinding batu temple hitam Pemasangan paving block tebal 8 cm natural
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA 4.5.1
4.5.2
Pekerjaan Plafond 1 Pemasangan langit-langit tripleks 4 mm Pekerjaan Penutup Atap 1 Pemasangan 1m2 gentang metal ukuran 80x100 atap pelana 2 Pemasangan 1 m2 nok genteng metal
4.5.2
DIVISI 5 5.1.1
89.20
M²
96.00
M'
-
1 2 4 5 6 7
Pekerjaan Kayu Pembuatan dan pemasangan kusen kayu Pembuatan dan pemasangan pintu panel kayu Pembuatan dan pemasangan pintu dan jendela kaca, Pemasangan rangka langit-langit Pemasangan lisplank 3x20 Pemasangan Lantai Kayu
M³ M³ M³ M² M' M²
1 2 3 4 5
Pekerjaan Kunci dan Kaca Pemasangan 1 buah kunci tanam biasa Pemasangan 1 buah engsel pintu Pemasangan 1 buah engsel jendela kupu-kupu Pemasangan 1 buah kait angin Pemasangan 1 buah doorcloser
Bh Bh Bh Bh Bh
-
M²
-
4.6.2
4.7.1
M²
Pekerjaan Pengecatan 1 Pengecatan bidang kayu baru 1 lapis cat dasar 2 lapis penutup 2 Pengecatan tembok baru Eksterior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 3 Pengecatan tembok baru Interior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerjaan Sanitasi Gedung 1 Pemasangan 1 buah kloset jongkok porselen 2 Pemasangan 1 buah bak mandi beton vol 0,6 m³ 3 Pemasangan 1 buah bak control pasangan bata 60x60 4 Pemasangan 1 m’ pipa PVC Ø 4” 5 Pemasangan 1 buah septiktank
PEKERJAAN LAIN - LAIN Pekerjaan Lain lain 1 Pemasangan listrik saklar pertitik 2 Pemesangan listrik stop kontak pertitik 3 Pemasangan MCB
65.00
M²
380.00
M²
380.00
Bh Bh Bh M' Bh
-
Titik Titik Titik
-
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA 4 Biaya Pemasangan Daya Listrik 2200 Watt
Ls
TOTAL NILAI DIBULATKAN TERBILANG : Tujuh Ratus Dua Belas Juta Lima Ratus Ribu Rupiah
-
NURUT JENIS PENGELUARAN
HARGA SATUAN PEKERJAAN (Rp.) 5
JUMLAH HARGA SATUAN PEKERJAAN (Rp.) 6
PAJAK PERTAMBAHAN NILAI ( PPN ) 10% (Rp.) 7
-
TOTAL (Rp.) 8
77,816.25 9,843.75
-
71,718.75 53,437.50
550,800.00 -
1,140,984.00
-
212,163.84 1,569,917.30 17,071.88 223,650.00 309,543.75 317,981.25 317,981.25
124,752.34 28,682,388.98 31,190,315.63 13,687,380.00 3,120,201.00 4,712,482.13 3,586,828.50
12,475.23 2,868,238.90 3,119,031.56 1,368,738.00 312,020.10 471,248.21 358,682.85
137,227.57 31,550,627.88 34,309,347.19 15,056,118.00 3,432,221.10 5,183,730.34 3,945,511.35
247,000.21
23,235,310.06
2,323,531.01
25,558,841.06
173,314.35
32,929,726.50
3,292,972.65
36,222,699.15
70,021.80
28,989,025.20
2,898,902.52
31,887,927.72
219,901.50 44,533.66 158,723.10 287,796.38 185,445.00
2,308,965.75 6,275,911.37 -
230,896.58 627,591.14 -
2,539,862.33 6,903,502.51 -
55,080.00 -
-
-
605,880.00 -
-
NURUT JENIS PENGELUARAN
-
-
74,351.25
7,137,720.00
77,793.75
-
-
7,851,492.00
-
713,772.00 -
6,541,031.25 640,125.00 551,396.25 97,425.00 70,706.25 267,412.50
17,381,812.50
1,738,181.25
19,119,993.75
245,306.25 73,195.31 73,195.31 56,320.31 357,693.75
-
59,793.75
-
26,443.13
10,048,387.50
21,763.13
8,269,987.50
597,942.00 4,737,747.46 915,059.93 136,299.38 5,549,941.06
-
-
-
265,000.00 275,000.00 315,000.00
-
-
-
-
1,004,838.75 826,998.75
-
-
11,053,226.25 9,096,986.25
NURUT JENIS PENGELUARAN 4,554,000.00
-
-
28,000,000.00 272,455,194.45 272,455,000.00
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA
NO. MATA PEMBAYARA N 1 DIVISI 2 2.2.1
2.3.1
3.2.1
SAT. URAIAN
2
PERKIRAA N KUANTITA S
3
4
Pekerjaan Pendahuluan 1 Pembersihan dan perataan lapangan 1 m² 2 Pengukuran dan pemasangan Bowplank
Ls M¹
-
Pekerjaan Tanah 1 Penggalian tanah biasa sedalam 1 m 2 Pengurugan kembali galian
M³ M³
7.68 -
Pekerjaan Pasangan dan Plesteran 1 Pemasangan pondasi batu belah 1PC:4PP
M³
69.69
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ Kg M² M² M² M²
0.59 18.27 2.48 2.88 2.18 2.40 0.45 1.39 1.63 2.68 1.19 0.63 0.36 1,827.00 61.20 40.32 29.64 45.12
M²
94.07
M² M²
95.51 89.20
4.1.1 1 2
3 4 5 6 7 4.2.1 1 2 3 4
Pekerjaan Beton Pembuatan 1 m3 beton mutu fc 7,4 MPa (K100) Pembuatan 1 m3 beton mutu fc 19,3 MPa (K225) a. Pondasi Umpak b. Tiang c. Balok lantai d. Tiang pilar e. Kolom praktis f. Ring balk g. Balok pinggang h. Plat lantai / DAK i. Talang beton + kanopi j. Balok tangga k. Tutup septictank Pembesian 100 Kg dengan besi polos atau ulir Pemasangan 1 m2 bekisting untuk sloof Pemasangan 1 m2 bekisting untuk kolom Pemasangan 1 m2 bekisting untuk balok Pemasangan 1 m2 bekisting untuk pondasi Pekerjaan Besi dan Allumunium Pemasangan 1m2 rangka atap pelana baja canai dingin profil C75 Pemasangan Atap Zincalume Pemasangan Rangka Plafon, besi hollow 2x4,dan 4x4, t.0 Pemasangan Pintu, Jendela, dan Ventilasi Alumunium a. Pintu
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA b. Jendela c. Ventilasi 4.4.1
4.4.2
4.4.3
4.5.1
4.5.2
4.6.1
Pekerjaan Dinding Pasangan 1 Pemasangan dinding bata merah 1/2 batu campuran 1PC:4PP a. Bangunan b. Septictank Pekerjaan Plesteran 1 Pemasangan plesteran 1PC:4PP tebal 15 mm a. Bangunan b. Septictank
190.00 17.00
414.00 380.00 34.00
Pekerjaan Penutup Lantai dan Penutup Dinding 1 Pemasangan 1 m² lantai keramik 40x40 2 Pemasangan 1 m² plint ubin Keramik 10x40 3 Pemasangan 1 m² dinding keramik 40x40
M² M' M²
10.50 7.68 39.54
Pekerjaan Plafond 1 Pemasangan langit-langit ( Sunda plafon )
M²
89.20
M²
96.00
Pekerjaan Penutup Atap 1 Pemasangan 1m2 atap Zincalume atap pelana 2 Pemasangan 1 m2 nok genteng metal Pekerjaan Kayu 1 Pekerjaan Lantai Kayu a. 1 M3 Mengerjakan Sloof dan gelagar kayu b. 1 M2 Mengerjakan lantai papan diketam
1 2 3 4 5
DIVISI 5
-
M²
4.6.2
4.7.1
M²
Pekerjaan Kunci dan Kaca Pemasangan 1 buah kunci tanam biasa Pemasangan 1 buah engsel pintu Pemasangan 1 buah engsel jendela kupu-kupu Pemasangan 1 buah kait angin Pemasangan 1 buah doorcloser
Pekerjaan Pengecatan 1 Pengecatan tembok baru Eksterior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 2 Pengecatan tembok baru Interior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
M'
M³ M²
Bh Bh Bh Bh Bh
-
65.00
-
M²
380.00
M²
380.00
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARA 5.1.1
Pekerjaan Sanitasi Gedung 1 Pemasangan 1 buah kloset jongkok porselen 2 Pemasangan 1 buah bak mandi beton vol 0,6 m³ 3 Pemasangan 1 buah bak control pasangan bata 60x60 4 Pemasangan 1 m’ pipa PVC Ø 3” 5 Pemasangan 1 buah septiktank
PEKERJAAN LAIN - LAIN Pekerjaan Lain lain 1 Pemasangan listrik saklar pertitik 2 Pemesangan listrik stop kontak pertitik 3 Pemasangan MCB 4 Biaya Pemasangan Daya Listrik 2200 Watt
Bh Bh Bh M' Bh
Titik Titik Titik Ls
TOTAL NILAI DIBULATKAN TERBILANG : Tujuh Ratus Dua Belas Juta Lima Ratus Ribu Rupiah
-
NURUT JENIS PENGELUARAN
HARGA SATUAN PEKERJAAN (Rp.) 5
JUMLAH HARGA SATUAN PEKERJAAN (Rp.) 6
PAJAK PERTAMBAHAN NILAI ( PPN ) 10% (Rp.) 7
TOTAL (Rp.) 8
NURUT JENIS PENGELUARAN
5,400,000.00
NURUT JENIS PENGELUARAN
5,400,000.00 5,400,000.00
DATA PERHITUNGAN VOLUM I.
PEKERJAAN PERSIAPAN
1
Pek. Pembersihan Lokasi Site PANJANG
X
LEBAR
23 2
25
Pek. Pasang Bouwplank PANJANG
X
UNIT
96 136.5 3
1 1
PANJANG
X
LEBAR
23
PEKERJAAN STRUKTUR
A.
PEKERJAAN GALIAN TANAH & URUGAN PASIR
1
Pek. Galian Tanah Luas
Tembok penahan Pondasi Pagar BRC Tembok
Pondasi bangunan Lantai bangunan + paving bloc
UNIT
X
Panjang
0
1
X
Dalam
0
0
0.45 0.52
31 65
0.68
129.5
328
0
0
0
X
0 0
0
0 0.25 0
Pek. Urugan Pasir PANJANG
Pondasi 1.kantor 2.pagar Saluran Paving Block
X
LEBAR
X
TEBAL
0
0
0.05
129.5 96
0.8 0.8
0.05 0.05
86
0.45
0.05
32
X
0.05
Pek. Urugan sirtu PANJANG
lantai kerami 4
X
25
II.
3
0 136.5 136.5 M'
Luas Bangunan (IMB) Kantor
2
575 575 M2
Pek Timbunan tanah pondasi lantai
X
LEBAR 154
TEBAL 0.06
Panjang
Luas
129.5
0.26 154
X
0.25
=
B.
PEKERJAAN PONDASI & STRUKTUR DASAR
1
Pek. Pondasi Batu kali camp. 1Pc:4Psr PANJANG
tembok penahan
X
LUAS
tangga akses pondasi pagar
31 65
pondasi dinding
X
2.01 0 0 0.255 0.2975 0.38
2
136.5
PEKERJAAN BETON 2 PANJANG
X
keramik 3
PANJANG
TEBAL
X
0.05
X
LEBAR
X
2.4
TEBAL
X
2.5
Sloof pagar
BRC Tembok
dinding KANTOR 1
X
Pek. Pondasi plat setempat tangga
4
LEBAR 154
PANJANG 31 65 136.5
X
UNIT
=
LUAS
1 1 1
0.025 0.04 0.03
Pekerjaan kolom Beton TINGGI
LUAS
pagar BRC Tembok kantor
2
Pek. Balok
2.63 1.5 4.25
PENAMPANG BALOK
0.045 0.04 0.0225
X
pagar BRC Tembok kantor 3
Lantai kerja beton kantor Selasar
PEKERJAAN langitlangit plafond
153
0.015 0.03 0.03 PENAMPANG BALOK 0.203
X
E.
PEKERJAAN ATAP
1
Volume kebutuhan rangka dan genteng LUAS 253
2
Bubung atap Metal PANJANG
NOK UTAMA 3
X
UNIT
45.50
=
1
45.50 45.50 M'
Lisplang PANJANG
Talang
X
UNIT
1 0
8.50
1
PEKERJAAN PASANGAN DINDING BATA
1
PAGAR BRC TEMBOK KANTOR
=
85.67 -
E.
E.
COS 38 0.788
85.67 85.67 M' 8.50
PANJANG 31.00 65.00 104.00
TINGGI
TOTAL
PANJANG
TINGGI/LEBAR UNIT TOTAL
0.35 1.25 3.85
327.55 327.55
PEKERJAAN PLESTERAN PAGAR BRC DINDING BRC KOLOM TEMBOK KANTOR
31.00
0.6
2
-
0.90
1.98
7
-
65.00
1.6
1
104.00
3.85
2
655.096 655.10
PEKERJAAN PENUTUP LANTAI DAN DINDING PASANG BATU TEMPEL ALAM PAGAR
PANJANG BRC DINDING BRC KOLOM TEMBOK
KANTOR
19.00 -
TINGGI/LEBAR UNIT TOTAL 0.35
1
-
1.98
7
-
2
2
-
14.15
0.8
1
11.32
0.90
0.8
9
6.48 17.80
PASANG KERAMIK LANTAI KANTOR LANTAI DINDING
PANJANG 108.97 6.90
TINGGI/LEBAR UNIT TOTAL 1 1 108.97 1.5 1 10.35
PASANG PLINT KERAMIK LANTAI KANTOR
PANJANG LANTAI
110.70
TINGGI/LEBAR UNIT TOTAL 0.1
1
11.07
PASANG paving block 31.63
PEKERJAAN ARSITEKTUR PEKERJAAN KUSEN 1
LUAS 0.0072 0.0036
UNIT 3
PANJANG 7.66 3.48
Kusen Type
P1
Kusen Type
P2
0.0072 0.0036
4
6.08 2.64
Kusen Type
J1
0.0072 0.0036
9
13.14 5.94
Kusen Type
J2
0.0072 0.0036
8
9.42 4.02
Kusen Type
BW
0.0072 0
0
2.46 3.74
Daun Pintu Daun Pintu Daun Jendela Daun Jendela Pasang Kaca
P1 P2
3 4 9 8 17
2.454 2.15 2.196 1.464 0.436
JUMLAH 0.165456 0.037584 0.20304 0.175104 0.038016 0.21312 0.851472 0.192456 1.043928 0.542592 0.115776 0.658368 0.017712 0.026928 0.04464 1.75
J1 J2
5
7.362 8.6 19.764 11.712 37.06
PEKERJAAN CAT P1
6.48 1.18
0.24 0.36 3
P2
6.08 0.6
0.24 0.36
J1
7.56 5.07 1.88
0.24 0.36 0.36
4
9 J2
6.28 1.69 1.24
0.24 0.36 0.36
BW1&2
6.2 0.41
0.24 0.36
8
1.5552 0.4248 5.94 1.4592 0.216 6.7008 1.8144 1.8252 0.6768 38.8476 1.5072 0.6084 0.4464 20.496 1.488 0.1476
1
PEKERJAAN PENGGANTUNG & PENGUNCI 1
Pek. Kunci Pintu tanam aluminium Kusen Type Kusen Type
P1 P2
BH 3 4 7
Pek. Kunci Pintu Bulat(KM/WC) 2 Kusen Type P3 Pek. Engsel Pintu 3 Kusen Type Kusen Type Kusen Type
P1 P2 P3
BH 1 BH 9 12 3 24
Pek. Engsel Jendela Kusen Type Kusen Type
J1 J2
BH 18 16 34
1.6356 73.62
272,455,194.45
= = =
575.00 0.00 0.00 575.00 M2
= 0
-
0 13.95 0
88.06
0
82.00
0
184.01
UNIT
=
0 1 1 1 1
5.18 1.94 1.60 8.72 M3
9.24 9.24
M3
250
0.295 Rp
33.67 38.5 72.17
96
73.75 84,147,570.00 28.32 32312666.88
= 4.02
17.82
M3
0 0 0 0 51.87
Rp 79,515,174.96
69.69
67888548
UNIT
=
1
7.70 7.70 M3
UNIT
=
1
6.00 M3 6.00 M3
LUAS
=
0.025 0.04 0.03
LUAS
600.00 VOLUME
0 0 4.095 4.095 M3 X
UNIT
= M3
0.045 0.04 0.0225
7.00 19.00 42.00
PANJANG
X
4.02 4.02
UNIT =
31 65 136.5 PANJANG 79.00
X
0
- M3 4.10 4.10
1
16.04 M3
UNIT
UNIT
TOTAL 321.07
9.96 9.12 1.4 32.076 19.296 1
72.852
45,871,001.09
Rp 79,303,367.95
P1 P2 P3 J1 J2 BW1+BW2
lunsump listrik pemasangan tiang listrik 3 saluran diplester kantor lunsump 5000000 plafond triplek hitung konstruksi pagar dan tembok penahan
TIAP ITEM ADA PPN tembok penahan kurangi 21 m tembok bata tinggi kurangi 40 cm (1,6 m)
2.16
4
272,455,194.45 No.
URAIAN / NAMA / JENIS BARANG
SATUAN
USULAN HARGA SATUAN 2019 (Rp)
KET.
1
2
3
4
5
A. UPAH 1 Mandor
oh
Rp
150,000.00
2 Kepala tukang
oh
Rp
150,000.00
3 Tukang
oh
Rp
110,000.00
4 Pekerja
oh
Rp
80,000.00
liter
Rp
100.00
2 Atap metal (biasa / polos)
lembar
Rp
29,500.00
3 Atap Zincalume 0,4mm
lembar
Rp
75,000.00
4 Gorong-gorong/Buis beton dia "60
m'
Rp
400,000.00
5 Batu alam tempel
m²
Rp
441,300.00
6 Batu alam Andesit
m²
Rp
175,000.00
B. MATERIAL/BAHAN 1 Air
7 Batu bata merah (lokal)
bh
Rp
1,200.00
8 Batu kali bulat
m³
Rp
345,000.00
9 Batu koral / Koral beton
m³
Rp
447,720.00
10 Besi baja ringan profil C75.100
kg
Rp
16,617.65
11 Besi baja ringan profil C75.80
kg
Rp
18,862.75
12 Besi baja ringan profil C75.65
kg
Rp
15,813.95
13 Besi beton
kg
Rp
13,000.00
14 Besi strip
kg
Rp
27,730.00
15 Bambu dia.6-8/600 cm
btg
Rp
30,000.00
16 Bubungan atap (nok) metal (biasa / polos)
buah
Rp
24,500.00
17 Bubungan atap (nok) metal (setara Sakura Roof)
buah
Rp
24,500.00
18 Cat dasar Kayu
kg
Rp
35,000.00
19 Cat dasar Tembok
kg
Rp
25,000.00
20 Cat menie
kg
Rp
45,000.00
21 Cat minyak kayu
kg
Rp
52,000.00
22 Cat minyak besi
kg
Rp
48,000.00
23 Cat tembok Eksterior
kg
Rp
38,000.00
24 Cat tembok Interior
kg
Rp
22,000.00
buah
Rp
220,000.00
m²
Rp
55,000.00
25 Closed jongkok keramik 26 Pavingblock segi 6 tebal 6 cm 27 Pavingblock segi 6 tebal 8 cm
m²
Rp
62,500.00
28 Door closer
buah
Rp
251,000.00
29 Door stop
buah
Rp
18,000.00
30 Engsel pintu / jendela 3" Stainless
buah
Rp
45,000.00
31 Engsel pintu / jendela 4" Stainless
buah
Rp
70,000.00
No.
URAIAN / NAMA / JENIS BARANG
SATUAN
USULAN HARGA SATUAN 2019 (Rp)
1
2
3
4
32 Engsel pintu / jendela 5" Stainless
buah
Rp
28,200.00
33 Floor drain stainless
buah
Rp
125,000.00
34 Grendel 3" Stainless
buah
Rp
30,000.00
m²
Rp
82,000.00
buah
Rp
30,000.00
35 Kaca bening tebal 3 mm 36 Kait angin 37 Kawat berduri
m'
Rp
1,916.67
38 Kawat beton
kg
Rp
20,000.00
39 Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
batang
Rp
7,000.00
40 Kayu gergajian kelas II, balok
m³
Rp
4,250,000.00
41 Kayu gergajian kelas II, papan
m³
Rp
4,250,000.00
42 Kayu gergajian kelas III, balok
m³
Rp
3,500,000.00
43 Kayu gergajian kelas III, papan
m³
Rp
3,500,000.00
44 Kayu gergajian kelas IV, balok
m³
Rp
2,500,000.00
45 Kayu gergajian kelas IV, papan
m³
Rp
2,500,000.00
46 Keramik 20 x 20 (cm) putih / berwarna
m²
Rp
2,240.00
47 Keramik 20 x 25 (cm)
m²
Rp
2,400.00
48 Keramik 30 x 30 (cm) putih / berwarna
m²
Rp
52,000.00
49 Keramik KM/WC anti slip 20 x 20 (cm)
m²
Rp
2,240.00
50 Kran air ø 0,75 (inch)
buah
Rp
55,000.00
51 Kran wastafel
buah
Rp
566,100.00
52 Kunci tanam kamar biasa
buah
Rp
160,000.00
53 Lis kayu profil uk. 3 x 3 cm
m'
Rp
23,310.00
54 Lis kayu biasa uk. 0,75 x 2 cm
m'
Rp
11,340.00
55 Lis Gypsum sedang
m'
Rp
10,000.00
56 Lis Gypsum besar
m'
Rp
11,764.71
57 Lis PVC
m'
Rp
20,338.98
58 Lem Kayu
kg
Rp
13,000.00
59 Minyak bekisting
liter
Rp
20,000.00
60 Pagar BRC Tinggi 100 cm lebar 240 cm
KET. 5
Keping
Rp
400,000.00
61 Paku berbagai ukuran
kg
Rp
21,000.00
62 Paku seng
kg
Rp
30,000.00
63 Sekrup Gypsum
kg
Rp
42,000.00
64 Pasir pasang
m³
Rp
380,400.00
0
65 Pasir urug / timbun
m³
Rp
355,400.00
0
66 Pegangan pintu/door holder
buah
Rp
66,000.00
67 Pipa Galvanis 2"
m'
Rp
41,000.00
68 Pipa Galvanis 3"
m'
Rp
58,000.00
69 Pipa PVC ø 3 (inch) AW, panjang 4 m
m'
Rp
35,000.00
70 Pipa PVC ø 4 - 6 (inch) AW, panjang 4 m
m'
Rp
60,000.00
71 Plamuer Kayu
kg
Rp
12,000.00
72 Plamuer Tembok
kg
Rp
12,000.00
buah
Rp
4,727.27
74 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm
lembar
Rp
65,000.00
75 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm
lembar
Rp
35,000.00
76 Sealent
tube
Rp
25,000.00
77 Sealtape
buah
Rp
3,000.00
kg
Rp
1,300.00
73 Plint keramik 10 x 30 cm
78 Semen PC @ 50 kg
No.
URAIAN / NAMA / JENIS BARANG
SATUAN
USULAN HARGA SATUAN 2019 (Rp)
1
2
3
4
79 Semen putih
kg
Rp
2,030.00
80 Semen warna
kg
Rp
11,500.00
81 Seng plat
lembar
Rp
40,000.00
82 Sirtu
m³
Rp
215,000.00
83 Tali ijuk
kg
Rp
38,000.00
- Stop kontak
Titik
Rp
275,000.00
- Saklar
Titik
Rp
265,000.00
- MCB
Titik
Rp
315,000.00
Ls
Rp
4,554,000.00
C. LAIN-LAIN 1 Biaya Pemasangan Instalasi Listrik
2 Biaya Pemasangan Daya Listrik 2200 Watt
KET. 5
KODE ANALISA
URAIAN PEKERJAAN
1
2
A.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
A.1
1 m' Pengukuran dan pemasangan bouwplank
HARGA SATUAN (Rp.)
0.0070 m³ Kayu gergajian kelas IV, papan 0.0120 m³ Kayu gergajian kelas IV, balok 0.0200 kg
Paku berbagai ukuran
BAHAN
UPAH
3
4
2,500,000.00 kasau 5/7
2,500,000.00 21,000.00
0.1000 Oh Pekerja
80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
A.3
( K3 ) 1 m² Membersihkan lapangan dan peralatan 0.1000 Oh Pekerja
80,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
17,500.00 30,000.00 420.00 8,000.00 11,000.00 1,500.00 750.00 69,170.00 8,646.25 77,816.25
8,000.00 750.00 8,750.00 1,093.75 9,843.75
KODE ANALISA
URAIAN PEKERJAAN
1
2
B.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH
B.1
1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga)
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
0.7500 Oh Pekerja
80,000.00
0.0250 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
B.2
1 m³ Urugan Kembali Galian Tanah (dengan tenaga) 0.5000 Oh Pekerja
80,000.00
0.0500 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
B.3
1 m³ Urugan Pasir (dengan tenaga) 1.2000 m³ Pasir urug / timbun
B.4
355,400.00
0.3000 Oh Pekerja
80,000.00
0.0100 Oh Mandor
150,000.00
1 m³ Urugan Sirtu (dengan tenaga) 1.2000 m³ Sirtu
215,000.00
0.2500 Oh Pekerja
80,000.00
0.0250 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
60,000.00 3,750.00 63,750.00 7,968.75 71,718.75 40,000.00 7,500.00 47,500.00 5,937.50 53,437.50 426,480.00 24,000.00 1,500.00 451,980.00 258,000.00 20,000.00 3,750.00 281,750.00 35,218.75 316,968.75
KODE ANALISA
URAIAN PEKERJAAN
1
2
C.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
C.1
1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps 1.1000 m³ Batu kali bulat 163.0000 kg
Semen PC @ 50 kg
0.5200 m³ Pasir pasang
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
345,000.00
JUMLAH (Rp.) 5
379,500.00
1,300.00
211,900.00
380,400.00
197,808.00
1.5000 Oh Pekerja
80,000.00
120,000.00
0.7500 Oh Tukang
110,000.00
82,500.00
0.0750 Oh Kepala tukang
150,000.00
11,250.00
0.0750 Oh Mandor
150,000.00
11,250.00 1,014,208.00
0.1250
Overhead & profit 12,5%
126,776.00
Harga Satuan Pekerjaan
1,140,984.00
KODE ANALISA
URAIAN PEKERJAAN
1
2
D.
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
D.1
Membuat 1 m3 lantai kerja beton tumbuk 1 PC : 3 Ps : 5 krk, tebal 5 cm (n0n SNI) 10.0000 kg
Semen PC @ 50 kg
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
1,300.00
0.0260 m³
Pasir pasang
380,400.00
0.0440 m³
batu koral / koral beton
447,720.00
200.0000 liter
Air
100.00
1.1500 Oh
Pekerja
80,000.00
0.2000 Oh
Tukang
110,000.00
0.0200 Oh
Kepala tukang
150,000.00
0.0600 Oh
Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
D.2
Membuat 1 m3 beton mutu f’c = 19,3 Mpa 371.0000 kg
Semen PC @ 50 kg
1,300.00
0.6980 m³
Pasir pasang
380,400.00
1.0470 m³
Batu koral / Koral beton
447,720.00
1.6500 Oh
Pekerja
80,000.00
0.2750 Oh
Tukang
110,000.00
0.0280 Oh
Kepala tukang
150,000.00
0.0830 Oh
Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
G.3
10 kg Pembesian dengan besi polos/ulir 10.5000 kg
Besi beton
13,000.00
0.0150 kg
Kawat beton
20,000.00
0.0700 Oh
Pekerja
80,000.00
0.0700 Oh
Tukang
110,000.00
0.0070 Oh
Kepala tukang
150,000.00
0.0040 Oh
Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan Dihitung per kg maka HSP/10
G.4
Pembongkaran Bekisting 1 m³ beton 2.0000 Oh
Pekerja
80,000.00
0.2000 Oh
Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
KODE ANALISA
HARGA SATUAN (Rp.)
URAIAN PEKERJAAN
1
2
D.
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.5
1 m² Pasang bekisting untuk sloof
BAHAN
UPAH
3
4
0.0450 m³
Kayu gergajian kelas IV, papan
0.3000 kg
Paku berbagai ukuran
21,000.00
0.1000 ltr
Minyak bekisting
20,000.00
0.5200 Oh
Pekerja
80,000.00
0.2600 Oh
Tukang
110,000.00
0.0260 Oh
Kepala tukang
150,000.00
0.0260 Oh
Mandor
150,000.00
Untuk 1 m³ beton memerlukan bekisting = 5,77 x 0.1250
2,500,000.00
198,800.00
Overhead & profit 12,5% Harga Satuan Pekerjaan
G.6
1 m² Pasang bekisting untuk kolom 0.0400 m³
Kayu gergajian kelas IV, papan
0.4000 kg
Paku berbagai ukuran
0.2000 ltr
Minyak bekisting
0.0150 m³
Kayu gergajian kelas IV, balok
0.3500 lbr
Plywood uk. 1,22 x 2,44 (m), tebal 9 mm
2.0000 btg
Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
0.6600 Oh
Pekerja
80,000.00
0.3300 Oh
Tukang
110,000.00
0.0330 Oh
Kepala tukang
150,000.00
0.0330 Oh
Mandor
150,000.00
Untuk 1 m³ beton memerlukan bekisting = 11,54 x 0.1250
2,500,000.00 21,000.00 20,000.00 2,500,000.00 35,000.00 7,000.00
275,150.00
Overhead & profit 12,5% Harga Satuan Pekerjaan
G.6
1 m² Pasang bekisting untuk balok 0.0400 m³
Kayu gergajian kelas IV, papan
0.4000 kg
Paku berbagai ukuran
0.2000 ltr
Minyak bekisting
0.0180 m³
Kayu gergajian kelas IV, balok
0.3500 lbr
Plywood uk. 1,22 x 2,44 (m), tebal 9 mm
2.0000 btg
Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
0.6600 Oh
Pekerja
80,000.00
0.3300 Oh
Tukang
110,000.00
0.0330 Oh
Kepala tukang
150,000.00
0.0330 Oh
Mandor
150,000.00
Untuk 1 m³ beton memerlukan bekisting = 8,65 x 0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
G.7
1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg G.20
Bekisting
G.10
Beton
G.13
Besi
G.16
Bongkaran
1 m³ Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 75 kg G.20 Bekisting
2,500,000.00 21,000.00 20,000.00 2,500,000.00 35,000.00 7,000.00
282,650.00
KODE ANALISA
URAIAN PEKERJAAN
1
D.
2
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON G.10 Beton G.13 Besi G.16 Bongkaran
1 m³ Membuat beton bertulang 1 : 2 : 3 untuk ringbalk, dengan pembesian 75 kg G.20 Bekisting G.10 Beton G.13 Besi G.16 Bongkaran
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
JUMLAH (Rp.) 5
13,000.00 9,890.40 19,699.68 20,000.00 92,000.00 22,000.00 3,000.00 9,000.00 188,590.08 23,573.76 212,163.84 482,300.00 265,519.20 468,762.84 132,000.00 30,250.00 4,200.00 12,450.00 1,395,482.04 174,435.26 1,569,917.30 136,500.00 300.00 5,600.00 7,700.00 1,050.00 600.00 151,750.00 18,968.75 170,718.75 17,071.88 160,000.00 30,000.00 190,000.00 23,750.00 213,750.00
50
JUMLAH (Rp.) 5
112,500.00 6,300.00 2,000.00
120,800.00
41,600.00 28,600.00 3,900.00 3,900.00 198,800.00 1,147,076.00 143,384.50
24850
1,290,460.50 223,650.00
100,000.00 8,400.00 4,000.00 37,500.00 12,250.00 14,000.00 52,800.00 36,300.00 4,950.00 4,950.00 275,150.00 3,175,231.00 396,903.88
34393.75
3,572,134.88 309,543.75
100,000.00 8,400.00 4,000.00 45,000.00 12,250.00 14,000.00 52,800.00 36,300.00 4,950.00 4,950.00 282,650.00 2,444,922.50 305,615.31 2,750,537.81 317,981.25 1,147,076.00 1,395,482.04 1,138,125.00 190,000.00 3,870,683.04
3,175,231.00
35331.25
JUMLAH (Rp.) 5 1,395,482.04 1,138,125.00 190,000.00 5,898,838.04
2,444,922.50 1,395,482.04 1,138,125.00 208,125.00 5,186,654.54
KODE ANALISA
URAIAN PEKERJAAN
1
2
M.
ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA
M.1
Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75.80
HARGA SATUAN (Rp.) BAHAN 3.00
3.0650 kg
Besi baja ringan profil C75.80
18,862.75
0.1000 %
Peralatan
57,814.31
UPAH 4.00
0.7340 Oh Pekerja
80,000.00
0.7340 Oh Tukang
110,000.00
0.0730 Oh Kepala tukang
150,000.00
0.0370 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
M.2
1 m² Pasang kaca bening tebal 3 mm 1.1000 m² Kaca bening tebal 3 mm
82,000.00
0.0500 Kg Sealent
25,000.00
0.0150 Oh Pekerja
80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0008 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.)
1,488M'14.500 149.941 1 M2 Atap Spandek Z 75.581 Bahan Nok Zincalume t 77.881 1M2 PA
5.00
57,814.31 5,781.43 58,720.00 80,740.00 10,950.00 5,550.00 219,555.75 27,444.47 247,000.21 90,200.00 1,250.00 1,200.00 16,500.00 2,250.00 120.00 111,520.00 13,940.00 125,460.00
272,455,000.00
00 21.576 C- 75, 0.62,23 M2 PASANG KUDA-K k Zincalume 1,100 M255 anPASANGAN ATAP SP me tebal 0,35 mm1,100 M
,232M'12.500 27.900 B -KUDA BAJA RINGA 55.000 60.500 Screw C
0 M'65.000 71.500 Scre SPANDECK ZINCALUM
0 Baut (Srew driver)28, GAN + RENG UNTUK w Cteks 12-4 x 506,000
crew Cteks 10 x 16-166, UMEBahanUpahJUMLA
8,000Bh350 9.800 Dyn K ATAP ASBES/SPAN 00 Bh1.200 7.200 Screw 6,000 Bh750 Pekerja0, LAH1M' PASANGAN N
ynabolt1,600Bh3.500 5. ANDEKBahanUpahJUM ew Cteks 10 x 16-162,00 0,02 Oh43.000 645 Tu NOK ZINCALUMEUpa
5.600 Reng 5,400M'7.0 UMLAH1 M2 PASANG ,000 Bh750 1.500 Peker Tukang atap0,08 Oh62.7 pahJUMLAH
7.000 37.800 Talang Ju NG KUDA-KUDA BAJ kerja0,02 Oh43.000 64 2.750 4.706 Kepala tuka
Jurai0,124M'48.000 5.9 AJA RINGAN + RENG 645 Tukang atap0,08 Oh
ukang0,01 Oh72.500 58
5.952 Pekerja0,200 Oh NG UNTUK ATAP GE Oh62.750 4.706 Kepala 580 Mandor0,006 Oh75
Oh43.000 8.600 Tukang GENTENG BIASA/ME ala tukang0,01 Oh72.50 75.000 450
ng besi0,450 Oh62.750 METALBahanUpahJUM 500 580 Mandor0,006 O
50 28.238 Kepala tukang UMLAH 6 Oh75.000 450
ang0,010 Oh72.500 725
25 Mandor0,050 Oh75.
Oh75.000 3.750
KODE ANALISA
URAIAN PEKERJAAN
1
2
D.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING
D.1
1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
70.0000 bh
Batu bata merah (lokal)
1,200.00
11.5000 kg
Semen PC @ 50 kg
1,300.00
0.0430 m³ Pasir pasang
380,400.00
0.3000 Oh Pekerja
80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0150 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
84,000.00 14,950.00 16,357.20 24,000.00 11,000.00 1,500.00 2,250.00 154,057.20 19,257.15 173,314.35
KODE ANALISA
URAIAN PEKERJAAN
1
2
E.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
E.1
1 m² Plesteran 1 PC : 2 Ps, tebal 15 mm 8.5200 kg
Semen PC @ 50 kg
0.0170 m³ Pasir pasang
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
1,300.00 380,400.00
0.2000 Oh Pekerja
80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0100 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
E.2
1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm 6.2400 kg
Semen PC @ 50 kg
0.0240 m³ Pasir pasang 0.3000 Oh
Pekerja
1,300.00 380,400.00 80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0150 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
11,076.00 6,466.80 16,000.00 16,500.00 2,250.00 1,500.00 53,792.80 6,724.10 60,516.90 8,112.00 9,129.60 24,000.00 16,500.00 2,250.00 2,250.00 62,241.60 7,780.20 70,021.80
KODE ANALISA
URAIAN PEKERJAAN
1
2
L.
ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK
L.1
1 m² Pasangan lantai keramik 20 cm x 20 cm 1.0500 m² Keramik 20 x 20 (cm) putih / berwarna 10.4000 kg
Semen PC @ 50 kg
0.0450 m³ Pasir pasang 0.5000 kg
Semen warna
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
2,240.00 1,300.00 380,400.00 11,500.00
0.7000 Oh Pekerja
80,000.00
0.3500 Oh Tukang
110,000.00
0.0350 Oh Kepala tukang
150,000.00
0.0350 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.2
1 m² Pasangan lantai keramik 30 cm x 30 cm 1.0500 m² Keramik 30 x 30 (cm) putih / berwarna 10.0000 kg
Semen PC @ 50 kg
0.0450 m³ Pasir pasang 0.5000 kg
Semen warna
52,000.00 1,300.00 380,400.00 11,500.00
0.7000 Oh Pekerja
80,000.00
0.3500 Oh Tukang
110,000.00
0.0350 Oh Kepala tukang
150,000.00
0.0350 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.3
1 m' Pasangan plint keramik 10 cm x 30 cm 3.5300 bh
Plint keramik 10 x 30 cm
1.1400 kg
Semen PC @ 50 kg
0.0030 m³ Pasir pasang 0.1000 kg
Semen warna
4,727.27 1,300.00 380,400.00 11,500.00
0.0900 Oh Pekerja
80,000.00
0.0900 Oh Tukang
110,000.00
0.0090 Oh Kepala tukang
150,000.00
0.0045 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.4
1 m² Pasangan dinding keramik 20 cm x 25 cm 1.0000 m² Keramik 20 x 25 (cm) 9.3000 m³ Semen PC @ 50 kg 0.0180 m³ Pasir pasang 1.5000 kg
Semen warna
2,400.00 1,300.00 380,400.00 11,500.00
0.6000 Oh Pekerja
80,000.00
0.4000 Oh Tukang
110,000.00
0.0400 Oh Kepala tukang
150,000.00
0.0300 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.5
1 m² Pasangan dinding keramik 20 cm x 20 cm 26.5000 m² Keramik KM/WC anti slip 20 x 20 (cm) 9.3000 m³ Semen PC @ 50 kg 0.0180 m³ Pasir pasang 1.9400 kg
Semen warna
2,240.00 1,300.00 380,400.00 11,500.00
0.9000 Oh Pekerja
80,000.00
0.4500 Oh Tukang
110,000.00
KODE ANALISA
URAIAN PEKERJAAN
1
L.
2
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK 0.0450 Oh Kepala tukang
150,000.00
0.0450 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.6
1 m² Pasangan dinding batu tempel hitam 1.0500 m² Batu alam Andesit 11.7500 m³ Semen PC @ 50 kg 0.0350 m³ Pasir pasang 0.6200 kg
Semen warna
175,000.00 1,300.00 380,400.00 11,500.00
0.3500 Oh Pekerja
80,000.00
0.0350 Oh Tukang
110,000.00
0.0300 Oh Kepala tukang
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
L.7
Pemasangan 1 m2 paving block segi 6 tebal 8 cm 1.0100 m² Pavingblock segi 6 tebal 8 cm 0.0500 m³ Pasir pasang
62,500.00 380,400.00
0.2500 Oh Pekerja
80,000.00
0.5000 Oh Tukang
110,000.00
0.0500 Oh Kepala tukang
150,000.00
0.0013 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.)
272,455,000.00
5
2,352.00 13,520.00 17,118.00 5,750.00 56,000.00 38,500.00 5,250.00 5,250.00 143,740.00 17,967.50 161,707.50 54,600.00 13,000.00 17,118.00 5,750.00 56,000.00 38,500.00 5,250.00 5,250.00 195,468.00 24,433.50 219,901.50 16,687.27 1,482.00 1,141.20 1,150.00 7,200.00 9,900.00 1,350.00 675.00 39,585.47 4,948.18 44,533.66 2,400.00 12,090.00 6,847.20 17,250.00 48,000.00 44,000.00 6,000.00 4,500.00 141,087.20 17,635.90 158,723.10 59,360.00 12,090.00 6,847.20 22,310.00 72,000.00 49,500.00
JUMLAH (Rp.)
272,455,000.00
5 6,750.00 6,750.00 235,607.20 29,450.90 265,058.10 183,750.00 15,275.00 13,314.00 7,130.00 28,000.00 3,850.00 4,500.00 255,819.00 31,977.38 287,796.38 63,125.00 19,020.00 20,000.00 55,000.00 7,500.00 195.00 164,840.00 20,605.00 185,445.00
KODE ANALISA
URAIAN PEKERJAAN
1
2
I.
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT
I.1
1 m² Langit-langit plywood uk. 122 cm x 244 cm, tebal 4 mm
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
0.3750 lbr
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm
65,000.00
0.0300 kg
Paku berbagai ukuran
21,000.00
0.0700 Oh Pekerja
80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0035 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
24,375.00 630.00 5,600.00 11,000.00 1,500.00 525.00 43,630.00 5,453.75 49,083.75
KODE ANALISA
URAIAN PEKERJAAN
1
H. H.01
2
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP 1 m² Pasang atap metal biasa (77x80 cm) setara Sakura Roof 1.0200 lbr
Atap metal (biasa / polos)
29,500.00
0.2000 kg
Paku seng
30,000.00
0.2000 Oh Pekerja
80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0100 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
H.02
1 m' Pasang atap nok genteng metal setara Sakura Roof 1.1000 lbr
Bubungan atap (nok) metal (setara Sakura Roof)
24,500.00
JUMLAH (Rp.) 5
30,090.00 6,000.00 16,000.00 11,000.00 1,500.00 1,500.00 66,090.00 8,261.25 74,351.25 26,950.00
KODE ANALISA
URAIAN PEKERJAAN
1
2
F.
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.0
Pekerjaan Lantai Papan Kayu Diketam 0.0254 m³ Kayu gergajian kelas II, papan 0.2500 kg
Paku berbagai ukuran
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
4,250,000.00 21,000.00
0.2800 Oh Pekerja
80,000.00
0.8000 Oh Tukang
110,000.00
0.0800 Oh Kepala tukang
150,000.00
0.0140 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
F.1
1 m³ Pembuatan dan Pasang kusen pintu / jendela, kayu kelas IV 1.2000 m³ Kayu gergajian kelas IV, balok
2,500,000.00
1.2500 m³ Paku berbagai ukuran
21,000.00
1.0000 kg
13,000.00
Lem Kayu
6.0000 Oh Pekerja
80,000.00
18.0000 Oh Tukang
110,000.00
1.8000 Oh Kepala tukang
150,000.00
0.3000 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
F.2
1 m² Pembuatan dan Pasang daun pintu / jendela panel, kayu kelas IV 0.0400 m³ Kayu gergajian kelas IV, papan 0.5000 kg
Lem kayu
2,500,000.00 13,000.00
1.0000 Oh Pekerja
80,000.00
3.0000 Oh Tukang
110,000.00
0.3000 Oh Kepala tukang
150,000.00
0.0500 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
F.3
1 m² Pembuatan dan Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas II 0.0350 m³ Kayu gergajian kelas IV, papan
2,500,000.00
1.0000 m² Kaca bening tebal 3 mm
82,000.00
0.0300 kg
21,000.00
Paku berbagai ukuran
0.8000 Oh Pekerja
80,000.00
2.0000 Oh Tukang
110,000.00
0.2000 Oh Kepala tukang
150,000.00
0.0400 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
F.4
1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas IV 0.0120 m³ Kayu gergajian kelas IV, balok 0.1000 kg
Paku berbagai ukuran
2,500,000.00 21,000.00
0.1500 Oh Pekerja
80,000.00
0.2500 Oh Tukang
110,000.00
0.0250 Oh Kepala tukang
150,000.00
0.0750 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
KODE ANALISA
URAIAN PEKERJAAN
1
2
F.
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.5
1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas IV 0.0108 m³ Kayu gergajian kelas IV, papan 0.1000 kg
Paku berbagai ukuran
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
2,500,000.00 21,000.00
0.1000 Oh Pekerja
80,000.00
0.2000 Oh Tukang
110,000.00
0.0200 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
107,950.00 5,250.00 22,400.00 88,000.00 12,000.00 2,100.00 237,700.00 29,712.50 267,412.50 3,000,000.00 26,250.00 13,000.00 480,000.00 1,980,000.00 270,000.00 45,000.00 5,814,250.00 726,781.25 6,541,031.25 100,000.00 6,500.00 80,000.00 330,000.00 45,000.00 7,500.00 569,000.00 71,125.00 640,125.00 87,500.00 82,000.00 630.00 64,000.00 220,000.00 30,000.00 6,000.00 490,130.00 61,266.25 551,396.25 30,000.00 2,100.00 12,000.00 27,500.00 3,750.00 11,250.00 86,600.00 10,825.00 97,425.00
JUMLAH (Rp.) 5
27,000.00 2,100.00 8,000.00 22,000.00 3,000.00 750.00 62,850.00 7,856.25 70,706.25
KODE ANALISA
URAIAN PEKERJAAN
1
2
J.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
J.1
Memasang 1 buah klosed jongkok keramik
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
1.0000 bh
Closed jongkok keramik
220,000.00
7.0000 bh
Batu bata merah (lokal)
1,200.00
6.0000 kg
Semen PC @ 50 kg
0.0100 m³ Pasir pasang
1,300.00 380,400.00
1.0000 Oh Pekerja
80,000.00
1.5000 Oh Tukang
110,000.00
0.1500 Oh Kepala tukang
150,000.00
0.1600 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.2
Memasang 1 buah bak mandi beton volume 0,6 m³ 0.9000 m³ Beton 1:2:3 90.0000 kg
Besi beton
8.0000 m³ Kayu bekisting 500.0000 bh 10.0000 %
Keramik 20 x 20 (cm) putih / berwarna
188,590.08 13,000.00 120,800.00 2,240.00
Perlengkapan
3.5000 Oh Pekerja
80,000.00
4.5000 Oh Tukang
110,000.00
0.0500 Oh Kepala tukang
150,000.00
0.0180 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.3
Memasang 1 m' Gorong-gorong/Buis beton dia "60 1.1000 bh
J.4
Gorong-gorong/Buis beton dia "60
400,000.00
25.0000 bh
Batu bata merah (lokal)
1,200.00
10.3000 kg
Semen PC @ 50 kg
1,300.00
0.0610 m³ Pasir pasang
380,400.00
0.0690 m³ Pasir urug / timbun
355,400.00
0.3800 Oh Pekerja
80,000.00
0.1900 Oh Tukang
110,000.00
0.0190 Oh Kepala tukang
150,000.00
0.0190 Oh Mandor
150,000.00
Memasang 1 bh bak kontrol pas. batu bata uk. 60 cm x 60 cm, tinggi 65 cm 167.0000 bh
Batu bata merah (lokal)
114.0000 kg
Semen PC @ 50 kg
1,200.00 1,300.00
0.1840 m³ Pasir pasang
380,400.00
0.0330 m³ Sirtu
215,000.00
4.8500 kg
Besi beton
0.1200 m³ Pasir pasang
13,000.00 380,400.00
2.1600 Oh Pekerja
80,000.00
0.7200 Oh Tukang
110,000.00
0.0720 Oh Kepala tukang
150,000.00
0.1080 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.5
Memasang 1 m' pipa PVC type AW ø 3" 1.2000 m' 35.0000 %
Pipa PVC ø 3 (inch) AW, panjang 4 m Perlengkapan (dari harga pipa)
35,000.00 -
0.0810 Oh Pekerja
80,000.00
0.1350 Oh Tukang
110,000.00
KODE ANALISA
URAIAN PEKERJAAN
1
J.
2
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI 0.1350 Oh Kepala tukang
150,000.00
0.0041 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.6
Memasang 1 m' pipa PVC type AW ø 4" - 6" 1.2000 m' 35.0000 %
Pipa PVC ø 4 - 6 (inch) AW, panjang 4 m Perlengkapan (dari harga pipa)
60,000.00 -
0.0810 Oh Pekerja
80,000.00
0.1350 Oh Tukang
110,000.00
0.0135 Oh Kepala tukang
150,000.00
0.0040 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.7
Memasang 1 bh kran air ø 3/4" atau 1/2" 1.0000 bh
Kran air ø 0,75 (inch)
0.0250 bh
Sealtape
55,000.00 3,000.00
0.0100 Oh Pekerja
80,000.00
0.4000 Oh Tukang
110,000.00
0.0400 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.8
Memasang 1 bh kran Wastafel 1.0000 bh
Kran Wastafel
0.0250 bh
Sealtape
566,100.00 3,000.00
0.0100 Oh Pekerja
80,000.00
0.4000 Oh Tukang
110,000.00
0.0400 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
J.9
Memasang 1 bh floor drain 1.0000 bh
Floor drain Stainless
0.0100 Oh Pekerja
125,000.00 80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
220,000.00 8,400.00 7,800.00 3,804.00 80,000.00 165,000.00 22,500.00 24,000.00 531,504.00 66,438.00 597,942.00 169,731.07 1,170,000.00 966,400.00 1,120,000.00 280,000.00 495,000.00 7,500.00 2,700.00 4,211,331.07 526,416.38 4,737,747.46 440,000.00 30,000.00 13,390.00 23,204.40 24,522.60 30,400.00 20,900.00 2,850.00 2,850.00 588,117.00 200,400.00 148,200.00 69,993.60 7,095.00 63,050.00 45,648.00 172,800.00 79,200.00 10,800.00 16,200.00 813,386.60 101,673.33 915,059.93 42,000.00 14,700.00 6,480.00 14,850.00
JUMLAH (Rp.) 5 20,250.00 615.00 98,895.00 12,361.88 111,256.88 72,000.00 25,200.00 6,480.00 14,850.00 2,025.00 600.00 121,155.00 15,144.38 136,299.38 55,000.00 75.00 800.00 44,000.00 6,000.00 750.00 106,625.00 13,328.13 119,953.13 566,100.00 75.00 800.00 44,000.00 6,000.00 750.00 617,725.00 77,215.63 694,940.63 125,000.00 800.00 11,000.00 1,500.00 750.00 139,050.00 17,381.25 156,431.25
KODE ANALISA
URAIAN PEKERJAAN
1
2
K.
ANALISA BIAYA PEKERJAAN CAT DAN TALANG
K.1
1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) Eksterior
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
0.1000 kg
Cat dasar tembok
25,000.00
0.2600 kg
Cat tembok eksterior
38,000.00
0.1000 kg
Plamuer tembok
12,000.00
0.0200 Oh Pekerja
80,000.00
0.0630 Oh Tukang
110,000.00
0.0063 Oh Kepala tukang
150,000.00
0.0030 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
K.2
1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) Interior 0.1000 kg
Cat dasar tembok
25,000.00
0.2600 kg
Cat tembok interior
22,000.00
0.1000 kg
Plamuer tembok
12,000.00
0.0200 Oh Pekerja
80,000.00
0.0630 Oh Tukang
110,000.00
0.0063 Oh Kepala tukang
150,000.00
0.0030 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
K.3
1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) 0.2000 kg
Cat menie
45,000.00
0.1500 kg
Plamuer Kayu
12,000.00
0.1700 kg
Cat dasar Kayu
35,000.00
0.3500 kg
Cat minyak kayu
52,000.00
0.0700 Oh Pekerja
80,000.00
0.1050 Oh Tukang
110,000.00
0.0040 Oh Kepala tukang
150,000.00
0.0030 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
JUMLAH (Rp.) 5
2,500.00 9,880.00 1,200.00 1,600.00 6,930.00 945.00 450.00 23,505.00 2,938.13 26,443.13 2,500.00 5,720.00 1,200.00 1,600.00 6,930.00 945.00 450.00 19,345.00 2,418.13 21,763.13 9,000.00 1,800.00 5,950.00 18,200.00 5,600.00 11,550.00 600.00 450.00 53,150.00 6,643.75 59,793.75
KODE ANALISA
URAIAN PEKERJAAN
1
2
N.
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT
N.1
1 Buah pasang kunci tanam kamar 1.0000 bh
Kunci tanam kamar biasa
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
160,000.00
0.0100 Oh Pekerja
80,000.00
0.5000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.2
1 Buah pasang engsel pintu/jendela 3" 1.0000 bh Engsel pintu / jendela 3" Stainless
45,000.00
0.0150 Oh Pekerja
80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0008 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.3
1 Buah pasang engsel pintu/jendela 4" 1.0000 bh Engsel pintu / jendela 4" Stainless
70,000.00
0.0150 Oh Pekerja
80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0008 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.4
1 Buah pasang kait angin 1.0000 bh
Kait angin
30,000.00
0.0150 Oh Pekerja
80,000.00
0.1500 Oh Tukang
110,000.00
0.0150 Oh Kepala tukang
150,000.00
0.0008 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.5
1 Buah pasang door closer 1.0000 bh
Door closer
251,000.00
0.0500 Oh Pekerja
80,000.00
0.5000 Oh Tukang
110,000.00
0.0500 Oh Kepala tukang
150,000.00
0.0030 Oh Mandor
150,000.00
0.1250
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.6
1 Buah pasang pegangan pintu/door holder 1.0000 bh
Pegangan pintu/door holder
66,000.00
0.0500 Oh Pekerja
80,000.00
0.5000 Oh Tukang
110,000.00
0.0500 Oh Kepala tukang
150,000.00
0.0030 Oh Mandor
150,000.00
KODE ANALISA
URAIAN PEKERJAAN
1
2 0.1250
HARGA SATUAN (Rp.) BAHAN
UPAH
3
4
Overhead & profit 12,5% Harga Satuan Pekerjaan
N.7
1 Buah pasang door stop 1.0000 bh
Door stop
18,000.00
0.0100 Oh Pekerja
80,000.00
0.1000 Oh Tukang
110,000.00
0.0100 Oh Kepala tukang
150,000.00
0.0050 Oh Mandor
150,000.00
JUMLAH (Rp.) 5
160,000.00 800.00 55,000.00 1,500.00 750.00 218,050.00 27,256.25 245,306.25 45,000.00 1,200.00 16,500.00 2,250.00 112.50 65,062.50 8,132.81 73,195.31 70,000.00 1,200.00 16,500.00 2,250.00 112.50 90,062.50 11,257.81 101,320.31 30,000.00 1,200.00 16,500.00 2,250.00 112.50 50,062.50 6,257.81 56,320.31 251,000.00 4,000.00 55,000.00 7,500.00 450.00 317,950.00 39,743.75 357,693.75 66,000.00 4,000.00 55,000.00 7,500.00 450.00 132,950.00
JUMLAH (Rp.) 5 16,618.75 149,568.75 18,000.00 800.00 11,000.00 1,500.00 750.00 32,050.00
DATA PERHITUNGAN VOLUME+A251 I.
PEKERJAAN PERSIAPAN
1
Pek. Pembersihan Lokasi Site PANJANG
X
LEBAR
109 2
45
4905 4905 M2
2 2
194.4 82 276.4 M'
Pek. Pasang Bouwplank PANJANG
X
UNIT
97.2 41 3
Luas Bangunan (IMB) PANJANG
Lt. 1 Lt. 2
X
LEBAR
95.2 43 12
II.
PEKERJAAN STRUKTUR
A.
PEKERJAAN GALIAN TANAH & URUGAN PASIR
1
Pek. Galian Tanah PANJANG
2
LEBAR
1.25
1.25
POER
1.25
1.25
Pondasi Tangga SLOOF
0.7 95.2
0.6 0.4
41
0.4
1 4 4
X
UNIT
= = =
X
144 24 72 10 20
DALAM
=
2 0.5 2 0.5 0.5
X
LEBAR 1
X
DALAM 1
=
TEBAL 0.1
X
224.7
M3
UNIT
=
Pek. Urugan Pasir Bawah Poer ,Pond.Tangga & Sloof S1 t=10cm
POER
PANJANG 1
X
LEBAR 1
X
1
1
0.1
Pondasi Tangga
0.7
0.6
0.1
SLOOF
95.2
0.2
0.1
41
0.2
0.1
144 24 72 10 20
Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm PANJANG
X
LEBAR
224.7
PEKERJAAN PONDASI & STRUKTUR DASAR
1
Pek. Aanstamping Batukali PANJANG
X
TEBAL
0.8
B.
X
224.7
2
UNIT
Pek. Galian Tanah Pondasi batu belah
PLAT SETEMPAT
4
X
PLAT SETEMPAT
PANJANG 224.7
3
X
41 5 5
=
0.1
LEBAR
X
TEBAL
0.8
17.976
M3
26.964
M3
TINGGI
=
=
0.15
Pek. Pondasi Batu kali camp. 1Pc:4Psr PANJANG 224.7
X
PENAMPANG PONDASI
0.3 +
0.6
2
X
0.7
3
Pek. Lantai Kerja dibawah Pond.plat, Pond. Tangga & Sloof t=5 cm PANJANG PLAT SETEMPAT POER
4
0.7
0.6
0.05
SLOOF
95.2
0.2
0.05
41
0.2
0.05
X
1
LEBAR
X
1
UNIT
=
144 24 72 10 20
TEBAL
X
UNIT
=
144
0.25
POER X
1
LEBAR
X
1
TEBAL
X
UNIT
=
24
0.25
Pondasi Tangga PANJANG Pondasi Tangga
X
0.7
LEBAR
X
0.6
TEBAL
X
UNIT
=
72
0.25
Sloof SL 1 SL 2
PANJANG 95.2 41
X
PANJANG
X
UNIT
=
10 20
PANJANG
X
952 820 1772 M'
LEBAR
X
0.2 0.2
Sloof 15/20 1
2
X
Pek. Pondasi plat setempat
POER
6
TEBAL
Pondasi Tangga
PANJANG
5
X
0.05 0.05
PANJANG
1
LEBAR 1 1
PLAT SETEMPAT
1
X
1 1
UNIT
=
1
Pek. Lantai Kerja t=5 cm,dibawah beton lantai wiremesh PANJANG X LEBAR 95.2 41
PANJANG
X
224.7
X
UNIT
X
0.15
= 1
LEBAR
LUAS X 3903.2 3,903.20 M2
C. 1
2
3
PEKERJAAN BETON Lantai 1 Pekerjaan kolom Beton K1 (40/40)
5
6
7
PANJANG X 0.5
LEBAR 0.5
X
X
TINGGI 3.78
PANJANG X 0.3
LEBAR 0.3
X
X
PENAMPANG KOLOM X 0.15 X 0.15 0.15 X 0.15
TINGGI 3.78 1
X
PENAMPANG BALOK X 0.3 X 0.6 0.3 X 0.6
PANJANG 7 6
X
PENAMPANG BALOK X 0.2 X 0.4 0.2 X 0.4 0.2 X 0.4
PANJANG 3 3 3
X
Pekerjaan kolom Beton K2 (30/30)
Pek Kolom Praktis KP 15/15 DINDING BATA
4
TINGGI 6.78
Pek. Balok B1 30/60 cm
Pek. Balok B2 20/40 cm
Pek. Plat Lantai PANJANG X 39 4 6
LEBAR
X
PANJANG X 88.2
LEBAR 2.75
UNIT
7 5 12
=
LUAS X 1092 80 288 1,460.00 M2
=
LUAS X 485.1 485.10 M2
4 4 4
Pek. Plat Talang Beton KANAN
X
UNIT 2
Lantai 2 1
Pekerjaan kolom Beton K2 (30/30) TINGGI
LEBAR 0.3
X
PENAMPANG KOLOM X 0.15 X 0.15
TINGGI
X
PENAMPANG BALOK X 0.2 X 0.4 0.2 X 0.4
PANJANG 26 28.4
X
PENAMPANG BALOK X 0.15 X 0.2 0.15 X 0.2
PANJANG 7 6
X
3 2
4
PANJANG X 0.3
Pek Kolom Praktis KP 15/15 DINDING BATA
3
X
3
Pek. Balok B2 20/40 cm
Pek. Balok RB 15/20 cm
0.15 0.15
1
PEKERJAAN ATAP
1
Pekerjaan Luas rangka atap PANJANG
PENAMPANG KOLOM X 0.15 X 0.15
TINGGI
PANJANG
PENAMPANG BALOK X 0.15 X 0.2 0.15 X 0.2 0.15 X 0.2
PANJANG 7 7.2 5
LEBAR
X
53.25 53.25 M'
X
UNIT
=
2 4
Pekerjaan Pasang Angkur baut Ø 16 mm, Pjg 25 cm JUMLAH UNIT 8 X 1
106.50 106.50 M'
X
UNIT 144
1152
0.3
X
UNIT 144
Berat 97.222222
JUMLAH 2
X
UNIT 11
Berat #REF!
X X X
UNIT 22 11 132
Berat #REF! #REF! #REF!
UNIT
Berat
Pekerjaan Base Plat t=12mm LUAS PLAT
Pekerjaan Kuda-kuda baja IWF KUDA-A
1
PANJANG 12.6 X
Pekerjaan Plat Simpul PINGGIR ATAS PADA IWF
1
UNIT
Lisplang
0.3 1
X
=
1
53.25 -
1
JUMLAH
UNIT
53.25
PANJANG
1
X 3
Bubung atap Metal NOK UTAMA
2
5 3
Pek. Balok RB 15/20 cm
E.
1
0.2 0.2
Lantai 3 Pek Kolom Praktis KP 15/15 DINDING BATA
2
X X
LUAS PLAT 0.3 0.3 0.2 0.3 0.07 0.3
Pekerjaan Siku dudukan Gordeng PANJANG
JUMLAH
Bh
KUDA-A 1
1
0.6
16
X
11
PANJANG 52.5 X
JUMLAH 8
X
UNIT 2
Berat 7.5166667
PANJANG 8 X
JUMLAH 2
X
UNIT 20
Berat 1.5833333
Pekerjaan Trekstang Gordeng
PEKERJAAN ARSITEKTUR
B.
PEKERJAAN KUSEN Pek. Kusen Pintu/jendela lengkap accessories Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type
2
4
1
3
J2 J3
RD PH P1 PVC J1 J2 J3
UNIT 72 4 4 14 80 4 30
PANJANG
7.5 24.9 5.2
JUMLAH 0 0 0 0 600 99.6 156 855.6
M' M' M' M' M' M' M' M'
PANJANG 0.48
LEBAR 1.38
JUMLAH 2
PANJANG 0.48 1.02 0.5
LEBAR 1.38 1.7 1.9
JUMLAH 2 1 1
Pek. Pasang Kaca Polos 5 mm J1 J2 J3
UNIT 80 4 30
PEKERJAAN PENGGANTUNG & PENGUNCI Pek. Kunci Pintu tanam aluminium Kusen Type Kusen Type
2
PVC J1
Pek. Daun Jendela Aluminium (tanpa kaca) UNIT Kusen Type 80 J1
Kusen Type Kusen Type Kusen Type
B.
UNIT 72 4 4 14 80 4 30
RD PH P1
Pek. Kusen Aluminium Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type Kusen Type
3
-
Pekerjaan Gordeng C
II. 1
X
P1 P2
BH 4 2 6
Pek. Kunci Pintu Bulat(KM/WC) Kusen Type P3 Pek. Engsel Pintu
BH 4 BH
Kusen Type Kusen Type Kusen Type 4
Pek. Slot Pintu tanam
5
Kusen Type P1 Pek. Slot Putar Jendela Kusen Type Kusen Type
6
24 6 12 42
P1 P2 P3
BH 4 BH 20 4 24
J1 J2
Pek. Engsel Jendela Kusen Type Kusen Type
C. 1
BH 40 8 48
J1 J2
PEKERJAAN PLAFOND Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 PANJANG 17.50 9.95 8.00
2
3
X
UNIT 2 1 1
=
LUAS 262.50 49.75 40.00
X
X
UNIT 2 2
=
LUAS 9.00 9.00
PANJANG 25.00 14.95 13.00 4.50 4.50
x
JMLH
LEBAR 1.50 1.50
Pekerjaan profil gipsum
C.
2 2 2 2 1
= = = = =
50 m' 29.9 m' 26 m' 9 m' 4.5 m'
PEKERJAAN LANTAI Urugan pasir bawah lantai t=10 cm
PANJANG 47.85 4.50 1.50 KERAMIK RABAT 54.15 4.50 1.50 8.00
X
LEBAR 20.00 1.00 1.50 1.58 1.58 1.95 1.00
X
UNIT 1 4 4 1 4 4 1
X
TEBAL 0.1 0.1 0.1 0.1 0.1 0.1 0.1
=
LUAS 95.70 1.80 0.90 8.56 2.84 1.17 0.80
X
LEBAR 20.00 1.00 1.50
X
UNIT 1 4 4
X
TEBAL 0.05 0.05 0.05
=
LUAS 47.85 0.90 0.45
FLOOR HARDENER
2
LEBAR 7.50 5.00 5.00
Pek. Plafond calsiboard+ Rangka Hollow 40x40 (KM/WC) PANJANG 3.00 3.00
1
X
Lantai kerja t = 5 cm
FLOOR HARDENER
PANJANG 47.85 4.50 1.50
KERAMIK RABAT
1
54.15 4.50 1.50 8.00
X
LEBAR 20.00 1.00 1.50
X
UNIT 1 4 4
X
LEBAR 1.58 1.58 1.95 1.00
1
8.56 1.42 0.59 0.80
X
TEBAL 0.1 0.1 0.1
=
X
UNIT 2 4 4 2
=
LUAS 95.70 1.80 0.90
171.11 28.44 11.70 16.00
Pekerjaan Plin lantai keramik 10X40 PANJANG 51.15 20.00 1.50
11
0.05 0.05 0.05 0.05
Pekerjaan lantai keramik Rabat 40X40 PANJANG 54.15 4.50 1.50 8.00
10
2 4 4 2
Pekerjaan lantai Beton t=10cm + Wiremesh M8 PANJANG 47.85 4.50 1.50
1
1.58 1.58 1.95 1.00
x
JMLH 2 2 4
= = =
102.3 m' 40 m' 6 m'
Pekerjaan lantai keramik KM 20X20 PANJANG 1.50
X
LEBAR 20.00 1.00 1.50
X
LEBAR 3.00
X
JUMLAH 4
Pekerjaan lantai Floorhardener PANJANG 47.85 4.50 1.50
X
UNIT 1 20 1.5
=
LUAS 957.00 90.00 3.38
=
LUAS 18.00
3903.20 860.00 240.00 5003.20 M2
450.00 18.75 60.48 190.40 164.00 883.63 M3
14.40 2.40 3.02 19.04 16.40 55.26 M3
70.7805
M3
7.20 1.20 1.51 9.52 8.20 27.63 M3
36.00 M3 36.00 M3
6.00 M3 6.00 M3
7.56 M3 7.56 M3 TINGGI
=
0.4 0.4
TINGGI
VOLUME
76.16 65.6 141.76 M3
=
0.2
TEBAL = 0.05
VOLUME
6.741 0 0 0 6.741 M3
JUMLAH 195.16 M3 195.16 M3
UNIT = 24.00
40.68 M3
UNIT = 144.00
48.99 M3
UNIT = 140 = 432 =
11.91 M3 9.72 M3 21.63 M3
UNIT
= 40 56
UNIT
50.40 M3 60.48 M3 110.88 M3 =
40 18 12
9.60 4.32 2.88 16.80
M3 M3 M3 M3
TEBAL = 0.12 0.12 0.12
JUMLAH 131.04 9.60 34.56 175.20
M3 M3 M3 M3
TEBAL = 0.1
JUMLAH 48.51 M3 48.51 M3
UNIT = 44.00
11.88 M3
UNIT = 260 =
17.55 M3 17.55 M3
UNIT
= 4 2
UNIT
8.32 M3 4.54 M3 12.86 M3 =
60 56
12.60 M3 10.08 M3
16 8
UNIT
2.40 M3 0.72 M3 25.80 M3
= 44 =
2.97 M3 2.97 M3
UNIT
= 12 4 8
1,260.00 Kg 1,260.00 Kg
#REF! Kg #REF! Kg
#REF! Kg #REF! Kg #REF! Kg #REF! Kg
2.52 0.86 1.20 4.58
M3 M3 M3 M3
-
Kg Kg
6,314.00 Kg 6,314.00 Kg
506.67 Kg 506.67 Kg
1.35 6.5 0.6
2.4 1.7 2
JUMLAH 105.984 M2 105.984 M2 LUAS 105.984 6.936 28.5 141.42
M2 M2 M2 M2
259.20 44.20 36.00 339.40
352.25 M2
18.00 M2
119.40 M'
111.77 M3
60.56 M3
98.40 M3
227.25 M2
148.30 M'
18.00 M2
1,050.38 M2
2.2 1.45 1.985 0.52
11.65 11.65 9.85
3.2 4.1 24 65
7.04 5.945 47.64 33.8 94.425
60.625