14 0 3 MB
RENCANA ANGGARAN BIAYA STRUKTUR & INFRASTRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
NO
URAIAN PEKERJAAN 2. PEKERJAAN PAGAR , TEMPAT SAMPAH & STREET FURNITURE 1 Pagar BRC + pintu h=1.8 - 2m 2 Tempat sampah ( 3 kantong ) 3 Sreet Furniture
1. B.4
SAT
VOLUME
HARGA SATUAN (Rp.)
3.
4.
6.
JUMLAH
(Rp.) 6.
m' bh bh
805.95 42.00 71.00
2,068,000.00 2,750,000.00 1,639,000.00
1,666,708,736.00 115,500,000.00 116,369,000.00
m3
4.99
91,800.00
457,806.60
m3 m3 m3 m3 m2 kg m3 m2
11.25 0.45 0.90 2.25 4.80 211.60 7.29 94.78
85,600.00 2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 11,100.00
963,000.00 1,298,115.00 424,260.00 9,586,800.00 727,680.00 6,305,680.00 457,812.00 1,052,091.30
m3 m2 kg
0.86 5.94 172.80
4,260,800.00 151,600.00 29,800.00
3,681,331.20 900,504.00 5,149,440.00
m3 m2 kg
2.58 12.00 515.00
4,260,800.00 151,600.00 29,800.00
10,971,560.00 1,819,200.00 15,347,000.00
m2 m3 m3
14.00 1.20 0.84
12,500.00 471,400.00 2,884,700.00
175,000.00 565,680.00 2,423,148.00
m3 m2
2.80 420.00
4,260,800.00 29,800.00
11,930,240.00 12,516,000.00
m2 m3 m3
30.00 2.40 1.70
12,500.00 471,400.00 2,884,700.00
375,000.00 1,131,360.00 4,903,990.00
m3 kg
7.31 548.44
4,260,800.00 29,800.00
31,157,100.00 16,343,437.50
m3 kg m2
1.76 352.80 23.52
4,260,800.00 29,800.00 249,300.00
7,516,051.20 10,513,440.00 5,863,536.00
m3 kg m2
1.34 268.80 14.08
4,260,800.00 29,800.00 252,600.00
5,726,515.20 8,010,240.00 3,556,608.00
m3 kg m2
0.88 110.25 28.75
4,260,800.00 29,800.00 252,600.00
3,758,025.60 3,285,450.00 7,262,250.00
m3 m2 m2
2.11 50.00 19.32
4,260,800.00 575,500.00 267,300.00
8,998,809.60 28,775,000.00 5,164,236.00
TOTAL B.4 B.24 A 1
2
3
1
2
RUMAH POMPA DAN PONDASI RESERVOIR WISMA INDONESIA PEKERJAAN STRUKTUR PEKERJAAN TANAH & PONDASI Pekerjaan Tanah a Pekerjaan Timbunan Tanah (Lantai Power House) menaikkan bangunan 15 cm dari level muka tanah Pas. Pondasi tapak/setempat beton bertulang a Pondasi Telapak - type P3 (uk. 130x130cm, tebal 20 cm, termasuk pedestal, kedalaman = 1.5m) - Galian pondasi - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - Bekisting - Besi tulangan - Urugan tanah kembali Pekerjaan Anti Rayap PEKERJAAN STRUKTUR ATAS Pekerjaan Sloof Rumah Pompa a Sloof S1, uk. 20x40cm - Beton K-300 - Bekisting - Besi tulangan Pekerjaan Sloof Reservoir b Sloof S2, uk. 25x40 cm - Beton K-300 - Bekisting - Besi tulangan Pekerjaan Plat Lantai Pekerjaan Plat Lantai Rumah Pompa 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5 4 Beton Plat, tebal 25 cm - Beton K-300 - Besi tulangan Pekerjaan Plat Lantai Reservoir 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5 4 Beton Plat, tebal 30 cm - Beton K-300 - Besi tulangan
3
4
5
B
Pekerjaan Kolom & Dinding Bangunan a Kolom K1 (Struktur Utama), uk. 30x30cm - Beton K-300 - Pembesian - Bekisting Pekerjaan Balok Atap a Balok B2 (Balok Induk), uk. 20x40cm - Beton K-300 - Pembesian - Bekisting b Balok LB, uk. 10x60cm - Beton K-300 - Pembesian - Bekisting Pekerjaan Plat Lantai Atap a Plat Lantai Atap (plat konvensional, tebal 10cm) - Beton K-300 - Wiremesh M8-150 (1 layer) - Bekisting
1 2 3 4 5 6 7 8
PEKERJAAN ARSITEKTUR PEKERJAAN DINDING DAN LAPISAN Pasangan Dinding Batako Kolom praktis & balok praktis, termasuk opening kusen Plester + aci dinding interior & eksterior Perbaikan Permukaan Kolom & Balok Cat Dinding Interior - Acrylic Emultion (Dinding & Kolom) Cat Eksterior, type weathershield Waterprofing Membrane Plat dak atap Screed Pelindung Water Proofing
m2 m3 m2 m2 m2 m2 m2 m2
34.26 0.59 68.52 38.30 36.42 71.16 28.09 23.04
450,900.00 12,974,400.00 153,600.00 127,400.00 67,800.00 81,200.00 255,100.00 173,900.00
15,447,834.00 7,706,793.60 10,524,672.00 4,879,420.00 2,469,276.00 5,778,192.00 7,165,759.00 4,006,656.00
1 2
PEKERJAAN LANTAI Lantai Floor hardener 5kg/m² -- Lantai R. Pompa + Teras dan Ramp Lantai Floor hardener 5kg/m² -- Lantai Ground Reservoir
m2 m2
12.54 30.81
2,111,800.00 2,111,800.00
26,481,972.00 65,069,837.50
1 2
PEKERJAAN PLAFON Plafon Ekspose + lisplank Cat Plafond Interior type Acrylic Emultion (Plafond Ekspose & Balok)
m2 m2
42.32 12.15
127,400.00 67,800.00
5,391,568.00 823,770.00
unit
1.00
8,672,000.00
8,672,000.00
unit
3.00
1,750,000.00
5,250,000.00
m'
19.70
2,068,000.00
40,739,600.00
1 2 3
PEKERJAAN PINTU, JENDELA DAN PARTISI Pintu SD-ME-1 (Akses Masuk R. Pompa) Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m Jendela Grill type 1 Single - Grill Besi - uk. 0.9 x 0.6 m Pagar BRC + Pintu, Area Trafo, h=1.8 - 2m
NO
URAIAN PEKERJAAN
SAT
VOLUME
HARGA SATUAN (Rp.)
JUMLAH
(Rp.)
TOTAL B.24 B.25 A 1
2
B 1
2
C 1
2
PEKERJAAN BAK PENAMPUNG STP (SUMP PIT) BAK PENAMPUNG STP (SUMP PIT) BANGUNAN MESS KARYAWAN Pekerjaan Tanah a Pekerjaan Galian Tanah Galian Bak Penampung STP (Sampit) sedalam 2.85 m Pekerjaan Beton Bertulang a Pekerjaan Dinding Beton, tebal 15cm - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - bekisting - Besi tulangan - Urugan tanah kembali - Water Stop - Pekerjaan Cerucuk Galam 10cm b. Pekerjaan Dinding - Pasangan Dinding Batako
m3
20.78
104,100.00
2,162,833.65
m3 m3 m3 m2 kg m3 m' m'
0.36 0.73 4.33 35.95 405.39 15.36 9.20 224.00
2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 173,800.00 43,300.00
1,051,473.15 343,650.60 18,438,612.00 5,450,020.00 12,080,681.60 964,325.40 1,598,960.00 9,699,200.00
m2
2.30
450,900.00
1,037,070.00
m3
20.78
104,100.00
2,162,833.65
m3 m3 m3 m2 kg m3 m' m'
0.36 0.73 4.33 35.95 405.39 15.36 9.00 224.00
2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 173,800.00 43,300.00
1,051,473.15 343,650.60 18,438,612.00 5,450,020.00 12,080,681.60 964,325.40 1,564,200.00 9,699,200.00
m2
2.30
450,900.00
1,037,070.00
m3
23.47
104,100.00
2,443,200.98
m3 m3 m3 m2 kg m3 m' m'
0.41 0.82 5.33 44.24 563.99 16.90 11.00 308.00
2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 173,800.00 43,300.00
1,187,775.23 388,197.90 22,720,716.00 6,706,026.00 16,806,961.60 1,061,445.60 1,911,800.00 13,336,400.00
m2
3.00
450,900.00
1,352,700.00
m3 m3 m3 m3 m2 kg m3 m2
82.50 0.90 1.80 4.50 12.00 117.51 75.30 130.00
85,600.00 2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 11,100.00
7,062,000.00 2,596,230.00 848,520.00 19,173,600.00 1,819,200.00 3,501,690.72 4,728,840.00 1,443,000.00
PEKERJAAN STRUKTUR ATAS Pekerjaan Sloof a Sloof S1, uk. 20x40cm - Galian pondasi - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton mutu K-300 - Pembesian - Bekisting - Pekerjaan Anti Rayap
m3 m3 m3 m3 kg m2 m2
2.12 0.11 0.22 0.88 131.81 8.80 6.57
85,600.00 2,884,700.00 471,400.00 4,260,800.00 29,800.00 249,300.00 11,100.00
181,258.00 317,317.00 103,708.00 3,749,504.00 3,927,992.83 2,193,840.00 72,927.00
Pekerjaan Kolom Pedestal a Kolom Pedestal Kp1, uk. 30x30cm - Beton mutu K-300 - Pembesian - Bekisting
m3 kg m2
1.22 122.40 16.32
4,260,800.00 29,800.00 249,300.00
5,215,219.20 3,647,520.00 4,068,576.00
Pekerjaan Kolom Bangunan a Kolom K1, uk. 30x30cm - Beton mutu K-300 - Pembesian - Bekisting
m3 kg m2
0.45 135.00 16.32
4,260,800.00 29,800.00 249,300.00
1,917,360.00 4,023,000.00 4,068,576.00
Pekerjaan Balok a Kolom B2, uk. 20x40cm - Beton mutu K-300 - Pembesian - Bekisting
m3 kg m2
0.88 131.81 11.00
4,260,800.00 29,800.00 249,300.00
3,749,504.00 3,927,992.83 2,742,300.00
Pekerjaan Plat Lantai Pekerjaan Slab On Ground 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5, t= 5cm
m2 m3 m3
5.01 0.50 0.25
12,500.00 471,400.00 2,884,700.00
62,562.50 235,935.70 721,896.18
BAK PENAMPUNG STP (SUMP PIT) BANGUNAN WISMA INDONESIA Pekerjaan Tanah a Pekerjaan Galian Tanah Galian Bak Penampung STP (Sampit) sedalam 2.85 m Pekerjaan Beton Bertulang a Pekerjaan Dinding Beton, tebal 15cm - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - bekisting - Besi tulangan - Urugan tanah kembali - Water Stop - Pekerjaan Cerucuk Galam 10cm b. Pekerjaan Dinding - Pasangan Dinding Batako BAK PENAMPUNG STP (SUMP PIT) BANGUNAN INTI Pekerjaan Tanah a Pekerjaan Galian Tanah Galian Bak Penampung STP (Sampit) sedalam 2.85 m Pekerjaan Beton Bertulang a Pekerjaan Dinding Beton, tebal 15cm - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - bekisting - Besi tulangan - Urugan tanah kembali - Water Stop - Pekerjaan Cerucuk Galam 10cm b. Pekerjaan Dinding - Pasangan Dinding Batako
TOTAL B.25 B.26
PEKERJAAN INCINERATOR II.1PEKERJAAN STRUKTUR A PEKERJAAN TANAH & PONDASI 1 Pas. Pondasi tapak/setempat beton bertulang a Pondasi Telapak - type FP1 (uk. 150x150cm, tebal 20cm, kedalaman = 1.5m) - Galian pondasi - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - Bekisting - Pembesian - Urugan tanah kembali 2 Pekerjaan Anti Rayap B 1
2
3
4
5
NO
URAIAN PEKERJAAN Beton Rabat Keliling Bangunan, tebal 15cm - Beton mutu K-225 - Wiremesh M8 - 150 (1 Layer) - Bekisting Pekerjaan Plat Lantai Dasar 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5, t= 5cm 4 Beton Plat, tebal 25cm - Beton mutu K-300 - Pembesian - Bekisting Pekerjaan Plat Lantai Dak 1 Beton Plat, tebal 10cm - Beton mutu K-300 - Wiremesh M8 - 150 (1 Layer) - Bekisting
SAT
VOLUME
HARGA SATUAN (Rp.)
JUMLAH
(Rp.)
4
II.2PEKERJAAN ARSITEKTUR A PEKERJAAN DINDING DAN LAPISAN 1 Pasangan Dinding Batako 2 Kolom praktis & balok praktis, termasuk opening kusen 3 Plester + aci dinding interior & eksterior - Dinding Pas. Batako - Finis Beton Kolom 4 Cat Dinding Interior - Acrylic Emultion (Dinding & Kolom) 5 Cat Eksterior, type weathershield 6 Pas. Dinding Roster
m3 m2 m2
0.75 5.01 2.15
575,500.00 151,600.00
3,086,108.03 2,880,377.50 325,182.00
m2 m3 m3
10.79 1.08 0.54
12,500.00 471,400.00 2,884,700.00
134,875.00 508,640.60 1,556,295.65
m3 kg m2
1.80 360.20 1.42
4,260,800.00 29,800.00 151,600.00
7,673,700.80 10,733,960.00 215,878.40
m3 m2 m2
0.84 10.00 1.16
4,260,800.00 575,500.00 151,600.00
3,583,332.80 5,755,000.00 175,856.00
m2 m3 m2
25.59 0.15 65.58
450,900.00 12,974,400.00 153,600.00
11,538,531.00 1,985,083.20 10,073,088.00
m2 m2 m2
39.99 39.99 7.20
67,800.00 81,200.00 2,570,400.00
2,711,322.00 3,247,188.00 18,506,880.00
4,110,700.00
B 1 2 3
PEKERJAAN LANTAI Lantai Floor hardener 5kg/m² -- Lantai Incinerator Water Proofing Coating Screed Pelindung Water Proofing (w/ chicken mesh)
m2 m2 m2
11.38 10.89 10.89
2,111,800.00 332,100.00 173,900.00
24,032,284.00 3,616,569.00 1,893,771.00
C 1
PEKERJAAN PENUTUP ATAP Plafon Ekspose -- Plat Dak
m2
8.41
127,400.00
1,071,434.00
D 1
PEKERJAAN PINTU, JENDELA DAN PARTISI Pintu SD-ME-1 Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m
unit
1.00
8,672,000.00
8,672,000.00
unit unit unit lot unit set m2
1.00 1.00 1.00 1.00 2.00 1.00 20.00
600,000,000.00 384,000,000.00 840,000,000.00 250,000,000.00 360,000,000.00 204,000,000.00 5,000,000.00
600,000,000.00 384,000,000.00 840,000,000.00 250,000,000.00 720,000,000.00 204,000,000.00 100,000,000.00
PEKERJAAN ELEKTRIKAL pekerjaan panel penerangan - Box Panel 450 x 300 x 200 mm - MCCB 40 A 3P 18 KA - MCB 16 A 3 P 10 KA - MCB 6 A 1 P 10 KA - Busbar & aksesories - Pengkabelan & grounding panel
unit bh bh bh lot lot
1.00 1.00 9.00 9.00 1.00 1.00
800,000.00 184,600.00 141,050.00 76,050.00 250,000.00 500,000.00
800,000.00 184,600.00 1,269,450.00 684,450.00 250,000.00 500,000.00
Pekerjaan Penerangan & power - Lampu dushproof 2 x 36 watt - Stop kontak 16 1 P - Saklar ganda - Instalasi penerangan - Instalasi stop kontak - Instalasi power exhaust fan
bh bh bh titik titik titik
4.00 2.00 1.00 4.00 2.00 2.00
1,200,000.00 641,536.50 73,312.50 274,194.17 434,484.17 434,484.17
4,800,000.00 1,283,073.00 73,312.50 1,096,776.67 868,968.33 868,968.33
Pekerjaan Kabel Power - Kabel dari SDP - Panel PP Incinerator (NYFGBY 4x25 mm2) - Kabel dari Panel PP Incinerator- Panel Kontrol Incinerator (NYY 4x16 mm2) - Grounding panel
m' m' titik
150.00 15.00 1.00
2,068,966.67 200,216.67 500,000.00
310,345,000.00 3,003,250.00 500,000.00
m3 m3 m3 m3 m2 kg m3 m2
13.05 0.45 0.90 2.25 4.80 200.00 9.09 74.50
85,600.00 2,884,700.00 471,400.00 4,260,800.00 151,600.00 29,800.00 62,800.00 11,100.00
1,117,080.00 1,298,115.00 424,260.00 9,586,800.00 727,680.00 5,960,000.00 570,852.00 826,965.54
m3 m2 kg
0.86 5.50 172.80
4,260,800.00 151,600.00 29,800.00
3,681,331.20 833,800.00 5,149,440.00
II.3PEKERJAAN MEKANIKAL - ELEKTRIKAL III Pekerjaan MEKANIKAL & ELEKTRIKAL A PEKERJAAN MEKANIKAL 1 Pengadaan dan Pemasangan incinerator kap : 1 m3/cycle kemampuan temperatur tertinggi minimal 1000 °C - peralatan incinerator (lengkap dgn burner, blower, cerobong & dapur) - tangki harian BBM kap 200 liter beserta kelengkapannya - Tangki bulanan kap 7000 liter beserta kelengkapannya - pemipaan bahan bakar - exhaust fan ruangan kap 800 CFM - pompa bahan bakar (1 unit pompa manual & 1 unit pompa elektrik automatic ) - pekerjaan dinding anti panas B 1
2
3
TOTAL B.26 B.27
PEKERJAAN BANGUNAN PENUNJANG ME III.1RUMAH POMPA DAN RESERVOIR AREA KARANTINA KESEHATAN DAN KANTOR PLBN A PEKERJAAN STRUKTUR PEKERJAAN TANAH & PONDASI 1 Pas. Pondasi tapak/setempat beton bertulang a Pondasi Telapak - type P3 (uk. 130x130cm, tebal 20cm, termasuk pedestal, kedalaman = 1.5m) - Galian pondasi - Pek. Lantai kerja, ad. 1:3:5 - Pasir Urug t =10cm - Beton K-300 - Bekisting - Besi tulangan - Urugan tanah kembali 2 Pekerjaan Anti Rayap
1
PEKERJAAN STRUKTUR ATAS Pekerjaan Sloof Rumah Pompa a Sloof S1, uk. 20x40cm - Beton K-300 - Bekisting - Besi tulangan
NO
URAIAN PEKERJAAN Pekerjaan Sloof Reservoir b Sloof S2, uk. 25x40 cm - Beton K-300 - Bekisting - Besi tulangan 2
Pekerjaan Plat Lantai Pekerjaan Plat Lantai Rumah Pompa 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5 4 Beton Plat, tebal 25 cm - Beton K-300 - Besi tulangan Pekerjaan Plat Lantai Reservoir 1 Pemadatan tanah 2 Pasir Urug t =10cm 3 Pek. Lantai kerja, ad. 1:3:5 4 Beton Plat, tebal 25 cm - Beton K-300 - Besi tulangan - Pekerjaan Cerucuk Galam 10cm
3
4
5
B
Pekerjaan Kolom Bangunan a Kolom K1 (Struktur Utama), uk. 30x30cm - Beton K-300 - Pembesian - Bekisting Pekerjaan BalokAtap a Balok B2 (Balok Induk), uk. 20x40cm - Beton K-300 - Pembesian - Bekisting b Balok LB, uk. 10x60cm - Beton K-300 - Pembesian - Bekisting Pekerjaan Plat Lantai Atap a Plat Lantai Atap (plat konvensional, tebal 10cm) - Beton K-300 - Wiremesh M8-150 (1 layer) - Bekisting
SAT
VOLUME
HARGA SATUAN (Rp.)
JUMLAH
(Rp.)
m3 m2 kg
1.90 8.00 380.00
4,260,800.00 151,600.00 29,800.00
8,095,520.00 1,212,800.00 11,324,000.00
m2 m3 m3
14.40 1.10 0.80
12,500.00 471,400.00 2,884,700.00
180,000.00 518,540.00 2,307,760.00
m3 kg
2.60 170.00
4,260,800.00 29,800.00
11,078,080.00 5,066,000.00
m2 m3 m3
12.88 1.29 0.90
12,500.00 471,400.00 2,884,700.00
161,000.00 607,163.20 2,600,845.52
m3 kg m'
3.70 320.00 1,360.00
4,260,800.00 29,800.00 43,300.00
15,764,960.00 9,536,000.00 58,888,000.00
m3 kg m2
1.70 375.00 23.00
4,260,800.00 29,800.00 249,300.00
7,243,360.00 11,175,000.00 5,733,900.00
m3 kg m2
1.30 300.00 14.08
4,260,800.00 29,800.00 252,600.00
5,539,040.00 8,940,000.00 3,556,608.00
m3 kg m2
0.80 117.00 25.00
4,260,800.00 29,800.00 252,600.00
3,408,640.00 3,486,600.00 6,315,000.00
m3 m2 m2
2.00 50.00 15.00
4,260,800.00 575,500.00 267,300.00
8,521,600.00 28,775,000.00 4,009,500.00
1 2 3 4 5 6 7 8
PEKERJAAN ARSITEKTUR PEKERJAAN DINDING DAN LAPISAN Pasangan Dinding Batako Kolom praktis & balok praktis, termasuk opening kusen Plester + aci dinding interior & eksterior Perbaikan Permukaan Kolom & Balok Cat Dinding Interior - Acrylic Emultion (Dinding & Kolom) Cat Eksterior, type weathershield Waterprofing Membrane Plat dak atap Screed Pelindung Water Proofing
m2 m3 m2 m2 m2 m2 m2 m2
34.26 0.59 68.52 36.32 36.48 69.18 28.09 23.04
450,900.00 12,974,400.00 153,600.00 127,400.00 67,800.00 81,200.00 255,100.00 173,900.00
15,447,834.00 7,706,793.60 10,524,672.00 4,627,168.00 2,473,344.00 5,617,416.00 7,165,759.00 4,006,656.00
1 2 3 4
PEKERJAAN LANTAI Lantai Floor hardener 5kg/m² -- Lantai R. Pompa + Teras dan Ramp Lantai Floor hardener 5kg/m² -- Lantai Ground Reservoir Penanaman rumput Grass block T 8 CM, type 2 lubang uk. 20 x 20
m2 m2 m2 m2
12.43 17.23 12.41 12.41
2,111,800.00 2,111,800.00 66,200.00 506,200.00
26,249,674.00 36,375,755.00 821,542.00 6,281,942.00
1 2
PEKERJAAN PLAFON Plafon Plafon Ekspose Ekspose + lisplank + lisplank Cat Plafond Interior type Acrylic Emultion (Plafond Ekspose & Balok)
m2 m2
42.32 12.15
127,400.00 67,800.00
5,391,568.00 823,770.00
unit
1.00
8,672,000.00
8,672,000.00
unit
3.00
1,750,000.00
5,250,000.00
m'
13.95
2,068,000.00
28,848,600.00
kva
1,385.00
100,000.00
138,500,000.00
25,000,000.00
25,000,000.00
1 2 3
PEKERJAAN PINTU, JENDELA DAN PARTISI Pintu SD-ME-1 (Akses Masuk R. Pompa) Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m Jendela Grill type 1 Single - Grill Besi - uk. 0.9 x 0.6 m Pagar BRC + Pintu, Area Trafo, h=1.8 - 2m
C PEKERJAAN MEKANIKAL ELEKTRIKAL KAWASAN ZONA PENDUKUNG PEKERJAAN LAIN LAIN PEKERJAAN ELEKTRIKAL 1 Penyambungan Daya Baru PLN icl : - Biaya Penyambungan - Jaminan Pelanggan - SLO - etc
2
Pemindahan jaringan SUTM (saluran Udara Tegangan Menengah) existing includ : - Perijinan - Pemasangan - Pengetesan
lot
1.00
3
Lemari penyimpan Jenasah Kap 4 jenasah
unit
1.00
924,000,000.00
924,000,000.00
4
Incinerator kap 1 m3/circle
unit
1.00
1,029,600,000.00
1,029,600,000.00
5
Pengeboran horisontal (untuk jalur kabel menuju gedung Kantor Pengelola) incl : - Pipa casing PVC dia 6" - pembuatan pit start & pit ujung
lot
1.00
35,000,000.00
35,000,000.00
TOTAL B 1-4 TOTAL B.18 ZONA PENDUKUNG
8,738,823,609.23 8,738,823,609.23
analisa harga satuan pekerjaan persiapan
ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG Item Pekerjaan Satuan Pembayaran
: Mobilisasi & Demobilisasi : Ls
1.00 Harga
No.
Uraian Pekerjaan
A 1
TENAGA KERJA Mob-demob tenaga kerja - Staff - Pekerja luar kota - Pekerja lokal
Satuan
3 trip 3 trip 3 trip
Koefisien
org/trip org/trip org/trip
45.00 125.00 25.00
Satuan (Rp)
5,700,000.00 2,500,000.00 500,000.00
Sub total tenaga kerja B
769,500,000.00 937,500,000.00 37,500,000.00 1,744,500,000.00
BAHAN
Sub total bahan C 1
PERALATAN Mob-demob perlatan - Dump truck, kap. 4 - 6 m3 - Bulldozer - Excavator - Motor Grader - Wheel loader - Vibratory roller - Pneumatic Tyre Roller - Compactor Roller - Mobile Crane - Concrete Pump Truck - Concrete vibrator - Alat Pancang - Bar bender - Bar cutter - Air Compressor - Mesin Las - Scafolding - Mobil Pick Up - Theodolite - Tangki air 5000 liter - Generator set kap 200 kva
unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip unit/trip set/trip unit/trip unit/trip unit/trip unit/trip Sub total peralatan
D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
15.00 3.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 5.00 2.00 2.00 2.00 2.00 2.00 1,500.00 2.00 4.00 2.00 1.00
2,500,000.00 15,000,000.00 15,000,000.00 15,000,000.00 15,000,000.00 15,000,000.00 15,000,000.00 15,000,000.00 20,000,000.00 20,000,000.00 5,000,000.00 15,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 300,000.00 10,000,000.00 1,000,000.00 15,000,000.00 20,000,000.00
37,500,000.00 45,000,000.00 45,000,000.00 15,000,000.00 30,000,000.00 30,000,000.00 30,000,000.00 30,000,000.00 40,000,000.00 40,000,000.00 25,000,000.00 30,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 450,000,000.00 20,000,000.00 4,000,000.00 30,000,000.00 20,000,000.00 961,500,000.00 2,706,000,000.00 2,706,000,000.00
1/1
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 1
Item Pekerjaan Satuan Pembayaran
: Galian untuk di buang : m3
1.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.093 0.023
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
10,044.44 3,993.33
Sub total tenaga kerja B
14,037.78
BAHAN
Sub total bahan C 1 2 3
PERALATAN Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer
-
jam jam jam
0.023 0.068 0.011
1,419,365.32 577,057.52 1,628,093.84
32,855.68 39,288.67 17,952.42
Sub total peralatan D E 2
90,096.77 104,134.55 104,100.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
: Galian untuk di timbun kembali : m3
2.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.067 0.017
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
7,232.00 2,875.20
Sub total tenaga kerja B
10,107.20
BAHAN
Sub total bahan C 1 2 3 4 5
PERALATAN Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer Vibrator roller Water tank truck
-
jam jam jam jam jam
0.023 0.068 0.011 0.017 0.025
1,419,365.32 577,057.52 1,628,093.84 1,287,249.91 594,004.44
32,855.68 39,288.67 17,952.42 21,454.17 14,850.11
Sub total peralatan D E 3
126,401.05 136,508.25 136,500.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
: Pek. Penyiapan Badan Jalan : m2
3.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.010 0.003
Satuan (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
1,084.80 431.28 1,516.08
BAHAN
Sub total bahan C 1 2 3
PERALATAN Motor grader Vibrator roller Water tank truck
jam jam jam Sub total peralatan
D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
0.002 0.003 0.004
1,401,084.16 1,287,249.91 594,004.44
2,554.06 3,218.12 2,227.52 7,999.70 9,515.78 9,500.00
1 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 4
Item Pekerjaan Satuan Pembayaran
: Pek. Sub Base Course Tebal 20 cm : m3
4.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.067 0.017
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
7,232.00 2,875.20
Sub total tenaga kerja B 1
BAHAN Agregat kelas B
m3
1.350
10,107.20
840,000.00
1,134,000.00
Sub total bahan C 1 2 3
PERALATAN Motor grader Vibrator roller Water tank truck
1,134,000.00
jam jam jam
0.012 0.017 0.025
1,401,084.16 1,287,249.91 594,004.44
17,027.06 21,454.17 14,850.11
Sub total peralatan D E 5
53,331.34 1,197,438.54 1,197,400.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
: Pengadaan tiang pancang 25x25 cm : m1
5.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.180 0.090 0.045 0.018
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
19,526.40 12,674.88 7,287.84 3,105.22
Sub total tenaga kerja B 1
BAHAN Tiang pancang segimpat 25 x 25 cm
m1
42,594.34
1.000
-
-
Sub total bahan C 1 2
PERALATAN Crane 10 - 15 ton Trailer
-
jam jam
0.045 0.045
2,789,556.77 1,895,664.06
125,530.05 85,304.88
Sub total peralatan D E 6
210,834.94 253,429.27 253,400.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
: Pemancangan tiang pancang 25x25 cm : m1
6.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.270 0.135 0.090 0.045
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
29,289.60 19,012.32 14,575.68 7,763.04 70,640.64
BAHAN
Sub total bahan C 1 2
PERALATAN Crane 10 - 15 ton Pile Driver + hammer
jam jam Sub total peralatan
D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
0.045 0.045
2,789,556.77 3,128,831.35
125,530.05 140,797.41 266,327.47 336,968.11 336,900.00
2 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 7
Item Pekerjaan Satuan Pembayaran
: Bobok kepala tiang pancang 25x25 cm : ttk
7.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.600 0.300 0.200 0.100
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
65,088.00 42,249.60 32,390.40 17,251.20
Sub total tenaga kerja B
156,979.20
BAHAN
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
Sub total peralatan
8
Item Pekerjaan Satuan Pembayaran
156,979.20 156,900.00
: Galian tanah pondasi & tie beam : m3
8.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.750 0.025
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
81,360.00 4,312.80
Sub total tenaga kerja B
85,672.80
BAHAN
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
Sub total peralatan
9
Item Pekerjaan Satuan Pembayaran
85,672.80 85,600.00
: Urugan tanah kembali : m3
9.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.500 0.050
Sub total tenaga kerja B
Satuan (Rp)
108,480.00 172,512.00
Total (Rp)
54,240.00 8,625.60 62,865.60
BAHAN
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Sub total peralatan
-
62,865.60 62,800.00
3 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 10 Item Pekerjaan Satuan Pembayaran
: Pengurugan dengan pasir urug : m3
10.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.300 0.010
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
32,544.00 1,725.12
Sub total tenaga kerja B 1
BAHAN Pasir urug
m3
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
11 Item Pekerjaan Satuan Pembayaran
1.200
34,269.12
364,320.00
437,184.00
Sub total bahan
437,184.00
Sub total peralatan
471,453.12 471,400.00
: Pengurugan dengan tanah urug : m3
11.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.300 0.010
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
32,544.00 1,725.12
Sub total tenaga kerja B 1
BAHAN Tanah urug di quarry
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
12 Item Pekerjaan Satuan Pembayaran
m3
1.200
34,269.12
48,000.00
57,600.00
Sub total bahan
57,600.00
Sub total peralatan
91,869.12 91,800.00
: Pemadatan tanah tanah ( per 20 cm) : m3
12.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.500 0.050
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
62,865.60
BAHAN
Sub total bahan C
-
PERALATAN
Sub total peralatan D E
54,240.00 8,625.60
VOLUME PEMADATAN PER 20 CM HARGA SATUAN PEKERJAAN (Dibulatkan)
0.20
62,865.60 12,573.12 12,500.00
4 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 13 Item Pekerjaan Satuan Pembayaran
: Pek. Lantai Kerja Beton K 100 - Struktur : m3
13.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.920 0.320 0.032 0.096
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
208,281.60 45,066.24 5,182.46 16,561.15
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
230.000 0.756 0.807 200.000
275,091.46
3,920.00 388,320.00 439,360.00 480.00
901,600.00 293,420.57 354,532.14 96,000.00
Sub total bahan C 1 2 3 4 5
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck
1,645,552.70
jam jam jam jam jam
0.095 0.095 0.095 0.095 0.095
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85
Sub total peralatan D E
964,134.54 2,884,778.70 2,884,700.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
14 Item Pekerjaan Satuan Pembayaran
: Pek. Lantai Kerja Beton K 100 - Rigid : m3
14.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.600 1.920 0.320 0.032 0.096
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
230.000 0.756 0.807 200.000
1 2 3 4 5 6
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete paver
jam jam jam jam jam jam Sub total peralatan
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
208,281.60 45,066.24 5,182.46 16,561.15 275,091.46
3,920.00 388,320.00 439,360.00 480.00
Sub total bahan C
Total (Rp)
901,600.00 293,420.57 354,532.14 96,000.00 1,645,552.70
0.095 0.095 0.095 0.095 0.095 0.556
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 1,562,970.08
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 868,316.71 1,832,451.26 3,753,095.42 3,753,000.00
5 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 15 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Beton K-250 - Struktur : m3
15.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.650 0.275 0.028 0.083
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
178,992.00 38,728.80 4,534.66 14,318.50
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
371.000 0.591 0.823 215.000
236,573.95
3,920.00 388,320.00 439,360.00 480.00
1,454,320.00 229,347.77 361,436.37 103,200.00
Sub total bahan C 1 2 3 4 5 6 7
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete vibrator Concrete pump
2,148,304.13
jam jam jam jam jam jam jam
0.095 0.095 0.095 0.095 0.095 0.556 0.333
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 516,098.24 1,425,000.00
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 286,721.24 475,000.00
Sub total peralatan D E
1,725,855.79 4,110,733.87 4,110,700.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
16 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Beton K-275 - Struktur : m3
16.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.650 0.275 0.028 0.083
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
406.000 0.579 0.806 215.000
1 2 3 4 5 6 7
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete vibrator Concrete pump
jam jam jam jam jam jam jam Sub total peralatan
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
178,992.00 38,728.80 4,534.66 14,318.50 236,573.95
3,920.00 388,320.00 439,360.00 480.00
Sub total bahan C
Total (Rp)
1,591,520.00 224,747.67 354,186.93 103,200.00 2,273,654.59
0.095 0.095 0.095 0.095 0.095 0.556 0.333
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 516,098.24 1,425,000.00
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 286,721.24 475,000.00 1,725,855.79 4,236,084.33 4,236,000.00
6 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 17 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Beton K-300- Rigid : m3
17.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
3.300 0.550 0.056 0.166
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
357,984.00 77,457.60 9,069.31 28,636.99
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air Jont filler asphalt Pipa PVC. ( AW ) Ø 1"
kg m3 m3 ltr m1 btg
413.000 0.576 0.802 215.000 7.333 1.083
473,147.90
3,920.00 388,320.00 439,360.00 480.00 106,750.00 54,400.00
1,618,960.00 223,761.93 352,460.87 103,200.00 782,833.33 58,933.33
Sub total bahan C 1 2 3 4 5 6 7
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete vibrator Concrete paver
3,140,149.47
jam jam jam jam jam jam jam
0.095 0.095 0.095 0.095 0.095 0.556 0.556
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 516,098.24 1,628,093.84
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 286,721.24 904,496.58
Sub total peralatan D E
2,155,352.36 5,768,649.73 5,768,600.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
18 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Beton K-300- Struktur : m3
18.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.650 0.275 0.028 0.083
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
413.000 0.576 0.802 215.000
1 2 3 4 5 6 7
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete vibrator Concrete pump
jam jam jam jam jam jam jam Sub total peralatan
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
178,992.00 38,728.80 4,534.66 14,318.50 236,573.95
3,920.00 388,320.00 439,360.00 480.00
Sub total bahan C
Total (Rp)
1,618,960.00 223,761.93 352,460.87 103,200.00 2,298,382.80
0.095 0.095 0.095 0.095 0.095 0.556 0.333
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 516,098.24 1,425,000.00
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 286,721.24 475,000.00 1,725,855.79 4,260,812.54 4,260,800.00
7 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 19 Item Pekerjaan Satuan Pembayaran
: Pemasangan besi beton : kg
19.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
10.000 0.007 0.007 0.0007 0.0004
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
759.36 985.82 113.37 60.38
Sub total tenaga kerja B 1 2
BAHAN Besi beton ulir/polos Kawat beton
kg kg
1.020 0.005
1,918.93
20,800.00 24,000.00
21,216.00 120.00
Sub total bahan C 1 2
PERALATAN Bar bender Bar cutter
21,336.00
jam jam
0.007 0.007
594,004.44 354,000.00
4,158.03 2,478.00
Sub total peralatan D E
6,636.03 29,890.96 29,800.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
20 Item Pekerjaan Satuan Pembayaran
: Pemasangan Wire Mesh M8 - 150 mm : m2
20.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
10.000 0.015 0.015 0.015 0.001
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
1,625.50 2,110.28 2,426.75 103.40
Sub total tenaga kerja B 1 2
BAHAN wire mesh M.8 - 150 Kawat beton
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
21 Item Pekerjaan Satuan Pembayaran
m2 kg
1.030 0.030
6,265.92
552,000.00 24,000.00
568,560.00 719.25
Sub total bahan
569,279.25
Sub total peralatan
575,545.17 575,500.00
: Pemasangan Wire Mesh M8 - 150 mm - 2 layer : m2
21.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
10.000 0.030 0.030 0.030 0.001
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2
BAHAN wire mesh M.8 - 150 Kawat beton
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2 kg
2.060 0.060
Total (Rp)
3,251.00 4,220.55 4,853.49 206.80 12,531.84
552,000.00 24,000.00
1,137,120.00 1,438.50
Sub total bahan
1,138,558.50
Sub total peralatan
1,151,090.34 1,151,000.00
8 / 20
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR
Anlisa harga satuan pekerjaan struktur
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
9 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 22 Item Pekerjaan Satuan Pembayaran
: Pemasangan Wire Mesh M6 - 150 mm : m2
22.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
10.000 0.008 0.008 0.008 0.000
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
914.43 1,187.14 1,365.17 58.17
Sub total tenaga kerja B 1 2
BAHAN wire mesh M.6 - 150 Kawat beton
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
23 Item Pekerjaan Satuan Pembayaran
m2 kg
1.020 0.017
3,524.90
528,000.00 24,000.00
538,560.00 404.61
Sub total bahan
538,964.61
Sub total peralatan
542,489.51 542,400.00
: Pemasangan Floor deck : m2
23.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.350 0.035 0.004 0.001
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
37,968.00 4,929.12 566.83 172.51
Sub total tenaga kerja B 1
BAHAN Floordeck Hi-ten; 0,7 BMT
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
24 Item Pekerjaan Satuan Pembayaran
m2
1.100
43,636.46
594,100.00
653,510.00
Sub total bahan
653,510.00
Sub total peralatan
697,146.46 697,100.00
: Pemasangan bekisting untuk pondasi : m2
24.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.520 0.260 0.026 0.026
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting
m3 kg ltr Sub total bahan
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Sub total peralatan
0.010 0.300 0.100
Total (Rp)
56,409.60 36,616.32 4,210.75 4,485.31 101,721.98
3,750,000.00 24,000.00 52,000.00
37,500.00 7,200.00 5,200.00 49,900.00
151,621.98 151,600.00
10 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 25 Item Pekerjaan Satuan Pembayaran
: Pemasangan bekisting untuk sloof : m2
25.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.520 0.260 0.026 0.026
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
56,409.60 36,616.32 4,210.75 4,485.31
Sub total tenaga kerja B 1 2 3
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting
m3 kg ltr
0.011 0.300 0.100
101,721.98
3,750,000.00 24,000.00 52,000.00
42,187.50 7,200.00 5,200.00
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
54,587.50
Sub total peralatan
26 Item Pekerjaan Satuan Pembayaran
156,309.48 156,300.00
: Pemasangan bekisting untuk kolom : m2
26.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.660 0.330 0.033 0.033
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Kayu kelas II Multiplek 9 mm, uk. 1,20 x 2,40 Dolken kayu dia. 8 - 10/400 cm
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m3 kg ltr m3 lbr btg
0.010 0.400 0.200 0.004 0.088 0.500
Total (Rp)
71,596.80 46,474.56 5,344.42 5,692.90 129,108.67
3,750,000.00 24,000.00 52,000.00 4,500,000.00 252,000.00 47,550.00
37,500.00 9,600.00 10,400.00 16,875.00 22,050.00 23,775.00
Sub total bahan
120,200.00
Sub total peralatan
249,308.67 249,300.00
11 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 27 Item Pekerjaan Satuan Pembayaran
: Pemasangan bekisting untuk balok : m2
27.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.660 0.330 0.033 0.033
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
71,596.80 46,474.56 5,344.42 5,692.90
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Kayu kelas II Multiplek 9 mm, uk. 1,20 x 2,40 Dolken kayu dia. 8 - 10/400 cm
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
28 Item Pekerjaan Satuan Pembayaran
m3 kg ltr m3 lbr btg
0.010 0.400 0.200 0.005 0.088 0.500
129,108.67
3,750,000.00 24,000.00 52,000.00 4,500,000.00 252,000.00 47,550.00
37,500.00 9,600.00 10,400.00 20,250.00 22,050.00 23,775.00
Sub total bahan
123,575.00
Sub total peralatan
252,683.67 252,600.00
: Pemasangan bekisting untuk lantai : m2
28.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.660 0.330 0.033 0.033
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Kayu kelas II Multiplek 9 mm, uk. 1,20 x 2,40 Dolken kayu dia. 8 - 10/400 cm
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m3 kg ltr m3 lbr btg
0.008 0.400 0.200 0.003 0.070 1.200
Total (Rp)
71,596.80 46,474.56 5,344.42 5,692.90 129,108.67
3,750,000.00 24,000.00 52,000.00 4,500,000.00 252,000.00 47,550.00
30,000.00 9,600.00 10,400.00 13,500.00 17,640.00 57,060.00
Sub total bahan
138,200.00
Sub total peralatan
267,308.67 267,300.00
12 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 29 Item Pekerjaan Satuan Pembayaran
: Pemasangan bekisting untuk dinding : m2
29.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.660 0.330 0.033 0.033
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
71,596.80 46,474.56 5,344.42 5,692.90
Sub total tenaga kerja B 1 2 3 4 5 6 7
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Kayu kelas II Multiplek 9 mm, uk. 1,20 x 2,40 Dolken kayu dia. 8 - 10/400 cm Penjaga jarak bekisting/spacer
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
30 Item Pekerjaan Satuan Pembayaran
m3 kg ltr m3 lbr btg bh
0.008 0.400 0.200 0.005 0.088 0.750 1.000
129,108.67
3,750,000.00 24,000.00 52,000.00 4,500,000.00 252,000.00 47,550.00 100,000.00
28,125.00 9,600.00 10,400.00 22,500.00 22,050.00 35,662.50 100,000.00
Sub total bahan
228,337.50
Sub total peralatan
357,446.17 357,400.00
: Pemasangan bekisting untuk tangga : m2
30.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.660 0.330 0.033 0.033
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Kayu kelas II Multiplek 9 mm, uk. 1,20 x 2,40 Dolken kayu dia. 8 - 10/400 cm
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m3 kg ltr m3 lbr btg
0.008 0.400 0.150 0.004 0.088 0.500
Total (Rp)
71,596.80 46,474.56 5,344.42 5,692.90 129,108.67
3,750,000.00 24,000.00 52,000.00 4,500,000.00 252,000.00 47,550.00
28,125.00 9,600.00 7,800.00 16,875.00 22,050.00 23,775.00
Sub total bahan
108,225.00
Sub total peralatan
237,333.67 237,300.00
13 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 31 Item Pekerjaan Satuan Pembayaran
: Pemasangan besi profil : kg
31.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.060 0.060 0.006 0.003
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
6,508.80 8,449.92 971.71 517.54
Sub total tenaga kerja B 1 2
BAHAN Baja profil WF Cat dasar besi
kg ltr
1.150 0.024
16,447.97
48,000.00 67,200.00
55,200.00 1,634.59
Sub total bahan C 1
PERALATAN Crane 10 - 15 ton
56,834.59
jam
0.003
2,789,556.77
8,368.67
Sub total peralatan D E
8,368.67 81,651.23 81,600.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
32 Item Pekerjaan Satuan Pembayaran
: Rangka Atap (Baja Ringan) : m2
32.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.286 0.143 0.048 0.048
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
30,994.29 20,118.86 7,712.00 8,214.86
Sub total tenaga kerja B 1
BAHAN Rangka atap baja ringan
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
33 Item Pekerjaan Satuan Pembayaran
m2
1.250
67,040.00
452,000.00
565,000.00
Sub total bahan
565,000.00
Sub total peralatan
632,040.00 632,000.00
: Pemasangan pondasi batu belah campuran 1SP : 4PP : m3
33.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.500 0.750 0.075 0.075
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3
BAHAN Batu belah Semen PC Pasir pasang
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m3 kg m3
1.200 163.000 0.520
Total (Rp)
162,720.00 105,624.00 12,146.40 12,938.40 293,428.80
383,360.00 3,920.00 388,320.00
460,032.00 638,960.00 201,926.40
Sub total bahan
1,300,918.40
Sub total peralatan
1,594,347.20 1,594,300.00
14 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 34 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Kansteen : m1
34.00 Harga
No.
A 1 2 3
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Mandor
Satuan
Koefisien
org/hari org/hari org/hari
0.333 0.167 0.083
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 172,512.00
36,160.00 23,472.00 14,376.00
Sub total tenaga kerja B 1 2 3 4
BAHAN Kansteen lebar 200mm x tinggi 400mm x panjang 600 mm bh .Semen PC @50 kg/zak zak Pasir pasang m3 Pasir urug m3
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
35 Item Pekerjaan Satuan Pembayaran
1.667 0.011 0.002 0.033
74,008.00
138,000.00 196,000.00 388,320.00 364,320.00
230,000.00 2,116.80 768.87 12,022.56
Sub total bahan
244,908.23
Sub total peralatan
318,916.23 318,900.00
: Pekerjaan grass blok : m2
35.00 Harga
No.
A 1 2 3
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Mandor
Satuan
Koefisien
org/hari org/hari org/hari
0.350 0.117 0.058
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 172,512.00
37,968.00 16,430.40 10,063.20
Sub total tenaga kerja B 1 2
BAHAN Grass Block 2 lubang - 20x20x8 Pasir urug
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
36 Item Pekerjaan Satuan Pembayaran
m2 m3
1.030 0.110
64,461.60
390,000.00 364,320.00
401,700.00 40,075.20
Sub total bahan
441,775.20
Sub total peralatan
506,236.80 506,200.00
: Galian untuk di buang (Galian Batu) : m3
ADD-2 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.200 0.050
Satuan (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
21,696.00 8,625.60 30,321.60
BAHAN
Sub total bahan C 1 2 3 4
PERALATAN Excavator 80 - 140 HP+ Breaker Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer
jam jam jam jam Sub total peralatan
D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
0.050 0.050 0.133 0.011
1,419,365.32 1,419,365.32 577,057.52 1,628,093.84
70,968.27 70,968.27 76,640.45 17,952.42 236,529.41 266,851.01 266,800.00
15 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 37 Item Pekerjaan Satuan Pembayaran
: Galian untuk di buang : m3
ADD-2 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.093 0.023
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
10,044.44 3,993.33
Sub total tenaga kerja B
14,037.78
BAHAN
Sub total bahan C 1 2 3
PERALATAN Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer
-
jam jam jam
0.023 0.101 0.011
1,419,365.32 577,057.52 1,628,093.84
32,855.68 58,223.37 17,952.42
Sub total peralatan D E
109,031.47 123,069.25 123,000.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
38 Item Pekerjaan Satuan Pembayaran
: Galian untuk di timbun kembali : m3
ADD-2 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.067 0.017
Satuan (Rp)
Total (Rp)
108,480.00 172,512.00
7,232.00 2,875.20
Sub total tenaga kerja B
10,107.20
BAHAN
Sub total bahan C 1 2 3
PERALATAN Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer
-
jam jam jam
0.023 0.068 0.011
1,419,365.32 577,057.52 1,628,093.84
32,855.68 39,288.67 17,952.42
Sub total peralatan D E
90,096.77 100,203.97 100,200.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
39 Item Pekerjaan Satuan Pembayaran
: Pek. Land Clearing : m2
ADD-2 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.013 0.003
Satuan (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
1,435.41 570.67 2,006.07
BAHAN
Sub total bahan C 1 2 3 4 5
PERALATAN Excavator 80 - 140 HP Dump truck 3.00 - 4.00 m3 Bulldozer Vibrator roller Water tank truck
jam jam jam jam jam Sub total peralatan
D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
0.007 0.014 0.003
1,419,365.32 577,057.52 1,628,093.84
9,856.70 7,999.66 5,385.73 23,242.09 25,248.17 25,200.00
16 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 40 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Cerucuk Galam Ø10cm : m
ADD-2 Harga
No.
A 1 2 3
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Mandor
Satuan
Koefisien
org/hari org/hari org/hari
0.133 0.067 0.033
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 172,512.00
14,464.00 9,388.80 5,750.40
Sub total tenaga kerja B 1
BAHAN Dolken kayu dia. 8 - 10/400 cm
btg
29,603.20
1.030
47,550.00
48,976.50
Sub total bahan C 1
PERALATAN Excavator 80 - 140 HP
48,976.50
jam
0.067
1,419,365.32
94,624.35
Sub total peralatan D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
41 Item Pekerjaan Satuan Pembayaran
94,624.35 173,204.05 173,200.00 43,300.00
1 m1
: Pasang Waltermoor dia 16mm : bh
ADD-2 Harga
No.
A 1 2 3
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Mandor
Satuan
Koefisien
org/hari org/hari org/hari
0.033 0.033 0.017
Satuan (Rp)
108,480.00 140,832.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Waltermoor dia 16mm
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
bh
1.000
Total (Rp)
3,616.00 4,694.40 2,875.20 11,185.60
112,880.00
112,880.00
Sub total bahan
112,880.00
Sub total peralatan
124,065.60 124,000.00
17 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 42 Item Pekerjaan Satuan Pembayaran
: Pekerjaan Beton K-175 - Struktur : m3
42.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.650 0.275 0.028 0.083
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
178,992.00 38,728.80 4,534.66 14,318.50
Sub total tenaga kerja B 1 2 3 4
BAHAN Semen PC Pasir beton Batu pecah mesin 2/3 Air
kg m3 m3 ltr
326.000 0.643 0.809 215.000
236,573.95
3,920.00 388,320.00 439,360.00 480.00
1,277,920.00 249,719.63 355,222.56 103,200.00
Sub total bahan C 1 2 3 4 5 6 7
PERALATAN Batching Plant kap. 35 m3/jam Generator set 250 Kva Wheel Loader Truck mixer 5 m3 Water tank truck Concrete vibrator Concrete pump
1,986,062.19
jam jam jam jam jam jam jam
0.095 0.095 0.095 0.095 0.095 0.556 0.333
4,875,000.00 1,199,302.72 1,580,105.55 1,875,000.00 594,004.44 516,098.24 1,425,000.00
464,285.71 114,219.31 150,486.24 178,571.43 56,571.85 286,721.24 475,000.00
Sub total peralatan D E
1,725,855.79 3,948,491.93 3,948,400.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
43 Item Pekerjaan Satuan Pembayaran
: Pembongkaran jalan existing : m2
43.00 Harga
No.
A 1 2
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
1.333 0.067
Sub total tenaga kerja B
Satuan (Rp)
108,480.00 172,512.00
Total (Rp)
144,647.23 11,489.30 156,136.53
BAHAN
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Sub total peralatan
-
156,136.53 156,100.00
18 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 44 Item Pekerjaan Satuan Pembayaran
: Angkur A325 M16 : unit
44.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
10.000 0.007 0.007 0.0007 0.0004
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
759.36 985.82 113.37 60.38
Sub total tenaga kerja B 1
BAHAN Angkur A325 M16
bh
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
46 Item Pekerjaan Satuan Pembayaran
1.020
1,918.93
28,000.00
28,560.00
Sub total bahan
28,560.00
Sub total peralatan
30,478.93 30,400.00
: Tes PDA : kg
46.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
3.000 1.000
Satuan (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
325,440.00 172,512.00
497,952.00
BAHAN
Sub total bahan C 1
PERALATAN Alat test PDA
hr
Sub total peralatan D E
Total (Rp)
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
1.000
1,250,000.00
1,250,000.00
1,250,000.00 1,747,952.00 1,747,900.00
19 / 20
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 47 Item Pekerjaan Satuan Pembayaran
: Endstop Floordeck : m1
47.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Besi Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.100 0.700 0.700 0.0700 0.0350
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Endstop floordeck
m1
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Sub total peralatan
1.000
Total (Rp)
75,936.00 98,582.40 11,336.64 6,037.92 191,892.96
52,000.00
52,000.00
52,000.00
243,892.96 243,800.00
20 / 20
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 1
Item Pekerjaan Satuan Pembayaran
: Pek. anti rayap : m2
1.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.025 0.008 0.008 0.008
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
2,712.00 1,173.60 1,349.60 1,437.60
Sub total tenaga kerja B 1
BAHAN Pest kontrol (anti rayap)
m2
6,672.80
1.100
4,080.00
4,488.00
Sub total bahan C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
4,488.00
Sub total peralatan
2
Item Pekerjaan Satuan Pembayaran
11,160.80 11,100.00
: Pek. pasangan bata ringan : m2
2.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.300 0.100 0.010 0.015
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
32,544.00 14,083.20 1,619.52 2,587.68
Sub total tenaga kerja B 1 2 3
3
BAHAN Bata ringan 10x20x60cm Perekat bata ringan : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
bh kg ltr
50,834.40
9.000 4.190 1.152
33,600.00 2,400.00 576.00
302,400.00 10,057.14 663.77
Sub total bahan
313,120.91
Sub total peralatan
363,955.31 363,900.00
: Pemasangan dinding batako campuran 1SP :4PP : m2
3.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4
BAHAN Batako 10x15x30 Semen PC Pasir pasang Besi beton ulir/polos
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.300 0.100 0.010 0.015
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
bh kg m3 kg
Total (Rp)
32,544.00 14,083.20 1,619.52 2,587.68 50,834.40
21.000 12.130 0.388 0.280
7,392.00 4,704.00 465,984.00 24,960.00
155,232.00 57,059.52 180,801.79 6,988.80
Sub total bahan
400,082.11
Sub total peralatan
450,916.51 450,900.00
1 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 4
Item Pekerjaan Satuan Pembayaran
: Pekerjaan plesteran 1SP : 4PP tebal 15 mm : m2
4.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.300 0.150 0.015 0.015
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
32,544.00 21,124.80 2,429.28 2,587.68
Sub total tenaga kerja B 1 2
5
BAHAN Semen PC Pasir pasang
kg m3
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
58,685.76
6.240 0.024
4,704.00 465,984.00
29,352.96 11,183.62
Sub total bahan
40,536.58
Sub total peralatan
99,222.34 99,200.00
: Pekerjaan acian dinding : m2
5.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.200 0.100 0.010 0.010
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
21,696.00 14,083.20 1,619.52 1,725.12
Sub total tenaga kerja B 1
6
BAHAN Semen PC
kg
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
39,123.84
3.250
4,704.00
15,288.00
Sub total bahan
15,288.00
Sub total peralatan
54,411.84 54,400.00
: Pekerjaan acian beton (skim coat) : m2
6.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.200 0.100 0.010 0.010
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2
BAHAN Skim coat : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
kg ltr
Total (Rp)
21,696.00 14,083.20 1,619.52 1,725.12 39,123.84
3.300 1.210
11,520.00 576.00
38,016.00 696.96
Sub total bahan
38,712.96
Sub total peralatan
77,836.80 77,800.00
2 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
7
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Pemasangan plesteran & acian dinding : m2
7.00 Harga
No.
A 1 2
D E 8
Uraian Pekerjaan
Satuan
HARGA SATUAN PEKERJAAN Pekerjaan plesteran 1SP : 4PP tebal 15 mm Pekerjaan acian dinding
Koefisien
m2 m2
1.000 1.000
Satuan (Rp)
Total (Rp)
99,222.34 54,411.84
99,222.34 54,411.84
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
153,634.18 153,600.00
: Pemasangan plesteran & acian beton : m2
8.00 Harga
No.
A 1 2
D E 9
Uraian Pekerjaan
Satuan
HARGA SATUAN PEKERJAAN Pekerjaan plesteran 1SP : 4PP tebal 15 mm Pekerjaan acian beton (skim coat)
Koefisien
m2 m2
0.500 1.000
Satuan (Rp)
Total (Rp)
99,222.34 77,836.80
49,611.17 77,836.80
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
127,447.97 127,400.00
: Pek. pasangan bata ringan (double dinding) : m2
9.00 Harga
No.
A 1
D E 10
Uraian Pekerjaan
Satuan
HARGA SATUAN PEKERJAAN Pek. pasangan bata ringan
Koefisien
m2
2.000
Satuan (Rp)
Total (Rp)
363,900.00
727,800.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
727,800.00 727,800.00
: Kolom praktis beton bertulang (11 x 11) cm : m1
10.00 Harga
No.
A 1 2 3 4 5 6
Uraian Pekerjaan
Satuan
TENAGA KERJA Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
Koefisien
org/hari org/hari org/hari org/hari org/hari org/hari
0.180 0.020 0.020 0.020 0.006 0.009
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 140,832.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6 7 8
BAHAN Kayu kelas III Paku uk. 2" - 5 " Minyak bekisting Besi beton ulir/polos Kawat beton Semen PC Pasir beton Batu pecah mesin 2/3
m3 kg ltr kg kg kg m3 m3
30,500.64
0.002 0.010 0.077 3.000 0.450 4.000 0.006 0.009
3,600,000.00 28,800.00 62,400.00 24,960.00 28,800.00 4,704.00 465,984.00 527,232.00
Sub total bahan C
PERALATAN
D
JUMLAH (A + B + C)
E
HARGA SATUAN PEKERJAAN (Dibulatkan)
7,200.00 288.00 4,804.80 74,880.00 12,960.00 18,816.00 2,795.90 4,745.09 126,489.79
Sub total peralatan vol : 11 cm x 11 cm x 100 cm vol : 1 m3
19,526.40 2,816.64 2,816.64 2,816.64 971.71 1,552.61
0.01 82.64
156,990.43 12,974,415.87 12,974,400.00
3 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 11
Item Pekerjaan Satuan Pembayaran
: Lantai Homogenous tile 60x60 cm type Venus 6 XOP 001 V- Polished : m2
11.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
27,120.00 17,604.00 2,024.40 2,156.40
Sub total tenaga kerja B 1 2 3 4 5 6
12
BAHAN Homogenous Tile 60x60 "polished" type VEN 6XOP001 V Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
827,520.00 4,704.00 465,984.00 1,824.00 1,824.00 576.00
868,896.00 42,336.00 20,503.30 11,465.14 401.28 3,580.75
Sub total bahan
947,182.46
Sub total peralatan
996,087.26 996,000.00
: Lantai Homogenous tile 60x60 cm type Venus 6LWP 008 V - Polished : m2
12.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4 5 6
BAHAN Homogenous Tile 60x60 "polished" type VEN 6WLP008 V Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
27,120.00 17,604.00 2,024.40 2,156.40
Sub total tenaga kerja B
13
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
486,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
510,510.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
575,748.72
Sub total peralatan
624,653.52 624,600.00
: Lantai Homogenous tile 60x60 cm type Monalisa 6 FN 2001 M - Unpolished : m2
13.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Homogenous Tile 60x60 "unpolished" type MON 6FN2001 V Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2 kg m3 kg kg ltr
Total (Rp)
27,120.00 17,604.00 2,024.40 2,156.40 48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
361,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
379,260.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
444,498.72
Sub total peralatan
493,403.52 493,400.00
4 / 21
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
Anlisa harga satuan pekerjaan arsitektur
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
5 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
14
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Lantai Homogenous tile 60x60 cm type Venus 6GN054 V : m2
14.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4 5 6
BAHAN Homogenous Tile 60x60 "unpolished" type VEN 6GN053V Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
27,120.00 17,604.00 2,024.40 2,156.40
Sub total tenaga kerja B
15
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
361,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
379,260.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
444,498.72
Sub total peralatan
493,403.52 493,400.00
: Pek. Pasangan Keramik 40x40 Unpolished : m2
15.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
27,120.00 17,604.00 2,024.40 2,156.40
Sub total tenaga kerja B 1 2 3 4 5 6
16
BAHAN Keramik tile 40 x 40 cm unpolished Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
229,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
240,660.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
305,898.72
Sub total peralatan
354,803.52 354,800.00
: Pek. Pasangan Keramik 40x40 Polished : m2
16.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4 5 6
BAHAN Keramik tile 40 x 40 cm polished Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2 kg m3 kg kg ltr
Total (Rp)
27,120.00 17,604.00 2,024.40 2,156.40 48,904.80
1.050 9.000 0.044 6.286 0.220 6.217
277,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
291,060.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
356,298.72
Sub total peralatan
405,203.52 405,200.00
6 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 17
Item Pekerjaan Satuan Pembayaran
: Pek. Pasangan lantai batu alam : m2
17.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.500 0.250 0.025 0.025
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
54,240.00 35,208.00 4,048.80 4,312.80
Sub total tenaga kerja B 1 2 3 4 5 6
18
BAHAN Batu alam andesit 30x30, 30x60 Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
97,809.60
1.050 9.000 0.044 6.286 0.220 6.217
440,000.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
462,000.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
527,238.72
Sub total peralatan
625,048.32 625,000.00
: Pemasangan lantai vinyl : m2
18.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2
BAHAN Vynil 30cm x 30cm Lem
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.150 0.150 0.015 0.008
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
16,272.00 21,124.80 2,429.28 1,293.84
Sub total tenaga kerja B
19
bh kg
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
41,119.92
11.870 0.350
32,083.33 20,000.00
380,829.17 7,000.00
Sub total bahan
387,829.17
Sub total peralatan
428,949.09 428,900.00
: Pemasangan floor harderner 5 kg/m2 : m2
19.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1
BAHAN Floor hardener
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.120 0.120 0.012 0.006
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
kg
Total (Rp)
13,017.60 16,899.84 1,943.42 1,035.07 32,895.94
5.500
378,000.00
2,079,000.00
Sub total bahan
2,079,000.00
Sub total peralatan
2,111,895.94 2,111,800.00
7 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
20
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Pemasangan floor harderner 3 kg/m2 : m2
20.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1
BAHAN Floor hardener
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.120 0.120 0.012 0.006
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
13,017.60 16,899.84 1,943.42 1,035.07
Sub total tenaga kerja B
21
kg
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
32,895.94
3.300
378,000.00
1,247,400.00
Sub total bahan
1,247,400.00
Sub total peralatan
1,280,295.94 1,280,200.00
: Pek. waterproofing coating cemen based : m2
21.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1
BAHAN Waterproofing coating
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.065 0.033 0.003 0.003
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
7,051.20 4,577.04 526.34 560.66
Sub total tenaga kerja B
22
kg
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
12,715.25
3.150
101,400.00
319,410.00
Sub total bahan
319,410.00
Sub total peralatan
332,125.25 332,100.00
: Pek. waterproofing sheet 1 lapis : m2
22.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1
BAHAN Waterproofing membrane 3 mm
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.250 0.125 0.013 0.013
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2
Total (Rp)
27,120.00 17,604.00 2,024.40 2,156.40 48,904.80
1.100
187,500.00
206,250.00
Sub total bahan
206,250.00
Sub total peralatan
255,154.80 255,100.00
8 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 23
Item Pekerjaan Satuan Pembayaran
: Pek. pasangan dinding keramik 40x40 cm : m2
23.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.900 0.450 0.045 0.045
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
97,632.00 63,374.40 7,287.84 7,763.04
Sub total tenaga kerja B 1 2 3 4 5 6
24
BAHAN Keramik tile 40 x 40 cm polished Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
176,057.28
1.050 9.000 0.044 6.286 0.220 6.217
277,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
291,060.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
356,298.72
Sub total peralatan
532,356.00 532,300.00
: Pek. pasangan dinding keramik 25x40 cm : m2
24.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4 5 6
BAHAN Keramik tile 25 x 40 cm polished Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.900 0.450 0.045 0.045
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
97,632.00 63,374.40 7,287.84 7,763.04
Sub total tenaga kerja B
25
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
176,057.28
1.050 9.000 0.044 6.286 0.220 6.217
229,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
240,660.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
305,898.72
Sub total peralatan
481,956.00 481,900.00
: Dinding homogenouse tile 30x60 cm type Venus 6 XOP 001 V : m2
25.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.900 0.450 0.045 0.045
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3 4 5 6
BAHAN Homogenous Tile 60x60 "polished" type VEN 6XOP001 V Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2 kg m3 kg kg ltr
Total (Rp)
97,632.00 63,374.40 7,287.84 7,763.04 176,057.28
1.050 9.000 0.044 6.286 0.220 6.217
486,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
510,510.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
575,748.72
Sub total peralatan
751,806.00 751,800.00
9 / 21
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
Anlisa harga satuan pekerjaan arsitektur
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
10 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
26
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Dinding homogenouse tile 60x60 cm type Monalisa 6 WLHP 6612 : m2
26.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2 3 4 5 6
BAHAN Homogenous Tile 60x60 "polished" type MON 6WLHP 6612 Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.900 0.450 0.045 0.045
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
97,632.00 63,374.40 7,287.84 7,763.04
Sub total tenaga kerja B
27
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
176,057.28
1.050 9.000 0.044 6.286 0.220 6.217
486,200.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
510,510.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
575,748.72
Sub total peralatan
751,806.00 751,800.00
: Pek. pasangan Dinding batu andesit : m2
27.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
1.300 0.650 0.065 0.065
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
141,024.00 91,540.80 10,526.88 11,213.28
Sub total tenaga kerja B 1 2 3 4 5 6
28
BAHAN Batu alam andesit Susun Sirih 3x30,5x30 Semen PC Pasir pasang Tile adhesive : semen instan Tile grout : semen instan Air
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
m2 kg m3 kg kg ltr
254,304.96
1.060 9.000 0.044 6.286 0.220 6.217
440,000.00 3,920.00 388,320.00 1,520.00 1,520.00 480.00
466,400.00 35,280.00 17,086.08 9,554.29 334.40 2,983.95
Sub total bahan
531,638.72
Sub total peralatan
785,943.68 785,900.00
: Pek. pasangan alumunium composite panel : m2
28.00 Harga
No.
A 1 2 3 D E 29
Uraian Pekerjaan
Harga satuan pekerjaan : Penutup alumunium composite panel (ACP) Rangka hollow alumunium composite panel (ACP) Pemasangan alumunium composite panel (ACP)
Satuan
m2 m2 m2
Koefisien
1.400 1.100 1.000
Satuan (Rp)
Total (Rp)
6,000,000.00 61,200.00 198,000.00
8,400,000.00 67,320.00 198,000.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
8,665,320.00 8,665,300.00
: Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.2 m : bh
29.00 Harga
No.
A 1
D E
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.2 m
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
22,661,280.00
Total (Rp)
22,661,280.00
22,661,280.00 22,661,200.00
11 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
30
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 0.85 x 2.2 m : bh
30.00 Harga
No.
A 1
D E 31
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 0.85 x 2.2 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
11,386,080.00
11,386,080.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
11,386,080.00 11,386,000.00
: Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. (0.96+0.54) x 2.2 m : bh
31.00 Harga
No.
A 1
B C 32
Uraian Pekerjaan
Satuan
Koefisien
Harga satuan pekerjaan : Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. (0.96+0.54) x 2.2 unitm
1.000
Satuan (Rp)
Total (Rp)
7,960,000.00
7,960,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
7,960,000.00 7,960,000.00
: Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.85 x 2.2 m : bh
32.00 Harga
No.
A 1
B C 33
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.85 x 2.2 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,626,000.00
4,626,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,626,000.00 4,626,000.00
: Single - Double Multiplek fin. HPL - kusen Alm - uk. 0.85 x 2.2 m : bh
33.00 Harga
No.
A 1
B C 34
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Double Multiplek fin. HPL - kusen Alm - uk. 0.85 x 2.2 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,144,880.00
4,144,880.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,144,880.00 4,144,800.00
: Jendela Fixed uk. 80x190cm (Kaca Clear 8mm) Area R. Kepala Klinik : bh
34.00 Harga
No.
A 1
B C 35
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 80x190cm (Kaca Clear 8mm)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
2,344,880.00
2,344,880.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
2,344,880.00 2,344,800.00
: Rolling Door - Metal Sheet w/ perforated : m2
35.00 Harga
No.
A 1
B C 36
Uraian Pekerjaan
Harga satuan pekerjaan : Rolling Door - Metal Sheet w/ perforated
Satuan
m2
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,337,120.00
1,337,120.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,337,120.00 1,337,100.00
: Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.72 x 2.3 m : bh
36.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.72 x 2.3 m
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
23,686,640.00
Total (Rp)
23,686,640.00
23,686,640.00 23,686,600.00
12 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
37
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.3 m : bh
37.00 Harga
No.
A 1
B C 38
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.3 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
23,686,640.00
23,686,640.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
23,686,640.00 23,686,600.00
: Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m : bh
38.00 Harga
No.
A 1
B C 39
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
4,646,560.00
4,646,560.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,646,560.00 4,646,500.00
: Partisi Kaca Panasap 8 mm, frame alum : m2
39.00 Harga
No.
A 1
B C 40
Uraian Pekerjaan
Harga satuan pekerjaan : Partisi Kaca Panasap 8 mm, frame alum
Satuan
Koefisien
m2
1.000
Satuan (Rp)
Total (Rp)
907,200.00
907,200.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
907,200.00 907,200.00
: Partisi Kaca Frameless Clear Temp. 12 mm : m2
40.00 Harga
No.
A 1
B C 41
Uraian Pekerjaan
Harga satuan pekerjaan : Partisi Kaca Frameless Clear Temp. 12 mm
Satuan
Koefisien
m2
1.000
Satuan (Rp)
Total (Rp)
1,944,000.00
1,944,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,944,000.00 1,944,000.00
: Dinding Kaca Frameless Area Sholat, Clear Temp. 12mm, w/ frame atas st. Steel : m2
41.00 Harga
No.
A 1
B C 42
Uraian Pekerjaan
Harga satuan pekerjaan : Dinding Kaca Frameless Clear Temp. 12mm, w/ frame atas st. Steel
Satuan
m2
Koefisien
Satuan (Rp)
1.000
Total (Rp)
-
-
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
-
: Curtain wall frame aluminium + kaca stopsol dark blue 8 mm : m2
42.00 Harga
No.
A 1
B C 43
Uraian Pekerjaan
Harga satuan pekerjaan : Curtain Wall, frame aluminium, kaca stopsol dark blue 8 mm
Satuan
m2
Koefisien
Satuan (Rp)
1.000
Total (Rp)
-
-
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
-
: Curtain wall frame aluminium + kaca panasap 8 mm : m2
43.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Curtain wall frame aluminium + kaca panasap 8 mm
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
m2
Koefisien
1.000
Satuan (Rp)
Total (Rp)
-
-
-
13 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
44
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Sirip Horizontal, Papan Kayu Lebar 20cm : m1
44.00 Harga
No.
A 1
B C 45
Uraian Pekerjaan
Harga satuan pekerjaan : Sirip Horizontal kayu - Papan Kayu Lebar 20cm
Satuan
m1
Koefisien
1.000
Satuan (Rp)
Total (Rp)
288,000.00
288,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
288,000.00 288,000.00
: Sirip Horizontal, Papan Kayu Lebar 10cm : m1
45.00 Harga
No.
A 1
B C 46
Uraian Pekerjaan
Harga satuan pekerjaan : Sirip Horizontal kayu - Papan Kayu Lebar 10cm
Satuan
m1
Koefisien
1.000
Satuan (Rp)
Total (Rp)
216,000.00
216,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
216,000.00 216,000.00
: Pekerjaan Suncreen : hollow 20x20mm : m1
46.00 Harga
No.
A 1
B C 47
Uraian Pekerjaan
Harga satuan pekerjaan : Pekerjaan Suncreen fin Cat w/ frame hollow 50x50 tinggi = 4.5 m
Satuan
m1
Koefisien
1.000
Satuan (Rp)
Total (Rp)
3,240,000.00
3,240,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
3,240,000.00 3,240,000.00
: Pek. Jendela Fixed uk. 109x132mm : bh
47.00 Harga
No.
A 1
B C 48
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 109x132mm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
2,156,160.00
2,156,160.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
2,156,160.00 2,156,100.00
: Pek. Jendela Fixed uk. 100x132mm : bh
48.00 Harga
No.
A 1
B C 49
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 100x132mm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,991,280.00
1,991,280.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,991,280.00 1,991,200.00
: Pek. Jendela Fixed uk. 55x102mm : bh
49.00 Harga
No.
A 1
B C 50
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 55x102mm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
916,960.00
916,960.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
916,960.00 916,900.00
: Pek. Jendela Fixed uk. 73x132mm : bh
50.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 73x132mm
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,496,720.00
1,496,720.00
1,496,720.00 1,496,700.00
14 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
51
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Pek. Jendela Fixed uk. 73x67mm : bh
51.00 Harga
No.
A 1
B C 52
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 73x67mm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
803,200.00
803,200.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
803,200.00 803,200.00
: Pek. Jendela Fixed uk. 40x300mm : bh
52.00 Harga
No.
A 1
B C 53
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 40x300cm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,555,200.00
1,555,200.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,555,200.00 1,555,200.00
: Pek. Jendela Fixed uk. 40x200mm : bh
53.00 Harga
No.
A 1
B C 54
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Fixed uk. 40x200cm
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,036,800.00
1,036,800.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,036,800.00 1,036,800.00
: Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.85 x 2.0 m : bh
54.00 Harga
No.
A 1
B C 55
Uraian Pekerjaan
Satuan
Harga satuan pekerjaan : Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.85 x 2.0 munit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,520,000.00
4,520,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,520,000.00 4,520,000.00
: Double - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 1.6 x 2.2 m : bh
55.00 Harga
No.
A 1
B C 56
Uraian Pekerjaan
Satuan
Harga satuan pekerjaan : Double - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 1.6 x 2.2 munit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
9,040,000.00
9,040,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
9,040,000.00 9,040,000.00
: Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.0 m : bh
56.00 Harga
No.
A 1
B C 57
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.0 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
9,040,000.00
9,040,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
9,040,000.00 9,040,000.00
: Single - Double Multiplek fin.Cat Duco - kusen Kayu Solid. - uk. 0.9 x 2.2 m : bh
57.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Double Multiplek fin.Cat Duco - kusen Kayu Solid. - uk. 0.9 x 2.2 m
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
9,040,000.00
9,040,000.00
9,040,000.00 9,040,000.00
15 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
58
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Single - Double Multiplek fin.HPL - kusen Kayu Solid. - uk. 0.8 x 2.2 m : bh
58.00 Harga
No.
A 1
B C 59
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Double Multiplek fin.HPL - kusen Kayu Solid. - uk. 0.8 x 2.2 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
9,040,000.00
9,040,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
9,040,000.00 9,040,000.00
: Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m : bh
59.00 Harga
No.
A 1
B C 60
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,646,560.00
4,646,560.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,646,560.00 4,646,500.00
: Double - Double Multiplek fin.HPL - kusen Alm. - uk. 1.28 x 2.0 m : bh
60.00 Harga
No.
A 1
B C 61
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Double Multiplek fin.HPL - kusen Alm. - uk. 1.28 x 2.0 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
9,040,000.00
9,040,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
9,040,000.00 9,040,000.00
: GRC Cetak polos Cover + Rangka besi : m2
61.00 Harga
No.
A 1
B C 62
Uraian Pekerjaan
Harga satuan pekerjaan : GRC Cetak polos Cover + Rangka besi
Satuan
m2
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,125,000.00
1,125,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,125,000.00 1,125,000.00
: Sirip Tower : Woodplank, w/ Metal Stud Frame 75 : m2
62.00 Harga
No.
A 1
B C 63
Uraian Pekerjaan
Harga satuan pekerjaan : Sirip woodplank, w/ Metal Stud Frame 75
Satuan
m2
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,011,000.00
1,011,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,011,000.00 1,011,000.00
: Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m : bh
63.00 Harga
No.
A 1
B C 64
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
8,672,000.00
8,672,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
8,672,000.00 8,672,000.00
: Single - Grill Besi - uk. 1.15 x 2.0 m : bh
64.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Grill Besi - uk. 1.15 x 2.0 m
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,336,000.00
4,336,000.00
4,336,000.00 4,336,000.00
16 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
65
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Jendela - Grill Besi - uk. 1.5 x 2.0 m : bh
65.00 Harga
No.
A 1
B C 66
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela - Grill Besi - uk. 1.5 x 2.0 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
4,336,000.00
4,336,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,336,000.00 4,336,000.00
: Kisi-Kisi Besi dia 22mm - uk. 2.9 x 2.9 m : bh
66.00 Harga
No.
A 1
B C 67
Uraian Pekerjaan
Harga satuan pekerjaan : Kisi-Kisi Besi dia 22mm - uk. 2.9 x 2.9 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
2,750,000.00
2,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
2,750,000.00 2,750,000.00
: Single - Pintu PVC. - Kusen Alum., uk. 0.7 x 2.0 m : bh
67.00 Harga
No.
A 1
B C 68
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Pintu PVC. - Kusen Alum., uk. 0.7 x 2.0 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
2,750,000.00
2,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
2,750,000.00 2,750,000.00
: Jendela Clear 6mm+Alum. Frame, uk 1.5 x 2.6 m1 : bh
68.00 Harga
No.
A 1
B C 69
Uraian Pekerjaan
Harga satuan pekerjaan : Jendela Clear 6mm+Alum. Frame, uk 1.5 x 2.6 m1
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
1,750,000.00
1,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,750,000.00 1,750,000.00
: Single - Double Multiplek fin.HPL - kusen Alm. - uk. 0.9 x 2.0 m : bh
69.00 Harga
No.
A 1
B C 70
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Double Multiplek fin.HPL - kusen Alm. - uk. 0.9 x 2.0 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
3,750,000.00
3,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
3,750,000.00 3,750,000.00
: Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.2 m : bh
70.00 Harga
No.
A 1
B C 71
Uraian Pekerjaan
Harga satuan pekerjaan : Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.2 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
26,000,000.00
26,000,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
26,000,000.00 26,000,000.00
: Single - Frameless Glass Door - Clear Temp 12mm, uk. 0.8 x 2.2 m : bh
71.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Frameless Glass Door - Clear Temp 12mm, uk. 0.8 x 2.2 m
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
13,000,000.00
Total (Rp)
13,000,000.00
13,000,000.00 13,000,000.00
17 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
72
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Double - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 1.6 x 2.2 m : bh
72.00 Harga
No.
A 1
B C 73
Uraian Pekerjaan
Satuan
Koefisien
Harga satuan pekerjaan : Double - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 1.6 x 2.2 munit
1.000
Satuan (Rp)
Total (Rp)
8,672,000.00
8,672,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
8,672,000.00 8,672,000.00
: Single - Wood Door - kusen & leaf dari kayu solid - uk. 0.9 x 2.2 m : bh
73.00 Harga
No.
A 1
B C 74
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Wood Door - kusen & leaf dari kayu solid - uk. 0.9 x 2.2 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
4,336,000.00
4,336,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,336,000.00 4,336,000.00
: Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.9 x 2.2 m : bh
74.00 Harga
No.
A 1
B C 75
Uraian Pekerjaan
Satuan
Koefisien
Harga satuan pekerjaan : Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.9 x 2.2 m unit
1.000
Satuan (Rp)
Total (Rp)
4,336,000.00
4,336,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
4,336,000.00 4,336,000.00
: Pintu Lipat Double Multiplek fin. HPL - uk. 6.55 x 2.8 m : bh
75.00 Harga
No.
A 1
B C 76
Uraian Pekerjaan
Harga satuan pekerjaan : Pintu Lipat Double Multiplek fin. HPL - uk. 6.55 x 2.8 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
7,535,000.00
7,535,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
7,535,000.00 7,535,000.00
: Pintu Lipat Double Multiplek fin. HPL - uk. 7.05 x 2.8 m : bh
76.00 Harga
No.
A 1
B C 77
Uraian Pekerjaan
Harga satuan pekerjaan : Pintu Lipat Double Multiplek fin. HPL - uk. 7.05 x 2.8 m
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
7,535,000.00
7,535,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
7,535,000.00 7,535,000.00
: Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid - uk. 5.00 x 3.5 m : bh
77.00 Harga
No.
A 1
B C 78
Uraian Pekerjaan
Harga satuan pekerjaan : Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid - uk. 5.00 x 3.5 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
15,200,000.00
15,200,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
15,200,000.00 15,200,000.00
: Single - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 0.8 x 2.2 m : bh
78.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Satuan
Harga satuan pekerjaan : Single - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 0.8 x 2.2 munit
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Koefisien
1.000
Satuan (Rp)
13,000,000.00
Total (Rp)
13,000,000.00
13,000,000.00 13,000,000.00
18 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
79
Item Pekerjaan Satuan Pembayaran
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Pek. Kaca Jendela Frameless 4 sisi dinding, uk. 127x150cm (Kaca Panasap 8mm) : bh
79.00 Harga
No.
A 1
B C 80
Uraian Pekerjaan
Harga satuan pekerjaan : Kaca Jendela Frameless 4 sisi dinding, uk. 127x150cm (Kaca Panasap 8mm)
Satuan
Koefisien
unit
1.000
Satuan (Rp)
Total (Rp)
18,350,000.00
18,350,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
18,350,000.00 18,350,000.00
: Atap Skylight, uk. 127x127cm (Kaca Tempered 12mm) : m2
80.00 Harga
No.
A 1
B C 81
Uraian Pekerjaan
Harga satuan pekerjaan : Atap Skylight, uk. 127x127cm (Kaca Tempered 12mm)
Satuan
Koefisien
m2
1.000
Satuan (Rp)
Total (Rp)
1,750,000.00
1,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan
Satuan Pembayaran
1,750,000.00 1,750,000.00
: Pekerjaan Kaca Atap Skylight Atrium uk. 11.21 x 7.21m Canopy Kaca - Laminated Tempered Sunergy Clear 6 mm + 1,14 + Temp. clear 6 mm Frame Alumunium (CW frame vertical 120x50xt=2,0 mm) : m2
81.00
Harga No.
A 1
B C 82
Uraian Pekerjaan
Satuan
Koefisien
Harga satuan pekerjaan : Atap Skylight Atrium uk. 11.21 x 7.21m Kaca Laminated Tempered Sunergy Clear 6 mm m2+ 1,14 + Temp. clear 1.000 6 mm
Satuan (Rp)
Total (Rp)
1,750,000.00
1,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,750,000.00 1,750,000.00
: Pek. Partisi Kaca Spider Fitting Kaca Tempered Clear 12mm : m2
82.00 Harga
No.
A 1
B C 83
Uraian Pekerjaan
Harga satuan pekerjaan : Partisi Kaca Spider Fitting Kaca Tempered Clear 12mm
Satuan
Koefisien
m2
1.000
Satuan (Rp)
Total (Rp)
1,750,000.00
1,750,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
1,750,000.00 1,750,000.00
: Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid uk. 4.00 x 3.1 m : bh
83.00 Harga
No.
A 1
B C 84
Uraian Pekerjaan
Harga satuan pekerjaan : Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid uk. 4.00 x 3.1 m
Satuan
unit
Koefisien
1.000
Satuan (Rp)
Total (Rp)
15,200,000.00
15,200,000.00
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
15,200,000.00 15,200,000.00
: Single - Glass Door 6mm w/ Frame Alum. - Kusen Alum., uk. 0.9 x 2.2 m : bh
84.00 Harga
No.
A 1
B C
Uraian Pekerjaan
Harga satuan pekerjaan : Single - Glass Door 6mm w/ Frame Alum. - Kusen Alum., uk. 0.9 x 2.2 m
JUMLAH (A ) HARGA SATUAN PEKERJAAN (Dibulatkan)
Satuan
unit
Koefisien
1.000
Satuan (Rp)
13,000,000.00
Total (Rp)
13,000,000.00
13,000,000.00 13,000,000.00
19 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG 85
Item Pekerjaan Satuan Pembayaran
: Pek. pengecatan dinding dalam : m2
85.00 Harga
No.
A 1 2 3 4
Uraian Pekerjaan
TENAGA KERJA Pekerja Tukang Cat Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.020 0.063 0.006 0.003
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
2,169.60 8,872.42 1,020.30 517.54
Sub total tenaga kerja B 1 2 3
86
BAHAN Dempul tembok (plamur) Cat dasar tembok Cat tembok Interior, Warna Standar
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
kg kg ltr
12,579.85
0.100 0.100 0.260
102,500.00 104,400.00 133,100.00
10,250.00 10,440.00 34,606.00
Sub total bahan
55,296.00
Sub total peralatan
67,875.85 67,800.00
: Pek. pengecatan dinding luar weathershield : m2
86.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Cat Kepala Tukang Mandor
1 2 3
BAHAN Dempul tembok (plamur) Cat dasar tembok Cat tembok Eksterior, Warna Standar
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.020 0.063 0.006 0.003
Satuan (Rp)
Total (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
2,169.60 8,872.42 1,020.30 517.54
Sub total tenaga kerja B
87
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
kg kg ltr
12,579.85
0.100 0.100 0.260
102,500.00 104,400.00 184,500.00
10,250.00 10,440.00 47,970.00
Sub total bahan
68,660.00
Sub total peralatan
81,239.85 81,200.00
: Screed lantai camp 1SP : 3PP tebal 50 mm. : m2
87.00 Harga
No.
A
Uraian Pekerjaan
1 2 3 4
TENAGA KERJA Pekerja Tukang Batu Kepala Tukang Mandor
1 2
BAHAN Semen PC Pasir pasang
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.360 0.180 0.018 0.018
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B
kg m3 Sub total bahan
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Sub total peralatan
Total (Rp)
39,052.80 25,349.76 2,915.14 3,105.22 70,422.91
11.250 0.060
3,920.00 388,320.00
44,100.00 23,299.20 67,399.20
137,822.11 137,800.00
20 / 21
Anlisa harga satuan pekerjaan arsitektur
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
88
Item Pekerjaan Satuan Pembayaran
: Pek. screeding + wiremesh M4 + asphalt joint filler : m2
88.00 Harga
No.
A 1 2
D E
89
Uraian Pekerjaan
Harga satuan pekerjaan : Screed lantai camp 1SP : 3PP tebal 50 mm. Kawat ayam
Satuan
Koefisien
m2 m2
1.075 1.075
Satuan (Rp)
Total (Rp)
137,800.00 24,000.00
148,135.00 25,800.00
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
173,935.00 173,900.00
: Water Stop : m1
89.00 Harga
No.
A
Uraian Pekerjaan
1 2
TENAGA KERJA Pekerja Mandor
1
BAHAN Water stop PVC 25 cm
Satuan
Koefisien
org/hari org/hari
0.050 0.010
Satuan (Rp)
108,480.00 172,512.00
Sub total tenaga kerja B
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m1
Total (Rp)
5,424.00 1,725.12
7,149.12
1.030
161,850.00
166,705.50
Sub total bahan
166,705.50
Sub total peralatan
173,854.62 173,800.00
21 / 21
Item Pekerjaan Satuan Pembayaran
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN LANSEKAP SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Pengukuran/pematokan : Ls
1.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
Satuan
TENAGA KERJA Pekerja Tukang Kayu Kepala Tukang Mandor
Koefisien
1,000.000 100.000 100.000 10.000 5.000
org/hari org/hari org/hari org/hari
Satuan (Rp)
Total (Rp)
10,848,000.00 14,083,200.00 1,619,520.00 862,560.00
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1 2 3
BAHAN Kayu kelas III Paku 1/2" - 1 " Kayu papan kelas III
m3 kg m3
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
27,413,280.00
12.000 20.000 7.000
45,000,000.00 480,000.00 26,250,000.00
3,750,000.00 24,000.00 3,750,000.00
Sub total bahan
71,730,000.00
Sub total peralatan
99,143,280.00 99,143,200.00
: Pembersihan lapangan dan perataan : m2
2.00 Harga
No.
Uraian Pekerjaan
A 1 2
TENAGA KERJA Pekerja Mandor
Satuan
Koefisien
org/hari org/hari
0.067 0.013
Satuan (Rp)
Total (Rp)
7,232.00 2,300.16
108,480.00 172,512.00
Sub total tenaga kerja B
9,532.16
BAHAN Sub total bahan
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
-
Sub total peralatan
Item Pekerjaan Satuan Pembayaran
9,532.16 9,500.00
: Bismarchia nobillis / Palem Bismaekia t.300 cm dia.20-30 : Ph
3.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
TENAGA KERJA Pekerja Tukang Lansekap Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.333 0.167 0.083 0.042
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Bismarchia nobillis / Palem Bismaekia t.300 cm dia.20-30
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Ph
Total (Rp)
36,160.00 23,472.00 13,496.00 7,188.00 80,316.00
1.000
1,404,000.00
1,404,000.00
Sub total bahan
1,404,000.00
Sub total peralatan
1,484,316.00 1,484,300.00
1/3
Item Pekerjaan Satuan Pembayaran
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN LANSEKAP SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Bucida molineti / Ketapang kencana t.300 cm dia.5-8 : Ph
4.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
TENAGA KERJA Pekerja Tukang Lansekap Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.333 0.167 0.083 0.042
Satuan (Rp)
Total (Rp)
36,160.00 23,472.00 13,496.00 7,188.00
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Bucida molineti / Ketapang kencana t.300 cm dia.5-8
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
Ph
80,316.00
1.000
877,000.00
877,000.00
Sub total bahan
877,000.00
Sub total peralatan
957,316.00 957,300.00
: Samanea saman / Trembesi t.300 cm dia.5 : Ph
5.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
TENAGA KERJA Pekerja Tukang Lansekap Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.333 0.167 0.083 0.042
Satuan (Rp)
Total (Rp)
36,160.00 23,472.00 13,496.00 7,188.00
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Samanea saman / Trembesi t.300 cm dia.5
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
Item Pekerjaan Satuan Pembayaran
Ph
80,316.00
1.000
292,000.00
292,000.00
Sub total bahan
292,000.00
Sub total peralatan
372,316.00 372,300.00
: Syzigium / Pucuk Merah t.100 cm dia.50 : pot
6.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
TENAGA KERJA Pekerja Tukang Lansekap Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.020 0.010 0.005 0.003
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Syzigium / Pucuk Merah t.100 cm dia.50
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
pot
Total (Rp)
2,169.60 1,408.32 809.76 431.28 4,818.96
1.000
117,000.00
117,000.00
Sub total bahan
117,000.00
Sub total peralatan
121,818.96 121,800.00
2/3
Item Pekerjaan Satuan Pembayaran
Anlisa harga satuan pekerjaan struktur
ANALISA HARGA SATUAN PEKERJAAN LANSEKAP SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG : Axonopus sp / Rumput Gajah Lempeng : m2
7.00 Harga
No.
Uraian Pekerjaan
A 1 2 3 4
TENAGA KERJA Pekerja Tukang Lansekap Kepala Tukang Mandor
Satuan
Koefisien
org/hari org/hari org/hari org/hari
0.013 0.007 0.003 0.002
Satuan (Rp)
108,480.00 140,832.00 161,952.00 172,512.00
Sub total tenaga kerja B 1
BAHAN Axonopus sp / Rumput Gajah Lempeng
C
PERALATAN
D E
JUMLAH (A + B + C) HARGA SATUAN PEKERJAAN (Dibulatkan)
m2
Total (Rp)
1,446.40 938.88 539.84 287.52 3,212.64
1.000
63,000.00
63,000.00
Sub total bahan
63,000.00
Sub total peralatan
66,212.64 66,200.00
3/3
DAFTAR HARGA SATUAN UPAH KERJA SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
No.
Keahlian
Sat.
Harga Satuan (Rp)
1
2
3
4
1
Pekerja
org/hari
Rp
2
Mandor
org/hari
Rp
108,480.00 172,512.00
3
Kepala Tukang
org/hari
Rp
161,952.00
4
Tukang Kayu
org/hari
Rp
140,832.00
5
Tukang Batu
org/hari
Rp
140,832.00
6
Tukang Gali
org/hari
Rp
140,832.00
7
Tukang Cat
org/hari
Rp
140,832.00
8
Tukang Aluminium/kaca
org/hari
Rp
140,832.00
9
Tukang Besi
org/hari
Rp
140,832.00
10
Tukang Mekanikal/Plumbing/Elektrikal
org/hari
Rp
140,832.00
11
Tukang Elektrikal/Elektronik
org/hari
Rp
140,832.00
12
Tukang Lansekap
org/hari
Rp
140,832.00
DAFTAR HARGA SATUAN BAHAN SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
1
2
3
4
1
BAHAN AGREGAT KASAR & BAHAN PEREKAT Tanah urug di quarry
m3
Rp
57,600.00
2
Pasir urug
m3
Rp
437,184.00
3
Pasir pasang
m3
Rp
465,984.00
4
Pasir beton
m3
Rp
465,984.00
5
Pasir batu ( sirtu )
m3
Rp
307,200.00
6
Batu belah
m3
Rp
460,032.00
7
Batu pecah mesin 2/3
m3
Rp
527,232.00
8
Agregat kelas A
m3
Rp
1,123,200.00 1,008,000.00
9
Agregat kelas B Bata merah
m3 bh
Rp
10
Rp
2,400.00
11
Bata ringan 10x20x60cm
bh
Rp
33,600.00
12
Batako 10x15x30
bh
Rp
7,392.00
13
.Semen PC @50 kg/zak
zak
Rp
235,200.00
14
Semen PC
kg
Rp
4,704.00
15
Perekat bata ringan : semen instan
kg
Rp
2,400.00
16
Skim coat : semen instan
kg
Rp
11,520.00
17
Tile adhesive : semen instan
kg
Rp
1,824.00
18
Tile grout : semen instan
kg
Rp
1,824.00
19
Lem
kg
Rp
24,000.00
20
Minyak bekisting
ltr
Rp
62,400.00
21
Penjaga jarak bekisting/spacer
bh
Rp
120,000.00
22
Air
ltr
Rp
576.00
23
Wallpaper
m2
Rp
91,200.00
24
Cat waterproof
kg
Rp
45,600.00
25
Semen warna
kg
Rp
33,600.00
26
BETON READY MIX Beton ready mix K-250
m3
Rp
4,621,728.00
27
PONDASI TIANG PANCANG Tiang pancang segimpat 25 x 25 cm
m1
Rp
1,881,984.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
28
BAHAN LOGAM DAN ALUMUNIUM Besi beton ulir/polos
kg
Rp
24,960.00
29
wire mesh M.6 - 150
m2
Rp
633,600.00
30
wire mesh M.8 - 150
m2
Rp
662,400.00
31
Rangka atap baja ringan
m2
Rp
542,400.00
32
Besi strip
kg
Rp
43,200.00
33
Baja profil WF
kg
Rp
57,600.00
34
Angkur A325 M16
bh
Rp
33,600.00
35
Endstop floordeck
m1
Rp
62,400.00
36
Baja hollow 30x60
btg
Rp
165,600.00
37
Baja hollow 25x25
btg
Rp
145,440.00
38
Siku Stainless 15x15
btg
Rp
62,400.00
39
List Stainless H.10 cm
m1
Rp
276,480.00
40
Plat Stainless 1.2 mm hairline w/ laser cutting
lbr
Rp
2,040,000.00
41
Stainless Sheet 0,8 mm
lbr
Rp
887,808.00
42
Waltermoor dia 16mm
bh
Rp
135,456.00
43
Aluminium cutting
pcs
Rp
2,412,000.00
44
Laser Cutting Tulisan Acrylic Berwarna
pcs
Rp
33,840,000.00
45
Signage Pintu Ruangan
pcs
Rp
72,000.00
34
Seng BJLS 0.30, l = 55 cm ( 1 rol = 50 m1 )
Rp
36,864.00
46
Seng gelombang BJLS 30 uk. 0.90 x 1.80 m
m1 lbr
Rp
109,344.00
47
Acrylic 8 mm - Milk White (203x305) cm
lbr
Rp
870,624.00
48
Kawat beton
kg
Rp
28,800.00
49
Kawat ayam
m2
Rp
28,800.00
50
Paku 1/2" - 1 "
kg
Rp
28,800.00
51
Paku uk. 2" - 5 "
kg
Rp
28,800.00
52
Paku hak panjang 15 cm.
kg
Rp
33,600.00
53
Paku triplek/gypsum
kg
Rp
38,400.00
54
Paku sekrup
kg
Rp
38,400.00
55
Tutup Sekrup stainless
pcs
Rp
14,400.00
56
Sekrup
pcs
Rp
16,320.00
57
Tutup Sekrup
bh
Rp
1,440.00
58
Engsel, ex. Huben/setara
set
Rp
78,336.00
59
Engsel, ex. Solid/setara
set
Rp
89,280.00
60
Rel, ex. Huben/setara
set
Rp
83,232.00
61
Kunci, Ex. Huben/setar
unit
Rp
21,600.00
62
Handle, Stainless
unit
Rp
396,000.00
63
Roda
bh
Rp
72,000.00
64
Leather
feet
Rp
75,840.00
65
Sponge
lbr
Rp
42,624.00
66
Penutup alumunium composite panel (ACP)
m2
Rp
7,200,000.00
67
Rangka hollow alumunium composite panel (ACP)
m2
Rp
73,440.00
68
Pemasangan alumunium composite panel (ACP)
m2
Rp
237,600.00
69
Rangka plafond metal furing tebal 0,45 mm
m1
Rp
45,696.00
70
Rangka partisi metal stud
m1
Rp
63,273.60
71
ACPcutting ornamen dayak
m2
Rp
7,200,000.00
72
Kantor & Klinik Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.2 m
unit
Rp
27,193,536.00
73
Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 0.85 x 2.2 m
unit
Rp
13,663,296.00
74
Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. (0.96+0.54) x 2.2 unitm
Rp
9,552,000.00
75
Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.85 x 2.2 m
unit
Rp
5,551,200.00
76
Single - Double Multiplek fin. HPL - kusen Alm - uk. 0.85 x 2.2 m
unit
Rp
4,973,856.00
77
Dinding panel lapis HPL (8925x2500)mm - 1 sisi
unit
Rp
29,683,584.00
77
Dinding panel lapis HPL (2925x2500)mm - 1 sisi
unit
Rp
9,721,632.00
78
Dinding panel lapis HPL (6008x2960)mm - 1 sisi
unit
Rp
23,645,760.00
78
Folding Door Ornamen Dayak -- FD1 ukuran 7.00 x 2.75
unit
Rp
46,331,232.00
79
Folding Door Ornamen Dayak -- FD2 ukuran 6.00 x 2.75
unit
Rp
39,712,512.00
79
Folding Door Ornamen Dayak -- FD3 ukuran 3.20 x 2.75
unit
Rp
21,180,000.00
80
Folding Door Ornamen Dayak -- FD4 ukuran 5.75 x 2.75
unit
Rp
14,119,968.00
81
Jendela Fixed uk. 80x190cm (Kaca Clear 8mm)
unit
Rp
2,813,856.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp) Rp
1,604,544.00
Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.72 x 2.3 m
m2 unit
Rp
28,423,968.00
84
Double - Glass Door w/ Alum Frame - Kusen Alum., uk. 1.72 x 2.3 m
unit
Rp
28,423,968.00
85
Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m
unit
Rp
5,575,872.00
86
Partisi Kaca Panasap 8 mm, frame alum
m2
Rp
1,088,640.00
87
Partisi Kaca Frameless Clear Temp. 12 mm
m2
Rp
2,332,800.00
88
Dinding Kaca Frameless Clear Temp. 12mm, w/ frame atas st. Steel
m2
Rp
8,242,560.00
89
Curtain Wall, frame aluminium, kaca stopsol dark blue 8 mm
m2
Rp
2,332,800.00
90
Curtain wall frame aluminium + kaca panasap 8 mm
m2
Rp
1,710,720.00
91
Sirip Horizontal kayu - Papan Kayu Lebar 20cm
m1
Rp
345,600.00
92
Sirip Horizontal kayu - Papan Kayu Lebar 10cm
m1
Rp
259,200.00
93
Pekerjaan Suncreen fin Cat w/ frame hollow 50x50 tinggi = 4.5 m
Rp
3,888,000.00
94
Jendela Fixed uk. 109x132mm
m1 unit
Rp
2,587,392.00
95
Jendela Fixed uk. 100x132mm
unit
Rp
2,389,536.00
96
Jendela Fixed uk. 55x102mm
unit
Rp
1,100,352.00
97
Jendela Fixed uk. 73x132mm
unit
Rp
1,796,064.00
98
Jendela Fixed uk. 73x67mm
unit
Rp
963,840.00
99
Jendela Fixed uk. 40x300cm
unit
Rp
1,866,240.00
100
Jendela Fixed uk. 40x200cm
unit
Rp
1,244,160.00
101
Nat aplikasi cutting pasangan dinding, lebar 3cm & dalam 3cm
M1
Rp
74,880.00
102
Double - Glass Door w/ Alum Frame - Kusen Alum
M2
Rp
7,186,452.43
103
Single - Glass Door w/ Alum Frame - Kusen Alumm
M2
Rp
7,306,575.40
104
Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm
M2
Rp
2,894,545.45
105
Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm
M2
Rp
2,968,556.15
106
Single - Double Multiplek fin. HPL - kusen Alm
M2
Rp
2,659,816.04
107
Jendela Fixed
M2
Rp
1,961,411.76
108
Partisi Kaca Clear Temp. 8 mm
M2
Rp
1,555,200.00
109
Single - WPC Board w/ Grill Window - kusen Alm
M2
Rp
2,736,000.00
110
Single - WPC - kusen Alm
M2
Rp
2,400,000.00
111
Single - Wood Door w/border papan kayu - kayu solid lokal
M2
Rp
1,680,000.00
112
Single - Pintu UPVC w/ Kaca Es 5mm + Grill
M2
Rp
2,352,000.00
113
Double - Steel Door fin. Duco w/ Panic Bar
M2
Rp
1,632,000.00
114
Jendela Kaca Naco Alum
M2
Rp
1,344,000.00
115
Jendela alumunium
m2
Rp
1,440,000.00
116
Jendela Fixed (Kaca Clear 8mm)
m2
Rp
1,851,221.05
117
Folding Door Ornamen Dayak kusen hollow 30x60
m2
Rp
2,093,472.00
118
Kisi kisi Frame Hollow 50x50, Lapis Multipleks 9mm Fin. HPL
m2
Rp
3,556,097.98
119
Single - Grill Besi - uk. 0.9 x 0.6 m
m2
Rp
4,482,490.43
120
Double - Steel Door fin. Duco, uk. 2 x 2.4 m
m2
Rp
6,248,988.24
121
Single - Steel Door fin. Duco, uk. 0.9 x 2.4 m
m2
Rp
6,248,988.24
82
Rolling Door - Metal Sheet w/ perforated
83
1
PINTU & JENDELA ZONA INTI (ADD) P1 - KK Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. (0.84+0.84) unit x 2.24 Rpm
4,560,000.00
2
P2 - KK Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. (0.84+0.64) unit x 2.24 Rpm
4,560,000.00
3
P3 - KK Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.88 x 2.24 unit m
Rp
3,484,800.00
4
P4 - KK Single - WPC Board w/ Grill Window - kusen Alm - uk. 0.78 x 2.24 m
unit
Rp
3,484,800.00
5
P5 - KK Single - WPC - kusen Alm - Uk. 0.88 x 2.24 m
unit
Rp
3,484,800.00
6
PJ1 - KK Double - Glass Door w/ Alum Frame - uk. 1.60 x 2.2 m
unit
Rp
16,320,000.00
7
PJ2 - KK Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.80 x 2.2 unitm
Rp
4,560,000.00
8
PJ1 - KK Partisi Kaca Clear 8mm w/ Alum Frame SF - uk. 5.85 x 2.65 m (excl. Openingunit Pintu)
Rp
7,200,000.00
9
PJ2 - KK Partisi Kaca Clear 8mm w/ Alum Frame SF - uk. 2.85 x 1.65 m (excl. Openingunit Pintu)
Rp
7,200,000.00
10
J1 - KK Partisi Kaca Clear 8mm w/ Alum Frame SF - uk. 5.85 x 2.65 m
unit
Rp
7,200,000.00
11
J1 A -KK Jendela Kaca Clear 8mm w/ Alum Frame SF - uk. (2.85+2.85+2.85) x 0.45 munit
Rp
4,560,000.00
12
J2 - KK Partisi Kaca Clear 8mm w/ Alum Frame SF - uk. 2.10 x 2.65 m
unit
Rp
7,200,000.00
13
J3 -KK Partisi Kaca Clear 8mm w/ Alum Frame SF - uk. 2.60 x 2.65 m
unit
Rp
7,200,000.00
14
J4 - KK Jendela Kaca - uk. 0.63 x 1.50 m
unit
Rp
3,379,200.00
15
J5 - KK Jendela Fixed - uk. 0.75 x 0.75 m
unit
Rp
3,379,200.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
16
J6 - KK Jendela Clear Glass 8mm w/ Alum Frame SF - uk. 2.85 x 0.95 m
unit
Rp
7,200,000.00
17
J6 A - KK Jendela Clear Glass 8mm w/ Alum Frame SF - uk. 2.11 x 0.95 m
unit
Rp
7,200,000.00
18
BV1 - KK Bouvenlight Fixed - uk. 3.10 x 0.32 m
unit
Rp
2,419,200.00
19
BV2 - KK Bouvenlight Fixed - uk. 2.53 x 0.32 m
unit
Rp
2,419,200.00
20
BV3 - KK Bouvenlight Fixed - uk. 1.34 x 0.39 m
unit
Rp
2,419,200.00
21
BV4 - KK Bouvenlight Fixed - uk. 1.34 x 0.39 m
unit
Rp
2,419,200.00
22
P1 - KP Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm
unit
Rp
3,600,000.00
23
P3 - KP Single - Double Multiplek fin. HPL w/ Glass Window - kusen Alm - uk. 0.88 x 2.24 unit m
Rp
3,600,000.00
24
P4 - KP Single - WPC Board w/ Grill Window - kusen Alm - uk. 0.78 x 2.24 m
Rp
4,153,920.00
unit
25
P5 - KP Single - Double Multiplek fin. HPL w/ Grill Window - kusen Alm - uk. 0.88 x 2.24 unitm
Rp
3,600,000.00
26
PJ1 - KP Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.60 x 2.2 m
unit
Rp
3,600,000.00
27
PJ1 - KP Double - Double Multiplek fin. HPL w/ Glass Window - kusen Alm
unit
Rp
3,600,000.00
28
PJ1 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 5.85 x 2.65 m (excl. unitOpening RpPintu)
29
PJ2 - KP Jendela Clear 8mm w/ Alum Frame SF - uk. 5.85 x 1.65 m (excl. Opening Pintu) unit
Rp
3,600,000.00
30
J1 - KP Jendela Clear 8mm w/ Alum Frame SF - uk. 5.85 x 1.65 m
unit
Rp
3,600,000.00
31
J6 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 2.85 x 2.65 m
unit
Rp
5,496,000.00
32
J7 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 5.10 x 2.65 m
unit
Rp
5,496,000.00
33
J8 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 4.69 x 2.65 m
unit
Rp
5,496,000.00
34
J9 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 3.77 x 2.65 m
unit
Rp
5,496,000.00
35
J10 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 4.10 x 2.65 m
unit
Rp
5,496,000.00
36
J11 - KP Jendela Clear Glass 8mm w/ Alum Frame SF - uk. 4.21 x 0.44 m
unit
Rp
3,600,000.00
5,496,000.00
37
J12 - KP Partisi Kaca Clear Tempered 8mm w/ Alum Frame SF - uk. 5.3 x 2.65 m
unit
Rp
5,496,000.00
38
BV5 - KP Bouvenlight Fixed - uk. 1.58 x 0.39 m
unit
Rp
3,600,000.00
39
BV6 - KP Bouvenlight Fixed - uk. 0.6 x 0.6 m
unit
Rp
2,419,200.00
40
BV7 - KP Bouvenlight Fixed - uk. 3.31 x 0.39 m
unit
Rp
2,419,200.00
41
BV8 - KP Bouvenlight Fixed - uk. 1.50 x 0.39 m
unit
Rp
2,419,200.00
42
BV9 - KP Bouvenlight Fixed - uk. 2.07 x 0.44 m
unit
Rp
2,419,200.00
43
P1 - MP Single - Wood Door w/border papan kayu - kayu solid lokal - uk. 0.96 x 2.17 m unit
Rp
6,460,800.00
44
P2 - MP Single - Double Multiplek fin. HPL - Kusen Alum - uk. 0.8 x 2.1 m
unit
Rp
3,600,000.00
45
P3 - MP Single - Pintu UPVC w/ Kaca Es 5mm + Grill - uk. 0.8 x 2.15 m
unit
Rp
2,544,000.00
46
P4 - MP Single - Double Multiplek fin. HPL w/ Ornamen Cutting - Kusen Alum - uk. 0.62 unit x 1.53 mRp
5,088,000.00
47
P5 - MP Double - Glass Door w/ Frame Alum. - Kusen Alum. - uk. 1.68 x 2.14 m
unit
Rp
5,088,000.00
48
PB - MP Double - Steel Door fin. Duco w/ Panic Bar - uk. 1.7 x 2.14 m
unit
Rp
8,307,840.00
49
PJ1 - MP Partisi Kaca SF (uk. 2.67 x 2.85 m) -- w/ Glass Door Frameless (uk. 1.6 x 2.2unit m)
Rp
8,307,840.00
50
PJ2 - MP Partisi Kaca SF (uk. 5.4 x 2.85 m) -- w/ Glass Door Alum. Frame (uk. 1.6 x 2.21 Unitm) & Jendela Rp Pivot 8,307,840.00
51
PJ 2A - MP Partisi Kaca SF (uk. 2.62 x 2.70 m) -- w/ Glass Door Alum. Frame (uk. 1.6 unit x 2.20 m) Rp
8,307,840.00
52
PJ 4A - MP Partisi Kaca SF (uk. (1.00 x 2.85 m)
8,307,840.00
unit
Rp
53
PJ 8 - MP Partisi Kaca SF (uk. 5.40 x 2.85 m) -- w/ Glass Door Alum. Frame (uk. 1.6 x unit 2.20 m) &Rp Jendela Pivot8,307,840.00
54
PCT - MP Double - Glass Door Frameless Tempered uk 1.64 x 2.17
Unit
Rp
55
BV1 - MP Jendela alumunium uk. 0.48 x 2.62 m
unit
Rp
3,600,000.00
56
J1 - MP Partisi Kaca SF, Kaca Panasap (uk. 2.67 x 2.85m) -- w/ Jendela Pivot
unit
Rp
8,307,840.00
57
J2 - MP Partisi Kaca SF, Kaca Panasap (uk. 5.40 x 2.85m) -- w/ Jendela Pivot
unit
Rp
8,307,840.00
58
J4 - MP Jendela Pivot alumunium uk. 1.0 x 2.85 m
unit
Rp
8,307,840.00
59
J 4A - MP Jendela Fixed Alum. uk. 1.0 x 2.85 m
unit
Rp
8,307,840.00
60
PJ 3A - MP Partisi Kaca SF (uk. 3.75 x 2.85m) -- w/ Glass Door Alum. Frame (uk. 0.8 xunit 2.20m) &Rp Jendela Pivot8,307,840.00
61
J 1 - MP Partisi Kaca SF, Kaca Panasap (uk. 2.67 x 2.85m) -- w/ Jendela Pivot
unit
Rp
8,307,840.00
62
PG - MP Double - Glass Door Frameless, uk. 1.64 x 2.17 m
unit
Rp
8,307,840.00
63
PJ 2E - MP Partisi Kaca SF (uk. 2.62 x 3.50m) -- w/ Glass Door Alum. Frame (uk. 1.6 xunit 2.20m) Rp
8,307,840.00
64
J 4A - MP Jendela Fixed Alum. uk. 1.0 x 2.70 m
unit
Rp
3,600,000.00
65
J 5 - MP Jendela Kaca Naco Alum. uk. 2.5 x 2.95 m
unit
Rp
3,600,000.00
66
P1 - MP Single - Wood Door w/border papan kayu - kayu solid lokal - uk. 0.96 x 2.18 m unit
Rp
9,360,000.00
67
P2 - MP Single - Double Multiplek fin. HPL - Kusen Alum - uk. 0.92 x 2.18 m
Rp
5,088,000.00
68
PJ 3 - MP Partisi Kaca SF (uk. 3.75 x 2.85m) -- w/ Glass Door Alum. Frame (uk. 0.8 x unit 2.20m) & Rp Jendela Pivot 8,307,840.00
69
PJ 4 - MP Partisi Kaca SF (uk. 3.75 x 2.85m) -- w/ Glass Door Alum. Frame (uk. 0.8 x 2.20m) unit & Jendela Rp Pivot 8,307,840.00
unit
5,496,000.00
70
PJ 5 - MP Partisi Kaca SF (uk. (2.67+2.67) x 2.90m) -- w/ Glass Door Alum. Frame (uk.unit 0.8 x 2.20m) Rp & Jendela8,307,840.00 Pivot
71
J 4 - MP Jendela Pivot alumunium uk. 1.0 x 2.85 m
Rp
3,600,000.00
72
PJ 10 - MP Partisi Kaca SF(uk. 0.70 x 6.96 ) -- w/ Glass Door Alum. Frame (uk. 0.7 x 2.2 unitm)
Rp
8,307,840.00
73
P 1 - CW Double - WPC Board w/ Glass Window - kusen Alm - uk. (0.875+0.875) x 2.1 unit m
Rp
8,307,840.00
74
P 2 - CW Single - WPC Board - kusen Alm - uk. 0.8 x 2.1 m
unit
Rp
5,088,000.00
75
J 1 - CW Frame Allumunium : Mullion & Transom
unit
Rp
5,088,000.00
76
J 2 - CW Jendela alumunium uk. 0.8 x 1.9m
unit
Rp
5,088,000.00
77
BV 1 - CW Jendela Bouvenlight , uk. 0.5x0.6m
unit
Rp
2,419,200.00
78
BV 2 - CW Jendela Bouvenlight , uk. 0.5x1.4m
unit
Rp
2,419,200.00
79
SD - ME - 1 Double - Steel Door fin. Duco, uk. 2 x 2.4 m
unit
Rp
2,419,200.00
unit
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
80
J - ME Single - Grill Besi - uk. 0.9 x 0.6 m
unit
Rp
3,566,400.00
81
S - ME 2 Single - Steel Door fin. Duco, uk. 0.9 x 2.4 m
unit
Rp
3,566,400.00
84
PINTU & JENDELA ZONA INTI (ADD) P2 Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.2 m
unit
Rp
5,496,000.00
85
K 1 - Kisi kisi Frame Hollow 50x50, Lapis Multipleks 9mm Fin. HPL
m1
Rp
4,339,200.00
86
K 2 - Kisi kisi Frame Hollow 50x50, Lapis Multipleks 9mm Fin. HPL
m1
Rp
4,339,200.00
87
Kisi kisi Frame Hollow 50x100, Lapis Multipleks 9mm Fin. HPL
m1
Rp
4,339,200.00
88
P 1 - SC Single - WPC Board w/ Grill Louvre - kusen Alm - uk. 0.90 x 2.15 m
unit
Rp
3,825,600.00
82 83
89
P2 - CS Single - Double Multiplek fin. HPL w/ Glass Window - Kusen Alum - uk. 0.90 xunit 2.15 m Rp
3,825,600.00
90
P 4 - CS Single - WPC Board w/ Grill Louvre - kusen Alm - uk. 0.79 x 2.15 m
unit
Rp
3,825,600.00
91
P 5 - CS Single - Steel Door fin. Duco, uk. 1.10 x 2.15 m
unit
Rp
3,825,600.00
92
P 5 B - CS Double - Steel Door fin. Duco, uk. 1.70 x 2.15 m
unit
Rp
7,651,200.00
93
P 6 - CS Single - WPC Board w/ Grill Louvre - kusen Alm - uk. 0.99 x 2.15 m
unit
Rp
3,825,600.00
94
PS - CS Single - Double Multiplek fin. HPL - Kusen Alum - uk. 0.60 x 2.15 m
unit
Rp
3,825,600.00
95
PS 2 - CS Double - Double Multiplek fin. HPL - Kusen Alum - uk. 1.32 x 2.15 m
unit
Rp
7,651,200.00
96
BV 1 - CS Jendela Grill Alumunium uk. 0.40 x 11.50 m
unit
Rp
2,625,600.00
97
BV 3 - CS Jendela Bouvenlight uk. 0.49 x 0.89 m
unit
Rp
2,625,600.00
98
BV 4 - CS Jendela Grill Alumunium uk. 0.40 x 5.05 m
unit
Rp
2,625,600.00
99
BV 5 - CS Jendela Grill Alumunium uk. 0.40 x 1.05 m
unit
Rp
2,625,600.00
100
PS - CS Single - Double Multiplek fin. HPL - Kusen Alum - uk. 0.60 x 2.15 m
unit
Rp
5,088,000.00
101
PS 2 - CS Double - Double Multiplek fin. HPL - Kusen Alum - uk. 1.32 x 2.15 m
unit
Rp
10,176,000.00
102
P 6 - CS Single - WPC Board w/ Grill Louvre - kusen Alm - uk. 0.99 x 2.15 m
unit
Rp
5,088,000.00
103
P 5 - CS Single - Steel Door fin. Duco, uk. 1.10 x 2.15 m
unit
Rp
4,339,200.00
104
BV 2 - CS Jendela Grill Alumunium uk. 0.40 x 9.50 m
unit
Rp
4,339,200.00
105
FD1 - Folding Door Ornamen Dayak 7.00x 2.75 kusen hollow 30x60
unit
Rp
4,540,800.00
106
FD 2 - Folding Door Ornamen Dayak 6.00 x 2.75
unit
Rp
4,540,800.00
107
FD 3 - Folding Door Ornamen Dayak 6.00 x 2.75
unit
Rp
4,540,800.00
108
FD 3 - Folding Door Ornamen Dayak 3.20 x 2.75
unit
Rp
4,540,800.00
109
P1 - PS Single - Double Multiplek fin. HPL - Kusen Alum - uk. 1.60 x 2.60 m
unit
Rp
10,176,000.00
110
P 2 - PS Single - WPC Board - kusen Alm - uk. 0.78 x 2.24 m
unit
Rp
5,088,000.00
111
P 3 - PS Single - WPC Board - kusen Alm - uk. 0.34 x 1.00 m
unit
Rp
5,088,000.00
112
Jendela Frame Aluminium SF4", Clear Glass 8mm
m2
Rp
2,640,000.00
113
P 2 - MSP Single - WPC Board w/ Glass Window - kusen Alm - uk. 0.88 x 2.14 m
bh
Rp
5,088,000.00
114
P 3 - MSP Single - WPC Board w/ Grill Window - kusen Alm - uk. 0.88 x 2.14 m
bh
Rp
5,088,000.00
115
J1 - MSP Jendela alumunium uk. 0.7 x 1.4m
unit
Rp
10,080,000.00
116
BV 1 - MSP Jendela Bouvenlight uk. 0.48 x 0.88 m
unit
Rp
5,088,000.00
117
P 2 - MSP Single - WPC Board w/ Glass Window - kusen Alm - uk. 0.88 x 2.14 m
bh
Rp
5,088,000.00
118
P 3 - MSP Single - WPC Board w/ Grill Window - kusen Alm - uk. 0.88 x 2.14 m
bh
Rp
5,088,000.00
119
P 10 - MSP Single - Alum. Grill Door - kusen Alm - uk. 0.88 x 2.24 m
bh
Rp
5,088,000.00
120
P 5 - MSP Single - Steel Door fin. Duco, uk. 1.10 x 2.10 m
bh
Rp
5,088,000.00
121
BV 1 - MSP Jendela Bouvenlight uk. 0.48 x 0.88 m
unit
Rp
2,625,600.00
122
BV 2 - MSP Jendela alumunium uk. 0.48 x 1.32 m
unit
Rp
2,625,600.00
123
J 2 - MSP Jendela alumunium Letter U, uk. (1.11+2.48+1.11) x 1.40 m
unit
Rp
5,088,000.00
124
Pintu kaca piot Single- Glass Door w/ Frame Alum. - incl. Pivot., uk. 1.2 x 2.47 m
unit
Rp
6,259,200.00
125
Mess Pegawai Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.85 x 2.0 munit
Rp
4,339,200.00
126
Double - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 1.6 x 2.2 m unit
Rp
8,678,400.00
127
Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.0 m
unit
Rp
8,678,400.00
128
Single - Double Multiplek fin.Cat Duco - kusen Kayu Solid. - uk. 0.9 x 2.2 m
unit
Rp
8,678,400.00
129
Single - Double Multiplek fin.HPL - kusen Kayu Solid. - uk. 0.8 x 2.2 m
unit
Rp
8,678,400.00
130
Single - Glass Door w/ Alum Frame - Kusen Alum., uk. 100 x 2.2 m
unit
Rp
4,339,200.00
131
Masjid Double - Double Multiplek fin.HPL - kusen Alm. - uk. 1.28 x 2.0 m
unit
Rp
8,678,400.00
132
GRC Cetak polos Cover + Rangka besi
m2
Rp
1,080,000.00
133
Sirip woodplank, w/ Metal Stud Frame 75
m2
Rp
970,560.00
134
Power House Double - Steel Door fin. Duco, uk. 0.85 x 2.4 m
unit
Rp
8,325,120.00
135
Single - Grill Besi - uk. 1.15 x 2.0 m
unit
Rp
4,162,560.00
136
Jendela - Grill Besi - uk. 1.5 x 2.0 m
unit
Rp
4,162,560.00
137
Kisi-Kisi Besi dia 22mm - uk. 2.9 x 2.9 m
unit
Rp
2,640,000.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
138
Pasar Single - Pintu PVC. - Kusen Alum., uk. 0.7 x 2.0 m
unit
Rp
139
Jendela Clear 6mm+Alum. Frame, uk 1.5 x 2.6 m1
unit
Rp
1,680,000.00
140
Single - Double Multiplek fin.HPL - kusen Alm. - uk. 0.9 x 2.0 m
unit
Rp
3,600,000.00
141
Wisma Indonesia Double - Frameless Glass Door - Clear Temp 12mm, uk. 1.6 x 2.2 m
unit
Rp
24,960,000.00
142
Single - Frameless Glass Door - Clear Temp 12mm, uk. 0.8 x 2.2 m
unit
Rp
12,480,000.00
143
Double - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 1.6 x 2.2 munit
Rp
8,325,120.00
144
Single - Wood Door - kusen & leaf dari kayu solid - uk. 0.9 x 2.2 m
unit
Rp
4,162,560.00
145
Single - Double Multiplek fin. HPL with Glass Window - Kusen Alum - uk. 0.9 x 2.2 m unit
Rp
4,162,560.00
146
Pintu Lipat Double Multiplek fin. HPL - uk. 6.55 x 2.8 m
unit
Rp
7,233,600.00
147
Pintu Lipat Double Multiplek fin. HPL - uk. 7.05 x 2.8 m
unit
Rp
7,233,600.00
148
Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid - uk. 5.00 x 3.5 m
unit
Rp
14,592,000.00
149
Single - Glass Door with Solid Frame - kusen & frame dari kayu solid - uk. 0.8 x 2.2 munit
Rp
12,480,000.00
150
Kaca Jendela Frameless 4 sisi dinding, uk. 127x150cm (Kaca Panasap 8mm)
unit
Rp
17,616,000.00
151
Atap Skylight, uk. 127x127cm (Kaca Tempered 12mm)
m2
Rp
1,680,000.00
152
Partisi Kaca Spider Fitting Kaca Tempered Clear 12mm
m2
Rp
1,680,000.00
153
Convention Store Pintu Geser kombinasi Kaca (Clear Temp. 12mm) dg Kayu Solid uk. 4.00 x 3.1 m
unit
Rp
14,592,000.00
154
Single - Glass Door 6mm w/ Frame Alum. - Kusen Alum., uk. 0.9 x 2.2 m
unit
Rp
12,480,000.00
155
Atap Skylight Atrium uk. 11.21 x 7.21m Kaca Laminated Tempered Sunergy Clear 6 mm m2+ 1,14 +RpTemp. clear1,680,000.00 6 mm
156
BAHAN PENGUNCI / PENGGANTUNG DAN KACA Grendel tanam pintu ganda
bh
Rp
180,000.00
157
Jendela nako
set
Rp
360,000.00
158
Kaca polos 5 mm
m2
Rp
309,600.00
159
Kaca cermin 5 mm
Rp
612,000.00
Kaca tempered 8 mm
m2 lbr
Rp
1,872,000.00
Kaca tempered 12 mm
m2
Rp
2,121,600.00
160
BAHAN KAYU / KAYU LAPIS DAN PLAFOND Kayu papan kelas III
m3
Rp
3,600,000.00
161
Kayu kelas III
m3
Rp
3,600,000.00
162
Kayu kelas II
Rp
4,320,000.00
163
Dolken kayu dia. 8 - 10/400 cm
m3 btg
Rp
45,648.00
164
Multiplek 9 mm, uk. 1,20 x 2,40
lbr
Rp
241,920.00
165
Plywood 18 mm, uk. 1,20 x 2,40
lbr
Rp
1,500,000.00
166
Plywood 12 mm, uk. 1,20 x 2,40
lbr
Rp
900,000.00
167
Plywood 9 mm, uk. 1,20 x 2,40
lbr
Rp
600,000.00
168
Plywood 4 mm, uk. 1,20 x 2,40
lbr
Rp
300,000.00
169
Teakwood 3 mm, uk. 1,20 x 2,40
lbr
Rp
250,000.00
170
Megateak 3 mm fin. Plamir, uk. 1,20 x 2,40
lbr
Rp
350,000.00
171
Blokmin 18 mm, uk. 1,20 x 2,40
lbr
Rp
1,500,000.00
172
Melaminto 3mm - Doff
lbr
Rp
396,000.00
173
MDF 12 mm, uk. 1,20 x 2,40
lbr
Rp
252,000.00
174
HPL Ex. Taco (New Catalog)
lbr
Rp
396,000.00
175
HPL TH 817 J ex. Taco/setara
lbr
Rp
396,000.00
176
HPL Grey Concrete ex. Smartlam
lbr
Rp
396,000.00
177
Edging PVC 4,5 cm
m1
Rp
285,120.00
178
Edging PVC 2,2 cm
m1
Rp
219,323.08
179
Vinyl PVC
m2
Rp
684,000.00
169
Gypsum board, uk. 1,20 x 2,40 m, tebal 9 mm
lbr
Rp
220,608.00
170
Gypsum board (wet), uk. 1,20 x 2,40 m, tebal 9 mm
lbr
Rp
220,608.00
171
Gypsum board, uk. 1,20 x 2,40 m, tebal 12 mm
lbr
Rp
330,912.00
172
GRC 9 mm 122 x 244 cm
lbr
Rp
650,880.00
173
GRC 6 mm 122 x 244 cm
lbr
Rp
464,914.29
180
List plapond (metal w type)
m1
Rp
201,600.00
2,640,000.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
181
BAHAN PENUTUP ATAP Rangka kaso Baja Ringan jarak 1m dan reng jarak 15cm
m²
Rp
401,088.00
182
Pipa D12"
Kg
Rp
36,960.00
183
IWF 250.125
Kg
Rp
57,600.00
184
C. 150.65.20.3,2
Kg
Rp
57,600.00
185
Plat 12 mm
Kg
Rp
57,600.00
186
Angkur M22
Bh
Rp
73,920.00
187
Talang 0.50 TST termasuk rangka, klem , dan penguat (lebar total 90cm)
m'
Rp
517,440.00
188
Roof Drain Dia 4"
Bh
Rp
164,736.00
189
Pipa Air Hujan
m'
Rp
132,000.00
190
Atap single bitumen IKO Cambridge 30 AR FULL SYSTEM
m²
Rp
732,480.00
191
Genteng metal double sheet isolasi EPS
m²
Rp
739,200.00
192
Plafond linear ceiling plank system
m²
Rp
465,600.00
193
Nok atap metal
m'
Rp
200,640.00
194
Lisplank GRC Motif terpasang fin. Cat
m'
Rp
179,520.00
195
Meni Besi
Kg
Rp
79,200.00
196
Atap metal boltless clip colorbond 0.50 TCT
m2
Rp
739,200.00
197
Floordeck Hi-ten; 0,7 BMT
m2
Rp
570,336.00
198
Flashing metal colorbond t=0.50 tct - Lebar 0.5 m1
m1
Rp
301,056.00
199
Nok atap zincalum colorbond t.0.50 TCT
m1
Rp
180,000.00
200
Talang BJLS 60 termasuk rangka (pit service)
Rp
93,600.00
201
Grouting
m1 ttk
Rp
1,680,000.00
202
BAHAN PENUTUP LANTAI & DINDING Homogenous Tile 60x60 "polished" type MON 6WLHP 6612
m2
Rp
827,520.00
203
Homogenous Tile 60x60 "polished" type VEN 6XOP001 V
m2
Rp
827,520.00
204
Homogenous Tile 60x60 "polished" type VEN 6WLP008 V
m2
Rp
827,520.00
205
Homogenous Tile 60x60 "unpolished" type MON 6FN2001 V
m2
Rp
587,520.00
206
Homogenous Tile 60x60 "unpolished" type VEN 6GN053V
m2
Rp
587,520.00
207
Batu Granit
m2
Rp
2,534,400.00
208
Slate Stone
m2
Rp
1,584,000.00
209
Keramik tile 50 x 50 cm unpolished
m2
Rp
376,992.00
210
Keramik tile 40 x 40 cm polished
m2
Rp
362,112.00
211
Keramik tile 40 x 40 cm unpolished
m2
Rp
316,032.00
212
Keramik tile 25 x 40 cm polished
Rp
316,032.00
213
Keramik tile 15 x 40 cm
m2 bh
Rp
19,752.00
214
Hospital plint
bh
Rp
109,440.00
215
Marmer ex lokal
Rp
1,305,600.00
216
Marmer ex. Serpeggiante Silver
m2 slab
Rp
1,566,720.00
217
Batu alam andesit Susun Sirih 3x30,5x30
m2
Rp
422,400.00
218
Batu alam andesit 30x30, 30x60
Rp
422,400.00
219
Vynil 30cm x 30cm
m2 bh
Rp
30,800.00
220
Jont filler asphalt
Rp
102,480.00
221
Grass Block 2 lubang - 20x20x8
m1 m2
Rp
600,000.00
222
Floor hardener
kg
Rp
362,880.00
223
Waterproofing coating
kg
Rp
97,344.00
224
Waterproofing membrane 3 mm
m2
Rp
180,000.00
225
Kansteen lebar 200mm x tinggi 400mm x panjang 600 mm
bh
Rp
132,480.00
226
Batu kricak maks 2 cm
m3
Rp
792,000.00
227
Batu koral
m3
Rp
792,000.00
228
Tefond drain
m2
Rp
271,872.00
229
geotextile non woven 250gr/m2
m2
Rp
112,320.00
230
Benang jahit Geo tekstile
glg
Rp
91,200.00
231
Paving, T 8 cm K 250
m2
Rp
1,824,000.00
232
Water stop PVC 25 cm
m1
Rp
155,376.00
233
Cuve Lampu 20x10x6x20cm
m1
Rp
304,224.00
234
Container sampah 6m3
unit
Rp
46,080,000.00
235
BAHAN FINISHING Cat dasar besi
ltr
Rp
64,512.00
236
Cat dasar tembok
kg
Rp
100,224.00
237
Cat tembok Interior, Warna Standar
ltr
Rp
127,776.00
238
Cat tembok Eksterior, Warna Standar
ltr
Rp
177,120.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
239
Cat kayu / besi
kg
Rp
94,848.00
240
Meni kayu / besi
kg
Rp
94,848.00
241
Compound Gypsum
kg
Rp
633,600.00
242
Cat duco
kg
Rp
182,880.00
243
Thinner
kg
Rp
33,600.00
244
Dempul tembok (plamur)
kg
Rp
98,400.00
245
Kuas 4"
bh
Rp
33,600.00
246
Sealent
tube
Rp
29,952.00
247
Minyak pelumas
ltr
Rp
51,840.00
248
Grease
kg
Rp
33,600.00
249
Solar
ltr
Rp
36,480.00
250
Premium
ltr
Rp
36,480.00
251
Minyak tanah
ltr
Rp
17,280.00
252
Pest kontrol (anti rayap)
m2
Rp
4,080.00
253
BAHAN / ALAT - ALAT SANITAIR Closet CW 660 NPJW/F
unit
Rp
2,252,160.00
254
Tabung SW 660 J / 660-8 (lengkap fitting & accesories)
unit
Rp
3,407,040.00
255
Plastic seat & cover TC505S
unit
Rp
842,400.00
256
Closet CW 826 JW/F
unit
Rp
4,454,400.00
257
Tabung SW 826 JP (lengkap fitting & accesories)
unit
Rp
7,228,800.00
258
Eco washer elongated TCW 03SL
unit
Rp
1,025,472.00
256
Squatting toilet CE9 W/F + T82C32
unit
Rp
741,888.00
259
Flush flange w/ vacum breaker TV150NWV12J
unit
Rp
3,600,000.00
260
Stainless steel paper holder TS116R (YH116)
unit
Rp
374,400.00
261
"Toja" concole lavatory 1 tap hole, ex Toto, Toja LW951CJW/F
unit
Rp
1,175,040.00
262
P-trap for lavatory THX1A-5N
unit
Rp
489,600.00
263
Stop valve w/ flexible hose TX277SV1 (x2)
unit
Rp
288,288.00
264
Wastafel Gantung, ex Toto, LW236CJW
unit
Rp
2,086,080.00
265
Waste & plug T6JV4
unit
Rp
300,960.00
266
P-trap for lavatory THX1A-3N
unit
Rp
312,000.00
265
Counter top lavatory 1 tap holes L521V3 (alternatif LW501CJ)
unit
Rp
936,000.00
266
11/4" pop-up waste THX3A-1N
unit
Rp
2,640,000.00
267
Wastafel type LW640NCJTW/F lengkap Fitting (Leher Angsa) /accesories
unit
Rp
2,995,200.00
267
Bath tub, ex Toto FBY1760CHPE
unit
Rp
7,222,080.00
267
Luxury pop-up waste fitting 9008LN
unit
Rp
2,400,000.00
267
Bath tub, ex Toto FB1700-75
unit
Rp
7,222,080.00
268
Standard pop-up waste fitting 9005N
unit
Rp
2,496,000.00
269
Shower spray w/ stop valve TX403SB#W
unit
Rp
839,904.00
270
Hand Dryer HD 4000 M (TYC322M)
unit
Rp
8,334,720.00
271
Hand Dryer tipe HD 3000 S (TYC322W)
unit
Rp
7,319,040.00
272
"Donna" single lever lavatory faucet, TX109LD
unit
Rp
1,331,990.40
273
"Royal crown" lavatory faucet TX111LRYR
unit
Rp
1,986,048.00
274
.Stop valve w/ flexible hose TX277S
unit
Rp
251,328.00
275
Lever handle sink tap T23BQ13N
unit
Rp
602,496.00
276
Kran Sink Tap, type T30ARQ13N
unit
Rp
2,995,200.00
277
Urinoir, type U57
unit
Rp
2,059,200.00
278
Partisi Urinoir, material Phenolic Board fin. HPL
unit
Rp
114,240.00
279
Kran Wudhu Mushola, ex. Toto TX133L
unit
Rp
589,824.00
280
"Toja" single lavatory faucet 1 1/4" ex Toto, TX115LT
unit
Rp
589,824.00
281
"Toja" Shower Column Set type TX492STN
unit
Rp
720,000.00
282
"Donna" single lever bath & shower, ex. Toto TX432SD
unit
Rp
2,932,800.00
283
"Hello" single lever lavatory faucet TX108LHBR
unit
Rp
2,932,800.00
284
Floor drain TX1-BN
unit
Rp
675,168.00
285
Cubicle toilet board 12mm / phenolic finish HPL
Rp
315,744.00
286
Wastafel, type LW642CJ
m2 unit
Rp
2,496,000.00
287
Kitchen Zink Stainless Steel satu lubang lengkap dengan aksesoris
Bh
Rp
1,092,000.00
288
Kran Kitcen
Bh
Rp
816,000.00
289
BAHAN INTERIOR Jam Dinding
unit
Rp
240,000.00
290
Kursi Hadap
unit
Rp
1,848,000.00
291
Lemari Alat Tinggi
unit
Rp
9,600,000.00
292
Lemari Alat Kargo
unit
Rp
7,680,000.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
293
Lemari Obat
unit
Rp
8,640,000.00
294
Sofa Single Seater
unit
Rp
7,259,695.10
295
Sofa Triple Seater
unit
Rp
17,760,000.00
296
Tempat Sampah Besar
unit
Rp
3,170,583.55
297
Tempat Sampah 12 liter
unit
Rp
361,658.88
298
Tanaman Hias
bh
Rp
2,592,000.00
299
Pembatas Antrian Koridor Utama
unit
Rp
648,000.00
300
BAHAN PLUMBING Pompa Booster Kap : 14 m3/hour
unit
Rp
78,336,000.00
301
Pompa Booster Kap : 100 m3/hour
unit
Rp
463,831,488.00
302
Electric Main Pump, Kap : 1000 UsGPM
unit
Rp
463,831,488.00
303
Diesel Fire Pump, Kap : 750 UsGPM
unit
Rp
773,052,576.00
304
Pompa Jockey Fire Pump
unit
Rp
211,300,992.00
305
Pompa air deep well Kapasitas : 150 liter / menit
unit
Rp
204,000,000.00
306
Pengeboran sedalam 150 m' - Deep Well
set
Rp
2,244,000,000.00
307
Lift up Pump ke STP kawasan, kap : 2 x 200 lpm
unit
Rp
170,687,904.00
308
Panel pompa
unit
Rp
13,178,400.00
309
Pipa PVC. ( AW ) Ø 1"
btg
Rp
62,668.80
310
Pipa PVC. ( AW ) Ø 1.5"
btg
Rp
94,003.20
311
Pipa PVC. ( AW ) Ø 2"
btg
Rp
138,240.00
312
Pipa PVC. ( AW ) Ø 2.5"
btg
Rp
201,830.40
313
Pipa PVC. ( AW ) Ø 3"
btg
Rp
272,217.60
314
Pipa PVC. ( AW ) Ø 4"
btg
Rp
451,238.40
315
Pipa PVC. ( AW ) Ø 6"
btg
Rp
826,176.00
316
Pipa PVC. ( AW ) Ø 8"
btg
Rp
1,101,600.00
317
Pipa PPR PN 10 dia. 100 mm
m1
Rp
834,528.00
318
Pipa PPR PN 10 dia. 80 mm
m1
Rp
542,304.00
319
Pipa PPR PN 10 dia. 65 mm
m1
Rp
380,544.00
320
Pipa PPR PN 10 dia. 50 mm
m1
Rp
238,752.00
321
Pipa PPR PN 10 dia. 40 mm
m1
Rp
149,952.00
322
Pipa PPR PN 10 dia. 32 mm
m1
Rp
97,344.00
323
Pipa PPR PN 10 dia. 25 mm
m1
Rp
63,648.00
324
Pipa PPR PN 10 dia. 20 mm
m1
Rp
39,456.00
325
Pipa PPR PN 10 dia. 15 mm
Rp
28,512.00
326
Fitting pipa PPR dia. 100 mm
m1 bh
Rp
447,456.00
327
Fitting pipa PPR dia. 80 mm
bh
Rp
399,840.00
328
Fitting pipa PPR dia. 65 mm
bh
Rp
390,336.00
329
Gate valve dia. 100 mm
bh
Rp
22,521,600.00
330
Gate valve dia. 65 mm
bh
Rp
7,520,256.00
331
Gate valve dia. 50 mm
bh
Rp
3,457,824.00
332
Gate valve dia. 40 mm
bh
Rp
2,766,240.00
333
Gate valve dia. 32 mm
bh
Rp
2,075,904.00
334
Gate valve dia. 25 mm
bh
Rp
1,621,824.00
335
Gate valve dia. 15 mm
bh
Rp
973,056.00
334
Ecentrik reducer valve dia. 65 mm
bh
Rp
2,506,752.00
336
Floor Clean Out dia. 50 mm
bh
Rp
265,152.00
337
Roof Drain dia. 100 mm
bh
Rp
652,800.00
338
Biotek septic Tank kap. 5 m3/day
unit
Rp
42,603,648.00
339
Sumur Resapan kap. 4 m3
unit
Rp
15,360,000.00
340
BAHAN PEMADAM KEBAKARAN BS SCH 40 dia. 200 mm
m1
Rp
1,325,760.00
341
BS SCH 40 dia. 150 mm
m1
Rp
709,440.00
342
BS SCH 40 dia. 100 mm
m1
Rp
402,240.00
343
BS SCH 40 dia. 80 mm
m1
Rp
283,200.00
344
BS SCH 40 dia. 65 mm
m1
Rp
203,520.00
345
BS SCH 40 dia. 40 mm
Rp
101,760.00
346
Hydrant Box Type Indoor ukuran : 125 x 75 x 18 cm
m1 bh
Rp
9,753,600.00
347
Hydrant Box Type Outdoor size ( 95 x 66 x 20)
bh
Rp
7,338,240.00
348
Pillar hydrant two way
bh
Rp
9,989,760.00
349
Fire Extingusher Trolley CO2, 25 kg
bh
Rp
22,032,000.00
350
CO2 Fire extinguiser 5 Kg
bh
Rp
3,590,400.00
351
ABC Fire extinguiser 3 Kg
bh
Rp
1,019,520.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
352
BAHAN MVAC AC Split Duct kap. 57.000 BTU/H
unit
Rp
51,768,000.00
353
AC Single Split Wall mounted kap 1 PK
unit
Rp
14,194,560.00
354
Wall mounted spot lighting led 3 watt
unit
Rp
15,481,920.00
355
Single Split Wall mounted kap 2 PK
unit
Rp
17,133,120.00
356
Single Split Wall mounted kap 3 PK
unit
Rp
21,563,520.00
357
BAHAN ELEKTRIKAL SDP-Panel
unit
Rp
115,957,440.00
358
PL - Penerangan dan Power
unit
Rp
66,481,920.00
359
PL - Penerangan luar
unit
Rp
74,728,320.00
360
.PUTR
unit
Rp
795,384,960.00
361
Capacitor Bank 1200 KVAR
unit
Rp
395,115,840.00
362
Transformer kap 2000 KVA
unit
Rp
824,691,840.00
363
Genset Kap 1000 KVA 1500 RPM
unit
Rp
3,006,315,840.00
364
Panel Kontrol Synchronizing 2 x 1000 KVA
unit
Rp
596,831,040.00
365
NYFGBY 4 x 185 mm2
m1
Rp
1,761,600.00
366
NYFGBY 4 x 150 mm2
m1
Rp
1,428,480.00
366
NYFGbY 4 x 120 mm2
m1
Rp
1,179,840.00
367
NYFGbY 4 x 95 mm2
m1
Rp
934,080.00
367
NYFGbY 4 x 70 mm2
m1
Rp
686,400.00
368
NYFGbY 4 x 50 mm2
m1
Rp
506,880.00
369
NYFGBY 4 x 35 mm2
m1
Rp
407,040.00
370
NYFGBY 4 x 16 mm2
m1
Rp
207,360.00
371
NYFGBY 4 x 10 mm2
m1
Rp
128,640.00
372
NYY 4 x (7x1x400 mm2) + NYA 120 mm2
m1
Rp
21,756,480.00
373
NYY 4 x (4x1x400 mm2) + NYA 120 mm2
m1
Rp
12,528,960.00
374
NYY 4 x 120 mm2
m1
Rp
1,245,120.00
375
NYY 4 x 70 mm2
m1
Rp
660,480.00
376
NYY 4 x 50 mm2
m1
Rp
471,360.00
377
NYY 4 x 35 mm2
m1
Rp
346,560.00
378
NYY 4 x 25 mm2
m1
Rp
273,600.00
379
NYY 4 x 16 mm2
m1
Rp
166,080.00
380
NYY 4 x 10 mm2
m1
Rp
103,680.00
381
NYY 4 x 4 mm2
m1
Rp
41,280.00
382
NYY 3 x 120 mm2
m1
Rp
963,840.00
383
NYY 3 x 10 mm2
m1
Rp
80,640.00
384
NYY 3 x 2,5 mm2
m1
Rp
20,160.00
385
NYA 16 mm2
m1
Rp
37,440.00
386
NYM 3 x 4 mm2
m1
Rp
32,256.00
387
NYM 3 x 2.5 mm2
m1
Rp
20,160.00
388
BC 120 mm²
m1
Rp
290,880.00
389
BC 95 mm²
m1
Rp
150,720.00
390
BC 70 mm²
m1
Rp
110,400.00
391
BC 50 mm²
m1
Rp
93,120.00
392
BC 35 mm²
m1
Rp
72,000.00
393
BC 25 mm²
m1
Rp
53,760.00
394
BC 16 mm²
m1
Rp
30,720.00
395
BC 10 mm²
m1
Rp
19,200.00
396
BC 6 mm²
m1
Rp
11,520.00
397
BC 4 mm²
m1
Rp
7,680.00
398
Pipa PVC Conduit dia. 20 mm2
Rp
5,760.00
399
Teedoos PVC
m1 bh
Rp
4,032.00
400
Klem Kabel
unit
Rp
2,400.00
401
LCD TV24"
unit
Rp
4,239,360.00
402
LCD Unit, 43”
unit
Rp
27,216,000.00
403
Touch Screen Panel Sensor
unit
Rp
19,440,000.00
404
Mini PC
unit
Rp
7,776,000.00
405
Kabel Power Mini PC
set
Rp
1,555,200.00
406
Kabel HDMI
set
Rp
412,128.00
407
Trafo LED Stripes
bh
Rp
414,720.00
408
LED Stripes, Warm Light
m1
Rp
376,320.00
409
Lampu Downlight, Cool Daylight
unit
Rp
349,440.00
410
Lampu Penerangan Taman + ( LED 40 Watt)
bh
Rp
2,405,760.00
411
Lampu Reses Mounted Reflector + LED 1x18 watt
bh
Rp
2,426,880.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
412
Lampu Reses Mounted Reflector + LED 1x18 watt + battery
bh
Rp
413
Lampu V Shape 2 x TLD 36 Watt
bh
Rp
3,270,720.00 816,960.00
414
Lampu DL +7 watts LED Bulb
bh
Rp
1,109,760.00
415
Lampu DL SpotLight + LED 15 watt Resis mounted
bh
Rp
1,850,880.00
416
Lampu Emergency Exit
bh
Rp
1,868,160.00
417
Saklar engkle
bh
Rp
124,800.00
418
Saklar seri
bh
Rp
198,720.00
419
Stop Kontak 10A 1P 200 Watt
bh
Rp
116,160.00
420
Inbowdoos
bh
Rp
12,480.00
421
Cable Tray 500 x 100 mm
Rp
509,760.00
422
Joint Tray 500 x 100 mm
m1 unit
Rp
32,640.00
423
Cable Tray 400 x 100 mm
Rp
303,360.00
424
Joint Tray 400 x 100 mm
m1 unit
Rp
29,760.00
425
Cable Tray 300 x 100 mm
Rp
276,480.00
426
Joint Tray 300 x 100 mm
m1 unit
Rp
29,760.00
427
Cable Tray 200 x 100 mm
Rp
264,000.00
428
Joint Tray 200 x 100 mm
m1 unit
Rp
24,000.00
429
Cable Tray 100 x 50 mm
Rp
117,120.00
430
Joint Tray 100 x 50 mm
m1 unit
Rp
24,000.00
431
BAHAN FIRE ALARM MCFA, kapasitas 2 loop , Addreesable
unit
Rp
125,286,720.00
432
Announciator
unit
Rp
24,643,200.00
433
Addressible Smoke Detector
unit
Rp
2,856,000.00
434
Addressible Heat Detector
unit
Rp
2,692,800.00
435
Rate of Rise Heat Detector konvensional
unit
Rp
2,692,800.00
436
Manual Break Glass
unit
Rp
1,632,000.00
437
Alarm Bell
unit
Rp
2,529,600.00
438
Indicator Lamp
unit
Rp
1,550,400.00
439
FRC 2 x 1.5 mm2
m1
Rp
18,240.00
440
Kabel STP AWG 18
m1
Rp
122,880.00
441
BAHAN TATA SUARA Central Car Call & Emergency Paging
unit
Rp
238,080,000.00
442
BAHAN X-RAY MOBILE Pengadaan Unit X-Ray (Mobile)
unit
Rp
77,280,000,000.00
443
BAHAN ELEVATOR Passenger Lift, Kap : 500 Kg, opening : 4 Opening, center
unit
Rp
873,621,120.00
444
Passenger Lift, Kap : 500 Kg, opening : 3 Opening, center
unit
Rp
870,165,120.00
445
PENANAMAN POHON Bismarchia nobillis / Palem Bismaekia t.300 cm dia.20-30
Ph
Rp
1,347,840.00
446
Bucida molineti / Ketapang kencana t.300 cm dia.5-8
Ph
Rp
841,920.00
447
Samanea saman / Trembesi t.300 cm dia.5
Ph
Rp
280,320.00
448
PENANAMAN SEMAK/PERDU Syzigium / Pucuk Merah t.100 cm dia.50
pot
Rp
112,320.00
449
Axonopus sp / Rumput Gajah Lempeng
m2
Rp
60,480.00
450
POHON DAN PERDU Benih rumput
kg
Rp
720,000.00
451
Sekam padi
m3
Rp
528,000.00
452
Tanah humus
m3
Rp
240,000.00
453
Batu kricak 3 cm
m3
Rp
624,000.00
454
Allamanda cathartica
m2
Rp
62,400.00
455
Palem Sadeng (Livistone chinensis), tinggi overall 2,5-3 m
Ph
Rp
720,000.00
456
Pohon Palem Ekor Tupai (Wodyetia bifurcata), tinggi overall 2 - 2,5m
Ph
Rp
480,000.00
457
Pohon Palem Canary (Phoenix canariensis), tinggi overall 2,5 - 3 m
Ph
Rp
480,000.00
458
Pohon Trembesi (Samanea saman), tinggi overall 2,5 - 3 m
Ph
Rp
240,000.00
459
Pohon Spathodea (Spathodea Campanulata), tinggi overall 2 2,5 m
Ph
Rp
264,000.00
460
Pohon Bungur (Lagerstromia Speciosa), tinggi overall 2,5 - 3 m
Ph
Rp
144,000.00
461
Pohon Sukun (Artocarpus Altilis), tinggi overall 2 - 2,5 m
Ph
Rp
480,000.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
462
Pohon Liang Liu (Salix Babylonica), tinggi overall 2 - 2,5 m
Ph
Rp
463
Pohon Pulai (Alstonia scholaris), tinggi overall 3-3,5 m
Ph
Rp
480,000.00 480,000.00
464
Pohon Kamboja (plumeria Sp), tinggi overall 1,5 - 2,5 m
Ph
Rp
240,000.00
465
Pohon Flamboyan (Delonix Regia), tinggi overall 3 - 3,5 m
Ph
Rp
240,000.00
466
Pohon Ketapang kencana (Terminalia mantaly), tinggi overall 3-4 m
Ph
Rp
624,000.00
467
Pohon Ketapang kencana Varigata (Terminalia mantaly variegata), tinggi overall 3-4 mPh
Rp
624,000.00
468
Pohon Golden Penda/ Penda Emas (Xanthostemon Chrysanthus), tinggi overall 2- 2,5 m Ph
Rp
576,000.00
469
Pohon Flamboyan Kuning (Peltophorum pterocarpum), tinggi overall 3,5-4 m
Ph
Rp
240,000.00
470
Alang Merah (Pennisetum rubra); tinggi overall 0,3 - 0,6 m
m2
Rp
62,400.00
471
Morea ( Dietes bicolor); tinggi overall 0,2 - 0,4 m
m2
Rp
62,400.00
472
Bakung Air Mancur (Hymenocallis littoralis); 50 pot/m2
pot
Rp
11,232.00
473
Air Mancur (Russella equisetifolia); tinggi overall 0,2 - 0,3 m
m2
Rp
62,400.00
474
Wedelia (Wedelia trilobata); tinggi overall 0,16 - 0,3 m
m2
Rp
62,400.00
475
Angelonia (Angelonia Angustifolia); tinggi overall 0,3 - 0,4 m
m2
Rp
62,400.00
476
Nanas Merah (Ananas sp); tinggi overall 0,3 - 0,4 m
m2
Rp
62,400.00
477
Lili Brazil (Dianella recolute white); 50 pot/m2
pot
Rp
11,232.00
478
Pandan Kuning (Pandarus pygmaeus); tinggi overall 0,2 - 0,3 m
m2
Rp
62,400.00
479
Pacing (Costus woodsoil); tinggi overall 0,4 - 0,5 m
m2
Rp
62,400.00
480
Kadaka Tanah (Asplenium nidus); 9 pot/m2
pot
Rp
11,232.00
481
Honje Kuning (Alpinia zerumbet); tinggi overall 0,3 - 0,5 m
m2
Rp
62,400.00
482
Bakung Lele (Crinum asiaticum); 25 pot/m2
pot
Rp
11,232.00
483
Heliconia thai (Heliconia sp); 35 pot/m2
pot
Rp
11,232.00
484
Cana (Canna indica); tinggi overall 0,6 - 1 m
m2
Rp
62,400.00
485
Soka ( Ixora javanica); tinggi overall 0,3 - 0,5 m
m2
Rp
62,400.00
486
Alang Putih (Ophiopogon jaburan); tinggi overall 0,3 - 0,5 m
m2
Rp
62,400.00
487
Pakis Haji (Cycas revolutaa); tinggi overall 0,8 - 2 m
m2
Rp
62,400.00
488
Bromelia (Bromeliad sp.); 25 pot/m2
pot
Rp
11,232.00
A. 1
Panel & Equipmentnya Box Panel 90cm x 60cm x 30cmm,
Unit
Rp
32,400,000.00
2
Box Uk. 120 x 80 x 15 cm (tebal 2 mm)
Unit
Rp
57,600,000.00
3
Box Panel 80cm x 40cm x 25cmm,
Unit
Rp
19,200,000.00
4
Box Panel 70cm x 50cm x 20cmm,
Unit
Rp
21,000,000.00
5
Box Uk. 60 x40 x 15 cm (tebal 2 mm)
Unit
Rp
14,400,000.00
6
Box Uk. 40 x40 x 15 cm (tebal 2 mm)
Unit
Rp
9,600,000.00
7
Box Uk. 30 x20 x 15 cm (tebal 2 mm)
Unit
Rp
3,600,000.00
8
Box Panel Tenan 5.500 VA
Unit
Rp
2,400,000.00
9
Box Panel Tenan 2.200 VA atau 1.300 VA
Unit
Rp
2,400,000.00
10
MCCB 500A 3P 36kA
pc
Rp
12,864,480.00
11
MCCB 250A 3P 18kA
pc
Rp
9,270,120.00
12
MCCB 200A 3P 25kA
pc
Rp
8,310,480.00
13
MCCB 100A 3P 18kA
pc
Rp
4,117,800.00
14
MCCB 80A 3P 18kA
pc
Rp
3,521,160.00
15
MCCB 60A 3P 10kA
pc
Rp
3,521,160.00
16
MCCB 50A 3P 10kA
pc
Rp
3,480,240.00
17
MCCB 40A 3P 10kA
pc
Rp
3,480,240.00
18
MCCB 25A 3P 10kA
pc
Rp
3,480,240.00
19
MCCB 16A 3P 10kA
pc
Rp
3,480,240.00
20
MCB 16A atau 10A atau 6A /1P/7,5kA
pc
Rp
142,560.00
21
MCB 4A atau 2A /1P/7,5kA
pc
Rp
156,600.00
22
Power Meter 3 Phasa
pc
Rp
33,649,440.00
23
KWH Meter 3 Phase 5500 va
unit
Rp
33,649,441.20
24
KWH Meter 1 Phase
unit
Rp
33,649,442.40
25
System DOL
unit
Rp
7,200,000.00
26
Timer
pc
Rp
900,000.00
27
Sekering 3 A
pc
Rp
30,000.00
28
Lampu tanda
pc
Rp
126,000.00
29
Volt metering SS 500V c/w CT & asesories
set
Rp
2,208,360.00
30
Amper Meter CT 50/5A
set
Rp
2,247,240.00
31
Selektor Switch
pc
Rp
300,000.00
32
Frekwensi Meter
pc
Rp
643,500.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
33
Kabel Grounding & aksesories
set
Rp
900,000.00
34
Grounding Rod
bh
Rp
1,440,000.00
35
Bak kontrol grounding
bh
Rp
1,200,000.00
36
Conection kit grounding
bh
Rp
240,000.00
37
Busbar 500 A
ls
Rp
698,400.00
38
Busbar 250 A
ls
Rp
638,400.00
39
Busbar 200 A
ls
Rp
638,400.00
40
Busbar 100 A
ls
Rp
638,400.00
41
Busbar 80 A
ls
Rp
626,400.00
42
Busbar 60 A
ls
Rp
614,400.00
43
Busbar 50 A
ls
Rp
602,400.00
44
Busbar 40 A
ls
Rp
602,400.00
45
Busbar 25 A
ls
Rp
590,400.00
46
Busbar 16 A
ls
Rp
578,400.00
47
Dyna Bolt dia 12 mm
pc
Rp
24,000.00
B
KABEL POWER
1
NYY 3x4 mm2
m'
Rp
36,000.00
2
NYY 4x4 mm2
m'
Rp
36,000.00
3
NYY 4x6 mm2
m'
Rp
81,000.00
4
NYY 4x10 mm2
m'
Rp
81,000.00
5
NYY 4x50 mm2
m'
Rp
411,000.00
6
NYY 4x95 mm2
m'
Rp
732,000.00
7
BC 4 mm2
m'
Rp
18,000.00
8
BC 6 mm2
m'
Rp
24,000.00
9
BC 10 mm2
m'
Rp
30,000.00
10
BC 16 mm2
m'
Rp
36,000.00
11
BC 25 mm2
m'
Rp
54,000.00
12
BC 50 mm2
m'
Rp
114,000.00
13
kabel tist,
bh
Rp
1,920.00
14
Conduit 25 mm
m'
Rp
24,000.00
C.
Kabel Tray & Ladder
1
Kable Tray 200 x 100 mm
264,000.00
Joint Tray/Ladder 100 mm
m1 unit
Rp
2
Rp
24,000.00
3
Kabel Ladder 200 x 100 mm
m1
Rp
312,000.00
4
Kabel Ladder 300 x 100 mm
360,000.00
Support Tray / Ladder
m1 Set
Rp
5
Rp
62,400.00
D
Armatur Penerangan & Stop Kontak
1
DownLight Recessed led 12 watt slim(dia 6'')
bh
Rp
300,000.00
2
DownLight led 12 watt (dia 6'')
bh
Rp
300,000.00
3
DownLight inbow led 7 watt (dia 6'') tutup acrilic
bh
Rp
300,000.00
4
DownLight led 12 watt (dia 6'') + Battry Emergensi
bh
Rp
1,440,000.00
5
DownLight inbow led 7 watt (dia 6'') tutup acrilic + Battry Emergensi
bh
Rp
1,440,000.00
6
Downlight Inbow ∅ 4" LED 12W + Tutup Acrilyc
bh
Rp
300,000.00
7
Downlight Outbow ∅ 4" LED 12W
bh
Rp
300,000.00
8
Downlight LED 7W
bh
Rp
300,000.00
9
Lampu Emergency Downlight Inbow ∅ 4" LED 12W + Tutup Acrilyc
bh
Rp
300,000.00
10
Lampu Emergency Downlight Outbow ∅ 4" LED 12W
bh
Rp
300,000.00
11
Visiont HPLN 150 watt
bh
Rp
21,000,000.00
12
Wall light led 10 watt
bh
Rp
900,000.00
13
Lampu Blak TL-D LED 18 watt
bh
Rp
420,000.00
14
Velue Flex (linear light) + Driver
bh
Rp
900,000.00
15
Lampu Meja
bh
Rp
1,800,000.00
16
Lampu RML TL LED 1x20W
bh
Rp
1,140,000.00
17
RM LED 2x20 W c/w Reflector
bh
Rp
1,350,000.00
18
Lampu Reses Mounted Reflector + LED 2x19 watt + c/wbattery
bh
Rp
3,000,000.00
19
Lampu Reses Mounted Reflector + LED 2x10 watt
bh
Rp
1,350,000.00
20
Lampu Reses Mounted Reflector + LED 2x10 watt + c/wbattery
bh
Rp
3,000,000.00
21
Lampu Reses Mounted TL 2x36 watt
bh
Rp
900,000.00
22
Lampu vshape TL 2x36 Watt
bh
Rp
900,000.00
23
Lampu Balk V-shape TL 1 x36 watt
bh
Rp
780,000.00
24
Lampu Balk V-shape TL 1 x36 watt + c/w battery
bh
Rp
1,980,000.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
25
Lampu Balk V-shape TL 1 x18 watt
bh
Rp
26
Lampu TL Balk 1x36 Watt
bh
Rp
780,000.00 420,000.00
27
Lampu TL LED 1x10 WATT, Balk
bh
Rp
420,000.00
28
Roset E27 + Bohlam LED 13 Watt
bh
Rp
300,000.00
29
Lampu Baret square 20 Watt c/w battery
bh
Rp
1,020,000.00
30
Lampu spot par 70 Watt
bh
Rp
1,800,000.00
31
Lampu Spot LED 10 Watt + Rel Lampu
bh
Rp
4,200,000.00
32
Lampu gantung 4 x13 Watt
bh
Rp
18,000,000.00
33
Lampu Gantung Clasic 1 X 13 Watt
bh
Rp
18,000,000.00
34
PENDANT LIGHT LED 10 WATT
bh
Rp
2,100,000.00
35
Lampu Spot Olux LED spot M740 12W
bh
Rp
4,200,000.00
36
Flood light HPLN 65 watt
bh
Rp
21,000,000.00
37
lampu taman led 18 watt
bh
Rp
7,800,000.00
38
Obstracsion Lamp
bh
Rp
5,280,000.00
39
Instalasi Ostracsion Lamp
m'
Rp
36,000.00
40
Lampu Industrial HPLN 80 watt+penggantung dan accesoris
bh
Rp
7,800,000.00
41
Kipas angin type ceiling +penggantung dan accesoris
bh
Rp
2,520,000.00
42
saklar 4 gangs
bh
Rp
201,000.00
43
saklar 6 gangs
bh
Rp
420,000.00
44
Kotak Kontak Dinding 2 X 16 Amp
bh
Rp
1,800,000.00
45
Kotak Kontak lantai 1 X 16 Amp
bh
Rp
1,020,000.00
46
penggantung lampu
bh
Rp
24,000.00
47
Lampu Taman GL Pilar Daiko Kotak + Bulb LED 10 watt
bh
Rp
4,200,000.00
48
Lampu Taman GL Tera + bulb LED 10 watt
bh
Rp
4,200,000.00
49
Lampu Spot PAR LED 35 watt
bh
Rp
4,200,000.00
50
Lampu PJU LED 120 Watt
bh
Rp
21,000,000.00
51
Instalasi Penerangan NYY 3x 2,5 + conduit High Impact
m'
Rp
42,000.00
52
Instalasi PJU NYY 3x 4 mm2
m'
Rp
108,000.00
53
Pondasi Lampu
bh
Rp
1,800,000.00
54
Galian
m'
Rp
72,000.00
E
Sound System
1
NYMHY 2x2,5 mm2,
m'
Rp
30,000.00
2
Conduit dia. 20mm HighImpact
m'
Rp
12,000.00
F
CCTV
1
NVR 16 Port, 2 TeraBit HardDisk
Unit
Rp
90,000,000.00
2
Dome Camera Indoor IP Base HD (POE)
Unit
Rp
17,400,000.00
3
Camera Indoor IP Base HD (POE)
Unit
Rp
17,400,000.00
4
Switch Hub 10 Port + PoE
Unit
Rp
10,200,000.00
5
UPS 2 KVA 30 menit
Unit
Rp
42,000,000.00
6
Instalasi CCTV (kabel UTP Cat 6)
m'
Rp
42,000.00
G
MATV
1
Antena Yagi
unit
Rp
900,000.00
2
Power Devider
unit
Rp
15,000,000.00
3
Support Antena
unit
Rp
2,620,800.00
No.
Jenis Bahan Bangunan
Sat.
Harga Satuan (Rp)
DAFTAR HARGA SATUAN PERALATAN SATKER PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS PENGEMBANGAN POS LINTAS BATAS NEGARA (PLBN) TERPADU LONG MIDANG
No.
Jenis Peralatan
Sat.
Harga Satuan (Rp)
1
2
3
4
1
HARGA SEWA ALAT BERAT Excavator 80 - 140 HP
jam
Rp
1,362,590.71
2
Generator set 250 Kva
jam
Rp
1,151,330.61
3
Generator set 80 Kva
jam
Rp
1,007,330.61
4
Generator set 40 Kva
jam
Rp
863,330.61
5
Generator set 20 Kva
jam
Rp
719,330.61
6
Bulldozer
jam
Rp
1,562,970.08
7
Motor grader
jam
Rp
1,345,040.79
8
Vibrator roller
jam
Rp
1,235,759.91
9
Water tank truck
jam
Rp
570,244.26
10
Wheel Loader
jam
Rp
1,516,901.33
11
Dump truck 3.00 - 4.00 m3
jam
Rp
553,975.22
12
Truck mixer 5 m3
jam
Rp
1,800,000.00
13
Batching Plant kap. 35 m3/jam
jam
Rp
4,680,000.00
14
Welding set
jam
Rp
432,000.00
15
Crane 10 - 15 ton
jam
Rp
2,677,974.50
16
Pile Driver + hammer
jam
Rp
3,003,678.10
17
Trailer
jam
Rp
1,819,837.50
18
Concrete mixer 0,3 - 0,6 m3
jam
Rp
152,210.77
19
Concrete vibrator
jam
Rp
495,454.31
20
Concrete paver
jam
Rp
1,562,970.08
21
Concrete pump
jam
Rp
1,368,000.00
22
Water tank truck
jam
Rp
570,244.26
23
Bar bender
jam
Rp
570,244.26
24
Bar cutter
jam
Rp
339,840.00
25
Alat test PDA
hr
Rp
1,200,000.00
26
Megger Tester
jam
Rp
403,200.00
27
Welding set
jam
Rp
508,800.00
28
Crane 10 - 15 ton
jam
Rp
2,467,200.00
29
Scafolding
hari
Rp
24,000.00