REKAPITULASI TOTAL RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROBOLINGGO (DID PENINGKATAN INVESTASI 2021) TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
II.
GEDUNG RAWAT INAP VIP (GEDUNG C1)
HARGA Rp
237,326,763.49
Rp
30,715,447,970.12
Rp
41,514,145,295.08
Rp
31,583,365,379.72
Rp
21,885,614,726.12
Rp
575,224,785.95
Rp
1,100,208,768.45
Rp
524,903,410.36
Rp
15,087,129,028.72
TOTAL PEKERJAAN Rp PPN 10 % Rp TOTAL = (JUMLAH + PPN 10%) Rp Rp
143,223,366,128.00 14,322,336,612.80 157,545,702,740.80 3,870,738,500.00
A. PEKERJAAN STRUKTUR
Rp
7,942,473,281.77
B. PEKERJAAN ARSITEKTUR C. PEKERJAAN M E P
Rp Rp
9,831,724,187.82 12,941,250,500.53
A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR
Rp Rp
16,932,402,626.18 11,812,209,982.43
C. PEKERJAAN M E P
Rp
12,769,532,686.47
Rp Rp Rp
12,515,833,091.00 8,336,054,680.45 10,731,477,608.26
A. PEKERJAAN STRUKTUR
Rp
11,459,935,577.48
B. PEKERJAAN ARSITEKTUR C. PEKERJAAN M E P
Rp Rp
8,780,658,216.87 1,645,020,931.76
Rp Rp Rp
143,963,734.42 245,709,628.61 185,551,422.93
Rp Rp Rp
594,286,131.93 278,530,412.73 227,392,223.78
A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR
Rp Rp
143,947,480.96 171,523,368.67
C. PEKERJAAN M E P
Rp
209,432,560.73
III. GEDUNG MEDIK SENTRAL (GEDUNG D1)
IV.
GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR C. PEKERJAAN M E P
V.
VI.
GEDUNG HALL UTAMA & RAMP (GEDUNG F1)
BANGUNAN SENTRAL GAS MEDIS (GEDUNG G3) A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR C. PEKERJAAN M E P
VII. BANGUNAN POWER HOUSE (GEDUNG G2) A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR C. PEKERJAAN M E P VIII. BANGUNAN RUMAH POMPA (G5)
IX.
X.
PEKERJAAN UTILITAS SITE
PEKERJAAN PENYAMBUNGAN TANPA PPN
JUMLAH HARGA
A. PEKERJAAN PENYAMBUNGAN DAYA LISTRIK PLN 3,465 Kva B. PEKERJAAN PENYAMBUNGAN PDAM
Rp Rp
3,560,738,500.00 300,000,000.00
C. PEKERJAAN PENYAMBUNGAN TELEPHONE
Rp
10,000,000.00
TOTAL KESELURUHAN Rp DIBULATKAN Rp TERBILANG : SERATUS ENAM PULUH SATU MILYAR EMPAT RATUS JUTA RUPIAH.
REKAPITULASI
161,416,441,240.80 161,400,000,000.00
REKAPITULASI PEKERJAAN ARSITEKTUR RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021
NO.
I.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
Rp
237,326,763.49
II. GEDUNG RAWAT INAP VIP (GEDUNG C1)
Rp
9,831,724,187.82
III. GEDUNG MEDIK SENTRAL (GEDUNG D1)
Rp
11,812,209,982.43
IV. GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2)
Rp
8,336,054,680.45
V.
Rp
8,780,658,216.87
VI. BANGUNAN SENTRAL GAS MEDIS (GEDUNG G3)
Rp
245,709,628.61
VII. BANGUNAN POWER HOUSE (G2)
Rp
278,530,412.73
VIII. BANGUNAN RUMAH POMPA (G5)
Rp
171,523,368.67
TOTAL PEKERJAAN Rp
39,693,737,241.07
GEDUNG HALL UTAMA (GEDUNG F1)
Kepala Dinas Dinas Pekerjaan Umum, Penataan Ruang dan Kawasan Permukiman kota Probolinggo
Pejabat Pembuat Komitmen Dinas Pekerjaan Umum Penataan Ruang , Perumahan dan Kawasan Permukiman kota Probolinggo
ANDRE NIRWANA KUSUMA
AGUS HARTADI
NIP. 1972324 200112 1 004
NIP.19660817 1992031 016
Mengetahui,
Probolinggo, Juli 2021
Konsultan Manajemen Konstruksi PT. Virama Karya (Persero)
Konsultan Perencana
KUSNADI Team Leader
PANJI HARJASA, ST.,MT Direktur Utama
REKAPITULASI
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) PEKERJAAN PERSIAPAN TAHUN ANGGARAN 2021
NO. 1. I.
URAIAN 2. PEKERJAAN PERSIAPAN 1 Pagar sementara dari seng gelombang tinggi 2 meter 2 Papan proyek 3 Pekerjaan Penyelenggaraan SMK3 Konstruksi
SATUAN 3.
m' ls ls
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
285,817.00 221.88 1.00 800,000.00 1.00 173,109,687.50 JUMLAH I.PEKERJAAN PERSIAPAN
63,417,075.99 800,000.00 173,109,687.50 237,326,763.49
Pek. Persiapan - page 3 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG RAWAT INAP VIP (GEDUNG C1) TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDAR
Rp
5,665,853,199.89
II.
PEKERJAAN NON STANDAR
Rp
4,165,870,987.93
TOTAL PEKERJAAN GEDUNG A Rp
9,831,724,187.82
Rekapitulasi Gedung A
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG RAWAT INAP VIP (GEDUNG C1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND + RANGKA 3.4. PEKERJAAN SANITAIR 3.5. PEKERJAAN PENGECATAN 3.6. PEKERJAAN RAILLING DAN HAND RAILLING JUMLAH III.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp Rp Rp Rp
3,283,361,462.69 533,348,030.59 402,061,842.79 1,009,123,886.23 257,277,688.77 180,680,288.82 5,665,853,199.89
JUMLAH PEKERJAAN STANDAR Rp
5,665,853,199.89
Rekapitulasi Gedung A
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG RAWAT INAP VIP (GEDUNG C1) TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
2.
1.
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR III.
PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING A. LANTAI SATU 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Kolom praktis uk. 11x11 cm 8 Meja beton tebal 10 cm - Besi d8-150 9 Pemasangan meja top table batu granite 10 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 11 Pemasangan dinding homogeneos tiles uk. 60 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm B.
C.
D.
E.
3.2.
m² m² m² m² m' m' m' m³ m² m² m² m² m' m'
2,790.71 5,628.27 459.79 5,628.27 775.64 469.52 2,077.81 0.90 7.90 564.13 4.35 29.99 228.30 594.25
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 73,835.41 2,280,519.39 1,282,204.09 209,046.38 236,964.03 1,282,204.09 40,720.99 140,211.99
249,023,802.75 216,488,282.71 28,556,944.35 155,163,249.06 8,450,910.62 42,554,972.05 153,415,963.63 2,049,388.75 10,134,861.71 117,929,544.92 1,029,608.72 38,456,506.30 9,296,601.36 83,320,973.36
LANTAI DUA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Kolom praktis uk. 11x11 cm 8 Meja beton tebal 10 cm - Besi d8-150 9 Pemasangan meja top table batu granite 10 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 11 Pemasangan dinding homogeneos tiles uk. 60 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m³ m² m² m² m² m' m'
2,300.45 4,638.14 465.97 4,638.14 750.40 475.02 1,650.39 0.90 7.90 562.30 4.35 30.68 230.90 579.92
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 73,835.41 2,280,519.39 1,282,204.09 209,046.38 236,964.03 1,282,204.09 40,720.99 140,211.99
205,276,071.41 178,403,598.88 28,940,681.50 127,866,883.60 8,175,944.37 43,053,464.87 121,857,230.55 2,049,388.75 10,134,861.71 117,547,721.70 1,029,608.72 39,334,816.11 9,402,475.92 81,311,735.58
LANTAI TIGA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Kolom praktis uk. 11x11 cm 8 Meja beton tebal 10 cm - Besi d8-150 9 Pemasangan meja top table batu granite 10 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 11 Pemasangan dinding homogeneos tiles uk. 60 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m³ m² m² m² m² m' m'
2,263.21 4,563.66 467.52 4,563.66 751.25 475.02 1,650.39 0.90 7.90 544.62 4.35 28.38 225.75 580.10
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 73,835.41 2,280,519.39 1,282,204.09 209,046.38 236,964.03 1,282,204.09 40,720.99 140,211.99
201,953,029.46 175,538,765.99 29,036,794.35 125,813,577.19 8,185,205.50 43,053,464.87 121,857,230.55 2,049,388.75 10,134,861.71 113,851,677.13 1,029,608.72 36,392,798.81 9,192,762.84 81,336,973.74
LANTAI EMPAT 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Kolom praktis uk. 11x11 cm 8 Meja beton tebal 10 cm - Besi d8-150 9 Pemasangan meja top table batu granite 10 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 11 Pemasangan dinding homogeneos tiles uk. 60 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m³ m² m² m² m² m' m'
520.02 988.03 467.52 988.03 355.11 283.56 250.80 1.62 15.32 567.37 4.35 33.85 230.90 580.27
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 73,835.41 2,280,519.39 1,282,204.09 209,046.38 236,964.03 1,282,204.09 40,720.99 140,211.99
LANTAI ROOF DECK 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm
m² 89,233.14 248.38 m² 38,464.46 496.76 m² 27,568.56 496.76 m' 10,895.45 5.50 m' 90,635.06 137.62 m' 73,835.41 87.32 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
PEKERJAAN PASANGAN LANTAI A. LANTAI SATU 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan timber flooring ebony 4 Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga 5 Pemasangan step noising keramik uk. 5 x 20 cm 6 Pemasangan Floor Hardener 7 Pemasangan Andesite stone 8 Pemasangan screed beton peninggian level 9 Pemasangan rabat beton K-175 tebal 5 cm 10 Saluran U ditch ukuran 30 x 40 cm - Galian tanah - Pasir urug tebal 10 cm
46,402,586.65 38,003,996.17
Tidak Dikerjakan 27,238,534.34 3,869,082.63 25,700,476.82 18,517,922.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
22,163,690.43 19,107,573.79 13,694,936.25 59,924.97 12,473,196.57 6,447,308.44 3,283,361,462.69
m² m² m² m² m' m² m² m² m³
561.28 105.92 16.85 24.65 49.30 63.19 5.74 431.09 7.28
224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 750,426.42
125,944,086.23 24,715,693.67 6,444,865.85 4,703,298.06 2,211,091.31 2,722,437.74 1,353,898.95 7,680,412.47 5,459,727.40
m³ m³
37.14 7.43
56,118.75 162,806.18
2,084,110.08 1,209,242.91
Pek. Standar Gedung A - page 6 of 139
NO.
URAIAN - Urugan tanah kembali - Saluran U dict 30 x 40 cm - Grill Besi lebar 30 cm 11 Bak Kontrol ukuran 80 x 80 cm - Galian tanah - Urugan pasir urug, t = 10 cm - Lantai kerja, t = 5 cm - Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP - Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm - Membuat acian semen - Plat penutup beton tebal 10 cm B.
C.
D.
E.
F.
3.3.
C.
D.
E.
3.4.
VOLUME
HARGA SATUAN
JUMLAH HARGA
m³ m' m'
11.14 148.55 148.55
(Rp.) 18,706.25 313,589.12 134,835.30
(Rp.) 208,411.01 46,583,664.44 20,029,783.60
m³ m³ m³ m² m² m² m³
5.12 0.51 0.26 25.60 29.44 29.44 0.51
56,118.75 162,806.18 557,440.00 93,418.18 49,008.36 28,236.56 2,280,519.39
287,328.00 83,356.76 142,704.64 2,391,505.30 1,442,806.06 831,284.25 1,167,625.93
LANTAI DUA 1 Pemasangan 2 Pemasangan 3 Pemasangan 4 Pemasangan 5 Pemasangan 6 Pemasangan 7 Pemasangan 8 Pemasangan 9 Pemasangan
lantai homogeneous tiles uk. 60 x 60 cm - Polished lantai homogeneous tiles uk. 60 x 60 cm - Unpolish timber flooring ebony lantai homogeneous tiles 30 x 60 cm + step noissing tangga step noising keramik uk. 5 x 20 cm Floor Hardener Andesite stone screed beton peninggian level waterproofing coating
m² m² m² m² m' m² m² m² m²
539.04 106.55 17.39 19.55 40.02 33.14 5.74 400.88 304.52
224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35
120,953,713.37 24,862,699.77 6,651,407.55 3,730,201.91 1,794,885.88 1,427,696.50 1,353,898.95 7,142,147.56 14,672,698.05
LANTAI TIGA 1 Pemasangan 2 Pemasangan 3 Pemasangan 4 Pemasangan 5 Pemasangan 6 Pemasangan 7 Pemasangan 8 Pemasangan 9 Pemasangan
lantai homogeneous tiles uk. 60 x 60 cm - Polished lantai homogeneous tiles uk. 60 x 60 cm - Unpolish timber flooring ebony lantai homogeneous tiles 30 x 60 cm + step noissing tangga step noising keramik uk. 5 x 20 cm Floor Hardener Andesite stone screed beton peninggian level waterproofing coating
m² m² m² m² m' m² m² m² m²
115.15 115.15 17.39 19.55 39.10 33.14 5.74 400.02 309.38
224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35
25,838,194.00 26,869,449.83 6,651,407.55 3,730,201.91 1,753,624.14 1,427,696.50 1,353,898.95 7,126,825.57 14,907,158.25
LANTAI EMPAT 1 Pemasangan 2 Pemasangan 3 Pemasangan 4 Pemasangan 5 Pemasangan 6 Pemasangan 7 Pemasangan 8 Pemasangan 9 Pemasangan
lantai homogeneous tiles uk. 60 x 60 cm - Polished lantai homogeneous tiles uk. 60 x 60 cm - Unpolish timber flooring ebony lantai homogeneous tiles 30 x 60 cm + step noissing tangga step noising keramik uk. 5 x 20 cm Floor Hardener Andesite stone screed beton peninggian level waterproofing coating
m² m² m² m² m' m² m² m² m²
539.42 106.55 17.39 19.55 39.10 33.14 5.74 400.02 304.52
224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² m²
9.48 29.61
224,387.27 43,083.36
2,127,191.31 1,275,698.39
m² 144,299.95 1,237.26 m² 67,312.94 1,232.55 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
533,348,030.59
LANTAI RUANG MESIN LIFT 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan Floor Hardener LANTAI DAK ATAP 1 Pemasangan waterproofing membran sheet 2 Pemasangan screed beton + kawat ayam
PEKERJAAN PASANGAN PLAFOND + RANGKA A. LANTAI SATU 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed 6 Pekerjaan curtain box B.
SATUAN
Tidak Dikerjakan Tidak Dikerjakan
m² m² m² m' m² m'
866.45 73.44 139.85 1,429.97 72.45 64.00
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56 62,259.81
81,026,778.72 19,032,085.23 12,560,912.60 13,979,927.87 1,997,342.24 3,984,628.05
LANTAI DUA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed 6 Pekerjaan curtain box
m² m² m² m' m² m'
867.20 73.44 160.12 1,442.62 51.83 64.00
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56 62,259.81
81,096,915.99 19,032,085.23 14,381,503.94 14,103,599.06 1,428,944.68 3,984,628.05
LANTAI TIGA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed 6 Pekerjaan curtain box
m² m² m² m' m² m'
867.55 73.44 164.94 1,430.50 51.83 64.00
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56 62,259.81
81,129,646.71 19,032,085.23 14,814,422.05 13,985,109.36 1,428,944.68 3,984,628.05
LANTAI EMPAT 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed 6 Pekerjaan curtain box
m² m² m² m' m² m'
866.72 73.44 160.12 1,442.67 51.83 64.00
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56 62,259.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 27,568.56 39.09 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND + RANGKA
1,077,655.05 402,061,842.79
LANTAI DAK ATAP 1 Plafond exposed
PEKERJAAN SANITAIR A. LANTAI SATU 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Soap dish
set set set bh m² set bh bh
23.00 4.00 21.00 25.00 24.48 23.00 21.00 4.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 171,063.06
58,403,909.26 8,281,123.96 29,633,722.51 11,647,669.27 8,479,406.81 8,284,029.20 7,811,432.02 684,252.23
Pek. Standar Gedung A - page 7 of 139
NO.
URAIAN
C.
D.
3.5.
C.
D.
HARGA SATUAN
JUMLAH HARGA
bh set bh bh unit unit bh bh set unit
25.00 19.00 18.00 6.00 2.00 3.00 3.00 2.00 18.00 18.00
LANTAI DUA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Soap dish 9 Floor drain 10 Hand Shower dengan kran air panas & dingin 11 Pemasangan towel bar 12 Pemasangan kran dinding Ø 1/2" 13 Pemasangan urinoir 14 Pemasangan cubical urinoir 15 Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories 16 Pemasangan service zink + kran & kelengkapan aksseories 17 Hand railling stainless stell dia. 5" di toilet pasien 18 Cubical toilet type T 2 daun - lengkap dengan aksesoris
set set set bh m² set bh bh bh set bh bh unit unit bh bh set unit
23.00 4.00 21.00 4.00 3.48 23.00 22.00 4.00 25.00 19.00 18.00 6.00 2.00 3.00 3.00 2.00 18.00 18.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 171,063.06 255,335.63 969,668.30 533,351.39 299,364.46 1,373,430.69 1,042,380.81 2,376,569.58 8,073,387.54 293,701.87 7,981,406.95
58,403,909.26 8,281,123.96 29,633,722.51 1,863,627.08 1,203,919.86 8,284,029.20 8,183,404.97 684,252.23 6,383,390.69 18,423,697.71 9,600,324.97 1,796,186.78 2,746,861.37 3,127,142.44 7,129,708.74 16,146,775.07 5,286,633.65 143,633,399.51
LANTAI TIGA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Soap dish 9 Floor drain 10 Hand Shower dengan kran air panas & dingin 11 Pemasangan towel bar 12 Pemasangan kran dinding Ø 1/2" 13 Pemasangan urinoir 14 Pemasangan cubical urinoir 15 Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories 16 Pemasangan service zink + kran & kelengkapan aksseories 17 Hand railling stainless stell dia. 5" di toilet pasien 18 Cubical toilet type T 2 daun - lengkap dengan aksesoris
set set set bh m² set bh bh bh set bh bh unit unit bh bh set unit
23.00 4.00 21.00 4.00 3.48 23.00 22.00 4.00 25.00 19.00 18.00 6.00 2.00 3.00 3.00 2.00 18.00 18.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 171,063.06 255,335.63 969,668.30 533,351.39 299,364.46 1,373,430.69 1,042,380.81 2,376,569.58 8,073,387.54 293,701.87 7,981,406.95
58,403,909.26 8,281,123.96 29,633,722.51 1,863,627.08 1,203,919.86 8,284,029.20 8,183,404.97 684,252.23 6,383,390.69 18,423,697.71 9,600,324.97 1,796,186.78 2,746,861.37 3,127,142.44 7,129,708.74 16,146,775.07 5,286,633.65 143,633,399.51
LANTAI EMPAT 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Soap dish 9 Floor drain 10 Hand Shower dengan kran air panas & dingin 11 Pemasangan towel bar 12 Pemasangan kran dinding Ø 1/2" 13 Pemasangan urinoir 14 Pemasangan cubical urinoir 15 Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories 16 Pemasangan service zink + kran & kelengkapan aksseories 17 Hand railling stainless stell dia. 5" di toilet pasien 18 Cubical toilet type T 2 daun - lengkap dengan aksesoris
set set set bh m² set bh bh bh set bh bh unit unit bh bh set unit
23.00 12.00 13.00 12.00 15.48 23.00 22.00 12.00 25.00 11.00 10.00 6.00 2.00 3.00 3.00 2.00 10.00 89.98
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 171,063.06 255,335.63 969,668.30 533,351.39 299,364.46 1,373,430.69 1,042,380.81 2,376,569.58 8,073,387.54 293,701.87 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 3.4.PEKERJAAN SANITAIR
1,009,123,886.23
Floor drain Hand Shower dengan kran air panas & dingin Pemasangan towel bar Pemasangan kran dinding Ø 1/2" Pemasangan urinoir Pemasangan cubical urinoir Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories Pemasangan service zink + kran & kelengkapan aksseories Hand railling stainless stell dia. 5" di toilet pasien Cubical toilet type T 2 daun - lengkap dengan aksesoris
PEKERJAAN PENGECATAN A. LANTAI SATU 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding cat weathershield - Exterior 4 Plint int semi - Gloss, Tinggi = 10 cm 5 Pengecatan plafond emulsion paint 6 Pengecatan list plafond emultion paint B.
VOLUME
(Rp.) 255,335.63 969,668.30 533,351.39 299,364.46 1,373,430.69 1,042,380.81 2,376,569.58 8,073,387.54 293,701.87 7,981,406.95
9 10 11 12 13 14 15 16 17 18
B.
SATUAN
(Rp.) 6,383,390.69 18,423,697.71 9,600,324.97 1,796,186.78 2,746,861.37 3,127,142.44 7,129,708.74 16,146,775.07 5,286,633.65 143,633,399.51
m² m² m² m' m² m'
1,079.09 32.08 494.85 64.42 1,151.82 1,039.10
25,621.94 33,132.99 31,959.16 4,972.37 27,876.94 3,256.58
27,648,381.30 1,062,740.56 15,814,972.37 320,320.24 32,109,079.85 3,383,909.72
LANTAI DUA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding cat weathershield - Exterior 4 Plint int semi - Gloss, Tinggi = 10 cm 5 Pengecatan plafond emulsion paint 6 Pengecatan list plafond emultion paint
m² m² m² m' m² m'
1,085.39 32.08 507.20 41.92 1,151.80 1,039.75
25,621.94 33,132.99 31,959.16 4,972.37 27,876.94 3,256.58
27,809,889.21 1,062,740.56 16,209,667.94 208,441.86 32,108,589.22 3,386,026.50
LANTAI TIGA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding cat weathershield - Exterior 4 Plint int semi - Gloss, Tinggi = 10 cm 5 Pengecatan plafond emulsion paint 6 Pengecatan list plafond emultion paint
m² m² m² m' m² m'
1,085.39 32.08 507.72 41.92 1,156.97 1,039.63
25,621.94 33,132.99 31,959.16 4,972.37 27,876.94 3,256.58
27,809,889.21 1,062,740.56 16,226,350.62 208,441.86 32,252,713.01 3,385,635.71
LANTAI EMPAT Pek. Standar Gedung A - page 8 of 139
NO.
URAIAN 1 2 3 4 5 6 E.
3.6.
Pengecatan dinding emultion paint - Interior Pengecatan dinding enamel (epoxy) paint Pengecatan dinding cat weathershield - Exterior Plint int semi - Gloss, Tinggi = 10 cm Pengecatan plafond emulsion paint Pengecatan list plafond emultion paint
LANTAI R. MESIN LIFT & DAK ATAP 1 Pengecatan dinding dustproof paint 2 Pengecatan dinding cat weathershield - Exterior 3 Plint int semi - Gloss, Tinggi = 10 cm 4 Pengecatan plafond dustproof paint
PEKERJAAN RAILLING DAN HAND RAILLING A. LANTAI SATU 1 Railling di tangga darurat - Hand Railing Pipa Besi ø 3" fin. Cat - Hollow Besi 25x50", fin. Cat - Hollow Besi 50x50", fin. Cat 2 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished 3 Railing di Selasar - bahan stainless steel sesuai gambar B.
C.
D.
LANTAI DUA 1 Railling di tangga darurat - Hand Railing Pipa Besi ø 3" fin. Cat - Hollow Besi 25x50", fin. Cat - Hollow Besi 50x50", fin. Cat 2 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished 3 Hand Railing di Selasar - ø 2" stainless steel LANTAI TIGA 1 Railling di tangga darurat - Hand Railing Pipa Besi ø 3" fin. Cat - Hollow Besi 25x50", fin. Cat - Hollow Besi 50x50", fin. Cat 2 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished 3 Hand Railing di Selasar - ø 2" stainless steel LANTAI EMPAT 1 Railling di tangga darurat - Hand Railing Pipa Besi ø 3" fin. Cat - Hollow Besi 25x50", fin. Cat - Hollow Besi 50x50", fin. Cat 2 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished 3 Hand Railing di Selasar - ø 2" stainless steel
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 25,621.94 33,132.99 31,959.16 4,972.37 27,876.94 3,256.58
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 28,328.94 97.95 m² 31,959.16 345.68 m' 4,972.37 35.90 m² 30,860.35 39.09 JUMLAH 3.5.PEKERJAAN PENGECATAN
2,774,678.06 11,047,641.05 178,508.17 1,206,331.19 257,277,688.77
m² m² m² m' m² m'
1,086.41 32.08 504.06 40.82 1,151.32 1,039.80
(Rp.)
m'
36.54
584,286.29
21,349,821.17
m'
28.22
283,154.13
7,990,609.46
m'
62.83
674,176.49
42,358,509.03
m'
31.58
584,286.29
18,451,761.15
m'
22.56
283,154.13
6,387,957.10
m'
62.83
314,615.70
19,767,304.21
m'
31.58
584,286.29
18,451,761.15
m'
22.56
283,154.13
6,387,957.10
m'
62.83
314,615.70
19,767,304.21
m'
25.71
584,286.29
Tidak Dikerjakan
m'
12.82
283,154.13
Tidak Dikerjakan
m'
62.83
314,615.70
19,767,304.21
JUMLAH 3.6.PEKERJAAN RAILLING DAN HAND RAILLING
180,680,288.82
Pek. Standar Gedung A - page 9 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG RAWAT INAP VIP (GEDUNG C1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR
II. PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA 2.3. PEKERJAAN INTERIOR MELEKAT JUMLAH II.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp
2,432,643,841.05 1,665,467,420.46 67,759,726.42 4,165,870,987.93
JUMLAH PEKERJAAN NON STANDAR Rp
4,165,870,987.93
Rekapitulasi Non Standar Gedung A
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG RAWAT INAP VIP (GEDUNG C1) TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
2.
1.
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
3.
4.
m' m' m² m' m² m' m' m²
376.54 155.52 13.83 297.25 367.90 16.65 110.06 813.50
364,356.28 364,356.28 1,282,204.09 89,798.62 269,931.75 34,330.31 806,202.72 24,163.68
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m² m' m' m²
376.84 155.52 13.83 297.55 367.74 16.95 109.14 812.97
364,356.28 364,356.28 1,282,204.09 89,798.62 269,931.75 34,330.31 806,202.72 24,163.68
Tidak Dikerjakan Tidak Dikerjakan
m² m² m² m²
2.92 12.13 1.43 1.43
9,101,382.65 8,732,832.83 8,732,832.83 8,732,832.83
Tidak Tidak Tidak Tidak
m' m' m² m' m² m' m' m²
374.54 155.52 13.83 295.25 366.88 109.14 16.95 805.80
364,356.28 364,356.28 1,282,204.09 89,798.62 269,931.75 806,202.72 34,330.31 24,163.68
Tidak Dikerjakan Tidak Dikerjakan
m² m² m² m²
2.92 12.13 1.43 1.43
9,101,382.65 8,732,832.83 8,732,832.83 8,732,832.83
Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan
m' m' m² m' m² m' m' m²
376.54 155.52 13.83 297.25 366.88 109.14 16.95 812.10
364,356.28 364,356.28 1,282,204.09 89,798.62 269,931.75 806,202.72 34,330.31 24,163.68
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
m² m² m² m²
2.92 10.68 1.43 1.43
9,101,382.65 8,732,832.83 8,732,832.83 8,732,832.83
Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan
m² m²
1.43 1.43
8,732,832.83 8,732,832.83
12,444,286.79 12,444,286.79
m² 844,495.05 245.00 m² 235,870.90 84.89 m² 27,568.56 315.56 m² 31,959.16 1,751.69 m² 678,647.63 2,004.29 JUMLAH 2.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
206,901,286.84 20,023,080.42 8,699,535.07 55,982,661.81 1,360,203,416.66 2,432,643,841.05
PEKERJAAN NON STANDAR II.
PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI A. LANTAI SATU 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Heterogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 8 Pengecatan dinding VirusGuard B. LANTAI DUA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Heterogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 8 Pengecatan dinding VirusGuard 9 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing ( Vertikal ) - Mortar ketebalan 10cm + Sealant c. Shaft Ducting - Mortar ketebalan 10cm + Sealant d. Shaft Hydrant - Mortar ketebalan 10cm + Sealant C. LANTAI TIGA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Heterogeneous 6 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 7 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 8 Pengecatan dinding VirusGuard 9 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing ( Vertikal ) - Mortar ketebalan 10cm + Sealant c. Shaft Ducting - Mortar ketebalan 10cm + Sealant d. Shaft Hydrant - Mortar ketebalan 10cm + Sealant D. LANTAI EMPAT 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Heterogeneous 6 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 7 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 8 Pengecatan dinding VirusGuard 9 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing ( Vertikal ) - Mortar ketebalan 10cm + Sealant c. Shaft Ducting - Mortar ketebalan 10cm + Sealant d. Shaft Hydrant - Mortar ketebalan 10cm + Sealant E.
F.
LANTAI DAK ATAP 1 Pasangan fire stop pada shaft a. Shaft Ducting - Mortar ketebalan 10cm + Sealant b. Shaft Hydrant - Mortar ketebalan 10cm + Sealant PEKERJAAN FASADE 1 Pekerjaan wall clading ACP corugated 1 Pasangan batu andesite 2 Pekerjaan acian semen instan 3 Pekerjaan cat weathershield 4 Alumunium Composite Panel PVDF 0.5 mm alloy 5005
2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA A. LANTAI SATU PINTU 1 A-ED-Uk. 2 x 900 x 2150-AL 2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 4 A-HM-Uk. 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 6 B-ED-Uk. 1200 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 2 x 900 x 2150-AL-SLIDING DOOR 9 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 750 x 2150-AL 12 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-HM-Uk. 900 x 2150-HM 16 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 17 M-ED-Uk. 900 x 2150-AL 18 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight 2 Bouvenlight 3 Bouvenlight 4 Bouvenlight
tipe tipe tipe tipe
BV BV BV BV
1E 6E 1EB 1EA
17,732,882.63 26,692,641.27 99,307,889.69 571,599.58 88,730,671.63 19,657,030.43
17,732,882.63 26,719,580.86 99,264,700.61 581,898.68 87,988,965.13 19,644,223.68
Dikerjakan Dikerjakan Dikerjakan Dikerjakan
17,732,882.63 26,513,044.02 99,032,559.30 87,988,965.13 581,898.68 19,470,970.12
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 2.00 1.00 8.00 2.00 17.00 1.00 2.00 2.00 2.00 21.00 3.00 1.00 1.00 1.00 19.00 2.00 2.00
7,206,091.82 4,314,980.33 13,265,681.06 2,669,873.85 4,973,310.20 7,076,388.46 9,277,000.01 9,007,828.26 5,311,446.89 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 5,137,427.57 5,060,602.56 5,258,722.10
7,206,091.82 8,629,960.65 13,265,681.06 21,358,990.80 9,946,620.40 120,298,603.86 9,277,000.01 18,015,656.53 10,622,893.78 8,003,250.90 69,594,289.79 10,720,362.67 4,001,625.45 5,818,967.63 6,631,784.37 97,611,123.81 10,121,205.12 10,517,444.21
unit unit unit unit
3.00 1.00 3.00 3.00
366,365.53 3,083,778.90 549,853.97 569,168.54
1,099,096.59 3,083,778.90 1,649,561.91 1,707,505.63
Pek. Non Standar Gedung A - page 11 of 139
NO.
URAIAN 5 6 7 8 9 10 11 12 13
Door Window tipe DW Door Window tipe DW Door Window tipe DW Door Window tipe DW Door Window tipe DW Window tipe W 3C Window tipe W 1E Window tipe W 3E Window tipe W 6E
1 2 1' 2E 5E
B. LANTAI DUA PINTU 1 A-ED-Uk. 2 x 900 x 2150-AL 2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 4 A-HM-Uk. 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 6 B-ED-Uk. 1200 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 2 x 900 x 2150-AL-SLIDING DOOR 9 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 750 x 2150-AL 12 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-HM-Uk. 900 x 2150-HM 16 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 17 M-ED-Uk. 900 x 2150-AL 18 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight tipe BV 1E 2 Bouvenlight tipe BV 3E 3 Bouvenlight tipe BV 6E 4 Bouvenlight tipe BV 1EB 5 Bouvenlight tipe BV 1EA 6 Door Window tipe DW 1 7 Door Window tipe DW 2 8 Door Window tipe DW 1' 9 Door Window tipe DW 2EA 10 Window tipe W 3C 11 Window tipe W 3EA C. LANTAI TIGA PINTU 1 A-ED-Uk. 2 x 900 x 2150-AL 2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 4 A-HM-Uk. 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 6 B-ED-Uk. 1200 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 2 x 900 x 2150-AL-SLIDING DOOR 9 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 750 x 2150-AL 12 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-HM-Uk. 900 x 2150-HM 16 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 17 M-ED-Uk. 900 x 2150-AL 18 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight tipe BV 1E 2 Bouvenlight tipe BV 3E 3 Bouvenlight tipe BV 6E 4 Bouvenlight tipe BV 1EB 5 Bouvenlight tipe BV 1EA 6 Door Window tipe DW 1 7 Door Window tipe DW 2 8 Door Window tipe DW 1' 9 Door Window tipe DW 2E 10 Door Window tipe DW 2EA 11 Window tipe W 3C 12 Window tipe W 3EA D. LANTAI EMPAT PINTU 1 A-ED-Uk. 2 x 900 x 2150-AL 2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 4 A-HM-Uk. 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 6 B-ED-Uk. 1200 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 2 x 900 x 2150-AL-SLIDING DOOR 9 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 750 x 2150-AL 12 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-HM-Uk. 900 x 2150-HM 16 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 17 M-ED-Uk. 900 x 2150-AL 18 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight tipe BV 1E 2 Bouvenlight tipe BV 3E 3 Bouvenlight tipe BV 6E 4 Bouvenlight tipe BV 1EB 5 Bouvenlight tipe BV 1EA 6 Door Window tipe DW 1 7 Door Window tipe DW 2 8 Door Window tipe DW 1' 9 Door Window tipe DW 2EA
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit unit unit unit unit unit
3.00 2.00 1.00 16.00 1.00 1.00 1.00 5.00 1.00
(Rp.) 654,394.54 1,765,195.66 482,219.15 2,942,460.56 6,462,719.45 1,782,643.51 685,638.66 3,733,953.35 4,852,250.58
(Rp.) 1,963,183.62 3,530,391.32 482,219.15 47,079,369.00 6,462,719.45 1,782,643.51 685,638.66 18,669,766.74 4,852,250.58
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 2.00 2.00 8.00 2.00 17.00 1.00 2.00 2.00 2.00 21.00 3.00 1.00 1.00 1.00 18.00 2.00 2.00
7,206,091.82 4,314,980.33 13,265,681.06 2,669,873.85 4,973,310.20 7,076,388.46 9,277,000.01 9,007,828.26 5,311,446.89 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 5,137,427.57 5,060,602.56 5,258,722.10
7,206,091.82 8,629,960.65 26,531,362.12 21,358,990.80 9,946,620.40 120,298,603.86 9,277,000.01 18,015,656.53 10,622,893.78 8,003,250.90 69,594,289.79 10,720,362.67 4,001,625.45 5,818,967.63 6,631,784.37 92,473,696.24 10,121,205.12 10,517,444.21
unit unit unit unit unit unit unit unit unit unit unit
4.00 2.00 3.00 3.00 3.00 2.00 2.00 1.00 16.00 1.00 3.00
366,365.53 1,534,078.01 3,083,778.90 549,853.97 569,168.54 654,394.54 1,765,195.66 482,219.15 1,903,414.50 1,782,643.51 2,462,257.26
1,465,462.12 3,068,156.03 9,251,336.69 1,649,561.91 1,707,505.63 1,308,789.08 3,530,391.32 482,219.15 30,454,632.05 1,782,643.51 7,386,771.77
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 2.00 2.00 8.00 2.00 17.00 1.00 2.00 2.00 2.00 21.00 3.00 1.00 1.00 1.00 18.00 2.00 2.00
7,206,091.82 4,314,980.33 13,265,681.06 2,669,873.85 4,973,310.20 7,076,388.46 9,277,000.01 9,007,828.26 5,311,446.89 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 5,137,427.57 5,060,602.56 5,258,722.10
7,206,091.82 8,629,960.65 26,531,362.12 21,358,990.80 9,946,620.40 120,298,603.86 9,277,000.01 18,015,656.53 10,622,893.78 8,003,250.90 69,594,289.79 10,720,362.67 4,001,625.45 5,818,967.63 6,631,784.37 92,473,696.24 10,121,205.12 10,517,444.21
unit unit unit unit unit unit unit unit unit unit unit unit
4.00 2.00 3.00 3.00 3.00 2.00 2.00 1.00 1.00 15.00 1.00 3.00
366,365.53 1,534,078.01 3,083,778.90 549,853.97 569,168.54 654,394.54 1,765,195.66 482,219.15 2,942,460.56 1,903,414.50 1,782,643.51 2,462,257.26
1,465,462.12 3,068,156.03 9,251,336.69 1,649,561.91 1,707,505.63 1,308,789.08 3,530,391.32 482,219.15 2,942,460.56 28,551,217.55 1,782,643.51 7,386,771.77
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 2.00 8.00 1.00 17.00 1.00 2.00 2.00 2.00 3.00 3.00 1.00 1.00 1.00 18.00 2.00 2.00
7,206,091.82 4,314,980.33 13,265,681.06 2,669,873.85 4,973,310.20 7,076,388.46 9,277,000.01 9,007,828.26 5,311,446.89 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 5,137,427.57 5,060,602.56 5,258,722.10
Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit
4.00 2.00 3.00 3.00 3.00 2.00 2.00 1.00 16.00
366,365.53 1,534,078.01 3,083,778.90 549,853.97 569,168.54 654,394.54 1,765,195.66 482,219.15 1,903,414.50
1,465,462.12 3,068,156.03 9,251,336.69 1,649,561.91 1,707,505.63 1,308,789.08
4,314,980.33
Tidak Dikerjakan 21,358,990.80 4,973,310.20
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
5,818,967.63
Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan 30,454,632.05
Pek. Non Standar Gedung A - page 12 of 139
NO.
URAIAN 10 11 E.
Window tipe W 3C Window tipe W 3EA
LANTAI ROOF DECK PINTU 1 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT
2.3. PEKERJAAN INTERIOR MELEKAT A. LANTAI SATU 1 Meja Nurse Station (panjang = 8,5 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Depo Obat (panjang = 3,92 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun B. LANTAI DUA 1 Meja Nurse Station (panjang = 8,5 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Depo Obat (panjang = 3,92 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun C. LANTAI TIGA 1 Meja Nurse Station (panjang = 8,5 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Depo Obat (panjang = 3,92 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun D. LANTAI EMPAT 1 Meja Nurse Station (panjang = 8,5 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Depo Obat (panjang = 3,92 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit unit
1.00 3.00
(Rp.) 1,782,643.51 2,462,257.26
(Rp.)
unit
1.00
13,265,681.06
13,265,681.06
JUMLAH 2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA
1,665,467,420.46
Tidak Dikerjakan 7,386,771.77
unit
1.00
16,446,535.54
16,446,535.54
unit
1.00
6,140,039.93
6,140,039.93
unit
1.00
16,446,535.54
16,446,535.54
unit
1.00
6,140,039.93
6,140,039.93
unit
1.00
16,446,535.54
16,446,535.54
unit
1.00
6,140,039.93
6,140,039.93
unit
1.00
16,446,535.54
Tidak Dikerjakan
unit
1.00
6,140,039.93
Tidak Dikerjakan
JUMLAH 2.3.PEKERJAAN INTERIOR MELEKAT
67,759,726.42
Pek. Non Standar Gedung A - page 13 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG MEDIK SENTRAL (GEDUNG D1) TAHUN ANGGARAN 2021
NO.
I.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
Rp
3,295,164,863.49
II. PEKERJAAN NON STANDAR
Rp
8,517,045,118.93
TOTAL PEKERJAAN GEDUNG C Rp
11,812,209,982.43
Rekapitulasi Gedung C
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG MEDIK SENTRAL (GEDUNG D1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND + RANGKA 3.4. PEKERJAAN SANITAIR 3.5. PEKERJAAN PENGECATAN 3.6. PEKERJAAN RAILLING DAN HAND RAILLING JUMLAH III.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp Rp Rp Rp
2,161,744,534.37 394,799,760.72 235,896,227.99 256,382,559.41 206,717,462.15 39,624,318.85 3,295,164,863.49
JUMLAH PEKERJAAN STANDAR Rp
3,295,164,863.49
Rekapitulasi Gedung C
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG MEDIK SENTRAL (GEDUNG D1) TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
2.
1.
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR III.
PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING A. LANTAI SATU 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan meja top table batu granite 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm B.
C.
D.
E.
3.2.
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
3,985.63 7,971.27 593.90 7,971.27 1,076.73 390.78 44.62 2,306.53 2.04 20.39 747.00 24.73 354.97 898.11
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
355,650,653.29 306,610,540.50 36,886,031.12 219,756,409.28 11,731,460.35 35,418,367.65 10,110,340.63 170,303,599.75 4,649,910.61 26,143,756.82 156,157,899.43 31,714,202.76 14,454,822.45 125,925,619.52
LANTAI DUA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan meja top table batu granite 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
672.29 1,277.34 438.76 1,277.34 157.80 124.40 43.10 37.80 1.12 11.19 677.54 22.88 393.87 629.40
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
59,990,258.92 49,132,381.07
LANTAI TIGA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan meja top table batu granite 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
672.29 1,277.34 262.36 1,277.34 157.80 124.40 43.10 37.80 0.80 8.01 469.68 21.08 197.12 524.62
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
LANTAI EMPAT 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan keramik 30 x 30 cm fin. meja beton 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
872.90 1,658.50 254.63 1,658.50 157.80 124.40 86.20 37.80 0.40 4.01 225.70 4.52 140.74 745.34
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 228,017.60 209,046.38 1,282,204.09 40,720.99 140,211.99
LANTAI DAK ATAP 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Balok praktis uk. 10x15 cm 5 Kolom praktis uk. 11x11 cm
m² 89,233.14 474.36 m² 38,464.46 948.73 m² 27,568.56 986.68 m' 90,635.06 171.51 m' 73,835.41 152.04 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
PEKERJAAN PASANGAN LANTAI A. LANTAI SATU 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga 4 Pemasangan step noising keramik uk. 5 x 20 cm 5 Pemasangan Floor Hardener 6 Pemasangan screed beton peninggian level 7 Pemasangan rabat beton K-175 tebal 5 cm 8 Pemasangan jalan asphalt B.
m² m² m² m' m² m² m³ m²
1,511.40 92.73 20.20 46.40 41.15 405.75 6.92 143.05
224,387.27 233,343.03 190,803.17 44,849.72 43,083.36 17,816.26 750,426.42 97,131.81
Tidak Dikerjakan 35,214,561.20 1,719,301.73 11,275,001.11
Tidak Dikerjakan 2,790,978.69
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
59,990,258.92 49,132,381.07
Tidak Dikerjakan 35,214,561.20 1,719,301.73 11,275,001.11
Tidak Dikerjakan 2,790,978.69
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
77,891,318.17 63,793,455.73
Tidak Dikerjakan 45,722,566.30 1,719,301.73 11,275,001.11
Tidak Dikerjakan 2,790,978.69
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,329,022.64 36,492,339.86 27,201,215.33 15,544,818.66 11,225,936.50 2,161,744,534.37
339,139,052.69 21,638,505.80 3,854,987.18 2,081,027.11 1,773,022.58 7,228,859.31 5,189,960.36 13,894,345.68
LANTAI DUA Pek. Standar Gedung C - page 16 of 139
NO.
URAIAN
D.
E.
3.3.
C.
D.
E.
3.4.
HARGA SATUAN
JUMLAH HARGA
Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish Pemasangan timber flooring ebony Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga Pemasangan Andesite stone Memasang lantai karpet sheet + underlayer pelapis bawah karpet Pemasangan step noising keramik uk. 5 x 20 cm Pemasangan Floor Hardener Pemasangan screed beton peninggian level Pemasangan waterproofing coating Grill Stainless lebar 15 cm
m² m² m² m² m² m² m' m² m² m² m'
1,069.23 91.75 15.89 18.70 5.16 68.29 46.40 32.96 810.26 121.45 3.80
LANTAI TIGA 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan timber flooring ebony 4 Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga 5 Pemasangan Andesite stone 6 Memasang lantai karpet sheet + underlayer pelapis bawah karpet 7 Pemasangan step noising keramik uk. 5 x 20 cm 8 Pemasangan Floor Hardener 9 Pemasangan screed beton peninggian level 10 Pemasangan waterproofing coating 11 Grill Stainless lebar 15 cm
m² m² m² m² m² m² m' m² m² m² m'
621.63 53.73 15.89 16.52 5.16 63.58 46.40 158.40 1,207.99 84.32 3.80
224,387.27 233,343.03 382,484.62 190,803.17 235,870.90 251,444.55 44,849.72 43,083.36 17,816.26 48,183.35 120,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan timber flooring ebony 4 Pemasangan Andesite stone 5 Pemasangan step noising keramik uk. 5 x 20 cm 6 Pemasangan Floor Hardener 7 Pemasangan screed beton peninggian level 8 Pemasangan waterproofing coating 9 Grill Stainless lebar 15 cm
m² m² m² m² m' m² m² m² m'
841.63 22.63 15.89 5.16 46.40 222.47 426.64 31.85 3.80
224,387.27 233,343.03 382,484.62 235,870.90 44,849.72 43,083.36 17,816.26 48,183.35 120,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 43,083.36 8.70 m² 144,299.95 2,212.81 m² 67,312.94 2,149.20 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI DAK ATAP 1 Pemasangan Floor Hardener 2 Pemasangan waterproofing membran sheet 3 Pemasangan screed beton + kawat ayam
PEKERJAAN PASANGAN PLAFOND + RANGKA A. LANTAI SATU 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed B.
VOLUME
(Rp.) 224,387.27 233,343.03 382,484.62 190,803.17 235,870.90 251,444.55 44,849.72 43,083.36 17,816.26 48,183.35 120,000.00
1 2 3 4 5 6 7 8 9 10 11 C.
SATUAN
(Rp.)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
394,799,760.72
m² m² m² m' m²
1,661.59 112.48 331.65 1,994.40 75.29
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
155,385,556.07 29,149,359.29 29,787,712.48 19,498,011.11 2,075,589.04
LANTAI DUA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed
m² m² m² m' m²
1,747.02 135.47 136.41 1,852.42 56.97
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed
m² m² m² m' m²
1,597.14 59.08 116.38 1,441.27 182.71
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed
m² m² m² m' m²
1,117.72 64.98 116.60 1,324.89 209.43
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 29.82 27,568.56 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND + RANGKA
235,896,227.99
LANTAI DAK ATAP 1 Plafond exposed
PEKERJAAN SANITAIR A. LANTAI SATU 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand Shower dengan kran air panas & dingin 10 Hand dryer 11 Pemasangan kran dinding Ø 1/2" 12 Pemasangan urinoir 13 Pemasangan cubical urinoir 14 Pemasangan sloof zink satu lubang + kran & kelengkapan akseories 15 Pemasangan service zink + kran & kelengkapan aksseories 16 Hand railling penyandang cacat (Stainless steel) 17 Cubical toilet type T 2 daun - lengkap dengan aksesoris 18 Cubical toilet type L 1 daun - lengkap dengan aksesoris
Tidak Dikerjakan
set set set bh m² set bh bh set bh bh unit unit bh bh set unit
24.00 9.00 33.00 42.00 38.91 24.00 24.00 27.00 2.00 7.00 1.00 2.00 1.00 1.00 5.00 1.00 1.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 969,668.30 905,154.61 299,364.46 1,373,430.69 1,042,380.81 5,524,174.53 8,073,387.54 444,070.19 7,981,406.95
60,943,209.67 18,632,528.90 46,567,278.24 19,568,084.38 13,478,705.70 8,644,204.38 8,927,350.88 6,894,061.95 1,939,336.60 6,336,082.29 299,364.46 2,746,861.37 1,042,380.81 5,524,174.53 40,366,937.69 444,070.19 7,981,406.95
unit
1.00
6,046,520.42
6,046,520.42
Pek. Standar Gedung C - page 17 of 139
NO.
URAIAN B.
C.
D.
3.5.
LANTAI DUA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand Shower dengan kran air panas & dingin 10 Hand dryer 11 Pemasangan kran dinding Ø 1/2" 12 Pemasangan urinoir 13 Pemasangan cubical urinoir 14 Pemasangan sloof zink satu lubang + kran & kelengkapan akseories 15 Pemasangan service zink + kran & kelengkapan aksseories 16 Hand railling penyandang cacat (Stainless steel) 17 Bak mandi bayi 18 Cubical toilet type T 2 daun - lengkap dengan aksesoris 19 Cubical toilet type L 1 daun - lengkap dengan aksesoris LANTAI TIGA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand Shower dengan kran air panas & dingin 10 Hand dryer 11 Pemasangan kran dinding Ø 1/2" 12 Pemasangan urinoir 13 Pemasangan cubical urinoir 14 Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories 15 Pemasangan sloof zink satu lubang + kran & kelengkapan akseories 16 Pemasangan service zink + kran & kelengkapan aksseories 17 Hand railling penyandang cacat (Stainless steel) 18 Cubical toilet type T 2 daun - lengkap dengan aksesoris 19 Cubical toilet type L 1 daun - lengkap dengan aksesoris LANTAI EMPAT 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand Shower dengan kran air panas & dingin 10 Hand dryer 11 Pemasangan kran dinding Ø 1/2" 12 Pemasangan sloof zink satu lubang + kran & kelengkapan akseories 13 Pemasangan service zink + kran & kelengkapan aksseories 14 Cubical toilet type T 2 daun - lengkap dengan aksesoris 15 Cubical toilet type L 1 daun - lengkap dengan aksesoris
PEKERJAAN PENGECATAN A. LANTAI SATU 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan dinding cat weathershield - Exterior 5 Pengecatan plafond emulsion paint 6 Pengecatan plafond enamel (epoxy) paint 7 Pengecatan plafond dustproof paint 8 Plint int semi - Gloss, Tinggi = 10 cm 9 Pengecatan list plafond emultion paint 10 Pengecatan list plafond enamel paint (epoxy) B.
C.
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
set set set bh m² set bh bh set bh bh unit unit bh bh set unit unit
21.00 4.00 31.00 35.00 31.39 21.00 21.00 26.00 2.00 2.00 5.00 2.00 1.00 3.00 9.00 1.00 2.00 1.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 969,668.30 905,154.61 299,364.46 1,373,430.69 1,042,380.81 5,524,174.53 8,073,387.54 444,070.19 250,000.00 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
6,046,520.42
Tidak Dikerjakan
set set set bh m² set bh bh set bh bh unit unit bh bh bh set unit
14.00 6.00 15.00 21.00 20.04 14.00 14.00 18.00 2.00 4.00 4.00 3.00 2.00 1.00 1.00 6.00 1.00 1.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 969,668.30 905,154.61 299,364.46 1,373,430.69 1,042,380.81 2,376,569.58 5,524,174.53 8,073,387.54 444,070.19 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
6,046,520.42
Tidak Dikerjakan
set set set bh m² set bh bh set bh bh bh bh unit
8.00 4.00 10.00 14.00 13.03 8.00 8.00 13.00 3.00 2.00 4.00 1.00 3.00 1.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 969,668.30 905,154.61 299,364.46 5,524,174.53 8,073,387.54 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
6,046,520.42
Tidak Dikerjakan
JUMLAH 3.4.PEKERJAAN SANITAIR
256,382,559.41
m² m² m² m² m² m² m² m' m' m'
1,494.32 2,143.20 120.82 213.76 1,035.05 958.18 75.29 37.06 1,198.29 796.11
25,621.94 33,132.99 28,328.94 31,959.16 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
38,287,414.49 71,010,747.75 3,422,618.71 6,831,737.80 28,854,113.75 33,908,157.09 2,323,422.32 184,264.19 3,902,314.21 3,312,553.13
LANTAI DUA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond enamel (epoxy) paint 6 Pengecatan plafond dustproof paint 7 Plint int semi - Gloss, Tinggi = 10 cm 8 Pengecatan list plafond emultion paint 9 Pengecatan list plafond enamel paint (epoxy)
m² m² m² m² m² m² m' m' m'
2,230.25 1,350.58 74.35 1,194.08 689.35 56.97 21.50 1,312.10 540.32
25,621.94 33,132.99 28,328.94 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond enamel (epoxy) paint 6 Pengecatan plafond dustproof paint 7 Plint int semi - Gloss, Tinggi = 10 cm 8 Pengecatan list plafond emultion paint
m² m² m² m² m² m² m' m'
1,402.43 1,349.26 227.44 688.25 1,025.27 106.02 68.75 838.96
25,621.94 33,132.99 28,328.94 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Standar Gedung C - page 18 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
D.
E.
3.6.
m'
602.31
4,160.91
Tidak Dikerjakan
LANTAI EMPAT 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond enamel (epoxy) paint 6 Pengecatan plafond dustproof paint 7 Plint int semi - Gloss, Tinggi = 10 cm 8 Pengecatan list plafond emultion paint 9 Pengecatan list plafond enamel paint (epoxy)
m² m² m² m² m² m² m' m' m'
2,362.36 787.02 250.92 807.67 426.64 85.72 85.80 1,021.88 303.01
25,621.94 33,132.99 28,328.94 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI DAK ATAP 1 Pengecatan dinding cat weathershield - Exterior 2 Pengecatan dinding dustproof paint 3 Pengecatan plafond dustproof paint
m² m² m²
31,959.16 459.34 28,328.94 71.70 30,860.35 29.82 JUMLAH 3.5.PEKERJAAN PENGECATAN
Tidak Dikerjakan Tidak Dikerjakan 206,717,462.15
16.81
1,348,352.99
22,665,813.68
m'
9.98
283,154.13
2,825,878.19
m'
20.97
584,286.29
12,252,483.58
m'
6.64
283,154.13
1,880,143.40
m'
15.91
1,348,352.99
Tidak Dikerjakan
m'
9.03
283,154.13
Tidak Dikerjakan
m'
18.63
584,286.29
Tidak Dikerjakan
m'
5.59
283,154.13
Tidak Dikerjakan
m'
15.31
1,348,352.99
Tidak Dikerjakan
m'
9.03
283,154.13
Tidak Dikerjakan
m'
17.73
584,286.29
Tidak Dikerjakan
m'
5.59
283,154.13
Tidak Dikerjakan
PEKERJAAN RAILLING DAN HAND RAILLING A. LANTAI SATU 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished B.
C.
D.
(Rp.)
Pengecatan list plafond enamel paint (epoxy)
9
LANTAI DUA 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished LANTAI TIGA 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished
m'
LANTAI EMPAT 1 Railing tangga utama m' 1,348,352.99 15.31 - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2.40 2 Railling di tangga darurat m' 584,286.29 - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 3 Hand railing menempel di dinding tangga darurat m' 283,154.13 3.40 - BSP ø 2" w/ synthetic enamel paint finished 4 Hand Railing di Ramp m' 314,615.70 7.30 - ø 2" stainless steel JUMLAH 3.6.PEKERJAAN RAILLING DAN HAND RAILLING
14,680,118.72
Tidak Dikerjakan
Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan 39,624,318.85
Pek. Standar Gedung C - page 19 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG MEDIK SENTRAL (GEDUNG D1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR
II. PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA 2.3. PEKERJAAN INTERIOR MELEKAT 2.4. PEKERJAAN MODULAR OPERATING THEATRE JUMLAH II.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp Rp
3,691,601,085.18 2,836,892,569.47 20,219,564.28 1,968,331,900.00 8,517,045,118.93
JUMLAH PEKERJAAN NON STANDAR Rp
8,517,045,118.93
Rekapitulasi Non Standar Gedung C
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG MEDIK SENTRAL (GEDUNG D1) TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
3.
4.
m' m' m² m' m² m² m² m'
441.61 198.45 12.59 317.05 405.75 283.08 354.41 163.11
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 2,092,865.98 112,904.27 806,202.72
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m² m' m² m² m' m² m' m² m' m²
554.42 165.74 12.59 506.14 741.97 47.44 104.16 96.34 63.35 35.31 2.34 98.94 131.63 15.23
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 34,330.31 2,092,865.98 112,904.27 223,942.39 112,904.27 112,362.75 251,110.45 806,202.72 4,597,883.68
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
m² m²
24.15 1.13
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m² m' m' m' m² m² m²
495.06 120.35 12.59 462.41 1,002.78 45.85 59.30 254.26 6.79 89.66 9.26
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 34,330.31 223,942.39 806,202.72 112,904.27 251,110.45 4,597,883.68
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
m² m²
24.15 1.13
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m' m² m' m' m²
218.84 63.35 12.59 15.40 292.91 461.58 44.70 93.17 9.26
364,356.28 364,356.28 1,282,204.09 34,330.31 89,798.62 300,337.11 223,942.39 806,202.72 4,597,883.68
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
m² m²
24.15 1.13
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m²
9.26
4,597,883.68
Tidak Dikerjakan
m² m²
24.15 1.13
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
467.42 698.90 1,508.82 3,196.88 3.00
844,495.05 27,568.56 31,959.16 678,647.63 2,767,500.00
394,735,986.72 19,267,545.90 48,220,744.79 2,169,557,045.09 8,302,500.00
30.24 349.48
509,413.34 678,647.63
15,404,659.31 237,176,407.28
PEKERJAAN NON STANDAR II.
PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI A. LANTAI SATU 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pekerjaan pemasangan timbal tebal 3 mm 7 Pekerjaan dinding partisi gypsum 1 layer, pelapis timbal 8 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester B. LANTAI DUA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Pekerjaan pemasangan timbal tebal 3 mm 8 Pekerjaan dinding partisi gypsum 1 layer, pelapis timbal 9 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 10 Pekerjaan dinding partisi gypsum 1 layer, penutup celah dinding dengan jendela 11 Pekerjaan Window sill penutup lantai dengan curtain wall 12 Pekerjaan pemasangan Soundproof Insulation + partisi gypsum single layer 13 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 14 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 15 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant C.
D.
E.
F.
LANTAI TIGA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 8 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 9 Pekerjaan dinding partisi gypsum 1 layer, penutup celah dinding dengan jendela 10 Pekerjaan pemasangan Soundproof Insulation + partisi gypsum single layer 11 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 12 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant LANTAI EMPAT 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 5 Pemasangan Plint Vinyl, t = 10 cm 6 Pemasangan Lantai Vinyl Homogeneous 7 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 8 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 9 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 10 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant LANTAI ATAP 1 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 2 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant PEKERJAAN FASADE 1 Pekerjaan wall clading ACP corugated 1 Pekerjaan acian semen instan 2 Pekerjaan cat weathershield 3 Alumunium Composite Panel PVDF 0.5 mm alloy 5005 3 Signage "IGD" tinggi 150cm, lengkap dengan support 4 Pekerjaan kanopi kaca a. Kaca tempered tebal 12 mm b. Alumunium Composite Panel PVDF 0.5 mm alloy 5005
m² m² m² m² huruf m² m²
16,142,949.55 28,470,627.10 121,860,279.37 592,448,500.98 40,013,839.08
Tidak Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
Pek. Non Standar Gedung C - page 21 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
JUMLAH 2.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA A. LANTAI SATU PINTU 1 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 2 A-ED-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +3500 AFFL 3 A-HM-Uk. 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 5 A-HM-Uk. 2 x 900 x 2150-HM-W/. BOUVENLIGHT +3500 AFFL 6 B- RADIATION DOOR-Uk. 900 x 2150 7 B- RADIATION DOOR-Uk. 2 x 900 x 2150 8 B-ED-Uk. 900 x 2150-AL 9 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +3500 AFFL 12 B-ED/PL-Uk. 750 x 2150-AL 13 B-HM-Uk. 900 x 2150-HM-W/. BOUVENLIGHT +3500 AFFL 14 B-HM-Uk. 2 x 900 x 2150-HM-W/. BOUVENLIGHT +3500 AFFL 15 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 16 C-ED/PL-Uk. 750 x 2150-AL 17 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 18 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 19 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL 20 C-HM-Uk. 900 x 2150-HM 21 C-HM-Uk. 2 x 900 x 2150-HM 22 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 23 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 24 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 25 M-ED-Uk. 900 x 2150-AL 26 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 27 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +3500 AFFL JENDELA 1 Bouvenlight type BV 1 2 Bouvenlight type BV 2 3 Bouvenlight type BV 3 4 Bouvenlight type BV 6 5 Door Window type DW 1 6 Door Window type DW 2 7 Jendela tipe W 1 8 Jendela tipe W 2 9 Jendela tipe W 6 10 Jendela tipe W 1R 11 Jendela tipe W 1EB 12 Jendela tipe W 2EB 13 Jendela tipe W 3EB 14 Jendela tipe W 4EB 15 Jendela tipe W 6EB 16 Jendela Tipe BV-1 (diatas pintu besi) 17 Jendela Tipe BV-2 (diatas pintu besi) B. LANTAI DUA PINTU 1 A-ED-Uk. 900 x 2150-AL 2 A-ED-Uk. 2 x 900 x 2150-AL 3 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 4 A-HM-Uk. 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 6 B- RADIATION DOOR-Uk. 900 x 2150 7 B- RADIATION DOOR-Uk. 2 x 900 x 2150 8 B-ED-Uk. 900 x 2150-AL 9 B-ED-Uk. 1200 x 2150-AL 10 B-ED-Uk. 2 x 900 x 2150-AL 11 B-ED-Uk. 1200 x 2150-AL-SWING DOOR 12 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 B-ED-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 16 C-ED/PL-Uk. 750 x 2150-AL 17 C-ED/PL-Uk. 900 x 2150-AL 18 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 19 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 20 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL 21 C-HM-Uk. 900 x 2150-HM 22 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL 23 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 24 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 25 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 26 M-ED-Uk. 900 x 2150-AL 27 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 28 M-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight type BV 6 2 Curtainwall type CW 3 3 Curtainwall type CW 7 4 Curtainwall type CW 1A 5 Door Window type DW 1 6 Jendela tipe W 1 7 Jendela tipe W 2 8 Jendela tipe W 3 9 Jendela tipe W 6 10 Jendela tipe W 1R 11 Jendela tipe W 2EB 12 Jendela tipe W 4EA 13 Jendela tipe W 6EA C. LANTAI TIGA PINTU 1 A-ED-Uk. 2 x 900 x 2150-AL 2 A-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 5 B-ED-Uk. 900 x 2150-AL 6 B-ED-Uk. 2 x 900 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL-SLIDING DOOR 8 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 9 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
3,691,601,085.18
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
5.00 1.00 3.00 1.00 1.00 8.00 5.00 2.00 8.00 4.00 5.00 2.00 2.00 2.00 3.00 19.00 4.00 8.00 1.00 2.00 1.00 3.00 1.00 3.00 3.00 15.00 1.00
4,314,980.33 6,470,519.02 2,669,873.85 13,265,681.06 10,501,557.44 30,230,529.00 56,911,232.24 5,035,352.29 5,311,446.89 9,603,927.93 9,922,191.96 4,161,459.92 5,433,997.47 8,566,670.91 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 8,198,121.09 9,034,587.75 5,137,427.57 9,361,515.67 5,060,602.56 5,258,722.10 5,448,177.75
21,574,901.63 6,470,519.02 8,009,621.55 13,265,681.06 10,501,557.44 241,844,231.99 284,556,161.19 10,070,704.58 42,491,575.13 38,415,711.72 49,610,959.80 8,322,919.83 10,867,994.94 17,133,341.81 12,004,876.36 62,966,262.19 14,293,816.90 32,013,003.62 5,818,967.63 13,263,568.74 8,198,121.09 27,103,763.24 5,137,427.57 28,084,547.01 15,181,807.68 78,880,831.55 5,448,177.75
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 1.00 1.00 4.00 1.00 1.00 7.00 1.00 4.00 1.00 2.00 1.00 1.00 6.00 2.00 3.00
426,476.52 790,486.36 1,016,374.82 1,755,454.65 1,054,944.35 1,378,453.81 961,735.05 1,744,993.86 4,852,250.58 44,183,633.72 2,260,410.48 5,245,559.59 5,340,572.08 6,755,547.15 9,437,023.31 472,595.68 722,096.06
852,953.05 790,486.36 1,016,374.82 1,755,454.65 4,219,777.42 1,378,453.81 961,735.05 12,214,957.05 4,852,250.58 176,734,534.87 2,260,410.48 10,491,119.18 5,340,572.08 6,755,547.15 56,622,139.84 945,191.36 2,166,288.17
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 6.00 6.00 2.00 2.00 2.00 6.00 11.00 3.00 2.00 10.00 1.00 1.00 7.00 14.00 1.00 3.00 4.00 1.00 1.00 1.00 5.00 1.00 3.00 4.00 13.00 1.00
4,038,885.72 7,206,091.82 4,314,980.33 2,669,873.85 13,265,681.06 30,230,529.00 56,911,232.24 5,035,352.29 7,076,388.46 9,277,000.01 7,076,388.46 5,311,446.89 7,291,452.45 9,603,927.93 4,001,625.45 3,314,013.80 3,725,530.85 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 5,060,602.56 9,034,587.75 5,137,427.57 9,361,515.67 5,060,602.56 5,258,722.10 10,281,138.22
unit m² m² unit unit unit unit unit unit unit unit unit unit
2.00 265.74 788.33 3.00 2.00 2.00 5.00 3.00 3.00 2.00 2.00 2.00 4.00
1,755,454.65 1,145,978.01 1,145,978.01 15,509,584.32 1,054,944.35 961,735.05 1,744,993.86 2,528,252.68 4,852,250.58 44,183,633.72 5,245,559.59 7,670,853.70 10,309,301.39
unit unit unit unit unit unit unit unit unit
1.00 1.00 3.00 3.00 13.00 10.00 8.00 2.00 1.00
7,206,091.82 7,533,019.74 2,669,873.85 13,265,681.06 5,035,352.29 9,277,000.01 9,007,828.26 5,311,446.89 9,603,927.93
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
3,510,909.30 304,532,196.78 903,403,115.94 46,528,752.95
Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
10,491,119.18 15,341,707.40 41,237,205.57
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
Pek. Non Standar Gedung C - page 22 of 139
NO.
URAIAN
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 5.00 1.00 4.00 8.00 2.00 2.00 2.00 4.00 2.00 3.00 1.00 2.00 6.00 1.00 1.00 4.00 2.00 2.00 4.00
426,476.52 790,486.36 1,610,112.58 1,755,454.65 1,054,944.35 1,378,453.81 3,271,973.33 1,954,910.52 1,847,986.46 961,735.05 1,744,993.86 2,528,252.68 3,495,059.38 4,852,250.58 1,285,373.58 2,375,716.76 3,440,872.72 5,245,559.59 7,670,853.70 10,309,301.39
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT PINTU 1 A-ED-Uk. 900 x 2150-AL 2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 3 A-HM-Uk. 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 6 B-ED-Uk. 900 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 9 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 C-ED-Uk. 900 x 2150-AL 11 C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 12 C-ED/PL-Uk. 750 x 2150-AL 13 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 14 C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 15 C-HM-Uk. 900 x 2150-HM 16 C-HM-Uk. 2 x 900 x 2150-HM 17 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 18 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 19 M-ED-Uk. 900 x 2150-AL 20 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 6.00 3.00 1.00 1.00 8.00 6.00 3.00 2.00 5.00 2.00 6.00 1.00 9.00 5.00 1.00 1.00 2.00 2.00 5.00
4,038,885.72 4,314,980.33 2,669,873.85 4,973,310.20 13,265,681.06 5,035,352.29 9,277,000.01 5,311,446.89 9,603,927.93 3,725,530.85 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 6,631,784.37 8,198,121.09 9,034,587.75 5,137,427.57 5,060,602.56 5,258,722.10
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
JENDELA 1 Bouvenlight type BV 6 2 Jendela tipe W 1 3 Jendela tipe W 2 4 Jendela tipe W 6 5 Jendela tipe W 1R 6 Jendela tipe W 2EB 7 Jendela tipe W 4EA 8 Jendela tipe W 6EA 9 Jendela tipe W L2
unit unit unit unit unit unit unit unit unit
4.00 5.00 3.00 2.00 1.00 2.00 2.00 4.00 1.00
1,755,454.65 961,735.05 1,744,993.86 4,852,250.58 44,183,633.72 5,245,559.59 7,670,853.70 10,309,301.39 1,348,289.86
LANTAI R. MESIN LIFT PINTU 1 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT
unit
1.00
13,265,681.06
13,265,681.06
JUMLAH 2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA
2,836,892,569.47
1 2 4 2B 2A'
B. LANTAI DUA 1 Meja Administrasi (panjang = 11 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun
D.
JUMLAH HARGA
1.00 2.00 9.00 3.00 2.00 1.00 2.00 1.00 2.00 8.00 1.00
2.3. PEKERJAAN INTERIOR MELEKAT A. LANTAI SATU 1 Meja Nurse Station (panjang = 10,45 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun
C.
HARGA SATUAN
unit unit unit unit unit unit unit unit unit unit unit
C-ED-Uk. 900 x 2150-AL C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 750 x 2150-AL C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL C-HM-Uk. 900 x 2150-HM C-HM-Uk. 2 x 900 x 2150-HM E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL M-ED-Uk. 900 x 2150-AL M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
JENDELA 1 Bouvenlight type BV 1 2 Bouvenlight type BV 2 3 Bouvenlight type BV 4 4 Bouvenlight type BV 6 5 Door Window type DW 6 Door Window type DW 7 Door Window type DW 8 Door Window type DW 9 Door Window type DW 10 Jendela tipe W 1 11 Jendela tipe W 2 12 Jendela tipe W 3 13 Jendela tipe W 4 14 Jendela tipe W 6 15 Jendela tipe W 1A 16 Jendela tipe W 2A 17 Jendela tipe W 3A 18 Jendela tipe W 2EB 19 Jendela tipe W 4EA 20 Jendela tipe W 6EA
E.
VOLUME
(Rp.) 3,725,530.85 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 8,198,121.09 5,137,427.57 5,060,602.56 5,258,722.10
10 11 12 13 14 15 16 17 18 19 20
D.
SATUAN
LANTAI TIGA 1 Meja Nurse Station (panjang = 7,55 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Nurse Station (panjang = 7,75 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 3 Meja Administrasi Critical Care (panjang = 6,45 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun LANTAI EMPAT 1 Meja Nurse Station (panjang = 5,65 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Nurse Station (panjang = 4,90 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun
(Rp.)
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
7,021,818.61
Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
10,491,119.18 15,341,707.40 41,237,205.57
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
7,021,818.61
Tidak Tidak Tidak Tidak Tidak
Dikerjakan Dikerjakan Dikerjakan Dikerjakan Dikerjakan
15,341,707.40 41,237,205.57
Tidak Dikerjakan
unit
1.00
20,219,564.28
20,219,564.28
unit
1.00
21,283,751.87
Tidak Dikerjakan
unit
1.00
14,608,393.33
Tidak Dikerjakan
unit
1.00
14,995,370.64
Tidak Dikerjakan
unit
1.00
12,480,018.14
Tidak Dikerjakan
unit
1.00
10,932,108.92
Tidak Dikerjakan
unit
1.00
9,480,944.02
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 23 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
JUMLAH 2.3.PEKERJAAN INTERIOR MELEKAT 2.4. PEKERJAAN MODULAR OPERATING THEATRE A. LANTAI SATU - RUANG OK A PERALATAN PADA DINDING 1 PANEL DINDING M2 67.80 PCGI Sheet, Tickness 0.426mm, Insulasi PIR Dengan Intensitas 35kg/m3 Double Skin , Terkoneksi Secara Modular, Male Female, Ketebalan 50mm Panel Dinding Terdiri Dari Modul-Modul Dengan Dimensi Tertentu Celah Antar Modul Dilapisi Glass Cement, Warna Dapat Dipilih Sesuai Keinginan Anti Korosif Tahan Api (Meleleh Setelah 2 Jam Pembakaran) Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 Rangka Penyangga : Fitting Penyangga Dengan Lapisan Spesial Treatment, Anodic Electrophore Dengan Accessories Yang Dengan Rivet dan Baut Tertutup Celah Wallpanel 3mm Ditutup Dengan Sealent Sewarna, Rapi Dan Hampir Tidak Terlihat 2 PINTU GESER OTOMATIS KEDAP UDARA SET 1.00 Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Memiliki Lapis Timbal Anti Radiasi 2mm Pintu Dapat Dibuka Secara Otomatis, Memiliki Motor Dan Pengontrol DC Dari German Dunker Motor Frame Pintu Terbuat Dari Stainless Steel 304, Terpasang Kokoh Di Dinding Ukuran Pintu Lebar 1600mm Dan Tinggi 2100mm, Ketebalan 44mm Memiliki Jendela Kaca Berukuran 350mm x 450mm Tanpa Frame (Frameless) Membuat Pintu Terlihat Flat, Pintu Terbuat Dari Stainless Steel 2mm , Sunblasting , Dengan Core Alumunium Honeycomb Sensor Tanpa Sentuh Dengan Bayangan Tangan Dan Kaki Pintu Dapat Dioperasikan Secara Manual Jika Terjadi Kegagalan Pasokan Daya Listrik Pintu Bisa Dikunci Secara Elektronis Dan Mekanis Memiliki Sertivikasi TUV , ISO and EN Class 4 3 PINTU AYUN MANUAL KEDAP UDARA SET 1.00 Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Buka Tutup Pintu Secara Manual Ukuran Pintu Lebar 900mm Dan Tinggi 2100mm Memiliki Jendela Kaca Berukuran 250mm x 500mm, Thickness 10mm Lead Glass, Frameless, Pintu Terbuat Dari Stainless Steel 2mm , Dengan Core Alumunium Honeycomb, Berlapis Timbal Antiradiasi 2mm Memiliki Sertivikasi TUV , ISO and EN Class 4 Magnetic Lock, With Card Reader 4 PANEL KONTROL TOUCHSCREEN UNIT 1.00 Panel Memiliki Minimal 6 Fitur Layanan Time Day Clock (Digital) Operating Timing (Stop Watch) Sistem Mengatur Cahaya Lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator With Controller And Humidity Indicator Dimensi : 980mm x 950mm x 350mm Panel dapat dibuka untuk Maintenance 5 PASSBOX UNIT 1.00 Berguna Untuk Menghantarkan Perlengkapan CSSD Ke Luar Ruang OK Tanpa Mengganggu Sterilitas Ruang OK UV light, Interlock system (Membuka Satu Sisi, Sisi Yang Berlawanan Akan Terkunci) Tempered Glass dengan Konstruksi Stainless Steel Dimensi : 790mm * 680mm * 690mm 6 LEMARI ALAT/INSTRUMENT UNIT 1.00 Berfungsi Untuk Menyimpan Instrument / Alat Dll Terbuat dari Stainless Steel, Plate Setebal 1.2 mm 304SS Lemari Tertanam Didalam Dinding Dimensi 980mm x 1700 mm x 350mm (Outside Dimension) 7 LEMARI OBAT UNIT 1.00 Berfungsi Untuk Menyimpan Obat-Obatan, Bahan Habis Pakai, Dll Terbuat Dari Lembaran Stainless Steel Setebal 1mm SS304 Keseluruhan Bingkai Terbuat Dari Stainless Steel Memiliki Laci Dimensi 980mm x 1700 mm x 350mm (Outside Dimension) 8 WRITING TABLE UNIT 1.00 Type Wall Mmounted (Tertanam Dalam Dinding) Terbuat Dari SS304, 1mm Memiliki Lampu Penerangan Otomatis (Jika Writing Table Dibuka) Dimensi 700mm x 400mm x 250mm 9 BOX TERMINAL GAS OUTLET SET 1.00 Bagian Bawah Terbuat Dari Lembaran Baja (Galvanis Steel) Yang Di Powder Coating Panel Depan Terbuat Dari Istainless Steel 304 Box Untuk Outlet Oxygen, Nitrous Oxide, Comp. Air, Vacuum serta AGSS Scavengeing Anastesi Sudah termasuk Outlet Oxygen, Nitrous Oxide, Comp. Air, Vacuum serta AGSS Scavengeing Anastesi Dimensi 585mm x 220mm x 100mm 10 X-RAY VIEWER (LED SUPER SLIM) UNIT 1.00 Digunakan Untuk Membaca Film X-Ray Terdiri dari 2 bagian dengan dimmer, bingkai terbuat dari aluminium profil Maksimal density sekitar dari 4400 hingga 6700 cd/m3 Tabung LED yang bebas flicker, hemat energi Kontrol kecerahan elektronik variable (dimmable) Dimensi 1000mm * 635mm * 35mm 11 BOX STOP KONTAK SET 4.00 Panel Depan Terbuat Dari Istainless Steel 304 Box Untuk 4 Stop Kontak Dan 2 Grounding Terminal Dimensi 600mm x 220mm x 100mm B PERALATAN PADA PLAFON 1 PANEL PLAFON M2 31.92 PCGI Sheet, Tickness 0.426mm, Insulasi PIR Dengan Intensitas 35kg/m3 Double Skin , Terkoneksi Secara Modular, Male Female, Ketebalan 50mm Panel Plafon Terdiri Dari Modul-Modul Dengan Dimensi Tertentu Celah Antar Modul Dilapisi Glass Cement, WarNa Dapat Dipilih Sesuai Keinginan Anti Korosif Tahan Api (Meleleh Setelah 2 Jam Pembakaran) Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 Rangka Penyangga : Fitting Penyangga Dengan Lapisan Spesial Treatment, Anodic Electrophore Dengan Accessories Yang Dengan Rivet dan Baut Tertutup Celah Wallpanel 3mm Ditutup Dengan Sealent Sewarna, Rapi Dan Hampir Tidak Terlihat 2 LAMPU PERIPHERAL LED SET 1.00 Set Lampu Yang Dipasang Pada Ceiling Plafon Yang Berfungsi Untuk Menambah Cahaya Untuk Kebutuhan Bedah Dimensi Lampu 1300mm x 300mm dan ukuran 600mm x 300mm Bingkai Terbuat Dari Alumunium. Memiliki Baterai Untuk Emergency 3 SURGICAL DOUBLE ARM ELECTRIC PENDANT SET 1.00 Double Arm Type : Electric mechanical Arm Length : 900 mm Extention Arm Length : 800 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340°
20,219,564.28
3,820,000.00
258,996,000.00
212,500,000.00
212,500,000.00
94,600,000.00
94,600,000.00
94,900,000.00
94,900,000.00
52,356,000.00
52,356,000.00
75,280,000.00
75,280,000.00
72,800,000.00
72,800,000.00
36,850,000.00
36,850,000.00
19,750,000.00
19,750,000.00
52,750,000.00
52,750,000.00
4,288,000.00
17,152,000.00
3,820,000.00
121,934,400.00
51,750,000.00
51,750,000.00
215,580,000.00
215,580,000.00
Pek. Non Standar Gedung C - page 24 of 139
NO.
URAIAN
SATUAN
VOLUME
JUMLAH HARGA
(Rp.)
(Rp.)
-
C
Material : Powder Coated Steel, And Allumunium Alloy Shelf Load Max : ≤ 75 kg Assesories: Electrical Sockets (220V/50Hz) : 10 Grounding Terminal :2 Medical Shelves :3 Drawer :1 IV Pole :1 Storage Basket :1 Phone Connector :1 Network Connector :1 Medical Gas Wall Outlet O2 :1 N2O :1 C/A :1 VACC :1 AGSS :1 Advance Movement Technology, Dengan Tingkat Kestabilan Tinggi Dan Hampir Tanpa Suara (Quiet Electric Motor) TUV, CE Approved, Terdaftar Kemenkes RI 4 SET 1.00 ANESTHESIA PENDANT It Is Dedicated Machines For Matching Different Anesthesia Machines Or Hanging The Mobile Lifting Trolley Single Arm Type Arm Length : 900 mm Load Max : 200 kg Brake System : Air Brake Vertical Travel : 350 mm Material : High Strength Alluminium Alloy Shelf Load Max : ≤ 75 kg Assesories Electrical Sockets (220V/50Hz) :8 Lifting Pothook :1 Grounding Terminal :2 Medical Shelves :3 Drawer :1 IV Pole :1 Storage Basket :1 Phone Connector :1 Network Connector :1 Medical Gas Wall Outlet O2 :1 N2O :1 C/A :1 VACC :1 AGSS :1 TUV, CE Approved, Terdaftar Kemenkes RI PERALATAN PADA LANTAI 1 M2 31.92 VYNIL High Performance Flexible Homogeneous Multi Purpose Flooring by GERFLOR FRANCE EVERCARE Surface Treatment, Anti Iodine Iosine, Class T Densely Compacted Surface For Improved Wear Maintenance Anti-Bacterial And Fungicidal Antistatic 2 UNIT 1.00 SCRUB UP STATION Scrub Station Untuk 2 Person, Ukuran 1500mm x 600mm x 970 mm (L x W x H) Washstand Terbuat Dari Stainless Steel SS 304, 1mm Plate, Tahan Terhadap Semua Bahan Pembersih Dan Disinfektan Yang Biasa Digunakan Di Rumah Sakit Terdapat 2 Pcs Sensor Otomatis Untuk Air Dan Sabun Dispenser Terdapat Sensor Pada Lutut Antibacterial UV Filter Dan Osmosis Water Pump 3 SET 1.00 PEREDAM TEKANAN Berfungsi Untuk Menjaga Kestabilan Tekanan Positif Di Dalam Ruang OK 8 Pascal Dengan Membuang Kelebihan Tekanan Terbuat Dari Stainless Steel 304 Dimensi : 300 mm x 500 mm 4 Unit 1.00 LAMINAR AIR FLOW Berfungsi Untuk Menjaga Konsistensi Aliran Udara Dan Kecepatannya Bingkai terbuat dari Aluminium Profil, bagian luar dari lembaran baja dicat warna, bagian dalam dari lembaran baja dilapisi PVC Film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang Berlapis Ganda Dan Berpori Sama Yang Berfungsi Untuk Menciptakan Aliran Udara Yang Laminar Grill Luminar Air Flow Di Plafond sesuai dengan ukuran ruang OK SET 1.00 5 RETURN AIR GRILL Box Bagian Bawah Terbuat Dari Plat Baja Yang Digulung setebal 1.0mm, Dengan Penutup Vertikal Yang Terbuat Dari Campuran Aluminium 1.00 Memiliki Ukuran 600mm x 350mm x 295mm dengan Filter Efisiensi Sedang -
HARGA SATUAN
B. LANTAI EMPAT - RUANG CATH-LAB (UKURAN 7500 x 5550 x 3000) A PERALATAN PADA DINDING 1 PANEL DINDING M2 86.40 Modular Galvanis Sheet , Tickness 0.426mm, Insulasi Honeycomb dengan Insensitas 35kg/m3 Double Skin , Terkoneksi Secara Modular, Male Female, Ketebalan 50mm Panel Dinding Terdiri Dari Modul-Modul Dengan Dimensi Tertentu Celah Antar Modul Dilapisi Glass Cement, Warna Dapat Dipilih Sesuai Keinginan Anti Korosif Tahan Api (Meleleh Setelah 2 Jam Pembakaran) Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 Rangka Penyangga : Fitting Penyangga Dengan Lapisan Spesial Treatment, Anodic Electrophore Dengan Accessories Yang Dengan Rivet dan Baut Tertutup Celah Wallpanel 3mm Ditutup Dengan Sealent Sewarna, Rapi Dan Hampir Tidak Terlihat Lapisan Timbal memiliki ketebalan 2mm, berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi 2 PINTU GESER OTOMATIS KEDAP UDARA SET 1.00 Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Memiliki Lapis Timbal Anti Radiasi 2mm Pintu Dapat Dibuka Secara Otomatis, Memiliki Motor Dan Pengontrol DC Dari German Dunker Motor Frame Pintu Terbuat Dari Stainless Steel 304, Terpasang Kokoh Di Dinding Ukuran Pintu Lebar 1600mm Dan Tinggi 2100mm, Ketebalan 44mm Memiliki Jendela Kaca Berukuran 350mm x 450mm Tanpa Frame (Frameless) Membuat Pintu Terlihat Flat, Pintu Terbuat Dari Stainless Steel 2mm , Sunblasting , Dengan Core Alumunium Honeycomb Sensor Tanpa Sentuh Dengan Bayangan Tangan Dan Kaki Pintu Dapat Dioperasikan Secara Manual Jika Terjadi Kegagalan Pasokan Daya Listrik Pintu Bisa Dikunci Secara Elektronis Dan Mekanis Memiliki Sertivikasi TUV , ISO and EN Class 4 3 SET 1.00 PINTU AYUN MANUAL KEDAP UDARA Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Buka Tutup Pintu Secara Manual Ukuran Pintu Lebar 900mm Dan Tinggi 2100mm Memiliki Jendela Kaca Berukuran 250mm x 500mm, Thickness 10mm Lead Glass, Frameless, Pintu Terbuat Dari Stainless Steel 2mm , Dengan Core Alumunium Honeycomb, Berlapis Timbal Antiradiasi 2mm
-
-
218,800,000.00
218,800,000.00 -
-
-
-
825,000.00
26,334,000.00
-
142,900,000.00
142,900,000.00
-
47,934,000.00
47,934,000.00
78,928,000.00
78,928,000.00 -
15,600,000.00
15,600,000.00
60,637,500.00
60,637,500.00
5,920,000.00
tidak dikerjakan
212,500,000.00
tidak dikerjakan
94,600,000.00
tidak dikerjakan
Pek. Non Standar Gedung C - page 25 of 139
NO.
URAIAN
B
C
-
SATUAN
VOLUME
Memiliki Sertivikasi TUV , ISO and EN Class 4 Magnetic Lock, With Card Reader 4 UNIT 1.00 PANEL KONTROL TOUCHSCREEN Panel Memiliki Minimal 6 Fitur Layanan Time Day Clock (Digital) Operating Timing (Stop Watch) Sistem Mengatur Cahaya Lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator With Controller And Humidity Indicator Dimensi : 980mm x 950mm x 350mm Panel dapat dibuka untuk Maintenance 5 UNIT 1.00 PASSBOX Berguna Untuk Menghantarkan Perlengkapan CSSD Ke Luar Ruang OK Tanpa Mengganggu Sterilitas Ruang OK UV light, Interlock system (Membuka Satu Sisi, Sisi Yang Berlawanan Akan Terkunci) Tempered Glass dengan Konstruksi Stainless Steel Dimensi : 790mm * 680mm * 690mm 6 UNIT 1.00 KACA TIMBAL uk. 120x100x10mm 7 UNIT 1.00 LEMARI ALAT/INSTRUMENT Berfungsi Untuk Menyimpan Instrument / Alat Dll Terbuat dari Stainless Steel, Plate Setebal 1.2 mm 304SS Lemari Tertanam Didalam Dinding Dimensi 980mm x 1700 mm x 350mm (Outside Dimension) PERALATAN PADA PLAFON 1 M2 50.94 PANEL PLAFON Modular Galvanis Sheet , Tickness 0.426mm, Insulasi Honeycomb dengan Insensitas 35kg/m3 Double Skin , Terkoneksi Secara Modular, Male Female, Ketebalan 50mm Panel Plafon Terdiri Dari Modul-Modul Dengan Dimensi Tertentu Celah Antar Modul Dilapisi Glass Cement, WarNa Dapat Dipilih Sesuai Keinginan Anti Korosif Tahan Api (Meleleh Setelah 2 Jam Pembakaran) Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 Rangka Penyangga : Fitting Penyangga Dengan Lapisan Spesial Treatment, Anodic Electrophore Dengan Accessories Yang Dengan Rivet dan Baut Tertutup Celah Wallpanel 3mm Ditutup Dengan Sealent Sewarna, Rapi Dan Hampir Tidak Terlihat Lapisan Timbal memiliki ketebalan 2mm, berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi PERALATAN PADA LANTAI 1 M2 50.94 VYNIL High Performance Flexible Homogeneous Multi Purpose Flooring by GERFLOR FRANCE EVERCARE Surface Treatment, Anti Iodine Iosine, Class T Densely Compacted Surface For Improved Wear Maintenance Anti-Bacterial And Fungicidal Antistatic 2 UNIT 1.00 SCRUB UP STATION Scrub Station Untuk 2 Person, Ukuran 1500mm x 600mm x 970 mm (L x W x H) Washstand Terbuat Dari Stainless Steel SS 304, 1mm Plate, Tahan Terhadap Semua Bahan Pembersih Dan Disinfektan Yang Biasa Digunakan Di Rumah Sakit Terdapat 2 Pcs Sensor Otomatis Untuk Air Dan Sabun Dispenser Terdapat Sensor Pada Lutut Antibacterial UV Filter Dan Osmosis Water Pump 3 SET 1.00 PEREDAM TEKANAN Berfungsi Untuk Menjaga Kestabilan Tekanan Positif Di Dalam Ruang OK 8 Pascal Dengan Membuang Kelebihan Tekanan Terbuat Dari Stainless Steel 304 Dimensi : 300 mm x 500 mm 4 set 1.00 PENDANT VIEWER X RAY RUANG OT-1 (UKURAN 8150 x 5625 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 2 PANEL DINDING BAGIAN BAWAH RUANG OK m² Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 3 PINTU GESER OTOMATIS KEDAP UDARA LAPIS TIMBAL set Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis Memiliki lapisan timbal setebal 3 mm 4 unit PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator 5 unit LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm 6 unit LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm 7 unit WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). -
89.31
40.92
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
94,900,000.00
tidak dikerjakan
52,356,000.00
tidak dikerjakan
90,000,000.00 75,280,000.00
tidak dikerjakan tidak dikerjakan
5,920,000.00
tidak dikerjakan
825,000.00
tidak dikerjakan
142,900,000.00
tidak dikerjakan
47,934,000.00
tidak dikerjakan
256,875,000.00
tidak dikerjakan
-
6,138,000.00
Tidak Dikerjakan
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 26 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 8
9
10
11
12
13
14 15
B. 1
2
3
4
C.
-
Dimensi 700 mm x 400 mm x 250 mm PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm RETURN AIR GRILL Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium HATCH/PASS BOX Pass Box memiliki 2 buah pintu dan 1 buah UV Lamp Kedua Pintu terhubung dan bekerja secara mekanis, sehingga tidak mungkin keduanya dapat dibuka secara bersamaan. Kalau satu dibuka, maka pintu lainnya tertutup Apabila kedua pintu tertutup, maka UV Lamp akan bekerja Terbuat dari stainless steel 304 Dimensi 600 mm x 600 mm x 600 mm Pintu Disposal Box type DBX LAPISAN TIMBAL Lembaran Timbal yang memiliki ketebalan 2 mm Berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (8 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2850 x 2500 x 520 mm. Laminar airflow ini dilengkapi 8 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
(Rp.)
buah
1.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
1.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
set
8.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit m²
1.00 71.72
m²
52.78
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
14.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
69.30
-
Tidak Dikerjakan
RUANG OT-2 (UKURAN 5875 x 4925 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung
60,637,500.00 -
Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung C - page 27 of 139
NO.
URAIAN seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) PANEL DINDING BAGIAN BAWAH RUANG OK Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) PINTU GESER OTOMATIS KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis PINTU AYUN MANUAL KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Buka tutup pintu secara manual Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). Dimensi 700 mm x 400 mm x 250 mm PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm RETURN AIR GRILL Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium HATCH/PASS BOX Pass Box memiliki 2 buah pintu dan 1 buah UV Lamp Kedua Pintu terhubung dan bekerja secara mekanis, sehingga tidak mungkin keduanya dapat dibuka secara bersamaan. Kalau satu dibuka, maka pintu lainnya tertutup Apabila kedua pintu tertutup, maka UV Lamp akan bekerja Terbuat dari stainless steel 304 Dimensi 600 mm x 600 mm x 600 mm Pintu Disposal Box type DBX
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
2
3
4
5
6
7
8
9
10
11
12
13
14
15 B. 1
2
PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (6 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2600 x 1800 x 520 mm. -
6,138,000.00
Tidak Dikerjakan
m²
30.93
set
1.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
buah
1.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
1.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
m²
15.55
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
60,637,500.00
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 28 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 3
-
Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency
4
SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs
C.
PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
(Rp.)
buah
10.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
30.68
-
Tidak Dikerjakan
RUANG OT-3 (UKURAN 5875 x 5150 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 2 PANEL DINDING BAGIAN BAWAH RUANG OK m² Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 3 PINTU GESER OTOMATIS KEDAP UDARA set Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis 4 set PINTU AYUN MANUAL KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Buka tutup pintu secara manual Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. 5 unit PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator 6 unit LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm 7 unit LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm 8 unit WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). Dimensi 700 mm x 400 mm x 250 mm 9 buah PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. 10 set BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC -
31.68
6,138,000.00
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 29 of 139
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 11
12
13
14
15 B. 1
2
3
4
C.
-
X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm RETURN AIR GRILL Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium HATCH/PASS BOX Pass Box memiliki 2 buah pintu dan 1 buah UV Lamp Kedua Pintu terhubung dan bekerja secara mekanis, sehingga tidak mungkin keduanya dapat dibuka secara bersamaan. Kalau satu dibuka, maka pintu lainnya tertutup Apabila kedua pintu tertutup, maka UV Lamp akan bekerja Terbuat dari stainless steel 304 Dimensi 600 mm x 600 mm x 600 mm Pintu Disposal Box type DBX PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (6 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2600 x 1800 x 520 mm. Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
(Rp.)
buah
1.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
m²
16.82
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
10.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
29.91
-
Tidak Dikerjakan
RUANG OT-4 (UKURAN 5875 x 4925 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 2 PANEL DINDING BAGIAN BAWAH RUANG OK m² Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 3 PINTU GESER OTOMATIS KEDAP UDARA set Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm
30.93
1.00
60,637,500.00
6,138,000.00
-
Tidak Dikerjakan
Tidak Dikerjakan
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 30 of 139
NO.
URAIAN Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis PINTU AYUN MANUAL KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Buka tutup pintu secara manual Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). Dimensi 700 mm x 400 mm x 250 mm PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm RETURN AIR GRILL Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium HATCH/PASS BOX Pass Box memiliki 2 buah pintu dan 1 buah UV Lamp Kedua Pintu terhubung dan bekerja secara mekanis, sehingga tidak mungkin keduanya dapat dibuka secara bersamaan. Kalau satu dibuka, maka pintu lainnya tertutup Apabila kedua pintu tertutup, maka UV Lamp akan bekerja Terbuat dari stainless steel 304 Dimensi 600 mm x 600 mm x 600 mm Pintu Disposal Box type DBX
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
-
4
5
6
7
8
9
10
11
12
13
14
15 B. 1
2
3
4
PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (6 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2600 x 1800 x 520 mm. Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
buah
1.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
1.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
set
4.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
unit
1.00
m²
15.55
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
10.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
60,637,500.00
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 31 of 139
NO.
URAIAN -
C.
-
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs
PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
unit
RUANG OT-5 (UKURAN 8150 x 5625 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 2 PANEL DINDING BAGIAN BAWAH RUANG OK m² Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 3 PINTU GESER OTOMATIS KEDAP UDARA set Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis 4 set PINTU AYUN MANUAL KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Buka tutup pintu secara manual Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. 5 unit PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator 6 unit LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm 7 unit LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm 8 unit WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). Dimensi 700 mm x 400 mm x 250 mm 9 buah PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. 10 set BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC 11 buah X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm 12 set BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm 13 set RETURN AIR GRILL
1.00
-
Tidak Dikerjakan
40.10
-
Tidak Dikerjakan
43.57
6,138,000.00
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
4.00
-
Tidak Dikerjakan
4.00
-
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 32 of 139
NO.
URAIAN 14 B. 1
2
3
4
C.
A
Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium Pintu Disposal Box type DBX
PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (6 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2600 x 1800 x 520 mm. Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
1.00
m²
27.58
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
10.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
RUANG OT-6 (UKURAN 5375 x 5150 x 3000) PERALATAN PADA DINDING 1 PANEL DINDING M2 71.85 TEMPERED GLASS 10mm dilapisi penguatan calsyboard gypsum tahan api tebal 16mm Panel Dinding Terdiri Dari Modul-Modul kaca selebar 1meter, dengan back packing sound proofing agar kedap suara Modul Dilapisi PVC film, Warna Dapat Dipilih Sesuai Keinginan , gambar pada 1 sisi dinding penguatan rangka dengan holo galvanis anti korosif celah antar dinding ditutup dengan sealent khusus warna Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 dengan stainless 304 Yang Dengan Rivet dan Baut Tertutup Celah Wallpanel 3mm Ditutup Dengan Sealent Sewarna, Rapi Dan Hampir Tidak Terlihat Lapisan Timbal memiliki ketebalan 2mm, berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi 2 PINTU GESER OTOMATIS KEDAP UDARA SET 1.00 Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Memiliki Lapis Timbal Anti Radiasi 2mm Pintu Dapat Dibuka Secara Otomatis, Memiliki Motor Dan Pengontrol DC Dari German Dunker Motor Frame Pintu Terbuat Dari Stainless Steel 304, Terpasang Kokoh Di Dinding Ukuran Pintu Lebar 1600mm Dan Tinggi 2100mm, Ketebalan 44mm Memiliki Jendela Kaca Berukuran 350mm x 450mm Tanpa Frame (Frameless) Membuat Pintu Terlihat Flat, Pintu Terbuat Dari Stainless Steel 2mm , Sunblasting , Dengan Core Alumunium Honeycomb Sensor Tanpa Sentuh Dengan Bayangan Tangan Dan Kaki Pintu Dapat Dioperasikan Secara Manual Jika Terjadi Kegagalan Pasokan Daya Listrik Pintu Bisa Dikunci Secara Elektronis Dan Mekanis Memiliki Sertivikasi TUV , ISO and EN Class 4 3 SET 1.00 PINTU AYUN MANUAL KEDAP UDARA Berfungsi Untuk Menjaga Kestabilan Tekanan Udara, Suhu Dan Kelembaban Ruang Operasi Buka Tutup Pintu Secara Manual Ukuran Pintu Lebar 900mm Dan Tinggi 2100mm Memiliki Jendela Kaca Berukuran 250mm x 500mm, Thickness 10mm Lead Glass, Frameless, Pintu Terbuat Dari Stainless Steel 2mm , Dengan Core Alumunium Honeycomb, Berlapis Timbal Antiradiasi 2mm Memiliki Sertivikasi TUV , ISO and EN Class 4 Magnetic Lock, With Card Reader 4 UNIT 1.00 PANEL KONTROL TOUCHSCREEN Panel Memiliki Minimal 6 Fitur Layanan Time Day Clock (Digital) Operating Timing (Stop Watch) Sistem Mengatur Cahaya Lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator With Controller And Humidity Indicator Dimensi : 980mm x 950mm x 350mm Panel dapat dibuka untuk Maintenance 5 UNIT 1.00 PASSBOX Berguna Untuk Menghantarkan Perlengkapan CSSD Ke Luar Ruang OK Tanpa Mengganggu Sterilitas Ruang OK UV light, Interlock system (Membuka Satu Sisi, Sisi Yang Berlawanan Akan Terkunci) -
60,637,500.00
Tidak Dikerjakan
unit
8,920,000.00
tidak dikerjakan
212,500,000.00
tidak dikerjakan
94,600,000.00
tidak dikerjakan
94,900,000.00
tidak dikerjakan
52,356,000.00
tidak dikerjakan
Pek. Non Standar Gedung C - page 33 of 139
NO.
URAIAN
B
C
SATUAN
VOLUME
Tempered Glass dengan Konstruksi Stainless Steel Dimensi : 790mm * 680mm * 690mm 6 UNIT 1.00 LEMARI ALAT/INSTRUMENT Berfungsi Untuk Menyimpan Instrument / Alat Dll Terbuat dari Stainless Steel, Plate Setebal 1.2 mm 304SS Lemari Tertanam Didalam Dinding Dimensi 980mm x 1700 mm x 350mm (Outside Dimension) 7 UNIT 1.00 LEMARI OBAT Berfungsi Untuk Menyimpan Obat-Obatan, Bahan Habis Pakai, Dll Terbuat Dari Lembaran Stainless Steel Setebal 1mm SS304 Keseluruhan Bingkai Terbuat Dari Stainless Steel Memiliki Laci Dimensi 980mm x 1700 mm x 350mm (Outside Dimension) 8 UNIT 1.00 WRITING TABLE Type Wall Mmounted (Tertanam Dalam Dinding) Terbuat Dari SS304, 1mm Memiliki Lampu Penerangan Otomatis (Jika Writing Table Dibuka) Dimensi 700mm x 400mm x 250mm 9 SET 1.00 BOX TERMINAL GAS OUTLET Bagian Bawah Terbuat Dari Lembaran Baja (Galvanis Steel) Yang Di Powder Coating Panel Depan Terbuat Dari Istainless Steel 304 Box Untuk Outlet Oxygen, Nitrous Oxide, Comp. Air, Vacuum serta AGSS Scavengeing Anastesi Sudah termasuk Outlet Oxygen, Nitrous Oxide, Comp. Air, Vacuum serta AGSS Scavengeing Anastesi Dimensi 585mm x 220mm x 100mm 10 UNIT 1.00 X-RAY VIEWER (LED SUPER SLIM) Digunakan Untuk Membaca Film X-Ray Terdiri dari 2 bagian dengan dimmer, bingkai terbuat dari aluminium profil Maksimal density sekitar dari 4400 hingga 6700 cd/m3 Tabung LED yang bebas flicker, hemat energi Kontrol kecerahan elektronik variable (dimmable) Dimensi 1000mm * 635mm * 35mm 11 SET 4.00 BOX STOP KONTAK Panel Depan Terbuat Dari Istainless Steel 304 Box Untuk 4 Stop Kontak Dan 2 Grounding Terminal Dimensi 600mm x 220mm x 100mm PERALATAN PADA PLAFON 1 M2 35.83 PANEL PLAFON Plate stainless steel 1,2mm matt finish panel, dilapisi gysum fire stop 13mm Anti Korosif Tahan Api (Meleleh Setelah 2 Jam Pembakaran) Pertemuan Dinding Dengan Ceiling Harus Berbentuk Lengkung Dengan Radius Minimum 30cm, 1/4 rangka Hollow galvanis 4x4 - Lapisan Timbal memiliki ketebalan 2mm, berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi 2 SET 1.00 LAMPU PERIPHERAL LED Set Lampu Yang Dipasang Pada Ceiling Plafon Yang Berfungsi Untuk Menambah Cahaya Untuk Kebutuhan Bedah Dimensi Lampu 1300mm x 300mm dan ukuran 600mm x 300mm Bingkai Terbuat Dari Alumunium. Memiliki Baterai Untuk Emergency 3 SET 1.00 SURGICAL DOUBLE ARM ELECTRIC PENDANT Double Arm Type : Electric mechanical Arm Length : 900 mm Extention Arm Length : 800 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : Powder Coated Steel, And Allumunium Alloy Shelf Load Max : ≤ 75 kg Assesories: Electrical Sockets (220V/50Hz) : 10 Grounding Terminal :2 Medical Shelves :3 Drawer :1 IV Pole :1 Storage Basket :1 Phone Connector :1 Network Connector :1 Medical Gas Wall Outlet - O2 :1 - N2O :1 :1 - C/A :1 - VACC - AGSS :1 Advance Movement Technology, Dengan Tingkat Kestabilan Tinggi Dan Hampir Tanpa Suara (Quiet Electric Motor) TUV, CE Approved, Terdaftar Kemenkes RI SET 1.00 4 ANESTHESIA PENDANT It Is Dedicated Machines For Matching Different Anesthesia Machines Or Hanging The Mobile Lifting Trolley Single Arm Type : 900 mm Arm Length : 200 kg Load Max : Air Brake Brake System : 350 mm Vertical Travel : High Strength Alluminium Alloy Material : ≤ 75 kg Shelf Load Max Assesories :8 Electrical Sockets (220V/50Hz) :1 Lifting Pothook :2 Grounding Terminal :3 Medical Shelves :1 Drawer :1 IV Pole :1 Storage Basket :1 Phone Connector Network Connector :1 Medical Gas Wall Outlet - O2 :1 - N2O :1 - C/A :1 - Vac :1 - AGSS :1 TUV, CE Approved, Terdaftar Kemenkes RI PERALATAN PADA LANTAI 1 VYNIL M2 35.83 High Performance Flexible Homogeneous Multi Purpose Flooring by GERFLOR FRANCE EVERCARE Surface Treatment, Anti Iodine Iosine, Class T Densely Compacted Surface For Improved Wear Maintenance Anti-Bacterial And Fungicidal Antistatic 2 SCRUB UP STATION UNIT 1.00
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
75,280,000.00
tidak dikerjakan
72,800,000.00
tidak dikerjakan
36,850,000.00
tidak dikerjakan
19,750,000.00
tidak dikerjakan
52,750,000.00
tidak dikerjakan
4,288,000.00
tidak dikerjakan
6,420,000.00
tidak dikerjakan
51,750,000.00
tidak dikerjakan
215,580,000.00
tidak dikerjakan
218,800,000.00
tidak dikerjakan
825,000.00
tidak dikerjakan
142,900,000.00
tidak dikerjakan
Pek. Non Standar Gedung C - page 34 of 139
NO.
URAIAN
SATUAN
VOLUME
JUMLAH HARGA
(Rp.)
(Rp.)
47,934,000.00
tidak dikerjakan
78,928,000.00
tidak dikerjakan
15,600,000.00
tidak dikerjakan
-
3
4
5
-
Scrub Station Untuk 2 Person, Ukuran 1500mm x 600mm x 970 mm (L x W x H) Washstand Terbuat Dari Stainless Steel SS 304, 1mm Plate, Tahan Terhadap Semua Bahan Pembersih Dan Disinfektan Yang Biasa Digunakan Di Rumah Sakit Terdapat 2 Pcs Sensor Otomatis Untuk Air Dan Sabun Dispenser Terdapat Sensor Pada Lutut Antibacterial UV Filter Dan Osmosis Water Pump PEREDAM TEKANAN SET 1.00 Berfungsi Untuk Menjaga Kestabilan Tekanan Positif Di Dalam Ruang OK 8 Pascal Dengan Membuang Kelebihan Tekanan Terbuat Dari Stainless Steel 304 Dimensi : 300 mm x 500 mm LAMINAR AIR FLOW Unit 1.00 Berfungsi Untuk Menjaga Konsistensi Aliran Udara Dan Kecepatannya Bingkai terbuat dari Aluminium Profil, bagian luar dari lembaran baja dicat warna, bagian dalam dari lembaran baja dilapisi PVC Film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang Berlapis Ganda Dan Berpori Sama Yang Berfungsi Untuk Menciptakan Aliran Udara Yang Laminar Grill Luminar Air Flow Di Plafond sesuai dengan ukuran ruang OK SET 1.00 RETURN AIR GRILL Box Bagian Bawah Terbuat Dari Plat Baja Yang Digulung setebal 1.0mm, Dengan Penutup Vertikal Yang Terbuat Dari Campuran Aluminium Memiliki Ukuran 600mm x 350mm x 295mm dengan Filter Efisiensi Sedang -
HARGA SATUAN
RUANG OT-7 (UKURAN 6150 x 5625 x 3000) GLASS + STAINLESS STEEL A. PERALATAN PADA DINDING 1 PANEL DINDING BAGIAN ATAS RUANG OK m² Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 2 PANEL DINDING BAGIAN BAWAH RUANG OK m² Panel Dinding Bagian Bawah Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Tinggi panel dinding SS ini dari lantai adalah 1100 mm, dan mengitari semua dinding Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) 3 PINTU GESER OTOMATIS KEDAP UDARA set Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik Pintu bisa dikunci secara elektronis dan mekanis 4 set PINTU AYUN MANUAL KEDAP UDARA Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi Buka tutup pintu secara manual Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. 5 unit PANEL KONTROL Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan Time Day Clock (digital) Time Elapse Day Clock (digital) Sistem mengatur cahaya lampu Alarm Panel Gas Medis Hand Free Telephone Set Temperature Indicator with controller and Humidity Indicator 6 unit LEMARI ALAT/INSTRUMENT Berfungsi untuk menyimpan instrument/alat dll Terbuat dari lembaran stainless steel setebal 0,8mm Frame/bingkai terbuat dari alumunium profil . Dimensi 900 mm x 1700 mm x 300 mm 7 unit LEMARI OBAT Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll Terbuat dari lembaran stainless steel setebal 0,8 mm Frame/bingkai terbuat dari alumunium profil . Memiliki laci Dimensi 900 mm x 1700 mm x 300 mm 8 unit WRITING TABLE Berfungsi sebagai wadah menulis dan menyimpan laptop Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile Memiliki lampu penerangan otomatis (jika writing table dibuka). Dimensi 700 mm x 400 mm x 250 mm 9 buah PEREDAM TEKANAN Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan Terbuat dari stainless steel 304 Dimensi 355 mm x 145 mm. 10 set BOX TERMINAL GAS OUTLET Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. Bingkai terbuat dari aluminium profil. Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum Sudah termasuk Outlet O2, N2O, CA dan VAC 11 buah X-RAY VIEWER LED Digunakan untuk membaca Film X-Ray X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film Terdiri dari 2 bagian dengan dimmer, Bingkai terbuat dari alumunium profil Daya Listrik 13 W. Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. Dimensi 900 mm x 640 mm x 50 mm 12 set BOX STOP KONTAK Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film Bingkai terbuat dari alumunium profil. Box untuk 4 Stopkontak dan 2 Grounding Terminal Dimensi 600 mm x 220 mm x 100 mm 13 set RETURN AIR GRILL Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang -
76.80
36.34
-
6,138,000.00
Tidak Dikerjakan
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
1.00
-
Tidak Dikerjakan
4.00
-
Tidak Dikerjakan
4.00
-
Tidak Dikerjakan
Pek. Non Standar Gedung C - page 35 of 139
NO.
URAIAN 14 B. 1
2
3
4
C.
SATUAN
Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium Pintu Disposal Box type DBX
PERALATAN PADA PLAFOND PANEL PLAFON Panel Plafon Ruang OK terbuat dari lembaran stainless steel SS 304 setebal 1.0 mm yang dilapisi/dicat dengan bahan antibacteri dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) LAMINAR AIR FLOW (6 HEPA Filter) Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. Memiliki ukuran 2600 x 1800 x 520 mm. Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W Bingkai Terbuat dari Alumunium. 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Double Arm Type Arm Length : 900 mm Extention Arm Length : 700 mm Load Max : 150 kg Brake System : Air Brake Rotating Angels : 340° Material : High strength alluminium alloy Shelf Load Max : ≤ 75 kg Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs PERALATAN PADA LANTAI SCRUB UP STATION Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit Terdapat 2 pcs sensor taps dan 1 pc soap dispenser -
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
60,637,500.00
Tidak Dikerjakan
unit
1.00
m²
41.05
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
buah
10.00
-
Tidak Dikerjakan
set
1.00
-
Tidak Dikerjakan
unit
1.00
-
Tidak Dikerjakan
JUMLAH 2.4.PEKERJAAN MODULAR OPERATING THEATRE
1,968,331,900.00
Pek. Non Standar Gedung C - page 36 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) TAHUN ANGGARAN 2021
NO.
I.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
Rp
4,164,285,938.81
II. PEKERJAAN NON STANDAR
Rp
4,171,768,741.63
TOTAL PEKERJAAN GEDUNG E Rp
8,336,054,680.45
Rekapitulasi Gedung E
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND + RANGKA 3.4. PEKERJAAN SANITAIR 3.5. PEKERJAAN PENGECATAN 3.6. PEKERJAAN RAILLING DAN HAND RAILLING JUMLAH III.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp Rp Rp Rp
2,585,273,133.73 550,023,058.66 285,726,429.17 418,120,367.48 250,573,995.84 74,568,953.94 4,164,285,938.81
JUMLAH PEKERJAAN STANDAR Rp
4,164,285,938.81
Rekapitulasi Gedung E
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
III.
PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING A. LANTAI SATU 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan batu granite fin. meja wastafel undercounter 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm B.
C.
D.
E.
3.2.
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
2,930.98 5,880.71 261.65 5,880.71 979.31 433.52 72.30 1,830.07 6.17 61.65 331.82 84.95 217.92 746.38
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
261,540,820.17 226,198,158.38 16,250,866.23 162,122,590.41 10,669,982.20 39,292,109.99 16,382,286.59 135,123,977.92 14,059,630.07 79,049,164.63 69,366,502.37 108,923,237.82 8,873,748.21 104,650,721.90
LANTAI DUA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan batu granite fin. meja wastafel undercounter 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
2,012.56 4,038.86 191.76 4,038.86 1,041.28 488.20 57.70 1,257.83 0.55 5.48 240.55 77.86 132.32 814.34
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
179,587,056.43 155,352,394.91 11,910,074.55 111,345,436.53 11,345,205.82 44,248,343.08 13,074,107.00 92,872,400.04 1,248,584.36 7,020,067.42 50,285,114.39 99,825,999.77 5,388,287.97 114,179,977.23
LANTAI TIGA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan batu granite fin. meja wastafel undercounter 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
433.01 822.71 124.21 822.71 197.20 157.92 57.70 44.20 1.28 12.83 186.28 48.45 93.98 807.76
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
38,638,518.64 31,645,178.00 7,714,337.18 22,680,990.28 2,148,582.40 14,313,088.23 13,074,107.00 3,263,525.34
LANTAI EMPAT 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Balok praktis uk. 10x15 cm 7 Balok praktis uk. 25x15 cm 8 Kolom praktis uk. 11x11 cm 9 Meja beton tebal 10 cm - Besi d8-150 10 Pemasangan batu granite fin. meja wastafel undercounter 11 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 12 Pemasangan granite stone uk. 15 x 60 cm border toilet 13 Pemasangan plint homogeneous uk. 10 x 30 cm cutting size 14 Pemasangan hospital plint, t = 10 cm
m² m² m² m² m' m' m' m' m³ m² m² m² m' m'
577.79 1,097.79 198.40 1,097.79 197.20 157.92 115.40 44.20 0.48 4.80 281.26 82.90 386.11 141.85
89,233.14 38,464.46 62,108.47 27,568.56 10,895.45 90,635.06 226,587.64 73,835.41 2,280,519.39 1,282,204.09 209,046.38 1,282,204.09 40,720.99 140,211.99
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 89,233.14 442.65 m² 38,464.46 885.30 m² 27,568.56 885.30 m' 10,895.45 5.50 m' 90,635.06 115.89 m' 73,835.41 146.84 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
39,499,225.76 34,052,739.25 24,406,557.23 59,924.97 10,503,696.78 10,841,992.34 2,585,273,133.73
LANTAI DAK ATAP 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm
PEKERJAAN PASANGAN LANTAI A. LANTAI SATU 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga 4 Pemasangan step noising keramik uk. 5 x 20 cm 5 Pemasangan Floor Hardener 6 Pemasangan batu granite alam 7 Pemasangan screed beton peninggian level 8 Pemasangan rabat beton K-175 tebal 5 cm 9 Pemasangan jalan asphalt B.
m² m² m² m' m² m² m² m³ m²
926.85 49.50 26.14 67.10 37.72 27.77 252.13 5.82 11.61
224,387.27 233,343.03 190,803.17 44,849.72 43,083.36 1,282,204.09 17,816.26 750,426.42 97,131.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
51,557,691.95 42,226,058.26 12,322,058.63 30,264,605.14 2,148,582.40 14,313,088.23 26,148,214.00 3,263,525.34
207,972,487.41 11,549,616.58 4,986,640.76 3,009,416.36 1,624,949.37 35,606,807.70 4,492,081.89 4,364,855.26 1,127,222.48
LANTAI DUA Pek. Standar Gedung E - page 39 of 139
NO.
URAIAN
D.
E.
3.3.
C.
D.
E.
3.4.
JUMLAH HARGA
m² m² m² m² m' m² m² m² m² m'
997.35 53.58 55.08 34.43 46.40 37.53 7.38 102.79 72.14 3.40
LANTAI TIGA 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan timber flooring ebony 4 Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga 5 Pemasangan step noising keramik uk. 5 x 20 cm 6 Pemasangan Floor Hardener 7 Pemasangan Andesite stone 8 Pemasangan screed beton peninggian level 9 Pemasangan waterproofing coating 10 Grill Stainless lebar 15 cm
m² m² m² m² m' m² m² m² m² m'
1,005.25 44.10 55.08 27.36 46.40 37.53 7.38 107.49 57.46 3.40
224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35 180,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish 3 Pemasangan timber flooring ebony 4 Memasang lantai karpet sheet + underlayer pelapis bawah karpet 5 Pemasangan step noising keramik uk. 5 x 20 cm 6 Pemasangan Floor Hardener 7 Pemasangan Andesite stone 8 Pemasangan screed beton peninggian level 9 Pemasangan waterproofing coating 10 Grill Stainless lebar 15 cm
m² m² m² m² m' m² m² m² m² m'
746.99 62.73 55.08 375.49 46.40 37.53 7.38 328.93 83.28 3.40
224,387.27 233,343.03 382,484.62 251,444.55 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35 180,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 43,083.36 8.70 m² 144,299.95 1,415.46 m² 67,312.94 1,372.63 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI DAK ATAP 1 Pemasangan Floor Hardener 2 Pemasangan waterproofing membran sheet 3 Pemasangan screed beton + kawat ayam
(Rp.) 223,792,642.53 12,502,519.51 21,067,252.89 6,568,494.42 2,081,027.11 1,616,940.17 1,740,727.22 1,831,333.59 3,476,043.40 612,000.00
550,023,058.66
m² m² m² m' m²
1,087.96 69.35 109.06 1,326.59 79.90
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
101,741,614.71 17,972,155.65 9,795,580.76 12,969,245.87 2,202,751.10
LANTAI DUA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed
m² m² m² m' m²
1,107.55 72.95 58.18 1,223.59 49.99
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
103,574,039.64 18,905,101.00 5,225,555.20 11,962,278.89 1,378,106.36
LANTAI TIGA 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed
m² m² m² m' m²
1,193.62 72.95 47.35 1,184.62 44.76
93,516.36 259,151.49 89,817.04 9,776.38 27,568.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond acoustic tile uk. 60 x 120 cm 4 Pemasangan plafond GRC tebal 6 mm 5 Pemasangan List profil gypsum 6 Plafond exposed
m² m² m² m² m' m²
1,023.06 55.48 336.28 66.13 846.21 33.91
93,516.36 259,151.49 265,549.92 89,817.04 9,776.38 27,568.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI DAK ATAP 1 Plafond exposed
PEKERJAAN SANITAIR A. LANTAI SATU 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand dryer 10 Pemasangan urinoir 11 Pemasangan cubical urinoir 12 Pemasangan kitchen zink satu lubang + kran & kelengkapan akseories 13 Pemasangan sloof zink satu lubang + kran & kelengkapan akseories 14 Pemasangan service zink + kran & kelengkapan aksseories 15 Hand railling penyandang cacat (Stainless steel) 16 Cubical toilet type T 2 daun - lengkap dengan aksesoris B.
HARGA SATUAN
Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Unpolish Pemasangan timber flooring ebony Pemasangan lantai homogeneous tiles 30 x 60 cm + step noissing tangga Pemasangan step noising keramik uk. 5 x 20 cm Pemasangan Floor Hardener Pemasangan Andesite stone Pemasangan screed beton peninggian level Pemasangan waterproofing coating Grill Stainless lebar 15 cm
PEKERJAAN PASANGAN PLAFOND + RANGKA A. LANTAI SATU 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond gypsum tile uk. 60 x 60 cm 3 Pemasangan plafond GRC tebal 6 mm 4 Pemasangan List profil gypsum 5 Plafond exposed B.
VOLUME
(Rp.) 224,387.27 233,343.03 382,484.62 190,803.17 44,849.72 43,083.36 235,870.90 17,816.26 48,183.35 180,000.00
1 2 3 4 5 6 7 8 9 10 C.
SATUAN
LANTAI DUA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin
m² 27,568.56 29.82 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND + RANGKA
Tidak Dikerjakan 285,726,429.17
set set set bh m² set bh bh bh unit unit bh bh bh set unit
11.00 6.00 19.00 25.00 25.19 11.00 11.00 11.00 4.00 3.00 2.00 1.00 1.00 17.00 1.00 2.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 905,154.61 1,373,430.69 1,042,380.81 2,376,569.58 5,524,174.53 8,073,387.54 444,070.19 7,981,406.95
27,932,304.43 12,421,685.94 26,811,463.23 11,647,669.27 8,725,387.56 3,961,927.01 4,091,702.49 2,808,691.90 3,620,618.45 4,120,292.06 2,084,761.63 2,376,569.58 5,524,174.53 137,247,588.13 444,070.19 15,962,813.90
set set set bh m²
9.00 4.00 28.00 32.00 30.33
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76
22,853,703.62 8,281,123.96 39,511,630.02 14,909,016.67 10,509,267.67
Pek. Standar Gedung E - page 40 of 139
NO.
URAIAN
D.
3.5.
C.
D.
H.
3.6.
HARGA SATUAN
JUMLAH HARGA
set bh bh bh bh unit unit bh set unit
9.00 9.00 13.00 2.00 6.00 3.00 2.00 2.00 1.00 2.00
LANTAI TIGA 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand dryer 10 Pemasangan kran dinding Ø 1/2" 11 Pemasangan urinoir 12 Pemasangan cubical urinoir 13 Pemasangan service zink + kran & kelengkapan aksseories 14 Hand railling penyandang cacat (Stainless steel) 15 Cubical toilet type T 2 daun - lengkap dengan aksesoris
set set set bh m² set bh bh bh bh unit unit bh set unit
6.00 4.00 23.00 27.00 25.82 6.00 6.00 10.00 2.00 6.00 3.00 2.00 3.00 1.00 2.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 905,154.61 299,364.46 1,373,430.69 1,042,380.81 8,073,387.54 444,070.19 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel undercounter lengkap + kran & kelengkapan akseories 3 Wastafel gantung + kran & kelengkapan akseories 4 Cove ligth wastafel 5 Kaca cermin 6 Jet washer 7 Tisue holder 8 Floor drain 9 Hand Shower dengan kran air panas & dingin 10 Hand dryer 11 Pemasangan kran dinding Ø 1/2" 12 Pemasangan urinoir 13 Pemasangan cubical urinoir 14 Pemasangan service zink + kran & kelengkapan aksseories 15 Hand railling penyandang cacat (Stainless steel) 16 Cubical toilet type T 2 daun - lengkap dengan aksesoris
set set set bh m² set bh bh set bh bh unit unit bh set unit
8.00 7.00 1.00 8.00 8.90 8.00 8.00 12.00 3.00 5.00 6.00 3.00 2.00 1.00 1.00 2.00
2,539,300.40 2,070,280.99 1,411,129.64 465,906.77 346,451.76 360,175.18 371,972.95 255,335.63 969,668.30 905,154.61 299,364.46 1,373,430.69 1,042,380.81 8,073,387.54 444,070.19 7,981,406.95
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 3.4.PEKERJAAN SANITAIR
418,120,367.48
Jet washer Tisue holder Floor drain Hand dryer Pemasangan kran dinding Ø 1/2" Pemasangan urinoir Pemasangan cubical urinoir Pemasangan service zink + kran & kelengkapan aksseories Hand railling penyandang cacat (Stainless steel) Cubical toilet type T 2 daun - lengkap dengan aksesoris
PEKERJAAN PENGECATAN A. LANTAI SATU 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan dinding cat weathershield - Exterior 5 Pengecatan plafond emulsion paint 6 Pengecatan plafond enamel (epoxy) paint 7 Pengecatan plafond dustproof paint 8 Plint int semi - Gloss, Tinggi = 10 cm 9 Pengecatan list plafond emultion paint 10 Pengecatan list plafond enamel paint (epoxy) B.
VOLUME
(Rp.) 360,175.18 371,972.95 255,335.63 905,154.61 299,364.46 1,373,430.69 1,042,380.81 8,073,387.54 444,070.19 7,981,406.95
6 7 8 9 10 11 12 13 14 15
C.
SATUAN
(Rp.) 3,241,576.64 3,347,756.58 3,319,363.16 1,810,309.23 1,796,186.78 4,120,292.06 2,084,761.63 16,146,775.07 444,070.19 15,962,813.90
m² m² m² m² m² m² m² m' m' m'
1,744.96 1,218.70 102.38 71.09 815.51 381.50 79.90 141.94 896.78 429.81
25,621.94 33,132.99 28,328.94 31,959.16 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
44,709,294.08 40,379,268.09 2,900,175.26 2,272,027.53 22,734,008.53 13,500,651.58 2,465,768.02 705,760.52 2,920,433.61 1,788,399.29
LANTAI DUA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond enamel (epoxy) paint 6 Pengecatan plafond dustproof paint 7 Plint int semi - Gloss, Tinggi = 10 cm 8 Pengecatan list plafond emultion paint 9 Pengecatan list plafond enamel paint (epoxy)
m² m² m² m² m² m² m' m' m'
2,486.71 103.47 56.56 1,074.69 78.68 49.99 22.87 1,149.39 48.05
25,621.94 33,132.99 28,328.94 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
63,714,278.71 3,428,104.52 1,602,284.86 29,959,070.71 2,784,326.83 1,542,657.54 113,720.54 3,743,077.66 199,931.56
LANTAI TIGA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond enamel (epoxy) paint 6 Pengecatan plafond dustproof paint 7 Plint int semi - Gloss, Tinggi = 10 cm 8 Pengecatan list plafond emultion paint 9 Pengecatan list plafond enamel paint (epoxy)
m² m² m² m² m² m² m' m' m'
2,474.17 164.56 67.89 1,161.52 79.45 44.76 22.87 1,096.24 88.38
25,621.94 33,132.99 28,328.94 27,876.94 35,387.99 30,860.35 4,972.37 3,256.58 4,160.91
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding enamel (epoxy) paint 3 Pengecatan dinding dustproof paint 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond dustproof paint 6 Plint int semi - Gloss, Tinggi = 10 cm 7 Pengecatan list plafond emultion paint
m² m² m² m² m² m' m'
1,022.53 215.15 56.56 1,089.19 33.91 22.87 796.16
25,621.94 33,132.99 28,328.94 27,876.94 30,860.35 4,972.37 3,256.58
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² 31,959.16 285.08 m² 28,328.94 71.70 m² 30,860.35 29.82 JUMLAH 3.5.PEKERJAAN PENGECATAN
Tidak Dikerjakan Tidak Dikerjakan
LANTAI DAK ATAP 1 Pengecatan dinding cat weathershield - Exterior 2 Pengecatan dinding dustproof paint 3 Pengecatan plafond dustproof paint
9,110,756.40
250,573,995.84
PEKERJAAN RAILLING DAN HAND RAILLING Pek. Standar Gedung E - page 41 of 139
NO.
URAIAN A.
B.
C.
D.
LANTAI SATU 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished 5 Hand Railing di Ramp - ø 2" stainless steel LANTAI DUA 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished LANTAI TIGA 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Hand Railing di tangga utama (menempel di dinding) - ø 2" syntethic enamel paint finished 3 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 4 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished LANTAI EMPAT 1 Railing tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished 2 Railling di tangga darurat - Hand Railing BSP ø 2" w/ synthetic enamel paint finished - BSP ø 2" w/ synthetic enamel paint finished - BSP ø 1" w/ synthetic enamel paint finished 3 Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
14.02
1,348,352.99
18,903,908.85
m'
9.59
283,154.13
2,715,448.08
m'
14.03
584,286.29
8,197,536.70
m'
SATUAN
m'
VOLUME
13.28
283,154.13
3,760,286.81
m'
17.06
314,615.70
5,367,343.78
m'
15.99
1,348,352.99
21,560,164.23
m'
10.19
283,154.13
2,885,340.55
m'
13.23
584,286.29
7,730,107.66
m'
12.18
283,154.13
3,448,817.27
m'
15.99
1,348,352.99
Tidak Dikerjakan
m'
10.19
283,154.13
Tidak Dikerjakan
m'
14.13
584,286.29
Tidak Dikerjakan
m'
12.18
283,154.13
Tidak Dikerjakan
m'
10.45
1,348,352.99
Tidak Dikerjakan
m'
17.33
584,286.29
Tidak Dikerjakan
m'
14.28
283,154.13
Tidak Dikerjakan
JUMLAH 3.6.PEKERJAAN RAILLING DAN HAND RAILLING
74,568,953.94
Pek. Standar Gedung E - page 42 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR
II. PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA 2.3. PEKERJAAN INTERIOR MELEKAT JUMLAH II.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp
2,614,962,675.93 1,524,503,135.02 32,302,930.68 4,171,768,741.63
JUMLAH PEKERJAAN NON STANDAR Rp
4,171,768,741.63
Rekapitulasi Non Standar Gedung E
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG POLIKLINIK, DIAGNOSTIK & KANTOR (GEDUNG D2) TAHUN ANGGARAN 2021
NO.
URAIAN
1.
SATUAN
2.
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
3.
4.
m' m' m² m' m² m' m'
166.30 119.30 12.59 226.31 252.13 1.25 16.21
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 223,942.39 806,202.72
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m² m' m' m' m' m²
449.30 114.90 12.59 68.50 102.79 29.25 5.00 19.29 48.34 3.39
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 34,330.31 223,942.39 112,362.75 806,202.72 4,597,883.68
Tidak Dikerjakan Tidak Dikerjakan
m² m²
6.08 1.43
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m² m' m' m' m' m²
475.61 112.40 12.59 89.53 107.49 30.95 5.00 19.29 44.36 3.39
364,356.28 364,356.28 1,282,204.09 89,798.62 300,337.11 34,330.31 223,942.39 112,362.75 806,202.72 4,597,883.68
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² m²
6.08 1.43
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m' m' m² m' m' m' m' m² m² m²
51.90 89.95 12.59 228.75 5.00 19.29 2.50 242.07 215.15 3.39
364,356.28 364,356.28 1,282,204.09 34,330.31 223,942.39 112,362.75 806,202.72 192,348.72 251,110.45 4,597,883.68
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m² m²
6.08 1.43
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m²
3.39
4,597,883.68
Tidak Dikerjakan
m² m²
6.08 1.43
9,101,382.65 8,732,832.83
Tidak Dikerjakan Tidak Dikerjakan
m² m² m² m²
723.60 409.00 864.59 2,400.00
844,495.05 27,568.56 31,959.16 678,647.63
611,074,632.40 11,275,595.99 27,631,620.38 1,628,756,622.12
m² 509,413.34 30.24 m² 678,647.63 222.34 JUMLAH 2.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
15,404,659.31 150,892,048.05 2,614,962,675.93
PEKERJAAN NON STANDAR II.
PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI A. LANTAI SATU 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 7 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester B. LANTAI DUA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 8 Pekerjaan Window sill penutup lantai dengan curtain wall 9 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 10 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 11 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant C.
D.
E.
F.
LANTAI TIGA 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint Vinyl, t = 10 cm 5 Pemasangan Lantai Vinyl Homogeneous 6 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 7 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 8 Pekerjaan Window sill penutup lantai dengan curtain wall 9 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 10 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 11 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant LANTAI EMPAT 1 Wall guard (Bumper guard) Alumunium Extrude profil (Cover Vinyl, Endcap Section) 2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 3 Pemasangan dinding batu granit (area lift) 4 Pemasangan Plint kayu tebal 2 cm lebar 10 cm 5 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 6 Pekerjaan Window sill penutup lantai dengan curtain wall 7 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester 8 Pekerjaan vinyl wall covering 9 Pekerjaan pemasangan Soundproof Insulation + partisi gypsum single layer 10 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 11 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant LANTAI DAK ATAP 1 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation 2 Pasangan fire stop pada shaft a. Shaft Elektrikal & Elektronik ( Vertikal ) - Mortar ketebalan 10cm + Sealant + Cable Coating 1m b. Shaft Plumbing, Hydrant dan Air Hujan - Mortar ketebalan 10cm + Sealant PEKERJAAN FASADE 1 Pekerjaan wall clading ACP corugated 2 Pekerjaan acian semen instan 3 Pekerjaan cat weathershield 4 Alumunium Composite Panel PVDF 0.5 mm alloy 5005 5 Pekerjaan kanopi kaca a. Kaca tempered tebal 12 mm b. Alumunium Composite Panel PVDF 0.5 mm alloy 5005
2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA A. LANTAI SATU PINTU 1 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 2 A-HM-Uk. 600 x 1250(+850 AFF)-HM 3 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM
unit unit unit
4.00 1.00 1.00
4,314,980.33 2,669,873.85 4,973,310.20
16,142,949.55 20,322,326.81 75,725,136.00 279,927.98
Tidak Dikerjakan
16,142,949.55 6,151,205.81 30,871,651.20 1,004,161.43 1,119,711.93 2,167,477.42
Tidak Dikerjakan Tidak Dikerjakan
17,259,921.31 2,669,873.85 4,973,310.20 Pek. Non Standar Gedung E- page 44 of 139
NO.
URAIAN 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT B-ED-Uk. 900 x 2150-AL B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL B-ED-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 750 x 2150-AL C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL C-HM-Uk. 900 x 2150-HM D-GL-1(12 MM THICK FRAMELESS DOOR)-Uk. 900 x 2150 D-GL-1(12 MM THICK FRAMELESS DOOR)-Uk. 2 x 900 x 2150 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL Partition Glass type PG 1 Partition Glass type PG 2 Partition Glass type PG 3 Partition Glass type PG 4 Partition Glass type PG 5
JENDELA 1 Bouvenlight type BV 1 2 Bouvenlight type BV 2 3 Bouvenlight type BV 3 4 Bouvenlight type BV 4 5 Curtainwall type CW 1 6 Door Window type DW 7 Door Window type DW 8 Door Window type DW 9 Door Window type DW 10 Door Window type DW 11 Jendela tipe W 1 12 Jendela tipe W 2 13 Jendela tipe W 6 14 Jendela tipe W 1EB 15 Jendela tipe W 2EB 16 Jendela tipe W 4EB 17 Jendela tipe W 6EB 18 Jendela tipe W L1
1 2 4 1' 2E
B. LANTAI DUA PINTU 1 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 2 A-HM-Uk. 600 x 1250(+850 AFF)-HM 3 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 5 B-ED-Uk. 900 x 2150-AL 6 B-ED-Uk. 1200 x 2150-AL 7 B-ED-Uk. 2 x 900 x 2150-AL 8 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 9 B-ED-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 10 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 750 x 2150-AL 12 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 13 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL 14 C-HM-Uk. 900 x 2150-HM 15 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL 16 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 17 M-ED-Uk. 900 x 2150-AL 18 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight type BV 2 2 Bouvenlight type BV 3 3 Bouvenlight type BV 6 4 Curtainwall type CW 2 5 Curtainwall type CW 1A 6 Door Window type DW 1 7 Door Window type DW 2 8 Door Window type DW 4 9 Door Window type DW 1' 10 Door Window type DW 2' 11 Jendela tipe W 1 12 Jendela tipe W 2 13 Jendela tipe W 3 14 Jendela tipe W 3C 15 Jendela tipe W 1EA 16 Jendela tipe W 2EB 17 Jendela tipe W 4EA 18 Jendela tipe W 6EA C. LANTAI TIGA PINTU 1 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 2 A-HM-Uk. 600 x 1250(+850 AFF)-HM 3 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 5 B-ED-Uk. 1200 x 2150-AL 6 B-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 7 B-ED-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 8 B-ED-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 9 C-ED/PL-Uk. 750 x 2150-AL 10 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 11 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL 12 C-HM-Uk. 900 x 2150-HM 13 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 14 M-ED-Uk. 900 x 2150-AL 15 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Bouvenlight type BV 3 2 Bouvenlight type BV 6 3 Door Window type DW 4 Door Window type DW 5 Door Window type DW 6 Door Window type DW 7 Jendela tipe W 1 8 Jendela tipe W 3C
1 2 4 2'
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
3.00 1.00 19.00 2.00 3.00 1.00 6.00 5.00 5.00 1.00 1.00 4.00 3.00 1.00 2.00 1.00 3.00 19.00 1.00 1.00 1.00 1.00 1.00
(Rp.) 13,265,681.06 5,035,352.29 5,311,446.89 7,291,452.45 9,603,927.93 4,001,625.45 3,314,013.80 3,573,454.22 4,001,625.45 5,818,967.63 6,631,784.37 4,709,720.21 8,526,232.30 5,060,602.56 9,034,587.75 5,137,427.57 9,361,515.67 5,258,722.10 14,798,613.87 14,437,193.01 17,935,876.10 15,713,931.87 17,820,918.11
(Rp.) 39,797,043.18 5,035,352.29 100,917,490.93 14,582,904.90 28,811,783.79 4,001,625.45 19,884,082.80 17,867,271.12 20,008,127.26 5,818,967.63 6,631,784.37 18,838,880.85 25,578,696.91 5,060,602.56 18,069,175.49 5,137,427.57 28,084,547.01 99,915,719.96 14,798,613.87 14,437,193.01 17,935,876.10 15,713,931.87 17,820,918.11
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 6.00 1.00 1.00 1.00 2.00 8.00 2.00
426,476.52 790,486.36 1,016,374.82 1,610,112.58 20,489,453.28 1,054,944.35 1,378,453.81 3,271,973.33 949,764.78 4,506,728.93 961,735.05 1,744,993.86 4,852,250.58 2,260,410.48 5,245,559.59 6,755,547.15 9,437,023.31 726,255.34
852,953.05 2,371,459.09 1,016,374.82 1,610,112.58 20,489,453.28 1,054,944.35 1,378,453.81 3,271,973.33 1,899,529.55 4,506,728.93 961,735.05 10,469,963.19 4,852,250.58 2,260,410.48 5,245,559.59 13,511,094.29 75,496,186.45 1,452,510.68
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 2.00 1.00 3.00 1.00 6.00 10.00 2.00 4.00 4.00 1.00 1.00 2.00 7.00 7.00 9.00
4,314,980.33 2,669,873.85 4,973,310.20 13,265,681.06 5,035,352.29 7,076,388.46 9,277,000.01 5,311,446.89 7,291,452.45 9,603,927.93 3,314,013.80 3,573,454.22 5,818,967.63 6,631,784.37 5,060,602.56 9,034,587.75 5,060,602.56 5,258,722.10
4,314,980.33 2,669,873.85 4,973,310.20 26,531,362.12 5,035,352.29 21,229,165.39 9,277,000.01 31,868,681.35 72,914,524.48 19,207,855.86 13,256,055.20 14,293,816.90 5,818,967.63 6,631,784.37 10,121,205.12 63,242,114.22 35,424,217.91 47,328,498.93
unit unit unit m² unit unit unit unit unit unit unit unit unit unit unit unit unit unit
6.00 1.00 3.00 1.00 3.00 2.00 3.00 1.00 1.00 4.00 9.00 10.00 1.00 1.00 1.00 1.00 2.00 6.00
790,486.36 1,016,374.82 1,755,454.65 1,145,978.01 15,509,584.32 1,054,944.35 1,378,453.81 3,271,973.33 949,764.78 1,632,064.81 961,735.05 1,744,993.86 2,528,252.68 1,928,899.28 1,911,584.73 5,245,559.59 7,670,853.70 10,309,301.39
4,742,918.19 1,016,374.82 5,266,363.96 1,145,978.01 46,528,752.95 2,109,888.71 4,135,361.44 3,271,973.33 949,764.78 6,528,259.24 8,655,615.48 17,449,938.65 2,528,252.68 1,928,899.28 1,911,584.73 5,245,559.59 15,341,707.40 61,855,808.36
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
3.00 1.00 1.00 2.00 10.00 2.00 9.00 2.00 1.00 3.00 1.00 1.00 5.00 11.00 9.00
4,314,980.33 2,669,873.85 4,973,310.20 13,265,681.06 7,076,388.46 5,311,446.89 7,291,452.45 9,603,927.93 3,314,013.80 3,573,454.22 5,818,967.63 6,631,784.37 9,034,587.75 5,060,602.56 5,258,722.10
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit
3.00 2.00 2.00 13.00 1.00 4.00 2.00 1.00
1,016,374.82 1,755,454.65 1,054,944.35 1,378,453.81 3,271,973.33 1,632,064.81 961,735.05 1,928,899.28
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,049,124.47 3,510,909.30
Pek. Non Standar Gedung E- page 45 of 139
NO.
URAIAN
E.
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit
1.00 1.00 2.00 6.00
(Rp.) 1,911,584.73 5,245,559.59 7,670,853.70 10,309,301.39
LANTAI EMPAT PINTU 1 A-ED-Uk. 900 x 2150-AL 2 A-ED-Uk. 2 x 900 x 2150-AL 3 A-HM-Uk. 600 x 1250(+850 AFF)-HM 4 A-HM-Uk. 2 x 600 x 1250(+850 AFF)-HM 5 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT 6 C-ED/PL-Uk. 750 x 2150-AL 7 C-ED/PL-Uk. 750 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 8 C-ED/PL-Uk. 1200 x 2150-AL-W/. BOUVENLIGHT +28550 AFFL 9 C-HM-Uk. 900 x 2150-HM 10 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL 11 E-AL/GL-1(8 MM THICK)-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL 12 M-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
unit unit unit unit unit unit unit unit unit unit unit unit
2.00 3.00 1.00 1.00 2.00 3.00 4.00 1.00 1.00 6.00 5.00 1.00
4,038,885.72 7,206,091.82 2,669,873.85 4,973,310.20 13,265,681.06 3,314,013.80 3,573,454.22 5,818,967.63 6,631,784.37 9,034,587.75 5,137,427.57 5,258,722.10
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JENDELA 1 Bouvenlight type BV 1 2 Bouvenlight type BV 3 3 Bouvenlight type BV 6 4 Jendela tipe W 1 5 Jendela tipe W 2 6 Jendela tipe W 3 7 Jendela tipe W 5 8 Jendela tipe W 1EA 9 Jendela tipe W 2EB 10 Jendela tipe W 4EA 11 Jendela tipe W 6EA
unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 3.00 1.00 2.00 2.00 3.00 1.00 1.00 2.00 6.00
426,476.52 1,016,374.82 1,755,454.65 961,735.05 1,744,993.86 2,528,252.68 4,073,198.95 1,911,584.73 5,245,559.59 7,670,853.70 10,309,301.39
852,953.05 1,016,374.82 5,266,363.96 961,735.05 3,489,987.73 5,056,505.35 12,219,596.86 1,911,584.73 5,245,559.59 15,341,707.40 61,855,808.36
LANTAI DAK ATAP PINTU 1 A-HM-Uk. 1000 x 2150-HM-TAHAN API 180 MENIT
unit
1.00
13,265,681.06
13,265,681.06
JUMLAH 2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA
1,524,503,135.02
9 10 11 12 D.
SATUAN
Jendela Jendela Jendela Jendela
tipe tipe tipe tipe
W W W W
1EA 2EB 4EA 6EA
2.3. PEKERJAAN INTERIOR MELEKAT A. LANTAI SATU 1 Meja ADM/ Pendaftaran (panjang = 6,65 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun 2 Meja Apotik (panjang = 5,975 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun B. LANTAI DUA 1 Meja ADM/ Pendaftaran (panjang = 4,07 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun C. LANTAI TIGA 1 Meja ADM/ Pendaftaran (panjang = 4,15 m) - Rangka kamper, multiplex 18 mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Lengkap dengan laci 3 susun
(Rp.) 1,911,584.73 5,245,559.59 15,341,707.40 61,855,808.36
unit
1.00
12,866,995.45
12,866,995.45
unit
1.00
11,560,947.04
11,560,947.04
unit
1.00
7,874,988.19
7,874,988.19
unit
1.00
8,029,779.12
Tidak Dikerjakan
JUMLAH 2.3.PEKERJAAN INTERIOR MELEKAT
32,302,930.68
Pek. Non Standar Gedung E- page 46 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG HALL UTAMA (GEDUNG F1) TAHUN ANGGARAN 2021
NO.
I.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
Rp
4,566,960,877.27
II. PEKERJAAN NON STANDAR
Rp
4,213,697,339.60
TOTAL PEKERJAAN GEDUNG E Rp
8,780,658,216.87
Rekapitulasi Gedung E
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG HALL UTAMA (GEDUNG F1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDAR
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND + RANGKA 3.4. PEKERJAAN PENGECATAN 3.5. PEKERJAAN RAILLING DAN HAND RAILLING 3.6. PEKERJAAN ATAP JUMLAH III.PEKERJAAN ARSITEKTUR
Rp Rp Rp Rp Rp Rp Rp
606,861,847.95 908,334,808.07 309,644,889.81 106,877,376.60 312,864,136.59 2,322,377,818.24 4,566,960,877.27
JUMLAH PEKERJAAN STANDAR Rp
4,566,960,877.27
Rekapitulasi Gedung E
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG HALL UTAMA (GEDUNG F1) TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR III.
PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING A. LANTAI SATU 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm 7 Pemasangan hospital plint, t = 10 cm B.
C.
D.
E.
3.2.
833.04 1,666.08 1,666.08 195.80 117.90 254.68 198.97
89,233.14 38,464.46 27,568.56 10,895.45 90,635.06 73,835.41 140,211.99
74,334,899.27 64,084,976.17 45,931,507.21 2,133,304.80 10,685,673.85 18,804,403.49 27,897,432.26
LANTAI DUA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm 7 Pemasangan hospital plint, t = 10 cm
m² m² m² m' m' m' m'
296.74 593.48 593.48 158.17 266.53 77.46 185.29
89,233.14 38,464.46 27,568.56 10,895.45 90,635.06 73,835.41 140,211.99
26,478,968.80 22,827,825.17 16,361,345.19 1,723,350.48 24,156,825.84 5,719,291.25 25,980,131.48
LANTAI TIGA 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm 7 Pemasangan hospital plint, t = 10 cm
m² m² m² m' m' m' m'
195.87 391.75 391.75 15.20 116.56 50.20 185.29
89,233.14 38,464.46 27,568.56 10,895.45 90,635.06 73,835.41 140,211.99
17,478,421.14 15,068,348.97 10,799,910.07 165,610.81 10,564,603.54 3,706,537.83 25,980,131.48
LANTAI EMPAT 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm 7 Pemasangan hospital plint, t = 10 cm
m² m² m² m' m' m' m'
241.11 482.22 482.22 15.20 116.56 65.08 57.81
89,233.14 38,464.46 27,568.56 10,895.45 90,635.06 73,835.41 140,211.99
21,515,000.52 18,548,330.72 13,294,110.99 165,610.81 10,564,603.54 4,805,208.81 8,105,640.96
m² 89,233.14 162.69 m² 38,464.46 325.38 m² 27,568.56 325.38 m' 10,895.45 227.75 m' 90,635.06 416.92 m' 73,835.41 36.66 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
14,517,558.28 12,515,754.86 8,970,393.98 2,481,471.03 37,787,858.08 2,706,806.31 606,861,847.95
LANTAI DAK ATAP 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Balok praktis uk. 10x15 cm 6 Kolom praktis uk. 11x11 cm
PEKERJAAN PASANGAN LANTAI A. LANTAI SATU 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan screed beton peninggian level 3 Pemasangan rabat beton K-175 tebal 5 cm 4 Pemasangan jalan asphalt B.
C.
D.
E.
3.3.
m² m² m² m' m' m' m'
m² m² m³ m²
1,396.93 78.28 1.06 163.79
224,387.27 17,816.26 750,426.42 97,131.81
313,453,136.86 1,394,713.30 796,119.88 15,909,218.76
LANTAI DUA 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan screed beton peninggian level
m² m²
1,163.96 96.72
224,387.27 17,816.26
261,178,375.33 1,723,245.18
LANTAI TIGA 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan screed beton peninggian level
m² m²
958.14 96.72
224,387.27 17,816.26
Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished
m²
881.65
224,387.27
Tidak Dikerjakan
m² 144,299.95 1,507.98 m² 67,312.94 1,430.31 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
217,601,717.85 96,278,280.91 908,334,808.07
LANTAI DAK ATAP 1 Pemasangan waterproofing membran sheet 2 Pemasangan screed beton + kawat ayam
PEKERJAAN PASANGAN PLAFOND + RANGKA A. LANTAI SATU 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond GRC tebal 6 mm 3 Pemasangan List profil gypsum 4 Plafond exposed B.
C.
D.
m² m² m' m²
793.18 101.77 503.89 195.81
93,516.36 89,817.04 9,776.38 27,568.56
74,175,256.17 9,140,769.65 4,926,222.26 5,398,314.51
LANTAI DUA 1 Pemasangan plafond GRC tebal 6 mm 2 Pemasangan List profil gypsum 3 Plafond exposed
m² m' m²
86.72 57.81 200.01
89,817.04 9,776.38 27,568.56
7,788,888.52 565,171.46 5,514,103.74
LANTAI TIGA 1 Pemasangan plafond GRC tebal 6 mm 2 Pemasangan List profil gypsum 3 Plafond exposed
m² m' m²
86.72 57.81 200.01
89,817.04 9,776.38 27,568.56
7,788,888.52 565,171.46 5,514,103.74
LANTAI EMPAT 1 Pemasangan plafond GRC tebal 6 mm 2 Pemasangan List profil gypsum
m² m'
86.72 57.81
89,817.04 9,776.38
7,788,888.52 565,171.46
Pek. Standar Gedung E - page 49 of 139
NO.
URAIAN 3 4
3.4.
C.
D.
C.
D.
3.6.
HARGA SATUAN
JUMLAH HARGA (Rp.) 168,691,977.11 11,221,962.67 309,644,889.81
m² m² m'
940.73 1,090.76 503.89
25,621.94 27,876.94 3,256.58
24,103,323.78 30,407,182.99 1,640,957.83
LANTAI DUA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan plafond emulsion paint 3 Pengecatan list plafond emultion paint
m² m² m'
534.46 286.73 57.81
25,621.94 27,876.94 3,256.58
13,693,793.54 7,993,258.79 188,262.42
LANTAI TIGA 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan plafond emulsion paint 3 Pengecatan list plafond emultion paint
m² m² m'
537.35 286.73 57.81
25,621.94 27,876.94 3,256.58
13,767,853.64 7,993,258.79 188,262.42
m² 25,621.94 167.65 m² 27,876.94 86.72 m' 3,256.58 57.81 JUMLAH 3.4.PEKERJAAN PENGECATAN
4,295,485.51 2,417,474.46 188,262.42 106,877,376.60
LANTAI EMPAT 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan plafond emulsion paint 3 Pengecatan list plafond emultion paint
PEKERJAAN RAILLING DAN HAND RAILLING A. LANTAI SATU 1 Hand Railing di Ramp - ø 2" stainless steel 2 Railing Stainless Steel (di Cafetaria) - bahan stainless steel sesuai gambar B.
VOLUME
(Rp.) m² 162,516.36 1,038.00 m² 93,516.36 120.00 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND + RANGKA
PEKERJAAN PENGECATAN A. LANTAI SATU 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan plafond emulsion paint 3 Pengecatan list plafond emultion paint B.
3.5.
Pemasangan plafond gypsum tebal 9 mm + Grasswoll Pemasangan drop ceilling gypsum tebal 9 mm
SATUAN
LANTAI DUA 1 Hand Railing di Ramp - ø 2" stainless steel 2 Hand Railing di void - ø 2" stainless steel 3 Railling Kaca Tempered t = 12 mm - bahan stainless steel kaca tempered 12mm sesuai gambar LANTAI TIGA 1 Hand Railing di Ramp - ø 2" stainless steel 2 Hand Railing di void - ø 2" stainless steel
m'
-
314,615.70
-
m'
55.93
674,176.49
m'
-
314,615.70
m'
83.32
314,615.70
26,215,132.69
m'
91.05
2,067,474.58
188,250,382.94
37,708,781.18
-
m'
-
314,615.70
m'
92.80
314,615.70
m'
-
314,615.70
m'
100.10
314,615.70
31,493,377.30
JUMLAH 3.5.PEKERJAAN RAILLING DAN HAND RAILLING
312,864,136.59
LANTAI EMPAT 1 Hand Railing di Ramp - ø 2" stainless steel 2 Hand Railing di void - ø 2" stainless steel
PEKERJAAN ATAP 1 Pekerjaan atap Alumunium Solid Panel tebal 3mm, Alloy AA 1100-H14 terpasang dengan rangka
m²
2,544.75
29,196,462.49
-
912,616.87
2,322,377,818.24
JUMLAH 3.6.PEKERJAAN ATAP
2,322,377,818.24
Pek. Standar Gedung E - page 50 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG HALL UTAMA (GEDUNG F1) TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR
II. PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI Rp 2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA Rp JUMLAH II.PEKERJAAN ARSITEKTUR Rp
1,472,739,502.29 2,740,957,837.32 4,213,697,339.60
JUMLAH PEKERJAAN NON STANDAR Rp
4,213,697,339.60
Rekapitulasi Non Standar Gedung E
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) GEDUNG HALL UTAMA (GEDUNG F1) TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
2.
1.
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
3.
4.
m' m² m² m'
103.28 78.28 249.64 -
364,356.28 300,337.11 538,272.72 831,484.34
Tidak Dikerjakan Tidak Dikerjakan
m' m² m' m' m' m²
127.48 96.72 17.58 66.45 10.96
364,356.28 300,337.11 112,362.75 223,942.39 831,484.34 4,597,883.68
Tidak Dikerjakan Tidak Dikerjakan
m' m² m' m' m' m²
127.48 96.72 19.52 76.11 10.96
364,356.28 300,337.11 223,942.39 112,362.75 831,484.34 4,597,883.68
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m²
19.52 75.70 10.96
223,942.39 112,362.75 831,484.34 4,597,883.68
4,371,713.67 8,505,972.44
Tidak Dikerjakan Tidak Dikerjakan
m' m' m²
45.50 45.30 21.64
223,942.39 831,484.34 4,597,883.68
10,189,378.53 37,666,240.64 99,498,202.83
m² m² m² m²
515.35 820.68 197.82 1,295.77
27,568.56 31,959.16 33,132.99 678,647.63
14,207,323.04 26,228,149.22 6,554,487.86 879,368,445.02
m² 27,568.56 250.66 m² 31,959.16 302.68 m² 678,647.63 302.68 JUMLAH 2.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
6,910,243.53 9,673,270.94 205,410,380.94 1,472,739,502.29
PEKERJAAN NON STANDAR II.
PEKERJAAN ARSITEKTUR 2.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI A. LANTAI SATU 1 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 2 Pemasangan Lantai Vinyl Homogeneous 3 Pekerjaan dinding partisi kaca 4 Pemasangan Ekspansion Joint (Sambungan Delatasi) B. LANTAI DUA 1 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 2 Pemasangan Lantai Vinyl Homogeneous 3 Pekerjaan Window sill penutup lantai dengan curtain wall 4 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 5 Pemasangan Ekspansion Joint (Sambungan Delatasi) 6 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation C.
D.
E.
F.
LANTAI TIGA 1 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) 2 Pemasangan Lantai Vinyl Homogeneous 3 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 4 Pekerjaan Window sill penutup lantai dengan curtain wall 5 Pemasangan Ekspansion Joint (Sambungan Delatasi) 6 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation LANTAI EMPAT 1 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 2 Pekerjaan Window sill penutup lantai dengan curtain wall 3 Pemasangan Ekspansion Joint (Sambungan Delatasi) 4 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation LANTAI ATAP 1 Pemasangan aluminium composit panel flashing (penutup antara CW dengan bata) 2 Pemasangan Ekspansion Joint (Sambungan Delatasi) 3 Pasangan fire stop pada celah dinding (Facade) * Intumescent Cable Coating DFT 1.6mm * Rockwool Density 120kg/m3 (Double Layer) * GRC Board 4mm Thickness * Besi Behel 8mm * Installation PEKERJAAN FASADE 1 Pekerjaan acian semen instan 2 Pekerjaan cat weathershield 3 Cat Enamel untuk Pipa besi diameter 15" 4 Alumunium Composite Panel PVDF 0.5 mm alloy 5005 FASADE RAMP 1 Pekerjaan acian semen instan 2 Pekerjaan cat weathershield 3 Alumunium Composite Panel PVDF 0.5 mm alloy 5005
2.2. PEKERJAAN PASANGAN PINTU DAN JENDELA A. LANTAI SATU PINTU 1 Pintu Kaca Lobby type D 1F 2 Pintu Kaca Lobby type D 2F 3 Pintu Kaca Lobby type DAF 4 A-ED-Uk. 2 x 900 x 2150-AL 5 D-GL-1(12 MM THICK FRAMELESS DOOR)-Uk. 2 x 900 x 2150 JENDELA 1 Curtainwall type CW 4 2 Curtainwall type CW 5 B. LANTAI DUA PINTU 1 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL JENDELA 1 Curtainwall type CW 6 2 Jendela Louvre type LV-3 - RAMP C.
134,375,407.45
Tidak Dikerjakan
1,975,191.05 14,881,553.76
Tidak Dikerjakan Tidak Dikerjakan
4,371,713.67 8,551,827.68
Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit
3.00 2.00 2.00 1.00 4.00
56,638,229.52 8,624,963.11 12,878,527.34 7,206,091.82 8,526,232.30
169,914,688.55 17,249,926.23 25,757,054.68 7,206,091.82 34,104,929.21
m² m²
485.29 259.83
1,145,978.01 1,145,978.01
556,136,688.60 297,759,392.25
unit
2.00
9,361,515.67
18,723,031.34
m² unit
865.75 2.00
1,145,978.01 1,039,983.62
992,134,027.47 2,079,967.24
LANTAI TIGA Pek. Non Standar Gedung E- page 52 of 139
NO.
URAIAN
D.
E.
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
PINTU 1 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
unit
2.00
9,361,515.67
18,723,031.34
JENDELA 1 Jendela Louvre type LV-3 - RAMP
unit
2.00
1,039,983.62
2,079,967.24
LANTAI EMPAT PINTU 1 E-AL/GL-1(8 MM THICK)-Uk. 2 x 900 x 2150-AL-W/. BOUVENLIGHT +2850 AFFL
unit
2.00
9,361,515.67
18,723,031.34
m² 1,145,978.01 506.44 JUMLAH 2.2.PEKERJAAN PASANGAN PINTU DAN JENDELA
580,366,010.02 2,740,957,837.32
LANTAI DAK ATAP JENDELA 1 Curtainwall type CW 8
Pek. Non Standar Gedung E- page 53 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN SENTRAL GAS MEDIS (GEDUNG G3) TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND 3.4. PEKERJAAN SANITAIR 3.5. PEKERJAAN PENGECATAN 3.6. PEKERJAAN PASANGAN PINTU DAN JENDELA 3.7. PEKERJAAN PENUTUP ATAP JUMLAH III.PEKERJAAN ARSITEKTUR
JUMLAH HARGA
Rp Rp Rp Rp Rp Rp Rp Rp
64,931,749.10 38,095,784.13 16,630,550.98 5,718,257.36 15,584,842.43 23,012,736.58 81,735,708.04 245,709,628.61
JUMLAH PEKERJAAN RUMAH GAS MEDIS Rp
245,709,628.61
Rekapitulasi Gedung F
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN SENTRAL GAS MEDIS (GEDUNG G3) TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
1.
2.
3.
4.
HARGA SATUAN
JUMLAH HARGA
(Rp) 5.
(Rp) 6 = (4. X 5.)
PEKERJAAN STANDAR III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat Plesteran 1 : 2, Trassram 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Kolom praktis 11/11 7 Balok praktis 10/15 8 Pemasangan dinding homogeneos tiles uk. 30 x 60 cm 9 Pemasangan plint homogeneos tile 10 x 30 cm cutting size 10 Pemasangan granite stone uk. 15 x 30 cm border toilet
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PASANGAN LANTAI 1 Pemasangan lantai homogeneous tiles uk. 60 x 60 cm - Polished 2 Pemasangan Floor Hardener 3 Pemasangan lantai keramik 30 x 30 cm 4 Pemasangan rabat beton K-175 tebal 5 cm 5 Saluran U ditch ukuran 30 x 40 cm - Galian tanah - Pasir urug tebal 10 cm - Urugan tanah kembali - Saluran U dict 30 x 40 cm - Grill Besi lebar 30 cm 6 Bak Kontrol ukuran 80 x 80 cm - Galian tanah - Urugan pasir urug, t = 10 cm - Lantai kerja, t = 5 cm - Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP - Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm - Membuat acian semen - Plat penutup beton tebal 10 cm
PEKERJAAN PASANGAN PLAFOND 1 Pemasangan plafond gypsum tebal 9 mm 2 Pemasangan plafond GRC tebal 6 mm 3 Pemasangan List profil gypsum
PEKERJAAN SANITAIR 1 Kloset duduk lengkap dengan aksesoris 2 Wastafel gantung lengkap dengan aksesoris + kran 3 Cove ligth wastafel 4 Kaca cermin 5 Jet washer 6 Tisue holder 7 Soap holder 8 Floor drain
PEKERJAAN PENGECATAN 1 Pengecatan dinding emultion paint - Interior 2 Pengecatan dinding cat weathershield - Exterior 3 Plint int semi - Gloss, Tinggi = 10 cm 4 Pengecatan plafond emulsion paint 5 Pengecatan plafond cat weathershield - Exterior 6 Pengecatan list plafond emultion paint
PEKERJAAN PASANGAN PINTU DAN JENDELA PINTU TYPE 1 Pintu tipe D 2 2 Pintu tipe TOI JENDELA TYPE 1 Bouvenlight tipe BV 2 2 Louvre tipe LV 3 3 Window tipe W 2
3.7.
PEKERJAAN PENUTUP ATAP 1 Konstruksi Atap Baja Ringan lengkap reng dan kaso 2 Atap Metal Flat Berpasir tebal 0,35 mm 3 Insulasi bubble 4mm (woven foil) thermal shield 4 Nok atap metal 5 Lisplank GRC Motif terpasang fin. Cat
m² 200.13 89,233.14 m² 400.26 38,464.46 m² 62,108.47 11.13 m² 465.75 27,568.56 m' 10,895.45 98.30 m' 96.00 73,835.41 m' 57.00 90,635.06 m² 209,046.38 14.82 m' 40,720.99 17.72 m² 1,282,204.09 0.78 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
17,858,414.74 15,395,945.84 691,391.43 12,840,186.81 1,071,022.56 7,088,199.84 5,166,198.26 3,098,694.53 721,575.89 1,000,119.19 64,931,749.10
m² m² m² m³
11.26 110.91 2.24 2.51
224,387.27 43,083.36 228,527.12 750,426.42
2,527,049.42 4,778,194.90 512,906.27 1,881,529.15
m³ m³ m³ m' m'
14.20 2.84 4.26 56.80 56.80
56,118.75 162,806.18 18,706.25 313,589.12 134,835.30
796,886.25 462,369.55 79,688.63 17,811,862.27 7,658,644.96
m³ 56,118.75 1.28 m³ 162,806.18 0.13 m³ 557,440.00 0.06 m² 6.40 93,418.18 m² 7.36 49,008.36 m² 7.36 28,236.56 m³ 2,280,519.39 0.13 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
71,832.00 20,839.19 35,676.16 597,876.32 360,701.52 207,821.06 291,906.48 38,095,784.13
m² 93,516.36 113.57 m² 89,817.04 58.73 m' 9,776.38 75.20 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND
10,620,858.24 5,274,509.08 735,183.66 16,630,550.98
set set bh m² set bh bh bh
2,539,300.40 1.00 1,411,129.64 1.00 465,906.77 1.00 346,451.76 0.53 360,175.18 1.00 371,972.95 1.00 132,549.60 1.00 255,335.63 1.00 JUMLAH 3.4.PEKERJAAN SANITAIR
2,539,300.40 1,411,129.64 465,906.77 181,887.17 360,175.18 371,972.95 132,549.60 255,335.63 5,718,257.36
m² 25,621.94 147.63 m² 31,959.16 194.50 m' 4,972.37 36.27 m² 27,876.94 115.82 m² 34,214.16 56.48 m' 3,256.58 75.20 JUMLAH 3.5.PEKERJAAN PENGECATAN
3,782,644.15 6,215,905.63 180,347.95 3,228,612.63 1,932,437.43 244,894.63 15,584,842.43
unit unit
1.00 1.00
7,180,650.73 3,314,013.80
7,180,650.73 3,314,013.80
unit 1.00 480,294.54 unit 7.00 1,032,345.64 unit 2.00 2,405,679.00 JUMLAH 3.6.PEKERJAAN PASANGAN PINTU DAN JENDELA
480,294.54 7,226,419.51 4,811,358.00 23,012,736.58
m² 206.18 157,307.85 m² 206.18 148,318.83 m² 206.18 67,417.65 m² 7.08 85,395.69 m² 55.20 76,406.67 JUMLAH 3.7.PEKERJAAN PENUTUP ATAP
32,433,386.08 30,580,049.73 13,900,022.61 604,601.48 4,217,648.14 81,735,708.04
Pek. Standar Gedung F - page 55 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN POWER HOUSE (G2) TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND 3.4. PEKERJAAN PENGECATAN 3.5. PEKERJAAN PASANGAN PINTU DAN JENDELA JUMLAH III.PEKERJAAN ARSITEKTUR
JUMLAH HARGA
Rp Rp Rp Rp Rp Rp
100,500,293.62 90,550,423.19 6,605,454.12 28,943,655.47 51,930,586.34 278,530,412.73
JUMLAH PEKERJAAN POWER HOUSE Rp
278,530,412.73
Rekapitulasi Gedung H
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN POWER HOUSE (G2) TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
1.
2.
3.
4.
HARGA SATUAN
JUMLAH HARGA
(Rp) 5.
(Rp) 6 = (4. X 5.)
PEKERJAAN STANDAR III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat nat tali air profil U alumunium 3 Membuat plesteran semen instan, tebal 1 cm 4 Membuat acian semen instan 5 Opening pintu & jendela 6 Kolom praktis 11/11 7 Balok praktis 10/15 8 Kanopi beton diatas jendela tebal 10 cm
3.2.
PEKERJAAN PASANGAN LANTAI A. LANTAI DASAR 1 Pemasangan Floor Hardener 2 Rabat beton keliling bangunan K-175 tebal 5 cm 3 Saluran U ditch ukuran 30 x 40 cm - Galian tanah - Pasir urug tebal 10 cm - Urugan tanah kembali - Saluran U dict 30 x 40 cm - Grill Besi lebar 30 cm B.
3.3.
3.4.
3.5.
LANTAI DAK 1 Waterproofing Membran Sheet 2 Pasangan screed + kawat ayam
PEKERJAAN PASANGAN PLAFOND 1 Plafond Exposed
m² 306.53 89,233.14 m' 161.37 13,969.60 m² 613.07 38,464.46 m² 728.77 27,568.56 m' 10,895.45 60.64 m' 150.27 73,835.41 m' 135.04 90,635.06 m³ 1.41 2,280,519.39 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
27,352,909.56 2,254,273.94 23,581,259.60 20,091,050.96 660,699.98 11,095,247.81 12,239,358.12 3,225,493.64 100,500,293.62
m² m³
226.54 2.11
43,083.36 750,426.42
9,760,109.48 1,583,422.25
m³ m³ m³ m' m'
16.90 3.38 5.07 67.60 67.60
56,118.75 162,806.18 18,706.25 313,589.12 134,835.30
948,406.88 550,284.89 94,840.69 21,198,624.81 9,114,866.18
m² 233.49 144,299.95 m³ 202.16 67,312.94 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
33,692,132.56 13,607,735.45 90,550,423.19
m² 233.93 28,236.56 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND
6,605,454.12 6,605,454.12
PEKERJAAN PENGECATAN 1 Pengecatan dinding dustproof paint 2 Pengecatan plafond dustproof paint 3 Pekerjaan cat weathershield - Exterior 4 Plint int semi - Gloss, Tinggi = 10 cm
m² m² m² m'
PEKERJAAN PASANGAN PINTU DAN JENDELA PINTU TYPE 1 C-HM-Uk. 2 x 900 x 2150-HM 2 Pintu Pipa Besi tipe PPB
unit unit
4.00 1.00
8,198,121.09 8,566,670.91
32,792,484.36 8,566,670.91
JENDELA ALUMUNIUM TYPE 1 Louvre tipe LV 2 2 Louvre tipe LV 4 3 Louvre tipe LV 6
unit unit unit
1.00 3.00 1.00
942,011.57 2,064,216.75 3,436,769.26
942,011.57 6,192,650.25 3,436,769.26
JUMLAH 3.5.PEKERJAAN PASANGAN PINTU DAN JENDELA
51,930,586.34
28,328.94 433.13 30,860.35 194.02 31,959.16 318.01 4,972.37 105.10 JUMLAH 3.4.PEKERJAAN PENGECATAN
12,270,213.07 5,987,528.71 10,163,317.33 522,596.36 28,943,655.47
Pek. Standar Gedung H - page 57 of 139
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN RUMAH POMPA (G5) TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 3.2. PEKERJAAN PASANGAN LANTAI 3.3. PEKERJAAN PASANGAN PLAFOND 3.4. PEKERJAAN PENGECATAN 3.5. PEKERJAAN PASANGAN PINTU DAN JENDELA JUMLAH III.PEKERJAAN ARSITEKTUR
JUMLAH HARGA
Rp Rp Rp Rp Rp Rp
113,551,025.28 34,189,371.16 1,503,031.95 9,041,114.04 13,238,826.24 171,523,368.67
JUMLAH PEKERJAAN RUMAH POMPA Rp
171,523,368.67
Rekapitulasi Rumah Pompa (Gedung I)
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) BANGUNAN RUMAH POMPA (G5) TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
1.
2.
3.
4.
HARGA SATUAN
JUMLAH HARGA
(Rp) 5.
(Rp) 6 = (4. X 5.)
PEKERJAAN STANDAR III. PEKERJAAN ARSITEKTUR 3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING 1 Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm 2 Membuat plesteran semen instan, tebal 1 cm 3 Membuat acian semen instan 4 Opening pintu & jendela 5 Kolom praktis 11/11 6 Balok praktis 10/15 7 Kanopi beton diatas jendela tebal 10 cm 8 Pasangan batu andesite 9 Pemasangan meja beton tebal 10 cm
3.2.
PEKERJAAN PASANGAN LANTAI A. LANTAI DASAR 1 Pemasangan Floor Hardener 2 Rabat beton keliling bangunan K-175 tebal 5 cm 3 Saluran U ditch ukuran 30 x 40 cm - Galian tanah - Pasir urug tebal 10 cm - Urugan tanah kembali - Saluran U dict 30 x 40 cm - Grill Besi lebar 30 cm B.
3.3.
3.4.
3.5.
LANTAI DAK 1 Waterproofing Membran Sheet 2 Pasangan screed + kawat ayam
PEKERJAAN PASANGAN PLAFOND 1 Plafond Exposed
m² 112.41 89,233.14 m² 224.81 38,464.46 m² 238.43 27,568.56 m' 10,895.45 23.35 m³ 7.70 73,835.41 m³ 41.74 90,635.06 m³ 2.37 2,280,519.39 m² 23.35 235,870.90 m' 31.91 2,280,519.39 JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING
m² m³
54.44 2.16
43,083.36 750,426.42
2,345,458.31 1,620,921.06
m³ m³ m³ m' m'
10.20 2.04 3.06 40.80 40.80
56,118.75 162,806.18 18,706.25 313,589.12 134,835.30
572,411.25 332,124.61 57,241.13 12,794,436.28 5,501,280.18
m² 53.60 144,299.95 m³ 48.00 67,312.94 JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
7,734,477.09 3,231,021.25 34,189,371.16
m² 53.23 28,236.56 JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND
1,503,031.95 1,503,031.95
PEKERJAAN PENGECATAN 1 Pengecatan dinding emultion paint - Interior 2 Pekerjaan cat weathershield - Exterior 3 Pengecatan Plafond Emultion Paint 4 Pekerjaan cat plafond weathershield - Exterior 5 Plint int semi - Gloss, Tinggi = 10 cm
m² m² m² m² m'
PEKERJAAN PASANGAN PINTU DAN JENDELA PINTU TYPE 1 RPP
unit
JENDELA ALUMUNIUM TYPE 1 LV-1 2 LV-2
10,030,250.56 8,647,194.99 6,573,061.70 254,408.72 568,532.70 3,783,107.29 5,414,409.13 5,506,406.08 72,773,654.12 113,551,025.28
25,621.94 98.15 31,959.16 125.05 48.14 27,876.94 30.88 34,214.16 4,972.37 26.40 JUMLAH 3.4.PEKERJAAN PENGECATAN
1.00
2,514,896.09 3,996,332.66 1,341,995.98 1,056,618.67 131,270.64 9,041,114.04
8,566,670.91
8,566,670.91
unit 4.00 505,305.06 unit 2.00 1,325,467.55 JUMLAH 3.5.PEKERJAAN PASANGAN PINTU DAN JENDELA
2,021,220.24 2,650,935.10 13,238,826.24
Pek. Standar Rumah Pompa (Gedung I) - page 59 of 139
REKAPITULASI PEKERJAAN ARSITEKTUR RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) PEKERJAAN SITE DEVELOPMENT & UTILITAS TAHUN ANGGARAN 2020 NO.
URAIAN PEKERJAAN
A. PEKERJAAN SITE DEVELOPMENT I. PEKERJAAN JALAN DAN PARKIR II. PEKERJAAN PLAZA III. PEKERJAAN SALURAN KELILING IV. PEKERJAAN KOLAM AIR MANCUR V. PEKERJAAN PONDASI DUDUKAN GRAND WATER TANK (2 UNIT) VI. PEKERJAAN PONDASI IPAL
JUMLAH HARGA
Rp Rp Rp Rp Rp Rp
1,268,312,723.73 1,109,993,090.63 356,851,377.84 218,619,569.86
JUMLAH PEKERJAAN SITE DEVELOPMENT & UTILITAS Rp
2,953,776,762.06
Rekapitulasi Pekerjaan Site Development Dan Utilitas
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) PEKERJAAN SITE DEVELOPMENT & UTILITAS TAHUN ANGGARAN 2020 NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
1.
2.
3.
4.
HARGA SATUAN
JUMLAH HARGA
(Rp) 5.
(Rp) 6 = (4. X 5.)
A PEKERJAAN SITE DEVELOPMENT I.
PEKERJAAN JALAN DAN PARKIR a. Pemadatan Tanah CBR + test b. Base Course ф5 - 7 mm T = 30 cm LPA c. Sub Base ф20 - 30 mm T = 30 cm LPB d. Lapisan resap pengikat aspal e. Lapisan aspal tebal 5 cm f. Kanstein 60 x 15 x 30 cm g. Pekerjaan paving block
II. PEKERJAAN PLAZA 1 Area Plaza a. Galian tanah b. Base Course ф5 - 7 mm T = 30 cm LPA c. Sub Base ф20 - 30 mm T = 30 cm LPB d. Urugan pasir urug, t = 10 cm e. Pemasangan Floor Hardener f. Pasangan screed + kawat ayam g. Pasangan river pebbles h. Pasangan batu alam 20x20 cm 2
Dinding Penahan Tanah a. Urugan pasir urug, t = 10 cm b. Pasangan batu kosong (aanstamping) c. Pasang pondasi batu belah 1 PC : 4 PP d. Pipa suling dia. 1" e. Sloof beton 20x35 cm - Cor Beton Ready Mix f'c=30 Mpa - Besi 4Ø16 - Besi 2Ø14 - Besi Ø8-150 - Bekisting Batako - Acian beton f. Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm g. Kolom praktis 10/10 h. Balok praktis 10/15 i. Pasangan batu alam
III. PEKERJAAN SALURAN KELILING 1 Saluran U ditch 80 x 120 tanpa coakan - Saluran U dict 80 x 120 cm - Galian tanah 2 Saluran U ditch 80 x 120 dengan coakan - Saluran U dict 80 x 120 cm - Galian tanah - Plat penutup beton tebal 10 cm 3 Saluran U ditch 60 x 80 tanpa coakan - Saluran U dict 60 x 80 cm - Galian tanah 4 Saluran U ditch 60 x 80 dengan coakan - Saluran U dict 60 x 80 cm - Galian tanah - Plat penutup beton tebal 10 cm 5 Saluran U ditch 30 x 40 tanpa coakan - Saluran U dict 30 x 40 cm - Galian tanah 6 Saluran U ditch 20 x 20 tanpa coakan - Saluran U dict 20 x 20 cm - Galian tanah - Grill besi lebar 20 cm 7 Bak Kontrol 50 x 50 cm - Galian tanah - Urugan pasir urug, t = 10 cm - Lantai kerja, t = 10 cm - Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm - Membuat plesteran semen instan, tebal 1 cm - Membuat acian semen instan - Plat penutup beton tebal 10 cm
IV. PEKERJAAN KOLAM AIR MANCUR 1 Galian tanah 2 Urugan pasir urug, t = 10 cm 3 Lantai kerja, t = 5 cm 4 Alas Kolam - Cor Beton Ready Mix f'c=30 Mpa - Besi D12-150 (double layer) - Bekisting Multipleks
m³ 1,154.84 28,050.00 m³ 718.88 556,318.31 m³ 718.88 477,875.90 m² 1,148.30 17,598.08 m² 1,148.30 115,687.21 m' 193.93 109,541.89 m² 2,318.70 137,214.00 JUMLAH I.PEKERJAAN JALAN DAN PARKIR
32,393,374.20 399,928,770.70 343,537,714.96 20,207,802.20 132,843,115.60 21,243,185.65 318,158,760.43 1,268,312,723.73
m³ m³ m³ m³ m² m² m² m²
285.90 704.79 704.79 704.79 704.79 704.79 197.15 2.76
60,225.00 556,318.31 477,875.90 135,960.00 104,016.00 72,191.90 271,458.00 271,458.00
17,218,159.97 392,087,030.10 336,801,681.33 95,823,113.73 73,309,333.61 50,880,057.69 53,518,039.71 749,224.08
m³ m³ m³ m'
30.43 6.09 39.77 152.13
135,960.00 471,329.10 737,368.50 22,400.00
4,136,689.05 2,868,111.10 29,322,560.37 3,407,687.36
1.52 1,533,537.50 141.49 11,630.30 54.69 11,630.30 63.38 11,283.80 15.21 144,997.42 7.61 29,975.00 58.58 104,134.80 1.05 73,031.54 1.20 88,982.30 131.97 271,458.00 JUMLAH II.PEKERJAAN PLAZA
2,332,953.73 1,645,559.64 636,046.42 715,156.93 2,205,829.75 228,003.19 6,100,005.19 76,639.30 106,617.32 35,824,591.05 1,109,993,090.63
m³ kg kg kg m² m² m² m³ m³ m²
m' m³
525.84 377.27
601,425.00 60,225.00
m' m³ m³
27.11 37.01 2.17
601,425.00 60,225.00 2,838,461.07
m' m³
458.02 350.38
449,955.00 60,225.00
m' m³ m³
105.14 80.43 9.93
449,955.00 60,225.00 2,838,461.07
m' m³
545.12 149.91
371,415.00 60,225.00
202,464,556.27 9,028,156.30
m' m³ m'
334.99 45.22 334.99
304,702.75 60,225.00 99,000.00
102,072,892.22 2,723,608.14 33,164,178.30
m³ 60,225.00 7.20 m³ 135,960.00 0.60 m³ 783,592.28 0.30 m² 25.20 104,134.80 m² 26.88 43,679.17 m² 26.88 29,975.00 m³ 2,838,461.07 0.72 JUMLAH III.PEKERJAAN SALURAN KELILING
433,620.00 81,576.00 235,077.68 2,624,196.96 1,174,096.00 805,728.00 2,043,691.97 356,851,377.84
m³ m³ m³
529.88 70.65 35.33
60,225.00 135,960.00 783,592.28
m³ kg m²
141.30 19,234.21 18.84
1,533,537.50 11,630.30 232,581.25 Pek. Site Development Dan Utilitas - page 61 of 139
NO.
URAIAN PEKERJAAN
SATUAN
Dinding Kolam Luar (Besar) - Cor Beton Ready Mix f'c=30 Mpa - Besi D12-150 (double layer) - Bekisting Multipleks 6 Dinding Kolam Dalam (Kecil) - Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm - Membuat plesteran semen instan, tebal 1 cm - Membuat acian semen instan - Balok Praktis uk. 10 x 15 cm - Balok Praktis uk. 15 x 30 cm - Pasangan batu alam 20x20 cm 7 Lantai Kolam Lingkaran Tengah (atas) - Cor Beton Ready Mix f'c=30 Mpa - Besi D12-150 (double layer) - Bekisting Multipleks 8 Kolom praktis 11 x 11 cm 9 Bahan Pelapis Dinding dan Lantai - Batu Alam keliling dinding kolam besar - Batu Alam keliling u/ bagian atas kolam besar - Batu Alam keliling dinding kolam kecil (tengah) - Batu Alam keliling u/ bagian sisi atas kolam kecil (tengah) 10 Saluran Keliling - Galian tanah - Pemasangan dinding bata ringan uk. 200 x 600 x 100 mm - Membuat plesteran semen instan, tebal 1 cm - Membuat acian semen instan 11 Pembuatan Jalan Sekeliling Kolam - Galian tanah - Base Course ф5 - 7 mm T = 30 cm LPA - Sub Base ф20 - 30 mm T = 30 cm LPB - Lapisan aspal tebal 5 cm 12 Grill besi lebar 20 cm
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5
V.
m³ kg m²
17.90 2,564.56 177.28
1,533,537.50 11,630.30 221,581.25
m² m² m² m³ m³ m²
10.72 13.78 13.78 20.40 0.88 6.12
104,134.80 43,679.17 29,975.00 88,982.30 2,690,800.76 271,458.00
m³ kg m² m'
3.63 988.71 32.23 3.20
1,533,537.50 11,630.30 232,581.25 73,031.54
m² m² m² m²
56.52 61.23 20.29 28.28
271,458.00 271,458.00 271,458.00 271,458.00
m³ m² m² m²
8.44 24.12 14.47 14.47
60,225.00 104,134.80 43,679.17 29,975.00
m³ 60,225.00 75.22 m² 25.07 556,318.31 m² 41.79 477,875.90 m² 167.15 115,687.21 m' 99,000.00 41.79 JUMLAH IV.PEKERJAAN KOLAM AIR MANCUR
PEKERJAAN PONDASI DUDUKAN GRAND WATER TANK (2 UNIT) A. PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bowplank
m'
34.00
50,105.00
B. PEKERJAAN TANAH a. Galian Tanah b. Urugan Tanah Kembali c. Pasir Urug Bawah Pondasi dan Lantai t.10 cm d. Lantai Kerja Bawah Pondasi dan Lantai t.5 cm
m³ m³ m³ m³
35.05 3.04 4.18 2.09
60,225.00 20,075.00 135,960.00 783,592.28
C. PEKERJAAN PONDASI TIANG PANCANG 1 Pengadaan & Pemancangan Tiang Pancang uk. Ø400 mm (Drop hammer) 2 Pek. Bobokan Tiang Pancang 3 Besi D16 (Stek Tambahan) 4 Cor Beton f'c= 30 Mpa (Isian Tiang Pancang)
m' titik titik titik
460.00 20.00 328.29 2.01
1,002,210.00 150,000.00 11,630.30 1,533,537.50
Kg Kg m² m³
418.20 184.05 25.60 5.12
11,630.30 11,630.30 144,997.42 1,533,537.50
Kg Kg m² m³
89.21 41.18 4.80 1.28
11,630.30 11,630.30 144,997.42 1,533,537.50
Kg Kg Kg m² m³
2,159.16 237.56 677.99 57.96 14.49
11,630.30 11,630.30 11,630.30 144,997.42 1,533,537.50
Kg m³
2,175.14 18.90
11,630.30 1,533,537.50
D.
PEKERJAAN PILECAP DAN SLOOF 1 Pile Cap Type PC1 (800x800x500) - Besi D 16 - Besi D 13 - Begisting Batako - Cor Beton f'c= 30 Mpa 2 Pile Cap Type PC2 (1,600x800x500) - Besi D 16 - Besi D 13 - Begisting Batako - Cor Beton f'c= 30 Mpa 3 Balok Type TB (350x500) - Besi D 16 - Besi D 13 - Besi D10 Sengkang - Begisting Batako - Cor Beton f'c= 30 Mpa 4 Plat Lantai Type Sa (t=150mm) - Besi D10 Dobel Layer - Cor Beton f'c= 30 Mpa 5 Balok Type BD (300x500) - Besi D 13 - Begisting Multiplex - Cor Beton f'c= 30 Mpa
VI. PEKERJAAN PONDASI IPAL A. PEKERJAAN PERSIAPAN 1 Pengukuran dan pemasangan bowplank B.
C.
PEKERJAAN TANAH a. Galian Tanah b. Urugan Tanah Kembali c. Pasir Urug Bawah Pondasi dan Lantai t.10 cm d. Lantai Kerja Bawah Pondasi dan Lantai t.5 cm PEKERJAAN BALOK, KOLOM DAN PLAT 1 Balok Type B1 (300x400) - Besi D 16 - Besi D10 Sengkang - Begisting Batako - Cor Beton f'c= 30 Mpa 2 Kolom Type K1 (300x300)
Kg 4,873.98 11,630.30 m² 180.80 204,531.25 m³ 27.12 1,533,537.50 JUMLAH V.PEKERJAAN PONDASI DUDUKAN GRAND WATER TANK (2 UNIT)
-
-
m'
37.00
50,105.00
1,853,885.00
m³ m³ m³ m³
300.70 7.84 10.30 5.15
60,225.00 20,075.00 135,960.00 783,592.28
18,109,416.60 157,388.00 1,399,844.16 4,033,933.03
Kg Kg m² m³
608.61 306.20 26.88 4.61
11,630.30 11,630.30 144,997.42 1,533,537.50
7,078,275.24 3,561,165.45 3,897,530.56 7,066,540.80
Pek. Site Development Dan Utilitas - page 62 of 139
NO.
URAIAN PEKERJAAN - Besi D 13 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Cor Beton f'c= 30 Mpa 2 Plat Lantai Type Sa (t=200mm) - Besi D13 Dobel Layer - Cor Beton f'c= 30 Mpa 3 Plat Dinding Type Sb (t=200mm) - Besi D 13 - Begisting Multiplex - Cor Beton f'c= 30 Mpa
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Kg Kg Kg m² m³
369.10 147.82 45.01 31.68 2.38
11,630.30 11,630.30 11,630.30 199,581.25 1,533,537.50
4,292,741.72 1,719,203.10 523,505.09 6,322,734.00 3,643,685.10
Kg m³
2,323.13 22.30
11,630.30 1,533,537.50
27,018,679.26 34,191,752.10
Kg 3,334.24 11,630.30 m² 153.60 204,531.25 m³ 15.36 1,533,537.50 JUMLAH VI.PEKERJAAN PONDASI IPAL
38,778,154.66 31,416,000.00 23,555,136.00 218,619,569.86
Pek. Site Development Dan Utilitas - page 63 of 139
HARGA BAHAN DAN UPAH STRUKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021 NO
HARGA SATUAN
URAIAN
A. DAFTAR UPAH 1 Pekerja 2 Tukang kayu 3 Tukang batu 4 Tukang besi 5 Kepala tukang 6 Mandor
Rp Rp Rp Rp Rp Rp
70,000 80,000 80,000 80,000 85,000 90,000
oh oh oh oh oh oh
B. BAHAN PASANGAN DAN BESI 1 Batako 2 Batu Split 1/2 3 Batu Belah 4 Beton Ready Mix f'c= 30 Mpa 5 Besi beton U-24 6 Besi beton U-40 7 Besi baja konstruksi 8 Semen 9 Pasir beton 10 Pasir pasang 11 Pasir urug 12 Tanah urug
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,517 224,725 170,791 782,045 9,888 10,337 10,787 1,169 134,835 134,835 112,363 58,429
bh m³ m³ m³ kg kg kg kg m³ m³ m³ m³
D. BAHAN KAYU 1 Dolken kayu dia. 8-10/400 cm 2 Kayu papan begisting kelas IV 3 Kayu 5/7 kelas IV 4 Kayu Kelas III 5 Balok Kayu Kelas II. 6 Plywood 4 mm 7 Plywood 9 mm 8 Residu
Rp Rp Rp Rp Rp Rp Rp Rp
20,675 943,847 1,618,024 3,299,869 4,911,151 67,418 115,059 3,236
btg m³ m³ m³ m³ lbr m³ ltr
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
22 14,382 8,989 14,382 13,484 13,484 66,069 175,286 104,632 41,349 54,384 134,835 61,125
ltr kg ltr kg kg kg lbr m² bh m² bh bh m'
Rp
52,436
m'
Rp Rp Rp Rp Rp Rp
407,502 349,573 477,317 305,627 206,550 269,671
m' m' jam jam jam jam
E. LAIN - LAIN 1 Air 2 Paku 3 Minyak bekisiting 4 Kawat beton 5 Paku biasa 6 Besi strip 7 Seng Gelombang 8 Seng plat 9 Jendela nako 10 Kaca polos 11 Kunci tanam 12 Bobokan Tiang Pancang 13 Pemancangan Tiang Pancang uk. Ø600 mm (Spun Pile uk. Ø600 mm) - termasuk biaya handling dan sambungan las 14 Pemancangan Tiang Pancang uk. Ø400 mm (Spun Pile uk. Ø400 mm) - termasuk biaya handling dan sambungan las 15 Pengadaan Tiang Pancang uk. Ø600 mm 16 Pengadaan Tiang Pancang uk. Ø400 mm 17 Motor Grader 100 HP 18 Vibro Roller 5 - 8 ton 19 Water Tank 3000 - 4500 liter 20 Dump truck 3-4 ton
Upah dan Bahan - page 64 of 139
NO 21 22 23 24 25 26 27 28 29 30 31 32
HARGA SATUAN
URAIAN Excavator Sewa pompa ready mix & vibrator Baut A 325 Ø13mm Baut A 325 Ø16mm Baut Ø12mm Baut Angkur A 325 Ø19mm Baut Angkur A 325 Ø16mm Sewa alat las Meni Besi Thiner Kuas Cat Rubber Dilatasi
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
485,407 898,902 17,978 26,967 13,484 85,396 67,418 80,901 67,418 17,978 13,484 2,696,706
jam hari bh bh bh bh bh jam Kg liter Bh m'
Upah dan Bahan - page 65 of 139
HARGA UPAH DAN BAHAN PEKERJAAN ARSITEKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021 NO
HARGA SATUAN
URAIAN
A. DAFTAR UPAH 1 Pekerja 2 Tukang kayu 3 Tukang batu 4 Tukang cat 5 Tukang Plafond 6 Kepala tukang 7 Mandor
Rp Rp Rp Rp Rp Rp Rp
70,000 80,000 80,000 80,000 80,000 85,000 90,000
oh oh oh oh oh oh oh
B. BAHAN PASANGAN DAN BESI 1 Bata merah 2 Bata ringan 100x200x600 3 Batako 4 Batu Split 1/2 5 Batu Belah 6 Besi beton U-24 7 Besi beton U-40 8 Besi baja konstruksi 9 Semen mortar Pemasangan Floor Hardener @ 25 kg 10 Semen mortar perekat bata Setara @ 50 kg 11 Semen mortar plesteran Setara @ 50 kg 12 Semen mortar plesteran trasam Setara @ 50 kg 13 Semen mortar acian Setara @ 40 kg 14 Semen mortar Self leveling floor @ 25 kg 15 Semen mortar tile adhesive @ 40 kg 16 Kanstein uk. 50 x 15 x 30 cm 17 Aggregat Kasar Untuk Pondasi Klas A 18 Aggregat Kasar Untuk Pondasi Klas B 19 Aggregat Kasar Untuk Campuran Asphalt 20 Aggregat Halus Untuk Pondasi Klas A 21 Aggregat Halus Untuk Pondasi Klas B 22 Aspal 23 Kerosene 24 Semen 25 Semen warna 26 Pasir beton 27 Pasir pasang 28 Pasir urug 29 Tanah urug 30 Buis Beton uk. 30 cm 31 U-dict 20 x 20 cm 32 U-dict 30 x 40 cm 33 U-dict 60 x 80 cm 34 U-dict 80 x 120 cm 35 Waterproofing Membrane sheet 36 Waterproofing coating area basah 37 Waterproofing Integral 38 Primer waterproofing 39 Sewa pompa ready mix
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
539 566,308 2,517 224,725 170,791 9,888 10,337 10,787 4,495 70,654 46,563 84,937 62,923 83,553 84,497 35,956 282,525 231,647 251,693 282,525 231,647 9,169 10,787 1,169 13,484 134,835 134,835 112,363 58,429 109,217 267,558 331,695 407,203 552,825 89,890 40,451 31,462 16,180 749,085
bh m³ bh m³ m³ kg kg kg kg sak sak sak sak sak sak bh m³ m³ m³ m³ m³ kg ltr kg kg m³ m³ m³ m³ m' bh bh bh bh m² m² ltr m² hari
C. BAHAN PASANGAN PENUTUP LANTAI DAN DINDING 1 Homogenius tile 60 x 60 cm - Polished 2 Homogenius tile 60 x 60 cm - Unpholish 3 Homogenius tile 30 x 30 cm 4 Homogenius tile 30 x 60 cm + step noising tangga 5 Homogenius tile border uk. 20 x 40 cm 6 Homogenous tile 30 x 60 cm 7 Keramik uk. 30 x 30 cm 8 Lantai vinyl sheet Heterogeneous 9 Lantai vinyl sheet Homogeneous 10 Lantai karpet 11 Underlayer pelapis bawah Karpet sheet 12 Paving block, tebal 8 cm natural 13 Plint homogenius tile 10 x 60 cm cutting size 14 Plint homogenius tile 10 x 30 cm cutting size
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,631 59,867 18,795 21,843 11,506 24,829 8,580 168,095 197,758 157,308 40,451 87,193 12,585 6,265
bh bh bh bh bh bh bh m² m² m² m² m² bh bh
Upah dan Bahan Pek. Arsitektur - page 66 of 139
NO
HARGA SATUAN
URAIAN 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,860 4,944 1,078,682 674,176 116,857 22,473 364,055 498,891 586,534 444,956 33,709 67,148 134,835 831,484
bh bh m² m² m² bh m² m² m² m² bh m' m² m'
Rp Rp Rp Rp
2,719,179 389,225 224,725 786,539
m² m² m² m'
Rp
311,470
m'
Rp
311,470
m'
Rp Rp Rp Rp Rp Rp
1,348,353 1,887,694 247,198 1,348,353 40,451 4,597,884
m² m² m² m² m² m²
Rp Rp
9,101,383 8,732,833
m²
D. BAHAN KAYU 1 Dolken kayu dia. 8-10/400 cm 2 Kayu papan begisting kelas IV 3 Kayu 5/7 kelas IV 4 Kayu Kelas III 5 Kayu Kelas IV 6 Kayu kamper 4/20 7 Balok Kayu Kelas II. 8 Balok Kayu Kelas I 9 Plywood 4 mm 10 Plywood 9 mm 11 Plywood 12 mm 12 Multiplek 9 mm 13 HPL 14 Wallpaper motif batik
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
20,675 943,847 1,618,024 3,299,869 1,618,024 51,832 4,911,151 4,494,510 67,418 115,059 132,139 117,981 336,549 134,835
btg m³ m³ m³ m³ m' m³ m³ lbr lbr lbr lbr lbr m²
E. BAHAN PARTISI DAN PLAFOND 1 Gypsum board 1200 mm x 2400 mm x 9 mm 2 Gypsum board 1200 mm x 2400 mm x 12 mm 3 GRC 1200 mm x 2400 mm x 6 mm 4 GRC 1200 mm x 2400 mm x 9 mm 5 Kalsiboard 1200 mm x 2400 mm x 6 mm 6 Plafond Akustik 60 x 120 cm 7 Plafond gypsum tile uk. 60 x 60 cm 8 Plafond Metal Ceiling 600x600 Perforated terpasang by specialis
Rp Rp Rp Rp Rp Rp Rp Rp
56,631 82,843 46,743 49,440 106,070 85,396 40,451 853,957
lbr lbr lbr lbr lbr lbr lbr m²
30
31
32
33 34 35 36 37 38
39 40
Plint keramik 10 x 30 cm cutting size Step Noising kermaik 5 x 20 cm Batu granite Batu marmer Batu Andesite Glassblock uk. 20 x 20 cm Allumunium Composite Panel PVDF 0.5 mm alloy 5005 Allumunium Composite Panel PVDF 0.5 mm alloy 5005 (Corrugated) Alumunium Solid Panel tebal 3mm Alloy AA 1100-H14 Flexi Wall ukuran 60 x 120 cm ex. Flexistone / setara Hospital plint/skriting Plint Vinyl Sheet Vinyl wall covering (vinyl dinding) Pemasangan Ekspansion Joint (Sambungan Delatasi) Facade NBK Terracotta, thick 28mm - Terrart-MID material panel - AL Support system - accessories (T-L Joint Profile, T Clip) - Installations Hospital curtain & Rail komplit set (Medical Track) - Rail RS Komplit set - Kain menggunakan Type Polyester FN Lebar 2.8 m Warna Cream dan Putih - Kain Polyester menggunakan type jahitan mata ayam - Sudah termasuk bending, joint, biaya pasang dan jahit Bumper guard+Aksesories terpasang - Alumunium Extrude profil - Cover Vinyl Handrail - Endcap Section Raill guard+Aksesories terpasang - Alumunium Extrude profil 140mm - Cover Vinyl Handrail 140mm - Braket Wall - Return Section (End Cap) Stainless steel framing lift Timbal 3 mm Lantai timber flooring Stainless steel Satin Polished Finish tebal 1,2 mm Glass Woll Aplikasi Façade Firestop pada celah dinding - Intumescent Cable Coating DFT 1.6mm - Rockwool Density 120kg/m3 (Double Layer) - GRC Board 4mm Thickness - Besi Behel 8mm - Installation Firestop Shaft Elektrikal Mortar ketebalan 10cm + Sealant + Cable Coating 1m Firestop Shaft Plumbing Mortar ketebalan 10cm + Sealant
Upah dan Bahan Pek. Arsitektur - page 67 of 139
NO
HARGA SATUAN
URAIAN 9
10
11 12 13 14 15 16 17 18 19 20 21 22 F. SANITAIR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
AL Linier Ceilling 180B thick 0.6mm, module 200 mm Non-Perforated - AL Panel 180B Thick 0.6mm, wood grain color - Fe Carrier - Panel splice 180B - Accessories (hollow, screw, bracket stc) - Installations Luxalon XLNT Interior Ceilling 12mm, Green Tone Polyester Color - AL XLNT Panel 12mm. Curve panel - Accessories Z profile - Accessories (hollow 40/40, screw, bracket stc) - Installations List alumunium profil U 2 cm List plafond gypsum t=7 cm List plafond alumunium grouting, profil u stainless steel Metal Furing ;tebal=0,4 mm, panjang= 4m Wall angle ; panjang=3 m Connecting clip Soffit cleat U-Clip Rod hanger ProTop 2 in 1 Paper tape Drywall screw 6x28
Kloset duduk lengkap dengan aksesoris Kloset jongkok lengkap dengan aksesoris Urinoir lengkap dengan aksesoris Wastafel gantung lengkap dengan aksesoris Wastafel undercounter lengkap dengan aksesoris + kran Jet washer Kran dinding Kran air panas dingin Penyekat Urinoir Kaca cermin Soap holder Tisue holder Hand Shower dengan kran air panas & dingin Hand Drayer Towel bar (Stainless steel) Soap desh Cove ligth wastafel MDF board Zink satu lubang + kran & accessories Zink dua lubang + kran & accessories Sloof zink satu lubang Service sink lengkap kran dan assesories Water drain Floor drain Hand railling penyandang cacat (Stainless steel) Hand railling stainless stell dia. 5" di toilet pasien Curtain rood lengkap rel tinggi 2,5 m Bak shower tray fiber Kitchen Zink Stainless Steel satu lubang lengkap dengan aksesoris Hand Dryer Spoelhoek Janitor lengkap dengan aksesoris Scrub up 3 person Cubical toilet type T 2 daun - lengkap dengan aksesoris Cubical toilet type L 1 daun - lengkap dengan aksesoris Cubical toilet type I 1 daun - lengkap dengan aksesoris
G. BAHAN FINISHING 1 Plamur (1 pail = @ 20 kg) 2 Cat emultion paint (1 pail = @ 25 kg) 3 Cat weathershield (1 pail = @ 25 kg) 4 Cat enamel paint (epoxy) 5 Cat Antivirus ( Virus Guard ) 6 Cat dustrproof 7 Cat dasar interior
Rp Rp Rp Rp Rp
97,890 284,772 36,585 80,901 148,319
m' pcs pcs m² m²
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,573,556 92,946 247,198 247,198 9,888 4,045 22,473 37,393 11,797 1,348 1,348 1,348 3,775 58,429 71,838 74
m² m² m² m² m' m' m' btg btg pcs pcs pcs pcs bag roll pcs
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,022,529 242,704 1,168,573 970,814 1,573,078 314,616 255,288 538,442 853,957 323,605 92,767 335,290 894,407 2,247,255 503,385 130,341 373,044 1,465,210 3,146,157 5,024,862 7,393,469 18,877 239,108 417,989 274,165 531,476 853,957 2,269,728 719,122 5,213,632 77,035,901 7,415,941
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh unit bh unit unit m' set bh bh unit unit bh
Rp
5,618,137
bh
Rp
3,820,333
bh
Rp Rp Rp Rp Rp Rp Rp
17,798 48,810 71,553 75,957 42,301 58,968 32,810
kg kg kg kg kg kg kg
Upah dan Bahan Pek. Arsitektur - page 68 of 139
NO
HARGA SATUAN
URAIAN 8 9 10 10
Cat dasar exterior Soda api Residu Lantai Epoxy Coating tebal 1000 micron terpasang - Surface preparation, primer coat, Epoxy Filler, Finish Coat, ongkos pasang
H. BAHAN PINTU DAN JENDELA a. Material 1 Alumunium Kusen Pintu 2 Alumunium Kusen Jendela 3 Alumunium Frame Daun Pintu 4 Alumunium Frame Daun Jendela 5 Alumunium profil U penjepit kaca di dinding 6 Rangka hollow alumunium 40x40 t:1mm 7 Kaca Clear tebal 8 mm 8 Kaca Clear Float tebal 6 mm 9 Kaca Stopsol tebal 6 mm 10 Kaca Stopsol tebal 8 mm 11 Kaca Reflected tebal 8 mm 12 Kaca Tinted tebal 6 mm 13 Kaca Tinted tebal 8 mm 14 Kaca tempered tebal 8 mm 15 Kaca tempered tebal 12 mm 16 Kaca anti radiasi tebal 12 mm 17 Skrup fixer 18 Profil kaca 19 Steel Bracket besi siku lengkap dengan anchor 20 Kick plat T=2 mm 21 Alumunium louvre 22 Alumunium Window sill penutup lantai dengan curtain wall 23 Alumunium Sistem Curtain Wall - Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm - Cover mullion (omega) tebal 1 mm - Ambang Transome tebal 1,2 mm - Alumunium Transom - Bracket - Kaca Reflected 8 mm - Kaca tempered tebal 8 mm - List Karet - Sealent - Paku Skrup - Pisher - Dinabold b.
6 7 8 9
Daun Pintu Engineering door, frame kayu meranti, PVC laminated Sheet Daun Pintu Engineering Door, PVC laminated Sheet ( 750 x 2100 ) mm Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) Daun Pintu Engineering Door, PVC laminated Sheet uk. 750 x 2100 mm. + kaca 8 mm (200 x 700 mm) Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2150 mm + kaca 8 mm (200 x 700 mm) Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm Daun Pintu Engineering Door, PVC laminated Sheet uk. 1000 x 2100 mm Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2100 mm Daun Pintu Engineering Door, PVC laminated Sheet uk. 800 x 1100 mm
1 2 3 4 5 6 7 8 9 10 11
Pintu Otomatis dan Pintu Besi lengkap handle, lockset, engsel SINGLE STEEL DOOR uk. 600x1250 mm SINGLE STEEL DOOR uk. 900x2150 mm SINGLE STEEL DOOR uk. 900x2150 mm - Slidding SINGLE STEEL DOOR uk. 1000x2150 mm SINGLE STEEL DOOR uk. 900x2150 mm (Tahan Api) SINGLE STEEL DOOR uk. 900x2150 mm + kaca (Tahan Api) SINGLE STEEL DOOR uk. 1000x2150 mm (Tahan Api) SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm (Tahan Api) SINGLE STEEL DOOR uk. 900x2150 mm with Lover SINGLE STEEL DOOR uk. 2x900x2150 mm with Lover SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm
1 2 3 4 5
c.
Rp Rp Rp Rp
35,507 22,473 3,236 160,963
kg kg ltr m²
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
67,418 67,418 107,868 85,396 15,731 67,418 148,319 105,082 294,166 412,776 412,776 283,154 346,077 332,863 448,013 5,393 360 8,540 200,779 291,154 404,506 112,363
m' m' m' m' m' m' m² m² m² m² m² m² m² m² m² cm² bh m' bh bh m² m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
84,047 44,496 64,271 85,396 14,832 412,776 332,863 4,944 5,933 297 1,483 2,472
m' m' m' m' pcs m² m² m' m' bh bh bh
Rp Rp
2,018,934 3,195,597
Unit Unit
Rp
2,880,981
Unit
Rp
2,287,706
Unit
Rp
4,454,059
Unit
Rp Rp Rp Rp
1,955,112 2,476,475 3,643,699 1,573,078
Unit Unit Unit Unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,247,255 4,943,961 6,112,534 5,842,863 11,685,726 14,382,432 12,584,628 16,629,687 6,112,534 7,640,667 8,000,228
Unit Unit Unit Unit Unit Unit Unit unit Unit Unit unit
Upah dan Bahan Pek. Arsitektur - page 69 of 139
NO
HARGA SATUAN
URAIAN 12 13 14 15 16
Rp Rp Rp Rp Rp
8,269,898 29,493,199 39,102,237 55,523,153 51,911,590
unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,380 1,246,417 193,264 408,911 43,866 792,202 187,673 212,887 112,623 337,969 300,395 366,842 78,906 225,346 707,885 117,846 31,462
set set set set set set set set set set set set bh set bh bh bh
Rp Rp Rp Rp Rp
3,151,910 297,716 637,501 566,308 51,720,933
bh bh bh bh unit
I. PEKERJAAN ATAP 1 Konstruksi Atap Baja Ringan lengkap reng dan kaso 2 Atap Metal Flat Berpasir tebal 0,35 mm 3 Atap enamel (termasuk rangka, perkuatan, insulasi, dan ongkos pasang) 4 Insulasi bubble 4mm (woven foil) thermal shield 5 Nok atap metal 6 Lisplank GRC Motif terpasang fin. Cat
Rp Rp Rp Rp Rp Rp
157,308 148,319 2,247,255 67,418 85,396 76,407
m² m² m² m² m' m'
J. LAIN - LAIN 1 Air 2 Paku 3 Minyak bekisiting 4 Solar 5 Minyak pelumas 6 Paku biasa 7 Besi strip 8 Seng Gelombang BJLS 40 PJG 2 mtr 9 Seng plat 10 Besi Hollow 40 x 40 11 Jendela nako 12 Kaca polos 13 Kunci tanam 14 Roll Cat 15 Kuas 16 Amplas 17 Kape 18 Kawat beton 19 Kawat ayam 20 Plastik cor 21 Skrup 22 Mur 23 Paku ramset+misiu 24 Gantungan (Rod Hanger) 25 Jointing Coumpond 26 Joint Tape @ 75 m 27 Siku metal furing L.2.5 cm
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
22 14,382 8,989 7,820 35,956 13,484 13,484 66,069 175,286 12,315 104,632 41,349 54,384 34,158 8,989 2,247 9,888 14,382 15,731 17,529 180 270 1,708 2,787 3,865 27,147 3,775
ltr kg ltr ltr ltr kg kg lbr m² m' bh m² bh bh bh lbr bh kg m² m² bh bh bh bh kg roll m'
d. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
SINGLE STEEL DOOR uk. 2 x 1200 x 2550 mm Pintu Radiation Door uk. 900 x 2150 mm Pintu Radiation Door uk. 1200 x 2150 mm Pintu Radiation Door uk. 2 x 900 x 2150 mm Pintu swing single for disposal uk. 800 mm x 800 mm - Finish stainless steel 1 swing, manual swing with elektrobolt, foot switch Hardware: Pull handle Floor Hinge Top patch Bottom Patch Top Pivot Corner Lock (patch fitting + double cylinder) Lever Handle Mortise Lock Cylinder Door closer Door Handle Lockcase Engsel pintu Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS Rel pintu slidding door Friction Stay Jendela Window Handle (Casement) Hardware pintu radiasi - Lockcase - Cylinder - Handle + Backplate - Door Closer Operator Mesin Aoutomatic + Radar termasuk pemasangan - Dilengkapi dengan : Mechanic Door Carrier, Alumunium profil, Electronic board, Motor, sensor radar, optima selector, electrical lock, manual release, Emergency Battery
Upah dan Bahan Pek. Arsitektur - page 70 of 139
NO
HARGA SATUAN
URAIAN 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
48
49
50 51 52 53 54
55
56
57 58 59
60 61 62 63 64 65 66 67 68
Canal C metal furing C.2 x 3 x 2 cm Main T-Section Cross T-Section U-Clip HCL Lem/adhesive Signage Stainless Steel tebal 0,6 mm Signage Lambang Stainless Steel tebal 0,6 mm Rockwool Sekrup Kaca Kaca Cermin 6 mm Rangka Hollow 40x40x1 mm galvanis Joint Tape @ 75 m U Chanel 75 C stud 75 Jointing Coumpond Joint Tape @ 75 m Mur 25 mm Sealent dengan lakban pemasangan cermin Meja Konter 150 x 600 mm GRC board thick framing w/ paint finished 10 mm thick grouting Fabrikasi dan pemasangan Meja Konter menempel dinding Rangka kamper, multiplek 18mm, lapis HPL Edging HPL, top counter fin. Solid surface (motif batu granit) Laci 3 susun Fabrikasi dan pemasangan Meja Konter Rangka kamper, multiplek 18mm, lapis HPL Edging HPL, top counter fin. Solid surface (motif batu granit) List Alumunium tebal 2 cm Laci 3 susun Fabrikasi dan pemasangan Hand Railling tangga ∅80 mm Timber Handrail W/. Clear Stained Finished Hand railing menempel di dinding tangga darurat - BSP ø 2" w/ synthetic enamel paint finished Hand Railling di Selasar - ø 2" stainless steel Railling di Selasar - bahan stainless steel sesuia gambar kerja Railling di tangga darurat - Hand Railing Pipa Besi ø 3" fin. Cat - Hollow Besi 25x50", fin. Cat - Hollow Besi 50x50", fin. Cat Railling di tangga utama - ø 80 mm timber handrail w/ clear stained finish - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished Railing void - kaca tempered 12 mm - ø 80 mm stainless steel railing w/ black matt paint finished - ø 20 mm stainless steel railing w/ black matt paint finished - 2 x (10x80) mm thick stainless steel plate railing w/ black matt paint finished Pipa Stainless Steel dia. 1 1/2" Sealtape Meja Counter Rangka kamper, multiplek 18 mm, 6 mm teakwood w/. Clear stained finish, list profil stainless stell trim, top counter granite stone. Compressor 4000-6500 L\M, 60 HP Kap. 5000 Liter Wheel Loader 1.0 - 1.6 M3 96 HP Kap.1,5 Ton Motor Grader > 100 HP Kap.10.800 HP Vibrator Roller 5-8 T 82 HP Kap.7,1 Ton Water Tanker 3000 - 4500 L Pneumatic Tire Roller 8-10 T Dump truck 3-4 ton Asphalt Mixing Plant 294 HP Kap. 60 T/Jam Asphalt finisher 72,4 HP Kap. 10 Ton
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
7,461 m' 9,888 m' 8,450 m' 1,079 bh 7,191 ltr 50,788 ltr 8,989 cm 31,462 cm 134,835 m² 13,484 bh 80,901 m² 27,866 m' 32,540 roll 5,034 m' 13,843 m' 10,427 kg 32,540 roll 270 bh 44,046 tube 1,618,024 m'
Rp
1,528,133
m'
Rp
1,887,694
m'
Rp
404,506
m'
Rp
283,154
m'
Rp
314,616
m'
Rp
674,176
m'
Rp
584,286
m'
Rp
1,348,353
m'
Rp
2,067,475
m'
Rp Rp Rp
67,418 8,989 1,887,694
m' bh m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp
141,829 494,396 477,317 305,627 206,550 267,864 269,671 5,273,759 314,616
jam jam jam jam jam jam jam jam jam
Upah dan Bahan Pek. Arsitektur - page 71 of 139
NO
HARGA SATUAN
URAIAN 69 70 71 72
Asphalt Sprayer 4 HP Kap. 850 Liter Tandem roller 6-8 T 82 HP Kap.8,1 Ton Excavator 80-140 HP Kap. 0,9 m3 Grill besi lebar 30 cm
Rp Rp Rp Rp
134,835 211,215 485,407 134,835
K. MODULAR OPERATING THEATRE PANEL DINDING Rp 5,517,460 - Panel Dinding Ruang OK terbuat dari plat baja galvanis (galvanized steel) setebal 1.2 mm dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. - Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) - Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm - Setelah panel dinding dan panel plafon terpasang, baru dilakukan pengecatan dengan antibacterial coating, pengecatan dilakukan sedemikian rupa sehingga celah antar panel tidak terlihat sama sekali (seamless panel) - Rangka Penyangga: terbuat dari baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm). - Sudah termasuk slope dan skirt board bila diperlukan. PANEL DINDING BAGIAN ATAS RUANG OK Rp 21,368,698 - Panel Dinding Bagian Atas Ruang OK terbuat dari kaca temper setebal 10 mm , rangka profil aluminium dan Gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm Panel dinding kaca temper ini mengitari semua dinding dengan ketinggian 1600 mm. - Sudut pertemuan antara panel dinding dan panel dinding membentuk sudut konus (sudut 135°) - Sudut pertemuan antara panel dinding dan panel ceiling harus melengkung seperempat lingkaran dengan radius 30 cm - Rangka Penyangga: terbuat dari tiang baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm) PINTU GESER OTOMATIS KEDAP UDARA Rp 187,259,263 - Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi - Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC - Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding - Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm - Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. - Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh - Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik - Pintu bisa dikunci secara elektronis dan mekanis PINTU AYUN OTOMATIS KEDAP UDARA (DOUBLE SWING) Rp 185,735,624 - Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi - Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC - Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding - Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm - Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. - Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh - Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik - Pintu bisa dikunci secara elektronis dan mekanis PINTU GESER OTOMATIS KEDAP UDARA LAIS TIMBAL Rp 220,275,933 - Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi - Pintu dapat dibuka secara otomatis, memiliki motor dan pengontrol DC - Frame pintu dibangun dengan ekstrusi aluminium, terpasang kokoh di dinding - Ukuran pintu Lebar 1500 mm dan Tinggi 2100 mm - Memiliki jendela kaca bulat berdiameter 550 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. - Pengontrol pintu dapat dioperasikan dengan saklar kaki dan sessor non sentuh - Pintu dapat dioperasikan secara manual jika terjadi kegagalan pasokan daya listrik - Pintu bisa dikunci secara elektronis dan mekanis - Memiliki lapisan timbal setebal 2 mm PINTU AYUN MANUAL KEDAP UDARA Rp 35,413,143 - Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi - Buka tutup pintu secara manual - Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm - Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. PINTU AYUN MANUAL KEDAP UDARA LAPIS TIMBAL Rp 70,970,110 - Berfungsi untuk menjaga kestabilan tekanan udara, suhu dan kelembaban ruang operasi - Buka tutup pintu secara manual - Ukuran pintu Lebar 900 mm dan Tinggi 2100 mm - Memiliki jendela kaca bulat berdiameter 350 mm berikut segala assesoriesnya, pintu terbuat dari stainless steel yang dilapisi PVC Film, bingkai luar terbuat dari alumunium profil. - Memiliki lapisan timbal setebal 2 mm
jam jam jam m'
m²
m²
set
set
set
set
set
Upah dan Bahan Pek. Arsitektur - page 72 of 139
NO
HARGA SATUAN
URAIAN
PANEL KONTROL Rp Panel memiliki minimal 6 fitur layanan - Time Day Clock (digital) - Time Elapse Day Clock (digital) - Sistem mengatur cahaya lampu - Alarm Panel Gas Medis - Hand Free Telephone Set - Temperature Indicator with controller and Humidity Indicator - Dimensi 780 mm x 780 mm x 150 mm PANEL KONTROL Rp Touch screen monitor 27" Panel memiliki minimal 6 fitur layanan - Time Day Clock (digital) - Time Elapse Day Clock (digital) - Sistem mengatur cahaya lampu - Alarm Panel Gas Medis - Hand Free Telephone Set - Temperature Indicator with controller and Humidity Indicator LEMARI ALAT/INSTRUMENT Rp - Berfungsi untuk menyimpan instrument/alat dll - Terbuat dari lembaran stainless steel setebal 0,8mm - Frame/bingkai terbuat dari alumunium profil . - Dimensi 900 mm x 1700 mm x 300 mm LEMARI OBAT Rp - Berfungsi untuk menyimpan obat-obatan, bahan habis pakai, dll - Terbuat dari lembaran stainless steel setebal 0,8 mm - Frame/bingkai terbuat dari alumunium profil . - Memiliki laci - Dimensi 900 mm x 1700 mm x 300 mm WRITING TABLE Rp - Berfungsi sebagai wadah menulis dan menyimpan laptop - Terbuat dari lembaran stainless steel , bingkai terbuat aluminium profile - Memiliki lampu penerangan otomatis (jika writing table dibuka). - Dimensi 700 mm x 400 mm x 250 mm PEREDAM TEKANAN Rp - Berfungsi untuk menjaga kestabilan tekanan positif di dalam ruang OK dengan membuang kelebihan tekanan - Terbuat dari stainless steel 304 - Dimensi 355 mm x 145 mm. BOX TERMINAL GAS OUTLET Rp - Bagian bawah terbuat dari lembaran baja (galvanis steel) yang di powder coating. - Bagian depan panel terbuat dari lembaran baja galvanis yang dilapisi PVC Film. - Bingkai terbuat dari aluminium profil. - Box untuk Outlet Oxygen, Nitrous Oxide, Comp. Air dan Vacuum - Sudah termasuk Outlet O2, N2O, CA dan VAC X-RAY VIEWER LED Rp - Digunakan untuk membaca Film X-Ray - X-Ray Viewer memiliki lampu fluoresen berfrekuensi tinggi, - Diffuser mampu menyebarkan cahaya secara merata dan memberikan luminansi yang cukup untuk melihat film - Terdiri dari 2 bagian dengan dimmer, - Bingkai terbuat dari alumunium profil - Daya Listrik 13 W. - Memiliki klip pegas untuk memudahkan pemasangan dan demounting film. - Dimensi 900 mm x 640 mm x 50 mm BOX STOP KONTAK Rp - Panel Depan Terbuat Dari Lembaran Baja Galvanis yang dilapisi PVC Film - Bingkai terbuat dari alumunium profil. - Box untuk 4 Stopkontak dan 2 Grounding Terminal - Dimensi 600 mm x 220 mm x 100 mm RETURN AIR GRILL Rp - Return air grill (600 mm x 350 mm x 295 mm) dengan filter efisiensi level sedang - Box bagian bawah terbuat dari pelat baja yang digulung setebal 1.0 mm, dengan penutup vertikal yang terbuat dari campuran aluminium HATCH/PASS BOX Rp - Pass Box memiliki 2 buah pintu dan 1 buah UV Lamp - Kedua Pintu terhubung dan bekerja secara mekanis, sehingga tidak mungkin keduanya dapat dibuka secara bersamaan. Kalau satu dibuka, maka pintu lainnya tertutup - Apabila kedua pintu tertutup, maka UV Lamp akan bekerja - Terbuat dari stainless steel 304 - Dimensi 600 mm x 600 mm x 600 mm
93,063,323
unit
174,906,551
unit
51,354,271
unit
63,084,942
unit
13,763,987
unit
26,654,242
buah
16,881,379
set
44,474,075
buah
4,379,450
set
14,119,952
set
43,048,416
unit
Upah dan Bahan Pek. Arsitektur - page 73 of 139
NO
HARGA SATUAN
URAIAN
LEAD GLASS, ukuran 800x1200 mm, tebal 15 mm, untuk operator room LAPISAN TIMBAL - Lembaran Timbal yang memiliki ketebalan 2 mm - Berfungsi untuk menahan radiasi sinar x keluar dari ruang operasi
Rp Rp
44,296,092 1,887,694
PERALATAN PADA PLAFOND PANEL PLAFON Rp 5,517,460 - Panel Plafon Ruang OK terbuat dari lembaran baja galvanis (galvanized steel) setebal 1.2 mm dan gypsum plasterboard yang tahan temperatur tinggi dengan ketebalan 12 mm. - Sudut pertemuan antara panel dinding dan panel ceiling (plafon) harus melengkung seperempat lingkaran dengan radius 30 cm - Setelah panel dinding dan panel plafon terpasang, baru dilakukan pengecatan dengan antibacterial coating, pengecatan dilakukan sedemikian rupa sehingga celah antar panel dan celah antar panel tidak terlihat sama sekali (seamless panel) - Rangka Penyangga: terbuat dari baja galvanis dengan semua assesories yang dibutuhkan (tinggi dari lantai ke plafon 3000 mm). LAMINAR AIR FLOW (6 HEPA Filter) Rp 213,839,794 - Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya - Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) - Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen - Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film - Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. - Memiliki ukuran 2600 x 1800 x 520 mm. - Laminar airflow ini dilengkapi 6 HEPA filter yang ditempatkan di samping LAMINAR AIR FLOW (8 HEPA Filter) Rp 233,022,363 - Berfungsi untuk menjaga konsistensi aliran udara dan kecepatannya - Laminar Air Flow terbuat dari stainless steel dan harus merupakan satu kesatuan (monolitik) - Screen terbuat dari serat polyester dua layer dengan ukuran 200-300 mesh screen - Bingkai terbuat dari aluminium profil, bagian luar terbuat dari lembaran baja dicat warna, bagian dalam dari lembaran baja galvanis yang dilapisi PVC film - Memiliki perangkat dengan kompensasi kecepatan medium dan memiliki saringan yang berlapis ganda dan berpori sama yang berfungsi untuk menciptakan aliran udara yang laminar. - Memiliki ukuran 2850 x 2500 x 520 mm. - Laminar airflow ini dilengkapi 8 HEPA filter yang ditempatkan di samping LAMPU PERIPHERAL LED Rp 4,152,927 - Set lampu yang dipasang pada ceiling plafon yang berfungsi untuk menambah cahaya untuk kebutuhan bedah - Dimensi per lampu 1200 mm x 300 mm dengan daya 36 W - Bingkai Terbuat dari Alumunium. - 2 buah dari pada nya adalah untuk emergency SURGICAL PENDANT Rp 173,038,633 - Double Arm Type - Arm Length : 900 mm - Extention Arm Length : 700 mm - Load Max : 150 kg - Brake System : Air Brake - Rotating Angels : 340° - Material : High strength alluminium alloy - Shelf Load Max : ≤ 75 kg - Assesories : - Electrical Sockets (220V/50Hz) : 10 Pcs - Grounding Terminal : 2 Pcs - Medical Shelves : 3 Pcs - Drawer : 1 Pcs - IV Pole : 1 Pcs - Storage Basket : 1 Pcs - Phone Connector : 1 Pcs - Network Connector : 1 Pcs - Medical Gas Wall Outlet - O2 : 1 Pcs - N2O : 1 Pcs - C/A : 1 Pcs - Vac : 1 Pcs - AGSS : 1 Pcs
set m²
m²
set
set
buah
set
Upah dan Bahan Pek. Arsitektur - page 74 of 139
NO
HARGA SATUAN
URAIAN
PERALATAN PADA LANTAI SCRUB UP STATION - Scrub Up Station untuk 2 person, ukuran 1500 mm x 550 mm x 970 mm (LxWxH). - Washstand terbuat dari stainless steel SS 304, tahan terhadap semua bahan pembersih dan disinfektan yang biasa digunakan di rumah sakit - Terdapat 2 pcs sensor taps dan 1 pc soap dispenser
Rp
155,032,727
unit
Upah dan Bahan Pek. Arsitektur - page 75 of 139
HARGA SATUAN TERPASANG STRUKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021
NO.
HARGA SATUAN
URAIAN PEKERJAAN
TERPASANG
PEKERJAAN PERSIAPAN 1 2 3 4
1 m² 1 m' 1 m' 1 m²
Pekerjaan kantor sementara (Direksi keet) Pagar sementara dari seng gelombang tinggi 2 meter Pengukuran dan pemasangan bowplank Pekerjaan Pembersihan Lahan
Rp Rp Rp Rp
765,136.64 285,817.00 43,657.71 11,787.50
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,118.75 68,726.25 81,518.25 162,806.18 557,440.00 12,037.14 12,520.86 18,071.46 145,527.62 132,691.26 153,702.51 179,227.35 171,137.91 117,216.67 1,011,287.52 480,343.26 412,059.17 30,028.71 18,706.25 26,137.50 94,791.94 67,312.94 659,758.00 421,107.21 46,272.48 469,466.12 403,761.72 14,921.42 97,131.81 92,495.48 750,426.42
PEKERJAAN STRUKTUR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 kg 1 kg 1 kg 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m³ 1 m' 1 m' 1 m³ 1 m³ 1 m³ 1 m³ 1 m² 1 m³ 1 m³ 1 m² 1 m³ 1 m³ 1 m² 1 m³ 1 m' 1 m³
Mengali tanah biasa sedalam 1 meter Mengali tanah biasa sedalam 2 meter Mengali tanah biasa sedalam 3 meter Mengurug pasir urug Memasang Lantai Kerja Memasang besi beton U-24 Memasang besi beton U-40 Memasang besi profil Memasang bekisting untuk kolom (2 X Pakai) Memasang bekisting untuk balok (2 X Pakai) Memasang bekisting untuk dinding (2 X Pakai) Memasang bekisting untuk plat lantai (2 X Pakai) Memasang bekisting untuk tangga Memasang Bekisting Batako Beton Ready mix f'c=30 Mpa Pengadaan & Pemancangan Tiang Pancang uk. Ø 600 mm (Drop Hammer) Pengadaan & Pemancangan Tiang Pancang uk. Ø 400 mm (Drop Hammer) Pekerjaan galian tanah menggunakan alat berat Mengurug kembali galian Memadatkan tanah 1 m2 tanah per 20 cm Pekerjaan timbunan tanah + pemadatan dengan alat berat Membuat Screed Beton + kawat ayam Memasang Pondasi Batu Belah 1 PC : 4 PP Memasang Pondasi Batu Kosong (Aanstamping) Pengecatan permukaan baja dengan meni besi Base Course (Lapisan Agregat Kelas A) Sub Base Course (Lapisan Agregat Kelas B) Pek. Lapisan Resap Pengikat Aspal Pek. Lapisan Permukaan Asphal Pasangan Kanstein Beton uk. 60/30/15 cm Membuat Beton mutu K 175 ,slump ( 12 + 2) cm
Harga Satuan - page 76 of 139
HARGA SATUAN TERPASANG PEKERJAAN ARSITEKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
HARGA SATUAN
PEKERJAAN ARSITEKTUR 1 1 ls Pekerjaan Penyelenggaraan SMK3 Konstruksi 2 1 m² Pemasangan Dinding Bata Merah 1 Batu ,Campuran 1 SP : 5 PP 3 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP 4 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP 5 1 m² Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm 6 1 m² Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm 7 1 m² Membuat acian semen 8 1 m² Pemasangan dinding bata ringan 200 x 600 x 100 9 1 m² Membuat plesteran semen instan, tebal 1 cm 10 1 m² Membuat plesteran trasram semen instan, tebal 1 cm 11 1 m² Membuat acian semen instan 12 1 m' Membuat nat tali air profil U alumunium 13 1 m' Pek. Opening Pintu dan Jendela semen instan 14 1 m' Pek. Opening Pintu dan Jendela semen biasa 15 1 m' Pemasangan kolom praktis 11/11 cm 16 1 m' Pemasangan balok praktis 10/15 cm 17 1 m' Pemasangan balok praktis 25/15 cm 18 1 m³ Pemasangan balok ukuran 15/30 cm 19 1 m³ Pemasangan meja beton tebal 10 cm 20 1 m³ Pemasangan beton plat canopy tebal 10 cm 21 1 m³ Pemasangan beton plat canopy tebal 8 cm 22 1 m³ Pemasangan beton lisplank tebal 15 cm 23 1 m³ Pemasangan plat deck beton tebal 10 cm 24 1 m² Pemasangan dinding keramik 30 x 30 cm 25 1 m² Pemasangan dinding homogenous tile 30 x 60 cm 26 1 m² Pemasangan dinding homogenous tile 60 x 60 cm 27 1 m' Pemasangan homogenius tile 10 x 60 cm 28 1 m' Pemasangan homogenius tile 10 x 30 cm 29 1 m' Pemasangan plint keramik 10 x 30 cm 30 1 m' Pemasangan hospital plint 31 1 m' Pemasangan Plint Vinyl Sheet 32 1 m' Pemasangan Plint kayu tebal 2 cm lebar 10 cm 33 1 m' Pemasangan Bumper Guard 34 1 m' Pemasangan Rail Guard 35 1 m² Pemasangan Flexi Wall uk. 60 x 120 cm 36 1 m² Pemasangan Batu Andesite 37 1 m² Pemasangan Batu Granite 38 1 m² Pemasangan Batu Marmer 39 1 m² Pemasangan Glass Block uk. 20 x 20 cm 40 1 m² Pemasangan Stainless steel framing 41 1 m² Alumunium Composite Panel PVDF 0.5 mm Alloy 5005 42 1 m' Aluminium composit panel flashing (penutup antara CW dengan bata) 43 1 m² Alumunium Solid Panel tebal 3mm Alloy AA 1100-H14 44 1 m² Facade NBK Terracotta, thick 28mm 45 1 m² Pemasangan dinding partisi gypsum double board tbl. 12 mm 46 1 m² Pemasangan dinding partisi gypsum single board tbl. 12 mm 47 1 m² Pemasangan dinding partisi GRC tebal 9 mm 48 1 m² Pemasangan soundproof + dinding partisi gypsum single board tbl. 12 mm 49 1 m² Pekerjaan Atap Metal Shingle Flat Berpasir tebal 0,35 mm 50 1 m² Pemasangan Penutup Atap Enamel 51 1 cm Pangadaan dan pemasangan Signate Stainless steel tebal 0,6 mm 52 1 cm Pangadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm 53 1 m² Pemasangan Timbal 3 mm 54 1 m² Pekerjaan Clading dinding fin HPL 55 1 m² Pekerjaan vinyl wall cavering (dinding vinyl) 56 1 cm Pengadaan dan pemasangan Signate Stainless steel tebal 0,6 mm 57 1 cm Pengadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm 58 1 m' Pekerjaan Hospital curtain & Rail komplit set (Medical Track). 59 1 m² Pemasangan Partisi GRC Board 1 Layer 60 1 m² Pekerjaan Clading dinding fin HPL 61 1 m² Pekerjaan Clading dinding fin wallpaper motif batik 62 1 m² Pekerjaan Clading dinding kaca cermin 63 1 m' Meja Fabrikasi Interior Melekat 64 1 unit Meja depo obat menempel dinding 65 1 m' Pemasangan Saluran U-Ditch 20x20 66 1 m' Pemasangan Saluran U-Ditch 30x40 67 1 m' Pemasangan Saluran U-Ditch 60x80 68 1 m' Pemasangan Saluran U-Ditch 80x120
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
173,109,687.50 182,043.36 93,418.18 88,491.59 49,008.36 46,318.31 28,236.56 89,233.14 38,464.46 62,108.47 27,568.56 13,969.60 10,895.45 12,745.41 73,835.41 90,635.06 226,587.64 2,087,431.19 2,280,519.39 2,280,519.39 2,663,042.63 3,837,844.11 3,789,174.68 228,017.60 209,046.38 236,964.03 40,173.75 40,720.99 28,505.79 140,211.99 89,798.62 34,330.31 364,356.28 364,356.28 497,665.64 235,870.90 1,282,204.09 842,708.44 603,169.19 1,581,306.14 678,647.63 223,942.39 912,616.87 3,416,456.79 149,305.15 112,904.27 124,339.74 251,110.45 170,384.99 2,303,436.35 18,450.00 46,125.00 2,092,865.98 631,010.72 192,348.72 11,977.87 45,147.35 806,202.72 127,079.17 765,185.12 793,014.32 773,433.36 1,934,886.53 1,566,336.72 257,710.06 313,589.12 379,375.27 506,248.54
Harga Satuan Terpasang Pek. Arsitektur - page 77 of 139
NO.
URAIAN PEKERJAAN
HARGA SATUAN
PEKERJAAN PELAPIS LANTAI 1 1 m² Pemasangan lantai keramik 30 x 30 cm 2 1 m² Pemasangan lantai homogenius tile 60 x 60 cm - Polished 3 1 m² Pemasangan lantai homogenius tile 60 x 60 cm Unpholish 4 1 m² Pemasangan lantai homogenius tile 30 x 60 cm + step noising tangga 5 1 m² Pemasangan Floor Hardener 6 1 m² Pemasangan screed beton, tebal 30 mm 7 1 m' Pemasangan step noising keramik uk. 5 x 20 cm 8 1 m² Pemasangan lantai vinyl sheet Heterogeneous 9 1 m² Pemasangan lantai vinyl sheet Homogeneous 10 1 m² Pemasangan lantai timber flooring 11 1 m² Pemasangan Karpet Sheet + Underlayer pelapis bawah karpet 12 1 m² Pemasangan paving block tebal 8 cm 13 1 m² Pemasangan waterproofing coating 14 1 m² Pemasangan waterproofing membran sheet PEKERJAAN PLAFOND 1 1 m² Pemasangan plafond gypsum T=9 mm dengan rangka metal furing 2 1 m² Pemasangan plafond GRC board T=6 mm dengan rangka metal furing 3 1 m² Pemasangan plafond Kalsiboard T=6 mm dengan rangka metal furing 4 1 m' Pemasangan curtain box gypsum T=9 mm dengan rangka metal furing 5 1 m' Pemasangan List alumunium profil U 2 cm 6 1 m' Pemasangan List profil gypsum 5 cm 7 1 m² Pemasangan plafond akustik 60 x 120 cm 8 1 m² Pemasangan plafond gypsum tile 60 x 60 cm 9 1 m' Pemasangan drop ceilling gypsum dengan rangka metal furing 10 1 m² Plafond Metal Ceiling 600x600 Perforated terpasang by specialis 11 1 m² Plafond AL Linier 180B think 0.6mm, module 200 mm non-perforated 12 1 m² Luxalon XLNT Interior Ceilling 12mm, Green Tone Polyester Color PEKERJAAN SANITARY 1 1 bh Pemasangan kloset duduk lengkap dengan aksesoris 2 1 bh Pemasangan kloset jongkok lengkap dengan aksesoris 3 1 bh Pemasangan wastafel gantung lengkap dengan aksesoris 4 1 bh Pemasangan Wastafel undercounter lengkap dengan aksesoris + kran 5 1 bh Pemasangan urinoir lengkap dengan aksesoris 6 1 bh Cove ligth wastafel MDF board 7 1 m² Kaca cermin 8 1 bh Pemasangan jet washer 9 1 bh Pemasangan Kran dinding 10 1 bh Pemasangan kran air panas dingin 11 1 bh Penyekat urinoir 12 1 bh Soap holder 13 1 bh Soap desh 14 1 bh Tisue holder 15 1 bh Towel bar (Stainless steel) 16 1 bh Hand railling stainless stell dia. 5" di toilet pasien 17 1 bh Hand railling penyandang cacat (Stainless steel) 18 1 bh Hand Shower dengan kran air panas & dingin 19 1 bh Zink satu lubang lengkap dengan kran dan aksesories 20 1 bh Zink dua lubang lengkap dengan kran dan aksesories 21 1 bh Pemasangan floor drain 22 1 bh Pemasangan sloof zink satu lubang 23 1 bh Pemasangan service zink lengkap kran dan asseosries 24 1 bh Pemasangan hand dryer lengkap dengan aksesoris 25 1 bh Pemasangan Kitchen Zink Stainless Steel satu lubang 26 1 bh Pemasangan Scrub up 3 person 27 1 bh Pemasangan Cubical toilet clear tempered glass 12mm type T 2 daun 28 1 bh Pemasangan Cubical toilet clear tempered glass 12mm type L 1 daun 29 1 bh Pemasangan Cubical toilet clear tempered glass 12mm type I 1 daun PEKERJAAN PENGECATAN 1 1 m² Pengecatan dinding emultion paint - Interior 2 1 m² Pengecatan dinding weathershield - Exterior 3 1 m² Pengecatan dinding dustproof paint 4 1 m² Pengecatan dinding enamel paint (Epoxy) 5 1 m² Pengecatan dinding VirusGuard 6 1 m² Pengecatan plafond emultion paint 8 1 m' Pengecatan list plafond weathershield - Exterior 7 1 m' Pengecatan list plafond emultion paint 9 1 m' Pengecatan list plafond enamel paint (epoxy) 10 1 m² Pengecatan plafond weathershield - Exterior 11 1 m² Pengecatan plafond enamel paint (Epoxy) 12 1 m² Pengecatan plafond dustrproof 13 1 m' Pengecatan plint Int Semi Gloss 14 1 m² Epoxy Floor system (1000 micron) w/. U.V. Laminate PEKERJAAN KUSEN PINTU DAN JENDELA ALLUMUNIUM 1 1 m' Pemasangan alumunium kusen pintu 2 1 m' Pemasangan alumunium kusen jendela
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
228,527.12 224,387.27 233,343.03 190,803.17 43,083.36 17,816.26 44,849.72 269,931.75 300,337.11 382,484.62 251,444.55 115,268.01 48,183.35 144,299.95
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
93,516.36 89,817.04 112,012.95 62,259.81 16,053.88 9,776.38 265,549.92 259,151.49 22,651.13 875,305.81 888,767.09 3,239,921.43
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,539,300.40 553,974.91 1,411,129.64 2,070,280.99 1,373,430.69 465,906.77 346,451.76 360,175.18 299,364.46 669,346.27 1,042,380.81 132,549.60 171,063.06 371,972.95 533,351.39 293,701.87 444,070.19 969,668.30 1,607,682.53 3,416,801.43 255,335.63 5,524,174.53 8,073,387.54 905,154.61 2,376,569.58 79,389,448.06 7,981,406.95 6,046,520.42 4,111,633.88
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
25,621.94 31,959.16 28,328.94 33,132.99 24,163.68 27,876.94 4,048.73 3,256.58 4,160.91 34,214.16 35,387.99 30,860.35 4,972.37 286,504.23
Rp Rp
84,525.81 84,525.81
Harga Satuan Terpasang Pek. Arsitektur - page 78 of 139
NO.
URAIAN PEKERJAAN
HARGA SATUAN
3 1 m² Pemasangan alumunium Frame Daun Pintu Kaca 4 1 m² Pemasangan alumunium Frame Daun Jendela Kaca 5 1 m² Pemasangan Kaca reflektif 8 mm 6 1 m² Pemasangan Kaca Tinted 6 mm 7 1 m² Pemasangan Kaca Tinted 8 mm 8 1 m² Pemasangan Kaca clear Float 6 mm 9 1 m² Pemasangan Kaca clear 8 mm 10 1 m² Pemasangan Kaca Stopsol Super Silver Green 6 mm 11 1 m² Pemasangan Kaca Stopsol Super Silver Green 8 mm 12 1 m² Pemasangan Kaca tempered 8 mm 13 1 m² Pemasangan Kaca tempered 12 mm 14 1 m² Pemasangan Kaca Stopsol 8 mm 15 1 m² Pemasangan Kaca Anti Radiasi 15 mm 16 1 m² Pemasangan Partisi Kaca tempered 12 mm PEKERJAAN KUSEN PINTU 1 1 unit Pemasangan Pintu type D 1F 2 1 unit Pemasangan Pintu type D 2F 3 1 unit Pemasangan Pintu type D 2M 4 1 unit Pemasangan Pintu type D 1 (Masjid) 5 1 unit Pemasangan Pintu type D-GL Uk. 900 x 2150 mm 6 1 unit Pemasangan Pintu type D-GL Uk. 1200 x 2150 mm 7 1 unit Pemasangan Pintu type D-GL Uk. 2 x 900 x 2150 mm 8 1 unit Pemasangan Pintu type A Uk. 900x2150 mm 9 1 unit Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight 10 1 unit Pemasangan Pintu type A Uk. 1200x2150 mm 11 1 unit Pemasangan Pintu type A Uk. 1200x2150 mm + Bouvenlight 12 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm 13 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm + Bouvenlight 14 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm 15 1 unit Pemasangan Pintu type B Uk. 800 x 1100 mm 16 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight 17 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight +3500 AFFL 18 1 unit Pemasangan Pintu type B Uk.900x2150 mm (sliding) 19 1 unit Pemasangan Pintu type B Uk. 750 x 2150 mm 20 1 unit Pemasangan Pintu type B Uk.2x900x2150 mm (sliding) 21 1 unit Pemasangan Pintu type B Uk. 1200x2150 mm 22 1 unit Pemasangan Pintu type B Uk. 1200x2150 mm + Bouvenlight 23 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm 24 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight 25 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight +3500 AFFL 26 1 unit Pemasangan Pintu type B Uk.1200x2150 mm (sliding) 27 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm 28 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight 29 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm 30 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm + Bouvenlight 31 1 unit Pemasangan Pintu type C Uk. 1200 x 2150 mm 32 1 unit Pemasangan Pintu type C Uk. 1200 x 2150 mm + Bouvenlight 33 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm 34 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm + Bouvenlight 35 1 unit Pemasangan Pintu type E Uk. 900x2150 mm 36 1 unit Pemasangan Pintu type E Uk. 900x2150 mm + Bouvenlight 37 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm 38 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm + Bouvenlight 39 1 unit Pemasangan Pintu type GUD Uk. 2x550x2150 mm 40 1 unit Pemasangan Pintu type M Uk. 900x2150 mm 41 1 unit Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight 42 1 unit Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight +3500 AFFL 43 1 unit Pemasangan Pintu type M Uk. 2x900x2150 mm 44 1 unit Pemasangan Pintu type M Uk. 2x900x2150 mm + Bouvenlight 45 1 unit Pemasangan Pintu Besi Type A-HM uk. 600 x 1250 mm 46 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 600 x 1250 mm 47 1 unit Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm 48 1 unit Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm - Slidding 49 1 unit Pemasangan Pintu Besi Type A-HM uk. 1000 x 2150 mm 50 1 unit Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm (Tahan Api) 51 1 unit Pemasangan Pintu Besi Type A-HM uk. 1000 x 2150 mm (Tahan Api) 52 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 900 x 2150 mm 53 1 unit Pemasangan Pintu Besi Type C-HM uk. 900 x 2150 mm 54 1 unit Pemasangan Pintu Besi Type C-HM uk. 2 x 900 x 2150 mm 55 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) 56 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) 57 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) (Tahan Api) 58 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) (Tahan Api) 59 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) sliding 60 1 unit Pemasangan Pintu Besi Type M-HM, HM (uk. 900 x 2150) 61 1 unit Pintu Type B, HM Radiation Door (uk. 900 x 2150)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
538,905.78 440,026.57 470,652.68 328,068.85 397,284.30 132,189.12 179,750.02 340,181.55 470,652.68 382,749.06 509,413.34 470,652.68 22,532.06 538,272.72
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,638,229.52 8,624,963.11 12,878,527.34 11,250,371.95 4,709,720.21 5,005,912.64 8,526,232.30 4,038,885.72 4,314,980.33 6,204,238.36 6,470,519.02 7,206,091.82 7,533,019.74 5,035,352.29 2,760,022.45 5,311,446.89 5,500,902.54 4,865,353.16 4,161,459.92 9,007,828.26 7,076,388.46 7,291,452.45 9,277,000.01 9,603,927.93 9,922,191.96 6,584,370.56 3,314,013.80 3,573,454.22 3,725,530.85 4,001,625.45 5,542,873.03 5,818,967.63 6,728,183.65 7,081,103.26 5,060,602.56 5,137,427.57 9,034,587.75 9,361,515.67 9,034,587.75 5,060,602.56 5,258,722.10 5,448,177.75 9,954,210.29 10,281,138.22 2,669,873.85 4,973,310.20 5,433,997.47 6,631,784.37 6,355,372.01 12,344,306.52 13,265,681.06 10,501,557.44 6,631,784.37 8,198,121.09 5,433,997.47 8,566,670.91 12,344,306.52 17,411,866.49 8,566,670.91 15,108,430.14 30,230,529.00
Harga Satuan Terpasang Pek. Arsitektur - page 79 of 139
NO.
URAIAN PEKERJAAN
62 1 unit Pintu Type B, HM Radiation Door (uk. 1200 x 2150) 63 1 unit Pintu Type B, HM Radiation Door (uk. 2x 900 x 2150) 64 1 unit Pintu swing single for disposal uk. 800 mm x 800 mm 65 1 unit Pemasangan Pintu Besi tipe D2 (Rumah Pompa) PEKERJAAN KUSEN DAN DAUN JENDELA GEDUNG B, C1 & C2 1 1 unit Jendela Tipe DW-2E 2 1 unit Jendela Tipe DW-2EA 3 1 unit Jendela Tipe W-3E 4 1 unit Jendela Tipe W-3EA 5 1 unit Jendela Tipe DW-5E 6 1 unit Jendela Tipe W-1E 7 1 unit Jendela Tipe W-6E 8 1 unit Jendela Tipe BV-1EA 10 1 unit Jendela Tipe BV-3E 11 1 unit Jendela Tipe BV-1E 12 1 unit Jendela Tipe DW-1 13 1 unit Jendela Tipe DW-1' 14 1 unit Jendela Tipe W-3C 15 1 unit Jendela Tipe DW-2 16 1 unit Jendela Tipe W-3E 17 1 unit Jendela Tipe W-2E 18 1 unit Jendela Tipe W-3EA 19 1 unit Jendela Tipe W-2EA 20 1 unit Jendela Tipe BV-6E 21 1 unit Jendela Tipe W-3EB 22 1 unit Jendela Tipe W-5E 23 1 unit Jendela Tipe W-5EA 24 1 unit Jendela Tipe BV-1EB GEDUNG D1, D2 & F1 1 1 m² Jendela curtain wall system 2 1 unit Jendela Tipe BV-6 3 1 unit Jendela Tipe W-6EB 4 1 unit Jendela Tipe W-4EB 5 1 unit Jendela Tipe W-3EB 6 1 unit Jendela Tipe W-2EB 7 1 unit Jendela Tipe W-1EB 8 1 unit Jendela Tipe DW-2E 9 1 unit Jendela Tipe W-6EA 10 1 unit Jendela Tipe W-4EA 11 1 unit Jendela Tipe W-2EA 12 1 unit Jendela Tipe CW-1 13 1 unit Jendela Tipe CW-1A 14 1 unit Jendela Tipe BV-3 15 1 unit Jendela Tipe W-6 16 1 unit Jendela Tipe DW-1 17 1 unit Jendela Tipe W-1 18 1 unit Jendela Tipe DW-2 19 1 unit Jendela Tipe BV-1 20 1 unit Jendela Tipe W-1R 21 1 unit Jendela Tipe W-L2 22 1 unit Jendela Tipe DW-4 23 1 unit Jendela Tipe W-3 24 1 unit Jendela Tipe DW-2A 25 1 unit Jendela Tipe BV-4 26 1 unit Jendela Tipe W-4 27 1 unit Jendela Tipe BV-6 (Gd. D1&D2) 28 1 unit Jendela Tipe W-3A 29 1 unit Jendela Tipe W-2A 30 1 unit Jendela Tipe W-1A 31 1 unit Jendela Tipe DW-2A' 32 1 unit Jendela Tipe DW-2B 33 1 unit Jendela Tipe W-1A 34 1 unit Jendela Tipe DW-4' 35 1 unit Jendela Tipe W-2 36 1 unit Jendela Tipe BV-2 37 1 unit Jendela Tipe BV-3 (Gd. D2) 38 1 unit Jendela Tipe DW-1' 39 1 unit Jendela Tipe W-L1 40 1 unit Pemasangan jendela tipe PG-1 41 1 unit Pemasangan jendela tipe PG-2 42 1 unit Pemasangan jendela tipe PG-3 43 1 unit Pemasangan jendela tipe PG-4 44 1 unit Pemasangan jendela tipe PG-5 45 1 unit Jendela Tipe DW-2A (Gd. D2)
HARGA SATUAN Rp Rp Rp Rp
40,079,792.49 56,911,232.24 53,209,379.68 8,566,670.91
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,942,460.56 1,903,414.50 3,733,953.35 2,414,446.44 6,462,719.45 685,638.66 4,852,250.58 569,168.54 1,534,078.01 366,365.53 654,394.54 482,219.15 1,782,643.51 1,765,195.66 3,733,953.35 2,737,846.96 2,462,257.26 1,810,472.92 3,083,778.90 5,104,291.86 4,042,180.51 6,203,757.80 549,853.97
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,145,978.01 1,755,454.65 9,437,023.31 6,755,547.15 5,340,572.08 5,245,559.59 2,260,410.48 4,506,728.93 10,309,301.39 7,670,853.70 5,641,508.96 20,489,453.28 15,509,584.32 1,016,374.82 4,852,250.58 1,054,944.35 961,735.05 1,378,453.81 426,476.52 44,183,633.72 1,348,289.86 3,271,973.33 2,528,252.68 1,891,830.00 1,610,112.58 3,495,059.38 2,233,582.62 3,440,872.72 2,375,716.76 1,310,560.80 1,847,986.46 1,954,910.52 1,285,373.58 3,995,876.53 1,744,993.86 790,486.36 1,154,496.20 949,764.78 726,255.34 14,798,613.87 14,437,193.01 17,935,876.10 15,713,931.87 17,820,918.11 2,026,488.22
Harga Satuan Terpasang Pek. Arsitektur - page 80 of 139
URAIAN PEKERJAAN
NO. 46 47 48 49 50 51 52 53 54
1 1 1 1 1 1 1 1 1
HARGA SATUAN
unit unit unit unit unit unit unit unit unit
Jendela Tipe DW-2' Jendela Tipe W-5 Jendela Tipe W-3C Jendela Tipe W-1EB Jendela Tipe W-1 Jendela Tipe W-1EA Jendela Tipe BV-1 (diatas pintu besi) Jendela Tipe BV-2 (diatas pintu besi) Jendela Tipe LV-3
Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,632,064.81 4,073,198.95 1,928,899.28 2,260,410.48 961,735.05 1,911,584.73 472,595.68 722,096.06 1,039,983.62
GEDUNG F2 & F3 1 1 unit 2 1 unit 3 1 unit 4 1 unit 5 1 unit 6 1 unit 7 1 unit 8 1 unit 9 1 unit 10 1 unit 11 1 unit 12 1 unit 13 1 unit 14 1 unit 15 1 unit 16 1 unit 17 1 unit 18 1 unit 19 1 unit 20 1 unit 21 1 unit 22 1 unit 23 1 unit 24 1 unit 25 1 unit 26 1 unit 27 1 unit 28 1 unit
Jendela Tipe W-1 Jendela Tipe W-2 Jendela Tipe W-3 Jendela Tipe W-1' Jendela Tipe W-2' Jendela Tipe W-3' Jendela Tipe DW-1 Jendela Tipe DW-2 Jendela Tipe W-4 Jendela Tipe W-5 Jendela Tipe BV-1 Jendela Tipe BV-2 Jendela Tipe BV-3 Jendela Tipe BV-4 Jendela Tipe BV-5 Jendela Tipe LV-2 Jendela Tipe W-1E Jendela Tipe W-2E Jendela Tipe W-3E Jendela Tipe W-6E Jendela Tipe BV-1 Jendela Tipe BV-2 Jendela Tipe BV-3 Jendela Tipe BV-4 Jendela Tipe BV-6 Jendela Tipe W-1EA Jendela Tipe BV-1 (diatas pintu besi) Jendela Tipe BV-2 (diatas pintu besi)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,911,584.73 2,694,843.54 4,427,952.04 2,063,289.54 3,644,693.23 5,377,801.72 2,001,334.57 3,938,805.28 5,211,210.85 6,944,319.34 426,476.52 790,486.36 1,154,496.20 1,518,506.04 1,882,515.88 1,187,234.21 1,911,584.73 2,694,843.54 3,478,102.36 7,727,578.15 569,168.54 1,075,870.40 1,582,572.26 2,089,274.12 3,102,677.84 1,917,001.88 472,595.68 722,096.06
GEDUNG G3 - Sentral Gas Medis 1 1 unit Pemasangan Pintu type D2 2 1 unit Pemasangan Pintu type TOI 3 1 unit Jendela Tipe BV-2 4 1 unit Jendela Tipe W-2' 5 1 unit Jendela Tipe LV-3
Rp Rp Rp Rp Rp
7,180,650.73 3,314,013.80 480,294.54 2,405,679.00 1,032,345.64
BANGUNAN MASJID 1 1 unit Jendela Tipe FR-1 2 1 unit Jendela Tipe WE-1 3 1 unit Jendela Tipe WE-1A 4 1 unit Jendela Tipe WE-2 5 1 unit Jendela Tipe WE-5A 6 1 unit Jendela Tipe WE-3 7 1 unit Jendela Tipe WE-5B 8 1 unit Jendela Tipe CW-4 9 1 unit Jendela Tipe WE-5
Rp Rp Rp Rp Rp Rp Rp Rp Rp
5,042,933.04 973,530.10 712,684.06 1,266,941.19 3,266,040.02 845,930.79 1,362,290.99 19,339,541.73 3,361,705.22
GEDUNG MORTUARY DAN FORENSIK 1 1 unit Jendela Type CW1 2 1 unit Jendela Type W1-E 3 1 unit Jendela Type W1-EB 4 1 unit Jendela Type W3-EB 5 1 unit Jendela Type W3-EA 6 1 unit Jendela Type BV1 7 1 unit Jendela Type BV3
Rp Rp Rp Rp Rp Rp Rp
4,100,612.82 2,418,979.89 2,025,570.81 5,808,694.28 4,763,321.85 470,076.94 1,267,854.73
BANGUNAN WORKSHOP 1 1 unit Jendela Tipe BV-1 2 1 unit Jendela Tipe W-4
Rp Rp
269,149.66 3,822,592.53
BANGUNAN POWER HOUSE 1 1 unit Jendela Tipe LV-2 2 1 unit Jendela Tipe LV-4 3 1 unit Jendela Tipe LV-6
Rp Rp Rp
942,011.57 2,064,216.75 3,436,769.26
Harga Satuan Terpasang Pek. Arsitektur - page 81 of 139
URAIAN PEKERJAAN
NO. RUMAH POMPA 1 1 unit 2 1 unit
Jendela Tipe LV-1 Jendela Tipe LV-2
HARGA SATUAN Rp Rp
505,305.06 1,325,467.55
Harga Satuan Terpasang Pek. Arsitektur - page 82 of 139
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021 Kebutuhan
NO.
Kode Satuan
Indeks
Harga Satuan
Jumlah Harga Satuan
PEKERJAAN PERSIAPAN 1
2
3
4
1 m²
1 m'
1 m'
1 m²
Pekerjaan kantor sementara (Direksi keet) Bahan: 1 Dolken 2 Kayu 3 Paku biasa 4 Besi strip 5 semen 6 Pasir pasang 7 Pasir beton 8 Koral beton 9 Bata merah 10 Seng plat 11 Jendela nako 12 Kaca polos 13 Kunci tanam 14 Plywood 4 mm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Pagar sementara dari seng gelombang tinggi 2 meter Bahan: 1 Dolken kayu dia. 8-10/400 cm 2 Semen 3 Seng Gelombang 4 Pasir beton 5 Koral beton 6 Kayu 5/7 7 Paku biasa 8 Residu Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Pengukuran dan pemasangan bowplank Bahan: 1 Kayu 5/7 2 Paku biasa 3 Kayu papan 3/20 Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Rp
765,136.64
20,674.75 943,847.09 14,382.43 13,483.53 1,168.57 134,835.30 134,835.30 224,725.50 539.34 175,285.89 104,632.19 41,349.49 54,383.57 67,417.65
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
25,843.43 169,892.48 1,150.59 14,831.88 40,900.04 20,225.29 13,483.53 33,708.82 16,180.24 43,821.47 20,926.44 3,307.96 8,157.54 4,045.06
oh 2.0000 Rp 70,000.00 oh 2.0000 Rp 80,000.00 oh 0.3000 Rp 85,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
140,000.00 160,000.00 25,500.00 4,500.00 746,474.78 18,661.87 765,136.64 285,817.00
20,674.75 1,168.57 66,069.30 134,835.30 224,725.50 1,618,023.58 13,483.53 3,236.05
Rp Rp Rp Rp Rp Rp Rp Rp
25,843.43 2,921.43 79,283.16 674.18 2,022.53 116,497.70 809.01 1,294.42
oh 0.2000 Rp 70,000.00 oh 0.4000 Rp 80,000.00 oh 0.0200 Rp 85,000.00 oh 0.0200 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp
14,000.00 32,000.00 1,700.00 1,800.00 278,845.85
Keuntungan+Over head 2,5%
Rp
6,971.15
Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp
285,817.00 43,657.71
1,618,023.58 13,483.53 943,847.09
Rp Rp Rp
19,416.28 269.67 6,606.93
oh 0.1000 Rp 70,000.00 oh 0.1000 Rp 80,000.00 oh 0.0100 Rp 85,000.00 oh 0.0050 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5%
Rp Rp Rp Rp Rp Rp
7,000.00 8,000.00 850.00 450.00 42,592.88 1,064.82
Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp
43,657.71 11,787.50
oh 0.1000 Rp 70,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5%
Rp Rp Rp Rp
7,000.00 4,500.00 11,500.00 287.50
Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp
11,787.50
Rp
56,118.75
Rp Rp Rp Rp Rp Rp
52,500.00 2,250.00 54,750.00 1,368.75 56,118.75 68,726.25
Rp Rp
63,000.00 4,050.00
btg m³ kg kg kg m³ m³ m³ bh lbr bh m² bh lbr
1.2500 0.1800 0.0800 1.1000 35.0000 0.1500 0.1000 0.1500 30.0000 0.2500 0.2000 0.0800 0.1500 0.0600
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
L.01 L.02 L.03 L.04
btg kg lbr m³ m³ m³ kg ltr L.01 L.02 L.03 L.04
m³ kg m³ L.01 L.02 L.03 L.04
Pekerjaan Pembersihan Lahan Tenaga Kerja: 1 Pekerja 2 Mandor
1.2500 2.5000 1.2000 0.0050 0.0090 0.0720 0.0600 0.4000
0.0120 0.0200 0.0070
Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp
PEKERJAAN TANAH DAN PONDASI 1
2
1 m³
1 m³
Mengali tanah biasa sedalam 1 meter Tenaga Kerja: 1 Pekerja 2 Mandor
Mengali tanah biasa sedalam 2 meter Tenaga Kerja: 1 Pekerja 2 Mandor
L.01 L.04
oh 0.7500 Rp 70,000.00 oh 0.0250 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
L.01 L.04
oh oh
0.9000 0.0450
Rp Rp
70,000.00 90,000.00
Analisa Harga Satuan - page 83 of 139
Kebutuhan
NO.
Kode Satuan
Indeks
Harga Satuan
Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) 3
4
5
6
7
8
9
1 m³
1 m³
1 m³
1 kg
1 kg
1 kg
1 m²
Mengali tanah biasa sedalam 3 meter Tenaga Kerja: 1 Pekerja 2 Mandor
Mengurug pasir urug Bahan: 1 Pasir Urug Tenaga Kerja: 1 Pekerja 2 Mandor
Memasang Lantai Kerja Bahan: 1 Semen 2 Pasir beton 3 Batu Split 1/2 4 Air Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Memasang besi beton U-24 Bahan: 1 Besi beton U-24 2 Kawat beton Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
Memasang besi beton U-40 Bahan: 1 Besi beton U-40 2 Kawat beton Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
Memasang besi profil Bahan: 1 Besi Baja IWF /HB 2 Sewa Alat Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
Memasang bekisting untuk kolom (2 X Pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II. 5 Plywood 9 mm
Jumlah Harga Satuan Rp Rp Rp Rp
67,050.00 1,676.25 68,726.25 81,518.25
Rp Rp Rp Rp Rp Rp
73,500.00 6,030.00 79,530.00 1,988.25 81,518.25 162,806.18
112,362.75
Rp
134,835.30
oh 0.3300 Rp 70,000.00 oh 0.0100 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp
23,100.00 900.00 158,835.30 3,970.88 162,806.18 557,440.00
1,168.57 134,835.30 224,725.50 22.47
Rp Rp Rp Rp
175,285.89 86,005.66 170,957.84 4,494.51
oh 1.2000 Rp 70,000.00 oh 0.2000 Rp 80,000.00 oh 0.0200 Rp 85,000.00 oh 0.0600 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
84,000.00 16,000.00 1,700.00 5,400.00 543,843.90 13,596.10 557,440.00 12,037.14
9,887.92 14,382.43
Rp Rp
103,823.18 2,157.36
0.0700 Rp 70,000.00 0.0700 Rp 80,000.00 0.0070 Rp 85,000.00 0.0040 Rp 90,000.00 Jumlah pekerjaan per sepuluh kg Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,900.00 5,600.00 595.00 360.00 117,435.54 11,743.55 293.59 12,037.14 12,520.86
10,337.37 14,382.43
Rp Rp
108,542.42 2,157.36
0.0700 Rp 70,000.00 0.0700 Rp 80,000.00 0.0070 Rp 85,000.00 0.0040 Rp 90,000.00 Jumlah pekerjaan per sepuluh kg Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,900.00 5,600.00 595.00 360.00 122,154.78 12,215.48 305.39 12,520.86 18,071.46
10,786.82 1,078.68
Rp Rp
11,541.90 862.95
oh 0.0400 Rp 70,000.00 oh 0.0200 Rp 80,000.00 oh 0.0060 Rp 85,000.00 oh 0.0035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,800.00 1,600.00 510.85 315.00 17,630.70 440.77 18,071.46 145,527.62
Rp Rp Rp Rp Rp
65,997.38 5,752.97 898.90 49,111.51 40,270.81
L.01 L.04
oh 1.0500 Rp 70,000.00 oh 0.0670 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
m³
1.2000
Rp
L.01 L.04
kg m³ m³ ltr
150.000 0.638 0.761 200.000
Rp Rp Rp Rp
L.01 L.02 L.03 L.04
kg kg L.01 L.02 L.03 L.04
Rp Rp
oh oh oh oh
kg kg L.01 L.02 L.03 L.04
10.5000 0.1500
10.5000 0.1500
Rp Rp
oh oh oh oh
kg jam
1.0700 0.8000
Rp Rp
L.01 L.02 L.03 L.04
m³ kg ltr m³ lbr
0.0200 0.4000 0.1000 0.0100 0.3500
Rp Rp Rp Rp Rp
3,299,869.21 14,382.43 8,989.02 4,911,151.02 115,059.45
Analisa Harga Satuan - page 84 of 139
Kebutuhan
NO.
6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
10
11
12
13
14
1 m²
1 m²
1 m²
1 m²
1 m²
Memasang bekisting untuk balok (2 X Pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II. 5 Plywood 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting untuk dinding (2 X Pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II. 5 Plywood 9 mm 6 Dolken kayu dia. 8-10/400 cm 7 Formite/penjaga jarak bekisting/spacer Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting untuk plat lantai (2 X Pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II. 5 Plywood 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting untuk tangga Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II. 5 Plywood 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang Bekisting Batako Bahan: 1 Batako 2 Semen
Kode Satuan btg
Indeks 1.0000
Harga Satuan Rp
Jumlah Harga Satuan
20,674.75
Rp
20,674.75
oh 0.4000 Rp 70,000.00 oh 0.2000 Rp 80,000.00 oh 0.0250 Rp 85,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 141,978.16 3,549.45 145,527.62 132,691.26
3,299,869.21 14,382.43 8,989.02 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
65,997.38 5,752.97 898.90 44,200.36 20,135.40 20,674.75
oh 0.4000 Rp 70,000.00 oh 0.2000 Rp 80,000.00 oh 0.0250 Rp 85,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 129,454.88 3,236.37 132,691.26 153,702.51
3,299,869.21 14,382.43 8,989.02 4,911,151.02 115,059.45 20,674.75 10,337.37
Rp Rp Rp Rp Rp Rp Rp
49,498.04 5,752.97 1,797.80 49,111.51 20,135.40 31,012.12 41,349.49
oh 0.4000 Rp 70,000.00 oh 0.2000 Rp 80,000.00 oh 0.0250 Rp 85,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 149,953.67 3,748.84 153,702.51 179,227.35
3,299,869.21 14,382.43 8,989.02 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
52,797.91 5,752.97 1,797.80 98,223.02 40,270.81 49,619.39
oh 0.4000 Rp 70,000.00 oh 0.2000 Rp 80,000.00 oh 0.0250 Rp 85,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 174,855.95 4,371.40 179,227.35 171,137.91
3,299,869.21 14,382.43 8,989.02 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
39,598.43 5,752.97 1,348.35 73,667.27 40,270.81 16,539.80
oh 0.6600 Rp 70,000.00 oh 0.3300 Rp 80,000.00 oh 0.0330 Rp 85,000.00 oh 0.0330 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
46,200.00 26,400.00 2,805.00 2,970.00 166,963.81 4,174.10 171,137.91 117,216.67
Rp Rp
58,728.26 19,036.05
L.01 L.02 L.03 L.04
m³ kg ltr m³ lbr btg
0.0200 0.4000 0.1000 0.0090 0.1750 1.0000
Rp Rp Rp Rp Rp Rp
L.01 L.02 L.03 L.04
m³ kg ltr m³ lbr btg bh
0.0150 0.4000 0.2000 0.0100 0.1750 1.5000 4.0000
Rp Rp Rp Rp Rp Rp Rp
L.01 L.02 L.03 L.04
m³ kg ltr m³ lbr btg
0.0160 0.4000 0.2000 0.0200 0.3500 2.4000
Rp Rp Rp Rp Rp Rp
L.01 L.02 L.03 L.04
m³ kg ltr m³ lbr btg
0.0120 0.4000 0.1500 0.0150 0.3500 0.8000
Rp Rp Rp Rp Rp Rp
L.01 L.02 L.03 L.04
bh kg
23.3333 16.2900
Rp Rp
2,516.93 1,168.57
Analisa Harga Satuan - page 85 of 139
Kebutuhan
NO. 3 Pasir pasang Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
15
16
17
1 m³
1 m'
1 m'
Kode Satuan
Indeks 0.0400
Harga Satuan Rp
Rp
5,393.41
oh 0.3000 Rp 70,000.00 oh 0.1000 Rp 80,000.00 oh 0.0100 Rp 85,000.00 oh 0.0150 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 8,000.00 850.00 1,350.00 114,357.72 2,858.94 117,216.67 1,011,287.52
782,044.73 4,500,000.00
Rp Rp
821,146.97 64,350.00
oh 1.0000 Rp 70,000.00 oh 0.2500 Rp 80,000.00 oh 0.0250 Rp 85,000.00 oh 0.1000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) Pengadaan & Pemancangan Tiang Pancang uk. Ø 600 mm (Drop Hammer) Bahan: 1 Pengadaan Tiang Pancang uk. Ø600 mm m' 1.0000 Rp 407,502.24 Upah : 1 Pemancangan Tiang Pancang uk. Ø600 mm m' 1.0000 Rp 61,125.34 - termasuk biaya handling dan sambungan las
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 20,000.00 2,125.00 9,000.00 986,621.97 24,665.55 1,011,287.52 480,343.26
Rp
407,502.24
Rp
61,125.34
Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) Pengadaan & Pemancangan Tiang Pancang uk. Ø 400 mm (Drop Hammer) Bahan: 1 Pengadaan Tiang Pancang uk. Ø400 mm m' 1.0000 Rp 349,573.00 Upah : 1 Pemancangan Tiang Pancang uk. Ø400 mm m' 1.0000 Rp 52,435.95 - termasuk biaya handling dan sambungan las
Rp Rp Rp Rp
468,627.57 11,715.69 480,343.26 412,059.17
Rp
349,573.00
Rp
52,435.95
Rp Rp Rp Rp
402,008.95 10,050.22 412,059.17 30,028.71
70,000.00 90,000.00
Rp Rp
7,616.00 4,896.00
jam 0.0068 Rp 485,407.07 jam 0.0500 Rp 269,670.60 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp
3,300.77 13,483.53 29,296.30 732.41 30,028.71 18,706.25
L.01 L.04
Rp Rp Rp Rp Rp Rp
17,500.00 750.00 18,250.00 456.25 18,706.25 26,137.50
L.01 L.04
Rp Rp Rp Rp Rp Rp
21,000.00 4,500.00 25,500.00 637.50 26,137.50 94,791.94
L.01 L.02 L.03 L.04
m³ hari
1.0500 0.0143
Rp Rp
L.01 L.02 L.03 L.04
Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) 18
19
20
21
1 m³
1 m³
1 m³
1 m³
Jumlah Harga Satuan
134,835.30
Beton Ready mix f'c=30 Mpa Bahan: 1 Ready mix f'c=30 Mpa 2 Peralatan (pompa beton, vibrator dll) Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
m³
Pekerjaan galian tanah menggunakan alat berat Tenaga Kerja: 1 Pekerja 2 Mandor Alat : 1 Ecavator 2 Dump truck
Mengurug kembali galian Tenaga Kerja: 1 Pekerja 2 Mandor
Memadatkan tanah 1 m2 tanah per 20 cm Tenaga Kerja: 1 Pekerja 2 Mandor
Pekerjaan timbunan tanah + pemadatan dengan alat berat Bahan: 1 Tanah Urug Tenaga Kerja: 1 Pekerja 2 Mandor Peralatan : 1 Excavator 2 Dump Truck 3 Motor Grader 4 Vibro Roller 5 Water Tank Truck
L.01 L.04
oh oh
0.1088 0.0544
Rp Rp
oh 0.2500 Rp 70,000.00 oh 0.0083 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
oh 0.3000 Rp 70,000.00 oh 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
m³
1.2000
Rp
58,428.63
Rp
70,114.36
oh oh
0.0054 0.0014
Rp Rp
70,000.00 90,000.00
Rp Rp
380.63 122.63
jam 0.0080 Rp 485,407.07 jam 0.0500 Rp 269,670.60 jam 0.0037 Rp 477,316.96 jam 0.0042 Rp 305,626.68 jam 0.0070 Rp 206,549.70 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
3,883.26 13,483.53 1,766.07 1,283.63 1,445.85 92,479.94 2,312.00 94,791.94
L.01 L.04
Analisa Harga Satuan - page 86 of 139
Kebutuhan
NO. 22
23
24
25
26
27
1 m²
1 m³
1 m³
1 m²
1 m³
1 m³
Membuat Screed Beton + kawat ayam Bahan: 1 Semen 2 Pasir pasang 3 Kawat ayam Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Memasang Pondasi Batu Belah 1 PC : 4 PP Bahan: 1 Batu Belah 15/20 cm 2 Semen 3 Pasir Pasang Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Memasang Pondasi Batu Kosong (Aanstamping) Bahan: 1 Batu Belah 15/20 cm 2 Pasir Urug Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pengecatan permukaan baja dengan meni besi Bahan: 1 Menie besi 2 Pengencer 3 Kuas Tenaga Kerja: 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Base Course (Lapisan Agregat Kelas A) Bahan : 1 Aggregat Kasar 2 Aggregat halus Peralatan : 1 Wheel Loader 2 Dump truck 3 Motor Grader 4 Vibrator Roller 5 Pneumatic Tire Roller 6 Water Tanker Tenaga Kerja : 1 Pekerja 2 Mandor
Sub Base Course (Lapisan Agregat Kelas B) Bahan : 1 Aggregat Kasar 2 Aggregat halus Peralatan : 1 Wheel Loader 2 Dump truck 3 Motor Grader 4 Vibrator Roller 5 Pneumatic Tire Roller 6 Water Tanker Tenaga Kerja :
Kode Satuan
Indeks
Harga Satuan
Jumlah Harga Satuan Rp
67,312.94
1,168.57 112,362.75 17,500.00
Rp Rp Rp
9,086.82 2,584.34 18,375.00
oh 0.3000 Rp 70,000.00 oh 0.1500 Rp 80,000.00 oh 0.0150 Rp 85,000.00 oh 0.0150 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 12,000.00 1,275.00 1,350.00 65,671.16 1,641.78 67,312.94 659,758.00
170,791.38 1,168.57 134,835.30
Rp Rp Rp
204,949.65 190,477.33 70,114.36
oh 1.5000 Rp 70,000.00 oh 0.7500 Rp 80,000.00 oh 0.0750 Rp 85,000.00 oh 0.0750 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5%
Rp Rp Rp Rp Rp Rp
105,000.00 60,000.00 6,375.00 6,750.00 643,666.34 16,091.66
Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp
659,758.00 421,107.21
224,725.50 112,362.75
Rp Rp
269,670.60 48,540.71
oh 0.7800 Rp 70,000.00 oh 0.3900 Rp 80,000.00 oh 0.0390 Rp 85,000.00 oh 0.0390 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
54,600.00 31,200.00 3,315.00 3,510.00 410,836.30 10,270.91 421,107.21 46,272.48
67,417.65 17,978.04 13,483.53
Rp Rp Rp
6,741.76 179.78 134.84
oh 0.2500 Rp 70,000.00 oh 0.2250 Rp 80,000.00 oh 0.0225 Rp 85,000.00 oh 0.0075 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
17,500.00 18,000.00 1,912.50 675.00 45,143.88 1,128.60 46,272.48 469,466.12
kg m³ m2
7.7760 0.0230 1.0500
Rp Rp Rp
L.01 L.02 L.03 L.04
m³ kg m³ L.01 L.02 L.03 L.04
m³ m³
1.2000 163.0000 0.5200
1.2000 0.4320
Rp Rp Rp
Rp Rp
L.01 L.02 L.03 L.04
Kg liter Buah
0.1000 0.0100 0.0100
Rp Rp Rp
L.01 L.02 L.03 L.04
m³ m³
0.7680 0.4320
Rp Rp
282,524.90 282,524.90
Rp Rp
216,979.12 122,050.75
jam jam jam jam jam jam
0.0625 0.1406 0.0117 0.0178 0.0043 0.0211
Rp Rp Rp Rp Rp Rp
494,396.09 269,670.60 477,316.96 305,626.68 267,863.80 206,549.70
Rp Rp Rp Rp Rp Rp
30,885.97 37,905.51 5,591.06 5,455.18 1,147.48 4,354.96
jam 0.4061 Rp 70,000.00 jam 0.0580 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp
28,424.81 5,220.88 458,015.73 11,450.39 469,466.12 403,761.72
m³ m³
0.7080 0.4920
Rp Rp
231,647.04 231,647.04
Rp Rp
164,006.11 113,970.35
jam jam jam jam jam jam
0.0625 0.1406 0.0088 0.0134 0.0032 0.0211
Rp Rp Rp Rp Rp Rp
494,396.09 269,670.60 477,316.96 305,626.68 267,863.80 206,549.70
Rp Rp Rp Rp Rp Rp
30,885.97 37,905.51 4,193.30 4,091.39 860.61 4,354.96
Analisa Harga Satuan - page 87 of 139
Kebutuhan
NO. 1 Pekerja 2 Mandor
28
29
30
31
1 m²
1 m³
1 m'
1 m³
Pek. Lapisan Resap Pengikat Aspal Bahan : 1 Aspal 2 Kerosene Tenaga Kerja : 1 Pekerja 2 Mandor Peralatan : 1 Asphalt Spray 2 Compressor 3 Dump truck 3-4 ton
Pek. Lapisan Permukaan Asphal Bahan : 1 Aspal 2 Agregat Kasar 3 Agregat Halus Tenaga Kerja : 1 Pekerja 2 Mandor Peralatan : 1 Wheel Loader 2 Asphalt Mixing Plant 3 Dump truck 4 Asphalt finisher 5 Tandem roller 6 Pneumatic Tire Roller
Pasangan Kanstein Beton uk. 60/30/15 cm Bahan : 1 Galian Tanah 2 Urugan Pasir 3 Kanstein uk. 60 x 15 x 30 cm 4 Urugan Kembali + Pemadatan 5 Upah Pasang
Membuat Beton mutu K 175 ,slump ( 12 + 2) cm Bahan : 1 Semen 2 Pasir beton 3 Batu Split 1/2 4 Air Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Kode Satuan
Indeks
Harga Satuan
jam 0.4061 Rp 70,000.00 jam 0.0580 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp
28,424.81 5,220.88 393,913.87 9,847.85 403,761.72 14,921.42
kg ltr
0.6417 0.4889
Rp Rp
9,168.80 10,786.82
Rp Rp
5,883.62 5,273.68
oh oh
0.0211 0.0030
Rp Rp
70,000.00 90,000.00
Rp Rp
1,477.00 270.00
jam 0.0030 Rp 134,835.30 jam 0.0031 Rp 141,828.76 jam 0.0030 Rp 269,670.60 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp
404.51 439.67 809.01 14,557.48 363.94 14,921.42 97,131.81
kg m³ m³
6.2517 0.0407 0.0252
Rp Rp Rp
9,168.80 251,692.56 282,524.90
Rp Rp Rp
57,320.59 10,243.89 7,119.63
oh oh
0.0282 0.0028
Rp Rp
70,000.00 90,000.00
Rp Rp
1,974.00 252.00
jam 0.0019 Rp 494,396.09 jam 0.0026 Rp 5,273,759.10 jam 0.0025 Rp 269,670.60 jam 0.0035 Rp 314,615.70 jam 0.0031 Rp 211,215.00 jam 0.0029 Rp 267,863.80 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
939.35 13,711.77 668.78 1,101.15 654.77 776.81 94,762.74 2,369.07 97,131.81 92,495.48
m³ 0.0400 Rp 56,118.75 m³ 0.0100 Rp 162,806.18 bh 1.6600 Rp 35,956.08 m³ 0.0200 Rp 44,843.75 m' 1.0000 Rp 25,782.71 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,244.75 1,628.06 59,687.09 896.88 25,782.71 90,239.49 2,255.99 92,495.48 750,426.42
1,168.57 134,835.30 224,725.50 22.47
Rp Rp Rp Rp
380,954.66 73,196.30 171,290.77 4,831.60
oh 1.0000 Rp 70,000.00 oh 0.2750 Rp 80,000.00 oh 0.0280 Rp 85,000.00 oh 0.0830 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp
70,000.00 22,000.00 2,380.00 7,470.00 732,123.33 18,303.08 750,426.42
kg m³ m³ ltr L.01 L.02 L.03 L.04
326.000 0.5429 0.7622 215.0000
Rp Rp Rp Rp
Analisa Harga Satuan - page 88 of 139
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2020) TAHUN ANGGARAN 2021 Kebutuhan
No 1
PEKERJAAN ARSITEKTUR 1 ls Pekerjaan Penyelenggaraan SMK3 Konstruksi A. Penyiapan RKK : 1 Pembuatan dokumen rencana keselamatan kerja 2 Pembuatan prosedur dan instruksi kerja 3 Penyiapan formulir B. Sosialisasi, promosi dan pelatihan : 1 Induksi K3 (Safety Induction) 2 Pengarahan K3 (Safety Briefing) 3 Pertemuan Keselamatan (Safety Talk dan/atau Tool Box Meeting) 4 Pelatihan K3 : - P3K - Bekerja di ketinggian - Simulasi K3 - Spanduk (Banner) - Poster - Papan Informasi K3 C. Alat Pelindung Kerja (APK) dan alat Pelindung Diri (APD) Alat Pelindung Kerja (APK), antara lain : 1 Jaring Pengaman (Safety Net) 2 Tali Keselamatan (Life Line) 3 Penahan Jatuh (Safety Deck) 4 Pagar Pengaman (Guard Railing) 5 Pembatas Area (Restricted Area) 1 2 3 4 5 6 7 8 9 10
Alat Pelindung Diri (APD), antara lain : Topi Pelindung (Safety Helmet) Pelindung Mata (Google, Spectacles) Tameng Muka (Faced Shield) Pelindung Pernapasan dan Mulut (Masker) Sarung Tangan (Safety Gloves) Sepatu Keselamatan (Safety Shoes) Penunjang Seluruh Tubuh (Full Body Harness) Rompi Keselamatan (Safety Vest) Celemek (Apron/Coveralls) Pelindung Jatuh (Fall Arrester)
Kode
Satuan
Indeks
Harga Satuan
Jumlah Harga Satuan
set
1.000
Rp
5,000,000.00
Rp Rp
173,109,687.50 5,000,000.00
org org org
75.000 75.000 75.000
Rp Rp Rp
7,500.00 15,000.00 15,000.00
Rp Rp Rp
562,500.00 1,125,000.00 1,125,000.00
org org org bh bh bh
1.000 3.000 40.000 10.000 10.000 2.000
Rp Rp Rp Rp Rp Rp
1,500,000.00 1,000,000.00 7,500.00 250,000.00 250,000.00 1,500,000.00
Rp Rp Rp Rp Rp Rp
1,500,000.00 3,000,000.00 300,000.00 2,500,000.00 2,500,000.00 3,000,000.00
ls ls ls ls ls
1.000 1.000 1.000 1.000 1.000
Rp Rp Rp Rp Rp
20,000,000.00 5,000,000.00 2,500,000.00 2,500,000.00 1,500,000.00
Rp Rp Rp Rp Rp
20,000,000.00 5,000,000.00 2,500,000.00 2,500,000.00 1,500,000.00
bh Psg bh box psg psg bh bh bh bh
85.000 75.000 75.000 75.000 75.000 75.000 3.000 75.000 5.000 10.000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
75,000.00 25,000.00 300,000.00 50,000.00 15,000.00 350,000.00 750,000.00 25,000.00 150,000.00 250,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,375,000.00 1,875,000.00 22,500,000.00 3,750,000.00 1,125,000.00 26,250,000.00 2,250,000.00 1,875,000.00 750,000.00 2,500,000.00
D. Asuransi dan Perizinan : ls 1.000 Rp 21,550,000.00 Rp 1 Asuransi 2 Surat Izin Laik Operasi (SILO) 3 Sertifikat Kompetensi Operator yang diterbitkan oleh lembaga/instansi yang berwenagn sesuai dengan ketentuan peraturan perundang-undangan 4 Surat Pengesahan, Organisasi K3 (P2K3), sesuai dengan ketentuan peraturan perundang-undangan 5 Perizinan terkait lingkungan kerja E. Personel K3 Konstruksi : 1 Ahli K3 Konstruksi 2 Petugas K3 Konstruksi 3 Petugas Tanggap Darurat 4 Petugas P3K 5 Petugas Pengatur Lalu Lintas (Flagman) 6 Tenaga Paramedis
OB OB OB OB OB OB
-
Rp Rp Rp Rp Rp Rp
10,000,000.00 7,500,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00
Rp Rp Rp Rp Rp Rp
F. Fasilitas, sarana dan prasarana kesehatan : 1 Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, dll) 2 Ruang P3K (Tmepat Tidur Pasien, Stetoskop, Timbangan Berat Badan) 3 Peralatan Pengasapan (Fogging)
ls ls ls
1.000 1.000 1.000
Rp Rp Rp
1,500,000.00 5,000,000.00 1,000,000.00
Rp Rp Rp
1,500,000.00 5,000,000.00 1,000,000.00
ls
1.000
Rp
15,000,000.00
Rp
15,000,000.00
H. Konsultasi dengan Ahli terkait Keselamatan Konstruksi : 1 Ahli Keselamatan terkait Jembatan
OJ
-
Rp
1,700,000.00
Rp
I. Lain-Lain Terkait Pengendalian Keselamatan Konstruksi : 1 Alat Pemadam Api Ringan (APAR) 2 Bendera K3 3 Lampu Darurat (Emergency Lamp) 4 Pembuatan Kartu Identitas Pekerja (KIP) 5 Program Inspeksi 6 Pelaporan dan Penyelidikan
bh bh bh lbr ls ls
4.000 Rp 550,000.00 1.000 Rp 150,000.00 4.000 Rp 150,000.00 75.000 Rp 7,000.00 1.000 Rp 4,000,000.00 1.000 Rp 1,000,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,200,000.00 150,000.00 600,000.00 525,000.00 4,000,000.00 1,000,000.00 168,887,500.00 4,222,187.50 173,109,687.50 182,043.36
Rp Rp Rp
75,507.77 25,942.31 13,753.20
G. Rambu - Rambu Yang Diperlukan : 1 Rambu Petunjuk 2 Rambu Larangan 3 Rambu Peringatan 4 Rambu Kewajiban 5 Rambu Informasi 6 Rambu Pekerjaan Sementara 7 Jalur Evakuasi (Escape Route) 8 Tongkat Pengatur Lalu Lintas (Warning Lights Stick) 9 Kerucut Lalu Lintas (Traffic Cone) 10 Lampu Putar (Rotary Lamp) 11 Lampu Selang Lalu Lintas
2
1 m²
21,550,000.00
Pemasangan Dinding Bata Merah 1 Batu ,Campuran 1 SP : 5 PP Bahan : 1 Bata Merah 2 Semen 3 Pasir Pasang Tenaga Kerja :
bh kg m³
140.000 22.200 0.102
Rp Rp Rp
539.34 1,168.57 134,835.30
-
-
Analisa Harga Satuan Pek. Arsitektur - page 89 of 139
Kebutuhan
No 1 2 3 4
3
4
5
6
7
8
9
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
Pekerja Tukang batu Kepala tukang Mandor
Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP Bahan : 1 Bata Merah 2 Semen 3 Pasir Pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP Bahan : 1 Bata Merah 2 Semen 3 Pasir Pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm Bahan : 1 Semen 2 Pasir Pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm Bahan : 1 Semen 2 Pasir Pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Membuat acian semen Bahan : 1 Semen Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan dinding bata ringan 200 x 600 x 100 Bahan : 1 Bata ringan 100x200x600 2 Semen mortar perekat bata ringan Setara @ 50 kg 3 Air Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Membuat plesteran semen instan, tebal 1 cm Bahan : 1 Semen mortar plesteran Setara @ 50 kg
Kode L.01 L.02 L.03 L.04
Satuan oh oh oh oh
Indeks Harga Satuan 0.600 Rp 70,000.00 0.200 Rp 80,000.00 0.020 Rp 85,000.00 0.030 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
bh kg m³
539.34 1,168.57 134,835.30
Rp Rp Rp
37,753.88 16,792.39 5,393.41
0.300 Rp 70,000.00 0.100 Rp 80,000.00 0.010 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 8,000.00 850.00 1,350.00 91,139.68 2,278.49 93,418.18 88,491.59
539.34 1,168.57 134,835.30
Rp Rp Rp
37,753.88 11,311.78 6,067.59
0.300 Rp 70,000.00 0.100 Rp 80,000.00 0.010 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 8,000.00 850.00 1,350.00 86,333.25 2,158.33 88,491.59 49,008.36
1,168.57 134,835.30
Rp Rp
9,086.82 3,101.21
0.300 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 12,000.00 1,275.00 1,350.00 47,813.03 1,195.33 49,008.36 46,318.31
1,168.57 134,835.30
Rp Rp
6,057.88 3,505.72
0.300 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
21,000.00 12,000.00 1,275.00 1,350.00 45,188.60 1,129.71 46,318.31 28,236.56
1,168.57
Rp
3,797.86
0.200 Rp 70,000.00 0.100 Rp 80,000.00 0.010 Rp 85,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
14,000.00 8,000.00 850.00 900.00 27,547.86 688.70 28,236.56 89,233.14
566,308.25 70,653.70 22.47
Rp Rp Rp
56,630.83 5,652.30 23.60
70,000.00 80,000.00 85,000.00 90,000.00 Jumlah Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
7,000.00 16,000.00 850.00 900.00 87,056.72 2,176.42 89,233.14 38,464.46
Rp
19,401.30
L.01 L.02 L.03 L.04
L.01 L.02 L.03 L.04
7.776 0.023
Rp Rp
5.184 0.026
Rp Rp
oh oh oh oh
kg L.01 L.02 L.03 L.04
Rp Rp Rp
oh oh oh oh
kg m³ L.01 L.02 L.03 L.04
70.000 9.680 0.045
oh oh oh oh
kg m³ L.01 L.02 L.03 L.04
Rp Rp Rp
oh oh oh oh
bh kg m³ L.01 L.02 L.03 L.04
70.000 14.370 0.040
Jumlah Harga Satuan Rp 42,000.00 Rp 16,000.00 Rp 1,700.00 Rp 2,700.00 Rp 177,603.28 Rp 4,440.08 Rp 182,043.36 Rp 93,418.18
3.250
Rp
oh oh oh oh
m³ sak ltr
0.100 0.080 1.050
Rp Rp Rp
oh oh oh oh
0.100 0.200 0.010 0.010
Rp Rp Rp Rp
sak
0.417
Rp
46,563.12
Analisa Harga Satuan Pek. Arsitektur - page 90 of 139
Kebutuhan
No Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
10
11
12
13
14
15
16
1 m²
1 m²
1 m'
1 m'
1 m'
1 m'
1 m'
Membuat plesteran trasram semen instan, tebal 1 cm Bahan : 1 Semen mortar plesteran trasam Setara @ 50 kg Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Membuat acian semen instan Bahan : 1 Semen mortar acian Setara @ 40 kg Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Membuat nat tali air profil U alumunium Bahan : 1 Semen 2 Profil alumunium U Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Kode
Satuan
Indeks
Harga Satuan
L.01 L.02 L.03 L.04
oh oh oh oh
0.050 0.150 0.015 0.015
Rp Rp Rp Rp
sak
0.500
Rp
oh oh oh oh
0.050 0.150 0.015 0.015
Rp Rp Rp Rp
sak
0.050
Rp
oh oh oh oh
0.200 0.100 0.010 0.010
Rp Rp Rp Rp
kg m'
1.083 1.000
Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00 Jumlah Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp
3,500.00 12,000.00 1,275.00 1,350.00 37,526.30 938.16 38,464.46 62,108.47
84,937.25
Rp
42,468.62
70,000.00 80,000.00 85,000.00 90,000.00 Jumlah Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
3,500.00 12,000.00 1,275.00 1,350.00 60,593.62 1,514.84 62,108.47 27,568.56
62,923.14
Rp
3,146.16
70,000.00 80,000.00 85,000.00 90,000.00 Jumlah Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
14,000.00 8,000.00 850.00 900.00 26,896.16 672.40 27,568.56 13,969.60
1,168.57 9,887.92
Rp Rp
1,265.95 9,887.92
0.010 Rp 70,000.00 0.020 Rp 80,000.00 0.001 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 1,600.00 85.00 90.00 13,628.88 340.72 13,969.60 10,895.45
L.01 L.02 L.03 L.04
L.01 L.02 L.03 L.04
L.01 L.02 L.03 L.04
oh oh oh oh
Pek. Opening Pintu dan Jendela semen instan Bahan : 1 Membuat plesteran semen instan, tebal 1 cm 2 Membuat acian semen instan
m' m'
0.165 Rp 38,464.46 0.165 Rp 27,568.56 Jumlah harga persatuan pekerjaan
Pek. Opening Pintu dan Jendela semen biasa Bahan : 1 Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm 2 Membuat acian semen
Rp Rp Rp Rp
6,346.64 4,548.81 10,895.45 12,745.41
m' m'
0.165 Rp 49,008.36 0.165 Rp 28,236.56 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp
8,086.38 4,659.03 12,745.41 73,835.41
3,299,869.21 14,382.43 9,887.92 14,382.43 1,168.57 134,835.30 224,725.50 9,887.92
Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,599.74 143.82 29,663.77 6,472.09 4,674.29 809.01 2,022.53 2,929.30
0.180 Rp 70,000.00 0.020 Rp 80,000.00 0.020 Rp 80,000.00 0.020 Rp 80,000.00 0.006 Rp 85,000.00 0.009 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
12,600.00 1,600.00 1,600.00 1,600.00 510.00 810.00 72,034.55 1,800.86 73,835.41 90,635.06
Rp Rp Rp Rp Rp Rp Rp Rp
9,899.61 287.65 35,596.52 719.12 6,427.15 1,213.52 3,370.88
Pemasangan kolom praktis 11/11 cm Bahan : 1 Kayu kelas III 2 Paku 5-10 cm 3 Minyak bekisting 4 Besi beton polos 5 Kawat beton 6 semen portland 7 Pasir beton 8 Kerikil 9 Besi starter d8-800 panjang satu sisi 300 mm Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Tukang kayu 4 Tukang besi 5 Kepala tukang 6 Mandor
Pemasangan balok praktis 10/15 cm Bahan : 1 Kayu kelas III 2 Paku 5-10 cm 3 Minyak bekisting 4 Besi beton polos 5 Kawat beton 6 semen portland 7 Pasir beton 8 Kerikil Tenaga Kerja:
m3 kg ltr kg kg kg m3 m3 kg
0.002 0.010 3.000 0.450 4.000 0.006 0.009 0.296
Rp Rp Rp Rp Rp Rp Rp Rp Rp
oh oh oh oh oh oh
m3 kg ltr kg kg kg m3 m3
0.003 0.020 3.600 0.050 5.500 0.009 0.015
Rp Rp Rp Rp Rp Rp Rp Rp
3,299,869.21 14,382.43 9,887.92 14,382.43 1,168.57 134,835.30 224,725.50
Analisa Harga Satuan Pek. Arsitektur - page 91 of 139
Kebutuhan
No 1 2 3 4 5 6
17
18
19
20
21
22
23
24
25
1 m'
1 m³
1 m³
1 m³
1 m³
1 m³
1 m³
1 m²
1 m²
Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor
Pemasangan balok praktis 25/15 cm Bahan : 1 Kayu kelas III 2 Paku 5-10 cm 3 Minyak bekisting 4 Besi beton polos 5 Kawat beton 6 semen portland 7 Pasir beton 8 Kerikil Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Tukang kayu 4 Tukang besi 5 Kepala tukang 6 Mandor
Kode
Satuan oh oh oh oh oh oh
Indeks Harga Satuan 0.297 Rp 70,000.00 0.033 Rp 80,000.00 0.033 Rp 80,000.00 0.033 Rp 80,000.00 0.010 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m3 kg ltr kg kg kg m3 m3
0.008 0.050 9.000 0.125 13.750 0.023 0.038
Rp Rp Rp Rp Rp Rp Rp Rp
Jumlah Harga Satuan Rp 20,790.00 Rp 2,640.00 Rp 2,640.00 Rp 2,640.00 Rp 850.00 Rp 1,350.00 Rp 88,424.45 Rp 2,210.61 Rp 90,635.06 Rp 226,587.64
3,299,869.21 14,382.43 9,887.92 14,382.43 1,168.57 134,835.30 224,725.50
Rp Rp Rp Rp Rp Rp Rp Rp
24,749.02 719.12 88,991.30 1,797.80 16,067.87 3,033.79 8,427.21
0.743 Rp 70,000.00 0.083 Rp 80,000.00 0.083 Rp 80,000.00 0.083 Rp 80,000.00 0.025 Rp 85,000.00 0.038 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
51,975.00 6,600.00 6,600.00 6,600.00 2,125.00 3,375.00 221,061.12 5,526.53 226,587.64 2,087,431.19
oh oh oh oh oh oh
Pemasangan balok ukuran 15/30 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi 4d8, d6-150 3 Pemasangan bekisting untuk balok 3 kali pakai
m³ kg m²
1.000 Rp 750,426.42 62.080 Rp 12,037.14 4.444 Rp 132,691.26 Jumlah harga persatuan pekerjaan
Pemasangan meja beton tebal 10 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi U 24 (d8-150) 3 Pemasangan bekisting untuk plat lantai 2 kali pakai
Rp Rp Rp Rp Rp
750,426.42 747,265.86 589,738.92 2,087,431.19 2,280,519.39
m³ kg m²
1.000 Rp 750,426.42 52.667 Rp 12,037.14 5.000 Rp 179,227.35 Jumlah harga persatuan pekerjaan
Pemasangan beton plat canopy tebal 10 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi U 24 (d8-150) 3 Pemasangan bekisting untuk plat lantai 2 kali pakai
Rp Rp Rp Rp Rp
750,426.42 633,956.22 896,136.75 2,280,519.39 2,280,519.39
m³ kg m²
1.000 Rp 750,426.42 52.667 Rp 12,037.14 5.000 Rp 179,227.35 Jumlah harga persatuan pekerjaan
Pemasangan beton plat canopy tebal 8 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi U 24 (d8-150) 3 Pemasangan bekisting untuk plat lantai 2 kali pakai
Rp Rp Rp Rp Rp
750,426.42 633,956.22 896,136.75 2,280,519.39 2,663,042.63
m³ kg m²
1.000 Rp 750,426.42 65.833 Rp 12,037.14 6.250 Rp 179,227.35 Jumlah harga persatuan pekerjaan
Pemasangan beton lisplank tebal 15 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi U 24 (d10-150) 3 Pemasangan bekisting untuk balok
Rp Rp Rp Rp Rp
750,426.42 792,445.27 1,120,170.94 2,663,042.63 3,837,844.11
m³ kg m²
1.000 Rp 750,426.42 109.511 Rp 12,037.14 13.333 Rp 132,691.26 Jumlah harga persatuan pekerjaan
Pemasangan plat deck beton tebal 10 cm 1 Beton mutu K 175 ,slump ( 12 + 2) cm 2 Besi U 24 (d12-100) 3 Pemasangan bekisting untuk plat lantai 2 kali pakai
Rp Rp Rp Rp Rp
750,426.42 1,318,200.94 1,769,216.75 3,837,844.11 3,789,174.68
m³ kg m²
1.000 Rp 750,426.42 178.000 Rp 12,037.14 5.000 Rp 179,227.35 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp
750,426.42 2,142,611.51 896,136.75 3,789,174.68 228,017.60
8,580.43 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
101,849.68 9,570.61 6,067.59 21,843.32
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 222,456.20 5,561.40 228,017.60 209,046.38
Pemasangan dinding keramik 30 x 30 cm Bahan : 1 Keramik uk. 30 x 30 cm 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan dinding homogenous tile 30 x 60 cm Bahan : 1 Homogenous tile 30 x 60 cm 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
bh kg m³ kg L.01 L.02 L.03 L.04
L.01 L.02 L.03 L.04
11.870 8.190 0.045 1.620
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg
5.556 9.600 0.045 1.500
Rp Rp Rp Rp
24,828.57 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
137,936.51 11,218.30 6,067.59 20,225.29
oh oh oh oh
0.240 0.120 0.012 0.012
Rp Rp Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00
Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00
Analisa Harga Satuan Pek. Arsitektur - page 92 of 139
Kebutuhan
No
26
27
28
29
30
31
1 m²
1 m'
1 m'
1 m'
1 m'
1 m'
Pemasangan dinding homogenous tile 60 x 60 cm Bahan : 1 Homogenius tile 60 x 60 cm - Polished 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan homogenius tile 10 x 60 cm Bahan : 1 Plint homogenius tile 10 x 60 cm cutting size 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan homogenius tile 10 x 30 cm Bahan : 1 Plint homogenius tile 10 x 30 cm cutting size 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan plint keramik 10 x 30 cm Bahan : 1 Plint keramik 10 x 30 cm cutting size 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan hospital plint Non Standar Bahan : 1 Hospital plint/skriting 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Plint Vinyl Sheet Bahan : 1 Vinyl Sheet 2 Lem/adhesive Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Kode
Satuan
Indeks Harga Satuan Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
bh kg m³ kg
56,630.83 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
165,173.24 11,218.30 6,067.59 20,225.29
0.240 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00 231,184.42 5,779.61 236,964.03 40,173.75
12,584.63 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
21,393.87 1,332.17 404.51 1,348.35
0.090 Rp 70,000.00 0.090 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
6,300.00 7,200.00 765.00 450.00 39,193.90 979.85 40,173.75 40,720.99
6,265.07 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
21,927.76 1,332.17 404.51 1,348.35
0.090 Rp 70,000.00 0.090 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
6,300.00 7,200.00 765.00 450.00 39,727.79 993.19 40,720.99 28,505.79
2,860.14 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
10,010.50 1,332.17 404.51 1,348.35
0.090 Rp 70,000.00 0.090 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
6,300.00 7,200.00 765.00 450.00 27,810.53 695.26 28,505.79 140,211.99
33,708.82 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
118,992.15 1,332.17 404.51 1,348.35
0.090 Rp 70,000.00 0.090 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
6,300.00 7,200.00 765.00 450.00 136,792.18 3,419.80 140,211.99 89,798.62
67,147.98 50,787.96
Rp Rp
70,505.38 4,063.04
0.080 Rp 70,000.00 0.080 Rp 80,000.00 0.008 Rp 85,000.00 0.004 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp
5,600.00 6,400.00 680.00 360.00 87,608.41
L.01 L.02 L.03 L.04
Rp Rp Rp Rp
3.500 1.140 0.003 0.100
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
1.700 1.140 0.003 0.100
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
2.917 9.600 0.045 1.500
Jumlah Harga Satuan Rp 203,947.69 Rp 5,098.69 Rp 209,046.38 Rp 236,964.03
3.500 1.140 0.003 0.100
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg
3.530 1.140 0.003 0.100
Rp Rp Rp Rp
oh oh oh oh
m' ltr L.01 L.02 L.03 L.04
oh oh oh oh
1.050 0.080
Rp Rp
Analisa Harga Satuan Pek. Arsitektur - page 93 of 139
Kebutuhan
No
32
33
34
35
36
37
38
1 m'
1 m'
1 m'
1 m²
1 m²
1 m²
1 m²
Pemasangan Plint kayu tebal 2 cm lebar 10 cm Bahan : 1 Papan 1 kayu kelas 1 2 Paku/sekrup 5 cm Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Bumper Guard Bahan dan upah pasang 1 Bumper guard+Aksesories terpasang - Alumunium Extrude profil - Cover Vinyl Handrail - Endcap Section Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Rail Guard Bahan dan upah pasang 1 Raill guard+Aksesories terpasang - Alumunium Extrude profil 140mm - Cover Vinyl Handrail 140mm - Braket Wall - Return Section (End Cap) Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Flexi Wall uk. 60 x 120 cm Bahan : 1 Flexi Wall ukuran 60 x 120 cm ex. Flexistone / setara 2 Semen mortar tile adhesive @ 40 kg Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Batu Andesite Bahan : 1 Batu Andesite 2 Semen 3 Pasir pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Batu Granite Bahan : 1 Batu granite 2 Semen 3 Semen warna 4 Pasir pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Batu Marmer Bahan :
Kode
Satuan
Indeks Harga Satuan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m³ kg
4,494,509.95 8,989.02
Rp Rp
13,483.53 449.45
0.120 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.006 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
8,400.00 9,600.00 1,020.00 540.00 33,492.98 837.32 34,330.31 364,356.28
311,469.54
Rp
311,469.54
0.250 Rp 70,000.00 0.250 Rp 80,000.00 0.050 Rp 85,000.00 0.025 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
17,500.00 20,000.00 4,250.00 2,250.00 355,469.54 8,886.74 364,356.28 364,356.28
311,469.54
Rp
311,469.54
0.250 Rp 70,000.00 0.250 Rp 80,000.00 0.050 Rp 85,000.00 0.025 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
17,500.00 20,000.00 4,250.00 2,250.00 355,469.54 8,886.74 364,356.28 497,665.64
444,956.49 84,496.79
Rp Rp
444,956.49 12,070.97
0.240 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00 485,527.45 12,138.19 497,665.64 235,870.90
116,857.26 1,168.57 134,835.30
Rp Rp Rp
128,542.98 13,730.73 4,719.24
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 230,117.95 5,752.95 235,870.90 1,282,204.09
1,078,682.39 1,168.57 13,483.53 134,835.30
Rp Rp Rp Rp
1,143,403.33 9,570.61 8,764.29 6,067.59
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 1,250,930.82 31,273.27 1,282,204.09 842,708.44
L.01 L.02 L.03 L.04
Rp
1.000 0.143
Rp Rp
1.100 11.750 0.035
Rp Rp Rp
oh oh oh oh
m² kg kg m³ L.01 L.02 L.03 L.04
1.000
oh oh oh oh
m² kg m³ L.01 L.02 L.03 L.04
Rp
oh oh oh oh
m² sak L.01 L.02 L.03 L.04
1.000
oh oh oh oh
m'
L.01 L.02 L.03 L.04
Rp Rp
oh oh oh oh
m'
L.01 L.02 L.03 L.04
0.003 0.050
Jumlah Harga Satuan Rp 2,190.21 Rp 89,798.62 Rp 34,330.31
oh oh oh oh
1.060 8.190 0.650 0.045
Rp Rp Rp Rp
Analisa Harga Satuan Pek. Arsitektur - page 94 of 139
Kebutuhan
No
Kode
1 Batu marmer 2 Semen 3 Semen warna 4 Pasir pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
39
40
41
1
42
43
44
45
1 m²
1 m²
1 m²
1 m²
1 m'
1 m²
1 m²
1 m²
Pemasangan Glass Block uk. 20 x 20 cm Bahan : 1 Glassblock uk. 20 x 20 cm 2 Semen Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Stainless steel framing Bahan : 1 Stainless steel framing lift 2 Peralatan bantu 5% Upah Pasang
Alumunium Composite Panel PVDF 0.5 mm Alloy 5005 Bahan : 1 Allumunium Composite Panel PVDF 0.5 mm alloy 5005 2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara 3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara -Ongkos Pasang dan Alat Bantu Pemasangan
Alumunium Composite Panel PVDF 0.5 mm Alloy 5005 (Corrugated) Bahan : 1 Allumunium Composite Panel PVDF 0.5 mm alloy 5005 (Corrugated) 2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara 3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara -Ongkos Pasang dan Alat Bantu Pemasangan
Aluminium composit panel flashing (penutup antara CW dengan bata) Bahan : 1 Allumunium Composite Panel PVDF 0.3 mm tebal 4 mm alloy 3003 2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara 3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara -Ongkos Pasang dan Alat Bantu Pemasangan
Alumunium Solid Panel tebal 3mm Alloy AA 1100-H14 Bahan : 1 Alumunium Solid Panel tebal 3mm Alloy AA 1100-H14 2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara 3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara -Ongkos Pasang dan Alat Bantu Pemasangan
Facade NBK Terracotta, thick 28mm Bahan : 1 Terrart-MID material panel 2 AL Support system - accessories Ongkos Pasang dan Alat Bantu Pemasangan
Pemasangan dinding partisi gypsum double board tbl. 12 mm Bahan : 1 Gypsum board 1200 mm x 2400 mm x 12 mm 2 Siku metal furing L.2.5 cm 3 Canal C metal furing C.2 x 3 x 2 cm 4 Paku ramset+misiu 5 Joint Tape @ 75 m 6 Skrup
L.01 L.02 L.03 L.04
Satuan m² kg kg m³
Indeks 1.060 8.190 0.650 0.045
Rp Rp Rp Rp
Harga Satuan 674,176.49 1,168.57 13,483.53 134,835.30
oh oh oh oh
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
Jumlah Harga Satuan 714,627.08 9,570.61 8,764.29 6,067.59
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 822,154.57 20,553.86 842,708.44 603,169.19
22,472.55 1,168.57
Rp Rp
561,813.74 6,544.01
oh oh oh oh
0.120 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
8,400.00 9,600.00 1,020.00 1,080.00 588,457.75 14,711.44 603,169.19 1,581,306.14
m² ls ls
Rp Rp Rp Rp Rp Rp Rp
1,375,320.04 67,417.65 100,000.00 1,542,737.69 38,568.44 1,581,306.14 678,647.63
m² m' tube ls
Rp Rp Rp Rp Rp Rp Rp Rp
364,055.31 134,835.30 52,855.44 110,349.21 662,095.25 16,552.38 678,647.63 844,495.05
m² m' tube ls
Rp Rp Rp Rp Rp Rp Rp Rp
498,890.60 134,835.30 52,855.44 137,316.27 823,897.61 20,597.44 844,495.05 223,942.39
m² m' tube ls
Rp Rp Rp Rp Rp Rp Rp Rp
127,419.36 44,945.10 17,618.48 28,497.44 218,480.38 5,462.01 223,942.39 912,616.87
m² m' tube ls
Rp Rp Rp Rp Rp Rp Rp Rp
586,533.55 134,835.30 52,855.44 116,133.64 890,357.93 22,258.95 912,616.87 3,416,456.79
m² m² m²
Rp Rp Rp Rp Rp Rp Rp
2,719,178.52 389,224.56 224,725.50 3,333,128.58 83,328.21 3,416,456.79 149,305.15
Rp Rp Rp Rp Rp Rp
60,406.21 15,101.55 14,921.77 3,164.14 3,878.12 2,876.49
bh kg L.01 L.02 L.03 L.04
25.000 5.600
Rp Rp
1.020 Rp 1,348,352.99 1.000 Rp 67,417.65 1.000 Rp 100,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
1.000 Rp 364,055.31 2.000 Rp 67,417.65 1.200 Rp 44,046.20 1.000 Rp 110,349.21 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
1.000 Rp 498,890.60 2.000 Rp 67,417.65 1.200 Rp 44,046.20 1.000 Rp 137,316.27 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
0.350 Rp 364,055.31 0.667 Rp 67,417.65 0.400 Rp 44,046.20 1.000 Rp 28,497.44 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
1.000 Rp 586,533.55 2.000 Rp 67,417.65 1.200 Rp 44,046.20 1.000 Rp 116,133.64 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
1.000 Rp 2,719,178.52 1.000 Rp 389,224.56 1.000 Rp 224,725.50 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
lbr m' m' kg roll bh
0.729 4.000 2.000 0.220 0.143 16.000
Rp Rp Rp Rp Rp Rp
82,842.81 3,775.39 7,460.89 14,382.43 27,146.84 179.78
Analisa Harga Satuan Pek. Arsitektur - page 95 of 139
Kebutuhan
No 7 Jointing Coumpond Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
46
47
48
49
50
51
1 m²
1 m²
1 m²
1 m²
1 m²
1 cm
Kode
Satuan kg
Indeks 1.000
Rp
Harga Satuan 3,865.28
14,000.00 24,000.00 2,550.00 900.00 145,663.56 3,641.59 149,305.15 112,904.27
82,842.81 3,775.39 7,460.89 14,382.43 27,146.84 179.78 3,865.28
Rp Rp Rp Rp Rp Rp Rp
30,203.11 15,101.55 14,921.77 3,164.14 1,939.06 1,438.24 1,932.64
0.200 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
14,000.00 24,000.00 2,550.00 900.00 110,150.51 2,753.76 112,904.27 124,339.74
49,439.61 3,775.39 7,460.89 14,382.43 27,146.84 179.78 3,865.28
Rp Rp Rp Rp Rp Rp Rp
36,049.72 15,101.55 14,921.77 3,164.14 3,878.12 2,876.49 3,865.28
0.200 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan soundproof + dinding partisi gypsum single board tbl. 12 mm Bahan : 1 Gypsum board 1200 mm x 2400 mm x 12 mm lbr 0.365 Rp 82,842.81 2 Pasangan rockwool m² 1.000 Rp 134,835.30 3 Siku metal furing L.2.5 cm m' 4.000 Rp 3,775.39 4 Canal C metal furing C.2 x 3 x 2 cm m' 2.000 Rp 7,460.89 5 Paku ramset+misiu kg 0.220 Rp 14,382.43 6 Joint Tape @ 75 m roll 0.071 Rp 27,146.84 7 Skrup bh 8.000 Rp 179.78 8 Jointing Coumpond kg 0.500 Rp 3,865.28 Tenaga Kerja : 1 Pekerja oh 0.200 Rp 70,000.00 2 Tukang batu oh 0.300 Rp 80,000.00 3 Kepala tukang oh 0.030 Rp 85,000.00 4 Mandor oh 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pekerjaan Atap Metal Shingle Flat Berpasir tebal 0,35 mm Bahan : 1 Atap Metal Shingle Flat Berpasir tebal 0,35 mm m² 1.000 Rp 148,318.83 2 Sekrup bh 7.150 Rp 179.78 Tenaga Kerja : 1 Pekerja L.01 oh 0.140 Rp 70,000.00 2 Tukang Kayu L.02 oh 0.070 Rp 80,000.00 3 Kepala Tukang L.03 oh 0.007 Rp 85,000.00 4 Mandor L.04 oh 0.007 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Penutup Atap Enamel 1 Atap enamel m² 1.0000 Rp 2,247,254.98 - termasuk rangka dan perkuatan - insulasi - Ongkos pasang Jumlah harga persatuan pekerjaan Keuntungan+Over head 5% Total = Jumlah+(Keuntungan+Over head 5%) Pangadaan dan pemasangan Signate Stainless steel tebal 0,6 mm lengkap dengan rangka/ perkuatan dan alat bantu Bahan :
Rp Rp Rp Rp Rp Rp Rp Rp
14,000.00 24,000.00 2,550.00 900.00 121,307.06 3,032.68 124,339.74 251,110.45
Rp Rp Rp Rp Rp Rp Rp Rp
30,203.11 134,835.30 15,101.55 14,921.77 3,164.14 1,939.06 1,438.24 1,932.64
Rp Rp Rp Rp Rp Rp Rp Rp
14,000.00 24,000.00 2,550.00 900.00 244,985.81 6,124.65 251,110.45 170,384.99
Rp Rp
148,318.83 1,285.43
Rp Rp Rp Rp Rp Rp Rp Rp
9,800.00 5,600.00 595.00 630.00 166,229.26 4,155.73 170,384.99 2,303,436.35
Rp
2,247,254.98
Rp Rp Rp Rp
2,247,254.98 56,181.37 2,303,436.35 18,450.00
Pemasangan dinding partisi GRC tebal 9 mm Bahan : 1 GRC 1200 mm x 2400 mm x 9 mm 2 Siku metal furing L.2.5 cm 3 Canal C metal furing C.2 x 3 x 2 cm 4 Paku ramset+misiu 5 Joint Tape @ 75 m 6 Skrup 7 Jointing Coumpond Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
0.200 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan 3,865.28
Rp Rp Rp Rp Rp Rp Rp Rp
Pemasangan dinding partisi gypsum single board tbl. 12 mm Bahan : 1 Gypsum board 1200 mm x 2400 mm x 12 mm 2 Siku metal furing L.2.5 cm 3 Canal C metal furing C.2 x 3 x 2 cm 4 Paku ramset+misiu 5 Joint Tape @ 75 m 6 Skrup 7 Jointing Coumpond Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
oh oh oh oh
Rp
lbr m' m' kg roll bh kg
0.365 4.000 2.000 0.220 0.071 8.000 0.500
Rp Rp Rp Rp Rp Rp Rp
oh oh oh oh
lbr m' m' kg roll bh kg oh oh oh oh
0.729 4.000 2.000 0.220 0.143 16.000 1.000
Rp Rp Rp Rp Rp Rp Rp
Analisa Harga Satuan Pek. Arsitektur - page 96 of 139
Kebutuhan
No 1 2
52
53
54
55
56
57
58
59
1 cm
1 m²
1 m²
1 m²
1 cm
1 cm
1 m'
1 m²
Signage Stainless steel tebal 0,6 mm Upah pasang dan material bantu
Pangadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm lengkap dengan rangka/ perkuatan dan alat bantu Bahan : 1 Lambang Stainless steel tebal 0,6 mm 2 Upah pasang dan material bantu
Pemasangan Timbal 3 mm Bahan : 1 Timbal 3 mm 2 Perlengkapan/alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pekerjaan Clading dinding fin HPL Bahan : 1 Rangka Hollow 40x40x1 mm galvanis 2 Multiplek 9 mm 3 HPL 4 Nad profil U stainless steel 5 Alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Pekerjaan vinyl wall cavering (dinding vinyl) Bahan : 1 Vinyl wall covering (vinyl dinding) 2 Lem/adhesive Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Kode
Satuan cm ls
Indeks Harga Satuan 1.000 Rp 15,000.00 1.000 Rp 3,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
cm ls
1.000 Rp 37,500.00 1.000 Rp 7,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
37,500.00 7,500.00 45,000.00 1,125.00 46,125.00 2,092,865.98
1,887,694.18 96,272.40
Rp Rp
1,925,448.06 96,272.40
0.120 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
8,400.00 9,600.00 1,020.00 1,080.00 2,041,820.47 51,045.51 2,092,865.98 631,010.72
21,000.00 115,059.45 200,000.00 25,000.00 100,000.00
Rp Rp Rp Rp Rp
126,000.00 39,120.21 68,000.00 25,000.00 100,000.00
1.500 Rp 70,000.00 1.500 Rp 80,000.00 0.250 Rp 85,000.00 0.125 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
105,000.00 120,000.00 21,250.00 11,250.00 615,620.21 15,390.51 631,010.72 192,348.72
134,835.30 50,787.96
Rp Rp
134,835.30 12,696.99
0.350 Rp 70,000.00 0.175 Rp 80,000.00 0.017 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
24,500.00 14,000.00 1,445.00 180.00 187,657.29 4,691.43 192,348.72 11,977.87
1.000 Rp 8,989.02 1.000 Rp 2,696.71 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp
8,989.02 2,696.71 11,685.73 292.14
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
11,977.87 45,147.35
1.000 Rp 31,461.57 1.000 Rp 12,584.63 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp
31,461.57 12,584.63 44,046.20 1,101.15
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
45,147.35 806,202.72
786,539.24
Rp
786,539.24
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp
786,539.24 19,663.48
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
806,202.72 127,079.17
Rp Rp Rp Rp Rp Rp
16,230.17 44,990.04 16,360.02 364.95 1,073.83 2,966.38
m² ls
1.020 1.000
Rp Rp
oh oh oh oh
m' lbr lbr m' ls
6.000 0.340 0.340 1.000 1.000
Rp Rp Rp Rp Rp
oh oh oh oh
m² kg
1.000 0.250
Rp Rp
oh oh oh oh
Pengadaan dan pemasangan Signate Stainless steel tebal 0,6 mm lengkap dengan rangka/ perkuatan dan alat bantu Bahan : 1 Signage Stainless steel tebal 0,6 mm 2 Upah pasang dan material bantu
cm ls
Pengadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm lengkap dengan rangka/ perkuatan dan alat bantu Bahan : 1 Lambang Stainless steel tebal 0,6 mm 2 Upah pasang dan material bantu
cm ls
Pekerjaan Hospital curtain & Rail komplit set (Medical Track). lengkap dengan rel, penggantung, perkuatan dan alat bantu Bahan : 1 Hospital curtain & Rail komplit set (Medical Track) - Rail RS Komplit set - Kain menggunakan Type Polyester FN Lebar 2.8 m Warna Cream dan Putih - Kain Polyester menggunakan type jahitan mata ayam - Sudah termasuk bending, joint, biaya pasang dan jahit
m'
1.000
Rp
Pemasangan Partisi GRC Board 1 Layer Bahan : 1 2 3 4 5 6
GRC 1200 mm x 2400 mm x 6 mm C stud 75 U Chanel 75 Jointing Coumpond Joint Tape @ 75 m Mur 25 mm
Jumlah Harga Satuan Rp 15,000.00 Rp 3,000.00 Rp 18,000.00 Rp 450.00 Rp 18,450.00 Rp 46,125.00
lbr m' m' kg roll bh
0.347 3.250 3.250 0.035 0.033 11.000
Rp Rp Rp Rp Rp Rp
46,742.90 13,843.09 5,033.85 10,427.26 32,540.25 269.67
Analisa Harga Satuan Pek. Arsitektur - page 97 of 139
Kebutuhan
No
Kode
Harga Satuan 544.29
Rp
0.200 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp
14,000.00 24,000.00 2,550.00 900.00 123,979.68 3,099.49
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
127,079.17 765,185.12
27,865.96 132,138.59 336,548.91 22,472.55 100,000.00
Rp Rp Rp Rp Rp
167,195.77 44,927.12 114,426.63 22,472.55 100,000.00
1.500 Rp 70,000.00 2.000 Rp 80,000.00 0.250 Rp 85,000.00 0.125 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp
105,000.00 160,000.00 21,250.00 11,250.00 746,522.07 18,663.05
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
765,185.12 793,014.32
27,865.96 132,138.59 134,835.30 22,472.55 100,000.00
Rp Rp Rp Rp Rp
167,195.77 44,927.12 141,577.06 22,472.55 100,000.00
1.500 Rp 70,000.00 2.000 Rp 80,000.00 0.250 Rp 85,000.00 0.125 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp
105,000.00 160,000.00 21,250.00 11,250.00 773,672.50 19,341.81
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
793,014.32 773,433.36
27,865.96 132,138.59 80,901.18 15,000.00 100,000.00
Rp Rp Rp Rp Rp
167,195.77 44,927.12 84,946.24 60,000.00 100,000.00
1.500 Rp 70,000.00 2.000 Rp 80,000.00 0.250 Rp 85,000.00 0.125 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp
105,000.00 160,000.00 21,250.00 11,250.00 754,569.13 18,864.23
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
773,433.36 1,934,886.53
1,887,694.18
Rp
1,887,694.18
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp
1,887,694.18 47,192.35
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
1,934,886.53 1,566,336.72
1,528,133.38
Rp
1,528,133.38
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp
1,528,133.38 38,203.33
Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp
1,566,336.72 257,710.06
267,558.18
Rp
227,424.45
0.330 Rp 70,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
23,100.00 900.00 251,424.45 6,285.61 257,710.06 313,589.12
331,694.83
Rp
281,940.61
0.330 Rp 70,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
23,100.00 900.00 305,940.61 7,648.52 313,589.12 379,375.27
7 Aksesoris Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
60
61
62
63
64
65
66
67
1 m²
1 m²
1 m²
1 m'
1 unit
1 m'
1 m'
1 m'
oh oh oh oh
Pekerjaan Clading dinding fin HPL Bahan : 1 Rangka Hollow 40x40x1 mm galvanis 2 Plywood 12 mm 3 HPL 4 Nad profil U stainless steel 5 Alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
m' lbr lbr m' ls oh oh oh oh
Pekerjaan Clading dinding fin wallpaper motif batik Bahan : 1 Rangka Hollow 40x40x1 mm galvanis 2 Plywood 12 mm 3 Wallpaper motif batik 4 Nad profil U stainless steel 5 Alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
m' lbr m² m' ls oh oh oh oh
Pekerjaan Clading dinding kaca cermin Bahan : 1 Rangka Hollow 40x40x1 mm galvanis 2 Plywood 12 mm 3 Kaca cermin 4 Sekrup kaca 5 Alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
m' lbr m² m² ls oh oh oh oh
Meja Fabrikasi Interior Melekat Meja Konter - Rangka kamper, multiplek 18mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - List Alumunium tebal 2 cm - Laci 3 susun - Fabrikasi dan pemasangan
m'
Meja depo obat menempel dinding Meja Konter menempel dinding - Rangka kamper, multiplek 18mm, lapis HPL - Edging HPL, top counter fin. Solid surface (motif batu granit) - Laci 3 susun - Fabrikasi dan pemasangan
Pemasangan Saluran U-Ditch 20x20 Bahan : 1 Saluran U-Ditch 20 x 20 cm @panjang = 1,2 m Tenaga Kerja : 1 Pekerja 2 Mandor
Pemasangan Saluran U-Ditch 30x40 Bahan : 1 Saluran U-Ditch 30 x 40 cm @panjang = 1,2 m Tenaga Kerja : 1 Pekerja 2 Mandor
Pemasangan Saluran U-Ditch 60x80
Satuan lot
m'
bh L.01 L.04
6.000 0.340 0.340 1.000 1.000
6.000 0.340 1.050 1.000 1.000
6.000 0.340 1.050 4.000 1.000
1.000
1.000
0.850
Rp
Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp
Rp
Rp
Rp
oh oh
bh L.01 L.04
Indeks 1.000
oh oh
0.850
Rp
Jumlah Harga Satuan 544.29
Analisa Harga Satuan Pek. Arsitektur - page 98 of 139
Kebutuhan
No
Kode
Bahan : 1 Saluran U-Ditch 60 x 80 cm @panjang = 1,2 m Tenaga Kerja : 1 Pekerja 2 Mandor
68
1
2
3
4
5
1 m'
Pemasangan Saluran U-Ditch 80x120 Bahan : 1 Saluran U-Ditch 80 x 120 cm @panjang = 1,2 m Tenaga Kerja : 1 Pekerja 2 Mandor
PEKERJAAN PELAPIS LANTAI 1 m² Pemasangan lantai keramik 30 x 30 cm Bahan : 1 Keramik uk. 30 x 30 cm 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
1 m²
1 m²
1 m²
1 m²
Pemasangan lantai homogenius tile 60 x 60 cm - Polished Bahan : 1 Homogenius tile 60 x 60 cm Polished 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan lantai homogenius tile 60 x 60 cm Unpholish Bahan : 1 Homogenius tile 60 x 60 cm - Unpholish 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan lantai homogenius tile 30 x 60 cm + step noising tangga Bahan : 1 Homogenius tile 30 x 60 cm + step noising tangga 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Floor Hardener Bahan : 1 Semen Mortar Pemasangan Floor Hardener @ 25 kg Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Satuan bh
Indeks
Rp
346,122.21
0.330 Rp 70,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
23,100.00 900.00 370,122.21 9,253.06 379,375.27 506,248.54
552,824.72
Rp
469,901.02
0.330 Rp 70,000.00 0.010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
23,100.00 900.00 493,901.02 12,347.53 506,248.54
Rp
228,527.12
8,580.43 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
101,849.68 11,685.73 6,067.59 20,225.29
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 222,953.29 5,573.83 228,527.12 224,387.27
56,630.83 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
152,903.23 11,218.30 6,067.59 20,225.29
0.240 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00 218,914.41 5,472.86 224,387.27 233,343.03
59,866.87 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
161,640.56 11,218.30 6,067.59 20,225.29
0.240 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00 227,651.74 5,691.29 233,343.03 190,803.17
21,843.32 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
120,138.25 11,218.30 6,067.59 20,225.29
0.240 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.012 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
16,800.00 9,600.00 1,020.00 1,080.00 186,149.43 4,653.74 190,803.17 43,083.36
4,494.51
Rp
22,472.55
0.120 Rp 70,000.00 0.120 Rp 80,000.00 0.012 Rp 85,000.00 0.006 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp
8,400.00 9,600.00 1,020.00 540.00 42,032.55 1,050.81
oh oh
bh L.01 L.04
2.700 9.600 0.045 1.500
Rp Rp Rp Rp
2.700 9.600 0.045 1.500
Rp Rp Rp Rp
5.500 9.600 0.045 1.500
Rp Rp Rp Rp
oh oh oh oh
kg L.01 L.02 L.03 L.04
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
11.870 10.000 0.045 1.500
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
Rp
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
0.850
oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
Rp
Jumlah Harga Satuan
407,202.60
L.01 L.04
0.850
Harga Satuan
oh oh oh oh
5.000
Rp
Analisa Harga Satuan Pek. Arsitektur - page 99 of 139
Kebutuhan
No 6
7
8
9
10
11
12
1 m²
1 m'
1 m²
1 m²
1 m²
1 m²
1 m²
Pemasangan screed beton, tebal 30 mm Bahan : 1 Semen 2 Pasir beton 3 Batu Split 1/2 4 Air Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan step noising keramik uk. 5 x 20 cm Bahan : 1 Step Noising kermaik 5 x 20 cm 2 Semen 3 Pasir pasang 4 Semen warna Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan lantai vinyl sheet Heterogeneous Bahan : 1 Lantai vinyl sheet Heterogeneous 2 Semen 3 Self leveling floor 3-10 mm 4 Lem/adhesive 5 Welding, polish Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan lantai vinyl sheet Homogeneous Bahan : 1 Lantai vinyl sheet Homogeneous 2 Semen 3 Self leveling floor 3-10 mm 4 Lem/adhesive 5 Welding, polish Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan lantai timber flooring Bahan : 1 Timber flooring 2 Lem Tenaga Kerja : 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Pemasangan Karpet Sheet + Underlayer pelapis bawah karpet Bahan : 1 Lantai karpet 2 Underlayer pelapis bawah Karpet sheet 3 Lem/adhesive Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan paving block tebal 8 cm
Kode Satuan Indeks Harga Satuan Total = Jumlah+(Keuntungan+Overhead 2,5%)
kg m³ m³ ltr
1,168.57 134,835.30 224,725.50 22.47
Rp Rp Rp Rp
7,330.14 2,345.61 4,662.49 122.58
0.033 Rp 70,000.00 0.005 Rp 80,000.00 0.001 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,290.91 436.36 46.36 147.27 17,381.72 434.54 17,816.26 44,849.72
4,943.96 1,168.57 134,835.30 13,483.53
Rp Rp Rp Rp
25,955.79 1,332.17 404.51 1,348.35
0.090 Rp 70,000.00 0.090 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
6,300.00 7,200.00 765.00 450.00 43,755.83 1,093.90 44,849.72 269,931.75
168,094.67 1,168.57 83,552.94 50,787.96 30,000.00
Rp Rp Rp Rp Rp
168,094.67 9,348.58 6,015.81 25,393.98 30,000.00
0.150 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.008 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
10,500.00 12,000.00 1,275.00 720.00 263,348.05 6,583.70 269,931.75 300,337.11
197,758.44 1,168.57 83,552.94 50,787.96 30,000.00
Rp Rp Rp Rp Rp
197,758.44 9,348.58 6,015.81 25,393.98 30,000.00
0.150 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.008 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
10,500.00 12,000.00 1,275.00 720.00 293,011.81 7,325.30 300,337.11 382,484.62
247,198.05 50,787.96
Rp Rp
259,557.95 30,472.78
0.700 Rp 70,000.00 0.350 Rp 80,000.00 0.035 Rp 85,000.00 0.035 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
49,000.00 28,000.00 2,975.00 3,150.00 373,155.73 9,328.89 382,484.62 251,444.55
157,307.85 40,450.59 50,787.96
Rp Rp Rp
157,307.85 42,473.12 17,775.79
0.1700 Rp 70,000.00 0.1700 Rp 80,000.00 0.0170 Rp 85,000.00 0.0090 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
11,900.00 13,600.00 1,445.00 810.00 245,311.75 6,132.79 251,444.55 115,268.01
L.01 L.02 L.03 L.04
Rp Rp Rp Rp Rp
1.000 8.000 0.072 0.500 1.000
Rp Rp Rp Rp Rp
1.050 0.600
Rp Rp
oh oh oh oh
m² m² kg L.01 L.02 L.03 L.04
1.000 8.000 0.072 0.500 1.000
oh oh oh oh
m² kg L.01 L.02 L.03 L.04
Rp Rp Rp Rp
oh oh oh oh
m² kg sak ltr ls L.01 L.02 L.03 L.04
5.250 1.140 0.003 0.100
oh oh oh oh
m² kg sak ltr ls L.01 L.02 L.03 L.04
Rp Rp Rp Rp
oh oh oh oh
bh kg m³ kg L.01 L.02 L.03 L.04
6.273 0.017 0.021 5.455
Jumlah Harga Satuan Rp 43,083.36 Rp 17,816.26
oh oh oh oh
1.0000 1.0500 0.3500
Rp Rp Rp
Analisa Harga Satuan Pek. Arsitektur - page 100 of 139
Kebutuhan
No
Kode
Bahan : 1 Paving block, tebal 8 cm natural 2 Pasir beton pengisi celah Tenaga Kerja : 1 Pekerja 2 Tukang batu
13
14
1
2
3
1 m²
1 m²
Pemasangan waterproofing coating Bahan : 1 Waterproofing coating area basah 2 Alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pemasangan waterproofing membran sheet Bahan : 1 Waterproofing Membrane sheet 2 Primer Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
PEKERJAAN PLAFOND 1 m² Pemasangan plafond gypsum T=9 mm dengan rangka metal furing Bahan : 1 Gypsum board 1200 mm x 2400 mm x 9 mm 2 Metal Furing ;tebal=0,4 mm, panjang= 4m 3 Wall angle ; panjang=3 m 4 Connecting clip 5 Soffit cleat 6 U-Clip 7 Rod hanger 8 ProTop 2 in 1 9 Paper tape 10 Drywall screw 6x28 Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
1 m²
1 m²
m² m3
Indeks Rp Rp
Jumlah Harga Satuan Rp Rp
88,937.36 4,719.24
0.200 Rp 70,000.00 0.060 Rp 80,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
14,000.00 4,800.00 112,456.60 2,811.41 115,268.01 48,183.35
40,450.59 4,045.06
Rp Rp
40,450.59 4,045.06
0.015 Rp 70,000.00 0.015 Rp 80,000.00 0.002 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,050.00 1,200.00 127.50 135.00 47,008.15 1,175.20 48,183.35 144,299.95
89,890.20 16,180.24
Rp Rp
89,890.20 16,180.24
0.300 Rp 70,000.00 0.150 Rp 80,000.00 0.018 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
21,000.00 12,000.00 1,530.00 180.00 140,780.43 3,519.51 144,299.95
Rp
93,516.36
56,630.83 37,392.52 11,797.19 1,348.35 1,348.35 1,348.35 3,775.39 58,428.63 71,838.45 74.48
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
20,670.25 25,913.02 1,616.21 2,696.71 1,348.35 1,348.35 3,775.39 584.29 1,293.09 744.80
Rp 70,000.00 Rp 80,000.00 Rp 85,000.00 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
17,500.00 10,000.00 2,125.00 1,620.00 91,235.47 2,280.89 93,516.36 89,817.04
46,742.90 37,392.52 11,797.19 1,348.35 1,348.35 1,348.35 3,775.39 58,428.63 71,838.45 74.48
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
17,061.16 25,913.02 1,616.21 2,696.71 1,348.35 1,348.35 3,775.39 584.29 1,293.09 744.80
Rp 70,000.00 Rp 80,000.00 Rp 85,000.00 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
17,500.00 10,000.00 2,125.00 1,620.00 87,626.38 2,190.66 89,817.04 112,012.95
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
38,715.71 25,913.02 1,616.21 2,696.71 1,348.35 1,348.35 3,775.39 584.29 1,293.09 744.80
L.01 L.02
1.020 0.035
Harga Satuan 87,193.49 134,835.30
oh oh
m² ls
1.000 1.000
Rp Rp
oh oh oh oh
m² m²
1.000 1.000
Rp Rp
oh oh oh oh
L.01 L.02 L.03 L.04
Pemasangan plafond GRC board T=6 mm dengan rangka metal furing Bahan : 1 GRC 1200 mm x 2400 mm x 6 mm 2 Metal Furing ;tebal=0,4 mm, panjang= 4m 3 Wall angle ; panjang=3 m 4 Connecting clip 5 Soffit cleat 6 U-Clip 7 Rod hanger 8 ProTop 2 in 1 9 Paper tape 10 Drywall screw 6x28 Tenaga Kerja : 1 Pekerja L.01 2 Tukang L.02 3 Kepala tukang L.03 4 Mandor L.04
Pemasangan plafond Kalsiboard T=6 mm dengan rangka metal furing Bahan : 1 Kalsiboard 1200 mm x 2400 mm x 6 mm 2 Metal Furing ;tebal=0,4 mm, panjang= 4m 3 Wall angle ; panjang=3 m 4 Connecting clip 5 Soffit cleat 6 U-Clip 7 Rod hanger 8 ProTop 2 in 1 9 Paper tape 10 Drywall screw 6x28 Tenaga Kerja :
Satuan
lbr btg btg pcs pcs pcs pcs bag roll pcs
0.365 0.693 0.137 2.000 1.000 1.000 1.000 0.010 0.018 10.000
oh oh oh oh
0.250 0.125 0.025 0.018
lbr btg btg pcs pcs pcs pcs bag roll pcs
0.365 0.693 0.137 2.000 1.000 1.000 1.000 0.010 0.018 10.000
oh oh oh oh
0.250 0.125 0.025 0.018
lbr btg btg pcs pcs pcs pcs bag roll pcs
0.365 0.693 0.137 2.000 1.000 1.000 1.000 0.010 0.018 10.000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
106,070.43 37,392.52 11,797.19 1,348.35 1,348.35 1,348.35 3,775.39 58,428.63 71,838.45 74.48
Analisa Harga Satuan Pek. Arsitektur - page 101 of 139
Kebutuhan
No 1 2 3 4
4
5
6
7
8
9
1 m'
1 m'
1 m'
1 m²
1 m²
1 m'
Pekerja Tukang Kepala tukang Mandor
Kode L.01 L.02 L.03 L.04
Harga Satuan Rp 70,000.00 Rp 80,000.00 Rp 85,000.00 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Pemasangan curtain box gypsum T=9 mm dengan rangka metal furing Bahan : 1 Gypsum board 1200 mm x 2400 mm x 9 mm 2 Metal Furing ;tebal=0,4 mm, panjang= 4m 3 Wall angle ; panjang=3 m 4 Connecting clip 5 Soffit cleat 6 U-Clip 7 Rod hanger 8 ProTop 2 in 1 9 Paper tape 10 Drywall screw 6x28 Tenaga Kerja : 1 Pekerja L.01 2 Tukang L.02 3 Kepala tukang L.03 4 Mandor L.04
Pemasangan List alumunium profil U 2 cm Bahan : 1 List alumunium profil U 2 cm Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan List profil gypsum 5 cm Bahan : 1 List profil gypsum 5 cm 2 Peralatan bantu Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan plafond akustik 60 x 120 cm Bahan : 1 Plafond Akustik 60 x 120 cm 2 Main T-Section 3 Croos T-Section 4 U-Clip 5 Gantungan (Rod Hanger) 6 Paku ramset+misiu Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan plafond gypsum tile 60 x 60 cm Bahan : 1 Plafond gypsum tile uk. 60 x 60 cm 2 Main T-Section 3 Croos T-Section 4 U-Clip 5 Gantungan (Rod Hanger) 6 Paku ramset+misiu Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan drop ceilling gypsum dengan rangka metal furing Bahan : 1 Gypsum board 1200 mm x 2400 mm x 9 mm
Satuan oh oh oh oh
Indeks 0.250 0.125 0.025 0.018
56,630.83 37,392.52 11,797.19 1,348.35 1,348.35 1,348.35 3,775.39 58,428.63 71,838.45 74.48
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
12,402.15 15,547.81 969.73 1,618.02 809.01 809.01 2,265.23 350.57 775.86 446.88
Rp 70,000.00 Rp 80,000.00 Rp 85,000.00 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
10,500.00 12,000.00 1,275.00 972.00 60,741.28 1,518.53 62,259.81 16,053.88
9,887.92
Rp
10,382.32
0.030 Rp 70,000.00 0.030 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 2,400.00 510.00 270.00 15,662.32 391.56 16,053.88 9,776.38
4,045.06 212.37
Rp Rp
4,247.31 10.62
0.030 Rp 70,000.00 0.030 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 2,400.00 510.00 270.00 9,537.93 238.45 9,776.38 265,549.92
85,395.69 9,887.92 8,449.68 1,078.68 2,786.60 1,707.91
Rp Rp Rp Rp Rp Rp
118,605.12 19,775.84 16,899.36 4,314.73 11,146.38 6,831.66
0.500 Rp 70,000.00 0.500 Rp 80,000.00 0.050 Rp 85,000.00 0.025 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 40,000.00 4,250.00 2,250.00 259,073.09 6,476.83 265,549.92 259,151.49
40,450.59 9,887.92 8,449.68 1,078.68 2,786.60 1,707.91
Rp Rp Rp Rp Rp Rp
112,362.75 19,775.84 16,899.36 4,314.73 11,146.38 6,831.66
0.500 Rp 70,000.00 0.500 Rp 80,000.00 0.050 Rp 85,000.00 0.025 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 40,000.00 4,250.00 2,250.00 252,830.72 6,320.77 259,151.49 22,651.13
Rp
6,184.09
L.01 L.02 L.03 L.04
lbr btg btg pcs pcs pcs pcs bag roll pcs
0.219 0.416 0.082 1.200 0.600 0.600 0.600 0.006 0.011 6.000
oh oh oh oh
0.150 0.150 0.015 0.011
m'
1.050
Rp Rp
1.389 2.000 2.000 4.000 4.000 4.000
Rp Rp Rp Rp Rp Rp
oh oh oh oh
lbr m' m' bh m' bh L.01 L.02 L.03 L.04
1.050 0.050
oh oh oh oh
lbr m' m' bh m' bh L.01 L.02 L.03 L.04
Rp
oh oh oh oh
m' ls L.01 L.02 L.03 L.04
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Jumlah Harga Satuan Rp 17,500.00 Rp 10,000.00 Rp 2,125.00 Rp 1,620.00 Rp 109,280.93 Rp 2,732.02 Rp 112,012.95 Rp 62,259.81
2.778 2.000 2.000 4.000 4.000 4.000
Rp Rp Rp Rp Rp Rp
oh oh oh oh
lbr
0.109
Rp
56,630.83
Analisa Harga Satuan Pek. Arsitektur - page 102 of 139
Kebutuhan 2 Metal Furing ;tebal=0,4 mm, panjang= 4m 3 Wall angle ; panjang=3 m 4 Connecting clip 5 Soffit cleat 6 U-Clip 7 Rod hanger 8 ProTop 2 in 1 9 Paper tape 10 Drywall screw 6x28 Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
No
10
11
12
1
2
3
4
1 m²
1 m²
1 m²
Kode
Plafond AL Linier 180B think 0.6mm, module 200 mm non-perforated Bahan dan upah : - AL Panel 180B Thick 0.6mm, wood grain color - Fe Carrier - Panel splice 180B - Accessories (hollow, screw, bracket stc) - Installations
Luxalon XLNT Interior Ceilling 12mm, Green Tone Polyester Color Bahan dan upah : - AL XLNT Panel 12mm. Curve panel - Accessories Z profile - Accessories (hollow 40/40, screw, bracket stc) - Installations
1 bh
1 bh
Pemasangan kloset jongkok lengkap dengan aksesoris Bahan : 1 Kloset jongkok lengkap dengan aksesoris 2 Semen 3 Pasir pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan wastafel gantung lengkap dengan aksesoris Bahan : 1 Wastafel gantung lengkap dengan aksesoris 2 Perlengkapan alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Wastafel undercounter lengkap dengan aksesoris + kran Bahan : 1 Wastafel undercounter lengkap dengan aksesoris + kran 2 Perlengkapan alat bantu
Indeks 0.218 0.043 0.630 0.315 0.315 0.315 0.006 0.003 3.150
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Harga Satuan 37,392.52 11,797.19 1,348.35 1,348.35 1,348.35 3,775.39 58,428.63 71,838.45 74.48
0.030 Rp 70,000.00 0.015 Rp 80,000.00 0.002 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
oh oh oh oh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Jumlah Harga Satuan 8,162.60 509.11 849.46 424.73 424.73 1,189.25 331.29 226.29 234.61
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 1,200.00 127.50 135.00 22,098.66 552.47 22,651.13 875,305.81
853,956.89
Rp
853,956.89
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
853,956.89 21,348.92 875,305.81 888,767.09
m' pcs pcs m² m²
Rp Rp Rp Rp Rp Rp Rp Rp Rp
489,452.13 56,954.43 91,463.28 80,901.18 148,318.83 867,089.85 21,677.25 888,767.09 3,239,921.43
m² m² m² m²
Rp Rp Rp Rp Rp Rp Rp
2,573,556.40 92,946.47 247,198.05 247,198.05 3,160,898.96 79,022.47 3,239,921.43
Rp
2,539,300.40
2,022,529.48 121,351.77
Rp Rp
2,022,529.48 121,351.77
3.300 Rp 70,000.00 1.100 Rp 80,000.00 0.001 Rp 85,000.00 0.160 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
231,000.00 88,000.00 85.00 14,400.00 2,477,366.25 61,934.16 2,539,300.40 553,974.91
242,703.54 1,168.57 134,835.30
Rp Rp Rp
242,703.54 7,011.44 1,348.35
1.000 Rp 70,000.00 1.500 Rp 80,000.00 1.000 Rp 85,000.00 0.160 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 120,000.00 85,000.00 14,400.00 540,463.33 13,511.58 553,974.91 1,411,129.64
970,814.15 116,497.70
Rp Rp
970,814.15 116,497.70
1.000 Rp 70,000.00 1.500 Rp 80,000.00 1.000 Rp 85,000.00 0.160 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 120,000.00 85,000.00 14,400.00 1,376,711.85 34,417.80 1,411,129.64 2,070,280.99
Rp Rp
1,573,078.48 157,307.85
Plafond Metal Ceiling 600x600 Perforated terpasang by specialis Bahan : 1 Plafond Metal Ceiling 600x600 Perforated terpasang by specialis - Termasuk ongkos pasang, alat dan material bantu
PEKERJAAN SANITARY 1 bh Pemasangan kloset duduk lengkap dengan aksesoris Bahan : 1 Kloset duduk lengkap dengan aksesoris 2 Perlengkapan alat bantu Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
1 bh
L.01 L.02 L.03 L.04
Satuan btg btg pcs pcs pcs pcs bag roll pcs
m²
1.000
Rp
5.000 Rp 97,890.43 0.200 Rp 284,772.15 2.500 Rp 36,585.31 1.000 Rp 80,901.18 1.000 Rp 148,318.83 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
1.000 Rp 2,573,556.40 1.000 Rp 92,946.47 1.000 Rp 247,198.05 1.000 Rp 247,198.05 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
bh ls L.01 L.02 L.03 L.04
1.000 6.000 0.010
Rp Rp Rp
oh oh oh oh
bh ls L.01 L.02 L.03 L.04
Rp Rp
oh oh oh oh
bh kg m³ L.01 L.02 L.03 L.04
1.000 1.000
1.000 1.000
Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
1,573,078.48 157,307.85
Analisa Harga Satuan Pek. Arsitektur - page 103 of 139
Kebutuhan
No Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
5
6
7
8
9
10
11
1 bh
1 bh
1 m²
1 bh
1 bh
1 bh
1 bh
Pemasangan urinoir lengkap dengan aksesoris Bahan : 1 Urinoir lengkap dengan aksesoris 2 Semen 3 Pasir pasang Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Cove ligth wastafel MDF board Bahan : 1 Cove ligth wastafel MDF board 2 Perlengkapan 10% Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Kaca cermin Bahan : 1 Kaca cermin Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan jet washer Bahan : 1 Jet washer 2 Sealtape Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan Kran dinding Bahan : 1 Kran dinding 2 Sealtape Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan kran air panas dingin Bahan : 1 Kran air panas dingin 2 Perlengkapan 20% Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Penyekat urinoir Bahan : 1 Partisi Urinoir Tenaga Kerja :
Kode
Satuan
L.01 L.02 L.03 L.04
oh oh oh oh
Indeks
Harga Satuan
1.000 Rp 70,000.00 1.500 Rp 80,000.00 1.000 Rp 85,000.00 0.160 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 120,000.00 85,000.00 14,400.00 2,019,786.33 50,494.66 2,070,280.99 1,373,430.69
1,168,572.59 1,168.57 134,835.30
Rp Rp Rp
1,168,572.59 7,011.44 1,348.35
1.000 Rp 70,000.00 1.000 Rp 80,000.00 0.100 Rp 85,000.00 0.050 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 80,000.00 8,500.00 4,500.00 1,339,932.38 33,498.31 1,373,430.69 465,906.77
373,044.33 74,608.87
Rp Rp
373,044.33 74,608.87
0.033 Rp 70,000.00 0.017 Rp 80,000.00 0.022 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,310.00 1,360.00 1,870.00 1,350.00 454,543.19 11,363.58 465,906.77 346,451.76
323,604.72
Rp
323,604.72
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 338,001.72 8,450.04 346,451.76 360,175.18
314,615.70 8,989.02
Rp Rp
314,615.70 224.73
0.010 Rp 70,000.00 0.400 Rp 80,000.00 0.040 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 32,000.00 3,400.00 450.00 351,390.42 8,784.76 360,175.18 299,364.46
255,288.17 8,989.02
Rp Rp
255,288.17 224.73
0.010 Rp 70,000.00 0.400 Rp 80,000.00 0.040 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 32,000.00 3,400.00 450.00 292,062.89 7,301.57 299,364.46 669,346.27
538,442.29 107,688.46
Rp Rp
538,442.29 107,688.46
0.033 Rp 70,000.00 0.017 Rp 80,000.00 0.022 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,310.00 1,360.00 1,870.00 1,350.00 653,020.75 16,325.52 669,346.27 1,042,380.81
Rp
853,956.89
bh kg m³ L.01 L.02 L.03 L.04
1.000 6.000 0.010
Rp Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
oh oh oh oh
m² L.01 L.02 L.03 L.04
1.000 0.025
Rp Rp
oh oh oh oh
bh bh L.01 L.02 L.03 L.04
Rp
oh oh oh oh
bh bh L.01 L.02 L.03 L.04
1.000
1.000 0.025
Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
oh oh oh oh
bh
1.000
Rp
853,956.89
Analisa Harga Satuan Pek. Arsitektur - page 104 of 139
Kebutuhan
No 1 2 3 4
12
13
14
15
16
17
18
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
Pekerja Tukang batu Kepala tukang Mandor
Soap holder Bahan : 1 Soap holder Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Soap desh Bahan : 1 Soap desh Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Tisue holder Bahan : 1 Tisue holder Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Towel bar (Stainless steel) Bahan : 1 Towel bar (Stainless steel) 2 Perlengkapan 2% Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Hand railling stainless stell dia. 5" di toilet pasien Bahan : 1 Hand railling stainless stell dia. 5" di toilet pasien 2 Perlengkapan 2% Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Hand railling penyandang cacat (Stainless steel) Bahan : 1 Hand railling penyandang cacat (Stainless steel) 2 Perlengkapan 2% Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Hand Shower dengan kran air panas & dingin Bahan : 1 Hand Shower dengan kran air panas & dingin 2 Perlengkapan 5% Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang
Kode
Satuan oh oh oh oh
Indeks Harga Satuan 1.000 Rp 70,000.00 1.000 Rp 80,000.00 0.100 Rp 85,000.00 0.050 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
bh
1.000
Rp
Jumlah Harga Satuan Rp 70,000.00 Rp 80,000.00 Rp 8,500.00 Rp 4,500.00 Rp 1,016,956.89 Rp 25,423.92 Rp 1,042,380.81 Rp 132,549.60
92,766.69
Rp
92,766.69
0.010 Rp 70,000.00 0.400 Rp 80,000.00 0.040 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 32,000.00 3,400.00 450.00 129,316.69 3,232.92 132,549.60 171,063.06
130,340.79
Rp
130,340.79
0.010 Rp 70,000.00 0.400 Rp 80,000.00 0.040 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 32,000.00 3,400.00 450.00 166,890.79 4,172.27 171,063.06 371,972.95
335,290.44
Rp
335,290.44
0.010 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.004 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 24,000.00 2,550.00 360.00 362,900.44 9,072.51 371,972.95 533,351.39
503,385.11 10,067.70
Rp Rp
503,385.11 10,067.70
0.033 Rp 70,000.00 0.017 Rp 80,000.00 0.022 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,310.00 1,360.00 1,870.00 1,350.00 520,342.82 13,008.57 533,351.39 293,701.87
274,165.11 5,483.30
Rp Rp
274,165.11 5,483.30
0.033 Rp 70,000.00 0.017 Rp 80,000.00 0.022 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,310.00 1,360.00 1,870.00 1,350.00 286,538.41 7,163.46 293,701.87 444,070.19
417,989.43 8,359.79
Rp Rp
417,989.43 8,359.79
0.033 Rp 70,000.00 0.017 Rp 80,000.00 0.022 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,310.00 1,360.00 1,870.00 1,350.00 433,239.21 10,830.98 444,070.19 969,668.30
oh oh oh oh
bh
1.000
Rp
oh oh oh oh
bh
1.000
Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
oh oh oh oh
bh ls
1.000 1.000
Rp Rp
894,407.48 44,720.37
Rp Rp
894,407.48 44,720.37
oh oh oh
0.033 0.017 0.022
Rp Rp Rp
70,000.00 80,000.00 85,000.00
Rp Rp Rp
2,310.00 1,360.00 1,870.00
Analisa Harga Satuan Pek. Arsitektur - page 105 of 139
Kebutuhan
No 4
19
20
21
22
23
24
25
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
Mandor
Zink satu lubang lengkap dengan kran dan aksesories Bahan : 1 Zink satu lubang + kran & accessories 2 Perlengkapan 5% Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Zink dua lubang lengkap dengan kran dan aksesories Bahan : 1 Zink dua lubang + kran & accessories 2 Perlengkapan 5% Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan floor drain Bahan : 1 Floor Drain Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan sloof zink satu lubang Bahan : 1 Sloof zink satu lubang 2 Perlengkapan Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan service zink lengkap kran dan asseosries Bahan : 1 Service sink lengkap kran dan assesories 2 Perlengkapan Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan hand dryer lengkap dengan aksesoris Bahan : 1 Hand Dryer 2 Perlengkapan 5% Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Pemasangan Kitchen Zink Stainless Steel satu lubang Bahan : 1 Kitchen Zink Stainless Steel satu lubang lengkap dengan aksesoris 2 Waterdrain Tenaga Kerja : 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Kode
Satuan oh
Indeks Harga Satuan 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
bh ls
1,465,210.24 73,260.51
Rp Rp
1,465,210.24 73,260.51
0.030 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 24,000.00 2,550.00 1,350.00 1,568,470.76 39,211.77 1,607,682.53 3,416,801.43
3,146,156.97 157,307.85
Rp Rp
3,146,156.97 157,307.85
0.030 Rp 70,000.00 0.300 Rp 80,000.00 0.030 Rp 85,000.00 0.015 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 24,000.00 2,550.00 1,350.00 3,333,464.81 83,336.62 3,416,801.43 255,335.63
239,107.93
Rp
239,107.93
0.010 Rp 70,000.00 0.100 Rp 80,000.00 0.010 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 8,000.00 850.00 450.00 249,107.93 6,227.70 255,335.63 5,524,174.53
5,024,862.13 251,243.11
Rp Rp
5,024,862.13 251,243.11
0.333 Rp 70,000.00 1.000 Rp 80,000.00 0.100 Rp 85,000.00 0.017 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
23,333.33 80,000.00 8,500.00 1,500.00 5,389,438.56 134,735.96 5,524,174.53 8,073,387.54
7,393,468.87 369,673.44
Rp Rp
7,393,468.87 369,673.44
0.333 Rp 70,000.00 1.000 Rp 80,000.00 0.100 Rp 85,000.00 0.017 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
23,333.33 80,000.00 8,500.00 1,500.00 7,876,475.65 196,911.89 8,073,387.54 905,154.61
719,121.59 35,956.08
Rp Rp
719,121.59 35,956.08
0.500 Rp 70,000.00 1.000 Rp 80,000.00 0.100 Rp 85,000.00 0.050 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 80,000.00 8,500.00 4,500.00 883,077.67 22,076.94 905,154.61 2,376,569.58
L.01 L.02 L.03 L.04
Rp Rp
oh oh oh oh
bh ls L.01 L.02 L.03 L.04
1.000 1.000
Jumlah Harga Satuan Rp 1,350.00 Rp 946,017.85 Rp 23,650.45 Rp 969,668.30 Rp 1,607,682.53
1.000 1.000
Rp Rp
oh oh oh oh
m²
1.000
Rp
oh oh oh oh
unit ls
1.000 1.000
Rp Rp
oh oh oh oh
unit ls
1.000 1.000
Rp Rp
oh oh oh oh
bh ls L.01 L.02 L.03 L.04
L.01 L.02 L.03 L.04
1.000 1.000
Rp Rp
oh oh oh oh
bh bh
1.000 1.000
Rp Rp
2,269,727.53 18,876.94
Rp Rp
2,269,727.53 18,876.94
oh oh oh oh
0.030 0.300 0.030 0.015
Rp Rp Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00
Rp Rp Rp Rp
2,100.00 24,000.00 2,550.00 1,350.00
Analisa Harga Satuan Pek. Arsitektur - page 106 of 139
Kebutuhan
No
26
27
28
29
1
2
3
4
1 bh
1 bh
1 bh
1 bh
1 m²
1 m²
Indeks Harga Satuan Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Pemasangan Scrub up 3 person Bahan : 1 Scrub up 3 person 2 Perlengkapan Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
Pemasangan Cubical toilet clear tempered glass 12mm type T 2 daun Bahan : 1 Cubical toilet type T 2 daun - lengkap dengan aksesoris Upah Pasang dan Material Bantu
Pemasangan Cubical toilet clear tempered glass 12mm type L 1 daun Bahan : 1 Cubical toilet type L 1 daun - lengkap dengan aksesoris Upah Pasang dan Material Bantu
Pemasangan Cubical toilet clear tempered glass 12mm type I 1 daun Bahan : 1 Cubical toilet type I 1 daun - lengkap dengan aksesoris Upah Pasang dan Material Bantu
PEKERJAAN PENGECATAN 1 m² Pengecatan dinding emultion paint - Interior Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
1 m²
Kode
Pengecatan dinding weathershield - Exterior Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan dinding dustproof paint Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan dinding enamel paint (Epoxy) Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis)
Satuan
bh ls
77,035,900.56 385,179.50
Rp Rp
77,035,900.56 385,179.50
0.067 Rp 70,000.00 0.007 Rp 80,000.00 0.033 Rp 85,000.00 0.267 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Harga Satuan Pekerjaan
Rp Rp Rp Rp Rp Rp Rp Rp
4,669.00 536.00 2,805.00 24,030.00 77,453,120.06 1,936,328.00 79,389,448.06 7,981,406.95
7,415,941.42
Rp
7,415,941.42
0.050 Rp 7,415,941.42 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
370,797.07 7,786,738.49 194,668.46 7,981,406.95 6,046,520.42
5,618,137.44
Rp
5,618,137.44
0.050 Rp 5,618,137.44 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
280,906.87 5,899,044.31 147,476.11 6,046,520.42 4,111,633.88
3,820,333.46
Rp
3,820,333.46
0.050 Rp 3,820,333.46 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
191,016.67 4,011,350.13 100,283.75 4,111,633.88
Rp
25,621.94
17,798.26 32,809.92 48,810.38
Rp Rp Rp
1,779.83 3,280.99 12,690.70
0.020 Rp 70,000.00 0.063 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,400.00 5,040.00 535.50 270.00 24,997.02 624.93 25,621.94 31,959.16
17,798.26 35,506.63 71,552.60
Rp Rp Rp
1,779.83 3,550.66 18,603.68
0.020 Rp 70,000.00 0.063 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,400.00 5,040.00 535.50 270.00 31,179.66 779.49 31,959.16 28,328.94
17,798.26 32,809.92 58,967.97
Rp Rp Rp
1,779.83 3,280.99 15,331.67
0.020 Rp 70,000.00 0.063 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,400.00 5,040.00 535.50 270.00 27,637.99 690.95 28,328.94 33,132.99
Rp Rp Rp
1,779.83 3,550.66 19,748.88
oh oh oh oh
bh
1.000 1.000
1.000
Rp Rp
Jumlah Harga Satuan Rp 2,318,604.47 Rp 57,965.11 Rp 2,376,569.58 Rp 79,389,448.06
Rp
ls
bh
1.000
Rp
ls
bh
1.000
Rp
ls
kg kg kg L.01 L.02 L.03 L.04
0.100 0.100 0.260
Rp Rp Rp
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
Rp Rp Rp
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
0.100 0.100 0.260
0.100 0.100 0.260
Rp Rp Rp
oh oh oh oh
kg kg kg
0.100 0.100 0.260
Rp Rp Rp
17,798.26 35,506.63 75,957.22
Analisa Harga Satuan Pek. Arsitektur - page 107 of 139
Kebutuhan
No Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
5
6
7
8
9
10
11
1 m²
1 m²
1 m'
1 m'
1 m'
1 m²
1 m²
Pengecatan dinding VirusGuard Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan plafond emultion paint Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan list plafond emultion paint Bahan : 1 Cat dasar (1 x Lapis) 2 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan list plafond weathershield - Exterior Bahan : 1 Cat dasar (1 x Lapis) 2 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan list plafond enamel paint (epoxy) Bahan : 1 Cat dasar (1 x Lapis) 2 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan plafond weathershield - Exterior Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan plafond enamel paint (Epoxy)
Kode
Satuan
L.01 L.02 L.03 L.04
oh oh oh oh
Indeks
Harga Satuan
0.020 Rp 70,000.00 0.063 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp
1,400.00 5,040.00 535.50 270.00 32,324.87 808.12 33,132.99 24,163.68
17,798.26 35,506.63 42,301.27
Rp Rp Rp
1,779.83 3,550.66 10,998.33
0.020 Rp 70,000.00 0.063 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
1,400.00 5,040.00 535.50 270.00 23,574.32 589.36 24,163.68 27,876.94
17,798.26 32,809.92 48,810.38
Rp Rp Rp
1,779.83 3,280.99 12,690.70
0.040 Rp 70,000.00 0.073 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,800.00 5,840.00 535.50 270.00 27,197.02 679.93 27,876.94 3,256.58
32,809.92 48,810.38
Rp Rp
410.12 1,586.34
0.005 Rp 70,000.00 0.009 Rp 80,000.00 0.001 Rp 85,000.00 0.000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
350.00 730.00 66.94 33.75 3,177.15 79.43 3,256.58 4,048.73
35,506.63 71,552.60
Rp Rp
443.83 2,325.46
0.005 Rp 70,000.00 0.009 Rp 80,000.00 0.001 Rp 85,000.00 0.000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
350.00 730.00 66.94 33.75 3,949.98 98.75 4,048.73 4,160.91
32,809.92 75,957.22
Rp Rp
410.12 2,468.61
0.005 Rp 70,000.00 0.009 Rp 80,000.00 0.001 Rp 85,000.00 0.000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
350.00 730.00 66.94 33.75 4,059.42 101.49 4,160.91 34,214.16
17,798.26 35,506.63 71,552.60
Rp Rp Rp
1,779.83 3,550.66 18,603.68
0.040 Rp 70,000.00 0.073 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,800.00 5,840.00 535.50 270.00 33,379.66 834.49 34,214.16 35,387.99
kg kg kg L.01 L.02 L.03 L.04
Rp Rp
0.013 0.033
Rp Rp
0.013 0.033
Rp Rp
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
0.013 0.033
oh oh oh oh
kg kg L.01 L.02 L.03 L.04
Rp Rp Rp
oh oh oh oh
kg kg L.01 L.02 L.03 L.04
0.100 0.100 0.260
oh oh oh oh
kg kg L.01 L.02 L.03 L.04
Rp Rp Rp
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
0.100 0.100 0.260
oh oh oh oh
0.100 0.100 0.260
Rp Rp Rp
Analisa Harga Satuan Pek. Arsitektur - page 108 of 139
Kebutuhan
No
Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
12
13
14
1
2
3
4
1 m²
1 m'
1 m²
Pengecatan plafond dustrproof Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
Pengecatan plint Int Semi Gloss Bahan : 1 Plamir (1 x Lapis) 2 Cat dasar (1 x Lapis) 3 Cat penutup (2 x lapis) Tenaga Kerja : 1 Pekerja 2 Tukang cat 3 Kepala tukang 4 Mandor
1 m²
1 m²
Pemasangan alumunium kusen jendela Bahan : 1 Alumunium Kusen Jendela 2 Skrup fixer 3 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan alumunium Frame Daun Pintu Kaca Bahan : 1 Alumunium Frame Daun Pintu 2 Profil Kaca 3 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan alumunium Frame Daun Jendela Kaca Bahan : 1 Alumunium Frame Daun Jendela
Satuan kg kg kg
Indeks
1,779.83 3,550.66 19,748.88
0.040 Rp 70,000.00 0.073 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,800.00 5,840.00 535.50 270.00 34,524.87 863.12 35,387.99 30,860.35
17,798.26 35,506.63 58,967.97
Rp Rp Rp
1,779.83 3,550.66 15,331.67
0.040 Rp 70,000.00 0.073 Rp 80,000.00 0.006 Rp 85,000.00 0.003 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,800.00 5,840.00 535.50 270.00 30,107.66 752.69 30,860.35 4,972.37
17,798.26 71,552.60 71,552.60
Rp Rp Rp
222.48 894.41 2,325.46
0.010 Rp 70,000.00 0.008 Rp 80,000.00 0.001 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
700.00 600.00 63.75 45.00 4,851.10 121.28 4,972.37 286,504.23
160,963.38
Rp
160,963.38
1.000 Rp 83,552.94 1.000 Rp 35,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
83,552.94 35,000.00 279,516.32 6,987.91 286,504.23
Rp
84,525.81
67,417.65 359.56 44,046.20
Rp Rp Rp
74,159.41 719.12 2,642.77
0.043 Rp 70,000.00 0.043 Rp 80,000.00 0.004 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
3,010.00 3,440.00 365.50 189.00 84,525.81 84,525.81
67,417.65 359.56 44,046.20
Rp Rp Rp
74,159.41 719.12 2,642.77
0.043 Rp 70,000.00 0.043 Rp 80,000.00 0.004 Rp 85,000.00 0.002 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
3,010.00 3,440.00 365.50 189.00 84,525.81 538,905.78
107,868.24 8,539.57 44,046.20
Rp Rp Rp
474,620.25 38,428.06 11,892.47
0.085 Rp 70,000.00 0.085 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
5,950.00 6,800.00 765.00 450.00 538,905.78 440,026.57
Rp
375,741.03
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
0.100 0.100 0.260
Rp Rp Rp
oh oh oh oh
kg kg kg L.01 L.02 L.03 L.04
Rp Rp Rp
Jumlah Harga Satuan Rp Rp Rp
L.01 L.02 L.03 L.04
0.100 0.100 0.260
Harga Satuan 17,798.26 35,506.63 75,957.22
Epoxy Floor system (1000 micron) w/. U.V. Laminate Bahan : 1 Lantai Epoxy Coating tebal 1000 micron terpasang - Surface preparation, primer coat, Epoxy Filler, Finish Coat, ongkos pasang 2 Self leveling floor 10 mm 3 Upah pasang self leveling
PEKERJAAN KUSEN PINTU DAN JENDELA ALLUMUNIUM 1 m' Pemasangan alumunium kusen pintu Bahan : 1 Alumunium Kusen Pintu 2 Skrup fixer 3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor 1 m'
Kode
0.013 0.013 0.033
Rp Rp Rp
oh oh oh oh
m²
1.000
Rp
zak m²
m' bh tube oh oh oh oh
m' bh tube oh oh oh oh
m' m' tube oh oh oh oh
m'
1.100 2.000 0.060
1.100 2.000 0.060
4.400 4.500 0.270
4.400
Rp Rp Rp
Rp Rp Rp
Rp Rp Rp
Rp
85,395.69
Analisa Harga Satuan Pek. Arsitektur - page 109 of 139
Kebutuhan
No 2 Profil Kaca 3 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor 5
6
7
8
9
10
11
12
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
Pemasangan Kaca reflektif 8 mm Bahan : 1 Kaca Reflected tebal 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Tinted 6 mm Bahan : 1 Kaca Tinted tebal 6 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Tinted 8 mm Bahan : 1 Kaca Tinted tebal 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca clear Float 6 mm Bahan : 1 Kaca Clear Float 6 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca clear 8 mm Bahan : 1 Kaca Clear 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Stopsol Super Silver Green 6 mm Bahan : 1 Kaca Stopsol Super Silver Green 6 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Stopsol Super Silver Green 8 mm Bahan : 1 Kaca Stopsol Super Silver Green 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca tempered 8 mm Bahan : 1 Kaca tempered 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja
Kode
Satuan m' tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
Indeks 4.500 0.270
Rp Rp
Harga Satuan 8,539.57 44,046.20
0.085 Rp 70,000.00 0.085 Rp 80,000.00 0.009 Rp 85,000.00 0.005 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp
Jumlah Harga Satuan 38,428.06 11,892.47
Rp Rp Rp Rp Rp Rp
5,950.00 6,800.00 765.00 450.00 440,026.57 470,652.68
412,775.79 44,046.20
Rp Rp
454,053.37 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 470,652.68 328,068.85
283,154.13 44,046.20
Rp Rp
311,469.54 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 328,068.85 397,284.30
346,077.27 44,046.20
Rp Rp
380,684.99 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 397,284.30 132,189.12
105,081.64 44,046.20
Rp Rp
115,589.81 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 132,189.12 179,750.02
148,318.83 44,046.20
Rp Rp
163,150.71 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 179,750.02 340,181.55
294,165.68 44,046.20
Rp Rp
323,582.24 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 340,181.55 470,652.68
412,775.79 44,046.20
Rp Rp
454,053.37 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 470,652.68 382,749.06
1.100 0.050
1.100 0.050
1.100 0.050
1.100 0.050
1.100 0.050
1.100 0.050
1.100 0.050
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
Rp Rp
m² tube
1.100 0.050
Rp Rp
332,863.41 44,046.20
Rp Rp
366,149.75 2,202.31
oh
0.015
Rp
70,000.00
Rp
1,050.00
Analisa Harga Satuan Pek. Arsitektur - page 110 of 139
Kebutuhan
No 2 3 4 13
14
15
16
1
2
3
1 m²
1 m²
1 m²
1 m²
Kode
Tukang Kepala tukang Mandor
Pemasangan Kaca tempered 12 mm Bahan : 1 Kaca tempered 12 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Stopsol 8 mm Bahan : 1 Kaca Stopsol 8 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Kaca Anti Radiasi 15 mm Bahan : 1 Kaca Anti Radiasi 15 mm 2 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor Pemasangan Partisi Kaca tempered 12 mm Bahan : 1 Kaca tempered 12 mm 2 Alumunium profil U penjepit kaca di dinding 3 Sealent Tenaga Kerja : 1 Pekerja 2 Tukang 3 Kepala tukang 4 Mandor
PEKERJAAN KUSEN PINTU 1 unit Pemasangan Pintu type D 1F '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos -Aksesories & Hardware 1 Operator Mesin Aoutomatic + Radar termasuk pemasangan - Dilengkapi dengan : Mechanic Door Carrier, Alumunium profil, Electronic board, Motor, sensor radar, optima selector, electrical lock, manual release, Emergency Battery -Ongkos Pasang dan Material Bantu
1 unit
1 unit
Pemasangan Pintu type D 2F '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos -Aksesories & Hardware 1 Pull Handle Kecil 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock -Material Bantu dan perkuatan
Pemasangan Pintu type D 2M -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Pemasangan alumunium Frame Daun Pintu Kaca 2 Kaca tempered 8 mm Clear/ Polos -Aksesories & Hardware 1 Pull Handle Kecil 2 Cylinder 3 Mortise Lock
Satuan oh oh oh
m² tube
Indeks Harga Satuan 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
448,012.75 44,046.20
Rp Rp
492,814.03 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 509,413.34 470,652.68
412,775.79 44,046.20
Rp Rp
454,053.37 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 470,652.68 22,532.06
5,393.41 44,046.20
Rp Rp
5,932.75 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan
Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 22,532.06 538,272.72
448,012.75 15,730.78 44,046.20
Rp Rp Rp
492,814.03 15,730.78 2,202.31
0.015 Rp 70,000.00 0.150 Rp 80,000.00 0.015 Rp 85,000.00 0.001 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
1,050.00 12,000.00 1,275.00 72.00 525,144.12 13,128.60 538,272.72
Rp
56,638,229.52
Rp
1,926,454.83
oh oh oh oh
m² tube oh oh oh oh
m² tube oh oh oh oh
m² m' tube
1.100 0.050
1.100 0.050
1.100 0.050
1.100 1.000 0.050
Rp Rp
Jumlah Harga Satuan Rp 12,000.00 Rp 1,275.00 Rp 72.00 Rp 382,749.06 Rp 509,413.34
Rp Rp
Rp Rp
Rp Rp Rp
oh oh oh oh
m²
4.3000
set
1.0000
Rp
448,012.75 51,720,932.82
1.0000 1,609,421.63 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
51,720,932.82
ls
Rp Rp Rp Rp
1,609,421.63 55,256,809.28 1,381,420.23 56,638,229.52 8,624,963.11
448,012.75
Rp
1,830,132.09
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 598,587.82 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 598,587.82 8,414,598.16 210,364.95 8,624,963.11 12,878,527.34
m²
4.085
Rp
set set set set set set ls
m'
23.363
Rp
84,525.81
Rp
1,974,776.44
m² m²
3.870 10.070
Rp Rp
538,905.78 382,749.06
Rp Rp
2,085,565.38 3,854,260.04
set set set
2.000 1.000 1.000
Rp Rp Rp
704,379.60 112,623.43 212,886.96
Rp Rp Rp
1,408,759.20 112,623.43 212,886.96
Analisa Harga Satuan Pek. Arsitektur - page 111 of 139
Kebutuhan
No
4 Floor Hinge -Material Bantu dan perkuatan
4
5
6
7
8
9
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type D 1 (Masjid) '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding -Aksesories & Hardware 1 Pull Handle Kecil 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock -Material Bantu dan perkuatan
Pemasangan Pintu type D-GL Uk. 900 x 2150 mm '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock -Material Bantu dan perkuatan
Pemasangan Pintu type D-GL Uk. 1200 x 2150 mm '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock -Material Bantu dan perkuatan
Pemasangan Pintu type D-GL Uk. 2 x 900 x 2150 mm '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock -Material Bantu dan perkuatan
Pemasangan Pintu type A Uk. 900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm
Kode
Satuan set ls
Indeks Harga Satuan 2.000 Rp 1,246,417.50 1.000 Rp 422,710.46 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m² m'
9.430 10.600
Rp Rp
Jumlah Harga Satuan Rp 2,492,835.00 Rp 422,710.46 Rp 12,564,416.92 Rp 314,110.42 Rp 12,878,527.34 Rp 11,250,371.95
448,012.75 15,730.78
Rp Rp
4,224,760.25 166,746.32
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 598,587.82 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 598,587.82 10,975,972.64 274,399.32 11,250,371.95 4,709,720.21
448,012.75
Rp
866,904.67
1.000 Rp 704,379.60 1.000 Rp 1,246,417.50 1.000 Rp 193,263.93 1.000 Rp 408,910.52 1.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 338,904.03 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,379.60 1,246,417.50 193,263.93 408,910.52 43,866.42 792,202.32 338,904.03 4,594,848.99 114,871.22 4,709,720.21 5,005,912.64
448,012.75
Rp
1,155,872.90
1.000 Rp 704,379.60 1.000 Rp 1,246,417.50 1.000 Rp 193,263.93 1.000 Rp 408,910.52 1.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 338,904.03 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,379.60 1,246,417.50 193,263.93 408,910.52 43,866.42 792,202.32 338,904.03 4,883,817.21 122,095.43 5,005,912.64 8,526,232.30
448,012.75
Rp
1,733,809.35
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 598,587.82 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 598,587.82 8,318,275.42 207,956.89 8,526,232.30 4,038,885.72
set set set set set set ls
m²
1.935
Rp
set set set set set set ls
m²
2.580
Rp
set set set set set set ls
m²
3.870
Rp
set set set set set set ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
1,955,111.83
Rp
1,955,111.83
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 166,706.77 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 291,154.35 166,706.77 3,940,376.32 98,509.41 4,038,885.72 4,314,980.33
set set set bh set bh ls
m'
7.500
Rp
84,525.81
Rp
633,943.56
bh m²
1.000 0.540
Rp Rp
1,955,111.83 132,189.12
Rp Rp
1,955,111.83 71,382.12
Analisa Harga Satuan Pek. Arsitektur - page 112 of 139
Kebutuhan
No
-Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
10
11
12
13
14
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type A Uk. 1200x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type A Uk. 1200x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type A Uk. 2x900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type A Uk. 2x900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 900 x 2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm
Kode
Satuan
Indeks
Harga Satuan
set set set bh set bh ls
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 170,275.87 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 291,154.35 170,275.87 4,209,736.90 105,243.42 4,314,980.33 6,204,238.36
m'
5.600
Rp
84,525.81
Rp
473,344.52
bh
1.000
Rp
3,643,699.22
Rp
3,643,699.22
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 2.000 Rp 291,154.35 1.000 Rp 265,693.85 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 582,308.71 265,693.85 6,052,915.47 151,322.89 6,204,238.36 6,470,519.02
set set set bh set bh ls
m'
6.900
Rp
84,525.81
Rp
583,228.07
bh m²
1.000 1.080
Rp Rp
3,643,699.22 132,189.12
Rp Rp
3,643,699.22 142,764.25
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 2.000 Rp 291,154.35 1.000 Rp 272,832.07 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 582,308.71 272,832.07 6,312,701.48 157,817.54 6,470,519.02 7,206,091.82
set set set bh set bh ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
2.000
Rp
1,955,111.83
Rp
3,910,223.66
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 2.000 Rp 337,969.17 1.000 Rp 225,345.74 1.000 Rp 291,154.35 1.000 Rp 313,847.58 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 675,938.34 225,345.74 291,154.35 313,847.58 7,030,333.48 175,758.34 7,206,091.82 7,533,019.74
set set set bh set set bh ls
m'
7.200
Rp
84,525.81
Rp
608,585.81
bh m²
2.000 1.080
Rp Rp
1,955,111.83 132,189.12
Rp Rp
3,910,223.66 142,764.25
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 2.000 Rp 337,969.17 1.000 Rp 225,345.74 1.000 Rp 291,154.35 1.000 Rp 320,985.80 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 675,938.34 225,345.74 291,154.35 320,985.80 7,349,287.55 183,732.19 7,533,019.74 5,035,352.29
set set set bh set set bh ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
2,880,980.88
Rp
2,880,980.88
Analisa Harga Satuan Pek. Arsitektur - page 113 of 139
Kebutuhan
No
Kode
+ kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
15
16
17
18
19
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type B Uk. 800 x 1100 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 800 x 1100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight +3500 AFFL -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk.900x2150 mm (sliding) -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Rel pintu slidding door -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 750 x 2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 750 x 2100 mm. + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware
Satuan
Indeks
Harga Satuan
set set set bh bh bh ls
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 213,000.22 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 291,154.35 213,000.22 4,912,538.82 122,813.47 5,035,352.29 2,760,022.45
m'
3.000
Rp
84,525.81
Rp
253,577.42
bh
1.000
Rp
1,573,078.48
Rp
1,573,078.48
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 116,148.92 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 116,148.92 2,692,704.83 67,317.62 2,760,022.45 5,311,446.89
set set set bh ls
m'
7.500
Rp
84,525.81
Rp
633,943.56
bh
1.000
Rp
2,880,980.88
Rp
2,880,980.88
m²
0.540
Rp
132,189.12
Rp
71,382.12
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 216,569.33 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 291,154.35 216,569.33 5,181,899.41 129,547.49 5,311,446.89 5,500,902.54
set set set bh bh bh ls
m'
8.800
Rp
84,525.81
Rp
743,827.11
bh
1.000
Rp
2,880,980.88
Rp
2,880,980.88
m²
1.080
Rp
132,189.12
Rp
142,764.25
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 220,138.43 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 291,154.35 220,138.43 5,366,734.19 134,168.35 5,500,902.54 4,865,353.16
set set set bh bh bh ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
2,880,980.88
Rp
2,880,980.88
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 1.000 Rp 707,885.32 1.000 Rp 205,102.47 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 707,885.32 205,102.47 4,746,686.01 118,667.15 4,865,353.16 4,161,459.92
set set set set ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
1.000
Rp
2,287,705.56
Rp
2,287,705.56
Analisa Harga Satuan Pek. Arsitektur - page 114 of 139
Kebutuhan
No
1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
20
21
22
23
24
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type B Uk.2x900x2150 mm (sliding) -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Rel pintu slidding door -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 1200x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu -Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2150 mm + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 1200x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu -Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2150 mm + kaca 8 mm (200 x 700 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer 6 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 2x900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 6 Door closer 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm + kaca 8 mm (200 x 700 mm) 2 Pemasangan Kaca clear Float 6 mm
Kode
Satuan set set set bh bh ls
Indeks Harga Satuan 1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 168,778.74 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 187,672.76 Rp 112,623.43 Rp 212,886.96 Rp 236,716.85 Rp 337,969.17 Rp 168,778.74 Rp 4,059,960.89 Rp 101,499.02 Rp 4,161,459.92 Rp 9,007,828.26
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
2,880,980.88
Rp
5,761,961.76
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 2.000 Rp 707,885.32 1.000 Rp 393,929.41 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 1,415,770.63 393,929.41 8,788,125.14 219,703.13 9,007,828.26 7,076,388.46
set set set set ls
m'
5.600
Rp
84,525.81
Rp
473,344.52
bh
1.000
Rp
4,454,059.36
Rp
4,454,059.36
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 2.000 Rp 291,154.35 1.000 Rp 306,211.86 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 582,308.71 306,211.86 6,903,793.62 172,594.84 7,076,388.46 7,291,452.45
set set set bh set bh ls
m'
6.900
Rp
84,525.81
Rp
583,228.07
bh
1.000
Rp
4,454,059.36
Rp
4,454,059.36
m²
0.720
Rp
132,189.12
Rp
95,176.16
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 2.000 Rp 291,154.35 1.000 Rp 310,970.67 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 582,308.71 310,970.67 7,113,612.14 177,840.30 7,291,452.45 9,277,000.01
set set set bh set bh ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
2,880,980.88
Rp
5,761,961.76
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 225,345.74 2.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 406,434.49 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 225,345.74 675,938.34 291,154.35 406,434.49 9,050,731.71 226,268.29 9,277,000.01 9,603,927.93
set set set bh set set bh ls
m'
8.100
Rp
84,525.81
Rp
684,659.04
bh
2.000
Rp
2,880,980.88
Rp
5,761,961.76
m²
1.080
Rp
132,189.12
Rp
142,764.25
Analisa Harga Satuan Pek. Arsitektur - page 115 of 139
Kebutuhan
No
-Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 6 Door closer 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
25
26
27
28
29
1 unit
1 unit
1 unit
1 unit
1 unit
Kode
Satuan set set set bh set set bh ls
Indeks
Harga Satuan
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 225,345.74 2.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 413,572.70 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight +3500 AFFL -Frame Allumunium 1 Pemasangan alumunium kusen pintu m' 10.000 Rp 84,525.81 '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100. mm bh 2.000 Rp 2,880,980.88 + kaca 8 mm (200 x 700 mm) 2 Pemasangan Kaca clear Float 6 mm m² 2.160 Rp 132,189.12 -Aksesories & Hardware 1 Lever Handle set 2.000 Rp 187,672.76 2 Cylinder set 1.000 Rp 112,623.43 3 Mortise Lock set 1.000 Rp 212,886.96 4 Engsel pintu bh 6.000 Rp 78,905.62 5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.000 Rp 225,345.74 6 Door closer set 2.000 Rp 337,969.17 7 Kick plat T=2 mm bh 1.000 Rp 291,154.35 -Ongkos Pasang, Material & Peralatan Bantu ls 1.000 Rp 420,710.91 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Pintu type B Uk.1200x2150 mm (sliding) -Frame Allumunium 1 Pemasangan alumunium kusen pintu m' 5.500 Rp 84,525.81 '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2150 mm bh 1.000 Rp 4,454,059.36 + kaca 8 mm (200 x 700 mm) -Aksesories & Hardware 1 Lever Handle set 1.000 Rp 187,672.76 2 Cylinder set 1.000 Rp 112,623.43 3 Mortise Lock set 1.000 Rp 212,886.96 4 Rel pintu slidding door set 1.000 Rp 707,885.32 -Ongkos Pasang, Material & Peralatan Bantu ls 1.000 Rp 283,756.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Pintu type C Uk. 750 x 2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu m' 5.050 Rp 84,525.81 '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet ( 750 x 2100 ) mm bh 1.000 Rp 2,018,933.87 -Aksesories & Hardware 1 Lever Handle set 1.000 Rp 187,672.76 2 Cylinder set 1.000 Rp 112,623.43 3 Mortise Lock set 1.000 Rp 212,886.96 4 Engsel pintu bh 3.000 Rp 78,905.62 -Ongkos Pasang, Material & Peralatan Bantu ls 1.000 Rp 37,495.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu m' 7.200 Rp 84,525.81 '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet ( 750 x 2100 ) mm bh 1.000 Rp 2,018,933.87 2 Pemasangan Kaca clear Float 6 mm m² 0.540 Rp 132,189.12 -Aksesories & Hardware 1 Lever Handle set 1.000 Rp 187,672.76 2 Cylinder set 1.000 Rp 112,623.43 3 Mortise Lock set 1.000 Rp 212,886.96 4 Engsel pintu bh 3.000 Rp 78,905.62 -Ongkos Pasang, Material & Peralatan Bantu ls 1.000 Rp 37,495.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) Pemasangan Pintu type C Uk. 900 x 2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu m' 5.200 Rp 84,525.81 '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm bh 1.000 Rp 1,955,111.83 -Aksesories & Hardware 1 Lever Handle set 1.000 Rp 187,672.76 2 Cylinder set 1.000 Rp 112,623.43 3 Mortise Lock set 1.000 Rp 212,886.96
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 225,345.74 675,938.34 291,154.35 413,572.70 9,369,685.79 234,242.14 9,603,927.93 9,922,191.96
Rp
845,258.08
Rp
5,761,961.76
Rp
285,528.49
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 225,345.74 675,938.34 291,154.35 420,710.91 9,680,187.28 242,004.68 9,922,191.96 6,584,370.56
Rp
464,891.94
Rp
4,454,059.36
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 707,885.32 283,756.39 6,423,776.16 160,594.40 6,584,370.56 3,314,013.80
Rp
426,855.33
Rp
2,018,933.87
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 37,495.00 3,233,184.19 80,829.60 3,314,013.80 3,573,454.22
Rp
608,585.81
Rp Rp
2,018,933.87 71,382.12
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 37,495.00 3,486,296.80 87,157.42 3,573,454.22 3,725,530.85
Rp
439,534.20
Rp
1,955,111.83
Rp Rp Rp
187,672.76 112,623.43 212,886.96
Analisa Harga Satuan Pek. Arsitektur - page 116 of 139
Kebutuhan
No
4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
30
31
32
33
34
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type C Uk. 900 x 2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type C Uk. 1200 x 2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type C Uk. 1200 x 2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 1200 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type C Uk. 2x900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type C Uk. 2x900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan bh bh ls
Indeks Harga Satuan 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 152,149.05 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 236,716.85 Rp 337,969.17 Rp 152,149.05 Rp 3,634,664.24 Rp 90,866.61 Rp 3,725,530.85 Rp 4,001,625.45
m'
7.500
Rp
84,525.81
Rp
633,943.56
bh m²
1.000 0.540
Rp Rp
1,955,111.83 132,189.12
Rp Rp
1,955,111.83 71,382.12
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 155,718.16 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 155,718.16 3,904,024.83 97,600.62 4,001,625.45 5,542,873.03
set set set bh bh ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
3,643,699.22
Rp
3,643,699.22
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 236,578.42 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 236,578.42 5,407,681.00 135,192.03 5,542,873.03 5,818,967.63
set set set bh bh ls
m'
7.500
Rp
84,525.81
Rp
633,943.56
bh m²
1.000 0.540
Rp Rp
3,643,699.22 132,189.12
Rp Rp
3,643,699.22 71,382.12
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 240,147.53 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 240,147.53 5,677,041.59 141,926.04 5,818,967.63 6,728,183.65
set set set bh bh ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
1,955,111.83
Rp
3,910,223.66
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 2.000 Rp 337,969.17 1.000 Rp 288,022.58 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 675,938.34 288,022.58 6,564,081.61 164,102.04 6,728,183.65 7,081,103.26
set set set bh bh ls
m'
8.400
Rp
84,525.81
Rp
710,016.78
bh m²
2.000 1.080
Rp Rp
1,955,111.83 132,189.12
Rp Rp
3,910,223.66 142,764.25
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 2.000 Rp 337,969.17 1.000 Rp 295,160.79 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 675,938.34 295,160.79 6,908,393.42 172,709.84 7,081,103.26
set set set bh bh ls
Analisa Harga Satuan Pek. Arsitektur - page 117 of 139
No 35 1 unit
36
37
38
39
40
1 unit
1 unit
1 unit
1 unit
1 unit
Kebutuhan Pemasangan Pintu type E Uk. 900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type E Uk. 900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type E Uk. 2x900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type E Uk. 2x900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type GUD Uk. 2x550x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type M Uk. 900x2150 mm -Frame Allumunium
Kode
Satuan
Indeks
Harga Satuan
Jumlah Harga Satuan Rp 5,060,602.56
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
3,195,596.58
Rp
3,195,596.58
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 214,173.29 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 214,173.29 4,937,173.23 123,429.33 5,060,602.56 5,137,427.57
set set set bh bh ls
m'
5.200
Rp
84,525.81
Rp
439,534.20
bh
1.000
Rp
3,195,596.58
Rp
3,195,596.58
m²
0.540
Rp
132,189.12
Rp
71,382.12
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 217,742.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 217,742.39 5,012,124.46 125,303.11 5,137,427.57 9,034,587.75
set set set bh bh ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
3,195,596.58
Rp
6,391,193.15
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 395,172.60 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 337,969.17 395,172.60 8,814,231.95 220,355.80 9,034,587.75 9,361,515.67
set set set bh bh ls
m'
8.100
Rp
84,525.81
Rp
684,659.04
bh
2.000
Rp
3,195,596.58
Rp
6,391,193.15
m²
1.080
Rp
132,189.12
Rp
142,764.25
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 402,310.81 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 337,969.17 402,310.81 9,133,186.02 228,329.65 9,361,515.67 9,034,587.75
set set set bh bh ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
3,195,596.58
Rp
6,391,193.15
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 395,172.60 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 337,969.17 395,172.60 8,814,231.95 220,355.80 9,034,587.75 5,060,602.56
set set set bh bh ls
Analisa Harga Satuan Pek. Arsitektur - page 118 of 139
Kebutuhan
No
Kode
1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
41
42
43
44
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight +3500 AFFL -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type M Uk. 2x900x2150 mm -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 6 Door closer 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan Pintu type M Uk. 2x900x2150 mm + Bouvenlight -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm + kaca 8 mm (700 x 1800 mm) 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS 6 Door closer 7 Kick plat T=2 mm -Ongkos Pasang, Material & Peralatan Bantu
Satuan m'
Indeks 5.200
Rp
Harga Satuan 84,525.81
Rp
Jumlah Harga Satuan 439,534.20
1.000
Rp
3,195,596.58
Rp
3,195,596.58
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 214,173.29 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 214,173.29 4,937,173.23 123,429.33 5,060,602.56 5,258,722.10
bh
set set set set set ls
m'
6.600
Rp
84,525.81
Rp
557,870.33
bh
1.000
Rp
3,195,596.58
Rp
3,195,596.58
m²
0.540
Rp
132,189.12
Rp
71,382.12
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 217,742.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 217,742.39 5,130,460.59 128,261.51 5,258,722.10 5,448,177.75
set set set set set ls
m'
7.900
Rp
84,525.81
Rp
667,753.88
bh
1.000
Rp
3,195,596.58
Rp
3,195,596.58
m²
1.080
Rp
132,189.12
Rp
142,764.25
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 337,969.17 1.000 Rp 221,311.50 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 337,969.17 221,311.50 5,315,295.37 132,882.38 5,448,177.75 9,954,210.29
set set set set set ls
m'
6.100
Rp
84,525.81
Rp
515,607.43
bh
2.000
Rp
3,195,596.58
Rp
6,391,193.15
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 225,345.74 2.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 437,896.06 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 225,345.74 675,938.34 291,154.35 437,896.06 9,711,424.68 242,785.62 9,954,210.29 10,281,138.22
set set set bh set set bh ls
m'
8.100
Rp
84,525.81
Rp
684,659.04
bh
2.000
Rp
3,195,596.58
Rp
6,391,193.15
m²
1.080
Rp
132,189.12
Rp
142,764.25
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 1.000 Rp 225,345.74 2.000 Rp 337,969.17 1.000 Rp 291,154.35 1.000 Rp 445,034.27 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 225,345.74 675,938.34 291,154.35 445,034.27 10,030,378.75 250,759.47
set set set bh set set bh ls
Analisa Harga Satuan Pek. Arsitektur - page 119 of 139
Kebutuhan
No 45
46
47
48
49
50
51
52
53
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu Besi Type A-HM uk. 600 x 1250 mm SINGLE STEEL DOOR uk. 600x1250 mm Hardware : - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 2 x 600 x 1250 mm SINGLE STEEL DOOR uk. 600x1250 mm Hardware : - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm SINGLE STEEL DOOR uk. 900x2150 mm Hardware : - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm - Slidding SINGLE STEEL DOOR uk. 900x2150 mm - Slidding Hardware : - Lockcase - Cylinder pintu besi - Door Handle - Rel pintu slidding besi -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 1000 x 2150 mm SINGLE STEEL DOOR uk. 1000x2150 mm Hardware : - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm (Tahan Api) SINGLE STEEL DOOR uk. 1000x2150 mm (Tahan Api) Lengkap Hardware tahan api - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 1000 x 2150 mm (Tahan Api) SINGLE STEEL DOOR uk. 1000x2150 mm (Tahan Api) Lengkap Hardware tahan api - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type A-HM uk. 2 x 900 x 2150 mm SINGLE STEEL DOOR uk. 900x2150 mm Hardware : - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type C-HM uk. 900 x 2150 mm SINGLE STEEL DOOR uk. 900x2150 mm with Lover
Kode Satuan Indeks Harga Satuan Total = Jumlah+(Keuntungan+Overhead 2,5%) unit
1.000
Rp
Jumlah Harga Satuan Rp 10,281,138.22 Rp 2,669,873.85
2,247,254.98
Rp
2,247,254.98
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 2,604,754.98 65,118.87 2,669,873.85 4,973,310.20
2,247,254.98
Rp
4,494,509.95
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 4,852,009.95 121,300.25 4,973,310.20 5,433,997.47
4,943,960.95
Rp
4,943,960.95
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 5,301,460.95 132,536.52 5,433,997.47 6,631,784.37
6,112,533.53
Rp
6,112,533.53
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 6,470,033.53 161,750.84 6,631,784.37 6,355,372.01
5,842,862.94
Rp
5,842,862.94
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 6,200,362.94 155,009.07 6,355,372.01 12,344,306.52
11,685,725.87
Rp
11,685,725.87
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 12,043,225.87 301,080.65 12,344,306.52 13,265,681.06
12,584,627.86
Rp
12,584,627.86
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 12,942,127.86 323,553.20 13,265,681.06 10,501,557.44
4,943,960.95
Rp
9,887,921.89
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 10,245,421.89 256,135.55 10,501,557.44 6,631,784.37
Rp
6,112,533.53
unit
unit
2.000
Rp
unit
unit
1.000
Rp
unit
unit
1.000
Rp
unit
unit
1.000
Rp
unit
unit
1.000
Rp
unit
unit
1.000
Rp
unit
unit
2.000
Rp
unit
unit
1.000
Rp
6,112,533.53
Analisa Harga Satuan Pek. Arsitektur - page 120 of 139
Kebutuhan
No
Kode
Hardware : - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 -Ongkos pasang & Material Bantu
54
55
56
57
58
59
60
61
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan Pintu Besi Type C-HM uk. 2 x 900 x 2150 mm SINGLE STEEL DOOR uk. 2x900x2150 mm with Lover Hardware : - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) - SINGLE STEEL DOOR uk. 900x2150 mm - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 - Upah pasang dan material bantu
Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) - SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 - Upah pasang dan material bantu
Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) (Tahan Api) SINGLE STEEL DOOR uk. 900x2150 mm (Tahan Api) Lengkap Hardware tahan api - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) (Tahan Api) SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm (Tahan Api) Lengkap Hardware tahan api - Lockcase - Cylinder pintu besi - Door Handle -Ongkos pasang & Material Bantu
Pemasangan Pintu Besi Type B-HM, HM (uk. 2 x 900 x 2150) sliding - SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm - Lockcase - Cylinder pintu besi - Door Handle - Rel sliding - Upah pasang dan material bantu
Pemasangan Pintu Besi Type M-HM, HM (uk. 900 x 2150) - SINGLE STEEL DOOR uk. 900x2150 mm + kaca (Tahan Api) - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 - Upah pasang dan material bantu
Pintu Type B, HM Radiation Door (uk. 900 x 2150) - Pintu Radiation Door uk. 900 x 2150 mm Terpasang lengkap dengan aksesorries dan hardware
Satuan
Indeks
Harga Satuan
unit
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan
Rp Rp Rp Rp Rp
357,500.00 6,470,033.53 161,750.84 6,631,784.37 8,198,121.09
7,640,666.92
Rp
7,640,666.92
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 7,998,166.92 199,954.17 8,198,121.09 5,433,997.47
4,943,960.95
Rp
4,943,960.95
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 5,301,460.95 132,536.52 5,433,997.47 8,566,670.91
8,000,227.71
Rp
8,000,227.71
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 8,357,727.71 208,943.19 8,566,670.91 12,344,306.52
11,685,725.87
Rp
11,685,725.87
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 12,043,225.87 301,080.65 12,344,306.52 17,411,866.49
16,629,686.82
Rp
16,629,686.82
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 16,987,186.82 424,679.67 17,411,866.49 8,566,670.91
8,000,227.71
Rp
8,000,227.71
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 8,357,727.71 208,943.19 8,566,670.91 15,108,430.14
14,382,431.84
Rp
14,382,431.84
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
357,500.00 14,739,931.84 368,498.30 15,108,430.14 30,230,529.00
29,493,199.02
Rp
29,493,199.02
Jumlah harga persatuan pekerjaan
Rp
29,493,199.02
unit
1.000
Rp
unit
unit
1.000
Rp
ls
unit
1.000
Rp
ls
unit
1.000
Rp
unit
unit
1.000
Rp
unit
unit
1.000
Rp
ls
unit
1.000
Rp
ls
unit
1.000
Rp
Analisa Harga Satuan Pek. Arsitektur - page 121 of 139
Kebutuhan
No
62
63
64
65
1
2
3
4
5
6
1 unit
1 unit
1 unit
1 unit
Pintu Type B, HM Radiation Door (uk. 1200 x 2150) - Pintu Radiation Door uk. 1200 x 2150 mm Terpasang lengkap dengan aksesorries dan hardware
Pintu Type B, HM Radiation Door (uk. 2x 900 x 2150) - Pintu Radiation Door uk. 2 x 900 x 2150 mm Terpasang lengkap dengan aksesorries dan hardware
Pintu swing single for disposal uk. 800 mm x 800 mm - Pintu swing single for disposal uk. 800 mm x 800 mm - Finish stainless steel 1 swing, manual swing with elektrobolt, foot switch
Pemasangan Pintu Besi tipe D2 (Rumah Pompa) - SINGLE STEEL DOOR uk. 2 x 900 x 2150 mm - Lockcase - Cylinder pintu besi - Door Handle - Door closer Griff 983 - Upah pasang dan material bantu
PEKERJAAN KUSEN DAN DAUN JENDELA GEDUNG B, C1 & C2 1 unit Jendela Tipe DW-2E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
1 unit
1 unit
1 unit
1 unit
1 unit
Kode
Jendela Tipe DW-2EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-5E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Satuan
Indeks Harga Satuan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%) unit
39,102,236.57
Rp
39,102,236.57
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
39,102,236.57 977,555.91 40,079,792.49 56,911,232.24
55,523,153.40
Rp
55,523,153.40
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
55,523,153.40 1,388,078.84 56,911,232.24 53,209,379.68
51,911,589.93
Rp
51,911,589.93
Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
51,911,589.93 1,297,789.75 53,209,379.68 8,566,670.91
8,000,227.71
Rp
8,000,227.71
1.000 Rp 357,500.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp
357,500.00 8,357,727.71 208,943.19 8,566,670.91
Rp
2,942,460.56
84,525.81
Rp
1,138,731.68
5.024 Rp 328,068.85 1.000 Rp 83,612.42 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,648,349.13 83,612.42 2,870,693.23 71,767.33 2,942,460.56 1,903,414.50
84,525.81
Rp
1,138,731.68
5.024 Rp 132,189.12 1.000 Rp 54,087.08 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
664,171.00 54,087.08 1,856,989.76 46,424.74 1,903,414.50 3,733,953.35
84,525.81
Rp
1,519,351.39
6.149 Rp 328,068.85 1.000 Rp 106,103.34 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
2,017,426.58 106,103.34 3,642,881.31 91,072.03 3,733,953.35 2,414,446.44
84,525.81
Rp
1,519,351.39
6.149 Rp 132,189.12 1.000 Rp 23,322.35 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
812,883.75 23,322.35 2,355,557.50 58,888.94 2,414,446.44 6,462,719.45
84,525.81
Rp
2,478,736.21
11.104 Rp 328,068.85 1.000 Rp 183,643.46 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
3,642,712.47 183,643.46 6,305,092.14 157,627.30 6,462,719.45 685,638.66
84,525.81
Rp
496,589.12
1.156 Rp 132,189.12 1.000 Rp 19,482.98 Jumlah harga persatuan pekerjaan
Rp Rp Rp
152,843.67 19,482.98 668,915.77
unit
unit
unit
1.000
1.000
1.000
1.000
Rp
Jumlah Harga Satuan Rp 737,329.98 Rp 30,230,529.00 Rp 40,079,792.49
Rp
Rp
Rp
ls
m'
13.472
Rp
m² ls
m'
13.472
Rp
m² ls
m'
17.975
Rp
m² ls
m'
17.975
Rp
m² ls
m'
29.325
Rp
m² ls
m' m² ls
5.875
Rp
Analisa Harga Satuan Pek. Arsitektur - page 122 of 139
Kebutuhan
No
7
8
9
10
11
12
13
14
15
16
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-6E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-6E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-3E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-1' -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3C -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3E
Kode
Satuan
Indeks Harga Satuan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
34.550
Rp
Jumlah Harga Satuan Rp 16,722.89 Rp 685,638.66 Rp 4,852,250.58
84,525.81
Rp
2,920,366.65
12.676 Rp 132,189.12 1.000 Rp 137,880.67 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,675,655.68 137,880.67 4,733,903.01 118,347.58 4,852,250.58 569,168.54
84,525.81
Rp
312,745.49
0.690 Rp 328,068.85 1.000 Rp 16,173.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
226,367.51 16,173.39 555,286.38 13,882.16 569,168.54 3,083,778.90
84,525.81
Rp
1,572,180.02
4.111 Rp 328,068.85 1.000 Rp 87,628.10 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,348,756.65 87,628.10 3,008,564.78 75,214.12 3,083,778.90 1,534,078.01
84,525.81
Rp
798,768.88
1.994 Rp 328,068.85 1.000 Rp 43,592.08 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
654,300.51 43,592.08 1,496,661.48 37,416.54 1,534,078.01 366,365.53
84,525.81
Rp
223,993.39
0.375 Rp 328,068.85 1.000 Rp 10,410.58 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
123,025.82 10,410.58 357,429.79 8,935.74 366,365.53 654,394.54
84,525.81
Rp
411,640.68
1.575 Rp 132,189.12 1.000 Rp 18,595.16 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
208,197.86 18,595.16 638,433.70 15,960.84 654,394.54 482,219.15
84,525.81
Rp
287,387.75
1.281 Rp 132,189.12 1.000 Rp 13,702.65 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
169,367.31 13,702.65 470,457.70 11,761.44 482,219.15 1,782,643.51
84,525.81
Rp
1,272,113.40
3.150 Rp 132,189.12 1.000 Rp 50,655.27 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
416,395.72 50,655.27 1,739,164.40 43,479.11 1,782,643.51 1,765,195.66
84,525.81
Rp
1,007,970.26
5.023 Rp 132,189.12 1.000 Rp 50,159.48 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
664,012.37 50,159.48 1,722,142.11 43,053.55 1,765,195.66 3,733,953.35
m² ls
m'
3.700
Rp
m² ls
m'
18.600
Rp
m² ls
m'
9.450
Rp
m² ls
m'
2.650
Rp
m² ls
m'
4.870
Rp
m² ls
m'
3.400
Rp
m² ls
m'
15.050
Rp
m² ls
m' m² ls
11.925
Rp
Analisa Harga Satuan Pek. Arsitektur - page 123 of 139
Kebutuhan
No
-Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
17
18
19
20
21
22
23
24
1
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-2E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-6E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3EB -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-5E -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-5EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1EB -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
GEDUNG D1, D2 & F1 1 m² Jendela curtain wall system -Material terpasang - Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm
Kode
Satuan m'
Indeks 17.975
Harga Satuan Rp
Jumlah Harga Satuan
84,525.81
Rp
1,519,351.39
6.149 Rp 328,068.85 1.000 Rp 106,103.34 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
2,017,426.58 106,103.34 3,642,881.31 91,072.03 3,733,953.35 2,737,846.96
84,525.81
Rp
1,122,080.10
4.484 Rp 328,068.85 1.000 Rp 77,798.16 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,471,191.95 77,798.16 2,671,070.21 66,776.76 2,737,846.96 2,462,257.26
84,525.81
Rp
1,519,351.39
6.149 Rp 132,189.12 1.000 Rp 69,967.05 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
812,883.75 69,967.05 2,402,202.20 60,055.06 2,462,257.26 1,810,472.92
84,525.81
Rp
1,122,080.10
4.484 Rp 132,189.12 1.000 Rp 51,446.07 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
592,788.88 51,446.07 1,766,315.04 44,157.88 1,810,472.92 3,083,778.90
84,525.81
Rp
1,572,180.02
4.111 Rp 328,068.85 1.000 Rp 87,628.10 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,348,756.65 87,628.10 3,008,564.78 75,214.12 3,083,778.90 5,104,291.86
84,525.81
Rp
2,053,977.13
8.476 Rp 328,068.85 1.000 Rp 145,042.63 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
2,780,777.18 145,042.63 4,979,796.94 124,494.92 5,104,291.86 4,042,180.51
84,525.81
Rp
2,447,022.13
10.453 Rp 132,189.12 1.000 Rp 114,861.87 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,381,706.74 114,861.87 3,943,590.74 98,589.77 4,042,180.51 6,203,757.80
84,525.81
Rp
2,447,022.13
10.453 Rp 328,068.85 1.000 Rp 176,284.85 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
3,429,139.65 176,284.85 6,052,446.63 151,311.17 6,203,757.80 549,853.97
84,525.81
Rp
304,292.91
0.660 Rp 328,068.85 1.000 Rp 15,624.55 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
216,525.44 15,624.55 536,442.90 13,411.07 549,853.97
Rp
1,145,978.01
Rp
168,094.67
m² ls
m'
13.275
Rp
m² ls
m'
17.975
Rp
m² ls
m'
13.275
Rp
m² ls
m'
18.600
Rp
m² ls
m'
24.300
Rp
m² ls
m'
28.950
Rp
m² ls
m'
28.950
Rp
m² ls
m'
3.600
Rp
m² ls
m'
2.000
Rp
84,047.34
Analisa Harga Satuan Pek. Arsitektur - page 124 of 139
Kebutuhan
No
- Cover mullion (omega) tebal 1 mm - Ambang Transome tebal 1,2 mm - Alumunium Transom - Bracket - Kaca Reflected 8 mm - Kaca Reflected 8 mm - List Karet - Sealent - Paku Skrup - Pisher - Dinabold -Ongkos Pasang, Material & Peralatan Bantu
2
3
4
5
6
7
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe BV-6 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-6EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-4EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement)
Kode
Satuan m' m' m' pcs m² m² m' m' bh bh bh ls
Indeks Harga Satuan 2.000 Rp 44,495.65 1.000 Rp 64,271.49 1.000 Rp 85,395.69 2.000 Rp 14,831.88 1.000 Rp 412,775.79 0.200 Rp 412,775.79 6.000 Rp 4,943.96 6.000 Rp 5,932.75 12.000 Rp 296.64 4.000 Rp 1,483.19 4.000 Rp 2,471.98 1.000 Rp 101,638.85 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
18.600
Rp
Jumlah Harga Satuan Rp 88,991.30 Rp 64,271.49 Rp 85,395.69 Rp 29,663.77 Rp 412,775.79 Rp 82,555.16 Rp 29,663.77 Rp 35,596.52 Rp 3,559.65 Rp 5,932.75 Rp 9,887.92 Rp 101,638.85 Rp 1,118,027.33 Rp 27,950.68 Rp 1,145,978.01 Rp 1,755,454.65
84,525.81
Rp
1,572,180.02
0.685 Rp 132,189.12 1.000 Rp 49,882.68 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
90,575.98 49,882.68 1,712,638.68 42,815.97 1,755,454.65 9,437,023.31
m² ls
m' m²
46.650 4.283
Rp Rp
84,525.81 440,026.57
Rp Rp
3,943,128.93 1,884,413.77
m²
17.473
Rp
132,189.12
Rp
2,309,687.56
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 268,160.74 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 268,160.74 9,206,852.01 230,171.30 9,437,023.31 6,755,547.15
bh bh ls
m' m²
33.550 3.093
Rp Rp
84,525.81 440,026.57
Rp Rp
2,835,840.85 1,360,782.15
m²
12.617
Rp
132,189.12
Rp
1,667,882.96
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 191,964.40 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 191,964.40 6,590,777.70 164,769.44 6,755,547.15 5,340,572.08
bh bh ls
m' m²
24.800 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
2,096,240.03 1,265,076.38
m²
8.798
Rp
132,189.12
Rp
1,162,933.75
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 151,756.73 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 151,756.73 5,210,314.23 130,257.86 5,340,572.08 5,245,559.59
bh bh ls
m' m²
20.450 3.813
Rp Rp
84,525.81 440,026.57
Rp Rp
1,728,552.77 1,677,601.28
m²
7.778
Rp
132,189.12
Rp
1,028,100.86
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 149,056.87 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 149,056.87 5,117,619.11 127,940.48 5,245,559.59 2,260,410.48
bh bh ls
m' m²
10.100 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
853,710.66 632,538.19
m²
2.933
Rp
132,189.12
Rp
387,644.58
bh
1.000
Rp
31,461.57
Rp
31,461.57
Analisa Harga Satuan Pek. Arsitektur - page 125 of 139
Kebutuhan
No
2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
8
9
10
11
12
13
14
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe DW-2E -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-6EA -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca Tinted 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-4EA -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca Tinted 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2EA -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca Tinted 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe CW-1 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Alumunium Transom 3 Steel Bracket besi siku lengkap dengan anchor -Kaca 1 Pemasangan Kaca reflektif 8 mm 2 Pemasangan Kaca tempered 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe CW-1A -Allumunium 1 Pemasangan alumunium kusen jendela 2 Alumunium Transom 3 Steel Bracket besi siku lengkap dengan anchor -Kaca 1 Pemasangan Kaca reflektif 8 mm 2 Pemasangan Kaca tempered 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-3 -Allumunium 1 Pemasangan alumunium kusen jendela
Kode
Satuan bh ls
Indeks Harga Satuan 2.000 Rp 117,846.05 1.000 Rp 64,231.41 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 235,692.10 Rp 64,231.41 Rp 2,205,278.51 Rp 55,131.96 Rp 2,260,410.48 Rp 4,506,728.93
m' m²
18.400 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
1,555,274.86 1,265,076.38
m²
6.915
Rp
132,189.12
Rp
914,087.74
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 128,062.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 128,062.39 4,396,808.71 109,920.22 4,506,728.93 10,309,301.39
bh bh ls
m' m²
34.550 4.283
Rp Rp
84,525.81 440,026.57
Rp Rp
2,920,366.65 1,884,413.77
m²
12.676
Rp
328,068.85
Rp
4,158,666.35
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 292,947.23 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 292,947.23 10,057,855.02 251,446.38 10,309,301.39 7,670,853.70
bh bh ls
m' m²
24.850 3.093
Rp Rp
84,525.81 440,026.57
Rp Rp
2,100,466.32 1,360,782.15
m²
9.154
Rp
328,068.85
Rp
3,003,076.63
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 217,973.58 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 217,973.58 7,483,759.71 187,093.99 7,670,853.70 5,641,508.96
bh bh ls
m' m²
15.150 3.813
Rp Rp
84,525.81 440,026.57
Rp Rp
1,280,565.99 1,677,601.28
m²
5.643
Rp
328,068.85
Rp
1,851,128.48
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 160,308.09 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 160,308.09 5,503,911.18 137,597.78 5,641,508.96 20,489,453.28
84,525.81 85,395.69 200,778.75
Rp Rp Rp
6,483,129.45 1,494,424.56 3,212,459.98
15.985 Rp 470,652.68 2.818 Rp 382,749.06 1.000 Rp 197,917.93 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
7,523,383.14 1,078,395.47 197,917.93 19,989,710.52 499,742.76 20,489,453.28 15,509,584.32
84,525.81 85,395.69 200,778.75
Rp Rp Rp
4,763,029.26 1,067,446.11 2,810,902.48
11.788 Rp 470,652.68 2.070 Rp 382,749.06 1.000 Rp 149,814.87 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
5,547,818.50 792,290.55 149,814.87 15,131,301.77 378,282.54 15,509,584.32 1,016,374.82
Rp
743,827.11
bh bh ls
m' m' bh
76.700 17.500 16.000
Rp Rp Rp
m² m² ls
m' m' bh
56.350 12.500 14.000
Rp Rp Rp
m² m² ls
m'
8.800
Rp
84,525.81
Analisa Harga Satuan Pek. Arsitektur - page 126 of 139
Kebutuhan
No
-Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
15
16
17
18
19
20
21
22
23
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-6 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1R -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Kaca anti radiasi tebal 12 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-L2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan
Indeks
Harga Satuan
m² ls
1.800 Rp 132,189.12 1.000 Rp 9,817.68 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp
237,940.41 9,817.68 991,585.19 24,789.63 1,016,374.82 4,852,250.58
84,525.81
Rp
2,920,366.65
12.676 Rp 132,189.12 1.000 Rp 137,880.67 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,675,655.68 137,880.67 4,733,903.01 118,347.58 4,852,250.58 1,054,944.35
84,525.81
Rp
646,622.43
2.668 Rp 132,189.12 1.000 Rp 29,977.11 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
352,614.47 29,977.11 1,029,214.00 25,730.35 1,054,944.35 961,735.05
84,525.81
Rp
629,717.27
2.128 Rp 132,189.12 1.000 Rp 27,328.49 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
281,232.35 27,328.49 938,278.10 23,456.95 961,735.05 1,378,453.81
84,525.81
Rp
781,863.72
3.963 Rp 132,189.12 1.000 Rp 39,169.89 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
523,799.38 39,169.89 1,344,832.99 33,620.82 1,378,453.81 426,476.52
84,525.81
Rp
312,745.49
0.690 Rp 132,189.12 1.000 Rp 12,118.68 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
91,210.49 12,118.68 416,074.66 10,401.87 426,476.52 44,183,633.72
84,525.81
Rp
321,198.07
####### Rp 5,393.41 1.000 Rp 1,255,514.10 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
41,529,271.95 1,255,514.10 43,105,984.12 1,077,649.60 44,183,633.72 1,348,289.86
84,525.81
Rp
950,915.34
2.468 Rp 132,189.12 1.000 Rp 38,312.76 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
326,176.65 38,312.76 1,315,404.74 32,885.12 1,348,289.86 3,271,973.33
84,525.81
Rp
1,992,188.76
8.374 Rp 132,189.12 1.000 Rp 92,975.80 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,107,004.54 92,975.80 3,192,169.10 79,804.23 3,271,973.33 2,528,252.68
m'
34.550
Rp
m² ls
m'
7.650
Rp
m² ls
m'
7.450
Rp
m² ls
m'
9.250
Rp
m² ls
m'
3.700
Rp
m² ls
m'
3.800
Rp
cm² ls
m'
11.250
Rp
m² ls
m'
23.569
Rp
m² ls
m'
18.350
Rp
84,525.81
Rp
1,551,048.57
m² ls
6.383 1.000
Rp Rp
132,189.12 71,842.37
Rp Rp
843,697.04 71,842.37
Analisa Harga Satuan Pek. Arsitektur - page 127 of 139
Kebutuhan
No
24
25
26
27
28
29
30
31
32
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe DW-2A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-6 (Gd. D1&D2) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2A' -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2B -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan
Indeks Harga Satuan Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
14.400
Rp
Jumlah Harga Satuan Rp 2,466,587.98 Rp 61,664.70 Rp 2,528,252.68 Rp 1,891,830.00
84,525.81
Rp
1,217,171.63
4.348 Rp 132,189.12 1.000 Rp 53,757.90 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
574,758.28 53,757.90 1,845,687.81 46,142.20 1,891,830.00 1,610,112.58
84,525.81
Rp
1,132,645.82
2.969 Rp 132,189.12 1.000 Rp 45,752.67 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
392,443.05 45,752.67 1,570,841.54 39,271.04 1,610,112.58 3,495,059.38
84,525.81
Rp
2,100,466.32
9.154 Rp 132,189.12 1.000 Rp 99,314.97 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,210,032.74 99,314.97 3,409,814.03 85,245.35 3,495,059.38 2,233,582.62
84,525.81
Rp
1,572,180.02
4.111 Rp 132,189.12 1.000 Rp 63,469.08 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
543,455.90 63,469.08 2,179,105.00 54,477.62 2,233,582.62 3,440,872.72
84,525.81
Rp
2,096,240.03
8.798 Rp 132,189.12 1.000 Rp 97,775.21 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,162,933.75 97,775.21 3,356,949.00 83,923.72 3,440,872.72 2,375,716.76
84,525.81
Rp
1,474,975.34
5.865 Rp 132,189.12 1.000 Rp 67,507.94 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
775,289.17 67,507.94 2,317,772.45 57,944.31 2,375,716.76 1,310,560.80
84,525.81
Rp
853,710.66
2.933 Rp 132,189.12 1.000 Rp 37,240.66 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
387,644.58 37,240.66 1,278,595.90 31,964.90 1,310,560.80 1,847,986.46
84,525.81
Rp
1,166,456.15
4.418 Rp 132,189.12 1.000 Rp 52,512.05 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
583,945.42 52,512.05 1,802,913.62 45,072.84 1,847,986.46 1,954,910.52
84,525.81
Rp
1,217,171.63
4.800 Rp 132,189.12 1.000 Rp 55,550.38 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
634,507.76 55,550.38 1,907,229.77 47,680.74 1,954,910.52
m² ls
m'
13.400
Rp
m² ls
m'
24.850
Rp
m² ls
m'
18.600
Rp
m² ls
m'
24.800
Rp
m² ls
m'
17.450
Rp
m² ls
m'
10.100
Rp
m² ls
m'
13.800
Rp
m² ls
m' m² ls
14.400
Rp
Analisa Harga Satuan Pek. Arsitektur - page 128 of 139
No 33 1 unit
34
35
36
37
38
39
40
41
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Kebutuhan Jendela Tipe W-1A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-4' -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-3 (Gd. D2) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-1' -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-L1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Pemasangan jendela tipe PG-1 '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding 3 Sealent -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock (patch fitting + double cylinder) -Material Bantu dan perkuatan
Pemasangan jendela tipe PG-2 '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding 3 Sealent
Kode
Satuan
m'
Indeks
9.270
Harga Satuan
Rp
Jumlah Harga Satuan Rp 1,285,373.58
84,525.81
Rp
783,554.24
3.283 Rp 132,189.12 1.000 Rp 36,524.94 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
433,943.82 36,524.94 1,254,023.00 31,350.58 1,285,373.58 3,995,876.53
84,525.81
Rp
2,341,364.87
10.920 Rp 132,189.12 1.000 Rp 113,546.10 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,443,505.16 113,546.10 3,898,416.13 97,460.40 3,995,876.53 1,744,993.86
84,525.81
Rp
1,090,382.92
4.255 Rp 132,189.12 1.000 Rp 49,585.43 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
562,464.69 49,585.43 1,702,433.04 42,560.83 1,744,993.86 790,486.36
84,525.81
Rp
566,322.91
1.380 Rp 132,189.12 1.000 Rp 22,462.32 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
182,420.98 22,462.32 771,206.21 19,280.16 790,486.36 1,154,496.20
84,525.81
Rp
819,900.33
2.070 Rp 132,189.12 1.000 Rp 32,805.95 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
273,631.47 32,805.95 1,126,337.76 28,158.44 1,154,496.20 949,764.78
84,525.81
Rp
595,906.94
2.298 Rp 132,189.12 1.000 Rp 26,988.34 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
303,704.50 26,988.34 926,599.78 23,164.99 949,764.78 726,255.34
84,525.81
Rp
528,286.30
1.208 Rp 132,189.12 1.000 Rp 20,637.14 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
159,618.36 20,637.14 708,541.80 17,713.54 726,255.34 14,798,613.87
509,413.34 15,730.78 44,046.20
Rp Rp Rp
7,694,688.45 224,950.22 232,861.23
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 299,293.91 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 299,293.91 14,437,672.07 360,941.80 14,798,613.87 14,437,193.01
Rp Rp Rp
7,353,508.87 223,849.07 222,536.26
m² ls
m'
27.700
Rp
m² ls
m'
12.900
Rp
m² ls
m'
6.700
Rp
m² ls
m'
9.700
Rp
m² ls
m'
7.050
Rp
m² ls
m'
6.250
Rp
m² ls
m² m' tube
15.105 14.300 5.287
Rp Rp Rp
set set set set set set ls
m² m' tube
14.435 14.230 5.052
Rp Rp Rp
509,413.34 15,730.78 44,046.20
Analisa Harga Satuan Pek. Arsitektur - page 129 of 139
Kebutuhan
No
-Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock (patch fitting + double cylinder) -Material Bantu dan perkuatan
42
43
44
45
46
47
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Pemasangan jendela tipe PG-3 '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding 3 Sealent -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock (patch fitting + double cylinder) -Material Bantu dan perkuatan
Pemasangan jendela tipe PG-4 '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding 3 Sealent -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock (patch fitting + double cylinder) -Material Bantu dan perkuatan
Pemasangan jendela tipe PG-5 '-Daun Pintu 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding 3 Sealent -Aksesories & Hardware 1 Pull Handle 2 Floor Hinge 3 Top patch 4 Bottom Patch 5 Top Pivot 6 Corner Lock (patch fitting + double cylinder) -Material Bantu dan perkuatan
Jendela Tipe DW-2A (Gd. D2) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2' -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-5 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan
Indeks
Harga Satuan
set set set set set set ls
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 299,293.91 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 299,293.91 14,085,066.35 352,126.66 14,437,193.01 17,935,876.10
509,413.34 15,730.78 44,046.20
Rp Rp Rp
10,598,344.48 294,165.68 320,733.40
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 1.000 Rp 792,202.32 1.000 Rp 299,293.91 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 792,202.32 299,293.91 17,498,415.71 437,460.39 17,935,876.10 15,713,931.87
509,413.34 15,730.78 44,046.20
Rp Rp Rp
7,749,857.92 229,291.92 234,530.81
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 2.000 Rp 792,202.32 1.000 Rp 338,904.03 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 1,584,404.65 338,904.03 15,330,665.24 383,266.63 15,713,931.87 17,820,918.11
509,413.34 15,730.78 44,046.20
Rp Rp Rp
7,331,731.45 220,230.99 221,877.21
2.000 Rp 704,379.60 2.000 Rp 1,246,417.50 2.000 Rp 193,263.93 2.000 Rp 408,910.52 2.000 Rp 43,866.42 5.000 Rp 792,202.32 1.000 Rp 457,734.38 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,408,759.20 2,492,835.00 386,527.86 817,821.03 87,732.83 3,961,011.62 457,734.38 17,386,261.57 434,656.54 17,820,918.11 2,026,488.22
84,525.81
Rp
1,234,076.79
5.185 Rp 132,189.12 1.000 Rp 57,584.32 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
685,400.57 57,584.32 1,977,061.68 49,426.54 2,026,488.22 1,632,064.81
84,525.81
Rp
1,043,893.72
3.798 Rp 132,189.12 1.000 Rp 46,376.46 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
501,988.17 46,376.46 1,592,258.35 39,806.46 1,632,064.81 4,073,198.95
84,525.81
Rp
2,461,729.62
10.564 Rp 132,189.12 1.000 Rp 115,743.28 Jumlah harga persatuan pekerjaan
Rp Rp Rp
1,396,379.74 115,743.28 3,973,852.64
m² m' tube
20.805 18.700 7.282
Rp Rp Rp
set set set set set set ls
m² m' tube
15.213 14.576 5.325
Rp Rp Rp
set set set set set set ls
m² m' tube
14.393 14.000 5.037
Rp Rp Rp
set set set set set set ls
m'
14.600
Rp
m² ls
m'
12.350
Rp
m² ls
m' m² ls
29.124
Rp
Analisa Harga Satuan Pek. Arsitektur - page 130 of 139
Kebutuhan
No
48
49
50
51
52
53
54
1
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-3C -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1EB -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1EA -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1 (diatas pintu besi) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 (diatas pintu besi) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe LV-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Alumunium louvre 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
GEDUNG F2 & F3 1 unit Jendela Tipe W-1 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement)
Kode
Satuan
Indeks Harga Satuan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
15.950
Rp
Jumlah Harga Satuan Rp 99,346.32 Rp 4,073,198.95 Rp 1,928,899.28
84,525.81
Rp
1,348,186.63
3.623 Rp 132,189.12 1.000 Rp 54,811.25 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
478,855.08 54,811.25 1,881,852.96 47,046.32 1,928,899.28 2,260,410.48
m² ls
m' m²
10.100 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
853,710.66 632,538.19
m²
2.933
Rp
132,189.12
Rp
387,644.58
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 64,231.41 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 64,231.41 2,205,278.51 55,131.96 2,260,410.48 961,735.05
84,525.81
Rp
629,717.27
2.128 Rp 132,189.12 1.000 Rp 27,328.49 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
281,232.35 27,328.49 938,278.10 23,456.95 961,735.05 1,911,584.73
bh bh ls
m'
7.450
Rp
m² ls
m' m²
7.450 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
629,717.27 632,538.19
m²
2.128
Rp
132,189.12
Rp
281,232.35
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 54,319.24 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 54,319.24 1,864,960.72 46,624.02 1,911,584.73 472,595.68
84,525.81
Rp
270,482.58
0.540 Rp 328,068.85 1.000 Rp 13,429.19 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
177,157.18 13,429.19 461,068.96 11,526.72 472,595.68 722,096.06
84,525.81
Rp
329,650.65
1.080 Rp 328,068.85 1.000 Rp 20,518.95 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
354,314.36 20,518.95 704,483.96 17,612.10 722,096.06 1,039,983.62
84,525.81
Rp
608,585.81
0.800 Rp 404,505.90 0.400 Rp 132,189.12 1.000 Rp 29,551.99 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
323,604.72 52,875.65 29,551.99 1,014,618.16 25,365.45 1,039,983.62
Rp
1,911,584.73
bh bh ls
m'
3.200
Rp
m² ls
m'
3.900
Rp
m² ls
m'
7.200
Rp
m² m² ls
m' m²
7.450 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
629,717.27 632,538.19
m²
2.128
Rp
132,189.12
Rp
281,232.35
bh
1.000
Rp
31,461.57
Rp
31,461.57
Analisa Harga Satuan Pek. Arsitektur - page 131 of 139
Kebutuhan
No
2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
2
3
4
5
6
7
8
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-2 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1' -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2' -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3' -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-1 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe DW-2
Kode
Satuan bh ls
Indeks Harga Satuan 2.000 Rp 117,846.05 1.000 Rp 54,319.24 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 235,692.10 Rp 54,319.24 Rp 1,864,960.72 Rp 46,624.02 Rp 1,911,584.73 Rp 2,694,843.54
m' m²
12.900 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
1,090,382.92 632,538.19
m²
4.255
Rp
132,189.12
Rp
562,464.69
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 76,576.18 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 76,576.18 2,629,115.65 65,727.89 2,694,843.54 4,427,952.04
bh bh ls
m' m²
18.350 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
1,551,048.57 1,265,076.38
m²
6.383
Rp
132,189.12
Rp
843,697.04
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 125,823.88 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 125,823.88 4,319,953.21 107,998.83 4,427,952.04 2,063,289.54
bh bh ls
m' m²
9.150 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
773,411.14 632,538.19
m²
2.128
Rp
132,189.12
Rp
281,232.35
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 58,630.06 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 58,630.06 2,012,965.41 50,324.14 2,063,289.54 3,644,693.23
bh bh ls
m' m²
12.900 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
1,090,382.92 1,265,076.38
m²
4.255
Rp
132,189.12
Rp
562,464.69
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 103,566.94 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 103,566.94 3,555,798.27 88,894.96 3,644,693.23 5,377,801.72
bh bh ls
m' m²
18.350 4.313
Rp Rp
84,525.81 440,026.57
Rp Rp
1,551,048.57 1,897,614.56
m²
6.383
Rp
132,189.12
Rp
843,697.04
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 152,814.64 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 152,814.64 5,246,635.82 131,165.90 5,377,801.72 2,001,334.57
bh bh ls
m' m²
7.630 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
644,931.91 632,538.19
m²
2.656
Rp
132,189.12
Rp
351,028.20
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 56,869.56 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 56,869.56 1,952,521.53 48,813.04 2,001,334.57 3,938,805.28
bh bh ls
Analisa Harga Satuan Pek. Arsitektur - page 132 of 139
Kebutuhan
No
-Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
9
10
11
12
13
14
15
16
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-4 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-5 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-5 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe LV-2
Kode
Satuan
Indeks
Harga Satuan
Jumlah Harga Satuan
m' m²
14.580 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
1,232,386.28 1,265,076.38
m²
5.288
Rp
132,189.12
Rp
699,042.49
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 111,924.37 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 111,924.37 3,842,736.86 96,068.42 3,938,805.28 5,211,210.85
bh bh ls
m' m²
23.800 2.875
Rp Rp
84,525.81 440,026.57
Rp Rp
2,011,714.22 1,265,076.38
m²
8.510
Rp
132,189.12
Rp
1,124,929.38
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 148,080.82 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 148,080.82 5,084,108.14 127,102.70 5,211,210.85 6,944,319.34
bh bh ls
m' m²
29.250 4.313
Rp Rp
84,525.81 440,026.57
Rp Rp
2,472,379.87 1,897,614.56
m²
10.638
Rp
132,189.12
Rp
1,406,161.73
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 197,328.52 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 197,328.52 6,774,945.70 169,373.64 6,944,319.34 426,476.52
84,525.81
Rp
312,745.49
0.690 Rp 132,189.12 1.000 Rp 12,118.68 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
91,210.49 12,118.68 416,074.66 10,401.87 426,476.52 790,486.36
84,525.81
Rp
566,322.91
1.380 Rp 132,189.12 1.000 Rp 22,462.32 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
182,420.98 22,462.32 771,206.21 19,280.16 790,486.36 1,154,496.20
84,525.81
Rp
819,900.33
2.070 Rp 132,189.12 1.000 Rp 32,805.95 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
273,631.47 32,805.95 1,126,337.76 28,158.44 1,154,496.20 1,518,506.04
84,525.81
Rp
1,073,477.76
2.760 Rp 132,189.12 1.000 Rp 43,149.59 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
364,841.96 43,149.59 1,481,469.31 37,036.73 1,518,506.04 1,882,515.88
84,525.81
Rp
1,327,055.18
3.450 Rp 132,189.12 1.000 Rp 53,493.23 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
456,052.45 53,493.23 1,836,600.86 45,915.02 1,882,515.88 1,187,234.21
bh bh ls
m'
3.700
Rp
m² ls
m'
6.700
Rp
m² ls
m'
9.700
Rp
m² ls
m'
12.700
Rp
m² ls
m' m² ls
15.700
Rp
Analisa Harga Satuan Pek. Arsitektur - page 133 of 139
Kebutuhan
No
-Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
17
18
19
20
21
22
23
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe W-1E -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-2E -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-3E -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-6E -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan m'
Indeks 6.700
Harga Satuan Rp
Jumlah Harga Satuan
84,525.81
Rp
566,322.91
1.380 Rp 404,505.90 1.000 Rp 33,736.23 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
558,218.14 33,736.23 1,158,277.28 28,956.93 1,187,234.21 1,911,584.73
m² ls
m' m²
7.450 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
629,717.27 632,538.19
m²
2.128
Rp
132,189.12
Rp
281,232.35
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 54,319.24 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 54,319.24 1,864,960.72 46,624.02 1,911,584.73 2,694,843.54
bh bh ls
m' m²
12.900 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
1,090,382.92 632,538.19
m²
4.255
Rp
132,189.12
Rp
562,464.69
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 76,576.18 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 76,576.18 2,629,115.65 65,727.89 2,694,843.54 3,478,102.36
bh bh ls
m' m²
18.350 1.438
Rp Rp
84,525.81 440,026.57
Rp Rp
1,551,048.57 632,538.19
m²
6.383
Rp
132,189.12
Rp
843,697.04
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.000 Rp 98,833.12 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 98,833.12 3,393,270.59 84,831.76 3,478,102.36 7,727,578.15
bh bh ls
m' m²
34.700 4.313
Rp Rp
84,525.81 440,026.57
Rp Rp
2,933,045.52 1,897,614.56
m²
12.765
Rp
132,189.12
Rp
1,687,394.08
3.000 Rp 31,461.57 6.000 Rp 117,846.05 1.000 Rp 219,585.46 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
94,384.71 707,076.31 219,585.46 7,539,100.63 188,477.52 7,727,578.15 569,168.54
84,525.81
Rp
312,745.49
0.690 Rp 328,068.85 1.000 Rp 16,173.39 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
226,367.51 16,173.39 555,286.38 13,882.16 569,168.54 1,075,870.40
84,525.81
Rp
566,322.91
1.380 Rp 328,068.85 1.000 Rp 30,571.74 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
452,735.01 30,571.74 1,049,629.66 26,240.74 1,075,870.40 1,582,572.26
bh bh ls
m'
3.700
Rp
m² ls
m'
6.700
Rp
m² ls
m'
9.700
Rp
84,525.81
Rp
819,900.33
m² ls
2.070 1.000
Rp Rp
328,068.85 44,970.09
Rp Rp
679,102.52 44,970.09
Analisa Harga Satuan Pek. Arsitektur - page 134 of 139
Kebutuhan
No
24
25
26
27
28
1
2
3
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe BV-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-6 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe W-1EA -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-1 (diatas pintu besi) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 (diatas pintu besi) -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca Tinted 6 mm -Ongkos Pasang, Material & Peralatan Bantu
GEDUNG G3 - Sentral Gas Medis 1 unit Pemasangan Pintu type D2 -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet uk. 900 x 2100 mm 2 Pemasangan Kaca clear Float 6 mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu 5 Door closer -Ongkos Pasang, Material & Peralatan Bantu
1 unit
1 unit
Pemasangan Pintu type TOI -Frame Allumunium 1 Pemasangan alumunium kusen pintu '-Daun Pintu 1 Daun Pintu Engineering Door, PVC laminated Sheet ( 750 x 2100 ) mm -Aksesories & Hardware 1 Lever Handle 2 Cylinder 3 Mortise Lock 4 Engsel pintu -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe BV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm
Kode
Satuan
Indeks Harga Satuan Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
12.700
Rp
Jumlah Harga Satuan Rp 1,543,972.94 Rp 38,599.32 Rp 1,582,572.26 Rp 2,089,274.12
84,525.81
Rp
1,073,477.76
2.760 Rp 328,068.85 1.000 Rp 59,368.43 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
905,470.02 59,368.43 2,038,316.21 50,957.91 2,089,274.12 3,102,677.84
84,525.81
Rp
1,580,632.60
4.140 Rp 328,068.85 1.000 Rp 88,165.13 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,358,205.04 88,165.13 3,027,002.77 75,675.07 3,102,677.84 1,917,001.88
84,525.81
Rp
853,710.66
2.933 Rp 328,068.85 1.000 Rp 54,473.18 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
962,061.90 54,473.18 1,870,245.73 46,756.14 1,917,001.88 472,595.68
84,525.81
Rp
270,482.58
0.540 Rp 328,068.85 1.000 Rp 13,429.19 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
177,157.18 13,429.19 461,068.96 11,526.72 472,595.68 722,096.06
84,525.81
Rp
329,650.65
1.080 Rp 328,068.85 1.000 Rp 20,518.95 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
354,314.36 20,518.95 704,483.96 17,612.10 722,096.06
Rp
7,180,650.73
m² ls
m'
18.700
Rp
m² ls
m'
10.100
Rp
m² ls
m'
3.200
Rp
m² ls
m'
3.900
Rp
m² ls
m'
9.760
Rp
84,525.81
Rp
824,971.88
bh m²
2.000 0.952
Rp Rp
1,955,111.83 132,189.12
Rp Rp
3,910,223.66 125,777.94
2.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 6.000 Rp 78,905.62 2.000 Rp 337,969.17 1.000 Rp 294,311.48 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
375,345.52 112,623.43 212,886.96 473,433.70 675,938.34 294,311.48 7,005,512.91 175,137.82 7,180,650.73 3,314,013.80
set set set bh bh ls
m'
5.050
Rp
84,525.81
Rp
426,855.33
bh
1.000
Rp
2,018,933.87
Rp
2,018,933.87
1.000 Rp 187,672.76 1.000 Rp 112,623.43 1.000 Rp 212,886.96 3.000 Rp 78,905.62 1.000 Rp 37,495.00 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,672.76 112,623.43 212,886.96 236,716.85 37,495.00 3,233,184.19 80,829.60 3,314,013.80 480,294.54
set set set bh ls
m'
4.350
Rp
84,525.81
Rp
367,687.26
m²
0.660
Rp
132,189.12
Rp
87,244.82
Analisa Harga Satuan Pek. Arsitektur - page 135 of 139
Kebutuhan
No
-Ongkos Pasang, Material & Peralatan Bantu
4
5
1
2
3
4
5
6
7
1 unit
1 unit
Jendela Tipe W-2' -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe LV-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
BANGUNAN MASJID 1 unit Jendela Tipe FR-1 -Kaca 1 Kaca tempered 12 mm Clear/ Polos 2 Alumunium profil U penjepit kaca di dinding -Ongkos Pasang, Material & Peralatan Bantu
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Tipe WE-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-1A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-5A -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-3 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-5B -Allumunium 1 Pemasangan alumunium kusen jendela
Kode
Satuan ls
Indeks Harga Satuan 1.000 Rp 13,647.96 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 13,647.96 Rp 468,580.04 Rp 11,714.50 Rp 480,294.54 Rp 2,405,679.00
m' m²
9.450 1.500
Rp Rp
84,525.81 440,026.57
Rp Rp
798,768.88 660,039.85
m²
2.160
Rp
132,189.12
Rp
285,528.49
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 68,359.34 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 68,359.34 2,347,003.90 58,675.10 2,405,679.00 1,032,345.64
84,525.81
Rp
540,965.17
1.080 Rp 404,505.90 1.000 Rp 29,334.95 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
436,866.37 29,334.95 1,007,166.48 25,179.16 1,032,345.64
Rp
5,042,933.04
Rp Rp Rp Rp Rp Rp Rp
4,584,720.03 191,915.57 143,299.07 4,919,934.68 122,998.37 5,042,933.04 973,530.10
84,525.81
Rp
710,016.78
1.180 Rp 179,750.02 1.000 Rp 27,663.65 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
212,105.02 27,663.65 949,785.46 23,744.64 973,530.10 712,684.06
84,525.81
Rp
524,060.01
0.840 Rp 179,750.02 1.000 Rp 20,251.50 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
150,990.02 20,251.50 695,301.53 17,382.54 712,684.06 1,266,941.19
84,525.81
Rp
805,361.90
2.196 Rp 179,750.02 1.000 Rp 36,001.17 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
394,677.12 36,001.17 1,236,040.19 30,901.00 1,266,941.19 3,266,040.02
84,525.81
Rp
1,901,830.67
6.630 Rp 179,750.02 1.000 Rp 92,807.20 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,191,742.64 92,807.20 3,186,380.51 79,659.51 3,266,040.02 845,930.79
84,525.81
Rp
574,775.49
1.260 Rp 179,750.02 1.000 Rp 24,037.82 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
226,485.03 24,037.82 825,298.33 20,632.46 845,930.79 1,362,290.99
Rp
912,878.72
bh bh ls
m'
6.400
Rp
m² ls
m² m' ls
9.000 Rp 509,413.34 12.200 Rp 15,730.78 1.000 Rp 143,299.07 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
m'
8.400
Rp
m² ls
m'
6.200
Rp
m² ls
m'
9.528
Rp
m² ls
m'
22.500
Rp
m² ls
m'
6.800
Rp
m² ls
m'
10.800
Rp
84,525.81
Analisa Harga Satuan Pek. Arsitektur - page 136 of 139
Kebutuhan
No
-Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
8
9
1 unit
1 unit
Jendela Tipe CW-4 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Steel Bracket besi siku lengkap dengan anchor -Kaca 1 Pemasangan Kaca reflektif 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe WE-5 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear 8 mm -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan
Indeks
Harga Satuan
m² ls
2.100 Rp 179,750.02 1.000 Rp 38,710.61 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp Rp Rp Rp Rp Rp
377,475.04 38,710.61 1,329,064.38 33,226.61 1,362,290.99 19,339,541.73
84,525.81 200,778.75
Rp Rp
6,206,222.90 3,011,681.23
20.106 Rp 470,652.68 1.000 Rp 186,810.35 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
9,463,131.11 186,810.35 18,867,845.59 471,696.14 19,339,541.73 3,361,705.22
84,525.81
Rp
1,939,867.29
6.923 Rp 179,750.02 1.000 Rp 95,525.60 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
1,244,319.52 95,525.60 3,279,712.41 81,992.81 3,361,705.22
Rp
4,100,612.82
84,525.81
Rp
2,253,458.03
8.6600 Rp 179,750.02 1.0000 Rp 190,504.66 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
1,556,635.18 190,504.66 4,000,597.87 100,014.95 4,100,612.82 2,418,979.89
m' bh
73.424 15.000
Rp Rp
m² ls
m'
22.950
Rp
m² ls
GEDUNG MORTUARY DAN FORENSIK 1
2
3
4
5
1 unit
1 unit
1 unit
1 unit
1 unit
Jendela Type CW1 -Allumunium 1 Pemasangan alumunium kusen jendela '-Kaca 1 Kaca Clear 8 mm -Ongkos Pasang dan Material Bantu
Jendela Type W1-E -Allumunium 1 Pemasangan alumunium kusen jendela -Daun Jendela 1 Pemasangan alumunium Frame Daun Jendela Kaca '-Kaca 1 Kaca Clear 8 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang dan Material Bantu
Jendela Type W1-EB -Allumunium 1 Pemasangan alumunium kusen jendela -Daun Jendela 1 Pemasangan alumunium Frame Daun Jendela Kaca '-Kaca 1 Kaca Clear 8 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang dan Material Bantu
Jendela Type W3-EB -Allumunium 1 Pemasangan alumunium kusen jendela -Daun Jendela 1 Pemasangan alumunium Frame Daun Jendela Kaca '-Kaca 1 Kaca Clear 8 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang dan Material Bantu
Jendela Type W3-EA -Allumunium 1 Pemasangan alumunium kusen jendela -Daun Jendela 1 Pemasangan alumunium Frame Daun Jendela Kaca '-Kaca 1 Kaca Clear 8 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang dan Material Bantu
m
26.6600
Rp
m² ls
m
10.0400
Rp
84,525.81
Rp
848,639.11
m²
1.419
Rp
440,026.57
Rp
624,287.69
m²
2.8943
Rp
179,750.02
Rp
520,241.50
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.0000 Rp 99,658.41 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 99,658.41 2,359,980.38 58,999.51 2,418,979.89 2,025,570.81
bh bh ls
m
7.4050
Rp
84,525.81
Rp
625,913.61
m²
1.419
Rp
440,026.57
Rp
624,287.69
m²
2.0998
Rp
179,750.02
Rp
377,430.11
1.000 Rp 31,461.57 2.000 Rp 117,846.05 1.0000 Rp 81,381.57 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
31,461.57 235,692.10 81,381.57 1,976,166.64 49,404.17 2,025,570.81 5,808,694.28
bh bh ls
m
24.5960
Rp
84,525.81
Rp
2,078,996.76
m²
2.838
Rp
440,026.57
Rp
1,248,575.38
m²
8.6828
Rp
179,750.02
Rp
1,560,724.50
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.0000 Rp 244,414.83 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 244,414.83 5,667,018.81 141,675.47 5,808,694.28 4,763,321.85
bh bh ls
m
18.1970
Rp
84,525.81
Rp
1,538,116.12
m²
2.838
Rp
440,026.57
Rp
1,248,575.38
m²
6.2882
Rp
179,750.02
Rp
1,130,295.10
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.0000 Rp 195,849.33 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5%
Rp Rp Rp Rp Rp
62,923.14 471,384.20 195,849.33 4,647,143.27 116,178.58
bh bh ls
Analisa Harga Satuan Pek. Arsitektur - page 137 of 139
Kebutuhan
No 6
7
1
2
1
2
3
1
2
1 unit
1 unit
Jendela Type BV1 -Allumunium 1 Pemasangan alumunium kusen jendela '-Kaca 1 Kaca Clear 8 mm -Ongkos Pasang dan Material Bantu
Jendela Type BV3 -Allumunium 1 Pemasangan alumunium kusen jendela '-Kaca 1 Kaca Clear 8 mm -Ongkos Pasang dan Material Bantu
BANGUNAN WORKSHOP 1 unit Jendela Tipe BV-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan Kaca clear Float 6 mm -Ongkos Pasang, Material & Peralatan Bantu
1 unit
Jendela Tipe W-4 -Allumunium 1 Pemasangan alumunium kusen jendela 2 Pemasangan alumunium Frame Daun Jendela Kaca -Kaca 1 Pemasangan Kaca clear Float 6 mm -Hardware 1 Window Handle (Casement) 2 Friction Stay Jendela -Ongkos Pasang, Material & Peralatan Bantu
BANGUNAN POWER HOUSE 1 unit Jendela Tipe LV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
1 unit
1 unit
Jendela Tipe LV-4 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
Jendela Tipe LV-6 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
RUMAH POMPA 1 unit Jendela Tipe LV-1 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan alumunium louvre -Ongkos Pasang, Material & Peralatan Bantu
1 unit
Jendela Tipe LV-2 -Allumunium 1 Pemasangan alumunium kusen jendela -Kaca 1 Pemasangan alumunium louvre
Kode Satuan Indeks Harga Satuan Total = Jumlah+(Keuntungan+Overhead 2,5%)
m
3.7000
Rp
Jumlah Harga Satuan Rp 4,763,321.85 Rp 470,076.94
84,525.81
Rp
312,745.49
0.6900 Rp 179,750.02 1.0000 Rp 21,838.65 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
124,027.51 21,838.65 458,611.65 11,465.29 470,076.94 1,267,854.73
84,525.81
Rp
811,447.75
2.0394 Rp 179,750.02 1.0000 Rp 58,901.50 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
366,582.19 58,901.50 1,236,931.44 30,923.29 1,267,854.73
Rp
269,149.66
84,525.81
Rp
211,314.52
0.330 Rp 132,189.12 1.000 Rp 7,648.11 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
43,622.41 7,648.11 262,585.04 6,564.63 269,149.66 3,822,592.53
m² ls
m
9.6000
Rp
m² ls
m'
2.500
Rp
m² ls
m' m²
18.600 1.845
Rp Rp
84,525.81 440,026.57
Rp Rp
1,572,180.02 811,849.01
m²
5.314
Rp
132,189.12
Rp
702,400.09
2.000 Rp 31,461.57 4.000 Rp 117,846.05 1.000 Rp 108,622.09 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
62,923.14 471,384.20 108,622.09 3,729,358.56 93,233.96 3,822,592.53
Rp
942,011.57
84,525.81
Rp
469,963.49
1.044 Rp 404,505.90 1.000 Rp 26,768.03 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
422,304.15 26,768.03 919,035.67 22,975.89 942,011.57 2,064,216.75
84,525.81
Rp
977,118.34
2.418 Rp 404,505.90 1.000 Rp 58,656.41 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
978,095.26 58,656.41 2,013,870.00 50,346.75 2,064,216.75 3,436,769.26
84,525.81
Rp
1,580,632.60
4.140 Rp 404,505.90 1.000 Rp 97,658.61 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp
1,674,654.41 97,658.61 3,352,945.62 83,823.64 3,436,769.26
Rp
505,305.06
84,525.81
Rp
266,256.29
0.525 Rp 404,505.90 1.000 Rp 14,358.66 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Rp Rp Rp Rp Rp Rp
212,365.60 14,358.66 492,980.55 12,324.51 505,305.06 1,325,467.55
bh bh ls
m'
5.560
Rp
m² ls
m'
11.560
Rp
m² ls
m'
18.700
Rp
m² ls
m'
3.150
Rp
m² ls
m'
7.000
Rp
84,525.81
Rp
591,680.65
m²
1.641
Rp
404,505.90
Rp
663,794.17
Analisa Harga Satuan Pek. Arsitektur - page 138 of 139
No
Kebutuhan -Ongkos Pasang, Material & Peralatan Bantu
Kode
Satuan ls
Indeks Harga Satuan 1.000 Rp 37,664.24 Jumlah harga persatuan pekerjaan Keuntungan+Overhead 2,5% Total = Jumlah+(Keuntungan+Overhead 2,5%)
Jumlah Harga Satuan Rp 37,664.24 Rp 1,293,139.07 Rp 32,328.48 Rp 1,325,467.55
Analisa Harga Satuan Pek. Arsitektur - page 139 of 139
REKAPITULASI PEKERJAAN STRUKTUR RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
GEDUNG D1
Rp
16,932,402,626.18
II.
GEDUNG D2
Rp
12,515,833,091.00
III.
GEDUNG F1
Rp
10,529,295,476.39
IV.
GEDUNG RAMP
Rp
930,640,101.09
V.
GEDUNG C1
Rp
7,942,473,281.77
VI.
GEDUNG POWER HOUSE G2
Rp
594,286,131.93
VII. GEDUNG G3
Rp
143,963,734.42
VIII. GEDUNG RUMAH POMPA
Rp
143,947,480.96
TOTAL
Rp
49,732,841,923.74
DIBULATKAN
Rp
49,732,840,000.00
REKAPITULASI TOTAL
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG D1 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
-
PEKERJAAN STANDAR
Rp
13,240,962,417.61
-
PEKERJAAN NON STANDAR
Rp
3,691,440,208.56
Rp
16,932,402,626.18
JUMLAH = (PEK STANDAR + NON STANDAR)
Rekapitulasi Gedung Utama
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II. PEKERJAAN STRUKTUR 2.1. PEKERJAAN TANAH 2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 2.3. PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95) 2.4. PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95) 2.5. PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95) 2.6. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95) 2.7. PEKERJAAN STRUKTUR LANTAI ATAP-2 (EL. +20.95) 2.8. PEKERJAAN TANGGA TIPE UTAMA (1 BUAH) 2.9. PEKERJAAN TANGGA DARURAT (1 BUAH) II. PEKERJAAN STRUKTUR
JUMLAH HARGA
Rp Rp
330,154,288.57 330,154,288.57
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
39,738,552.43 2,531,390,856.65 2,607,240,893.28 2,460,578,751.43 2,480,330,405.68 2,159,360,923.49 505,925,377.24 53,598,071.05 72,644,297.78 12,910,808,129.04
Rekapitulasi Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG D1 TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
I.
II.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 1 2 3
Pengukuran dan pemasangan bowplank Biaya Loading Test (2 Axial + 1 Lateral) Mobilisasi dan Demobilisasi Alat Boredpile
m¹ ls ls
248.00 81,267.29 1.00 235,000,000.00 1.00 75,000,000.00 JUMLAH I.PEKERJAAN PERSIAPAN
20,154,288.57 235,000,000.00 75,000,000.00 330,154,288.57
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah Untuk Pondasi 2 Pembuangan tanah keluar site
m3 m3
444.57 68,726.25 444.57 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
30,553,711.43 9,184,840.99 39,738,552.43
2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 1 Kolom K1-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
136.42 23,490.05 3,985.13 3,985.13 779.52
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
156,741,984.00 293,625,600.00 49,814,112.00 49,814,112.00 113,498,112.00
PEKERJAAN STRUKTUR 2.1.
2
Kolom K2-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
1.74 439.52 97.34 51.53 18.56
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
1,999,260.00 5,494,000.00 1,216,724.00 644,148.00 2,702,336.00
3
Kolom K3-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
2.93 715.56 163.63 86.63 31.20
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,360,825.00 8,944,500.00 2,045,355.00 1,082,835.00 4,542,720.00
4
Kolom K4-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
0.87 219.76 48.67 25.77 9.28
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
999,630.00 2,747,000.00 608,362.00 322,074.00 1,351,168.00
5
Kolom K5-1 a. IWF 500.200.10.16 b. Base Pelat t=13mm c. Angkur Ashental D19 d. Las t=6mm
kg m2 bh m
1,039.36 0.72 20.00 3.49
18,071.46 1,101,154.94 85,395.69 32,340.00
18,782,757.76 792,831.56 1,707,913.78 112,911.88
6
TieBeam TB1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
73.23 7,246.04 640.59 2,891.71 1,506.10 463.79
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
84,141,270.00 90,575,508.68 8,007,415.72 36,146,328.00 18,826,212.50 61,544,933.00
7
TieBeam TB2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
85.41 8,789.29 747.14 3,372.67 1,756.60 540.93
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
98,136,090.00 109,866,125.42 9,339,251.35 42,158,376.00 21,957,487.50 71,781,411.00
8
TieBeam TB3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
4.13 503.45 55.64 209.29 78.48 33.92
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
4,749,966.00 6,293,161.11 695,441.27 2,616,080.00 981,030.00 4,501,184.00
9
TieBeam TB4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
3.82 503.45 27.82 198.82 73.25 31.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
4,384,584.00 6,293,161.11 347,720.63 2,485,276.00 915,628.00 4,219,860.00
10 TieBeam TBA a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
79.00 7,958.42 622.35 3,545.04 670.32
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
90,773,298.00 99,480,276.00 7,779,382.80 44,312,940.00 88,951,464.00
11 TieBeam TBA2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
29.79 2,640.64 344.16 1,633.69 304.50
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
34,226,124.75 33,008,004.36 4,302,057.18 20,421,157.50 40,406,751.90
Pek. Standar Gedung Utama - page 4 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
12 Balok IW1 a. IWF 300.150.6,5.9 b. Base Pelat t=10mm c. Angkur Ashental D16 d. Baut D16, L 300mm e. Las t=6mm
kg m2 bh bh m
223.87 0.64 12.00 12.00 4.66
18,071.46 966,319.64 85,395.69 15,730.78 32,340.00
4,045,658.85 618,444.57 1,024,748.27 188,769.42 150,665.59
13 Pelat Lantai Tipe S1 a. Beton Ready Mix K-350 b. Tul D10 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm
m3 kg m3 m3
207.10 17,037.10 69.03 138.06
1,149,000.00 12,500.00 557,440.00 163,100.00
237,953,304.00 212,963,720.00 38,481,197.75 22,518,238.40
m3 52.44 1,149,000.00 kg 5,464.46 12,500.00 m3 13.11 557,440.00 m3 26.22 163,100.00 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05)
60,255,858.00 68,305,705.00 7,308,317.06 4,276,645.10 2,531,390,856.65
14 Pelat Lantai Tipe S2 a. Beton Ready Mix K-350 b. Tul D13 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm 2.3. PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95) 1 Kolom K1-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
94.08 16,614.91 2,748.36 2,748.36 537.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
108,097,920.00 207,686,400.00 34,354,560.00 34,354,560.00 78,274,560.00
2
Kolom K2-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
1.20 310.88 67.13 35.54 12.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
1,378,800.00 3,886,000.00 839,120.00 444,240.00 1,863,680.00
3
Kolom K3-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
2.40 621.76 134.26 71.08 25.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,757,600.00 7,772,000.00 1,678,240.00 888,480.00 3,727,360.00
4
Kolom K4-2 a. IWF 500.200.10.16 b. Pelat t=13mm c. Baut D19 d. Las t=6mm
kg m2 bh m
716.80 0.80 16.00 3.49
18,071.46 1,101,154.94 15,730.78 32,340.00
12,953,626.04 880,923.95 251,692.56 112,911.88
5
Balok B1-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
72.27 8,867.30 632.20 2,853.80 2,497.07 457.71
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
83,038,230.00 110,841,268.54 7,902,443.45 35,672,472.00 31,213,413.00 60,738,117.00
6
Balok B2-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
85.41 11,493.69 747.14 3,372.67 2,951.09 540.93
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
98,136,090.00 143,671,087.08 9,339,251.35 42,158,376.00 36,888,579.00 71,781,411.00
7
Balok B3-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
6.71 980.31 90.28 339.60 127.35 55.04
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,707,492.00 12,253,853.33 1,128,451.87 4,244,960.00 1,591,860.00 7,303,808.00
8
Balok B4-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
0.68 86.09 6.56 34.71 30.08 4.38
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
775,575.00 1,076,071.18 82,009.58 433,828.13 375,984.38 580,562.50
9
Balok BA1-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
85.54 12,310.85 680.22 3,838.23 1,663.23 725.76
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
98,280,864.00 153,885,600.00 8,502,753.60 47,977,920.00 20,790,432.00 96,308,352.00
10 Balok BA2-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
16.50 1,706.87 190.68 905.14 168.71
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
18,962,808.75 21,335,901.30 2,383,532.70 11,314,237.50 22,387,153.50
11 Balok BA3-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
7.26 754.50 118.00 485.46 90.79
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
8,344,957.20 9,431,199.73 1,475,044.42 6,068,220.71 12,047,169.50
12 Balok B5-2 a. Beton Ready Mix K-350
m3
1.58
1,149,000.00
1,820,016.00
Pek. Standar Gedung Utama - page 5 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg kg kg m2
205.18 12.60 106.62 38.50 13.44
(Rp.) 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
13 Balok BL-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.40 166.22 51.99 167.82 28.00
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,757,600.00 2,077,700.00 649,906.67 2,097,800.00 3,715,600.00
14 Balok IW2 a. IWF 300.150.6,5.9 b. Base Pelat t=10mm c. Angkur Ashental D16 d. Baut D16, L 300mm e. Las t=6mm
kg m2 bh bh m
223.87 0.64 12.00 12.00 4.66
18,071.46 966,319.64 85,395.69 15,730.78 32,340.00
4,045,658.85 618,444.57 1,024,748.27 188,769.42 150,665.59
15 Pelat Lantai Tipe S3 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
m3 kg m2
195.58 18,565.10 1,504.47
1,149,000.00 12,500.00 179,300.00
224,721,937.05 232,063,726.25 269,750,574.50
m3 10.72 1,149,000.00 kg 1,102.70 12,500.00 m2 89.36 179,300.00 ltr 53.62 46,200.00 JUMLAH 2.3.PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95)
12,320,956.80 13,783,780.00 16,022,248.00 2,477,059.20 2,607,240,893.28
b. c. d. e. f.
Tul Utama D19 Tul Mountase D10 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
16 Pelat Lantai Tipe S4 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral 2.4. PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95) 1 Kolom K1-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
(Rp.) 2,564,760.00 157,458.40 1,332,720.00 481,260.00 1,783,488.00
m3 kg kg kg m2
69.12 13,291.93 2,369.28 2,369.28 460.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
79,418,880.00 166,149,120.00 29,616,000.00 29,616,000.00 67,092,480.00
2
Kolom K2-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
1.20 310.88 67.13 35.54 12.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
1,378,800.00 3,886,000.00 839,120.00 444,240.00 1,863,680.00
3
Kolom K3-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
2.40 621.76 134.26 71.08 25.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,757,600.00 7,772,000.00 1,678,240.00 888,480.00 3,727,360.00
4
Kolom K4-3 a. IWF 500.200.10.16 b. Pelat t=13mm c. Baut D19 d. Las t=6mm
kg m2 bh m
716.80 0.80 16.00 3.49
18,071.46 1,101,154.94 15,730.78 32,340.00
12,953,626.04 880,923.95 251,692.56 112,911.88
5
Balok B1-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
72.27 7,723.13 632.20 2,853.80 2,497.07 457.71
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
83,038,230.00 96,539,169.38 7,902,443.45 35,672,472.00 31,213,413.00 60,738,117.00
6
Balok B2-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
85.41 10,817.59 747.14 3,372.67 2,951.09 540.93
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
98,136,090.00 135,219,846.67 9,339,251.35 42,158,376.00 36,888,579.00 71,781,411.00
7
Balok B3-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
6.71 980.31 90.28 339.60 127.35 55.04
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,707,492.00 12,253,853.33 1,128,451.87 4,244,960.00 1,591,860.00 7,303,808.00
8
Balok B4-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
0.68 80.15 6.56 34.71 30.08 4.38
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
775,575.00 1,001,859.38 82,009.58 433,828.13 375,984.38 580,562.50
Balok BA1-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
85.54 12,310.85 680.22 3,838.23 1,663.23 725.76
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
98,280,864.00 153,885,600.00 8,502,753.60 47,977,920.00 20,790,432.00 96,308,352.00
10 Balok BA2-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10
m3 kg kg
14.31 1,479.70 165.30
1,149,000.00 12,500.00 12,500.00
16,438,958.44 18,496,204.83 2,066,297.01
9
Pek. Standar Gedung Utama - page 6 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg m2
784.67 146.25
(Rp.) 12,500.00 132,700.00
11 Balok BA3-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
1.51 156.45 24.47 100.66 18.83
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
1,730,394.00 1,955,635.13 305,862.33 1,258,294.38 2,498,077.50
12 Balok B5-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
1.58 205.18 12.60 106.62 38.50 13.44
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
1,820,016.00 2,564,760.00 157,458.40 1,332,720.00 481,260.00 1,783,488.00
13 Balok BL-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.40 199.46 51.99 167.82 28.00
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,757,600.00 2,493,240.00 649,906.67 2,097,800.00 3,715,600.00
14 Balok IW3 a. IWF 300.150.6,5.9 b. Base Pelat t=10mm c. Angkur Ashental D16 d. Baut D16, L 300mm e. Las t=6mm
kg m2 bh bh m
223.87 0.64 12.00 12.00 4.66
18,071.46 966,319.64 85,395.69 15,730.78 32,340.00
4,045,658.85 618,444.57 1,024,748.27 188,769.42 150,665.59
15 Pelat Lantai Tipe S5 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
m3 kg m2
172.77 16,399.74 1,328.99
1,149,000.00 12,500.00 179,300.00
198,511,236.30 204,996,707.50 238,287,907.00
16 Pelat Lantai Tipe S6 a. Beton Ready Mix K-350 b. Tul D13 c. Begisting Untuk Pelat lantai
m3 kg m2
24.15 3,354.61 160.97
1,149,000.00 12,500.00 179,300.00
27,743,179.50 41,932,685.00 28,861,921.00
m3 8.95 1,149,000.00 kg 920.07 12,500.00 m2 74.56 179,300.00 ltr 44.74 46,200.00 JUMLAH 2.4.PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95)
10,280,332.80 11,500,880.00 13,368,608.00 2,066,803.20 2,460,578,751.43
d. e.
Tul Sengkang D10 Begisting Untuk Balok
17 Pelat Lantai Tipe S7 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral 2.5. PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95) 1 Kolom K1-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
(Rp.) 9,808,371.88 19,407,540.88
m3 kg kg kg m2
86.40 15,583.64 2,961.60 2,961.60 576.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
99,273,600.00 194,795,520.00 37,020,000.00 37,020,000.00 83,865,600.00
2
Kolom K2-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
3.00 728.96 167.82 88.85 32.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,447,000.00 9,112,000.00 2,097,800.00 1,110,600.00 4,659,200.00
3
Kolom K3-4 a. IWF 500.200.10.16 b. Pelat t=13mm c. Baut D19 d. Las t=6mm
kg m2 bh m
896.00 0.80 16.00 3.49
18,071.46 1,101,154.94 15,730.78 32,340.00
16,192,032.55 880,923.95 251,692.56 112,911.88
4
Balok B1-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
59.83 8,408.85 640.86 2,651.82 2,350.47 427.35
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
68,743,521.00 105,110,632.92 8,010,696.10 33,147,708.00 29,380,923.00 56,709,345.00
5
Balok B2-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
18.51 9,937.73 757.37 3,133.97 2,777.83 505.05
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
21,270,144.38 124,221,657.08 9,467,186.30 39,174,564.00 34,722,909.00 67,020,135.00
6
Balok B3-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
6.34 1,003.11 92.38 330.12 121.62 52.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,280,064.00 12,538,826.67 1,154,694.93 4,126,496.00 1,520,288.00 7,006,560.00
7
Balok B4-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
0.61 83.35 6.82 34.49 30.48 4.42
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
705,773.25 1,041,933.75 85,289.97 431,128.75 380,997.50 586,534.00
8
Balok BA1-4 a. Beton Ready Mix K-350
m3
86.15
1,149,000.00
98,982,328.50
Pek. Standar Gedung Utama - page 7 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg kg kg m2
12,398.71 685.08 3,865.63 1,675.11 730.94
(Rp.) 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Balok BA2-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
18.51 1,914.56 213.88 1,015.27 189.23
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
21,270,144.38 23,931,987.45 2,673,553.55 12,690,918.75 25,111,152.75
10 Balok BA3-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
5.53 574.03 89.78 369.34 69.07
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
6,348,914.40 7,175,336.95 1,122,226.34 4,616,753.92 9,165,589.00
11 Balok B5-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
1.58 205.18 12.60 106.62 38.50 13.44
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
1,820,016.00 2,564,760.00 157,458.40 1,332,720.00 481,260.00 1,783,488.00
12 Balok BL-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.20 199.46 51.99 157.95 26.00
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,527,800.00 2,493,240.00 649,906.67 1,974,400.00 3,450,200.00
13 Balok IW4 a. IWF 300.150.6,5.9 b. Base Pelat t=10mm c. Angkur Ashental D16 d. Baut D16, L 300mm e. Las t=6mm
kg m2 bh bh m
223.87 0.64 12.00 12.00 4.66
18,071.46 966,319.64 85,395.69 15,730.78 32,340.00
4,045,658.85 618,444.57 1,024,748.27 188,769.42 150,665.59
14 Pelat Lantai Tipe S8 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
m3 kg m2
175.63 16,671.34 1,351.00
1,149,000.00 12,500.00 179,300.00
201,798,870.00 208,391,750.00 242,234,300.00
15 Pelat Lantai Tipe S9 a. Beton Ready Mix K-350 b. Tul D13 c. Begisting Untuk Pelat lantai
m3 kg m2
24.15 3,354.61 160.97
1,149,000.00 12,500.00 179,300.00
27,743,179.50 41,932,685.00 28,861,921.00
m3 9.02 1,149,000.00 kg 927.97 12,500.00 m2 75.20 179,300.00 ltr 45.12 46,200.00 JUMLAH 2.5.PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95)
10,368,576.00 11,599,600.00 13,483,360.00 2,084,544.00 2,480,330,405.68
b. c. d. e. f. 9
Tul Utama D19 Tul Mountase D10 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
16 Pelat Lantai Tipe S10 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
2.6. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95) 1 Kolom K1-5 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom 2
3
4
5
6
7
(Rp.) 154,983,934.72 8,563,440.69 48,320,355.00 20,938,820.50 96,995,738.00
m3 kg kg kg m2
1.80 257.82 74.63 74.63 14.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,068,200.00 3,222,720.00 932,904.00 932,904.00 2,096,640.00
Kolom K2-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
0.54 80.40 30.21 15.99 5.76
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
620,460.00 1,005,000.00 377,604.00 199,908.00 838,656.00
Kolom K3-5 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D10 d. Begisting Untuk kolom
m3 kg kg m2
0.32 45.45 23.10 4.32
1,149,000.00 12,500.00 12,500.00 145,600.00
372,276.00 568,080.00 288,756.00 628,992.00
Kolom K4-5 a. HB 300.300.10.15 b. Base Pelat t=10mm c. Angkur D16 d. Las t=6mm
kg m2 bh m
9,475.20 7.84 224.00 46.20
18,071.46 966,319.64 85,395.69 32,340.00
171,230,744.23 7,575,945.97 19,128,634.35 1,494,108.00
Kolom K5-5 a. IWF 500.200.10.16 b. Pelat t=13mm c. Baut D19 d. Las t=6mm
kg m2 bh m
709.92 0.80 16.00 3.49
18,071.46 1,101,154.94 85,395.69 32,340.00
12,829,294.36 880,923.95 1,366,331.03 112,911.88
Balok B1-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
59.83 8,118.89 640.86 2,651.82 2,350.47 427.35
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
68,743,521.00 101,486,128.33 8,010,696.10 33,147,708.00 29,380,923.00 56,709,345.00
Balok B2-5 Pek. Standar Gedung Utama - page 8 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
Beton Ready Mix K-350 Tul Utama D19 Tul Mountase D10 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
m3 kg kg kg kg m2
70.71 9,595.05 757.37 3,133.97 2,777.83 505.05
(Rp.) 1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Balok B3-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
6.34 1,003.11 92.38 330.12 121.62 52.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,280,064.00 12,538,826.67 1,154,694.93 4,126,496.00 1,520,288.00 7,006,560.00
Balok B4-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
0.61 80.27 6.82 34.49 30.48 4.42
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
705,773.25 1,003,343.61 85,289.97 431,128.75 380,997.50 586,534.00
10 Balok BA1-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
80.37 11,567.54 639.15 3,606.49 1,562.81 681.94
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
92,346,853.50 144,594,281.94 7,989,373.61 45,081,105.00 19,535,145.50 90,493,438.00
11 Balok BA2-5 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.90 93.08 10.40 49.36 9.20
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
1,034,100.00 1,163,512.00 129,981.33 617,000.00 1,220,840.00
12 Balok B5-5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
1.58 205.18 12.60 106.62 38.50 13.44
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
1,820,016.00 2,564,760.00 157,458.40 1,332,720.00 481,260.00 1,783,488.00
13 Balok BL-5 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.20 205.18 51.99 157.95 26.00
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,527,800.00 2,564,760.00 649,906.67 1,974,400.00 3,450,200.00
14 Balok IW5 a. IWF 300.150.6,5.9 b. Base Pelat t=10mm c. Angkur Ashental D16 d. Baut D16, L 300mm e. Las t=6mm
kg m2 bh bh m
223.87 0.64 12.00 12.00 4.66
18,071.46 966,319.64 85,395.69 15,730.78 32,340.00
4,045,658.85 618,444.57 1,024,748.27 188,769.42 150,665.59
15 Pelat Lantai Tipe S11 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
m3 kg m2 ltr
172.77 17,766.64 1,439.76 863.86
1,149,000.00 12,500.00 179,300.00 46,200.00
198,514,108.80 222,082,980.00 258,148,968.00 39,910,147.20
m3 22.39 1,149,000.00 kg 3,110.16 12,500.00 m2 149.24 179,300.00 ltr 111.93 46,200.00 JUMLAH 2.6.PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
25,721,514.00 38,877,020.00 26,758,732.00 5,171,166.00 2,159,360,923.49
a. b. c. d. e. f. 8
9
16 Pelat Lantai Tipe S12 a. Beton Ready Mix K-350 b. Tul D13 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
2.7. PEKERJAAN STRUKTUR LANTAI ATAP-2 (EL. +20.95) 1 Balok B1-6 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok 2
3
4
(Rp.) 81,242,343.00 119,938,151.67 9,467,186.30 39,174,564.00 34,722,909.00 67,020,135.00
m3 kg kg kg m2
2.20 265.95 20.80 134.26 21.60
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,527,800.00 3,324,320.00 259,962.67 1,678,240.00 2,866,320.00
Balok B2-6 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.90 93.08 10.40 59.23 9.20
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
1,034,100.00 1,163,512.00 129,981.33 740,400.00 1,220,840.00
Balok BA-6 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.36 39.89 5.20 23.03 4.40
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
413,640.00 498,648.00 64,990.67 287,933.33 583,880.00
Balok B3-6 a. IWF400.200.8.13
kg
24,182.40
18,071.46
437,011,392.82
Pek. Standar Gedung Utama - page 9 of 78
NO.
URAIAN b. c. d. 5
2.8.
Pelat Lantai Tipe S13 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
PEKERJAAN TANGGA TIPE UTAMA (1 BUAH) 1 PELAT TANGGA LANTAI 1 KE LANTAI 2 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga 2
3
4
5
6
2.9.
Pelat t=10mm Baut D16 Las t=6mm
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 966,319.64 15,730.78 32,340.00
(Rp.) 24,351,254.91 8,809,239.50 3,691,307.00
m3 4.11 1,149,000.00 kg 230.76 12,500.00 m2 37.40 179,300.00 ltr 20.57 46,200.00 JUMLAH 2.7.PEKERJAAN STRUKTUR LANTAI ATAP-2 (EL. +20.95)
4,726,986.00 2,884,475.00 6,705,820.00 950,334.00 505,925,377.24
m2 bh m
25.20 560.00 114.14
m3 kg kg m2
4.13 386.86 260.75 19.50
1,149,000.00 12,500.00 12,500.00 171,200.00
4,749,793.65 4,835,748.33 3,259,405.33 3,337,544.00
Balok BA2-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.39 40.72 4.55 21.60 4.03
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
452,418.75 509,036.50 56,866.83 269,937.50 534,117.50
PELAT TANGGA LANTAI 2 KE LANTAI 3 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
4.03 416.08 234.56 18.78
1,149,000.00 12,500.00 12,500.00 171,200.00
4,626,304.88 5,201,056.17 2,931,984.00 3,214,879.20
Balok BA2-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.39 40.72 4.55 21.60 4.03
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
452,418.75 509,036.50 56,866.83 269,937.50 534,117.50
PELAT TANGGA LANTAI 3 KE LANTAI 4 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
4.03 416.08 234.56 18.78
1,149,000.00 12,500.00 12,500.00 171,200.00
4,626,304.88 5,201,056.17 2,931,984.00 3,214,879.20
m3 0.39 1,149,000.00 kg 40.72 12,500.00 kg 4.55 12,500.00 kg 21.60 12,500.00 m2 4.03 132,700.00 JUMLAH 2.8.PEKERJAAN TANGGA TIPE UTAMA (1 BUAH)
452,418.75 509,036.50 56,866.83 269,937.50 534,117.50 53,598,071.05
Balok BA2-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
PEKERJAAN TANGGA DARURAT (1 BUAH) 1
2
3
4
5
6
PELAT TANGGA LANTAI 1 KE LANTAI 2 a.
Beton Ready Mix K-350
m3
4.13
1,149,000.00
4,749,793.65
b.
Tul D13
kg
386.86
12,500.00
4,835,748.33
c.
Tul D10
kg
260.75
12,500.00
3,259,405.33
d.
Begisting Untuk Tangga
m2
19.50
171,200.00
3,337,544.00
Balok BA2-2 a.
Beton Ready Mix K-350
m3
0.45
1,149,000.00
517,050.00
b.
Tul Utama D16
kg
46.54
12,500.00
581,756.00
c.
Tul Mountase D10
kg
5.20
12,500.00
64,990.67
d.
Tul Sengkang D10
kg
24.68
12,500.00
308,500.00
e.
Begisting Untuk Balok
m2
4.60
132,700.00
610,420.00
PELAT TANGGA LANTAI 2 KE LANTAI 3 a.
Beton Ready Mix K-350
m3
4.03
1,149,000.00
4,626,304.88
b.
Tul D13
kg
416.08
12,500.00
5,201,056.17
c.
Tul D10
kg
234.56
12,500.00
2,931,984.00
d.
Begisting Untuk Tangga
m2
18.78
171,200.00
3,214,879.20
Balok BA2-2 a.
Beton Ready Mix K-350
m3
0.45
1,149,000.00
517,050.00
b.
Tul Utama D16
kg
46.54
12,500.00
581,756.00
c.
Tul Mountase D10
kg
5.20
12,500.00
64,990.67
d.
Tul Sengkang D10
kg
24.68
12,500.00
308,500.00
e.
Begisting Untuk Balok
m2
4.60
132,700.00
610,420.00
PELAT TANGGA LANTAI 3 KE LANTAI 4 a.
Beton Ready Mix K-350
m3
4.03
1,149,000.00
4,626,304.88
b.
Tul D13
kg
416.08
12,500.00
5,201,056.17
c.
Tul D10
kg
234.56
12,500.00
2,931,984.00
d.
Begisting Untuk Tangga
m2
18.78
171,200.00
3,214,879.20
Balok BA2-3 a.
Beton Ready Mix K-350
m3
0.45
1,149,000.00
517,050.00
b.
Tul Utama D16
kg
46.54
12,500.00
581,756.00
Pek. Standar Gedung Utama - page 10 of 78
NO.
URAIAN
7
8
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
c.
Tul Mountase D10
kg
5.20
12,500.00
64,990.67
d.
Tul Sengkang D10
kg
24.68
12,500.00
308,500.00
e.
Begisting Untuk Balok
m2
4.60
132,700.00
610,420.00
PELAT TANGGA LANTAI 4 KE LANTAI DAK a.
Beton Ready Mix K-350
m3
4.13
1,149,000.00
4,749,793.65
b.
Tul D13
kg
386.86
12,500.00
4,835,748.33
c.
Tul D10
kg
260.75
12,500.00
3,259,405.33
d.
Begisting Untuk Tangga
m2
19.50
171,200.00
3,337,544.00
Balok BA2-4 a.
Beton Ready Mix K-350
m3
0.45
1,149,000.00
517,050.00
b.
Tul Utama D16
kg
46.54
12,500.00
581,756.00
c.
Tul Mountase D10
kg
5.20
12,500.00
64,990.67
d.
Tul Sengkang D10
kg
24.68
12,500.00
308,500.00
e.
Begisting Untuk Balok
m2 4.60 132,700.00 JUMLAH 2.9.PEKERJAAN TANGGA DARURAT (1 BUAH)
610,420.00 72,644,297.78
Pek. Standar Gedung Utama - page 11 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG D1 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN NON STANDAR
I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1.2. PEKERJAAN PIT LIFT
Rp Rp JUMLAH I.PEKERJAAN STRUKTUR Rp
JUMLAH HARGA
3,657,728,079.24 33,712,129.32 3,691,440,208.56
Rekapitulasi Non Standar Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG D1 TAHUN ANGGARAN 2021
NO.
URAIAN
1.
I.
2. PEKERJAAN NON STANDAR PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1 Pondasi Bored Pile Tipe P2 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm 2
3
4
Pondasi Bored Pile Tipe P3 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm Pondasi Bored Pile Tipe P4 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm Pondasi Bored Pile Tipe P5 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm
1.2. PEKERJAAN PIT LIFT 1 Dinding Beton T=20 cm a. Beton Ready Mix K-350 b. Besi Tul vertikal D13 c. Besi Tul Horizontal D13 e. Begisting Batako f. Water Proofing Integral 2
3
4
SATUAN 3.
VOLUME 4.
HARGA SATUAN (Rp.) 5.
JUMLAH HARGA (Rp.) 6 = (4. X 5.)
m¹ m3 m3 kg kg ttk
320.00 84.53 84.53 6,614.98 3,442.61 20.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
84,856,347.87 1,746,334.02 93,478,741.07 82,687,200.00 43,032,665.00 3,146,156.97
m3 kg kg m2 m3 m3
43.20 3,627.94 397.66 100.80 6.84 3.60
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
49,636,800.00 45,349,200.00 4,970,700.00 11,813,760.00 3,812,889.57 587,160.00
m¹ m3 m3 kg kg ttk
1,152.00 304.30 304.30 23,813.91 12,393.41 72.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
305,482,852.34 6,286,802.46 336,523,467.85 297,673,920.00 154,917,594.00 11,326,165.08
m3 kg kg m2 m3 m3
197.48 16,691.92 1,308.63 331.72 26.52 19.86
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
226,906,358.40 208,649,001.60 16,357,863.60 38,877,396.48 14,782,372.17 3,239,948.88
m¹ m3 m3 kg kg ttk
1,024.00 270.49 270.49 21,167.92 11,016.36 64.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
271,540,313.19 5,588,268.86 299,131,971.42 264,599,040.00 137,704,528.00 10,067,702.29
m3 kg kg m2 m3 m3
172.80 11,950.85 908.93 230.40 18.72 14.40
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
198,547,200.00 149,385,600.00 11,361,600.00 27,002,880.00 10,435,276.71 2,348,640.00
m¹ m3 m3 kg kg ttk
160.00 42.26 42.26 3,307.49 1,721.31 10.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
42,428,173.94 873,167.01 46,739,370.54 41,343,600.00 21,516,332.50 1,573,078.48
31.09 1,149,000.00 2,056.40 12,500.00 138.57 12,500.00 35.13 117,200.00 3.05 557,440.00 2.59 163,100.00 JUMLAH 1.1.PEKERJAAN PONDASI
35,721,950.40 25,704,993.60 1,732,170.60 4,116,814.08 1,701,150.78 422,559.48 3,657,728,079.24
m3 kg kg m2 m3 m3
m3 kg kg m2 ltr
3.58 335.36 186.31 17.88 17.88
1,149,000.00 12,500.00 12,500.00 117,200.00 46,200.00
4,108,824.00 4,191,966.00 2,328,870.00 2,095,536.00 826,056.00
TieBeam TB1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Begisting Batako g. Pasir Urug t=10cm
m3 kg kg kg m3 m2 m3
0.27 26.72 2.36 16.21 0.02 1.35 0.31
1,149,000.00 12,500.00 12,500.00 12,500.00 557,440.00 117,200.00 163,100.00
310,230.00 333,953.13 29,523.45 202,684.50 10,033.92 158,220.00 50,104.32
TieBeam TB2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Begisting Batako g. Pasir Urug t=10cm
m3 kg kg kg m3 m2 m3
2.30 237.10 20.15 138.37 0.15 11.52 0.31
1,149,000.00 12,500.00 12,500.00 12,500.00 557,440.00 117,200.00 163,100.00
2,647,296.00 2,963,722.67 251,933.44 1,729,574.40 85,622.78 1,350,144.00 50,104.32
Pelat a. b. c. d. e.
m3 kg m3 m3 ltr
3.44 1,149,000.00 358.45 12,500.00 0.86 557,440.00 1.72 163,100.00 17.20 46,200.00 JUMLAH 1.2.PEKERJAAN PIT LIFT
3,952,560.00 4,480,600.00 479,398.40 280,532.00 794,640.00 33,712,129.32
Lantai Pit Lift Beton Ready Mix K-350 Tul D13 Lantai Kerja t=5cm Pasir Urug t=10cm Water Proofing Integral
Pek. Non Standar Gedung Utama - page 13 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG D2 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
-
PEKERJAAN STANDAR
Rp
9,009,241,308.13
-
PEKERJAAN NON STANDAR
Rp
3,506,591,782.87
JUMLAH = (PEK STANDAR + NON STANDAR) Rp
12,515,833,091.00
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG D2 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
JUMLAH HARGA
Rp
248,815,439.75
2.1.
PEKERJAAN TANAH
Rp
33,561,055.81
2.2.
PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05)
Rp
3,057,395,501.20
2.3.
PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95)
Rp
1,671,503,380.26
2.4.
PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95)
Rp
1,643,627,974.77
2.5.
PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95)
Rp
1,696,320,785.46
2.6.
PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
Rp
45,549,535.22
2.7.
PEKERJAAN STRUKTUR BAJA LANTAI DAK (EL. +17.95)
Rp
433,095,038.40
2.8.
PEKERJAAN TANGGA (As. 2'-3 / E-E')
Rp
110,782,343.95
2.9
PEKERJAAN TANGGA (As. 7-8 / E-E')
Rp
68,590,253.30
Rp
9,009,241,308.13
JUMLAH PEKERJAAN STANDAR
RINCIAN RENCANA ANGGARAN BIAYA RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO GEDUNG D2 TAHUN ANGGARAN 2021 NO.
URAIAN 2.
1.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN 1 2
II.
Pengukuran & pemasangan bouwplank Biaya Loading Test (2 Axial + 1 Lateral)
m¹ ls
170.00 81,267.29 1.00 235,000,000.00 JUMLAH I.PEKERJAAN PERSIAPAN
13,815,439.75 235,000,000.00 248,815,439.75
PEKERJAAN STRUKTUR 2.1.
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah untuk Pile Cap 2 Pekerjaan Urugan tanah kembali 3 Pembuangan tanah keluar site
m³ m³ m³
438.62 56,100.00 54.63 18,700.00 383.99 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
24,606,331.79 1,021,564.17 7,933,159.85 33,561,055.81
2.2.
PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05) 1 Kolom tipe K1-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
22.54 3,009.79 1,003.22 1,399.84 128.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
25,898,460.00 37,622,399.86 12,540,217.81 17,497,978.33 18,753,280.00
2
Kolom tipe K2-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
4.14 809.00 259.93 308.94 39.68
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
4,756,860.00 10,112,521.28 3,249,168.10 3,861,778.85 5,776,680.00
3
Kolom tipe K3-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
18.63 3,566.26 1,128.62 1,364.84 124.20
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
21,405,870.00 44,578,205.32 14,107,745.03 17,060,528.88 18,083,520.00
4
Kolom tipe K4-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
26.91 4,597.25 1,630.23 1,971.44 179.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
30,919,590.00 57,465,598.03 20,377,853.93 24,642,986.15 26,120,640.00
5
Kolom tipe K5-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.88 366.69 204.14 256.64 23.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,303,375.00 4,583,588.12 2,551,788.51 3,207,962.69 3,348,800.00
6
Kolom tipe K6-1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.75 107.07 88.53 22.91 8.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
861,750.00 1,338,350.20 1,106,635.22 286,332.19 1,164,800.00
7
Kolom tipe K7-1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.75 104.28 85.09 22.02 8.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
861,750.00 1,303,544.26 1,063,677.44 275,217.24 1,164,800.00
8
Kolom tipe K8-1 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 e. Begisting Untuk kolom
m³ kg kg m²
1.75 277.32 174.29 27.50
1,149,000.00 12,500.00 12,500.00 145,600.00
2,010,750.00 3,466,488.89 2,178,674.77 4,004,000.00
9
Balok tipe 1-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10
m³ kg kg kg kg
54.78 4,751.63 838.35 1,793.66 462.59
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00
62,942,220.00 59,395,405.21 10,479,337.92 22,420,807.29 5,782,333.33
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
m²
346.94
(Rp.) 132,700.00
10 Balok tipe 1-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
46.44 4,505.55 710.71 1,520.59 392.16 294.12
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
53,359,560.00 56,319,384.38 8,883,907.50 19,007,343.75 4,902,000.00 39,029,724.00
11 Balok tipe 1-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
6.66 504.23 101.92 218.07 42.18
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
7,652,340.00 6,302,834.38 1,274,048.75 2,725,859.38 5,597,286.00
12 Balok tipe 1-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.05 270.80 51.95 140.19 18.99 19.33
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
3,507,322.50 3,384,961.46 649,348.87 1,752,388.90 237,353.15 2,565,422.75
13 Balok tipe 1-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.23 304.70 56.17 151.21 20.67 20.43
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
3,705,525.00 3,808,783.04 702,178.14 1,890,129.47 258,319.64 2,710,397.50
14 Balok tipe 1-G6 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.81 508.71 102.83 222.88 57.49 43.13
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,824,690.00 6,358,859.57 1,285,373.63 2,785,959.97 718,581.11 5,723,351.00
15 Balok tipe 1-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
18.62 2,014.43 252.20 867.31 157.97
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
21,391,349.51 25,180,364.77 3,152,502.32 10,841,363.95 20,962,021.85
16 Balok tipe 1-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
49.62 3,862.76 672.19 2,311.66 421.03
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
57,014,844.98 48,284,492.26 8,402,435.33 28,895,731.17 55,870,548.30
17 Balok tipe 1-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.22 378.46 51.78 191.65 27.28
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
3,694,063.73 4,730,788.52 647,273.43 2,395,640.16 3,619,923.30
18 Balok tipe 1-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
2.43 183.21 105.04 24.25
1,149,000.00 12,500.00 12,500.00 132,700.00
2,786,325.00 2,290,123.81 1,312,940.23 3,217,975.00
19 Balok tipe 1-BA5 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
2.99 227.60 139.68 31.40
1,149,000.00 12,500.00 12,500.00 132,700.00
3,435,510.00 2,845,060.09 1,745,958.62 4,166,116.50
20 Balok tipe 2-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
54.78 5,836.54 838.35 1,793.66 925.17 346.94
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
62,942,220.00 72,956,783.85 10,479,337.92 22,420,807.29 11,564,666.67 46,038,938.00
21 Balok tipe 2-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13
m³ kg kg
46.44 4,435.70 710.71
1,149,000.00 12,500.00 12,500.00
53,359,560.00 55,446,215.63 8,883,907.50
f.
Begisting Untuk Balok
(Rp.) 46,038,938.00
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg m²
1,520.59 784.32 294.12
(Rp.) 12,500.00 12,500.00 132,700.00
22 Balok tipe 2-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.66 3,359.68 577.41 425.67 107.95 56.51
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,652,340.00 41,995,941.82 7,217,577.61 5,320,841.21 1,349,349.28 7,498,756.36
23 Balok tipe 2-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.05 287.17 51.95 140.19 18.99 19.33
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
3,507,322.50 3,589,628.61 649,348.87 1,752,388.90 237,353.15 2,565,422.75
24 Balok tipe 2-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.76 355.01 65.45 176.18 24.08 23.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
4,317,367.50 4,437,675.12 818,119.18 2,202,220.62 300,972.42 3,157,928.25
25 Balok tipe 2-G6 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.81 545.77 102.83 222.88 114.97 43.13
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,824,690.00 6,822,087.75 1,285,373.63 2,785,959.97 1,437,162.22 5,723,351.00
26 Balok tipe 2-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
13.60 1,471.11 184.18 633.38 115.36
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
15,621,804.00 18,388,868.96 2,302,228.44 7,917,296.78 15,308,272.00
27 Balok tipe 2-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
53.85 4,191.77 729.45 2,508.55 456.89
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
61,871,064.75 52,397,107.25 9,118,109.86 31,356,915.11 60,629,303.00
28 Balok tipe 2-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.49 410.80 56.21 208.03 29.61
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,009,722.75 5,135,036.04 702,583.17 2,600,348.44 3,929,247.00
29 Balok tipe 2-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
4.22 318.96 182.86 42.22
1,149,000.00 12,500.00 12,500.00 132,700.00
4,850,934.38 3,987,058.33 2,285,801.87 5,602,428.13
30 Balok tipe 2-BA5 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
0.76 61.55 37.09 7.98
1,149,000.00 12,500.00 12,500.00 132,700.00
873,240.00 769,428.41 463,572.46 1,058,946.00
m³ kg m²
124.12 16,638.24 336.94
1,149,000.00 12,500.00 179,300.00
142,609,423.26 207,977,973.52 60,412,671.58
d. e. f.
Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
(Rp.) 19,007,343.75 9,804,000.00 39,029,724.00
31 Pelat Lantai (EL. -0,05) a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
32 Pelat Lantai (EL. +4,95) a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
m3 kg m2
128.51 17,226.92 988.52
1,149,000.00 12,500.00 179,300.00
147,655,162.31 215,336,551.65 177,241,551.87
a. b.
Pelat Lantai Tipe S2 Beton Ready Mix K-350 Tul D10
m3 kg
5.81 916.98
1,149,000.00 12,500.00
6,676,246.12 11,462,294.45
NO.
URAIAN c. 2.3.
Begisting Untuk Pelat lantai
SATUAN
VOLUME
HARGA SATUAN
(Rp.) 179,300.00 m2 48.42 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05)
PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95) 1 Kolom tipe K1-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
JUMLAH HARGA (Rp.) 8,681,831.51 3,057,395,501.20
m³ kg kg kg m²
15.68 2,093.77 697.89 973.80 89.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
18,016,320.00 26,172,104.25 8,723,629.78 12,172,506.67 13,045,760.00
2
Kolom tipe K2-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.88 562.78 180.82 214.92 27.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,309,120.00 7,034,797.41 2,260,290.85 2,686,454.85 4,018,560.00
3
Kolom tipe K3-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
12.96 2,480.87 785.13 949.46 86.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
14,891,040.00 31,010,925.44 9,814,083.50 11,868,194.00 12,579,840.00
4
Kolom tipe K4-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
18.72 3,198.09 1,134.07 1,371.44 124.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
21,509,280.00 39,976,068.20 14,175,898.39 17,142,946.89 18,170,880.00
5
Kolom tipe K5-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.00 255.09 142.01 178.53 16.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,298,000.00 3,188,583.04 1,775,157.22 2,231,626.22 2,329,600.00
6
Kolom tipe K6-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 107.07 88.53 22.91 8.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,338,350.20 1,106,635.22 286,332.19 1,164,800.00
7
Kolom tipe K7-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 104.28 85.09 22.02 8.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,303,544.26 1,063,677.44 275,217.24 1,164,800.00
8
Kolom tipe K8-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 e. Begisting Untuk kolom
m³ kg kg m²
1.40 277.32 174.29 27.50
1,149,000.00 12,500.00 12,500.00 145,600.00
1,608,600.00 3,466,488.89 2,178,674.77 4,004,000.00
9 Balok tipe 3-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
54.78 5,053.76 838.35 1,793.66 462.59 346.94
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
62,942,220.00 63,171,991.67 10,479,337.92 22,420,807.29 5,782,333.33 46,038,938.00
10 Balok tipe 3-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
46.44 4,947.96 710.71 1,520.59 784.32 294.12
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
53,359,560.00 61,849,453.13 8,883,907.50 19,007,343.75 9,804,000.00 39,029,724.00
11 Balok tipe 3-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.66 614.42 101.92 218.07 56.24 42.18
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,652,340.00 7,680,275.00 1,274,048.75 2,725,859.38 703,000.00 5,597,286.00
12 Balok tipe 3-G4 a. Beton Ready Mix K-350 b. Tul Utama D19
m³ kg
3.05 287.17
1,149,000.00 12,500.00
3,507,322.50 3,589,628.61
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg kg m²
51.95 140.19 18.99 19.33
(Rp.) 12,500.00 12,500.00 12,500.00 132,700.00
13 Balok tipe 3-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.76 355.01 65.45 176.18 24.08 23.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
4,317,367.50 4,437,675.12 818,119.18 2,202,220.62 300,972.42 3,157,928.25
14 Balok tipe 3-G6 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.81 508.71 102.83 222.88 57.49 43.13
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,824,690.00 6,358,859.57 1,285,373.63 2,785,959.97 718,581.11 5,723,351.00
15 Balok tipe 3-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
15.17 1,641.61 205.52 706.79 128.73
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
17,432,340.75 20,520,103.16 2,569,052.25 8,834,896.11 17,082,471.00
16 Balok tipe 3-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
50.84 3,957.36 688.66 2,368.27 431.34
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
58,411,138.50 49,466,979.45 8,608,210.96 29,603,387.61 57,238,818.00
17 Balok tipe 3-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
4.48 527.34 72.15 267.04 38.01
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
5,147,232.75 6,591,783.85 901,897.55 3,338,035.94 5,043,927.00
18 Balok tipe 3-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
3.07 231.85 132.92 30.69
1,149,000.00 12,500.00 12,500.00 132,700.00
3,525,993.75 2,898,069.05 1,661,478.48 4,072,231.25
19 Balok tipe 3-BA5 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
0.31 25.11 15.13 3.26
1,149,000.00 12,500.00 12,500.00 132,700.00
356,190.00 313,845.80 189,088.77 431,938.50
m3 kg m2
130.15 17,446.63 1,001.13
1,149,000.00 12,500.00 179,300.00
149,538,310.12 218,082,886.75 179,502,035.24
1,149,000.00 m3 4.07 12,500.00 kg 641.55 179,300.00 m2 33.88 JUMLAH 2.3.PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95) 2.4. PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95) 1 Kolom tipe K1-3 1,149,000.00 a. Beton Ready Mix K-350 m³ 15.68 12,500.00 b. Tul Utama D22 kg 2,093.77 12,500.00 c. Tul Sengkang D13 kg 697.89 12,500.00 d. Tul Kekang D13 kg 973.80 145,600.00 e. Begisting Untuk kolom m² 89.60
4,670,933.18 8,019,418.49 6,074,110.24 1,671,503,380.26
c. d. e. f.
Tul Mountase D13 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
(Rp.) 649,348.87 1,752,388.90 237,353.15 2,565,422.75
20 Pelat Lantai (EL. +8,95) a. b. c. a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai Pelat Lantai Tipe S2 Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai
2
Kolom tipe K2-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.88 562.78 180.82 214.92 27.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
18,016,320.00 26,172,104.25 8,723,629.78 12,172,506.67 13,045,760.00 3,309,120.00 7,034,797.41 2,260,290.85 2,686,454.85 4,018,560.00
3
Kolom tipe K3-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13
m³ kg kg kg
12.96 2,480.87 785.13 949.46
1,149,000.00 12,500.00 12,500.00 12,500.00
14,891,040.00 31,010,925.44 9,814,083.50 11,868,194.00
NO.
URAIAN e.
Begisting Untuk kolom
SATUAN
VOLUME
HARGA SATUAN
m²
86.40
(Rp.) 145,600.00
JUMLAH HARGA (Rp.) 12,579,840.00
4
Kolom tipe K4-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
18.72 3,198.09 1,134.07 1,371.44 124.80
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
21,509,280.00 39,976,068.20 14,175,898.39 17,142,946.89 18,170,880.00
5
Kolom tipe K5-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.00 255.09 142.01 178.53 16.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,298,000.00 3,188,583.04 1,775,157.22 2,231,626.22 2,329,600.00
6
Kolom tipe K6-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 85.65 70.82 18.33 6.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,070,680.16 885,308.18 229,065.75 931,840.00
7
Kolom tipe K7-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 83.43 68.08 17.61 6.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,042,835.41 850,941.95 220,173.79 931,840.00
8
Kolom tipe K8-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 e. Begisting Untuk kolom
m³ kg kg m²
1.40 221.86 139.44 22.00
1,149,000.00 12,500.00 12,500.00 145,600.00
1,608,600.00 2,773,191.11 1,742,939.81 3,203,200.00
9
Balok tipe 4-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
54.78 5,012.56 838.35 1,793.66 462.59 346.94
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
62,942,220.00 62,657,002.60 10,479,337.92 22,420,807.29 5,782,333.33 46,038,938.00
10 Balok tipe 4-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
46.44 4,505.55 710.71 1,520.59 784.32 294.12
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
53,359,560.00 56,319,384.38 8,883,907.50 19,007,343.75 9,804,000.00 39,029,724.00
11 Balok tipe 4-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.66 540.96 101.92 218.07 56.24 42.18
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,652,340.00 6,761,981.25 1,274,048.75 2,725,859.38 703,000.00 5,597,286.00
12 Balok tipe 4-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.05 287.17 51.95 140.19 18.99 19.33
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
3,507,322.50 3,589,628.61 649,348.87 1,752,388.90 237,353.15 2,565,422.75
13 Balok tipe 4-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
3.76 355.01 65.45 176.18 24.08 23.80
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
4,317,367.50 4,437,675.12 818,119.18 2,202,220.62 300,972.42 3,157,928.25
14 Balok tipe 4-G6 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
6.81 508.71 102.83 222.88 57.49 43.13
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
7,824,690.00 6,358,859.57 1,285,373.63 2,785,959.97 718,581.11 5,723,351.00
15 Balok tipe 4-BA1 a. Beton Ready Mix K-350
m³
10.15
1,149,000.00
11,664,217.13
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg kg m²
1,098.42 137.52 472.92 86.14
(Rp.) 12,500.00 12,500.00 12,500.00 132,700.00
16 Balok tipe 4-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
53.82 4,189.52 729.06 2,507.21 456.65
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
61,837,887.38 52,369,010.14 9,113,220.42 31,340,100.47 60,596,791.50
17 Balok tipe 4-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.36 395.46 54.11 200.26 28.50
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
3,859,950.60 4,943,230.91 676,340.11 2,503,219.58 3,782,480.80
18 Balok tipe 4-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
3.60 271.75 155.79 35.97
1,149,000.00 12,500.00 12,500.00 132,700.00
4,132,809.38 3,396,820.24 1,947,415.21 4,773,053.13
19 Balok tipe 4-BA5 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
0.46 37.26 22.45 4.83
1,149,000.00 12,500.00 12,500.00 132,700.00
528,540.00 465,706.67 280,583.33 640,941.00
m3 kg m2
129.50 17,359.53 996.13
1,149,000.00 12,500.00 179,300.00
148,791,728.98 216,994,091.72 178,605,857.98
1,149,000.00 m3 3.61 12,500.00 kg 569.27 179,300.00 m2 30.06 JUMLAH 2.4.PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95)
4,144,672.80 7,115,894.05 5,389,758.00 1,643,627,974.77
b. c. d. f.
Tul Utama D19 Tul Mountase D13 Tul Sengkang D10 Begisting Untuk Balok
(Rp.) 13,730,281.10 1,718,987.92 5,911,549.57 11,430,114.50
20 Pelat Lantai (EL. +12,95) a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai
a. b. c.
Pelat Lantai Tipe S2 Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai
2.5. PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95) 1 Kolom tipe K1-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
19.60 2,617.21 872.36 1,217.25 112.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
22,520,400.00 32,715,130.31 10,904,537.22 15,215,633.33 16,307,200.00
2
Kolom tipe K2-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
3.60 703.48 226.03 268.65 34.50
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
4,136,400.00 8,793,496.76 2,825,363.56 3,358,068.57 5,023,200.00
3
Kolom tipe K3-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
16.20 3,101.09 981.41 1,186.82 108.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
18,613,800.00 38,763,656.80 12,267,604.38 14,835,242.50 15,724,800.00
4
Kolom tipe K4-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
23.40 3,997.61 1,417.59 1,714.29 156.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
26,886,600.00 49,970,085.24 17,719,872.99 21,428,683.61 22,713,600.00
5
Kolom tipe K5-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.50 318.86 177.52 223.16 20.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,872,500.00 3,985,728.80 2,218,946.53 2,789,532.78 2,912,000.00
6
Kolom tipe K6-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 85.65 70.82 18.33 6.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,070,680.16 885,308.18 229,065.75 931,840.00
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
7
Kolom tipe K7-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
0.60 83.43 68.08 17.61 6.40
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
689,400.00 1,042,835.41 850,941.95 220,173.79 931,840.00
8
Kolom tipe K8-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 e. Begisting Untuk kolom
m³ kg kg m²
1.40 277.32 174.29 27.50
1,149,000.00 12,500.00 12,500.00 145,600.00
1,608,600.00 3,466,488.89 2,178,674.77 4,004,000.00
9
Balok tipe 5-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
54.78 4,971.36 838.35 1,793.66 462.59 346.94
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
62,942,220.00 62,142,013.54 10,479,337.92 22,420,807.29 5,782,333.33 46,038,938.00
10 Balok tipe 5-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
46.44 3,515.96 710.71 1,520.59 294.12
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
53,359,560.00 43,949,493.75 8,883,907.50 19,007,343.75 39,029,724.00
11 Balok tipe 5-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
6.66 467.50 101.92 218.07 42.18
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
7,652,340.00 5,843,687.50 1,274,048.75 2,725,859.38 5,597,286.00
12 Balok tipe 5-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.05 270.80 51.95 140.19 19.33
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
3,507,322.50 3,384,961.46 649,348.87 1,752,388.90 2,565,422.75
13 Balok tipe 5-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.76 355.01 65.45 176.18 23.80
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,317,367.50 4,437,675.12 818,119.18 2,202,220.62 3,157,928.25
14 Balok tipe 5-G6 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
6.81 471.65 102.83 222.88 43.13
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
7,824,690.00 5,895,631.39 1,285,373.63 2,785,959.97 5,723,351.00
15 Balok tipe 5-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
2.10 129.39 28.44 97.81 17.82
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,412,469.13 1,617,325.18 355,532.24 1,222,665.07 2,364,050.50
16 Balok tipe 5-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
52.71 2,909.94 714.08 2,455.71 447.27
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
60,567,667.88 36,374,190.44 8,926,024.66 30,696,339.68 59,352,065.50
17 Balok tipe 5-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.76 243.73 50.97 220.80 31.89
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,317,798.38 3,046,639.72 637,106.65 2,759,945.42 4,231,139.50
18 Balok tipe 5-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
3.60 271.75 155.79 35.97
1,149,000.00 12,500.00 12,500.00 132,700.00
4,132,809.38 3,396,820.24 1,947,415.21 4,773,053.13
19 Balok tipe 5-BA5 a. Beton Ready Mix K-350
m³
0.23
1,149,000.00
264,270.00
NO.
URAIAN b. d. f.
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg m²
18.63 11.22 2.42
(Rp.) 12,500.00 12,500.00 132,700.00
m³ kg kg m²
0.80 48.36 41.13 8.00
1,149,000.00 12,500.00 12,500.00 132,700.00
919,200.00 604,456.67 514,145.83 1,061,600.00
1,149,000.00 m3 139.95 12,500.00 kg 18,760.77 179,300.00 m2 1,076.54 41,529.27 kg 699.75 JUMLAH 2.5.PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95)
160,802,047.89 234,509,636.84 193,022,743.43 29,060,017.30 1,696,320,785.46
Tul Utama D16 Tul Sengkang D10 Begisting Untuk Balok
20 Balok dudukan Roof Tank a. Beton Ready Mix K-350 b. Tul Utama D13 c. Tul Sengkang D10 d. Begisting Untuk Balok
(Rp.) 232,853.33 140,291.67 320,470.50
21 Pelat Lantai (EL. +17,95) a. b. c. d.
Pelat Lantai Tipe SA Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai Waterproofing Integral
2.6. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95) 1 Kolom tipe K2-Atap a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
1.15 225.11 72.33 85.97 11.04
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
1,323,648.00 2,813,918.96 904,116.34 1,074,581.94 1,607,424.00
2
Kolom tipe K6-Atap a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
1.08 154.18 127.48 32.99 11.52
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
1,240,920.00 1,927,224.29 1,593,554.72 412,318.35 1,677,312.00
3
Balok tipe 6-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg m²
3.49 263.39 151.00 34.86
1,149,000.00 12,500.00 12,500.00 132,700.00
4,005,701.25 3,292,348.10 1,887,520.77 4,626,253.75
4
Pelat Lantai Dak 2 (EL. +20,95) 1,149,000.00 m3 3.89 12,500.00 kg 521.52 179,300.00 m2 29.93 41,529.27 kg 19.45 JUMLAH 2.6.PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
4,470,069.60 6,519,036.37 5,365,759.38 807,827.40 45,549,535.22
2.7. PEKERJAAN STRUKTUR BAJA LANTAI DAK (EL. +17.95) 18,071.46 1 Kolom K9-Atap (HB 250.250.9.14) kg 5,735.40 18,071.46 2 Kolom K10-Atap (WF 500.200.10.16) kg 1,934.93 18,071.46 3 Balok tipe 6-B6 (WF 300.150.6,5.9) kg 12,574.34 18,071.46 4 Pelat penyambung PL 10 mm kg 1,100.12 85,395.69 5 Angkur baut M16 bh 254.00 15,730.78 6 Mur baut M16 bh 426.00 32,340.00 7 Pengelasan M 173.20 22,434.04 8 Pengecatan dengan zinchromat m² 595.99 JUMLAH 2.7.PEKERJAAN STRUKTUR BAJA LANTAI DAK (EL. +17.95)
103,647,079.79 34,966,983.44 227,236,698.79 19,880,704.07 21,690,505.02 6,701,314.34 5,601,288.00 13,370,464.95 433,095,038.40
a. b. c. d.
2.8.
Pelat Dak Tipe SA Beton Ready Mix K-350 Tul D13 Begisting Untuk Pelat lantai Waterproofing Integral
PEKERJAAN TANGGA (As. 2'-3 / E-E') 1 PELAT TANGGA LANTAI 1 KE LANTAI 2 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
4.26 667.12 428.25 41.41
1,149,000.00 12,500.00 12,500.00 171,200.00
4,894,625.10 8,338,948.83 5,353,062.64 7,089,677.50
2
Balok 1-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.68 73.82 9.24 31.78 5.79
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
783,933.98 922,790.94 115,530.52 397,306.09 768,200.30
3
PELAT TANGGA LANTAI 2 KE LANTAI 3 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
3.91 612.04 392.89 37.99
1,149,000.00 12,500.00 12,500.00 171,200.00
4,490,544.78 7,650,519.17 4,911,135.58 6,504,382.59
4
Balok 2-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.68 73.82 9.24 31.78 5.79
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
783,933.98 922,790.94 115,530.52 397,306.09 768,200.30
NO.
URAIAN
2.9
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
5
PELAT TANGGA LANTAI 3 KE LANTAI 4 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
3.97 621.54 398.99 38.58
1,149,000.00 12,500.00 12,500.00 171,200.00
4,560,220.14 7,769,224.74 4,987,336.83 6,605,304.69
6
Balok 3-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
0.68 73.82 9.24 31.78 5.79
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
783,933.98 922,790.94 115,530.52 397,306.09 768,200.30
7
PELAT TANGGA LANTAI 4 KE LANTAI DAK 1 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
4.26 667.12 428.25 41.41
1,149,000.00 12,500.00 12,500.00 171,200.00
4,894,625.10 8,338,948.83 5,353,062.64 7,089,677.50
8
Balok 4-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
1,149,000.00 m3 0.68 12,500.00 kg 73.82 kg 9.24 12,500.00 kg 31.78 12,500.00 m2 5.79 132,700.00 JUMLAH 2.8.PEKERJAAN TANGGA (As. 2'-3 / E-E')
783,933.98 922,790.94 115,530.52 397,306.09 768,200.30 110,782,343.95
PEKERJAAN TANGGA (As. 7-8 / E-E') 1 PELAT TANGGA LANTAI 1 KE LANTAI 2 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
3.30 304.30 253.09 26.01
1,149,000.00 12,500.00 12,500.00 171,200.00
3,790,855.49 3,803,802.65 3,163,583.40 4,452,871.45
2
Balok 1-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
1.47 158.89 19.89 68.41 12.46
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
1,687,306.50 1,986,176.38 248,663.02 855,144.92 1,653,442.00
3
PELAT TANGGA LANTAI 2 KE LANTAI 3 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
3.40 313.97 261.13 26.84
1,149,000.00 12,500.00 12,500.00 171,200.00
3,911,310.90 3,924,669.46 3,264,107.08 4,594,362.59
4
Balok 2-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.03 219.60 27.49 94.55 17.22
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,331,895.50 2,744,940.39 343,657.89 1,181,829.50 2,285,094.00
5
PELAT TANGGA LANTAI 3 KE LANTAI 4 a. Beton Ready Mix K-350 b. Tul D13 c. Tul D10 d. Begisting Untuk Tangga
m3 kg kg m2
3.46 318.80 265.14 27.25
1,149,000.00 12,500.00 12,500.00 171,200.00
3,971,461.05 3,985,025.05 3,314,304.20 4,665,017.06
6
Balok 3-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Begisting Untuk Balok
1,149,000.00 m3 1.47 12,500.00 kg 158.89 12,500.00 kg 19.89 12,500.00 kg 68.41 132,700.00 m2 12.46 JUMLAH 2,9PEKERJAAN TANGGA (As. 7-8 / E-E')
1,687,306.50 1,986,176.38 248,663.02 855,144.92 1,653,442.00 68,590,253.30
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG D2 TAHUN ANGGRAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN NON STANDAR
I.
PEKERJAAN STRUKTUR
JUMLAH HARGA
1.1. PEKERJAAN PONDASI
Rp
3,455,033,433.23
1.2. PEKERJAAN PIT LIFT
Rp
51,558,349.65
Rp
3,506,591,782.87
JUMLAH PEKERJAAN NON STANDAR
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG D2 TAHUN ANGGRAN 2021 NO.
URAIAN
1.
2.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6.
PEKERJAAN NON STANDAR I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1
2
3
4
Pondasi Bored Pile Tipe P2 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul.D19 - Besi Tul. D13 - Pemotongan Kepala Bored Pile B. Pile cap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - Pasir Urug t=10cm Pondasi Bored Pile Tipe P3 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul.D19 - Besi Tul. D13 - Pemotongan Kepala Bored Pile B. Pile cap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - Pasir Urug t=10cm Pondasi Bored Pile Tipe P4 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul.D19 - Besi Tul. D13 - Pemotongan Kepala Bored Pile B. Pile cap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - Pasir Urug t=10cm Pondasi Bored Pile Tipe P5 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul.D19 - Besi Tul. D13 - Pemotongan Kepala Bored Pile B. Pile cap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - Pasir Urug t=10cm
m¹ m3 m3 kg kg ttk
61.80 17.48 17.48 2,101.50 1,774.60 4.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
16,387,882.18 361,148.61 19,331,763.94 26,268,766.67 22,182,517.50 629,231.39
m3 kg kg m2 m3 m3
8.64 758.97 78.62 20.16 0.36 0.72
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
9,927,360.00 9,487,180.28 982,720.00 2,362,752.00 200,678.40 117,432.00
m¹ m3 m3 kg kg ttk
648.90 183.55 183.55 22,065.76 18,633.31 42.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
172,072,762.92 3,792,060.36 202,983,521.40 275,822,050.00 232,916,433.75 6,606,929.63
m3 kg kg m2 m3 m3
100.32 8,759.55 646.46 165.12 4.18 8.36
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
115,270,989.12 109,494,385.58 8,080,800.00 19,352,317.15 2,330,166.07 1,363,555.14
m¹ m3 m3 kg kg ttk
618.00 174.81 174.81 21,015.01 17,746.01 40.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
163,878,821.83 3,611,486.06 193,317,639.43 262,687,666.67 221,825,175.00 6,292,313.93
m3 kg kg m2 m3 m3
108.00 6,065.56 187.86 144.00 4.50 9.00
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
124,092,000.00 75,819,526.39 2,348,266.67 16,876,800.00 2,508,479.98 1,467,900.00
m¹ m3 m3 kg kg ttk
618.00 174.81 174.81 21,015.01 17,746.01 40.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
163,878,821.83 3,611,486.06 193,317,639.43 262,687,666.67 221,825,175.00 6,292,313.93
m3 kg kg m2 m3 m3
124.36 8,331.23 183.58 140.51 5.18 10.36
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
142,887,801.60 104,140,373.49 2,294,749.87 16,467,256.32 2,888,431.08 1,690,237.92
JUMLAH 1.1.PEKERJAAN PONDASI
3,455,033,433.23
1.2. PEKERJAAN PIT LIFT 1
Beton Pit Lift, t : 25 cm (2,800 x 2,875) m a. Beton Ready Mix K-350 b. Besi Tul D13
m3 kg
4.33 718.88
1,149,000.00 12,500.00
4,973,374.69 8,985,973.52
NO.
URAIAN
2
SATUAN
e. f. g. h. i. j.
Begisting Batako Begisting Untuk Dinding Pasir urug t=10 cm Lantai Kerja t=5 cm Water Proofing Integral Waterproofing coating Elastomeric Acrylic/ Terpasang
m2 m2 m2 m3 ltr m2
Beton a. b. e. f. g. h. i. j.
Pit Lift, t : 25 cm (2,7600 x 3,685) m Beton Ready Mix K-350 Besi Tul D13 Begisting Batako Begisting Untuk Dinding Pasir urug t=10 cm Lantai Kerja t=5 cm Water Proofing Integral Waterproofing coating Elastomeric Acrylic/ Terpasang
m3 kg m2 m2 m2 m3 ltr m2
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 117,200.00 157,200.00 163,100.00 557,440.00 41,529.27 157,307.85
(Rp.) 1,596,264.00 2,204,730.00
5.04 1,149,000.00 861.18 12,500.00 117,200.00 15.47 16.34 157,200.00 163,100.00 0.85 557,440.00 0.43 12.61 41,529.27 38.89 157,307.85 JUMLAH 1.2.PEKERJAAN PIT LIFT
5,795,461.21 10,764,769.65 1,812,849.60 2,567,862.00
13.62 14.03 0.71 0.36 10.82 33.89
198,100.24 449,392.15 5,330,769.71
237,031.85 523,675.55 6,118,095.49 51,558,349.65
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG F1 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
-
PEKERJAAN STANDAR
Rp
8,121,584,931.06
-
PEKERJAAN NON STANDAR
Rp
2,407,710,545.33
Rp
10,529,295,476.39
JUMLAH = (PEK STANDAR + NON STANDAR)
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG F1 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
JUMLAH HARGA
Rp
155,847,122.06
2.1.
PEKERJAAN TANAH
Rp
21,248,136.00
2.2.
PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05)
Rp
2,660,737,796.88
2.3.
PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95)
Rp
1,253,644,428.02
2.4.
PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95)
Rp
1,216,972,863.77
2.5.
PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95)
Rp
1,345,501,429.31
2.6.
PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
Rp
161,122,448.11
2.7.
PEKERJAAN STRUKTUR ATAP
Rp
1,306,510,706.91
Rp
8,121,584,931.06
JUMLAH PEKERJAAN STANDAR
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG F1 TAHUN ANGGARAN 2021 NO. 1.
I.
URAIAN 2. PEKERJAAN STANDAR
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN PERSIAPAN 1 2
II.
SATUAN
Pengukuran & pemasangan bouwplank Biaya Loading Test (1 Axial + 1 Lateral)
m¹ ls
195.00 81,267.29 1.00 140,000,000.00 JUMLAH I.PEKERJAAN PERSIAPAN
15,847,122.06 140,000,000.00 155,847,122.06
278.21 56,100.00 54.65 18,700.00 223.56 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
15,607,468.80 1,021,917.60 4,618,749.60 21,248,136.00
PEKERJAAN STRUKTUR 2.1.
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah untuk Pile Cap 2 Pekerjaan Urugan tanah kembali 3 Pembuangan tanah keluar site
m3 m4 m5
2.2.
PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05) 1 Kolom tipe K1-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
5.08 745.13 352.56 23.49
1,149,000.00 12,500.00 12,500.00 145,600.00
5,839,895.09 9,314,070.19 4,407,025.07 3,420,560.00
Kolom tipe K2-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
30.50 4,044.98 2,147.79 202.63
1,149,000.00 12,500.00 12,500.00 145,600.00
35,039,370.54 50,562,311.72 26,847,394.11 29,502,330.00
3
Kolom tipe K3-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
10.17 1,319.79 705.12 46.99
1,149,000.00 12,500.00 12,500.00 145,600.00
11,679,790.18 16,497,327.15 8,814,050.14 6,841,120.00
4
Kolom tipe K4-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
7.64 1,490.25 596.64 39.76
1,149,000.00 12,500.00 12,500.00 145,600.00
8,772,820.18 18,628,140.37 7,458,042.43 5,788,640.00
5
Kolom tipe K5-1 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
15.27 2,639.57 1,193.29 79.51
1,149,000.00 12,500.00 12,500.00 145,600.00
17,545,640.36 32,994,654.29 14,916,084.86 11,577,280.00
6
Kolom tipe K6-1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
11.45 2,022.49 908.68 59.64
1,149,000.00 12,500.00 12,500.00 145,600.00
13,159,230.27 25,281,155.86 11,358,512.89 8,682,960.00
7
Kolom tipe K7-1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
3.82 1,164.81 345.28 19.88
1,149,000.00 12,500.00 12,500.00 145,600.00
4,386,410.09 14,560,099.40 4,315,996.78 2,894,320.00
8
Kolom tipe K8-1 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
4.10 738.29 366.12 24.40
1,149,000.00 12,500.00 12,500.00 145,600.00
4,710,848.71 9,228,618.44 4,576,526.04 3,552,120.00
9
Kolom tipe K9-1 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Tul Kekang D10 e. Begisting Untuk kolom
m³ kg kg kg m²
3.49 614.50 313.97 1,817.53 36.44
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
4,013,600.63 7,681,295.18 3,924,679.73 22,719,171.58 5,306,253.33
10 Balok tipe 1-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
36.79 2,451.28 654.02 1,389.06 313.69 240.53
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
42,268,722.60 30,640,942.86 8,175,290.60 17,363,255.36 3,921,153.92 31,918,729.10
2
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
11 Balok tipe 1-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
50.62 3,419.53 912.36 1,912.21 431.80 330.98
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
58,162,586.82 42,744,087.28 11,404,522.91 23,902,598.54 5,397,555.72 43,920,793.87
12 Balok tipe 1-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
7.57 570.50 129.66 285.36 64.45 49.47
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
8,693,334.00 7,131,269.45 1,620,757.10 3,566,997.76 805,686.37 6,564,669.00
13 Balok tipe 1-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
1.77 280.71 51.40 103.72 39.25 11.59
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
2,037,108.06 3,508,847.03 642,549.16 1,296,557.08 490,589.17 1,538,298.21
14 Balok tipe 1-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
12.68 765.61 179.91 603.36 107.57
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
14,567,332.23 9,570,178.64 2,248,827.31 7,541,995.94 14,274,963.64
15 Balok tipe 1-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
4.85 374.46 69.62 233.38 41.16
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
5,573,799.00 4,680,746.67 870,209.17 2,917,218.75 5,461,932.00
16 Balok tipe 1-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.72 219.98 53.61 211.47 31.61
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,279,881.38 2,749,778.33 670,096.88 2,643,380.21 4,193,983.50
17 Balok tipe 2-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
27.93 3,617.34 554.49 1,188.70 552.21 182.62
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
32,092,443.24 45,216,697.53 6,931,156.33 14,858,798.17 6,902,655.94 24,234,231.34
18 Balok tipe 2-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
46.01 3,971.70 829.19 1,925.78 448.51 300.81
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
52,860,698.67 49,646,265.02 10,364,928.42 24,072,236.15 5,606,324.95 39,917,135.35
19 Balok tipe 2-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
7.57 768.03 129.66 316.21 73.66 49.47
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
8,693,334.00 9,600,398.49 1,620,757.10 3,952,619.14 920,784.43 6,564,669.00
20 Balok tipe 2-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
1.77 401.01 51.40 114.94 44.85 11.59
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
2,037,108.06 5,012,638.61 642,549.16 1,436,725.42 560,673.33 1,538,298.21
21 Balok tipe 2-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
8.72 919.59 157.17 344.68 160.12 56.06
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
10,019,969.40 11,494,840.88 1,964,580.16 4,308,522.58 2,001,476.05 7,439,294.70
22 Balok tipe 2-G6
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
Beton Ready Mix K-350 Tul Utama D19 Tul Mountase D13 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
m³ kg kg kg kg m²
15.06 1,706.62 234.25 687.64 268.35 96.83
(Rp.) 1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
23 Balok tipe 2-G7 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
5.66 1,103.06 248.66 585.22 136.31 96.83
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
6,505,178.40 13,788,306.54 3,108,274.49 7,315,254.68 1,703,813.29 12,849,473.70
24 Balok tipe 2-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
10.83 670.93 160.19 512.66 91.91
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
12,445,876.08 8,386,618.49 2,002,374.03 6,408,287.20 12,196,085.44
25 Balok tipe 2-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
4.85 374.46 69.62 233.38 41.16
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
5,573,799.00 4,680,746.67 870,209.17 2,917,218.75 5,461,932.00
26 Balok tipe 2-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.61 213.45 52.02 205.19 30.67
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,152,859.43 2,668,168.08 650,209.18 2,564,927.73 4,069,510.90
27 Balok tipe 2-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
12.14 1,121.44 174.82 566.69 103.01
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
13,950,043.47 14,017,995.98 2,185,246.04 7,083,652.17 13,670,063.96
28 Balok tipe 2-BA6 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
1.50 177.76 21.79 71.98 12.73
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
1,723,327.65 2,221,976.24 272,434.63 899,788.08 1,688,740.20
29 Balok tipe 2-BA7 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
0.37 195.07 23.47 75.06 12.73
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
420,878.70 2,438,329.38 293,373.44 938,195.31 1,688,740.20
30 Beton janggutan (Detail - 1) a. Beton Ready Mix K-350 b. Tul D10 c Begisting Untuk Balok
m³ kg m²
6.76 564.55 111.97
1,149,000.00 12,500.00 132,700.00
7,768,640.34 7,056,867.08 14,858,833.69
a. b. c. d. e. f.
(Rp.) 17,306,927.40 21,332,693.21 2,928,100.06 8,595,446.39 3,354,320.54 12,849,473.70
31 Pelat Lantai (EL. -0,05) a. b. c.
Pelat Lantai Tipe SB Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
m³ kg m²
103.23 11,993.78 242.88
1,149,000.00 12,500.00 179,300.00
118,616,440.50 149,922,252.75 43,548,860.80
a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
m³ kg m²
84.19 11,286.17 228.55
1,149,000.00 12,500.00 179,300.00
96,735,873.21 141,077,149.17 40,979,567.87
1,149,000.00 m3 114.35 12,500.00 kg 15,329.23 179,300.00 m2 879.63 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI - 1 (EL. -0.05)
131,389,713.21 191,615,432.36 157,716,914.91 2,660,737,796.88
32 Pelat Lantai (EL. +4,95) a. b. c. 2.3.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95) 1 Kolom tipe K1-2 a. Beton Ready Mix K-350 b. Tul Utama D22
m³ kg
3.54 518.35
1,149,000.00 12,500.00
4,062,535.71 6,479,353.17
NO.
URAIAN c. d.
Tul Sengkang D13 Begisting Untuk kolom
SATUAN
VOLUME
HARGA SATUAN
kg m²
245.26 16.34
(Rp.) 12,500.00 145,600.00
JUMLAH HARGA (Rp.) 3,065,756.57 2,379,520.00
2
Kolom tipe K2-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
21.21 2,813.90 1,494.12 140.96
1,149,000.00 12,500.00 12,500.00 145,600.00
24,375,214.29 35,173,782.07 18,676,448.08 20,523,360.00
3
Kolom tipe K3-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
7.07 918.11 490.52 32.69
1,149,000.00 12,500.00 12,500.00 145,600.00
8,125,071.43 11,476,401.49 6,131,513.14 4,759,040.00
4
Kolom tipe K4-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
5.31 1,036.70 415.06 27.66
1,149,000.00 12,500.00 12,500.00 145,600.00
6,102,831.43 12,958,706.35 5,188,203.43 4,026,880.00
5
Kolom tipe K5-2 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
10.62 1,836.22 830.11 55.31
1,149,000.00 12,500.00 12,500.00 145,600.00
12,205,662.86 22,952,802.99 10,376,406.86 8,053,760.00
6
Kolom tipe K6-2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
7.97 2,022.49 908.68 59.64
1,149,000.00 12,500.00 12,500.00 145,600.00
9,154,247.14 25,281,155.86 11,358,512.89 8,682,960.00
7
Kolom tipe K8-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
2.85 738.29 366.12 24.40
1,149,000.00 12,500.00 12,500.00 145,600.00
3,277,112.14 9,228,618.44 4,576,526.04 3,552,120.00
8
Kolom tipe K9-2 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.43 614.50 313.97 202.56 36.44
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,792,070.00 7,681,295.18 3,924,679.73 2,532,051.44 5,306,253.33
9
Balok tipe 3-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
31.43 3,079.13 617.40 1,336.79 310.53 205.48
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
36,108,405.06 38,489,114.98 7,717,521.21 16,709,863.38 3,881,593.51 27,266,837.71
10 Balok tipe 3-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
50.62 3,944.51 887.89 2,117.16 493.15 330.99
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
58,164,080.52 49,306,321.14 11,098,646.24 26,464,558.86 6,164,347.75 43,921,921.82
11 Balok tipe 3-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
7.57 694.54 129.66 285.55 73.66 49.47
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
8,693,334.00 8,681,776.29 1,620,757.10 3,569,418.62 920,784.43 6,564,669.00
12 Balok tipe 3-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
1.77 401.01 51.40 114.94 44.85 11.59
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
2,037,108.06 5,012,638.61 642,549.16 1,436,725.42 560,673.33 1,538,298.21
13 Balok tipe 3-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
17.37 1,075.09 256.69 821.96 147.36
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
19,955,148.35 13,438,652.39 3,208,588.60 10,274,472.01 19,554,645.46
14 Balok tipe 3-BA2
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
Beton Ready Mix K-350 Tul Utama D19 Tul Mountase D13 Tul Sengkang D10 Begisting Untuk Balok
m³ kg kg kg m²
4.85 374.46 69.62 233.38 41.16
(Rp.) 1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
15 Balok tipe 3-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.82 226.39 55.17 216.89 32.41
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,388,892.75 2,829,923.86 689,627.64 2,711,150.46 4,300,807.00
16 Balok tipe 3-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
12.14 1,121.44 174.82 566.69 103.01
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
13,950,043.47 14,017,995.98 2,185,246.04 7,083,652.17 13,670,063.96
17 Beton janggutan (Detail - 1) a. Beton Ready Mix K-350 b. Tul D10 c Begisting Untuk Balok
m³ kg m²
5.69 563.55 98.97
1,149,000.00 12,500.00 132,700.00
6,541,285.73 7,044,355.09 13,133,458.34
1,149,000.00 m3 91.38 12,500.00 kg 12,249.74 179,300.00 m2 702.92 JUMLAH 2.3.PEKERJAAN STRUKTUR LANTAI - 2 (EL. +4.95)
104,994,809.38 153,121,772.65 126,033,134.65 1,253,644,428.02
a. b. c. d. f.
(Rp.) 5,573,799.00 4,680,746.67 870,209.17 2,917,218.75 5,461,932.00
18 Pelat Lantai (EL. +8,95) a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
2.4. PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95) 1 Kolom tipe K1-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
3.54 518.35 245.26 16.34
1,149,000.00 12,500.00 12,500.00 145,600.00
4,062,535.71 6,479,353.17 3,065,756.57 2,379,520.00
2
Kolom tipe K2-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
21.21 2,813.90 1,494.12 140.96
1,149,000.00 12,500.00 12,500.00 145,600.00
24,375,214.29 35,173,782.07 18,676,448.08 20,523,360.00
3
Kolom tipe K3-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
7.07 918.11 490.52 32.69
1,149,000.00 12,500.00 12,500.00 145,600.00
8,125,071.43 11,476,401.49 6,131,513.14 4,759,040.00
4
Kolom tipe K4-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
5.31 1,036.70 415.06 27.66
1,149,000.00 12,500.00 12,500.00 145,600.00
6,102,831.43 12,958,706.35 5,188,203.43 4,026,880.00
5
Kolom tipe K5-3 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
10.62 1,836.22 830.11 55.31
1,149,000.00 12,500.00 12,500.00 145,600.00
12,205,662.86 22,952,802.99 10,376,406.86 8,053,760.00
6
Kolom tipe K6-3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
7.97 1,406.95 632.13 41.49
1,149,000.00 12,500.00 12,500.00 145,600.00
9,154,247.14 17,586,891.03 7,901,574.19 6,040,320.00
7
Kolom tipe K8-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
2.85 513.59 254.69 16.97
1,149,000.00 12,500.00 12,500.00 145,600.00
3,277,112.14 6,419,908.48 3,183,670.29 2,471,040.00
8
Kolom tipe K9-3 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
2.43 427.48 218.42 140.91 25.35
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
2,792,070.00 5,343,509.69 2,730,211.99 1,761,427.09 3,691,306.67
9
Balok tipe 4-G1 a. Beton Ready Mix K-350 b. Tul Utama D19
m³ kg
31.43 2,612.51
1,149,000.00 12,500.00
36,108,405.06 32,656,372.51
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg kg kg m²
617.40 1,336.79 310.53 205.48
(Rp.) 12,500.00 12,500.00 12,500.00 132,700.00
10 Balok tipe 4-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
50.62 3,636.16 887.89 2,117.16 493.15 330.99
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
58,164,080.52 45,451,992.20 11,098,646.24 26,464,558.86 6,164,347.75 43,921,921.82
11 Balok tipe 4-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
7.57 615.53 129.66 285.55 73.66 49.47
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
8,693,334.00 7,694,124.68 1,620,757.10 3,569,418.62 920,784.43 6,564,669.00
12 Balok tipe 4-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg kg kg m²
1.77 320.81 51.40 114.94 44.85 11.59
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
2,037,108.06 4,010,110.89 642,549.16 1,436,725.42 560,673.33 1,538,298.21
13 Balok tipe 4-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
17.37 1,075.09 256.69 821.96 147.36
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
19,955,148.35 13,438,652.39 3,208,588.60 10,274,472.01 19,554,645.46
14 Balok tipe 4-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
4.85 374.46 69.62 233.38 41.16
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
5,573,799.00 4,680,746.67 870,209.17 2,917,218.75 5,461,932.00
15 Balok tipe 4-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.82 226.39 55.17 216.89 32.41
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,388,892.75 2,829,923.86 689,627.64 2,711,150.46 4,300,807.00
16 Balok tipe 4-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
12.14 1,121.44 174.82 566.69 103.01
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
17 Beton janggutan (Detail - 1) a. Beton Ready Mix K-350 b. Tul D10 c Begisting Untuk Balok
13,950,043.47 14,017,995.98 2,185,246.04 7,083,652.17 13,670,063.96 -
m³ kg m²
5.69 563.55 98.97
1,149,000.00 12,500.00 132,700.00
6,541,285.73 7,044,355.09 13,133,458.34
1,149,000.00 m3 91.38 12,500.00 kg 12,249.74 179,300.00 m2 702.92 JUMLAH 2.4.PEKERJAAN STRUKTUR LANTAI - 3 (EL. +8.95)
104,994,809.38 153,121,772.65 126,033,134.65 1,216,972,863.77
c. d. e. f.
Tul Mountase D13 Tul Sengkang D10 Tul Kekang D10 Begisting Untuk Balok
(Rp.) 7,717,521.21 16,709,863.38 3,881,593.51 27,266,837.71
18 Pelat Lantai (EL. +12,95) a. b. c.
Pelat Lantai Tipe S1 Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai
2.5. PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95) 1 Kolom tipe K1-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
4.42 647.94 306.58 20.43
1,149,000.00 12,500.00 12,500.00 145,600.00
5,078,169.64 8,099,191.47 3,832,195.71 2,974,400.00
2
Kolom tipe K2-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
26.52 3,517.38 1,867.64 176.20
1,149,000.00 12,500.00 12,500.00 145,600.00
30,469,017.86 43,967,227.59 23,345,560.10 25,654,200.00
3
Kolom tipe K3-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13
m³ kg kg
8.84 1,147.64 613.15
1,149,000.00 12,500.00 12,500.00
10,156,339.29 14,345,501.87 7,664,391.43
NO.
URAIAN d.
Begisting Untuk kolom
SATUAN
VOLUME
HARGA SATUAN
m²
40.86
(Rp.) 145,600.00
JUMLAH HARGA (Rp.) 5,948,800.00
4
Kolom tipe K4-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
6.64 1,295.87 518.82 34.57
1,149,000.00 12,500.00 12,500.00 145,600.00
7,628,539.29 16,198,382.93 6,485,254.29 5,033,600.00
5
Kolom tipe K5-4 a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
13.28 2,295.28 1,037.64 69.14
1,149,000.00 12,500.00 12,500.00 145,600.00
15,257,078.57 28,691,003.73 12,970,508.57 10,067,200.00
6
Kolom tipe K6-4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
9.96 1,758.69 790.16 51.86
1,149,000.00 12,500.00 12,500.00 145,600.00
11,442,808.93 21,983,613.79 9,876,967.73 7,550,400.00
7
Kolom tipe K8-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Begisting Untuk kolom
m³ kg kg m²
3.57 738.29 366.12 24.40
1,149,000.00 12,500.00 12,500.00 145,600.00
4,096,390.18 9,228,618.44 4,576,526.04 3,552,120.00
8
Kolom tipe K9-4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Sengkang D13 d. Tul Kekang D13 e. Begisting Untuk kolom
m³ kg kg kg m²
3.04 614.50 313.97 202.56 36.44
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,490,087.50 7,681,295.18 3,924,679.73 2,532,051.44 5,306,253.33
9
Balok tipe 5-G1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
31.43 2,379.20 617.40 1,336.79 205.48
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
36,108,405.06 29,740,001.27 7,717,521.21 16,709,863.38 27,266,837.71
10 Balok tipe 5-G2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
50.62 3,636.16 887.89 2,117.16 330.99
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
58,164,080.52 45,451,992.20 11,098,646.24 26,464,558.86 43,921,921.82
11 Balok tipe 5-G3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
7.57 531.00 129.66 316.21 49.47
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
8,693,334.00 6,637,443.65 1,620,757.10 3,952,619.14 6,564,669.00
12 Balok tipe 5-G4 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
1.77 280.71 51.40 114.94 11.59
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
2,037,108.06 3,508,847.03 642,549.16 1,436,725.42 1,538,298.21
13 Balok tipe 5-BA1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
17.37 1,075.09 256.69 821.96 147.36
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
19,955,148.35 13,438,652.39 3,208,588.60 10,274,472.01 19,554,645.46
14 Balok tipe 5-BA2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
4.85 374.46 69.62 233.38 41.16
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
5,573,799.00 4,680,746.67 870,209.17 2,917,218.75 5,461,932.00
15 Balok tipe 5-BA3 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 f. Begisting Untuk Balok
m³ kg kg kg m²
3.82 226.39 55.17 216.89 32.41
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
4,388,892.75 2,829,923.86 689,627.64 2,711,150.46 4,300,807.00
16 Balok tipe 5-BA4 a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D13
m³ kg kg
12.14 1,121.44 174.82
1,149,000.00 12,500.00 12,500.00
13,950,043.47 14,017,995.98 2,185,246.04
NO.
URAIAN d. f.
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
kg m²
566.69 103.01
(Rp.) 12,500.00 132,700.00
m³ kg m²
17.08 1,298.19 274.14
1,149,000.00 12,500.00 132,700.00
19,623,857.18 16,227,390.88 36,378,517.34
1,149,000.00 m3 91.38 12,500.00 kg 12,249.74 179,300.00 m2 702.92 41,529.27 kg 456.90 JUMLAH 2.5.PEKERJAAN STRUKTUR LANTAI - 4 (EL. +12.95)
104,994,809.38 153,121,772.65 126,033,134.65 18,974,577.86 1,345,501,429.31
Tul Sengkang D10 Begisting Untuk Balok
17 Beton janggutan (Detail - 1) a. Beton Ready Mix K-350 b. Tul D10 c Begisting Untuk Balok
(Rp.) 7,083,652.17 13,670,063.96
18 Pelat Lantai (EL. +17,95) a. b. c. d.
Pelat Lantai Tipe SA Beton Ready Mix K-350 Tul D10 Begisting Untuk Pelat lantai Waterproofing Integral
2.6. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95) 1 Kolom tipe K2-Atap b. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom 2
Kolom tipe K6-Atap a. Beton Ready Mix K-350 b. Tul Utama D22 c. Tul Sengkang D13 d. Begisting Untuk kolom
3
Balok tipe 5-G5 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D13 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m³ kg kg m²
5.30 703.48 373.53 35.24
1,149,000.00 12,500.00 12,500.00 145,600.00
6,093,803.57 8,793,445.52 4,669,112.02 5,130,840.00
m³ kg kg m²
7.97 1,406.95 632.13 41.49
1,149,000.00 12,500.00 12,500.00 145,600.00
9,154,247.14 17,586,891.03 7,901,574.19 6,040,320.00
1,149,000.00 m³ 24.44 12,500.00 kg 2,025.67 12,500.00 kg 430.57 12,500.00 kg 1,022.41 12,500.00 kg 238.14 132,700.00 m² 159.82 JUMLAH 2.6.PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
28,084,547.40 25,320,912.74 5,382,103.13 12,780,142.24 2,976,793.23 21,207,715.90 161,122,448.11
2.7. PEKERJAAN STRUKTUR ATAP a.
Pekerjaan Pedestal 1 Kolom pedestal a. Beton Ready Mix K-350 b. Tul Utama D22 d. Tul Sengkang D13 e. Tul Kekang D13 f. Begisting untuk kolom
m³ kg kg kg m²
3.40 401.14 148.51 249.49 13.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
3,906,600.00 5,014,240.00 1,856,359.38 3,118,683.75 1,980,160.00
kg kg bh
1,200.26 210.00 24.00
18,071.46 18,071.46 85,395.69
21,690,404.83 3,794,920.89 2,049,496.54
1 Truss tipe F1 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh M m²
7.48 135.36 121.43 38.16 10.00 2.59 78.99 19.29 48.00 24.00 110.53 89.62
473,991.02 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
3,543,082.87 18,555,494.44 10,358,256.63 689,552.12 853,956.89 46,847.02 1,427,519.62 348,568.75 755,077.67 377,538.84 3,574,699.13 2,010,549.54
2 Truss tipe F2 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
14.95 270.72 242.85 76.31 20.00 5.18 157.99 38.58 96.00 48.00 221.07 358.48
473,991.02 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
7,086,165.74 37,110,988.88 20,716,513.26 1,379,104.25 1,707,913.78 93,694.04 2,855,039.24 697,137.51 1,510,155.34 755,077.67 7,149,398.26 8,042,198.15
3 Truss tipe F3 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm
m¹ m¹
14.66 255.28
473,991.02 137,082.55
6,946,812.38 34,994,434.26
2 3 4 b.
Baseplate PL 22 mm Pelat stiffener PL 12 mmBaseplate PL 22 mm Angkur baut M24
Pekerjaan Truss
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
Pipa hitam ø 3", t : 4,00 mm Base plate PL 16 mm Angkur baut M20 Pelat stiffener PL 10 mm Pelat penyambung pipa ø 4", PL 8 mm Pelat penyambung pipa ø 3", PL 6 mm Mur baut M16 Mur baut M12 Pengelasan Cat zinchromate
m¹ kg bh kg kg kg bh bh m m²
219.56 76.31 20.00 5.18 157.99 38.58 96.00 48.00 210.38 333.87
(Rp.) 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
4 Truss tipe F4 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
14.95 240.50 198.47 76.31 20.00 5.18 157.99 38.58 96.00 48.00 207.33 311.97
473,991.02 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
7,084,269.78 32,968,902.45 16,930,641.90 1,379,104.25 1,707,913.78 93,694.04 2,855,039.24 697,137.51 1,510,155.34 755,077.67 6,704,891.42 6,998,671.67
5 Truss tipe F5 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
14.95 227.24 189.15 76.31 20.00 5.18 105.32 25.72 64.00 32.00 167.39 297.23
473,991.02 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
7,085,217.76 31,150,639.46 16,135,933.08 1,379,104.25 1,707,913.78 93,694.04 1,903,359.49 464,758.34 1,006,770.23 503,385.11 5,413,268.78 6,668,174.19
6 Truss tipe F6 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
198.31 159.91 105.32 25.72 64.00 32.00 142.49 231.84
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
27,184,567.02 13,641,591.52 1,903,359.49 464,758.34 1,006,770.23 503,385.11 4,608,220.85 5,201,012.88
7 Truss tipe F7 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
141.50 111.81 78.99 19.29 48.00 24.00 101.91 164.14
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
19,397,729.65 9,537,870.76 1,427,519.62 348,568.75 755,077.67 377,538.84 3,295,649.28 3,682,388.11
8 Truss tipe F8 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pengelasan • Cat zinchromate
m¹ m¹ m m²
85.89 67.51 32.07 99.43
137,082.55 85,305.80 85,305.80 22,434.04
11,774,294.69 5,758,823.87 2,735,859.34 2,230,688.43
9 Truss tipe F9 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pengelasan • Cat zinchromate
m¹ m¹ m m²
32.58 27.54 13.74 38.80
137,082.55 85,305.80 32,340.00 22,434.04
4,466,149.59 2,349,321.70 444,506.83 870,366.49
10 Truss tipe S1 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
22.91 17.73 52.66 12.86 32.00 16.00 39.94 26.37
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
3,140,287.14 1,512,813.04 951,679.75 232,379.17 503,385.11 251,692.56 1,291,622.64 591,544.77
11 Truss tipe S2 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm
m¹ m¹ kg kg
54.51 43.38 157.99 38.58
137,082.55 85,305.80 18,071.46 18,071.46
7,472,644.16 3,700,736.17 2,855,039.24 697,137.51
• • • • • • • • • •
(Rp.) 18,729,399.98 1,379,104.25 1,707,913.78 93,694.04 2,855,039.24 697,137.51 1,510,155.34 755,077.67 6,803,670.72 7,489,998.68
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
bh bh m m²
96.00 48.00 116.76 4.00
(Rp.) 15,730.78 15,730.78 32,340.00 22,434.04
12 Truss tipe S3 • Pipa hitam ø 14", t : 6,40 mm • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pengelasan • Cat zinchromate
m¹ m¹ m¹ m¹ m m²
53.12 2.73 43.35 35.88 21.27 87.31
690,400.00 527,300.00 137,082.55 85,305.80 32,340.00 22,434.04
36,674,048.00 1,439,529.00 5,942,528.69 3,060,516.15 688,027.03 1,958,642.27
13 Truss tipe S4 • Pipa hitam ø 14", t : 6,40 mm • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pengelasan • Cat zinchromate
m¹ m¹ m¹ m¹ m m²
54.20 2.73 55.78 47.63 25.53 96.26
690,400.00 527,300.00 137,082.55 85,305.80 32,340.00 22,434.04
37,419,680.00 1,439,529.00 7,645,916.50 4,062,859.28 825,562.58 2,159,510.67
14 Truss tipe S5 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
11.09 69.17 57.01 38.16 10.00 2.59 289.64 70.72 176.00 88.00 213.02 41.43
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
5,847,757.00 9,482,274.39 4,863,027.68 689,552.12 853,956.89 46,847.02 5,234,238.61 1,278,085.43 2,768,618.13 1,384,309.06 6,889,077.89 929,432.63
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
10.46 73.37 64.80 38.16 10.00 2.59 315.97 77.15 192.00 96.00 229.17 45.11
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
5,514,503.40 10,057,472.79 5,527,559.85 689,552.12 853,956.89 46,847.02 5,710,078.48 1,394,275.02 3,020,310.69 1,510,155.34 7,411,415.09 1,012,076.26
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
9.72 77.28 71.89 38.16 10.00 2.59 368.63 90.01 224.00 112.00 267.58 48.50
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
5,124,301.40 10,594,288.06 6,132,719.19 689,552.12 853,956.89 46,847.02 6,661,758.23 1,626,654.19 3,523,695.80 1,761,847.90 8,653,648.08 1,088,100.80
17 Truss tipe S8 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
8.78 80.13 77.07 38.16 10.00 2.59 394.97 96.44 240.00 120.00 286.79 50.97
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
4,629,694.00 10,984,973.34 6,574,432.61 689,552.12 853,956.89 46,847.02 7,137,598.10 1,742,843.77 3,775,388.36 1,887,694.18 9,274,764.58 1,143,524.88
18 Truss tipe S9 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
81.64 80.56 394.97 96.44 240.00 120.00 281.22 51.84
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
11,191,584.17 6,872,320.46 7,137,598.10 1,742,843.77 3,775,388.36 1,887,694.18 9,094,494.02 1,162,904.37
• • • •
Mur baut M16 Mur baut M12 Pengelasan Cat zinchromate
15 Truss tipe S6 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 • Pelat penyambung pipa ø 3", PL 6 • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate 16 Truss tipe S7 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 • Pelat penyambung pipa ø 3", PL 6 • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
mm mm
mm mm
(Rp.) 1,510,155.34 755,077.67 3,776,088.62 89,736.17
NO.
URAIAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
19 Truss tipe S10 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg m m²
7.40 80.13 78.54 38.16 10.00 2.59 44.52 51.38
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 32,340.00 22,434.04
3,899,910.80 10,984,425.01 6,699,490.91 689,552.12 853,956.89 46,847.02 1,439,706.58 1,152,681.64
20 Truss tipe S11 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
78.50 75.73 394.97 96.44 240.00 120.00 276.63 49.36
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
10,761,528.78 6,460,464.07 7,137,598.10 1,742,843.77 3,775,388.36 1,887,694.18 8,946,325.08 1,107,359.59
21 Truss tipe S12 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
6.00 77.29 72.32 38.16 10.00 2.59 394.97 96.44 240.00 120.00 283.73 48.62
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
3,161,690.80 10,594,562.23 6,168,888.85 689,552.12 853,956.89 46,847.02 7,137,598.10 1,742,843.77 3,775,388.36 1,887,694.18 9,175,985.28 1,090,774.59
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
5.07 69.10 60.92 38.16 10.00 2.59 368.63 90.01 224.00 112.00 261.47 42.50
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
2,674,465.60 9,471,856.12 5,197,085.18 689,552.12 853,956.89 46,847.02 6,661,758.23 1,626,654.19 3,523,695.80 1,761,847.90 8,456,089.49 953,365.92
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
4.33 63.79 54.24 38.16 10.00 2.59 315.97 77.15 192.00 96.00 226.12 38.72
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
2,285,318.20 8,744,221.92 4,626,730.61 689,552.12 853,956.89 46,847.02 5,710,078.48 1,394,275.02 3,020,310.69 1,510,155.34 7,312,635.79 868,680.70
24 Truss tipe S15 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ m¹ kg bh kg kg kg bh bh m m²
3.74 55.32 44.95 38.16 10.00 2.59 263.31 64.29 160.00 80.00 190.76 33.09
527,300.00 137,082.55 85,305.80 18,071.46 85,395.69 18,071.46 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
1,972,102.00 7,583,406.86 3,834,580.96 689,552.12 853,956.89 46,847.02 4,758,398.73 1,161,895.85 2,516,925.57 1,258,462.79 6,169,182.10 742,232.20
25 Truss tipe S16 • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Pelat penyambung pipa ø 4", PL 8 mm • Pelat penyambung pipa ø 3", PL 6 mm • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
m¹ m¹ kg kg bh bh m m²
44.49 35.14 210.65 51.44 128.00 64.00 92.66 25.80
137,082.55 85,305.80 18,071.46 18,071.46 15,730.78 15,730.78 32,340.00 22,434.04
6,099,076.97 2,997,901.69 3,806,718.99 929,516.68 2,013,540.46 1,006,770.23 2,996,535.70 578,837.59
22 Truss tipe S13 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 • Pelat penyambung pipa ø 3", PL 6 • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate 23 Truss tipe S14 • Pipa hitam ø 10", t : 6,40 mm • Pipa hitam ø 4", t : 4,50 mm • Pipa hitam ø 3", t : 4,00 mm • Base plate PL 16 mm • Angkur baut M20 • Pelat stiffener PL 10 mm • Pelat penyambung pipa ø 4", PL 8 • Pelat penyambung pipa ø 3", PL 6 • Mur baut M16 • Mur baut M12 • Pengelasan • Cat zinchromate
c.
SATUAN
Pekerjaan Gording
mm mm
mm mm
NO.
URAIAN 1 2 3 4 5
Gording CNP. 125.50.20.2,3 Pelat dudukan gording PL 8 mm Mur baut M12 Pengelasan Cat zinchromate
SATUAN kg kg bh m² m²
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
18,071.46 6,640.18 18,071.46 505.74 17,500.00 1,156.00 32,340.00 208.08 22,434.04 681.89 JUMLAH 2.7.PEKERJAAN STRUKTUR ATAP
119,997,749.45 9,139,434.47 20,230,000.00 6,729,307.20 15,297,497.60 1,306,510,706.91
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG F1 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN NON STANDAR
I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI
JUMLAH HARGA
Rp
2,407,710,545.33
JUMLAH PEKERJAAN NON STANDAR Rp
2,407,710,545.33
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO DID PENINGKATAN INVESTASI GEDUNG F1 TAHUN ANGGARAN 2021 NO.
URAIAN
1.
2.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6.
PEKERJAAN NON STANDAR I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1
Pondasi Bored Pile Tipe P2 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D22 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B.
-
Pile cap Beton Ready Mix K-350 Besi Tul. D19 Besi Tul. D16 Begisting Batako Lantai Kerja t=5cm Pasir Urug t=10cm
m¹ m3 m3 kg kg ttk m3 kg kg m2 m3 m3
1,361.60 385.14 385.14 46,301.04 39,098.66 92.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
361,063,760.20 7,956,956.98 425,924,430.17 578,762,988.57 488,733,265.83 14,472,322.04
198.72 1,149,000.00 17,456.41 12,500.00 1,808.20 12,500.00 463.68 117,200.00 557,440.00 8.28 163,100.00 16.56 JUMLAH 1.1.PEKERJAAN PONDASI
228,329,280.00 218,205,146.39 22,602,560.00 54,343,296.00 4,615,603.16 2,700,936.00 2,407,710,545.33
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RAMP TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
-
PEKERJAAN STANDAR
Rp
62,270,160.91
-
PEKERJAAN NON STANDAR
Rp
868,369,940.18
JUMLAH = (PEK STANDAR + NON STANDAR) Rp
930,640,101.09
Rekapitulasi Gedung Utama
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II. PEKERJAAN STRUKTUR 2.1. PEKERJAAN TANAH 2.2. PEKERJAAN STRUKTUR DI PILECAP (EL. -0.65) 2.3. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0,05) 2.4. PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95) 2.5. PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95) 2.6. PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95) 2.7. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
JUMLAH HARGA
Rp Rp
6,586,714.07 6,586,714.07
Rp Rp Rp Rp Rp Rp Rp II. PEKERJAAN STRUKTUR Rp
8,579,792.84 47,103,654.00 55,683,446.84
Rekapitulasi Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RAMP TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
I.
II.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 1 2
Pengukuran dan pemasangan bowplank Biaya PDA TEST
m¹ ttk
81.05 81,267.29 2.00 20,000,000.00 JUMLAH I.PEKERJAAN PERSIAPAN
Tidak Dikerjakan
6,586,714.07
m3 m3
95.99 68,726.25 95.99 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
6,596,730.34 1,983,062.50 8,579,792.84
m3 kg kg kg m2
7.90 1,146.26 57.58 411.52 52.66
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
9,075,261.60 14,328,221.72 719,716.10 5,144,052.40 6,987,451.20
m3 2.16 1,149,000.00 kg 327.72 12,500.00 kg 22.63 12,500.00 kg 136.23 12,500.00 m2 17.25 132,700.00 JUMLAH 2.2.PEKERJAAN STRUKTUR DI PILECAP (EL. -0.65)
2,477,531.25 4,096,491.67 282,933.06 1,702,920.00 2,289,075.00 47,103,654.00
6,586,714.07
PEKERJAAN STRUKTUR 2.1.
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah Untuk Pondasi 2 Pembuangan tanah keluar site
2.2. PEKERJAAN STRUKTUR DI PILECAP (EL. -0.65) 1 TieBeam TB1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok 2
TieBeam TB2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
2.3. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0,05) 1 Kolom KR1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
25.06 4,698.01 858.86 446.61 167.04
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2
Kolom KR2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
12.53 1,758.08 429.43 429.43 83.52
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3
Balok B1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
26.23 3,460.76 191.22 1,366.71 503.53 218.60
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
4
Balok B2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
7.13 879.86 74.79 450.16 168.81 71.25
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5
Balok BA a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
3.24 418.86 46.79 207.31 39.60
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
6
Pelat Lantai Tipe S1 a. Beton Ready Mix K-350 b. Tul D10 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm e. Waterproofing Integral
m3 kg m3 m3 kg
6.13 504.34 2.04 4.09 30.65
1,149,000.00 12,500.00 557,440.00 163,100.00 46,200.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
7
Pelat Lantai Tipe SR a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
m3 26.29 1,149,000.00 kg 2,495.77 12,500.00 m2 222.48 179,300.00 JUMLAH 2.3.PEKERJAAN STRUKTUR LANTAI 1 (EL. -0,05)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2.4. PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95) 1 Kolom KR1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom 2
Kolom KR2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
-
m3 kg kg kg m2
17.28 3,666.74 592.32 308.01 115.20
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m3 kg kg kg m2
8.64 1,372.16 296.16 296.16 57.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Standar Gedung Utama - page 45 of 78
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
3
Balok B1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
21.91 2,890.82 159.73 1,141.63 420.60 182.60
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
4
Balok B2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
4.88 602.01 51.17 308.01 115.50 48.75
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5
Balok BA a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.16 279.24 31.20 138.21 26.40
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
6
Pelat Lantai Tipe SR a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
m3 26.29 1,149,000.00 kg 2,495.77 12,500.00 m2 222.48 179,300.00 JUMLAH 2.4.PEKERJAAN STRUKTUR LANTAI 2 (EL. +4.95)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2.5. PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95) 1 Kolom KR1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
-
m3 kg kg kg m2
17.28 3,666.74 592.32 308.01 115.20
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2
Kolom KR2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
8.64 1,372.16 296.16 296.16 57.60
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3
Balok B1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
21.91 2,890.82 159.73 1,141.63 420.60 182.60
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
4
Balok B2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
4.88 602.01 51.17 308.01 115.50 48.75
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5
Balok BA a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.16 279.24 31.20 138.21 26.40
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m3 26.29 1,149,000.00 kg 2,495.77 12,500.00 m2 222.48 179,300.00 JUMLAH 2.5.PEKERJAAN STRUKTUR LANTAI 3 (EL. +8.95)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
6
Pelat Lantai Tipe SR a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai
2.6. PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95) 1 Kolom KR1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom 2
3
4
-
m3 kg kg kg m2
15.00 2,148.48 621.94 325.78 120.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Kolom KR2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
7.50 804.00 310.97 162.89 60.00
1,149,000.00 12,500.00 12,500.00 12,500.00 145,600.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Balok B1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
5.06 667.79 36.90 263.72 97.16 42.18
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Balok B2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10
m3 kg kg kg kg
0.75 92.62 7.87 47.39 17.77
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Standar Gedung Utama - page 46 of 78
NO.
URAIAN f.
Begisting Untuk Balok
2.7. PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95) 1 Balok B1 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok 2
3
4
SATUAN
VOLUME
HARGA SATUAN
(Rp.) m2 7.50 132,700.00 JUMLAH 2.6.PEKERJAAN STRUKTUR LANTAI 4 (EL. +12.95)
JUMLAH HARGA (Rp.)
Tidak Dikerjakan -
m3 kg kg kg kg m2
16.79 2,214.48 122.36 874.54 322.20 139.88
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Balok B2 a. Beton Ready Mix K-350 b. Tul Utama D19 c. Tul Mountase D10 d. Tul Sengkang D10 e. Tul Kekang D10 f. Begisting Untuk Balok
m3 kg kg kg kg m2
5.63 694.62 59.05 355.39 133.27 56.25
1,149,000.00 12,500.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Balok BA a. Beton Ready Mix K-350 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Begisting Untuk Balok
m3 kg kg kg m2
2.16 279.24 31.20 138.21 26.40
1,149,000.00 12,500.00 12,500.00 12,500.00 132,700.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m3 24.27 1,149,000.00 kg 2,495.77 12,500.00 m2 222.48 179,300.00 ltr 121.35 46,200.00 JUMLAH 2.7.PEKERJAAN STRUKTUR LANTAI DAK (EL. +17.95)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pelat Lantai Tipe S2 a. Beton Ready Mix K-350 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
-
Pek. Standar Gedung Utama - page 47 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RAMP TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN NON STANDAR
I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI
Rp JUMLAH I.PEKERJAAN STRUKTUR Rp
JUMLAH HARGA
868,369,940.18 868,369,940.18
Rekapitulasi Non Standar Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RAMP TAHUN ANGGARAN 2021
NO.
URAIAN
1.
I.
2. PEKERJAAN NON STANDAR PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1 Pondasi Bored Pile Tipe P2 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm 2
3
Pondasi Bored Pile Tipe P3 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm Pondasi Bored Pile Tipe P4 A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap - Beton Ready Mix K-350 - Besi Tul. D19 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm
SATUAN 3.
VOLUME 4.
HARGA SATUAN (Rp.) 5.
JUMLAH HARGA (Rp.) 6 = (4. X 5.)
m¹ m3 m3 kg kg ttk
256.00 67.62 67.62 5,291.98 2,754.09 16.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
67,885,078.30 1,397,067.21 74,782,992.86 66,149,760.00 34,426,132.00 2,516,925.57
m3 kg kg m2 m3 m3
34.56 2,902.35 318.12 80.64 5.47 2.88
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
39,709,440.00 36,279,360.00 3,976,560.00 9,451,008.00 3,050,311.65 469,728.00
m¹ m3 m3 kg kg ttk
192.00 50.72 50.72 3,968.99 2,065.57 12.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
50,913,808.72 1,047,800.41 56,087,244.64 49,612,320.00 25,819,599.00 1,887,694.18
m3 kg kg m2 m3 m3
32.91 2,781.99 218.10 55.29 4.42 3.31
1,149,000.00 12,500.00 12,500.00 117,200.00 557,440.00 163,100.00
37,817,726.40 34,774,833.60 2,726,310.60 6,479,566.08 2,463,728.70 539,991.48
m¹ m3 m3 kg kg ttk
192.00 50.72 50.72 3,968.99 2,065.57 12.00
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
50,913,808.72 1,047,800.41 56,087,244.64 49,612,320.00 25,819,599.00 1,887,694.18
28.51 1,149,000.00 2,240.78 12,500.00 221.55 12,500.00 56.16 117,200.00 4.00 557,440.00 2.38 163,100.00 JUMLAH 1.1.PEKERJAAN PONDASI
32,760,288.00 28,009,800.00 2,769,390.00 6,581,952.00 2,227,530.22 387,525.60 868,369,940.18
m3 kg kg m2 m3 m3
Pek. Non Standar Gedung Utama - page 49 of 78
RINCIAN RENCANA ANGGARAN BIAYA REKAPITULASI RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO GEDUNG RAWAT INAP & VIP / C1 KOTA PROBOLINGGO
URAIAN
NO. A. PEKERJAAN STANDAR I. PEKERJAAN PERSIAPAN II.
PEKERJAAN STRUKTUR 2.1. Lantai Satu 2.2. Lantai Dua 2.3. Lantai Tiga 2.4. Lantai Empat 2.5. Lantai Dak Beton 2.6. Lantai Dak Atap
JUMLAH
Rp I.PEKERJAAN PERSIAPAN Rp
12,076,319.69 12,076,319.69
Rp Rp Rp Rp Rp Rp II.PEKERJAAN STRUKTUR Rp
957,426,676.47 1,754,943,260.25 1,714,794,000.92 1,688,790,097.91 1,400,857,133.00 360,501,316.02 7,877,312,484.57
SUB TOTAL PEKERJAAN STANDAR Rp
7,889,388,804.26
RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO GEDUNG RAWAT INAP & VIP / C1 KOTA PROBOLINGGO NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
A. PEKERJAAN STANDAR I. PEKERJAAN PERSIAPAN 1 Pas. Bauwplank bangunan 2 Biaya Loading Test (1 Axial + 1 Lateral)
m¹ ls
II. PEKERJAAN STRUKTUR 2.1. Lantai Satu a. Pekerjaan Tanah 1 Galian Tanah Poer Pondasi Type P-1 2 Galian Tanah Poer Pondasi Type P-2 3 Galian Tanah Poer Pondasi Type P-3 4 Galian Tanah Poer Pondasi Type P-4 5 Galian Tanah Sloof SL-1 (Manual) 6 Galian Tanah Sloof SL-2 (Manual) 7 Galian Tanah Sloof SL-3 (Manual) 8 Urugan Tanah Kembali 9 Buangan Tanah Bekas Galian
m³ m³ m³ m³ m³ m³ m³ m³ m³
3.40 4.32 16.58 201.60 38.40 49.10 13.10 108.83 217.67
56,100.00 56,100.00 56,100.00 56,100.00 56,100.00 56,100.00 56,100.00 18,700.00 20,660.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
77.04 15,566.52 1,566.69 4,296.41 220.11
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
31.92 5,745.02 351.62 3,030.45 116.07
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
11.55 2,771.78 318.88 1,871.67 57.75
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg m² m³ liter
151.52 21,952.26 1,165.51 58.28 303.04
1,105,900.00 12,500.00 8,500.00 557,440.00 41,529.27
167,565,968.00 274,403,250.00 9,906,835.00 32,485,094.44 12,585,030.57
m³ kg kg m²
8.28 1,629.01 602.19 50.95
1,105,900.00 12,500.00 12,500.00 145,600.00
9,156,852.00 20,362,625.00 7,527,375.00 7,418,880.00
m³ kg kg m²
57.97 11,403.04 4,215.31 356.74
1,105,900.00 12,500.00 12,500.00 145,600.00
64,109,023.00 142,538,000.00 52,691,375.00 51,941,120.00
m³ kg kg
5.28 1,241.08 425.15
1,105,900.00 12,500.00 12,500.00
5,839,152.00 15,513,500.00 5,314,375.00
b.
c.
Pekerjaan Struktur Beton Sloof 1 Pas. Sloof Beton Type SL-1 400/700 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting Batako 2 Pas. Sloof Beton Type SL-2 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting Batako 3 Pas. Sloof Beton Type SL-3 200/400 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting Batako 4 Pas. Lantai Beton t=13 cm -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting Plastik cor -Lantai Kerja -Waterproofing integral Pekerjaan Struktur Beton Kolom 1 Pas. Kolom Beton Type K-1 650/650 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting 2 Pas. Kolom Beton Type K-2 650/650 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting 3 Pas. Kolom Beton Type K-3 300/550 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) Page 51 of 78 STD C1
148.60 81,267.29 1.00 140,000,000.00 JUMLAH I.PEKERJAAN PERSIAPAN
12,076,319.69 Sudah Dikerjakan 12,076,319.69
NO.
URAIAN PEKERJAAN 4
d.
-Bekisting Pas. Kolom Beton Type K-4 350/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting
Pekerjaan Struktur Beton Tangga Pas. Tangga Beton 2 UNIT -Balok Tangga Type BT 250/450 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting -Plat Tangga t =15 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting -Trap Tangga -Cor Beton Ready Mix K-300 -Besi dia 8 (BJTD 24) -Bekisting
2.2. Lantai Dua a. Pekerjaan Struktur Beton Balok dan Plat Lantai 1 Pas. Balok Beton Type B2-1 400/750 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting 2 Pas. Balok Beton Type B2-2 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 3 Pas. Balok Beton Type B2-3 300/400 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 4 Pas. Balok Beton Type B2-4 200/400 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 5 Pas. Plat Lantai Bangunan -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting b.
m²
54.40
HARGA SATUAN (Rp) 145,600.00
m³ kg kg m²
6.17 1,221.75 439.43 55.82
1,105,900.00 12,500.00 12,500.00 145,600.00
6,823,403.00 15,271,875.00 5,492,875.00 8,127,946.67
m³ kg kg kg m²
0.52 122.92 10.56 70.16 10.63
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
575,068.00 1,536,500.00 132,000.00 877,000.00 1,410,748.44
m³ kg m²
3.66 775.40 24.36
1,105,900.00 12,500.00 171,200.00
4,047,594.00 9,692,500.00 4,170,432.00
m³ kg m²
1.70 508.95 23.40
1,105,900.00 12,000.00 171,200.00
1,876,159.35 6,107,400.00 4,006,080.00
JUMLAH 2.1.Lantai Satu
957,426,676.47
SATUAN
Pekerjaan Struktur Beton Kolom 1 Pas. Kolom Beton Type K-1 650/650 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting 2 Pas. Kolom Beton Type K-2 650/650 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Page 52 of 78 STD C1
VOLUME
JUMLAH HARGA (Rp) 7,920,640.00
m³ kg kg kg m²
84.89 15,695.53 1,615.91 8,861.74 537.64
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
93,879,851.00 196,194,125.00 20,198,875.00 110,771,750.00 71,344,385.67
m³ kg kg kg m²
32.47 5,398.59 344.91 2,854.96 275.50
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
35,908,573.00 67,482,375.00 4,311,375.00 35,687,000.00 36,559,252.12
m³ kg kg kg m²
0.58 156.09 10.07 64.86 5.32
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
641,422.00 1,951,125.00 125,875.00 810,750.00 705,521.67
m³ kg kg kg m²
10.94 2,320.60 283.91 1,593.22 136.75
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
12,098,546.00 29,007,500.00 3,548,875.00 19,915,250.00 18,146,725.00
m³ kg m²
139.87 20,649.07 1,096.32
1,105,900.00 12,500.00 179,300.00
154,682,233.00 258,113,375.00 196,570,176.00
m³ kg kg m²
6.76 1,414.98 491.58 41.60
1,105,900.00 12,500.00 12,500.00 145,600.00
7,475,884.00 17,687,250.00 6,144,750.00 6,056,960.00
m³ kg kg m²
47.32 9,904.83 3,441.07 291.20
1,105,900.00 12,500.00 12,500.00 145,600.00
52,331,188.00 123,810,375.00 43,013,375.00 42,398,720.00
NO.
URAIAN PEKERJAAN 3
4
c.
SATUAN
Pas. Kolom Beton Type K-3 300/550 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K-4 350/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 10 (BJTD 39) -Bekisting
Pekerjaan Struktur Beton Tangga Pas. Tangga Beton 2 UNIT -Balok Tangga Type BT 250/450 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting -Plat Tangga t =15 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting -Trap Tangga -Cor Beton Ready Mix K-300 -Besi dia 8 (BJTD 24) -Bekisting
2.3. Lantai Tiga a. Pekerjaan Struktur Beton Balok dan Plat Lantai 1 Pas. Balok Beton Type B3-1 400/750 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting 2 Pas. Balok Beton Type B3-2 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 3 Pas. Balok Beton Type B3-3 300/400 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 4 Pas. Balok Beton Type B3-4 200/400 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 5 Pas. Plat Lantai Bangunan -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting b.
Pekerjaan Struktur Beton Kolom 1 Pas. Kolom Beton Type K-1 600/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting 2 Pas. Kolom Beton Type K-2 600/600 Page 53 of 78 STD C1
HARGA SATUAN (Rp)
VOLUME
JUMLAH HARGA (Rp)
m³ kg kg m²
3.30 884.36 265.72 34.00
1,105,900.00 12,500.00 12,500.00 145,600.00
3,649,470.00 11,054,500.00 3,321,500.00 4,950,400.00
m³ kg kg m²
5.04 1,061.23 358.72 45.60
1,105,900.00 12,500.00 12,500.00 145,600.00
5,573,736.00 13,265,375.00 4,484,000.00 6,639,360.00
m³ kg kg kg m²
0.52 122.92 10.56 70.16 10.63
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
575,068.00 1,536,500.00 132,000.00 877,000.00 1,410,748.44
m³ kg m²
3.66 775.40 24.36
1,105,900.00 12,500.00 171,200.00
4,047,594.00 9,692,500.00 4,170,432.00
m³ kg m²
1.70 508.95 23.40
1,105,900.00 12,000.00 171,200.00
1,876,159.35 6,107,400.00 4,006,080.00
JUMLAH 2.2.Lantai Dua
1,754,943,260.25
m³ kg kg kg m²
84.85 15,695.53 1,615.91 9,247.04 537.38
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
93,835,615.00 196,194,125.00 20,198,875.00 115,588,000.00 71,310,768.33
m³ kg kg kg m²
32.47 5,398.59 344.91 2,854.96 275.50
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
35,908,573.00 67,482,375.00 4,311,375.00 35,687,000.00 36,559,252.12
m³ kg kg kg m²
0.58 156.09 10.07 64.86 5.32
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
641,422.00 1,951,125.00 125,875.00 810,750.00 705,521.67
m³ kg kg kg m²
10.40 1,934.03 270.71 1,516.66 130.00
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
11,501,360.00 24,175,375.00 3,383,875.00 18,958,250.00 17,251,000.00
m³ kg m²
141.41 20,875.56 1,108.35
1,105,900.00 12,500.00 179,300.00
156,385,319.00 260,944,500.00 198,727,155.00
m³ kg kg m²
5.76 1,414.98 451.72 38.40
1,105,900.00 12,500.00 12,500.00 145,600.00
6,369,984.00 17,687,250.00 5,646,500.00 5,591,040.00
NO.
URAIAN PEKERJAAN
3
4
c.
-Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K-3 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K-4 350/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 10 (BJTD 39) -Bekisting
Pekerjaan Struktur Beton Tangga Pas. Tangga Beton 2 UNIT -Balok Tangga Type BT 250/450 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting -Plat Tangga t =15 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting -Trap Tangga -Cor Beton Ready Mix K-300 -Besi dia 8 (BJTD 24) -Bekisting
2.4. Lantai Empat a. Pekerjaan Struktur Beton Balok dan Plat Lantai 1 Pas. Balok Beton Type B4-1 400/750 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting 2 Pas. Balok Beton Type B4-2 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 3 Pas. Balok Beton Type B4-3 300/400 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 4 Pas. Balok Beton Type B4-4 200/400 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 5 Pas. Plat Lantai Bangunan -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting b.
m³ kg kg m²
40.32 7,923.86 3,162.06 268.80
HARGA SATUAN (Rp) 1,105,900.00 12,500.00 12,500.00 145,600.00
m³ kg kg m²
3.30 659.62 265.72 34.00
1,105,900.00 12,500.00 12,500.00 145,600.00
3,649,470.00 8,245,250.00 3,321,500.00 4,950,400.00
m³ kg kg m²
5.04 1,061.23 358.72 45.60
1,105,900.00 12,500.00 12,500.00 145,600.00
5,573,736.00 13,265,375.00 4,484,000.00 6,639,360.00
m³ kg kg kg m²
0.52 122.92 10.56 70.16 10.63
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
575,068.00 1,536,500.00 132,000.00 877,000.00 1,410,748.44
m³ kg m²
3.66 775.40 24.36
1,105,900.00 12,500.00 171,200.00
4,047,594.00 9,692,500.00 4,170,432.00
m³ kg m²
1.70 508.95 23.40
1,105,900.00 12,000.00 171,200.00
1,876,159.35 6,107,400.00 4,006,080.00
JUMLAH 2.3.Lantai Tiga
1,714,794,000.92
SATUAN
Pekerjaan Struktur Beton Kolom 1 Pas. Kolom Beton Type K-1 600/600 -Cor Beton Ready Mix K-300 Page 54 of 78 STD C1
VOLUME
JUMLAH HARGA (Rp) 44,589,888.00 99,048,250.00 39,525,750.00 39,137,280.00
m³ kg kg kg m²
84.85 15,695.53 1,615.91 9,247.04 537.38
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
93,835,615.00 196,194,125.00 20,198,875.00 115,588,000.00 71,310,768.33
m³ kg kg kg m²
32.47 5,398.59 344.91 2,854.96 275.50
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
35,908,573.00 67,482,375.00 4,311,375.00 35,687,000.00 36,559,252.12
m³ kg kg kg m²
0.58 156.09 10.07 64.86 5.32
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
641,422.00 1,951,125.00 125,875.00 810,750.00 705,521.67
m³ kg kg kg m²
10.40 1,934.03 270.71 1,516.66 130.00
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
11,501,360.00 24,175,375.00 3,383,875.00 18,958,250.00 17,251,000.00
m³ kg m²
141.41 20,875.56 1,108.35
1,105,900.00 12,500.00 179,300.00
156,385,319.00 260,944,500.00 198,727,155.00
m³
5.76
1,105,900.00
6,369,984.00
NO.
URAIAN PEKERJAAN
2
3
4
c.
kg kg m²
1,131.98 451.72 38.40
HARGA SATUAN (Rp) 12,500.00 12,500.00 145,600.00
m³ kg kg m²
40.32 7,923.86 3,162.06 268.80
1,105,900.00 12,500.00 12,500.00 145,600.00
44,589,888.00 99,048,250.00 39,525,750.00 39,137,280.00
m³ kg kg m²
3.30 659.62 265.72 34.00
1,105,900.00 12,500.00 12,500.00 145,600.00
3,649,470.00 8,245,250.00 3,321,500.00 4,950,400.00
m³ kg kg m²
5.04 791.54 358.72 45.60
1,105,900.00 12,500.00 12,500.00 145,600.00
5,573,736.00 9,894,250.00 4,484,000.00 6,639,360.00
m³ kg kg kg m²
0.26 61.46 5.28 35.08 2.66
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
287,534.00 768,250.00 66,000.00 438,500.00 352,687.11
m³ kg m²
1.83 387.70 12.18
1,105,900.00 12,500.00 171,200.00
2,023,797.00 4,846,250.00 2,085,216.00
m³ kg m²
0.85 127.24 11.70
1,105,900.00 12,000.00 171,200.00
938,079.68 1,526,850.00 2,003,040.00
JUMLAH 2.4.Lantai Empat
1,688,790,097.91
SATUAN
-Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K-2 600/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K3 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pas. Kolom Beton Type K4 350/600 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting
Pekerjaan Struktur Beton Tangga Pas. Tangga Beton -Balok Tangga Type BT 250/450 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting -Plat Tangga t =15 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting -Trap Tangga -Cor Beton Ready Mix K-300 -Besi dia 8 (BJTD 24) -Bekisting
2.5. Lantai Dak Beton a. Pekerjaan Struktur Beton Balok dan Plat Lantai 1 Pas. Balok Beton Type BD-1 400/750 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Besi dia 13 (BJTD 39) Sengkang -Bekisting 2 Pas. Balok Beton Type BD-2 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 3 Pas. Balok Beton Type BD-3 300/400 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 4 Pas. Balok Beton Type BD-4 200/400 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 5 Pas. Balok Beton Dudukan Rooftank 300/500 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 10 (BJTD 39) Page 55 of 78 STD C1
VOLUME
JUMLAH HARGA (Rp) 14,149,750.00 5,646,500.00 5,591,040.00
m³ kg kg kg m²
84.85 15,695.53 1,615.91 9,247.04 537.38
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
93,835,615.00 196,194,125.00 20,198,875.00 115,588,000.00 71,310,768.33
m³ kg kg kg m²
34.37 5,710.77 364.81 3,020.05 291.62
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
38,009,783.00 71,384,625.00 4,560,125.00 37,750,625.00 38,698,536.97
m³ kg kg kg m²
0.58 156.09 10.07 64.86 5.32
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
641,422.00 1,951,125.00 125,875.00 810,750.00 705,521.67
m³ kg kg kg m²
1.11 233.49 28.25 160.30 13.88
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
1,227,549.00 2,918,625.00 353,125.00 2,003,750.00 1,841,212.50
m³ kg kg
2.28 390.23 25.06
1,105,900.00 12,500.00 12,500.00
2,521,452.00 4,877,875.00 313,250.00
NO.
URAIAN PEKERJAAN
6
b.
-Besi dia 10 (BJTD 39) Sengkang -Bekisting -Baja Channal C 125.65.6 Pas. Plat Lantai Bangunan -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting
Pekerjaan Struktur Beton Kolom 1 Pas. Kolom Beton Type K-1 600/600 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting 2 Pas. Kolom Beton Type K3 300/550 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting
2.6. Lantai Dak Atap a. Pekerjaan Struktur Beton Balok dan Plat Lantai 1 Pas. Balok Beton Type BA-1 400/700 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 2 Pas. Balok Beton Type BA-2 300/400 -Cor Beton Ready Mix K-300 -Besi dia 19 (BJTD 39) -Besi dia 10 (BJTD 39) -Besi dia 10 (BJTD 39) Sengkang -Bekisting 3 Pas. Plat Lantai Bangunan -Cor Beton Ready Mix K-300 -Besi dia 10 (BJTD 39) -Bekisting b.
kg m² kg
191.62 19.76 341.00
HARGA SATUAN (Rp) 12,500.00 132,700.00 18,071.46
m³ kg m²
144.59 21,345.96 1,133.32
1,105,900.00 12,500.00 179,300.00
159,902,081.00 266,824,500.00 203,204,276.00
m³ kg kg m²
5.76 1,131.98 451.72 38.40
1,105,900.00 12,500.00 12,500.00 145,600.00
6,369,984.00 14,149,750.00 5,646,500.00 5,591,040.00
m³ kg kg m²
3.30 659.62 265.72 34.00
1,105,900.00 12,500.00 12,500.00 145,600.00
3,649,470.00 8,245,250.00 3,321,500.00 4,950,400.00
JUMLAH 2.5.Lantai Dak Beton
1,400,857,133.00
SATUAN
Pekerjaan Struktur Baja Crown 1 Pas. Kolom HB 250.250.9.14 2 Pas. Balok IWF 300.150.5,5.8 3 Base Plate t =15 mm ukuran 40 x 35 cm 4 Plat Stiffner dan Simpul t = 10 mm 5 Baut M19 6 Baut Angkur M19
Page 56 of 78 STD C1
VOLUME
JUMLAH HARGA (Rp) 2,395,250.00 2,622,152.00 6,162,369.53
m³ kg kg kg m²
6.72 1,046.37 134.52 730.73 43.20
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
7,431,648.00 13,079,625.00 1,681,500.00 9,134,125.00 5,732,640.00
m³ kg kg kg m²
1.83 468.27 29.85 194.57 16.78
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
2,023,797.00 5,853,375.00 373,125.00 2,432,125.00 2,226,042.50
m³ kg m²
8.17 1,205.43 64.00
1,105,900.00 12,500.00 179,300.00
9,035,203.00 15,067,875.00 11,475,200.00
kg kg kg kg bh bh
4,518.80 8,087.20 1,131.98 451.72 396.00 144.00
18,071.46 18,071.46 18,071.46 18,071.46 15,730.78 85,395.69
81,661,335.59 146,147,550.95 20,456,536.84 8,163,242.13 6,229,390.79 12,296,979.23
JUMLAH 2.6.Lantai Dak Atap
360,501,316.02
RINCIAN RENCANA ANGGARAN BIAYA REKAPITULASI RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO GEDUNG RAWAT INAP & VIP / C1 KOTA PROBOLINGGO
NO. B. II. PEKERJAAN STRUKTUR 1.1. Pekerjaan Fondasi 1.2. Pekerjaan Struktur LIFT
URAIAN
II.PEKERJAAN STRUKTUR SUB TOTAL PEKERJAAN NON STANDAR
AYA N BIAYA
C1
JUMLAH
Rp Rp
53,084,477.51
Rp
53,084,477.51
Rp
53,084,477.51
RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO GEDUNG RAWAT INAP & VIP / C1 KOTA PROBOLINGGO NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
B. PEKERJAAN NON STANDAR I. PEKERJAAN STRUKTUR 1.1. Pekerjaan Fondasi a. Pekerjaan Tanah 1 Pemboran Bored Pile Type P1 Ø 600 2 Pemboran Bored Pile Type P3 Ø 600 3 Pemboran Bored Pile Type P3 Ø 600 4 Pemboran Bored Pile Type P4 Ø 500 b.
Pekerjaan Pondasi 1 Pas. Pondasi Bored Pile P1 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 13 (BJTD 39) Spiral 2 Pas. Pondasi Bored Pile P2 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 13 (BJTD 39) Spiral 3 Pas. Pondasi Bored Pile P3 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 13 (BJTD 39) Spiral 4 Pas. Pondasi Bored Pile P3 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 13 (BJTD 39) Spiral 5 Pas. Lantai kerja Poer Beton P-1 6 Pas. Lantai kerja Poer Beton P-2 7 Pas. Lantai kerja Poer Beton P-3 8 Pas. Lantai kerja Poer Beton P-4 9 Pas. Lantai kerja Sloof S-1 10 Pas. Lantai kerja Sloof S-2 11 Pas. Lantai kerja Sloof S-3 12 Pas. Poer Beton P-1 -Cor Beton Ready Mix K-300 -Besi dia 16 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pasangan Bata 13 Pas. Poer Beton P-2 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pasangan Bata 13 Pas. Poer Beton P-3 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pasangan Bata 14 Pas. Poer Beton P-4 -Cor Beton Ready Mix K-300 -Besi dia 22 (BJTD 39) -Besi dia 19 (BJTD 39) -Besi dia 13 (BJTD 39) -Bekisting Pasangan Bata
m¹ m¹ m¹ m¹
103.60 59.20 177.60 1,657.60
265,176.09 265,176.09 265,176.09 249,265.52
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg
29.29 2,201.23 2,014.97
1,105,900.00 12,500.00 12,500.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg
16.74 1,257.84 1,151.41
1,105,900.00 12,500.00 12,500.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg
50.22 3,773.53 3,454.24
1,105,900.00 12,500.00 12,500.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg m³ m³ m³ m³ m³ m³ m³
468.68 35,219.62 32,239.55 5.67 7.20 20.72 252.00 2.60 2.50 1.60
1,105,900.00 12,500.00 12,500.00 557,440.00 557,440.00 557,440.00 557,440.00 557,440.00 557,440.00 557,440.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg m²
3.36 261.95 50.86 15.12
1,105,900.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
5.65 488.70 364.51 34.46 13.44
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
17.45 1,345.81 1,003.80 79.72 31.04
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
m³ kg kg kg m²
198.38 13,983.29 10,429.68 691.70 268.80
1,105,900.00 12,500.00 12,500.00 12,500.00 117,200.00
Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan Sudah Dikerjakan
JUMLAH 1.1.Pekerjaan Fondasi 1.2.
Pekerjaan Struktur LIFT Page 59 of 78 NSTD C1
-
NO.
URAIAN PEKERJAAN 1
2
SATUAN
Pas. Dinding Beton t=20 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting Multipleks 12 mm -Waterproofing integral - Waterstop Pas. Lantai Beton t=25 cm -Cor Beton Ready Mix K-300 -Besi dia 13 (BJTD 39) -Bekisting Plastik cor -Lantai Kerja -Waterproofing integral
Page 60 of 78 NSTD C1
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
m³ kg m² liter m²
7.94 1,428.53 39.68 15.88 12.80
1,105,900.00 12,500.00 117,200.00 41,529.27 189,318.00
8,780,846.00 17,856,625.00 4,650,496.00 659,484.84 2,423,270.40
m³ kg m² m³ liter
5.00 963.38 19.98 1.00 10.00
1,105,900.00 12,500.00 8,500.00 557,440.00 41,529.27
5,529,500.00 12,042,250.00 169,830.00 556,882.56 415,292.72
JUMLAH 1.2. Pekerjaan Struktur LIFT
53,084,477.51
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG POWER HOUSE G2 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
-
PEKERJAAN STANDAR
Rp
453,957,200.35
-
PEKERJAAN NON STANDAR
Rp
140,328,931.59
JUMLAH = (PEK STANDAR + NON STANDAR) Rp
594,286,131.93
Rekapitulasi Gedung Utama
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
JUMLAH HARGA
Rp Rp
5,688,710.48 5,688,710.48
II. PEKERJAAN STRUKTUR 2.1. PEKERJAAN TANAH Rp 2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) Rp 2.3. PEKERJAAN STRUKTUR LANTAI DAK (ELV. +3,95) Rp 2.4. PEKERJAAN STRUKTUR LANTAI ATAP-2 (ELV. +4,95) Rp II. PEKERJAAN STRUKTUR Rp
7,890,303.06 238,612,452.72 185,703,709.69 16,062,024.39 448,268,489.86
Rekapitulasi Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG POWER HOUSE G2 TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
I.
II.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 1
Pengukuran dan pemasangan bowplank
m¹
70.00 81,267.29 JUMLAH I.PEKERJAAN PERSIAPAN
5,688,710.48 5,688,710.48
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah Untuk Pondasi 2 Pembuangan tanah keluar site
m3 m3
88.27 68,726.25 88.27 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
6,066,603.54 1,823,699.52 7,890,303.06
2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 1 Fondasi Telapak Tipe PT a. Beton Ready Mix K-300 b. Tul Utama D16 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm e. Cerucuk Dolken Dia. 10cm
m3 kg m3 m3 btg
10.80 1,755.04 2.79 2.70 108.00
1,105,900.00 12,500.00 557,440.00 163,100.00 20,674.75
11,943,720.00 21,938,048.78 1,555,257.59 440,370.00 2,232,872.54
PEKERJAAN STRUKTUR 2.1.
2
Kolom K1 a. Beton Ready Mix K-300 b. Tul Utama D16 c. Tul Sengkang D10 d. Tul Kekang D10 e. Begisting Untuk kolom
m3 kg kg kg m2
16.16 1,647.43 935.50 393.89 143.64
1,105,900.00 12,500.00 12,500.00 12,500.00 145,600.00
17,870,791.05 20,592,900.00 11,693,692.50 4,923,660.00 20,913,984.00
3
Tie Beam TB-1 a. Beton Ready Mix K-300 b. Tul Utama D16 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Pasir Urug t=10cm
m3 kg kg kg m3 m3
16.91 2,545.34 175.80 1,068.15 1.69 3.38
1,105,900.00 12,500.00 12,500.00 12,500.00 557,440.00 163,100.00
18,696,621.88 31,816,811.11 2,197,496.92 13,351,880.00 942,421.99 551,481.88
4
Tie Beam TB-A a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Pasir Urug t=10cm
m3 kg kg kg m3 m3
1.98 143.50 28.32 152.03 0.22 0.44
1,105,900.00 12,500.00 12,500.00 12,500.00 557,440.00 163,100.00
2,189,682.00 1,793,803.00 354,055.17 1,900,360.00 122,636.80 71,764.00
5
Pelat Lantai Tipe SA a. Beton Ready Mix K-300 b. Tul D10 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm
m3 20.28 1,105,900.00 kg 1,768.86 12,500.00 m3 6.76 557,440.00 m3 13.52 163,100.00 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05)
22,432,628.55 22,110,781.15 3,769,130.53 2,205,601.30 238,612,452.72
2.3. PEKERJAAN STRUKTUR LANTAI DAK (ELV. +3,95) 1 Balok B1 a. Beton Ready Mix K-300 b. Tul Utama D16 c. Tul Sengkang D10 d. Tul Mountase D10 e. Begisting Untuk Balok
m3 kg kg kg m2
10.95 1,854.67 691.83 113.86 109.50
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
12,109,605.00 23,183,340.00 8,647,872.00 1,423,295.60 14,530,650.00
2
Balok BA a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Tul Mountase D10 e. Begisting Untuk Balok
m3 kg kg kg m2
6.84 495.74 525.19 97.85 83.60
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
7,564,356.00 6,196,774.00 6,564,880.00 1,223,099.67 11,093,720.00
3
Kolom K2 a. Beton Ready Mix K-300 b. Tul Utama D16 dan D16 c. Tul Sengkang D10 d. Begisting Untuk kolom
m3 kg kg m2
0.63 167.68 54.30 10.00
1,105,900.00 12,500.00 12,500.00 145,600.00
691,187.50 2,096,000.00 678,700.00 1,456,000.00
4
Pelat Lantai Tipe SB a. Beton Ready Mix K-300 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
m3 21.44 1,105,900.00 kg 2,204.42 12,500.00 m2 178.64 179,300.00 ltr 107.18 46,200.00 JUMLAH 2.3.PEKERJAAN STRUKTUR LANTAI DAK (ELV. +3,95)
23,706,957.12 27,555,220.00 32,030,152.00 4,951,900.80 185,703,709.69
2.4. PEKERJAAN STRUKTUR LANTAI ATAP-2 (ELV. +4,95) 1 Balok B2 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Begisting Untuk Balok 2
Pelat Lantai Tipe SB a. Beton Ready Mix K-300 b. Tul D10 c. Begisting Untuk Pelat lantai d. Waterproofing Integral
m3 kg kg m2
2.20 179.38 176.46 27.50
1,105,900.00 12,500.00 12,500.00 132,700.00
2,432,980.00 2,242,253.75 2,205,775.00 3,649,250.00
m3 1.51 1,105,900.00 kg 84.59 12,500.00 m2 13.71 179,300.00 ltr 7.54 46,200.00 JUMLAH 2.4.PEKERJAAN STRUKTUR LANTAI ATAP-2 (ELV. +4,95)
1,667,807.79 1,057,383.75 2,458,203.00 348,371.10 16,062,024.39
Pek. Standar Gedung Utama - page 63 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG POWER HOUSE G2 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN NON STANDAR
I.
PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI
Rp JUMLAH I.PEKERJAAN STRUKTUR Rp
JUMLAH HARGA
140,328,931.59 140,328,931.59
Rekapitulasi Non Standar Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG POWER HOUSE G2 TAHUN ANGGARAN 2021
NO. 1.
I.
URAIAN 2. PEKERJAAN NON STANDAR PEKERJAAN STRUKTUR 1.1. PEKERJAAN PONDASI 1 Pondasi Bored Pile Tipe PG A. Bored Pile - Pengeboran + Casing Bored Piled dia. 60cm - Buangan Lumpur Bekas Pengeboran - Beton Ready Mix K-300 - Besi Tul. D16 - Besi Tul. D10 - Pemotongan Kepala Bored Pile B. Pilecap / Pelat Dudukan Genset - Beton Ready Mix K-300 - Besi Tul. D16 - Begisting Batako - Lantai Kerja t=5cm - pasir Urug t=10cm
SATUAN 3.
m¹ m3 m3 kg kg ttk m3 kg m2 m3 m3
VOLUME 4.
HARGA SATUAN (Rp.) 5.
JUMLAH HARGA (Rp.) 6 = (4. X 5.)
265,176.09 20,660.00 1,105,900.00 12,500.00 12,500.00 157,307.85
15,910,565.23 350,434.92 18,758,275.80 15,780,000.00 8,722,837.50 1,573,078.48
1,105,900.00 34.27 12,500.00 2,776.02 28.32 117,200.00 4.27 557,440.00 5.71 163,100.00 JUMLAH 1.1.PEKERJAAN PONDASI
37,901,404.80 34,700,220.00 3,319,104.00 2,381,383.66 931,627.20 140,328,931.59
60.00 16.96 16.96 1,262.40 697.83 10.00
Pek. Non Standar Gedung Utama - page 65 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG G3 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
-
PEKERJAAN NON STANDAR
JUMLAH HARGA Rp
143,963,734.42 -
JUMLAH = (PEK STANDAR + NON STANDAR) Rp
143,963,734.42
Rekapitulasi Gedung Utama
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II. PEKERJAAN STRUKTUR 2.1. PEKERJAAN TANAH 2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 2.3. PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95)
JUMLAH HARGA
Rp Rp
3,738,295.46 3,738,295.46
Rp Rp Rp II. PEKERJAAN STRUKTUR Rp
3,620,143.13 96,885,306.28 39,719,989.55 140,225,438.96
Rekapitulasi Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG G3 TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
I.
II.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 1
Pengukuran dan pemasangan bowplank
m¹
46.00 81,267.29 JUMLAH I.PEKERJAAN PERSIAPAN
3,738,295.46 3,738,295.46
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah Untuk Pondasi 2 Pembuangan tanah keluar site
m3 m3
40.50 68,726.25 40.50 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
2,783,413.13 836,730.00 3,620,143.13
2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 1 Fondasi Telapak Tipe PT a. Beton Ready Mix K-300 b. Tul Utama D16 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm e. Cerucuk Dolken Dia. 10cm
m3 kg m3 m3 btg
8.10 1,316.28 2.09 2.03 81.00
1,105,900.00 12,500.00 557,440.00 163,100.00 20,674.75
8,957,790.00 16,453,536.59 1,166,443.19 330,277.50 1,674,654.41
PEKERJAAN STRUKTUR 2.1.
2
Fondasi Batu kali a. Batu Kali 1:4 b. Pasir Urug t=10cm c. Galian Tanah
m3 m3 m3
3.38 0.66 6.39
659,160.00 163,100.00 68,726.25
2,230,597.44 107,319.80 439,298.19
3
Kolom K1 a. Beton Ready Mix K-300 b. Tul Utama D16 c. Tul Sengkang D10 d. Begisting Untuk kolom
m3 kg kg m2
7.33 823.72 553.91 83.79
1,105,900.00 12,500.00 12,500.00 145,600.00
8,108,044.09 10,296,450.00 6,923,896.88 12,199,824.00
4
Sloof SL-1 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Pasir Urug t=10cm
m3 kg kg kg m3 m3
8.63 600.11 88.84 544.93 0.86 1.73
1,105,900.00 12,500.00 12,500.00 12,500.00 557,440.00 163,100.00
9,538,387.50 7,501,358.00 1,110,445.75 6,811,680.00 480,792.00 281,347.50
5
Sloof SL-2 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Lantai Kerja t=5cm e. Pasir Urug t=10cm
m3 0.66 1,105,900.00 kg 61.32 12,500.00 kg 55.68 12,500.00 m3 0.09 557,440.00 m3 0.19 163,100.00 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05)
727,682.20 766,443.10 695,976.00 52,399.36 30,662.80 96,885,306.28
2.3. PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95) 1 Balok RB1 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Tul Mountase D10 e. Begisting Untuk Balok 2
Balok RB2 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Begisting Untuk Balok
m3 kg kg kg m2
8.63 600.11 88.84 544.93 86.25
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
9,538,387.50 7,501,358.00 1,110,445.75 6,811,680.00 11,445,375.00
m3 0.66 1,105,900.00 kg 61.32 12,500.00 kg 55.68 12,500.00 m2 8.46 132,700.00 JUMLAH 2.3.PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95)
727,682.20 766,443.10 695,976.00 1,122,642.00 39,719,989.55
Pek. Standar Gedung Utama - page 68 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RUMAH POMPA TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN PEKERJAAN STANDAR
JUMLAH HARGA Rp
143,947,480.96
JUMLAH = (PEK STANDAR + NON STANDAR) Rp
143,947,480.96
Rekapitulasi Gedung Utama
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
-
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
II. PEKERJAAN STRUKTUR 2.1. PEKERJAAN TANAH 2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 2.3. PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95)
JUMLAH HARGA
Rp Rp
3,722,042.00 3,722,042.00
Rp Rp Rp II. PEKERJAAN STRUKTUR Rp
3,620,143.13 96,885,306.28 39,719,989.55 140,225,438.96
Rekapitulasi Gedung Utama
RINCIAN RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 GEDUNG RUMAH POMPA TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1.
I.
II.
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 1
Pengukuran dan pemasangan bowplank
m¹
45.80 81,267.29 JUMLAH I.PEKERJAAN PERSIAPAN
3,722,042.00 3,722,042.00
PEKERJAAN TANAH 1 Pekerjaan Galian Tanah Untuk Pondasi 2 Pembuangan tanah keluar site
m3 m3
40.50 68,726.25 40.50 20,660.00 JUMLAH 2.1.PEKERJAAN TANAH
2,783,413.13 836,730.00 3,620,143.13
2.2. PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05) 1 Fondasi Telapak Tipe PT a. Beton Ready Mix K-300 b. Tul Utama D16 c. Lantai Kerja t=5cm d. Pasir Urug t=10cm e. Cerucuk Dolken Dia. 10cm
m3 kg m3 m3 btg
8.10 1,316.28 2.09 2.03 81.00
1,105,900.00 12,500.00 557,440.00 163,100.00 20,674.75
8,957,790.00 16,453,536.59 1,166,443.19 330,277.50 1,674,654.41
PEKERJAAN STRUKTUR 2.1.
2
Fondasi Batu kali a. Batu Kali 1:4 b. Pasir Urug t=10cm c. Galian Tanah
m3 m3 m3
3.38 0.66 6.39
659,160.00 163,100.00 68,726.25
2,230,597.44 107,319.80 439,298.19
3
Kolom K1 a. Beton Ready Mix K-300 b. Tul Utama D16 c. Tul Sengkang D10 d. Begisting Untuk kolom
m3 kg kg m2
7.33 823.72 553.91 83.79
1,105,900.00 12,500.00 12,500.00 145,600.00
8,108,044.09 10,296,450.00 6,923,896.88 12,199,824.00
4
Sloof SL-1 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Mountase D10 d. Tul Sengkang D10 e. Lantai Kerja t=5cm f. Pasir Urug t=10cm
m3 kg kg kg m3 m3
8.63 600.11 88.84 544.93 0.86 1.73
1,105,900.00 12,500.00 12,500.00 12,500.00 557,440.00 163,100.00
9,538,387.50 7,501,358.00 1,110,445.75 6,811,680.00 480,792.00 281,347.50
5
Sloof SL-2 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Lantai Kerja t=5cm e. Pasir Urug t=10cm
m3 0.66 1,105,900.00 kg 61.32 12,500.00 kg 55.68 12,500.00 m3 0.09 557,440.00 m3 0.19 163,100.00 JUMLAH 2.2.PEKERJAAN STRUKTUR LANTAI 1 (EL. -0.05)
727,682.20 766,443.10 695,976.00 52,399.36 30,662.80 96,885,306.28
2.3. PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95) 1 Balok RB1 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Tul Mountase D10 e. Begisting Untuk Balok 2
Balok RB2 a. Beton Ready Mix K-300 b. Tul Utama D13 c. Tul Sengkang D10 d. Begisting Untuk Balok
m3 kg kg kg m2
8.63 600.11 88.84 544.93 86.25
1,105,900.00 12,500.00 12,500.00 12,500.00 132,700.00
9,538,387.50 7,501,358.00 1,110,445.75 6,811,680.00 11,445,375.00
m3 0.66 1,105,900.00 kg 61.32 12,500.00 kg 55.68 12,500.00 m2 8.46 132,700.00 JUMLAH 2.3.PEKERJAAN STRUKTUR RING BALOK (ELV. +3,95)
727,682.20 766,443.10 695,976.00 1,122,642.00 39,719,989.55
Pek. Standar Gedung Utama - page 71 of 78
HARGA BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021 HARGA SATUAN UPAH KERJA NOMOR 1 2 3 4 5 6 7 8
Pekerja Tukang Kayu Tukang Batu Tukang Besi Tukang Cat Tukang Gali Kepala Tukang Mandor
URAIAN
SATUAN Orang Orang Orang Orang Orang Orang Orang Orang
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
HARGA 70,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 85,000.00 90,000.00
HARGA SATUAN BAHAN BANGUNAN NOMOR 1 Semen Semen ( 50 Kg ) Semen
URAIAN
HARGA
SATUAN Sak kg
Rp. Rp.
58,428.63 1,168.57
M3 M3 M3
Rp. Rp. Rp.
112,362.75 134,835.30 134,835.30
M3 Buah M3
Rp. Rp. Rp.
224,725.50 2,516.93 170,791.38
4 Besi Besi beton polos U24 Besi beton ulir U39 Paku (rata-rata) Kawat Beton Besi baja konstruksi Angkur Bolt M 19 lengkap dengan Baut Baut Ø 16, 19, 22 mm Dynabolt kawat las minyak pelumas Canal C 150. 65. 20. 3,2 Trekstang Cat Zincromate kuas Black Steel Pipe ø 14", t : 6,4 mm Black Steel Pipe ø 10", t : 6,4 mm Black Steel Pipe ø 4", t : 4,5 mm Black Steel Pipe ø 3", t : 4,0 mm
Kg Kg Kg Kg Kg bh bh bh kg kg m bh kg bh m¹ m¹ m¹ m¹
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9,887.92 10,337.37 14,382.43 14,382.43 10,786.82 85,395.69 15,730.78 4,045.06 16,629.69 22,472.55 36,705.16 40,450.59 24,270.35 13,483.53 620,601.93 473,991.02 137,082.55 85,305.80
5 Kayu Balok kayu kelas II Papan Bekisting 2x20x400 ( Kayu Klas III ) Kaso 4x6x400 ( Kayu Klas III ) Dolken kayu dia. 10 cm/2-3meter
M3 M3 M3 btg
Rp. Rp. Rp. Rp.
4,911,151.02 3,299,869.21 3,299,869.21 20,674.75
Lembar Lembar Lembar
Rp. Rp. Rp.
115,059.45 160,004.55 58,428.63
7 Bobokan Tiang
bh
Rp.
157,307.85
8 Pemancangan Tiang Pancang
m¹
Rp.
61,125.34
2 Pasir Pasir urug Pasir pasang Pasir beton I 3 Batu Belah dan Split Split 1-2 Batako Batu Belah
6 Kayu Lapis + Asbes Multipleks t= 9mm Multipleks t= 12mm Triplek t= 4mm
Harga Satuan Bahan Dan Upah Struktur - 72
HARGA SATUAN BAHAN BANGUNAN NOMOR
(Hydrolic/ Jack Pile)
URAIAN
9 Pengeboran dia. 60 cm + casing sementara
HARGA
SATUAN m¹
Rp.
265,176.09
10 Pengadaan Tiang Pancang Spun Pile Dia. 60cm
m¹
Rp.
407,502.24
11 Water proofing Waterprofing Bithuthene Sheet 3000 Waterprofing Integral Air
M2 ltr ltr
Rp. Rp. Rp.
157,307.85 41,529.27 22.47
12 Tanah urug Tanah urug (untuk peninggian lantai)
M3
Rp.
59,926.20
13 Dump truck Dump truck 3-4 ton
Jam
Rp.
98,879.22
13 Wiremesh M-12
Lembar
Rp.
1,364,533.22
14 Bondex t= 1mm
m2
Rp.
193,263.93
15 Kawat Jaring t=1.5mm
m2
Rp.
112,362.75
16 Pelat Besi t=10mm
m2
Rp.
966,319.64
17 Pelat Besi t=13mm
m2
Rp.
1,101,154.94
18 Pelat Bordes t=4mm
m2
Rp.
471,923.54
Harga Satuan Bahan Dan Upah Struktur - 73
HARGA SATUAN TERPASANG PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021
NO.
HARGA SATUAN
URAIAN PEKERJAAN
TERPASANG
PEKERJAAN PERSIAPAN 1 2
1 m¹ 1 m²
Pengukuran dan pemasangan bowplank Pekerjaan Pembersihan Lahan
Rp Rp
81,267.29 11,787.50
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,100.00 68,726.25 81,518.25 163,100.00 18,700.00 40,487.50 81,691.97 557,440.00 746,300.00 20,660.00 659,160.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
12,000.00 12,500.00 18,071.46 117,200.00 132,700.00 179,300.00 145,600.00 157,200.00 171,200.00 1,105,900.00 1,149,000.00 14,800.00 32,340.00 80,650.00 22,434.04
PEKERJAAN TANAH DAN PONDASI 1 2 3 4 5 6 7 8 9 10 11
1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m3 1 m3
Mengali tanah biasa sedalam 1 meter Mengali tanah biasa sedalam 2 meter Mengali tanah biasa sedalam 3 meter Mengurug pasir urug Mengurug kembali galian Memadatkan tanah (per 20 cm) Mengurug tanah untuk peninggian lantai bangunan Memasang Lantai Kerja Beton K-100 Beton Tumbuk (2Pc : 3Ps : 5 Kr) Pembuangan tanah keluar site Pemasangan pondasi batu belah campuran 1SP: 4PP
PEKERJAAN STRUKTUR ATAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 kg 1 kg 1 kg 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m³ 1 m³ 1 kg 1M 1M 1 m²
Memasang besi beton U-24 Memasang besi beton U-39 Memasang besi kontruksi Memasang bekisting batako Memasang bekisting balok (Dua kali pakai) Memasang bekisting lantai (Dua kali pakai) Memasang bekisting kolom (Dua kali pakai) Memasang bekisting dinding (Dua kali pakai) Memasang bekisting tangga Beton Ready Mix K-300 Beton Ready Mix K-350 Memasang Wiremesh M-12 Pengerjaan pengelasan Pengerjaan Pemasangan Gording Pekerjaan pengecatan besi / baja dengan menie besi
Harga Satuan Terpasang Pekerjaan Struktur - page 74 of 78
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR PEKERJAAN PEMBANGUNAN RSUD KOTA PROPOLINGGO (DID PENINGKATAN INVESTASI 2021
Kebutuhan
NO.
PEKERJAAN PERSIAPAN 1 1 m¹ Pengukuran dan pemasangan bowplank PERMEN PU NOMOR 28/PRT/M/2016 Bahan: 1 Kayu balok 5/7 2 Paku biasa 3 Kayu papan 3/20 Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
2
1 m²
PEKERJAAN TANAH DAN PONDASI 1 1 m³ Mengali tanah biasa sedalam 1 meter PERMEN PU NOMOR 28/PRT/M/2016 Tenaga Kerja: 1 Pekerja 2 Mandor
3
4
5
6
7
1 m³
1 m³
1 m³
1 m³
1 m³
1 m³
Satuan
Indeks
Harga Satuan
Mengali tanah biasa sedalam 2 meter PERMEN PU NOMOR 28/PRT/M/2016 Tenaga Kerja: 1 Pekerja 2 Mandor
Mengali tanah biasa sedalam 3 meter PERMEN PU NOMOR 28/PRT/M/2016 Tenaga Kerja: 1 Pekerja 2 Mandor
Mengurug pasir urug PERMEN PU NOMOR 28/PRT/M/2016 1 Pasir urug Tenaga Kerja: 1 Pekerja 2 Mandor
Mengurug kembali galian PERMEN PU NOMOR 28/PRT/M/2016 Tenaga Kerja: 1 Pekerja 2 Mandor
Memadatkan tanah (per 20 cm) PERMEN PU NOMOR 28/PRT/M/2016 Tenaga Kerja: 1 Pekerja 2 Mandor
Mengurug tanah untuk peninggian lantai bangunan Bahan: 1 Dump truck 2 Tanah Urug Tenaga Kerja: 1 Pekerja 2 Mandor
Jumlah Harga Satuan Rp
81,267.29
3,299,869.21 14,382.43 3,299,869.21
Rp Rp Rp
39,598.43 287.65 23,099.08
0.1000 Rp 70,000.00 0.1000 Rp 80,000.00 0.0100 Rp 85,000.00 0.0050 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
m³ kg m³
0.0120 0.0200 0.0070
Rp Rp Rp
L.01 L.02 L.03 L.04
oh oh oh oh
Rp Rp Rp Rp Rp Rp Rp Rp
7,000.00 8,000.00 850.00 450.00 79,285.16 1,982.13 81,267.29 11,787.50
L.01 L.04
oh oh
Rp Rp Rp Rp Rp
7,000.00 4,500.00 11,500.00 287.50 11,787.50
Rp
56,100.00
Pekerjaan Pembersihan Lahan PERMEN PU NOMOR 28/PRT/M/2016 TENAGA KERJA 1 Pekerja 2 Mandor
2
Kode
0.1000 Rp 70,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
L.01 L.04
oh oh
0.7500 Rp 70,000.00 0.0250 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp
52,500.00 2,250.00 54,750.00 1,368.75 56,100.00 68,726.25
L.01 L.04
oh oh
Rp Rp Rp Rp Rp Rp
63,000.00 4,050.00 67,050.00 1,676.25 68,726.25 81,518.25
L.01 L.04
oh oh
Rp Rp Rp Rp Rp
73,500.00 6,030.00 79,530.00 1,988.25 81,518.25 163,100.00
112,362.75
Rp
134,835.30
0.3333 Rp 70,000.00 0.0111 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
0.9000 Rp 70,000.00 0.0450 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
1.0500 Rp 70,000.00 0.0670 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) m³
1.2000
Rp
L.01 L.04
oh oh
Rp Rp Rp Rp Rp Rp
23,333.33 1,000.00 159,168.63 3,979.22 163,147.85 18,700.00
L.01 L.04
oh oh
Rp Rp Rp Rp Rp Rp
17,500.00 750.00 18,250.00 456.25 18,700.00 40,487.50
L.01 L.04
oh oh
Rp Rp Rp Rp Rp Rp
35,000.00 4,500.00 39,500.00 987.50 40,487.50 81,691.97
98,879.22 59,926.20
Rp Rp
7,617.36 59,926.20
0.1539 Rp 70,000.00 0.0154 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5%
Rp Rp Rp Rp
10,771.07 1,384.85 79,699.49 1,992.49
0.2500 Rp 70,000.00 0.0083 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
0.5000 Rp 70,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
jam m³ L.01 L.04
oh oh
0.0770 1.0000
Rp Rp
Analisa Harga Satuan Pekerjaan Struktur page 75 of 78
Kebutuhan
NO.
Kode
Satuan
Indeks
Harga Satuan
Total = Jumlah+(Keuntungan+Over head 2,5%) 8
9
10
11
1 m³
1 m³
Memasang Lantai Kerja Beton K-100 Bahan: 1 Semen 2 Pasir beton 3 Batu Split 1/2 4 Air Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor
Beton Tumbuk (2Pc : 3Ps : 5 Kr) Bahan: 1 Split 2-3 (Mesin) 2 Semen (50 Kg) 3 Pasir beton Tenaga Kerja: 1 Tukang batu 2 Kepala tukang 3 Pekerja 4 Mandor
1 m3 Pembuangan tanah keluar site a. Tenaga Kerja: 1 Pekerja 2 Mandor b. Bahan: 1 Alat Bantu 2 Dump truck
1 m3
Pemasangan pondasi batu belah campuran 1SP: 4PP a. Tenaga Kerja: 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor b. Bahan: 1 Batu belah 2 Semen portland 3 Pasir pasang c. Peralatan :
PEKERJAAN STRUKTUR ATAS 1 1 kg Memasang besi beton U-24 Bahan: 1 Besi beton 2 Kawat beton Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
2
3
1 kg
1 kg
Memasang besi beton U-39 Bahan: 1 Besi beton 2 Kawat beton Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
Memasang besi kontruksi Bahan: 1 Pipa besi,IWF 2 Sewa Alat Tenaga Kerja: 1 Pekerja 2 Tukang besi 3 Kepala tukang 4 Mandor
kg m³ m³ ltr
150.000 0.638 0.761 200.000
Rp Rp Rp Rp
1,168.57 134,835.30 224,725.50 22.47
oh oh oh oh
1.2000 Rp 70,000.00 0.2000 Rp 80,000.00 0.0200 Rp 85,000.00 0.0600 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head Total = Jumlah+(Keuntungan+Over head) m³ sak m³
Rp Rp Rp Rp
175,285.89 86,005.66 170,957.84 4,494.51
Rp Rp Rp Rp Rp Rp Rp
84,000.00 16,000.00 1,700.00 5,400.00 543,843.90 13,596.10 557,440.00 746,300.00
Rp Rp Rp
224,725.50 252,411.68 72,811.06
0.7500 Rp 80,000.00 0.0750 Rp 85,000.00 1.5000 Rp 70,000.00 0.0750 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
60,000.00 6,375.00 105,000.00 6,750.00 728,073.24 18,201.83 746,275.07 20,660.00
70,000.00 90,000.00
Rp Rp
10,771.07 1,384.85
1.0000 Rp 380.87 0.0770 Rp 98,879.22 Jumlah harga persatuan pekerjaan Keuntungan+Over head Total = Jumlah+(Keuntungan+Over head)
Rp Rp Rp Rp Rp Rp
380.87 7,617.36 20,154.15 503.85 20,660.00 659,160.00
oh oh oh oh
L.01 L.04
oh oh
0.1539 0.0154
Rp Rp Rp
81,691.97 557,440.00
224,725.50 58,428.63 134,835.30
L.01 L.04 L.04 L.04
1.0000 4.3200 0.5400
Jumlah Harga Satuan Rp Rp
Rp Rp
ls jam
L.01 L.02 L.03 L.04
Rp Rp Rp Rp
oh oh oh oh
1.5000 0.7500 0.0750 0.0750
m3 zak m3
1.2000 Rp 3.2500 Rp 0.5200 Rp
70,000.00 80,000.00 85,000.00 90,000.00
Rp Rp Rp Rp
105,000.00 60,000.00 6,375.00 6,750.00
170,791.38 Rp 58,428.63 Rp 134,835.30 Rp
204,949.65 189,893.05 70,114.36
Jumlah harga persatuan pekerjaan Rp Keuntungan+Over head Rp Total = Jumlah+(Keuntungan+Over head) Rp
643,082.05 16,077.05 659,160.00
Rp
12,000.00
9,887.92 14,382.43
Rp Rp
103,823.18 2,157.36
0.0700 Rp 70,000.00 0.0700 Rp 80,000.00 0.0070 Rp 85,000.00 0.0040 Rp 90,000.00 Jumlah pekerjaan per sepuluh kg Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,900.00 5,600.00 595.00 360.00 117,435.54 11,743.55 293.59 12,000.00 12,500.00
10,337.37 14,382.43
Rp Rp
108,542.42 2,157.36
0.0700 Rp 70,000.00 0.0700 Rp 80,000.00 0.0070 Rp 85,000.00 0.0040 Rp 90,000.00 Jumlah pekerjaan per sepuluh kg Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,900.00 5,600.00 595.00 360.00 122,154.78 12,215.48 305.39 12,500.00 18,071.46
kg kg L.04 L.02 L.03 L.04
L.01 L.02 L.03 L.04
Rp Rp
oh oh oh oh
kg kg L.04 L.02 L.03 L.04
10.5000 0.1500
10.5000 0.1500
Rp Rp
oh oh oh oh
kg jam
1.0700 0.8000
Rp Rp
10,786.82 1,078.68
Rp Rp
11,541.90 862.95
oh oh oh oh
0.0400 0.0200 0.0060 0.0035
Rp Rp Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00
Rp Rp Rp Rp
2,800.00 1,600.00 510.85 315.00
Analisa Harga Satuan Pekerjaan Struktur page 76 of 78
Kebutuhan
NO.
Kode
Satuan
Indeks
Harga Satuan
Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%) 4
5
6
7
8
9
1 m²
1 m²
1 m²
1 m²
1 m²
1 m²
Memasang bekisting batako Bahan: 1 Batako 2 Semen (50 Kg) 3 Pasir pasang Tenaga Kerja: 1 Tukang batu 2 Kepala tukang 3 Pekerja 4 Mandor
Memasang bekisting balok (Dua kali pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II 5 Multipleks t = 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting lantai (Dua kali pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II 5 Multipleks t = 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting kolom (Dua kali pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II 5 Multipleks t = 9 mm 6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting dinding (Dua kali pakai) Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II 5 Multipleks t = 9 mm 6 Dolken kayu dia. 8-10/400 cm 7 Formite/penjaga jarak bekisting/spacer Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
Memasang bekisting tangga Bahan: 1 Kayu Kelas III 2 Paku 3 Minyak bekisiting 4 Balok Kayu Kelas II 5 Multipleks t = 9 mm
Jumlah Harga Satuan Rp Rp Rp Rp
17,630.70 440.77 18,071.46 117,200.00
2,516.93 58,428.63 134,835.30
Rp Rp Rp
58,728.26 19,033.71 5,393.41
0.1000 Rp 80,000.00 0.0100 Rp 85,000.00 0.3000 Rp 70,000.00 0.0150 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
8,000.00 850.00 21,000.00 1,350.00 114,355.39 2,858.88 117,214.27 132,700.00
3,299,869.21 14,382.43 10,000.00 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
65,997.38 5,752.97 1,000.00 44,200.36 20,135.40 20,674.75
0.4000 Rp 70,000.00 0.2000 Rp 80,000.00 0.0250 Rp 85,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 129,505.43 3,237.64 132,743.07 179,300.00
3,299,869.21 14,382.43 10,000.00 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
52,797.91 5,752.97 2,000.00 98,223.02 40,270.81 49,619.39
0.4000 Rp 70,000.00 0.2000 Rp 80,000.00 0.0250 Rp 85,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 174,957.05 4,373.93 179,330.98 145,600.00
3,299,869.21 14,382.43 10,000.00 4,911,151.02 115,059.45 20,674.75
Rp Rp Rp Rp Rp Rp
65,997.38 5,752.97 1,000.00 49,111.51 40,270.81 20,674.75
0.4000 Rp 70,000.00 0.2000 Rp 80,000.00 0.0250 Rp 85,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 142,028.71 3,550.72 145,579.43 157,200.00
3,299,869.21 14,382.43 10,000.00 4,911,151.02 115,059.45 20,674.75 12,000.00
Rp Rp Rp Rp Rp Rp Rp
49,498.04 5,752.97 2,000.00 49,111.51 20,135.40 31,012.12 48,000.00
0.4000 Rp 70,000.00 0.2000 Rp 80,000.00 0.0250 Rp 85,000.00 0.0500 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
28,000.00 16,000.00 2,125.00 4,500.00 153,380.02 3,834.50 157,214.52 171,200.00
Rp Rp Rp Rp Rp
39,598.43 5,752.97 1,500.00 73,667.27 40,270.81
buah sak m³ L.01 L.02 L.03 L.04
23.3333 0.3258 0.0400
Rp Rp Rp
oh oh oh oh
m³ kg ltr m³ m³ btg
0.0200 0.4000 0.1000 0.0090 0.1750 1.0000
Rp Rp Rp Rp Rp Rp
oh oh oh oh
m³ kg ltr m³ m³ btg
0.0160 0.4000 0.2000 0.0200 0.3500 2.4000
Rp Rp Rp Rp Rp Rp
oh oh oh oh
m³ kg ltr m³ m³ btg
0.0200 0.4000 0.1000 0.0100 0.3500 1.0000
Rp Rp Rp Rp Rp Rp
oh oh oh oh
m³ kg ltr m³ m³ btg bh
0.0150 0.4000 0.2000 0.0100 0.1750 1.5000 4.0000
Rp Rp Rp Rp Rp Rp Rp
oh oh oh oh
m³ kg ltr m³ m³
0.0120 0.4000 0.1500 0.0150 0.3500
Rp Rp Rp Rp Rp
3,299,869.21 14,382.43 10,000.00 4,911,151.02 115,059.45
Analisa Harga Satuan Pekerjaan Struktur page 77 of 78
Kebutuhan
NO.
6 Dolken kayu dia. 8-10/400 cm Tenaga Kerja: 1 Pekerja 2 Tukang kayu 3 Kepala tukang 4 Mandor
10
11
12
13
1 m³
1 m³
1 kg
1M
Beton Ready Mix K-300 Bahan: 1 Ready Mix K-300 2 Peralatan (pompa beton, vibrator,dll) Tenaga Kerja: 1 Tukang batu 2 Kepala tukang 3 Pekerja 4 Mandor
Beton Ready Mix K-350 Bahan: 1 Ready Mix K-350 2 Peralatan (pompa beton, vibrator,dll) Tenaga Kerja: 1 Tukang batu 2 Kepala tukang 3 Pekerja 4 Mandor
Memasang Wiremesh M-12 Bahan: 1 Wiremesh M-10 2 Kawat beton Tenaga Kerja: 1 Tukang besi 2 Kepala tukang 3 Pekerja 4 Mandor
Pengerjaan pengelasan a. Tenaga Kerja: Pekerja Tukang Las biasa Kepala Tukang Mandor
Kode
btg
1M
1 m²
Rp
Jumlah Harga Satuan 16,539.80
0.6600 Rp 70,000.00 0.3300 Rp 80,000.00 0.0330 Rp 85,000.00 0.0330 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
46,200.00 26,400.00 2,805.00 2,970.00 167,039.64 4,175.99 171,215.63 1,105,900.00
870,000.00 4,500,000.00
Rp Rp
913,500.00 64,350.00
0.2500 Rp 80,000.00 0.0250 Rp 85,000.00 1.0000 Rp 70,000.00 0.1000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
20,000.00 2,125.00 70,000.00 9,000.00 1,078,975.00 26,974.38 1,105,949.38 1,149,000.00
910,000.00 4,500,000.00
Rp Rp
955,500.00 64,350.00
0.2500 Rp 80,000.00 0.0250 Rp 85,000.00 1.0000 Rp 70,000.00 0.1000 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
20,000.00 2,125.00 70,000.00 9,000.00 1,120,975.00 28,024.38 1,148,999.38 14,800.00
9,816.79 14,382.43
Rp Rp
10,013.12 503.39
0.0250 Rp 80,000.00 0.0020 Rp 85,000.00 0.0250 Rp 70,000.00 0.0010 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp Rp
2,000.00 170.00 1,750.00 90.00 14,526.51 363.16 14,800.00 32,340.00
oh oh oh oh
m³ hari L.01 L.04 L.04 L.04
L.01 L.04 L.04 L.04
1.0500 0.0143
Rp Rp
oh oh oh oh
m³ hari
1.0500 0.0143
Rp Rp
oh oh oh oh
kg jam
1.0200 0.0350
Rp Rp
L.02 L.03 L.04 L.04
oh oh oh oh
L.01 L.03 L.03 L.04
oh oh oh oh
0.0400 0.0200 0.0020 0.0020
kg kg kg
0.4000 Rp 0.3000 Rp 0.0400 Rp
c. Peralatan : Sewa Alat
jam
Pengerjaan Pemasangan Gording a. Tenaga Kerja: Pekerja Tukang Las biasa Kepala Tukang Mandor
L.01 L.03 L.03 L.04
Pekerjaan pengecatan besi / baja dengan menie besi Bahan: 1 Meni besi / zinchromate 2 Kuas Tenaga Kerja: 1 Pekerja 2 Tukang Cat 3 Kepala tukang 4 Mandor
0.8000
Harga Satuan
Rp
b. Bahan: Canal C 150. 65. 20. 3,2 Siku 40.40.4 Baut
15
Indeks
20,674.75
b. Bahan: Kawat Las Listrik Solar Minyak Pelumas
14
Satuan
Rp Rp Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00
Rp Rp Rp Rp
2,800.00 1,600.00 170.00 180.00
16,629.69 Rp 7,500.00 Rp 22,472.55 Rp
6,651.87 2,250.00 898.90
jam
0.1700 Rp 100,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head)
oh oh oh oh
0.2100 0.0700 0.0061 0.0065
Rp Rp Rp Rp
70,000.00 80,000.00 85,000.00 90,000.00
m m bh
1.0500 Rp 36,705.16 0.3000 Rp 36,250.00 0.5000 Rp 15,730.78 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head)
Rp Rp Rp Rp Rp
17,000.00 31,550.78 788.77 32,340.00 80,650.00
Rp Rp Rp Rp
14,700.00 5,600.00 515.95 585.00
Rp Rp Rp Rp Rp Rp Rp
38,540.42 10,875.00 7,865.39 78,681.77 1,967.04 80,650.00 22,434.04
24,270.35 13,483.53
Rp Rp
2,427.04 134.84
0.0200 Rp 70,000.00 0.2000 Rp 80,000.00 0.0200 Rp 85,000.00 0.0025 Rp 90,000.00 Jumlah harga persatuan pekerjaan Keuntungan+Over head 2,5% Total = Jumlah+(Keuntungan+Over head 2,5%)
Rp Rp Rp Rp Rp Rp Rp
1,400.00 16,000.00 1,700.00 225.00 21,886.87 547.17 22,434.04
kg bh L.01 L.02 L.03 L.04
oh oh oh oh
0.1000 0.0100
Rp Rp
Analisa Harga Satuan Pekerjaan Struktur page 78 of 78
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN PEMBANGUNAN GEDUNG D1 (MEDIK SENTRAL)
Rp
12,769,532,686.47
II.
PEKERJAAN PEMBANGUNAN GEDUNG D2 (POLIKLINIK, DIAG, & KANTOR)
Rp
10,731,477,608.26
III.
PEKERJAAN PEMBANGUNAN GEDUNG F1 (HALL)
Rp
1,645,020,931.76
V.
PEKERJAAN PEMBANGUNAN GEDUNG C1 (RAWAT INAP)
Rp
12,941,250,500.53
XI.
PEKERJAAN PEMBANGUNAN GEDUNG G2 (POWER HOUSE)
Rp
227,392,223.78
XII.
PEKERJAAN PEMBANGUNAN GEDUNG G3 (SENTRAL GAS MEDIS)
Rp
185,551,422.93
XII.
PEKERJAAN PEMBANGUNAN GEDUNG G5 (R.POMPA)
Rp
209,432,560.73
Rp
38,709,657,934.47
JUMLAH TOTAL PEKERJAAN
TERBILANG : TIGA PULUH DELAPAN MILYAR TUJUH RATUS SEMBILAN JUTA ENAM RATUS LIMA PULUH TUJUH RIBU SEMBILAN RATUS TIGA PULUH EMPAT, 47 / 100 RUPIAH.
Rekapitulasi Gedung RS Probolinggo
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG D1 (MEDIK SENTRAL) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
5,659,390,973.90
II.
PEKERJAAN NON STANDAR
Rp
7,110,141,712.57
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
12,769,532,686.47
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD
III. PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 3.3. PEKERJAAN AIR PANAS 3.4. PEKERJAAN REVERSE OSMOSIS (RO) 3.5. PEKERJAAN AIR HUJAN IV.
Rp Rp Rp Rp Rp
295,368,595.31 623,837,567.18 362,743,159.34 316,989,124.05 89,291,221.57
Rp Rp Rp Rp Rp
341,540,290.16 153,940,120.55 3,066,227,812.36 409,453,083.38 5,659,390,973.90
JUMLAH PEKERJAAN STANDAR Rp
5,659,390,973.90
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 4.2. PEKERJAAN RAK KABEL 4.3. PEKERJAAN PANEL DAN KABEL FEEDER STD 4.4. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI JUMLAH -PEKERJAAN STANDARD
Rekapitulasi Standar Gedung D1 (Medik Sentral)
PEKERJAAN STANDARD
RAP
RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
VOLUME
1.
2.
3.
4.
III.
PEKERJAAN STANDARD PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 1. SISTEM AIR BERSIH a. Roof Tank (Lantai Atap) - Roof Tank + Dudukan kapasitas : 20 M3 Material : Fibre Type : Panell - Gate valve dia. 65 mm (Dari Pompa GWT ke Roof Tank) - Gate valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Gate valve dia. 65 mm (Dari Header ke Booster Pump) - Gate valve dia. 80 mm (Dari Roof tank ke Header) - Gate valve dia. 80 mm (Dari Roof tank ke Pipa Kuras) - Check valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Floating Valve dia. 65 mm (Dari GWT ke Roof Tank) - Header dimeter 100 mm - Water Level Control ( WLC ) - Pipa Kuras dia. 80 mm - Vent Out dia. 65 mm b. Pompa Tekan (lantai Atap) - Packaged Booster Pump (1 Unit Operasi / 1 Stand By) (LANTAI ATAP) kapasitas : 250 Lpm head : 18 meter Putaran : 1500 Rpm Type : Package Booster Pump - Gate valve dia. 65 mm - Strainer dia. 65 mm - Check valve dia. 65 mm - Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) c. Pemipaan Polypropelyne PN-10 - Pipa Distribusi Dari Lantai 1 ke Roof Tank, PPR dia. 80 mm - Pipa Distribusi Dari Roof Tank ke Shaft Gedung, PPR dia. 50 mm 2.
3.
4.
5.
6.
LANTAI SATU 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI DUA 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI TIGA 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm
3.
4.
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
unit
1.00
70,174,062.50
70,174,062.50
70,174,062.50
70,174,062.50
bh bh bh bh bh bh bh bh set m' bh
1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 1.00 30.00 2.00
3,759,305.94 3,759,305.94 3,759,305.94 4,705,483.44 4,705,483.44 3,868,227.00 1,313,101.88 3,232,914.63 2,671,520.03 154,041.27 267,601.88
3,759,305.94 7,518,611.89 7,518,611.89 9,410,966.89 4,705,483.44 7,736,454.00 1,313,101.88 6,465,829.25 2,671,520.03 4,621,238.13 535,203.75
3,759,305.94 3,759,305.94 3,759,305.94 4,705,483.44 4,705,483.44 3,868,227.00 1,313,101.88 3,232,914.63 2,671,520.03 154,041.27 267,601.88
3,759,305.94 7,518,611.89 7,518,611.89 9,410,966.89 4,705,483.44 7,736,454.00 1,313,101.88 6,465,829.25 2,671,520.03 4,621,238.13 535,203.75
unit
1.00
56,101,925.14
56,101,925.14
56,101,925.14
56,101,925.14
bh bh bh bh bh ttk
6.00 2.00 4.00 4.00 1.00 1.00
3,759,305.94 3,139,528.88 4,655,488.50 791,366.63 3,232,914.63 8,917,884.38
22,555,835.67 6,279,057.75 18,621,954.00 3,165,466.50 3,232,914.63 8,917,884.38
3,759,305.94 3,139,528.88 4,655,488.50 791,366.63 3,232,914.63 8,917,884.38
m' m'
50.00 130.00
154,041.27 64,473.33
7,702,063.54 8,381,533.52
154,041.27 64,473.33
22,555,835.67 6,279,057.75 18,621,954.00 3,165,466.50 3,232,914.63 8,917,884.38 7,702,063.54 8,381,533.52
m' m' m' m'
50.00 110.00 250.00 180.00
64,473.33 42,693.87 28,966.44 13,697.34
3,223,666.74 4,696,325.78 7,241,610.44 2,465,521.02
64,473.33 42,693.87 28,966.44 13,697.34
3,223,666.74 4,696,325.78 7,241,610.44 2,465,521.02
bh
1.00
3,224,009.94
3,224,009.94
3,224,009.94
3,224,009.94
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
LANTAI EMPAT 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
RISER DI SHAFT Pemipaan Polypropelyne PN.10 : - Pemipaan Polypropelyne PN-10, PPR Dia. 80 mm - Water Hamer ( WH ) - AAV
m' bh bh
40.00 4.00 1.00
154,041.27 1,337,340.80 1,617,422.67
6,161,650.83 5,349,363.18 1,617,422.67
154,041.27 1,337,340.80 1,617,422.67
6,161,650.83 5,349,363.18 1,617,422.67
JUMLAH 3.1.PEKERJAAN AIR BERSIH
295,368,595.31
3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 1. SISTEM PEGOLAHAN LIMBAH 1. Bak Netralisasi 4 m3 2. Bak Kontrol/Sewage 3. Sewage Pump Kap. 200 Lpm 4. Gate valve diameter 150 mm / 20 K 5. Gate valve diameter 100 mm / 20 K 6. Gate valve diameter 65 mm / 20 K 2.
HARGA SATUAN
LANTAI SATU a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm d. Pemipaan Air kotor Limbah Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm LANTAI DUA a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm LANTAI TIGA a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm
JUMLAH
295,368,595.31
unit unit unit bh bh bh
1.00 2.00 4.00 4.00 5.00 1.00
7,500,000.00 2,248,059.23 12,639,500.00 14,843,102.22 9,815,798.38 5,678,023.03
7,500,000.00 4,496,118.47 50,558,000.00 59,372,408.87 49,078,991.92 5,678,023.03
7,500,000.00 2,248,059.23 12,639,500.00 14,843,102.22 9,815,798.38 5,678,023.03
7,500,000.00 4,496,118.47 50,558,000.00 59,372,408.87 49,078,991.92 5,678,023.03
m' m' bh
170.00 330.00 67.00
214,300.29 100,092.70 325,155.63
36,431,050.11 33,030,591.69 21,785,426.88
214,300.29 100,092.70 325,155.63
36,431,050.11 33,030,591.69 21,785,426.88
m' m' m' m' m' bh
70.00 90.00 130.00 220.00 280.00 66.00
214,300.29 100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
15,001,020.64 9,008,343.19 6,468,165.98 8,226,850.73 10,470,537.29 11,903,355.75
214,300.29 100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
15,001,020.64 9,008,343.19 6,468,165.98 8,226,850.73 10,470,537.29 11,903,355.75
m' m' m'
130.00 220.00 280.00
49,755.12 37,394.78 37,394.78
6,468,165.98 8,226,850.73 10,470,537.29
49,755.12 37,394.78 37,394.78
6,468,165.98 8,226,850.73 10,470,537.29
m' m'
60.00 30.00
1,012,006.82 845,760.58
60,720,409.23 25,372,817.39
1,012,006.82 845,760.58
70,174,062.50 70,174,062.50
m' m' bh
110.00 360.00 58.00
214,300.29 100,092.70 325,155.63
23,573,032.43 36,033,372.75 18,859,026.25
214,300.29 100,092.70 325,155.63
23,573,032.43 36,033,372.75 18,859,026.25
m' m' m' m' bh
95.00 90.00 240.00 206.00 67.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 8,974,746.25 7,703,323.86 12,083,709.63
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 8,974,746.25 7,703,323.86 12,083,709.63
m' m' m'
90.00 240.00 206.00
49,755.12 37,394.78 37,394.78
4,477,961.06 8,974,746.25 7,703,323.86
49,755.12 37,394.78 37,394.78
4,477,961.06 8,974,746.25 7,703,323.86
m' m' bh
80.00 180.00 40.00
214,300.29 100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
214,300.29 100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m'
30.00 110.00 180.00
100,092.70 49,755.12 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
100,092.70 49,755.12 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Standar Gedung Gedung D1 (Medik Sentral) - page 3 of 280
NO.
URAIAN
c.
5.
6.
- Diameter 50 mm - FCO diameter 50 mm Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm
LANTAI EMPAT a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm d. Pemipaan Air kotor Limbah Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm RISER DI SHAFT a. Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm b. Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 : - Diameter 100 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 90 mm d. Pemipaan Air kotor Limbah PVC Kelas 10 kg/cm2 : - Diameter 90 mm
3.3. PEKERJAAN AIR PANAS 1. SISTEM AIR PANAS a. Heat Pump - Heat Pump Water Heater Kapasitas: 21 - 28.5 kW Type : Air to Water Power Input : 8.45 kW Refrigerant : R134 A Req. Hot Water Flow Rate : 8 m3/h Rate Water Temp. / Max. Water Output Temp. : 70 oC - Aksesoris - Gate Valve dia. 32 mm (Dari Heat Pump ke Pompa) - Check valve dia. 32 mm (Dari Heat Pump ke Pompa) b. Pompa Heat Pump - Pompa Sirkulasi Pompa ke Heat Pump ( P-HP 1. & P-HP.2 ) Kapasitas : 10 M3/h , Head. 22.8 - 40 Meter - Pompa Return Kapasitas : 3.1 M3/h , Head. 20.61 - 60 Meter - Accessories Flexible Joint dia.32 mm Gate valve dia. 32 mm Check valve dia. 32 mm Y-Strainer dia.32 mm Pipa Haeder 63/DN50 mm c. Panel Kontrol & instalasi Pengkabelan ke unit d. Hot Water Storage Tank Kapasitas : 2000 liter Type : Vertical Cylinder Working Pressure : 5 Bar Material : SS 400 / Isolasi : Polyurethane 50 mm kelengkapan : Safety valve, Preesure dauge, Air fan & Magnesium Anode - Accessories Gate valve dia. 50 mm Gate valve dia. 32 mm Pipa Haeder 100/DN50 mm (Dari Pressure Tank) e. Pipa Supply & Distribusi Polypropeline PN-20 - Pipa Supply Dari Roof Tank ke Heat Pump, PPR PN-10 dia. 32 mm - Pipa Supply Air Panas, PPR PN-20, dia. 50 mm (Ke Shaft Gedung) - Pipa Supply & Return Air Panas, PPR PN-20, dia. 32 mm - Pipa Supply & Return Air Panas, PPR PN-10 dia. 32 mm 2.
3.
4.
5.
6.
LANTAI SATU 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI DUA 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI TIGA 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI EMPAT 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm RISER DI SHAFT Pemipaan Polypropelyne PN.20 : - Pemipaan Polypropelyne PN-20, PPR Dia. 80 mm - Water Hamer ( WH )
3.4. PEKERJAAN REVERSE OSMOSIS (RO) 1 RO SYSTEM - High Pressure Pump - Membrane 4" x 40" - 1500 GPD - Housing FRP - Permeate & Concentrate Rotameter - System Pressure Gauge - Recyle Valve - Low Pressure Switch - Solenoid Valve 3/4" - TDS Monitor - Cartridge Filter - Piping & Interconnecting - Frame - Aksesoris 2 Stronge Tank (Stainless Steel) - Tangki Air Kapasitas 2000 Litter 3 Pompa Distribusi - Pompa Isap - Kapasitas : 10 Lpm - Head : 32m - Pompa Tekan - Kapasitas : 10 Lpm - Head : 32m 4 Catridge
SATUAN
VOLUME
HARGA SATUAN
210.00 45.00
(Rp.) 37,394.78 180,353.88
m' m' m'
110.00 180.00 210.00
m' bh
JUMLAH HARGA (Rp.)
HARGA SATUAN
JUMLAH HARGA
Tidak Dikerjakan Tidak Dikerjakan
(Rp.) 37,394.78 180,353.88
Tidak Dikerjakan Tidak Dikerjakan
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
40.00 24.00
100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan
100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' bh
40.00 90.00 110.00 190.00 31.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m'
90.00 110.00 190.00
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m'
60.00 30.00
1,012,006.82 845,760.58
Tidak Dikerjakan Tidak Dikerjakan
1,012,006.82 845,760.58
Tidak Dikerjakan Tidak Dikerjakan
m'
40.00
214,300.29
8,572,011.79
214,300.29
8,572,011.79
m'
40.00
100,092.70
4,003,708.08
100,092.70
4,003,708.08
m'
40.00
65,820.46
2,632,818.42
65,820.46
2,632,818.42
m'
40.00
649,783.84
25,991,353.64
649,783.84
25,991,353.64
JUMLAH 3.2.PEKERJAAN AIR KOTOR, AIR BEKAS & VENT
623,837,567.18
m' bh
JUMLAH
(Rp.)
678,092,465.56
unit
1.00
183,665,483.44
183,665,483.44
183,665,483.44
183,665,483.44
bh bh
1.00 1.00
497,501.97 589,554.38
497,501.97 589,554.38
497,501.97 589,554.38
497,501.97 589,554.38
unit
1.00
19,218,788.44
19,218,788.44
19,218,788.44
19,218,788.44
unit
1.00
8,136,488.44
8,136,488.44
8,136,488.44
8,136,488.44
bh bh bh bh bh unit unit
3.00 3.00 2.00 2.00 1.00 1.00 1.00
488,187.00 497,501.97 589,554.38 790,290.38 664,067.16 8,917,884.38 62,750,756.25
1,464,561.00 1,492,505.92 1,179,108.75 1,580,580.75 664,067.16 8,917,884.38 62,750,756.25
488,187.00 497,501.97 589,554.38 790,290.38 664,067.16 8,917,884.38 62,750,756.25
1,464,561.00 1,492,505.92 1,179,108.75 1,580,580.75 664,067.16 8,917,884.38 62,750,756.25
bh bh bh
1.00 4.00 1.00
3,224,009.94 497,501.97 1,152,175.17
3,224,009.94 1,990,007.89 1,152,175.17
3,224,009.94 497,501.97 1,152,175.17
3,224,009.94 1,990,007.89 1,152,175.17
m' m' m' m'
20.00 150.00 50.00 50.00
28,966.44 101,735.52 44,858.68 44,858.68
579,328.84 15,260,328.13 2,242,933.93 2,242,933.93
28,966.44 101,735.52 44,858.68 44,858.68
579,328.84 15,260,328.13 2,242,933.93 2,242,933.93
m' m' m' m'
50.00 110.00 250.00 180.00
101,735.52 69,044.43 44,858.68 20,007.79
5,086,776.04 7,594,886.98 11,214,669.63 3,601,401.56
101,735.52 69,044.43 44,858.68 20,007.79
5,086,776.04 7,594,886.98 11,214,669.63 3,601,401.56
bh
1.00
3,224,009.94
3,224,009.94
3,224,009.94
3,224,009.94
m' m' m'
150.00 270.00 180.00
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' m' m'
150.00 270.00 180.00
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' m' m'
150.00 270.00 180.00
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' 40.00 245,576.33 bh 4.00 1,337,340.80 JUMLAH 3.3.PEKERJAAN AIR PANAS
9,823,053.33 5,349,363.18 362,743,159.34
245,576.33 1,337,340.80 JUMLAH
9,823,053.33 5,349,363.18 362,743,159.34
unit unit unit unit unit unit unit unit unit unit unit lot lot
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00
13,078,487.50 18,096,887.50 13,078,487.50 7,328,237.50 745,482.50 1,163,682.50 2,937,137.50 1,891,637.50 32,942,987.50 14,437,637.50 7,326,290.00 2,098,790.00 4,396,942.50
13,078,487.50 18,096,887.50 13,078,487.50 7,328,237.50 745,482.50 1,163,682.50 2,937,137.50 1,891,637.50 32,942,987.50 43,312,912.50 7,326,290.00 2,098,790.00 4,396,942.50
13,078,487.50 18,096,887.50 13,078,487.50 7,328,237.50 745,482.50 1,163,682.50 2,937,137.50 1,891,637.50 32,942,987.50 14,437,637.50 7,326,290.00 2,098,790.00 4,396,942.50
13,078,487.50 18,096,887.50 13,078,487.50 7,328,237.50 745,482.50 1,163,682.50 2,937,137.50 1,891,637.50 32,942,987.50 43,312,912.50 7,326,290.00 2,098,790.00 4,396,942.50
unit
1.00
11,553,082.50
11,553,082.50
11,553,082.50
11,553,082.50
unit
1.00
8,821,150.00
8,821,150.00
8,821,150.00
8,821,150.00
unit
1.00
8,821,150.00
8,821,150.00
8,821,150.00
8,821,150.00
Pek. Standar Gedung Gedung D1 (Medik Sentral) - page 4 of 280
NO.
URAIAN - Housing Catridge 10", in/out 3/4" - Housing Catridge 10", in/out 4" 5 Mixed Bed - Granular Resin Mixed Bed 6 Filter - Carbon Filter - Sand Filter 7 Ultra Violet Sterilight 5 GPM, 30 Watt 8 Control Panel (Indoor) 9 Cabling 10 Installation 11 Pipa utama RO, menggunakan Pipa Stainless Steel 304 Sch.10 - Pipa Supply Dari Tangki RO, 304 SCH.10 (40 mm) - Pipa Supply Dari Tangki RO, 304 SCH.10 (32 mm) 12 Testing & Commisioning 3.5. PEKERJAAN AIR HUJAN 1. Roof Drain diameter 100 mm 2. Pemipaan Air hujan PVC Kelas 10 kg/cm2 : - Diameter 100 mm (di Shaft) 3. Bak Kontrol / Bak Sumpit 80x80 4. Sewage Pump Kap. 200 Lpm
IV.
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 1. Air Terminal - Radius 20 m 2. Kabel Coaxial 2 x 35 mm2 - Lantai Satu, Kabel Coaxial 2 x 35 mm2 - dari Lantai Atap ke Lantai Satu, Kabel Coaxial 2 x 35 mm2 - Lantai Atap, Kabel Coaxial 2 x 35 mm2 3. Obstuction Lamp & Instalasi 4. Connecting Sleeve lengkap surge Arester 5. Lightning Arrester 10KA 6. Lightning Flash Counter 7. Tiang Menara 8. Grounding sistem - Copper road - Pentanahan max.2 Ohm bahan GSP dia.50mm² + BC.70mm² - Bak kontrol ( 40x40) cm lengkap tutup - Testing/pengukuran pentanahan - Material bantu dan accessories - Proses pengesahan gambar ke DepNaker RI 9. Fitting-Fitting 4.2.
PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2.
3.
4.
5.
6.
4.3.
VOLUME
HARGA SATUAN (Rp.) 13,074,592.50 6,487,942.50
JUMLAH HARGA (Rp.) 13,074,592.50 6,487,942.50
HARGA SATUAN (Rp.) 13,074,592.50 6,487,942.50
JUMLAH HARGA (Rp.) 13,074,592.50 6,487,942.50
unit unit
1.00 1.00
lot
1.00
2,828,692.50
2,828,692.50
2,828,692.50
2,828,692.50
bh bh unit set lot lot
1.00 1.00 1.00 1.00 1.00 1.00
25,158,298.23 24,814,788.75 5,893,750.00 9,886,125.00 575,332.50 6,188,950.00
25,158,298.23 24,814,788.75 5,893,750.00 9,886,125.00 575,332.50 6,188,950.00
25,158,298.23 24,814,788.75 5,893,750.00 9,886,125.00 575,332.50 6,188,950.00
25,158,298.23 24,814,788.75 5,893,750.00 9,886,125.00 575,332.50 6,188,950.00
m' 40.00 138,334.00 m' 300.00 122,999.97 lot 1.00 2,053,957.53 JUMLAH 3.4.PEKERJAAN REVERSE OSMOSIS (RO)
5,533,360.00 36,899,989.55 2,053,957.53 316,989,124.05
138,334.00 122,999.97 2,053,957.53 JUMLAH
5,533,360.00 36,899,989.55 2,053,957.53 316,989,124.05
bh
19.00
129,645.42
2,463,262.92
129,645.42
2,463,262.92
m' unit unit
570.00 2.00 2.00
100,092.70 2,248,059.23 12,639,500.00
57,052,840.19 4,496,118.47 25,279,000.00
100,092.70 2,248,059.23 12,639,500.00
57,052,840.19 4,496,118.47 25,279,000.00
JUMLAH 3.5.PEKERJAAN AIR HUJAN
89,291,221.57
JUMLAH
89,291,221.57
bh
9.00
1,685,441.23
15,168,971.08
1,685,441.23
15,168,971.08
m' m' m' bh bh bh bh bh unit
200.00 100.00 240.00 4.00 9.00 9.00 4.00 9.00 4.00
376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
75,238,096.58 37,619,048.29 90,285,715.89 7,712,579.08 6,067,588.43 6,370,967.86 17,663,783.67 38,827,800.00 15,536,622.00
376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
75,238,096.58 37,619,048.29 90,285,715.89 7,712,579.08 6,067,588.43 6,370,967.86 17,663,783.67 38,827,800.00 15,536,622.00
lot 1.00 31,049,117.29 JUMLAH 4.1.PEKERJAAN PENANGKAL PETIR
31,049,117.29 341,540,290.16
31,049,117.29 JUMLAH
31,049,117.29 341,540,290.16
btg
45.00
1,032,478.94
46,461,552.12
1,032,478.94
46,461,552.12
btg
45.00
786,226.43
35,380,189.15
786,226.43
35,380,189.15
LANTAI DUA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
45.00
1,032,478.94
Tidak Dikerjakan
1,032,478.94
Tidak Dikerjakan
btg
45.00
786,226.43
Tidak Dikerjakan
786,226.43
Tidak Dikerjakan
LANTAI TIGA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
43.00
1,032,478.94
Tidak Dikerjakan
1,032,478.94
Tidak Dikerjakan
btg
43.00
786,226.43
Tidak Dikerjakan
786,226.43
Tidak Dikerjakan
LANTAI EMPAT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
45.00
1,032,478.94
Tidak Dikerjakan
1,032,478.94
Tidak Dikerjakan
btg
45.00
786,226.43
Tidak Dikerjakan
786,226.43
Tidak Dikerjakan
SHAFT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
15.00
1,032,478.94
15,487,184.04
1,032,478.94
15,487,184.04
btg
15.00
786,226.43
11,793,396.38
786,226.43
11,793,396.38
pcs
900.00
49,797.55
44,817,798.85
JUMLAH 4.2.PEKERJAAN RAK KABEL
153,940,120.55
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik - MDP - D1 (SMART PANEL) - SDP - D.D1 - LP - D.D1 - PP - D.D1 - PP - ALKES - SDP - AC.D1 - PP - AC.1 - PP - AC.OK.1 - SDP - KHS - SDP - UPS - PP - OK.1.1 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - MEDIK.1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - MEDIK.2 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - MEDIK.3 - 1 Phase, 10KVA, With fault lovator (72 MCB) Type Test Standar b. Unitruptable Power Supply (UPS) Incoming 3 Phase Outgoing 3 Phase - SDP - UPS ke PP - KRITIKAL Kapasitas 120 KVA, 15 Menit c. Kabel Feeder - Dari MDP - D1 ke SDP - D.D1, NYY 4 x 70 mm2 + Grounding - Dari SDP - D.D1 ke LP - D.D1, NYY 4 x 6 mm2 + Grounding - Dari SDP - D.D1 ke PP - D.D1 , NYY 4 x 50 mm2 + Grounding - Dari MDP - D1 ke SDP - AC.D1, NYY 4 x (4 x 300) mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC,1, NYY 4 x 10 mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC.OK.1, NYY 4 x 6 mm2 + Grounding - Dari MDP - D1 ke SDP - UPS, NYY 4 x 185 mm2 + Grounding - Dari SDP - UPS - UPS.1 120 KVA, NYY 4 x 150 mm2 + Grounding - Dari SDP - UPS ke UPS.2 120 KVA, NYY 4 x 150 mm2 + Grounding - Dari UPS.1 120 KVA ke SDP.KHS, NYY 4 x 150 mm2 + Grounding - Dari UPS.2 120 KVA ke SDP.KHS, NYY 4 x 150 mm2 + Grounding - Dari SDP.KHS ke PP - OK.1.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.1.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 3, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - MEDIK 3, NYY 3 x 35 mm2 + Grounding 2.
SATUAN
LANTAI DUA a. Panel Listrik - SDP - 2.D1 - LP - 2.D1 - PP - 2.D1 - PP - AC.2.D1 - PP - ENDOSCOPY - 1 Phase, 10KVA, With fault lovator (40 MCB) Type Test Standar - PP - BERSALIN 1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - BERSALIN 2 - 1 Phase, 10KVA, With fault lovator (40 MCB) Type Test Standar - PP - BAYI - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar b. Kabel Feeder - Dari MDP - D1 ke SDP - 2.D1, NYY 4 x 70 mm2 + Grounding - Dari SDP - 2.D1 ke LP - 2.D1, NYY 4 x 6 mm2 + Grounding
49,797.55 JUMLAH
44,817,798.85 153,940,120.55
unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
201,972,937.80 25,497,287.14 16,255,044.46 11,904,556.21 37,365,295.06 78,774,882.63 13,371,518.08 22,023,217.63 28,226,550.38 28,698,258.39 216,132,997.93
201,972,937.80 25,497,287.14 16,255,044.46 11,904,556.21 37,365,295.06 78,774,882.63 13,371,518.08 22,023,217.63 28,226,550.38 28,698,258.39 216,132,997.93
201,972,937.80 25,497,287.14 16,255,044.46 11,904,556.21 37,365,295.06 78,774,882.63 13,371,518.08 22,023,217.63 28,226,550.38 28,698,258.39 216,132,997.93
201,972,937.80 25,497,287.14 16,255,044.46 11,904,556.21 37,365,295.06 78,774,882.63 13,371,518.08 22,023,217.63 28,226,550.38 28,698,258.39 216,132,997.93
unit
1.00
296,407,754.72
296,407,754.72
296,407,754.72
296,407,754.72
unit
1.00
296,407,754.72
296,407,754.72
296,407,754.72
296,407,754.72
unit
1.00
288,576,071.13
288,576,071.13
288,576,071.13
288,576,071.13
unit
1.00
879,620,693.12
879,620,693.12
879,620,693.12
879,620,693.12
10.00 10.00 12.00 8.00 8.00 10.00 10.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
540,449.03 50,502.03 383,971.99 9,133,635.45 81,684.67 50,502.03 1,428,668.50 1,135,450.26 1,135,450.26 1,135,450.26 1,135,450.26 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07
5,404,490.27 505,020.35 4,607,663.87 73,069,083.58 653,477.33 505,020.35 14,286,684.99 5,677,251.32 5,677,251.32 5,677,251.32 5,677,251.32 2,459,150.71
5,404,490.27 505,020.35 4,607,663.87 73,069,083.58 653,477.33 505,020.35 14,286,684.99 5,677,251.32 5,677,251.32 5,677,251.32 5,677,251.32 2,459,150.71
Tidak Dikerjakan
540,449.03 50,502.03 383,971.99 9,133,635.45 81,684.67 50,502.03 1,428,668.50 1,135,450.26 1,135,450.26 1,135,450.26 1,135,450.26 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07
unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00
25,497,287.14 17,618,907.28 11,815,235.40 12,746,272.39 257,249,336.77
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
25,497,287.14 17,618,907.28 11,815,235.40 12,746,272.39 257,249,336.77
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
296,407,754.72
Tidak Dikerjakan
296,407,754.72
Tidak Dikerjakan
unit
1.00
257,249,336.77
Tidak Dikerjakan
257,249,336.77
Tidak Dikerjakan
unit
1.00
296,407,754.72
Tidak Dikerjakan
296,407,754.72
Tidak Dikerjakan
20.00 8.00
540,449.03 50,502.03
Tidak Dikerjakan Tidak Dikerjakan
540,449.03 50,502.03
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
m' m'
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
2,459,150.71
Tidak Dikerjakan
Pek. Standar Gedung Gedung D1 (Medik Sentral) - page 5 of 280
NO.
URAIAN 3.
4.
5.
4.4.
Dari SDP - 2.D1 ke PP - 2.D1, NYY 4 x 50 mm2 + Grounding Dari SDP - AC.D1 ke PP - AC.2.D1, NYY 4 x 10 mm2 + Grounding Dari SDP.KHS ke PP - ENDOSCOPY, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - ENDOSCOPY, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 1, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 1, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 2, NYY 3 x 10 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 2, NYY 3 x 10 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 3, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BERSALIN 3, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BAYI, NYY 3 x 35 mm2 + Grounding Dari SDP.KHS ke PP - BAYI, NYY 3 x 35 mm2 + Grounding
LANTAI TIGA a. Panel Listrik - SDP - 3.D1 - LP - 3.D1 - PP - 3.D1 - PP -AC.3 - PP - NICU.1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - NICU.2 - 1 Phase, 10KVA, With fault lovator (56 MCB) Type Test Standar - PP - ICU.1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - ICU.2 - 1 Phase, 10KVA, With fault lovator (24 MCB) Type Test Standar - PP - ICCU.1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - ICCU.2 - 1 Phase, 10KVA, With fault lovator (56 MCB) Type Test Standar b. Kabel Feeder - Dari MDP -D1 ke SDP - 3.D1, NYY 4 x 70 mm2 + Grounding - Dari SDP - 3.D1 ke LP - 3.D1, NYY 4 x 6 mm2 + Grounding - Dari SDP - 3.D1 ke PP - 3.D1, NYY 4 x 35 mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC.3, NYY 4 x 6 mm2 + Grounding - Dari SDP.KHS ke PP - NICU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - NICU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - NICU.2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - NICU.2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICU.2, NYY 3 x 10 mm2 + Grounding - Dari SDP.KHS ke PP - ICU.2, NYY 3 x 10 mm2 + Grounding - Dari SDP.KHS ke PP - ICCU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICCU.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICCU.2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - ICCU.2, NYY 3 x 35 mm2 + Grounding LANTAI EMPAT a. Panel Listrik - SDP - 4.D1 - LP - 4.D1 - PP - 4.D1 - PP - CSSD - PP - AC.4 - PP - AC.OK.4.D1 - PP - REC.1 - 1 Phase, 10KVA, With fault lovator (80 MCB) Type Test Standar - PP - REC.2 - 1 Phase, 10KVA, With fault lovator (40 MCB) Type Test Standar - PP - CATHLAB.1 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.1 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.2 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.3 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.4 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.5 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.6 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OK.4.7 - 1 Phase, 10KVA, With fault lovator (18 MCB) Type Test Standar - PP - OU.OK.4.1 -4.7 dan OU.CATHLAB.1 b. Kabel Feeder - Dari MDP -D1 ke SDP - 4.D1, NYY 4 x 70 mm2 + Grounding - Dari SDP - 4.D1 ke LP - 4.D1, NYY 4 x 6 mm2 + Grounding - Dari SDP - 4.D1 ke PP - 4.D1, NYY 4 x 35 mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC.4, NYY 4 x 6 mm2 + Grounding - Dari MDP - D1 ke PP - PP - CSSD, NYY 2 x (4 x 185) mm2 + Grounding - Dari SDP.KHS ke PP - REC.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - REC.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - REC.2, NYY 3 x 10 mm2 + Grounding - Dari SDP.KHS ke PP - REC.2, NYY 3 x 10 mm2 + Grounding - Dari SDP.KHS ke PP - CATHLAB.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - CATHLAB.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.1, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.2, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.3,NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.3,NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.4, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.4, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.5, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.5, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.6, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.6, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.7, NYY 3 x 35 mm2 + Grounding - Dari SDP.KHS ke PP - OK.4.7, NYY 3 x 35 mm2 + Grounding LANTAI ATAP a. Panel Listrik - PP - BP - PP - LF - PP - AC.OU - PP - AC.OU.OK.1 b. Kabel Feeder - Dari SDP - 4.D1 ke PP - BP.D1, NYY 4 x 16 mm2 + Grounding - Dari MDP-D1 ke PP - LF.D1, FRC 4 x 70 mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC.OU, NYY 3 x (4 x 185) mm2 + Grounding - Dari SDP - AC.D1 ke PP - AC.OU.OK, NYY 4 x 120 mm2 + Grounding
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W - Lampu LED Taman18 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak
SATUAN
VOLUME
HARGA SATUAN
10.00 20.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
(Rp.) 383,971.99 81,684.67 245,915.07 245,915.07 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07
unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00
unit unit
JUMLAH HARGA
JUMLAH HARGA
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
24,214,765.11 16,255,044.46 13,196,001.75 12,576,215.21 296,407,754.72
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
24,214,765.11 16,255,044.46 13,196,001.75 12,576,215.21 296,407,754.72
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1.00
272,912,703.95
Tidak Dikerjakan
272,912,703.95
Tidak Dikerjakan
1.00
296,407,754.72
Tidak Dikerjakan
296,407,754.72
Tidak Dikerjakan
unit
1.00
222,006,760.62
Tidak Dikerjakan
222,006,760.62
Tidak Dikerjakan
unit
1.00
296,407,754.72
Tidak Dikerjakan
296,407,754.72
Tidak Dikerjakan
unit
1.00
272,912,703.95
Tidak Dikerjakan
272,912,703.95
Tidak Dikerjakan
30.00 8.00 10.00 30.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
540,449.03 50,502.03 285,762.68 50,502.03 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
540,449.03 50,502.03 285,762.68 50,502.03 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00
25,706,861.15 15,573,113.05 12,173,104.64 44,478,565.42 12,129,611.15 21,632,554.83 296,407,754.72
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
25,706,861.15 15,573,113.05 12,173,104.64 44,478,565.42 12,129,611.15 21,632,554.83 296,407,754.72
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
257,249,336.77
Tidak Dikerjakan
257,249,336.77
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
1.00
216,132,997.93
Tidak Dikerjakan
216,132,997.93
Tidak Dikerjakan
unit
8.00
21,632,554.83
Tidak Dikerjakan
21,632,554.83
Tidak Dikerjakan
40.00 8.00 10.00 40.00 40.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
540,449.03 50,502.03 285,762.68 50,502.03 4,041,574.94 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
540,449.03 50,502.03 285,762.68 50,502.03 4,041,574.94 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07 245,915.07
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1.00 1.00 1.00 1.00
14,305,665.63 13,485,868.03 53,998,136.72 26,045,991.90
14,305,665.63 13,485,868.03 53,998,136.72 26,045,991.90
26,045,991.90
26,045,991.90
10.00 50.00 50.00 12.00
138,683.66 607,331.81 6,849,703.41 945,140.35
1,386,836.59 30,366,590.57 342,485,170.42 11,341,684.24
138,683.66 607,331.81 6,849,703.41 945,140.35
1,386,836.59 30,366,590.57 342,485,170.42 11,341,684.24
JUMLAH 4.3.PEKERJAAN PANEL DAN KABEL FEEDER STD
3,066,227,812.36
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
unit unit unit unit m' m' m' m'
(Rp.)
HARGA SATUAN (Rp.) 383,971.99 81,684.67 245,915.07 245,915.07 245,915.07 245,915.07 88,338.46 88,338.46 245,915.07 245,915.07 245,915.07 245,915.07
m' m' m' m' m' m' m' m' m' m' m' m'
JUMLAH
(Rp.)
2,984,438,141.99
bh bh bh bh bh bh bh bh bh
136.00 11.00 9.00 45.00 21.00 10.00 36.00 30.00 3.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62 2,172,259.06
128,440,257.21 10,388,550.22 5,590,095.82 14,755,658.57 5,386,049.96 2,564,785.69 7,609,250.59 5,551,608.45 6,516,777.17
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62 2,172,259.06
bh bh bh bh
2.00 4.00 10.00 10.00
324,144.32 739,912.73 629,450.98 700,875.94
648,288.63 2,959,650.94 6,294,509.83 7,008,759.38
324,144.32 739,912.73 629,450.98 700,875.94
128,440,257.21 10,388,550.22 5,590,095.82 14,755,658.57 5,386,049.96 2,564,785.69 7,609,250.59 5,551,608.45 6,516,777.17 648,288.63 2,959,650.94 6,294,509.83 7,008,759.38
bh bh bh
54.00 30.00 3.00
26,683.58 33,132.97 31,018.41
1,440,913.14 993,989.04 93,055.24
26,683.58 33,132.97 31,018.41
1,440,913.14 993,989.04 93,055.24
Pek. Standar Gedung Gedung D1 (Medik Sentral) - page 6 of 280
NO.
URAIAN
d.
2.
3.
4.
- Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
LANTAI DUA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI TIGA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 9 W + Tool Kit Emergency - Lampu LED Down Light 13 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
65.00 4.00 27.00 16.00
(Rp.) 104,731.79 104,731.79 104,731.79 302,654.09
(Rp.) 6,807,566.07 418,927.14 2,827,758.21 4,842,465.49
(Rp.) 104,731.79 104,731.79 104,731.79 302,654.09
(Rp.) 6,807,566.07 418,927.14 2,827,758.21 4,842,465.49
ttk ttk ttk ttk
301.00 26.00 87.00 112.00
159,922.37 531,697.00 159,922.37 159,922.37
48,136,634.37 13,824,122.00 13,913,246.48 17,911,305.81
159,922.37 531,697.00 159,922.37 159,922.37
48,136,634.37 13,824,122.00 13,913,246.48 17,911,305.81
bh bh bh bh bh bh bh bh
122.00 17.00 7.00 20.00 69.00 10.00 30.00 28.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
4.00 4.00 10.00 10.00
324,144.32 739,912.73 629,450.98 700,875.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 700,875.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh
53.00 38.00 3.00
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
61.00 5.00 14.00 21.00
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
ttk ttk ttk ttk
303.00 28.00 94.00 101.00
159,922.37 531,697.00 159,922.37 159,922.37
48,456,479.12 14,887,516.01 15,032,703.09 16,152,159.71
159,922.37 531,697.00 159,922.37 159,922.37
48,456,479.12 14,887,516.01 15,032,703.09 16,152,159.71
bh bh bh bh bh bh bh bh
114.00 31.00 27.00 1.00 29.00 35.00 6.00 28.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
4.00 4.00 10.00 10.00
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh
38.00 16.00 3.00
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
35.00 5.00 23.00 13.00
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
ttk ttk ttk ttk
271.00 28.00 57.00 76.00
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
v 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
v 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37 INSTALASI
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
LANTAI EMPAT a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W bh 119.00 - Lampu LED Panel 26 W bh 10.00 - Lampu LED Batten Tube 20 W bh 32.00 - Lampu LED Down Light 16 W bh 2.00 - Lampu LED Down Light 13 W bh 43.00 - Lampu LED Down Light 9 W bh 42.00 - Lampu LED Down Light 7 W bh 25.00 - Lampu LED Down Light 5 W bh 22.00 Lampu Emergency - Lampu LED Plat 12 W + Baterai bh 3.00 - Lampu LED Exit 5 W + Baterai bh 4.00 - Lampu LED Down Light 9 W + Tool Kit Emergency bh 10.00 - Lampu LED Down Light 13 W + Tool Kit Emergency bh 10.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 37.00 - Saklar Ganda bh 21.00 - Saklar Putar bh 3.00 c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A bh 43.00 - Stop Kontak 350 W / 16 A bh 3.00 - Stop Kontak 400 W / 16 A bh 15.00 - Stop Kontak 500 W / 16 A bh 20.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 295.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 27.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 61.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 81.00 JUMLAH 4.4.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN
409,453,083.38
409,453,083.38
Pek. Standar Gedung Gedung D1 (Medik Sentral) - page 7 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING 5.3. PEKERJAAN DUCTING TATA UDARA 5.4. PEKERJAAN INSTALASI GAS MEDIS 5.5. PEKERJAAN NURSE CALL 5.6. PEKERJAAN BED HEAD 5.7. PEKERJAAN PNEUMATIC TUBE 5.8. PEKERJAAN TRANSPORTASI DALAM GEDUNG
Rp Rp Rp Rp Rp Rp Rp Rp
379,666,802.63 2,070,547,504.16 1,236,071,524.68 458,231,321.60 626,315,356.49 180,603,455.71 -
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA Rp 6.2. PEKERJAAN FIRE ALARM Rp 6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) Rp 6.4. PEKERJAAN TELEPON Rp 6.5. PEKERJAAN IPTV Rp 6.6. PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) (D1, D2 & F1) Rp 6.7. PEKERJAAN MASTER CLOCK SYSTEM Rp JUMLAH -PEKERJAAN NON STANDAR Rp
187,388,709.81 320,001,377.27 1,046,263,034.57 88,280,762.77 27,020,082.89 489,751,779.98 7,110,141,712.57
JUMLAH PEKERJAAN NON STANDAR Rp
7,110,141,712.57
Rekapitulasi Non Standar Gedung D1 (Medik Sentral)
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA
RAP
RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN
SATUAN
VOLUME
1.
2.
3.
4.
V.
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm c. Instalasi Pemadam Kebakaran Ruang OK - FACP Full Adressable - Heat Detector (HD) - Head Springkler Supression (HS) - Kabel FRC 2 x 2,5 mm - Tabung Silinder kap. 150 kg (Fire Supression) - Gate Vale dia 32 mm K.20 - Pemipaan Fire Supression BSP Schedule 40 : BSP Sch.40 diameter 32 mm 2.
3.
4.
5.
LANTAI DUA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI TIGA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI EMPAT a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm c. Instalasi Pemadam Kebakaran Ruang OK - FACP Full Adressable - Heat Detector (HD) - Head Springkler Supression (HS) - Kabel FRC 2 x 2,5 mm - Tabung Silinder kap. 150 kg (Fire Supression) - Gate Vale dia 32 mm K.20 - Pemipaan Fire Supression BSP Schedule 40 : BSP Sch.40 diameter 32 mm RISER DI SHAFT a. Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - Diameter 100 mm ( Pipa Hydrant ) - Diameter 100 mm ( Pipa Sprinkler ) - Diameter 50 mm ( Pipa Test Flashing) - Diameter 50 mm ( Pipa Flashing) b. Gate Vale dia 100 mm K.20 c. Automatic Air valve ( AAV )
5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV SISTEM 1 - IU.D1.1.1.1 & 2 KORIDOR Kapasitas : 12 300 Btu/h - 4 Way Ceiling Cassette + Purifying Kit - IU.D1.1.1.3 & 4 KORIDOR Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette + Purifying Kit - IU.D1.1.1.5 R. ISTIRAHAT RADIOGRAPHER Kapasitas : 12 300 Btu/h - Wall Mounted
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
(Rp.) 5.
(Rp.) -
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 9.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 11,567,405.85 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 11,567,405.85 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
70.00
334,952.92
23,446,704.17
334,952.92
23,446,704.17
m' m' m' m' m' m' m' bh bh set
55.00 80.00 85.00 40.00 190.00 250.00 10.00 110.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 15,590,292.71 3,018,625.00 10,832,968.75 14,253,906.25 570,156.25 14,091,870.83 9,815,798.38 8,196,754.17
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 15,590,292.71 3,018,625.00 10,832,968.75 14,253,906.25 570,156.25 14,091,870.83 9,815,798.38 8,196,754.17
set bh bh m' Unit bh
1.00 5.00 12.00 30.00 1.00 2.00
44,056,398.56 1,127,083.17 1,127,083.17 16,180.24 51,608,814.06 3,805,628.54
44,056,398.56 5,635,415.83 13,524,998.00 485,407.07 51,608,814.06 7,611,257.08
44,056,398.56 1,127,083.17 1,127,083.17 16,180.24 51,608,814.06 3,805,628.54
44,056,398.56 5,635,415.83 13,524,998.00 485,407.07 51,608,814.06 7,611,257.08
m¹
110.00
57,015.63
6,271,718.75
57,015.63
6,271,718.75
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
50.00
334,952.92
Tidak Dikerjakan
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
55.00 80.00 85.00 40.00 280.00 330.00 10.00 154.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
50.00
334,952.92
Tidak Dikerjakan
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
55.00 80.00 85.00 40.00 280.00 330.00 10.00 154.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 8.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
70.00
334,952.92
Tidak Dikerjakan
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
55.00 80.00 85.00 40.00 177.00 210.00 10.00 110.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set bh bh m' Unit bh
1.00 8.00 16.00 30.00 8.00 5.00
44,056,398.56 1,127,083.17 1,127,083.17 16,180.24 51,608,814.06 3,805,628.54
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
44,056,398.56 1,127,083.17 1,127,083.17 16,180.24 51,608,814.06 3,805,628.54
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m¹
250.00
57,015.63
Tidak Dikerjakan
57,015.63
Tidak Dikerjakan
m' m' m' m' bh bh
40.00 40.00 40.00 40.00 2.00 3.00
334,952.92 334,952.92 118,148.33 118,148.33 9,815,798.38 1,617,422.67
13,398,116.67 13,398,116.67 4,725,933.33 4,725,933.33 19,631,596.77 4,852,268.00
JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
379,666,802.63
unit unit unit
2.00 2.00 1.00
14,501,188.24 17,740,636.76 6,083,457.95
29,002,376.48 35,481,273.52 6,083,457.95
334,952.92 334,952.92 118,148.33 118,148.33 9,815,798.38 1,617,422.67 JUMLAH
14,501,188.24 17,740,636.76 6,083,457.95
13,398,116.67 13,398,116.67 4,725,933.33 4,725,933.33 19,631,596.77 4,852,268.00 379,666,802.63
29,002,376.48 35,481,273.52 6,083,457.95
Pek. Non Standar Gedung D1 (Medik Sentral) - page 9 of 280
NO.
URAIAN
b.
- IU.D1.1.1.6 - IU.D1.1.1.7 - IU.D1.1.1.8 - IU.D1.1.1.9 - IU.D1.1.1.10 - IU.D1.1.1.11 - IU.D1.1.1.12 - IU.D1.1.1.13 - IU.D1.1.1.16 - IU.D1.1.1.17 - IU.D1.1.1.18 - IU.D1.1.1.19 - IU.D1.1.1.20 - IU.D1.1.1.21 - IU.D1.1.1.22 - IU.D1.1.1.23 - IU.D1.1.1.24 - IU.D1.1.1.25 - IU.D1.1.1.26 - IU.D1.1.1.27 - IU.D1.1.1.28 - IU.D1.1.1.29 - IU.D1.1.1.30 SISTEM 2 - IU.D1.1.2.1 - IU.D1.1.2.2 - IU.D1.1.2.3 - IU.D1.1.2.4 - IU.D1.1.2.5 - IU.D1.1.2.6 - IU.D1.1.2.7 - IU.D1.1.2.8 - IU.D1.1.2.9 - IU.D1.1.2.10 - IU.D1.1.2.11 - IU.D1.1.2.13 - IU.D1.1.2.14 - IU.D1.1.2.16 - IU.D1.1.2.17 - IU.D1.1.2.18 - IU.D1.1.2.19 - IU.D1.1.2.20 Indoor Unit AHU - IU.OT.1.1
R. CO-AS R. KA. RJ BACK OFFICE R. JAGA ADMISSION / PENDAFTARAN R. PERSIAPAN R. OPERATOR KORIDOR FLUORCOSCOPY DENTAL X-RAY DIGITAL PANORAMIC CT-SCAN CR / PACS R. EXPERTISE X-RAY R. OPERATOR R. MESIN X-RAY R. KONSULTASI R. KA. INSTALASI R. TUNGGU USG MAMMOGRAPHY
: : : : : : : : : : : : : : : : : : : : : : :
5 500 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 36 200 Btu/h - 4 Way Ceiling Cassette 7 500 Btu/h - Wall Mounted 9 600 Btu/h - Wall Mounted 20 500 Btu/h - 4 Way Ceiling Cassette 36 200 Btu/h - Ceiling Concealed Duct 5 500 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 36 200 Btu/h - Ceiling Concealed Duct 5 500 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted 19 100 Btu/h - Ceiling Concealed Duct 7 500 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted 24 200 Btu/h - Ceiling Concealed Duct 5 500 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted 20 500 Btu/h - 4 Way Ceiling Cassette 9 600 Btu/h - Wall Mounted 9 600 Btu/h - Wall Mounted
RADIOLOGI IGD Kapasitas SCREENING Kapasitas TRIASE MEDIS IGD Kapasitas KORIDOR Kapasitas DEPO OBAT Kapasitas MINI LAB Kapasitas R. PERAWAT Kapasitas R. KA. RU Kapasitas R. ISOLASI Kapasitas ADMINISTRASI IGD Kapasitas & 12 KORIDOR & LOBBY LIFT Kapasitas PREPARATION / RECOVERY Kapasitas & 15 LOBBY LIFT MEDIK & NURSE STATION Kapasitas R. KONSULTASI Kapasitas R. ODGJ Kapasitas DOCTORS ON CALL Kapasitas RESUSITASI Kapasitas & 21 R. TINDAKAN & OBSERVASI Kapasitas
: : : : : : : : : : : : : : : : : :
15 400 Btu/h - Ceiling Concealed Duct 42 000 Btu/h - Ceiling Concealed Duct 28 000 Btu/h - 4 Way Ceiling Cassette 15 400 Btu/h - 4 Way Ceiling Cassette 7 500 Btu/h - Wall Mounted 9 600 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted 9 600 Btu/h - Wall Mounted 19 100 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 19 100 Btu/h - 4 Way Ceiling Cassette 19 100 Btu/h - 4 Way Ceiling Cassette 28 000 Btu/h - 4 Way Ceiling Cassette 9 600 Btu/h - Wall Mounted 9 600 Btu/h - Wall Mounted 15 400 Btu/h - Wall Mounted 24 200 Btu/h - Wall Mounted 95 500 Btu/h - Ceiling Concealed Duct
&15
R. OT -
c.
d.
e. f. g. h. i. j. k. l. m.
n.
o. 2.
SATUAN
Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas
Outdoor Unit VRV - OU.D1.1.1 LANTAI ATAP - OU.D1.1.2 LANTAI ATAP - OU.OT.1.1 LANTAI ATAP Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 - Outdoor Pipe Connection - 31 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Titik Instalasi Indoor Unit AHU Kabel Kontrol Indoor ke Outdoor Aksesoris - ACP 5 - AC Manager 5 - EEV Kit 4-10HP - AHU Comm. Kit . Plenum Box - Mixing Box Fresh Air dan Return Air - Pre-Filter (G-4) - Med. Filter (F-9) - Diferential Pressure Switch (Detection Pressure drop - Damper Fresh Air - Damper Return - Iris Damper - Fan Titik Instalasi Daya Plenum Box
+ Purifying Kit + Purifying Kit (Mid / High) (Mid / High) (Mid / High) (Mid / High) + Purifying Kit
(Mid / High) (Mid / High) + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit + Purifying Kit
(High)
Kapasitas : 85 000 Btu/h - Air Handling Unit Include : Booster Fan Deferensial Pressure Switch (Medium Filter) Deferensial Pressure Switch (Pre Filter) Mixing Box untuk Fresh air & Return Sensor Temperatur Cooling Coil Temperatur Supply Iris Damper kapasitas : 401 300 BTU/h kapasitas : 496 800 BTU/h kapasitas : 95 500 BTU/h
for Med.Filter)
LANTAI DUA a. Indoor Unit VRV SISTEM 1 - IU.D1.2.1.1 s/d 3 KORIDOR Kapasitas : 19 100 Btu/h - 4 Way Ceiling - IU.D1.2.1.4 LIFT LOBBY Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.1.5 ADMIN Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.1.6 & 7 FATHERS VIEWING Kapasitas : 19 100 Btu/h - 4 Way Ceiling - IU.D1.2.1.8 RAWAT BAYI TINGKAT 1 Kapasitas : 24 200 Btu/h - 4 Way Ceiling - IU.D1.2.1.9 RESUSITASI / PILAH Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.1.10 RAWAT BAYI TINGKAT 2 Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.1.11 & 12 PRE & RECOVERY ENDOSCOPY Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.1.13 R. TUNGGU Kapasitas : 15 400 Btu/h - 4 Way Ceiling - IU.D1.2.1.14 R. STAFF Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.1.15 R. ENDOSCOPY Kapasitas : 19 100 Btu/h - 4 Way Ceiling - IU.D1.2.1.16 R. OPERATOR Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D1.2.1.17 R. BRONCOSCOPY Kapasitas : 19 100 Btu/h - 4 Way Ceiling - IU.D1.2.1.18 MUSHOLA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D1.2.1.19 RAWAT BAYI TINGKAT 3 Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.1.20 R. ISOLASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.1.21 R. BAYI SEHAT Kapasitas : 54 000 Btu/h - 4 Way Ceiling SISTEM 2 - IU.D1.2.2.1 & 2 KORIDOR Kapasitas : 19 100 Btu/h - 4 Way Ceiling - IU.D1.2.2.3 LIFT LOBBY & ADMINISTRASI Kapasitas : 42 000 Btu/h - 4 Way Ceiling - IU.D1.2.2.4 R. TINDAKAN Kapasitas : 24 200 Btu/h - Wall Mounted - IU.D1.2.2.5 R. RAWAT INAP VIP Kapasitas : 19 100 Btu/h - Wall Mounted - IU.D1.2.2.6 & 7 KORIDOR & NURSE STATION Kapasitas : 24 200 Btu/h - 4 Way Ceiling - IU.D1.2.2.8 R. PERAWAT Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.2.9 DEPO OBAT Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.2.10 R. BERSALIN Kapasitas : 19 100 Btu/h - Wall Mounted - IU.D1.2.2.11 & 12 KAMAR BESALIN (BANGSAL) Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.2.13 R. PERSIAPAN DENGAN KOMPLIKASI Kapasitas : 19 100 Btu/h - Wall Mounted - IU.D1.2.2.14 R. PEMULIHAN Kapasitas : 19 100 Btu/h - Wall Mounted - IU.D1.2.2.15 R. KALA FASE LATEN Kapasitas : 20 500 Btu/h - 4 Way Ceiling - IU.D1.2.2.16 R. ISOLASI Kapasitas : 15 400 Btu/h - Wall Mounted - IU.D1.2.2.17 R. KONSULTASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.2.2.18 R. TUNGGU Kapasitas : 30 700 Btu/h - 4 Way Ceiling - IU.D1.2.2.19 R. KONSULTASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.2.2.20 KA. RU. PERINATOLOGI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.2.2.21 KA. RU. KEBIDANAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.2.2.22 R. INKUBATOR Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.2.2.23 R. CO-AS Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.2.2.24 R. AKPER Kapasitas : 24 200 Btu/h - 4 Way Ceiling - IU.D1.2.2.25 & 26 MEETING ROOM Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.2.27 DOCTOR'S OFFICE Kapasitas : 28 000 Btu/h - 4 Way Ceiling - IU.D1.2.2.28 NURSE BASE Kapasitas : 28 000 Btu/h - 4 Way Ceiling b. Outdoor Unit VRV - OU.D1.2.1 LANTAI ATAP kapasitas : 382 200 BTU/h - OU.D1.2.2 LANTAI ATAP kapasitas : 515 900 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8")
Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit
Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit
Cassette Cassette Cassette Cassette
+ + + +
Purifying Purifying Purifying Purifying
Kit Kit Kit Kit
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
(Rp.) 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,903,874.88 15,843,525.80 10,613,848.64 5,638,581.27 5,638,581.27 10,613,848.64 5,638,581.27 5,728,372.80 7,760,926.35 5,728,372.80 5,728,372.80 8,769,041.12 5,638,581.27 5,728,372.80 15,843,525.80 5,903,874.88 5,903,874.88
(Rp.) 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,903,874.88 47,530,577.40 10,613,848.64 5,638,581.27 5,638,581.27 10,613,848.64 5,638,581.27 5,728,372.80 7,760,926.35 5,728,372.80 5,728,372.80 8,769,041.12 5,638,581.27 5,728,372.80 15,843,525.80 5,903,874.88 5,903,874.88
(Rp.) 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,903,874.88 15,843,525.80 10,613,848.64 5,638,581.27 5,638,581.27 10,613,848.64 5,638,581.27 5,728,372.80 7,760,926.35 5,728,372.80 5,728,372.80 8,769,041.12 5,638,581.27 5,728,372.80 15,843,525.80 5,903,874.88 5,903,874.88
(Rp.) 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,903,874.88 47,530,577.40 10,613,848.64 5,638,581.27 5,638,581.27 10,613,848.64 5,638,581.27 5,728,372.80 7,760,926.35 5,728,372.80 5,728,372.80 8,769,041.12 5,638,581.27 5,728,372.80 15,843,525.80 5,903,874.88 5,903,874.88
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 2.00
8,046,626.87 11,997,454.52 17,740,637.81 14,850,377.55 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 7,760,926.35 5,638,581.27 15,199,566.86 15,199,566.86 17,740,637.81 5,903,874.88 5,903,874.88 6,169,167.54 8,201,722.04 26,564,091.45
8,046,626.87 11,997,454.52 17,740,637.81 14,850,377.55 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 7,760,926.35 5,638,581.27 30,399,133.73 15,199,566.86 35,481,275.63 5,903,874.88 5,903,874.88 6,169,167.54 8,201,722.04 53,128,182.91
8,046,626.87 11,997,454.52 17,740,637.81 14,850,377.55 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 7,760,926.35 5,638,581.27 15,199,566.86 15,199,566.86 17,740,637.81 5,903,874.88 5,903,874.88 6,169,167.54 8,201,722.04 26,564,091.45
8,046,626.87 11,997,454.52 17,740,637.81 14,850,377.55 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 7,760,926.35 5,638,581.27 30,399,133.73 15,199,566.86 35,481,275.63 5,903,874.88 5,903,874.88 6,169,167.54 8,201,722.04 53,128,182.91
unit
1.00
99,736,339.42
99,736,339.42
99,736,339.42
99,736,339.42
unit unit unit
1.00 1.00 1.00
233,492,770.63 290,510,396.94 59,746,145.56
233,492,770.63 290,510,396.94 59,746,145.56
233,492,770.63 290,510,396.94 59,746,145.56
233,492,770.63 290,510,396.94 59,746,145.56
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78
m'
367.00
114,253.33
41,930,973.33
114,253.33
41,930,973.33
bh bh
1.00 1.00
1,842,808.55 2,346,687.28
1,842,808.55 2,346,687.28
1,842,808.55 2,346,687.28
1,842,808.55 2,346,687.28
bh
50.00
2,208,160.01
110,408,000.28
2,208,160.01
110,408,000.28
bh bh ttk ttk ttk m'
27.00 25.00 2.00 51.00 1.00 549.00
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 730,174.25 421,780.67
30,769,294.70 46,583,921.05 7,823,675.88 37,238,886.62 730,174.25 231,557,586.00
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 730,174.25 421,780.67
30,769,294.70 46,583,921.05 7,823,675.88 37,238,886.62 730,174.25 231,557,586.00
unit unit unit unit
1.00 1.00 1.00 1.00
43,868,519.39 60,496,517.31 4,342,331.96 7,767,090.74
43,868,519.39 60,496,517.31 4,342,331.96 7,767,090.74
43,868,519.39 60,496,517.31 4,342,331.96 7,767,090.74
43,868,519.39 60,496,517.31 4,342,331.96 7,767,090.74
set pcs pcs set pcs pcs set set ttk
1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 7,355,513.89 5,000,000.00 5,500,000.00 159,922.37
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 7,355,513.89 5,000,000.00 5,500,000.00 159,922.37
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
3.00 1.00 1.00 2.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
15,199,566.86 17,740,637.81 5,638,581.27 15,199,566.86 17,740,636.76 5,638,581.27 17,740,637.81 17,740,637.81 14,850,377.55 5,638,581.27 15,199,566.86 5,903,874.88 15,199,566.86 5,903,874.88 17,740,637.81 5,638,581.27 20,933,224.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
15,199,566.86 17,740,637.81 5,638,581.27 15,199,566.86 17,740,636.76 5,638,581.27 17,740,637.81 17,740,637.81 14,850,377.55 5,638,581.27 15,199,566.86 5,903,874.88 15,199,566.86 5,903,874.88 17,740,637.81 5,638,581.27 20,933,224.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00
15,199,566.86 19,024,021.24 8,201,722.04 7,760,926.35 17,740,636.76 5,638,581.27 5,638,581.27 7,760,926.35 17,740,637.81 7,760,926.35 7,760,926.35 15,843,525.80 6,169,167.54 5,728,372.80 17,844,939.58 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 5,638,581.27 17,740,636.76 17,740,637.81 17,740,637.81 17,740,637.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
15,199,566.86 19,024,021.24 8,201,722.04 7,760,926.35 17,740,636.76 5,638,581.27 5,638,581.27 7,760,926.35 17,740,637.81 7,760,926.35 7,760,926.35 15,843,525.80 6,169,167.54 5,728,372.80 17,844,939.58 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 5,638,581.27 17,740,636.76 17,740,637.81 17,740,637.81 17,740,637.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit
1.00 1.00
220,024,040.00 303,979,127.56
Tidak Dikerjakan Tidak Dikerjakan
220,024,040.00 303,979,127.56
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m'
33.00 26.00 40.00 37.00 51.00 85.00 35.00 26.00 8.00 12.00 40.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 10 of 280
NO.
URAIAN
d. e. f. g. h. i. j. k.
l. 3.
4.
SATUAN
- Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 - Outdoor Pipe Connection - 31 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Kabel Kontrol Indoor ke Outdoor Plenum Box - Mixing Box Fresh Air dan Return Air - Pre-Filter (G-4) - Med. Filter (F-9) - Diferential Pressure Switch (Detection Pressure drop for Med.Filter) - Damper Fresh Air - Damper Return - Iris Damper - Fan Titik Instalasi Daya Plenum Box
LANTAI TIGA a. Indoor Unit VRV SISTEM 1 - IU.D1.3.1.1 R. OBAT Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.2 R. LAKTASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.3 R. KONSULTASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.4 R. STAFF Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.5 R. ISOLASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.3.1.6 & 7 KORIDOR Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette + - IU.D1.3.1.8 FOYER ISOLASI Kapasitas : 12 300 Btu/h - 4 Way Ceiling Cassette + - IU.D1.3.1.9 R. ISOLASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.3.1.10 & 11 R. NICU Kapasitas : 76 400 Btu/h - Ceiling Concealed (High) - IU.D1.3.1.12 R. DOKTER Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.13 R. ICCU Kapasitas : 95 500 Btu/h - Ceiling Concealed (High) - IU.D1.3.1.14 R. KA. RUANG Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.15 R. PERAWAT Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.1.16 ADMINISTRASI CRITICAL CARE Kapasitas : 19 100 Btu/h - Wall Mounted - IU.D1.3.1.17 R. KONSULTASI Kapasitas : 7 500 Btu/h - Wall Mounted SISTEM 2 - IU.D1.3.2.1 R. PACU Kapasitas : 76 400 Btu/h - Ceiling Concealed (High) - IU.D1.3.2.2 & 3 R. ICU Kapasitas : 76 400 Btu/h - Ceiling Concealed (High) - IU.D1.3.2.4 & 5 KORIDOR Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette + - IU.D1.3.2.6 R. ISOLASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.3.2.7 FOYER ISOLASI Kapasitas : 12 300 Btu/h - 4 Way Ceiling Cassette + - IU.D1.3.2.8 R. ISOLASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D1.3.2.9 LIFT LOBBY Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette + - IU.D1.3.2.10 DEPO OBAT Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D1.3.2.11 R. STERIL Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D1.3.2.12 R. ICCU Kapasitas : 95 500 Btu/h - Ceiling Concealed (High) b. Outdoor Unit VRV - OU.D1.3.1 LANTAI ATAP kapasitas : 363 100 BTU/h - OU.D1.3.2 LANTAI ATAP kapasitas : 420 400 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 - Outdoor Pipe Connection - 31 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor k. Plenum Box - Mixing Box Fresh Air dan Return Air - Pre-Filter (G-4) - Med. Filter (F-9) - Diferential Pressure Switch (Detection Pressure drop for Med.Filter) - Damper Fresh Air - Damper Return - Iris Damper - Fan l. Titik Instalasi Daya Plenum Box LANTAI EMPAT a. Indoor Unit VRV SISTEM 1 - IU.D1.4.1.1 - IU.D1.4.1.2 - IU.D1.4.1.3 & 4 - IU.D1.4.1.5 & 6 - IU.D1.4.1.7 - IU.D1.4.1.8 - IU.D1.4.1.9 - IU.D1.4.1.10 - IU.D1.4.1.11 - IU.D1.4.1.12 - IU.D1.4.1.13 - IU.D1.4.1.14 - IU.D1.4.1.15 - IU.D1.4.1.16 SISTEM 2 - IU.D1.4.2.1 & 2 - IU.D1.4.2.3 s/d 6 - IU.D1.4.2.7 - IU.D1.4.2.8 & 9 - IU.D1.4.2.10 - IU.D1.4.2.11 - IU.D1.4.2.12 - IU.D1.4.2.13 b. Indoor Unit AHU - IU.OT.4.1
R. PEMILIHAN / SORTIR Kapasitas : 9 600 Btu/h - Wall Mounted R. PEMBERSIHAN Kapasitas : 24 200 Btu/h - 4 Way Ceiling KORIDOR Kapasitas : 19 100 Btu/h - 4 Way Ceiling RECOVERY ROOM Kapasitas : 42 000 Btu/h - 4 Way Ceiling R. APD Kapasitas : 5 500 Btu/h - Wall Mounted R. PENGEMASAN LINEN & BHMP Kapasitas : 30 700 Btu/h - 4 Way Ceiling R. KA. RU Kapasitas : 7 500 Btu/h - Wall Mounted R. DISTRIBUSI STERIL Kapasitas : 7 500 Btu/h - Wall Mounted R. STERILISASI Kapasitas : 30 700 Btu/h - 4 Way Ceiling MUSHOLA Kapasitas : 9 600 Btu/h - Wall Mounted NURSE STATION Kapasitas : 12 300 Btu/h - Wall Mounted R. KA. INSTALASI Kapasitas : 5 500 Btu/h - Wall Mounted R. PERAWAT Kapasitas : 5 500 Btu/h - Wall Mounted R. DOKTER Kapasitas : 7 500 Btu/h - Wall Mounted PRE-OP & NURSE STATION KORIDOR STERIL DOCTORS LOUNGE LIFT LOBBY & KORIDOR TRANSFER BAY DEPO OBAT R. OPERATOR R. MESIN
Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas
R. OT 1 -
-
IU.OT.4.2
R. OT 2 -
-
IU.OT.4.3
R. OT 3 -
-
IU.OT.4.4
R. OT 4 -
: : : : : : : :
24 200 Btu/h - 4 Way Ceiling 24 200 Btu/h - 4 Way Ceiling 9 600 Btu/h - Wall Mounted 19 100 Btu/h - 4 Way Ceiling 24 200 Btu/h - 4 Way Ceiling 5 500 Btu/h - Wall Mounted 12 300 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted
Purifying Kit Purifying Kit
Purifying Kit Purifying Kit Purifying Kit
Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit
Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit Cassette + Purifying Kit
Kapasitas : 125 000 Btu/h - Air Handling Unit Include : Booster Fan Deferensial Pressure Switch (Medium Filter) Deferensial Pressure Switch (Pre Filter) Mixing Box untuk Fresh air & Return Sensor Temperatur Cooling Coil Temperatur Supply Iris Damper Kapasitas : 85 000 Btu/h - Air Handling Unit Include : Booster Fan Deferensial Pressure Switch (Medium Filter) Deferensial Pressure Switch (Pre Filter) Mixing Box untuk Fresh air & Return Sensor Temperatur Cooling Coil Temperatur Supply Iris Damper Kapasitas : 85 000 Btu/h - Air Handling Unit Include : Booster Fan Deferensial Pressure Switch (Medium Filter) Deferensial Pressure Switch (Pre Filter) Mixing Box untuk Fresh air & Return Sensor Temperatur Cooling Coil Temperatur Supply Iris Damper Kapasitas : 85 000 Btu/h - Air Handling Unit Include : Booster Fan Deferensial Pressure Switch (Medium Filter) Deferensial Pressure Switch (Pre Filter) Mixing Box untuk Fresh air & Return Sensor Temperatur Cooling Coil
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.) 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
272.00
114,253.33
2.00 1.00
1,842,808.55 2,346,687.28
bh
48.00
bh bh ttk ttk m'
JUMLAH HARGA
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan
1,842,808.55 2,346,687.28
Tidak Dikerjakan Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
29.00 20.00 2.00 49.00 454.50
5,778,010.42 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,778,010.42 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set pcs pcs set pcs pcs set set ttk
1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00
5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 17,740,636.76 14,501,188.24 5,728,372.80 25,584,546.55 5,638,581.27 26,564,091.45 5,638,581.27 5,638,581.27 7,760,926.35 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 17,740,636.76 14,501,188.24 5,728,372.80 25,584,546.55 5,638,581.27 26,564,091.45 5,638,581.27 5,638,581.27 7,760,926.35 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit
1.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
25,584,546.55 25,584,546.55 17,740,636.76 5,728,372.80 6,083,457.95 5,728,372.80 17,740,637.81 5,903,874.88 5,638,581.27 26,564,091.45
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
25,584,546.55 25,584,546.55 17,740,636.76 5,728,372.80 6,083,457.95 5,728,372.80 17,740,637.81 5,903,874.88 5,638,581.27 26,564,091.45
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit
1.00 1.00
211,044,886.25 246,512,543.56
Tidak Dikerjakan Tidak Dikerjakan
211,044,886.25 246,512,543.56
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
23.00 29.00 46.00 37.00 53.00 70.00 56.00 8.00 24.00 37.00 53.00 8.00 29.00 50.00 25.00 56.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
258.00
114,253.33
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
bh bh
2.00 1.00
1,842,808.55 2,346,687.28
Tidak Dikerjakan Tidak Dikerjakan
1,842,808.55 2,346,687.28
Tidak Dikerjakan Tidak Dikerjakan
bh
28.00
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
bh bh ttk ttk m'
15.00 14.00 2.00 29.00 519.00
692,843.06 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
692,843.06 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set pcs pcs set pcs pcs set set ttk
11.00 11.00 11.00 11.00 11.00 22.00 11.00 11.00 11.00
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
13,972,000.00 614,441.94 1,900,406.94 1,500,000.00 3,677,756.94 3,677,756.94 5,000,000.00 5,500,000.00 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,903,874.88 17,740,636.76 15,199,566.86 19,024,021.24 5,638,581.27 17,844,939.58 5,728,372.80 5,728,372.80 17,844,939.58 5,903,874.88 6,083,457.95 5,638,581.27 5,638,581.27 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,903,874.88 17,740,636.76 15,199,566.86 19,024,021.24 5,638,581.27 17,844,939.58 5,728,372.80 5,728,372.80 17,844,939.58 5,903,874.88 6,083,457.95 5,638,581.27 5,638,581.27 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit
2.00 4.00 1.00 2.00 1.00 1.00 1.00 1.00
17,740,636.76 17,740,636.76 5,903,874.88 15,199,566.86 17,740,636.76 5,638,581.27 6,083,457.95 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
17,740,636.76 17,740,636.76 5,903,874.88 15,199,566.86 17,740,636.76 5,638,581.27 6,083,457.95 5,728,372.80
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
129,949,901.45
Tidak Dikerjakan
129,949,901.45
Tidak Dikerjakan
unit
1.00
99,736,339.42
Tidak Dikerjakan
99,736,339.42
Tidak Dikerjakan
unit
1.00
99,736,339.42
Tidak Dikerjakan
99,736,339.42
Tidak Dikerjakan
unit
1.00
99,736,339.42
Tidak Dikerjakan
99,736,339.42
Tidak Dikerjakan
50.00 13.00 53.00 31.00 35.00
m' bh bh
(Rp.)
HARGA SATUAN (Rp.) 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
m' m' m' m' m'
(Rp.)
Pek. Non Standar Gedung D1 (Medik Sentral) - page 11 of 280
NO.
URAIAN
c.
d.
e. f. g. h. i. j. k. l. m.
-
IU.OT.4.5
R. OT 5
-
IU.OT.4.6
R. OT 6
-
IU.OT.4.7
R. OT 7
-
IU.CL.4.1
R. CL.1
Outdoor Unit VRV - OU.D1.4.1 LANTAI ATAP - OU.D1.4.2 LANTAI ATAP - OU.OT.4. - 2, 3, 4, 6LANTAI ATAP - OU.CL.4. - 1, 5 LANTAI ATAP - OU.OT.4. - 2, 3, 4, 6LANTAI ATAP Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 - Outdoor Pipe Connection - 31 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Titik Instalasi Indoor Unit AHU Kabel Kontrol Indoor ke Outdoor Aksesoris - ACP 5 - AC Manager 5 - EEV Kit 4-10HP - EEV Kit 12-20HP - AHU Comm. Kit .
SATUAN
- Temperatur Supply - Iris Damper Kapasitas : 125 000 Btu/h - Air Handling Unit Include : - Booster Fan - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Pre Filter) - Mixing Box untuk Fresh air & Return - Sensor Temperatur Cooling Coil - Temperatur Supply - Iris Damper Kapasitas : 85 000 Btu/h - Air Handling Unit Include : - Booster Fan - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Pre Filter) - Mixing Box untuk Fresh air & Return - Sensor Temperatur Cooling Coil - Temperatur Supply - Iris Damper Kapasitas : 95 000 Btu/h - Air Handling Unit Include : - Booster Fan - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Pre Filter) - Mixing Box untuk Fresh air & Return - Sensor Temperatur Cooling Coil - Temperatur Supply - Iris Damper Kapasitas : 113 000 Btu/h - Air Handling Unit Include : - Booster Fan - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Pre Filter) - Mixing Box untuk Fresh air & Return - Sensor Temperatur Cooling Coil - Temperatur Supply - Iris Damper kapasitas kapasitas kapasitas kapasitas kapasitas
: : : : :
401 300 BTU/h 496 800 BTU/h 95 500 BTU/h 114 600 BTU/h 133 800 BTU/h
5.3. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 556 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 552 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 1050 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 600 CFM, Inline Type 5. Exhaust Fan ( EF.5 ) , Kapasitas : 800 CFM, Inline Type 6. Exhaust Fan ( EF.6 ) , Kapasitas : 300 CFM, Inline Type 7. Exhaust Fan ( EF.7 ) , Kapasitas : 400 CFM, Inline Type 8. Exhaust Fan ( EF.8 ) , Kapasitas : 650 CFM, Inline Type 9. Exhaust Fan ( EF.OT ) , Kapasitas : 200 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 18" x 12" - 16" x 10" - 16" x 8" - 14" x 12" - 14" x 10" - 14" x 8" - 12" x 10" - 12" x 8" - 12" x 6" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" d. Instalasi Ducting Air Handling Unit (AHU) dan Ceiling Concealed Dengan Isolasi Supply Ducting c/w OBD (Finishing Cat Powder Coating) - 22" x 20" - 20" x 18" - 20" x 16" - 20" x 14" - 18" x 16" - 16" x 14" - 16" x 12" - 16" x 8" - 14" x 12" - 14" x 10" - 14" x 9" - 14" x 8" - 14" x 6" - 12" x 10" - 12" x 8" - 12" x 6" Return Ducting c/w OBD (Finishing Cat Powder Coating) - 16" x 14" - 16" x 10" - 16" x 8" - 14" x 14" - 14" x 12" - 14" x 8" - 14" x 6" - 12" x 10" - 12" x 8" - 12" x 6" - 11" x 6" - 10" x 6" Exhaust Ducting c/w OBD (Finishing Cat Powder Coating) - 22" x 10" Fresh air Ducting c/w OBD (Finishing Cat Powder Coating) - 10" x 10" - 8" x 6" e. Aksesoris Ducting Elbow, Reducer dan Hanger f. Terminal Udara - Diffuser Fresh Air grille almunium FAG - Diffuser Supply grille almunium SAD - Diffuser Return grille almunium FAG - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust - Volume Damper Supply - Volume Damper Fresh Air g. Fume Hood - Blower Centrifugal PP FEB01 - Box Peredam Blower (Sudah Termasuk Seal, Material Penunjang) - Pipe MM Mechanical, PN 10 150mm + RRJ Power Lock h. Titik Instalasi Daya Fume Hood 2.
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
(Rp.)
(Rp.)
(Rp.)
JUMLAH HARGA (Rp.)
unit
1.00
129,949,901.45
Tidak Dikerjakan
129,949,901.45
Tidak Dikerjakan
unit
1.00
99,736,339.42
Tidak Dikerjakan
99,736,339.42
Tidak Dikerjakan
unit
1.00
108,669,599.72
Tidak Dikerjakan
108,669,599.72
Tidak Dikerjakan
unit
1.00
116,486,202.00
Tidak Dikerjakan
116,486,202.00
Tidak Dikerjakan
unit unit unit unit unit
1.00 1.00 5.00 2.00 1.00
233,492,770.63 290,510,396.94 59,746,145.56 70,521,130.06 79,051,326.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
233,492,770.63 290,510,396.94 59,746,145.56 70,521,130.06 79,051,326.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
35.00 30.00 50.00 45.00 60.00 95.00 40.00 30.00 10.00 15.00 45.00 55.00 15.00 55.00 35.00 40.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
315.00
114,253.33
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
bh bh
1.00 1.00
1,842,808.55 2,346,687.28
Tidak Dikerjakan Tidak Dikerjakan
1,842,808.55 2,346,687.28
Tidak Dikerjakan Tidak Dikerjakan
bh
28.00
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
bh bh ttk ttk ttk m'
13.00 24.00 10.00 29.00 8.00 510.00
413,433.18 1,863,356.84 3,911,837.94 730,174.25 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
413,433.18 1,863,356.84 3,911,837.94 730,174.25 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit
1.00 1.00 5.00 3.00 8.00
43,868,519.39 60,496,517.31 4,342,331.96 6,551,853.81 7,767,090.74
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
43,868,519.39 60,496,517.31 4,342,331.96 6,551,853.81 7,767,090.74
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
unit unit unit unit unit unit unit unit unit ttk
2,070,547,504.16
JUMLAH
2,070,547,504.16
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00
6,353,035.42 6,353,035.42 12,687,563.89 6,928,060.42 9,228,160.42 3,477,910.42 4,627,960.42 7,503,085.42 2,327,860.42 369,535.08
6,353,035.42 6,353,035.42 12,687,563.89 6,928,060.42 9,228,160.42 3,477,910.42 4,627,960.42 7,503,085.42 2,327,860.42 3,325,815.73
6,353,035.42 6,353,035.42 12,687,563.89 6,928,060.42 9,228,160.42 3,477,910.42 4,627,960.42 7,503,085.42 2,327,860.42 369,535.08
6,353,035.42 6,353,035.42 12,687,563.89 6,928,060.42 9,228,160.42 3,477,910.42 4,627,960.42 7,503,085.42 2,327,860.42 3,325,815.73
m' m' m' m' m' m' m' m' m' m' m' m' m' m'
10.00 20.00 20.00 30.00 30.00 25.00 30.00 30.00 30.00 30.00 60.00 60.00 90.00 100.00
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 239,634.18 210,575.43 173,285.93 135,996.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
3,252,831.81 5,649,173.61 5,649,173.61 8,473,760.42 7,189,025.42 5,990,854.51 6,317,262.92 5,198,577.92 4,079,892.92 5,198,577.92 8,159,785.83 8,159,785.83 7,205,596.25 9,870,693.06
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 239,634.18 210,575.43 173,285.93 135,996.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
3,252,831.81 5,649,173.61 5,649,173.61 8,473,760.42 7,189,025.42 5,990,854.51 6,317,262.92 5,198,577.92 4,079,892.92 5,198,577.92 8,159,785.83 8,159,785.83 7,205,596.25 9,870,693.06
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
10.00 10.00 10.00 10.00 20.00 20.00 20.00 30.00 30.00 30.00 40.00 40.00 40.00 70.00 70.00 70.00
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
7,466,555.56 7,466,555.56 7,466,555.56 7,466,555.56 14,933,111.11 14,933,111.11 14,933,111.11 22,399,666.67 22,399,666.67 22,399,666.67 29,866,222.22 29,866,222.22 29,866,222.22 52,265,888.89 52,265,888.89 52,265,888.89
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
7,466,555.56 7,466,555.56 7,466,555.56 7,466,555.56 14,933,111.11 14,933,111.11 14,933,111.11 22,399,666.67 22,399,666.67 22,399,666.67 29,866,222.22 29,866,222.22 29,866,222.22 52,265,888.89 52,265,888.89 52,265,888.89
m' m' m' m' m' m' m' m' m' m' m' m'
20.00 20.00 20.00 20.00 20.00 20.00 20.00 60.00 40.00 40.00 40.00 40.00
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 41,570,583.33 27,713,722.22 27,713,722.22 27,713,722.22 27,713,722.22
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 13,856,861.11 41,570,583.33 27,713,722.22 27,713,722.22 27,713,722.22 27,713,722.22
m'
20.00
692,843.06
13,856,861.11
692,843.06
13,856,861.11
m' m' lot
20.00 20.00 1.00
854,280.56 854,280.56 38,112,530.16
17,085,611.11 17,085,611.11 38,112,530.16
854,280.56 854,280.56 38,112,530.16
17,085,611.11 17,085,611.11 38,112,530.16
bh bh bh bh bh bh bh
2.00 34.00 40.00 42.00 10.00 10.00 10.00
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
2,023,463.89 34,713,504.17 40,839,416.67 42,492,741.67 36,777,569.44 36,777,569.44 36,777,569.44
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
2,023,463.89 34,713,504.17 40,839,416.67 42,492,741.67 36,777,569.44 36,777,569.44 36,777,569.44
unit unit m' ttk
1.00 1.00 60.00 1.00
5,500,000.00 1,100,000.00 1,012,006.82 369,535.08
5,500,000.00 1,100,000.00 60,720,409.23 369,535.08
5,500,000.00 1,100,000.00 1,012,006.82 369,535.08
5,500,000.00 1,100,000.00 60,720,409.23 369,535.08
LANTAI DUA
Pek. Non Standar Gedung D1 (Medik Sentral) - page 12 of 280
NO.
URAIAN a.
b. c.
d.
e. f.
3.
4.
5.
Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 1350 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 1200 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 450 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 250 CFM, Wall Type 5. Exhaust Fan ( EF.5 ) , Kapasitas : 550 CFM, Inline Type 6. Exhaust Fan ( EF.6 ) , Kapasitas : 1000 CFM, Inline Type Titik Instalasi daya FAN Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 18" x 12" - 16" x 12" - 16" x 10" - 14" x 12" - 14" x 10" - 14" x 8" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" Instalasi Ducting Ceiling Concealed / FCU Dengan Isolasi Supply Ducting c/w OBD (Finishing Cat Powder Coating) - 14" x 12" - 12" x 8" Return Ducting c/w OBD (Finishing Cat Powder Coating) - 12" x 10" - 10" x 8" Fresh air Ducting c/w OBD (Finishing Cat Powder Coating) - 10" x 10" Aksesoris Ducting Elbow, Reducer dan Hanger Terminal Udara - Diffuser Fresh air grille almunium FAG - Diffuser Supply grille almunium SAD - Diffuser Return grille almunium FAG - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust - Volume Damper Supply - Volume Damper Fresh Air
LANTAI TIGA a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 1050 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 200 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 1000 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 800 CFM, Inline Type 5. Exhaust Fan ( EF.5 ) , Kapasitas : 800 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 18" x 12" - 16" x 12" - 16" x 10" - 14" x 12" - 14" x 10" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" d. Instalasi Ducting Ceiling Concealed / FCU Dengan Isolasi Supply Ducting c/w OBD (Finishing Cat Powder Coating) - 20" x 18" - 20" x 16" - 18" x 16" - 18" x 14" - 16" x 14" - 16" x 12" - 14" x 12" - 14" x 10" - 12" x 12" - 12" x 10" - 12" x 8" - 10" x 10" - 10" x 8" Return Ducting c/w OBD (Finishing Cat Powder Coating) - 20" x 16" - 18" x 16" - 18" x 12" - 18" x 14" - 16" x 14" - 16" x 12" - 14" x 12" - 14" x 10" - 12" x 10" - 10" x 8" - 10" x 6" - 8" x 4" Fresh air Ducting c/w OBD (Finishing Cat Powder Coating) - 12" x 10" - 12" x 8" - 8" x 4" e. Aksesoris Ducting Elbow, Reducer dan Hanger f. Terminal Udara - Diffuser Fresh Air grille almunium FAG - Diffuser Supply grille almunium SAD - Diffuser Return grille almunium FAG - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust - Volume Damper Supply - Volume Damper Fresh Air LANTAI EMPAT a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 500 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 400 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 1600 CFM, Inline Type 4. Exhaust Fan ( EF.OT/CATHLAB ) , Kapasitas : 200 CFM, Inline Type 5. Exhaust Fan ( EF.4 - 11 ) , Kapasitas : 400 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 18" x 14" - 14" x 10" - 12" x 10" - 10" x 8" - 10" x6" - 8" x 6" - 8" x 4" - 6" x 4" d. Instalasi Ducting Air Handling Unit (AHU) Dengan Isolasi Supply Ducting c/w OBD (Finishing Cat Powder Coating) - 26" x 16" - 20" x 16" - 20" x 14" - 16" x 14" - 14" x 12" - 12" x 12" - 10" x 10" Return Ducting c/w OBD (Finishing Cat Powder Coating) - 18" x 14" - 16" x 14" - 14" x 14" - 14" x 10" - 12" x 10" Fresh air Ducting c/w OBD (Finishing Cat Powder Coating) - 14" x 14" - 14" x 10" - 12" x 10" e. Aksesoris Ducting Elbow, Reducer dan Hanger f. Terminal Udara - Diffuser Fresh Air grille almunium FAG - Diffuser Supply grille almunium SAD - Diffuser Return grille almunium FAG - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust - Volume Damper Supply - Volume Damper Fresh Air LANTAI ATAP a. Ventilasi Udara / Fan 1. Exhaust Fan ( SPF.MS.1) , Kapasitas : 6000 CFM, Inline Type + Box peredam b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 40" x 28" - 28" x 16" (Dari Lantai Atap Ke Lantai Satu) d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Fresh air grille almunium FAG - Diffuser Exhaust air grille almunium EAG
5.4. PEKERJAAN INSTALASI GAS MEDIS
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
(Rp.)
(Rp.)
(Rp.)
JUMLAH HARGA (Rp.)
unit unit unit unit unit unit ttk
1.00 1.00 1.00 1.00 1.00 1.00 6.00
16,137,713.89 13,307,688.89 5,202,985.42 4,846,313.89 6,353,035.42 11,528,260.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
16,137,713.89 13,307,688.89 5,202,985.42 4,846,313.89 6,353,035.42 11,528,260.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m'
20.00 20.00 20.00 40.00 30.00 30.00 30.00 30.00 40.00 60.00 60.00 60.00 80.00
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m'
15.00 15.00
746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan
746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan
m' m'
25.00 15.00
746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan
746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan
m' lot
10.00 1.00
746,655.56 -
Tidak Dikerjakan Tidak Dikerjakan
746,655.56 -
Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh bh
1.00 2.00 3.00 43.00 6.00 1.00 1.00
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit ttk
1.00 1.00 1.00 1.00 1.00 5.00
12,687,563.89 2,327,860.42 11,528,260.42 9,228,160.42 9,228,160.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
12,687,563.89 2,327,860.42 11,528,260.42 9,228,160.42 9,228,160.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m'
10.00 10.00 10.00 30.00 30.00 30.00 20.00 20.00 20.00 10.00 90.00 90.00
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
325,283.18 282,458.68 282,458.68 282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m'
30.00 30.00 30.00 30.00 30.00 60.00 70.00 30.00 50.00 30.00 30.00 90.00 90.00
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m'
30.00 30.00 30.00 30.00 50.00 30.00 30.00 30.00 30.00 110.00 40.00 70.00
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' lot
60.00 150.00 90.00 1.00
854,280.56 854,280.56 854,280.56 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
854,280.56 854,280.56 854,280.56 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh bh
22.00 47.00 54.00 25.00 5.00 11.00 11.00
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit ttk
1.00 1.00 1.00 8.00 8.00 19.00
5,778,010.42 4,627,960.42 18,437,813.89 2,327,860.42 4,627,960.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,778,010.42 4,627,960.42 18,437,813.89 2,327,860.42 4,627,960.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m'
20.00 20.00 50.00 50.00 50.00 85.00 85.00 70.00
325,283.18 239,634.18 210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
325,283.18 239,634.18 210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m'
150.00 30.00 320.00 30.00 180.00 80.00 80.00
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56 746,655.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m'
150.00 140.00 90.00 90.00 90.00
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
692,843.06 692,843.06 692,843.06 692,843.06 692,843.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' lot
20.00 20.00 20.00 1.00
692,843.06 692,843.06 692,843.06 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
692,843.06 692,843.06 692,843.06 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh bh
1.00 32.00 24.00 30.00 19.00 32.00 8.00
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,011,731.94 1,020,985.42 1,020,985.42 1,011,731.94 3,677,756.94 3,677,756.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit ttk
1.00 1.00
75,313,013.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan
75,313,013.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan
m' m' lot
20.00 60.00 1.00
916,846.35 501,209.06 2,420,473.52
18,336,927.01 30,072,543.33 2,420,473.52
916,846.35 501,209.06 2,420,473.52
18,336,927.01 30,072,543.33 2,420,473.52
bh 2.00 1,011,731.94 bh 8.00 1,011,731.94 JUMLAH 5.3.PEKERJAAN DUCTING TATA UDARA
2,023,463.89 8,093,855.56 1,236,071,524.68
1,011,731.94 1,011,731.94 JUMLAH
2,023,463.89 8,093,855.56 1,236,071,524.68
Pek. Non Standar Gedung D1 (Medik Sentral) - page 13 of 280
NO.
URAIAN 1.
2.
3.
4.
LANTAI SATU a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 2 Gas - Alarm System for 4 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 2 Gas - Zone Valve for 4 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum • for Air • for N2O • For CO2 d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet LANTAI DUA a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 3 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 3 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum • for Air d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet LANTAI TIGA a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 3 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 3 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum • for Air d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet LANTAI EMPAT a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 1 Gas - Alarm System for 4 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 1 Gas - Zone Valve for 4 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum • for Air d. Gas Medis Wall Point Outlet / Standard DISS : • for Oxygen • for Vacuum • for Air • for N2O • for AGSS (Ohmeda)
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
(Rp.)
(Rp.)
set set
1.00 1.00
19,147,000.00 32,800,000.00
19,147,000.00 32,800,000.00
19,147,000.00 32,800,000.00
19,147,000.00 32,800,000.00
set set
1.00 1.00
10,455,000.00 20,787,000.00
10,455,000.00 20,787,000.00
10,455,000.00 20,787,000.00
10,455,000.00 20,787,000.00
bh bh bh bh bh
29.00 29.00 29.00 1.00 1.00
1,310,770.00 1,310,770.00 1,310,770.00 1,310,770.00 1,517,000.00
38,012,330.00 38,012,330.00 38,012,330.00 1,310,770.00 1,517,000.00
1,310,770.00 1,310,770.00 1,310,770.00 1,310,770.00 1,517,000.00
38,012,330.00 38,012,330.00 38,012,330.00 1,310,770.00 1,517,000.00
m' m' m' m' m' m' ls
8.00 9.00 290.00 116.00 638.00 116.00 1.00
346,409.00 346,409.00 229,067.00 179,580.00 127,100.00 90,461.25 36,946,593.60
2,771,272.00 3,117,681.00 66,429,430.00 20,831,280.00 81,089,800.00 10,493,505.00 36,946,593.60
346,409.00 346,409.00 229,067.00 179,580.00 127,100.00 90,461.25 36,946,593.60
2,771,272.00 3,117,681.00 66,429,430.00 20,831,280.00 81,089,800.00 10,493,505.00 36,946,593.60
set set set
2.00 2.00 89.00
1,435,000.00 1,230,000.00 287,000.00
2,870,000.00 2,460,000.00 25,543,000.00
1,435,000.00 1,230,000.00 287,000.00
2,870,000.00 2,460,000.00 25,543,000.00
set
3.00
27,347,000.00
Tidak Dikerjakan
27,347,000.00
Tidak Dikerjakan
set
3.00
15,580,000.00
Tidak Dikerjakan
15,580,000.00
Tidak Dikerjakan
bh bh bh
20.00 12.00 12.00
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' ls
8.00 9.00 116.00 290.00 87.00 87.00 1.00
346,409.00 346,409.00 229,067.00 127,100.00 90,461.25 179,580.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
346,409.00 346,409.00 229,067.00 127,100.00 90,461.25 179,580.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set set set
3.00 3.00 44.00
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set
4.00
27,347,000.00
Tidak Dikerjakan
27,347,000.00
Tidak Dikerjakan
set
4.00
15,580,000.00
Tidak Dikerjakan
15,580,000.00
Tidak Dikerjakan
bh bh bh
46.00 46.00 46.00
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' ls
8.00 33.00 232.00 551.00 290.00 232.00 1.00
346,409.00 346,409.00 229,067.00 179,580.00 127,100.00 179,580.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
346,409.00 346,409.00 229,067.00 179,580.00 127,100.00 179,580.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set set set
4.00 4.00 138.00
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set set
1.00 6.00
10,947,000.00 32,800,000.00
Tidak Dikerjakan Tidak Dikerjakan
10,947,000.00 32,800,000.00
Tidak Dikerjakan Tidak Dikerjakan
set set
1.00 6.00
5,494,000.00 20,787,000.00
Tidak Dikerjakan Tidak Dikerjakan
5,494,000.00 20,787,000.00
Tidak Dikerjakan Tidak Dikerjakan
bh bh bh
15.00 11.00 11.00
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,310,770.00 1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh
12.00 12.00 12.00 12.00 6.00
1,517,000.00 1,517,000.00 1,517,000.00 1,517,000.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,517,000.00 1,517,000.00 1,517,000.00 1,517,000.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 14 of 280
NO.
URAIAN e.
f.
Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Fitting & Accessories Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
(Rp.)
(Rp.)
(Rp.)
3.
4.
5.
6.
8.00 56.00 232.00 435.00 580.00 290.00 1.00
346,409.00 346,409.00 179,580.00 229,067.00 179,580.00 127,100.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
346,409.00 346,409.00 179,580.00 229,067.00 179,580.00 127,100.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set set set
6.00 6.00 37.00
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,625,000.00 458,231,321.60
5,625,000.00 JUMLAH
5,625,000.00 458,231,321.60
SERVER IP NURSE CALL SYSTEM - IP ARK 1 Server Controller Hardware - Interface & Software license
unit ls
1.00 1.00
101,314,344.41 162,833,100.00
101,314,344.41 162,833,100.00
101,314,344.41 162,833,100.00
101,314,344.41 162,833,100.00
Instalasi - Rak Server Unit lengkap dengan Power Supply, Power Distribution Unit, dan UPS - Instalasi UTP Data Cable CAT5e dalam conduit PVC HI 20 mm - Instalasi Central AC Power 3x2.5mm & DC Power 2x1.5mm - Instalasi Aksesoris Konektor, Plug, dan pendukung lain - Programming & Testing Commissioning - Training User & Maintenance (1x)
set ls ls ls ls ls
1.00 1.00 1.00 1.00 1.00 1.00
27,641,236.20 809,011.79 5,393,411.94 35,956,079.61 12,584,627.86 5,393,411.94
27,641,236.20 809,011.79 5,393,411.94 35,956,079.61 12,584,627.86 5,393,411.94
27,641,236.20 809,011.79 5,393,411.94 35,956,079.61 12,584,627.86 5,393,411.94
27,641,236.20 809,011.79 5,393,411.94 35,956,079.61 12,584,627.86 5,393,411.94
LANTAI SATU NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
1.00
22,095,814.54
22,095,814.54
22,095,814.54
22,095,814.54
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - Flashing Over Door Light, 1 LED, Red, British Plate - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs pcs
2.00 24.00 2.00 26.00 26.00 2.00
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
4,680,582.66 36,619,109.71 4,444,710.78 63,473,123.51 27,788,656.12 6,545,444.73
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
4,680,582.66 36,619,109.71 4,444,710.78 63,473,123.51 27,788,656.12 6,545,444.73
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
2.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
21,773,923.13 5,528,247.24 3,685,498.16
10,886,961.56 5,528,247.24 3,685,498.16
21,773,923.13 5,528,247.24 3,685,498.16
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
59.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
47,731,695.68 1,618,023.58 3,595,607.96
809,011.79 539,341.19 3,595,607.96
47,731,695.68 1,618,023.58 3,595,607.96
LANTAI DUA NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
1.00
22,095,814.54
Tidak Dikerjakan
22,095,814.54
Tidak Dikerjakan
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - Flashing Over Door Light, 1 LED, Red, British Plate - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs pcs
7.00 6.00 7.00 16.00 16.00 4.00
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
2.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
43.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
2.00
22,095,814.54
Tidak Dikerjakan
22,095,814.54
Tidak Dikerjakan
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - Flashing Over Door Light, 1 LED, Red, British Plate - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m
pcs pcs pcs pcs pcs
4.00 25.00 4.00 29.00 29.00
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,340,291.33 1,525,796.24 2,222,355.39 2,441,273.98 1,068,794.47
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
2.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
66.00 4.00 1.00
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
2.00
22,095,814.54
Tidak Dikerjakan
22,095,814.54
Tidak Dikerjakan
PATIENT ROOM EQUIPMENT - Flashing Over Door Light, 1 LED, Red, British Plate - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs
15.00 15.00 15.00
1,525,796.24 1,068,794.47 3,272,722.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,525,796.24 1,068,794.47 3,272,722.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
1.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
33.00 4.00 1.00
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
TESTING & COMMISIONING a. Pemograman Sistem, Testing & Commissioning (Di Setiap Lantai) b. Pelatihan Pemeliharaan dan Pengunaan (Di Setiap Lantai)
5.6. PEKERJAAN BED HEAD 1. LANTAI SATU Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm • Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] • Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] • Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] • Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC 2.
(Rp.)
m' m' m' m' m' m' ls
5. TESTING & COMMISIONING - Testing & Commisioning ls 1.00 5,625,000.00 JUMLAH 5.4.PEKERJAAN INSTALASI GAS MEDIS 5.5. PEKERJAAN NURSE CALL 1. MASTER CONTROL IP NURSE CALL Seperangkat sistem komunikasi keperawatan khusus rumah sakit yang berbasis jaringan IP Network yang meliputi segala jenis panggilan pasien, bantuan perawat, panggilan darurat dan semua tombol-tombol panggilan mempunyai fungsi upgrade manjadi panggilan khusus lainnya seperti Emergency dan Code Blue dalam sebuah jaringan server yang dilengkapi dengan sistem fail-safe sesuai peraturan keselamatan pasien yang dilengkapi dengan rekam data panggilan, data proses pekerjaan, dan data rangkuman secara keseluruhan.
2.
JUMLAH HARGA
LANTAI DUA Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm • Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] • Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] • Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] • Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet
bh 4.00 5,393,411.94 bh 4.00 809,011.79 JUMLAH 5.5.PEKERJAAN NURSE CALL
21,573,647.76 3,236,047.16 626,315,356.49
5,393,411.94 809,011.79 JUMLAH
21,573,647.76 3,236,047.16 626,315,356.49
unit unit unit unit unit
2.00 4.00 1.00 2.00 1.00
2,100,733.95 13,120,373.45 15,744,448.14 16,621,596.70 10,496,298.76
4,201,467.90 52,481,493.79 15,744,448.14 33,243,193.40 10,496,298.76
2,100,733.95 13,120,373.45 15,744,448.14 16,621,596.70 10,496,298.76
4,201,467.90 52,481,493.79 15,744,448.14 33,243,193.40 10,496,298.76
bh bh bh bh bh bh titik titik
27.00 27.00 27.00 27.00 27.00 27.00 81.00 27.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
4,627,142.94 2,258,841.82 2,786,236.61 1,602,086.05 6,219,278.14 746,313.38 746,313.38 248,771.13
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
4,627,142.94 2,258,841.82 2,786,236.61 1,602,086.05 6,219,278.14 746,313.38 746,313.38 248,771.13
unit ttk ttk
10.00 216.00 54.00
202,252.95 159,922.37 159,922.37
2,022,529.48 34,543,232.64 8,635,808.16
202,252.95 159,922.37 159,922.37
2,022,529.48 34,543,232.64 8,635,808.16
unit unit unit unit unit
4.00 3.00 1.00 1.00 1.00
2,100,733.95 8,766,114.30 9,971,483.82 21,007,339.51 10,496,298.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,100,733.95 8,766,114.30 9,971,483.82 21,007,339.51 10,496,298.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh titik titik
20.00 20.00 20.00 20.00 20.00 20.00 60.00 20.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 15 of 280
NO.
URAIAN Biaya • • • 3.
4.
Pemasangan : Biaya Instalasi Bedhead Panel Medical Service Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
LANTAI TIGA Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm • Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] • Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] • Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] • Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] • Dimensi : 5900mm x 220mm x 80mm [ 2 Bed Patients] Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI EMPAT Bedhead Panel Medical Service • Dimensi : 11900mm x 220mm x 80mm [5 Bed Patients] • Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] • Dimensi : 95000mm x 220mm x 80mm [4 Bed Patients] • Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
5.7. PEKERJAAN PNEUMATIC TUBE 1 BLOWER • Three phase blower RB-2200 - 2,2Kw/50Hz • Blower interface SD6 • Silencer NW63 • Carrier damper for Blower NW110 • Elbow NW110 • Blower connection set • Air Diverter NW110 • Instalasi Blower, kabel TR, NYY 4 x 4 mm² 2 CONTROLLER • Skyrail V1 Software license package 10 units • Bus Converter • Power Pack 230V - 36VDC 3 PC & SOFTWARE • PC Win. 10, 64 Bit • LG LED Monitor 19" • UPS c/w Battery Back-up 4 DIVERTER • 3-way Diverter NW110 • 3-way Diverter NW110 (Transfer Unnit) • Optical tube switch 5 STATION • Compact Station NW110 with PCB - 10" Touch Screen Display • Topload (Through) Station NW110 with PCB - 10" Touch Screen Display • Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display - including Receiving unit - including Arrival Chute - including Stainless Steel Conveyor Belt Unit - including Control Panel - including Sensors • Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display • V-piece with valve • Arrival signal 6 CARRIER & AKSESORIS • Carrier rack up to NW110 • Receiving basket up to NW110 • Upholstery for carrier basket • Carrier NW110, 330 x 76 - red/blue/green/yellow • Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) 7 PEMIPAAN & PENGABELAN • Forwarding Tube PVC 110 x 2.3 - light grey • Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey • Sleeve PVC 110 x 2.3 L=110 - light grey • PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS • Material support 8 INSTALASI & TESTING COMMISSIONING • Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm • Wall chasing, sparing, and finishing • Floor coring • Trasportasi & Akomodasi • Pengiriman Material • Testing & Commissioning • Training User & Maintenance (1x) • Shopdrawing, As Build Drawing, SOP, and Blue Print 5.8. PEKERJAAN TRANSPORTASI DALAM GEDUNG 1. BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 23000 mm - Service Floors : Lantai 1 s/d Lantai 4 - Control Mode : Duplex Selective Collective - Door : 1200 x 2100 ( Side Opening) - ARD : Yes Termasuk : - Biaya pasang & Ijin Disnaker - Biaya Pengiriman unit Ke Lokasi Proyek
VI.
2.
Aksesoris Earthquake Device Mimic Panel ( Supervisory Panel )
3.
Testing and Commisioning - Testing and Commisioning
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. SENTRAL TATA SUARA a. Digital Matrix Mixer b. CD/MMC/USB Player w/ FM Tuner c. MDF-TS d. Power Amplifier 480 W e. Power Amplifier 120 W f. Emergency Message Panel g. Remote Microphone i. Emergency & Paging Microphone w/RU-2002 (Car Call) j. Speaker Selector 10 ch k. Cabinet Rack dengan Aksesoris l. Unitruptable Power Supply (UPS) Kapasitas 2 kVA, Incoming 1 Phase Outgoing 1 Phase (10 Menit) + Include Battery Cabinet m. Kabel FRC 2 x 2.5 mm2, dari MDF TS ke Instalasi Emergency 2.
3.
LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI DUA a. TBS-2 b. Kabel dari MDF-TS ke TBS-2, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
(Rp.)
(Rp.)
(Rp.)
JUMLAH HARGA (Rp.)
unit ttk ttk
10.00 160.00 40.00
202,252.95 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
202,252.95 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit
11.00 1.00 1.00 1.00 1.00 2.00
2,100,733.95 73,474,091.31 36,737,045.66 20,992,597.52 26,240,746.90 10,496,298.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,100,733.95 73,474,091.31 36,737,045.66 20,992,597.52 26,240,746.90 10,496,298.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh titik titik
45.00 45.00 45.00 45.00 45.00 45.00 135.00 45.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit ttk ttk
17.00 360.00 90.00
202,252.95 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
202,252.95 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 1.00 2.00
20,992,597.52 8,766,114.30 16,621,596.70
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
20,992,597.52 8,766,114.30 16,621,596.70
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh bh bh titik titik
15.00 15.00 15.00 15.00 15.00 15.00 45.00 115.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
4.00 202,252.95 120.00 159,922.37 30.00 159,922.37 JUMLAH 5.6.PEKERJAAN BED HEAD
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
202,252.95 159,922.37 159,922.37 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit ttk ttk
180,603,455.71
180,603,455.71
set
2.00
192,660,486.25
Tidak Dikerjakan
192,660,486.25
Tidak Dikerjakan
linc. pcs pcs
2.00 2.00 2.00
32,298,800.63 17,241,550.63 12,175,488.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
32,298,800.63 17,241,550.63 12,175,488.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 1.00 1.00
14,873,800.63 8,467,550.63 18,768,800.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
14,873,800.63 8,467,550.63 18,768,800.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
3.00 2.00 1.00
38,038,800.63 38,038,800.63 2,199,675.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
38,038,800.63 38,038,800.63 2,199,675.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
5.00 12.00 1.00
51,158,800.63 55,120,425.63 158,881,175.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
51,158,800.63 55,120,425.63 158,881,175.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 19.00 18.00
65,298,675.63 2,025,425.63 2,271,425.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
65,298,675.63 2,025,425.63 2,271,425.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit
19.00 18.00 18.00 57.00 38.00
1,395,050.63 2,456,950.63 1,313,050.63 1,651,300.63 2,112,550.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,395,050.63 2,456,950.63 1,313,050.63 1,651,300.63 2,112,550.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
mtr pcs pcs mtr ls
770.00 100.00 385.00 57.00 1.00
160,438.13 612,027.50 56,503.13 1,554,540.63 85,094,141.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
160,438.13 612,027.50 56,503.13 1,554,540.63 85,094,141.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
mtr 262,528.13 770.00 pcs 781,818.75 19.00 pcs 1,806,818.75 12.00 ls 6,000,000.00 1.00 ls 5,000,000.00 1.00 ls 12,500,000.00 1.00 ls 7,500,000.00 1.00 ls 3,500,000.00 1.00 JUMLAH 5.7.PEKERJAAN PNEUMATIC TUBE
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
262,528.13 781,818.75 1,806,818.75 6,000,000.00 5,000,000.00 12,500,000.00 7,500,000.00 3,500,000.00 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
-
-
unit
2.00
873,458,875.00
Tidak Dikerjakan
873,458,875.00
Tidak Dikerjakan
ls set
1.00 2.00
13,936,361.25 5,136,736.25
Tidak Dikerjakan Tidak Dikerjakan
13,936,361.25 5,136,736.25
Tidak Dikerjakan Tidak Dikerjakan
unit
2.00
5,500,000.00
Tidak Dikerjakan
5,500,000.00
Tidak Dikerjakan
JUMLAH 5.8.PEKERJAAN TRANSPORTASI DALAM GEDUNG
bh bh unit bh set bh bh bh bh set unit
1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
-
24,814,641.23 5,095,012.23 3,112,092.18 8,302,368.60 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
24,814,641.23 5,095,012.23 3,112,092.18 33,209,474.39 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
JUMLAH
-
24,814,641.23 5,095,012.23 3,112,092.18 8,302,368.60 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
24,814,641.23 5,095,012.23 3,112,092.18 33,209,474.39 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
m'
200.00
34,259.08
6,851,816.33
34,259.08
6,851,816.33
bh m' bh bh bh ttk ttk
1.00 10.00 105.00 1.00 5.00 106.00 5.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 17,206,452.08 217,689.89 766,995.43 16,375,639.00 772,435.80
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 17,206,452.08 766,995.43 16,375,639.00 772,435.80
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh bh ttk
1.00 15.00 96.00 2.00 3.00 98.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 16 of 280
NO.
URAIAN g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² 4.
5.
6.
LANTAI TIGA a. TBS-3 b. Kabel dari MDF-TS ke TBS-3, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Attenuator e. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit f. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI EMPAT a. TBS-4 b. Kabel dari MDF-TS ke TBS-4, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. SISTEM UTAMA FIRE ALARM a. MCFA Full Addressible b. Output control module c. Announciator d. Module for Pressurized Fan (Kontrol) e. Module for AC f. Module IP PABX (Autodial) g. Module for Sound System h. Module for Genset Panel i. Control Module Elevator j. Isolator Module k. Back up battery 2x12V l. End of Line (Aksesoris) m. Kabel FRC 3 x 1,5 mm2 2.
3.
4.
5.
6.
VOLUME
HARGA SATUAN
JUMLAH HARGA (Rp.)
HARGA SATUAN
JUMLAH HARGA
ttk
3.00
(Rp.) 154,487.16
Tidak Dikerjakan
(Rp.) 154,487.16
Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
bh m' bh bh ttk ttk
1.00 20.00 93.00 5.00 93.00 5.00
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
bh m' bh bh bh ttk ttk
1.00 25.00 83.00 2.00 3.00 85.00 3.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
ls
1.00
5,000,000.00
5,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
187,388,709.81
5,000,000.00 JUMLAH
(Rp.)
25,000,000,000,000.00 25,000,182,171,019.90
unit unit unit unit unit unit unit unit unit unit unit unit m'
1.00 9.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 58.00 78.00
59,162,035.46 2,465,769.28 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 1,981,072.92 48,839.20 84,227.12
59,162,035.46 22,191,923.48 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 3,962,145.85 2,832,673.81 6,569,715.09
59,162,035.46 2,465,769.28 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 1,981,072.92 48,839.20 -
59,162,035.46 22,191,923.48 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 3,962,145.85 2,832,673.81 -
LANTAI SATU a. TBFA - 1 b. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 10.00 10.00 10.00 97.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 101.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 115,636,808.73 4,977,578.13 1,339,356.11 9,697,919.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 9,647,438.17 1,337,268.66 191,038.38
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 115,636,808.73 4,977,578.13 1,339,356.11 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 9,647,438.17 1,337,268.66 191,038.38
LANTAI DUA a. TBFA - 2 b. Kabel dari MCFA ke TBFA-2, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-2, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 15.00 15.00 15.00 105.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 108.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 2,051,526.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA a. TBFA - 3 b. Kabel dari MCFA ke TBFA-3, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-3, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 20.00 20.00 20.00 100.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 103.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 35,288,941.37 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. TBFA - 4 b. Kabel dari MCFA ke TBFA-4, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-4, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 25.00 25.00 25.00 75.00 7.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 82.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 3,112,092.18 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
ls
1.00
10,000,000.00
10,000,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
320,001,377.27
TESTING & COMMISSIONING a. Progamming, Supervisi, Testing & Commissioning
6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 1. SENTRAL ICT (DISTRIBUTIONS) a. FIBER OPTIC CABLE DISTRIBUTIONS & UPS Support Equipment - Distribution Switch 16 Port SFP+ - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support - Unitruptable Power Supply (UPS) Kapasitas 5 kVA, Incoming 3 Phase Outgoing 1 Phase UPS. 15 Menit b.
2.
SATUAN
STRUKTUR SISTEM KABEL & INSTALASI INSTALASI DISTRIBUSI GEDUNG DENGAN MENGGUNAKAN KABEL FO - Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 1 FO SM 4 Core (Vertical Cabling System)
10,000,000.00 JUMLAH
10,000,000.00 303,733,742.53
unit unit unit
1.00 1.00 1.00
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
m
10.00
50,698.07
506,980.72
50,698.07
506,980.72
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 2 FO SM 4 Core (Vertical Cabling System)
m
16.00
50,698.07
811,169.16
50,698.07
811,169.16
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 3 FO SM 24 Core
m
22.00
50,698.07
1,115,357.59
50,698.07
1,115,357.59
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 4 FO SM 24 Core
m
28.00
50,698.07
1,419,546.02
50,698.07
1,419,546.02
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
4.00 6.00
20,931,439.39 573,823.72
83,725,757.55 3,442,942.31
20,931,439.39 573,823.72
83,725,757.55 3,442,942.31
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
15.00
7,982,546.77
119,738,201.58
7,982,546.77
119,738,201.58
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas 24 Port
unit
4.00
1,705,345.36
6,821,381.45
1,705,345.36
6,821,381.45
LANTAI 1 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
Pek. Non Standar Gedung D1 (Medik Sentral) - page 17 of 280
NO.
URAIAN
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 10.00 252.00 4.00 15.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 7,387,176.56 186,156,849.19 2,954,870.62 11,080,764.83
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 7,387,176.56 186,156,849.19 2,954,870.62 11,080,764.83
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
4.00 4.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
12.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 116.00 116.00 58.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 8.00 235.00 4.00 12.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
4 Pair, Category 6 SL Series Modular Jack ( Blue ) Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) BS Shuttered Faceplate - 1 Port
LANTAI 2 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support
LANTAI 3 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
4.00 4.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
10.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 130.00 130.00 65.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 8.00 263.00 4.00 10.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
e.
f.
LANTAI 4 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
4.00 4.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
11.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
2.00 86.00 86.00 43.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 8.00 174.00 4.00 11.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
e.
f.
TESTING COMMISIONING - Testing Commisioning, Labeling, & Documentation Data & Voice ( Fluke )
6.4. PEKERJAAN TELEPON 1. LANTAI SATU a. IP TELEPON - Handset Telepon TB 30 Pair - IP Phone Series - Titik Instalasi Phone
3.
4.
5.
lot 1.00 25,000,000.00 JUMLAH 6.3.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
25,000,000.00 1,046,263,034.57
25,000,000.00 JUMLAH
25,000,000.00 1,046,263,034.57
4,567,044.64 59,545,234.26 3,168,483.88
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 59,545,234.26 3,168,483.88
unit unit ttk
1.00 20.00 20.00
4,567,044.64 2,977,261.71 158,424.19
LANTAI DUA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 16.00 16.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 11.00 11.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 18.00 18.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
JUMLAH 6.4.PEKERJAAN TELEPON
88,280,762.77
6.5. PEKERJAAN IPTV 1. LANTAI SATU a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV 2.
JUMLAH HARGA (Rp.) 13,352,556.99 10,369,249.42 3,692,970.93
f.
2.
HARGA SATUAN (Rp.) 107,681.91 83,622.98 59,564.05
e.
6.
JUMLAH HARGA (Rp.) 13,352,556.99 10,369,249.42 3,692,970.93
b.
5.
HARGA SATUAN (Rp.) 107,681.91 83,622.98 59,564.05
f.
4.
VOLUME 124.00 124.00 62.00
e.
3.
SATUAN pcs pcs pcs
-
LANTAI DUA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 2.00 2.00
1,659,816.11 80,948.69 1,269,276.64
unit unit unit
2.00 1.00 1.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 161,897.39 2,538,553.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00 JUMLAH
1,659,816.11 80,948.69 1,269,276.64
1,659,816.11 80,948.69 1,269,276.64
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00 88,280,762.77
3,319,632.21 161,897.39 2,538,553.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 18 of 280
NO.
URAIAN
3.
4.
5.
SATUAN
3.
4.
5.
6.
7.
8.
9.
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
(Rp.)
(Rp.)
LANTAI TIGA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 1.00 1.00
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 4.00 4.00
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
JUMLAH 6.5.PEKERJAAN IPTV
27,020,082.89
6.6. PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) (D1, D2 & F1) 1. CENTRAL CONTROL - Software Management : '- OPENweb basic package for up to 1000 physical data points '- 250 Modbus data points - PC Server '- OS Windows, Core I7 '- Monitor 50" - 'System Integration with AC System - 'System Integration with Fire Alarm System INSTALASI CENTRAL CONTROL - Installation, cable UTP Cat-6 to LAN Time Server - Installation, cable UTP Cat-6 to LAN PC Server - Installation, cable UTP Cat-6 to LAN HVAC System (BACnet IP) - Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm 2.
VOLUME
MATERIAL BAS LANTAI DASAR DAN LANTAI 2 - Web Controller Onboard Ios DI8DO12 & AI8AO4 '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Maksimum IO Module 5 unit '- Gateway Modbus OR BACnet - 'Capacitive Monitor Touch Screen minimum 10" - IO Module DI16 CPU : ARM7 Architecture - Coupler module integrated bus terminating resistor - Bridge Bus Connector - Motion Sensor - Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories - Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC INSTALASI BAS LANTAI DASAR DAN LANTAI 2 - Installation, cable UTP Cat-6 to LAN for Web Controller - Installation, cable UTP Cat-6 to LAN for Capacitive Monitor Touch Screen - Installation, cable STP 18 AWG 1P, Integration data point Modbus for Power Meter ELectrical Panels - Installation, cable NYM 3X1,5mm for power supply Capacitive Monitor Touch Screen - Installation, cable NYM 3X1,5mm for power supply BAS Panel - Installation, cable ITC 2x0.6mm2 for digital point MATERIAL BAS LANTAI 3 S/D LANTAI MESIN LIFT - Web Controller Onboard Ios DI8DO12 & AI8AO4 '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Maksimum IO Module 5 unit '- Gateway Modbus OR BACnet - IO Module DI16 CPU : ARM7 Architecture - IO Module AI8AO4 CPU : ARM7 Architecture - Coupler module integrated bus terminating resistor - Bridge Bus Connector - Outdoor Temperature (PT1000) - Water Level Transmitter - Differential Pressure Transmitter - Motion Sensor - Mini Inverter to Control Exhaust Fan (Tangga Darurat) - Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories - Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC INSTALASI BAS LANTAI DASAR DAN LANTAI 2 - Installation, cable UTP Cat-6 to LAN for Web Controller - Installation, cable STP 18 AWG 1P, Integration data point Modbus for Power Meter ELectrical Panels - Installation, cable NYM 3X1,5mm for power supply BAS Panel - Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter - Installation, cable NYM 3X1,5mm for power supply Differential Pressure Transmitter - Installation, cable ITC 2x0.6mm2 for digital point - Installation, cable NYAF 2x0,75mm2 for analog point
MATERIAL DALI LIGHTING CONTROL LANTAI 2 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI MATERIAL DALI LIGHTING CONTROL LANTAI 3 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI MATERIAL DALI LIGHTING CONTROL LANTAI 4 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI TESTING, COMMISSIONING & TRAINING - Testing and Commissioning - Training operator 2 person 2 days
6.7. PEKERJAAN MASTER CLOCK SYSTEM 1. CENTRAL CONTROL a. Time Server
JUMLAH
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00 27,020,082.89
lot
1.00
28,000,964.58
Tidak Dikerjakan
28,000,964.58
Tidak Dikerjakan
unit
1.00
31,995,123.21
Tidak Dikerjakan
31,995,123.21
Tidak Dikerjakan
lot lot
1.00 1.00
6,821,460.30 6,821,460.30
Tidak Dikerjakan Tidak Dikerjakan
6,821,460.30 6,821,460.30
Tidak Dikerjakan Tidak Dikerjakan
titik titik titik titik
1.00 1.00 1.00 1.00
719,904.84 719,904.84 719,904.84 699,934.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
719,904.84 719,904.84 719,904.84 699,934.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
2.00
28,000,964.58
Tidak Dikerjakan
28,000,964.58
Tidak Dikerjakan
unit unit unit unit unit unit unit
2.00 4.00 2.00 6.00 85.00 2.00 2.00
24,406,221.81 7,231,339.70 1,120,277.00 161,678.93 739,875.64 5,234,260.39 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
24,406,221.81 7,231,339.70 1,120,277.00 161,678.93 739,875.64 5,234,260.39 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik titik titik titik titik titik
2.00 2.00 9.00 2.00 2.00 54.00
719,904.84 719,904.84 819,758.81 699,934.05 699,934.05 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
719,904.84 719,904.84 819,758.81 699,934.05 699,934.05 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
2.00
28,000,964.58
Tidak Dikerjakan
28,000,964.58
Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit
4.00 1.00 4.00 7.00 1.00 1.00 1.00 34.00 1.00 1.00 1.00
7,231,339.70 12,823,161.78 1,120,277.00 161,678.93 1,898,181.64 3,016,546.06 2,028,469.94 739,875.64 1,019,466.74 5,234,260.39 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
7,231,339.70 12,823,161.78 1,120,277.00 161,678.93 1,898,181.64 3,016,546.06 2,028,469.94 739,875.64 1,019,466.74 5,234,260.39 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik titik titik titik titik titik titik
2.00 4.00 2.00 1.00 1.00 50.00 4.00
719,904.84 819,758.81 699,934.05 540,167.71 699,934.05 819,758.81 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
719,904.84 819,758.81 699,934.05 540,167.71 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan
28,000,964.58
Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,120,277.00 161,678.93 6,432,507.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan
20,629,800.67
Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,019,466.74 2,028,469.94 1,698,473.71 580,109.29 510,689.66 1,618,590.54 1,299,057.85 620,050.88 10,000,000.00 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
719,904.84 719,904.84 719,904.84 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
KONTROL HVAC RUANG OK & CATHLAB - Web Controller Onboard Ios DI8DO12 & AI8AO4 unit 8.00 28,000,964.58 '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Maksimum IO Module 5 unit '- Gateway Modbus OR BACnet - Coupler module integrated bus terminating resistor unit 8.00 1,120,277.00 - Bridge Bus Connector unit 8.00 161,678.93 - LCD Display Nurse Station Operating Management unit 1.00 6,432,507.98 '- 32" complete with Mini PC for Control & monitoring AHU, Temperature, Humidity Sensor, Pressure,Stopwatch & Digital Clock patient, schedule operation room, alarm etc. - Hospital Automation System (HAS) unit 8.00 20,629,800.67 '- Capacitive Monitor Touch Screen minimum 21,5" complete with Mini PC, for Control & monitoring AHU, Temperature, Humidity Sensor, Pressure, Stopwatch & Digital Clock - Differential Pressure Switch unit 24.00 1,019,466.74 - Differential Pressure Transmitter unit 16.00 2,028,469.94 - Room Temperature & Humidity Transmitter unit 8.00 1,698,473.71 - Pipe Temperature unit 16.00 580,109.29 - Duct Temperature Sensor unit 16.00 510,689.66 - Damper Modulating 10Nm unit 16.00 1,618,590.54 - Damper Konstan 10Nm unit 16.00 1,299,057.85 - Control 0-100% Exhaust Fan unit 16.00 620,050.88 - Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories unit 1.00 10,000,000.00 - Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC unit 3.00 819,758.81 INSTALASI KONTROL HVAC RUANG OK & CATHLAB - Installation, cable UTP Cat-6 to LAN for Web Controller titik 8.00 719,904.84 - Installation, cable UTP Cat-6 to LAN for LCD Display Nurse Station Operating Management titik 1.00 719,904.84 - Installation, cable UTP Cat-6 to LAN for Hospital Automation System (HAS) titik 7.00 719,904.84 - Installation, cable NYM 3X1,5mm for power supply LCD Display Nurse Station Operating Management titik 1.00 540,167.71 - Installation, cable NYM 3X1,5mm for power supply Hospital Automation System (HAS) titik 7.00 540,167.71 - Installation, cable NYM 3X1,5mm for power supply BAS Panel titik 1.00 699,934.05 - Installation, cable NYM 3X1,5mm for power supply Differential Pressure Transmitter titik 16.00 540,167.71 - Installation, cable NYM 3X1,5mm for power supply Room Temperature & Humidity Transmitter titik 8.00 540,167.71 - Installation, cable NYM 3X1,5mm for power supply Damper Modulating & Konstan titik 32.00 540,167.71 - Installation, cable ITC 2x0.6mm2 for digital point titik 72.00 819,758.81 - Installation, cable NYAF 2x0,75mm2 for analog point titik 96.00 819,758.81 MATERIAL DALI LIGHTING CONTROL LANTAI DASAR - Web Controller DALI '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Controller with 4 DALI Interface - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable UTP Cat-6 to LAN - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
unit
2.00
46,752,583.06
93,505,166.12
46,752,583.06
93,505,166.12
unit unit unit unit
45.00 45.00 38.00 38.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
42,281,260.58 51,268,117.50 38,739,736.16 46,328,637.56
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
42,281,260.58 51,268,117.50 38,739,736.16 46,328,637.56
titik titik
2.00 166.00
719,904.84 699,934.05
1,439,809.69 116,189,052.39
719,904.84 699,934.05
1,439,809.69 116,189,052.39
unit unit unit unit
23.00 23.00 53.00 53.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik
152.00
699,934.05
Tidak Dikerjakan
699,934.05
Tidak Dikerjakan
unit unit unit unit
16.00 16.00 38.00 38.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik
108.00
699,934.05
Tidak Dikerjakan
699,934.05
Tidak Dikerjakan
unit unit unit unit
13.00 13.00 25.00 25.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik
76.00
699,934.05
Tidak Dikerjakan
699,934.05
Tidak Dikerjakan
lot lot 1.00 85,000,000.00 lot 1.00 15,000,000.00 JUMLAH 6.6.PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) (D1, D2 & F1) unit
1.00
31,749,709.16
85,000,000.00 15,000,000.00 489,751,779.98
Tidak Dikerjakan
85,000,000.00 15,000,000.00 JUMLAH 31,749,709.16
85,000,000.00 15,000,000.00 489,751,779.98
Tidak Dikerjakan
Pek. Non Standar Gedung D1 (Medik Sentral) - page 19 of 280
NO.
URAIAN
b.
c.
2.
3.
4.
5.
6.
- AC input: 90 - 240 VAC / 50 - 60 Hz / max. 30 VA (typical < 5 VA - NTP server, max. number NTP and SNTP client requests: typical 250 requests / sec. - Synchronized with DCF, GPS (3148, 4500), LAN - 10BaseT / 100BaseTX (IEEE 802.3) - 1 slave clock line, 700mA, for up to 100 slave clocks. - 1 Serial Interface RS 232 / 422, telegram programmable by script file - Accuracy GPS to NTP Server typical < +/- 0.5 ms, NTP client to NTP server typical < +/- 0.5 ms - Dimensions: height x width x depth in mm: 44 (1 HU) x 483 (19") x 120 mm. GPS Antenna - Input voltage 10 – 40 VDC - Power Consumption < 0.4 W (< 40 mA @ 10V) - Standards EN 50081-1, EN 61000-6-2 - Degree of protection IP 65 - Cable 10 m, UV-protected, 4 wires, 0.25 mm (AWG 23) - Satellites 56 channel satellite tracking, min. 3 satellites required - Accuracy of leading edge typically +/- 5 µs Installation - Installation Time Server, Cable UTP Cat-6 to LAN - Installation GPS Antenna, UV-protected, 4 wires, 0.25 mm (AWG 23)
LANTAI 1 a. Converter b. 'Analog Clock '- Diameter 500mm '- Hour and Minute c. 'Installation Analog Clock, Cable ITC 2X1X0,6mm d. 'Installation Converter, Cable UTP Cat-6 to LAN LANTAI 2 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 3 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 4 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm TESTING, COMMISSIONING AND TRANING a. Testing and Commissioning b. Training operator 5 person 1 days
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
(Rp.)
(Rp.)
unit
1.00
19,908,203.57
Tidak Dikerjakan
19,908,203.57
Tidak Dikerjakan
titik titik
1.00 1.00
719,904.84 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
719,904.84 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
unit unit
1.00 5.00
8,362,735.63 5,931,216.34
Tidak Dikerjakan Tidak Dikerjakan
8,362,735.63 5,931,216.34
Tidak Dikerjakan Tidak Dikerjakan
titik titik
5.00 1.00
819,758.81 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
819,758.81 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
unit
5.00
5,931,216.34
Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
titik
5.00
819,758.81
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
unit
4.00
5,931,216.34
Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
titik
4.00
819,758.81
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
unit
10.00
5,931,216.34
Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
titik
10.00
819,758.81
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
unit 1.00 17,500,000.00 unit 1.00 10,000,000.00 JUMLAH 6.7.PEKERJAAN MASTER CLOCK SYSTEM
Tidak Dikerjakan Tidak Dikerjakan
17,500,000.00 10,000,000.00 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan
-
-
Pek. Non Standar Gedung D1 (Medik Sentral) - page 20 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG D2 (POLIKLINIK, DIAG & KANTOR) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
3,557,492,892.39
II.
PEKERJAAN NON STANDAR
Rp
7,173,984,715.88
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
10,731,477,608.26
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD
III. PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 3.3. PEKERJAAN AIR PANAS 3.4. PEKERJAAN AIR HUJAN IV.
Rp Rp Rp Rp
315,283,146.16 518,658,084.99 392,037,078.11 89,291,221.57
Rp Rp Rp Rp Rp
319,463,417.31 280,599,660.68 1,207,881,996.18 434,278,287.39 3,557,492,892.39
JUMLAH PEKERJAAN STANDAR Rp
3,557,492,892.39
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 4.2. PEKERJAAN RAK KABEL 4.3. PEKERJAAN PANEL DAN KABEL FEEDER STD 4.4. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI JUMLAH -PEKERJAAN STANDARD
Rekapitulasi Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall)
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA
RAP
RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. III.
URAIAN 2. PEKERJAAN STANDARD PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 1. SISTEM AIR BERSIH a. Roof Tank (Lantai Atap) - Roof Tank + Dudukan kapasitas : 20 M3 Material : Fibre Type : Panell - Gate valve dia. 65 mm (Dari Pompa GWT ke Roof Tank) - Gate valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Gate valve dia. 65 mm (Dari Header ke Booster Pump) - Gate valve dia. 80 mm (Dari Roof tank ke Header) - Gate valve dia. 80 mm (Dari Roof tank ke Pipa Kuras) - Check valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Floating Valve dia. 65 mm (Dari GWT ke Roof Tank) - Header dimeter 100 mm - Water Level Control ( WLC ) - Pipa Kuras dia. 80 mm - Vent Out dia. 65 mm b. Pompa Tekan (lantai Atap) - Packaged Booster Pump (1 Unit Operasi / 1 Stand By) (LANTAI ATAP) kapasitas : 250 Lpm head : 18 meter Putaran : 1500 Rpm Type : Package Booster Pump - Gate valve dia. 65 mm - Strainer dia. 65 mm - Check valve dia. 65 mm - Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) c. Pemipaan Polypropelyne PN-10 - Pipa Distribusi Dari Lantai 1 ke Roof Tank, PPR dia. 80 mm - Pipa Distribusi Dari Roof Tank ke Shaft Gedung, PPR dia. 50 mm 2.
3.
4.
5.
6.
LANTAI SATU 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI DUA 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI TIGA 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm
3.
4.
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
unit
1.00
70,174,062.50
70,174,062.50
70,174,062.50
70,174,062.50
bh bh bh bh bh bh bh bh set m' bh
1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 1.00 30.00 2.00
3,759,305.94 3,759,305.94 3,759,305.94 4,705,483.44 4,705,483.44 3,868,227.00 1,313,101.88 3,232,914.63 2,671,520.03 154,041.27 267,601.88
3,759,305.94 7,518,611.89 7,518,611.89 9,410,966.89 4,705,483.44 7,736,454.00 1,313,101.88 6,465,829.25 2,671,520.03 4,621,238.13 535,203.75
70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50
70,174,062.50 140,348,125.00 140,348,125.00 140,348,125.00 70,174,062.50 140,348,125.00 70,174,062.50 140,348,125.00 70,174,062.50 2,105,221,875.00 140,348,125.00
unit
1.00
56,101,925.14
56,101,925.14
70,174,062.50
70,174,062.50
bh bh bh bh bh ttk
6.00 2.00 4.00 4.00 1.00 1.00
3,759,305.94 3,139,528.88 4,655,488.50 791,366.63 3,232,914.63 8,917,884.38
22,555,835.67 6,279,057.75 18,621,954.00 3,165,466.50 3,232,914.63 8,917,884.38
70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50
421,044,375.00 140,348,125.00 280,696,250.00 280,696,250.00 70,174,062.50 70,174,062.50
m' m'
50.00 130.00
154,041.27 64,473.33
7,702,063.54 8,381,533.52
70,174,062.50 70,174,062.50
3,508,703,125.00 9,122,628,125.00
m' m' m' m'
50.00 110.00 250.00 180.00
64,473.33 42,693.87 28,966.44 13,697.34
3,223,666.74 4,696,325.78 7,241,610.44 2,465,521.02
70,174,062.50 70,174,062.50 70,174,062.50 70,174,062.50
3,508,703,125.00 7,719,146,875.00 17,543,515,625.00 12,631,331,250.00
bh
1.00
3,224,009.94
3,224,009.94
70,174,062.50
70,174,062.50
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
6,404,080.61 7,820,939.28 2,465,521.02
70,174,062.50 70,174,062.50 70,174,062.50
10,526,109,375.00 18,946,996,875.00 12,631,331,250.00
bh
1.00
3,224,009.94
3,224,009.94
70,174,062.50
70,174,062.50
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
LANTAI EMPAT 1 Pemipaan Polypropelyne PN.10 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm
m' m' m'
150.00 270.00 180.00
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
RISER DI SHAFT Pemipaan Polypropelyne PN.10 : - Pemipaan Polypropelyne PN-10, PPR Dia. 80 mm - Water Hamer ( WH ) - AAV
m' bh bh
40.00 4.00 1.00
154,041.27 1,337,340.80 1,617,422.67
6,161,650.83 5,349,363.18 1,617,422.67
JUMLAH 3.1.PEKERJAAN AIR BERSIH
315,283,146.16
3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 1. SISTEM PEGOLAHAN LIMBAH 1. Bak Netralisasi 4 m3 2. Bak Kontrol/Sewage 3. Sewage Pump Kap. 200 Lpm 4. Gate valve diameter 150 mm / 20 K 5. Gate valve diameter 100 mm / 20 K 6. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm 2.
SATUAN
LANTAI SATU a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm d. Pemipaan Air kotor Limbah Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 60 mm LANTAI DUA a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm
154,041.27 1,337,340.80 1,617,422.67 JUMLAH
6,161,650.83 5,349,363.18 1,617,422.67 100,923,430,311.68
unit unit unit bh bh
1.00 1.00 2.00 2.00 3.00
7,500,000.00 2,248,059.23 12,639,500.00 14,843,102.22 9,815,798.38
7,500,000.00 2,248,059.23 25,279,000.00 29,686,204.43 29,447,395.15
7,500,000.00 2,248,059.23 12,639,500.00 14,843,102.22 9,815,798.38
7,500,000.00 2,248,059.23 25,279,000.00 29,686,204.43 29,447,395.15
m'
170.00
214,300.29
36,431,050.11
214,300.29
36,431,050.11
m' m' bh
150.00 200.00 14.00
214,300.29 100,092.70 325,155.63
32,145,044.22 20,018,540.42 4,552,178.75
214,300.29 100,092.70 325,155.63
32,145,044.22 20,018,540.42 4,552,178.75
m' m' m' m' m' bh
70.00 90.00 110.00 190.00 270.00 45.00
214,300.29 100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
15,001,020.64 9,008,343.19 5,473,063.52 7,105,007.45 10,096,589.53 8,115,924.38
214,300.29 100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
15,001,020.64 9,008,343.19 5,473,063.52 7,105,007.45 10,096,589.53 8,115,924.38
m' m' m'
110.00 190.00 270.00
49,755.12 37,394.78 37,394.78
5,473,063.52 7,105,007.45 10,096,589.53
49,755.12 37,394.78 37,394.78
5,473,063.52 7,105,007.45 10,096,589.53
m' m'
80.00 44.00
845,760.58 367,876.23
67,660,846.36 16,186,554.00
845,760.58 367,876.23
67,660,846.36 16,186,554.00
m' bh
110.00 10.00
100,092.70 325,155.63
11,010,197.23 3,251,556.25
100,092.70 325,155.63
11,010,197.23 3,251,556.25
m' m' m' m' bh
95.00 90.00 140.00 180.00 43.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 5,235,268.65 6,731,059.69 7,755,216.63
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 5,235,268.65 6,731,059.69 7,755,216.63
m' m' m'
90.00 140.00 180.00
49,755.12 37,394.78 37,394.78
4,477,961.06 5,235,268.65 6,731,059.69
49,755.12 37,394.78 37,394.78
4,477,961.06 5,235,268.65 6,731,059.69
LANTAI TIGA
Pek. Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 22 of 280
NO.
URAIAN a.
Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
(Rp.)
(Rp.)
m' bh
110.00 10.00
100,092.70 325,155.63
11,010,197.23 3,251,556.25
100,092.70 325,155.63
11,010,197.23 3,251,556.25
m' m' m' m' bh
95.00 90.00 140.00 180.00 43.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 5,235,268.65 6,731,059.69 7,755,216.63
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,508,806.70 4,477,961.06 5,235,268.65 6,731,059.69 7,755,216.63
m' m' m'
90.00 140.00 180.00
49,755.12 37,394.78 37,394.78
4,477,961.06 5,235,268.65 6,731,059.69
49,755.12 37,394.78 37,394.78
4,477,961.06 5,235,268.65 6,731,059.69
m' bh
40.00 9.00
100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan
100,092.70 325,155.63
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' bh
30.00 20.00 45.00 40.00 18.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m'
20.00 45.00 40.00
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
49,755.12 37,394.78 37,394.78
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
40.00
214,300.29
8,572,011.79
214,300.29
8,572,011.79
m'
40.00
100,092.70
4,003,708.08
100,092.70
4,003,708.08
m'
40.00
65,820.46
2,632,818.42
65,820.46
2,632,818.42
m'
40.00
649,783.84
25,991,353.64
649,783.84
25,991,353.64
JUMLAH 3.2.PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 3.3. PEKERJAAN AIR PANAS 1. SISTEM AIR PANAS a. Heat Pump - Heat Pump Water Heater unit 1.00 183,665,483.44 Kapasitas: 21 - 28.5 kW Type : Air to Water Power Input : 8.45 kW Refrigerant : R134 A Req. Hot Water Flow Rate : 8 m3/h Rate Water Temp. / Max. Water Output Temp. : 70 oC - Aksesoris - Gate Valve dia. 32 mm (Dari Heat Pump ke Pompa) bh 1.00 497,501.97 - Check valve dia. 32 mm (Dari Heat Pump ke Pompa) bh 1.00 589,554.38 b. Pompa Heat Pump - Pompa Sirkulasi Pompa ke Heat Pump ( P-HP 1. & P-HP.2 ) unit 1.00 19,218,788.44 Kapasitas : 10 M3/h , Head. 22.8 - 40 Meter - Pompa Return unit 1.00 8,136,488.44 Kapasitas : 3.1 M3/h , Head. 20.61 - 60 Meter - Accessories Flexible Joint dia.32 mm bh 3.00 488,187.00 Gate valve dia. 32 mm bh 3.00 497,501.97 Check valve dia. 32 mm bh 2.00 589,554.38 Y-Strainer dia.32 mm bh 2.00 790,290.38 Pipa Haeder 63/DN50 mm bh 1.00 664,067.16 c. Panel Kontrol & instalasi Pengkabelan ke unit unit 1.00 8,917,884.38 d. Hot Water Storage Tank unit 1.00 62,750,756.25 Kapasitas : 2000 liter Type : Vertical Cylinder Working Pressure : 5 Bar Material : SS 400 / Isolasi : Polyurethane 50 mm kelengkapan : Safety valve, Preesure dauge, Air fan & Magnesium Anode - Accessories Gate valve dia. 50 mm bh 1.00 3,224,009.94 Gate valve dia. 32 mm bh 4.00 497,501.97 Pipa Haeder 100/DN50 mm (Dari Pressure Tank) bh 1.00 1,152,175.17 e. Pipa Supply & Distribusi Polypropeline PN-20 - Pipa Supply Dari Roof Tank ke Heat Pump, PPR PN-10 dia. 32 mm m' 20.00 28,966.44 - Pipa Supply Air Panas, PPR PN-20, dia. 50 mm (Ke Shaft Gedung) m' 150.00 101,735.52 - Pipa Supply & Return Air Panas, PPR PN-20, dia. 32 mm m' 50.00 44,858.68 - Pipa Supply & Return Air Panas, PPR PN-10 dia. 32 mm m' 50.00 44,858.68
518,658,084.99
b.
c.
5.
6.
2.
3.
4.
5.
6.
LANTAI EMPAT a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm RISER DI SHAFT a. Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm b. Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 : - Diameter 100 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 90 mm d. Pemipaan Air kotor Limbah PVC Kelas 10 kg/cm2 : - Diameter 90 mm
LANTAI SATU 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI DUA 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI TIGA 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm LANTAI EMPAT 1 Pemipaan Polypropelyne PN.20 : * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 50 mm RISER DI SHAFT Pemipaan Polypropelyne PN.20 : - Pemipaan Polypropelyne PN-20, PPR Dia. 80 mm - Water Hamer ( WH )
3.4. PEKERJAAN AIR HUJAN 1. Roof Drain diameter 100 mm 2. Pemipaan Air hujan PVC Kelas 10 kg/cm2 : - Diameter 100 mm (di Shaft) 3. Bak Kontrol / Bak Sumpit 80x80 4. Sewage Pump Kap. 200 Lpm IV.
SATUAN
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 1. Air Terminal - Radius 20 m 2. Kabel Coaxial 2 x 35 mm2
JUMLAH
518,658,084.99
183,665,483.44
183,665,483.44
183,665,483.44
497,501.97 589,554.38
497,501.97 589,554.38
497,501.97 589,554.38
19,218,788.44
19,218,788.44
19,218,788.44
8,136,488.44
8,136,488.44
8,136,488.44
1,464,561.00 1,492,505.92 1,179,108.75 1,580,580.75 664,067.16 8,917,884.38 62,750,756.25
488,187.00 497,501.97 589,554.38 790,290.38 664,067.16 8,917,884.38 62,750,756.25
1,464,561.00 1,492,505.92 1,179,108.75 1,580,580.75 664,067.16 8,917,884.38 62,750,756.25
3,224,009.94 1,990,007.89 1,152,175.17
3,224,009.94 497,501.97 1,152,175.17
3,224,009.94 1,990,007.89 1,152,175.17
579,328.84 15,260,328.13 2,242,933.93 2,242,933.93
28,966.44 101,735.52 44,858.68 44,858.68
579,328.84 15,260,328.13 2,242,933.93 2,242,933.93
m' m' m' m'
50.00 110.00 250.00 180.00
101,735.52 69,044.43 44,858.68 20,007.79
5,086,776.04 7,594,886.98 11,214,669.63 3,601,401.56
101,735.52 69,044.43 44,858.68 20,007.79
5,086,776.04 7,594,886.98 11,214,669.63 3,601,401.56
bh
1.00
3,224,009.94
3,224,009.94
3,224,009.94
3,224,009.94
m' m' m'
150.00 270.00 180.00
69,044.43 44,858.68 20,007.79
10,356,664.06 12,111,843.20 3,601,401.56
69,044.43 44,858.68 20,007.79
10,356,664.06 12,111,843.20 3,601,401.56
bh
1.00
3,224,009.94
3,224,009.94
3,224,009.94
3,224,009.94
m' m' m'
150.00 270.00 180.00
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' m' m'
100.00 88.00 90.00
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
3,224,009.94
Tidak Dikerjakan
3,224,009.94
Tidak Dikerjakan
m' 40.00 245,576.33 bh 4.00 1,337,340.80 JUMLAH 3.3.PEKERJAAN AIR PANAS
9,823,053.33 5,349,363.18 392,037,078.11
245,576.33 1,337,340.80 JUMLAH
9,823,053.33 5,349,363.18 392,037,078.11
bh
19.00
129,645.42
2,463,262.92
129,645.42
2,463,262.92
m' unit unit
570.00 2.00 2.00
100,092.70 2,248,059.23 12,639,500.00
57,052,840.19 4,496,118.47 25,279,000.00
100,092.70 2,248,059.23 12,639,500.00
57,052,840.19 4,496,118.47 25,279,000.00
JUMLAH 3.4.PEKERJAAN AIR HUJAN
89,291,221.57
bh
8.00
1,685,441.23
13,483,529.85
JUMLAH 1,685,441.23
89,291,221.57 13,483,529.85
Pek. Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 23 of 280
NO.
URAIAN
3. 4. 5. 6. 7. 8.
9. 4.2.
PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2.
3.
4.
5.
6.
4.3.
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
(Rp.) 75,238,096.58 37,619,048.29 90,285,715.89 3,856,289.54 5,393,411.94 5,663,082.54 8,831,891.83 34,513,600.00 15,536,622.00
(Rp.) 376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
(Rp.) 75,238,096.58 37,619,048.29 90,285,715.89 3,856,289.54 5,393,411.94 5,663,082.54 8,831,891.83 34,513,600.00 15,536,622.00
lot 1.00 29,042,128.85 JUMLAH 4.1.PEKERJAAN PENANGKAL PETIR
29,042,128.85 319,463,417.31
29,042,128.85 JUMLAH
29,042,128.85 319,463,417.31
m' m' m' bh bh bh bh bh unit
200.00 100.00 240.00 2.00 8.00 8.00 2.00 8.00 4.00
btg
45.00
1,032,478.94
46,461,552.12
btg
45.00
786,226.43
35,380,189.15
1,032,478.94 786,226.43
46,461,552.12 35,380,189.15
LANTAI DUA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
45.00
1,032,478.94
46,461,552.12
1,032,478.94
46,461,552.12
btg
45.00
786,226.43
35,380,189.15
786,226.43
35,380,189.15
LANTAI TIGA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
43.00
1,032,478.94
Tidak Dikerjakan
1,032,478.94
Tidak Dikerjakan
btg
43.00
786,226.43
Tidak Dikerjakan
786,226.43
Tidak Dikerjakan
LANTAI EMPAT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
45.00
1,032,478.94
Tidak Dikerjakan
1,032,478.94
Tidak Dikerjakan
btg
45.00
786,226.43
Tidak Dikerjakan
786,226.43
Tidak Dikerjakan
SHAFT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
15.00
1,032,478.94
15,487,184.04
1,032,478.94
15,487,184.04
btg
15.00
786,226.43
11,793,396.38
786,226.43
11,793,396.38
pcs
1,800.00
49,797.55
89,635,597.71
JUMLAH 4.2.PEKERJAAN RAK KABEL
280,599,660.68
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik MDPMDP - D2- (SMART D1 (SMART PANEL), PANEL), Type Type TestTest - 3B- 3B - SDP - D.D2 - LP - D.D2 - PP - D.D2 - PP - LAB.D2 - PP - SERVER - SDP - AC.D2 - PP - AC.1 b. Kabel Feeder - Dari MDP - D2 ke SDP - D.D2, NYY 4 x 185 mm2 + Grounding - Dari SDP - D.D2 ke LP - D.D2, NYY 4 x 6 mm2 + Grounding - Dari SDP - D.D2 ke PP - D.D2 , NYY 4 x 120 mm2 + Grounding - Dari SDP - D.D2 ke PP - LAB.D2, NYY 4 x 50 mm2 + Grounding - Dari SDP - D.D2 ke PP - SERVER, NYY 4 x 16 mm2 + Grounding - Dari SDP - AC.D2 ke PP - AC,1, NYY 4 x 10 mm2 + Grounding
49,797.55 JUMLAH
89,635,597.71 280,599,660.68
unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
116,644,939.20 30,031,932.37 16,255,044.46 26,188,718.76 15,367,086.34 11,780,099.70 35,561,718.11 15,838,882.62
116,644,939.20 30,031,932.37 16,255,044.46 26,188,718.76 15,367,086.34 11,780,099.70 35,561,718.11 15,838,882.62
116,644,939.20 30,031,932.37 16,255,044.46 26,188,718.76 15,367,086.34 11,780,099.70 35,561,718.11 15,838,882.62
116,644,939.20 30,031,932.37 16,255,044.46 26,188,718.76 15,367,086.34 11,780,099.70 35,561,718.11 15,838,882.62
m' m' m' m' m' m'
10.00 8.00 10.00 12.00 12.00 8.00
1,428,668.50 50,502.03 945,140.35 383,971.99 138,683.66 81,684.67
14,286,684.99 404,016.28 9,451,403.54 4,607,663.87 1,664,203.91 653,477.33
1,428,668.50 50,502.03 945,140.35 383,971.99 138,683.66 81,684.67
14,286,684.99 404,016.28 9,451,403.54 4,607,663.87 1,664,203.91 653,477.33
unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00
26,612,768.58 17,618,907.28 19,397,217.27 16,162,750.38 296,407,754.72
26,612,768.58 17,618,907.28 19,397,217.27 16,162,750.38 296,407,754.72
26,612,768.58 17,618,907.28 19,397,217.27 16,162,750.38 296,407,754.72
26,612,768.58 17,618,907.28 19,397,217.27 16,162,750.38 296,407,754.72
unit
1.00
85,398,313.44
m' m' m' m' m' m'
20.00 8.00 10.00 20.00 10.00 10.00
741,203.31 50,502.03 383,971.99 81,684.67 383,971.99 383,971.99
unit unit unit unit
1.00 1.00 1.00 1.00
25,497,287.14 16,255,044.46 19,738,182.98 14,457,921.85
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
25,497,287.14 16,255,044.46 19,738,182.98 14,457,921.85
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m'
30.00 8.00 10.00 30.00
973,677.70 50,502.03 383,971.99 81,684.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
973,677.70 50,502.03 383,971.99 81,684.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit
1.00 1.00 1.00 1.00
26,375,809.47 15,573,113.05 20,420,114.39 14,215,641.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
26,375,809.47 15,573,113.05 20,420,114.39 14,215,641.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m'
40.00 8.00 10.00 40.00
741,203.31 50,502.03 81,684.67 50,502.03
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
741,203.31 50,502.03 81,684.67 50,502.03
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 1.00 1.00
14,696,328.44 15,087,931.04 34,898,540.05
14,696,328.44 15,087,931.04 34,898,540.05
14,696,328.44 15,087,931.04 34,898,540.05
14,696,328.44 15,087,931.04 34,898,540.05
m' m' m'
15.00 50.00 50.00
138,683.66 607,331.81 8,148,722.92
2,080,254.89 30,366,590.57 407,436,145.96
138,683.66 607,331.81 8,148,722.92
2,080,254.89 30,366,590.57 407,436,145.96
JUMLAH 4.3.PEKERJAAN PANEL DAN KABEL FEEDER STD PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W bh 944,413.66 52.00 - Lampu LED Panel 26 W bh 944,413.66 32.00 - Lampu LED Batten Tube 20 W bh 621,121.76 8.00 - Lampu LED Down Light 16 W bh 327,903.52 4.00
1,207,881,996.18
2.
3.
4.
5.
4.4.
- Lantai Satu, Kabel Coaxial 2 x 35 mm2 - dari Lantai Atap ke Lantai Satu, Kabel Coaxial 2 x 35 mm2 - Lantai Atap, Kabel Coaxial 2 x 35 mm2 Obstuction Lamp & Instalasi Connecting Sleeve lengkap surge Arester Lightning Arrester 10KA Lightning Flash Counter Tiang Menara Grounding sistem - Copper road - Pentanahan max.2 Ohm bahan GSP dia.50mm² + BC.70mm² - Bak kontrol ( 40x40) cm lengkap tutup - Testing/pengukuran pentanahan - Material bantu dan accessories - Proses pengesahan gambar ke DepNaker RI Fitting-Fitting
SATUAN
LANTAI DUA a. Panel Listrik - SDP - 2.D2 - LP - 2.D2 - PP - 2.D2 - PP - AC.2 - PP - BEDAH b. Unitruptable Power Supply (UPS) Incoming 3 Phase Outgoing 3 Phase - SDP - 2.D2 ke PP - BEDAH Kapasitas 5 KVA, 10 Menit c. Kabel Feeder - Dari MDP - D2 ke SDP - 2.D2, NYY 4 x 95 mm2 + Grounding - Dari SDP - 2.D2 ke LP - 2.D2, NYY 4 x 6 mm2 + Grounding - Dari SDP - 2.D2 ke PP - 2.D2, NYY 4 x 50 mm2 + Grounding - Dari SDP - AC.D2 ke PP - AC.2, NYY 4 x 10 mm2 + Grounding - Dari SDP - 2.D2 ke PP - BEDAH, NYY 4 x 50 mm2 + Grounding - Dari SDP - 2.D2 ke PP - BEDAH, NYY 4 x 50 mm2 + Grounding LANTAI TIGA a. Panel Listrik - SDP - 3.D2 - LP - 3.D2 - PP - 3.D2 - PP -AC.3 b. Kabel Feeder - Dari MDP -D2 ke SDP - 3.D2, NYY 4 x 95 mm2 + Grounding - Dari SDP - 3.D2 ke LP - 3.D2, NYY 4 x 6 mm2 + Grounding - Dari SDP - 3.D2 ke PP - 3.D2, NYY 4 x 50 mm2 + Grounding - Dari SDP - AC.D2 ke PP - AC.3, NYY 4 x 10 mm2 + Grounding LANTAI EMPAT a. Panel Listrik - SDP - 4.D2 - LP - 4.D2 - PP - 4.D2 - PP - AC.4 b. Kabel Feeder - Dari MDP - D2 ke SDP - 4.D2, NYY 4 x 95 mm2 + Grounding - Dari SDP - 4.D2 ke LP - 4.D2, NYY 4 x 6 mm2 + Grounding - Dari SDP - 4.D2 ke PP - 4.D2, NYY 4 x 10 mm2 + Grounding - Dari SDP - AC.D2 ke PP - AC.4, NYY 4 x 6 mm2 + Grounding LANTAI ATAP a. Panel Listrik - PP - BP.D2 - PP - LF.D2 - PP - AC.OU.D2 b. Kabel Feeder - Dari SDP - 4.D2 ke PP - BP.D2, NYY 4 x 16 mm2 + Grounding - Dari MDP-D2 ke PP - LF.D2, FRC 4 x 70 mm2 + Grounding - Dari SDP - AC.D2 ke PP - AC.OU, NYY 2 x 4 (1 x 150) mm2 + Grounding
Tidak Dikerjakan 14,824,066.26 404,016.28 3,839,719.89 1,633,693.32 3,839,719.89 3,839,719.89
49,109,510.11 30,221,236.99 4,968,974.06 1,311,614.10
85,398,313.44 741,203.31 50,502.03 383,971.99 81,684.67 383,971.99 383,971.99
JUMLAH
944,413.66 944,413.66 621,121.76 327,903.52
Tidak Dikerjakan 14,824,066.26 404,016.28 3,839,719.89 1,633,693.32 3,839,719.89 3,839,719.89
1,207,881,996.18
49,109,510.11 30,221,236.99 4,968,974.06 1,311,614.10
Pek. Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 24 of 280
NO.
URAIAN
b.
c.
d.
2.
3.
4.
- Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A - Stop Kontak 3000 W / 3 Phase Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
LANTAI DUA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI TIGA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 9 W + Tool Kit Emergency - Lampu LED Down Light 13 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh
34.00 44.00 5.00 27.00
(Rp.) 256,478.57 256,478.57 211,368.07 185,053.62
bh bh bh bh
2.00 4.00 10.00 10.00
324,144.32 739,912.73 629,450.98 700,875.94
648,288.63 2,959,650.94 6,294,509.83 7,008,759.38
324,144.32 739,912.73 629,450.98 700,875.94
648,288.63 2,959,650.94 6,294,509.83 7,008,759.38
bh bh bh
46.00 26.00 3.00
26,683.58 33,132.97 31,018.41
1,227,444.52 861,457.17 93,055.24
26,683.58 33,132.97 31,018.41
1,227,444.52 861,457.17 93,055.24
bh bh bh bh bh
62.00 6.00 26.00 11.00 5.00
104,731.79 104,731.79 104,731.79 302,654.09 302,654.09
6,493,370.72 628,390.71 2,723,026.43 3,329,195.03 1,513,270.47
104,731.79 104,731.79 104,731.79 302,654.09 302,654.09
6,493,370.72 628,390.71 2,723,026.43 3,329,195.03 1,513,270.47
ttk ttk ttk ttk
206.00 26.00 75.00 105.00
159,922.37 531,697.00 159,922.37 159,922.37
32,944,008.90 13,824,122.00 11,994,178.00 16,791,849.20
159,922.37 531,697.00 159,922.37 159,922.37
32,944,008.90 13,824,122.00 11,994,178.00 16,791,849.20
bh bh bh bh bh bh bh bh
50.00 36.00 1.00 2.00 36.00 69.00 1.00 21.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
47,220,682.80 33,998,891.61 621,121.76 655,807.05 9,233,228.50 17,697,021.29 211,368.07 3,886,125.92
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
47,220,682.80 33,998,891.61 621,121.76 655,807.05 9,233,228.50 17,697,021.29 211,368.07 3,886,125.92
bh bh bh
4.00 4.00 10.00
324,144.32 739,912.73 629,450.98
1,296,577.26 2,959,650.94 6,294,509.83
324,144.32 739,912.73 629,450.98
1,296,577.26 2,959,650.94 6,294,509.83
bh bh bh
33.00 27.00 3.00
26,683.58 33,132.97 31,018.41
880,558.03 894,590.14 93,055.24
26,683.58 33,132.97 31,018.41
880,558.03 894,590.14 93,055.24
bh bh bh bh
78.00 2.00 26.00 11.00
104,731.79 104,731.79 104,731.79 302,654.09
8,169,079.29 209,463.57 2,723,026.43 3,329,195.03
104,731.79 104,731.79 104,731.79 302,654.09
8,169,079.29 209,463.57 2,723,026.43 3,329,195.03
ttk ttk ttk ttk
216.00 18.00 63.00 117.00
159,922.37 531,697.00 159,922.37 159,922.37
34,543,232.64 9,570,546.00 10,075,109.52 18,710,917.68
159,922.37 531,697.00 159,922.37 159,922.37
34,543,232.64 9,570,546.00 10,075,109.52 18,710,917.68
bh bh bh bh bh bh bh
22.00 69.00 3.00 75.00 14.00 1.00 13.00
944,413.66 944,413.66 621,121.76 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
4.00 4.00 10.00 10.00
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh
25.00 2.00 3.00
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh bh bh
70.00 2.00 26.00 16.00
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
ttk ttk ttk ttk
197.00 28.00 30.00 114.00
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
324,144.32 739,912.73 629,450.98 629,450.98
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
26,683.58 33,132.97 31,018.41
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
104,731.79 104,731.79 104,731.79 302,654.09
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W bh 944,413.66 97.00 - Lampu LED Panel 26 W bh 944,413.66 10.00 - Lampu LED Batten Tube 20 W bh 621,121.76 1.00 - Lampu LED Down Light 16 W bh 327,903.52 111.00 - Lampu LED Down Light 13 W bh 256,478.57 44.00 - Lampu LED Down Light 9 W bh 256,478.57 33.00 - Lampu LED Down Light 7 W bh 211,368.07 17.00 - Lampu LED Down Light 5 W bh 185,053.62 25.00 Lampu Emergency - Lampu LED Plat 12 W + Baterai bh 324,144.32 3.00 - Lampu LED Exit 5 W + Baterai bh 739,912.73 4.00 - Lampu LED Down Light 9 W + Tool Kit Emergency bh 629,450.98 10.00 - Lampu LED Down Light 13 W + Tool Kit Emergency bh 629,450.98 10.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 26,683.58 11.00 - Saklar Ganda bh 33,132.97 21.00 - Saklar Putar bh 31,018.41 3.00 c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A bh 104,731.79 63.00 - Stop Kontak 350 W / 16 A bh 104,731.79 2.00 - Stop Kontak 400 W / 16 A bh 104,731.79 63.00 - Stop Kontak 500 W / 16 A bh 302,654.09 15.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 338.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 27.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 35.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 143.00 JUMLAH 4.4.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
(Rp.) 8,720,271.36 11,285,057.06 1,056,840.36 4,996,447.61
(Rp.) 256,478.57 256,478.57 211,368.07 185,053.62
(Rp.) 8,720,271.36 11,285,057.06 1,056,840.36 4,996,447.61
434,278,287.39
434,278,287.39
Pek. Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 25 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING 5.3. PEKERJAAN DUCTING TATA UDARA 5.4. PEKERJAAN PNEUMATIC TUBE 5.5. PEKERJAAN TRANSPORTASI DALAM GEDUNG
Rp Rp Rp Rp Rp
417,310,279.33 3,193,721,218.95 221,523,044.04 903,531,972.50
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA Rp 6.2. PEKERJAAN FIRE ALARM Rp 6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) Rp 6.4. PEKERJAAN TELEPON Rp 6.5. PEKERJAAN IPTV Rp 6.6. PEKERJAAN MASTER CLOCK SYSTEM Rp JUMLAH -PEKERJAAN NON STANDAR Rp
211,706,228.25 398,230,103.52 1,622,446,570.09 160,323,105.39 45,192,193.81 7,173,984,715.88
JUMLAH PEKERJAAN NON STANDAR Rp
7,173,984,715.88
Rekapitulasi Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall)
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN 2. PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm 2.
3.
4.
5.
LANTAI DUA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI TIGA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI EMPAT a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm RISER DI SHAFT a. Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - Diameter 100 mm ( Pipa Hydrant ) - Diameter 100 mm ( Pipa Sprinkler ) - Diameter 50 mm ( Pipa Test Flashing) - Diameter 50 mm ( Pipa Flashing) b. Gate Vale dia 100 mm K.20 c. Automatic Air valve ( AAV )
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 3,855,801.95 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
70.00
334,952.92
23,446,704.17
m' m' m' m' m' m' m' bh bh set
55.00 80.00 55.00 40.00 190.00 240.00 10.00 102.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 10,087,836.46 3,018,625.00 10,832,968.75 13,683,750.00 570,156.25 13,067,007.50 9,815,798.38 8,196,754.17
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 9.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 11,567,405.85 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
50.00
334,952.92
16,747,645.83
m' m' m' m' m' m' m' bh bh set
55.00 80.00 55.00 40.00 259.00 280.00 10.00 98.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 10,087,836.46 3,018,625.00 14,767,046.88 15,964,375.00 570,156.25 12,554,575.83 9,815,798.38 8,196,754.17
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 9.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
50.00
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
55.00 80.00 55.00 20.00 278.00 274.00 10.00 86.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 8.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
70.00
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
55.00 80.00 85.00 40.00 117.00 160.00 10.00 86.00 1.00 1.00
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' bh bh
40.00 40.00 40.00 40.00 2.00 3.00
334,952.92 334,952.92 118,148.33 118,148.33 9,815,798.38 1,617,422.67
13,398,116.67 13,398,116.67 4,725,933.33 4,725,933.33 19,631,596.77 4,852,268.00
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 27 of 280
NO.
URAIAN
5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV SISTEM 1 - IU.D2.1.1.1 R. KONSULTASI / R. PIO Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.2 R. TUNGGU APOTIK Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.1.3 R. RACIK Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.4 R. PENYIMPANAN SESIAAN FARMASI Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.1.5 DISTRIBUSI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.6 PENYIMPANAN VAKSIN & OBAT NARKOTIKA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.1.1.7 & 8 KORIDOR Kapasitas : 15 400 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.1.9 PENYIMPAAN OBAT PRODUKSI Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.1.1.10 R. PERSIAPAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.1.11 R. STAFF Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.12 R. PENERIMAAN & LABELING FARMASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.13 R. PENYIMPANAN BAHAN BAKU OBAT & B3: 5 500 Btu/h - Wall Mounted Kapasitas - IU.D2.1.1.14 PENYIMPANAN NUTRISI PERENTERAL Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.15 PENYIMPAAN OBAT KEMO Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.16 PENYIMPANAN ALAT KESEHATANKapasitas (BHMP) : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.17 R. KA. INSTALASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.1.18 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.1.1.19 R. TUNGGU KLINIK PARU-ADM / Kapasitas PENDAFTARAN : 42 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.1.20 MDR-TB Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.1.21 R. TINDAKAN DIAGNOSTIK Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.1.1.22 R. PERIKSA DOTS Kapasitas : 12 300 Btu/h - Wall Mounted SISTEM 2 - IU.D2.1.2.1 & 2 LIFT LOBBY Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.3 CUSTOMER SERVICE Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.1.2.4 R. DISKUSI / KONSULTASI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.5 R. TUNGGU LABORATORIUM Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.6 BACK OFFICE Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.1.2.7 R. ADM Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.8 R. PENUNJANG / R. KA. LAB / R. Kapasitas SERVER : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.9 R. PENGAMBILAN SAMPLE Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.10 s/d 12 KORIDOR Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.13 R. PENYIMPANAN URIN & FESESKapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.14 R. REAGEN Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.15 LAB. HISTO PATOLOGI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.16 R. DIAGNOSTIK Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.17 LAB. PATOLOGI KLINIK Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.18 LAB. PATOLOGI MOLEKULER Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.19 LAB. SITOLOGI Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.20 LAB. IMMUNO HISTO KIMIA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.1.2.21 R. CROSSING-POTING BEKU Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.22 LAB. PATOLOGI ANATOMI Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.23 R. BLOCK-SLIDE Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.24 R. REAGEN Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.1.2.25 R. TUNGGU Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.1.2.26 R. ADMINISTRASI Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.1.2.27 LABORATORIUM Kapasitas : 15 400 Btu/h - Wall Mounted - IU.D2.1.2.28 R. PENYIMPANAN BLOOD BANK /Kapasitas PMI : 36 200 Btu/h - 4 Way Ceiling Cassette b. Outdoor Unit VRV - OU.D2.1.1 LANTAI ATAP kapasitas : 248 400 BTU/h - OU.D2.1.2 LANTAI ATAP kapasitas : 363 100 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 - Outdoor Pipe Connection - 31 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV l. Kabel Kontrol Indoor ke Outdoor k. Aksesoris - ACP 5 2.
LANTAI DUA a. Indoor Unit VRV SISTEM 1 - IU.D2.2.1.1 GYMNASIUM Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.1.2 FISIOTERAPI Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.1.3 R. KONSULTASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.4 & 5 R. TUNGGU / KORIDOR REHAB MEDIK Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.1.6 TERAPI SENSORI Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.1.7 R. DISKUSI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.8 R. TERAPI WICARA 3 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.9 R. STAFF Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.10 R. TUNGGU TERAPI OKUPASI & VOKASIONAL Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.11 R. TUNGGU TERAPI WICARA Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.12 R. TERAPI WICARA 1 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.13 R. TERAPI WICARA 2 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.14 R. KA. RU Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.15 R. TERAPI OKUPASI & VOKASIONAL 2 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.16 R. TERAPI OKUPASI & VOKASIONAL 1 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.17 R. TERAPI OKUPASI & VOKASIONAL 3 Kapasitas : 5 500 Btu/h - Wall Mounted - IU.D2.2.1.18 R. PERIKSA Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.1.19 ADM / PENDAFTARAN Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.1.20 R. PERAWAT-PJRU Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.2.1.21 R. TUNGGU KLINIK ANAK Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.1.22 MUSHOLA Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette SISTEM 2 - IU.D2.2.2.1 & 2 LIFT LOBBY Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.3 ADMINISTRASI REKAM MEDIK Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.2.4 & 5 GUDANG REKAM MEDIK Kapasitas : 24 200 Btu/h - Wall Mounted - IU.D2.2.2.6 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.7 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.8 R. TUNGGU KLINIK P. DALAM Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.9 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.10 s/d 12 KORIDOR Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.13 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.14 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.15 R. PERWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.16 R. TINDAKAN Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.17 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.18 R. TUNGGU KLINIK BEDAH Kapasitas : 42 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.19 R. TINDAKAN Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.20 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.21 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.2.2.22 ADM / PENDAFTARAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.2.23 R. PERWAT-PJRU Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.2.24 ADM / PENDAFTARAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.2.25 R. PERWAT-PJRU Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.2.2.26 R. KONSULTASI Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.27 R. TUNGGU KLINIK KEBIDANAN Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.2.2.28 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted
SATUAN
VOLUME
HARGA SATUAN
(Rp.) JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
+ Purifying Kit + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit
+ Purifying Kit
+ Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit
+ Purifying Kit + Purifying Kit
JUMLAH HARGA (Rp.) 417,310,279.33
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,638,581.27 17,740,637.81 5,638,581.27 15,199,566.86 5,638,581.27 5,903,874.88 14,850,377.55 5,903,874.88 5,728,372.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,903,874.88 19,024,021.24 15,199,566.86 6,083,457.95 6,083,457.95
5,638,581.27 17,740,637.81 5,638,581.27 15,199,566.86 5,638,581.27 5,903,874.88 29,700,755.10 5,903,874.88 5,728,372.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,903,874.88 19,024,021.24 15,199,566.86 6,083,457.95 6,083,457.95
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
15,843,525.80 5,903,874.88 5,728,372.80 17,740,637.81 6,083,457.95 5,728,372.80 5,728,372.80 5,728,372.80 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,728,372.80 5,903,874.88 5,638,581.27 15,199,566.86 5,728,372.80 5,638,581.27 5,728,372.80 15,843,525.80 6,169,167.54 18,325,642.61
31,687,051.60 5,903,874.88 5,728,372.80 17,740,637.81 6,083,457.95 5,728,372.80 5,728,372.80 5,728,372.80 47,530,577.40 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,728,372.80 5,903,874.88 5,638,581.27 15,199,566.86 5,728,372.80 5,638,581.27 5,728,372.80 15,843,525.80 6,169,167.54 18,325,642.61
unit unit
1.00 1.00
149,537,683.06 211,044,886.25
149,537,683.06 211,044,886.25
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78
m'
367.00
114,253.33
41,930,973.33
bh bh
1.00 1.00
1,842,808.55 2,346,687.28
1,842,808.55 2,346,687.28
bh
49.00
2,208,160.01
108,199,840.27
bh bh ttk ttk m'
34.00 16.00 2.00 50.00 549.00
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 421,780.67
38,746,519.26 29,813,709.47 7,823,675.88 36,508,712.37 231,557,586.00
unit
1.00
43,868,519.39
43,868,519.39
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
17,740,636.76 15,199,566.86 5,638,581.27 15,199,566.86 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 5,903,874.88 6,083,457.95 17,740,637.81 18,325,642.61
17,740,636.76 15,199,566.86 5,638,581.27 30,399,133.73 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 5,903,874.88 6,083,457.95 17,740,637.81 18,325,642.61
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 2.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
15,843,525.80 5,728,372.80 8,201,722.04 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 17,740,636.76 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 19,024,021.24 5,903,874.88 5,903,874.88 5,903,874.88 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 17,740,637.81 17,740,636.76 5,903,874.88
31,687,051.60 5,728,372.80 16,403,444.07 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 53,221,910.28 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 19,024,021.24 5,903,874.88 5,903,874.88 5,903,874.88 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 17,740,637.81 17,740,636.76 5,903,874.88
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 28 of 280
NO.
URAIAN b. c.
d. e. f. g. h. i. j. 3.
4.
Outdoor Unit VRV - OU.D2.2.1 LANTAI ATAP - OU.D2.2.2 LANTAI ATAP Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Kabel Kontrol Indoor ke Outdoor
SATUAN
kapasitas : 248 400 BTU/h kapasitas : 420 400 BTU/h
LANTAI TIGA a. Indoor Unit VRV SISTEM 1 - IU.D2.3.1.1 R. PERIKSA GIGI Kapasitas : 12 300 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.2 R. TUNGGU KLINIK GIGI Kapasitas : 15 400 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.3 R. PERIKSA GIGI Kapasitas : 12 300 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.4 ADM / PENDAFTARAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.1.5 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.1.6 ADM / PENDAFTARAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.1.7 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.1.8 R. TINDAKAN Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.1.9 R. PERIKSA Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.1.10 R. TUNGGU KLINIK KULIT & KELAMIN Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.11 R. PERIKSA Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.1.12 LAB Kapasitas : 15 400 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.13 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.1.14 ADM / PENDAFTARAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.1.15 R. PERIKSA Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.3.1.16 R. PERIKSA Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.3.1.17 R. TUNGGU KLINIK GCU Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.1.18 MUSHOLA Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette SISTEM 2 - IU.D2.3.2.1 & 2 LIFT LOBBY Kapasitas : 20 500 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.3 ADMINISTRASI REKAM MEDIK Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.2.4 & 5 GUDANG REKAM MEDIK Kapasitas : 24 200 Btu/h - Wall Mounted - IU.D2.3.2.6 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.7 R. TUNGGU KLINIK MATA Kapasitas : 28 000 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.8 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.9 R. TINDAKAN LASER Kapasitas : 15 400 Btu/h - Wall Mounted - IU.D2.3.2.10 s/d 12 KORIDOR Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.13 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.14 R. USG Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.3.2.15 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.16 R. TINDAKAN Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.17 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.18 R. TUNGGU KLINIK THT Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.19 R. PERIKSA Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.20 R. AUDIOMETRI Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.21 ECHO Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.22 TREADMILL Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.23 EKG Kapasitas : 9 600 Btu/h - Wall Mounted - IU.D2.3.2.24 ADM / PENDAFTARAN Kapasitas : 12 300 Btu/h - Wall Mounted - IU.D2.3.2.25 R. TUNGGU CLUSTER KLINIK JANTUNG Kapasitas : 36 200 Btu/h - 4 Way Ceiling Cassette - IU.D2.3.2.26 R. PERIKSA Kapasitas : 7 500 Btu/h - Wall Mounted - IU.D2.3.2.27 R. PERAWAT-PJRU Kapasitas : 9 600 Btu/h - Wall Mounted b. Outdoor Unit VRV - OU.D2.3.1 LANTAI ATAP kapasitas : 229 200 BTU/h - OU.D2.3.2 LANTAI ATAP kapasitas : 420 400 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor LANTAI EMPAT a. Indoor Unit VRV SISTEM 1 - IU.D2.4.1.1 - IU.D2.4.1.2 - IU.D2.4.1.3 - IU.D2.4.1.4 - IU.D2.4.1.5 - IU.D2.4.1.6 - IU.D2.4.1.7 - IU.D2.4.1.8 s/d 11 - IU.D2.4.1.12 & 13 - IU.D2.4.1.14 SISTEM 2 - IU.D2.4.2.1 & 2 - IU.D2.4.2.3 & 4 - IU.D2.4.2.5 & 6 - IU.D2.4.2.7 & 8 - IU.D2.4.2.9 & 10 - IU.D2.4.2.11 - IU.D2.4.2.12 - IU.D2.4.2.13 - IU.D2.4.2.14 - IU.D2.4.2.15 c. Outdoor Unit VRV - OU.D2.4.1
+ Purifying Kit + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit + Purifying Kit
+ Purifying Kit + Purifying Kit
+ Purifying Kit
+ Purifying Kit + Purifying Kit
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
unit unit
1.00 1.00
149,537,683.06 246,512,543.56
149,537,683.06 246,512,543.56
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
33.00 26.00 40.00 37.00 51.00 85.00 35.00 26.00 8.00 12.00 40.00 50.00 13.00 53.00 31.00 35.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
9,182,961.33 5,033,237.44 11,130,862.22 7,162,684.06 9,872,888.83 16,454,814.72 14,350,159.44 10,660,118.44 3,280,036.44 4,920,054.67 19,118,482.22 21,336,627.78 4,106,824.22 17,186,498.44 8,626,418.22 6,775,511.94 31,076,906.67
m'
272.00
114,253.33
bh
2.00
1,842,808.55
3,685,617.10
bh
49.00
2,208,160.01
108,199,840.27
bh bh ttk ttk m'
34.00 16.00 2.00 50.00 454.50
5,778,010.42 1,863,356.84 3,911,837.94 730,174.25 421,780.67
196,452,354.17 29,813,709.47 7,823,675.88 36,508,712.37 191,699,313.00
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
6,083,457.95 14,850,377.55 6,083,457.95 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 5,903,874.88 5,728,372.80 17,740,637.81 5,728,372.80 14,850,377.55 5,903,874.88 5,728,372.80 6,083,457.95 6,083,457.95 15,199,566.86 18,325,642.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 2.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
15,843,525.80 5,728,372.80 8,201,722.04 5,903,874.88 17,740,637.81 5,903,874.88 6,169,167.54 17,740,636.76 5,903,874.88 6,083,457.95 5,903,874.88 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 5,903,874.88 5,903,874.88 17,740,636.76 5,903,874.88 6,083,457.95 18,325,642.61 5,728,372.80 5,903,874.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit
1.00 1.00
141,007,487.00 246,512,543.56
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
23.00 29.00 46.00 37.00 53.00 70.00 56.00 8.00 24.00 37.00 53.00 8.00 29.00 50.00 25.00 56.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
258.00
114,253.33
Tidak Dikerjakan
bh
2.00
1,842,808.55
Tidak Dikerjakan
bh
44.00
2,208,160.01
Tidak Dikerjakan
bh bh ttk ttk m'
32.00 13.00 2.00 45.00 519.00
692,843.06 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
R. DEWAN PENGAWAS Kapasitas : 12 R. SPI Kapasitas : 12 R. KOMITE ETIK DAN HUKUM Kapasitas : 12 KORIDOR Kapasitas : 15 R. KOMITE MEDIK Kapasitas : 12 R. KOMITE MUTU & KESELAMANTAN PASIEN Kapasitas : 12 R. KOMITE KEPERAWATAN Kapasitas : 12 R. STAFF UMUM & KEUANGAN Kapasitas : 24 R. RAPAT DIREKSI Kapasitas : 30 MUSHOLA Kapasitas : 36
300 300 300 400 300 300 300 200 700 200
Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h
-
Wall Mounted Wall Mounted Wall Mounted Wall Mounted Wall Mounted Wall Mounted Wall Mounted 4 Way Ceiling Cassette + Purifying Kit 4 Way Ceiling Cassette + Purifying Kit 4 Way Ceiling Cassette + Purifying Kit
unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00 1.00 4.00 2.00 1.00
6,083,457.95 6,083,457.95 6,083,457.95 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 17,740,636.76 17,844,939.58 18,325,642.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LIFT LOBBY R. RAPAT STAFF R. STAFF KEPERAWATAN KORIDOR R. STAFF PELAYANAN MEDIS R. WADIR 2 R. WADIR 1 SEKRETARIS R. ARSIP R. DIREKTUR UTAMA
500 200 000 200 000 200 200 300 300 000
Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h Btu/h
-
4 Way Ceiling Cassette 4 Way Ceiling Cassette 4 Way Ceiling Cassette 4 Way Ceiling Cassette 4 Way Ceiling Cassette 4 Way Ceiling Cassette 4 Way Ceiling Cassette Wall Mounted Wall Mounted 4 Way Ceiling Cassette
unit unit unit unit unit unit unit unit unit unit
2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00
15,843,525.80 18,325,642.61 19,024,021.24 17,740,636.76 19,024,021.24 17,740,636.76 17,740,636.76 6,083,457.95 6,083,457.95 19,844,842.58
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
158,516,836.81
Tidak Dikerjakan
LANTAI ATAP
Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas Kapasitas
: : : : : : : : : :
20 36 42 24 42 24 24 12 12 48
kapasitas : 267 500 BTU/h
+ + + + + + +
Purifying Purifying Purifying Purifying Purifying Purifying Purifying
Kit Kit Kit Kit Kit Kit Kit
+ Purifying Kit
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 29 of 280
NO.
URAIAN
d.
e. f. g. h. i. j. l.
- OU.D2.4.2 LANTAI ATAP Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Kabel Kontrol Indoor ke Outdoor
SATUAN kapasitas : 420 400 BTU/h
5.3. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 250 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 400 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 700 CFM, Inline Type 5. Exhaust Fan ( EF.5 ) , Kapasitas : 350 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 14" x 10" - 12" x 10" - 12" x 8" - 12" x 6" - 10" x 8" - 10" x 6" - 8" x 6" - 6" x 4" d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Exhaust air grille almunium EAG 2.
3.
4.
5.
LANTAI DUA a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 250 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 600 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 200 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 12" x 10" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" e. Aksesoris Ducting Elbow, Reducer dan Hanger f. Terminal Udara - Diffuser Exhaust air grille almunium EAG LANTAI TIGA a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 250 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 1100 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 16" x 12" - 14" x 12" - 12" x 10" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" e. Aksesoris Ducting Elbow, Reducer dan Hanger f. Terminal Udara - Diffuser Exhaust air grille almunium EAG LANTAI EMPAT a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 250 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 400 CFM, Inline Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 550 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 12" x 10" - 10" x 8" - 10" x 6" - 8" x 6" - 8" x 4" - 6" x 4" d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Exhaust air grille almunium EAG LANTAI ATAP a. Ventilasi Udara / Fan 1. Exhaust Fan ( SPF.MS.1) , Kapasitas : 6000 CFM, Inline Type + Box peredam b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 40" x 28" - 28" x 16" (Dari Lantai Atap Ke Lantai Satu) d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Fresh air grille almunium FAG - Diffuser Exhaust air grille almunium EAG
5.4. PEKERJAAN PNEUMATIC TUBE 1 PERALATAN UTAMA DAN PENDUKUNG A. STATIONS & DIVERTERS AND ACCESSORIES 1 Diverter 3-Way (Lantai 1 - Lantai 2) - Lantai 1 - Lantai 2 - Lantai 3 2 Bottom Loading Station - Lantai 1 - Lantai 2 - Lantai 3 3 MultiLab Station with 2 fully automatic sending dispatchs - All Stations incl.: Basket, Cushion and Carrier Rack B. TUBE AND LINE SYSTEM 1 Tubes PVC - Diam. 110 MM RAL 7000 2 Tubes PVC - Diam. 110 MM Transparent 3 Bend R=800, RAL 7001, Grey 4 Bend R=800, RAL 7001, Transparent
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit
1.00
(Rp.) 290,510,396.94
(Rp.)
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
35.00 30.00 50.00 45.00 60.00 95.00 40.00 30.00 10.00 15.00 45.00 55.00 15.00 55.00 35.00 40.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan
m'
315.00
114,253.33
Tidak Dikerjakan
bh
2.00
1,842,808.55
Tidak Dikerjakan
bh
28.00
2,208,160.01
Tidak Dikerjakan
bh bh ttk ttk m'
8.00 21.00 2.00 29.00 510.00
413,433.18 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
3,193,721,218.95
unit unit unit unit unit ttk
1.00 1.00 1.00 1.00 1.00 5.00
3,042,826.39 7,503,085.42 4,627,960.42 8,078,110.42 4,250,247.92 369,535.08
3,042,826.39 7,503,085.42 4,627,960.42 8,078,110.42 4,250,247.92 1,847,675.41
m' m' m' m' m' m' m' m' lot
30.00 30.00 30.00 40.00 40.00 40.00 60.00 60.00 1.00
239,634.18 210,575.43 173,285.93 135,996.43 173,285.93 135,996.43 135,996.43 98,706.93 2,529,910.98
7,189,025.42 6,317,262.92 5,198,577.92 5,439,857.22 6,931,437.22 5,439,857.22 8,159,785.83 5,922,415.83 2,529,910.98
bh
20.00
1,011,731.94
20,234,638.89
unit unit unit unit ttk
1.00 1.00 1.00 1.00 4.00
3,042,826.39 7,503,085.42 7,503,085.42 2,327,860.42 369,535.08
3,042,826.39 7,503,085.42 7,503,085.42 2,327,860.42 1,478,140.32
m' m' m' m' m' m' lot
20.00 20.00 20.00 30.00 30.00 30.00 1.00
210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 992,006.10
4,211,508.61 3,465,718.61 2,719,928.61 4,079,892.92 2,401,865.42 2,961,207.92 992,006.10
bh
15.00
1,011,731.94
15,175,979.17
unit unit unit ttk
1.00 1.00 1.00 3.00
3,042,826.39 7,503,085.42 12,687,563.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' lot
20.00 20.00 30.00 30.00 40.00 40.00 30.00 30.00 1.00
282,458.68 282,458.68 210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
15.00
1,011,731.94
Tidak Dikerjakan
unit unit unit unit ttk
1.00 1.00 1.00 1.00 4.00
3,042,826.39 7,503,085.42 4,627,960.42 6,353,035.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' lot
20.00 80.00 20.00 20.00 40.00 80.00 1.00
210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
13.00
1,011,731.94
Tidak Dikerjakan
unit ttk
1.00 1.00
75,313,013.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan
m' m' lot
20.00 60.00 1.00
916,846.35 501,209.06 2,420,473.52
18,336,927.01 30,072,543.33 2,420,473.52
bh 2.00 1,011,731.94 bh 8.00 1,011,731.94 JUMLAH 5.3.PEKERJAAN DUCTING TATA UDARA
2,023,463.89 8,093,855.56 221,523,044.04
unit unit
3.00 1.00
32,727,400.00 32,727,400.00
Tidak Dikerjakan Tidak Dikerjakan
unit unit
6.00 3.00
44,041,600.00 44,041,600.00
Tidak Dikerjakan Tidak Dikerjakan
unit m' m' bh bh
1.00 200.00 20.00 20.00 10.00
198,000.00 1,254,000.00 1,366,700.00 4,280,900.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 30 of 280
NO.
URAIAN
2
5 Sleeve 6 Cable 2x2x0.23 + 3x2.5F C. CARRIERS AND ACCESSORIES 1 Long Carrier With Chip 2 Short Carrier With Chip D. VARIOUS INSTALLATION MATERIAL 1 Supporting Material terdiri dari: - Clutch Clamp Stainless Steel - Endpiece Above / Below - PVC Conduit 20 MM - Sikla Base Plate - Pipeclamp - Sikla Screw Bolt - Screw Bolt - Cable Clip - Hose Clamp 100-120 - Air Lid (Silicon Flap) - Adhesive Glue - Cleaner For PVC-Tube - Dowel M10 INSTALATION, TEST AND COMMISSIONING 1 Biaya Instalasi 2 Biaya Test dan Commissioning
5.5. PEKERJAAN TRANSPORTASI DALAM GEDUNG 1. BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 23000 mm - Service Floors : Lantai 1 s/d Lantai 4 - Control Mode : Duplex Selective Collective - Door : 1200 x 2100 ( Side Opening) - ARD : Yes Termasuk : - Biaya pasang & Ijin Disnaker - Biaya Pengiriman unit Ke Lokasi Proyek 2.
PASSENGER Spesifikasi : - Tipe : Passenger Elevator - Kapasitas : 1600 Kg - Kecepatan : 1.5 m/s - Traveling Height : 23000 mm - Service Floors : Lantai 1 s/d Lantai 4 - Control Mode : Duplex Selective Collective - Door : 1200 x 2100 ( Side Opening) - ARD : Yes Termasuk : - Biaya pasang & Ijin Disnaker - Biaya Pengiriman unit Ke Lokasi Proyek
3.
Aksesoris Earthquake Device Mimic Panel ( Supervisory Panel )
4.
VI.
Testing and Commisioning - Testing and Commisioning
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. SENTRAL TATA SUARA a. Digital Matrix Mixer b. CD/MMC/USB Player w/ FM Tuner c. MDF-TS d. Power Amplifier 480 W e. Power Amplifier 120 W f. Emergency Message Panel g. Remote Microphone i. Emergency & Paging Microphone w/RU-2002 (Car Call) j. Speaker Selector 10 ch k. Cabinet Rack dengan Aksesoris l. Unitruptable Power Supply (UPS) Kapasitas 2 kVA, Incoming 1 Phase Outgoing 1 Phase (10 Menit) + Include Battery Cabinet m. Kabel FRC 2 x 2.5 mm2, dari MDF TS ke Instalasi Emergency 2.
3.
4.
5.
6.
LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI DUA a. TBS-2 b. Kabel dari MDF-TS ke TBS-2, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI TIGA a. TBS-3 b. Kabel dari MDF-TS ke TBS-3, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI EMPAT a. TBS-4 b. Kabel dari MDF-TS ke TBS-4, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. SISTEM UTAMA FIRE ALARM a. MCFA Full Addressible b. Output control module c. Announciator d. Module for Pressurized Fan (Kontrol) e. Module for AC
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
bh m'
133.33 180.00
(Rp.) 72,800.00 151,800.00
(Rp.)
bh bh
5.00 16.00
3,365,200.00 2,639,700.00
Tidak Dikerjakan Tidak Dikerjakan
lot
1.00
45,000,000.00
Tidak Dikerjakan
lot 40,000,000.00 1.00 lot 10,000,000.00 1.00 JUMLAH 5.4.PEKERJAAN PNEUMATIC TUBE
Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan
-
unit
1.00
873,458,875.00
unit
1.00
800,868,375.00
ls set
1.00 1.00
13,936,361.25 5,136,736.25
unit
2.00
5,500,000.00
11,000,000.00
JUMLAH 5.5.PEKERJAAN TRANSPORTASI DALAM GEDUNG
903,531,972.50
bh bh unit bh set bh bh bh bh set unit
873,458,875.00
Tidak Dikerjakan
13,936,361.25 5,136,736.25
1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
24,814,641.23 5,095,012.23 3,112,092.18 8,302,368.60 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
24,814,641.23 5,095,012.23 3,112,092.18 33,209,474.39 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
m'
200.00
34,259.08
6,851,816.33
bh m' bh bh bh ttk ttk
1.00 10.00 82.00 2.00 6.00 84.00 6.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 13,437,419.72 435,379.78 920,394.51 12,976,921.47 926,922.96
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh bh ttk ttk
1.00 15.00 72.00 2.00 5.00 74.00 5.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
1,279,196.28 535,462.10 11,798,710.00 435,379.78 766,995.43 11,432,049.87 772,435.80
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh bh ttk ttk
1.00 20.00 60.00 2.00 4.00 62.00 4.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
bh m' bh bh bh ttk ttk
1.00 25.00 40.00 2.00 3.00 42.00 3.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
1.00
5,000,000.00
5,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
211,706,228.25
ls
unit unit unit unit unit
1.00 9.00 1.00 1.00 1.00
59,162,035.46 2,465,769.28 44,691,164.16 1,255,783.26 1,255,783.26
59,162,035.46 22,191,923.48 44,691,164.16 1,255,783.26 1,255,783.26
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 31 of 280
NO.
URAIAN
3.
4.
5.
6.
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit unit unit unit m'
1.00 1.00 1.00 1.00 1.00 2.00 58.00 78.00
LANTAI SATU a. TBFA - 1 b. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 10.00 10.00 10.00 65.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 67.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 77,488,583.17 2,488,789.07 1,339,356.11 9,697,919.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 6,399,785.72 1,337,268.66 191,038.38
LANTAI DUA a. TBFA - 2 b. Kabel dari MCFA ke TBFA-2, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-2, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 15.00 15.00 15.00 73.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 74.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 2,051,526.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 224,256.33 950,894.17 130,447.00 87,025,639.56 1,244,394.53 1,339,356.11 4,103,053.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 7,068,420.05 1,337,268.66 191,038.38
LANTAI TIGA a. TBFA - 3 b. Kabel dari MCFA ke TBFA-3, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-3, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 20.00 20.00 20.00 61.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 64.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 35,288,941.37 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. TBFA - 4 b. Kabel dari MCFA ke TBFA-4, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-4, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 25.00 25.00 25.00 41.00 7.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 48.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 3,112,092.18 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1.00
10,000,000.00
10,000,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
398,230,103.52
Module IP PABX (Autodial) Module for Sound System Module for Genset Panel Control Module Elevator Isolator Module Back up battery 2x12V End of Line (Aksesoris) Kabel FRC 3 x 1,5 mm2
TESTING & COMMISSIONING a. Progamming, Supervisi, Testing & Commissioning
6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 1. SENTRAL ICT (DISTRIBUTIONS) a. FIBER OPTIC CABLE DISTRIBUTIONS & UPS Support Equipment - Distribution Switch 16 Port SFP+ - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support - Unitruptable Power Supply (UPS) Kapasitas 5 kVA, Incoming 3 Phase Outgoing 1 Phase UPS. 15 Menit b.
2.
VOLUME
(Rp.) 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 1,981,072.92 48,839.20 84,227.12
f. g. h. i. j. k. l. m. 2.
SATUAN
STRUKTUR SISTEM KABEL & INSTALASI INSTALASI DISTRIBUSI GEDUNG DENGAN MENGGUNAKAN KABEL FO - Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 1 FO SM 4 Core (Vertical Cabling System)
ls
(Rp.) 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 3,962,145.85 2,832,673.81 6,569,715.09
unit unit unit
1.00 1.00 1.00
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
m
10.00
50,698.07
506,980.72
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 2 FO SM 4 Core (Vertical Cabling System)
m
16.00
50,698.07
811,169.16
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 3 FO SM 24 Core
m
22.00
50,698.07
1,115,357.59
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 4 FO SM 24 Core
m
28.00
50,698.07
1,419,546.02
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
5.00 5.00
20,931,439.39 573,823.72
104,657,196.94 2,869,118.59
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
14.00
7,982,546.77
111,755,654.81
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas 24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 110.00 110.00 55.00
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 11,845,010.23 9,198,527.71 3,276,022.60
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi
unit titik
1.00 10.00
158,566.31 738,717.66
158,566.31 7,387,176.56
LANTAI 1 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
e.
f.
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 32 of 280
NO.
URAIAN
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
5.00 5.00
20,931,439.39 573,823.72
104,657,196.94 2,869,118.59
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
12.00
7,982,546.77
95,790,561.26
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
2.00 88.00 88.00 44.00
1,705,345.36 107,681.91 83,622.98 59,564.05
3,410,690.73 9,476,008.19 7,358,822.17 2,620,818.08
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 10.00 178.00 4.00 12.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 7,387,176.56 131,491,742.68 2,954,870.62 8,864,611.87
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
5.00 5.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
12.00
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 76.00 76.00 38.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 10.00 155.00 4.00 12.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
5.00 5.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
4.00
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
4.00 172.00 172.00 86.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 10.00 348.00 4.00 4.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Instalasi ,Penarikan Kabel Data Instalasi ,Penarikan HRVGA Instalasi ,Penarikan Kabel CCTV
LANTAI 2 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support
f.
LANTAI 3 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
e.
f.
LANTAI 4 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
e.
f.
6.
TESTING COMMISIONING - Testing Commisioning, Labeling, & Documentation Data & Voice ( Fluke )
6.4. PEKERJAAN TELEPON 1. LANTAI SATU a. IP TELEPON - Handset Telepon TB 30 Pair - IP Phone Series - Titik Instalasi Phone 2.
3.
4.
5.
JUMLAH HARGA
223.00 4.00 14.00
e.
5.
HARGA SATUAN
titik titik titik
b.
4.
VOLUME
(Rp.) 738,717.66 738,717.66 738,717.66
3.
SATUAN
lot 1.00 25,000,000.00 JUMLAH 6.3.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
(Rp.) 164,734,037.18 2,954,870.62 10,342,047.18
25,000,000.00 1,622,446,570.09
unit unit ttk
1.00 18.00 18.00
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 53,590,710.83 2,851,635.49
LANTAI DUA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 24.00 24.00
3,057,252.67 2,977,261.71 158,424.19
3,057,252.67 71,454,281.11 3,802,180.65
LANTAI TIGA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 27.00 27.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 15.00 15.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 33 of 280
NO.
URAIAN
6.5. PEKERJAAN IPTV 1. LANTAI SATU a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV 2.
3.
4.
5.
3.
4.
5.
VOLUME
HARGA SATUAN
(Rp.) JUMLAH 6.4.PEKERJAAN TELEPON
JUMLAH HARGA (Rp.) 160,323,105.39
unit unit unit
2.00 10.00 10.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 809,486.94 12,692,766.44
LANTAI DUA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 3.00 3.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 242,846.08 3,807,829.93
LANTAI TIGA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 6.00 6.00
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 13.00 13.00
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
JUMLAH 6.5.PEKERJAAN IPTV
45,192,193.81
6.6. PEKERJAAN MASTER CLOCK SYSTEM 1. LANTAI 1 a. Converter b. 'Analog Clock '- Diameter 500mm '- Hour and Minute c. 'Installation Analog Clock, Cable ITC 2X1X0,6mm d. 'Installation Converter, Cable UTP Cat-6 to LAN 2.
SATUAN
LANTAI 2 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 3 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 4 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm TESTING, COMMISSIONING AND TRANING a. Testing and Commissioning b. Training operator 5 person 1 days
unit unit
1.00 1.00
8,362,735.63 5,931,216.34
Tidak Dikerjakan Tidak Dikerjakan
titik titik
1.00 1.00
819,758.81 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
unit
1.00
5,931,216.34
Tidak Dikerjakan
titik
1.00
819,758.81
Tidak Dikerjakan
unit
1.00
5,931,216.34
Tidak Dikerjakan
titik
1.00
819,758.81
Tidak Dikerjakan
unit
1.00
5,931,216.34
Tidak Dikerjakan
titik
1.00
819,758.81
Tidak Dikerjakan
unit 1.00 17,500,000.00 unit 1.00 10,000,000.00 JUMLAH 6.6.PEKERJAAN MASTER CLOCK SYSTEM
Tidak Dikerjakan Tidak Dikerjakan
-
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 34 of 280
RAP HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 3,855,801.95 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
334,952.92
23,446,704.17
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 10,087,836.46 3,018,625.00 10,832,968.75 13,683,750.00 570,156.25 13,067,007.50 9,815,798.38 8,196,754.17
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 11,567,405.85 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
334,952.92
16,747,645.83
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
18,422,410.42 19,084,133.33 10,087,836.46 3,018,625.00 14,767,046.88 15,964,375.00 570,156.25 12,554,575.83 9,815,798.38 8,196,754.17
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92
Tidak Dikerjakan
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92
Tidak Dikerjakan
334,952.92 238,551.67 183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
334,952.92 334,952.92 118,148.33 118,148.33 9,815,798.38 1,617,422.67
13,398,116.67 13,398,116.67 4,725,933.33 4,725,933.33 19,631,596.77 4,852,268.00
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 35 of 280
HARGA SATUAN (Rp.) JUMLAH
JUMLAH HARGA (Rp.) 417,310,279.33
5,638,581.27 17,740,637.81 5,638,581.27 15,199,566.86 5,638,581.27 5,903,874.88 14,850,377.55 5,903,874.88 5,728,372.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,903,874.88 19,024,021.24 15,199,566.86 6,083,457.95 6,083,457.95
5,638,581.27 17,740,637.81 5,638,581.27 15,199,566.86 5,638,581.27 5,903,874.88 29,700,755.10 5,903,874.88 5,728,372.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,903,874.88 19,024,021.24 15,199,566.86 6,083,457.95 6,083,457.95
15,843,525.80 5,903,874.88 5,728,372.80 17,740,637.81 6,083,457.95 5,728,372.80 5,728,372.80 5,728,372.80 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,728,372.80 5,903,874.88 5,638,581.27 15,199,566.86 5,728,372.80 5,638,581.27 5,728,372.80 15,843,525.80 6,169,167.54 18,325,642.61
31,687,051.60 5,903,874.88 5,728,372.80 17,740,637.81 6,083,457.95 5,728,372.80 5,728,372.80 5,728,372.80 47,530,577.40 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 18,325,642.61 5,728,372.80 5,728,372.80 5,903,874.88 5,638,581.27 15,199,566.86 5,728,372.80 5,638,581.27 5,728,372.80 15,843,525.80 6,169,167.54 18,325,642.61
149,537,683.06 211,044,886.25
149,537,683.06 211,044,886.25
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78
114,253.33
41,930,973.33
1,842,808.55 2,346,687.28
1,842,808.55 2,346,687.28
2,208,160.01
108,199,840.27
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 421,780.67
38,746,519.26 29,813,709.47 7,823,675.88 36,508,712.37 231,557,586.00
43,868,519.39
43,868,519.39
17,740,636.76 15,199,566.86 5,638,581.27 15,199,566.86 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 5,903,874.88 6,083,457.95 17,740,637.81 18,325,642.61
17,740,636.76 15,199,566.86 5,638,581.27 30,399,133.73 15,843,525.80 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,638,581.27 5,728,372.80 5,903,874.88 6,083,457.95 17,740,637.81 18,325,642.61
15,843,525.80 5,728,372.80 8,201,722.04 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 17,740,636.76 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 19,024,021.24 5,903,874.88 5,903,874.88 5,903,874.88 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 17,740,637.81 17,740,636.76 5,903,874.88
31,687,051.60 5,728,372.80 16,403,444.07 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 53,221,910.28 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 5,903,874.88 19,024,021.24 5,903,874.88 5,903,874.88 5,903,874.88 5,728,372.80 5,728,372.80 5,728,372.80 5,728,372.80 17,740,637.81 17,740,636.76 5,903,874.88
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 36 of 280
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
149,537,683.06 246,512,543.56
149,537,683.06 246,512,543.56
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
9,182,961.33 5,033,237.44 11,130,862.22 7,162,684.06 9,872,888.83 16,454,814.72 14,350,159.44 10,660,118.44 3,280,036.44 4,920,054.67 19,118,482.22 21,336,627.78 4,106,824.22 17,186,498.44 8,626,418.22 6,775,511.94
114,253.33
31,076,906.67
1,842,808.55
3,685,617.10
2,208,160.01
108,199,840.27
5,778,010.42 1,863,356.84 3,911,837.94 730,174.25 421,780.67
196,452,354.17 29,813,709.47 7,823,675.88 36,508,712.37 191,699,313.00
6,083,457.95 14,850,377.55 6,083,457.95 5,728,372.80 5,903,874.88 5,728,372.80 5,903,874.88 5,903,874.88 5,728,372.80 17,740,637.81 5,728,372.80 14,850,377.55 5,903,874.88 5,728,372.80 6,083,457.95 6,083,457.95 15,199,566.86 18,325,642.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
15,843,525.80 5,728,372.80 8,201,722.04 5,903,874.88 17,740,637.81 5,903,874.88 6,169,167.54 17,740,636.76 5,903,874.88 6,083,457.95 5,903,874.88 5,903,874.88 5,903,874.88 18,325,642.61 5,903,874.88 5,903,874.88 5,903,874.88 17,740,636.76 5,903,874.88 6,083,457.95 18,325,642.61 5,728,372.80 5,903,874.88
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
141,007,487.00 246,512,543.56
Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
1,842,808.55
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
692,843.06 1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
6,083,457.95 6,083,457.95 6,083,457.95 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 17,740,636.76 17,844,939.58 18,325,642.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
15,843,525.80 18,325,642.61 19,024,021.24 17,740,636.76 19,024,021.24 17,740,636.76 17,740,636.76 6,083,457.95 6,083,457.95 19,844,842.58
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,516,836.81
Tidak Dikerjakan
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 37 of 280
HARGA SATUAN
JUMLAH HARGA
(Rp.) 290,510,396.94
Tidak Dikerjakan
(Rp.)
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
1,842,808.55
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH
3,042,826.39 7,503,085.42 4,627,960.42 8,078,110.42 4,250,247.92 369,535.08
3,193,721,218.95
239,634.18 210,575.43 173,285.93 135,996.43 173,285.93 135,996.43 135,996.43 98,706.93 2,529,910.98
3,042,826.39 7,503,085.42 4,627,960.42 8,078,110.42 4,250,247.92 1,847,675.41 7,189,025.42 6,317,262.92 5,198,577.92 5,439,857.22 6,931,437.22 5,439,857.22 8,159,785.83 5,922,415.83 2,529,910.98
1,011,731.94
20,234,638.89
3,042,826.39 7,503,085.42 7,503,085.42 2,327,860.42 369,535.08
3,042,826.39 7,503,085.42 7,503,085.42 2,327,860.42 1,478,140.32
210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 992,006.10
4,211,508.61 3,465,718.61 2,719,928.61 4,079,892.92 2,401,865.42 2,961,207.92 992,006.10
1,011,731.94
15,175,979.17
3,042,826.39 7,503,085.42 12,687,563.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
282,458.68 282,458.68 210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,011,731.94
Tidak Dikerjakan
3,042,826.39 7,503,085.42 4,627,960.42 6,353,035.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
210,575.43 173,285.93 135,996.43 135,996.43 80,062.18 98,706.93 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,011,731.94
Tidak Dikerjakan
75,313,013.89 369,535.08
Tidak Dikerjakan Tidak Dikerjakan
916,846.35 501,209.06 2,420,473.52
18,336,927.01 30,072,543.33 2,420,473.52
1,011,731.94 1,011,731.94 JUMLAH
2,023,463.89 8,093,855.56 221,523,044.04
32,727,400.00 32,727,400.00
Tidak Dikerjakan Tidak Dikerjakan
44,041,600.00 44,041,600.00
Tidak Dikerjakan Tidak Dikerjakan
198,000.00 1,254,000.00 1,366,700.00 4,280,900.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 38 of 280
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
72,800.00 151,800.00
Tidak Dikerjakan Tidak Dikerjakan
3,365,200.00 2,639,700.00
Tidak Dikerjakan Tidak Dikerjakan
45,000,000.00
Tidak Dikerjakan
40,000,000.00 10,000,000.00 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan
873,458,875.00
800,868,375.00
13,936,361.25 5,136,736.25 5,500,000.00 JUMLAH
-
873,458,875.00
Tidak Dikerjakan
13,936,361.25 5,136,736.25 11,000,000.00 903,531,972.50
24,814,641.23 5,095,012.23 3,112,092.18 8,302,368.60 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
24,814,641.23 5,095,012.23 3,112,092.18 33,209,474.39 2,689,579.53 9,196,934.41 5,721,766.20 5,380,586.33 3,827,125.31 15,640,577.62 25,934,257.90
34,259.08
6,851,816.33
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 13,437,419.72 920,394.51 12,976,921.47 926,922.96
830,378.57 154,487.16
3,321,514.29 617,948.64
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
1,279,196.28 535,462.10 11,798,710.00 766,995.43 11,432,049.87 772,435.80
830,378.57 154,487.16
3,321,514.29 617,948.64
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
5,000,000.00 JUMLAH 59,162,035.46 2,465,769.28 44,691,164.16 1,255,783.26 1,255,783.26
5,000,000.00 210,835,468.69 59,162,035.46 22,191,923.48 44,691,164.16 1,255,783.26 1,255,783.26 Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 39 of 280
HARGA SATUAN
JUMLAH HARGA
(Rp.) 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 1,981,072.92 48,839.20 84,227.12
(Rp.) 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 3,962,145.85 2,832,673.81 6,569,715.09
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 77,488,583.17 2,488,789.07 1,339,356.11 9,697,919.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 6,399,785.72 1,337,268.66 191,038.38
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 2,051,526.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 224,256.33 950,894.17 130,447.00 87,025,639.56 1,244,394.53 1,339,356.11 4,103,053.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 7,068,420.05 1,337,268.66 191,038.38
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
10,000,000.00 JUMLAH
10,000,000.00 398,230,103.52
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
50,698.07
506,980.72
50,698.07
811,169.16
50,698.07
1,115,357.59
50,698.07
1,419,546.02
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
20,931,439.39 573,823.72
104,657,196.94 2,869,118.59
7,982,546.77
111,755,654.81
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 11,845,010.23 9,198,527.71 3,276,022.60
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
158,566.31 738,717.66
158,566.31 7,387,176.56
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 40 of 280
HARGA SATUAN (Rp.)
JUMLAH HARGA
738,717.66 738,717.66 738,717.66
(Rp.) 164,734,037.18 2,954,870.62 10,342,047.18
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
20,931,439.39 573,823.72
104,657,196.94 2,869,118.59
7,982,546.77
95,790,561.26
1,705,345.36 107,681.91 83,622.98 59,564.05
3,410,690.73 9,476,008.19 7,358,822.17 2,620,818.08
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 7,387,176.56 131,491,742.68 2,954,870.62 8,864,611.87
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
25,000,000.00 JUMLAH
25,000,000.00 1,622,446,570.09
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 53,590,710.83 2,851,635.49
3,057,252.67 2,977,261.71 158,424.19
3,057,252.67 71,454,281.11 3,802,180.65
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 41 of 280
HARGA SATUAN (Rp.) JUMLAH
JUMLAH HARGA (Rp.) 160,323,105.39
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 809,486.94 12,692,766.44
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 242,846.08 3,807,829.93
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00 JUMLAH
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00 45,192,193.81
8,362,735.63 5,931,216.34
Tidak Dikerjakan Tidak Dikerjakan
819,758.81 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
5,931,216.34
Tidak Dikerjakan
819,758.81
Tidak Dikerjakan
17,500,000.00 10,000,000.00 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan
-
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 42 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG F1 (HALL) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
338,762,187.03
II.
PEKERJAAN NON STANDAR
Rp
1,306,258,744.73
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
1,645,020,931.76
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN PEKERJAAN STANDARD
III. PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR HUJAN IV.
JUMLAH HARGA
Rp
47,452,472.10
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR Rp 4.2. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI Rp JUMLAH -PEKERJAAN STANDARD Rp
207,734,843.89 83,574,871.04 338,762,187.03
JUMLAH PEKERJAAN STANDAR Rp
338,762,187.03
Rekapitulasi Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall)
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA
RAP
RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1. III.
IV.
PEKERJAAN STANDARD PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR HUJAN 1. Roof Drain diameter 100 mm 2. Pemipaan Air hujan PVC Kelas 10 kg/cm2 : - Diameter 100 mm (di Shaft) 3. Bak Kontrol / Bak Sumpit 80x80 4. Sewage Pump Kap. 200 Lpm PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 1. Air Terminal - Radius 20 m 2. Kabel Coaxial 2 x 35 mm2 - Lantai Satu, Kabel Coaxial 2 x 35 mm2 - dari Lantai Atap ke Lantai Satu, Kabel Coaxial 2 x 35 mm2 - Lantai Atap, Kabel Coaxial 2 x 35 mm2 3. Obstuction Lamp & Instalasi 4. Connecting Sleeve lengkap surge Arester 5. Lightning Arrester 10KA 6. Lightning Flash Counter 7. Tiang Menara 8. Grounding sistem - Copper road - Pentanahan max.2 Ohm bahan GSP dia.50mm² + BC.70mm² - Bak kontrol ( 40x40) cm lengkap tutup - Testing/pengukuran pentanahan - Material bantu dan accessories - Proses pengesahan gambar ke DepNaker RI 9. Fitting-Fitting 4.2.
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Taman18 W Lampu Emergency - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC 2.
3.
4.
LANTAI DUA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Down Light 16 W - Lampu LED Down Light 9 W Lampu Emergency - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Ganda c. Pekerjaan Stop Kontak - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI TIGA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Down Light 16 W - Lampu LED Down Light 9 W Lampu Emergency - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Ganda c. Pekerjaan Stop Kontak - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
bh
19.00
129,645.42
2,463,262.92
129,645.42
2,463,262.92
m' unit unit
152.00 2.00 2.00
100,092.70 2,248,059.23 12,639,500.00
15,214,090.72 4,496,118.47 25,279,000.00
100,092.70 2,248,059.23 12,639,500.00
15,214,090.72 4,496,118.47 25,279,000.00
JUMLAH 3.1.PEKERJAAN AIR HUJAN
47,452,472.10
JUMLAH
47,452,472.10
bh
8.00
1,685,441.23
13,483,529.85
1,685,441.23
13,483,529.85
m' m' m' bh bh bh bh bh unit
120.00 50.00 100.00 2.00 8.00 8.00 2.00 8.00 4.00
376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
45,142,857.95 18,809,524.14 37,619,048.29 3,856,289.54 5,393,411.94 5,663,082.54 8,831,891.83 34,513,600.00 15,536,622.00
376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
45,142,857.95 18,809,524.14 37,619,048.29 3,856,289.54 5,393,411.94 5,663,082.54 8,831,891.83 34,513,600.00 15,536,622.00
lot 1.00 18,884,985.81 JUMLAH 4.1.PEKERJAAN PENANGKAL PETIR
18,884,985.81 207,734,843.89
18,884,985.81 JUMLAH
18,884,985.81 207,734,843.89
bh bh bh bh bh bh
13.00 2.00 21.00 13.00 31.00 6.00
944,413.66 944,413.66 327,903.52 256,478.57 256,478.57 2,172,259.06
12,277,377.53 1,888,827.31 6,885,974.00 3,334,221.40 7,950,835.65 13,033,554.34
944,413.66 944,413.66 327,903.52 256,478.57 256,478.57 2,172,259.06
12,277,377.53 1,888,827.31 6,885,974.00 3,334,221.40 7,950,835.65 13,033,554.34
bh bh bh
2.00 5.00 5.00
739,912.73 629,450.98 700,875.94
1,479,825.47 3,147,254.92 3,504,379.69
739,912.73 629,450.98 700,875.94
1,479,825.47 3,147,254.92 3,504,379.69
bh bh
2.00 4.00
26,683.58 33,132.97
53,367.15 132,531.87
26,683.58 33,132.97
53,367.15 132,531.87
bh bh bh
13.00 1.00 11.00
104,731.79 104,731.79 302,654.09
1,361,513.21 104,731.79 3,329,195.03
104,731.79 104,731.79 302,654.09
1,361,513.21 104,731.79 3,329,195.03
ttk ttk ttk ttk
86.00 12.00 6.00 25.00
159,922.37 531,697.00 159,922.37 159,922.37
13,753,324.11 6,380,364.00 959,534.24 3,998,059.33
159,922.37 531,697.00 159,922.37 159,922.37
13,753,324.11 6,380,364.00 959,534.24 3,998,059.33
bh bh
134.00 13.00
327,903.52 256,478.57
Tidak Dikerjakan Tidak Dikerjakan
327,903.52 256,478.57
Tidak Dikerjakan Tidak Dikerjakan
bh bh
1.00 10.00
739,912.73 700,875.94
Tidak Dikerjakan Tidak Dikerjakan
739,912.73 700,875.94
Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
33,132.97
Tidak Dikerjakan
33,132.97
Tidak Dikerjakan
bh
9.00
302,654.09
Tidak Dikerjakan
302,654.09
Tidak Dikerjakan
ttk ttk ttk ttk
147.00 11.00 1.00 9.00
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh
101.00 13.00
327,903.52 256,478.57
Tidak Dikerjakan Tidak Dikerjakan
327,903.52 256,478.57
Tidak Dikerjakan Tidak Dikerjakan
bh bh
1.00 10.00
739,912.73 700,875.94
Tidak Dikerjakan Tidak Dikerjakan
739,912.73 700,875.94
Tidak Dikerjakan Tidak Dikerjakan
bh
1.00
33,132.97
Tidak Dikerjakan
33,132.97
Tidak Dikerjakan
bh
8.00
302,654.09
Tidak Dikerjakan
302,654.09
Tidak Dikerjakan
ttk ttk ttk ttk
114.00 11.00 1.00 8.00
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan
327,903.52 256,478.57
Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan
739,912.73 700,875.94
Tidak Dikerjakan Tidak Dikerjakan
Tidak Dikerjakan
33,132.97
Tidak Dikerjakan
Tidak Dikerjakan
302,654.09
Tidak Dikerjakan
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
159,922.37 531,697.00 159,922.37 159,922.37 JUMLAH
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Down Light 16 W bh 327,903.52 101.00 - Lampu LED Down Light 9 W bh 256,478.57 13.00 Lampu Emergency - Lampu LED Exit 5 W + Baterai bh 739,912.73 1.00 - Lampu LED Down Light 16 W + Tool Kit Emergency bh 700,875.94 10.00 b. Pekerjaan Saklar Lampu - Saklar Ganda bh 33,132.97 1.00 c. Pekerjaan Stop Kontak - Stop Kontak 500 W / 16 A bh 302,654.09 8.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 114.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 11.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 1.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 8.00 JUMLAH 4.2.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
83,574,871.04
83,574,871.04
Pek. Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 44 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING
Rp Rp
19,651,003.43 994,660,786.68
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 6.2. PEKERJAAN FIRE ALARM 6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 6.4. PEKERJAAN TELEPON 6.5. PEKERJAAN IPTV JUMLAH -PEKERJAAN NON STANDAR
Rp Rp Rp Rp Rp Rp
18,644,159.66 38,069,350.28 184,346,290.48 35,016,845.98 15,870,308.22 1,306,258,744.73
JUMLAH PEKERJAAN NON STANDAR Rp
1,306,258,744.73
Rekapitulasi Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall)
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA
RAP
RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN
SATUAN
2. PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler 2.
3.
4.
LANTAI DUA a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler LANTAI TIGA a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler LANTAI EMPAT a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 40 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler
5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV SISTEM 1 - IU.F1.1.1.1 & 2 LOBBY / HALL IU.F1.1.1.3 R. FCC IU.F1.1.1.4 s/d 6 INFORMASI PENDAFTARAN IU.F1.1.1.7 LOBBY / HALL SISTEM 2 - IU.F1.1.2.1 INFORMATION CENTER - IU.F1.1.2.2 & 3 LOBBY / HALL - IU.F1.1.2.4 & 5 BANK - IU.F1.1.2.6 ATM CENTER b. Outdoor Unit VRV - OU.F1.1.1 LANTAI ATAP - OU.F2.1.2 LANTAI ATAP c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV l. Kabel Kontrol Indoor ke Outdoor k. Aksesoris - ACP 5 2.
3.
LANTAI DUA a. Indoor Unit VRV SISTEM 1 - IU.F1.2.1.1 s/d 6 HALL LANTAI 2 SISTEM 2 - IU.F1.2.2.1 s/d 6 HALL LANTAI 2 b. Outdoor Unit VRV - OU.F1.2.1 LANTAI ATAP - OU.F1.2.2 LANTAI ATAP c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor LANTAI TIGA a. Indoor Unit VRV SISTEM 1 - IU.F1.3.1.1 s/d 6 HALL LANTAI 2 SISTEM 2 - IU.F1.3.2.1 s/d 6 HALL LANTAI 2 b. Outdoor Unit VRV - OU.F1.3.1 LANTAI ATAP - OU.F1.3.2 LANTAI ATAP c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8")
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
(Rp.) 5.
(Rp.) -
bh
4.00
1,285,267.32
5,141,069.27
1,285,267.32
5,141,069.27
m' m' m' m' m' bh
20.00 30.00 50.00 50.00 10.00 18.00
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
3,668,304.17 2,263,968.75 2,850,781.25 2,850,781.25 570,156.25 2,305,942.50
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
3,668,304.17 2,263,968.75 2,850,781.25 2,850,781.25 570,156.25 2,305,942.50
bh
3.00
1,285,267.32
Tidak Dikerjakan
1,285,267.32
Tidak Dikerjakan
m' m' m' m' m' bh
20.00 30.00 50.00 50.00 10.00 18.00
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
3.00
1,285,267.32
Tidak Dikerjakan
1,285,267.32
Tidak Dikerjakan
m' m' m' m' m' bh
30.00 20.00 50.00 60.00 10.00 29.00
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh
4.00
1,285,267.32
Tidak Dikerjakan
1,285,267.32
Tidak Dikerjakan
m' m' m' m' m' bh
30.00 20.00 50.00 60.00 10.00 29.00
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
183,415.21 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
19,651,003.43
JUMLAH
19,651,003.43
Kapasitas : Kapasitas : Kapasitas : Kapasitas :
54 000 Btu/h 12 300 Btu/h 28 000 Btu/h 54 000 Btu/h
-
4 Way Ceiliing Cassette + Purifying Kit Wall Mounted 4 Way Ceiling Cassette + Purifying Kit 4 Way Ceiliing Cassette + Purifying Kit
unit unit unit unit
2.00 1.00 3.00 1.00
20,933,224.76 6,083,457.95 17,740,637.81 20,933,224.76
41,866,449.52 6,083,457.95 53,221,913.44 20,933,224.76
20,933,224.76 6,083,457.95 17,740,637.81 20,933,224.76
41,866,449.52 6,083,457.95 53,221,913.44 20,933,224.76
Kapasitas : Kapasitas : Kapasitas : Kapasitas :
12 300 Btu/h 54 000 Btu/h 28 000 Btu/h 36 200 Btu/h
-
Wall Mounted 4 Way Ceiliing Cassette + Purifying Kit 4 Way Ceiling Cassette + Purifying Kit 4 Way Ceiling Cassette + Purifying Kit
unit unit unit unit
1.00 2.00 2.00 1.00
6,083,457.95 20,933,224.76 17,740,637.81 17,740,637.81
6,083,457.95 41,866,449.52 35,481,275.63 17,740,637.81
6,083,457.95 20,933,224.76 17,740,637.81 17,740,637.81
6,083,457.95 41,866,449.52 35,481,275.63 17,740,637.81
unit unit
1.00 1.00
149,537,683.06 141,007,487.00
149,537,683.06 141,007,487.00
149,537,683.06 141,007,487.00
149,537,683.06 141,007,487.00
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
30.00 50.00 15.00 50.00 70.00 40.00 10.00 50.00 15.00 5.00 30.00 15.00 5.00 56.00 30.00 80.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,348,146.67 9,679,302.78 4,174,073.33 9,679,302.78 13,551,023.89 7,743,442.22 4,100,045.56 20,500,227.78 6,150,068.33 2,050,022.78 14,338,861.67 6,400,988.33 1,579,547.78 18,159,319.11 8,348,146.67 15,486,884.44
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,348,146.67 9,679,302.78 4,174,073.33 9,679,302.78 13,551,023.89 7,743,442.22 4,100,045.56 20,500,227.78 6,150,068.33 2,050,022.78 14,338,861.67 6,400,988.33 1,579,547.78 18,159,319.11 8,348,146.67 15,486,884.44 29,134,600.00
kapasitas : 248 400 BTU/h kapasitas : 210 100 BTU/h
m'
255.00
114,253.33
29,134,600.00
114,253.33
bh
2.00
1,842,808.55
3,685,617.10
1,842,808.55
3,685,617.10
bh
12.00
2,208,160.01
26,497,920.07
2,208,160.01
26,497,920.07
bh bh ttk ttk m'
2.00 11.00 2.00 13.00 444.00
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 421,780.67
2,279,207.02 20,496,925.26 7,823,675.88 9,492,265.22 187,270,616.00
1,863,356.84 3,911,837.94 730,174.25 421,780.67
20,496,925.26 7,823,675.88 9,492,265.22 187,270,616.00
unit
1.00
43,868,519.39
43,868,519.39
43,868,519.39
43,868,519.39
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
kapasitas : 305 700 BTU/h kapasitas : 305 700 BTU/h
unit unit
1.00 1.00
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
30.00 20.00 30.00 30.00 50.00 55.00 30.00 20.00 5.00 10.00 40.00 50.00 10.00 50.00 25.00 30.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
215.00
114,253.33
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
bh
2.00
1,842,808.55
Tidak Dikerjakan
1,842,808.55
Tidak Dikerjakan
bh
11.00
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
bh ttk ttk m'
12.00 2.00 12.00 405.00
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
kapasitas : 305 700 BTU/h kapasitas : 305 700 BTU/h
unit unit
1.00 1.00
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m'
30.00 20.00 30.00 30.00 50.00 50.00 30.00 20.00 5.00 10.00 40.00 50.00 10.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 46 of 280
NO.
URAIAN
d. e. f. g. h. i. j. 4.
VI.
- Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 Y- Branch - Pipe Indoor Connetion Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Kabel Kontrol Indoor ke Outdoor
LANTAI EMPAT a. Indoor Unit VRV SISTEM 1 - IU.F1.4.1.1 s/d 6 HALL LANTAI 2 SISTEM 2 - IU.F1.4.2.1 s/d 6 HALL LANTAI 2 b. Outdoor Unit VRV - OU.F1.4.1 LANTAI ATAP - OU.F1.4.2 LANTAI ATAP c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor
3.
4.
5.
3.
4.
5.
50.00 25.00 30.00
HARGA SATUAN
JUMLAH HARGA
(Rp.) 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.) 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
(Rp.)
m'
210.00
114,253.33
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
2.00
1,842,808.55
Tidak Dikerjakan
1,842,808.55
Tidak Dikerjakan
bh
11.00
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
bh ttk ttk m'
12.00 2.00 12.00 405.00
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
Kapasitas : 54 000 Btu/h - 4 Way Ceiliing Cassette + Purifying Kit
unit
6.00
20,933,224.76
Tidak Dikerjakan
20,933,224.76
Tidak Dikerjakan
kapasitas : 305 700 BTU/h kapasitas : 305 700 BTU/h
unit unit
1.00 1.00
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
430,654,083.13 430,654,083.13
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
30.00 20.00 30.00 30.00 50.00 50.00 30.00 20.00 5.00 10.00 40.00 50.00 10.00 50.00 25.00 30.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI DUA a. TBS-2 b. Kabel dari MDF-TS ke TBS-2, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Column Speaker 15 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI TIGA a. TBS-3 b. Kabel dari MDF-TS ke TBS-3, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Attenuator e. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit f. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI EMPAT a. TBS-4 b. Kabel dari MDF-TS ke TBS-4, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Attenuator e. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit f. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. LANTAI SATU a. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair b. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 c. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm d. Rate Of Rise (ROR) e. Breakglass Call point w/phone jack f. Av Phase Ii S/Strobe Non Iso g. Manual Call Point Backbox h. Indicator Lamp i. Mias 200 Series Advance Base j. Outside Screw & Yoke Supervisory Switch W/2 Spdt. k. Waterflow Detector 2.5" l. Instalasi Detector dalam konduit m. Instalasi Bell & Indicator dalam konduit n. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit 2.
VOLUME
m' m' m'
bh
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Column Speaker 15 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² 2.
SATUAN
m'
210.00
114,253.33
Tidak Dikerjakan
114,253.33
Tidak Dikerjakan
bh
2.00
1,842,808.55
Tidak Dikerjakan
1,842,808.55
Tidak Dikerjakan
bh
11.00
2,208,160.01
Tidak Dikerjakan
2,208,160.01
Tidak Dikerjakan
bh ttk ttk m'
12.00 2.00 12.00 405.00
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,863,356.84 3,911,837.94 730,174.25 421,780.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
994,660,786.68
JUMLAH
992,381,579.66
bh m' bh bh bh ttk ttk
1.00 10.00 7.00 10.00 1.00 7.00 1.00
1,279,196.28 35,697.47 163,870.97 848,672.97 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 1,147,096.81 8,486,729.73 153,399.09 1,081,410.12 154,487.16
1,279,196.28 35,697.47 163,870.97 848,672.97 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 1,147,096.81 8,486,729.73 153,399.09 1,081,410.12 154,487.16
bh ttk
1.00 1.00
830,378.57 154,487.16
830,378.57 154,487.16
830,378.57 154,487.16
830,378.57 154,487.16
bh m' bh bh bh ttk ttk
1.00 15.00 7.00 4.00 1.00 7.00 1.00
1,279,196.28 35,697.47 163,870.97 848,672.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 848,672.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
1.00 1.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
bh m' bh bh ttk ttk
1.00 20.00 8.00 1.00 8.00 1.00
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
1.00 1.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
bh m' bh bh ttk ttk
1.00 25.00 8.00 1.00 8.00 1.00
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
1.00 1.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
1.00
5,000,000.00
5,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
18,644,159.66
ls
5,000,000.00 JUMLAH
5,000,000.00 18,644,159.66
m' m' m' bh bh bh bh bh bh bh bh ttk ttk ttk
30.00 30.00 30.00 12.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 12.00 7.00 1.00
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
LANTAI DUA a. Kabel dari MCFA ke TBFA-2, STP 18 AWG 1 Pair b. Kabel dari MCFA ke TBFA-2, FRC 3 x 4 mm3 c. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm d. Rate Of Rise (ROR) e. Breakglass Call point w/phone jack f. Av Phase Ii S/Strobe Non Iso g. Manual Call Point Backbox h. Indicator Lamp i. Mias 200 Series Advance Base j. Outside Screw & Yoke Supervisory Switch W/2 Spdt. k. Waterflow Detector 2.5" l. Instalasi Detector dalam konduit m. Instalasi Bell & Indicator dalam konduit n. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
m' m' m' bh bh bh bh bh bh bh bh ttk ttk ttk
35.00 35.00 35.00 25.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25.00 7.00 1.00
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 2,051,526.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI TIGA a. Kabel dari MCFA ke TBFA-3, STP 18 AWG 1 Pair b. Kabel dari MCFA ke TBFA-3, FRC 3 x 4 mm3 c. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm d. Rate Of Rise (ROR) e. Breakglass Call point w/phone jack f. Av Phase Ii S/Strobe Non Iso g. Manual Call Point Backbox h. Indicator Lamp i. Mias 200 Series Advance Base j. Outside Screw & Yoke Supervisory Switch W/2 Spdt. k. Waterflow Detector 2.5" l. Instalasi Detector dalam konduit m. Instalasi Bell & Indicator dalam konduit n. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
m' m' m' bh bh bh bh bh bh bh bh ttk ttk ttk
40.00 40.00 40.00 14.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 14.00 7.00 1.00
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 35,288,941.37 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
LANTAI EMPAT a. Kabel dari MCFA ke TBFA-4, STP 18 AWG 1 Pair b. Kabel dari MCFA ke TBFA-4, FRC 3 x 4 mm3 c. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm d. Rate Of Rise (ROR) e. Breakglass Call point w/phone jack f. Av Phase Ii S/Strobe Non Iso g. Manual Call Point Backbox h. Indicator Lamp i. Mias 200 Series Advance Base j. Outside Screw & Yoke Supervisory Switch W/2 Spdt. k. Waterflow Detector 2.5" l. Instalasi Detector dalam konduit m. Instalasi Bell & Indicator dalam konduit n. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
m' m' m' bh bh bh bh bh bh bh bh ttk ttk ttk
45.00 45.00 45.00 14.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 14.00 8.00 1.00
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 3,112,092.18 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
448,512.65 1,901,788.34 260,893.99 14,305,584.58 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 1,146,230.28 668,634.33 95,519.19
14,950.42 63,392.94 8,696.47 1,192,132.05 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
448,512.65 1,901,788.34 260,893.99 14,305,584.58 669,678.06 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 1,146,230.28 668,634.33 95,519.19
TESTING & COMMISSIONING
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 47 of 280
NO.
URAIAN a.
Progamming, Supervisi, Testing & Commissioning
6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 1. SISTEM PERKABELAN UTAMA a. STRUKTUR SISTEM KABEL & INSTALASI INSTALASI DISTRIBUSI GEDUNG DENGAN MENGGUNAKAN KABEL FO - Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 1 FO SM 4 Core (Vertical Cabling System)
2.
4.
5.
6.
HARGA SATUAN
JUMLAH HARGA
HARGA SATUAN
(Rp.) 5,500,000.00
(Rp.) 5,500,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
38,069,350.28
1.00
m
10.00
50,698.07
m
16.00
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 3 FO SM 24 Core
m
22.00
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 4 FO SM 24 Core
m
(Rp.) 5,500,000.00 JUMLAH
JUMLAH HARGA (Rp.) 5,500,000.00 33,220,390.45
506,980.72
50,698.07
506,980.72
50,698.07
811,169.16
50,698.07
811,169.16
50,698.07
1,115,357.59
50,698.07
1,115,357.59
28.00
50,698.07
1,419,546.02
50,698.07
1,419,546.02
unit unit
2.00 2.00
20,931,439.39 573,823.72
41,862,878.77 1,147,647.44
20,931,439.39 573,823.72
41,862,878.77 1,147,647.44
b.
CCTV - IP Camera Fix Dome Camera Indoor
unit
7.00
7,982,546.77
55,877,827.40
7,982,546.77
55,877,827.40
c.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas 24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 36.00 36.00 18.00
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 3,876,548.80 3,010,427.25 1,072,152.85
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 3,876,548.80 3,010,427.25 1,072,152.85
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan Kabel CCTV
titik titik titik
4.00 75.00 7.00
738,717.66 738,717.66 738,717.66
2,954,870.62 55,403,824.16 5,171,023.59
738,717.66 738,717.66 738,717.66
2,954,870.62 55,403,824.16 5,171,023.59
LANTAI 2 a. WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
2.00 2.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
b.
CCTV - IP Camera Fix Dome Camera Indoor
unit
3.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
c.
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel CCTV
titik titik
4.00 3.00
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
LANTAI 3 a. WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
2.00 2.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
b.
CCTV - IP Camera Fix Dome Camera Indoor
unit
3.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
c.
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel CCTV
titik titik
4.00 3.00
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
LANTAI 4 a. WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
2.00 2.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
b.
CCTV - IP Camera Fix Dome Camera Indoor
unit
3.00
7,982,546.77
Tidak Dikerjakan
7,982,546.77
Tidak Dikerjakan
c.
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel CCTV
titik titik
4.00 3.00
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan
TESTING COMMISIONING - Testing Commisioning, Labeling, & Documentation Data & Voice ( Fluke )
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
6.5. PEKERJAAN IPTV 1. LANTAI SATU a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV 2.
VOLUME
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 2 FO SM 4 Core (Vertical Cabling System)
6.4. PEKERJAAN TELEPON 1. LANTAI SATU a. IP TELEPON - Handset Telepon TB 30 Pair - IP Phone Series - Titik Instalasi Phone 2.
ls
-
LANTAI 1 a. WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
d.
3.
SATUAN
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot 1.00 5,000,000.00 JUMLAH 6.3.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
5,000,000.00 184,346,290.48
5,000,000.00 JUMLAH
5,000,000.00 184,346,290.48
unit unit ttk
1.00 7.00 7.00
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 20,840,831.99 1,108,969.36
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 20,840,831.99 1,108,969.36
lot lot lot lot
1.00 1.00 1.00 1.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
JUMLAH 6.4.PEKERJAAN TELEPON
35,016,845.98
JUMLAH
35,016,845.98
unit unit unit
2.00 3.00 3.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 242,846.08 3,807,829.93
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 242,846.08 3,807,829.93
lot lot lot lot
1.00 1.00 1.00 1.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
2,000,000.00 3,000,000.00 2,000,000.00 1,500,000.00
JUMLAH 6.5.PEKERJAAN IPTV
15,870,308.22
JUMLAH
15,870,308.22
Pek. Non Standar Gedung D2-F1 (Poliklinik, Diagnosa, Kantor, Hall) - page 48 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG C1 (RAWAT INAP) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
3,264,028,282.88
II.
PEKERJAAN NON STANDAR
Rp
9,677,222,217.65
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
12,941,250,500.53
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. -
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD
III. PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 3.3. PEKERJAAN AIR PANAS 3.4. PEKERJAAN AIR HUJAN IV.
Rp Rp Rp Rp
364,526,936.50 388,307,692.67 708,807,213.91 64,231,809.74
Rp Rp Rp Rp Rp
314,231,101.05 193,431,770.36 663,403,160.95 567,088,597.71 3,264,028,282.88
JUMLAH PEKERJAAN STANDAR Rp
3,264,028,282.88
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 4.2. PEKERJAAN RAK KABEL 4.3. PEKERJAAN PANEL DAN KABEL FEEDER STD 4.4. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI JUMLAH -PEKERJAAN STANDARD
Rekapitulasi Standar Gedung B (Rawat Inap)
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1. III.
PEKERJAAN STANDARD PEKERJAAN PLUMBING 3.1. PEKERJAAN AIR BERSIH 1. SISTEM AIR BERSIH a. Roof Tank (Lantai Atap) - Roof Tank + Dudukan kapasitas : 16 M3 Material : Fibre Type : Panell - Gate valve dia. 65 mm (Dari Pompa GWT ke Roof Tank) - Gate valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Gate valve dia. 65 mm (Dari Header ke Booster Pump) - Gate valve dia. 80 mm (Dari Roof tank ke Header) - Gate valve dia. 80 mm (Dari Roof tank ke Pipa Kuras) - Check valve dia. 65 mm (Dari Header ke Distribusi Gedung) - Floating Valve dia. 65 mm (Dari GWT ke Roof Tank) - Header dimeter 100 mm - Water Level Control ( WLC ) - Pipa Kuras dia. 80 mm - Vent Out dia. 65 mm b. Pompa Tekan (lantai Atap) - Packaged Booster Pump (1 Unit Operasi / 1 Stand By) (LANTAI ATAP) kapasitas : 250 Lpm head : 18 meter Putaran : 1500 Rpm Type : Package Booster Pump - Gate valve dia. 65 mm - Strainer dia. 65 mm - Check valve dia. 65 mm - Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) c. Pemipaan Polypropelyne PN-10 - Pipa Distribusi Dari Lantai 1 ke Roof Tank, PPR dia. 80 mm - Pipa Distribusi Dari Roof Tank ke Shaft Gedung, PPR dia. 50 mm 2.
3.
4.
5.
6.
LANTAI SATU 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm LANTAI DUA 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm LANTAI TIGA 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm
3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
unit
1.00
56,164,362.50
56,164,362.50
bh bh bh bh bh bh bh bh set m' bh
1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 1.00 30.00 2.00
3,759,305.94 3,759,305.94 3,759,305.94 4,705,483.44 4,705,483.44 3,868,227.00 1,313,101.88 3,232,914.63 2,671,520.03 154,041.27 267,601.88
3,759,305.94 7,518,611.89 7,518,611.89 9,410,966.89 4,705,483.44 7,736,454.00 1,313,101.88 6,465,829.25 2,671,520.03 4,621,238.13 535,203.75
unit
1.00
56,101,925.14
56,101,925.14
bh bh bh bh bh ttk
6.00 2.00 4.00 4.00 1.00 1.00
3,759,305.94 3,139,528.88 4,655,488.50 791,366.63 3,232,914.63 8,917,884.38
22,555,835.67 6,279,057.75 18,621,954.00 3,165,466.50 3,232,914.63 8,917,884.38
m' m'
110.00 180.00
154,041.27 64,473.33
16,944,539.79 11,605,200.26
m' m' m' m'
20.00 80.00 145.00 120.00
64,473.33 42,693.87 28,966.44 13,697.34
1,289,466.70 3,415,509.66 4,200,134.06 1,643,680.68
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
m' m' m' m'
20.00 80.00 145.00 120.00
64,473.33 42,693.87 28,966.44 13,697.34
1,289,466.70 3,415,509.66 4,200,134.06 1,643,680.68
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
m' m' m' m'
20.00 80.00 145.00 120.00
64,473.33 42,693.87 28,966.44 13,697.34
1,289,466.70 3,415,509.66 4,200,134.06 1,643,680.68
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
LANTAI EMPAT 1 Pemipaan Polypropelyne PN.10 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm
m' m' m' m'
20.00 80.00 145.00 120.00
64,473.33 42,693.87 28,966.44 13,697.34
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh
2.00 7.00
3,224,009.94 497,501.97
Tidak Dikerjakan Tidak Dikerjakan
RISER DI SHAFT Pemipaan Polypropelyne PN.10 : - Pemipaan Polypropelyne PN-10, PPR Dia. 80 mm - Water Hamer ( WH ) - AAV
m' bh bh
225.00 4.00 2.00
154,041.27 1,337,340.80 1,617,422.67
34,659,285.94 5,349,363.18 3,234,845.33
JUMLAH 3.1.PEKERJAAN AIR BERSIH
364,526,936.50
3.2. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 1. SISTEM PEGOLAHAN LIMBAH 1. Bak Kontrol/Sewage 2. Sewage Pump Kap. 200 Lpm 3. Gate valve diameter 150 mm / 20 K 4. Gate valve diameter 100 mm / 20 K 2.
SATUAN
LANTAI SATU a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 100 mm - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm
unit unit bh bh
1.00 2.00 2.00 1.00
2,248,059.23 12,639,500.00 14,843,102.22 9,815,798.38
2,248,059.23 25,279,000.00 29,686,204.43 9,815,798.38
m' m' bh
150.00 250.00 25.00
214,300.29 100,092.70 325,155.63
32,145,044.22 25,023,175.52 8,128,890.63
m' m' m' m' bh
90.00 90.00 140.00 180.00 70.00
100,092.70 49,755.12 37,394.78 37,394.78 180,353.88
9,008,343.19 4,477,961.06 5,235,268.65 6,731,059.69 12,624,771.25
m' m' m'
90.00 90.00 90.00
49,755.12 37,394.78 37,394.78
4,477,961.06 3,365,529.84 3,365,529.84
Pek. Standar Gedung B (Rawat Inap) - page 50 of 280
NO.
URAIAN
3.
4.
5.
6.
LANTAI DUA a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 65 mm - Diameter 50 mm LANTAI TIGA a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 65 mm - Diameter 50 mm LANTAI EMPAT a. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Diameter 100 mm - FCO diameter 100 mm b. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Diameter 80 mm - Diameter 65 mm - Diameter 50 mm - FCO diameter 50 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 65 mm - Diameter 50 mm RISER DI SHAFT a. Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 : - Diameter 150 mm b. Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 : - Diameter 100 mm c. Pemipaan Vent PVC Kelas 10 kg/cm2 : - Diameter 80 mm
3.3. PEKERJAAN AIR PANAS 1. SISTEM AIR PANAS a. Heat Pump - Heat Pump Water Heater Kapasitas: 21 - 28.5 kW Type : Air to Water Power Input : 8.45 kW Refrigerant : R134 A Req. Hot Water Flow Rate : 8 m3/h Rate Water Temp. / Max. Water Output Temp. : 70 oC - Aksesoris - Gate Valve dia. 32 mm (Dari Heat Pump ke Pompa) - Check valve dia. 32 mm (Dari Heat Pump ke Pompa) b. Pompa Heat Pump - Pompa Sirkulasi Pompa ke Heat Pump ( P-HP 1. & P-HP.2 ) Kapasitas : 10 M3/h , Head. 22.8 - 40 Meter - Pompa Return Kapasitas : 3.1 M3/h , Head. 20.61 - 60 Meter - Accessories Flexible Joint dia.32 mm Gate valve dia. 32 mm Check valve dia. 32 mm Y-Strainer dia.32 mm Pipa Haeder 63/DN50 mm c. Panel Kontrol & instalasi Pengkabelan ke unit d. Hot Water Storage Tank Kapasitas : 1500 liter Type : Vertical Cylinder Working Pressure : 5 Bar Material : SS 400 / Isolasi : Polyurethane 50 mm kelengkapan : Safety valve, Preesure dauge, Air fan & Magnesium Anode - Accessories Gate valve dia. 50 mm Gate valve dia. 32 mm Pipa Haeder 100/DN50 mm (Dari Pressure Tank) e. Pipa Supply & Distribusi Polypropeline PN-20 - Pipa Supply Dari Roof Tank ke Heat Pump, PPR PN-10 dia. 32 mm - Pipa Supply Air Panas, PPR PN-20, dia. 50 mm (Ke Shaft Gedung) - Pipa Supply & Return Air Panas, PPR PN-20, dia. 32 mm - Pipa Supply & Return Air Panas, PPR PN-10 dia. 32 mm 2.
3.
4.
LANTAI SATU 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
m' bh
60.00 25.00
100,092.70 325,155.63
6,005,562.13 8,128,890.63
m' m' m' bh
50.00 120.00 110.00 70.00
49,755.12 37,394.78 37,394.78 180,353.88
2,487,756.15 4,487,373.13 4,113,425.36 12,624,771.25
m' m'
50.00 50.00
37,394.78 37,394.78
1,869,738.80 1,869,738.80
m' bh
60.00 25.00
100,092.70 325,155.63
6,005,562.13 8,128,890.63
m' m' m' bh
50.00 120.00 110.00 70.00
49,755.12 37,394.78 37,394.78 180,353.88
2,487,756.15 4,487,373.13 4,113,425.36 12,624,771.25
m' m'
50.00 50.00
37,394.78 37,394.78
1,869,738.80 1,869,738.80
m' bh
60.00 25.00
100,092.70 325,155.63
6,005,562.13 8,128,890.63
m' m' m' bh
50.00 120.00 110.00 70.00
49,755.12 37,394.78 37,394.78 180,353.88
2,487,756.15 4,487,373.13 4,113,425.36 12,624,771.25
m' m'
50.00 50.00
37,394.78 37,394.78
1,869,738.80 1,869,738.80
m'
225.00
214,300.29
48,217,566.33
m'
225.00
100,092.70
22,520,857.97
m'
225.00
49,755.12
11,194,902.66
JUMLAH 3.2.PEKERJAAN AIR KOTOR, AIR BEKAS & VENT
388,307,692.67
unit
2.00
183,665,483.44
367,330,966.88
bh bh
2.00 2.00
497,501.97 589,554.38
995,003.94 1,179,108.75
unit
2.00
19,218,788.44
38,437,576.88
unit
2.00
8,136,488.44
16,272,976.88
bh bh bh bh bh unit unit
6.00 6.00 3.00 3.00 2.00 2.00 2.00
488,187.00 497,501.97 589,554.38 790,290.38 664,067.16 8,917,884.38 41,840,756.25
2,929,122.00 2,985,011.83 1,768,663.13 2,370,871.13 1,328,134.32 17,835,768.75 83,681,512.50
bh bh bh
2.00 8.00 1.00
3,224,009.94 497,501.97 1,152,175.17
6,448,019.89 3,980,015.78 1,152,175.17
m' m' m' m'
20.00 150.00 50.00 50.00
28,966.44 101,735.52 44,858.68 44,858.68
579,328.84 15,260,328.13 2,242,933.93 2,242,933.93
m' m' m' m'
20.00 80.00 145.00 120.00
101,735.52 69,044.43 44,858.68 20,007.79
2,034,710.42 5,523,554.17 6,504,508.38 2,400,934.38
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
LANTAI DUA 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm
m' m' m' m'
20.00 80.00 145.00 120.00
101,735.52 69,044.43 44,858.68 20,007.79
2,034,710.42 5,523,554.17 6,504,508.38 2,400,934.38
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
LANTAI TIGA 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm
m' m'
20.00 80.00
101,735.52 69,044.43
2,034,710.42 5,523,554.17
Pek. Standar Gedung B (Rawat Inap) - page 51 of 280
NO.
URAIAN
2
5.
6.
* Diameter 32 mm * Diameter 20 mm Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm
LANTAI EMPAT 1 Pemipaan Polypropelyne PN.20 : * Diameter 50 mm * Diameter 40 mm * Diameter 32 mm * Diameter 20 mm 2 Gate Valve (Menuju Shaft) * Diameter 40 mm * Diameter 32 mm RISER DI SHAFT Pemipaan Polypropelyne PN.20 : - Pemipaan Polypropelyne PN-20, PPR Dia. 80 mm - Water Hamer ( WH )
3.4. PEKERJAAN AIR HUJAN 1. Roof Drain diameter 100 mm 2. Pemipaan Air hujan PVC Kelas 10 kg/cm2 : - Diameter 100 mm (di Shaft) 3. Bak Kontrol / Bak Sumpit 80x80 4. Sewage Pump Kap. 200 Lpm IV.
PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN PENANGKAL PETIR 1. Air Terminal - Radius 20 m 2. Kabel Coaxial 2 x 35 mm2 Lantai Satu, Kabel Coaxial 2 x 35 mm2 dari Lantai Atap ke Lantai Satu, Kabel Coaxial 2 x 35 mm2 Lantai Atap, Kabel Coaxial 2 x 35 mm2 3. Obstuction Lamp & Instalasi 4. Connecting Sleeve lengkap surge Arester 5. Lightning Arrester 10KA 6. Lightning Flash Counter 7. Tiang Menara 8. Grounding sistem - Copper road - Pentanahan max.2 Ohm bahan GSP dia.50mm² + BC.70mm² - Bak kontrol ( 40x40) cm lengkap tutup - Testing/pengukuran pentanahan - Material bantu dan accessories - Proses pengesahan gambar ke DepNaker RI 9. Fitting-Fitting 4.2.
PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2.
3.
4.
5.
5.
4.3.
3.
VOLUME
HARGA SATUAN
JUMLAH HARGA
m' m'
145.00 120.00
(Rp.) 44,858.68 20,007.79
(Rp.) 6,504,508.38 2,400,934.38
bh bh
2.00 7.00
3,224,009.94 497,501.97
6,448,019.89 3,482,513.81
m' m' m' m'
20.00 80.00 145.00 120.00
101,735.52 69,044.43 44,858.68 20,007.79
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh
2.00 7.00
3,224,009.94 497,501.97
Tidak Dikerjakan Tidak Dikerjakan
m' 225.00 245,576.33 bh 4.00 1,337,340.80 JUMLAH 3.3.PEKERJAAN AIR PANAS
55,254,675.00 5,349,363.18 708,807,213.91
bh
11.00
129,645.42
1,426,099.58
m' unit unit
330.00 2.00 2.00
100,092.70 2,248,059.23 12,639,500.00
33,030,591.69 4,496,118.47 25,279,000.00
JUMLAH 3.4.PEKERJAAN AIR HUJAN
64,231,809.74
bh
15.00
1,685,441.23
25,281,618.47
m' m' m' bh bh bh bh bh unit
160.00 50.00 180.00 2.00 15.00 15.00 2.00 15.00 4.00
376,190.48 376,190.48 376,190.48 1,928,144.77 674,176.49 707,885.32 4,415,945.92 4,314,200.00 3,884,155.50
60,190,477.26 18,809,524.14 67,714,286.92 3,856,289.54 10,112,647.39 10,618,279.76 8,831,891.83 64,713,000.00 15,536,622.00
lot 1.00 28,566,463.73 JUMLAH 4.1.PEKERJAAN PENANGKAL PETIR
28,566,463.73 314,231,101.05
btg
19.00
1,032,478.94
19,617,099.78
btg
19.00
786,226.43
14,938,302.09
LANTAI DUA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
19.00
1,032,478.94
19,617,099.78
btg
19.00
786,226.43
14,938,302.09
LANTAI TIGA a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
19.00
1,032,478.94
19,617,099.78
btg
19.00
786,226.43
14,938,302.09
LANTAI EMPAT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
19.00
1,032,478.94
Tidak Dikerjakan
btg
19.00
786,226.43
Tidak Dikerjakan
SHAFT a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm
btg
5.00
1,032,478.94
5,162,394.68
btg
5.00
786,226.43
3,931,132.13
pcs
1,620.00
49,797.55
80,672,037.94
JUMLAH 4.2.PEKERJAAN RAK KABEL
193,431,770.36
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik - MDP - RANAP.C1 - SDP - 1 - LP - 1 - PP - 1 - SDP - AC.RANAP.C1 - PP - AC.1 b. Kabel Feeder - Dari MDP - RANAP.C1 ke SDP - 1, NYY 4 x 95 mm2 + Grounding - Dari SDP - 1 ke LP - 1, NYY 4 x 4 mm2 + Grounding - Dari SDP - 1 ke PP - 1 , NYY 4 x 50 mm2 + Grounding - Dari MDP - RANAP.C1 ke SDP - AC.RANAP.C1, NYY 2 x 4 (1 x 150) mm2 + Grounding - Dari SDP - AC.RANAP.C1 ke PP - AC.1, NYY 4 x 6 mm2 + Grounding 2.
SATUAN
LANTAI DUA a. Panel Listrik - SDP - 2 - LP - 2 - PP - 2 - PP - AC.2 b. Kabel Feeder - Dari MDP - RANAP.C1 ke SDP - 2, NYY 4 x 95 mm2 + Grounding - Dari SDP - 2 ke LP - 2, NYY 4 x 6 mm2 + Grounding - Dari SDP - 2 ke PP - 2, NYY 4 x 50 mm2 + Grounding - Dari SDP - AC.RANAP.C1 ke PP - AC.2, NYY 4 x 6 mm2 + Grounding
unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 1.00
99,170,370.80 28,699,819.20 13,868,284.53 19,397,217.27 32,412,290.40 15,579,504.63
99,170,370.80 28,699,819.20 13,868,284.53 19,397,217.27 32,412,290.40 15,579,504.63
m' m' m' m' m'
8.00 10.00 12.00 10.00 8.00
741,203.31 39,224.41 383,971.99 8,148,722.92 50,502.03
5,929,626.50 392,244.10 4,607,663.87 81,487,229.19 404,016.28
unit unit unit unit
1.00 1.00 1.00 1.00
28,699,819.20 14,209,250.23 20,079,148.68 12,851,778.99
28,699,819.20 14,209,250.23 20,079,148.68 12,851,778.99
m' m' m' m'
20.00 8.00 10.00 20.00
741,203.31 50,502.03 383,971.99 50,502.03
14,824,066.26 404,016.28 3,839,719.89 1,010,040.69
LANTAI TIGA Pek. Standar Gedung B (Rawat Inap) - page 52 of 280
NO.
URAIAN
SATUAN
VOLUME
HARGA SATUAN (Rp.)
a.
b.
4.
5.
4.4.
Panel Listrik - SDP - 3 - LP - 3 - PP - 3 - PP -AC.3 Kabel Feeder - Dari MDP -RANAP.C1 ke SDP - 3, NYY 4 x 95 mm2 + Grounding - Dari SDP - 3 ke LP - 3, NYY 4 x 4 mm2 + Grounding - Dari SDP - 3 ke PP - 3, NYY 4 x 70 mm2 + Grounding - Dari SDP - AC.RANAPC1ke PP - AC.3, NYY 4 x 6 mm2 + Grounding
LANTAI EMPAT a. Panel Listrik - SDP - 4 - LP - 4 - PP - 4 - PP - AC.4 b. Kabel Feeder - Dari MDP -RANAPC1ke SDP - 4, NYY 4 x 95 mm2 + Grounding - Dari SDP - 4 ke LP - 4, NYY 4 x 4 mm2 + Grounding - Dari SDP - 4 ke PP - 4, NYY 4 x 70 mm2 + Grounding - Dari SDP - AC ke PP - AC.4, NYY 4 x 6 mm2 + Grounding LANTAI ATAP a. Panel Listrik - PP - BP - PP - LF - PP - AC.OU b. Kabel Feeder - Dari SDP - 4 ke PP - BP, NYY 4 x 16 mm2 + Grounding - Dari MDP-RANAPC1ke PP - LF, FRC 4 x 70 mm2 + Grounding - Dari SDP - AC.RANAPC1ke PP - AC.OU, NYY 4 x 185 mm2 + Grounding
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W
JUMLAH HARGA (Rp.)
unit unit unit unit
1.00 1.00 1.00 1.00
28,699,819.20 14,209,250.23 20,079,148.68 12,851,778.99
28,699,819.20 14,209,250.23 20,079,148.68 12,851,778.99
m' m' m' m'
30.00 8.00 10.00 30.00
741,203.31 39,224.41 540,449.03 50,502.03
22,236,099.39 313,795.28 5,404,490.27 1,515,061.04
unit unit unit unit
1.00 1.00 1.00 1.00
28,884,207.43 14,209,250.23 20,420,114.39 12,851,778.99
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m'
40.00 8.00 10.00 40.00
741,203.31 39,224.41 540,449.03 50,502.03
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 1.00 1.00
14,696,328.44 15,410,412.13 26,934,018.21
14,696,328.44 15,410,412.13 26,934,018.21
m' m' m'
10.00 50.00 50.00
138,683.66 607,331.81 1,428,668.50
1,386,836.59 30,366,590.57 71,433,424.93
JUMLAH 4.3.PEKERJAAN PANEL DAN KABEL FEEDER STD
663,403,160.95
bh bh bh bh bh bh bh bh
16.00 12.00 3.00 15.00 71.00 7.00 60.00 13.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
15,110,618.50 11,332,963.87 1,863,365.27 4,918,552.86 18,209,978.43 1,795,349.99 12,682,084.32 2,405,697.00
Pek. Standar Gedung B (Rawat Inap) - page 53 of 280
NO.
URAIAN
b.
c.
d.
2.
3.
4.
Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
LANTAI DUA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 13 W + Tool Kit Emergency - Lampu LED Down Light 16 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI TIGA a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W - Lampu LED Panel 26 W - Lampu LED Batten Tube 20 W - Lampu LED Down Light 16 W - Lampu LED Down Light 13 W - Lampu LED Down Light 9 W - Lampu LED Down Light 7 W - Lampu LED Down Light 5 W Lampu Emergency - Lampu LED Plat 12 W + Baterai - Lampu LED Exit 5 W + Baterai - Lampu LED Down Light 9 W + Tool Kit Emergency - Lampu LED Down Light 13 W + Tool Kit Emergency b. Pekerjaan Saklar Lampu - Saklar Tunggal - Saklar Ganda - Saklar Putar c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A - Stop Kontak 350 W / 16 A - Stop Kontak 400 W / 16 A - Stop Kontak 500 W / 16 A d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
bh bh bh bh
4.00 4.00 8.00 8.00
324,144.32 739,912.73 629,450.98 700,875.94
1,296,577.26 2,959,650.94 5,035,607.87 5,607,007.50
bh bh bh
47.00 29.00 2.00
26,683.58 33,132.97 31,018.41
1,254,128.10 960,856.07 62,036.83
bh bh bh bh
142.00 5.00 4.00 12.00
104,731.79 104,731.79 104,731.79 302,654.09
14,871,913.57 523,658.93 418,927.14 3,631,849.12
ttk ttk ttk ttk
197.00 24.00 78.00 163.00
159,922.37 531,697.00 159,922.37 159,922.37
31,504,707.54 12,760,728.00 12,473,945.12 26,067,346.85
bh bh bh bh bh bh bh bh
16.00 14.00 3.00 15.00 71.00 7.00 60.00 13.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
15,110,618.50 13,221,791.18 1,863,365.27 4,918,552.86 18,209,978.43 1,795,349.99 12,682,084.32 2,405,697.00
bh bh bh bh
4.00 4.00 8.00 8.00
324,144.32 739,912.73 629,450.98 700,875.94
1,296,577.26 2,959,650.94 5,035,607.87 5,607,007.50
bh bh bh
47.00 29.00 2.00
26,683.58 33,132.97 31,018.41
1,254,128.10 960,856.07 62,036.83
bh bh bh bh
142.00 5.00 4.00 12.00
104,731.79 104,731.79 104,731.79 302,654.09
14,871,913.57 523,658.93 418,927.14 3,631,849.12
ttk ttk ttk ttk
199.00 24.00 78.00 163.00
159,922.37 531,697.00 159,922.37 159,922.37
31,824,552.29 12,760,728.00 12,473,945.12 26,067,346.85
bh bh bh bh bh bh bh bh
16.00 14.00 3.00 15.00 71.00 7.00 60.00 13.00
944,413.66 944,413.66 621,121.76 327,903.52 256,478.57 256,478.57 211,368.07 185,053.62
15,110,618.50 13,221,791.18 1,863,365.27 4,918,552.86 18,209,978.43 1,795,349.99 12,682,084.32 2,405,697.00
bh bh bh bh
4.00 4.00 8.00 8.00
324,144.32 739,912.73 629,450.98 629,450.98
1,296,577.26 2,959,650.94 5,035,607.87 5,035,607.87
bh bh bh
47.00 29.00 2.00
26,683.58 33,132.97 31,018.41
1,254,128.10 960,856.07 62,036.83
bh bh bh bh
142.00 5.00 4.00 12.00
104,731.79 104,731.79 104,731.79 302,654.09
14,871,913.57 523,658.93 418,927.14 3,631,849.12
ttk ttk ttk ttk
199.00 24.00 78.00 163.00
159,922.37 531,697.00 159,922.37 159,922.37
31,824,552.29 12,760,728.00 12,473,945.12 26,067,346.85
LANTAI EMPAT a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Panel 36 W bh 944,413.66 16.00 - Lampu LED Panel 26 W bh 944,413.66 14.00 - Lampu LED Batten Tube 20 W bh 621,121.76 6.00 - Lampu LED Down Light 16 W bh 327,903.52 15.00 - Lampu LED Down Light 13 W bh 256,478.57 71.00 - Lampu LED Down Light 9 W bh 256,478.57 7.00 - Lampu LED Down Light 7 W bh 211,368.07 60.00 - Lampu LED Down Light 5 W bh 185,053.62 13.00 Lampu Emergency - Lampu LED Plat 12 W + Baterai bh 324,144.32 6.00 - Lampu LED Exit 5 W + Baterai bh 739,912.73 4.00 - Lampu LED Down Light 9 W + Tool Kit Emergency bh 629,450.98 8.00 - Lampu LED Down Light 13 W + Tool Kit Emergency bh 629,450.98 8.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 26,683.58 47.00 - Saklar Ganda bh 33,132.97 29.00 - Saklar Putar bh 31,018.41 2.00 c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A bh 104,731.79 142.00 - Stop Kontak 350 W / 16 A bh 104,731.79 5.00 - Stop Kontak 400 W / 16 A bh 104,731.79 4.00 - Stop Kontak 500 W / 16 A bh 302,654.09 12.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 202.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 26.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 78.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 163.00 JUMLAH 4.4.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
567,088,597.71
Pek. Standar Gedung B (Rawat Inap) - page 54 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING 5.3. PEKERJAAN DUCTING TATA UDARA 5.4. PEKERJAAN INSTALASI GAS MEDIS 5.5. PEKERJAAN NURSE CALL 5.6. PEKERJAAN BED HEAD 5.7. PEKERJAAN PNEUMATIC TUBE 5.8. PEKERJAAN TRANSPORTASI DALAM GEDUNG
Rp Rp Rp Rp Rp Rp Rp Rp
416,257,660.45 3,244,949,435.53 428,782,350.21 532,318,511.70 980,813,896.49 221,501,636.46 898,031,972.50
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA Rp 6.2. PEKERJAAN FIRE ALARM Rp 6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) Rp 6.4. PEKERJAAN TELEPON Rp 6.5. PEKERJAAN IPTV Rp 6.6. PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) Rp 6.7. PEKERJAAN MASTER CLOCK SYSTEM Rp JUMLAH -PEKERJAAN NON STANDAR Rp
75,472,978.61 507,523,673.27 1,513,864,606.69 88,123,896.31 120,073,768.92 649,507,830.51 9,677,222,217.65
JUMLAH PEKERJAAN NON STANDAR Rp
9,677,222,217.65
Rekapitulasi Non Standar Gedung B (Rawat Inap)
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN 2. PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 50 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm 2.
3.
4.
5.
LANTAI DUA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 50 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI TIGA a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 50 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm LANTAI EMPAT a. Pemasangan Instalasi Hydrant - Indoor Fire Hose Cabinet ( FHC ) - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) - Gate Vale dia 100 mm K.20 - Landing Valve/ KSSK dia 100 mm K.20 - Indicating Valve diameter 100 mm - Test Valve diameter 100 mm - Drain Valve diameter 100 mm - Flashing valve diameter 100 mm - Plat Orifice diameter 100 mm - Water Flow Switch - Sight glass - Nozzle Pemadam Kebakaran 38 mm - Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : BSP Sch.40 diameter 100 mm b. Pemasangan Instalasi Sprinkler Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - BSP Sch.40 diameter 100 mm - BSP Sch.40 diameter 80 mm - BSP Sch.40 diameter 65 mm - BSP Sch.40 diameter 50 mm - BSP Sch.40 diameter 32 mm - BSP Sch.40 diameter 25 mm - BSP Sch.40 diameter 50 mm (Flashing) Head Sprinkler Gate Vale dia 100 mm K.20 Branch kontrol Valve (BCV) dia. 100 mm RISER DI SHAFT a. Pemipaan BSP Schedule 40 termasuk fitting, sambungan, penggantung & alat bantu lainnya : - Diameter 100 mm ( Pipa Hydrant ) - Diameter 100 mm ( Pipa Sprinkler ) - Diameter 50 mm ( Pipa Test Flashing) - Diameter 50 mm ( Pipa Flashing) b. Gate Vale dia 100 mm K.20 c. Automatic Air valve ( AAV )
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 3,855,801.95 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
30.00
334,952.92
10,048,587.50
m' m' m' m' m' m' m' bh bh set
20.00 30.00 30.00 20.00 110.00 180.00 20.00 69.00 1.00 1.00
334,952.92 238,551.67 118,148.33 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
6,699,058.33 7,156,550.00 3,544,450.00 1,509,312.50 6,271,718.75 10,262,812.50 1,140,312.50 8,839,446.25 9,815,798.38 8,196,754.17
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 3,855,801.95 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
30.00
334,952.92
10,048,587.50
m' m' m' m' m' m' m' bh bh set
20.00 30.00 30.00 20.00 120.00 180.00 20.00 72.00 1.00 1.00
334,952.92 238,551.67 118,148.33 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
6,699,058.33 7,156,550.00 3,544,450.00 1,509,312.50 6,841,875.00 10,262,812.50 1,140,312.50 9,223,770.00 9,815,798.38 8,196,754.17
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
3,816,117.71 3,855,801.95 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
m'
30.00
334,952.92
10,048,587.50
m' m' m' m' m' m' m' bh bh set
20.00 30.00 30.00 20.00 110.00 180.00 20.00 69.00 1.00 1.00
334,952.92 238,551.67 118,148.33 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
6,699,058.33 7,156,550.00 3,544,450.00 1,509,312.50 6,271,718.75 10,262,812.50 1,140,312.50 8,839,446.25 9,815,798.38 8,196,754.17
Set bh bh bh bh bh bh bh bh bh bh bh
1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3,816,117.71 1,285,267.32 9,815,798.38 5,760,713.54 950,472.59 4,506,113.54 4,506,113.54 4,506,113.54 621,347.06 2,909,005.61 2,991,913.76 466,093.13
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m'
30.00
334,952.92
Tidak Dikerjakan
m' m' m' m' m' m' m' bh bh set
20.00 30.00 30.00 20.00 105.00 160.00 20.00 70.00 1.00 1.00
334,952.92 238,551.67 118,148.33 75,465.63 57,015.63 57,015.63 57,015.63 128,107.92 9,815,798.38 8,196,754.17
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' bh bh
40.00 40.00 40.00 40.00 2.00 3.00
334,952.92 334,952.92 118,148.33 118,148.33 9,815,798.38 1,617,422.67
13,398,116.67 13,398,116.67 4,725,933.33 4,725,933.33 19,631,596.77 4,852,268.00
Pek. Non Standar Gedung B (Rawat Inap) - page 56 of 280
NO.
URAIAN
SATUAN
5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV IU.C1.1.1 R. PERAWAT Kapasitas : 7 500 Btu/h - Wall Mounted IU.C1.1.2 R. RAPAT Kapasitas : 7 500 Btu/h - Wall Mounted IU.C1.1.3 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.4 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.5 s/d 8 KORIDOR & NURSE STATION (ANAK) Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette + Purifying Kit IU.C1.1.9 R. TINDAKAN Kapasitas : 7 500 Btu/h - Wall Mounted IU.C1.1.10 R. KONSULTASI Kapasitas : 5 500 Btu/h - Wall Mounted IU.C1.1.11 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted IU.C1.1.12 DEPO OBAT Kapasitas : 5 500 Btu/h - Wall Mounted IU.C1.1.13 R. DOKTER & CO AS Kapasitas : 5 500 Btu/h - Wall Mounted IU.C1.1.14 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted IU.C1.1.15 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.16 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.17 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.18 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.19 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.20 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.21 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.22 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.23 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.24 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.25 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.26 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.27 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.28 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted IU.C1.1.29 R. SHOLAT Kapasitas : 19 100 Btu/h - Wall Mounted IU.C1.1.30 R. TUNGGU Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette + Purifying Kit b. Outdoor Unit VRV - OU.C1.1 LANTAI ATAP kapasitas : 382 200 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor k. Aksesoris - AC Smart 5 2.
3.
LANTAI DUA a. Indoor Unit VRV - IU.C1.2.1 R. PERAWAT Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.2.2 R. RAPAT Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.2.3 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.4 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.5 s/d 8 KORIDOR & NURSE STATION (OBSGYN) Kapasitas : 24 200 Btu/h - 4 Way Ceiling Cassette + Purifying Kit - IU.C1.2.9 R. TINDAKAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.2.10 R. KONSULTASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.C1.2.11 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted - IU.C1.2.12 DEPO OBAT Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.13 R. DOKTER & CO AS Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.14 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.15 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.16 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.17 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.18 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.19 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.20 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.21 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.22 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.23 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.24 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.25 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.26 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.27 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.28 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.29 R. SHOLAT Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.2.30 R. TUNGGU Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette + Purifying Kit b. Outdoor Unit VRV - OU.C1.2 LANTAI ATAP kapasitas : 382 200 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor LANTAI TIGA a. Indoor Unit VRV - IU.C1.3.1 - IU.C1.3.2 - IU.C1.3.3 - IU.C1.3.4 - IU.C1.3.5 s/d 8 - IU.C1.3.9 - IU.C1.3.10 - IU.C1.3.11 - IU.C1.3.12
R. PERAWAT Kapasitas R. RAPAT Kapasitas RAWAT INAP VVIP BED Kapasitas RAWAT INAP VVIP BED Kapasitas KORIDOR & NURSE STATION (BEDAH) Kapasitas R. TINDAKAN Kapasitas R. KONSULTASI Kapasitas RAWAT INAP VVIP (R. KELUARGA) Kapasitas DEPO OBAT Kapasitas
: : : : : : : : :
7 500 Btu/h - Wall Mounted 7 500 Btu/h - Wall Mounted 12 300 Btu/h - Wall Mounted 12 300 Btu/h - Wall Mounted 24 200 Btu/h - 4 Way Ceiling Cassette + Purifying Kit 7 500 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted 15 400 Btu/h - Wall Mounted 5 500 Btu/h - Wall Mounted
VOLUME
HARGA SATUAN
(Rp.) JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
JUMLAH HARGA (Rp.) 416,257,660.45
1.00 1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 17,740,636.76 5,728,372.80 5,638,581.27 6,169,167.54 5,638,581.27 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 7,760,926.35 15,199,566.86
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 70,962,547.03 5,728,372.80 5,638,581.27 6,169,167.54 5,638,581.27 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 7,760,926.35 15,199,566.86
1.00
158,516,836.81
158,516,836.81
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78 41,930,973.33
m'
367.00
114,253.33
bh
1.00
1,842,808.55
1,842,808.55
bh
29.00
2,208,160.01
64,036,640.16
bh bh ttk ttk m'
25.00 5.00 1.00 30.00 549.00
1,139,603.51 1,863,356.84 3,911,837.94 730,174.25 421,780.67
28,490,087.69 9,316,784.21 3,911,837.94 21,905,227.42 231,557,586.00
unit
1.00
29,670,995.31
29,670,995.31
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 17,740,636.76 5,728,372.80 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 15,199,566.86
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 70,962,547.03 5,728,372.80 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 15,199,566.86
unit
1.00
233,492,770.63
233,492,770.63
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78 41,930,973.33
m'
367.00
114,253.33
bh
2.00
1,842,808.55
3,685,617.10
bh
29.00
2,208,160.01
64,036,640.16
bh bh ttk ttk m'
25.00 5.00 1.00 30.00 549.00
5,778,010.42 1,863,356.84 3,911,837.94 730,174.25 421,780.67
144,450,260.42 9,316,784.21 3,911,837.94 21,905,227.42 231,557,586.00
unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 17,740,636.76 5,728,372.80 5,638,581.27 6,169,167.54 5,638,581.27
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 70,962,547.03 5,728,372.80 5,638,581.27 6,169,167.54 5,638,581.27
Pek. Non Standar Gedung B (Rawat Inap) - page 57 of 280
NO.
URAIAN
b. c.
d. e. f. g. h. i. j. 4.
- IU.C1.3.13 R. DOKTER & CO AS Kapasitas : 5 500 Btu/h - Wall Mounted - IU.C1.3.14 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted - IU.C1.3.15 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.16 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.17 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.18 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.19 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.20 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.21 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.22 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.23 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.24 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.25 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.26 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.27 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.28 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.29 R. SHOLAT Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.3.30 R. TUNGGU Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette + Purifying Kit Outdoor Unit VRV - OU.C1.3 LANTAI ATAP kapasitas : 382 200 BTU/h Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") Pemipaan Drain VRV Pemipaan Drain Outdoor Pipe Connection - Outdoor Pipe Connection - 21 Y- Branch - Pipe Indoor Connetion Remocon - Wireless Remocon - Standard 3 Wired Remocon White Titik Instalasi Outdoor Unit Titik Instalasi Indoor Unit VRV Kabel Kontrol Indoor ke Outdoor
LANTAI EMPAT a. Indoor Unit VRV - IU.C1.4.1 R. PERAWAT Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.4.2 R. RAPAT Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.4.3 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.4 RAWAT INAP VVIP BED Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.5 s/d 8 KORIDOR & NURSE STATION (P.Kapasitas DALAM) : 24 200 Btu/h - 4 Way Ceiling Cassette + Purifying Kit - IU.C1.4.9 R. TINDAKAN Kapasitas : 7 500 Btu/h - Wall Mounted - IU.C1.4.10 R. KONSULTASI Kapasitas : 5 500 Btu/h - Wall Mounted - IU.C1.4.11 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted - IU.C1.4.12 DEPO OBAT Kapasitas : 5 500 Btu/h - Wall Mounted - IU.C1.4.13 R. DOKTER & CO AS Kapasitas : 5 500 Btu/h - Wall Mounted - IU.C1.4.14 RAWAT INAP VVIP (R. KELUARGA) Kapasitas : 15 400 Btu/h - Wall Mounted - IU.C1.4.15 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.16 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.17 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.18 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.19 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.20 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.21 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.22 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.23 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.24 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.25 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.26 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.27 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.28 RAWAT INAP VIP Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.29 R. SHOLAT Kapasitas : 12 300 Btu/h - Wall Mounted - IU.C1.4.30 R. TUNGGU Kapasitas : 19 100 Btu/h - 4 Way Ceiling Cassette + Purifying Kit b. Outdoor Unit VRV - OU.C1.4 LANTAI ATAP kapasitas : 382 200 BTU/h c. Pipa Refrigerant - Pemipaan (Liquid 7/8") - Pemipaan (Liquid 3/4") - Pemipaan (Liquid 5/8") - Pemipaan (Liquid 1/2") - Pemipaan (Liquid 3/8") - Pemipaan (Liquid 1/4") - Pemipaan (Gas 1 1/2") - Pemipaan (Gas 1 5/8") - Pemipaan (Gas 1 1/4") - Pemipaan (Gas 1 3/8") - Pemipaan (Gas 1 1/8") - Pemipaan (Gas 1") - Pemipaan (Gas 7/8") - Pemipaan (Gas 3/4") - Pemipaan (Gas 5/8") - Pemipaan (Gas 1/2") d. Pemipaan Drain VRV Pemipaan Drain e. Outdoor Pipe Connection - Outdoor Pipe Connection - 21 f. Y- Branch - Pipe Indoor Connetion g. Remocon - Wireless Remocon - Standard 3 Wired Remocon White h. Titik Instalasi Outdoor Unit i. Titik Instalasi Indoor Unit VRV j. Kabel Kontrol Indoor ke Outdoor
5.3. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 400 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 900 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 16' x 10" - 14" x 10" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 6" x 4" d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust 2.
LANTAI DUA a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 400 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 900 CFM, Inline Type
SATUAN unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
VOLUME
HARGA SATUAN
JUMLAH HARGA
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
(Rp.) 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 15,199,566.86
(Rp.) 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 15,199,566.86
1.00
233,492,770.63
233,492,770.63
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
8,904,689.78 9,485,716.72 4,452,344.89 8,904,958.56 16,261,228.67 27,102,047.78 4,510,050.11 22,960,255.11 6,970,077.44 2,870,031.89 16,250,709.89 6,400,988.33 1,579,547.78 15,565,130.67 9,182,961.33 27,102,047.78 41,930,973.33
m'
367.00
114,253.33
bh
2.00
1,842,808.55
3,685,617.10
bh
29.00
2,208,160.01
64,036,640.16
bh bh ttk ttk m'
25.00 3.00 1.00 30.00 549.00
692,843.06 1,863,356.84 3,911,837.94 730,174.25 421,780.67
17,321,076.39 5,590,070.53 3,911,837.94 21,905,227.42 231,557,586.00 -
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
1.00 1.00 1.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,728,372.80 5,728,372.80 6,083,457.95 6,083,457.95 17,740,636.76 5,728,372.80 5,638,581.27 6,169,167.54 5,638,581.27 5,638,581.27 6,169,167.54 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 6,083,457.95 15,199,566.86
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1.00
233,492,770.63
Tidak Dikerjakan
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
32.00 49.00 16.00 46.00 84.00 140.00 11.00 56.00 17.00 7.00 34.00 15.00 5.00 48.00 33.00 140.00
278,271.56 193,586.06 278,271.56 193,586.06 193,586.06 193,586.06 410,004.56 410,004.56 410,004.56 410,004.56 477,962.06 426,732.56 315,909.56 324,273.56 278,271.56 193,586.06
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
m'
367.00
114,253.33
Tidak Dikerjakan
bh
2.00
1,842,808.55
Tidak Dikerjakan
bh
29.00
2,208,160.01
Tidak Dikerjakan
bh 25.00 173,285.93 bh 3.00 1,863,356.84 ttk 1.00 3,911,837.94 ttk 30.00 730,174.25 m' 549.00 421,780.67 JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
3,244,949,435.53
unit unit unit ttk
1.00 1.00 1.00 3.00
4,627,960.42 7,503,085.42 10,378,210.42 369,535.08
4,627,960.42 7,503,085.42 10,378,210.42 1,108,605.24
m' m' m' m' m' m' m' m' lot
20.00 30.00 40.00 40.00 90.00 90.00 90.00 70.00 1.00
282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 98,706.93 3,758,861.49
5,649,173.61 7,189,025.42 8,423,017.22 6,931,437.22 15,595,733.75 12,239,678.75 12,239,678.75 6,909,485.14 3,758,861.49
bh bh
29.00 3.00
1,011,731.94 3,677,756.94
29,340,226.39 11,033,270.83
unit unit unit
1.00 1.00 1.00
4,627,960.42 7,503,085.42 10,378,210.42
4,627,960.42 7,503,085.42 10,378,210.42
Pek. Non Standar Gedung B (Rawat Inap) - page 58 of 280
NO.
URAIAN b. c.
d. e.
3.
4.
Titik Instalasi daya FAN Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 16' x 10" - 14" x 10" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 6" x 4" Aksesoris Ducting Elbow, Reducer dan Hanger Terminal Udara - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust
LANTAI TIGA a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 400 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 900 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 16' x 10" - 14" x 10" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 6" x 4" d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust LANTAI EMPAT a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 400 CFM, Inline Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 650 CFM, Inline Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 900 CFM, Inline Type b. Titik Instalasi daya FAN c. Ducting Ventilasi Udara ( Exhaust Fan/Round Duct ) Tanpa isolasi - 16' x 10" - 14" x 10" - 12" x 10" - 12" x 8" - 10" x 8" - 10" x 6" - 8" x 6" - 6" x 4" d. Aksesoris Ducting Elbow, Reducer dan Hanger e. Terminal Udara - Diffuser Exhaust air grille almunium EAG - Volume Damper Exhaust
5.4. PEKERJAAN INSTALASI GAS MEDIS 1. LANTAI SATU a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 2 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 2 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet 2.
LANTAI DUA a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 2 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 2 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
ttk
3.00
(Rp.) 369,535.08
m' m' m' m' m' m' m' m' lot
20.00 30.00 40.00 40.00 90.00 90.00 90.00 70.00 1.00
282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 98,706.93 3,758,861.49
5,649,173.61 7,189,025.42 8,423,017.22 6,931,437.22 15,595,733.75 12,239,678.75 12,239,678.75 6,909,485.14 3,758,861.49
bh bh
29.00 3.00
1,011,731.94 3,677,756.94
29,340,226.39 11,033,270.83
unit unit unit ttk
1.00 1.00 1.00 3.00
4,627,960.42 7,503,085.42 10,378,210.42 369,535.08
4,627,960.42 7,503,085.42 10,378,210.42 1,108,605.24
m' m' m' m' m' m' m' m' lot
20.00 30.00 40.00 40.00 90.00 90.00 90.00 70.00 1.00
282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 98,706.93 3,758,861.49
5,649,173.61 7,189,025.42 8,423,017.22 6,931,437.22 15,595,733.75 12,239,678.75 12,239,678.75 6,909,485.14 3,758,861.49
bh bh
29.00 3.00
1,011,731.94 3,677,756.94
29,340,226.39 11,033,270.83
unit unit unit ttk
1.00 1.00 1.00 3.00
4,627,960.42 7,503,085.42 10,378,210.42 369,535.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' m' m' lot
20.00 30.00 40.00 40.00 90.00 90.00 90.00 70.00 1.00
282,458.68 239,634.18 210,575.43 173,285.93 173,285.93 135,996.43 135,996.43 98,706.93 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh bh
29.00 3.00
1,011,731.94 3,677,756.94
Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.3.PEKERJAAN DUCTING TATA UDARA
428,782,350.21
set
(Rp.) 1,108,605.24
1.00
19,147,000.00
19,147,000.00
set
1.00
10,455,000.00
10,455,000.00
bh bh
16.00 16.00
1,310,770.00 1,310,770.00
20,972,320.00 20,972,320.00
m' m' m' m' m' m' ls
12.00 24.00 99.00 44.00 232.00 87.00 1.00
346,409.00 346,409.00 229,067.00 179,580.00 127,100.00 90,461.25 16,081,441.15
4,156,908.00 8,313,816.00 22,677,633.00 7,901,520.00 29,487,200.00 7,870,128.75 16,081,441.15
set set set
1.00 1.00 32.00
1,435,000.00 1,230,000.00 287,000.00
1,435,000.00 1,230,000.00 9,184,000.00
set
1.00
19,147,000.00
19,147,000.00
set
1.00
10,455,000.00
10,455,000.00
bh bh
16.00 16.00
1,310,770.00 1,310,770.00
20,972,320.00 20,972,320.00
m' m' m' m' m' m' ls
12.00 24.00 99.00 44.00 232.00 87.00 1.00
346,409.00 346,409.00 229,067.00 127,100.00 90,461.25 179,580.00 15,470,245.40
4,156,908.00 8,313,816.00 22,677,633.00 5,592,400.00 20,987,010.00 15,623,460.00 15,470,245.40
set set set
1.00 1.00 32.00
1,435,000.00 1,230,000.00 287,000.00
1,435,000.00 1,230,000.00 9,184,000.00
Pek. Non Standar Gedung B (Rawat Inap) - page 59 of 280
NO.
URAIAN 3.
4.
5.
LANTAI TIGA a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 2 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 2 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet LANTAI EMPAT a. Alarm System : • Closed circuit design monitor the gas distributing system • Designed to be installed in new and renovated medical facilities • Visual and audible alarms • Up to 20 functions monitored from single panel • Completely factory assembled and pre - wired • Recessed installation • Dry electrical contacts for connecting remote alarm signals • Meet to NFPA 99 - Alarm System for 2 Gas b. Zone Valve : • Creates an independent sub-zone for an individual service within the hospital medical gas pipeline system • Attarctive appearance suitable for any location • Valve serviceable from front • Inculdes a line pressure monitoring gauge for each gas service • Be available to accommodate on to six valves of various size • Compliance with NFPA 99 • Designed for installation at any location that allows departemental staff to view and access easily • The tranparent window is easily removed or replaced withaut using tools • Clear labeling and colour coding help staff in potential emergency situations • Provides a single point isolation unit for each individual gas service pipeline within an area zone • Metal Outer box provides durability and fire resistance - Zone Valve for 2 Gas c. Gas Medis Wall Outlet / Standart Ohmeda : • for Oxygen • for Vacuum d. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 1⅛" - Length 5,8mtr • Copper Tube ø 1" - Length 5,8mtr • Copper Tube ø ¾" - Length 5,8mtr • Copper Tube ø ½" - Length 5,8mtr • Copper Tube ø ⅜" - Length 5,8mtr • Copper Tube ø ⅝" - Length 5,8mtr • Fitting & Accessories e. Instalasi : • Instalasi Area Alarm • Instalasi Zone Valve • Instalasi Gas Medis Wall Outlet TESTING & COMMISIONING - Testing & Commisioning
5.5. PEKERJAAN NURSE CALL 1. LANTAI SATU NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
2.
3.
SATUAN
set
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
1.00
19,147,000.00
19,147,000.00
set
1.00
10,455,000.00
10,455,000.00
bh bh
16.00 16.00
1,310,770.00 1,310,770.00
20,972,320.00 20,972,320.00
m' m' m' m' m' m' ls
12.00 24.00 99.00 44.00 232.00 87.00 1.00
346,409.00 346,409.00 229,067.00 127,100.00 90,461.25 179,580.00 15,470,245.40
4,156,908.00 8,313,816.00 22,677,633.00 5,592,400.00 20,987,010.00 15,623,460.00 15,470,245.40
set set set
1.00 1.00 32.00
1,435,000.00 1,230,000.00 287,000.00
1,435,000.00 1,230,000.00 9,184,000.00
set
1.00
19,147,000.00
Tidak Dikerjakan
set
1.00
10,455,000.00
Tidak Dikerjakan
bh bh
16.00 16.00
1,310,770.00 1,310,770.00
Tidak Dikerjakan Tidak Dikerjakan
m' m' m' m' m' m' ls
12.00 24.00 99.00 44.00 232.00 87.00 1.00
346,409.00 346,409.00 229,067.00 127,100.00 90,461.25 179,580.00 -
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set set set
1.00 1.00 32.00
1,435,000.00 1,230,000.00 287,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
ls 1.00 5,625,000.00 JUMLAH 5.4.PEKERJAAN INSTALASI GAS MEDIS
532,318,511.70
Tidak Dikerjakan
unit
1.00
22,095,814.54
22,095,814.54
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs
16.00 16.00 16.00 16.00 16.00
2,340,291.33 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
37,444,661.30 35,557,686.24 39,060,383.70 17,100,711.46 52,363,557.85
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
3.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
32,660,884.69 5,528,247.24 3,685,498.16
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
84.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
67,956,990.46 1,618,023.58 3,595,607.96
LANTAI DUA NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
1.00
22,095,814.54
22,095,814.54
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs
16.00 16.00 16.00 16.00 16.00
2,340,291.33 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
37,444,661.30 35,557,686.24 39,060,383.70 17,100,711.46 52,363,557.85
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
3.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
32,660,884.69 5,528,247.24 3,685,498.16
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
84.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
67,956,990.46 1,618,023.58 3,595,607.96
LANTAI TIGA NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
1.00
22,095,814.54
22,095,814.54
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs
16.00 16.00 16.00 16.00 16.00
2,340,291.33 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
37,444,661.30 35,557,686.24 39,060,383.70 17,100,711.46 52,363,557.85
Pek. Non Standar Gedung B (Rawat Inap) - page 60 of 280
NO.
URAIAN
4.
5.
3.
4.
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
3.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
32,660,884.69 5,528,247.24 3,685,498.16
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
84.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
67,956,990.46 1,618,023.58 3,595,607.96
LANTAI EMPAT NURSE STATION EQUIPMENT - IP Corridor Digital Display, 12 Characters, 50mm
unit
1.00
22,095,814.54
Tidak Dikerjakan
PATIENT ROOM EQUIPMENT - IP Over Door Lamp 4 RGB Programmable - IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] - IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] - Patient Call Pendant, Momentary Action, Green Button, 2m - IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions]
pcs pcs pcs pcs pcs
16.00 16.00 16.00 16.00 16.00
2,340,291.33 2,222,355.39 2,441,273.98 1,068,794.47 3,272,722.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
FLOOR ELECT. PANEL - IP Net Room Controller - PSU 24 VDC - Panel Elektrikal lengkap dengan aksesorisnya
unit unit unit
3.00 1.00 1.00
10,886,961.56 5,528,247.24 3,685,498.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
INSTALLATION & SUPPORT - Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm - Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm - Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm
ttk ttk ls
84.00 3.00 1.00
809,011.79 539,341.19 3,595,607.96
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
TESTING & COMMISIONING a. Pemograman Sistem, Testing & Commissioning (Di Setiap Lantai) b. Pelatihan Pemeliharaan dan Pengunaan (Di Setiap Lantai)
bh bh
4.00 5,393,411.94 4.00 809,011.79 JUMLAH 5.5.PEKERJAAN NURSE CALL
21,573,647.76 3,236,047.16 980,813,896.49
5.6. PEKERJAAN BED HEAD 1. LANTAI SATU Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC 2.
SATUAN
LANTAI DUA Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI TIGA Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC LANTAI EMPAT Bedhead Panel Medical Service • Dimensi : 1200mm x 220mm x 80mm Material : Aluminum Extruded Powdercoat Finished Aksesoris : • 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider • 1 x Universal Socket 16A 250V - Vivase Schneider • 1 x Single Switch 16A 250V - Vivase Schneider • 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover • 1 x Patient Name Tag • Provision Access for Medical Gas Outlet • Provision Access for Nurse Call Outlet Biaya Pemasangan : • Biaya Instalasi Bedhead Panel Medical Service • Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC • Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
5.7. PEKERJAAN PNEUMATIC TUBE 1 DIVERTER • 3-way Diverter NW110 • 3-way Diverter NW110 (Transfer Unnit) • Optical tube switch 2 STATION • Compact Station NW110 with PCB - 10" Touch Screen Display • Topload (Through) Station NW110 with PCB - 10" Touch Screen Display • Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display - including Receiving unit - including Arrival Chute - including Stainless Steel Conveyor Belt Unit - including Control Panel - including Sensors • Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display • V-piece with valve • Arrival signal 3 CARRIER & AKSESORIS • Carrier rack up to NW110 • Receiving basket up to NW110 • Upholstery for carrier basket • Carrier NW110, 330 x 76 - red/blue/green/yellow • Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) 4 PEMIPAAN & PENGABELAN • Forwarding Tube PVC 110 x 2.3 - light grey • Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey • Sleeve PVC 110 x 2.3 L=110 - light grey • PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS
unit
16.00
2,100,733.95
33,611,743.22
bh bh bh bh bh bh titik titik
16.00 16.00 16.00 16.00 16.00 16.00 48.00 16.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
2,742,010.63 1,338,572.93 1,651,103.18 949,384.33 3,685,498.16 442,259.78 442,259.78 147,419.93
unit ttk ttk
16.00 128.00 32.00
202,252.95 159,922.37 159,922.37
3,236,047.16 20,470,063.78 5,117,515.95
unit
16.00
2,100,733.95
33,611,743.22
bh bh bh bh bh bh titik titik
16.00 16.00 16.00 16.00 16.00 16.00 48.00 16.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
2,742,010.63 1,338,572.93 1,651,103.18 949,384.33 3,685,498.16 442,259.78 442,259.78 147,419.93
unit ttk ttk
16.00 128.00 32.00
202,252.95 159,922.37 159,922.37
3,236,047.16 20,470,063.78 5,117,515.95
unit
16.00
2,100,733.95
33,611,743.22
bh bh bh bh bh bh titik titik
16.00 16.00 16.00 16.00 16.00 16.00 48.00 16.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
2,742,010.63 1,338,572.93 1,651,103.18 949,384.33 3,685,498.16 442,259.78 442,259.78 147,419.93
unit ttk ttk
16.00 128.00 32.00
202,252.95 159,922.37 159,922.37
3,236,047.16 20,470,063.78 5,117,515.95
unit
16.00
2,100,733.95
Tidak Dikerjakan
bh bh bh bh bh bh titik titik
16.00 16.00 16.00 16.00 16.00 16.00 48.00 16.00
171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit ttk ttk
16.00 128.00 32.00
202,252.95 159,922.37 159,922.37
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH 5.6.PEKERJAAN BED HEAD
221,501,636.46
unit unit unit
1.00 1.00 1.00
38,038,800.63 38,038,800.63 2,199,675.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
4.00 4.00 1.00
51,158,800.63 55,120,425.63 158,881,175.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit
1.00 8.00 8.00
65,298,675.63 2,025,425.63 2,271,425.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit unit unit unit unit
4.00 4.00 4.00 16.00 16.00
1,395,050.63 2,456,950.63 1,313,050.63 1,651,300.63 2,112,550.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
mtr pcs pcs mtr
200.00 70.00 300.00 40.00
160,438.13 612,027.50 56,503.13 1,554,540.63
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Non Standar Gedung B (Rawat Inap) - page 61 of 280
NO.
URAIAN
5
• Material support INSTALASI & TESTING COMMISSIONING • Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm • Wall chasing, sparing, and finishing • Floor coring • Trasportasi & Akomodasi • Pengiriman Material • Testing & Commissioning • Training User & Maintenance (1x) • Shopdrawing, As Build Drawing, SOP, and Blue Print
5.8. PEKERJAAN TRANSPORTASI DALAM GEDUNG 1. BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 23000 mm - Service Floors : Lantai 1 s/d Lantai 4 - Control Mode : Duplex Selective Collective - Door : 1200 x 2100 ( Side Opening) - ARD : Yes Termasuk : - Biaya pasang & Ijin Disnaker - Biaya Pengiriman unit Ke Lokasi Proyek 2.
3.
VI.
Aksesoris Earthquake Device Mimic Panel ( Supervisory Panel ) Testing and Commisioning - Testing and Commisioning
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Attenuator e. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit f. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² 2.
3.
4.
5.
LANTAI DUA a. TBS-2 b. Kabel dari MDF-TS ke TBS-2, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI TIGA a. TBS-3 b. Kabel dari MDF-TS ke TBS-3, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Attenuator e. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit f. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² LANTAI EMPAT a. TBS-4 b. Kabel dari MDF-TS ke TBS-4, NYMHY ( 3 x 2,5 mm2 ) c. Ceiling Speaker 3 Watt d. Box Speaker 6 W e. Attenuator f. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit g. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. SISTEM UTAMA FIRE ALARM a. MCFA Full Addressible b. Output control module c. Announciator d. Module for Pressurized Fan (Kontrol) e. Module for AC f. Module IP PABX (Autodial) g. Module for Sound System h. Module for Genset Panel i. Control Module Elevator j. Isolator Module k. Back up battery 2x12V l. End of Line (Aksesoris) m. Kabel FRC 3 x 1,5 mm2 2.
3.
SATUAN ls mtr pcs pcs ls ls ls ls ls
VOLUME
HARGA SATUAN
1.00
(Rp.) 85,094,141.88
200.00 19.00 12.00 1.00 1.00 1.00 1.00 1.00
262,528.13 781,818.75 1,806,818.75 6,000,000.00 5,000,000.00 12,500,000.00 7,500,000.00 3,500,000.00
JUMLAH 5.7.PEKERJAAN PNEUMATIC TUBE
JUMLAH HARGA (Rp.)
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan -
unit
1.00
873,458,875.00
873,458,875.00
ls set
1.00 1.00
13,936,361.25 5,136,736.25
13,936,361.25 5,136,736.25
unit
1.00
5,500,000.00
5,500,000.00
JUMLAH 5.8.PEKERJAAN TRANSPORTASI DALAM GEDUNG
898,031,972.50
bh m' bh bh ttk ttk
1.00 10.00 53.00 2.00 53.00 2.00
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
1,279,196.28 356,974.74 8,685,161.53 306,798.17 8,187,819.50 308,974.32
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh bh ttk ttk
1.00 15.00 53.00 2.00 2.00 55.00 2.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
1,279,196.28 535,462.10 8,685,161.53 435,379.78 306,798.17 8,496,793.82 308,974.32
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh ttk ttk
1.00 20.00 53.00 2.00 53.00 2.00
1,279,196.28 35,697.47 163,870.97 153,399.09 154,487.16 154,487.16
1,279,196.28 713,949.47 8,685,161.53 306,798.17 8,187,819.50 308,974.32
bh ttk
4.00 4.00
830,378.57 154,487.16
3,321,514.29 617,948.64
bh m' bh bh bh ttk ttk
1.00 25.00 53.00 2.00 2.00 55.00 2.00
1,279,196.28 35,697.47 163,870.97 217,689.89 153,399.09 154,487.16 154,487.16
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
bh ttk
4.00 4.00
830,378.57 154,487.16
Tidak Dikerjakan Tidak Dikerjakan
1.00
5,000,000.00
5,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
75,472,978.61
ls
unit unit unit unit unit unit unit unit unit unit unit unit m'
1.00 9.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 58.00 78.00
59,162,035.46 2,465,769.28 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 1,981,072.92 48,839.20 84,227.12
59,162,035.46 22,191,923.48 44,691,164.16 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,255,783.26 1,386,690.00 729,682.08 3,962,145.85 2,832,673.81 6,569,715.09
LANTAI SATU a. TBFA - 1 b. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 10.00 10.00 10.00 49.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 51.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 58,414,470.39 2,488,789.07 1,339,356.11 9,697,919.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 4,871,478.68 1,337,268.66 191,038.38
LANTAI DUA a. TBFA - 2 b. Kabel dari MCFA ke TBFA-2, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-2, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk
1.00 15.00 15.00 15.00 49.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 51.00 14.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 2,051,526.83 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19
2,051,526.83 224,256.33 950,894.17 130,447.00 58,414,470.39 2,488,789.07 1,339,356.11 4,103,053.66 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 4,871,478.68 1,337,268.66
Pek. Non Standar Gedung B (Rawat Inap) - page 62 of 280
NO.
URAIAN
5.
6.
LANTAI TIGA a. TBFA - 3 b. Kabel dari MCFA ke TBFA-3, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-3, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 20.00 20.00 20.00 49.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 51.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 35,288,941.37 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
2,051,526.83 299,008.43 1,267,858.89 173,929.33 58,414,470.39 2,488,789.07 1,339,356.11 70,577,882.74 376,195.69 359,782.60 388,844.69 8,144,480.73 7,177,794.35 4,871,478.68 1,337,268.66 191,038.38
LANTAI EMPAT a. TBFA - 4 b. Kabel dari MCFA ke TBFA-4, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-4, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Optical Smoke Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base l. Outside Screw & Yoke Supervisory Switch W/2 Spdt. m. Waterflow Detector 2.5" n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
unit m' m' m' bh bh bh bh bh bh bh bh bh ttk ttk ttk
1.00 25.00 25.00 25.00 49.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 51.00 14.00 2.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 1,244,394.53 669,678.06 3,112,092.18 188,097.85 179,891.30 194,422.35 4,072,240.36 3,588,897.17 95,519.19 95,519.19 95,519.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
1.00
10,000,000.00
10,000,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
507,523,673.27
TESTING & COMMISSIONING a. Progamming, Supervisi, Testing & Commissioning
STRUKTUR SISTEM KABEL & INSTALASI INSTALASI DISTRIBUSI GEDUNG DENGAN MENGGUNAKAN KABEL FO - Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 1 FO SM 4 Core (Vertical Cabling System)
ls
(Rp.) 191,038.38
unit unit unit
1.00 1.00 1.00
256,984,676.13 12,415,329.31 85,398,313.44
256,984,676.13 12,415,329.31 85,398,313.44
m
10.00
50,698.07
506,980.72
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 2 FO SM 4 Core (Vertical Cabling System)
m
16.00
50,698.07
811,169.16
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 3 FO SM 24 Core
m
22.00
50,698.07
1,115,357.59
-
Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses Switch lantai 4 FO SM 24 Core
m
28.00
50,698.07
1,419,546.02
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
3.00 3.00
20,931,439.39 573,823.72
62,794,318.16 1,721,471.16
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
8.00
7,982,546.77
63,860,374.18
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas 24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
4.00 16.00 16.00 8.00
1,705,345.36 107,681.91 83,622.98 59,564.05
6,821,381.45 1,722,910.58 1,337,967.67 476,512.38
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 6.00 36.00 4.00 8.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 4,432,305.93 26,593,835.60 2,954,870.62 5,909,741.24
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
3.00 3.00
20,931,439.39 573,823.72
62,794,318.16 1,721,471.16
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
7.00
7,982,546.77
55,877,827.40
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 16.00 16.00 8.00
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 1,722,910.58 1,337,967.67 476,512.38
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 6.00 35.00 4.00 7.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 4,432,305.93 25,855,117.94 2,954,870.62 5,171,023.59
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
LANTAI 1 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
e.
f.
LANTAI 2 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support b.
e.
f.
4.
JUMLAH HARGA
2.00
b.
3.
HARGA SATUAN
ttk
Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit
6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 1. SENTRAL ICT (DISTRIBUTIONS) a. FIBER OPTIC CABLE DISTRIBUTIONS & UPS Support Equipment - Distribution Switch 16 Port SFP+ - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support - Unitruptable Power Supply (UPS) Kapasitas 5 kVA, Incoming 3 Phase Outgoing 1 Phase UPS. 15 Menit
2.
VOLUME
(Rp.) 95,519.19
p. 4.
SATUAN
LANTAI 3 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support
Pek. Non Standar Gedung B (Rawat Inap) - page 63 of 280
NO.
URAIAN
b.
62,794,318.16 1,721,471.16
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
7.00
7,982,546.77
55,877,827.40
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
3.00 16.00 16.00 8.00
1,705,345.36 107,681.91 83,622.98 59,564.05
5,116,036.09 1,722,910.58 1,337,967.67 476,512.38
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
3,949,592.61 1,363,257.42 493,545.22
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 6.00 35.00 4.00 7.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
158,566.31 4,432,305.93 25,855,117.94 2,954,870.62 5,171,023.59
unit unit unit unit
1.00 1.00 1.00 1.00
124,477,323.45 78,577,392.27 2,641,388.19 2,227,875.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
unit unit
3.00 3.00
20,931,439.39 573,823.72
Tidak Dikerjakan Tidak Dikerjakan
c.
CCTV - IP Camera Fix Dome Camera Indoor
unit
7.00
7,982,546.77
Tidak Dikerjakan
d.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
2.00 16.00 16.00 8.00
1,705,345.36 107,681.91 83,622.98 59,564.05
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
MATERIAL SUPPORT RACK SYSTEM - 19"Wallmounted 12 RU Double door - Optic Terminal Box 8 Port - Patch Cords SM SC-LC Duplex
unit unit unit
1.00 1.00 2.00
3,949,592.61 1,363,257.42 246,772.61
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
PEKERJAAN INSTALASI - Instalasi Rack - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan HRVGA - Instalasi ,Penarikan Kabel CCTV
unit titik titik titik titik
1.00 6.00 34.00 4.00 7.00
158,566.31 738,717.66 738,717.66 738,717.66 738,717.66
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
lot 1.00 25,000,000.00 JUMLAH 6.3.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
1,513,864,606.69
LANTAI 4 a. ACCESS SWITCH - Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). - Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base - SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. - Transceiver, SFP+, 10GbE, LR, SMF Third Party Support
f.
TESTING COMMISIONING - Testing Commisioning, Labeling, & Documentation Data & Voice ( Fluke )
6.4. PEKERJAAN TELEPON 1. LANTAI SATU a. IP TELEPON - Handset Telepon TB 30 Pair - IP Phone Series - Titik Instalasi Phone
4.
5.
3.
4.
5.
Tidak Dikerjakan
unit unit ttk
1.00 6.00 6.00
4,567,044.64 2,977,261.71 158,424.19
4,567,044.64 17,863,570.28 950,545.16
LANTAI DUA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 6.00 6.00
3,057,252.67 2,977,261.71 158,424.19
3,057,252.67 17,863,570.28 950,545.16
LANTAI TIGA a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 6.00 6.00
3,057,252.67 2,977,261.71 158,424.19
3,057,252.67 17,863,570.28 950,545.16
LANTAI EMPAT a. IP TELEPON - Handset Telepon TB 20 Pair - IP Phone Series - Titik Instalasi Phone
unit unit ttk
1.00 6.00 6.00
3,057,252.67 2,977,261.71 158,424.19
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
JUMLAH 6.4.PEKERJAAN TELEPON
88,123,896.31
6.5. PEKERJAAN IPTV 1. LANTAI SATU a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV 2.
(Rp.)
20,931,439.39 573,823.72
e.
3.
JUMLAH HARGA
(Rp.)
3.00 3.00
b.
2.
HARGA SATUAN
unit unit
f.
6.
VOLUME
WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
e.
5.
SATUAN
unit unit unit
2.00 22.00 22.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 1,780,871.27 27,924,086.16
LANTAI DUA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 22.00 22.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 1,780,871.27 27,924,086.16
LANTAI TIGA a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 22.00 22.00
1,659,816.11 80,948.69 1,269,276.64
3,319,632.21 1,780,871.27 27,924,086.16
LANTAI EMPAT a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV
unit unit unit
2.00 22.00 22.00
1,659,816.11 80,948.69 1,269,276.64
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
SETTING, CONFIGURATION & DOCUMENTATION a. Setting b. Programing c. Commisioning d. Documentation
lot lot lot lot
1.00 1.00 1.00 1.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
5,000,000.00 8,000,000.00 5,000,000.00 3,000,000.00
JUMLAH 6.5.PEKERJAAN IPTV
120,073,768.92
6.6. PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) 1. MATERIAL BAS LANTAI DASAR DAN LANTAI 2 - Web Controller Onboard Ios DI8DO12 & AI8AO4 '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Maksimum IO Module 5 unit '- Gateway Modbus OR BACnet - 'Capacitive Monitor Touch Screen minimum 10" - IO Module DI16 CPU : ARM7 Architecture - Coupler module integrated bus terminating resistor
unit
1.00
28,000,964.58
28,000,964.58
unit unit unit
1.00 1.00 1.00
24,406,221.81 7,231,339.70 1,120,277.00
24,406,221.81 7,231,339.70 1,120,277.00
Pek. Non Standar Gedung B (Rawat Inap) - page 64 of 280
NO.
URAIAN - Bridge Bus Connector - Motion Sensor - Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories - Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC INSTALASI BAS LANTAI DASAR DAN LANTAI 2 - Installation, cable UTP Cat-6 to LAN for Web Controller - Installation, cable UTP Cat-6 to LAN for Capacitive Monitor Touch Screen - Installation, cable STP 18 AWG 1P, Integration data point Modbus for Power Meter ELectrical Panels - Installation, cable NYM 3X1,5mm for power supply Capacitive Monitor Touch Screen - Installation, cable NYM 3X1,5mm for power supply BAS Panel - Installation, cable ITC 2x0.6mm2 for digital point 2.
3.
4.
5.
6.
7.
MATERIAL BAS LANTAI 3 S/D LANTAI MESIN LIFT - Web Controller Onboard Ios DI8DO12 & AI8AO4 '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Maksimum IO Module 5 unit '- Gateway Modbus OR BACnet - IO Module DI16 CPU : ARM7 Architecture - IO Module AI8AO4 CPU : ARM7 Architecture - Coupler module integrated bus terminating resistor - Bridge Bus Connector - Outdoor Temperature (PT1000) - Water Level Transmitter - Differential Pressure Transmitter - Motion Sensor - Mini Inverter to Control Exhaust Fan (Tangga Darurat) - Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories - Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC INSTALASI BAS LANTAI DASAR DAN LANTAI 2 - Installation, cable UTP Cat-6 to LAN for Web Controller - Installation, cable STP 18 AWG 1P, Integration data point Modbus for Power Meter ELectrical Panels - Installation, cable NYM 3X1,5mm for power supply BAS Panel - Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter - Installation, cable NYM 3X1,5mm for power supply Differential Pressure Transmitter - Installation, cable ITC 2x0.6mm2 for digital point - Installation, cable NYAF 2x0,75mm2 for analog point MATERIAL DALI LIGHTING CONTROL LANTAI DASAR - Web Controller DALI '- RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB '- Fast Ethernet: 2 x 10/100 BaseT (RJ45) '- Controller with 4 DALI Interface - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable UTP Cat-6 to LAN - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI MATERIAL DALI LIGHTING CONTROL LANTAI 2 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI MATERIAL DALI LIGHTING CONTROL LANTAI 3 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI MATERIAL DALI LIGHTING CONTROL LANTAI 4 - On/Off Module DALI to DALI Lighting Control 1 channel - Touch Screen Glass On/Off DALI 1 Group - On/Off Module DALI to DALI Lighting ControL 2 channel - Touch Screen Glass On/Off DALI 2 Group INSTALASI DALI LIGHTING CONTROL LANTAI DASAR - Installation, cable NYM 3x1.5mm Touch Screen Glass On/Off DALI & Module DALI TESTING, COMMISSIONING & TRAINING - Testing and Commissioning - Training operator 2 person 2 days
6.7. PEKERJAAN MASTER CLOCK SYSTEM 1. LANTAI 1 a. Converter b. 'Analog Clock '- Diameter 500mm '- Hour and Minute c. 'Installation Analog Clock, Cable ITC 2X1X0,6mm d. 'Installation Converter, Cable UTP Cat-6 to LAN 2.
3.
4.
5.
LANTAI 2 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 3 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm LANTAI 4 a. 'Analog Clock '- Diameter 500mm '- Hour and Minute b. 'Installation Analog Clock, Cable ITC 2X1X0,6mm TESTING, COMMISSIONING AND TRANING a. Testing and Commissioning b. Training operator 5 person 1 days
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
unit unit unit unit
2.00 46.00 1.00 1.00
(Rp.) 161,678.93 739,875.64 5,234,260.39 819,758.81
(Rp.)
titik titik titik titik titik titik
1.00 1.00 4.00 1.00 1.00 20.00
719,904.84 719,904.84 819,758.81 699,934.05 699,934.05 819,758.81
719,904.84 719,904.84 3,279,035.24 699,934.05 699,934.05 16,395,176.19
unit
1.00
28,000,964.58
Tidak Dikerjakan
unit unit unit unit unit unit unit unit unit unit unit
2.00 1.00 2.00 4.00 1.00 1.00 1.00 45.00 1.00 1.00 1.00
7,231,339.70 12,823,161.78 1,120,277.00 161,678.93 1,898,181.64 3,016,546.06 2,028,469.94 739,875.64 1,019,466.74 5,234,260.39 819,758.81
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik titik titik titik titik titik titik
1.00 2.00 1.00 1.00 1.00 22.00 4.00
719,904.84 819,758.81 699,934.05 540,167.71 699,934.05 819,758.81 819,758.81
719,904.84 1,639,517.62 699,934.05 540,167.71 699,934.05 18,034,693.81 3,279,035.24
unit
1.00
46,752,583.06
46,752,583.06
unit unit unit unit
3.00 3.00 30.00 30.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
2,818,750.71 3,417,874.50 30,584,002.23 36,575,240.18
titik titik
1.00 66.00
719,904.84 699,934.05
719,904.84 46,195,647.34
unit unit unit unit
3.00 3.00 29.00 29.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
2,818,750.71 3,417,874.50 29,564,535.49 35,356,065.50
titik
64.00
699,934.05
44,795,779.23
unit unit unit unit
2.00 2.00 27.00 27.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
1,879,167.14 2,278,583.00 27,525,602.01 32,917,716.16
titik
58.00
699,934.05
40,596,174.93
unit unit unit unit
2.00 2.00 28.00 28.00
939,583.57 1,139,291.50 1,019,466.74 1,219,174.67
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
titik
60.00
699,934.05
41,996,043.03
lot lot 1.00 55,000,000.00 lot 1.00 15,000,000.00 JUMLAH 6.6.PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS)
55,000,000.00 15,000,000.00 649,507,830.51
323,357.85 34,034,279.29 5,234,260.39 819,758.81
unit unit
1.00 3.00
8,362,735.63 5,931,216.34
Tidak Dikerjakan Tidak Dikerjakan
titik titik
3.00 1.00
819,758.81 719,904.84
Tidak Dikerjakan Tidak Dikerjakan
unit
2.00
5,931,216.34
Tidak Dikerjakan
titik
2.00
819,758.81
Tidak Dikerjakan
unit
2.00
5,931,216.34
Tidak Dikerjakan
titik
2.00
819,758.81
Tidak Dikerjakan
unit
2.00
5,931,216.34
Tidak Dikerjakan
titik
2.00
819,758.81
Tidak Dikerjakan
unit 1.00 17,500,000.00 unit 1.00 10,000,000.00 JUMLAH 6.7.PEKERJAAN MASTER CLOCK SYSTEM
Tidak Dikerjakan Tidak Dikerjakan -
Pek. Non Standar Gedung B (Rawat Inap) - page 65 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG G2 (POWER HOUSE) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
79,818,924.41
II.
PEKERJAAN NON STANDAR
Rp
147,573,299.37
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
227,392,223.78
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. IV.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL 4.2. PEKERJAAN PANEL DAN KABEL FEEDER STD 4.3. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI JUMLAH -PEKERJAAN STANDARD
Rp Rp Rp Rp
38,217,239.25 12,150,599.58 29,451,085.58 79,818,924.41
JUMLAH PEKERJAAN STANDAR Rp
79,818,924.41
Rekapitulasi Standar Gedung Power House
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1. IV.
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 800 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2.
4.2.
4.3.
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik - PP/LP = PH b. Kabel Feeder - Dari LVMDP ke PP/LP - PH, NYY 4 x 6 mm2 + Grounding
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
btg
10.00
2,039,546.41
20,395,464.14
btg
10.00
786,226.43
7,862,264.26
pcs
200.00
49,797.55
9,959,510.86
JUMLAH 4.1.PEKERJAAN RAK KABEL
38,217,239.25
unit
11,140,558.89
11,140,558.89
m' 50,502.03 20.00 JUMLAH 4.2.PEKERJAAN PANEL DAN KABEL FEEDER STD
1,010,040.69 12,150,599.58
1.00
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Batten Tube 20 W bh 621,121.76 28.00 Lampu Emergency - Lampu LED Exit 5 W + Baterai bh 739,912.73 1.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 26,683.58 2.00 - Saklar Ganda bh 33,132.97 2.00 c. Pekerjaan Stop Kontak - Stop Kontak 500 W / 16 A bh 302,654.09 12.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 28.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 1.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 4.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 12.00 JUMLAH 4.3.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
17,391,409.21 739,912.73 53,367.15 66,265.94 3,631,849.12 4,477,826.45 531,697.00 639,689.49 1,919,068.48 29,451,085.58
Pek. Standar Gedung Power House - page 67 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING 5.3. PEKERJAAN DUCTING TATA UDARA
Rp Rp Rp
2,570,534.63 25,948,741.08 32,903,967.79
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 6.2. PEKERJAAN FIRE ALARM 6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) JUMLAH -PEKERJAAN NON STANDAR
Rp Rp Rp Rp
10,218,829.31 18,603,640.00 57,327,586.57 147,573,299.37
JUMLAH PEKERJAAN NON STANDAR Rp
147,573,299.37
Rekapitulasi Non Standar Gedung Power House
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN 2.
3.
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) 5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV - IU.G2.1 & IU.G2.2 R. PANEL c. Pipa Refrigerant - Pemipaan (Liquid 3/4") - Pemipaan (Gas 3/4") d. Pemipaan Drain VRV Pemipaan Drain e. Remocon - Wireless Remocon f. Titik Instalasi Indoor + Outdoor Unit VRV g. Kabel Kontrol Indoor ke Outdoor
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Box Speaker 6 W d. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit e. Titik instalasi Attenuator, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² 2.
TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. LANTAI SATU a. TBFA - 1 b. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Optical Smoke Detector f. Breakglass Call point w/phone jack g. Av Phase Ii S/Strobe Non Iso h. Manual Call Point Backbox i. Indicator Lamp j. Instalasi Detector dalam konduit k. Instalasi Bell & Indicator dalam konduit l. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit 2.
TESTING & COMMISSIONING a. Progamming, Supervisi, Testing & Commissioning
6.3. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) a. CCTV - IP Camera Fix Dome Camera Indoor B. 2.
bh
Kapasitas : 12 000 Btu/h - Split Wall + Outdoor - ECO
5.3. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1.1 s/d EF.1.4 ) , Kapasitas : 400 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 250 CFM, Wall Type 3. Exhaust Fan ( EF.3 ) , Kapasitas : 250 CFM, Wall Type 4. Exhaust Fan ( EF.4 ) , Kapasitas : 400 CFM, Wall Type b. Titik Instalasi daya FAN VI.
SATUAN
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel CCTV
TESTING COMMISIONING - Testing Commisioning, Labeling, & Documentation Data & Voice ( Fluke )
VOLUME 4.
2.00
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
1,285,267.32
2,570,534.63
JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
2,570,534.63
unit
2.00
8,061,251.01
16,122,502.03
m' m'
5.00 5.00
193,586.06 324,273.56
967,930.28 1,621,367.78
m'
5.00
114,253.33
571,266.67
bh ttk m'
2.00 2.00 7.50
1,020,985.42 730,174.25 421,780.67
2,041,970.83 1,460,348.49 3,163,355.00
JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
25,948,741.08
unit unit unit unit ttk
4.00 1.00 1.00 1.00 7.00
4,846,313.89 3,042,826.39 3,042,826.39 4,846,313.89 369,535.08
19,385,255.56 3,042,826.39 3,042,826.39 4,846,313.89 2,586,745.57
JUMLAH 5.3.PEKERJAAN DUCTING TATA UDARA
32,903,967.79
bh m' bh ttk ttk
1.00 10.00 4.00 4.00 4.00
1,279,196.28 35,697.47 217,689.89 154,487.16 154,487.16
1,279,196.28 356,974.74 870,759.56 617,948.64 617,948.64
bh ttk
4.00 1.00
830,378.57 154,487.16
3,321,514.29 154,487.16
1.00
3,000,000.00
3,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
10,218,829.31
ls
unit m' m' m' bh bh bh bh bh ttk ttk ttk ls
1.00 10.00 10.00 10.00 5.00 1.00 1.00 1.00 1.00 1.00 4.00 1.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,244,394.53 669,678.06 4,848,959.83 188,097.85 179,891.30 95,519.19 95,519.19 95,519.19
2,051,526.83 149,504.22 633,929.45 86,964.66 6,221,972.67 669,678.06 4,848,959.83 188,097.85 179,891.30 95,519.19 382,076.76 95,519.19
1.00
3,000,000.00
3,000,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
18,603,640.00
unit
6.00
7,982,546.77
47,895,280.63
titik
6.00
738,717.66
4,432,305.93
lot 1.00 5,000,000.00 JUMLAH 6.3.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
5,000,000.00 57,327,586.57
Pek. Non Standar Gedung Power House - page 69 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG G3 (SENTRAL GAS MEDIS) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
43,494,870.95
II.
PEKERJAAN NON STANDAR
Rp
142,056,551.98
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
185,551,422.93
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. IV.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL 4.2. PEKERJAAN PANEL DAN KABEL FEEDER STD 4.3. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI JUMLAH -PEKERJAAN STANDARD
Rp Rp Rp Rp
14,073,282.24 11,635,359.79 17,786,228.93 43,494,870.95
JUMLAH PEKERJAAN STANDAR Rp
43,494,870.95
Rekapitulasi Standar Gedung G3 (Sentral Gas Medis)
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1. IV.
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2.
4.2.
4.3.
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik - PP/LP - G3 b. Kabel Feeder - Dari LVMDP ke PP/LP - G3, NYY 4 x 4 mm2 + Grounding
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
btg
5.00
1,032,478.94
5,162,394.68
btg
5.00
786,226.43
3,931,132.13
pcs
100.00
49,797.55
4,979,755.43
JUMLAH 4.1.PEKERJAAN RAK KABEL
14,073,282.24
unit
10,458,627.48
10,458,627.48
m' 39,224.41 30.00 JUMLAH 4.2.PEKERJAAN PANEL DAN KABEL FEEDER STD
1,176,732.31 11,635,359.79
1.00
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Batten Tube 20 W bh 621,121.76 17.00 Lampu Emergency - Lampu LED Exit 5 W + Baterai bh 739,912.73 1.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 26,683.58 6.00 c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A bh 104,731.79 8.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 17.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 1.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 6.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 8.00 JUMLAH 4.3.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
10,559,069.88 739,912.73 160,101.46 837,854.29 2,718,680.35 531,697.00 959,534.24 1,279,378.99 17,786,228.93
Pek. Standar Gedung G3 (Sentral Gas Medis) - page 71 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
VI.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN AIR CONDITIONING 5.3. PEKERJAAN DUCTING TATA UDARA
Rp Rp Rp
2,570,534.63 13,998,436.65 20,863,395.88
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA Rp 6.2. PEKERJAAN FIRE ALARM Rp 6.3. PEKERJAAN TELEPON Rp 6.4. PEKERJAAN IPTV Rp 6.5. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) Rp JUMLAH -PEKERJAAN NON STANDAR Rp
8,365,390.85 26,245,817.67 4,683,146.62 3,010,041.44 62,319,788.23 142,056,551.98
JUMLAH PEKERJAAN NON STANDAR Rp
142,056,551.98
Rekapitulasi Non Standar Gedung G3 (Sentral Gas Medis)
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN 2.
3.
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) 5.2. PEKERJAAN AIR CONDITIONING 1. LANTAI SATU a. Indoor Unit VRV - IU.G3.1 R.STAFF PENGOLAHAN c. Pipa Refrigerant - Pemipaan (Liquid 3/4") - Pemipaan (Gas 3/4") d. Pemipaan Drain VRV Pemipaan Drain e. Remocon - Wireless Remocon f. Titik Instalasi Indoor + Outdoor Unit VRV g. Kabel Kontrol Indoor ke Outdoor
PEKERJAAN ELEKTRONIC 6.1. PEKERJAAN TATA SUARA 1. LANTAI SATU a. TBS-1 b. Kabel dari MDF-TS ke TBS-1, NYMHY ( 3 x 2,5 mm2 ) c. Box Speaker 6 W d. Titik instalasi Speaker, NYMHY 3 x 2,5 mm2 dalam conduit Emergency a. Firedome Speaker w/ metal box 6 Watt b. Titik Instalasi Speaker, Kabel FRC 2x2.5 mm² 2.
TESTING & COMMISIONING a. Testing & Commisioning
6.2. PEKERJAAN FIRE ALARM 1. LANTAI SATU a. TBFA - 1 b. Kabel dari MCFA ke TBFA-1, STP 18 AWG 1 Pair c. Kabel dari MCFA ke TBFA-1, FRC 3 x 4 mm3 d. Kabel dari FIREMAN INTERCOM ke Back Box, ITC 2x2x0.6 mm e. Rate Of Rise (ROR) f. Gase Detector g. Breakglass Call point w/phone jack h. Av Phase Ii S/Strobe Non Iso i. Manual Call Point Backbox j. Indicator Lamp k. Mias 200 Series Advance Base n. Instalasi Detector dalam konduit o. Instalasi Bell & Indicator dalam konduit p. Instalasi Back Box, ITC 2x2x0,6 mm2 dalam Counduit 1.
bh
Kapasitas : 9 200 Btu/h - Split Wall + Outdoor - ECO
5.3. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1) , Kapasitas : 50 CFM, Wall Type 2. Exhaust Fan ( EF.2.1 s/d EF.2.3) , Kapasitas : 500 CFM, Wall Type b. Titik Instalasi daya FAN VI.
SATUAN
TESTING & COMMISSIONING a. Progamming, Supervisi, Testing & Commissioning
6.3. PEKERJAAN TELEPON 1. LANTAI SATU a. IP TELEPON - Handset Telepon TB 10 Pair - IP Phone Series - Titik Instalasi Phone 6.4. PEKERJAAN IPTV 1. LANTAI SATU a. IPTV - Set Top Box - Outlet TV - Titik Instalasi TV 6.5. PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT) 1. LANTAI 1 a. WIRELESS - AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain - AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
VOLUME 4.
2.00
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
1,285,267.32
2,570,534.63
JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
2,570,534.63
unit
1.00
5,923,357.26
5,923,357.26
m' m'
5.00 5.00
193,586.06 324,273.56
967,930.28 1,621,367.78
m'
5.00
114,253.33
571,266.67
bh ttk m'
1.00 1.00 7.50
1,020,985.42 730,174.25 421,780.67
1,020,985.42 730,174.25 3,163,355.00
JUMLAH 5.2.PEKERJAAN AIR CONDITIONING
13,998,436.65
unit unit ttk
1.00 3.00 4.00
1,239,338.89 6,048,638.89 369,535.08
1,239,338.89 18,145,916.67 1,478,140.32
JUMLAH 5.3.PEKERJAAN DUCTING TATA UDARA
20,863,395.88
bh m' bh ttk
1.00 10.00 2.00 2.00
1,279,196.28 35,697.47 217,689.89 154,487.16
1,279,196.28 356,974.74 435,379.78 308,974.32
bh ttk
1.00 1.00
830,378.57 154,487.16
830,378.57 154,487.16
1.00
5,000,000.00
5,000,000.00
JUMLAH 6.1.PEKERJAAN TATA SUARA
8,365,390.85
ls
unit m' m' m' bh bh bh bh bh bh bh ttk ttk ttk ls
unit unit ttk
unit unit unit
1.00 10.00 10.00 10.00 1.00 4.00 1.00 1.00 1.00 1.00 1.00 5.00 5.00 1.00
2,051,526.83 14,950.42 63,392.94 8,696.47 1,192,132.05 3,000,000.00 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 95,519.19 95,519.19 95,519.19
1.00
3,000,000.00
3,000,000.00
JUMLAH 6.2.PEKERJAAN FIRE ALARM
26,245,817.67
1.00 1.00 1.00
2,051,526.83 149,504.22 633,929.45 86,964.66 1,192,132.05 12,000,000.00 669,678.06 4,848,959.83 188,097.85 179,891.30 194,422.35 477,595.95 477,595.95 95,519.19
1,547,460.71 2,977,261.71 158,424.19
1,547,460.71 2,977,261.71 158,424.19
JUMLAH 6.3.PEKERJAAN TELEPON
4,683,146.62
1.00 1.00 1.00
1,659,816.11 80,948.69 1,269,276.64
1,659,816.11 80,948.69 1,269,276.64
JUMLAH 6.4.
3,010,041.44
unit unit
1.00 1.00
20,931,439.39 573,823.72
20,931,439.39 573,823.72
b.
CCTV - IP Camera Fix Dome Camera Indoor
unit
3.00
7,982,546.77
23,947,640.32
c.
HORIZONTAL CABLING SYSTEM - Patch Panel Category 6 SL Kapasitas 24 Port - 4 Pair, Category 6 SL Series Modular Jack ( Blue ) - Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) - BS Shuttered Faceplate - 1 Port
unit pcs pcs pcs
4.00 2.00 2.00 1.00
1,705,345.36 107,681.91 83,622.98 59,564.05
6,821,381.45 215,363.82 167,245.96 59,564.05
titik 2.00 738,717.66 titik 8.00 738,717.66 titik 3.00 738,717.66 JUMLAH 6.5.PEKERJAAN SISTEM TEKNOLOGI INFORMASI DAN KOMUNIKASI (ICT)
1,477,435.31 5,909,741.24 2,216,152.97 62,319,788.23
d.
PEKERJAAN INSTALASI - Instalasi ,Penarikan Kabel Wifi - Instalasi ,Penarikan Kabel Data - Instalasi ,Penarikan Kabel CCTV
Pek. Non Standar Gedung G3 (Sentral Gas Medis) - page 73 of 280
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN GEDUNG G5 (R.POMPA) RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO.
URAIAN PEKERJAAN
JUMLAH HARGA
I.
PEKERJAAN STANDARD
Rp
178,618,795.58
II.
PEKERJAAN NON STANDAR
Rp
30,813,765.15
TOTAL PEKERJAAN ELEKTRIKAL GEDUNG DIREKTORAT Rp
209,432,560.73
REKAPITULASI PEKERJAAN STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. IV.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL Rp 4.2. PEKERJAAN PANEL DAN KABEL FEEDER STD Rp 4.3. PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI Rp JUMLAH -PEKERJAAN STANDARD Rp
14,073,282.24 143,415,224.13 21,130,289.22 178,618,795.58
JUMLAH PEKERJAAN STANDAR Rp
178,618,795.58
Rekapitulasi Standar Gedung R.Pompa
PEKERJAAN STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN 2.
1. IV.
PEKERJAAN STANDARD PEKERJAAN ELEKTRIKAL ARUS KUAT 4.1. PEKERJAAN RAK KABEL 1. LANTAI SATU a. Rak Kabel arus kuat - Ukuran 400 x 100 mm b. Rak Kabel arus lemah - Ukuran 200 x 100 mm 2. 4.2.
4.3.
AKSESORIS a. Jointing / Connector Tray c/w bolt & Nut H100
PEKERJAAN PANEL DAN KABEL FEEDER STD 1. LANTAI SATU a. Panel Listrik - PP - AB - PP - FH - LP - PL b. Kabel Feeder - Dari LVMDP ke PP - AB, NYY 4 x 50 mm2 + Grounding - Dari LVMDP ke PP - FH, FRC 4 x 185 mm2 + Grounding - Dari LVMDP ke LP - PL, NYY 4 x 10 mm2 + Grounding
SATUAN 3.
VOLUME 4.
HARGA SATUAN
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
btg
5.00
1,032,478.94
5,162,394.68
btg
5.00
786,226.43
3,931,132.13
pcs 49,797.55 100.00 JUMLAH 4.1.PEKERJAAN RAK KABEL
4,979,755.43 14,073,282.24
unit unit unit
12,399,669.22 50,446,792.50 36,605,810.61
12,399,669.22 50,446,792.50 36,605,810.61
m' 383,971.99 30.00 m' 1,540,504.94 20.00 m' 81,684.67 20.00 JUMLAH 4.2.PEKERJAAN PANEL DAN KABEL FEEDER STD
11,519,159.68 30,810,098.80 1,633,693.32 143,415,224.13
1.00 1.00 1.00
PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI 1. LANTAI SATU a. Fixtures lampu lengkap dengan armature Lampu General - Lampu LED Batten Tube 20 W bh 621,121.76 20.00 Lampu Emergency - Lampu LED Exit 5 W + Baterai bh 739,912.73 1.00 b. Pekerjaan Saklar Lampu - Saklar Tunggal bh 26,683.58 5.00 c. Pekerjaan Stop Kontak - Stop Kontak 200 W / 16 A bh 104,731.79 2.00 - Stop Kontak 500 W / 16 A bh 302,654.09 6.00 d. Titik instalasi - Instalasi Lampu General dan Khusus, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 20.00 - Instalasi Lampu Emergency, FRC 3 x 4 mm2 dalam conduit PVC ttk 531,697.00 1.00 - Instalasi Saklar, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 5.00 - Instalasi Stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 159,922.37 8.00 JUMLAH 4.3.PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
12,422,435.15 739,912.73 133,417.88 209,463.57 1,815,924.56 3,198,447.47 531,697.00 799,611.87 1,279,378.99 21,130,289.22
Pek. Standar Gedung R.Pompa - page 75 of 280
REKAPITULASI PEKERJAAN NON STANDARD RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021 NO. V.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 5.2. PEKERJAAN DUCTING TATA UDARA
Rp Rp JUMLAH -PEKERJAAN NON STANDAR Rp
5,141,069.27 25,672,695.88 30,813,765.15
JUMLAH PEKERJAAN NON STANDAR Rp
30,813,765.15
Rekapitulasi Non Standar Gedung R.Pompa
PEKERJAAN NON STANDARD RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. 1. V.
URAIAN 2. PEKERJAAN NON STANDAR PEKRJAAN MEKANIKAL 5.1. PEKERJAAN FIRE FIGHTING 1. LANTAI SATU a. Pemasangan Instalasi Hydrant - Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) 5.2. PEKERJAAN DUCTING TATA UDARA 1. LANTAI SATU a. Ventilasi Udara / Fan 1. Exhaust Fan ( EF.1 ) , Kapasitas : 500 CFM, Wall Type 2. Exhaust Fan ( EF.2 ) , Kapasitas : 500 CFM, Wall Type b. Titik Instalasi daya FAN
SATUAN 3.
bh
VOLUME 4.
JUMLAH HARGA
(Rp.) 5.
(Rp.) 6 = (4. X 5.)
1,285,267.32
5,141,069.27
JUMLAH 5.1.PEKERJAAN FIRE FIGHTING
5,141,069.27
unit unit ttk
4.00
HARGA SATUAN
2.00 2.00 4.00
6,048,638.89 6,048,638.89 369,535.08
12,097,277.78 12,097,277.78 1,478,140.32
JUMLAH 5.2.PEKERJAAN DUCTING TATA UDARA
25,672,695.88
Pek. Non Standar Gedung R.Pompa - page 77 of 280
DAFTAR HARGA BAHAN DAN UPAH ELEKTRIKAL PEKERJAAN PERENCANA NO
URAIAN
A. 1 2 3 4 B. 1 2 3 4 5 6 7 8 9 10
11
12
13
14
15 16 17 18 19 20 21 22 C. 1
DAFTAR UPAH Pekerja Tukang listrik Kepala tukang listrik Mandor PEKERJAAN ELEKTRIKAL MVMDP, PQCR & TRAFO Lightning Arrester Cubicle Incoming Cubicle with Surge Arrester Incoming Cubicle IM ATS Cubicle Metering Cubicle CM Outgoing Circuit Breaker Cubicle Outgoing QM Lightning Arrester Cubicle Accessories Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-31 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-31 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator iol Type 1600 kVA, Step Down AL-AL, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-31 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-20 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Fans Interlock Module IP 30, FROM 1, BOTTOM INCOMING H.600 x W.600 x D.250 mm, Indoor ATS Interlock Module AHF Accusine PCS+ 300A IP00 AHF Accusine PCS+ 200A IP00 AHF Accusine PCS+ 120A IP00 Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 MCCB NSX 400A 3P MCCB NSX 300A 3P MCCB NSX 160A 3P Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) PEKERJAAN PANEL LVMDP (SMART PANEL IP 30, Form 3B, Bottom Incoming) a. H.2200 x W.900 x D.600 mm, Indoor Form 3B Non Type Test b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT 4000/5 30VA Cls.1 INCOMING a. PREMIUM ACB FIXED 4P 4000 A 100KA b. MOTOR OPERATOR 230V A.C./D.C. c. CLOSING COIL 230V A.C./D.C. d. UVR 230V A.C./D.C. e. Fuse Housing f. Miniatute Fuse Link 10x38 2A g. Emergency Stop latching turn to reset 2 N/C (Red) i. Pilot Lamp 220VAC "R" (Red) j. Pilot Lamp 220VAC "G" (Green)
HARGA SATUAN Rp Rp Rp Rp
70,000 80,000 85,000 90,000
hari hari hari hari
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
41,745,008 247,314,905 45,870,969 544,464,935 83,247,313 240,438,304 56,145,418 36,890,938 202,252,948 448,411,774
bh bh bh bh bh bh bh bh set bh
Rp
557,490,025
bh
Rp
552,869,759
bh
Rp
1,520,942,167
bh
Rp
58,550,880
unit
Rp Rp Rp Rp Rp Rp Rp Rp
786,016,723 786,016,723 376,663,714 14,966,718 7,157,327 7,157,327 4,445,610 18,663,902
unit unit unit unit unit unit unit set
Rp Rp
49,813,748 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 1,258,463
unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp
152,813,338 7,191,216 1,618,024 1,977,584 10,544 1,757 42,894 31,462 31,462
unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 78 of 280
NO
URAIAN k. l. m. n. o. a. b. a. b. 2
3
4
5
6
Push Button (Green) 1 N/O Push Button (Red) 1 N/C Timer 220 VAC + Socket Relay 220 VAC + Socket Selector Switch A-O-M 2 Pole ARRESTER MCCB MT 50A 4P 20KA Arrester SPD T1+T2 12,5KA 3P+N SMART PANEL MODBUS INTERFACE GATEWAY RS485/ETHERNET
MDP (IP 30, Form 1, Bottom Incoming) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA INCOMING a. MCCB AUX CONTACTS b. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET SDP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS PP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS
HARGA SATUAN Rp Rp Rp Rp Rp
19,667 19,667 222,508 55,145 57,305
unit unit unit unit unit
Rp Rp
1,618,024 4,756,989
unit unit
Rp Rp
2,220,288 14,770,758
unit unit
Rp Rp
7,390,424 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp Rp
314,616 7,191,216
unit unit
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
unit unit unit unit
Rp
1,533,527
unit
Rp Rp
2,442,317 14,770,758
unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp
314,616
unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp
314,616
unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp
314,616
unit
PP-AC (IP 30, Form 1, Bottom Incoming) Bahan Elektikal - page 79 of 280
NO
URAIAN a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A 7
8
9
10
PP-AC.OU (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP-PL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 50/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-BP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-AB (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
HARGA SATUAN Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
unit unit unit unit unit unit
Rp
314,616
unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp
314,616
unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp
314,616
unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
unit unit unit unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp
8,634
unit
Bahan Elektikal - page 80 of 280
NO
URAIAN b. c. d. e. f. g. a. b. c. d. a. b. c. d.
11
12
13
14
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING MCCB AUX CONTACTS MCCB SHUNT TRIP 200-277 VAC/DC Fuse Housing Miniatute Fuse Link 10x38 2A PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A
PP-LF (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC b. Time Switch, 24 hours / 220VAC, Analog c. Fuse Housing d. Miniatute Fuse Link 10x38 2A e. MCCB SHUNT TRIP 200-277 VAC/DC PP-EWH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC b. Time Switch, 24 hours / 220VAC, Analog c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-SOLAR PANEL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP/LP-PH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter
HARGA SATUAN Rp Rp Rp Rp Rp Rp
8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
unit unit unit unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp Rp Rp Rp Rp
332,594 701,144 10,544 1,757 607,029
unit unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp Rp Rp Rp
332,594 701,144 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
unit unit unit unit
Rp Rp
1,273,295 736,650
unit unit
Bahan Elektikal - page 81 of 280
NO
URAIAN c. Fuse Housing d. Miniatute Fuse Link 10x38 2A
15
16
17
18
19
PP-FH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP-PL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS LP/PL-PENUNJANG (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS PP-CRANE (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A
HARGA SATUAN Rp Rp
10,544 1,757
unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
unit unit unit unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp
314,616
unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
unit unit unit unit unit
Rp
314,616
unit
Rp Rp
3,668,927 179,780
unit unit
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
unit unit unit unit unit unit unit
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
unit unit unit unit
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
unit unit unit unit
Rp
284,534,616
unit
Bahan Elektikal - page 82 of 280
NO
URAIAN
-
-
HARGA SATUAN
- Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris
20
PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
Rp
276,893,949
unit
21
PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
Rp
246,331,281
unit
22
PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone
Rp
261,612,615
unit
Bahan Elektikal - page 83 of 280
NO
URAIAN
-
-
HARGA SATUAN
- LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris
23
PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
Rp
211,948,280
unit
24
PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
Rp
206,217,780
unit
25
PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar
Rp
229,483,611
unit
Bahan Elektikal - page 84 of 280
NO
URAIAN
HARGA SATUAN
INCLUDE : Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris -
20 a. b. c. d. e. f. g. h. i. j. k. l. m. n. D. 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
Modul ACOS Interlock (IP 30, Form 1, Bottom Incoming) H.600 x W.600 x D.250 mm, Indoor Cu-Busbar Automatic Mains Failure Module Fuse RT-18-1PL ref. 3OZFHR8L Miniatute Fuse Link 10x38 2A ref. 3OZM3802 MCB 1P C6 6kA Emergency Stop latching turn to reset 2 N/C (Red) SIREN 100dB 24VDC Timer H3CR-A8 220 VAC + Socket Relay MY-4GS 220 VAC + Socket Relay MY-4GS 24 VDC + Socket Relay LY-4GS 24VDC + Socket Terminal PTU-20 22A Jasa Sinkronisasi LV MV
PEKERJAAN KABEL kabel ITC 0.6 mm Kabel FRC 2 x 2.5 mm2 Kabel FRC 3 x 2.5 mm2 Kabel FRC 3 x 4 mm2 Kabel FRC 4 x 10 mm2 Kabel FRC 4 x 16 mm2 Kabel FRC 4 x 35 mm2 Kabel FRC 4 x 50 mm2 Kabel FRC 4 x 70 mm2 Kabel FRC 4 x 150 mm2 Kabel FRC 4 x 185 mm2 Kabel FRC 4 x 240 mm3 Kabel FRC 4 x 300 mm3 Kabel FRC 1 x 300 mm3 Kabel FRC 1 x 185 mm3 Kabel N2XSEbY 3 x 25 mm2 Kabel N2XSEbY 3 x 35 mm2 Kabel N2XSEbY 3 x 50 mm2 Kabel N2XSEbY 3 x 70 mm2 Kabel N2XSEbY 3 x 95 mm2 Kabel N2XSEbY 3 x 120 mm2 Kabel N2XSEbY 3 x 150 mm2 Kabel N2XSEbY 3 x 185 mm2 Kabel N2XSEbY 3 x 240 mm2 Kabel N2XSY 1 x 35 mm2 Kabel N2XSY 1 x 50 mm2 Kabel N2XSY 1 x 70 mm2 Kabel N2XSY 1 x 95 mm2 Kabel N2XSY 1 x 120 mm2 Kabel N2XSY 1 x 120 mm2 Kabel N2XSY 1 x 150 mm2 Kabel N2XSY 1 x 185 mm2 Kabel N2XSY 1 x 240 mm2 Kabel N2XSY 1 x 300 mm2 Kabel N2XSY 1 x 400 mm2 Kabel N2XSY 1 x 500 mm2 Kabel N2XSY 1 x 630 mm2
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,230,937 179,780 10,247,483 10,544 1,757 51,912 42,894 269,671 222,508 55,145 55,145 118,902 4,193 22,472,550
unit unit unit unit unit unit unit unit unit unit unit unit unit lot
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,416 16,180 84,227 44,046 306,256 153,353 221,130 383,831 529,993 833,282 1,013,063 1,002,684 1,102,953 507,880 320,009 317,312 364,055 433,271 553,724 712,829 877,328 1,028,344 1,225,203 1,577,573 92,587 115,059 152,813 199,107 242,704 242,704 288,548 351,471 451,249 563,162 762,718 950,589 1,297,116
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m' m¹ m¹ m' m' m¹ m¹ m¹ m' m¹ m¹ m¹
Bahan Elektikal - page 85 of 280
NO 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113
Kabel N2XSY 1 x 300 mm2 Kabel NYFGbY 4 x 4 mm2 Kabel NYFGbY 4 x 6 mm2 Kabel NYFGbY 4 x 16 mm2 Kabel NYFGbY 4 x 35 mm2 Kabel NYFGbY 4 x 70 mm2 Kabel NYFGbY 4 x 95 mm2 Kabel NYFGbY 4 x 120 mm2 Kabel NYFGbY 4 x 150 mm2 Kabel NYFGbY 4 x 185 mm2 Kabel NYFGbY 4 x 240 mm2 Kabel NYFGbY 4 x 300 mm2 Kabel NYAF 1 x 150 mm2 Kabel NYA 1 x 2,5 mm2 Kabel NYA 1 x 6 mm2 Kabel NYA 1 x 10 mm2 Kabel NYA 1 x 16 mm2 Kabel NYA 1 x 25 mm2 Kabel NYA 1 x 35 mm2 Kabel NYA 1 x 50 mm2 Kabel NYA 1 x 70 mm2 Kabel NYA 1 x 95 mm2 Kabel NYA 1 x 120 mm2 Kabel NYM 3 x 2,5 mm2 Kabel NYM 4 x 4 mm2 Kabel NYY 2 x 2,5 mm2 Kabel NYY 4 x 2,5 mm2 Kabel NYY 1 x 150 mm2 Kabel NYY 1 x 300 mm2 Kabel NYY 3 x 50 mm3 Kabel NYY 4 x 300 mm2 Kabel NYY 4 x 10 mm2 Kabel NYY 4 x 16 mm2 Kabel NYY 4 x 25 mm2 Kabel NYY 4 x 35 mm2 Kabel NYY 4 x 4 mm2 Kabel NYY 4 x 50 mm2 Kabel NYY 4 x 6 mm2 Kabel NYY 4 x 70 mm2 Kabel NYY 4 x 95 mm2 Kabel NYY 4 x 120 mm2 Kabel NYY 4 x 150 mm2 Kabel NYY 1 x 185 mm2 Kabel NYY 4 x 185 mm2 Kabel NYY 4 x 240 mm2 Kabel NYY 4 x 300 mm3 Kabel NYY 1 x 240 mm2 Kabel NYY 3 x 10 mm2 Kabel NYY 3 x 35 mm2 Kabel NYMHY 3 x 2,5 mm2 Kabel Tray lebar 20 cm (200 -100) Kabel Tray lebar 40 cm (400 -100) Kabel Tray lebar 80 cm (800 -100) Jointing / Connector Tray c/w bolt & Nut H100 Galian, urugan & pelindung kabel Busduct 1000A / AL IP54 - 1000A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - Class B 130 C Insullation (hanger) - IEC Standard - Couple Bar - Flexible Box - Hanger 114 Busduct 2500A / AL IP54 - 2500A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - Class B 130 C Insullation (hanger) - IEC Standard - Couple Bar - Flexible Box - Hanger 115 Busduct 1600A / AL IP54 - 1600A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - IEC Standard - Couple Bar
URAIAN
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
563,162 45,215 58,968 129,891 259,783 479,564 655,749 821,596 1,006,321 1,248,575 1,633,305 2,032,867 213,040 1,951 7,506 12,585 26,518 40,900 56,181 75,058 107,868 149,218 187,421 11,686 24,270 9,888 17,978 786,090 484,508 245,400 1,995,113 65,620 115,059 177,533 241,805 30,563 321,357 41,349 455,743 627,883 790,135 972,163 295,289 1,211,270 1,599,147 1,995,113 384,281 71,984 203,691 13,484 737,999 968,387 1,936,774 33,619 118,655
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp
5,278,802 5,265,858 5,678,454 6,339,416 230,568
m unit unit unit unit
Rp Rp Rp
9,586,790 5,784,434 230,568
bh bh bh
Rp Rp Rp Rp Rp
11,730,671 5,265,858 5,678,454 6,339,416 230,568
m unit unit unit unit
Rp Rp Rp
9,586,790 5,784,434 230,568
bh bh bh
Rp Rp Rp Rp
5,278,802 6,202,693 6,464,004 8,457,409
m unit unit unit
Rp
11,597,184
bh
Bahan Elektikal - page 86 of 280
NO
URAIAN
- Flexible Box - Hanger 116 Busduct 3200A / AL IP54 - 3200A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - IEC Standard - Couple Bar - Flexible Box - Hanger E.
HARGA SATUAN Rp Rp
5,574,091 230,568
bh bh
Rp Rp Rp Rp
14,663,339 6,202,693 6,464,004 8,457,409
m unit unit unit
Rp Rp Rp
11,597,184 5,574,091 230,568
bh bh bh
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
PEKERJAAN PENERANGAN Lampu Down Light LED 4 W Lampu Down Light LED 5 W Lampu Down Light LED 6 W Lampu Down Light LED 7 W Lampu Down Light LED 9 W Lampu Down Light LED 10 W Lampu Down Light LED 13 W Lampu Down Light LED 16 W Lampu Down Light LED 30 W + Driver + Armature Lampu LED Down Light Spot 23 W Lampu Panel LED 60 x 60 20 W Lampu LED Spot Light 15 W Lampu LED Spot Light 23 W Lampu Dinding 5 W Lampu Strip 5 W / meter + Driver + Diffuser Lampu Indicator Lampu LED Panel 36 W Lampu LED Panel 26 W Lampu LED Batten 36 W + Inter Cable Lampu LED Batten 20 W + Inter Cable Lampu LED Prismatic 36 W Lampu LED Prismatic 20 W Lampu Panel LED Dust Proof 40 W Lampu Panel LED Dust Proof 26 W Lampu TL LED Louvre M7 20 W Lampu TLT5 1x12 W (BALK) Lampu TLT5 1x28 W (BALK) Lampu TLT5 2x28 W (BALK) Lampu TLT5 1x28 W (DF) Lampu TLT5 1x28 W (Louvre M6) Lampu TLT5 2x28 W (Acrilic Putih susu) Lampu TLT5 2x28 W (Louvre M6) Lampu LED Plat 12 W + baterai Lampu LED RMO 12 W Lampu Jalan LED ( 2 x 20 W ) Lampu Jalan LED ( 1 x 20 W ) Lampu Taman Essential 18 W Lampu Taman Essential 28 W Tube Line (True Line Slim Balance) LED 20 W Lampu Exit 5 W + Baterai Lampu Up Light 5 W Lampu Track Spot 15 W Lampu LED Down Light Outbow 12 W Lampu Tree Light 10 W Lampu Bollard Light 18 W Tiang Lampu Jalan (P : 7 m) Tool Kit Emergency (Lampu)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
168,994 168,994 168,994 194,163 237,310 237,310 237,310 305,627 916,880 341,439 810,810 1,315,993 1,315,993 179,780 631,389 156,049 895,306 895,306 693,952 586,084 835,619 538,622 835,619 538,622 886,677 251,693 369,045 463,923 665,682 374,887 504,374 504,374 302,031 192,365 24,126,529 12,063,265 1,869,716 2,711,088 1,689,936 699,705 898,902 583,208 147,420 2,566,545 2,678,728 2,286,807 363,876
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PEKERJAAN STOP KONTAK & SAKLAR Saklar Ganda 10 A Saklar Putar 10 A Saklar Tunggal 10 A Stop kontak daya 10/16 A - 1 Phase (Partisi) Stop kontak daya 10/16 A - 1 Phase Stop kontak daya 10/16 A - 3 Phase Socket Pipa Tee Doos Pipa Conduit Las Doop Klem Pipa Fhiser Isolasi Ban Sensor System
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
25,686 23,664 19,517 153,389 94,169 283,478 4,495 3,596 5,393 1,798 4,495 1,798 1,798 2,869,295
bh bh bh bh bh bh bh bh m' bh bh bh bh bh
1 2 3
PEKERJAAN ACB, MCB, MCCB MCB 1P 4,5 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa
Rp Rp Rp
52,950 52,950 52,950
bh bh bh
F.
G.
Bahan Elektikal - page 87 of 280
NO
URAIAN 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2
MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 4,5 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 6 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 2P 6 KA MCB 6 A/2 Phasa MCB 3P 6 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 10 KA MCB 4 A/1 Phasa MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 10 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 15 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 15 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 25 - 30 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa
HARGA SATUAN Rp Rp Rp Rp Rp Rp
52,950 58,902 61,671 73,853 146,701 146,701
bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
241,424 241,424 241,424 241,424 255,405 280,323 316,176 491,879 491,879
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
58,902 58,902 58,902 58,902 66,654 69,146 73,853 157,056 157,056
bh bh bh bh bh bh bh bh bh
Rp
203,395
bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
259,766 259,766 259,766 259,766 276,579 294,996 316,176 526,397 526,397
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
95,379 87,142 87,142 87,142 87,142 91,503 104,031 108,530 146,529 172,346
bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
332,649 332,649 332,649 332,649 357,221 380,823 388,991 544,310 661,284
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
146,529 146,529 146,529 146,529 181,483 189,304 198,233 250,214 266,895
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
569,020 569,020 569,020 569,020 585,701 627,923 652,633 753,479 776,667
bh bh bh bh bh bh bh bh bh
Rp Rp
313,061 313,061
bh bh
Bahan Elektikal - page 88 of 280
NO
URAIAN 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4
1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 1 2 3 4 5 6 7 8 9 10
MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 25 - 30 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 50 KA MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 80 A/1 Phasa MCB 3P 50 KA MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 80 A/3 Phasa MCCB 3P 25 KA NON-ADJUSTABLE MCCB 32 A/3 Phasa MCCB 40 A/3 Phasa MCCB 63 A/3 Phasa MCCB 50 A/3 Phasa MCCB 3P 35 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 65-70 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 25 KA ADJUSTABLE MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 50-55 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp
313,061 313,061 313,061 313,061 313,061 335,349 375,494
bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,064,741 1,064,741 1,064,741 1,064,741 1,064,741 1,064,741 1,064,741 1,088,275 1,156,798
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
757,632 757,632 757,632 757,632 757,632 791,133 791,133 791,133 959,326
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,789,566 1,789,566 1,789,566 1,779,322 1,779,322 1,836,632 1,836,632 1,850,890 2,381,496
bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp
1,240,485 1,240,485 1,402,287 1,294,419
bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,425,271 4,179,229 4,179,229 4,179,229 3,540,370 3,540,370 3,111,927 3,111,927 2,964,498 2,964,498 2,964,498
bh bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,485,122 6,531,170 4,188,227 4,188,227 4,188,227 4,025,571 3,938,359 3,938,359 3,938,359 3,938,359 3,938,359
bh bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp
2,373,101 1,941,628 1,402,287 1,402,287
bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
7,311,228 5,562,846 3,806,158 3,806,158 3,806,158 3,413,706 3,260,740 3,260,740 3,260,740 3,260,740
bh bh bh bh bh bh bh bh bh bh
Bahan Elektikal - page 89 of 280
NO
URAIAN
11
1 2 3 4 5 6 7 8 9 10
MCCB 63-80 A/3 Phasa MCCB 3P 70 KA ADJUSTABLE MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 50 KA NON ADJUSTABLE MCCB 800 A/3 Phasa ACB 50 KA ACB 800 A, 3P, 50KA ACB 1000 A, 3P, 50KA ACB 1250 A, 3P, 50KA ACB 1600 A, 3P, 50KA ACB 2000 A, 3P, 50KA ACB 2500 A, 3P, 50KA ACB 3200 A, 3P, 50KA ACB 4000 A, 3P, 50KA ACB 65 KA ACB 800 A, 3P, 50KA ACB 1000 A, 3P, 50KA ACB 1250 A, 3P, 50KA ACB 1600 A, 3P, 50KA ACB 2000 A, 3P, 50KA ACB 2500 A, 3P, 50KA ACB 3200 A, 3P, 50KA ACB 4000 A, 3P, 50KA ACB 70 KA ACB 800 A, 3P, 70KA ACB 1000 A, 3P, 70KA ACB 1250 A, 3P, 70KA ACB 1600 A, 3P, 70KA ACB 2000 A, 3P, 70KA ACB 2500 A, 3P, 70KA ACB 3200 A, 3P, 100KA ACB 4000 A, 3P, 100KA ACB 100 KA ACB 800 A, 3P, 100KA ACB 1000 A, 3P, 100KA ACB 1250 A, 3P, 100KA ACB 1600 A, 3P, 100KA ACB 2000 A, 3P, 100KA ACB 2500 A, 3P, 100KA ACB 3200 A, 3P, 100KA ACB 4000 A, 3P, 100KA ACB 5000 A, 3P, 100KA ACB 6000 A, 3P, 100KA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
AKSESORIS PANEL (Box Panel, Shun Trip, dst) Contactor Lighting Power Meter Arrester Ampere Meter 800/5A EC 96 Fuse & Indicator Selector Switch M-O-A 2P Volt Meter 0-500V EC 96 Occu Swtich (Sensor Penerangan) Pilot Lamp Pilot Lamp 220VAC "R" (Red) Auxilarry Contact Shun trip Way Delta A Way Delta B Auxilarry Contact + Alarm Switch Shun trip Interlock Contactor Type Test Box Panel - Form 3B H.2200 x W.900 x D.600 mm, Indoor (Include Indikator, Metering) Box Panel ( 220 x 100 x 100 ) cm + Analog Meter & Pilot Lamp Box Panel ( 200 x 100 x 60 ) cm Box Panel ( 180 x 80 x 60 ) cm Box Panel ( 100 x 90 x 25 ) cm Box Panel ( 80 x 60 x 25 ) cm Box Panel ( 43 x 33 x 20 ) cm Box Panel ( 60 x 60 x 40 ) cm Box Panel ( 30 x 20 x 15 ) cm Grounding BC 240 mm2 Grounding BC 185 mm2 Grounding BC 120 mm2 Grounding BC 95 mm2 Grounding BC 70 mm2 Grounding BC 50 mm2
1 2 3 4 1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
H.
HARGA SATUAN Rp
3,260,740
bh
Rp Rp Rp Rp
4,883,842 4,456,091 4,456,091 4,456,091
bh bh bh bh
Rp
16,611,709
bh
Rp Rp Rp Rp Rp Rp Rp Rp
21,732,960 22,942,846 23,291,692 29,878,235 33,739,765 40,433,591 43,573,896 76,339,108
bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp
24,246,173 25,640,865 27,280,579 34,904,661 38,904,622 47,105,961 52,238,979 89,532,957
bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp
34,896,355 36,648,198 37,151,395 41,799,904 47,454,807 58,459,026 67,133,798 110,865,506
bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
40,846,461 43,246,853 43,936,585 50,795,145 54,694,743 70,807,409 77,119,858 125,834,732 208,468,293 264,070,451
bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,374,253 18,863,980 1,490,070 153,982 92,407 104,722 154,521 1,226,439 22,562 31,462 149,218 1,779,826 1,260,261 729,639 184,275 381,134 3,856,290 3,319,915 187,984,901 301,982,528 12,257,754 11,331,109 10,684,174 3,132,673 5,233,857 2,398,864 5,730,500 1,046,771 3,242,398 2,401,776 2,401,776 1,779,826 1,662,969 1,384,848
bh bh bh bh bh bh bh bh bh bh unit unit bh bh unit unit unit unit Unit unit bh bh bh bh bh bh bh bh LS LS LS LS LS LS
Bahan Elektikal - page 90 of 280
NO
URAIAN
35 36 37 38 39 40 41 42
43 44 45 46 47 48 49 I. 1 2 3 4 5 6 7 8 9 10 11 J.
Grounding BC 35 mm2 Grounding BC 25 mm2 Grounding BC 16 mm2 Grounding BC 6-10 mm2 Premium Capasitor 80kVAR/3p/400V/50Hz/In = 1,7 Capasitor Regulator, Type : RM 2112 (20 step) Capasitor Regulator, Type : RM 2112 (10 step) Capacitor Bank - Contractor CTX 65 3P 50A Control 230V ac-Screw Terminal - MCCB DPX 160 16kA 3P 40A Magnetic - ACB DMX 1600N 3P 1250 50kA Fixed - DMX 1600 T0 Protection Unit LCD MP4 - DMX 1600 T0 External Auxiliary Power 24V DC - Motor Operator DMX T0 220-250V ac/dc - Clossing Coil 220-250V ac/dc - Shunt trip ET 220-250V ac/dc Toogle Switch Busbar Tembaga SolidStandard NEMA (300x100x10) CU BUSBAR Genset Synchronizer kit KWH Meter 1 Phase KWH Meter 3 Phase Change Over Switch 4 Pole 1600 Ampere COS Ohm Saklar Manual UPS UNIT UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet and Battery UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet and Battery Installation, commissionin and testing
8
PENANGKAL PETIR Air Terminal - Radiuas 20 M Obstruction Lamp Coaxial Cable 2 x 35 mm Connecting Sleeve lengkap surge Arrester Lightning Arrester 10KA Lightening Flash counter Grounding sistem - Copper road - Pentanahan & pipa GIP dia. 1 1/2 " - Bak kontrol ( 40x40) cm lengkap tutup - Kawat BCC dia. 70 mm Testing/pengukuran pentanahan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
PEKERJAAN SOUND SISTEM Flight Case 16U Driver Unit 60 W w/ Horn Dual Power Amplifier 1250 W Power Amplifier 480 W Digital Amplifier 480 W w/Selector Power Amplifier 240 W Mixer Amplifier 60 W (Monitor) Slim Array Speaker F-Series Box Speaker Power Amplifier 120 W CD/MMC/USB Player With FM Tunner Mixer Amplifier 60 W (Monitor) Speaker Selector 10 ch Gooseneck Microphone (Mimbar) Voice Alarm System Amplifier 360 W w/Zone Selector Digital Matrix Mixer w/ Equalizer Program Pagging Microphone w/Android Base Remote Microphone Dynamic Microphone w/ Stand (Muadzin) Emergency Microphone
1 2 3 4 5 6 7
K.
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp
1,033,737 853,957 674,176 620,782 10,738,823 15,393,697 14,366,431 87,900,533
LS LS LS LS bh bh bh Unit
Rp Rp Rp Rp Rp Rp Rp
764,067 4,442,643 179,780 22,472,550 1,231,496 2,565,646 9,887,922
bh bh kg bh bh bh bh
Rp Rp
4,746,203 24,797,596
unit unit
Rp
81,673,785
unit
Rp
192,868,411
unit
Rp
163,347,571
unit
Rp
203,053,869
unit
Rp
297,093,400
unit
Rp
607,956,181
unit
Rp
631,506,514
unit
Rp
841,323,722
unit
Rp
106,969,337
ls
Rp Rp Rp Rp Rp Rp Rp
1,685,441 1,928,145 376,190 674,176 707,885 4,415,946 3,884,155
bh bh m' Set bh Set Set
Rp
584,556
titik
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
7,331,265 1,296,037 10,488,029 7,921,034 5,613,733 3,811,255 1,963,795 6,666,257 1,380,174 2,552,513 4,853,262 1,963,795 3,640,553 1,057,378 33,713,139 23,688,674 34,383,001 5,452,739 1,614,788 8,786,677
unit bh bh bh set bh bh bh bh set bh bh bh bh bh set bh bh bh bh
Bahan Elektikal - page 91 of 280
NO
URAIAN
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 53 L. 1 2 3 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 16 17
18 19 20 21 22 23 24 25 26 27 1
Firedome Speaker w/Metal Box Inlet Microphone Emergency Message Panel Wireless Set (Dual Wireless Lavalier and Handheld) Ceiling Speaker 3 W Ceiling Speaker 3 W + Pagging Box Speaker 6 W Box Speaker 15 W Box Speaker 30 W Attenuator Kabel NYMHY 2 x 1,5 mm2 Kabel NYMHY 3 x 1,5 mm2 Kabel NYMHY 3 x 2,5 mm2 Cabinet Rack with Accecories Set Top Box MDF / CTB Testing & Commisioning Factory Acceptance Test (FAT) Kabel STP 18 AWG 1 Pair 16-Channel Mixing Console Hand Held Wireless Microphone w/ Receiver Undirectional Lavaliere Wireless Microphone w/ Receiver Wireless Antena Dynamic Microphone Floor Stand Mic. Digital Speaker Processor w/ Equalizer Multi Channel Power Amplifier Dual Power Amplifier Speaker System Subwofer System Monitor Speaker HX-Series Speaker Yamaha Mixer Paging Microphone w/RU-2002 (Car Call) PEKERJAAN TV MATV Active Combiner 2 x 8 DVBS/T to IP Penerima Channel FTA Power Devider Digital A/V Encoder Antena Parabola 32 feet Antena Yagi VHF 22 Element Digital Satelite Receiver & Modulator Spliter 4 way Socket TV Terminal Box 1:12 + Booster signal Terminal Box 1:8 + Booster signal Terminal Box 1:4 + Booster signal Kabel Coaxial RG11( 0,6 mm2 ) Kabel Coaxial RG8 ( 0,6 mm2 ) Kabel Coaxial 5C-2V UTP Cat 6 Tiang / Dudukan Demodulator Parabola Tv Berbayar Coupler 19” Rack Mounting Bracket(Option) Reciver Satellite Parabola - Fully compliant with the DVD-S2 digital tv - H.264 decoding - Support 576i / 576p / 720 p / 1080i, 1080p 50/60Hz - Convenient auto search funtion - Inteligent GUI - Capacity for storing up to 2000 transponder dan 4000 channels - Support DVB - S/ S2 digital tv signal modulated in QPSK / 8PSK - Input frequency range 950 MHz-2150 MHz - Support DiseqC 1.0 / DiseqC 1.2 - Fast channel selection - Favourite channel edit Active Combiner Booster Amplifiere Parabola Antenne lengkap dengan tiang dan aksesories Instalasi Kabel dari Antena ke Sentral unit Splitter Titik Instalasi TV Setting Programing Commisioning Documentation PEKERJAAN IPTV Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
774,224 339,785 8,786,677 198,208 136,723 438,484 198,208 801,731 1,603,461 137,532 7,551 11,326 16,180 14,904,020 1,577,573 2,966,646 3,236,047 161,802,358 10,297 5,582,181 11,462,888 11,339,918 1,967,517 991,848 622,939 32,281,188 17,411,552 6,887,117 24,062,438 12,927,199 2,634,142 6,628,234 23,461,342 5,136,416
bh bh bh bh bh bh bh bh bh bh m' m' m' set bh bh ls ls m' bh set set bh bh bh set bh set bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,951,034 3,078,739 3,078,739 7,335,040 16,419,973 2,873,520 4,884,903 242,434 67,418 3,883,257 3,106,605 1,553,303 12,944 5,483 10,337 40,451 646,580 2,471,980 584,286 134,835 8,539,569 988,792
bh bh bh bh bh bh bh bh bh bh bh bh m' m' m' m' unit unit set bh set unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,146,157 5,842,863 2,247,255 11,865,506 314,616 314,616 1,797,804 1,078,682 1,438,243 1,078,682
set set set lot unit titik lot lot lot lot
Rp
20,629,801
unit
Bahan Elektikal - page 92 of 280
NO
URAIAN
HARGA SATUAN
2 3 4 5 6
Antena Parabola + Kabel Coaxial + Pekerjaan Sipil 8 CH HD Encoder 8 CH DVBS to IP Middleware & VoD Server c/w IPTV Application Multicast Switch 24G
Rp Rp Rp Rp Rp
9,352,176 64,720,943 36,405,531 242,703,537 16,503,841
unit unit unit unit unit
1 2 3 4 5
PEKERJAAN CCTV Dome Camera : 4MP IR Ball Camera Eyeball Fixed Lens IP Camera Bullet Camera : 4 MP Bullet Camera Rack CCTV UTP Cable Cat 6 in PVC HI Conduit 20 mm for CCTV, DATA, WIFI
Rp Rp Rp Rp Rp
7,595,115 7,595,115 7,928,223 3,591,833 1,221,985
bh bh bh unit titik
M.
N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PEKERJAAN DATA HUB Un Managable Path Panel 1 x 12 port Rp 2,137,948 bh HUB Un Managable Path Panel 1 x 24 port Rp 3,998,676 bh HUB Un Managable Path Panel 1 x 48 port Rp 8,551,794 bh Path Panel 1 x 12 port Rp 2,137,948 bh Path Panel 1 x 24 port Rp 3,591,833 bh Path Panel 1 x 32 port Rp 6,734,214 bh Path Panel 1 x 48 port Rp 7,183,665 bh Path Panel 1 x 64 port Rp 13,468,428 bh Data Outlet ( RG-45 ) Rp 54,873 bh Floor Outlet Data Rp 292,143 bh Set Top Box ICT Rp 1,123,627 bh Proyektor Rp 16,659,171 bh Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Rp 11,816,362 bh Fiber Optic 8 core Rp 80,901 m' Panel I/O Rp 2,509,965 unit SISTEM ICT EPON 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door Rp 20,764,663 unit Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories Rp 39,473,061 unit MMF - Patch Cord OM3, 3m Rp 214,307 pcs MMF - 12F MC DJ Trunk MPO Pol B 5M Rp 2,320,084 pcs Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Port to Rp PSU air flow 244,621,866 unit Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fans Rp 608,304,962 unit Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD, Rp 314,223,998 unit Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, 2 AC PSU Rp 30,120,771 unit 300W QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF Rp 54,608,296 unit SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF Rp 15,775,730 unit 1U Wiring Management Rp 234,371 unit NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB Rp 34,227,676 unit WLAN Controller Rp 154,526,041 unit UPS 10KVA Rp 44,900,154 unit UPS 2KVA Rp 4,611,367 unit 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door Rp 11,110,483 unit 19" Wallmounted Rack 15U Depth 600 mm Double Door Rp 3,775,415 unit Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories Rp 4,252,166 unit Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant Rp fans, front-to-back 75,482,645 airflow, unit 2 AC PSU Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, airflow, 2 AC Rpfront-to-back 39,725,424 unitPSU 300W UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager Rp 1,527,172 unit UTP Cat 6 Patchcord Blue 2m Rp 58,087 pcs UTP Cat 6 Patchcord Blue 3m Rp 74,186 pcs SISTEM ICT GPON Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Rp 20,629,801 unit POS ( Passive Optical Splitter) 2 :8 c/w accessories Rp 750,431 unit POS ( Passive Optical Splitter) 2 :16 c/w accessories Rp 1,500,861 unit Wiring Management 1U Rp 206,298 unit UTP Cat 6 Patch Panel 24 Port Loaded Rp 1,937,951 unit UTP Cat 6 Patch Cord, 3m Rp 50,011 set Optical Line Terminal ( OLT ) 4 PON Rp 63,311,483 unit Farm Switch 24 Gb, L3 Rp 28,257,326 unit Network Management System Rp 55,012,802 unit Router Fire Wall for Internet Rp 38,612,204 unit UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 175,628,370 unit UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 24,480,697 unit Grounding Sistem Rp 68,766,002 lot Sistem Pengkabelan Perangkat Utama Data Rp 8,090,118 lot A/P Controller license max 50 A/P Rp 223,515,387 lot Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Rp 3,271,073 unit Patch Panel F.O 12 Core Rp 1,694,628 pcs Patch Panel F.O 24 Core Rp 3,127,805 pcs Patch Cord F.O SC to LC, 3 meter Rp 133,681 pcs Patch Panel UTP 24 Port, Cat 6 Loaded Rp 1,937,951 unit Patch Cord UTP Cat 6, 1 meter Rp 50,011 pcs ONU 24G PoE Rp 7,467,988 unit ONU 48G PoE Rp 14,935,976 unit POS ( Passive Optical Splitter) 1:4 c/w accessories Rp 464,793 unit POS ( Passive Optical Splitter) 2:4 c/w accessories Rp 929,555 unit Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Rp 34,324 m Terminasi Kabel FO Rp 137,532 lot Kabel FO 12 Core, SM, Outdoor Rp 129,139 m Bahan Elektikal - page 93 of 280
NO
URAIAN
HARGA SATUAN
1 2 3 4 5 6
INSTALASI ICT EPON & GPON MMF - 12core OM3 SLT STA in PVC HI Conduit Seting and Configure Core, Router, Firewall & Access Switch. Seting and Configure Wireless Access Point Seting and Configure IP CCTV Documentation SISTEM ICT PON Distribution Switch 16 Port SFP+ Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. Transceiver, SFP+, 1GbE, LR, SMF Third Party Support AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit Patch Panel Category 6 SL Kapasitas24 Port 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) BS Shuttered Faceplate - 2 Port BS Shuttered Faceplate - 1 Port 19"Wallmounted 12 RU Double door Optic Terminal Box 8 Port Patch Cords SM SC-LC Duplex INSTALASI ICT PON Instalasi Rack Instalasi ,Penarikan Kabel Wifi Instalasi ,Penarikan Kabel Data Instalasi ,Penarikan HRVGA Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses FO SM 4 Core (Vertical Cabling System) Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses FO SM 24 Core
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PEKERJAAN FIRE ALARM MDFA (60 x 80 x 20) Rp 4,805,530 unit Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels require a 24 VdcRp supply. 24 42,722,192 Vdc supply and unit an RS485 Module for Pressurized Fan (Kontrol) Rp 1,177,112 unit Module for AC Rp 1,177,112 unit Leicense Key Rp 7,573,642 unit Module for PABX (Autodial) Rp 1,177,112 unit Module for Sound System Rp 1,177,112 unit Module for Genset Panel Rp 1,177,112 unit Isolated USB Upload/Download Lead Rp 7,244,701 unit PANEL DXc1-S SINGLE LOOP REGION 2 Rp 42,115,051 unit Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) Rp 56,563,293 unit Panel Dxc4-M Four Loop Region 5 Rp 106,678,975 unit Battery 12 V 17 AH Rp 1,922,212 unit Terminal Box Fire Rp 1,213,518 unit Av Phase Ii S/Strobe Non Iso Rp 4,621,921 bh Rate Of Rise Heat Detector Rp 1,124,238 bh Fixed Temperature Heat Detector Rp 1,124,238 bh Breakglass Call point w/phone jack Rp 624,521 bh Optical Smoke Detector Rp 1,174,226 bh End of Line Rp 26,697 m' Mias 200 Series Advance Base Rp 161,942 bh Isolator Module Rp 673,907 bh Reflektor Rp 1,419,816 bh TBFA Rp 1,922,212 unit Manual Call Point Backbox Rp 159,896 unit Outside Screw & Yoke Supervisory Switch W/2 Spdt. Rp 3,885,009 bh Waterflow Detector 2.5" Rp 3,422,701 bh Conventional Zone Module, Mias, In. For Integrasi and M400K/t Rp 3,397,872 unit Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Rp 2,148,664 unit Output Module, Mias, In. For Integrasi Rp 2,348,451 unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PEKERJAAN TELEPHONE PABX 16 Line / 160 Extention PABX 8 Line / 80 Extention PABX 2 Line / 12 Extension MDF 160 Pairs MDF 80 Pairs Pesawat Telephone Single Line Faximile Socket Telephone Floor Socket Telephone HANDSET TELEPON (SIP) / TB 10 Pair HANDSET TELEPON (SIP) / TB 20 Pair HANDSET TELEPON (SIP) / TB 30 Pair Kabel ITC 2 x 2 x 2 x 0,6 mm2 Kabel ITC 10 x 2 x 2 x 0,6 mm2 Kabel ITC 20 x 2 x 2 x 0,6 mm2
1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
O.
P.
Rp Rp Rp Rp Rp
81,530 299,818,421 268,322,244 6,741,765 4,494,510
m lot lot lot lot
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
248,224,809 11,865,506 3,415,828 119,050,580 67,831,144 75,148,206 51,417,194 2,516,926 2,121,409 20,010,997 539,341 1,621,619 93,486 70,474 49,619 47,462 3,768,197 1,294,419 226,523
unit unit unit unit unit unit unit unit unit unit unit unit pcs pcs pcs pcs unit unit unit
Rp Rp Rp Rp Rp Rp
158,566 738,718 738,718 738,718 50,698 50,698
unit titik titik titik m m
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
215,511,752 121,540,538 7,066,269 3,591,833 1,909,717 674,176 1,512,852 1,221,985 369,880 1,444,086 2,888,172 4,332,258 4,315 23,731 32,360
unit unit unit bh bh bh bh unit bh unit unit unit m' m' m'
Bahan Elektikal - page 94 of 280
NO
URAIAN
16 17 18 18 19
20 21 22
23 24
25 26 27 28 29 Q. 1
2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Kabel ITC 30 x 2 x 2 x 0,6 mm2 Kabel ITC 80 x 2 x 2 x 0,6 mm2 IP PHONE SERIES SENTRAL UNIT PABX SIP PBX 20/200 PABX 6 Co line/100 Ext - Starter Package System Unit, 12 CO Lines + 36 (6 D+30 SLT) Extensions - 1 unit eMG800-MPB - 200 ports System License - 1 unit eMG800-BKSU - 30 ports IP Extension License - 1 unit eMG800-PSU - 5 copies UCS Std Desktop License - 1 unit eMG800-LCOB12 - 5 copies UCS Mobile License - 1 unit eMG800-SLIB24 24 ports Single Line Interface Board Proffesional Digital Proprietary Phone Single Line Telephone with CID (white grey/black) - CID Type 1 & DTMF • LCD Display - Monitoring (On Hook Dial) - Storage incoming call(199) 19” Rack Mounting Bracket(Option) Terminal Box PABX 1 Set : - Terminal Box 200 Pair 1 buah - Terminal LSA Highband 2 Dus ( 20 buah) - Breket LSA 11 way 4 bua Instalasi Telephone Setting Programing Commisioning Documentation
HARGA SATUAN Rp Rp Rp
44,226 96,003 2,842,688
m' m' unit
Rp Rp
412,596,013 53,295,899
lot set
Rp Rp Rp
13,526,677 5,208,957 866,182
unit unit unit
Rp Rp
8,539,569 1,752,859
unit set
Rp Rp Rp Rp Rp
138,227 2,516,926 3,272,003 3,595,608 1,078,682
titik lot lot lot lot
BUILDING AUTOMATION SYSTEM (BAS) Data Center Web Controller 12 IO Rp 66,855,836 unit RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB Controller with 4 DALI Interface Gateway Modbus OR BACnet Fast Ethernet: 2 x 10/100 BaseT (RJ45) Web Controller Onboard Ios DI8DO12 & AI8AO4 Rp 26,742,334 unit RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB Controller with 4 DALI Interface Gateway Modbus OR BACnet Fast Ethernet: 2 x 10/100 BaseT (RJ45) Capacitive Monitor Touch Screen minimum 10" Rp 23,304,034 unit LCD Display Nurse Station Operating Management Rp 6,112,534 unit - 32" complete with Mini PC for Control & monitoring AHU, Temperature, Humidity Sensor, Pressure,Stopwatch & Digital Clock Software Management : OPENweb basic Rp 114,610,004 lot package for up to 1000 physical data points, 250 Modbus data points and 500 BACnet Objects Hospital Automation System (HAS) Rp 20,629,801 unit '- Capacitive Monitor Touch Screen minimum 21,5" complete with Mini PC, for Control & monitoring AHU, Temperature, Humidity Sensor, Pressure, Stop BAS Main PC Core i7, 52" Display Rp 30,562,668 unit IO Module DI8DO8T CPU : ARM7 Architecture Rp 9,168,800 unit IO Module DI16 CPU : ARM7 Architecture Rp 6,876,600 unit IO Module AI8AO4 CPU : ARM7 Architecture Rp 12,225,067 unit IO Module AO4 CPU : ARM7 Architecture Rp 6,494,567 unit Bridge bus connector Rp 114,610 unit Coupler module integrated bus terminating resistor Rp 1,031,490 unit Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Rp 764,067 pcs Instalation, Cable Cat6 to LAN Rp 668,558 ttk Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Rp 4,966,433 unit Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Rp 687,660 ttk Installation, cable STP 18 AWG for data communication between panel Rp 764,067 ttk Installation, cable STP 18 AWG Modbus for CO2 Transmitter Rp 534,847 ttk Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Rp 649,457 ttk Installation, cable NYM 3 x 1,5mm for power supply Rp 496,643 ttk Installation, Cable ITC 2 x 0.6mm for analog and digital point Rp 573,050 ttk Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift & Generator Rp Set 649,457 ttk Battery starting genset sensor voltage Rp 1,107,897 pcs Duct Temperature Sensor Rp 458,440 pcs Differential Pressure Transmitter Rp 1,910,167 pcs System Integration with AC System (BACNet) Rp 6,494,567 pcs System integration with Fire Alarm (ModBus) Rp 6,494,567 unit Differential Pressure Switch Rp 955,083 unit Mini Inverter to Control Exhaust Fan (Tangga Darurat) Rp 955,083 unit Temperature Sensor PT 1000 Rp 1,795,557 unit Room Temperature Sensor & Humidity Sensor Rp 1,604,540 unit Pipe Temperature Rp 534,847 unit Static Pressure Transmitter Rp 1,031,490 unit Outside Temperature & Humidity Rp 1,528,133 unit Control 0-100% Exhaust Fan Rp 573,050 unit Slim Relay Rp 152,813 unit Damper Modulating 10Nm Rp 1,528,133 unit Damper Konstan 10Nm Rp 1,222,507 unit Outdoor Temperature (PT1000) Rp 1,795,557 pcs Bahan Elektikal - page 95 of 280
NO
URAIAN
41 42 43 44 45 46 47
HARGA SATUAN
Outdoor Humidity Sensor Rp Fuel Level Sensor Genset Rp Motion Sensor Rp Water Level Transmitter Rp Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Rp Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Rp Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Rp
981,826 2,215,793 687,660 2,865,250 2,903,453 2,941,657 2,139,387
pcs pcs pcs unit unit unit unit
Rp
44,697,901
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
878,677 1,069,693 955,083 1,146,100 1,222,507 1,528,133 458,440 916,880 687,660 880,205 782,404 3,820,333 3,224,361
unit unit unit unit unit unit ttk unit unit unit unit unit unit
Rp Rp
35,956,080 8,989,020
lot lot
62 63
DALI Interface Web Controller DALI RAM memory: 128 MB, NV-RAM battery buffered: 2 MB Fast Ethernet: 2 x 10/100 BaseT (RJ45) Controller with 4 DALI Interface On/Off Module DALI to control lighting 1 channel Touch Screen Glass On/Off DALI 1 Group On/Off Module DALI to control lighting 2 channel Touch Screen Glass On/Off DALI 2 Group On/Off Module DALI to control lighting 6 channel Touch Screen Glass On/Off DALI 6 Group Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Dimmable Module DALI to control lighting 1 channel Touch Screen Glass Dimmable DALI 1 Group Dimmable Module DALI to control lighting 2 channel Touch Screen Glass Dimmable DALI 2 Group RGB Module DALI to control lighting 6 channel Saklar LCD control RGB DALI 6 group Testing Comissioning dan Training Testing and Commissioning Training operator 2 person 2 days
1 2 3 4 5 6 7 8 40 41 42 43 44 45 46 47
INFRASTRUCTURE ICT Data Center : Patchpanel UTP Cat6 24 port Loaded Patchpanel UTP Cat6 48 port Loaded Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT Core Switch Layer 3 Core Firewall + Router + IPS Hdd PC WD CCTV PURPLE 4TB IPPABX Headend Support Up to 400 Lines IPPABX Headend Support Up to 200 Lines Monitor 40" + Bracket Monitor 32"+ PC for System IPTV Management System ( Server + Software ) IPTV Headend Patch Cord 1 mtr Cat6 UTP OTB (Optical Terminal Box) UTP Cat 6 dalam conduit Access Point (Wi-Fi)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,221,665 6,443,329 781,757 289,446,441 341,582,756 1,589,101 289,356,551 144,678,275 5,982,642 26,612,443 332,234,176 159,824,774 130,341 2,182,714 786,539 5,707,578
unit unit unit unit unit unit unit unit unit unit unit unit unit unit m' bh
1 2 3 4 5 6 7
PEKERJAAN SOLAR PANEL JSKYE 200 Wp Solar Panel SMA Sunny Boy 1.5kW SMA Sunny Island 4.4 NS VRLA 12v 100 Ah Panel Combiner Box Cabling & accs Solar Mounting
Rp Rp Rp Rp Rp Rp Rp
1,618,024 13,483,530 43,147,296 2,516,926 9,887,922 4,943,961 4,045,059
bh bh bh bh set lot set
48
49 50 51 52 53 54 55 56 57 58 59 60 61
R
S.
Bahan Elektikal - page 96 of 280
NO
URAIAN 8 9
10 11 12 13 14
15 16
T. 1
2 3 4 5 6 7 8 9 10 11 12 U. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 V. 1
Battery Rack & Accs Inverter Hybrid san Solar Panel Charge Controller - Hybrid Inverter - Perlengkapan Proteksi - Box Panel Sistribusi - Grounding System Solar Cable 6mm2 MC4 Connector Female MC4 Connector Male Cable Trenching Prewiring and Components - Cable Tray 100x50 + Cover + Accessories - Cable Conduit Metal 3/4 '' @1roll 50m - HDPE Pipe 2" - Conduit Pipe 2" - Schoen Cable Grounding System Instalasi & Test Commisioning - Pekerjaan Pondasi & Pemasangan Bracket - Set Up Solar Panel System - Test & Commisioning PEKERJAAN MASTER CLOCK NTP Time Server Master Clock - NTP V4 (fully V3 compatible), RFC 1305 (port 123) - ax. number of NTP and SNTP requests per second: typically 250 - 10BaseT / 100BaseTX (IEEE 802.3) - Operation via LAN: Telnet or SSH, web interface or operation via SNMP - Synchronized with GPS ± 10 µs to UTC - GPS (DCF input) to NTP server typically < ± 0.5 m - Power Supply AC input: 100 - 240 VAC / 50-60 Hz / max. 12 W GPS Antenna Receiver Converter Teak Wood Clock Installation Slave Clock NTP to Signal Time Covert Module Junction Box Master Clock (SERVER) Analog Clock Lingkaran Dia.500mm,HH:MM Analog Clock Lingkaran Dia.400mm,HH:MM Junction Box Master Clock TESTING & COMMISSIONING AND TRANING Testing and Commissioning Training operator 5 person 1 days
HARGA SATUAN Rp Rp
16,180,236 49,439,609
lot lot
Rp Rp Rp Rp Rp
49,080 6,427 6,427 67,418 30,738,178
m pcs pcs m set
Rp Rp
24,270,354 26,967,060
set lot
Rp
30,337,942
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp
19,011,777 7,968,766 13,348,695 404,506 8,090,118 485,407 5,663,083 10,395,802 485,407
unit unit unit titik unit unit unit unit unit
Rp Rp
22,472,550 8,989,020
lot lot
98,843,263 5,142,079 93,270,071 53,362,418 26,967,060 3,192,900 5,393,412 1,605,511 1,042,726 2,381,731 10,621,426 1,488,582 2,283,211 21,556,892 3,595,608 2,168,152
set set set set set set bh bh bh bh bh bh bh bh bh bh
809,012 5,393,412 35,956,080 12,584,628 5,393,412 809,012 539,341 3,595,608
ls ls ls ls ls titik titik titik
2,049,497 71,682,040 35,841,020 25,600,729 20,480,583 20,494,965 16,216,192 15,360,437 10,240,291
unit unit unit unit unit unit unit unit unit
PEKERJAAN NURSE CALL Ruang Kontrol Master Controller IP-Ark 1 + Data Report License Rp Desktop Touch Screen Nurse Station 18" Rp Event Management Module Rack + Interface License Rp IntelPage IP Paging Module Rack + Dipole Antenna Rp Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS Rp IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] Rp PSU 24 VDC Rp Over Bed Indicator Led Single Color Rp Patient Call Pendant, Momentary Action, Green Button, 2m Rp IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] Rp IP Net Room Controller Rp Flashing Over Door Light, 1 LED, Red, British Plate Rp IP Over Door Lamp 4 RGB Programmable Rp IP Corridor Digital Display, 12 Characters, 50mm Rp Panel Elektrikal lengkap dengan aksesorisnya Rp IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] Rp INSTALASI Rp Instalasi UTP Data Cable CAT5e dalam conduit PVC HI 20 mm Rp Instalasi Central AC Power 3x2.5mm & DC Power 2x1.5mm Rp Instalasi Aksesoris Konektor, Plug, dan pendukung lain Rp Programming & Testing Commissioning Rp Training User & Maintenance (1x) Rp Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm Rp Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm Rp Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm PEKERJAAN BED HEAD (SINGLE UNIT) Bedhead Panel Medical Service (Material : Aluminum Extruded Powdercoat Finished ) Dimensi : 1200mm x 220mm x 80mm Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients]
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Bahan Elektikal - page 97 of 280
NO
URAIAN Dimensi Dimensi Dimensi Dimensi Dimensi 2 3 4 5 6 7 8 9 9
: : : : :
7100mm 6000mm 5900mm 5700mm 4700mm
x x x x x
220mm 220mm 220mm 220mm 220mm
x x x x x
80mm 80mm 80mm 80mm 80mm
[3 [2 [2 [2 [2
Bed Bed Bed Bed Bed
Patients] Patients] Patients] Patients] Patients]
Accessories : 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 x Universal Socket 16A 250V - Vivase Schneider 1 x Single Switch 16A 250V - Vivase Schneider 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 x Patient Name Tag Provision Access for Medical Gas Outlet Provision Access for Nurse Call Outlet Pengadaan Bedhead Panel Service Wall to Wall Biaya Instalasi Bedhead Panel Medical Service
HARGA SATUAN Rp Rp Rp Rp Rp
12,800,364 10,240,291 10,240,291 9,728,277 8,535,973
unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp
167,196 81,620 100,677 57,889 224,725 26,967 8,989 8,989
bh bh bh bh bh bh ttk ttk
Rp
202,253
unit
Bahan Elektikal - page 98 of 280
ANALISA HARGA SATUAN ELEKTRIKAL PEKERJAAN PERENCANA URAIAN
NO. 1 M' 1 2 3 4
Kabel TM N2XSY 3 x ( 1 x 50 mm2) Kabel N2XSY 1 x 50 mm2 Galian, urugan & pelindung kabel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (1 x 120 mm2) + Grounding Kabel N2XSY 1 x 120 mm2 Galian, urugan & pelindung kabel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (4 X 300) mm2 + Grounding Kabel N2XSY 1 x 300 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding Kabel N2XSEbY 3 x 120 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSEbY 7 x (4 x 300) mm2 + Grounding Kabel N2XSEbY 3 x 240 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (1 x 120) mm2 + Grounding Kabel N2XSY 1 x 120 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR NYM 3 x 2,5 mm2 + Grounding Kabel NYM 3 x 2,5 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR NYMHY 3 x 2,5 mm2 + Grounding KABEL TR NYMHY 3 x 2,5 mm2 + Grounding Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x 50 mm2 + Grounding Kabel NYY 3 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x 35 mm2 + Grounding Kabel NYY 3 x 35 mm2 Kabel NYA 1 x 16 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
12.00 Rp 12.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
7.00 Rp 7.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
HARGA SATUAN
115,059 118,655 6,904
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 242,704 118,655 14,562
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 563,162 187,421 135,159
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 877,328 187,421 21,295
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,577,573 187,421 247,099
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 242,704 187,421 25,807
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 11,686 1,951 273
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,180 1,951 363
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 245,400 40,900 5,726
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 203,691 26,518 4,604 85,000 80,000 Jumlah Keuntungan 2,5%
JUMLAH HARGA
Rp Rp Rp
345,178 355,965 6,904
Rp Rp Rp Rp Rp
7,083 13,333 728,464 18,212 746,675
Rp Rp Rp
728,111 355,965 14,562
Rp Rp Rp Rp Rp
7,083 13,333 1,119,055 27,976 1,147,031
Rp Rp Rp
6,757,945 2,249,053 135,159
Rp Rp Rp Rp Rp
7,083 13,333 9,162,574 229,064 9,391,638
Rp Rp Rp
877,328 187,421 21,295
Rp Rp Rp Rp Rp
7,083 13,333 1,106,461 27,662 1,134,123
Rp Rp Rp
11,043,011 1,311,947 247,099
Rp Rp Rp Rp Rp
7,083 13,333 12,622,474 315,562 12,938,036
Rp Rp Rp
728,111 562,263 25,807
Rp Rp Rp Rp Rp
7,083 13,333 1,336,598 33,415 1,370,013
Rp Rp Rp
11,686 1,951 273
Rp Rp Rp Rp Rp
5,667 10,667 30,242 756 30,998
Rp Rp Rp
16,180 1,951 363
Rp Rp Rp Rp Rp
5,667 10,667 34,827 871 35,697
Rp Rp Rp
245,400 40,900 5,726
Rp Rp Rp Rp Rp
1,771 3,333 297,130 7,428 304,559
Rp Rp Rp
203,691 26,518 4,604
Rp Rp Rp Rp
1,771 3,333 239,917 5,998
TOTAL HARGA Rp
746,675
Rp
1,147,031
Rp
9,391,638
Rp
1,134,123
Rp
12,938,036
Rp
1,370,013
Rp
30,998
Rp
35,697
Rp
304,559
Rp
245,915
Analisa Harga Satuan Elektrikal - page 99 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Total = Jumlah+(Keuntungan 2,5%) Rp 1 M' 1 2 3 4
KABEL TR, NYY 3 x 10 mm2 + Grounding Kabel NYY 3 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 4 mm2 + Grounding Kabel NYY 4 x 4 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 6 mm2 + Grounding Kabel NYY 4x6 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 10 mm2 + Grounding Kabel NYY 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 (4 x 10 mm2 ) + Grounding Kabel NYY 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 16 mm2 + Grounding Kabel NYY 4 x 16 mm2 Kabel NYA 1 x 10 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 25 mm2 + Grounding Kabel NYY 4 x 25 mm2 Kabel NYA 1 x 10 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 35 mm2 + Grounding Kabel NYY 4 x 35 mm2 Kabel NYA 1 x 16 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 50 mm2 + Grounding Kabel NYY 4 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 70 mm2 + Grounding Kabel NYY 4 x 70 mm2 Kabel NYA 1 x 35 mm2 Instalasi Tenaga Kerja :
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
2.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
71,984 7,506 1,590
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,563 1,951 650
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 41,349 1,951 866
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 65,620 7,506 1,463
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 65,620 7,506 2,775
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 115,059 12,585 2,553
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 177,533 12,585 3,802
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 241,805 26,518 5,366
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 321,357 40,900 7,245
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 455,743 56,181 10,238
TOTAL HARGA
245,915
Rp Rp Rp
71,984 7,506 1,590
Rp Rp Rp Rp Rp
1,771 3,333 86,184 2,155 88,338
Rp Rp Rp
30,563 1,951 650
Rp Rp Rp Rp Rp
1,771 3,333 38,268 957 39,224
Rp Rp Rp
41,349 1,951 866
Rp Rp Rp Rp Rp
1,771 3,333 49,270 1,232 50,502
Rp Rp Rp
65,620 7,506 1,463
Rp Rp Rp Rp Rp
1,771 3,333 79,692 1,992 81,685
Rp Rp Rp
131,240 7,506 2,775
Rp Rp Rp Rp Rp
1,771 3,333 146,625 3,666 150,290
Rp Rp Rp
115,059 12,585 2,553
Rp Rp Rp Rp Rp
1,771 3,333 135,301 3,383 138,684
Rp Rp Rp
177,533 12,585 3,802
Rp Rp Rp Rp Rp
1,771 3,333 199,024 4,976 204,000
Rp Rp Rp
241,805 26,518 5,366
Rp Rp Rp Rp Rp
1,771 3,333 278,793 6,970 285,763
Rp Rp Rp
321,357 40,900 7,245
Rp Rp Rp Rp Rp
1,771 3,333 374,607 9,365 383,972
Rp Rp Rp
455,743 56,181 10,238
Rp
88,338
Rp
39,224
Rp
50,502
Rp
81,685
Rp
150,290
Rp
138,684
Rp
204,000
Rp
285,763
Rp
383,972
Rp
540,449
Analisa Harga Satuan Elektrikal - page 100 of 280
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
SAT
INDEK
hari orang hari orang
0.02 Rp 0.04 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
HARGA SATUAN
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 M' 1 2 3 4
KABEL TR, NYY 4 x 95 mm2 + Grounding Kabel NYY 4 x 95 mm2 Kabel NYA 1 x 50 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 120 mm2 + Grounding Kabel NYY 4 x 120 mm2 Kabel NYA 1 x 70 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 150 mm2 + Grounding Kabel NYY 4 x 150 mm2 Kabel NYA 1 x 70 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 185 mm2 + Grounding Kabel NYY 4x185 mm2 Kabel NYA 1 x 95 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 240 mm2 + Grounding Kabel NYY 4 x 240 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 300 mm2 + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x (4 x 150 mm2) + Grounding Kabel NYY 4 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x (4 x 300 mm2) + Grounding Kabel NYY 4 x 300 mm3 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x (4 x 300 mm2) + Grounding Kabel NYY 4 x 300 mm3 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
1 M' 1 2
KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding Kabel NYY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding)
M' M'
4.00 Rp 4.00 Rp
627,883 75,058 14,059
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 790,135 107,868 17,960
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 972,163 107,868 21,601
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,211,270 149,218 27,210
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,599,147 187,421 35,731
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,995,113 187,421 43,651
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 972,163 187,421 46,383
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,995,113 187,421 87,301
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,995,113 187,421 174,603
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 295,289 187,421
JUMLAH HARGA Rp Rp Rp Rp Rp
1,771 3,333 527,267 13,182 540,449
Rp Rp Rp
627,883 75,058 14,059
Rp Rp Rp Rp Rp
2,125 4,000 723,125 18,078 741,203
Rp Rp Rp
790,135 107,868 17,960
Rp Rp Rp Rp Rp
2,125 4,000 922,088 23,052 945,140
Rp Rp Rp
972,163 107,868 21,601
Rp Rp Rp Rp Rp
2,125 4,000 1,107,756 27,694 1,135,450
Rp Rp Rp
1,211,270 149,218 27,210
Rp Rp Rp Rp Rp
2,125 4,000 1,393,823 34,846 1,428,668
Rp Rp Rp
1,599,147 187,421 35,731
Rp Rp Rp Rp Rp
2,125 4,000 1,828,424 45,711 1,874,135
Rp Rp Rp
1,995,113 187,421 43,651
Rp Rp Rp Rp Rp
2,125 4,000 2,232,310 55,808 2,288,117
Rp Rp Rp
1,944,325 374,842 46,383
Rp Rp Rp Rp Rp
2,125 4,000 2,371,675 59,292 2,430,967
Rp Rp Rp
3,990,226 374,842 87,301
Rp Rp Rp Rp Rp
2,125 4,000 4,458,494 111,462 4,569,957
Rp Rp Rp
7,980,452 749,684 174,603
Rp Rp Rp Rp Rp
2,125 4,000 8,910,864 222,772 9,133,635
Rp Rp
1,181,157 749,684
TOTAL HARGA
Rp
741,203
Rp
945,140
Rp
1,135,450
Rp
1,428,668
Rp
1,874,135
Rp
2,288,117
Rp
2,430,967
Rp
4,569,957
Rp
9,133,635
Rp
2,024,973
Analisa Harga Satuan Elektrikal - page 101 of 280
URAIAN
NO. 3 4
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding Kabel NYY 1 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding Kabel NYY 1 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding Kabel NYY 1 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 16 x (1 x 240) mm2 + Grounding Kabel NYY 1 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x 4 ( 1 X 300 mm2 ) + Grounding Kabel NYY 1 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 ( 1 X 300 mm2 ) + Grounding Kabel NYY 1 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x ( 3 x 300 mm2 ) + Grounding Kabel NYY 3 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR FRC 3 x 4 mm2 + Grounding Kabel FRC 3 x 4 mm2 Kabel NYA 1 x 10 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR FRC 2 x 2,5 mm2 + Grounding KABEL TR FRC 2 x 2,5 mm2 + Grounding Kabel NYA 1 x 10 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1
KABEL TR, NYFGbY 2 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2
SAT
INDEK
lot
1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
12.00 Rp 12.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
16.00 Rp 16.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
12.00 Rp 12.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M'
2.00 Rp
HARGA SATUAN 38,617
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 786,090 187,421 155,762
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 786,090 187,421 233,643
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 384,281 187,421 45,736
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 384,281 187,421 182,945
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 484,508 187,421 161,263
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 484,508 187,421 107,509
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,995,113 187,421 174,603
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 44,046 12,585 1,133
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,180 12,585 575
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,032,867
JUMLAH HARGA Rp
38,617
Rp Rp Rp Rp Rp
2,125 4,000 1,975,583 49,390 2,024,973
Rp Rp Rp
6,288,718 1,499,369 155,762
Rp Rp Rp Rp Rp
2,125 4,000 7,949,974 198,749 8,148,723
Rp Rp Rp
9,433,077 2,249,053 233,643
Rp Rp Rp Rp Rp
2,125 4,000 11,921,898 298,047 12,219,945
Rp Rp Rp
1,537,122 749,684 45,736
Rp Rp Rp Rp Rp
2,125 4,000 2,338,668 58,467 2,397,134
Rp Rp Rp
6,148,490 2,998,737 182,945
Rp Rp Rp Rp Rp
2,125 4,000 9,336,296 233,407 9,569,704
Rp Rp Rp
5,814,098 2,249,053 161,263
Rp Rp Rp Rp Rp
2,125 4,000 8,230,539 205,763 8,436,302
Rp Rp Rp
3,876,065 1,499,369 107,509
Rp Rp Rp Rp Rp
2,125 4,000 5,489,068 137,227 5,626,294
Rp Rp Rp
7,980,452 749,684 174,603
Rp Rp Rp Rp Rp
2,125 4,000 8,910,864 222,772 9,133,635
Rp Rp Rp
44,046 12,585 1,133
Rp Rp Rp Rp Rp
1,417 2,667 61,847 1,546 63,393
Rp Rp Rp
16,180 12,585 575
Rp Rp Rp Rp Rp
1,417 2,667 33,423 836 34,259
Rp
4,065,734
TOTAL HARGA
Rp
8,148,723
Rp
12,219,945
Rp
2,397,134
Rp
9,569,704
Rp
8,436,302
Rp
5,626,294
Rp
9,133,635
Rp
63,393
Rp
34,259
Rp
4,890,050
Analisa Harga Satuan Elektrikal - page 102 of 280
URAIAN
NO. 2 3 4 5
Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
M' lot M'
2.00 Rp 1.00 Rp 2.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
187,421 88,812 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 7 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 (Grounding) M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 300 mm2 + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x (4 X 300 mm2 ) + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 6 x (4 X 300 mm2 ) + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 (1 x 185) mm2 + Grounding Kabel NYY 1 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x ( 1 X 150 mm2 ) + Grounding Kabel NYFGbY 4 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
7.00 7.00 1.00 7.00
Rp Rp Rp Rp
2,032,867 187,421 310,840 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
4.00 4.00 1.00 4.00
hari orang hari orang
Rp Rp Rp Rp
2,032,867 187,421 177,623 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
6.00 Rp 6.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
2,032,867 187,421 44,406 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,995,113 187,421 130,952
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,995,113 187,421 261,904
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 295,289 187,421 77,234
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
4.00 4.00 1.00 4.00
hari orang hari orang
Rp Rp Rp Rp
1,006,321 187,421 95,499 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x ( 4 X 150 mm2 ) + Grounding Kabel NYFGbY 4 x 150 mm2 M' Kabel NYA 1 x 120 mm2 (Grounding) M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M'
KABEL TR, NYFGbY 4 x 185 mm2 + Grounding
0.02 Rp 0.03 Rp
2.00 2.00 1.00 2.00
Rp Rp Rp Rp
0.02 Rp 0.03 Rp
1,006,321 187,421 47,750 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp
374,842 88,812 237,310
Rp Rp Rp Rp Rp
1,417 2,667 4,770,781 119,270 4,890,050
Rp Rp Rp Rp
14,230,068 1,311,947 310,840 830,585
Rp Rp Rp Rp Rp
1,417 2,667 16,687,524 417,188 17,104,713
Rp Rp Rp Rp
8,131,467 749,684 177,623 474,620
Rp Rp Rp Rp Rp
1,417 2,667 9,537,478 238,437 9,775,915
Rp Rp Rp Rp
2,032,867 187,421 44,406 118,655
Rp Rp Rp Rp Rp
1,417 2,667 2,387,432 59,686 2,447,118
Rp Rp Rp
5,985,339 562,263 130,952
Rp Rp Rp Rp Rp
1,417 2,667 6,682,637 167,066 6,849,703
Rp Rp Rp
11,970,678 1,124,526 261,904
Rp Rp Rp Rp Rp
1,417 2,667 13,361,192 334,030 13,695,221
Rp Rp Rp
2,362,314 1,499,369 77,234
Rp Rp Rp Rp Rp
1,417 2,667 3,943,000 98,575 4,041,575
Rp Rp Rp Rp
4,025,283 749,684 95,499 474,620
Rp Rp Rp Rp Rp
1,417 2,667 5,349,170 133,729 5,482,900
Rp Rp Rp Rp
2,012,642 374,842 47,750 237,310
Rp Rp Rp Rp Rp
1,417 2,667 2,676,627 66,916 2,743,542
TOTAL HARGA
Rp
17,104,713
Rp
9,775,915
Rp
2,447,118
Rp
6,849,703
Rp
13,695,221
Rp
4,041,575
Rp
5,482,900
Rp
2,743,542
Rp
1,627,141
Analisa Harga Satuan Elektrikal - page 103 of 280
URAIAN
NO. 1 2 3 4 5
Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x (4 x 185 mm2) + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 3 x (4 x 185 mm2) + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 240 mm2 + Grounding Kabel NYFGbY 4 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGby 3 x (4 x 300 mm2) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 x (1 X 240 mm2) + Grounding Kabel FRC 4 x 240 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 2 x (4 X 300 mm2) + Grounding Kabel FRC 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 x (1 x 185 mm2) + Grounding Kabel FRC 1 x 185 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 2 x 4 X 150 mm2 + Grounding Kabel FRC 4 x 150 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 150 mm2 + Grounding Kabel FRC 4 x 150 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja :
SAT
INDEK
M' M' lot M'
1.00 1.00 1.00 1.00
hari orang hari orang
HARGA SATUAN Rp Rp Rp Rp
1,248,575 187,421 28,720 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
2.00 2.00 1.00 2.00
hari orang hari orang
Rp Rp Rp Rp
1,248,575 187,421 57,440 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
3.00 3.00 1.00 3.00
hari orang hari orang
Rp Rp Rp Rp
1,248,575 187,421 86,160 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
1,633,305 187,421 36,415 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.02 Rp 0.03 Rp
3.00 3.00 1.00 3.00
Rp Rp Rp Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot
4.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
2,032,867 187,421 133,217 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,002,684 187,421 23,802
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,102,953 187,421 51,615
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 320,009 187,421 29,349
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 833,282 187,421 40,828
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 833,282 187,421 20,414
JUMLAH HARGA Rp Rp Rp Rp
1,248,575 187,421 28,720 118,655
Rp Rp Rp Rp Rp
1,417 2,667 1,587,454 39,686 1,627,141
Rp Rp Rp Rp
2,497,150 374,842 57,440 237,310
Rp Rp Rp Rp Rp
1,417 2,667 3,170,825 79,271 3,250,096
Rp Rp Rp Rp
3,745,725 562,263 86,160 355,965
Rp Rp Rp Rp Rp
1,417 2,667 4,754,196 118,855 4,873,051
Rp Rp Rp Rp
1,633,305 187,421 36,415 118,655
Rp Rp Rp Rp Rp
1,417 2,667 1,979,879 49,497 2,029,376
Rp Rp Rp Rp
6,098,601 562,263 133,217 355,965
Rp Rp Rp Rp Rp
1,417 2,667 7,154,130 178,853 7,332,983
Rp Rp Rp
1,002,684 187,421 23,802
Rp Rp Rp Rp Rp
1,417 2,667 1,217,991 30,450 1,248,441
Rp Rp Rp
2,205,905 374,842 51,615
Rp Rp Rp Rp Rp
1,417 2,667 2,636,446 65,911 2,702,357
Rp Rp Rp
1,280,036 187,421 29,349
Rp Rp Rp Rp Rp
2,125 4,000 1,502,932 37,573 1,540,505
Rp Rp Rp
1,666,564 374,842 40,828
Rp Rp Rp Rp Rp
3,542 6,667 2,092,443 52,311 2,144,754
Rp Rp Rp
833,282 187,421 20,414
TOTAL HARGA
Rp
3,250,096
Rp
4,873,051
Rp
2,029,376
Rp
7,332,983
Rp
1,248,441
Rp
2,702,357
Rp
1,540,505
Rp
2,144,754
Rp
1,077,609
Analisa Harga Satuan Elektrikal - page 104 of 280
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 70 mm2 + Grounding Kabel FRC 4 x 70 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 50 mm2 + Grounding Kabel FRC 4 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 35 mm2 + Grounding Kabel FRC 4 x 35 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 16 mm2 + Grounding Kabel FRC 4 x 16 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 10 mm2 + Grounding Kabel FRC 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 6 mm2 + Grounding Kabel NYFGbY 4 x 6 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
hari orang hari orang
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
529,993 40,900 11,418
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 383,831 40,900 8,495
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 221,130 40,900 5,241
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 153,353 40,900 3,885
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 306,256 40,900 6,943
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
58,968 7,506 1,329 118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 4 mm2 + Grounding Kabel NYFGbY 4 x 4 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 16 mm2 + Grounding Kabel NYFGbY 4 x 16 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 35 mm2 + Grounding Kabel NYFGbY 4 x 35 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
hari orang hari orang
0.04 Rp 0.08 Rp
1 M' 1 2 3
KABEL TR, NYFGbY 4 x 70 mm2 + Grounding Kabel NYFGbY 4 x 70 mm2 Kabel NYA 1 x 95 mm2 Instalasi
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
M' M' lot M'
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
45,215 7,506 1,054 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.04 Rp 0.08 Rp
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
129,891 7,506 2,748 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.04 Rp 0.08 Rp
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
259,783 149,218 8,180 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Total = Jumlah+(Keuntungan 2,5%) 479,564 149,218 12,576
JUMLAH HARGA Rp Rp Rp Rp Rp
3,542 6,667 1,051,326 26,283 1,077,609
Rp Rp Rp
529,993 40,900 11,418
Rp Rp Rp Rp Rp
3,542 6,667 592,519 14,813 607,332
Rp Rp Rp
383,831 40,900 8,495
Rp Rp Rp Rp Rp
3,542 6,667 443,434 11,086 454,520
Rp Rp Rp
221,130 40,900 5,241
Rp Rp Rp Rp Rp
3,542 6,667 277,479 6,937 284,416
Rp Rp Rp
153,353 40,900 3,885
Rp Rp Rp Rp Rp
3,542 6,667 208,346 5,209 213,555
Rp Rp Rp
306,256 40,900 6,943
Rp Rp Rp Rp Rp
3,542 6,667 364,307 9,108 373,415
Rp Rp Rp Rp
58,968 7,506 1,329 118,655
Rp Rp Rp Rp Rp
3,542 6,667 196,667 4,917 201,583
Rp Rp Rp Rp
45,215 7,506 1,054 118,655
Rp Rp Rp Rp Rp
3,542 6,667 182,638 4,566 187,204
Rp Rp Rp Rp
129,891 7,506 2,748 118,655
Rp Rp Rp Rp Rp
3,542 6,667 269,009 6,725 275,734
Rp Rp Rp Rp
259,783 149,218 8,180 118,655
Rp Rp Rp Rp Rp Rp
3,542 6,667 546,044 13,651 559,695 559,695
Rp Rp Rp
479,564 149,218 12,576
TOTAL HARGA
Rp
607,332
Rp
454,520
Rp
284,416
Rp
213,555
Rp
373,415
Rp
201,583
Rp
187,204
Rp
275,734
Rp
559,695
Rp
789,477
Analisa Harga Satuan Elektrikal - page 105 of 280
URAIAN
NO. 4 5
1 M' 1 2 3 4 5
Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
KABEL TR, NYFGbY 4 x 95 mm2 + Grounding Kabel NYFGbY 4 x 95 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
M'
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
655,749 149,218 16,099 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 120 mm2 + Grounding Kabel NYFGbY 4 x 120 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 185 mm2 + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 5 x 4 (1 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 3 x (4 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x 4 (1 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3
Kabel ITC 2 x 2 x 2 x 0,6 mm2 Kabel ITC 2 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 10 x 2 x 2 x 0,6 mm2 Kabel ITC 10 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 20 x 2 x 2 x 0,6 mm2 Kabel ITC 20 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 30 x 2 x 2 x 0,6 mm2 Kabel ITC 30 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja :
M' M' lot M'
0.04 Rp 0.08 Rp
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
821,596 149,218 19,416 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.04 Rp 0.08 Rp
1.00 1.00 1.00 1.00
hari orang hari orang
Rp Rp Rp Rp
1,248,575 187,421 28,720 118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5.00 5.00 1.00 5.00
Rp Rp Rp Rp
2,032,867 187,421 222,029 118,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' lot M'
0.04 Rp 0.08 Rp
3.00 3.00 1.00 3.00
hari orang hari orang
Rp Rp Rp Rp
2,032,867 187,421 133,217 118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2.00 2.00 1.00 2.00
Rp Rp Rp Rp
2,032,867 187,421 88,812 118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' lot
1.00 Rp 1.00 Rp
4,315 86
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,731 475
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 32,360 647
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 44,226 885
JUMLAH HARGA Rp
118,655
Rp Rp Rp Rp Rp Rp
3,542 6,667 770,221 19,256 789,477 789,477
Rp Rp Rp Rp
655,749 149,218 16,099 118,655
Rp Rp Rp Rp Rp
3,542 6,667 949,929 23,748 973,678
Rp Rp Rp Rp
821,596 149,218 19,416 118,655
Rp Rp Rp Rp Rp
3,542 6,667 1,119,094 27,977 1,147,071
Rp Rp Rp Rp
1,248,575 187,421 28,720 118,655
Rp Rp Rp Rp Rp
3,542 6,667 1,593,579 39,839 1,633,419
Rp Rp Rp Rp
10,164,334 937,105 222,029 593,275
Rp Rp Rp Rp Rp
3,542 6,667 11,926,952 298,174 12,225,126
Rp Rp Rp Rp
6,098,601 562,263 133,217 355,965
Rp Rp Rp Rp Rp
3,542 6,667 7,160,255 179,006 7,339,261
Rp Rp Rp Rp
4,065,734 374,842 88,812 237,310
Rp Rp Rp Rp Rp
3,542 6,667 4,776,906 119,423 4,896,328
Rp Rp
4,315 86
Rp Rp Rp Rp Rp
1,417 2,667 8,484 212 8,696
Rp Rp
23,731 475
Rp Rp Rp Rp Rp
1,417 2,667 28,289 707 28,996
Rp Rp
32,360 647
Rp Rp Rp Rp Rp
1,417 2,667 37,091 927 38,018
Rp Rp
44,226 885
TOTAL HARGA
Rp
973,678
Rp
1,147,071
Rp
1,633,419
Rp
12,225,126
Rp
7,339,261
Rp
4,896,328
Rp
8,696
Rp
28,996
Rp
38,018
Rp
68,020
Analisa Harga Satuan Elektrikal - page 106 of 280
URAIAN
NO.
Mandor Kepala Tukang listrik Tukang
1 M' 1 2 3
Kabel ITC 80 x 2 x 2 x 0,6 mm2 Kabel ITC 80 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel STP 18 AWG 1 Pair Kabel STP 18 AWG 1 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BTG 1 2 3
KABEL TRAY LEBAR 20 CM 1BTG > 4M Kabel Tray lebar 20 cm (200 x100 mm) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BTG 1 2 3
KABEL TRAY LEBAR 40 CM - 1BTG > 4M Kabel Tray lebar 40 cm (400 x 100 mm) Instalasi Tenaga Kerja : Mandor Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TRAY LEBAR 80 CM 1BTG > 4M Kabel Tray lebar 80 cm (800 x 100 mm) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
hari orang hari orang hari orang
0.08 Rp 0.08 Rp 0.08 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
btg lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
btg lot
1.00 Rp 1.00 Rp
hari orang hari orang hari orang
0.06 Rp 0.06 Rp 0.12 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,297 206
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 737,999 14,760
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 968,387 19,368
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,936,774 38,735
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Jointing / Connector Tray c/w bolt & Nut H100 Jointing / Connector Tray c/w bolt & Nut H100 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Exit 5 W + Baterai Lampu Exit 5 W + Baterai Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Tube Line (True Line Slim Balance) LED 20 W + Gantungan Tube Line (True Line Slim Balance) LED 20 W + Gantungan bh Gantungan lot Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2
Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Tool Kit Emergency Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Toolbh Kit Emergency 1.00 Rp Gantungan lot 1.00 Rp Tool Kit Emergency (Lampu) bh 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Rp Tukang Listrik hari orang 0.07 Rp
1 BH 1 2 3
96,003 1,920
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 PCS 1 2 3
3 4
HARGA SATUAN
33,619 672
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 699,705 13,994
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp 1.00 Rp
1,689,936 84,497 33,799
0.03 Rp 0.07 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,689,936 84,497 363,876 33,799
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Lampu LED Panel 36 W Lampu LED Panel 36 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
JUMLAH HARGA Rp Rp Rp Rp Rp Rp
7,500 7,083 6,667 66,360 1,659 68,020
Rp Rp
96,003 1,920
Rp Rp Rp Rp Rp
1,417 2,667 102,006 2,550 104,556
Rp Rp
10,297 206
Rp Rp Rp Rp Rp
1,417 2,667 14,586 365 14,950
Rp Rp
737,999 14,760
Rp Rp Rp Rp Rp
4,958 9,333 767,050 19,176 786,226
Rp Rp
968,387 19,368
Rp Rp Rp Rp Rp Rp
5,250 4,958 9,333 1,007,297 25,182 1,032,479
Rp Rp
1,936,774 38,735
Rp Rp Rp Rp Rp
4,958 9,333 1,989,801 49,745 2,039,546
Rp Rp
33,619 672
Rp Rp Rp Rp Rp
4,958 9,333 48,583 1,215 49,798
Rp Rp
699,705 13,994
Rp Rp Rp Rp Rp
2,833 5,333 721,866 18,047 739,913
Rp Rp Rp
1,689,936 84,497 33,799
Rp Rp Rp Rp Rp
2,833 5,333 1,816,398 45,410 1,861,808
Rp Rp Rp Rp
1,689,936 84,497 363,876 33,799
Rp Rp Rp Rp Rp
2,833 5,333 2,180,273 54,507 2,234,780
bh lot
1.00 Rp 1.00 Rp
895,306 17,906
Rp Rp
895,306 17,906
hari orang hari orang
0.03 Rp 0.07 Rp
85,000 80,000 Jumlah
Rp Rp Rp
2,833 5,333 921,379
TOTAL HARGA
Rp
104,556
Rp
14,950
Rp
786,226
Rp
1,032,479
Rp
2,039,546
Rp
49,798
Rp
739,913
Rp
1,861,808
Rp
2,234,780
Rp
944,414
Analisa Harga Satuan Elektrikal - page 107 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 BH 1 2 3
Lampu LED Panel 26 W Lampu LED Panel 26 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Batten 36 W + Inter Cable Lampu LED Batten 36 W + Inter Cable Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Batten 20 W + Inter Cable Lampu LED Batten 20 W + Inter Cable Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Prismatic 36 W Lampu LED Prismatic 36 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Prismatic 20 W Lampu LED Prismatic 20 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Panel LED Dust Proof 40 W Lampu Panel LED Dust Proof 40 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Panel LED Dust Proof 26 W Lampu Panel LED Dust Proof 26 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu TLT5 1x12 W (BALK) Lampu TLT5 1x12 W (BALK) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light Spot 23 W Lampu LED Down Light Spot 23 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Spot Light 15 W Lampu LED Spot Light 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1
Lampu LED Spot Light 23 W Lampu LED Spot Light 23 W
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh
1.00 Rp
895,306 17,906
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 693,952 13,879
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 586,084 11,722
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 835,619 16,712
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 538,622 10,772
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 835,619 16,712
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 538,622 10,772
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 251,693 5,034
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 341,439 6,829
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,315,993 26,320
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,315,993
TOTAL HARGA
23,034 944,414
Rp Rp
895,306 17,906
Rp Rp Rp Rp Rp
2,833 5,333 921,379 23,034 944,414
Rp Rp
693,952 13,879
Rp Rp Rp Rp Rp
2,833 5,333 715,998 17,900 733,898
Rp Rp
586,084 11,722
Rp Rp Rp Rp Rp
2,833 5,333 605,972 15,149 621,122
Rp Rp
835,619 16,712
Rp Rp Rp Rp Rp
2,833 5,333 860,498 21,512 882,011
Rp Rp
538,622 10,772
Rp Rp Rp Rp Rp
2,833 5,333 557,561 13,939 571,500
Rp Rp
835,619 16,712
Rp Rp Rp Rp Rp
2,833 5,333 860,498 21,512 882,011
Rp Rp
538,622 10,772
Rp Rp Rp Rp Rp
2,833 5,333 557,561 13,939 571,500
Rp Rp
251,693 5,034
Rp Rp Rp Rp Rp
2,833 5,333 264,893 6,622 271,515
Rp Rp
341,439 6,829
Rp Rp Rp Rp Rp
2,833 5,333 356,434 8,911 365,345
Rp Rp
1,315,993 26,320
Rp Rp Rp Rp Rp
2,833 5,333 1,350,479 33,762 1,384,241
Rp
1,315,993
Rp
944,414
Rp
733,898
Rp
621,122
Rp
882,011
Rp
571,500
Rp
882,011
Rp
571,500
Rp
271,515
Rp
365,345
Rp
1,384,241
Rp
1,384,241
Analisa Harga Satuan Elektrikal - page 108 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 4 W Lampu LED Down Light 4 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 5 W Lampu Down Light LED 5 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 6 W Lampu LED Down Light 6 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 7 W Lampu LED Down Light 7 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 9 W Lampu LED Down Light 9 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 10 W Lampu LED Down Light 10 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 13 W Lampu LED Down Light 13 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 16 W Lampu LED Down Light 16 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 30 W Lampu LED Down Light 30 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light Outbow 12 W Lampu LED Down Light Outbow 12 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
lot
1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
HARGA SATUAN 26,320
JUMLAH HARGA Rp
26,320
Rp Rp Rp Rp Rp
2,833 5,333 1,350,479 33,762 1,384,241
Rp Rp
168,994 3,380
Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
168,994 3,380
Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
168,994 3,380
Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
194,163 3,883
Rp Rp Rp Rp Rp
2,833 5,333 206,213 5,155 211,368
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
305,627 6,113
Rp Rp Rp Rp Rp
2,833 5,333 319,906 7,998 327,904
Rp Rp
916,880 18,338
Rp Rp Rp Rp Rp
2,833 5,333 943,384 23,585 966,969
147,420 2,948
Rp Rp
147,420 2,948
85,000 80,000 Jumlah
Rp Rp Rp
2,833 5,333 158,535
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 168,994 3,380
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 168,994 3,380
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 168,994 3,380
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 194,163 3,883
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 237,310 4,746
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 237,310 4,746
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 237,310 4,746
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 305,627 6,113
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 916,880 18,338
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
185,054
Rp
185,054
Rp
185,054
Rp
211,368
Rp
256,479
Rp
256,479
Rp
256,479
Rp
327,904
Rp
966,969
Rp
162,498
Analisa Harga Satuan Elektrikal - page 109 of 280
URAIAN
NO.
1 BH 1 2 3 4
Lampu LED Down Light 9 W + Tool Kit Emergency Lampu LED Down Light 9 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu LED Down Light 13 W + Tool Kit Emergency Lampu LED Down Light 13 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu LED Down Light 16 W + Tool Kit Emergency Lampu LED Down Light 16 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED 60 x 60 20 W Lampu LED 60 x 60 20 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Lampu Strip 5 W / meter + Driver + Diffuser Lampu Strip 5 W / meter + Driver + Diffuser Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Dinding 5 W Lampu LED Dinding 5 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Sensor Lampu Sensor Lampu Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Jalan LED (2 x 20 )W + TIANG Lampu Jalan LED ( 2 x 20 W ) Tiang Lampu Jalan (P : 7 m) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Jalan LED (1 x 20 )W + TIANG Lampu Jalan LED ( 1 x 20 W ) Tiang Lampu Jalan (P : 7 m) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Plat 12 W + baterai Lampu LED Plat 12 W + baterai Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1
Lampu LED RMO 12 W Lampu LED RMO 12 W
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh
1.00 Rp
237,310 363,876 4,746
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 237,310 363,876 4,746
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 305,627 363,876 6,113
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 810,810 16,216
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 631,389 12,628
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 179,780 3,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,226,439 24,529
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 24,126,529 2,286,807 528,267
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,063,265 2,286,807 287,001
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 302,031 6,041
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 192,365
3,963 162,498
Rp Rp Rp
237,310 363,876 4,746
Rp Rp Rp Rp Rp
2,833 5,333 614,099 15,352 629,451
Rp Rp Rp
237,310 363,876 4,746
Rp Rp Rp Rp Rp
2,833 5,333 614,099 15,352 629,451
Rp Rp Rp
305,627 363,876 6,113
Rp Rp Rp Rp Rp
2,833 5,333 683,781 17,095 700,876
Rp Rp
810,810 16,216
Rp Rp Rp Rp Rp
2,833 5,333 835,192 20,880 856,072
Rp Rp
631,389 12,628
Rp Rp Rp Rp Rp
2,833 5,333 652,183 16,305 668,488
Rp Rp
179,780 3,596
Rp Rp Rp Rp Rp
2,833 5,333 191,543 4,789 196,331
Rp Rp
1,226,439 24,529
Rp Rp Rp Rp Rp
2,833 5,333 1,259,135 31,478 1,290,613
Rp Rp Rp
24,126,529 2,286,807 528,267
Rp Rp Rp Rp Rp
2,833 5,333 26,949,769 673,744 27,623,514
Rp Rp Rp
12,063,265 2,286,807 287,001
Rp Rp Rp Rp Rp
2,833 5,333 14,645,239 366,131 15,011,370
Rp Rp
302,031 6,041
Rp Rp Rp Rp Rp
2,833 5,333 316,238 7,906 324,144
Rp
192,365
TOTAL HARGA
Rp
629,451
Rp
629,451
Rp
700,876
Rp
856,072
Rp
668,488
Rp
196,331
Rp
1,290,613
Rp
27,623,514
Rp
15,011,370
Rp
324,144
Rp
209,488
Analisa Harga Satuan Elektrikal - page 110 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Tiang Lampu Jalan (P : 8 m) Tiang Lampu Galvanised tinggi 8 M Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Tree Light 10 W Lampu Tree Light 10 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Bollard Light 18 W Lampu Bollard Light 18 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Taman Essential 18 W Lampu Taman Essential 18 W Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Taman Essential 28 W Lampu Taman Essential 28 W Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Up Light 5 W Lampu Up Light 5 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Track Spot 15 W Lampu Track Spot 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SENSOR SYSTEM SENSOR SYSTEM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SAKLAR TUNGGAL 10A SAKLAR TUNGGAL 10A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
lot
1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
HARGA SATUAN 3,847
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,286,807 200,000 49,736
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,566,545 51,331
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,678,728 53,575
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,869,716 200,000 41,394
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,711,088 200,000 58,222
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 898,902 17,978
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 583,208 11,664
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,869,295 57,386
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 19,517 390
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 BH 1 2 3
SAKLAR GANDA 10A SAKLAR GANDA 10A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
1 BH 1 2
SAKLAR PUTAR 10A SAKLAR PUTAR 10A Instalasi
bh lot
1.00 Rp 1.00 Rp
25,686 514
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,664 473
JUMLAH HARGA Rp
3,847
Rp Rp Rp Rp Rp
2,833 5,333 204,379 5,109 209,488
Rp Rp Rp
2,286,807 200,000 49,736
Rp Rp Rp Rp Rp
2,833 5,333 2,544,709 63,618 2,608,327
Rp Rp
2,566,545 51,331
Rp Rp Rp Rp Rp
2,833 5,333 2,626,043 65,651 2,691,694
Rp Rp
2,678,728 53,575
Rp Rp Rp Rp Rp
2,833 5,333 2,740,469 68,512 2,808,981
Rp Rp Rp
1,869,716 200,000 41,394
Rp Rp Rp Rp Rp
2,833 5,333 2,119,277 52,982 2,172,259
Rp Rp Rp
2,711,088 200,000 58,222
Rp Rp Rp Rp Rp
2,833 5,333 2,977,477 74,437 3,051,914
Rp Rp
898,902 17,978
Rp Rp Rp Rp Rp
2,833 5,333 925,047 23,126 948,173
Rp Rp
583,208 11,664
Rp Rp Rp Rp Rp
2,833 5,333 603,038 15,076 618,114
Rp Rp
2,869,295 57,386
Rp Rp Rp Rp Rp
2,125 4,000 2,932,806 73,320 3,006,126
Rp Rp
19,517 390
Rp Rp Rp Rp Rp
2,125 4,000 26,033 651 26,684
Rp Rp
25,686 514
Rp Rp Rp Rp Rp
2,125 4,000 32,325 808 33,133
Rp Rp
23,664 473
TOTAL HARGA
Rp
2,608,327
Rp
2,691,694
Rp
2,808,981
Rp
2,172,259
Rp
3,051,914
Rp
948,173
Rp
618,114
Rp
3,006,126
Rp
26,684
Rp
33,133
Rp
31,018
Analisa Harga Satuan Elektrikal - page 111 of 280
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 1 Phase (Partisi) Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 1 Phase Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 3 Phase Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN EMERGENCY Kabel FRC 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN LUAR Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI STOP KONTAK Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3
TITIK INSTALASI DAYA AC INDOOR Kabel NYY 4 x 10 mm2 Isolasi ban Tenaga Kerja : Kepala Tukang listrik
SAT
INDEK
HARGA SATUAN
hari orang hari orang
0.03 Rp 0.05 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
153,389 3,068
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 94,169 1,883
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 283,478 5,670
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
hari orang hari orang
Rp Rp Rp Rp Rp Rp Rp Rp
11,686 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
0.13 Rp 0.25 Rp
5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
hari orang hari orang
Rp Rp Rp Rp Rp Rp Rp Rp
84,227 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
0.13 Rp 0.25 Rp
7.00 7.00 1.00 2.00 3.00 6.00 2.00 0.25
hari orang hari orang
Rp Rp Rp Rp Rp Rp Rp Rp
11,686 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
0.13 Rp 0.25 Rp
5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
11,686 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
2,125 4,000 30,262 757 31,018
Rp Rp
153,389 3,068
Rp Rp Rp Rp Rp
2,125 4,000 162,581 4,065 166,646
Rp Rp
94,169 1,883
Rp Rp Rp Rp Rp
2,125 4,000 102,177 2,554 104,732
Rp Rp
283,478 5,670
Rp Rp Rp Rp Rp
2,125 4,000 295,272 7,382 302,654
Rp Rp Rp Rp Rp Rp Rp Rp
58,429 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 156,022 3,901 159,922
Rp Rp Rp Rp Rp Rp Rp Rp
421,136 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 518,729 12,968 531,697
Rp Rp Rp Rp Rp Rp Rp Rp
81,800 37,754 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 190,180 4,755 194,935
Rp Rp Rp Rp Rp Rp Rp Rp
58,429 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 156,022 3,901 159,922
hari orang hari orang
0.13 Rp 0.25 Rp
M' bh
5.00 Rp 1.00 Rp
65,620 1,798
Rp Rp
328,099 1,798
hari orang
0.13 Rp
85,000
Rp
10,625
TOTAL HARGA
Rp
166,646
Rp
104,732
Rp
302,654
Rp
159,922
Rp
531,697
Rp
194,935
Rp
159,922
Rp
369,535
Analisa Harga Satuan Elektrikal - page 112 of 280
URAIAN
NO. Tukang Listrik
1 TITIK 1 2 3
TITIK INSTALASI DAYA AC OUTDOOR Kabel NYY 4 x 25 mm2 Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK TITIK INSTALASI TELEPHONE 1 Instalasi Telephone Include : - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser - Las Doop - Isolasi ban 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI SPEAKER EMERGENCY Kabel FRC 2 x 2.5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI SPEAKER Kabel NYMHY 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6
TITIK INSTALASI FIRE ALARM Kabel NYMHY 2 x 1,5 mm2 Pipa Conduit Socket Pipa Tee Doos Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK TITIK INSTALASI IPTV 1 Titik Instalasi TV Include: - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser - Las Doop - Isolasi ban 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
hari orang
0.25 Rp
80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' bh
5.00 Rp 1.00 Rp
hari orang hari orang
0.23 Rp 0.47 Rp
titik
1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
177,533 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 138,227
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
hari orang hari orang
Rp Rp Rp Rp Rp Rp Rp Rp
16,180 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh bh bh bh
0.07 Rp 0.13 Rp
5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
hari orang hari orang
Rp Rp Rp Rp Rp Rp Rp Rp
13,484 5,393 4,495 3,596 4,495 1,798 1,798 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
M' M' bh bh bh
0.07 Rp 0.13 Rp
5.00 5.00 1.00 2.00 0.25
Rp Rp Rp Rp Rp
hari orang hari orang
0.07 Rp 0.13 Rp
titik
1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
7,551 5,393 4,495 3,596 1,798
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,221,985
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 TITIK TITIK INSTALASI CCTV, WIFI, DATA 1 UTP Cable Cat 6 in PVC HI Conduit 20 mm for CCTV, DATA, WIFI titik Include: - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser - Las Doop - Isolasi ban 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
JUMLAH HARGA Rp Rp Rp Rp
20,000 360,522 9,013 369,535
Rp Rp
887,666 1,798
Rp Rp Rp Rp Rp
19,833 37,333 946,630 23,666 970,296
Rp
138,227
Rp Rp Rp Rp Rp
5,667 10,667 154,560 3,864 158,424
Rp Rp Rp Rp Rp Rp Rp Rp
80,901 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
5,667 10,667 164,203 4,105 168,308
Rp Rp Rp Rp Rp Rp Rp Rp
67,418 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
5,667 10,667 150,719 3,768 154,487
Rp Rp Rp Rp Rp
37,754 26,967 4,495 7,191 449
Rp Rp Rp Rp Rp
5,667 10,667 93,189 2,330 95,519
Rp
1,221,985
Rp Rp Rp Rp Rp
5,667 10,667 1,238,319 30,958 1,269,277
1.00 Rp
1,221,985
Rp
1,221,985
0.07 Rp 0.13 Rp
85,000 80,000
Rp Rp
5,667 10,667
TOTAL HARGA
Rp
970,296
Rp
158,424
Rp
168,308
Rp
154,487
Rp
95,519
Rp
1,269,277
Rp
1,269,277
Analisa Harga Satuan Elektrikal - page 113 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 TTK TTK INST.DAYA U/ MOTOR LISTRIK/POMPA-MOTOR DI BAWAH 5 HP 1 Kabel, NYY 4 x 2,5 mm2 M' 5.00 Rp 17,978 2 Pipa Conduit M' 5.00 Rp 5,393 3 Socket Pipa bh 1.00 Rp 4,495 4 Tee Doos bh 2.00 Rp 3,596 5 Klem Pipa bh 3.00 Rp 4,495 6 Fhiser bh 6.00 Rp 1,798 7 Las Doop bh 2.00 Rp 1,798 8 Isolasi ban bh 0.25 Rp 1,798 9 Tenaga Kerja : Kepala Tukang listrik hari orang 0.25 Rp 85,000 Tukang Listrik hari orang 0.50 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 BH Set Top Box ICT 1 Set Top Box ICT bh 1.00 Rp 1,123,627 2 Instalasi lot 1.00 Rp 22,473 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.17 Rp 85,000 Tukang Listrik hari orang 0.33 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 BH 1 2 3
HUB Un Managable Path Panel 1 x 48 port HUB Un Managable Path Panel 1 x 48 port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HUB Un Managable Path Panel 1 x 24 port HUB Un Managable Path Panel 1 x 24 port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Web Controller 12 IO Web Controller 12 IO Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Web Controller Onboard Ios DI8DO12 & AI8AO4 Web Controller Onboard Ios DI8DO12 & AI8AO4 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Capacitive Monitor Touch Screen minimum 10" Capacitive Monitor Touch Screen minimum 10" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
LCD Display Nurse Station Operating Management LCD Display Nurse Station Operating Management Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Software Management : OPENweb basic Software Management : OPENweb basic Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
BAS Main PC Core i7, 52" Display BAS Main PC Core i7, 52" Display Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
8,551,794 171,036
JUMLAH HARGA Rp Rp Rp
1,238,319 30,958 1,269,277
Rp Rp Rp Rp Rp Rp Rp Rp
89,890 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
21,250 40,000 218,108 5,453 223,561
Rp Rp
1,123,627 22,473
Rp Rp Rp Rp Rp
14,167 26,667 1,186,933 29,673 1,216,607
Rp Rp
8,551,794 171,036
Rp Rp Rp Rp Rp
14,167 26,667 8,763,663 219,092 8,982,755
Rp Rp
3,998,676 79,974
Rp Rp Rp Rp Rp
14,167 26,667 4,119,482 102,987 4,222,470
Rp Rp
66,855,836 1,337,117
Rp Rp Rp Rp Rp
14,167 26,667 68,233,786 1,705,845 69,939,630
Rp Rp
26,742,334 534,847
Rp Rp Rp Rp Rp
14,167 26,667 27,318,014 682,950 28,000,965
Rp Rp
23,304,034 466,081
Rp Rp Rp Rp Rp
14,167 26,667 23,810,948 595,274 24,406,222
Rp Rp
6,112,534 122,251
Rp Rp Rp Rp Rp
14,167 26,667 6,275,618 156,890 6,432,508
Rp Rp
114,610,004 2,292,200
Rp Rp Rp Rp Rp
14,167 26,667 116,943,037 2,923,576 119,866,613
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
30,562,668 611,253
Rp Rp
30,562,668 611,253
hari orang hari orang
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah
Rp Rp Rp
14,167 26,667 31,214,754
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,998,676 79,974
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 66,855,836 1,337,117
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 26,742,334 534,847
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,304,034 466,081
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,112,534 122,251
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 114,610,004 2,292,200
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
223,561
Rp
1,216,607
Rp
8,982,755
Rp
4,222,470
Rp
69,939,630
Rp
28,000,965
Rp
24,406,222
Rp
6,432,508
Rp
119,866,613
Rp
31,995,123
Analisa Harga Satuan Elektrikal - page 114 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
IO Module DI8DO8T CPU : ARM7 Architecture IO Module DI8DO8T CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module DI16 CPU : ARM7 Architecture IO Module DI16 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module AI8AO4 CPU : ARM7 Architecture IO Module AI8AO4 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module AO4 CPU : ARM7 Architecture IO Module AO4 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 BH 1 2 3
Coupler module integrated bus terminating resistor Coupler module integrated bus terminating resistor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24bh V DC Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
12,225,067 244,501
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Bridge bus connector Bridge bus connector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
6,876,600 137,532
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 BH 1 2 3
1 TITIK 1 2 3
9,168,800 183,376
114,610 2,292
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,031,490 20,630
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
764,067 15,281
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Instalation, Cable Cat6 to LAN Instalation, Cable Cat6 to LAN Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.08 Rp 0.17 Rp
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
668,558 13,371
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Box Panel I/O Module, with Electronic Terminal Block clamp type, Unit label cable, wiring1.00 & accessories Rp 4,966,433 Instalasi lot 1.00 Rp 99,329 Tenaga Kerja : Kepala Tukang listrik hari orang 0.17 Rp 85,000 Tukang Listrik hari orang 0.33 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Installation, cable STP 18 AWG & Integration data point Modbus Power ttk Meter 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Tukang Listrik hari orang 0.17
Rp Rp
687,660 13,753
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 TITIK Installation, cable STP 18 AWG for data communication between panel 1 Installation, cable STP 18 AWG for data communication between panel ttk
Rp Rp
1.00 Rp
764,067
TOTAL HARGA
780,369 31,995,123
Rp Rp
9,168,800 183,376
Rp Rp Rp Rp Rp
14,167 26,667 9,393,010 234,825 9,627,835
Rp Rp
6,876,600 137,532
Rp Rp Rp Rp Rp
14,167 26,667 7,054,966 176,374 7,231,340
Rp Rp
12,225,067 244,501
Rp Rp Rp Rp Rp
14,167 26,667 12,510,402 312,760 12,823,162
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
14,167 26,667 6,665,292 166,632 6,831,924
Rp Rp
114,610 2,292
Rp Rp Rp Rp Rp
14,167 26,667 157,736 3,943 161,679
Rp Rp
1,031,490 20,630
Rp Rp Rp Rp Rp
14,167 26,667 1,092,953 27,324 1,120,277
Rp Rp
764,067 15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
Rp Rp
668,558 13,371
Rp Rp Rp Rp Rp
7,083 13,333 702,346 17,559 719,905
Rp Rp
4,966,433 99,329
Rp Rp Rp Rp Rp
14,167 26,667 5,106,595 127,665 5,234,260
Rp Rp
687,660 13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp
764,067
Rp
9,627,835
Rp
7,231,340
Rp
12,823,162
Rp
6,831,924
Rp
161,679
Rp
1,120,277
Rp
819,759
Rp
719,905
Rp
5,234,260
Rp
739,876
Rp
819,759
Analisa Harga Satuan Elektrikal - page 115 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
lot
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
15,281
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 TITIK 1 2 3
Installation, cable STP 18 AWG Modbus for CO2 Transmitter Installation, cable STP 18 AWG Modbus for CO2 Transmitter ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between ttk panel 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Tukang Listrik hari orang 0.17
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Room Temperature & Humidity Transmitter Installation, cable NYM 3X1,5mm for power supply Room Temperature ttk & Humidity Transmitter 1.00 Rp 496,643 Instalasi lot 1.00 Rp 9,933 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Air Quality CO2 & CO Transmitter Installation, cable NYM 3X1,5mm for power supply Air Quality CO2ttk & CO Transmitter1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Motorized Damper Installation, cable NYM 3X1,5mm for power supply Motorized Damper ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter ttk 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Tukang Listrik hari orang 0.17
1.00 Rp 1.00 Rp
534,847 10,697
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
649,457 12,989
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
496,643 9,933
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
496,643 9,933
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
496,643 9,933
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp
15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
Rp Rp
534,847 10,697
Rp Rp Rp Rp Rp
7,083 13,333 565,960 14,149 580,109
Rp Rp
649,457 12,989
Rp Rp Rp Rp Rp
7,083 13,333 682,862 17,072 699,934
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
764,067 15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
TOTAL HARGA
Rp
580,109
Rp
699,934
Rp
540,168
Rp
540,168
Rp
540,168
Rp
540,168
Rp
819,759
1 TITIK 1 2 3
Installation, Cable ITC 2 x 0.6mm for analog and digital point Installation, Cable ITC 2 x 0.6mm for analog and digital point ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift & Generator Set Installation, cable STP 18 AWG & Integration data point Modbus Fire ttk Alarm, Server 1.00 AccessRp Control Lift & Generator 649,457 Set Rp 649,457 Instalasi lot 1.00 Rp 12,989 Rp 12,989 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 682,862 Keuntungan 2,5% Rp 17,072 Total = Jumlah+(Keuntungan 2,5%) Rp 699,934
Rp
699,934
1 PCS 1 2 3
Battery starting genset sensor voltage Battery starting genset sensor voltage Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
1,179,233
1 PCS 1 2 3
Duct Temperature Sensor Duct Temperature Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
510,690
1.00 Rp 1.00 Rp
764,067 15,281
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
1,107,897 22,158
Rp Rp
1,107,897 22,158
Rp Rp Rp Rp Rp
7,083 13,333 1,150,471 28,762 1,179,233
458,440 9,169
Rp Rp
458,440 9,169
85,000 80,000 Jumlah
Rp Rp Rp
10,625 20,000 498,234
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Analisa Harga Satuan Elektrikal - page 116 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 PCS 1 2 3
Differential Pressure Transmitter Differential Pressure Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
System Integration with AC System (BACNet) System Integration with AC System (BACNet) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
System integration with Fire Alarm (ModBus) System integration with Fire Alarm (ModBus) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,910,167 38,203
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Differential Pressure Switch Differential Pressure Switch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Mini Inverter to Control Exhaust Fan (Tangga Darurat) Mini Inverter to Control Exhaust Fan (Tangga Darurat) unit Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Temperature Sensor PT 1000 Temperature Sensor PT 1000 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Room Temperature Sensor & Humidity Sensor Room Temperature Sensor & Humidity Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Pipe Temperature Pipe Temperature Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Static Pressure Transmitter Static Pressure Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Outside Temperature & Humidity Outside Temperature & Humidity Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
955,083 19,102
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
955,083 19,102
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Control 0-100% Exhaust Fan 1 Control 0-100% Exhaust Fan
0.08 Rp 0.17 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs
1.00 Rp
1,795,557 35,911
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,604,540 32,091
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 534,847 10,697
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,031,490 20,630
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,528,133 30,563
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 573,050
TOTAL HARGA
12,456 510,690
Rp Rp
1,910,167 38,203
Rp Rp Rp Rp Rp
10,625 20,000 1,978,995 49,475 2,028,470
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
10,625 20,000 6,655,083 166,377 6,821,460
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
10,625 20,000 6,655,083 166,377 6,821,460
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
1,795,557 35,911
Rp Rp Rp Rp Rp
7,083 13,333 1,851,885 46,297 1,898,182
Rp Rp
1,604,540 32,091
Rp Rp Rp Rp Rp
7,083 13,333 1,657,048 41,426 1,698,474
Rp Rp
534,847 10,697
Rp Rp Rp Rp Rp
7,083 13,333 565,960 14,149 580,109
Rp Rp
1,031,490 20,630
Rp Rp Rp Rp Rp
7,083 13,333 1,072,537 26,813 1,099,350
Rp Rp
1,528,133 30,563
Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp
573,050
Rp
2,028,470
Rp
6,821,460
Rp
6,821,460
Rp
1,019,467
Rp
1,019,467
Rp
1,898,182
Rp
1,698,474
Rp
580,109
Rp
1,099,350
Rp
1,618,591
Rp
620,051
Analisa Harga Satuan Elektrikal - page 117 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Slim Relay Slim Relay Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Damper Modulating 10Nm Damper Modulating 10Nm Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Damper Konstan 10Nm Damper Konstan 10Nm Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Outdoor Temperature (PT1000) Outdoor Temperature (PT1000) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Outdoor Humidity Sensor Outdoor Humidity Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Fuel Level Sensor Genset Fuel Level Sensor Genset Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Motion Sensor Motion Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
lot
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.27 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
HARGA SATUAN 11,461
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 152,813 3,056
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,528,133 30,563
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,222,507 24,450
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,795,557 35,911
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 981,826 19,637
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,215,793 44,316
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 687,660 13,753
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp
11,461
Rp Rp Rp Rp Rp
7,083 13,333 604,928 15,123 620,051
Rp Rp
152,813 3,056
Rp Rp Rp Rp Rp
7,083 13,333 176,286 4,407 180,693
Rp Rp
1,528,133 30,563
Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp Rp
1,222,507 24,450
Rp Rp Rp Rp Rp
7,083 13,333 1,267,374 31,684 1,299,058
Rp Rp
1,795,557 35,911
Rp Rp Rp Rp Rp
7,083 13,333 1,851,885 46,297 1,898,182
Rp Rp
981,826 19,637
Rp Rp Rp Rp Rp
7,083 13,333 1,021,879 25,547 1,047,426
Rp Rp
2,215,793 44,316
Rp Rp Rp Rp Rp
11,333 21,333 2,292,776 57,319 2,350,095
Rp Rp
687,660 13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp Rp
2,865,250 57,305
Rp Rp Rp Rp Rp
7,083 13,333 2,942,972 73,574 3,016,546
1 UNIT 1 2 3
Water Level Transmitter Water Level Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, unit Accuracy1.00 40 ppm Rp + 3% reading 2,903,453 Rp Instalasi lot 1.00 Rp 58,069 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp Tukang Listrik hari orang 0.17 Rp 80,000 Rp Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1 UNIT 1 2 3
Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ unit 0-50°C 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
2,865,250 57,305
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,903,453 58,069
TOTAL HARGA
Rp
180,693
Rp
1,618,591
Rp
1,299,058
Rp
1,898,182
Rp
1,047,426
Rp
2,350,095
Rp
739,876
Rp
3,016,546
Rp
3,056,488
Rp
3,096,429
7,083 13,333 2,981,939 74,548 3,056,488
2,941,657 58,833
Rp Rp
2,941,657 58,833
85,000 80,000 Jumlah
Rp Rp Rp
7,083 13,333 3,020,907 Analisa Harga Satuan Elektrikal - page 118 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V unit Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Web Controller DALI Web Controller DALI Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
On/Off Module DALI to control lighting 1 channel On/Off Module DALI to control lighting 1 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass On/Off DALI 1 Group Touch Screen Glass On/Off DALI 1 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
On/Off Module DALI to control lighting 2 channel On/Off Module DALI to control lighting 2 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Touch Screen Glass On/Off DALI 2 Group Touch Screen Glass On/Off DALI 2 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
On/Off Module DALI to control lighting 6 channel On/Off Module DALI to control lighting 6 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass On/Off DALI 6 Group Touch Screen Glass On/Off DALI 6 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3
Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Installation, cable STP 18 AWG Digital Switch DALI & Module DALI ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimmable Module DALI to control lighting 1 channel Dimmable Module DALI to control lighting 1 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1.00 Rp 1.00 Rp
2,139,387 42,788
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
44,697,901 893,958
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 878,677 17,574
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,069,693 21,394
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 955,083 19,102
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,146,100 22,922
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,222,507 24,450
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,528,133 30,563
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
458,440 9,169
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Touch Screen Glass Dimmable DALI 1 Group 1 Touch Screen Glass Dimmable DALI 1 Group
0.07 Rp 0.13 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit
1.00 Rp
916,880 18,338
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 687,660
TOTAL HARGA
75,523 3,096,429
Rp Rp
2,139,387 42,788
Rp Rp Rp Rp Rp
7,083 13,333 2,202,591 55,065 2,257,656
Rp Rp
44,697,901 893,958
Rp Rp Rp Rp Rp
7,083 13,333 45,612,276 1,140,307 46,752,583
Rp Rp
878,677 17,574
Rp Rp Rp Rp Rp
7,083 13,333 916,667 22,917 939,584
Rp Rp
1,069,693 21,394
Rp Rp Rp Rp Rp
7,083 13,333 1,111,504 27,788 1,139,291
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
1,146,100 22,922
Rp Rp Rp Rp Rp
7,083 13,333 1,189,439 29,736 1,219,175
Rp Rp
1,222,507 24,450
Rp Rp Rp Rp Rp
7,083 13,333 1,267,374 31,684 1,299,058
Rp Rp
1,528,133 30,563
Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp Rp
458,440 9,169
Rp Rp Rp Rp Rp
5,667 10,667 483,942 12,099 496,041
Rp Rp
916,880 18,338
Rp Rp Rp Rp Rp
7,083 13,333 955,634 23,891 979,525
Rp
687,660
Rp
2,257,656
Rp
46,752,583
Rp
939,584
Rp
1,139,291
Rp
1,019,467
Rp
1,219,175
Rp
1,299,058
Rp
1,618,591
Rp
496,041
Rp
979,525
Rp
739,876
Analisa Harga Satuan Elektrikal - page 119 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Dimmable Module DALI to control lighting 2 channel Dimmable Module DALI to control lighting 2 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass Dimmable DALI 2 Group Touch Screen Glass Dimmable DALI 2 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
RGB Module DALI to control lighting 6 channel RGB Module DALI to control lighting 6 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Saklar LCD control RGB DALI 6 group Saklar LCD control RGB DALI 6 group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4 5 6
PANEL MVMDP Incoming Cubicle with Surge Arrester Lightning Arrester Cubicle Metering Cubicle CM Outgoing Circuit Breaker Cubicle Accessories Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
PANEL MVMDP (NEW) Outgoing Circuit Breaker Cubicle Accessories Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-A) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-B) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-C) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT PANEL AMF + Syncronizing
SAT
INDEK
HARGA SATUAN
lot
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
13,753
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 880,205 17,604
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 782,404 15,648
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,820,333 76,407
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,224,361 64,487
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh bh bh bh lot
1.00 1.00 1.00 3.00 1.00
Rp Rp Rp Rp Rp
hari orang hari orang
0.40 Rp 0.80 Rp
bh lot
2.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
247,314,905 41,745,008 83,247,313 240,438,304 21,872,443
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 240,438,304 9,617,532
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp
13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp Rp
880,205 17,604
Rp Rp Rp Rp Rp
7,083 13,333 918,226 22,956 941,181
Rp Rp
782,404 15,648
Rp Rp Rp Rp Rp
7,083 13,333 818,469 20,462 838,931
Rp Rp
3,820,333 76,407
Rp Rp Rp Rp Rp
7,083 13,333 3,917,157 97,929 4,015,086
Rp Rp
3,224,361 64,487
Rp Rp Rp Rp Rp
7,083 13,333 3,309,265 82,732 3,391,997
Rp Rp Rp Rp Rp
247,314,905 41,745,008 83,247,313 721,314,913 21,872,443
Rp Rp Rp Rp Rp
34,000 64,000 868,277,678 21,706,942 889,984,619
Rp Rp
480,876,609 9,617,532
Rp Rp Rp Rp Rp
34,000 64,000 490,592,141 12,264,804 502,856,944
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
TOTAL HARGA
Rp
941,181
Rp
838,931
Rp
4,015,086
Rp
3,391,997
Rp
889,984,619
Rp
502,856,944
Rp
759,305,147
Rp
759,305,147
Rp
759,305,147
Rp
399,363,862
Analisa Harga Satuan Elektrikal - page 120 of 280
URAIAN
NO. 1 2 3 4 5 6
SAT
INDEK
Box Panel ( 220 x 100 x 100 ) cm + Analog Meter & Pilot Lamp bh ACB 2500 A, 3P, 70KA bh CU Busbar kg Genset Synchronizer kit bh Alat Bantu lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
4.00 4.00 20.00 4.00 1.00
HARGA SATUAN Rp Rp Rp Rp Rp
JUMLAH HARGA Rp Rp Rp Rp Rp
49,031,018 233,836,103 3,595,608 89,890,199 13,172,352
Rp Rp Rp Rp Rp
34,000 64,000 389,623,280 9,740,582 399,363,862
Rp Rp Rp
247,314,905 56,145,418 30,346,032
Rp Rp Rp Rp Rp
17,000 32,000 333,855,355 8,346,384 342,201,739
Rp Rp Rp Rp Rp
2,358,050,169 44,900,154 14,314,655 7,157,327 55,991,706 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
OPTIONAL OPTIONAL 2,480,414,012 62,010,350 2,542,424,362
0.40 Rp 0.80 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3 4 5
PANEL KONTROL GENSET Incoming Cubicle with Surge Arrester Outgoing QM Accessories Upah Pasang Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4 5 6 7
PQCR/PQS/HARMONIC FILTER, Kapasitas 1000 A AHF Accusine PCS+ 300A IP00 unit 3.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 3.00 Rp MCCB NSX 400A 3P unit 2.00 Rp MCCB NSX 300A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 3.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 600 A AHF Accusine PCS+ 300A IP00 unit 2.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 2.00 Rp MCCB NSX 400A 3P unit 2.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6 7 8
PQCR/PQS/HARMONIC FILTER, Kapasitas 320 A AHF Accusine PCS+ 200A IP00 unit 1.00 Rp AHF Accusine PCS+ 120A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 2.00 Rp MCCB NSX 300A 3P unit 1.00 Rp MCCB NSX 160A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 250-300 A AHF Accusine PCS+ 300A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 1.00 Rp MCCB NSX 400A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 200 A AHF Accusine PCS+ 200A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 1.00 Rp MCCB NSX 300A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3
12,257,754 58,459,026 179,780 22,472,550 13,172,352
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.20 Rp 0.40 Rp
247,314,905 56,145,418 30,346,032
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 786,016,723 14,966,718 7,157,327 7,157,327 18,663,902 49,608,280
786,016,723 14,966,718 7,157,327 18,663,902 32,698,909
Rp Rp Rp Rp
1,572,033,446 29,933,436 14,314,655 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
OPTIONAL OPTIONAL 1,634,945,439 40,873,636 1,675,819,075
786,016,723 376,663,714 14,966,718 7,157,327 4,445,610 18,663,902 15,720,334
Rp Rp Rp Rp Rp Rp
786,016,723 376,663,714 29,933,436 7,157,327 4,445,610 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
OPTIONAL OPTIONAL 1,222,880,713 30,572,018 1,253,452,731
786,016,723 14,966,718 7,157,327 18,663,902 15,720,334
Rp Rp Rp Rp
786,016,723 14,966,718 7,157,327 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
OPTIONAL OPTIONAL 826,804,671 20,670,117 847,474,787
Rp Rp Rp Rp
786,016,723 14,966,718 7,157,327 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
OPTIONAL OPTIONAL 826,804,671 20,670,117 847,474,787
Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, unit 20 kV - 380 Volt 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
786,016,723 14,966,718 7,157,327 18,663,902 15,720,334
448,411,774 8,968,235
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt 1 Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz,unit 20 kV - 380 Volt1.00 Rp 2 Instalasi lot 1.00 Rp
557,490,025 11,149,801
Rp Rp
448,411,774 8,968,235
Rp Rp Rp Rp Rp
17,000 32,000 457,429,010 11,435,725 468,864,735
Rp Rp
557,490,025 11,149,801
TOTAL HARGA
Rp
342,201,739
Rp
2,542,424,362
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
1,675,819,075
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
1,253,452,731
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
847,474,787
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
847,474,787
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
468,864,735
Rp
582,906,046
Analisa Harga Satuan Elektrikal - page 121 of 280
URAIAN
NO. 3
1 UNIT 1 2 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
hari orang hari orang
HARGA SATUAN
0.20 Rp 0.40 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Transformator iol Type 1600 kVA, Step Down AL-AL, Dyn5/50Hz, 20 kV - 380 Volt Transformator iol Type 1600 kVA, Step Down AL-AL, Dyn5/50Hz, 20 unitkV - 380 Volt 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
Rp Rp Rp Rp Rp
17,000 32,000 568,688,826 14,217,221 582,906,046
Rp Rp
552,869,759 11,057,395
Rp Rp Rp Rp Rp
17,000 32,000 563,976,154 14,099,404 578,075,558
1,520,942,167
Rp
1,520,942,167
30,418,843
Rp
30,418,843
Rp Rp Rp Rp Rp
17,000 32,000 1,551,361,011 38,784,025 1,590,145,036
552,869,759 11,057,395
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Transformator Dry Type 4000 kVA, Step Down CU-CU, unit 1.00 Rp 1 Dyn5/50Hz, 20 kV - 380 Volt 2 Instalasi lot 1.00 Rp 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
BUSDUCT 1000A / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
BUSDUCT 2500 / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
BUSDUCT 1600A / AL IP 54 1600A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
BUSDUCT 3200A / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT LVMDP, (IP 30 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor Form 3B Non Type Test b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A
JUMLAH HARGA
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
5,278,802 5,265,858 5,678,454 6,339,416
Rp Rp Rp Rp
42,230,415 10,531,715 17,035,361 6,339,416
bh bh bh lot
1.00 1.00 4.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 1,848,608
Rp Rp Rp Rp
9,586,790 5,784,434 922,273 1,848,608
Rp Rp Rp Rp Rp
7,650 8,000 94,294,664 2,357,367 96,652,031
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m unit unit unit
8.00 2.00 4.00 35.00
Rp Rp Rp Rp
11,730,671 5,265,858 5,678,454 230,568
Rp Rp Rp Rp
93,845,368 10,531,715 22,713,815 8,069,893
bh bh bh lot
1.00 1.00 35.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 2,703,216
Rp
2,703,216
Rp Rp Rp Rp Rp
7,650 8,000 137,879,657 3,446,991 141,326,648
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
5,278,802 6,202,693 6,464,004 8,457,409
Rp Rp Rp Rp
42,230,415 12,405,387 19,392,013 8,457,409
bh bh bh lot
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
11,597,184 5,574,091 230,568 1,997,741
Rp Rp Rp Rp
11,597,184 5,574,091 230,568 1,997,741
Rp Rp Rp Rp Rp
7,650 8,000 101,900,459 2,547,511 104,447,971
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
14,663,339 5,265,858 5,678,454 6,339,416
Rp Rp Rp Rp
117,306,710 10,531,715 17,035,361 6,339,416
bh bh bh lot
1.00 1.00 4.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 3,350,134
Rp Rp Rp Rp
9,586,790 5,784,434 922,273 3,350,134
Rp Rp Rp Rp Rp
7,650 8,000 170,872,484 4,271,812 175,144,296
49,813,748 179,780
Rp
49,813,748 INCLUDE BOX
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
17,268 17,268 17,268 31,632 10,544
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 70.00 Rp
bh bh bh bh bh
2.00 2.00 2.00 3.00 6.00
Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
578,075,558
Rp
1,590,145,036
Rp
96,652,031
Rp
141,326,648
Rp
104,447,971
Rp
175,144,296
Rp
284,134,053
Analisa Harga Satuan Elektrikal - page 122 of 280
URAIAN
NO. f. g. h. i. a. b. c. d. e. f. g. h i j k l m a. b. c. d. e. f. a. a. b. a. b.
SAT
DIGITAL MULTI METER bh CT 4000/5 30VA Cls.1 bh KWH Meter 3 Phase bh Change Over Switch 4 Pole 1600 Ampere COS Ohm Saklar Manual bh INCOMING ACB 2500 A, 3P, 100KA bh MOTOR OPERATOR 230V A.C./D.C. bh CLOSING COIL 230V A.C./D.C. bh UVR 230V A.C./D.C. bh Emergency Stop latching turn to reset 2 N/C (Red) bh Pilot Lamp 220VAC "R" (Red) bh Pilot Lamp 220VAC "G" (Green) bh Push Button (Green) 1 N/O bh Push Button (Red) 1 N/C bh Timer 220 VAC + Socket bh Relay 220 VAC + Socket bh Selector Switch A-O-M 2 Pole bh Interlock bh OUTGOING ACB 1000 A, 3P, 70KA bh MCCB 400-630 A/3 Phasa bh MCCB 350-500 A/3 Phasa bh MCCB 250-350 A/3 Phasa bh MCCB 175-250 A/3 Phasa bh MCB 20 A/3 Phasa bh ARRESTER Arrester SPD T1+T2 12,5KA 3P+N bh SMART PANEL MODBUS INTERFACE unit GATEWAY RS485/ETHERNET unit PEMASANGAN Biaya Transport LS Biaya Handling LS
1 UNIT MDP-D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 2500 A, 3P, 100KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. ACB 1250 A, 3P, 50KA b. MCCB 400-630 A/3 Phasa c. MCCB 250-350 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 1000 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 400-630 A/3 Phasa b. MCCB 175-250 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN
bh kg
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 3.00 1.00 1.00
Rp Rp Rp Rp
5,791,135 1,258,463 2,565,646 9,887,922
Rp Rp Rp Rp
5,791,135 3,775,388 2,565,646 9,887,922
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
70,807,409 7,191,216 1,618,024 1,977,584 42,894 31,462 31,462 19,667 19,667 222,508 55,145 57,305 3,856,290
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
70,807,409 7,191,216 1,618,024 1,977,584 42,894 31,462 31,462 19,667 19,667 222,508 55,145 57,305 3,856,290
1.00 1.00 1.00 5.00 7.00 1.00
Rp Rp Rp Rp Rp Rp
36,648,198 5,562,846 3,806,158 3,806,158 3,413,706 1,789,566
Rp Rp Rp Rp Rp Rp
36,648,198 5,562,846 3,806,158 19,030,789 23,895,943 1,789,566
1.00 Rp
4,756,989
Rp
4,756,989
2.00 Rp 1.00 Rp
2,220,288 14,770,758
Rp Rp
4,440,576 14,770,758
Rp Rp Rp Rp Rp
1,652,400 2,991,282 277,203,954 6,930,099 284,134,053
7,390,424 179,780
Rp Rp
7,390,424 3,236,047
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 18.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
70,807,409 314,616 7,191,216
Rp Rp Rp
70,807,409 314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
2.00 1.00 2.00 6.00
Rp Rp Rp Rp
23,291,692 5,562,846 3,540,370 2,964,498
Rp Rp Rp Rp
46,583,384 5,562,846 7,080,741 17,786,987
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
Rp Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 197,046,769 4,926,169 201,972,938
7,390,424 179,780
Rp Rp
7,390,424 3,236,047
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 18.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
36,648,198 314,616 7,191,216
Rp Rp Rp
36,648,198 314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
2.00 1.00 4.00 1.00
Rp Rp Rp Rp
5,562,846 3,540,370 2,964,498 1,402,287
Rp Rp Rp Rp
11,125,692 3,540,370 11,857,991 1,402,287
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
Rp Rp
2,442,317 14,770,758
TOTAL HARGA
Rp
201,972,938
Rp
116,644,939
Analisa Harga Satuan Elektrikal - page 123 of 280
URAIAN
NO. a. b.
Biaya Transport Biaya Handling
1 UNIT MDP-RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 800 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCCB 250-350 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 800 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCCB 250-350 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 800 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCCB 250-350 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa
SAT ls ls
bh kg
INDEK
HARGA SATUAN
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 18.00 Rp
JUMLAH HARGA Rp Rp Rp Rp Rp
1,652,400 2,991,282 113,799,941 2,844,999 116,644,939
7,390,424 179,780
Rp Rp
7,390,424 3,236,047
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
34,896,355 314,616 7,191,216
Rp Rp Rp
34,896,355 314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
3,806,158 3,540,370 3,938,359 1,402,287
Rp Rp Rp Rp
3,806,158 3,540,370 19,691,796 2,804,574
bh
1.00 Rp
1,533,527
Rp
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 18.00 Rp
1,652,400 2,991,282 96,751,581 2,418,790 99,170,371
7,390,424 179,780
Rp Rp
7,390,424 3,236,047
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
34,896,355 314,616 7,191,216
Rp Rp Rp
34,896,355 314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
3,806,158 3,540,370 3,938,359 1,402,287
Rp Rp Rp Rp
3,806,158 3,540,370 19,691,796 2,804,574
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
1.00 Rp 18.00 Rp
99,170,371
Rp
99,170,371
Rp
99,170,371
1,533,527
bh bh bh bh bh bh bh bh
bh kg
Rp
OPTIONAL OPTIONAL Rp Rp Rp Rp Rp
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
OPTIONAL OPTIONAL Rp Rp Rp Rp Rp
1,652,400 2,991,282 96,751,581 2,418,790 99,170,371
7,390,424 179,780
Rp Rp
7,390,424 3,236,047
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
34,896,355 314,616 7,191,216
Rp Rp Rp
34,896,355 314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
3,806,158 3,540,370 3,938,359 1,402,287
Rp Rp Rp Rp
3,806,158 3,540,370 19,691,796 2,804,574 Analisa Harga Satuan Elektrikal - page 124 of 280
URAIAN
NO. a. a. b. a. b.
ARRESTER Arrester SPD T2 40KA 3P+N SMART PANEL MODBUS INTERFACE GATEWAY RS485/ETHERNET PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 63 A/1 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER
SAT
INDEK
HARGA SATUAN
bh
1.00 Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp
1,533,527 OPTIONAL OPTIONAL
Rp Rp Rp Rp Rp
1,652,400 2,991,282 96,751,581 2,418,790 99,170,371
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 569,020
Rp Rp
2,804,574 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 24,875,402 621,885 25,497,287
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 569,020
Rp Rp
2,804,574 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 24,875,402 621,885 25,497,287
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
776,667 569,020
Rp Rp
1,553,333 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 23,624,161 590,604 24,214,765
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
8,634 8,634 8,634 10,544 1,757 5,791,135
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135
Rp Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
25,497,287
Rp
25,497,287
Rp
24,214,765
Rp
25,706,861
Analisa Harga Satuan Elektrikal - page 125 of 280
URAIAN
NO. g. a. b. a. b. c. d. a. b. c. d. a. b.
CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 80-100 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 40 A/3 Phasa MCB 25 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - AC.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. ACB 1250 A, 3P, 50KA b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. ACB 800 A, 3P, 50KA b. MCCB 125-160 A/3 Phasa c. MCB 32 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - UPS (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 140-200 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - KHS (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 140-200 A/3 Phasa PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 50 A/1 Phasa b. MCB 25 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
51,237
Rp
51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,402,287 652,633 357,221 332,649
Rp Rp Rp Rp
2,804,574 652,633 357,221 332,649
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 25,079,865 626,997 25,706,861
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
23,291,692 314,616
Rp Rp
23,291,692 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 3.00 3.00 4.00
Rp Rp Rp Rp
21,732,960 3,111,927 1,064,741 332,649
Rp Rp Rp Rp
21,732,960 9,335,780 3,194,224 1,330,598
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 76,853,544 1,921,339 78,774,883
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,806,158 314,616
Rp Rp
3,806,158 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
3,111,927
Rp
6,223,854
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,998,301 699,958 28,698,258
7,390,424 179,780
Rp Rp
7,390,424 1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
2.00 Rp
3,111,927
Rp
6,223,854
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
20.00 Rp 4.00 Rp
250,214 181,483
Rp Rp
5,004,277 725,932
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,538,098 688,452 28,226,550
Rp
3,668,927
bh
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp
3,668,927
TOTAL HARGA
Rp
78,774,883
Rp
28,698,258
Rp
28,226,550
Rp
30,031,932
Analisa Harga Satuan Elektrikal - page 126 of 280
URAIAN
NO. b. a. b. c. d. e. f. g. a. b. a. b. c. d. a. b. c. d. a. b.
Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 175-250 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 140-200 A/3 Phasa MCCB 80-100 A/3 Phasa MCB 40 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING
SAT
INDEK
HARGA SATUAN
kg
8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
179,780
Rp
1,438,243
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,540,370 314,616
Rp Rp
3,540,370 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 2.00 2.00 1.00
Rp Rp Rp Rp
3,111,927 1,402,287 652,633 569,020
Rp Rp Rp Rp
3,111,927 2,804,574 1,305,265 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 29,299,446 732,486 30,031,932
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 2.00 Rp
1,402,287 1,088,275 569,020
Rp Rp Rp
2,804,574 1,088,275 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 25,963,677 649,092 26,612,769
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 569,020
Rp Rp
2,804,574 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 24,875,402 621,885 25,497,287
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
TOTAL HARGA
Rp
26,612,769
Rp
25,497,287
Rp
26,375,809
Analisa Harga Satuan Elektrikal - page 127 of 280
URAIAN
NO. a. b. c. d. a. b.
MCCB 80-100 A/3 Phasa MCB 40 A/3 Phasa MCB 25 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - AC.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCB 32 A/3 Phasa c. MCB 25 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green)
SAT
INDEK
HARGA SATUAN
bh bh bh bh
2.00 2.00 1.00 1.00
Rp Rp Rp Rp
ls ls
1.00 Rp 1.00 Rp
1,402,287 652,633 357,221 332,649
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
2,804,574 1,305,265 357,221 332,649
Rp Rp Rp Rp Rp
1,652,400 2,991,282 25,732,497 643,312 26,375,809
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
5,562,846 314,616
Rp Rp
5,562,846 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 1.00 2.00 3.00
Rp Rp Rp Rp
4,179,229 627,923 357,221 332,649
Rp Rp Rp Rp
4,179,229 627,923 714,442 997,948
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
3,304,800 5,982,563 34,694,359 867,359 35,561,718
3,304,800 5,982,563 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
2,964,498 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,642,855 666,071 27,308,926
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
2,964,498 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,642,855 666,071 27,308,926
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
8,634 8,634 8,634
Rp Rp Rp
8,634 8,634 8,634
TOTAL HARGA
Rp
35,561,718
Rp
27,308,926
Rp
27,308,926
Rp
27,308,926
Analisa Harga Satuan Elektrikal - page 128 of 280
URAIAN
NO. d. e. f. g. a. b. a. b. c. d. a. b. c. a. b.
Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 100-125 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 50 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 40 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - AC.RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 350-500 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 250-350 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp
10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
2,964,498 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,642,855 666,071 27,308,926
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 2.00 1.00 1.00
Rp Rp Rp Rp
1,402,287 1,088,275 652,633 332,649
Rp Rp Rp Rp
2,804,574 2,176,549 652,633 332,649
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,899,193 672,480 27,571,673
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,806,158 314,616
Rp Rp
3,806,158 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
3,540,370 332,649
Rp Rp
3,540,370 1,663,247
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,978,065 674,452 27,652,517
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 1.00 Rp
2,964,498 569,020 569,020
Rp Rp Rp
5,928,996 569,020 569,020
ls
1.00 Rp
1,652,400
Rp
1,652,400
TOTAL HARGA
Rp
27,571,673
Rp
27,652,517
Rp
28,699,819
Analisa Harga Satuan Elektrikal - page 129 of 280
URAIAN
NO. b.
Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 40 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - AC.RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz
SAT ls
INDEK
HARGA SATUAN
1.00 Rp
2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
2,991,282 27,999,824 699,996 28,699,819
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
2,964,498 569,020
Rp Rp
5,928,996 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,999,824 699,996 28,699,819
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
2,964,498 569,020
Rp Rp
5,928,996 1,138,040
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,999,824 699,996 28,699,819
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 2.00 Rp
2,964,498 652,633 332,649
Rp Rp Rp
5,928,996 652,633 665,299
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 28,179,715 704,493 28,884,207
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,806,158 314,616
Rp Rp
3,806,158 314,616
bh
1.00 Rp
1,273,295
Rp
1,273,295
TOTAL HARGA
Rp
28,699,819
Rp
28,699,819
Rp
28,884,207
Rp
32,412,290
Analisa Harga Satuan Elektrikal - page 130 of 280
URAIAN
NO. b. c. d. a. b. a. b.
Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 250-350 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
736,650 10,544 1,757
Rp Rp Rp
736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
3,540,370 332,649
Rp Rp
3,540,370 1,663,247
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
3,304,800 5,982,563 31,621,747 790,544 32,412,290
3,304,800 5,982,563 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
5,928,996 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 29,607,353 740,184 30,347,536
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
5,928,996 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 29,607,353 740,184 30,347,536
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
2,964,498 1,088,275 569,020
Rp Rp Rp
5,928,996 2,176,549 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 29,607,353 740,184 30,347,536
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh
1.00 Rp 1.00 Rp
8,634 8,634
Rp Rp
8,634 8,634
TOTAL HARGA
Rp
30,347,536
Rp
30,347,536
Rp
30,347,536
Rp
27,571,673
Analisa Harga Satuan Elektrikal - page 131 of 280
URAIAN
NO. c. d. e. f. g. a. b. a. b. c. d. a. b. c. d. a. b.
Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 100-125 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 50 A/3 Phasa MCB 40 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - AC.RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 350-500 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 250-350 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - F2-F3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 175-250 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 63 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 40 A/3 Phasa e. MCB 20 A/3 Phasa f. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - F5 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp
8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
2,964,498 314,616
Rp Rp
2,964,498 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 2.00 1.00 1.00
Rp Rp Rp Rp
1,402,287 1,088,275 652,633 332,649
Rp Rp Rp Rp
2,804,574 2,176,549 652,633 332,649
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,899,193 672,480 27,571,673
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,806,158 314,616
Rp Rp
3,806,158 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
3,540,370 332,649
Rp Rp
3,540,370 1,663,247
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 26,978,065 674,452 27,652,517
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,540,370 314,616
Rp Rp
3,540,370 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh bh bh
2.00 1.00 2.00 2.00 3.00 2.00
Rp Rp Rp Rp Rp Rp
1,402,287 776,667 753,479 652,633 569,020 332,649
Rp Rp Rp Rp Rp Rp
2,804,574 776,667 1,506,959 1,305,265 1,707,061 665,299
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 30,274,484 756,862 31,031,346
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
3,111,927 314,616
Rp Rp
3,111,927 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
TOTAL HARGA
Rp
27,652,517
Rp
31,031,346
Rp
28,324,203
Analisa Harga Satuan Elektrikal - page 132 of 280
URAIAN
NO. b. c. d. e. a. b.
MCB 50 A/3 Phasa MCB 40 A/3 Phasa MCB 20 A/3 Phasa MCB 16 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT
INDEK
HARGA SATUAN
bh bh bh bh
2.00 1.00 5.00 2.00
Rp Rp Rp Rp
ls ls
1.00 Rp 1.00 Rp
753,479 652,633 569,020 332,649
JUMLAH HARGA Rp Rp Rp Rp
1,506,959 652,633 2,845,101 665,299
Rp Rp Rp Rp Rp
1,560,600 2,563,956 27,633,369 690,834 28,324,203
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,560,600 2,563,956 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
22.00 Rp
332,649
Rp
7,318,288
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,858,580 396,464 16,255,044
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
26.00 Rp
332,649
Rp
8,648,886
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 17,189,178 429,729 17,618,907
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
22.00 Rp
332,649
Rp
7,318,288
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,858,580 396,464 16,255,044
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
20.00 Rp
332,649
Rp
6,652,989
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,193,281 379,832 15,573,113
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
22.00 Rp
332,649
Rp
7,318,288
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,858,580 396,464 16,255,044
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
16,255,044
Rp
17,618,907
Rp
16,255,044
Rp
15,573,113
Rp
16,255,044
Analisa Harga Satuan Elektrikal - page 133 of 280
NO.
URAIAN 1 UNIT LP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
26.00 Rp
332,649
Rp
8,648,886
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 17,189,178 429,729 17,618,907
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
22.00 Rp
332,649
Rp
7,318,288
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,858,580 396,464 16,255,044
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
20.00 Rp
332,649
Rp
6,652,989
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,193,281 379,832 15,573,113
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
15.00 Rp
332,649
Rp
4,989,742
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,530,034 338,251 13,868,285
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
TOTAL HARGA Rp
17,618,907
Rp
16,255,044
Rp
15,573,113
Rp
13,868,285
Rp
14,209,250
Rp
14,209,250
Analisa Harga Satuan Elektrikal - page 134 of 280
URAIAN
NO. a. a. a. b.
MCB 10 A/3 Phasa OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
15.00 Rp
332,649
Rp
4,989,742
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,530,034 338,251 13,868,285
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
14,209,250
Rp
13,868,285
Rp
14,209,250
Rp
14,209,250
Rp
14,209,250
Rp
13,868,285
Analisa Harga Satuan Elektrikal - page 135 of 280
URAIAN
NO. a. b. a. b. c. d. e. a. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 10 A/3 Phasa OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
15.00 Rp
332,649
Rp
4,989,742
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,530,034 338,251 13,868,285
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
332,649 314,616
Rp Rp
332,649 314,616
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,177,299 354,432 14,531,731
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
14,531,731
Rp
14,209,250
Rp
14,209,250
Rp
14,209,250
Rp
14,209,250
Analisa Harga Satuan Elektrikal - page 136 of 280
URAIAN
NO. a. a. a. b.
MCB 10 A/3 Phasa OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 25 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - F4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - PH (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - G3 (IP 30 FORM 1 BOTTOM INCOMING)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,862,683 346,567 14,209,250
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
357,221
Rp
357,221
bh
18.00 Rp
332,649
Rp
5,987,690
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,552,554 363,814 14,916,367
3,668,927 179,780
Rp Rp
3,668,927 1,078,682 8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
bh
1.00 Rp
332,649
Rp
332,649
bh
7.00 Rp
332,649
Rp
2,328,546
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 10,868,838 271,721 11,140,559
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
7.00 Rp
332,649
Rp
2,328,546
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 10,868,838 271,721 11,140,559
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
14,209,250
Rp
14,209,250
Rp
14,916,367
Rp
11,140,559
Rp
11,140,559
Rp
10,458,627
Analisa Harga Satuan Elektrikal - page 137 of 280
URAIAN
NO. a. b. a. b. c. d. e. a. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 10 A/3 Phasa OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 50 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 50 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
332,649
Rp
332,649
bh
5.00 Rp
332,649
Rp
1,663,247
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 10,203,539 255,088 10,458,627
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
23.00 Rp
87,142
Rp
2,004,272
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,614,201 290,355 11,904,556
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
22.00 Rp
87,142
Rp
1,917,130
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,527,059 288,176 11,815,235
3,668,927 179,780
Rp Rp
3,668,927 1,078,682 8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
bh
1.00 Rp
753,479
Rp
753,479
bh bh
6.00 Rp 22.00 Rp
332,649 87,142
Rp Rp
1,995,897 1,917,130
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,874,148 321,854 13,196,002
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
753,479
Rp
753,479
bh bh
3.00 Rp 22.00 Rp
332,649 87,142
Rp Rp
997,948 1,917,130
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,876,200 296,905 12,173,105
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
11,904,556
Rp
11,815,235
Rp
13,196,002
Rp
12,173,105
Rp
14,305,666
Analisa Harga Satuan Elektrikal - page 138 of 280
URAIAN
NO. a. a. a. b.
INCOMING MCB 32 A/3 Phasa OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - LF.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - ALKES (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 140-200 A/3 Phasa b. MCCB 100-125 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - CSSD (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Toogle Switch INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 125-160 A/3 Phasa b. MCB 25 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 125-160 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
627,923
Rp
627,923
bh
9.00 Rp
569,020
Rp
5,121,182
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,956,747 348,919 14,305,666
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
627,923 332,649 332,649
Rp Rp Rp
1,883,768 665,299 997,948
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,156,944 328,924 13,485,868
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
5,562,846 314,616
Rp Rp
5,562,846 314,616
bh bh bh bh
2.00 5.00 1.00 1.00
3,111,927 2,964,498 753,479 569,020
Rp Rp Rp Rp
6,223,854 14,822,489 753,479 569,020
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 36,453,946 911,349 37,365,295
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 764,067
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 9,168,800
bh bh
1.00 Rp 1.00 Rp
5,562,846 314,616
Rp Rp
5,562,846 314,616
bh bh bh
4.00 Rp 3.00 Rp 7.00 Rp
2,373,101 1,064,741 1,064,741
Rp Rp Rp
9,492,405 3,194,224 7,453,189
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 43,393,722 1,084,843 44,478,565
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh kg bh bh bh bh bh bh
Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 6.00 Rp 1.00 1.00 1.00 1.00 1.00 12.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
2,373,101
Rp
2,373,101
bh
45.00 Rp
332,649
Rp
14,969,226
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 25,549,970 638,749 26,188,719
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
13,485,868
Rp
37,365,295
Rp
44,478,565
Rp
26,188,719
Rp
19,397,217
Analisa Harga Satuan Elektrikal - page 139 of 280
URAIAN
NO. a. a. a. b.
INCOMING MCCB 63-80 A/3 Phasa OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LAB.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
28.00 Rp
332,649
Rp
9,314,185
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 18,924,114 473,103 19,397,217
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
29.00 Rp
332,649
Rp
9,646,835
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,256,764 481,419 19,738,183
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
31.00 Rp
332,649
Rp
10,312,134
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,922,063 498,052 20,420,114
3,668,927 179,780
Rp Rp
3,668,927 1,078,682 8,634 8,634 8,634 10,544 1,757 381,134
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
627,923 569,020 569,020
Rp Rp Rp
1,883,768 1,138,040 1,707,061
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,719,933 367,998 15,087,931
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
4,456,091
Rp
4,456,091
bh
7.00 Rp
332,649
Rp
2,328,546
TOTAL HARGA
Rp
19,738,183
Rp
20,420,114
Rp
14,696,328
Rp
15,087,931
Rp
15,367,086
Analisa Harga Satuan Elektrikal - page 140 of 280
URAIAN
NO. a. b.
Biaya Transport Biaya Handling
1 UNIT PP - SERVER (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING
SAT ls ls
INDEK
HARGA SATUAN
1.00 Rp 1.00 Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,992,279 374,807 15,367,086
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
627,923
Rp
627,923
bh
4.00 Rp
569,020
Rp
2,276,081
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,492,780 287,320 11,780,100
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
31.00 Rp
332,649
Rp
10,312,134
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,922,063 498,052 20,420,114
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
bh kg
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 6.00 Rp
3,668,927 179,780
TOTAL HARGA
Rp
11,780,100
Rp
20,079,149
Rp
20,079,149
Rp
20,079,149
Rp
20,420,114
Rp
14,696,328
Analisa Harga Satuan Elektrikal - page 141 of 280
URAIAN
NO. a. b. c. d. e. f. a. a. b. a. b.
Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A Shun trip INCOMING MCB 32 A/3 Phasa OUTGOING MCB 16 A/3 Phasa MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
627,923 569,020 569,020
Rp Rp Rp
1,883,768 1,138,040 1,707,061
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,034,548 375,864 15,410,412
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
28.00 Rp
332,649
Rp
9,314,185
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 18,924,114 473,103 19,397,217
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544
Rp Rp Rp Rp
8,634 8,634 8,634 10,544
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
TOTAL HARGA
Rp
15,410,412
Rp
19,397,217
Rp
20,079,149
Rp
20,079,149
Rp
20,420,114
Analisa Harga Satuan Elektrikal - page 142 of 280
URAIAN
NO. e. a. a. a. b.
Miniatute Fuse Link 10x38 2A INCOMING MCCB 63-80 A/3 Phasa OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING
SAT bh
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
1,757
Rp
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
31.00 Rp
332,649
Rp
10,312,134
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,922,063 498,052 20,420,114
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
627,923 569,020 569,020
Rp Rp Rp
1,883,768 1,138,040 1,707,061
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,034,548 375,864 15,410,412
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
30.00 Rp
332,649
Rp
9,979,484
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
1,757
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
Rp
14,696,328
Rp
15,410,412
Rp
20,079,149
Rp
20,079,149
Rp
20,079,149
Analisa Harga Satuan Elektrikal - page 143 of 280
URAIAN
NO. a. a. b.
MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 40 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT
INDEK
HARGA SATUAN
bh
30.00 Rp
ls ls
1.00 Rp 1.00 Rp
332,649
JUMLAH HARGA Rp
9,979,484
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,589,413 489,735 20,079,149
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh
31.00 Rp
332,649
Rp
10,312,134
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,922,063 498,052 20,420,114
3,668,927 179,780
Rp Rp
3,668,927 1,078,682 8,634 8,634 8,634 10,544 1,757 381,134
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
1,402,287
Rp
1,402,287
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
627,923 569,020 569,020
Rp Rp Rp
1,883,768 1,138,040 1,707,061
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,719,933 367,998 15,087,931
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
652,633
Rp
652,633
bh
17.00 Rp
332,649
Rp
5,655,041
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,515,316 362,883 14,878,199
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
627,923
Rp
627,923
bh
12.00 Rp
332,649
Rp
3,991,794
ls ls
1.00 Rp 1.00 Rp
1,285,200 2,136,630 Jumlah
Rp Rp Rp
1,285,200 2,136,630 12,827,358
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
TOTAL HARGA
Rp
20,420,114
Rp
14,696,328
Rp
15,087,931
Rp
14,878,199
Rp
13,148,042
Analisa Harga Satuan Elektrikal - page 144 of 280
NO.
URAIAN
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - PERALATAN (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 50 A/3 Phasa OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 20 A/3 Phasa OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
320,684 13,148,042
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh
1.00 Rp
753,479
Rp
753,479
bh
10.00 Rp
259,766
Rp
2,597,656
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,939,912 298,498 12,238,410
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
569,020
Rp
569,020
bh
17.00 Rp
332,649
Rp
5,655,041
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,431,703 360,793 14,792,496
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
569,020
Rp
569,020
bh
12.00 Rp
332,649
Rp
3,991,794
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,768,456 319,211 13,087,667
3,668,927 179,780
Rp Rp
3,668,927 1,078,682 8,634 8,634 8,634 10,544 1,757 381,134
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
bh
1.00 Rp
627,923
Rp
627,923
bh bh
2.00 Rp 7.00 Rp
569,020 569,020
Rp Rp
1,138,040 3,983,142
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,337,881 358,447 14,696,328
Rp Rp
3,668,927 1,078,682
bh kg
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 6.00 Rp
3,668,927 179,780
TOTAL HARGA
Rp
14,696,328
Rp
12,238,410
Rp
14,792,496
Rp
13,087,667
Rp
14,696,328
Rp
13,371,518
Analisa Harga Satuan Elektrikal - page 145 of 280
URAIAN
NO. a. b. c. d. e. f. a. c. d. e. f. g. a. a. b.
METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING MCB 25 A/3 Phasa PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/1 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 25 A/3 Phasa c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.OK.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
585,701
Rp
585,701
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
25.00 Rp
87,142
Rp
2,178,556
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,045,383 326,135 13,371,518
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
585,701
Rp
585,701
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
18.00 Rp
87,142
Rp
1,568,561
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,435,388 310,885 12,746,272
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
332,649
Rp
332,649
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
19.00 Rp
87,142
Rp
1,655,703
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,269,478 306,737 12,576,215
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
14.00 Rp
87,142
Rp
1,219,992
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 11,833,767 295,844 12,129,611
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544
Rp Rp Rp Rp
8,634 8,634 8,634 10,544
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
TOTAL HARGA
Rp
12,746,272
Rp
12,576,215
Rp
12,129,611
Rp
22,023,218
Analisa Harga Satuan Elektrikal - page 146 of 280
URAIAN
NO. e. f. a. b. c. d. e. f. g. h. a. b. c. a. b.
Miniatute Fuse Link 10x38 2A CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING MCCB 125-160 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A Shun trip OUTGOING MCB 20 A/3 Phasa MCB 16 A/3 Phasa MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.OK.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 20 A/3 Phasa b. MCB 16 A/3 Phasa MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 25 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 20 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh
1.00 Rp 1.00 Rp
1,757 51,237
Rp Rp
1,757 51,237
bh bh
1.00 Rp 1.00 Rp
3,111,927 314,616
Rp Rp
3,111,927 314,616
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757 381,134
Rp Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757 381,134
bh bh bh
3.00 Rp 5.00 Rp 5.00 Rp
569,020 569,020 569,020
Rp Rp Rp
1,707,061 2,845,101 2,845,101
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 21,486,066 537,152 22,023,218
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
3,111,927 314,616
Rp Rp
3,111,927 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
3.00 Rp 5.00 Rp 5.00 Rp
569,020 569,020 569,020
Rp Rp Rp
1,707,061 2,845,101 2,845,101
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 21,104,932 527,623 21,632,555
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
585,701
Rp
585,701
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,452,568 386,314 15,838,883
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
569,020
Rp
569,020
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
17.00 Rp
332,649
Rp
5,655,041
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,768,537 394,213 16,162,750
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544
Rp Rp Rp Rp
8,634 8,634 8,634 10,544
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
TOTAL HARGA
Rp
21,632,555
Rp
15,838,883
Rp
16,162,750
Rp
14,457,922
Analisa Harga Satuan Elektrikal - page 147 of 280
URAIAN
NO. e. f. a. b. c. d. e. a. a. b.
Miniatute Fuse Link 10x38 2A CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING MCB 20 A/3 Phasa PROTEKSI Earth Leakage Relay 50/60Hz Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh
1.00 Rp 1.00 Rp
1,757 51,237
Rp Rp
1,757 51,237
bh
1.00 Rp
569,020
Rp
569,020
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
12.00 Rp
332,649
Rp
3,991,794
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,105,290 352,632 14,457,922
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
12.00 Rp
332,649
Rp
3,991,794
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 13,868,919 346,723 14,215,642
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp 8.00 1.00 Rp 1.00 Rp
332,649
Rp
5,322,391
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,199,517 379,988 15,579,505
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
ls ls
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
TOTAL HARGA
Rp
14,215,642
Rp
15,579,505
Rp
12,851,779
Rp
12,851,779
Analisa Harga Satuan Elektrikal - page 148 of 280
URAIAN
NO. a. a. b.
MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor
SAT
INDEK
HARGA SATUAN
bh
8.00 Rp
ls ls
1.00 Rp 1.00 Rp
332,649
JUMLAH HARGA Rp
2,661,196
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp 8.00 1.00 Rp 1.00 Rp
332,649
Rp
5,322,391
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,199,517 379,988 15,579,505
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
ls ls
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
Rp
3,668,927
bh
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp
3,668,927
TOTAL HARGA
Rp
12,851,779
Rp
15,579,505
Rp
12,851,779
Rp
12,851,779
Rp
12,851,779
Analisa Harga Satuan Elektrikal - page 149 of 280
URAIAN
NO. b. a. b. c. d. e. f. a. b. c. d. e. a. a. b.
Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING MCB 16 A/3 Phasa PROTEKSI Earth Leakage Relay 50/60Hz Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING
SAT
INDEK
HARGA SATUAN
kg
6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
179,780
Rp
1,078,682
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp 8.00 1.00 Rp 1.00 Rp
332,649
Rp
5,322,391
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,199,517 379,988 15,579,505
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
ls ls
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
15,579,505
Rp
12,851,779
Rp
12,851,779
Rp
12,851,779
Analisa Harga Satuan Elektrikal - page 150 of 280
URAIAN
NO. a. b. c. d. e. a. a. b.
MCB 16 A/3 Phasa PROTEKSI Earth Leakage Relay 50/60Hz Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
8.00 Rp
332,649
Rp
2,661,196
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,538,321 313,458 12,851,779
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,199,517 379,988 15,579,505
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
9.00 Rp
332,649
Rp
2,993,845
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 12,870,970 321,774 13,192,745
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
16.00 Rp
332,649
Rp
5,322,391
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 15,199,517 379,988 15,579,505
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
9.00 Rp
332,649
Rp
2,993,845
ls
1.00 Rp
1,285,200
Rp
1,285,200
TOTAL HARGA
Rp
15,579,505
Rp
13,192,745
Rp
15,579,505
Rp
13,192,745
Analisa Harga Satuan Elektrikal - page 151 of 280
URAIAN
NO. b.
Biaya Handling
1 UNIT PP-AC.MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 6 A/3 Phasa b. PROTEKSI c. Earth Leakage Relay 50/60Hz d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. ACB 800 A, 3P, 50KA PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCCB 63-80 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 40 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU.OK.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 25 A/3 Phasa b. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 350-500 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter
SAT ls
INDEK
HARGA SATUAN
1.00 Rp
2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
2,136,630 12,870,970 321,774 13,192,745
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
bh
1.00 Rp
332,649
Rp
332,649
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 10,544 1,757
Rp Rp Rp
1,273,295 10,544 1,757
bh
13.00 Rp
332,649
Rp
4,324,443
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 14,201,568 355,039 14,556,608
Rp Rp Rp Rp Rp Rp
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh
1.00 Rp
21,732,960
Rp
21,732,960
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 5.00 4.00 2.00
Rp Rp Rp Rp
1,402,287 1,402,287 753,479 652,633
Rp Rp Rp Rp
2,804,574 7,011,436 3,013,918 1,305,265
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 52,681,109 1,317,028 53,998,137
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
3,111,927 314,616
Rp Rp
3,111,927 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
3.00 Rp 6.00 Rp
585,701 569,020
Rp Rp
1,757,103 3,414,121
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 25,410,724 635,268 26,045,992
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
4,179,229 314,616
Rp Rp
4,179,229 314,616
bh bh
1.00 Rp 1.00 Rp
1,273,295 736,650
Rp Rp
1,273,295 736,650
TOTAL HARGA
Rp
14,556,608
Rp
53,998,137
Rp
26,045,992
Rp
34,898,540
Analisa Harga Satuan Elektrikal - page 152 of 280
URAIAN
NO. c. d. a. b. c. a. b.
Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 63-80 A/3 Phasa MCB 50 A/3 Phasa MCB 40 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh
1.00 Rp 1.00 Rp
10,544 1,757
Rp Rp
10,544 1,757
bh bh bh
4.00 Rp 6.00 Rp 4.00 Rp
1,402,287 753,479 652,633
Rp Rp Rp
5,609,148 4,520,877 2,610,530
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 34,047,356 851,184 34,898,540
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
3,540,370 314,616
Rp Rp
3,540,370 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 26,277,091 656,927 26,934,018
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
3,540,370 314,616
Rp Rp
3,540,370 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 26,277,091 656,927 26,934,018
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
3,540,370 314,616
Rp Rp
3,540,370 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 26,277,091 656,927 26,934,018
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
TOTAL HARGA
Rp
26,934,018
Rp
26,934,018
Rp
26,934,018
Rp
20,837,414
Analisa Harga Satuan Elektrikal - page 153 of 280
URAIAN
NO. f. g. h. a. b. a. b. c. d. a. b. a. b.
DIGITAL MULTI METER CT Window Ratio 500/5A Class 1 Burden 10 VA Shun trip INCOMING MCCB 63-80 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 32 A/3 Phasa MCB 25 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCB 50 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 32 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU.MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCB 6 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 32 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
5,791,135 51,237 381,134
Rp Rp Rp
5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 2.00 Rp
627,923 585,701
Rp Rp
627,923 1,171,402
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 20,329,184 508,230 20,837,414
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
1,088,275 314,616
Rp Rp
1,088,275 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
627,923
Rp
1,255,845
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 19,471,692 486,792 19,958,484
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 8.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,438,243
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
332,649 314,616
Rp Rp
332,649 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
627,923
Rp
1,255,845
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,285,200 2,136,630 18,716,067 467,902 19,183,968
Rp
284,534,616
1,285,200 2,136,630 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar Include : unit 1.00 Rp 284,534,616 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN
TOTAL HARGA
Rp
19,958,484
Rp
19,183,968
Rp
296,407,755
Analisa Harga Satuan Elektrikal - page 154 of 280
URAIAN
NO. a. b.
Biaya Transport Biaya Handling
SAT LS LS
INDEK 1.00 Rp 1.00 Rp
HARGA SATUAN
1,652,400 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar Include : unit 1.00 Rp 276,893,949 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar Include : unit 1.00 Rp 246,331,281 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar Include : unit 1.00 Rp 261,612,615 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah
JUMLAH HARGA Rp Rp Rp Rp Rp
1,652,400 2,991,282 289,178,297 7,229,457 296,407,755
Rp
276,893,949
Rp Rp Rp Rp Rp
1,652,400 2,991,282 281,537,630 7,038,441 288,576,071
Rp
246,331,281
Rp Rp Rp Rp Rp
1,652,400 2,991,282 250,974,963 6,274,374 257,249,337
Rp
261,612,615
Rp Rp Rp
1,652,400 2,991,282 266,256,297
TOTAL HARGA
Rp
288,576,071
Rp
257,249,337
Rp
272,912,704
Analisa Harga Satuan Elektrikal - page 155 of 280
URAIAN
NO.
1 UNIT
a. b.
1 UNIT
a. b.
1 UNIT
a. b.
1 UNIT
SAT
INDEK
HARGA SATUAN
Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar Include : unit 1.00 Rp 211,948,280 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport LS 1.00 Rp 1,652,400 Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar Include : unit 1.00 Rp 206,217,780 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport LS 1.00 Rp 1,652,400 Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar Include : unit 1.00 Rp 229,483,611 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport LS 1.00 Rp 1,652,400 Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) LP-PL (IP 30 FORM 1 BOTTOM INCOMING)
JUMLAH HARGA Rp Rp
6,656,407 272,912,704
Rp
211,948,280
Rp Rp Rp Rp Rp
1,652,400 2,991,282 216,591,962 5,414,799 222,006,761
Rp
206,217,780
Rp Rp Rp Rp Rp
1,652,400 2,991,282 210,861,461 5,271,537 216,132,998
Rp
229,483,611
Rp Rp Rp Rp Rp
1,652,400 2,991,282 234,127,292 5,853,182 239,980,474
TOTAL HARGA
Rp
222,006,761
Rp
216,132,998
Rp
239,980,474
Rp
36,605,811
Analisa Harga Satuan Elektrikal - page 156 of 280
URAIAN
NO. a. b. a. b. c. d. e. f. g. a. b. a. b. c. d. a. a. a. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 50/5A Class 1 Burden 2.5 VA INCOMING MCB 20 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING ZONE 1 MCB 10 A/3 Phasa ZONE 2 MCB 10 A/3 Phasa ZONE 3 MCB 10 A/3 Phasa ZONE 4 MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS c. MCCB SHUNT TRIP 200-277 VAC/DC d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 20 A/3 Phasa b. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC c. Time Switch, 24 hours / 220VAC, Analog d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. MCCB SHUNT TRIP 200-277 VAC/DC OUTGOING a. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AB (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCB 40 A/3 Phasa b. MCCB AUX CONTACTS c. MCCB SHUNT TRIP 200-277 VAC/DC d. Fuse Housing e. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 16 A/3 Phasa b. MCB 6 A/1 Phasa PEMASANGAN
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 2.00 2.00 1.00 2.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 21,088 3,515 5,791,135 102,475
bh bh
1.00 Rp 1.00 Rp
569,020 314,616
Rp Rp
569,020 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
17.00 Rp
332,649
Rp
5,655,041
bh
16.00 Rp
332,649
Rp
5,322,391
bh
16.00 Rp
332,649
Rp
5,322,391
bh
8.00 Rp
332,649
Rp
2,661,196
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
459,000 2,695,360 35,712,986 892,825 36,605,811
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
459,000 2,695,360 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 2.00 4.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 21,088 7,029
bh bh bh bh bh
1.00 1.00 1.00 1.00 2.00
Rp Rp Rp Rp Rp
569,020 314,616 607,029 10,544 1,757
Rp Rp Rp Rp Rp
569,020 314,616 607,029 10,544 3,515
bh
3.00 Rp
259,766
Rp
779,297
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
459,000 2,695,360 10,240,009 256,000 10,496,009
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
459,000 2,695,360 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 2.00 2.00
Rp Rp Rp Rp
8,634 8,634 8,634 1,757
Rp Rp Rp Rp
8,634 8,634 17,268 3,515
bh bh bh bh bh bh
1.00 2.00 2.00 2.00 2.00 1.00
Rp Rp Rp Rp Rp Rp
1,064,741 332,594 701,144 10,544 1,757 607,029
Rp Rp Rp Rp Rp Rp
1,064,741 665,187 1,402,287 21,088 3,515 607,029
bh
2.00 Rp
627,923
Rp
1,255,845
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
OPTIONAL 2,695,360 12,500,712 312,518 12,813,230
459,000 2,695,360 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 OPTIONAL 51,237
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
652,633 314,616 607,029 10,544 1,757
Rp Rp Rp Rp Rp
652,633 314,616 607,029 10,544 1,757
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
3.00 Rp 3.00 Rp
259,766 58,902
Rp Rp
779,297 176,707
TOTAL HARGA
Rp
10,496,009
Rp
12,813,230
Rp
12,399,669
Analisa Harga Satuan Elektrikal - page 157 of 280
URAIAN
NO. a. b.
Biaya Transport Biaya Handling
1 UNIT PP - FH (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 140-200 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP-PH (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS c. MCCB SHUNT TRIP 200-277 VAC/DC d. Fuse Housing e. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa c. MCB 6 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 BH 1 2 3
PESAWAT TELEPON SINGLE LINE Pesawat Telephone Single Line Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Faximile Faximile Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SOCKET TELEPON Socket Telephone RJ-45 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
FLOOR SOCKET TELEPON Floor Socket Telephone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
IP PHONE SERIES IP PHONE SERIES Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT LS LS
INDEK
HARGA SATUAN
1.00 Rp 1.00 Rp
459,000 2,695,360 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
OPTIONAL 2,695,360 12,097,238 302,431 12,399,669
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
3,806,158 314,616
Rp Rp
3,806,158 314,616
bh
4.00 Rp
3,111,927
Rp
12,447,707
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
9,914,400 17,947,690 49,216,383 1,230,410 50,446,792
9,914,400 17,947,690 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh kg
1.00 Rp 6.00 Rp
3,668,927 179,780
Rp Rp
3,668,927 1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 OPTIONAL 51,237
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
332,649 314,616 607,029 10,544 1,757
Rp Rp Rp Rp Rp
332,649 314,616 607,029 10,544 1,757
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 5.00 Rp 28.00 Rp
332,649 259,766 58,902
Rp Rp Rp
332,649 1,298,828 1,649,266
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
OPTIONAL 2,695,360 14,101,995 352,550 14,454,545
Rp Rp
674,176 13,484
Rp Rp Rp Rp Rp
1,771 3,333 692,764 17,319 710,083
Rp Rp
1,512,852 30,257
Rp Rp Rp Rp Rp
1,771 3,333 1,548,213 38,705 1,586,919
Rp Rp
1,221,985 24,440
Rp Rp Rp Rp Rp
1,771 3,333 1,251,529 31,288 1,282,817
Rp Rp
369,880 7,398
Rp Rp Rp Rp Rp
1,771 3,333 382,382 9,560 391,942
Rp Rp
2,842,688 56,854
Rp Rp Rp Rp
1,771 3,333 2,904,646 72,616
459,000 2,695,360 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
674,176 13,484
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,512,852 30,257
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,221,985 24,440
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 369,880 7,398
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,842,688 56,854 85,000 80,000 Jumlah Keuntungan 2,5%
TOTAL HARGA
Rp
50,446,792
Rp
14,454,545
Rp
710,083
Rp
1,586,919
Rp
1,282,817
Rp
391,942
Rp
2,977,262
Analisa Harga Satuan Elektrikal - page 158 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Total = Jumlah+(Keuntungan 2,5%) Rp 1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 10 Pair HANDSET TELEPON (SIP) / TB 10 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 20 Pair Terminal Box 20 Pairs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 30 Pair HANDSET TELEPON (SIP) / TB 30 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 2 / 12 Extention PABX 2 Line / 12 Extension Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 16 / 160 Extention PABX 16 Line / 160 Extention Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 8 / 80 Extention PABX 8 Line / 80 Extention Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
MDF 160 PAIRS MDF 160 PAIRS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
MDF 80 PAIRS MDF 80 PAIRS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TELEPON 10 PAIRS Kabel ITC 10x4x0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TELEPON 20 PAIRS Kabel ITC 20x4x0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel UTP Cat 5E,-0,6 mm2 Kabel Coaxial RG11( 0,6 mm2 ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
1,444,086 28,882
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,888,172 57,763
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,332,258 86,645
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,066,269 141,325
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 215,511,752 4,310,235
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 121,540,538 2,430,811
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,591,833 71,837
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,909,717 38,194
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,731 475
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 32,360 647
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,944 259
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
2,977,262
Rp Rp
1,444,086 28,882
Rp Rp Rp Rp Rp
12,750 24,000 1,509,718 37,743 1,547,461
Rp Rp
2,888,172 57,763
Rp Rp Rp Rp Rp
12,750 24,000 2,982,686 74,567 3,057,253
Rp Rp
4,332,258 86,645
Rp Rp Rp Rp Rp
12,750 24,000 4,455,653 111,391 4,567,045
Rp Rp
7,066,269 141,325
Rp Rp Rp Rp Rp
12,750 24,000 7,244,344 181,109 7,425,453
Rp Rp
215,511,752 4,310,235
Rp Rp Rp Rp Rp
12,750 24,000 219,858,737 5,496,468 225,355,206
Rp Rp
121,540,538 2,430,811
Rp Rp Rp Rp Rp
12,750 24,000 124,008,099 3,100,202 127,108,301
Rp Rp
3,591,833 71,837
Rp Rp Rp Rp Rp
12,750 24,000 3,700,419 92,510 3,792,930
Rp Rp
1,909,717 38,194
Rp Rp Rp Rp Rp
12,750 24,000 1,984,662 49,617 2,034,278
Rp Rp
23,731 475
Rp Rp Rp Rp Rp
708 1,333 26,247 656 26,903
Rp Rp
32,360 647
Rp Rp Rp Rp Rp
708 1,333 35,049 876 35,926
Rp Rp
12,944 259
Rp Rp Rp Rp Rp
708 1,333 15,245 381 15,626
Rp
1,547,461
Rp
3,057,253
Rp
4,567,045
Rp
7,425,453
Rp
225,355,206
Rp
127,108,301
Rp
3,792,930
Rp
2,034,278
Rp
26,903
Rp
35,926
Rp
15,626
Analisa Harga Satuan Elektrikal - page 159 of 280
URAIAN
NO. 1 M' 1 2 3
Kabel UTP Cat 6 UTP Cat 6 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Fiber Optic 8 core Fiber Optic 8 core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
40,451 809
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 80,901 1,618
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 1 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Tukang Listrik hari orang 0.13
1 UNIT 1 2 3 4
UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Rp Installation, commissionin and testing ls 1.00 Rp Panel I / O unit 1.00 Tenaga Kerja :
Rp Rp
4,746,203 94,924
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
24,797,596 495,952
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
81,673,785 1,633,476
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
192,868,411 3,857,368
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
163,347,571 3,266,951
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
203,053,869 4,061,077
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
297,093,400 5,941,868
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Rp Rp
607,956,181 12,159,124
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 631,506,514 12,630,130
JUMLAH HARGA Rp Rp
40,451 809
Rp Rp Rp Rp Rp
708 1,333 43,301 1,083 44,384
Rp Rp
80,901 1,618
Rp Rp Rp Rp Rp
1,417 2,667 86,603 2,165 88,768
Rp Rp
4,746,203 94,924
Rp Rp Rp Rp Rp
2,833 5,333 4,849,293 121,232 4,970,526
Rp Rp
24,797,596 495,952
Rp Rp Rp Rp Rp
2,833 5,333 25,301,715 632,543 25,934,258
Rp Rp
81,673,785 1,633,476
Rp Rp Rp Rp Rp
2,833 5,333 83,315,428 2,082,886 85,398,313
Rp Rp
192,868,411 3,857,368
Rp Rp Rp Rp Rp
2,833 5,333 196,733,946 4,918,349 201,652,295
Rp Rp
163,347,571 3,266,951
Rp Rp Rp Rp Rp
2,833 5,333 166,622,689 4,165,567 170,788,256
Rp Rp
203,053,869 4,061,077
Rp Rp Rp Rp Rp
2,833 5,333 207,123,114 5,178,078 212,301,191
Rp Rp
297,093,400 5,941,868
Rp Rp Rp Rp Rp
2,833 5,333 303,043,435 7,576,086 310,619,521
Rp Rp
607,956,181 12,159,124
Rp Rp Rp Rp Rp
5,667 10,667 620,131,638 15,503,291 635,634,929
Rp Rp Rp
631,506,514 12,630,130 -
TOTAL HARGA Rp
44,384
Rp
88,768
Rp
4,970,526
Rp
25,934,258
Rp
85,398,313
Rp
201,652,295
Rp
170,788,256
Rp
212,301,191
Rp
310,619,521
Rp
635,634,929
Rp
660,256,802
Analisa Harga Satuan Elektrikal - page 160 of 280
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
SAT
INDEK
hari orang hari orang
HARGA SATUAN
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Panel I / O unit 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Tukang Listrik hari orang 0.13
Rp Rp
841,323,722 16,826,474
Rp Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 BH 1 2 3
Data Outlet ( RG-45 ) Data Outlet ( RG-45 ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
FLOOR SOCKET DATA Floor Outlet Data Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Proyektor Proyektor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac bh Wave 2)1.00 Rp Instalasi ls 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Rp Tukang Listrik hari orang 0.05 Rp
1 BH 1 2 3
PATH PANEL 1 X 32 PORT PATH PANEL 1 X 32 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 24 PORT PATH PANEL 1 X 24 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 12 PORT PATH PANEL 1 X 12 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 48 PORT PATH PANEL 1 X 48 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 64 PORT PATH PANEL 1 X 64 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1
SMOKE DETECTOR Smoke Detector
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
54,873 1,097
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 292,143 5,843
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,659,171 333,183
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 11,816,362 236,327
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
bh
1.00 Rp
6,734,214 134,684
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,591,833 71,837
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,137,948 42,759
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,183,665 143,673
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,468,428 269,369
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,174,226
JUMLAH HARGA Rp Rp Rp Rp Rp
5,667 10,667 644,152,978 16,103,824 660,256,802
Rp Rp Rp
841,323,722 16,826,474 -
Rp Rp Rp Rp Rp
5,667 10,667 858,166,530 21,454,163 879,620,693
Rp Rp
54,873 1,097
Rp Rp Rp Rp Rp
2,125 4,000 62,096 1,552 63,648
Rp Rp
292,143 5,843
Rp Rp Rp Rp Rp
2,125 4,000 304,111 7,603 311,714
Rp Rp
16,659,171 333,183
Rp Rp Rp Rp Rp
2,125 4,000 16,998,479 424,962 17,423,441
Rp Rp
11,816,362 236,327
Rp Rp Rp Rp Rp
2,125 4,000 12,058,814 301,470 12,360,284
Rp Rp
6,734,214 134,684
Rp Rp Rp Rp Rp
2,125 4,000 6,875,023 171,876 7,046,899
Rp Rp
3,591,833 71,837
Rp Rp Rp Rp Rp
2,125 4,000 3,669,794 91,745 3,761,539
Rp Rp
2,137,948 42,759
Rp Rp Rp Rp Rp
2,125 4,000 2,186,832 54,671 2,241,503
Rp Rp
7,183,665 143,673
Rp Rp Rp Rp Rp
2,125 4,000 7,333,463 183,337 7,516,800
Rp Rp
13,468,428 269,369
Rp Rp Rp Rp Rp
2,125 4,000 13,743,922 343,598 14,087,520
Rp
1,174,226
TOTAL HARGA
Rp
879,620,693
Rp
63,648
Rp
311,714
Rp
17,423,441
Rp
12,360,284
Rp
7,046,899
Rp
3,761,539
Rp
2,241,503
Rp
7,516,800
Rp
14,087,520
Rp
1,244,395
Analisa Harga Satuan Elektrikal - page 161 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Rate Of Rise Heat Detector Rate Of Rise Heat Detector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Fixed Temperature Heat Detector Fixed Temperature Heat Detector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Breakglass Call point w/phone jack Manual Breack glass Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Av Phase Ii S/Strobe Non Iso Av Phase Ii S/Strobe Non Iso Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
INDICATOR LAMP Lampu Indicator Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
MDFA (60 x 80 x 20) MDFA (60 x 80 x 20) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Isolated USB Upload/Download Lead Isolated USB Upload/Download Lead Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
PANEL DXc1-S SINGLE LOOP REGION 2 PANEL DXc1-S SINGLE LOOP REGION 2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
ls
1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
HARGA SATUAN 23,485
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,124,238 22,485
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,124,238 22,485
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 624,521 12,490
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,621,921 92,438
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 156,049 3,121
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,805,530 96,111
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,244,701 144,894
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 42,115,051 842,301
JUMLAH HARGA Rp
23,485
Rp Rp Rp Rp Rp
5,667 10,667 1,214,043 30,351 1,244,395
Rp Rp
1,124,238 22,485
Rp Rp Rp Rp Rp
5,667 10,667 1,163,056 29,076 1,192,132
Rp Rp
1,124,238 22,485
Rp Rp Rp Rp Rp
5,667 10,667 1,163,056 29,076 1,192,132
Rp Rp
624,521 12,490
Rp Rp Rp Rp Rp
5,667 10,667 653,344 16,334 669,678
Rp Rp
4,621,921 92,438
Rp Rp Rp Rp Rp
5,667 10,667 4,730,693 118,267 4,848,960
Rp Rp
156,049 3,121
Rp Rp Rp Rp Rp
5,667 10,667 175,504 4,388 179,891
Rp Rp
4,805,530 96,111
Rp Rp Rp Rp Rp
5,667 10,667 4,917,974 122,949 5,040,923
Rp Rp
7,244,701 144,894
Rp Rp Rp Rp Rp
8,500 16,000 7,414,095 185,352 7,599,447
Rp Rp
42,115,051 842,301
TOTAL HARGA
Rp
1,192,132
Rp
1,192,132
Rp
669,678
Rp
4,848,960
Rp
179,891
Rp
5,040,923
Rp
7,599,447
Rp
44,056,399
85,000 Rp 8,500 80,000 Rp 16,000 Jumlah Rp 42,981,852 Keuntungan 2,5% Rp 1,074,546 Total = Jumlah+(Keuntungan 2,5%) Rp 44,056,399 1 UNIT Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) Rp 1 Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device unit / loop ) 1.00 Rp 56,563,293 Rp 56,563,293 2 Instalasi ls 1.00 Rp 1,131,266 Rp 1,131,266 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.10 Rp 85,000 Rp 8,500 Tukang Listrik hari orang 0.20 Rp 80,000 Rp 16,000 Jumlah Rp 57,719,059 Keuntungan 2,5% Rp 1,442,976 Total = Jumlah+(Keuntungan 2,5%) Rp 59,162,035 1 UNIT Panel Dxc4-M Four Loop Region 5 Rp 1 Panel Dxc4-M Four Loop Region 5 unit 1.00 Rp 106,678,975 Rp 106,678,975 2 Instalasi ls 1.00 Rp 2,133,580 Rp 2,133,580 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.10 Rp 85,000 Rp 8,500 Tukang Listrik hari orang 0.20 Rp 80,000 Rp 16,000 Jumlah Rp 108,837,055 Keuntungan 2,5% Rp 2,720,926 Total = Jumlah+(Keuntungan 2,5%) Rp 111,557,981 1 UNIT Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels require a 24 Vdc supply. 24 Vdc supp Rp
59,162,035
111,557,981
44,691,164
Analisa Harga Satuan Elektrikal - page 162 of 280
URAIAN
NO. 1 2 3
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test unit Controls.DX control 1.00 panels Rp require a42,722,192 24 Vdc supply. Rp24 Vdc supply 42,722,192 and an RS485 Instalasi ls 1.00 Rp 854,444 Rp 854,444 Tenaga Kerja : Kepala Tukang listrik hari orang 0.10 Rp 85,000 Rp 8,500 Tukang Listrik hari orang 0.20 Rp 80,000 Rp 16,000 Jumlah Rp 43,601,136 Keuntungan 2,5% Rp 1,090,028 Total = Jumlah+(Keuntungan 2,5%) Rp 44,691,164
1 UNIT 1 2 3
Module for Pressurized Fan (Kontrol) Module for Pressurized Fan (Kontrol) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for AC Module for AC Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for PABX (Autodial) Module for PABX (Autodial) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for Sound System Module for Sound System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for Genset Panel Module for Genset Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Mias 200 Series Advance Base Mias 200 Series Advance Base Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Isolator Module Isolator Module Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
TBFA (20 x 30 x 20) TBFA (20 x 30 x 20) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Battery 12 V 17 AH Battery 12 V 17 AH Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
End of Line End of Line Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,177,112 23,542
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
161,942 3,239
Rp Rp Rp Rp Rp
8,500 16,000 189,680 4,742 194,422
Rp Rp
673,907 13,478
Rp Rp Rp Rp Rp
8,500 16,000 711,885 17,797 729,682
Rp Rp
1,922,212 38,444
Rp Rp Rp Rp Rp
14,167 26,667 2,001,490 50,037 2,051,527
Rp Rp
1,922,212 38,444
Rp Rp Rp Rp Rp
7,083 13,333 1,981,073 49,527 2,030,600
26,697 534
Rp Rp
26,697 534
85,000 80,000 Jumlah
Rp Rp Rp
7,083 13,333 47,648
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 161,942 3,239
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 673,907 13,478
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,922,212 38,444
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,922,212 38,444
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
194,422
Rp
729,682
Rp
2,051,527
Rp
1,981,073
Rp
48,839
Analisa Harga Satuan Elektrikal - page 163 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
Manual Call Point Backbox Manual Call Point Backbox Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Outside Screw & Yoke Supervisory Switch W/2 Spdt. Outside Screw & Yoke Supervisory Switch W/2 Spdt. Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Waterflow Detector 2.5" Waterflow Detector 2.5" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
159,896 3,198
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,885,009 77,700
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,422,701 68,454
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Conventional Zone Module, Mias, In. For Integrasi and M400K/t Conventional Zone Module, Mias, In. For Integrasi and M400K/t bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasibh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Output Module, Mias, In. For Integrasi Output Module, Mias, In. For Integrasi Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Antena Parabola + Kabel Coaxial + Pekerjaan Sipil Antena Parabola + Kabel Coaxial + Pekerjaan Sipil Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
8 CH HD Encoder 8 CH HD Encoder Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
8 CH DVBS to IP 8 CH DVBS to IP Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1.00 Rp 1.00 Rp
3,397,872 67,957
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
2,148,664 42,973
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
2,348,451 46,969
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
20,629,801 412,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Middleware & VoD Server c/w IPTV Application 1 Middleware & VoD Server c/w IPTV Application
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh
1.00 Rp
9,352,176 187,044
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 64,720,943 1,294,419
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 36,405,531 728,111
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 242,703,537
TOTAL HARGA
1,191 48,839
Rp Rp
159,896 3,198
Rp Rp Rp Rp Rp
7,083 13,333 183,510 4,588 188,098
Rp Rp
3,885,009 77,700
Rp Rp Rp Rp Rp
3,542 6,667 3,972,917 99,323 4,072,240
Rp Rp
3,422,701 68,454
Rp Rp Rp Rp Rp
3,542 6,667 3,501,363 87,534 3,588,897
Rp Rp
3,397,872 67,957
Rp Rp Rp Rp Rp
3,542 6,667 3,476,038 86,901 3,562,939
Rp Rp
2,148,664 42,973
Rp Rp Rp Rp Rp
3,542 6,667 2,201,846 55,046 2,256,892
Rp Rp
2,348,451 46,969
Rp Rp Rp Rp Rp
3,542 6,667 2,405,629 60,141 2,465,769
Rp Rp
20,629,801 412,596
Rp Rp Rp Rp Rp
3,542 6,667 21,052,605 526,315 21,578,920
Rp Rp
9,352,176 187,044
Rp Rp Rp Rp Rp
3,542 6,667 9,549,428 238,736 9,788,164
Rp Rp
64,720,943 1,294,419
Rp Rp Rp Rp Rp
3,542 6,667 66,025,570 1,650,639 67,676,210
Rp Rp
36,405,531 728,111
Rp Rp Rp Rp Rp
3,542 6,667 37,143,850 928,596 38,072,446
Rp
242,703,537
Rp
188,098
Rp
4,072,240
Rp
3,588,897
Rp
3,562,939
Rp
2,256,892
Rp
2,465,769
Rp
21,578,920
Rp
9,788,164
Rp
67,676,210
Rp
38,072,446
Rp
253,757,012
Analisa Harga Satuan Elektrikal - page 164 of 280
URAIAN
NO. 2 3
1 UNIT 1 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Multicast Switch 24G Multicast Switch 24G Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
SIP PBX 20/200 SIP PBX 20/200 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Access Point (Wi-Fi) Access Point (Wi-Fi) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET PABX 6 Co line/100 Ext 1 PABX 6 Co line/100 Ext 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 24 ports Single Line Interface Board 1 24 ports Single Line Interface Board 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Proffesional Digital Proprietary Phone 1 Proffesional Digital Proprietary Phone 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Single Line Telephone with CID (white grey/black) 1 Single Line Telephone with CID (white grey/black) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 19” Rack Mounting Bracket(Option) 1 19” Rack Mounting Bracket(Option) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Terminal Box PABX 1 Set : 1 Terminal Box PABX 1 Set : 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 19” Rack Mounting Bracket(Option) 1 19” Rack Mounting Bracket(Option) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Reciver Satellite Parabola 1 Reciver Satellite Parabola 2 Tenaga Kerja : Kepala Tukang listrik
SAT
INDEK
ls
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang
0.04 Rp
HARGA SATUAN 4,854,071
JUMLAH HARGA Rp
4,854,071
Rp Rp Rp Rp Rp
3,542 6,667 247,567,816 6,189,195 253,757,012
Rp Rp
16,503,841 330,077
Rp Rp Rp Rp Rp
3,542 6,667 16,844,126 421,103 17,265,229
Rp Rp
412,596,013 8,251,920
Rp Rp Rp Rp Rp
3,542 6,667 420,858,142 10,521,454 431,379,596
Rp Rp
5,707,578 114,152
Rp Rp Rp Rp Rp
3,542 6,667 5,831,938 145,798 5,977,737
Rp
53,295,899
Rp Rp Rp Rp Rp
3,542 6,667 53,306,107 1,332,653 54,638,760
Rp
13,526,677
Rp Rp Rp Rp Rp
3,542 6,667 13,536,885 338,422 13,875,308
Rp
5,208,957
Rp Rp Rp Rp Rp
3,542 6,667 5,219,166 130,479 5,349,645
Rp
866,182
Rp Rp Rp Rp Rp
3,542 6,667 876,390 21,910 898,300
Rp
8,539,569
Rp Rp Rp Rp Rp
3,542 6,667 8,549,777 213,744 8,763,522
Rp
1,752,859
Rp Rp Rp Rp Rp
3,542 6,667 1,763,067 44,077 1,807,144
Rp
8,539,569
Rp Rp Rp Rp Rp
3,542 6,667 8,549,777 213,744 8,763,522
988,792
Rp
988,792
85,000
Rp
3,542
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,503,841 330,077
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 412,596,013 8,251,920
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,707,578 114,152
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 53,295,899
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,526,677
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,208,957
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 866,182
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,539,569
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,752,859
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,539,569
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
17,265,229
Rp
431,379,596
Rp
5,977,737
Rp
54,638,760
Rp
13,875,308
Rp
5,349,645
Rp
898,300
Rp
8,763,522
Rp
1,807,144
Rp
8,763,522
Rp
1,023,976
Analisa Harga Satuan Elektrikal - page 165 of 280
URAIAN
NO. Tukang Listrik
1 UNIT Active Combiner 1 Active Combiner 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Booster Amplifiere 1 Booster Amplifiere 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
hari orang
0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
HARGA SATUAN
80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,146,157
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,842,863
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Parabola Antenne lengkap dengan tiang dan aksesories 1 Parabola Antenne lengkap dengan tiang dan aksesories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp
2,247,255
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Splitter 1 Splitter 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Instalasi Kabel dari Antena ke Sentral unit 1 Instalasi Kabel dari Antena ke Sentral unit 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
2 x 8 DVBS/T to IP Penerima Channel FTA 2 x 8 DVBS/T to IP Penerima Channel FTA Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
TBS (Terminal Box Speaker) TBS (Terminal Box Speaker) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
314,616
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 11,865,506
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,078,739 61,575
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,213,518 24,270
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 BH 1 2 3
CD/MMC/USB Player With FM Tunner CD/MMC/USB Player With FM Tunner Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Remote Microphone Remote Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Voice Alarm System Amplifier 360 W w/Zone Selector Voice Alarm System Amplifier 360 W w/Zone Selector bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
SPEAKER SELECTOR 1x10 Channel Speaker Selector 10 ch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
4,853,262 97,065
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,452,739 109,055
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
33,713,139 674,263
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
6,667 999,001 24,975 1,023,976
Rp
3,146,157
Rp Rp Rp Rp Rp
3,542 6,667 3,156,365 78,909 3,235,274
Rp
5,842,863
Rp Rp Rp Rp Rp
3,542 6,667 5,853,071 146,327 5,999,398
Rp
2,247,255
Rp Rp Rp Rp Rp
3,542 6,667 2,257,463 56,437 2,313,900
Rp
314,616
Rp Rp Rp Rp Rp
3,542 6,667 324,824 8,121 332,945
Rp
11,865,506
Rp Rp Rp Rp Rp
3,542 6,667 11,875,715 296,893 12,172,607
Rp Rp
3,078,739 61,575
Rp Rp Rp Rp Rp
3,542 6,667 3,150,522 78,763 3,229,285
Rp Rp
1,213,518 24,270
Rp Rp Rp Rp Rp
3,542 6,667 1,247,996 31,200 1,279,196
Rp Rp
4,853,262 97,065
Rp Rp Rp Rp Rp
7,083 13,333 4,970,744 124,269 5,095,012
Rp Rp
5,452,739 109,055
Rp Rp Rp Rp Rp
7,083 13,333 5,582,211 139,555 5,721,766
Rp Rp
33,713,139 674,263
Rp Rp Rp Rp Rp
14,167 26,667 34,428,235 860,706 35,288,941
bh ls
1.00 Rp 1.00 Rp
3,640,553 72,811
Rp Rp
3,640,553 72,811
hari orang hari orang
0.08 Rp 0.17 Rp
85,000 80,000
Rp Rp
7,083 13,333
TOTAL HARGA
Rp
3,235,274
Rp
5,999,398
Rp
2,313,900
Rp
332,945
Rp
12,172,607
Rp
3,229,285
Rp
1,279,196
Rp
5,095,012
Rp
5,721,766
Rp
35,288,941
Rp
3,827,125
Analisa Harga Satuan Elektrikal - page 166 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 BH 1 2 3
SPEAKER SELECTOR 2x10 Channel Speaker Selector 10 ch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Digital Matrix Mixer w/ Equalizer Program Digital Matrix Mixer w/ Equalizer Program Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Flight Case 16U Flight Case 16U Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Firedome Speaker w/Metal Box Firedome Speaker w/Metal Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Wireless Set (Dual Wireless Lavalier and Handheld) Wireless Set (Dual Wireless Lavalier and Handheld) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Power Amplifier 120 W Power Amplifier 120 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Amplifier 480 W Power Amplifier 480 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Amplifier 240 W Power Amplifier 240 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Slim Array Speaker Slim Array Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
F-Series Box Speaker F-Series Box Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Ceiling Speaker 3 W Ceiling Speaker 3 W Instalasi Tenaga Kerja : Kepala Tukang listrik
bh ls
2.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.19 Rp 0.38 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang
0.08 Rp
3,640,553 72,811
Rp Rp
7,281,106 72,811
Rp Rp Rp Rp Rp
7,083 13,333 7,374,334 184,358 7,558,692
Rp Rp
23,688,674 473,773
Rp Rp Rp Rp Rp
16,292 30,667 24,209,406 605,235 24,814,641
Rp Rp
7,331,265 146,625
Rp Rp Rp Rp Rp
7,083 13,333 7,498,307 187,458 7,685,764
Rp Rp
774,224 15,484
Rp Rp Rp Rp Rp
7,083 13,333 810,125 20,253 830,379
Rp Rp
198,208 3,964
Rp Rp Rp Rp Rp
7,083 13,333 222,589 5,565 228,153
Rp Rp
2,552,513 51,050
Rp Rp Rp Rp Rp
7,083 13,333 2,623,980 65,600 2,689,580
Rp Rp
7,921,034 158,421
Rp Rp Rp Rp Rp
7,083 13,333 8,099,872 202,497 8,302,369
Rp Rp
3,811,255 76,225
Rp Rp Rp Rp Rp
7,083 13,333 3,907,896 97,697 4,005,594
Rp Rp
6,666,257 133,325
Rp Rp Rp Rp Rp
7,083 13,333 6,819,999 170,500 6,990,499
Rp Rp
1,380,174 27,603
Rp Rp Rp Rp Rp
7,083 13,333 1,428,194 35,705 1,463,899
136,723 2,734
Rp Rp
136,723 2,734
85,000
Rp
7,083
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,688,674 473,773
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,331,265 146,625
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 774,224 15,484
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 198,208 3,964
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,552,513 51,050
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,921,034 158,421
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,811,255 76,225
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,666,257 133,325
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,380,174 27,603
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
3,733,781 93,345 3,827,125 Rp
7,558,692
Rp
24,814,641
Rp
7,685,764
Rp
830,379
Rp
228,153
Rp
2,689,580
Rp
8,302,369
Rp
4,005,594
Rp
6,990,499
Rp
1,463,899
Rp
163,871
Analisa Harga Satuan Elektrikal - page 167 of 280
URAIAN
NO. Tukang Listrik
1 BH 1 2 3
Emergency Message Panel Emergency Message Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Ceiling Speaker 3 W + Pagging Ceiling Speaker 3 W + Pagging Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 6 W Box Speaker 6 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 15 W Box Speaker 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 30 W Box Speaker 30 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Set Top Box Set Top Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Cabinet Rack with Accecories Cabinet Rack with Accecories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Attenuator Attenuator Instalasi Tenaga Kerja : Kepala Tukang listrik Pekerja
1 BH 1 2 3
Dynamic Microphone w/ Stand (Muadzin) Dynamic Microphone w/ Stand (Muadzin) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
MDF / CTB MDF / CTB Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH
16-Channel Mixing Console
SAT
INDEK
hari orang
0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.20 Rp 0.50 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
HARGA SATUAN
80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,786,677 175,734
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 438,484 8,770
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 198,208 3,964
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 801,731 16,035
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,603,461 32,069
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,577,573 31,551
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,904,020 298,080
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 137,532 2,751
85,000 70,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,614,788 32,296
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,966,646 59,333
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp Rp Rp
13,333 159,874 3,997 163,871
Rp Rp
8,786,677 175,734
Rp Rp Rp Rp Rp
3,542 6,667 8,972,619 224,315 9,196,934
Rp Rp
438,484 8,770
Rp Rp Rp Rp Rp
3,542 6,667 457,462 11,437 468,899
Rp Rp
198,208 3,964
Rp Rp Rp Rp Rp
3,542 6,667 212,380 5,310 217,690
Rp Rp
801,731 16,035
Rp Rp Rp Rp Rp
3,542 6,667 827,974 20,699 848,673
Rp Rp
1,603,461 32,069
Rp Rp Rp Rp Rp
3,542 6,667 1,645,739 41,143 1,686,882
Rp Rp
1,577,573 31,551
Rp Rp Rp Rp Rp
3,542 6,667 1,619,333 40,483 1,659,816
Rp Rp
14,904,020 298,080
Rp Rp Rp Rp Rp
17,000 40,000 15,259,100 381,478 15,640,578
Rp Rp
137,532 2,751
Rp Rp Rp Rp Rp
3,542 5,833 149,658 3,741 153,399
Rp Rp
1,614,788 32,296
Rp Rp Rp Rp Rp
3,542 6,667 1,657,292 41,432 1,698,724
Rp Rp
2,966,646 59,333
Rp Rp Rp Rp Rp
3,542 6,667 3,036,187 75,905 3,112,092
TOTAL HARGA
Rp
9,196,934
Rp
468,899
Rp
217,690
Rp
848,673
Rp
1,686,882
Rp
1,659,816
Rp
15,640,578
Rp
153,399
Rp
1,698,724
Rp
3,112,092
Rp
5,846,634
Analisa Harga Satuan Elektrikal - page 168 of 280
URAIAN
NO. 1 2 3
16-Channel Mixing Console Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
HARGA SATUAN 5,582,181 111,644
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 SET 1 2 3
Hand Held Wireless Microphone w/ Receiver Hand Held Wireless Microphone w/ Receiver Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Undirectional Lavaliere Wireless Microphone w/ Receiver Undirectional Lavaliere Wireless Microphone w/ Receiver set Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
Wireless Antena Wireless Antena Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dynamic Microphone Dynamic Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Floor Stand Mic. Floor Stand Mic. Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Digital Speaker Processor w/ Equalizer Digital Speaker Processor w/ Equalizer Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Multi Channel Power Amplifier Multi Channel Power Amplifier Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Dual Power Amplifier Dual Power Amplifier Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Speaker System Speaker System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Subwofer System Subwofer System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Monitor Speaker Monitor Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
11,462,888 229,258
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
11,339,918 226,798
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,967,517 39,350
JUMLAH HARGA Rp Rp
5,582,181 111,644
Rp Rp Rp Rp Rp
3,542 6,667 5,704,033 142,601 5,846,634
Rp Rp
11,462,888 229,258
Rp Rp Rp Rp Rp
3,542 6,667 11,702,354 292,559 11,994,913
Rp Rp
11,339,918 226,798
Rp Rp Rp Rp Rp
3,542 6,667 11,576,925 289,423 11,866,348
Rp Rp
1,967,517 39,350
Rp Rp Rp Rp Rp
3,542 6,667 2,017,075 50,427 2,067,502
Rp Rp
991,848 19,837
Rp Rp Rp Rp Rp
3,542 6,667 1,021,894 25,547 1,047,441
Rp Rp
622,939 12,459
Rp Rp Rp Rp Rp
3,542 6,667 645,606 16,140 661,746
Rp Rp
32,281,188 645,624
Rp Rp Rp Rp Rp
3,542 6,667 32,937,021 823,426 33,760,446
Rp Rp
17,411,552 348,231
Rp Rp Rp Rp Rp
3,542 6,667 17,769,991 444,250 18,214,241
Rp Rp
6,887,117 137,742
Rp Rp Rp Rp Rp
3,542 6,667 7,035,068 175,877 7,210,945
Rp Rp
24,062,438 481,249
Rp Rp Rp Rp Rp
3,542 6,667 24,553,895 613,847 25,167,742
Rp Rp
12,927,199 258,544
Rp Rp Rp Rp Rp
3,542 6,667 13,195,952 329,899 13,525,851
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
2,634,142 52,683
Rp Rp
2,634,142 52,683
hari orang hari orang
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah
Rp Rp Rp
3,542 6,667 2,697,034
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 991,848 19,837
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 622,939 12,459
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 32,281,188 645,624
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,411,552 348,231
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,887,117 137,742
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 24,062,438 481,249
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,927,199 258,544
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
11,994,913
Rp
11,866,348
Rp
2,067,502
Rp
1,047,441
Rp
661,746
Rp
33,760,446
Rp
18,214,241
Rp
7,210,945
Rp
25,167,742
Rp
13,525,851
Rp
2,764,459
Analisa Harga Satuan Elektrikal - page 169 of 280
URAIAN
NO.
1 BH 1 2 3
HX-Series Speaker HX-Series Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Yamaha Mixer Yamaha Mixer Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Paging Microphone w/RU-2002 (Car Call) Paging Microphone w/RU-2002 (Car Call) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ANTENA PARABOLA 32 Feet Antena Parabola 32 Feet Instalasi Tenaga Kerja : Tiang/Dudukan Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ANTENA YAGI VHF 22 ELEMENT Antena Yagi VHF 22 Element Instalasi Tenaga Kerja : Tiang/Dudukan Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
TERMINAL BOX + BOOSTER Terminal Box + Booster signal & P.supply Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ACTIVE COMBINER Active Filter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
POWER DEVIDER Power DeviderActive Filter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Digital A/V Encoder Digital A/V Encoder Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
DEMODULATOR Demodulator Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
JSKYE 200 Wp Solar Panel JSKYE 200 Wp Solar Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
Ls hari orang hari orang
1.00 Rp 0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
Ls hari orang hari orang
1.00 Rp 0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
6,628,234 132,565
67,426 2,764,459
Rp Rp
6,628,234 132,565
Rp Rp Rp Rp Rp
3,542 6,667 6,771,007 169,275 6,940,282
Rp Rp
23,461,342 469,227
Rp Rp Rp Rp Rp
3,542 6,667 23,940,777 598,519 24,539,297
Rp Rp
5,136,416 102,728
Rp Rp Rp Rp Rp
3,542 6,667 5,249,353 131,234 5,380,586
Rp Rp
16,419,973 328,399
Rp Rp Rp Rp Rp Rp
1,500,000 14,167 26,667 18,289,206 457,230 18,746,436
Rp Rp
2,873,520 57,470
Rp Rp Rp Rp Rp Rp
646,580 14,167 26,667 3,618,404 90,460 3,708,864
Rp Rp
3,883,257 77,665
Rp Rp Rp Rp Rp
10,625 20,000 3,991,547 99,789 4,091,335
Rp Rp
3,951,034 79,021
Rp Rp Rp Rp Rp
10,625 20,000 4,060,679 101,517 4,162,196
Rp Rp
3,078,739 61,575
Rp Rp Rp Rp Rp
10,625 20,000 3,170,939 79,273 3,250,213
Rp Rp
7,335,040 146,701
Rp Rp Rp Rp Rp
10,625 20,000 7,512,366 187,809 7,700,175
Rp Rp
2,471,980 49,440
Rp Rp Rp Rp Rp
10,625 20,000 2,552,045 63,801 2,615,846
1,618,024 32,360
Rp Rp
1,618,024 32,360
85,000 80,000 Jumlah
Rp Rp Rp
28,333 53,333 1,732,051
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,461,342 469,227
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,136,416 102,728
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,419,973 328,399
1,500,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,873,520 57,470
646,580 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,883,257 77,665
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,951,034 79,021
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,078,739 61,575
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,335,040 146,701
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,471,980 49,440
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
6,940,282
Rp
24,539,297
Rp
5,380,586
Rp
18,746,436
Rp
3,708,864
Rp
4,091,335
Rp
4,162,196
Rp
3,250,213
Rp
7,700,175
Rp
2,615,846
Rp
1,775,352
Analisa Harga Satuan Elektrikal - page 170 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 BH 1 2 3
SMA Sunny Boy 1.5kW SMA Sunny Boy 1.5kW Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SMA Sunny Island 4.4 SMA Sunny Island 4.4 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
NS VRLA 12v 100 Ah NS VRLA 12v 100 Ah Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Panel Combiner Box Panel Combiner Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Cabling & accs Cabling & accs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Solar Mounting Solar Mounting Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Battery Rack & Accs Battery Rack & Accs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Inverter Hybrid san Solar Panel Charge Controller Inverter Hybrid san Solar Panel Charge Controller Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
Solar Cable 6mm2 Solar Cable 6mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
MC4 Connector Female MC4 Connector Female Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS MC4 Connector Male 1 MC4 Connector Male
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
pcs
1.00 Rp
13,483,530 269,671
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 43,147,296 862,946
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,516,926 50,339
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,887,922 197,758
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,943,961 98,879
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,045,059 80,901
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,180,236 323,605
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 49,439,609 988,792
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 49,080 982
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,427 129
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,427
TOTAL HARGA
43,301 1,775,352
Rp Rp
13,483,530 269,671
Rp Rp Rp Rp Rp
28,333 53,333 13,834,867 345,872 14,180,739
Rp Rp
43,147,296 862,946
Rp Rp Rp Rp Rp
28,333 53,333 44,091,908 1,102,298 45,194,206
Rp Rp
2,516,926 50,339
Rp Rp Rp Rp Rp
28,333 53,333 2,648,931 66,223 2,715,154
Rp Rp
9,887,922 197,758
Rp Rp Rp Rp Rp
14,167 26,667 10,126,514 253,163 10,379,677
Rp Rp
4,943,961 98,879
Rp Rp Rp Rp Rp
14,167 26,667 5,083,673 127,092 5,210,765
Rp Rp
4,045,059 80,901
Rp Rp Rp Rp Rp
14,167 26,667 4,166,793 104,170 4,270,963
Rp Rp
16,180,236 323,605
Rp Rp Rp Rp Rp
14,167 26,667 16,544,674 413,617 16,958,291
Rp Rp
49,439,609 988,792
Rp Rp Rp Rp Rp
14,167 26,667 50,469,235 1,261,731 51,730,966
Rp Rp
49,080 982
Rp Rp Rp Rp Rp
2,550 6,400 59,012 1,475 60,487
Rp Rp
6,427 129
Rp Rp Rp Rp Rp
2,550 6,400 15,506 388 15,893
Rp
6,427
Rp
14,180,739
Rp
45,194,206
Rp
2,715,154
Rp
10,379,677
Rp
5,210,765
Rp
4,270,963
Rp
16,958,291
Rp
51,730,966
Rp
60,487
Rp
15,893
Rp
15,893
Analisa Harga Satuan Elektrikal - page 171 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
Cable Trenching Cable Trenching Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Prewiring and Components Prewiring and Components Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Grounding System Grounding System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH
Instalasi & Test Commisioning Instalasi & Test Commisioning
1 BH 1 2 3
DIGITAL SATELITE RECEIVER & MODULATOR Digital Satelite Receiver & Modulator Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Parabola Tv Berbayar Parabola Tv Berbayar Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SPLITER Spliter 4 way Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
COUPLER Coupler Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SOCKET TV SOCKET TV Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Mixer Amplifier 60 W (Monitor) Mixer Amplifier 60 W (Monitor) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2
Gooseneck Microphone (Mimbar) Gooseneck Microphone (Mimbar) Instalasi
SAT
INDEK
ls
1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh
1.00 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
bh ls
1.00 Rp 1.00 Rp
HARGA SATUAN 129
JUMLAH HARGA Rp
129
Rp Rp Rp Rp Rp
2,550 6,400 15,506 388 15,893
Rp Rp
67,418 1,348
Rp Rp Rp Rp Rp
2,550 6,400 77,716 1,943 79,659
Rp Rp
30,738,178 614,764
Rp Rp Rp Rp Rp
14,167 26,667 31,393,775 784,844 32,178,620
Rp Rp
24,270,354 485,407
Rp Rp Rp Rp Rp
14,167 26,667 24,796,594 619,915 25,416,509
26,967,060 Jumlah
Rp Rp
26,967,060 26,967,060
4,884,903 97,698
Rp Rp
4,884,903 97,698
Rp Rp Rp Rp Rp
14,167 26,667 5,023,434 125,586 5,149,020
Rp Rp
584,286 11,686
Rp Rp Rp Rp Rp
14,167 26,667 636,805 15,920 652,725
Rp Rp
242,434 4,849
Rp Rp Rp Rp Rp
7,083 13,333 267,699 6,692 274,392
Rp Rp
134,835 2,697
Rp Rp Rp Rp Rp
7,083 13,333 157,949 3,949 161,897
Rp Rp
67,418 1,348
Rp Rp Rp Rp Rp
3,542 6,667 78,974 1,974 80,949
Rp Rp
1,963,795 39,276
Rp Rp Rp Rp Rp
3,542 6,667 2,013,279 50,332 2,063,611
Rp Rp
1,057,378 21,148
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 67,418 1,348
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,738,178 614,764
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 24,270,354 485,407
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 584,286 11,686
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 242,434 4,849
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 134,835 2,697
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 67,418 1,348
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,963,795 39,276
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,057,378 21,148
TOTAL HARGA
Rp
79,659
Rp
32,178,620
Rp
25,416,509
Rp
26,967,060
Rp
5,149,020
Rp
652,725
Rp
274,392
Rp
161,897
Rp
80,949
Rp
2,063,611
Rp
1,126,416
Analisa Harga Satuan Elektrikal - page 172 of 280
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dynamic Microphone w/ Stand (Muadzin) Dynamic Microphone w/ Stand (Muadzin) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dome Camera : 4MP IR Ball Camera Dome Camera : 4MP IR Ball Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Eyeball Fixed Lens IP Camera Eyeball Fixed Lens IP Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Bullet Camera : 4 MP Bullet Camera Bullet Camera : 4 MP Bullet Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Driver Unit 60 W w/ Horn Driver Unit 60 W w/ Horn Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dual Power Amplifier 1250 W Dual Power Amplifier 1250 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1SET 1 2 3
Digital Amplifier 480 W w/Selector Digital Amplifier 480 W w/Selector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Terminal Box 1:12 + Booster signal Terminal Box 1:12 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Terminal Box 1:8 + Booster signal Terminal Box 1:8 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Terminal Box 1:4 + Booster signal Terminal Box 1:4 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Patchpanel UTP Cat6 24 port Loaded 1 Patchpanel UTP Cat6 24 port Loaded
SAT
INDEK
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.25 Rp 0.50 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit
1.00 Rp
HARGA SATUAN
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,614,788 32,296
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,595,115 151,902
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,595,115 151,902
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,928,223 158,564
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,296,037 25,921
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,488,029 209,761
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,613,733 112,275
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,883,257 77,665
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,106,605 62,132
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,553,303 31,066
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,221,665
JUMLAH HARGA Rp Rp Rp Rp Rp
7,083 13,333 1,098,943 27,474 1,126,416
Rp Rp
1,614,788 32,296
Rp Rp Rp Rp Rp
21,250 40,000 1,708,333 42,708 1,751,042
Rp Rp
7,595,115 151,902
Rp Rp Rp Rp Rp
14,167 26,667 7,787,851 194,696 7,982,547
Rp Rp
7,595,115 151,902
Rp Rp Rp Rp Rp
14,167 26,667 7,787,851 194,696 7,982,547
Rp Rp
7,928,223 158,564
Rp Rp Rp Rp Rp
14,167 26,667 8,127,621 203,191 8,330,811
Rp Rp
1,296,037 25,921
Rp Rp Rp Rp Rp
17,708 33,333 1,372,999 34,325 1,407,324
Rp Rp
10,488,029 209,761
Rp Rp Rp Rp Rp
17,708 33,333 10,748,831 268,721 11,017,552
Rp Rp
5,613,733 112,275
Rp Rp Rp Rp Rp
17,708 33,333 5,777,049 144,426 5,921,475
Rp Rp
3,883,257 77,665
Rp Rp Rp Rp Rp
14,167 26,667 4,001,755 100,044 4,101,799
Rp Rp
3,106,605 62,132
Rp Rp Rp Rp Rp
14,167 26,667 3,209,571 80,239 3,289,810
Rp Rp
1,553,303 31,066
Rp Rp Rp Rp Rp
14,167 26,667 1,625,202 40,630 1,665,832
Rp
3,221,665
TOTAL HARGA
Rp
1,751,042
Rp
7,982,547
Rp
7,982,547
Rp
8,330,811
Rp
1,407,324
Rp
11,017,552
Rp
5,921,475
Rp
4,101,799
Rp
3,289,810
Rp
1,665,832
Rp
3,410,105
Analisa Harga Satuan Elektrikal - page 173 of 280
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
ls
1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
HARGA SATUAN 64,433
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
OTB (Optical Terminal Box) OTB (Optical Terminal Box) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patchpanel UTP Cat6 48 port Loaded Patchpanel UTP Cat6 48 port Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Core Switch Layer 3 Core Switch Layer 3 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Core Firewall + Router + IPS Core Firewall + Router + IPS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Hdd PC WD CCTV PURPLE 4TB Hdd PC WD CCTV PURPLE 4TB Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
2,182,714 43,654
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,443,329 128,867
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
781,757 15,635
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
IPPABX Headend Support Up to 400 Lines IPPABX Headend Support Up to 400 Lines Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPPABX Headend Support Up to 200 Lines IPPABX Headend Support Up to 400 Lines Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPTV Management System ( Server + Software ) IPTV Management System ( Server + Software ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPTV Headend IPTV Headend Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.17 Rp 0.33 Rp
289,446,441 5,788,929
JUMLAH HARGA Rp
64,433
Rp Rp Rp Rp Rp
14,167 26,667 3,326,931 83,173 3,410,105
Rp Rp
2,182,714 43,654
Rp Rp Rp Rp Rp
14,167 26,667 2,267,201 56,680 2,323,881
Rp Rp
6,443,329 128,867
Rp Rp Rp Rp Rp
14,167 26,667 6,613,029 165,326 6,778,355
Rp Rp
781,757 15,635
Rp Rp Rp Rp Rp
14,167 26,667 838,226 20,956 859,181
Rp Rp
289,446,441 5,788,929
Rp Rp Rp Rp Rp
7,083 13,333 295,255,786 7,381,395 302,637,181
Rp Rp
341,582,756 6,831,655
Rp Rp Rp Rp Rp
14,167 26,667 348,455,245 8,711,381 357,166,626
Rp Rp
1,589,101 31,782
Rp Rp Rp Rp Rp
12,042 22,667 1,655,592 41,390 1,696,982
Rp Rp
289,356,551 5,787,131
Rp Rp Rp Rp Rp
14,167 26,667 295,184,515 7,379,613 302,564,128
Rp Rp
144,678,275 2,893,566
Rp Rp Rp Rp Rp
14,167 26,667 147,612,674 3,690,317 151,302,991
Rp Rp
332,234,176 6,644,684
Rp Rp Rp Rp Rp
14,167 26,667 338,919,692 8,472,992 347,392,685
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.14 Rp 0.28 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1.00 Rp 1.00 Rp
159,824,774 3,196,495
Rp Rp
159,824,774 3,196,495
hari orang hari orang
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah
Rp Rp Rp
10,625 20,000 163,051,894
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 341,582,756 6,831,655
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,589,101 31,782
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 289,356,551 5,787,131
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 144,678,275 2,893,566
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 332,234,176 6,644,684
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
2,323,881
Rp
6,778,355
Rp
859,181
Rp
302,637,181
Rp
357,166,626
Rp
1,696,982
Rp
302,564,128
Rp
151,302,991
Rp
347,392,685
Rp
167,128,192
Analisa Harga Satuan Elektrikal - page 174 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
Monitor 32"+ PC for System Monitor 32"+ PC for System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Inlet Microphone Inlet Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patch Cord 1 mtr Cat6 UTP Patch Cord 1 mtr Cat6 UTP Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
TOTAL HARGA
4,076,297 167,128,192 Rp
27,844,236
Rp
376,172
Rp
157,198
Rp
21,304,707
Rp
40,480,814
Rp
240,592
Rp
2,399,013
1 UNIT Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Port to PSU air flow 1 Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, unit redundant power 1.00 supplies, Rp Built in 244,621,866 Port to PSU airRp flow 244,621,866 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 244,642,283 Keuntungan 2,5% Rp 6,116,057 Total = Jumlah+(Keuntungan 2,5%) Rp 250,758,340
Rp
250,758,340
1 UNIT Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fans 1 Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy unit Power 1.00 supplies Rpand fans608,304,962 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp
623,533,513
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
26,612,443 532,249
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 339,785 6,796
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 130,341 2,607
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door 1 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front unitdoor 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
20,764,663
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories 1 Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp
39,473,061
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 PCS MMF - Patch Cord OM3, 3m 1 MMF - Patch Cord OM3, 3m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS MMF - 12F MC DJ Trunk MPO Pol B 5M 1 MMF - 12F MC DJ Trunk MPO Pol B 5M 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.08 Rp 0.17 Rp
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
214,307
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,320,084
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
26,612,443 532,249
Rp Rp Rp Rp Rp
7,083 13,333 27,165,108 679,128 27,844,236
Rp Rp
339,785 6,796
Rp Rp Rp Rp Rp
7,083 13,333 366,997 9,175 376,172
Rp Rp
130,341 2,607
Rp Rp Rp Rp Rp
7,083 13,333 153,364 3,834 157,198
Rp
20,764,663
Rp Rp Rp Rp Rp
7,083 13,333 20,785,080 519,627 21,304,707
Rp
39,473,061
Rp Rp Rp Rp Rp
7,083 13,333 39,493,477 987,337 40,480,814
Rp
214,307
Rp Rp Rp Rp Rp
7,083 13,333 234,724 5,868 240,592
Rp
2,320,084
Rp Rp Rp Rp Rp
7,083 13,333 2,340,501 58,513 2,399,013
Rp
608,304,962
Rp Rp Rp Rp Rp
7,083 13,333 608,325,379 15,208,134 623,533,513
1 UNIT Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD,AC PSU, cable and RMK) and Software Rp 322,100,525 Base (Firewall, NAT, IPSec, Ro 1 Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G unit RAM, 16G Flash,1.00 100GRp SSD,AC PSU, 314,223,998 cable and RMK) Rp and Software 314,223,998 Base (Firewall, NAT, IPSec, Routing, MPLS and Swi 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 314,244,415 Keuntungan 2,5% Rp 7,856,110 Total = Jumlah+(Keuntungan 2,5%) Rp 322,100,525 1 UNIT Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, Rp 2 AC PSU 30,894,717 300W 1 Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, unit 2 x 40G QSFP+, 1.00 Rp redundant 30,120,771 fans, front-to-back Rp airflow,30,120,771 2 AC PSU 300W 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 30,141,188 Keuntungan 2,5% Rp 753,530 Total = Jumlah+(Keuntungan 2,5%) Rp 30,894,717
Analisa Harga Satuan Elektrikal - page 175 of 280
NO.
URAIAN
SAT
INDEK
HARGA SATUAN
1 UNIT QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF 1 QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission unit on MMF 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
54,608,296
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF 1 SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m unit Transmission 1.00 on MMF Rp 15,775,730 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1 UNIT 1U Wiring Management 1 1U Wiring Management 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
234,371
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB 1 NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDDunit up to 32TB 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
34,227,676
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT WLAN Controller 1 WLAN Controller 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT UPS 10KVA 1 UPS 10KVA 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT UPS 2KVA 1 UPS 2KVA 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
154,526,041
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 44,900,154
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,611,367
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door 1 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front unitdoor 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
11,110,483
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 19" Wallmounted Rack 15U Depth 600 mm Double Door 1 19" Wallmounted Rack 15U Depth 600 mm Double Door unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp
3,775,415
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories 1 Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
0.08 Rp 0.17 Rp
1.00 Rp 0.08 Rp 0.17 Rp
4,252,166
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp
54,608,296
Rp Rp Rp Rp Rp
7,083 13,333 54,628,713 1,365,718 55,994,430
Rp
15,775,730
Rp Rp Rp Rp Rp
7,083 13,333 15,796,147 394,904 16,191,050
Rp
234,371
Rp Rp Rp Rp Rp
7,083 13,333 254,787 6,370 261,157
Rp
34,227,676
Rp Rp Rp Rp Rp
7,083 13,333 34,248,092 856,202 35,104,295
Rp
154,526,041
Rp Rp Rp Rp Rp
7,083 13,333 154,546,458 3,863,661 158,410,120
Rp
44,900,154
Rp Rp Rp Rp Rp
7,083 13,333 44,920,571 1,123,014 46,043,585
Rp
4,611,367
Rp Rp Rp Rp Rp
7,083 13,333 4,631,784 115,795 4,747,578
Rp
11,110,483
Rp Rp Rp Rp Rp
7,083 13,333 11,130,899 278,272 11,409,172
Rp
3,775,415
Rp Rp Rp Rp Rp
7,083 13,333 3,795,832 94,896 3,890,728
Rp
4,252,166
Rp Rp Rp Rp Rp
7,083 13,333 4,272,583 106,815 4,379,397
TOTAL HARGA Rp
55,994,430
Rp
16,191,050
Rp
261,157
Rp
35,104,295
Rp
158,410,120
Rp
46,043,585
Rp
4,747,578
Rp
11,409,172
Rp
3,890,728
Rp
4,379,397
1 UNIT Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back Rp airflow, 77,390,638 2 AC PSU 1840W 1 Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4unit x 1/10G SFP/SFP+, 1.00 2 x Rp 40G QSFP+,75,482,645 redundant fans, Rp front-to-back 75,482,645 airflow, 2 AC PSU 1840W 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 75,503,061 Keuntungan 2,5% Rp 1,887,577 Total = Jumlah+(Keuntungan 2,5%) Rp 77,390,638 1 UNIT Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, Rp 2 40,739,486 AC PSU 300W 1 Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10Gunit SFP/SFP+, 2 x 40G 1.00 QSFP+, Rp redundant 39,725,424 fans, front-to-back Rp airflow, 39,725,424 2 AC PSU 300W 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 39,745,840 Analisa Harga Satuan Elektrikal - page 176 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager 1 UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loadedunit with cable Manager 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
1,527,172
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 PCS UTP Cat 6 Patchcord Blue 2m 1 UTP Cat 6 Patchcord Blue 2m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS UTP Cat 6 Patchcord Blue 3m 1 UTP Cat 6 Patchcord Blue 3m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2
MMF - 12core OM3 SLT STA in PVC HI Conduit MMF - 12core OM3 SLT STA in PVC HI Conduit Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
meter
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
81,530
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2 :8 c/w accessories POS ( Passive Optical Splitter) 2 :8 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2 :16 c/w accessories POS ( Passive Optical Splitter) 2 :16 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Wiring Management 1U Wiring Management 1U Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
UTP Cat 6 Patch Panel 24 Port Loaded UTP Cat 6 Patch Panel 24 Port Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
74,186
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
1 SET 1 2 3
58,087
1.00 Rp 1.00 Rp
20,629,801 412,596
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
UTP Cat 6 Patch Cord, 3m UTP Cat 6 Patch Cord, 3m Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Optical Line Terminal ( OLT ) 4 PON Optical Line Terminal ( OLT ) 4 PON Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.02 Rp 0.10 Rp
750,431 15,009
Rp
1,527,172
Rp Rp Rp Rp Rp
7,083 13,333 1,547,588 38,690 1,586,278
Rp
58,087
Rp Rp Rp Rp Rp
7,083 13,333 78,504 1,963 80,466
Rp
74,186
Rp Rp Rp Rp Rp
7,083 13,333 94,603 2,365 96,968
Rp
81,530
Rp Rp Rp Rp Rp
7,083 13,333 101,947 2,549 104,496
Rp Rp
20,629,801 412,596
Rp Rp Rp Rp Rp
1,700 8,000 21,052,097 526,302 21,578,399
Rp Rp
750,431 15,009
Rp Rp Rp Rp Rp
1,700 8,000 775,139 19,378 794,518
Rp Rp
1,500,861 30,017
Rp Rp Rp Rp Rp
1,700 8,000 1,540,578 38,514 1,579,093
Rp Rp
206,298 4,126
Rp Rp Rp Rp Rp
1,700 8,000 220,124 5,503 225,627
Rp Rp
1,937,951 38,759
Rp Rp Rp Rp Rp
1,700 8,000 1,986,410 49,660 2,036,071
Rp Rp
50,011 1,000
Rp Rp Rp Rp Rp
1,700 8,000 60,712 1,518 62,230
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
63,311,483 1,266,230
Rp Rp
63,311,483 1,266,230
hari orang hari orang
0.02 Rp 0.10 Rp
85,000 80,000
Rp Rp
1,700 8,000
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,500,861 30,017
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 206,298 4,126
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,937,951 38,759
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 50,011 1,000
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
993,646 40,739,486 Rp
1,586,278
Rp
80,466
Rp
96,968
Rp
104,496
Rp
21,578,399
Rp
794,518
Rp
1,579,093
Rp
225,627
Rp
2,036,071
Rp
62,230
Rp
66,202,098
Analisa Harga Satuan Elektrikal - page 177 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
Farm Switch 24 Gb, L3 Farm Switch 24 Gb, L3 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Network Management System Network Management System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Router Fire Wall for Internet Router Fire Wall for Internet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan unit utama diruang 1.00 Server Rp 175,628,370 Instalasi ls 1.00 Rp 3,512,567 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Grounding Sistem Grounding Sistem Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Sistem Pengkabelan Perangkat Utama Data Sistem Pengkabelan Perangkat Utama Data Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
A/P Controller license max 50 A/P A/P Controller license max 50 A/P Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
28,257,326 565,147
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 55,012,802 1,100,256
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 38,612,204 772,244
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan unit utama diruang 1.00Server Rp 24,480,697 Instalasi ls 1.00 Rp 489,614 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 LOT 1 2 3
1 UNIT 1 2 3
unit ls
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
68,766,002 1,375,320
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,090,118 161,802
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 223,515,387 4,470,308
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap unit terpasang 1.00 Instalasi ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Tukang Listrik hari orang 0.10
Rp Rp
3,271,073 65,421
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Patch Panel F.O 12 Core Patch Panel F.O 12 Core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS Patch Panel F.O 24 Core
Rp Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
1,694,628 33,893
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
64,587,413 1,614,685 66,202,098
Rp Rp
28,257,326 565,147
Rp Rp Rp Rp Rp
1,700 8,000 28,832,172 720,804 29,552,976
Rp Rp
55,012,802 1,100,256
Rp Rp Rp Rp Rp
1,700 8,000 56,122,758 1,403,069 57,525,827
Rp Rp
38,612,204 772,244
Rp Rp Rp Rp Rp
1,700 8,000 39,394,148 984,854 40,379,002
Rp Rp
175,628,370 3,512,567
Rp Rp Rp Rp Rp
1,700 8,000 179,150,637 4,478,766 183,629,403
Rp Rp
24,480,697 489,614
Rp Rp Rp Rp Rp
1,700 8,000 24,980,011 624,500 25,604,511
Rp Rp
68,766,002 -
Rp Rp Rp Rp Rp
1,700 8,000 68,775,702 1,719,393 70,495,095
Rp Rp
8,090,118 -
Rp Rp Rp Rp Rp
1,700 8,000 8,099,818 202,495 8,302,313
Rp Rp
223,515,387 -
Rp Rp Rp Rp Rp
1,700 8,000 223,525,087 5,588,127 229,113,214
Rp Rp
3,271,073 65,421
Rp Rp Rp Rp Rp
1,700 8,000 3,346,195 83,655 3,429,850
Rp Rp
1,694,628 33,893
Rp Rp Rp Rp Rp
1,700 8,000 1,738,221 43,456 1,781,676
Rp
29,552,976
Rp
57,525,827
Rp
40,379,002
Rp
183,629,403
Rp
25,604,511
Rp
70,495,095
Rp
8,302,313
Rp
229,113,214
Rp
3,429,850
Rp
1,781,676
Rp
3,280,063
Analisa Harga Satuan Elektrikal - page 178 of 280
URAIAN
NO. 1 2 3
1 PCS 1 2 3
1 UNIT 1 2 3
1 PCS 1 2 3
Patch Panel F.O 24 Core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Patch Cord F.O SC to LC, 3 meter Patch Cord F.O SC to LC, 3 meter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Patch Panel UTP 24 Port, Cat 6 Loaded Patch Panel UTP 24 Port, Cat 6 Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Patch Cord UTP Cat 6, 1 meter Patch Cord UTP Cat 6, 1 meter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
ONU 24G PoE ONU 24G PoE Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
ONU 48G PoE ONU 48G PoE Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 1:4 c/w accessories POS ( Passive Optical Splitter) 1:4 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2:4 c/w accessories POS ( Passive Optical Splitter) 2:4 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
1 LOT 1 2 3
1M 1 2 3
Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Terminasi Kabel FO Terminasi Kabel FO Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Kabel FO 12 Core, SM, Outdoor Kabel FO 12 Core, SM, Outdoor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
HARGA SATUAN 3,127,805 62,556
JUMLAH HARGA Rp Rp
3,127,805 62,556
Rp Rp Rp Rp Rp
1,700 8,000 3,200,062 80,002 3,280,063
Rp Rp
133,681 2,674
Rp Rp Rp Rp Rp
1,700 8,000 146,055 3,651 149,706
Rp Rp
1,937,951 38,759
Rp Rp Rp Rp Rp
1,700 8,000 1,986,410 49,660 2,036,071
Rp Rp
50,011 1,000
Rp Rp Rp Rp Rp
1,700 8,000 60,712 1,518 62,230
Rp Rp
7,467,988 149,360
Rp Rp Rp Rp Rp
1,700 8,000 7,627,048 190,676 7,817,724
Rp Rp
14,935,976 298,720
Rp Rp Rp Rp Rp
1,700 8,000 15,244,395 381,110 15,625,505
Rp Rp
464,793 9,296
Rp Rp Rp Rp Rp
1,700 8,000 483,789 12,095 495,884
Rp Rp
929,555 18,591
Rp Rp Rp Rp Rp
1,700 8,000 957,846 23,946 981,792
Rp Rp
34,324 686
Rp Rp Rp Rp Rp
1,700 8,000 44,710 1,118 45,828
Rp Rp
137,532 2,751
Rp Rp Rp Rp Rp
1,700 8,000 149,983 3,750 153,732
129,139 2,583
Rp Rp
129,139 2,583
85,000 80,000
Rp Rp
1,700 8,000
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 133,681 2,674
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,937,951 38,759
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 50,011 1,000
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,467,988 149,360
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,935,976 298,720
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 464,793 9,296
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 929,555 18,591
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 34,324 686
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 137,532 2,751
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
149,706
Rp
2,036,071
Rp
62,230
Rp
7,817,724
Rp
15,625,505
Rp
495,884
Rp
981,792
Rp
45,828
Rp
153,732
Rp
144,957
Analisa Harga Satuan Elektrikal - page 179 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT 1 2 3
Distribution Switch 16 Port SFP+ Distribution Switch 16 Port SFP+ Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Transceiver, SFP+, 10GbE, LR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Transceiver, SFP+, 10GbE, SR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). unit (EU1.00 power Rpcord). 119,050,580 Instalasi ls 1.00 Rp 2,381,012 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
248,224,809 2,482,248
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
11,865,506 237,310
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
3,415,828 68,317
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
248,224,809 2,482,248
Rp Rp Rp Rp Rp
1,700 8,000 250,716,757 6,267,919 256,984,676
Rp Rp
11,865,506 237,310
Rp Rp Rp Rp Rp
1,700 8,000 12,112,516 302,813 12,415,329
Rp Rp
3,415,828 68,317
Rp Rp Rp Rp Rp
1,700 8,000 3,493,844 87,346 3,581,190
Rp Rp
119,050,580 2,381,012
Rp Rp Rp Rp Rp
1,700 8,000 121,441,291 3,036,032 124,477,323
Rp Rp
67,831,144 1,356,623
Rp Rp Rp Rp Rp
1,700 8,000 69,197,467 1,729,937 70,927,404
Rp Rp
75,148,206 1,502,964
Rp Rp Rp Rp Rp
1,700 8,000 76,660,871 1,916,522 78,577,392
Rp Rp
51,417,194 1,028,344
Rp Rp Rp Rp Rp
1,700 8,000 52,455,238 1,311,381 53,766,619
1 UNIT 1 2 3
Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). unit (EU1.00 power Rpcord). 67,831,144 Instalasi ls 1.00 Rp 1,356,623 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party unit Support with Acess 1.00 series Rp switches.2,516,926 Rp Instalasi ls 1.00 Rp 50,339 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Rp Tukang Listrik hari orang 0.10 Rp 80,000 Rp Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1 UNIT 1 2 3
Transceiver, SFP+, 1GbE, LR, SMF Third Party Support Transceiver, SFP+, 1GbE, LR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp 1.00 Rp
75,148,206 1,502,964
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
51,417,194 1,028,344
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1.00 Rp 1.00 Rp
2,121,409 42,428
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit
0.02 Rp 0.10 Rp
20,010,997 400,220
TOTAL HARGA
141,421 3,536 144,957
2,516,926 50,339
Rp
256,984,676
Rp
12,415,329
Rp
3,581,190
Rp
124,477,323
Rp
70,927,404
Rp
78,577,392
Rp
53,766,619
Rp
2,641,388
Rp
2,227,875
Rp
20,931,439
Rp
573,824
1,700 8,000 2,576,964 64,424 2,641,388
Rp Rp
2,121,409 42,428
Rp Rp Rp Rp Rp
1,700 8,000 2,173,537 54,338 2,227,875
Rp Rp
20,010,997 400,220
Rp Rp Rp Rp Rp
1,700 8,000 20,420,916 510,523 20,931,439
Analisa Harga Satuan Elektrikal - page 180 of 280
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
SAT
INDEK
AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kitunit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp 1.00 Rp
HARGA SATUAN 539,341 10,787
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Patch Panel Category 6 SL Kapasitas24 Port Patch Panel Category 6 SL Kapasitas24 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
4 Pair, Category 6 SL Series Modular Jack ( Blue ) 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
BS Shuttered Faceplate - 2 Port BS Shuttered Faceplate - 2 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
BS Shuttered Faceplate - 1 Port BS Shuttered Faceplate - 1 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
19"Wallmounted 12 RU Double door 19"Wallmounted 12 RU Double door Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Optic Terminal Box 8 Port Optic Terminal Box 8 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patch Cords SM SC-LC Duplex Patch Cords SM SC-LC Duplex Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
NTP Time Server Master Clock NTP Time Server Master Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
GPS Antenna Receiver GPS Antenna Receiver Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.02 Rp 0.10 Rp
1,621,619 32,432
JUMLAH HARGA Rp Rp
539,341 10,787
Rp Rp Rp Rp Rp
1,700 8,000 559,828 13,996 573,824
Rp Rp
1,621,619 32,432
Rp Rp Rp Rp Rp
1,700 8,000 1,663,752 41,594 1,705,345
Rp Rp
93,486 1,870
Rp Rp Rp Rp Rp
1,700 8,000 105,056 2,626 107,682
Rp Rp
70,474 1,409
Rp Rp Rp Rp Rp
1,700 8,000 81,583 2,040 83,623
Rp Rp
49,619 992
Rp Rp Rp Rp Rp
1,700 8,000 60,312 1,508 61,820
Rp Rp
47,462 949
Rp Rp Rp Rp Rp
1,700 8,000 58,111 1,453 59,564
Rp Rp
3,768,197 75,364
Rp Rp Rp Rp Rp
1,700 8,000 3,853,261 96,332 3,949,593
Rp Rp
1,294,419 25,888
Rp Rp Rp Rp Rp
1,700 8,000 1,330,007 33,250 1,363,257
Rp Rp
226,523 4,530
Rp Rp Rp Rp Rp
1,700 8,000 240,754 6,019 246,773
Rp Rp
30,337,942 606,759
Rp Rp Rp Rp Rp
10,625 20,000 30,975,326 774,383 31,749,709
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
unit ls
1.00 Rp 1.00 Rp
19,011,777 380,236
Rp Rp
19,011,777 380,236
hari orang hari orang
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah
Rp Rp Rp
10,625 20,000 19,422,638
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 93,486 1,870
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 70,474 1,409
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 49,619 992
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 47,462 949
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,768,197 75,364
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,294,419 25,888
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 226,523 4,530
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,337,942 606,759
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
1,705,345
Rp
107,682
Rp
83,623
Rp
61,820
Rp
59,564
Rp
3,949,593
Rp
1,363,257
Rp
246,773
Rp
31,749,709
Rp
19,908,204
Analisa Harga Satuan Elektrikal - page 181 of 280
URAIAN
NO.
1 UNIT 1 2 3
Converter Converter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Teak Wood Clock Teak Wood Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TTK 1 2 3
Installation Slave Clock Installation Slave Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
NTP to Signal Time Covert Module NTP to Signal Time Covert Module Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Junction Box Master Clock (SERVER) Junction Box Master Clock (SERVER) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Analog Clock Lingkaran Dia.500mm,HH:MM Analog Clock Lingkaran Dia.500mm,HH:MM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Analog Clock Lingkaran Dia.400mm,HH:MM Analog Clock Lingkaran Dia.400mm,HH:MM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Junction Box Master Clock Junction Box Master Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Master Controller IP-Ark 1 + Data Report License Master Controller IP-Ark 1 + Data Report License Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Desktop Touch Screen Nurse Station 18" Desktop Touch Screen Nurse Station 18" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Event Management Module Rack + Interface License Event Management Module Rack + Interface License Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
IntelPage IP Paging Module Rack + Dipole Antenna IntelPage IP Paging Module Rack + Dipole Antenna Instalasi Tenaga Kerja :
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
titik ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
set ls
1.00 Rp 1.00 Rp
7,968,766 159,375
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,348,695 266,974
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 404,506 8,090
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,090,118 161,802
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 485,407 9,708
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,663,083 113,262
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,395,802 207,916
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 485,407 9,708
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 98,843,263 1,976,865
485,566 19,908,204
Rp Rp
7,968,766 159,375
Rp Rp Rp Rp Rp
10,625 20,000 8,158,766 203,969 8,362,736
Rp Rp
13,348,695 266,974
Rp Rp Rp Rp Rp
10,625 20,000 13,646,293 341,157 13,987,451
Rp Rp
404,506 8,090
Rp Rp Rp Rp Rp
10,625 20,000 443,221 11,081 454,302
Rp Rp
8,090,118 161,802
Rp Rp Rp Rp Rp
7,083 13,333 8,272,337 206,808 8,479,145
Rp Rp
485,407 9,708
Rp Rp Rp Rp Rp
7,083 13,333 515,532 12,888 528,420
Rp Rp
5,663,083 113,262
Rp Rp Rp Rp Rp
3,542 6,667 5,786,553 144,664 5,931,216
Rp Rp
10,395,802 207,916
Rp Rp Rp Rp Rp
3,542 6,667 10,613,926 265,348 10,879,274
Rp Rp
485,407 9,708
Rp Rp Rp Rp Rp
7,083 13,333 515,532 12,888 528,420
Rp
98,843,263 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 98,843,263 Keuntungan 2,5% Rp 2,471,082 Total = Jumlah+(Keuntungan 2,5%) Rp 101,314,344 5,142,079 102,842
Rp
5,142,079 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 5,142,079 Keuntungan 2,5% Rp 128,552 Total = Jumlah+(Keuntungan 2,5%) Rp 5,270,631 93,270,071 1,865,401
Rp
93,270,071 SUDAH TERMASUK
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 53,362,418 1,067,248
Rp
TERMASUK TERMASUK 93,270,071 2,331,752 95,601,822
53,362,418 SUDAH TERMASUK
TOTAL HARGA
Rp
8,362,736
Rp
13,987,451
Rp
454,302
Rp
8,479,145
Rp
528,420
Rp
5,931,216
Rp
10,879,274
Rp
528,420
Rp
101,314,344
Rp
5,270,631
Rp
95,601,822
Rp
54,696,478
Analisa Harga Satuan Elektrikal - page 182 of 280
NO.
URAIAN Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
JUMLAH HARGA
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 53,362,418 Keuntungan 2,5% Rp 1,334,060 Total = Jumlah+(Keuntungan 2,5%) Rp 54,696,478 1 SET Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS 1 Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, setdan UPS 1.00 Rp 26,967,060 Rp 26,967,060 2 Instalasi ls 1.00 Rp 539,341 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 26,967,060 Keuntungan 2,5% Rp 674,176 Total = Jumlah+(Keuntungan 2,5%) Rp 27,641,236 1 SET IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] 1 IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for set Emergency & Code 1.00 Blue Rp functions]3,192,900 Rp 3,192,900 2 Instalasi ls 1.00 Rp 63,858 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 3,192,900 Keuntungan 2,5% Rp 79,822 Total = Jumlah+(Keuntungan 2,5%) Rp 3,272,722 1 BH PSU 24 VDC 1 PSU 24 VDC bh 1.00 Rp 5,393,412 Rp 5,393,412 2 Instalasi ls 1.00 Rp 107,868 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 5,393,412 Keuntungan 2,5% Rp 134,835 Total = Jumlah+(Keuntungan 2,5%) Rp 5,528,247 1 BH Over Bed Indicator Led Single Color 1 Over Bed Indicator Led Single Color bh 1.00 Rp 1,605,511 Rp 1,605,511 2 Instalasi ls 1.00 Rp 32,110 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,605,511 Keuntungan 2,5% Rp 40,138 Total = Jumlah+(Keuntungan 2,5%) Rp 1,645,649 1 BH Patient Call Pendant, Momentary Action, Green Button, 2m 1 Patient Call Pendant, Momentary Action, Green Button, 2m bh 1.00 Rp 1,042,726 Rp 1,042,726 2 Instalasi ls 1.00 Rp 20,855 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,042,726 Keuntungan 2,5% Rp 26,068 Total = Jumlah+(Keuntungan 2,5%) Rp 1,068,794 1 BH IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] 1 IP Callpoint, General with Pendant Socket, British Plate - Emergency bhIcon [upgrade call 1.00forRp Code Blue function] 2,381,731 Rp 2,381,731 2 Instalasi ls 1.00 Rp 47,635 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 2,381,731 Keuntungan 2,5% Rp 59,543 Total = Jumlah+(Keuntungan 2,5%) Rp 2,441,274 1 BH IP Net Room Controller 1 IP Net Room Controller bh 1.00 Rp 10,621,426 Rp 10,621,426 2 Instalasi ls 1.00 Rp 212,429 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 10,621,426 Keuntungan 2,5% Rp 265,536 Total = Jumlah+(Keuntungan 2,5%) Rp 10,886,962 1 BH Flashing Over Door Light, 1 LED, Red, British Plate 1 Flashing Over Door Light, 1 LED, Red, British Plate bh 1.00 Rp 1,488,582 Rp 1,488,582 2 Instalasi ls 1.00 Rp 29,772 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,488,582 Keuntungan 2,5% Rp 37,215 Total = Jumlah+(Keuntungan 2,5%) Rp 1,525,796 1 BH IP Over Door Lamp 4 RGB Programmable 1 IP Over Door Lamp 4 RGB Programmable bh 1.00 Rp 2,283,211 Rp 2,283,211 2 Instalasi ls 1.00 Rp 45,664 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 2,283,211 Keuntungan 2,5% Rp 57,080 Total = Jumlah+(Keuntungan 2,5%) Rp 2,340,291 1 BH IP Corridor Digital Display, 12 Characters, 50mm 1 IP Corridor Digital Display, 12 Characters, 50mm bh 1.00 Rp 21,556,892 Rp 21,556,892 2 Instalasi ls 1.00 Rp 431,138 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 21,556,892 Keuntungan 2,5% Rp 538,922 Total = Jumlah+(Keuntungan 2,5%) Rp 22,095,815 1 BH Panel Elektrikal lengkap dengan aksesorisnya 1 Panel Elektrikal lengkap dengan aksesorisnya bh 1.00 Rp 3,595,608 Rp 3,595,608 2 Instalasi ls 1.00 Rp 71,912 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 3,595,608 Keuntungan 2,5% Rp 89,890 Total = Jumlah+(Keuntungan 2,5%) Rp 3,685,498 1 BH IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function]
TOTAL HARGA
0.07 Rp 0.13 Rp
Rp
27,641,236
Rp
3,272,722
Rp
5,528,247
Rp
1,645,649
Rp
1,068,794
Rp
2,441,274
Rp
10,886,962
Rp
1,525,796
Rp
2,340,291
Rp
22,095,815
Rp
3,685,498
Rp
2,222,355
Analisa Harga Satuan Elektrikal - page 183 of 280
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
SAT
INDEK
HARGA SATUAN
IP Callpoint, General, British Plate - Staff Presence Icon [upgrade bh call for Emergency/Code 1.00 RpBlue function] 2,168,152 Instalasi ls 1.00 Rp 43,363 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 1200mm x 220mm x 80mm Dimensi : 1200mm x 220mm x 80mm unit 1.00 Rp 2,049,497 Instalasi ls 1.00 Rp 40,990 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] unit 1.00 Rp 71,682,040 Instalasi ls 1.00 Rp 1,433,641 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] bh 1.00 Rp 35,841,020 Instalasi ls 1.00 Rp 716,820 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] bh 1.00 Rp 25,600,729 Instalasi ls 1.00 Rp 512,015 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 20,480,583 Instalasi ls 1.00 Rp 409,612 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 20,494,965 Instalasi ls 1.00 Rp 409,899 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] bh 1.00 Rp 16,216,192 Instalasi ls 1.00 Rp 324,324 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] bh 1.00 Rp 15,360,437 Instalasi ls 1.00 Rp 307,209 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 10,240,291 Instalasi ls 1.00 Rp 204,806 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] unit 1.00 Rp 12,800,364 Instalasi ls 1.00 Rp 256,007 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] unit 1.00 Rp 10,240,291 Instalasi ls 1.00 Rp 204,806 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 Tukang Listrik hari orang 0.13 Rp 80,000 Jumlah
JUMLAH HARGA Rp
SUDAH TERMASUK SUDAH TERMASUK Rp 2,168,152 Rp 54,204 Rp 2,222,355 Rp
2,049,497 SUDAH TERMASUK
SUDAH TERMASUK SUDAH TERMASUK Rp 2,049,497 Rp 51,237 Rp 2,100,734 Rp
71,682,040 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
Rp
TERMASUK TERMASUK 10,240,291 256,007 10,496,299
12,800,364 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 15,360,437 384,011 15,744,448
10,240,291 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 16,216,192 405,405 16,621,597
15,360,437 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp
Rp
2,100,734
Rp
73,474,091
Rp
36,737,046
Rp
26,240,747
Rp
20,992,598
Rp
21,007,340
Rp
16,621,597
Rp
15,744,448
Rp
10,496,299
Rp
13,120,373
Rp
10,496,299
TERMASUK TERMASUK 20,494,965 512,374 21,007,340
16,216,192 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 20,480,583 512,015 20,992,598
20,494,965 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 25,600,729 640,018 26,240,747
20,480,583 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 35,841,020 896,026 36,737,046
25,600,729 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TERMASUK TERMASUK 71,682,040 1,792,051 73,474,091
35,841,020 SUDAH TERMASUK
SUDAH SUDAH Rp Rp Rp Rp
TOTAL HARGA
2,168,152 SUDAH TERMASUK
TERMASUK TERMASUK 12,800,364 320,009 13,120,373
10,240,291 SUDAH TERMASUK
SUDAH TERMASUK SUDAH TERMASUK Rp 10,240,291 Analisa Harga Satuan Elektrikal - page 184 of 280
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1 UNIT 1 2 3
Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Universal Socket 16A 250V - Vivase Schneider 1 x Universal Socket 16A 250V - Vivase Schneider Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
1 x Single Switch 16A 250V - Vivase Schneider 1 x Single Switch 16A 250V - Vivase Schneider Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Patient Name Tag 1 x Patient Name Tag Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Provision Access for Medical Gas Outlet Provision Access for Medical Gas Outlet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Provision Access for Nurse Call Outlet Provision Access for Nurse Call Outlet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1.00 Rp 1.00 Rp
10,240,291 204,806
Rp
10,240,291 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1.00 Rp 1.00 Rp
9,728,277 194,566
Rp
256,007 10,496,299
TERMASUK TERMASUK 10,240,291 256,007 10,496,299
9,728,277 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 9,728,277 Keuntungan 2,5% Rp 243,207 Total = Jumlah+(Keuntungan 2,5%) Rp 9,971,484
TOTAL HARGA
Rp
10,496,299
Rp
9,971,484
Rp
8,766,114
Rp
171,376
Rp
83,661
Rp
103,194
Rp
59,337
Rp
230,344
Rp
27,641
Rp
9,214
Rp
9,214
0.07 Rp 0.13 Rp
1.00 Rp 1.00 Rp
8,535,973 170,719
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1.00 Rp 1.00 Rp
167,196 3,344
Rp
8,535,973
Rp Rp Rp Rp Rp
5,667 10,667 8,552,307 213,808 8,766,114
Rp
167,196 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 167,196 Keuntungan 2,5% Rp 4,180 Total = Jumlah+(Keuntungan 2,5%) Rp 171,376 1.00 Rp 1.00 Rp
81,620 1,632
Rp
81,620 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 81,620 Keuntungan 2,5% Rp 2,041 Total = Jumlah+(Keuntungan 2,5%) Rp 83,661
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
100,677 2,014
Rp
100,677 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 100,677 Keuntungan 2,5% Rp 2,517 Total = Jumlah+(Keuntungan 2,5%) Rp 103,194 57,889 1,158
Rp
57,889 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 57,889 Keuntungan 2,5% Rp 1,447 Total = Jumlah+(Keuntungan 2,5%) Rp 59,337 1.00 Rp 1.00 Rp
224,725 4,495
Rp
224,725 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 224,725 Keuntungan 2,5% Rp 5,618 Total = Jumlah+(Keuntungan 2,5%) Rp 230,344
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
26,967 539
Rp
26,967 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 26,967 Keuntungan 2,5% Rp 674 Total = Jumlah+(Keuntungan 2,5%) Rp 27,641 8,989 180
Rp
8,989 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 8,989 Keuntungan 2,5% Rp 225 Total = Jumlah+(Keuntungan 2,5%) Rp 9,214 8,989 180
Rp
8,989 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 8,989 Keuntungan 2,5% Rp 225 Total = Jumlah+(Keuntungan 2,5%) Rp 9,214
Analisa Harga Satuan Elektrikal - page 185 of 280
HARGA SATUAN PEKERJAAN ELEKTRIKAL PEKERJAAN PERENCANA NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77
SATUAN
URAIAN
PEKERJAAN KABEL 1 M' Kabel TM N2XSY 3 x ( 1 x 50 mm2) 1 M' Kabel TM N2XSY 3 x (1 x 120 mm2) + Grounding 1 M' Kabel TM N2XSY 3 x (4 X 300) mm2 + Grounding 1 M' Kabel TM N2XSY 3 x (1 x 120) mm2 + Grounding 1 M' Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding 1 M' Kabel TM N2XSEbY 7 x (4 x 300) mm2 + Grounding 1 M' KABEL TR NYM 3 x 2,5 mm2 + Grounding 1 M' KABEL TR NYMHY 3 x 2,5 mm2 + Grounding 1 M' KABEL TR, NYY 3 x 35 mm2 + Grounding 1 M' KABEL TR, NYY 3 x 10 mm2 + Grounding 1 M' KABEL TR, NYY 3 x 50 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 4 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 6 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 10 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 16 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 25 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 35 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 50 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 70 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 95 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 120 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 150 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 240 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 300 mm2 + Grounding 1 M' KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYY 2 x (4 x 150 mm2) + Grounding 1 M' KABEL TR, NYY 4 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYY 2 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYY 16 x (1 x 240) mm2 + Grounding 1 M' KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding 1 M' KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding 1 M' KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding 1 M' KABEL TR, NYY 3 x 4 ( 1 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 2 x 4 ( 1 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 4 x ( 3 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 3 x (4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 6 x (4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 2 x 4 (1 x 185) mm2 + Grounding 1 M' KABEL TR FRC 2 x 2,5 mm2 + Grounding 1 M' KABEL TR FRC 3 x 4 mm2 + Grounding 1 M' KABEL TR, FRC 4 x (1 X 240 mm2) + Grounding 1 M' KABEL TR, FRC 2 x (4 X 300 mm2) + Grounding 1 M' KABEL TR, FRC 4 x (1 x 185 mm2) + Grounding 1 M' KABEL TR, FRC 2 x 4 X 150 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 150 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 10 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 16 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 35 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 50 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 70 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 6 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 4 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 16 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 35 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 70 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 95 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 120 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 240 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 300 mm2 + Grounding 1 M' KABEL TR, NYFGbY 5 x 4 (1 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 3 x (4 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 2 x 4 (1 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x ( 4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x ( 1 X 150 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYFGbY 2 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYFGbY 3 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYFGby 3 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYFGbY 2 x ( 4 X 150 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 2 x ( 4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 7 x ( 4 X 300 mm2 ) + Grounding 1 M' Kabel ITC 2 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 10 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 20 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 30 x 2 x 2 x 0,6 mm2
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
746,675.38 1,147,031.05 9,391,637.85 1,370,012.90 1,134,122.59 12,938,036.09 30,998.46 35,697.47 245,915.07 88,338.46 304,558.72 39,224.41 50,502.03 81,684.67 138,683.66 203,999.90 285,762.68 383,971.99 540,449.03 741,203.31 945,140.35 1,135,450.26 1,428,668.50 1,874,134.66 2,288,117.46 2,024,972.89 2,430,967.36 9,133,635.45 4,569,956.79 9,569,703.59 2,397,134.49 12,219,945.32 8,148,722.92 8,436,302.34 5,626,294.27 9,133,635.45 6,849,703.41 13,695,221.40 4,041,574.94 34,259.08 63,392.94 1,248,440.59 2,702,357.05 1,540,504.94 2,144,753.95 1,077,608.75 373,415.09 213,554.76 284,415.83 454,520.00 607,331.81 201,583.34 187,204.37 275,733.72 559,694.90 789,476.50 973,677.70 1,147,071.17 1,633,418.73 2,029,375.87 2,447,117.87 12,225,125.82 7,339,260.91 4,896,328.45 9,775,915.24 5,482,899.56 1,627,140.60 3,250,095.78 4,873,050.97 7,332,982.78 2,743,542.49 4,890,050.33 17,104,712.60 8,696.47 28,996.19 38,018.29 68,019.51
Harga Satuan Pekerjaan Elektrikal - page 186 of 280
NO.
SATUAN
78 79 80 81 82 83 84 85 86 87 88 89 90
1 M' 1 M' 1 M' 1 M' 1 M' 1 BTG 1 BTG 1 M' 1 PCS 1 LOT 1 LOT 1 LOT 1 LOT
URAIAN
HARGA SATUAN
Kabel ITC 80 x 2 x 2 x 0,6 mm2 Kabel UTP Cat 5E,-0,6 mm2 Kabel UTP Cat 6 Fiber Optic 8 core Kabel STP 18 AWG 1 Pair KABEL TRAY LEBAR 20 CM 1BTG > 4M KABEL TRAY LEBAR 40 CM - 1BTG > 4M KABEL TRAY LEBAR 80 CM 1BTG > 4M Jointing / Connector Tray c/w bolt & Nut H100 BUSDUCT 2500 / AL IP 54 BUSDUCT 1000A / AL IP 54 BUSDUCT 1600A / AL IP 54 BUSDUCT 3200A / AL IP 54
1 2 3 4 5 6 7 8 9 10 11 12
PEKERJAAN PENERANGAN 1 BH Lampu LED Panel 36 W 1 BH Lampu LED Panel 26 W 1 BH Lampu LED Batten 36 W + Inter Cable 1 BH Lampu LED Batten 20 W + Inter Cable 1 BH Lampu LED Prismatic 36 W 1 BH Lampu LED Prismatic 20 W 1 BH Lampu Panel LED Dust Proof 40 W 1 BH Lampu Panel LED Dust Proof 26 W 1 BH Lampu LED Down Light 4 W 1 BH Lampu LED Down Light 5 W 1 BH Lampu LED Down Light 6 W 1 BH Lampu LED Down Light 7 W 1 BH Lampu LED Down Light 9 W 1 BH Lampu LED Down Light 10 W 1 BH Lampu LED Down Light 13 W 1 BH Lampu LED Down Light 16 W 1 BH Lampu LED Down Light 30 W 1 BH Lampu LED Down Light Spot 23 W 1 BH Lampu LED Down Light Outbow 12 W 1 BH Lampu LED Down Light 9 W + Tool Kit Emergency 1 BH Lampu LED Down Light 13 W + Tool Kit Emergency 1 BH Lampu LED Down Light 16 W + Tool Kit Emergency 1 BH Lampu LED 60 x 60 20 W 1 M' Lampu Strip 5 W / meter + Driver + Diffuser 1 BH Lampu LED Dinding 5 W 1 BH Lampu Exit 5 W + Baterai 1 BH Sensor Lampu 1 BH Lampu LED Spot Light 15 W 1 BH Lampu LED Spot Light 23 W 1 BH Lampu Jalan LED (2 x 20 )W + TIANG 1 BH Lampu Jalan LED (1 x 20 )W + TIANG 1 BH Lampu LED Plat 12 W + baterai 1 BH Lampu LED RMO 12 W 1 BH Tube Line (True Line Slim Balance) LED 20 W + Gantungan 1 BH Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Tool Kit Emergency 1 BH Tiang Lampu Jalan (P : 8 m) 1 BH Lampu Tree Light 10 W 1 BH Lampu Bollard Light 18 W 1 BH Lampu Taman Essential 18 W 1 BH Lampu Taman Essential 28 W 1 BH Lampu Up Light 5 W 1 BH Lampu Track Spot 15 W PEKERJAAN STOP KONTAK DAN SAKLAR 1 BH SAKLAR TUNGGAL 10A 1 BH SAKLAR GANDA 10A 1 BH SAKLAR PUTAR 10A 1 BH SENSOR SYSTEM 1 BH STOP KONTAK DAYA / 1 Phase (Partisi) 1 BH STOP KONTAK DAYA / 1 Phase 1 BH STOP KONTAK DAYA / 3 Phase PEKERJAAN TITIK INSTALASI 1 TITIK TITIK INSTALASI PENERANGAN 1 TITIK TITIK INSTALASI PENERANGAN EMERGENCY 1 TITIK TITIK INSTALASI PENERANGAN LUAR 1 TITIK TITIK INSTALASI STOP KONTAK 1 TITIK TITIK INSTALASI DAYA AC INDOOR 1 TITIK TITIK INSTALASI DAYA AC OUTDOOR 1 TITIK TITIK INSTALASI TELEPHONE 1 TITIK TITIK INSTALASI SPEAKER EMERGENCY 1 TITIK TITIK INSTALASI SPEAKER 1 TITIK TITIK INSTALASI FIRE ALARM 1 TITIK TITIK INSTALASI IPTV 1 TITIK TITIK INSTALASI CCTV, WIFI, DATA
1
PEKERJAAN PANEL POWER HOUSE/UTILITAS/KHUSUS 1 UNIT PANEL MVMDP
87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 1 2 3 4 5 6 7
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
104,556.27 15,625.86 44,383.80 88,767.60 14,950.42 786,226.43 1,032,478.94 2,039,546.41 49,797.55 141,326,648.17 96,652,030.88 104,447,970.67 175,144,296.49
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
944,413.66 944,413.66 733,898.00 621,121.76 882,010.80 571,500.21 882,010.80 571,500.21 185,053.62 185,053.62 185,053.62 211,368.07 256,478.57 256,478.57 256,478.57 327,903.52 966,968.90 365,345.24 162,498.37 629,450.98 629,450.98 700,875.94 856,072.27 668,487.78 196,331.24 739,912.73 1,290,613.23 1,384,241.01 1,384,241.01 27,623,513.70 15,011,370.45 324,144.32 209,488.47 1,861,807.86 2,234,780.27 2,608,327.20 2,691,693.59 2,808,980.88 2,172,259.06 3,051,913.76 948,172.86 618,114.39
Rp Rp Rp Rp Rp Rp Rp
26,683.58 33,132.97 31,018.41 3,006,126.21 166,645.94 104,731.79 302,654.09
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
159,922.37 531,697.00 194,934.61 159,922.37 369,535.08 970,295.94 158,424.19 168,307.78 154,487.16 95,519.19 1,269,276.64 1,269,276.64
Rp
889,984,619.45
Harga Satuan Pekerjaan Elektrikal - page 187 of 280
NO. 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SATUAN
URAIAN
1 UNIT PANEL KONTROL GENSET 1 UNIT PANEL AMF + Syncronizing 1 UNIT LVMDP, (IP 30 BOTTOM INCOMING) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar PANEL GEDUNG D1 1 UNIT MDP-D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - UPS (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - KHS (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - ALKES (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - CSSD (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.OK.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.OK.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU.OK.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-LF (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG D2-F1 1 UNIT MDP-D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LAB.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - SERVER (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG B (RANAP) 1 UNIT MDP-RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
342,201,739.03 399,363,862.02 284,134,053.29 296,407,754.72 288,576,071.13 257,249,336.77 272,912,703.95 222,006,760.62 216,132,997.93 239,980,474.46
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
201,972,937.80 25,497,287.14 25,497,287.14 24,214,765.11 25,706,861.15 78,774,882.63 28,698,258.39 28,226,550.38 16,255,044.46 17,618,907.28 16,255,044.46 15,573,113.05 11,904,556.21 11,815,235.40 13,196,001.75 12,173,104.64 14,305,665.63 13,485,868.03 37,365,295.06 44,478,565.42 13,371,518.08 12,746,272.39 12,576,215.21 12,129,611.15 22,023,217.63 21,632,554.83 53,998,136.72 26,045,991.90 10,496,008.96 12,813,230.03
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
116,644,939.20 30,031,932.37 26,612,768.58 25,497,287.14 26,375,809.47 35,561,718.11 16,255,044.46 17,618,907.28 16,255,044.46 15,573,113.05 26,188,718.76 19,397,217.27 19,738,182.98 20,420,114.39 14,696,328.44 15,087,931.04 15,367,086.34 15,838,882.62 16,162,750.38 14,457,921.85 14,215,641.81 34,898,540.05 11,780,099.70
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
99,170,370.80 27,308,926.01 27,308,926.01 27,308,926.01 27,571,672.55 27,652,516.71 13,868,284.53 14,209,250.23 14,209,250.23 14,209,250.23 20,079,148.68 20,079,148.68 20,079,148.68 20,420,114.39 14,696,328.44 15,410,412.13
Harga Satuan Pekerjaan Elektrikal - page 188 of 280
NO. 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1 2 3 1 1 1 1
SATUAN
URAIAN
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG C1 (RANAP) 1 UNIT MDP-RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG C2 (RANAP) 1 UNIT MDP-RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG F2-F3 1 UNIT SDP - F2-F3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - PERALATAN (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG F5 1 UNIT SDP - F5 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN MASJID 1 UNIT PP/LP - MASJID (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.MASJID (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU.MASJID (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN MASJID 1 UNIT PP/LP - F4 (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN POWER HOUSE 1 UNIT PP/LP - PH (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN SENTRAL MEDIS 1 UNIT PP/LP - G3 (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN RUANG POMPA 1 UNIT PP-AB (IP 30 FORM 1 BOTTOM INCOMING)
HARGA SATUAN Rp Rp Rp Rp Rp
15,579,504.63 12,851,778.99 12,851,778.99 12,851,778.99 26,934,018.21
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
99,170,370.80 28,699,819.20 28,699,819.20 28,699,819.20 28,884,207.43 32,412,290.40 13,868,284.53 14,209,250.23 14,209,250.23 14,209,250.23 19,397,217.27 20,079,148.68 20,079,148.68 20,420,114.39 14,696,328.44 15,410,412.13 15,579,504.63 12,851,778.99 12,851,778.99 12,851,778.99 26,934,018.21
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
99,170,370.80 30,347,536.32 30,347,536.32 30,347,536.32 27,571,672.55 27,652,516.71 13,868,284.53 14,531,731.32 14,209,250.23 14,209,250.23 20,079,148.68 20,079,148.68 20,079,148.68 20,420,114.39 14,696,328.44 15,087,931.04 15,579,504.63 12,851,778.99 12,851,778.99 12,851,778.99 26,934,018.21
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
31,031,346.41 14,209,250.23 14,209,250.23 14,878,198.56 13,148,042.37 14,696,328.44 12,238,409.82 15,579,504.63 13,192,744.69 20,837,413.71
Rp Rp Rp Rp Rp Rp Rp Rp Rp
28,324,203.19 14,209,250.23 14,209,250.23 14,792,495.98 13,087,667.46 14,696,328.44 15,579,504.63 13,192,744.69 19,958,484.13
Rp Rp Rp
14,916,367.42 14,556,607.51 19,183,968.40
Rp
11,140,558.89
Rp
11,140,558.89
Rp
10,458,627.48
Rp
12,399,669.22
Harga Satuan Pekerjaan Elektrikal - page 189 of 280
NO. 2 3
SATUAN
URAIAN
HARGA SATUAN
1 UNIT PP - FH (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP-PL (IP 30 FORM 1 BOTTOM INCOMING)
Rp Rp
50,446,792.50 36,605,810.61
1 2 3 4 5 6 7 8 9
PEKERJAAN TRAFO DAN PQCR 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 1000 A 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 600 A 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 320 A 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 250-300 A 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 200 A 1 UNIT Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt 1 UNIT Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt 1 UNIT Transformator iol Type 1600 kVA, Step Down AL-AL, Dyn5/50Hz, 20 kV - 380 Volt 1 UNIT Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt
Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,542,424,362.20 1,675,819,075.23 1,253,452,730.61 847,474,787.40 847,474,787.40 468,864,735.24 582,906,046.44 578,075,557.98 1,590,145,035.99
1 2 3 4 5 6 7 8 9 10
PEKERJAAN UPS 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,970,525.56 25,934,257.90 85,398,313.44 201,652,294.55 170,788,256.06 212,301,191.36 310,619,520.60 635,634,928.71 660,256,802.12 879,620,693.12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
PEKERJAAN ARUS LEMAH PEKERJAAN FA, TELP, MATV 1 BH PESAWAT TELEPON SINGLE LINE Rp 710,083.29 1 BH Faximile Rp 1,586,918.59 1 BH SOCKET TELEPON Rp 1,282,817.45 1 BH FLOOR SOCKET TELEPON Rp 391,941.51 1 BH IP PHONE SERIES Rp 2,977,261.71 1 BH HANDSET TELEPON (SIP) / TB 10 Pair Rp 1,547,460.71 1 BH HANDSET TELEPON (SIP) / TB 20 Pair Rp 3,057,252.67 1 BH HANDSET TELEPON (SIP) / TB 30 Pair Rp 4,567,044.64 1 BH MDF 160 PAIRS Rp 3,792,929.70 1 BH MDF 80 PAIRS Rp 2,034,278.16 1 BH P A B X 2 / 12 Extention Rp 7,425,452.51 1 BH P A B X 16 / 160 Extention Rp 225,355,205.62 1 BH P A B X 8 / 80 Extention Rp 127,108,301.32 1 M' KABEL TELEPON 10 PAIRS Rp 26,903.48 1 M' KABEL TELEPON 20 PAIRS Rp 35,925.58 1 BH Data Outlet ( RG-45 ) Rp 63,648.34 1 BH FLOOR SOCKET DATA Rp 311,713.78 1 BH Proyektor Rp 17,423,441.20 1 BH Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Rp 12,360,284.07 1 BH PATH PANEL 1 X 64 PORT Rp 14,087,519.91 1 BH PATH PANEL 1 X 48 PORT Rp 7,516,800.03 1 BH PATH PANEL 1 X 32 PORT Rp 7,046,899.02 1 BH PATH PANEL 1 X 24 PORT Rp 3,761,539.08 1 BH PATH PANEL 1 X 12 PORT Rp 2,241,503.27 1 BH HUB Un Managable Path Panel 1 x 48 port Rp 8,982,754.77 1 BH HUB Un Managable Path Panel 1 x 24 port Rp 4,222,469.52 1 BH SMOKE DETECTOR Rp 1,244,394.53 1 BH Rate Of Rise Heat Detector Rp 1,192,132.05 1 BH Fixed Temperature Heat Detector Rp 1,192,132.05 1 BH Breakglass Call point w/phone jack Rp 669,678.06 1 BH Av Phase Ii S/Strobe Non Iso Rp 4,848,959.83 1 BH INDICATOR LAMP Rp 179,891.30 1 UNIT MDFA (60 x 80 x 20) Rp 5,040,923.32 1 UNIT PANEL DXc1-S SINGLE LOOP REGION 2 Rp 44,056,398.56 1 UNIT Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) Rp 59,162,035.46 1 UNIT Panel Dxc4-M Four Loop Region 5 Rp 111,557,980.90 1 UNIT Isolated USB Upload/Download Lead Rp 7,599,446.97 1 UNIT Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels requireRp a 24 Vdc supply. 44,691,164.16 24 Vdc supp 1 UNIT Module for Pressurized Fan (Kontrol) Rp 1,255,783.26 1 UNIT Module for AC Rp 1,255,783.26 1 UNIT Module for Sound System Rp 1,255,783.26 1 BH Mias 200 Series Advance Base Rp 194,422.35 1 BH Isolator Module Rp 729,682.08 1 UNIT Module for PABX (Autodial) Rp 1,255,783.26 1 UNIT Module for Sound System Rp 1,255,783.26 1 UNIT Module for Genset Panel Rp 1,255,783.26 1 UNIT Battery 12 V 17 AH Rp 1,981,072.92 1 UNIT End of Line Rp 48,839.20 1 UNIT TBFA (20 x 30 x 20) Rp 2,051,526.83 1 UNIT Manual Call Point Backbox Rp 188,097.85 1 BH Outside Screw & Yoke Supervisory Switch W/2 Spdt. Rp 4,072,240.36 1 BH Waterflow Detector 2.5" Rp 3,588,897.17 1 SET SIP PBX 20/200 Rp 431,379,595.65 1 SET PABX 6 Co line/100 Ext Rp 54,638,760.01
1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase
Harga Satuan Pekerjaan Elektrikal - page 190 of 280
NO.
SATUAN
55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 SET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
URAIAN 24 ports Single Line Interface Board Proffesional Digital Proprietary Phone Single Line Telephone with CID (white grey/black) 19” Rack Mounting Bracket(Option) Terminal Box PABX 1 Set : 19” Rack Mounting Bracket(Option) Reciver Satellite Parabola Active Combiner Booster Amplifiere Parabola Antenne lengkap dengan tiang dan aksesories Splitter Instalasi Kabel dari Antena ke Sentral unit 2 x 8 DVBS/T to IP Penerima Channel FTA Conventional Zone Module, Mias, In. For Integrasi and M400K/t Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Output Module, Mias, In. For Integrasi Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Antena Parabola + Kabel Coaxial + Pekerjaan Sipil 8 CH HD Encoder 8 CH DVBS to IP Middleware & VoD Server c/w IPTV Application Multicast Switch 24G Access Point (Wi-Fi)
PEKERJAAN SOUND SYSTEM 1 UNIT TBS (Terminal Box Speaker) 1 BH SPEAKER SELECTOR 1x10 Channel 1 BH SPEAKER SELECTOR 2x10 Channel 1 BH CD/MMC/USB Player With FM Tunner 1 BH Remote Microphone 1 BH Voice Alarm System Amplifier 360 W w/Zone Selector 1 BH Digital Matrix Mixer w/ Equalizer Program 1 BH Flight Case 16U 1 BH Wireless Set (Dual Wireless Lavalier and Handheld) 1 SET Power Amplifier 120 W 1 BH Power Amplifier 240 W 1 BH Power Amplifier 480 W 1 BH Slim Array Speaker 1 BH F-Series Box Speaker 1 BH Ceiling Speaker 3 W 1 BH Emergency Message Panel 1 BH Ceiling Speaker 3 W + Pagging 1 BH Box Speaker 6 W 1 BH Box Speaker 15 W 1 BH Box Speaker 30 W 1 BH Dynamic Microphone w/ Stand (Muadzin) 1 BH Firedome Speaker w/Metal Box 1 BH Set Top Box 1 BH MDF / CTB 1 BH ANTENA PARABOLA 32 Feet 1 BH ANTENA YAGI VHF 22 ELEMENT 1 SET Parabola Tv Berbayar 1 BH TERMINAL BOX + BOOSTER 1 BH Attenuator 1 BH Cabinet Rack with Accecories 1 BH ACTIVE COMBINER 1 BH POWER DEVIDER 1 BH Digital A/V Encoder 1 BH DEMODULATOR 1 BH DIGITAL SATELITE RECEIVER & MODULATOR 1 BH SPLITER 1 BH COUPLER 1 BH SOCKET TV 1 SET Mixer Amplifier 60 W (Monitor) 1 BH Gooseneck Microphone (Mimbar) 1 BH Dynamic Microphone w/ Stand (Muadzin) 1 BH Dome Camera : 4MP IR Ball Camera 1 UNIT Eyeball Fixed Lens IP Camera 1 UNIT Bullet Camera : 4 MP Bullet Camera 1 BH Driver Unit 60 W w/ Horn 1 BH Dual Power Amplifier 1250 W 1SET Digital Amplifier 480 W w/Selector 1 UNIT Inlet Microphone 1 BH Terminal Box 1:12 + Booster signal 1 BH Terminal Box 1:8 + Booster signal 1 BH Terminal Box 1:4 + Booster signal 1 BH Set Top Box ICT 1 BH 16-Channel Mixing Console 1 SET Hand Held Wireless Microphone w/ Receiver 1 SET Undirectional Lavaliere Wireless Microphone w/ Receiver 1 BH Wireless Antena 1 BH Dynamic Microphone
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
13,875,307.62 5,349,644.73 898,300.05 8,763,521.67 1,807,143.89 8,763,521.67 1,023,975.54 3,235,274.43 5,999,398.05 2,313,899.89 332,944.63 12,172,607.47 3,229,285.50 3,562,938.90 2,256,891.88 2,465,769.28 21,578,920.15 9,788,163.87 67,676,209.75 38,072,445.79 253,757,011.84 17,265,228.83 5,977,736.54
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,279,196.28 3,827,125.31 7,558,692.19 5,095,012.23 5,721,766.20 35,288,941.37 24,814,641.23 7,685,764.49 228,153.43 2,689,579.53 4,005,593.71 8,302,368.60 6,990,498.94 1,463,899.12 163,870.97 9,196,934.41 468,898.97 217,689.89 848,672.97 1,686,882.40 1,698,723.91 830,378.57 1,659,816.11 3,112,092.18 18,746,435.92 3,708,864.02 652,725.49 4,091,335.40 153,399.09 15,640,577.62 4,162,196.47 3,250,212.58 7,700,175.20 2,615,846.21 5,149,020.34 274,391.69 161,897.39 80,948.69 2,063,611.45 1,126,416.21 1,751,041.62 7,982,546.77 7,982,546.77 8,330,811.09 1,407,324.28 11,017,551.88 5,921,475.37 376,172.25 4,101,798.94 3,289,809.98 1,665,832.08 1,216,606.71 5,846,634.15 11,994,913.02 11,866,348.10 2,067,502.23 1,047,441.10
Harga Satuan Pekerjaan Elektrikal - page 191 of 280
NO.
SATUAN
58 59 60 61 62 63 64 65 66 67
1 BH 1 SET 1 BH 1 SET 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH
URAIAN Floor Stand Mic. Digital Speaker Processor w/ Equalizer Multi Channel Power Amplifier Dual Power Amplifier Speaker System Subwofer System Monitor Speaker HX-Series Speaker Yamaha Mixer Paging Microphone w/RU-2002 (Car Call)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
661,746.35 33,760,446.11 18,214,240.92 7,210,944.76 25,167,742.16 13,525,850.53 2,764,459.41 6,940,281.78 24,539,296.54 5,380,586.33
47 48 49 50 51 52 53 54 55 56 57 58 59 60
PERKERJAAN BAS (BUILDING AUTOMATIC SYSTEM) 1 Unit Web Controller 12 IO Rp 69,939,630.20 1 Unit Web Controller Onboard Ios DI8DO12 & AI8AO4 Rp 28,000,964.58 1 UNIT Capacitive Monitor Touch Screen minimum 10" Rp 24,406,221.81 1 UNIT LCD Display Nurse Station Operating Management Rp 6,432,507.98 1 UNIT Software Management : OPENweb basic Rp 119,866,613.08 1 UNIT BAS Main PC Core i7, 52" Display Rp 31,995,123.21 1 UNIT IO Module DI8DO8T CPU : ARM7 Architecture Rp 9,627,834.88 1 UNIT IO Module DI16 CPU : ARM7 Architecture Rp 7,231,339.70 1 UNIT IO Module AI8AO4 CPU : ARM7 Architecture Rp 12,823,161.78 1 UNIT IO Module AO4 CPU : ARM7 Architecture Rp 6,831,923.84 1 BH Bridge bus connector Rp 161,678.93 1 BH Coupler module integrated bus terminating resistor Rp 1,120,277.00 1 BH Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Rp 819,758.81 1 TITIK Instalation, Cable Cat6 to LAN Rp 719,904.84 1 Unit Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Rp 5,234,260.39 1 TITIK Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Rp 739,875.64 1 TITIK Installation, cable STP 18 AWG for data communication between panel Rp 819,758.81 1 TITIK Installation, cable STP 18 AWG Modbus for CO2 Transmitter Rp 580,109.29 1 TITIK Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Rp 699,934.05 1 TITIK Installation, cable NYM 3X1,5mm for power supply Room Temperature & Humidity Transmitter Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Air Quality CO2 & CO Transmitter Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Motorized Damper Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter Rp 540,167.71 1 TITIK Installation, Cable ITC 2 x 0.6mm for analog and digital point Rp 819,758.81 1 TITIK Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift Rp& Generator Set 699,934.05 1 PCS Battery starting genset sensor voltage Rp 1,179,233.09 1 PCS Duct Temperature Sensor Rp 510,689.66 1 PCS Differential Pressure Transmitter Rp 2,028,469.94 1 PCS System Integration with AC System (BACNet) Rp 6,821,460.30 1 PCS System integration with Fire Alarm (ModBus) Rp 6,821,460.30 1 UNIT Differential Pressure Switch Rp 1,019,466.74 1 UNIT Mini Inverter to Control Exhaust Fan (Tangga Darurat) Rp 1,019,466.74 1 UNIT Temperature Sensor PT 1000 Rp 1,898,181.64 1 UNIT Room Temperature Sensor & Humidity Sensor Rp 1,698,473.71 1 UNIT Pipe Temperature Rp 580,109.29 1 UNIT Static Pressure Transmitter Rp 1,099,349.91 1 UNIT Outside Temperature & Humidity Rp 1,618,590.54 1 UNIT Control 0-100% Exhaust Fan Rp 620,050.88 1 UNIT Slim Relay Rp 180,693.43 1 UNIT Damper Modulating 10Nm Rp 1,618,590.54 1 UNIT Damper Konstan 10Nm Rp 1,299,057.85 1 PCS Outdoor Temperature (PT1000) Rp 1,898,181.64 1 PCS Outdoor Humidity Sensor Rp 1,047,425.85 1 PCS Fuel Level Sensor Genset Rp 2,350,095.34 1 PCS Motion Sensor Rp 739,875.64 1 UNIT Water Level Transmitter Rp 3,016,546.06 1 UNIT Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Rp 3,056,487.64 1 UNIT Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Rp 3,096,429.23 1 UNIT Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Rp 2,257,655.92 PEKERJAAN DALI System BAS 1 UNIT Web Controller DALI Rp 46,752,583.06 1 UNIT On/Off Module DALI to control lighting 1 channel Rp 939,583.57 1 UNIT Touch Screen Glass On/Off DALI 1 Group Rp 1,139,291.50 1 UNIT On/Off Module DALI to control lighting 2 channel Rp 1,019,466.74 1 Unit Touch Screen Glass On/Off DALI 2 Group Rp 1,219,174.67 1 UNIT On/Off Module DALI to control lighting 6 channel Rp 1,299,057.85 1 UNIT Touch Screen Glass On/Off DALI 6 Group Rp 1,618,590.54 1 TITIK Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Rp 496,040.70 1 UNIT Dimmable Module DALI to control lighting 1 channel Rp 979,525.15 1 UNIT Touch Screen Glass Dimmable DALI 1 Group Rp 739,875.64 1 UNIT Dimmable Module DALI to control lighting 2 channel Rp 941,181.23 1 UNIT Touch Screen Glass Dimmable DALI 2 Group Rp 838,930.77 1 Unit RGB Module DALI to control lighting 6 channel Rp 4,015,085.71 1 UNIT Saklar LCD control RGB DALI 6 group Rp 3,391,996.97
1 2
PEKERJAAN DATA CENTER 1 UNIT Patchpanel UTP Cat6 24 port Loaded 1 UNIT Patchpanel UTP Cat6 48 port Loaded
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Rp Rp
3,410,104.64 6,778,355.12
Harga Satuan Pekerjaan Elektrikal - page 192 of 280
NO.
SATUAN
URAIAN
HARGA SATUAN
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 M' 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 SET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 LOT 1 LOT 1 LOT 1 UNIT 1 PCS 1 PCS 1 PCS 1 UNIT 1 PCS 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1M 1 LOT 1M
Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT Rp 859,181.20 Core Switch Layer 3 Rp 302,637,180.98 Core Firewall + Router + IPS Rp 357,166,625.84 Hdd PC WD CCTV PURPLE 4TB Rp 1,696,981.57 IPPABX Headend Support Up to 200 Lines Rp 151,302,991.01 IPPABX Headend Support Up to 400 Lines Rp 302,564,127.86 IPTV Management System ( Server + Software ) Rp 347,392,684.72 IPTV Headend Rp 167,128,191.69 Monitor 32"+ PC for System Rp 27,844,236.10 OTB (Optical Terminal Box) Rp 2,323,881.46 Patch Cord 1 mtr Cat6 UTP Rp 157,198.38 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door Rp 21,304,706.60 Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories Rp 40,480,814.21 MMF - Patch Cord OM3, 3m Rp 240,591.99 MMF - 12F MC DJ Trunk MPO Pol B 5M Rp 2,399,013.20 Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Rp Port to PSU 250,758,339.84 air flow Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fansRp 623,533,513.12 Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD,AC PSU, Rp cable and 322,100,525.26 RMK) and Software Base (F Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundantRpfans, front-to-back 30,894,717.40 airflow, 2 AC PSU 300 QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF Rp 55,994,430.38 SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF Rp 16,191,050.26 1U Wiring Management Rp 261,157.07 NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB Rp 35,104,294.69 WLAN Controller Rp 158,410,119.58 UPS 10KVA Rp 46,043,585.35 UPS 2KVA Rp 4,747,578.47 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door Rp 11,409,171.68 19" Wallmounted Rack 15U Depth 600 mm Double Door Rp 3,890,727.79 Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories Rp 4,379,397.21 Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, Rpredundant77,390,637.86 fans, front-to-back airflow, 2 Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant Rp fans, front-to-back 40,739,486.43 airflow, 2 AC PSU UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager Rp 1,586,277.93 UTP Cat 6 Patchcord Blue 2m Rp 80,466.31 UTP Cat 6 Patchcord Blue 3m Rp 96,968.12 MMF - 12core OM3 SLT STA in PVC HI Conduit Rp 104,495.75 Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Rp 21,578,399.11 POS ( Passive Optical Splitter) 2 :8 c/w accessories Rp 794,517.69 POS ( Passive Optical Splitter) 2 :16 c/w accessories Rp 1,579,092.88 Wiring Management 1U Rp 225,627.07 UTP Cat 6 Patch Panel 24 Port Loaded Rp 2,036,070.63 UTP Cat 6 Patch Cord, 3m Rp 62,229.51 Optical Line Terminal ( OLT ) 4 PON Rp 66,202,097.92 Farm Switch 24 Gb, L3 Rp 29,552,976.46 Network Management System Rp 57,525,826.78 Router Fire Wall for Internet Rp 40,379,001.89 UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 183,629,403.07 UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 25,604,511.00 Grounding Sistem Rp 70,495,094.80 Sistem Pengkabelan Perangkat Utama Data Rp 8,302,313.36 A/P Controller license max 50 A/P Rp 229,113,213.96 Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Rp 3,429,849.67 Patch Panel F.O 12 Core Rp 1,781,676.18 Patch Panel F.O 24 Core Rp 3,280,063.08 Patch Cord F.O SC to LC, 3 meter Rp 149,706.10 Patch Panel UTP 24 Port, Cat 6 Loaded Rp 2,036,070.63 Patch Cord UTP Cat 6, 1 meter Rp 62,229.51 ONU 24G PoE Rp 7,817,723.79 ONU 48G PoE Rp 15,625,505.08 POS ( Passive Optical Splitter) 1:4 c/w accessories Rp 495,884.06 POS ( Passive Optical Splitter) 2:4 c/w accessories Rp 981,791.78 Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Rp 45,828.18 Terminasi Kabel FO Rp 153,732.21 Kabel FO 12 Core, SM, Outdoor Rp 144,956.81
66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 PCS 1 PCS 1 UNIT 1 UNIT
Distribution Switch 16 Port SFP+ Rp Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Rp Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Rp Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Rp Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Rp Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Rp Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base Rp SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. Rp Transceiver, SFP+, 1GbE, LR, SMF Third Party Support Rp AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain Rp AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit Rp Patch Panel Category 6 SL Kapasitas24 Port Rp 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Rp Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Rp BS Shuttered Faceplate - 2 Port Rp BS Shuttered Faceplate - 1 Port Rp 19"Wallmounted 12 RU Double door Rp Optic Terminal Box 8 Port Rp
256,984,676.13 12,415,329.31 3,581,190.22 124,477,323.45 70,927,403.74 78,577,392.27 53,766,618.66 2,641,388.19 2,227,875.29 20,931,439.39 573,823.72 1,705,345.36 107,681.91 83,622.98 61,819.57 59,564.05 3,949,592.61 1,363,257.42
Harga Satuan Pekerjaan Elektrikal - page 193 of 280
NO. 84
SATUAN
URAIAN
1 UNIT Patch Cords SM SC-LC Duplex
HARGA SATUAN Rp
246,772.61
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PEKERJAAN SOLAR PANEL 1 BH JSKYE 200 Wp Solar Panel 1 BH SMA Sunny Boy 1.5kW 1 BH SMA Sunny Island 4.4 1 BH NS VRLA 12v 100 Ah 1 SET Panel Combiner Box 1 LOT Cabling & accs 1 LOT Solar Mounting 1 LOT Battery Rack & Accs 1 BH Inverter Hybrid san Solar Panel Charge Controller 1M Solar Cable 6mm2 1 PCS MC4 Connector Female 1 PCS MC4 Connector Male 1M Cable Trenching 1 SET Prewiring and Components 1 SET Grounding System 1 BH Instalasi & Test Commisioning
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,775,351.99 14,180,738.79 45,194,205.81 2,715,154.02 10,379,676.50 5,210,765.34 4,270,963.30 16,958,290.72 51,730,965.86 60,486.94 15,893.33 15,893.33 79,658.90 32,178,619.56 25,416,509.00 26,967,059.71
1 2 3 4 5 6 7 8 9 10
PEKERJAAN MASTER CLOCK 1 UNIT NTP Time Server Master Clock 1 UNIT GPS Antenna Receiver 1 UNIT Converter 1 UNIT Teak Wood Clock 1 TTK Installation Slave Clock 1 UNIT NTP to Signal Time Covert Module 1 UNIT Junction Box Master Clock (SERVER) 1 UNIT Analog Clock Lingkaran Dia.500mm,HH:MM 1 UNIT Analog Clock Lingkaran Dia.400mm,HH:MM 1 UNIT Junction Box Master Clock
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
31,749,709.16 19,908,203.57 8,362,735.63 13,987,450.78 454,301.54 8,479,145.36 528,420.18 5,931,216.34 10,879,274.03 528,420.18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PEKERJAAN NURSE CALL 1 SET Master Controller IP-Ark 1 + Data Report License Rp 101,314,344.41 1 SET Desktop Touch Screen Nurse Station 18" Rp 5,270,630.92 1 SET Event Management Module Rack + Interface License Rp 95,601,822.26 1 SET IntelPage IP Paging Module Rack + Dipole Antenna Rp 54,696,478.19 1 SET Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS Rp 27,641,236.20 1 SET IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] Rp 3,272,722.37 1 BH PSU 24 VDC Rp 5,528,247.24 1 BH Over Bed Indicator Led Single Color Rp 1,645,648.64 1 BH Patient Call Pendant, Momentary Action, Green Button, 2m Rp 1,068,794.47 1 BH IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code BlueRpfunction] 2,441,273.98 1 BH IP Net Room Controller Rp 10,886,961.56 1 BH Flashing Over Door Light, 1 LED, Red, British Plate Rp 1,525,796.24 1 BH IP Over Door Lamp 4 RGB Programmable Rp 2,340,291.33 1 BH IP Corridor Digital Display, 12 Characters, 50mm Rp 22,095,814.54 1 BH Panel Elektrikal lengkap dengan aksesorisnya Rp 3,685,498.16 1 BH IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] Rp 2,222,355.39
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PERKERJAAN BED HEAD 1 UNIT Dimensi : 1200mm x 220mm x 80mm 1 UNIT Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] 1 UNIT Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] 1 UNIT Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] 1 UNIT Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] 1 UNIT Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] 1 UNIT Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] 1 BH 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 BH 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 BH 1 x Universal Socket 16A 250V - Vivase Schneider 1 BH 1 x Single Switch 16A 250V - Vivase Schneider 1 BH 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 BH 1 x Patient Name Tag 1 BH Provision Access for Medical Gas Outlet 1 BH Provision Access for Nurse Call Outlet
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,100,733.95 73,474,091.31 36,737,045.66 26,240,746.90 20,992,597.52 21,007,339.51 16,621,596.70 15,744,448.14 10,496,298.76 13,120,373.45 10,496,298.76 10,496,298.76 9,971,483.82 8,766,114.30 171,375.66 83,660.81 103,193.95 59,336.52 230,343.63 27,641.24 9,213.75 9,213.75
Harga Satuan Pekerjaan Elektrikal - page 194 of 280
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL & PLUMBING PEKERJAAN PERENCANAAN NO
TIPE
A. 1 2 3 4 5 6 7 8 B. 1 2 3 4 5 6 7 8 9 10 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
DAFTAR UPAH Pekerja Tukang pipa Tukang listrik Tukang AC Kepala tukang AC Kepala tukang listrik Kepala tukang pipa Mandor PEKERJAAN EXHAUST : Axial Fan Inline Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Wall Fan Type Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Exhaust Fan , Kapasitas : 800 CFM / Wall Type Exhaust Fan , Kapasitas : 850 CFM / Wall Type Exhaust Fan , Kapasitas : 950 CFM / Wall Type Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Inline Fan Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Exhaust Fan , Kapasitas : 2900 CFM / Inline Type Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Exhaust Fan , Kapasitas : 950 CFM / Inline Type Exhaust Fan , Kapasitas : 900 CFM / Inline Type Exhaust Fan , Kapasitas : 850 CFM / Inline Type Exhaust Fan , Kapasitas : 800 CFM / Inline Type Exhaust Fan , Kapasitas : 750 CFM / Inline Type Exhaust Fan , Kapasitas : 700 CFM / Inline Type Exhaust Fan , Kapasitas : 650 CFM / Inline Type Exhaust Fan , Kapasitas : 600 CFM / Inline Type Exhaust Fan , Kapasitas : 550 CFM / Inline Type Exhaust Fan , Kapasitas : 500 CFM / Inline Type
PRICE Rp Rp Rp Rp Rp Rp Rp Rp
70,000 80,000 80,000 80,000 85,000 85,000 85,000 90,000
hari hari hari hari hari hari hari hari
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,200,000 6,240,000 7,380,000 7,920,000 10,800,000 14,400,000 24,000,000 30,000,000 37,200,000 43,200,000 57,600,000 72,000,000 96,000,000 144,000,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,150,000 1,725,000 2,300,000 2,875,000 3,450,000 4,025,000 4,600,000 5,175,000 5,750,000 6,900,000 9,200,000 9,775,000 10,925,000 13,800,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
55,000,000 33,000,000 31,900,000 30,800,000 28,600,000 28,600,000 27,500,000 26,400,000 25,300,000 24,200,000 23,100,000 22,000,000 20,900,000 19,800,000 18,700,000 17,600,000 16,500,000 15,400,000 14,300,000 13,200,000 12,100,000 11,000,000 10,450,000 9,900,000 9,350,000 8,800,000 8,250,000 7,700,000 7,150,000 6,600,000 6,050,000 5,500,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 195 of 280
NO 33 34 35 36 37 38 39 40 41
1 2 3 4 5 6 7 8 9 10
TIPE Exhaust Fan , Kapasitas : 450 CFM / Inline Type Exhaust Fan , Kapasitas : 400 CFM / Inline Type Exhaust Fan , Kapasitas : 350 CFM / Inline Type Exhaust Fan , Kapasitas : 300 CFM / Inline Type Exhaust Fan , Kapasitas : 250 CFM / Inline Type Exhaust Fan , Kapasitas : 200 CFM / Inline Type Exhaust Fan , Kapasitas : 150 CFM / Inline Type Exhaust Fan , Kapasitas : 100 CFM / Inline Type Exhaust Fan , Kapasitas : 70 CFM / Inline Type ERV Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Booster Fan Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer
1 2 3 4 5 6
DUCTING SENG BJLS BJLS 60 ( untuk ukuran ducting s/d 12“ ) BJLS 70 ( untuk ukuran ducting s/d 18 “) BJLS 80 ( untuk ukuran ducting s/d 30 “ ) BJLS 90 ( untuk ukuran ducting s/d 40 “ ) BJLS 100 (untuk ukuran ducting > 40 “ ) Penggantung Ducting
Rp Rp Rp Rp Rp Rp
181,900 208,900 235,700 287,600 341,000 45,000
m' m' m' m' m' Set
DUCTING TERISOLASI - Supply Air c/w OBD (Finishing Cat Powder Coating) 44" x 38" 44" x 36" 40" x 34" 36" x 34 34" x 30" 32" x 28" 30" x 30" 30" x 24" 28" x 28" 28" x 24" 28" x 22" 28" x 20" 26" x 26" 26" x 24" 26" x 16" 24" x 24" 24" x 20" 22" x 22" 22" x 20" 22" x 18" 20" x 20" 20" x 18" 20" x 12 18" x 18" 18" x 16" 18" x 14" 18" x 12" 16" x 16" 16" x 14" 16" x 12" 16" x 10" 14" x 12" 14" x 10" 12" x 12" 12" x 10" 12" x 8" 10" x 10" 10" x 8" 8" x 8" 8" x 6" 6" x 6"
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
1 2 3 4
C.
1
Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 4,950,000 4,400,000 3,850,000 3,300,000 2,750,000 2,200,000 1,650,000 1,100,000 770,000
unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp
21,000,000 29,500,000 29,500,000 60,000,000
unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,261,700 5,905,580 8,022,125 9,842,634 11,811,161 13,779,688 20,055,312 29,084,913 38,034,117 43,740,000
unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 196 of 280
NO 2
3
4 D. 1
TIPE Return Air c/w OBD (Finishing Cat Powder Coating) 40" x 36 40" x 34" 40" x 32" 34" x 32" 32" x 24" 24" x 20" 36" x 32" 34" x 30" 32" x 28" 30" x 24" 28" x 28" 28" x 24" 26" x 26" 24" x 24" 24" x 22" 24" x 16" 22" x 22" 22" x 20" 22" x 18" 20" x 20" 20" x 18" 20" x 16" 18" x 18" 18" x 16" 18" x 14" 16" x 16" 16" x 14" 16" x 12" 15" x 10" 14" x 14" 14" x 12" 14" x 10" 12" x 12" 12" x 10" 12" x 8" 10" x 10" 10" x 8" 8" x 8" 8" x 6" 6" x 6" - Fresh Air Louvre (Finishing Cat Powder Coating) 32" x 28" 24" x 20" 22" x 14" 20" x 18" 20" x 16" 18" x 16" 16" x 16" 14" x 14" 14" x 12" 14" x 10" 12" x 12" 10" x 10" 10" x 8" 8" x 8" 8" x 6" - Volume Damper (Painted) VD 14" X 14" VD 12" X 12" VD 10" X 10" VD 8" X 8" Ducting HOOD SUS - 304
PRICE
-
PEKERJAAN AIR CONDITIONING Outdoor Unit Air Conditioning kapasitas : 95 500 BTU/h - OU kapasitas : 114 600 BTU/h - OU kapasitas : 133 800 BTU/h - OU kapasitas : 152 900 BTU/h - OU kapasitas : 229 200 BTU/h - OU kapasitas : 248 400 BTU/h - OU kapasitas : 267 500 BTU/h - OU kapasitas : 286 600 BTU/h - OU kapasitas : 305 700 BTU/h - OU kapasitas : 363 100 BTU/h - OU kapasitas : 382 200 BTU/h - OU kapasitas : 401 300 BTU/h - OU
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp
695,200 596,000 413,600 264,800 5,040,000
bh bh bh bh unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,558,250 66,764,250 74,844,000 194,040,000 133,528,500 141,608,250 150,113,250 379,170,000 407,880,000 199,867,500 208,372,500 221,130,000
unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 197 of 280
NO
2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
TIPE kapasitas : 420 400 BTU/h - OU kapasitas : 496 800 BTU/h - OU kapasitas : 515 900 BTU/h - OU kapasitas : 535 000 BTU/h - OU kapasitas : 592 400 BTU/h - OU kapasitas : 763 000 BTU/h - OU kapasitas : 821 700 BTU/h - OU kapasitas : 859 900 BTU/h - OU Indoor Unit Air Conditioning Wall Mounted Type - VRV kapasitas : 5 460 BTU/h - Wall Mounted kapasitas : 7 510 BTU/h - Wall Mounted kapasitas : 9 550 BTU/h - Wall Mounted kapasitas : 12 280 BTU/h - Wall Mounted kapasitas : 15 350 BTU/h - Wall Mounted kapasitas : 19 110 BTU/h - Wall Mounted kapasitas : 24 230 BTU/h - Wall Mounted Ceilling Mounted Type - VRV 1 Way Ceilling Cassette kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Way Ceilling Cassette kapasitas : 19 100 BTU/h - 2 Way Cassette Type 4 Way Ceilling Cassette kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit Wall Split Type - Inverter kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) AHU (Air Handling Unit) Kapasitas : 85 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 95 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 114 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 125 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Ceiling Concealed Duct (Mid / High) Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 1/2 INCH
Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 233,462,250 275,136,750 287,894,250 698,940,000 756,360,000 990,000,000 1,047,420,000 1,096,920,000
unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp
5,307,893 5,392,943 5,559,178 5,729,278 5,810,461 7,318,166 7,735,685
unit unit unit unit unit unit unit
Rp Rp Rp
15,381,000 26,655,000 27,942,000
unit unit unit
Rp
20,358,000
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
13,702,501 14,033,251 14,364,001 14,973,955 16,770,887 16,770,888 16,869,682 17,325,001 27,405,000 17,986,501 18,763,978 19,794,887
unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp
5,442,631 5,577,631 7,602,631 10,522,895
unit unit unit unit
Rp
94,436,719
unit
Rp
102,898,249
unit
Rp
110,302,088
unit
Rp
123,054,822
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
7,588,779 7,739,550 8,273,046 10,020,436 11,330,979 24,200,591 25,128,410 252,000 252,000 171,000 171,000 171,000 171,000 288,000 296,000 288,000 288,000 394,000 378,000 378,000 443,000 378,000 378,000 159,000 646,000 861,000
unit unit unit unit unit unit unit m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' set set
Bahan Mekanikal dan Plumbing - page 198 of 280
NO 22 23 24 25 26 27 28 29 30 31 32 33 34 34 35 36
TIPE KABEL LEADER (Kabel Indoor to Outdoor) PIPA DRAIN Y BRANCH AC MANAGER 5 ACP 5 Standard 3 Wired Remocon Wireless Remocon Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 41 AHU Comm. Kit EEV Kit 4-10HP EEV Kit 12-20HP TVX Kit for 18-26 HP TVX Kit for 28-36 HP Terminal Udara - DIFFUSER SUPPLY GRILLE ALUMUNIUM - DIFFUSER RETURN GRILLE ALUMUNIUM - DIFFUSER FRESH AIR GRILLE ALUMUNIUM - DIFFUSER EXHAUST GRILLE ALUMUNIUM - BOX DIFFUSER PERPORATE STAINLESS STEEL - LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL - DAMPER RETURN - DAMPER FRESH AIR - DAMPER EXHAUST - DAMPER SUPPLY 37 Filter Udara - Pre-Filter (G-4) - Medium filter (F-9) - HEPA filter ( H-13) 38 Air Filter (On Ceilling Room) 39 Deferential Pressure Switch (detection pressure drop for Medium Filter) 40 Deferential Pressure Switch (detection pressure drop for Hepa Filter) 41 Analoge Deferential Pressure Gauge (Detection Room Pressure) 42 Mixing Box untuk Fresh air dan Return Air 43 IRIS Damper 44 AC Smart 5 45 AC EZ Touch
E. 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
PEKERJAAN FIRE HYDRANT Fire House Cabinet (Indoor ) Fire House Cabinet (Outdoor) PILLAR HYDRANT SIAMESE CONNECTION Fire Extinguisher ( Dry Chemical ) Kap. 6 Kg Dudukan Fire Extinguisher Package Diesel Fire Pump, Kapasitas : 1250 USGpm Package Electric Fire Pump, Kapasitas 1250 USGpm Package Jockey Fire Pump, Kapasitas : 50 Gpm Diapraghma Tank Kap. 300 liter DAILY TANK 200 LITER HORN BUZZER HAND PUMP NOZZLE PEMADAM KEBAKARAN dia.38 mm NOZZLE PEMADAM KEBAKARAN dia.65 mm FLEXIBLE JOINT DIA 150 MM FLEXIBLE JOINT DIA 100 MM FLEXIBLE JOINT DIA 80 MM FLEXIBLE JOINT DIA 65 MM FLEXIBLE JOINT DIA 50 MM CHECK VALVE DIA 50 MM / 20 K CHECK VALVE DIA 65 MM / 20 K CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 150 MM / 20K CONTROL VALVE DIA. 65 MM / 20 K GATE VALVE DIA. 200 MM / 20 K GATE VALVE DIA. 150 MM / 20 K GATE VALVE DIA.25 MM / 20 K GATE VALVE DIA.32 MM / 20 K GATE VALVE DIA.50 MM / 20 K GATE VALVE DIA.65 MM / 20 K GATE VALVE DIA.80 MM / 20 K GATE VALVE DIA.100 MM / 20 K FOOT VALVE dia. 65 mm FOOT VALVE dia. 100 mm FOOT VALVE dia. 150 mm INDOCATING VALVE 100 mm LANDING VALVE / KSSK dia. 150 mm
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 383,000 90,000 2,097,900 57,834,000 41,929,650 1,752,546 1,060,290 1,729,350 2,211,300 5,346,000 7,399,350 4,123,636 6,237,000 16,200,000 19,800,000
m' m' bh bh unit unit unit bh bh bh unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
950,000 950,000 950,000 950,000 90,000,000 8,500,000 3,500,000 3,500,000 3,500,000 3,500,000
bh bh bh bh unit unit pcs pcs pcs pcs
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
570,000 1,800,000 9,500,000 72,000,000 1,500,000 1,500,000 1,650,000 13,972,000 5,000,000 28,350,000 16,726,500
pcs pcs pcs set set set set set set unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,600,000 7,400,000 5,362,500 7,722,000 1,189,300 114,200 630,000,000 405,000,000 81,000,000 25,058,100 3,000,000 5,594,200 3,995,800 435,000 725,000 2,103,000 1,062,000 744,000 728,000 574,000 3,729,000 3,929,000 4,300,000 5,500,000 5,410,900 21,235,650 14,157,100 2,568,800 3,630,000 4,215,400 5,410,900 6,410,900 9,368,600 3,300,000 8,100,000 10,500,000 899,100 7,425,000
set set bh bh bh bh unit unit unit unit unit bh unit bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Mekanikal dan Plumbing - page 199 of 280
NO 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 F. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
LANDING VALVE / KSSK dia. 100 mm TEST VAVE 100 mm DRAIN VALVE 100 mm FLASHING VALVE 100 mm Plat Orifice 100 mm SIGHT GLASS WATER FLOW SWITCH SAFETY VALVE dia. 150 mm SAFETY VALVE dia. 100 mm SAFETY VALVE dia. 80 mm SAFETY VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 100 mm BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 65 mm PRESSURE GAUGE PRESSURE SWITCH AAV HEAD SPRINKLER PIPA BSP SCH.40 Dia. 1” PIPA BSP SCH.40 Dia. 1 1/4” PIPA BSP SCH.40 Dia. 2” PIPA BSP SCH. 40 Dia. 2 1/2” PIPA BSP SCH. 40 Dia. 3” PIPA BSP SCH.40 Dia. 4” PIPA BSP SCH. Dia. 6” PIPA BSP SCH.40 Dia. 8”
TIPE Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 5,500,000 4,300,000 4,300,000 4,300,000 586,800 2,854,200 2,774,900 29,400,000 29,400,000 18,300,000 9,300,000 7,800,000 5,400,000 4,200,000 2,550,000 1,250,000 1,507,000 82,500 36,667 50,000 79,333 126,500 164,833 234,500 410,000 626,667
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹
PEKERJAAN PLUMBING Package Pompa Booster, Kapasitas : 200 Lpm Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m Package Pompa Submersible, Kapasitas : 150 Lpm Package Pompa Submersible, kapasitas : 300 Lpm Package Sewage Pump, Kapasitas : 300 Lpm Package Sewage Pump, Kapasitas : 200 Lpm WTP (Water Treatment Plant) Include All Panel Kontrol Pompa Sand Filter Carbon Filter Keran Taman Putar Keran Taman Biasa Keran Air Bersih & Air Panas (stailess) Chemical Tank + Dosing Pump Ground Water Tank kap. 120 m3 Pressure tank kap. 500 m3 Pressure tank kap. 1000 m3 Pressure tank kap. 1500 m3 Pressure tank kap. 2000 m3 Pressure tank kap. 3000 m3 Tangki Air, FRP Modul Sistem kapasitas : 250 M3 Tangki Air, FRP Modul Sistem kapasitas : 120 M3 Tangki Air, FRP Modul Sistem kapasitas : 75 M3 Tangki Air, FRP Modul Sistem kapasitas : 30 M3 Tangki Air, FRP Modul Sistem kapasitas : 20 M3 Tangki Air, FRP Modul Sistem kapasitas : 18 M3 Tangki Air, FRP Modul Sistem kapasitas : 16 M3 Tangki Air, FRP Modul Sistem kapasitas : 15 M3 Tangki Air, FRP Modul Sistem kapasitas : 6 M3 Tangki Air, FRP Modul Sistem kapasitas : 4 M3 Dudukan Roof Tank Water Level Control ( WLC ) Vent Out (VO) GATE VALVE DIA.20 MM / 10 Kg GATE VALVE DIA.32 MM / 10 Kg GATE VALVE DIA.50 MM / 10 Kg GATE VALVE DIA.65 MM / 10 Kg GATE VALVE DIA.80 MM / 10 Kg SELENOID VALVE DIA.150 MM SELENOID VALVE DIA.50 MM FLEXIBLE JOINT DIA.80 MM/ 10 KG FLEXIBLE JOINT DIA.65 MM/ 10 KG FLEXIBLE JOINT DIA.50 MM/ 10 KG FLEXIBLE JOINT DIA.32 MM/ 10 KG STRAINER DIA.150 MM STRAINER DIA.100 MM STRAINER DIA.65 MM STRAINER DIA.40 MM
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
53,640,525 170,000,000 157,250,000 144,500,000 39,828,450 47,175,000 17,000,000 12,639,500 357,093,849 8,500,000 23,715,000 24,043,560 98,000 32,000 467,000 3,500,000 20,000,000 15,000,000 30,000,000 40,000,000 60,000,000 120,000,000 837,500,000 402,000,000 251,250,000 100,500,000 67,000,000 60,300,000 53,600,000 50,250,000 20,100,000 13,400,000 2,500,000 2,549,300 250,000 277,000 467,000 3,066,000 3,578,000 4,483,000 4,200,000 2,200,000 963,000 747,000 612,000 459,000 10,655,000 5,042,000 2,989,000 975,000
unit set set set unit unit unit unit unit set unit unit bh bh bh bh unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit Set bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Mekanikal dan Plumbing - page 200 of 280
NO 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 G. 1 2 3 4 5 6 7 8 9 10 11 12 13 10 H. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
TIPE STRAINER DIA.32 MM CHECK VALVE DIA. 80 MM CHECK VALVE DIA. 65 MM CHECK VALVE DIA. 50 MM CHECK VALVE DIA. 32 MM Floor Clean Out + Cover dia. 32-50 mm Floor Clean Out + Cover dia. 65 mm Floor Clean Out + Cover dia. 80 mm Floor Clean Out + Cover dia. 100 mm Floor Clean Out + Cover dia. 150 mm Roof Drain diameter 150 mm Roof Drain diameter 100 mm Roof Drain diameter 80 mm Roof Drain diameter 65 mm Bak Kontrol PIPA PVC Dia. 2 1/2” PIPA PVC Dia. 2” PIPA PVC Dia. 3” PIPA PVC Dia. 4” PIPA PVC Dia. 6” PIPA PVC Dia. 8” PIPA PVC Dia. 10” SEPTIK TANK BIOLOGICAL SISTEM KAP. 20 M3 SEPTIK TANK BIOLOGICAL SISTEM KAP. 40 M3 SEPTIK TANK BIOLOGICAL SISTEM KAP. 50 M3 Grease Trap portable kapasitas 5 liter Floating valve dia 20 mm (1/2") Floating valve dia 25 mm (3/4") Floating valve dia 32 mm (1") Floating valve dia 50 mm (1 1/2") Floating valve dia 63 mm (2") Packaged Bio. Spetic, Kap. 100 m3 Bak Netralisasi Bak Kontrol / Bak Sumpit Water Meter Blower Aersai IPAL
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 742,000 4,437,000 3,684,000 2,749,000 550,000 166,500 222,500 250,000 305,000 415,000 180,000 120,000 100,000 50,000 317,200 28,395 19,463 40,005 66,285 147,308 247,208 382,253 56,000,000 140,000,000 180,000,000 4,139,600 242,000 286,000 363,000 475,900 1,250,000 15,000,000 7,500,000 2,030,126 1,793,000 27,000,000
bh bh bh bh bh bh bh bh bh bh bh bh bh bh unit m¹ m¹ m¹ m¹ m¹ m¹ m¹ unit unit unit unit bh bh bh bh bh unit unit unit bh unit
HEAT PUMP Heat Pump Water Heater, kap. 25.5 kW Heat Pump Water Heater, kap. 43 kW Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Pompa Return, kap. 5 M3/h - Head. 20 m Water Softenner Electric Water Heater, kap. 50 liter Electric Water Heater, kap. 30 liter Package Treatment Pump 150 Lpm Pompa tekan RO ( Stainless Steel ), lengkap accesories Tangki stainless steel kap. 2000 liter lengkap accessories Membran Filter Lengkap dengan accessories Electric Water Heather
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
175,590,000 342,800,000 18,300,000 13,400,000 7,700,000 13,400,000 36,000,000 3,650,000 2,350,000 3,800,000 26,000,000 19,980,000 30,000,000 3,298,000
unit unit unit unit unit unit unit unit unit Unit unit unit unit unit
12,500,000.00 17,300,000.00 12,500,000.00 7,000,000.00 700,000.00 1,100,000.00 2,800,000.00 1,800,000.00 31,500,000.00 13,800,000.00 7,000,000.00 2,000,000.00 4,200,000.00 5,500,000.00 11,000,000.00 8,400,000.00 8,400,000.00 12,500,000.00 6,200,000.00 2,700,000.00 5,600,000.00 9,400,000.00 500,000.00 6,000,000.00
unit unit unit unit unit unit unit unit unit unit unit lot lot unit unit unit unit unit unit lot unit set lot lot
PEKERJAAN RO (REVERSE OSMOSIS)) High Pressure Pump Membrane 4" x 40" - 1500 GPD Housing FRP Permeate & Concentrate Rotameter System Pressure Gauge Recyle Valve Low Pressure Switch Solenoid Valve 3/4" TDS Monitor Cartridge Filter Piping & Interconnecting Frame Aksesoris Stronge Tank SS304, Volume 1000 Litter Stronge Tank SS304, Volume 2000 Litter Pompa Distribusi Kap. 10 Lpm, Head 32 m Pompa Isap Kap. 10 Lpm, Head 32 m Housing Catridge 10", in/out 3/4" Housing Catridge 10", in/out 4" Granular Resin Mixed Bed Ultra Voilet Sterlight 5 GPM, 30 Watt Control Panel Indoor Cabling Installation
Bahan Mekanikal dan Plumbing - page 201 of 280
NO
TIPE
PRICE 2,000,000.00
lot
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,386 11,577 18,665 28,585 43,947 70,875 108,675 155,925 236,250 865,064 559,913
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
11,813 18,665 29,772 47,250 70,875 115,763 174,825 259,875 378,000 374,993 897,750 4,785,066 2,321,343 948,717 661,914 464,904 121,770 1,219,091
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp
969,265 858,721 716,351 596,209 454,582 250,855
m m m m m m
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
39,180.00 49,999.95 83,340.00 108,333.30 123,000.00 153,450.00 208,335.00 250,005.00 330,000.00 500,010.00 600,000.00 866,670.00 1,291,800.00 1,038,000.00 49,324,375.00 456,500.00
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ bh unit bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,950,000 31,500,000 16,810,000 11,867,500 14,500,000 8,250,000 18,300,000 37,100,000 37,100,000 2,135,000 49,900,000 53,765,000 154,995,000 63,695,000
set ls pcs pcs unit unit unit unit unit unit unit unit unit unit
Rp
1,965,000
unit
25 Test Run & Commisioning I. 1
2
3 4 5 6 7 8 9 10
11
12 13 14 J. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PIPA AIR BERSIH PIPA POLIPROFELINE - PN 10 - PPR PN-10 Ø 20 mm ( 1/2") - PPR PN-10 Ø 25 mm ( 3/4") - PPR PN-10 Ø 32 mm ( 1") - PPR PN-10 Ø 40 mm (1 1/4") - PPR PN-10 Ø 50 mm (1 1/2") - PPR PN-10 Ø 63 mm (2") - PPR PN-10 Ø 75 mm (2 1/2") - PPR PN-10 Ø 90 mm (3") - PPR PN-10 Ø 110 mm (4") - PPR PN-10 Ø 125 mm (5") - PPR PN-10 Ø 160 mm (6") PIPA POLIPROFELINE - PN 20 - PPR PN-20 Ø 20 mm ( 1/2") - PPR PN-20 Ø 25 mm ( 3/4") - PPR PN-20 Ø 32 mm ( 1") - PPR PN-20 Ø 40 mm (1 1/4") - PPR PN-20 Ø 50 mm (1 1/2") - PPR PN-20 Ø 63 mm (2") - PPR PN-20 Ø 75 mm (2 1/2") - PPR PN-20 Ø 90 mm (3") - PPR PN-20 Ø 110 mm (4") - PPR PN-20 Ø 125 mm (5") - PPR PN-20 Ø 160 mm (6") PIPA HEADER Dia. 150 mm PIPA HEADER Dia. 100 mm PIPA HEADER Dia. 90 mm PIPA HEADER Dia. 80 mm PIPA HEADER Dia. 63 mm PIPA HEADER Dia. 32 mm Water Hammer PIPA PVC-O - PN 10 - PN 10 Diameter 10" (250 mm) + RRJ Power Lock - PN 10 Diameter 8" (200 mm) + RRJ Power Lock - PN 10 Diameter 6" (160 mm) + RRJ Power Lock - PN 10 Diameter 4" (110 mm) + RRJ Power Lock - PN 10 Diameter 3" (90 mm) + RRJ Power Lock - PN 10 Diameter 2" (63 mm) + RRJ Power Lock STAINLESS STEEL 304 SCHEDULE.10 WELDED - Diameter 1/2" ( 15 mm ) - Diameter 3/4" ( 20 mm ) - Diameter 1" ( 25 mm ) - Diameter 1 1/4" ( 32 mm ) - Diameter 1 1/2" ( 40 mm ) - Diameter 2" ( 50 mm ) - Diameter 2 1/2" ( 65 mm ) - Diameter 3" ( 80 mm ) - Diameter 4" ( 100 mm ) - Diameter 5" ( 125 mm ) - Diameter 6" ( 150 mm ) - Diameter 8" ( 200 mm ) - Diameter 10 ( 250 mm ) Alarm Heat Detector (HD) Tabung Silinder Kap. 150 Kg (Fire Supression) Head Springkler Supression (HS) PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG ) CENTRAL CONTROL UNIT Blower Skyrail V1 Software license package 10 units Bus Converter Power Pack 230V - 36VDC PC Win. 10, 64 Bit LG LED Monitor 19" UPS c/w Battery Back-up 3-way Diverter NW110 3-way Diverter NW110 (Transfer Unnit) Optical tube switch Compact Station NW110 with PCB - 10" Touch Screen Display Topload (Through) Station NW110 with PCB - 10" Touch Screen Display Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display INSTALLATION & MATERIAL SUPPORT V-piece with valve
Bahan Mekanikal dan Plumbing - page 202 of 280
NO 16 17 18 19 20 21 22 23 24 25 26 27 28 29 K. D1
1
2 3 D2
1
2 3 1
PRICE 2,205,000 1,350,000 2,386,000 1,270,000 1,600,000 2,050,000 145,500 597,100 49,000 1,510,500 83,012,550 250,000 750,000 1,750,000
unit unit unit unit unit unit m psc psc m ls m pcs pcs
Rp
801,930,000
unit
Rp Rp
15,000,000 35,000,000
unit unit
Rp
563,830,000
unit
Rp Rp
15,000,000 35,000,000
unit unit
Rp
755,110,000
unit
Rp Rp
5,000,000 21,000,000
unit unit
Rp Rp Rp
134,000,000 20,000,000 2,500,000
unit unit unit
- DW 50 - 24 - 2/2 Floor Type Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek
Rp Rp Rp
109,250,000 20,000,000 2,500,000
unit unit unit
ESCALATOR - Kapasitas : 9000 passanger / hour - Kecepatan : 30 MPM - Lintasan : 2 Lantai Inklinasi : 30-35 derajad - Kelengkapan : ARD Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
Rp
513,000,000
unit
Rp Rp
15,000,000 25,000,000
ls ls
Rp Rp
13,585,000 5,000,000
ls set
PEKERJAAN DALAM GEDUNG BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 19500 mm - Service Floors : - Control Mode : Duplex full Collective Selective VVVF Close Loop - Door : 1200*2100*2500 ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1000 Kg - Kecepatan : 1 m/s - Traveling Height : 23000 mm - Service Floors : - Control Mode : Duplex full Collective Selective VVVF Close Loop - Door : 900*2100 ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
2 3
PASSENGER ELEVATOR Spesifikasi : - Tipe : Passenger Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 19500 mm - Service Floors : - Control Mode : Simplex full Collective Selective VVVF Close Loop - Door : 1200*2100 SO ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
1
DUMB WAITER
2 3
- DW 200 - 24 - 4/4 Floor Type Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek
1
DUMB WAITER
2 3 1
2 3 1 2 L.
TIPE Arrival signal Rp Carrier rack up to NW110 Rp Receiving basket up to NW110 Rp Upholstery for carrier basket Rp Carrier NW110, 330 x 76 - red/blue/green/yellow Rp Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) Rp Forwarding Tube PVC 110 x 2.3 - light grey Rp Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey Rp Sleeve PVC 110 x 2.3 L=110 - light grey Rp PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Rp Material support Rp Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm Rp Wall chasing, sparing, and finishing Rp Floor coring Rp
Earthquake device Mimic Panel ( Supervisory Panel ) GENSET
Bahan Mekanikal dan Plumbing - page 203 of 280
NO 1
2 3 4 5 6 7 8 9 10 M. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 N. 1
TIPE Unit Genset type silent, Kapasitas : 1600 KVA Stanby Operation Rp - Pengadaan & Pemasangan Lengkap, Type Silent Capacity 1250 Kva Standby Model SILENT Type, Voltage 380/220 Volt, 3 Phase Starting System, Electric, Cooling System, Radiator (Germany), Frek. 50 HZ Altenator and Intalation Duc Radiator + Sound Atenuator, Ready for Pararel System overnor, Electric + Tanky Harian - 2 Unit Residential Silencer + Exhaust Gas + Compensator Stainless Steel - 2 unit Stronge Battery 200 AH + Their Cable - DC Engine Panel - Anti Cavitations and Corrotion Liquid - Certivicate of origin (C.O.D) Engine and Altenator From Origin Manufacture Mecc Alte (Made in Italy), Stamford (Made in UK) Pemindahan Genset ke Pondasi Rp Radiator Ducting dan Flexible connection Rp Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi Rp Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Rp Hand Pump 15 lpm Rp Intake Attenuator Rp Discharge Attenuator Rp Grounding body genset Rp - Melapis ruang genset dengan rockwool density - 80 KG/M3 , tebal 2 ", glas clot dan kawat ayam Drop KIT CT-1000A Rp GAS MEDIS Sentral Oxygen Automatic System Kap. 2x10 cyl Sentral N2O Automatic System Kap. 2x2 cyl Oil Free Air Compressor - Duplex Vacuum Pump Duplex System Master Alarm 10 function Alarm System for 4 Gases Zone Valve for 4 gases Alarm System for 3 Gases Zone Valve for 3 gases Alarm System for 2 Gases Zone Valve for 2 gases Alarm System for 1 Gases Zone Valve for 1 gases Gas Medis For Oxygen Gas Medis For Valve Gas Medis For Gas Medis Wall Outlet Gas Medis For Oxygen DISS Gas Medis For N2O DISS Gas Medis For Air DISS Gas Medis for VACUM DISS Gas Medis for CO2 DISS Gas Medis for N20 Gas Medis For Vacum Gas Medis For AGSS Gas Medis For Compress Air Pemipaan Gas Medis (Seamless Copper Tube) Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Area Alarm Instalasi Zone Valve Instalasi Gas Medis Wall Outlet Instalasi Pipa Gas Fitting & Accessories Testing & Commisioning PERALATAN UTAMA DEEP WELL Sumur Dalam 120m Sewa Alat dan Mesin Bor Pekerja Bor 5 Orang (1 Deep Well)
PRICE 5,225,044,874
unit
2,500,000 6,500,000 95,000,000 45,000,000 6,342,000 12,000,000 18,000,000 1,850,000
unit unit unit unit unit unit unit Ls
16,992,000
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
287,936,000 260,200,000 795,872,400 432,580,000 54,810,000 32,000,000 20,280,000 26,680,000 15,200,000 18,680,000 10,200,000 10,680,000 5,360,000 1,278,800 1,278,800 1,278,800 1,480,000 1,480,000 1,480,000 1,480,000 1,480,000 1,278,800 1,278,800 1,278,800 1,278,800
set set set set set set set set set set set set set bh bh bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
880,000 836,000 337,960 337,960 337,960 223,480 175,200 124,000 82,238
m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
440,000 440,000 600,000 600,000 440,000 1,400,000 1,200,000 280,000 60,000 10,617,900 63,750,000
m' m' m' m' m' set set set m' ls ls
Rp Rp Rp
102,000,000 170,000,000 550,000
lot lot hari
Bahan Mekanikal dan Plumbing - page 204 of 280
NO 2
TIPE Cassing 4" Mobillisasi Demobilisasi Mesin Bor Sumur Imbuhan Pekerjaan Persiapan - Mobilisasi dan Demobilisasi Peralatan - Pembersihan Lokasi, Setting Mesin, dll - Pengadaan Lumpur Pengeboran dan Air Sirkulasi - Pengadaan Tempat Tinggal Pekerjaan Pengeboran - Pembuatan Pilot Hole 6" Sampai Kedalaman 130 m - Well Logging untuk Menentukan letak saringan 130 m - Konstruksi Sumur Meliputi Pemasangan Pipa, Casing, dll - Pembersihan Sumur dengan Air Jetting - Reaming (pembesaran Lubang Bor) 130 m - Pumping Test Pengadaian Material - Pipa Casting PVC Rucika AW 6" - Pembuatan Saringan PVC - Sock 6" - Pembuatan Piezometer dengan PVC 3/4 inch - Gravel Pack 4mm - Semen - Lem Paralaon - Alat Pantau Muka Air Tanah (AWLR) - Planes 8" Pembuatan Bak Saringan Ukuran 6000 x 3000 x 2000 mm - Galian Tanah - Pembuangan Galian tanah - pasang Bigesting, Sloof & pengecoran - Pipa 6" - Pipa 4" - Saringan, Gravel - Meter Air - Aksesoris - Pekerjaan Finishing
PRICE 4,800,000 40,000,000
btg lot
12,000,000.00
lot
Rp
68,230,000
lot
Rp
57,150,000
lot
Rp
85,650,000
lot
Rp Rp
Bahan Mekanikal dan Plumbing - page 205 of 280
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN PERENCANAAN URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT I. A. 1 2 B. 1 2 3 4 5 6 7 8 C. 1 2 3 4 II. 1
Package Pompa Booster, Kapasitas : 200 Lpm Harga Unit Pompa Booster Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Submersible, Kapasitas : 150 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Submersible, kapasitas : 300 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Sewage Pump Kapasitas : 300 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Sewage Pump Kapasitas : 200 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PEKERJAAN DEEPWELL JASA PENGEBORAN Persiapan Lapangan Mobilisasi & Demobilisasi Peralatan Pembuatan Spull bak / Bak sirkulasi Jasa Kontruksi Jasa Bor pilot hole dia 8" Reaming Bor Hole dia. 12" Tenaga kerja ( 5 orang x 60 hari ) Solar/olie/bensin/bahan las Air Kerja Buang Lumpur Bor Electrical Logging Spolling ( Pemberesihan sumur ) Lain - Lain Pumping Test ( 3 hari x 8 jam ) Analisa Air Bersih Foto dan Laporan Pemasangan pompa MATERIAL Pompa Deepwell Kapasitas : 150 ltr/mnt - Head : 150 m 2 Pipa GIP Medium,dia. 6 " 3 Pipa GIP Medium,dia. 3 " 4 Screen Stainless Steel, dia. 3 "
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
53,640,525 1,072,811
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
170,000,000 3,400,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
157,250,000 3,145,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
144,500,000 2,890,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
39,828,450 796,569
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
47,175,000 943,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
17,000,000 340,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,639,500 252,790
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
53,640,525 1,072,811
Rp Rp Rp Rp Rp
16,000 4,250 54,733,586 1,368,340 56,101,925
Rp Rp
170,000,000 3,400,000
Rp Rp Rp Rp Rp
16,000 4,250 173,420,250 4,335,506 177,755,756
Rp Rp
157,250,000 3,145,000
Rp Rp Rp Rp Rp
16,000 4,250 160,415,250 4,010,381 164,425,631
Rp Rp
144,500,000 2,890,000
Rp Rp Rp Rp Rp
16,000 4,250 147,410,250 3,685,256 151,095,506
Rp Rp
39,828,450 796,569
Rp Rp Rp Rp Rp
16,000 4,250 40,645,269 1,016,132 41,661,401
Rp Rp
47,175,000 943,500
Rp Rp Rp Rp Rp
16,000 4,250 48,138,750 1,203,469 49,342,219
Rp Rp
17,000,000 340,000
Rp Rp Rp Rp Rp
16,000 4,250 17,360,250 434,006 17,794,256
Rp Rp
12,639,500 252,790
Rp Rp Rp Rp Rp
16,000 4,250 12,912,540 322,814 13,235,354
ls Unit
1.000 1.000
Rp Rp
5,000,000 2,000,000
Rp Rp
5,000,000 2,000,000
M' M' Hari Ls Ls Ls St Ls
200.000 77.000 300.000 1.000 1.000 1.000 1.000 1.000
Rp Rp Rp Rp Rp Rp Rp Rp
450,000 250,000 80,000 5,000,000 3,000,000 3,000,000 1,800,000 2,400,000
Rp Rp Rp Rp Rp Rp Rp Rp
90,000,000 19,250,000 24,000,000 5,000,000 3,000,000 3,000,000 1,800,000 2,400,000
Hari Set Set Ls
3.000 1.000 1.000 1.000
Rp Rp Rp Rp
200,000 1,500,000 600,000 1,200,000
Rp Rp Rp Rp
600,000 1,500,000 600,000 1,200,000
Unit
1.000
Rp
35,000,000
Rp
35,000,000
72.000 113.000 15.000
Rp Rp Rp
444,000 216,000 600,000
Rp Rp Rp
31,968,000 24,408,000 9,000,000
M' M' M'
TOTAL HARGA Rp
56,101,925
Rp
177,755,756
Rp
164,425,631
Rp
151,095,506
Rp
41,661,401
Rp
49,342,219
Rp
17,794,256
Rp
13,235,354
Rp
302,315,550
Analisa Harga Satuan Mekanikal dan Plumbing - page 206 of 280
NO. 5 6 7 8 9 10 III. 1 2 3 4 5 6 7 8 IV. 1 2
1 m³
1 m³
1 m³
1 m³
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Dop dia. 3 " Reducer 6 " x 3 " Gravel Tutup Sumur Semen Pasir ACCESSORIES POMPA Panel dan Accesoriesnya Kabel Power, NYY 3 x 4 mm - dari DW ke Panel Kabel WLC, NYMHY 3 x 1,5 mm2 - dari DW ke Panel Electroda Sock / Connector Pipa Hisap GIP Medium dia. 2 " Bak Kontrol Accessories Bak Control ( Manometer, Check valve ) PERIZINAN Izin Sumur dari BPLHD Meter Air 2 " + Tera & segel
Menggali Tanah Sedalam 1 meter Tenaga Kerja: 1. Pekerja 2. Mandor
SAT Bh Pcs M3 Pcs Zak M3
INDEK 1.000 1.000 5.000 1.000 5.000 5.000
Rp Rp Rp Rp Rp Rp
HARGA SATUAN 360,000 360,000 900,000 420,000 72,000 30,000
Rp Rp Rp Rp Rp Rp
JUMLAH HARGA 360,000 360,000 4,500,000 420,000 360,000 150,000
Unit M' M' Pcs Ls M' Unit Ls
1.000 100.000 100.000 6.000 1.000 66.000 1.000 1.000
Rp Rp Rp Rp Rp Rp Rp Rp
3,000,000 42,000 30,000 120,000 600,000 156,000 750,000 1,500,000
Rp Rp Rp Rp Rp Rp Rp Rp
3,000,000 4,200,000 3,000,000 720,000 600,000 10,296,000 750,000 1,500,000
Rp Include
5,000,000
Rp Rp Jumlah Rp (Keuntungan 2,5%) Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,000,000 294,942,000 7,373,550 302,315,550
Ls Ls
hari hari
Menggali Tanah Sedalam 2 meter Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
Menggali Tanah Sedalam 3 meter Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
Mengurug Kembali Galian Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
SAND FILTER Harga Unit Sand Filter Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CARBON FILTER Harga Unit Carbon Filter Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Chemical Tank + Dosing Pump Chemical Tank + Dosing Pump Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GROUND TANK KAP. 120 m3 GROUND TANK KAP. 120 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 500 m3 PRESSURE TANK KAP. 500 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 1000 m3 PRESSURE TANK KAP. 1000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1.000 1.000
0.7500 0.0250
Rp Rp
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp
Rp Rp
Rp Rp Rp Rp Rp
63,000 4,050 67,050 1,676 68,726
1.0500 0.0670
Rp Rp
Rp Rp Rp Rp Rp
73,500 6,030 79,530 1,988 81,518
0.2500 0.0083
Rp Rp
Rp Rp Rp Rp Rp
17,500 750 18,250 456 18,706
unit lot
1.00 1.00
Rp Rp
Rp Rp
23,715,000 474,300
hari hari
0.20 0.05
Rp Rp
Rp Rp Rp Rp Rp
16,000 4,250 24,209,550 605,239 24,814,789
unit lot
1.00 1.00
Rp Rp
Rp Rp
24,043,560 480,871
hari hari
0.20 0.05
Rp Rp
Rp Rp Rp Rp Rp
16,000 4,250 24,544,681 613,617 25,158,298
unit lot
1.00 1.00
Rp Rp
Rp Rp
3,500,000 70,000
hari hari
0.20 0.10
Rp Rp
Rp Rp Rp Rp Rp
16,000 8,500 3,594,500 89,863 3,684,363
unit lot
1.00 1.00
Rp Rp
Rp Rp
20,000,000 400,000
hari hari
0.10 0.03
Rp Rp
Rp Rp Rp Rp Rp
8,000 2,125 20,410,125 510,253 20,920,378
unit lot
1.00 1.00
Rp Rp
Rp Rp
15,000,000 300,000
hari hari
0.10 0.03
Rp Rp
Rp Rp Rp Rp Rp
8,000 2,125 15,310,125 382,753 15,692,878
unit lot
1.00 1.00
Rp Rp
30,000,000 600,000
Rp Rp
30,000,000 600,000
hari hari
0.20 0.05
Rp Rp
80,000 85,000 Jumlah
Rp Rp Rp
16,000 4,250 30,620,250
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
23,715,000 474,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
24,043,560 480,871
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
20,000,000 400,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
15,000,000 300,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp
56,119
Rp
68,726
Rp
81,518
Rp
18,706
Rp
24,814,789
Rp
25,158,298
Rp
3,684,363
Rp
20,920,378
Rp
15,692,878
Rp
31,385,756
52,500 2,250 54,750 1,369 56,119
0.9000 0.0450
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Analisa Harga Satuan Mekanikal dan Plumbing - page 207 of 280
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 SET 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
PRESSURE TANK KAP. 1500 m3 PRESSURE TANK KAP. 1500 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 2000 m3 PRESSURE TANK KAP. 2000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 3000 m3 PRESSURE TANK KAP. 3000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 20 MM (1/2") FLOATING VALVE DIA. 20 MM (1/2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 25 MM (3/4") FLOATING VALVE DIA. 25 MM (3/4") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 32 MM (1") FLOATING VALVE DIA. 32 MM (1") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 50 MM (1 1/2") FLOATING VALVE DIA. 50 MM (1 1/2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 63 MM (2") FLOATING VALVE DIA. 63 MM (2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
WATER LEVEL CONTROL WATER LEVEL CONTROL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Vent Out (VO) Vent Out (VO) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Elektrik Water Heater (EWH) Elektrik Water Heater (EWH) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 765,506 Total = Jumlah+(Keuntungan 2,5%) Rp 31,385,756
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
40,000,000 800,000
Rp Rp
40,000,000 800,000
Rp Rp Rp Rp Rp
16,000 4,250 40,820,250 1,020,506 41,840,756
Rp Rp
60,000,000 1,200,000
Rp Rp Rp Rp Rp
16,000 4,250 61,220,250 1,530,506 62,750,756
Rp Rp
120,000,000 2,400,000
Rp Rp Rp Rp Rp
16,000 4,250 122,420,250 3,060,506 125,480,756
Rp Rp
242,000 4,840
Rp Rp Rp Rp Rp
4,800 1,275 252,915 6,323 259,238
Rp Rp
286,000 5,720
Rp Rp Rp Rp Rp
4,800 1,275 297,795 7,445 305,240
Rp Rp
363,000 7,260
Rp Rp Rp Rp Rp
4,800 1,275 376,335 9,408 385,743
Rp Rp
475,900 9,518
Rp Rp Rp Rp Rp
4,800 1,275 491,493 12,287 503,780
Rp Rp
1,250,000 25,000
Rp Rp Rp Rp Rp
4,800 1,275 1,281,075 32,027 1,313,102
Rp Rp
2,549,300 50,986
Rp Rp Rp Rp Rp
4,800 1,275 2,606,361 65,159 2,671,520
Rp Rp
250,000 5,000
Rp Rp Rp Rp Rp
4,800 1,275 261,075 6,527 267,602
3,298,000 65,960
Rp Rp
3,298,000 65,960
80,000 85,000 Jumlah
Rp Rp Rp
66,400 17,638 3,447,998
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
60,000,000 1,200,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
120,000,000 2,400,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
242,000 4,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
286,000 5,720
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
363,000 7,260
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
475,900 9,518
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,250,000 25,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,549,300 50,986
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,000 5,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
41,840,756
Rp
62,750,756
Rp
125,480,756
Rp
259,238
Rp
305,240
Rp
385,743
Rp
503,780
Rp
1,313,102
Rp
2,671,520
Rp
267,602
Rp
3,534,197
Analisa Harga Satuan Mekanikal dan Plumbing - page 208 of 280
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
Heat Pump Water Heater, kap. 25.5 kW Heat Pump Water Heater, kap. 25.5 kW Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Heat Pump Water Heater, kap. 43 kW Heat Pump Water Heater, kap. 43 kW Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Return, kap. 5 M3/h - Head. 20 m Pompa Return, kap. 5 M3/h - Head. 20 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Treatment Pump 150 Lpm Package Treatment Pump 150 Lpm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
WTP (Water Treatment Plant) Include All WTP (Water Treatment Plant) Include All Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.50 MM' FLEXIBLE JOINT DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 86,200 Total = Jumlah+(Keuntungan 2,5%) Rp 3,534,197
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.10 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.10 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.02
Rp Rp
175,590,000 3,511,800
Rp Rp
175,590,000 3,511,800
Rp Rp Rp Rp Rp
66,400 17,638 179,185,838 4,479,646 183,665,483
Rp Rp
342,800,000 6,856,000
Rp Rp Rp Rp Rp
66,400 17,638 349,740,038 8,743,501 358,483,538
Rp Rp
18,300,000 366,000
Rp Rp Rp Rp Rp
66,400 17,638 18,750,038 468,751 19,218,788
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
66,400 17,638 13,752,038 343,801 14,095,838
Rp Rp
7,700,000 154,000
Rp Rp Rp Rp Rp
66,400 17,638 7,938,038 198,451 8,136,488
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
66,400 17,638 13,752,038 343,801 14,095,838
Rp Rp
3,800,000 76,000
Rp Rp Rp Rp Rp
66,400 17,638 3,960,038 99,001 4,059,038
Rp Rp
357,093,849 7,141,877
Rp Rp Rp Rp Rp
66,400 17,638 364,319,763 9,107,994 373,427,757
Rp Rp
963,000 19,260
Rp Rp Rp Rp Rp
8,000 2,125 992,385 24,810 1,017,195
Rp Rp
747,000 14,940
Rp Rp Rp Rp Rp
8,000 2,125 772,065 19,302 791,367
612,000 12,240
Rp Rp
612,000 12,240
80,000 85,000 Jumlah
Rp Rp Rp
6,400 1,700 632,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
342,800,000 6,856,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000 366,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,700,000 154,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,800,000 76,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
357,093,849 7,141,877
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
963,000 19,260
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
747,000 14,940
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
183,665,483
Rp
358,483,538
Rp
19,218,788
Rp
14,095,838
Rp
8,136,488
Rp
14,095,838
Rp
4,059,038
Rp
373,427,757
Rp
1,017,195
Rp
791,367
Rp
648,149
Analisa Harga Satuan Mekanikal dan Plumbing - page 209 of 280
URAIAN
NO.
1 BH 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
FLEXIBLE JOINT DIA.32 MM' FLEXIBLE JOINT DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PANEL KONTROL POMPA PANEL KONTROL POMPA Instalasi Upah Pasang : Tukang Listrik Kepala tukang Listrik
STRAINER DIA.150 MM' STRAINER DIA.150 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.100 MM' STRAINER DIA.100 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.65 MM' STRAINER DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.40 MM' STRAINER DIA.40 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.32 MM' STRAINER DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.80 MM' CHECK VALVE DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.65 MM' CHECK VALVE DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.50 MM' CHECK VALVE DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.32 MM' CHECK VALVE DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 15,809 Total = Jumlah+(Keuntungan 2,5%) Rp 648,149
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.30 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
459,000 9,180
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,500,000 170,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,655,000 213,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,042,000 100,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,989,000 59,780
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
975,000 19,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
742,000 14,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,437,000 88,740
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,684,000 73,680
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,749,000 54,980
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 550,000 11,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
459,000 9,180
Rp Rp Rp Rp Rp
6,400 1,700 476,280 11,907 488,187
Rp Rp
8,500,000 170,000
Rp Rp Rp Rp Rp
24,000 6,375 8,700,375 217,509 8,917,884
Rp Rp
10,655,000 213,100
Rp Rp Rp Rp Rp
12,800 3,400 10,884,300 272,108 11,156,408
Rp Rp
5,042,000 100,840
Rp Rp Rp Rp Rp
12,800 3,400 5,159,040 128,976 5,288,016
Rp Rp
2,989,000 59,780
Rp Rp Rp Rp Rp
11,200 2,975 3,062,955 76,574 3,139,529
Rp Rp
975,000 19,500
Rp Rp Rp Rp Rp
11,200 2,975 1,008,675 25,217 1,033,892
Rp Rp
742,000 14,840
Rp Rp Rp Rp Rp
11,200 2,975 771,015 19,275 790,290
Rp Rp
4,437,000 88,740
Rp Rp Rp Rp Rp
12,800 3,400 4,541,940 113,549 4,655,489
Rp Rp
3,684,000 73,680
Rp Rp Rp Rp Rp
12,800 3,400 3,773,880 94,347 3,868,227
Rp Rp
2,749,000 54,980
Rp Rp Rp Rp Rp
11,200 2,975 2,818,155 70,454 2,888,609
Rp Rp
550,000 11,000
Rp Rp Rp Rp
11,200 2,975 575,175 14,379
TOTAL HARGA
Rp
488,187
Rp
8,917,884
Rp
11,156,408
Rp
5,288,016
Rp
3,139,529
Rp
1,033,892
Rp
790,290
Rp
4,655,489
Rp
3,868,227
Rp
2,888,609
Rp
589,554
Analisa Harga Satuan Mekanikal dan Plumbing - page 210 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PIPA PVC Dia. 2” (63mm) PIPA PVC Dia. 2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 2 1/2” (75mm) PIPA PVC Dia. 2 1/2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 3” (90mm) PIPA PVC Dia. 3” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 4” (110mm) PIPA PVC Dia. 4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 6” (160mm) PIPA PVC Dia. 6” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 8” (200mm) PIPA PVC Dia. 8” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 10” (250mm) PIPA PVC Dia. 10” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 1" (32mm) PIPA BSP SCH.40 Dia. 1” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 1 1/4" (40mm) PIPA BSP SCH.40 Dia. 1 1/4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 2" (63mm) PIPA BSP SCH.40 Dia. 2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 2 1/2" (70mm) PIPA BSP SCH. 40 Dia. 2 1/2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 589,554
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
19,463 6,812
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
28,395 9,938
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
40,005 14,002
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
66,285 23,200
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
147,308 51,558
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
247,208 86,523
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
382,253 133,788
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
36,667 12,833
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 17,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
79,333 27,767
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
126,500 44,275
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
19,463 6,812
Rp Rp Rp Rp Rp
6,667 3,542 36,483 912 37,395
Rp Rp
28,395 9,938
Rp Rp Rp Rp Rp
6,667 3,542 48,542 1,214 49,755
Rp Rp
40,005 14,002
Rp Rp Rp Rp Rp
6,667 3,542 64,215 1,605 65,820
Rp Rp
66,285 23,200
Rp Rp Rp Rp Rp
5,333 2,833 97,651 2,441 100,093
Rp Rp
147,308 51,558
Rp Rp Rp Rp Rp
6,667 3,542 209,073 5,227 214,300
Rp Rp
247,208 86,523
Rp Rp Rp Rp Rp
6,667 3,542 343,938 8,598 352,537
Rp Rp
382,253 133,788
Rp Rp Rp Rp Rp
6,667 3,542 526,249 13,156 539,405
Rp Rp
36,667 12,833
Rp Rp Rp Rp Rp
4,000 2,125 55,625 1,391 57,016
Rp Rp
50,000 17,500
Rp Rp Rp Rp Rp
4,000 2,125 73,625 1,841 75,466
Rp Rp
79,333 27,767
Rp Rp Rp Rp Rp
5,333 2,833 115,267 2,882 118,148
Rp Rp
126,500 44,275
Rp Rp Rp Rp Rp
5,333 2,833 178,942 4,474 183,415
TOTAL HARGA Rp
37,395
Rp
49,755
Rp
65,820
Rp
100,093
Rp
214,300
Rp
352,537
Rp
539,405
Rp
57,016
Rp
75,466
Rp
118,148
Rp
183,415
Analisa Harga Satuan Mekanikal dan Plumbing - page 211 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PIPA BSP SCH.40 DIA. 3" (90mm) PIPA BSP SCH. 40 Dia. 3” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 4" (110mm) PIPA BSP SCH.40 Dia. 4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 6" (160mm) PIPA BSP SCH. Dia. 6” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 8" (200mm) PIPA BSP SCH.40 Dia. 8” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 20 mm ( 1/2") PPR PN-10 Ø 20 mm ( 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 25 mm ( 3/4") PPR PN-10 Ø 25 mm ( 3/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 32 mm ( 1") PPR PN-10 Ø 32 mm ( 1") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 40 mm (1 1/4") PPR PN-10 Ø 40 mm (1 1/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 50 mm (1 1/2") PPR PN-10 Ø 50 mm (1 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 63 mm (2") PPR PN-10 Ø 63 mm (2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 75 mm (2 1/2") PPR PN-10 Ø 75 mm (2 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.02 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
164,833 57,692
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
234,500 82,075
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
410,000 143,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
626,667 219,333
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,386 2,935
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,577 4,052
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,665 6,533
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
28,585 10,005
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,947 15,381
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,875 24,806
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
108,675 38,036
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
164,833 57,692
Rp Rp Rp Rp Rp
6,667 3,542 232,733 5,818 238,552
Rp Rp
234,500 82,075
Rp Rp Rp Rp Rp
6,667 3,542 326,783 8,170 334,953
Rp Rp
410,000 143,500
Rp Rp Rp Rp Rp
6,667 3,542 563,708 14,093 577,801
Rp Rp
626,667 219,333
Rp Rp Rp Rp Rp
6,667 3,542 856,208 21,405 877,614
Rp Rp
8,386 2,935
Rp Rp Rp Rp Rp
1,333 708 13,363 334 13,697
Rp Rp
11,577 4,052
Rp Rp Rp Rp Rp
2,000 1,063 18,692 467 19,159
Rp Rp
18,665 6,533
Rp Rp Rp Rp Rp
2,000 1,063 28,260 706 28,966
Rp Rp
28,585 10,005
Rp Rp Rp Rp Rp
2,000 1,063 41,653 1,041 42,694
Rp Rp
43,947 15,381
Rp Rp Rp Rp Rp
2,333 1,240 62,901 1,573 64,473
Rp Rp
70,875 24,806
Rp Rp Rp Rp Rp
2,333 1,240 99,254 2,481 101,736
Rp Rp
108,675 38,036
Rp Rp Rp Rp Rp
2,333 1,240 150,284 3,757 154,041
TOTAL HARGA Rp
238,552
Rp
334,953
Rp
577,801
Rp
877,614
Rp
13,697
Rp
19,159
Rp
28,966
Rp
42,694
Rp
64,473
Rp
101,736
Rp
154,041
Analisa Harga Satuan Mekanikal dan Plumbing - page 212 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PPR PN-10 Ø 90 mm (3") PPR PN-10 Ø 90 mm (3") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 110 mm (4") PPR PN-10 Ø 110 mm (4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 125 mm (5") PPR PN-10 Ø 125 mm (5") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 160 mm (6") PPR PN-10 Ø 160 mm (6") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 20 mm ( 1/2") PPR PN-20 Ø 20 mm ( 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 25 mm ( 3/4") PPR PN-20 Ø 25 mm ( 3/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 32 mm ( 1") PPR PN-20 Ø 32 mm ( 1") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 40 mm (1 1/4") PPR PN-20 Ø 40 mm (1 1/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 50 mm (1 1/2") PPR PN-20 Ø 50 mm (1 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 63 mm (2") PPR PN-20 Ø 63 mm (2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 75 mm (2 1/2") PPR PN-20 Ø 75 mm (2 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
155,925 54,574
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
236,250 82,688
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
865,064 302,772
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
559,913 195,969
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,813 4,134
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,665 6,533
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,772 10,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
47,250 16,538
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,875 24,806
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
115,763 40,517
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
174,825 61,189
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
155,925 54,574
Rp Rp Rp Rp Rp
2,333 1,240 214,072 5,352 219,423
Rp Rp
236,250 82,688
Rp Rp Rp Rp Rp
2,333 1,240 322,510 8,063 330,573
Rp Rp
865,064 302,772
Rp Rp Rp Rp Rp
2,333 1,240 1,171,409 29,285 1,200,694
Rp Rp
559,913 195,969
Rp Rp Rp Rp Rp
2,333 1,240 759,455 18,986 778,441
Rp Rp
11,813 4,134
Rp Rp Rp Rp Rp
2,333 1,240 19,520 488 20,008
Rp Rp
18,665 6,533
Rp Rp Rp Rp Rp
2,333 1,240 28,770 719 29,490
Rp Rp
29,772 10,420
Rp Rp Rp Rp Rp
2,333 1,240 43,765 1,094 44,859
Rp Rp
47,250 16,538
Rp Rp Rp Rp Rp
2,333 1,240 67,360 1,684 69,044
Rp Rp
70,875 24,806
Rp Rp Rp Rp Rp
2,333 1,240 99,254 2,481 101,736
Rp Rp
115,763 40,517
Rp Rp Rp Rp Rp
2,333 1,240 159,852 3,996 163,849
Rp Rp
174,825 61,189
Rp Rp Rp Rp Rp
2,333 1,240 239,587 5,990 245,576
TOTAL HARGA Rp
219,423
Rp
330,573
Rp
1,200,694
Rp
778,441
Rp
20,008
Rp
29,490
Rp
44,859
Rp
69,044
Rp
101,736
Rp
163,849
Rp
245,576
Analisa Harga Satuan Mekanikal dan Plumbing - page 213 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1M 1 2 3
PPR PN-20 Ø 90 mm (3") PPR PN-20 Ø 90 mm (3") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 110 mm (4") PPR PN-20 Ø 110 mm (4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 125 mm (5") PPR PN-20 Ø 125 mm (5") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 160 mm (6") PPR PN-20 Ø 160 mm (6") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 150 mm PIPA HEADER Dia. 150 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 100 mm PIPA HEADER Dia. 100 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 90 mm PIPA HEADER Dia. 90 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 80 mm PIPA HEADER Dia. 80 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 63 mm PIPA HEADER Dia. 63 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 32 mm PIPA HEADER Dia. 32 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 10" (250 mm) + RRJ Power Lock PN 10 Diameter 10" (250 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
259,875 90,956
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 132,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
374,993 131,248
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
897,750 314,213
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,785,066 1,674,773
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,321,343 812,470
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
948,717 332,051
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
661,914 231,670
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
464,904 162,716
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
121,770 42,620
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
969,265 339,243
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
259,875 90,956
Rp Rp Rp Rp Rp
2,333 1,240 354,404 8,860 363,264
Rp Rp
378,000 132,300
Rp Rp Rp Rp Rp
2,333 1,240 513,873 12,847 526,720
Rp Rp
374,993 131,248
Rp Rp Rp Rp Rp
2,333 1,240 509,814 12,745 522,559
Rp Rp
897,750 314,213
Rp Rp Rp Rp Rp
2,333 1,240 1,215,535 30,388 1,245,924
Rp Rp
4,785,066 1,674,773
Rp Rp Rp Rp Rp
16,000 4,250 6,480,089 162,002 6,642,091
Rp Rp
2,321,343 812,470
Rp Rp Rp Rp Rp
16,000 4,250 3,154,063 78,852 3,232,915
Rp Rp
948,717 332,051
Rp Rp Rp Rp Rp
16,000 4,250 1,301,018 32,525 1,333,543
Rp Rp
661,914 231,670
Rp Rp Rp Rp Rp
16,000 4,250 913,834 22,846 936,680
Rp Rp
464,904 162,716
Rp Rp Rp Rp Rp
16,000 4,250 647,870 16,197 664,067
Rp Rp
121,770 42,620
Rp Rp Rp Rp Rp
16,000 4,250 184,640 4,616 189,255
Rp Rp
969,265 339,243
Rp Rp Rp Rp Rp
16,000 4,250 1,328,758 33,219 1,361,976
TOTAL HARGA Rp
363,264
Rp
526,720
Rp
522,559
Rp
1,245,924
Rp
6,642,091
Rp
3,232,915
Rp
1,333,543
Rp
936,680
Rp
664,067
Rp
189,255
Rp
1,361,976
Analisa Harga Satuan Mekanikal dan Plumbing - page 214 of 280
URAIAN
NO. 1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
PN 10 Diameter 8" (200 mm) + RRJ Power Lock PN 10 Diameter 8" (200 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 6" (160 mm) + RRJ Power Lock PN 10 Diameter 6" (160 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 4" (110 mm) + RRJ Power Lock PN 10 Diameter 4" (110 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 3" (90 mm) + RRJ Power Lock PN 10 Diameter 3" (90 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 2" (63 mm) + RRJ Power Lock PN 10 Diameter 2" (63 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Taman Putar Keran Taman Putar Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Taman Biasa Keran Taman Biasa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Air Bersih & Air Panas (stailess) Keran Air Bersih & Air Panas (stailess) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.20 MM /10 Kg GATE VALVE DIA.20 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.32 MM /10 Kg GATE VALVE DIA.32 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.50 MM /10 Kg GATE VALVE DIA.50 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
858,721 300,552
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
716,351 250,723
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
596,209 208,673
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
454,582 159,104
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,855 87,799
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
98,000 1,960
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
32,000 640
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
467,000 9,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
277,000 5,540
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
467,000 9,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,066,000 61,320
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
858,721 300,552
Rp Rp Rp Rp Rp
16,000 4,250 1,179,523 29,488 1,209,012
Rp Rp
716,351 250,723
Rp Rp Rp Rp Rp
16,000 4,250 987,324 24,683 1,012,007
Rp Rp
596,209 208,673
Rp Rp Rp Rp Rp
16,000 4,250 825,132 20,628 845,761
Rp Rp
454,582 159,104
Rp Rp Rp Rp Rp
16,000 4,250 633,935 15,848 649,784
Rp Rp
250,855 87,799
Rp Rp Rp Rp Rp
16,000 4,250 358,904 8,973 367,876
Rp Rp
98,000 1,960
Rp Rp Rp Rp Rp
2,333 620 102,913 2,573 105,486
Rp Rp
32,000 640
Rp Rp Rp Rp Rp
2,333 620 35,593 890 36,483
Rp Rp
467,000 9,340
Rp Rp Rp Rp Rp
2,333 620 479,293 11,982 491,275
Rp Rp
277,000 5,540
Rp Rp Rp Rp Rp
6,667 2,361 291,568 7,289 298,857
Rp Rp
467,000 9,340
Rp Rp Rp Rp Rp
6,667 2,361 485,368 12,134 497,502
Rp Rp
3,066,000 61,320
Rp Rp Rp Rp Rp
13,333 4,722 3,145,376 78,634 3,224,010
TOTAL HARGA Rp
1,209,012
Rp
1,012,007
Rp
845,761
Rp
649,784
Rp
367,876
Rp
105,486
Rp
36,483
Rp
491,275
Rp
298,857
Rp
497,502
Rp
3,224,010
Analisa Harga Satuan Mekanikal dan Plumbing - page 215 of 280
URAIAN
NO. 1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
GATE VALVE DIA.65 MM /10 Kg GATE VALVE DIA.65 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.80 MM /10 Kg GATE VALVE DIA.80 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Water Hammer Water Hammer Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 150 mm FLOOR CLEAN OUT DIA. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 100 mm FLOOR CLEAN OUT DIA. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 80 mm FLOOR CLEAN OUT DIA. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 65 mm FLOOR CLEAN OUT DIA. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 50 mm FLOOR CLEAN OUT DIA. 50 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM Instalasi Upah Pasang :
SAT
INDEK
HARGA SATUAN
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
1.00 1.00
Rp Rp
Unit Ls
3,578,000 71,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,483,000 89,660
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,219,091 24,382
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 415,000 8,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 305,000 6,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,000 5,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
222,500 4,450
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
166,500 3,330
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
837,500,000 16,750,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 402,000,000 8,040,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 251,250,000 5,025,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 100,500,000 2,010,000
JUMLAH HARGA Rp Rp
3,578,000 71,560
Rp Rp Rp Rp Rp
13,333 4,722 3,667,616 91,690 3,759,306
Rp Rp
4,483,000 89,660
Rp Rp Rp Rp Rp
13,333 4,722 4,590,716 114,768 4,705,483
Rp Rp
1,219,091 24,382
Rp Rp Rp Rp Rp
40,000 21,250 1,304,723 32,618 1,337,341
Rp Rp
415,000 8,300
Rp Rp Rp Rp Rp
4,000 2,125 429,425 10,736 440,161
Rp Rp
305,000 6,100
Rp Rp Rp Rp Rp
4,000 2,125 317,225 7,931 325,156
Rp Rp
250,000 5,000
Rp Rp Rp Rp Rp
4,000 2,125 261,125 6,528 267,653
Rp Rp
222,500 4,450
Rp Rp Rp Rp Rp
4,000 2,125 233,075 5,827 238,902
Rp Rp
166,500 3,330
Rp Rp Rp Rp Rp
4,000 2,125 175,955 4,399 180,354
Rp Rp
837,500,000 16,750,000
Rp Rp Rp Rp Rp
80,000 42,500 854,372,500 21,359,313 875,731,813
Rp Rp
402,000,000 8,040,000
Rp Rp Rp Rp Rp
80,000 42,500 410,162,500 10,254,063 420,416,563
Rp Rp
251,250,000 5,025,000
Rp Rp Rp Rp Rp
80,000 42,500 256,397,500 6,409,938 262,807,438
Rp Rp
100,500,000 2,010,000
TOTAL HARGA Rp
3,759,306
Rp
4,705,483
Rp
1,337,341
Rp
440,161
Rp
325,156
Rp
267,653
Rp
238,902
Rp
180,354
Rp
875,731,813
Rp
420,416,563
Rp
262,807,438
Rp
105,198,313
Analisa Harga Satuan Mekanikal dan Plumbing - page 216 of 280
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
TANKI AIR KAP.20 M3, PANEL FRV SYSTEM TANKI AIR KAP.20 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.18 M3, PANEL FRV SYSTEM TANKI AIR KAP.18 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.16 M3, PANEL FRV SYSTEM TANKI AIR KAP.16 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.15 M3, PANEL FRV SYSTEM TANKI AIR KAP.15 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 150 mm Roof Drain dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 100 mm Roof Drain dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 80 mm Roof Drain dia. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 65 mm Roof Drain dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BAK KONTROL BAK KONTROL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Water Meter 1 Water Meter
SAT hari hari
INDEK 1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.33
Rp Rp
1.00
Rp
unit
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 67,000,000 1,340,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 60,300,000 1,206,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 53,600,000 1,072,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 50,250,000 1,005,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,100,000 402,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 180,000 3,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
120,000 2,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
100,000 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 1,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
317,200 6,344
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,793,000
Rp Rp Rp Rp Rp
JUMLAH HARGA 80,000 42,500 102,632,500 2,565,813 105,198,313
Rp Rp
67,000,000 1,340,000
Rp Rp Rp Rp Rp
80,000 42,500 68,462,500 1,711,563 70,174,063
Rp Rp
60,300,000 1,206,000
Rp Rp Rp Rp Rp
80,000 42,500 61,628,500 1,540,713 63,169,213
Rp Rp
53,600,000 1,072,000
Rp Rp Rp Rp Rp
80,000 42,500 54,794,500 1,369,863 56,164,363
Rp Rp
50,250,000 1,005,000
Rp Rp Rp Rp Rp
80,000 42,500 51,377,500 1,284,438 52,661,938
Rp Rp
20,100,000 402,000
Rp Rp Rp Rp Rp
80,000 42,500 20,624,500 515,613 21,140,113
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
80,000 42,500 13,790,500 344,763 14,135,263
Rp Rp
180,000 3,600
Rp Rp Rp Rp Rp
2,667 1,417 187,683 4,692 192,375
Rp Rp
120,000 2,400
Rp Rp Rp Rp Rp
2,667 1,417 126,483 3,162 129,645
Rp Rp
100,000 2,000
Rp Rp Rp Rp Rp
2,667 1,417 106,083 2,652 108,735
Rp Rp
50,000 1,000
Rp Rp Rp Rp Rp
2,667 1,417 55,083 1,377 56,460
Rp Rp
317,200 6,344
Rp Rp Rp Rp Rp
53,333 28,333 405,211 10,130 415,341
Rp
1,793,000
TOTAL HARGA
Rp
70,174,063
Rp
63,169,213
Rp
56,164,363
Rp
52,661,938
Rp
21,140,113
Rp
14,135,263
Rp
192,375
Rp
129,645
Rp
108,735
Rp
56,460
Rp
415,341
Rp
1,916,436
Analisa Harga Satuan Mekanikal dan Plumbing - page 217 of 280
URAIAN
NO. 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
AAV AAV Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 20 m3 SEPTIK TANK BIOLOGICAL SISTEM 20 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 40 m3 SEPTIK TANK BIOLOGICAL SISTEM 40 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 50 m3 SEPTIK TANK BIOLOGICAL SISTEM 50 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GREASE TRAP GREASE TRAP Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Blower Aersai IPAL Blower Aersai IPAL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BED ELEVATOR BED ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
BED ELEVATOR BED ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
PASSENGER ELEVATOR PASSENGER ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
ESCALATOR ESCALATOR Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek Upah Pasang : Pekerja Kepala Tukang Listrik
1 UNIT DUMB WAITER 200 1 DW 200 - 24 - 4/4 Floor Type 2 Biaya pasang & Disnaker
SAT lot
INDEK 1.00
Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
1.50 0.75
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
1.50 0.75
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
1.00 1.00
Rp Rp
Unit Unit
HARGA SATUAN 35,860
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,507,000 30,140
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 56,000,000 1,120,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 140,000,000 2,800,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 180,000,000 3,600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,139,600 82,792
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
27,000,000 540,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
801,930,000 15,000,000 35,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
563,830,000 15,000,000 35,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
755,110,000 5,000,000 21,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
513,000,000 25,000,000 15,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
134,000,000 20,000,000
Rp
JUMLAH HARGA 35,860
Rp Rp Rp Rp Rp
26,667 14,167 1,869,693 46,742 1,916,436
Rp Rp
1,507,000 30,140
Rp Rp Rp Rp Rp
26,667 14,167 1,577,973 39,449 1,617,423
Rp Rp
56,000,000 1,120,000
Rp Rp Rp Rp Rp
160,000 76,500 57,356,500 1,433,913 58,790,413
Rp Rp
140,000,000 2,800,000
Rp Rp Rp Rp Rp
160,000 76,500 143,036,500 3,575,913 146,612,413
Rp Rp
180,000,000 3,600,000
Rp Rp Rp Rp Rp
160,000 76,500 183,836,500 4,595,913 188,432,413
Rp Rp
4,139,600 82,792
Rp Rp Rp Rp Rp
120,000 63,750 4,406,142 110,154 4,516,296
Rp Rp
27,000,000 540,000
Rp Rp Rp Rp Rp
120,000 63,750 27,723,750 693,094 28,416,844
Rp Rp Rp
801,930,000 15,000,000 35,000,000
Rp Rp Rp Rp Rp
140,000 85,000 852,155,000 21,303,875 873,458,875
Rp Rp Rp
563,830,000 15,000,000 35,000,000
Rp Rp Rp Rp Rp
140,000 85,000 614,055,000 15,351,375 629,406,375
Rp Rp Rp
755,110,000 5,000,000 21,000,000
Rp Rp Rp Rp Rp
140,000 85,000 781,335,000 19,533,375 800,868,375
Rp Rp Rp
513,000,000 25,000,000 15,000,000
Rp Rp Rp Rp Rp
140,000 85,000 553,225,000 13,830,625 567,055,625
Rp Rp
134,000,000 20,000,000
TOTAL HARGA
Rp
1,617,423
Rp
58,790,413
Rp
146,612,413
Rp
188,432,413
Rp
4,516,296
Rp
28,416,844
Rp
873,458,875
Rp
629,406,375
Rp
800,868,375
Rp
567,055,625
Rp
160,643,125
Analisa Harga Satuan Mekanikal dan Plumbing - page 218 of 280
NO. 3 4
1 UNIT 1 2 3 4
1 LS 1 2
1 SET 1 2
1 SET 1 2
URAIAN Biaya Pengiriman unit Escalator ke lokasi proyek Upah Pasang : Pekerja Kepala Tukang Listrik
DUMB WAITER 50 DW 50 - 24 - 2/2 Floor Type Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
Earthquake device Earthquake device Upah Pasang : Tukang pipa Kepala tukang pipa
Mimic Panel ( Supervisory Panel ) Mimic Panel ( Supervisory Panel ) Upah Pasang : Tukang pipa Kepala tukang pipa
Blower Blower Upah Pasang : Tukang pipa Kepala tukang pipa
1 LOT Skyrail V1 Software license package 10 units 1 Skyrail V1 Software license package 10 units 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Bus Converter 1 Bus Converter 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Power Pack 230V - 36VDC 1 Power Pack 230V - 36VDC 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT PC Win. 10, 64 Bit 1 PC Win. 10, 64 Bit 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT LG LED Monitor 19" 1 LG LED Monitor 19" 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT UPS c/w Battery Back-up 1 UPS c/w Battery Back-up 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT 3-way Diverter NW110 1 3-way Diverter NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT 3-way Diverter NW110 (Transfer Unnit) 1 3-way Diverter NW110 (Transfer Unnit)
SAT Unit
INDEK 1.00
Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
ls
1.00
Rp
hari hari
0.09 0.05
Rp Rp
ls
1.00
Rp
hari hari
0.09 0.05
Rp Rp
set
1.00
Rp
hari hari
0.09 0.05
Rp Rp
lot
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1.00
Rp
unit
HARGA SATUAN 2,500,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
109,250,000 20,000,000 2,500,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,585,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,000,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
187,950,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
31,500,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
16,810,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 11,867,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,500,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,100,000
Rp
JUMLAH HARGA 2,500,000
Rp Rp Rp Rp Rp
140,000 85,000 156,725,000 3,918,125 160,643,125
Rp Rp Rp
109,250,000 20,000,000 2,500,000
Rp Rp Rp Rp Rp
140,000 85,000 131,975,000 3,299,375 135,274,375
Rp
13,585,000
Rp Rp Rp Rp Rp
7,200 4,250 13,596,450 339,911 13,936,361
Rp
5,000,000
Rp Rp Rp Rp Rp
7,200 4,250 5,011,450 125,286 5,136,736
Rp
187,950,000
Rp Rp Rp Rp Rp
7,200 4,250 187,961,450 4,699,036 192,660,486
Rp
31,500,000
Rp Rp Rp Rp Rp
7,200 3,825 31,511,025 787,776 32,298,801
Rp
16,810,000
Rp Rp Rp Rp Rp
7,200 3,825 16,821,025 420,526 17,241,551
Rp
11,867,500
Rp Rp Rp Rp Rp
7,200 3,825 11,878,525 296,963 12,175,488
Rp
14,500,000
Rp Rp Rp Rp Rp
7,200 3,825 14,511,025 362,776 14,873,801
Rp
8,250,000
Rp Rp Rp Rp Rp
7,200 3,825 8,261,025 206,526 8,467,551
Rp
18,300,000
Rp Rp Rp Rp Rp
7,200 3,825 18,311,025 457,776 18,768,801
Rp
37,100,000
Rp Rp Rp Rp Rp
7,200 3,825 37,111,025 927,776 38,038,801
Rp
37,100,000
TOTAL HARGA
Rp
135,274,375
Rp
13,936,361
Rp
5,136,736
Rp
192,660,486
Rp
32,298,801
Rp
17,241,551
Rp
12,175,488
Rp
14,873,801
Rp
8,467,551
Rp
18,768,801
Rp
38,038,801
Rp
38,038,801
Analisa Harga Satuan Mekanikal dan Plumbing - page 219 of 280
URAIAN
NO. 2
Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Optical tube switch 1 Optical tube switch 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Compact Station NW110 with PCB - 10" Touch Screen Display 1 Compact Station NW110 with PCB - 10" Touch Screen Display 2 Upah Pasang : Tukang pipa Kepala tukang pipa
SAT hari hari
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1 UNIT Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display 1 Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display 1 Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT Arrival signal 1 Arrival signal 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Carrier rack up to NW110 1 Carrier rack up to NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Receiving basket up to NW110 1 Receiving basket up to NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Upholstery for carrier basket 1 Upholstery for carrier basket 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Carrier NW110, 330 x 76 - red/blue/green/yellow 1 Carrier NW110, 330 x 76 - red/blue/green/yellow 2 Upah Pasang : Tukang pipa Kepala tukang pipa
HARGA SATUAN
0.09 0.05
1 UNIT Topload (Through) Station NW110 with PCB - 10" Touch Screen Display 1 Topload (Through) Station NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT V-piece with valve 1 V-piece with valve 2 Upah Pasang : Tukang pipa Kepala tukang pipa
INDEK
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,135,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,900,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
53,765,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
154,995,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
63,695,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,965,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,205,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,350,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,386,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,270,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) 1 Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6unit test tube (1 pcs/station) 1.00 Rp 2,050,000 2 Upah Pasang : Tukang pipa hari 0.09 Rp 80,000
JUMLAH HARGA Rp Rp Rp Rp Rp
7,200 3,825 37,111,025 927,776 38,038,801
Rp
2,135,000
Rp Rp Rp Rp Rp
7,200 3,825 2,146,025 53,651 2,199,676
Rp
49,900,000
Rp Rp Rp Rp Rp
7,200 3,825 49,911,025 1,247,776 51,158,801
Rp
53,765,000
Rp Rp Rp Rp Rp
7,200 3,825 53,776,025 1,344,401 55,120,426
Rp
154,995,000
Rp Rp Rp Rp Rp
7,200 3,825 155,006,025 3,875,151 158,881,176
Rp
63,695,000
Rp Rp Rp Rp Rp
7,200 3,825 63,706,025 1,592,651 65,298,676
Rp
1,965,000
Rp Rp Rp Rp Rp
7,200 3,825 1,976,025 49,401 2,025,426
Rp
2,205,000
Rp Rp Rp Rp Rp
7,200 3,825 2,216,025 55,401 2,271,426
Rp
1,350,000
Rp Rp Rp Rp Rp
7,200 3,825 1,361,025 34,026 1,395,051
Rp
2,386,000
Rp Rp Rp Rp Rp
7,200 3,825 2,397,025 59,926 2,456,951
Rp
1,270,000
Rp Rp Rp Rp Rp
7,200 3,825 1,281,025 32,026 1,313,051
Rp
1,600,000
Rp Rp Rp Rp Rp
7,200 3,825 1,611,025 40,276 1,651,301
Rp
2,050,000
Rp
7,200
TOTAL HARGA
Rp
2,199,676
Rp
51,158,801
Rp
55,120,426
Rp
158,881,176
Rp
65,298,676
Rp
2,025,426
Rp
2,271,426
Rp
1,395,051
Rp
2,456,951
Rp
1,313,051
Rp
1,651,301
Rp
2,112,551
Analisa Harga Satuan Mekanikal dan Plumbing - page 220 of 280
URAIAN
NO. Kepala tukang pipa
1M 1 2
Forwarding Tube PVC 110 x 2.3 - light grey Forwarding Tube PVC 110 x 2.3 - light grey Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey 1 Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Sleeve PVC 110 x 2.3 L=110 - light grey 1 Sleeve PVC 110 x 2.3 L=110 - light grey 2 Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1M 1 2
PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1 LOT Material support 1 Material support 2 Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1M 1 2
SAT hari
INDEK 0.05
Rp
HARGA SATUAN 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.05 0.03
Rp Rp
m'
1.00
Rp
hari hari
0.05 0.03
Rp Rp
lot
1.00
Rp
hari hari
0.05 0.03
Rp Rp
145,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
597,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,510,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
83,012,550
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit m' PVC HI 20mm 1.00 Rp Upah Pasang : Tukang Listrik hari 0.05 Rp Kepala Tukang Listrik hari 0.03 Rp
250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 PCS 1 2 3
1 PCS 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Wall chasing, sparing, and finishing Wall chasing, sparing, and finishing Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Floor coring Floor coring Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Diesel Fire Pump, Kapasitas : 1250 USGpm Package Diesel Fire Pump, Kapasitas : 1250 USGpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Electric Fire Pump, Kapasitas 1250 USGpm Package Electric Fire Pump, Kapasitas 1250 USGpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Jockey Fire Pump, Kapasitas : 50 Gpm Package Jockey Fire Pump, Kapasitas : 50 Gpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1 UNIT DIAPRAGHMA TANK Kap. 300 L
pcs lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
750,000 15,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,750,000 35,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000,000 12,600,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
405,000,000 8,100,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
81,000,000 1,620,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp
JUMLAH HARGA 3,825 2,061,025 51,526 2,112,551
Rp
145,500
Rp Rp Rp Rp Rp
7,200 3,825 156,525 3,913 160,438
Rp
597,100
Rp Rp Rp Rp Rp
7,200 3,825 597,100 14,928 612,028
Rp
49,000
Rp Rp Rp Rp Rp
4,000 2,125 55,125 1,378 56,503
Rp
1,510,500
Rp Rp Rp Rp Rp
4,000 2,125 1,516,625 37,916 1,554,541
Rp
83,012,550
Rp Rp Rp Rp Rp
4,000 2,125 83,018,675 2,075,467 85,094,142
Rp
250,000
Rp Rp Rp Rp Rp
4,000 2,125 256,125 6,403 262,528
Rp
750,000
Rp Rp Rp Rp Rp
8,250 4,500 762,750 19,069 781,819
Rp
1,750,000
Rp Rp Rp Rp Rp
8,250 4,500 1,762,750 44,069 1,806,819
Rp Rp
630,000,000 12,600,000
Rp Rp Rp Rp Rp
8,250 4,500 642,612,750 16,065,319 658,678,069
Rp Rp
405,000,000 8,100,000
Rp Rp Rp Rp Rp
8,250 4,500 413,112,750 10,327,819 423,440,569
Rp Rp
81,000,000 1,620,000
Rp Rp Rp Rp Rp
8,250 4,500 82,632,750 2,065,819 84,698,569
TOTAL HARGA
Rp
160,438
Rp
612,028
Rp
56,503
Rp
1,554,541
Rp
85,094,142
Rp
262,528
Rp
781,819
Rp
1,806,819
Rp
658,678,069
Rp
423,440,569
Rp
84,698,569
Rp
26,211,312
Analisa Harga Satuan Mekanikal dan Plumbing - page 221 of 280
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
Harga Unit Diapraghma Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Bak Netralisasi Bak Netralisasi Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Bak Kontrol / Bak Sumpit Bak Kontrol / Bak Sumpit Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HORN BUZZER HORN BUZZER Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
DAILY TANK 200 LITER DAILY TANK 200 LITER Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HAND PUMP HAND PUMP Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
NOZZLE PEMADAM KEBAKARAN dia.38 mm NOZZLE PEMADAM KEBAKARAN dia.38 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
NOZZLE PEMADAM KEBAKARAN dia.65 mm NOZZLE PEMADAM KEBAKARAN dia.65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 65 mm FOOT VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 100 mm FOOT VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 150 mm FOOT VALVE dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.25 MM / 20 K
SAT unit lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
HARGA SATUAN 25,058,100 501,162
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,500,000 150,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,030,126 40,603
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,594,200 111,884
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,000,000 60,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,995,800 79,916
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
435,000 8,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
725,000 14,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,300,000 66,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,100,000 162,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,500,000 210,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 25,058,100 501,162
Rp Rp Rp Rp Rp
8,250 4,500 25,572,012 639,300 26,211,312
Rp Rp
7,500,000 150,000
Rp Rp Rp Rp Rp
8,250 4,500 7,662,750 191,569 7,854,319
Rp Rp
2,030,126 40,603
Rp Rp Rp Rp Rp
80,000 42,500 2,193,229 54,831 2,248,059
Rp Rp
5,594,200 111,884
Rp Rp Rp Rp Rp
7,200 3,825 5,717,109 142,928 5,860,037
Rp Rp
3,000,000 60,000
Rp Rp Rp Rp Rp
80,000 42,500 3,182,500 79,563 3,262,063
Rp Rp
3,995,800 79,916
Rp Rp Rp Rp Rp
7,200 3,825 4,086,741 102,169 4,188,910
Rp Rp
435,000 8,700
Rp Rp Rp Rp Rp
7,200 3,825 454,725 11,368 466,093
Rp Rp
725,000 14,500
Rp Rp Rp Rp Rp
7,200 3,825 750,525 18,763 769,288
Rp Rp
3,300,000 66,000
Rp Rp Rp Rp Rp
6,667 3,542 3,376,208 84,405 3,460,614
Rp Rp
8,100,000 162,000
Rp Rp Rp Rp Rp
6,667 3,542 8,272,208 206,805 8,479,014
Rp Rp
10,500,000 210,000
Rp Rp Rp Rp Rp
6,667 3,542 10,720,208 268,005 10,988,214
TOTAL HARGA
Rp
7,854,319
Rp
2,248,059
Rp
5,860,037
Rp
3,262,063
Rp
4,188,910
Rp
466,093
Rp
769,288
Rp
3,460,614
Rp
8,479,014
Rp
10,988,214
Rp
2,696,144
Analisa Harga Satuan Mekanikal dan Plumbing - page 222 of 280
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
URAIAN GATE VALVE DIA.25 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.32MM / 20 K GATE VALVE DIA.32 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.50 MM / 20 K GATE VALVE DIA.50 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.65 MM / 20 K GATE VALVE DIA.65 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.80 MM / 20 K GATE VALVE DIA.80 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.100 MM / 20 K GATE VALVE DIA. 100 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.150 MM / 20 K GATE VALVE DIA. 150 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.200 MM / 20 K GATE VALVE DIA. 200 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
INDICATING VALVE 100 MM INDICATING VALVE 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
LANDING VALVE/ KSSK dia. 150 MM LANDING VALVE/ KSSK dia. 150 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
LANDING VALVE/ KSSK dia. 100 MM LANDING VALVE/ KSSK dia. 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Test Valve 100 mm
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
HARGA SATUAN 2,568,800 51,376
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,630,000 72,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,215,400 84,308
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,410,900 108,218
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,410,900 128,218
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,368,600 187,372
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,157,100 283,142
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
21,235,650 424,713
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
899,100 17,982
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,425,000 148,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 2,568,800 51,376
Rp Rp Rp Rp Rp
6,667 3,542 2,630,384 65,760 2,696,144
Rp Rp
3,630,000 72,600
Rp Rp Rp Rp Rp
6,667 3,542 3,712,808 92,820 3,805,629
Rp Rp
4,215,400 84,308
Rp Rp Rp Rp Rp
13,333 7,083 4,320,125 108,003 4,428,128
Rp Rp
5,410,900 108,218
Rp Rp Rp Rp Rp
13,333 7,083 5,539,535 138,488 5,678,023
Rp Rp
6,410,900 128,218
Rp Rp Rp Rp Rp
13,333 7,083 6,559,535 163,988 6,723,523
Rp Rp
9,368,600 187,372
Rp Rp Rp Rp Rp
13,333 7,083 9,576,389 239,410 9,815,798
Rp Rp
14,157,100 283,142
Rp Rp Rp Rp Rp
26,667 14,167 14,481,075 362,027 14,843,102
Rp Rp
21,235,650 424,713
Rp Rp Rp Rp Rp
26,667 14,167 21,701,196 542,530 22,243,726
Rp Rp
899,100 17,982
Rp Rp Rp Rp Rp
6,667 3,542 927,290 23,182 950,473
Rp Rp
7,425,000 148,500
Rp Rp Rp Rp Rp
6,667 3,542 7,583,708 189,593 7,773,301
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
6,667 3,542 5,620,208 140,505 5,760,714
TOTAL HARGA
Rp
3,805,629
Rp
4,428,128
Rp
5,678,023
Rp
6,723,523
Rp
9,815,798
Rp
14,843,102
Rp
22,243,726
Rp
950,473
Rp
7,773,301
Rp
5,760,714
Rp
4,506,114
Analisa Harga Satuan Mekanikal dan Plumbing - page 223 of 280
URAIAN
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
Test Valve 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
DRAIN VALVE 100 mm DRAIN VALVE 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLASHING VALVE 100 mm FLASHING VALVE 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SELENOID VALVE DIA.150 MM SELENOID VALVE DIA.150 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SELENOID VALVE DIA.50 MM SELENOID VALVE DIA.50 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE GAUGE PRESSURE GAUGE Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE SWITCH PRESSURE SWITCH Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 150 mm SAFETY VALVE dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 100 mm SAFETY VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 80 mm SAFETY VALVE dia. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 65 mm SAFETY VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PELAT ORIFICE 100 MM
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
HARGA SATUAN 4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,200,000 44,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,550,000 51,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,250,000 25,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,400,000 588,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,400,000 588,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000 366,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,300,000 186,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
6,667 3,542 4,294,208 107,355 4,401,564
Rp Rp
2,200,000 44,000
Rp Rp Rp Rp Rp
6,667 3,542 2,254,208 56,355 2,310,564
Rp Rp
2,550,000 51,000
Rp Rp Rp Rp Rp
5,000 2,656 2,608,656 65,216 2,673,873
Rp Rp
1,250,000 25,000
Rp Rp Rp Rp Rp
5,000 2,656 1,282,656 32,066 1,314,723
Rp Rp
29,400,000 588,000
Rp Rp Rp Rp Rp
40,000 21,250 30,049,250 751,231 30,800,481
Rp Rp
29,400,000 588,000
Rp Rp Rp Rp Rp
40,000 21,250 30,049,250 751,231 30,800,481
Rp Rp
18,300,000 366,000
Rp Rp Rp Rp Rp
40,000 21,250 18,727,250 468,181 19,195,431
Rp Rp
9,300,000 186,000
Rp Rp Rp Rp Rp
40,000 21,250 9,547,250 238,681 9,785,931
TOTAL HARGA
Rp
4,506,114
Rp
4,506,114
Rp
4,401,564
Rp
2,310,564
Rp
2,673,873
Rp
1,314,723
Rp
30,800,481
Rp
30,800,481
Rp
19,195,431
Rp
9,785,931
Rp
621,347
Analisa Harga Satuan Mekanikal dan Plumbing - page 224 of 280
URAIAN
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 Unit 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
PELAT ORIFICE 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOW SWITCH FLOW SWITCH Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SIGHTGLASS SIGHTGLASS Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PILLAR HYDRANT PILLAR HYDRANT Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SIAMISE CONNECTION SIAMISE CONNECTION Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Tabung Silinder Kap. 150 Kg (Fire Supression) Tabung Silinder Kap. 150 Kg (Fire Supression) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE HOUSE CABINET / FHC ( INDOOR ) Fire House Cabinet ( Indoor ) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE HOUSE CABINET / FHC ( OUTDOOR ) Fire House Cabinet ( OUTDOOR ) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE EXTINGUISHER 6KG Fire Extinguisher 6 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HEAD SPRINKLER Head Sprinkler Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Alarm Heat Detector (HD) Alarm Heat Detector (HD) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Head Springkler Supression (HS) Head Springkler Supression (HS) Instalasi Upah Pasang :
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.83 0.42
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.32 0.16
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.42 0.21
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.42 0.21
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
1.00 1.00
Rp Rp
bh lot
HARGA SATUAN 586,800 11,736
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,774,900 55,498
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,854,200 57,084
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,362,500 107,250
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,722,000 154,440
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,324,375 986,488
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,600,000 72,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,400,000 148,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,189,300 23,786
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
82,500 1,650
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,038,000 20,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
456,500 9,130
Rp Rp
JUMLAH HARGA 586,800 11,736
Rp Rp Rp Rp Rp
5,000 2,656 606,192 15,155 621,347
Rp Rp
2,774,900 55,498
Rp Rp Rp Rp Rp
5,000 2,656 2,838,054 70,951 2,909,006
Rp Rp
2,854,200 57,084
Rp Rp Rp Rp Rp
5,000 2,656 2,918,940 72,974 2,991,914
Rp Rp
5,362,500 107,250
Rp Rp Rp Rp Rp
5,000 2,656 5,477,406 136,935 5,614,341
Rp Rp
7,722,000 154,440
Rp Rp Rp Rp Rp
66,667 35,417 7,978,523 199,463 8,177,986
Rp Rp
49,324,375 986,488
Rp Rp Rp Rp Rp
25,600 13,600 50,350,063 1,258,752 51,608,814
Rp Rp
3,600,000 72,000
Rp Rp Rp Rp Rp
33,333 17,708 3,723,042 93,076 3,816,118
Rp Rp
7,400,000 148,000
Rp Rp Rp Rp Rp
33,333 17,708 7,599,042 189,976 7,789,018
Rp Rp
1,189,300 23,786
Rp Rp Rp Rp Rp
26,667 14,167 1,253,919 31,348 1,285,267
Rp Rp
82,500 1,650
Rp Rp Rp Rp Rp
26,667 14,167 124,983 3,125 128,108
Rp Rp
1,038,000 20,760
Rp Rp Rp Rp Rp
26,667 14,167 1,099,593 27,490 1,127,083
Rp Rp
456,500 9,130
TOTAL HARGA
Rp
2,909,006
Rp
2,991,914
Rp
5,614,341
Rp
8,177,986
Rp
51,608,814
Rp
3,816,118
Rp
7,789,018
Rp
1,285,267
Rp
128,108
Rp
1,127,083
Rp
467,913
Analisa Harga Satuan Mekanikal dan Plumbing - page 225 of 280
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
FLEXIBLE JOINT DIA.150 MM' FLEXIBLE JOINT DIA.150 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.100 MM' FLEXIBLE JOINT DIA.100 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.50 MM' FLEXIBLE JOINT DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.50 MM' / 20 Kg CHECK VALVE DIA.50 MM' / 20 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.65 MM' / 20 Kg CHECK VALVE DIA.65 MM' / 20 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 100 MM / 20K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA 150 MM / 20K CHECK VALVE DIA 150 MM / 20K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BRANCH CONTROL VALVE dia. 100 mm BRANCH CONTROL VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 80 mm Instalasi Upah Pasang :
SAT hari hari
INDEK 0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
1.00 1.00
Rp Rp
bh lot
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,103,000 42,060
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,062,000 21,240
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
744,000 14,880
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
728,000 14,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
574,000 11,480
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,729,000 74,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,929,000 78,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,800,000 156,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,400,000 108,000
Rp Rp Rp Rp Rp
JUMLAH HARGA 26,667 14,167 456,500 11,413 467,913
Rp Rp
2,103,000 42,060
Rp Rp Rp Rp Rp
26,667 14,167 2,185,893 54,647 2,240,541
Rp Rp
1,062,000 21,240
Rp Rp Rp Rp Rp
26,667 14,167 1,124,073 28,102 1,152,175
Rp Rp
744,000 14,880
Rp Rp Rp Rp Rp
26,667 14,167 799,713 19,993 819,706
Rp Rp
728,000 14,560
Rp Rp Rp Rp Rp
26,667 14,167 783,393 19,585 802,978
Rp Rp
574,000 11,480
Rp Rp Rp Rp Rp
26,667 14,167 626,313 15,658 641,971
Rp Rp
3,729,000 74,580
Rp Rp Rp Rp Rp
26,667 14,167 3,844,413 96,110 3,940,524
Rp Rp
3,929,000 78,580
Rp Rp Rp Rp Rp
26,667 14,167 4,048,413 101,210 4,149,624
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
26,667 14,167 4,426,833 110,671 4,537,504
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
26,667 14,167 5,650,833 141,271 5,792,104
Rp Rp
7,800,000 156,000
Rp Rp Rp Rp Rp
26,667 14,167 7,996,833 199,921 8,196,754
Rp Rp
5,400,000 108,000
TOTAL HARGA
Rp
2,240,541
Rp
1,152,175
Rp
819,706
Rp
802,978
Rp
641,971
Rp
3,940,524
Rp
4,149,624
Rp
4,537,504
Rp
5,792,104
Rp
8,196,754
Rp
5,687,554
Analisa Harga Satuan Mekanikal dan Plumbing - page 226 of 280
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 BH 1 2 3
BRANCH CONTROL VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT kapasitas : 5 460 BTU/h - Wall Mounted 1 kapasitas : 5 460 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 7 510 BTU/h - Wall Mounted 1 kapasitas : 7 510 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 9 550 BTU/h - Wall Mounted 1 kapasitas : 9 550 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 280 BTU/h - Wall Mounted 1 kapasitas : 12 280 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 15 350 BTU/h - Wall Mounted 1 kapasitas : 15 350 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 110 BTU/h - Wall Mounted 1 kapasitas : 19 110 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 24 230 BTU/h - Wall Mounted 1 kapasitas : 24 230 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT hari hari
INDEK 0.33 0.17
Rp Rp
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp
JUMLAH HARGA 26,667 14,167 5,548,833 138,721 5,687,554
bh lot
1.00 1.00
Rp Rp
Rp Rp
4,200,000 84,000
hari hari
0.33 0.17
Rp Rp
Rp Rp Rp Rp Rp
26,667 14,167 4,324,833 108,121 4,432,954
unit ls
1.00 1.00
Rp Rp
5,307,893 159,237
Rp Rp
5,307,893 159,237
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,501,055 137,526 5,638,581
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit ls
1.00 1.00
Rp Rp
5,392,943 161,788
Rp Rp
5,392,943 161,788
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,588,656 139,716 5,728,373
unit ls
1.00 1.00
Rp Rp
5,559,178 166,775
Rp Rp
5,559,178 166,775
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,759,878 143,997 5,903,875
unit ls
1.00 1.00
Rp Rp
5,729,278 171,878
Rp Rp
5,729,278 171,878
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,935,081 148,377 6,083,458
unit ls
1.00 1.00
Rp Rp
5,810,461 174,314
Rp Rp
5,810,461 174,314
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
6,018,700 150,468 6,169,168
unit ls
1.00 1.00
Rp Rp
7,318,166 219,545
Rp Rp
7,318,166 219,545
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,571,635 189,291 7,760,926
unit ls
1.00 1.00
Rp Rp
7,735,685 232,071
Rp Rp
7,735,685 232,071
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
TOTAL HARGA
Rp
4,432,954
Rp
5,638,581
Rp
5,728,373
Rp
5,903,875
Rp
6,083,458
Rp
6,169,168
Rp
7,760,926
Rp
8,201,722
Analisa Harga Satuan Mekanikal dan Plumbing - page 227 of 280
NO.
URAIAN
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 2 Way Cassette Type 1 kapasitas : 19 100 BTU/h - 2 Way Cassette Type 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit
unit ls
1.00 1.00
Rp Rp
15,381,000 461,430
Rp Rp
15,381,000 461,430
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
15,876,355 396,909 16,273,264
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
26,655,000 799,650
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,942,000 838,260
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,358,000 610,740
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,702,501 411,075
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,033,251 420,998
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,364,001 430,920
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,973,955 449,219
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
8,001,680 200,042 8,201,722
Rp Rp
26,655,000 799,650
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 27,488,575 687,214 28,175,790
Rp Rp
27,942,000 838,260
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 28,814,185 720,355 29,534,540
Rp Rp
20,358,000 610,740
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 21,002,665 525,067 21,527,732
Rp Rp
13,702,501 411,075
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,147,501 353,688 14,501,188
Rp Rp
14,033,251 420,998
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,488,173 362,204 14,850,378
Rp Rp
14,364,001 430,920
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,828,846 370,721 15,199,567
Rp Rp
14,973,955 449,219
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 15,457,098 386,427 15,843,526
Rp
16,273,264
Rp
28,175,790
Rp
29,534,540
Rp
21,527,732
Rp
14,501,188
Rp
14,850,378
Rp
15,199,567
Rp
15,843,526
Rp
17,740,637
Analisa Harga Satuan Mekanikal dan Plumbing - page 228 of 280
NO. 1 2
3
URAIAN kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT unit ls
INDEK 1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
1.00 1.00
Rp Rp
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
1.00 1.00
Rp Rp
1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit 1 kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit unit 2 Material Instalasi : ls - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor hari Tukang AC hari Pembantu tukang AC hari
1 UNIT kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja :
unit ls
HARGA SATUAN 16,770,887 503,127
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,770,888 503,127
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,869,682 506,090
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,325,001 519,750
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,405,000 822,150
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,986,501 539,595
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 18,763,978 562,919
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 19,794,887 593,847
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,442,631 163,279
Rp Rp
JUMLAH HARGA 16,770,887 503,127
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,307,938 432,698 17,740,637
Rp Rp
16,770,888 503,127
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,307,939 432,698 17,740,638
Rp Rp
16,869,682 506,090
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,409,697 435,242 17,844,940
Rp Rp
17,325,001 519,750
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,878,676 446,967 18,325,643
Rp Rp
27,405,000 822,150
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 28,261,075 706,527 28,967,602
Rp Rp
17,986,501 539,595
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 18,560,021 464,001 19,024,021
Rp Rp
18,763,978 562,919
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 19,360,822 484,021 19,844,843
Rp Rp
19,794,887 593,847
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 20,422,658 510,566 20,933,225
Rp Rp
5,442,631 163,279
TOTAL HARGA
Rp
17,740,638
Rp
17,844,940
Rp
18,325,643
Rp
28,967,602
Rp
19,024,021
Rp
19,844,843
Rp
20,933,225
Rp
5,780,831
Analisa Harga Satuan Mekanikal dan Plumbing - page 229 of 280
URAIAN
NO. Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 85 000 BTU/h - AHU 1 Kapasitas : 85 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 95 000 BTU/h - AHU 1 Kapasitas : 95 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 114 000 BTU/h - AHU 1 Kapasitas : 114 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 125 000 BTU/h - AHU 1 Kapasitas : 125 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU
SAT hari hari hari
INDEK 0.06 0.23 0.12
Rp Rp Rp
JUMLAH HARGA 5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,639,835 140,996 5,780,831
Rp Rp Rp
HARGA SATUAN 90,000 85,000 80,000
unit ls
1.00 1.00
Rp Rp
5,577,631 167,329
Rp Rp
5,577,631 167,329
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,778,885 144,472 5,923,357
unit ls
1.00 1.00
Rp Rp
7,602,631 228,079
Rp Rp
7,602,631 228,079
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,864,635 196,616 8,061,251
unit ls
1.00 1.00
Rp Rp
10,522,895 315,687
Rp Rp
10,522,895 315,687
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
10,872,506 271,813 11,144,319
unit ls
1.00 1.00
Rp Rp
94,436,719 2,833,102
Rp Rp
94,436,719 2,833,102
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
97,303,746 2,432,594 99,736,339
unit ls
1.00 1.00
Rp Rp
102,898,249 3,086,947
Rp Rp
102,898,249 3,086,947
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
106,019,122 2,650,478 108,669,600
unit ls
1.00 1.00
Rp Rp
110,302,088 3,309,063
Rp Rp
110,302,088 3,309,063
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
113,645,075 2,841,127 116,486,202
unit ls
1.00 1.00
Rp Rp
123,054,822 3,691,645
Rp Rp
123,054,822 3,691,645
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
126,780,392 3,169,510 129,949,901
unit ls
1.00 1.00
Rp Rp
7,588,779 227,663
Rp Rp
TOTAL HARGA
Rp
5,923,357
Rp
8,061,251
Rp
11,144,319
Rp
99,736,339
Rp
108,669,600
Rp
116,486,202
Rp
129,949,901
Rp
8,046,627
7,588,779 227,663
Analisa Harga Satuan Mekanikal dan Plumbing - page 230 of 280
URAIAN
NO. 3
- Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 95 500 BTU/h - OU 1 kapasitas : 95 500 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 114 600 BTU/h - OU 1 kapasitas : 114 600 BTU/h - OU 2 Material Instalasi :
SAT hari hari hari
INDEK 0.06 0.23 0.12
HARGA SATUAN Rp Rp Rp
90,000 85,000 80,000
JUMLAH HARGA Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,850,368 196,259 8,046,627
unit ls
1.00 1.00
Rp Rp
7,739,550 232,187
Rp Rp
7,739,550 232,187
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
8,005,662 200,142 8,205,803
unit ls
1.00 1.00
Rp Rp
8,273,046 248,191
Rp Rp
8,273,046 248,191
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
8,555,162 213,879 8,769,041
unit ls
1.00 1.00
Rp Rp
10,020,436 300,613
Rp Rp
10,020,436 300,613
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
10,354,974 258,874 10,613,849
unit ls
1.00 1.00
Rp Rp
11,330,979 339,929
Rp Rp
11,330,979 339,929
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
11,704,834 292,621 11,997,455
unit ls
1.00 1.00
Rp Rp
24,200,591 726,018
Rp Rp
24,200,591 726,018
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
24,960,533 624,013 25,584,547
unit ls
1.00 1.00
Rp Rp
25,128,410 753,852
Rp Rp
25,128,410 753,852
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
25,916,187 647,905 26,564,091
unit ls
1.00 1.00
Rp Rp
56,558,250 1,696,748
Rp Rp
56,558,250 1,696,748
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
58,288,923 1,457,223 59,746,146
unit ls
1.00 1.00
Rp Rp
66,764,250 2,002,928
Rp Rp
TOTAL HARGA
Rp
8,205,803
Rp
8,769,041
Rp
10,613,849
Rp
11,997,455
Rp
25,584,547
Rp
26,564,091
Rp
59,746,146
Rp
70,521,130
66,764,250 2,002,928 Analisa Harga Satuan Mekanikal dan Plumbing - page 231 of 280
URAIAN
NO.
3
- Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 133 800 BTU/h - OU 1 kapasitas : 133 800 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 152 900 BTU/h - OU 1 kapasitas : 152 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 229 200 BTU/h - OU 1 kapasitas : 229 200 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 248 400 BTU/h - OU 1 kapasitas : 248 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 267 500 BTU/h - OU 1 kapasitas : 267 500 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 286 600 BTU/h - OU 1 kapasitas : 286 600 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 305 700 BTU/h - OU 1 kapasitas : 305 700 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 363 100 BTU/h - OU
SAT
hari hari hari
INDEK
0.06 0.23 0.12
HARGA SATUAN
Rp Rp Rp
90,000 85,000 80,000
JUMLAH HARGA
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
68,801,103 1,720,028 70,521,130
unit ls
1.00 1.00
Rp Rp
74,844,000 2,245,320
Rp Rp
74,844,000 2,245,320
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
77,123,245 1,928,081 79,051,326
unit ls
1.00 1.00
Rp Rp
194,040,000 5,821,200
Rp Rp
194,040,000 5,821,200
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
199,895,125 4,997,378 204,892,503
unit ls
1.00 1.00
Rp Rp
133,528,500 4,005,855
Rp Rp
133,528,500 4,005,855
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
137,568,280 3,439,207 141,007,487
unit ls
1.00 1.00
Rp Rp
141,608,250 4,248,248
Rp Rp
141,608,250 4,248,248
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
145,890,423 3,647,261 149,537,683
unit ls
1.00 1.00
Rp Rp
150,113,250 4,503,398
Rp Rp
150,113,250 4,503,398
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
154,650,573 3,866,264 158,516,837
unit ls
1.00 1.00
Rp Rp
379,170,000 11,375,100
Rp Rp
379,170,000 11,375,100
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
390,579,025 9,764,476 400,343,501
unit ls
1.00 1.00
Rp Rp
407,880,000 12,236,400
Rp Rp
407,880,000 12,236,400
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
420,150,325 10,503,758 430,654,083
TOTAL HARGA
Rp
79,051,326
Rp
204,892,503
Rp
141,007,487
Rp
149,537,683
Rp
158,516,837
Rp
400,343,501
Rp
430,654,083
Rp
211,044,886
Analisa Harga Satuan Mekanikal dan Plumbing - page 232 of 280
NO. 1 2
3
URAIAN kapasitas : 363 100 BTU/h - OU Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 382 200 BTU/h - OU 1 kapasitas : 382 200 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 401 300 BTU/h - OU 1 kapasitas : 401 300 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 420 400 BTU/h - OU 1 kapasitas : 420 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 496 800 BTU/h - OU 1 kapasitas : 496 800 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 515 900 BTU/h - OU 1 kapasitas : 515 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 535 000 BTU/h - OU 1 kapasitas : 535 000 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 592 400 BTU/h - OU 1 kapasitas : 592 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT unit ls
INDEK 1.00 1.00
Rp Rp
HARGA SATUAN 199,867,500 5,996,025
Rp Rp
JUMLAH HARGA 199,867,500 5,996,025
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
205,897,450 5,147,436 211,044,886
unit ls
1.00 1.00
Rp Rp
208,372,500 6,251,175
Rp Rp
208,372,500 6,251,175
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
214,657,600 5,366,440 220,024,040
unit ls
1.00 1.00
Rp Rp
221,130,000 6,633,900
Rp Rp
221,130,000 6,633,900
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
227,797,825 5,694,946 233,492,771
unit ls
1.00 1.00
Rp Rp
233,462,250 7,003,868
Rp Rp
233,462,250 7,003,868
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
240,500,043 6,012,501 246,512,544
unit ls
1.00 1.00
Rp Rp
275,136,750 8,254,103
Rp Rp
275,136,750 8,254,103
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
283,424,778 7,085,619 290,510,397
unit ls
1.00 1.00
Rp Rp
287,894,250 8,636,828
Rp Rp
287,894,250 8,636,828
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
296,565,003 7,414,125 303,979,128
unit ls
1.00 1.00
Rp Rp
698,940,000 20,968,200
Rp Rp
698,940,000 20,968,200
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
719,942,125 17,998,553 737,940,678
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
756,360,000 22,690,800
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
756,360,000 22,690,800
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 779,084,725 19,477,118 798,561,843
TOTAL HARGA
Rp
220,024,040
Rp
233,492,771
Rp
246,512,544
Rp
290,510,397
Rp
303,979,128
Rp
737,940,678
Rp
798,561,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 233 of 280
NO.
URAIAN 1 UNIT kapasitas : 763 000 BTU/h - OU 1 kapasitas : 763 000 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 821 700 BTU/h - OU 1 kapasitas : 821 700 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 859 900 BTU/h - OU 1 kapasitas : 859 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 M' 1 2 3
1 BH 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
PIPA DRAIN (AC) PIPA DRAIN (AC) Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Y - Branch Y - Branch Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
unit ls
1.00 1.00
Rp Rp
990,000,000 29,700,000
Rp Rp
990,000,000 29,700,000
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,019,733,925 25,493,348 1,045,227,273
unit ls
1.00 1.00
Rp Rp
1,047,420,000 31,422,600
Rp Rp
1,047,420,000 31,422,600
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,078,876,525 26,971,913 1,105,848,438
unit ls
1.00 1.00
Rp Rp
1,096,920,000 32,907,600
Rp Rp
1,096,920,000 32,907,600
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,129,861,525 28,246,538 1,158,108,063
m' lot
1.00 1.00
Rp Rp
hari hari hari
0.03 0.13 0.07
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
90,000 1,800
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,097,900 41,958
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
252,000 5,040
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
252,000 5,040
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
90,000 1,800
Rp Rp Rp Rp Rp Rp
3,000 11,333 5,333 111,467 2,787 114,253
Rp Rp
2,097,900 41,958
Rp Rp Rp Rp Rp
10,667 3,778 2,154,302 53,858 2,208,160
Rp Rp
252,000 5,040
Rp Rp Rp Rp Rp
10,667 3,778 271,484 6,787 278,272
Rp Rp
252,000 5,040
Rp Rp Rp Rp Rp
10,667 3,778 271,484 6,787 278,272
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
171,000 3,420
Rp Rp Rp Rp
10,667 3,778 188,864 4,722
Rp
TOTAL HARGA 1,045,227,273
Rp
1,105,848,438
Rp
1,158,108,063
Rp
114,253
Rp
2,208,160
Rp
278,272
Rp
278,272
Rp
193,586
Rp
193,586
Rp
193,586
Analisa Harga Satuan Mekanikal dan Plumbing - page 234 of 280
URAIAN
NO. 1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 193,586
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
296,000 5,920
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
394,000 7,880
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
443,000 8,860
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
296,000 5,920
Rp Rp Rp Rp Rp
10,667 3,778 316,364 7,909 324,274
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
394,000 7,880
Rp Rp Rp Rp Rp
10,667 3,778 416,324 10,408 426,733
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
443,000 8,860
Rp Rp Rp Rp Rp
10,667 3,778 466,304 11,658 477,962
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
378,000 7,560
Rp Rp Rp Rp
10,667 3,778 400,004 10,000
TOTAL HARGA Rp
193,586
Rp
315,910
Rp
324,274
Rp
315,910
Rp
315,910
Rp
426,733
Rp
410,005
Rp
410,005
Rp
477,962
Rp
410,005
Rp
410,005
Analisa Harga Satuan Mekanikal dan Plumbing - page 235 of 280
URAIAN
NO. 1M 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 3/8 INCH Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HAND VALVE DIAMETER : 1/2 INCH HAND VALVE DIAMETER : 1/2 INCH Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
AC MANAGER 5 AC MANAGER 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
ACP 5 ACP 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AC Smart 5 AC Smart 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AC EZ Touch AC EZ Touch Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AHU Comm. Kit AHU Comm. Kit Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
EEV Kit 4-10HP EEV Kit 4-10HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
EEV Kit 12-20HP EEV Kit 12-20HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
TVX Kit for 18-26 HP TVX Kit for 18-26 HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 410,005
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.07
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
159,000 3,180
Rp Rp
159,000 3,180
Rp Rp Rp Rp Rp
10,667 3,778 176,624 4,416 181,040
Rp Rp
646,000 12,920
Rp Rp Rp Rp Rp
16,000 5,667 680,587 17,015 697,601
Rp Rp
861,000 17,220
Rp Rp Rp Rp Rp
16,000 5,667 899,887 22,497 922,384
Rp Rp
57,834,000 1,156,680
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 59,020,993 1,475,525 60,496,517
Rp Rp
41,929,650 838,593
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 42,798,556 1,069,964 43,868,519
Rp Rp
28,350,000 567,000
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 28,947,313 723,683 29,670,995
Rp Rp
16,726,500 334,530
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 17,091,343 427,284 17,518,626
Rp Rp
7,399,350 147,987
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 7,577,650 189,441 7,767,091
Rp Rp
4,123,636 82,473
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 4,236,421 105,911 4,342,332
Rp Rp
6,237,000 124,740
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 6,392,053 159,801 6,551,854
16,200,000 324,000
Rp Rp
16,200,000 324,000
70,000 80,000 90,000 Jumlah
Rp Rp Rp Rp
17,500 10,000 2,813 16,554,313
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
646,000 12,920
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
861,000 17,220
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
57,834,000 1,156,680
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 41,929,650 838,593
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,350,000 567,000
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,726,500 334,530
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,399,350 147,987
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,123,636 82,473
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,237,000 124,740
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA Rp
181,040
Rp
697,601
Rp
922,384
Rp
60,496,517
Rp
43,868,519
Rp
29,670,995
Rp
17,518,626
Rp
7,767,091
Rp
4,342,332
Rp
6,551,854
Rp
16,968,170
Analisa Harga Satuan Mekanikal dan Plumbing - page 236 of 280
URAIAN
NO. 1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
TVX Kit for 28-36 HP TVX Kit for 28-36 HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Standard 3 Wired Remocon Standard 3 Wired Remocon Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Wireless Remocon Wireless Remocon Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 21 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 31 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Outdoor Pipe Connection - 41 Outdoor Pipe Connection - 41 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
DIFFUSER SUPPLY GRILLE ALUMUNIUM DIFFUSER SUPPLY GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER RETURN GRILLE ALUMUNIUM DIFFUSER RETURN GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER FRESH AIR GRILLE ALUMUNIUM DIFFUSER FRESH AIR GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER EXHAUST GRILLE ALUMUNIUM DIFFUSER EXHAUST GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
BOX DIFFUSER PERPORATE STAINLESS STEEL BOX DIFFUSER PERPORATE STAINLESS STEEL Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 413,858 Total = Jumlah+(Keuntungan 2,5%) Rp 16,968,170
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
19,800,000 396,000
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,752,546 35,051
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,060,290 21,206
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,729,350 34,587
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,211,300 44,226
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,346,000 106,920
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
90,000,000 4,500,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
19,800,000 396,000
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 20,226,313 505,658 20,731,970
Rp Rp
1,752,546 35,051
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 1,817,909 45,448 1,863,357
Rp Rp
1,060,290 21,206
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 1,111,808 27,795 1,139,604
Rp Rp
1,729,350 34,587
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 1,797,862 44,947 1,842,809
Rp Rp
2,211,300 44,226
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 2,289,451 57,236 2,346,687
Rp Rp
5,346,000 106,920
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 5,486,845 137,171 5,624,016
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
20,000 7,083 996,083 24,902 1,020,985
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
20,000 7,083 996,083 24,902 1,020,985
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
13,333 4,722 987,056 24,676 1,011,732
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
13,333 4,722 987,056 24,676 1,011,732
Rp Rp
90,000,000 4,500,000
Rp Rp Rp Rp
13,333 4,722 94,518,056 2,362,951
TOTAL HARGA Rp
20,731,970
Rp
1,863,357
Rp
1,139,604
Rp
1,842,809
Rp
2,346,687
Rp
5,624,016
Rp
1,020,985
Rp
1,020,985
Rp
1,011,732
Rp
1,011,732
Rp
96,881,007
Analisa Harga Satuan Mekanikal dan Plumbing - page 237 of 280
URAIAN
NO. 1 UNIT 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER RETURN DAMPER RETURN Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER FRESH AIR DAMPER FRESH AIR Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER EXHAUST DAMPER EXHAUST Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER SUPPLY DAMPER SUPPLY Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Pre-Filter (G-4) Pre-Filter (G-4) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Medium filter (F-9) Medium filter (F-9) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HEPA filter ( H-13) HEPA filter ( H-13) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 96,881,007
unit lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
8,500,000 170,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
570,000 11,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,800,000 36,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,500,000 190,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,240,000 124,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,380,000 147,600 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
8,500,000 170,000
Rp Rp Rp Rp Rp
13,333 4,722 8,688,056 217,201 8,905,257
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
570,000 11,400
Rp Rp Rp Rp Rp
13,333 4,722 599,456 14,986 614,442
Rp Rp
1,800,000 36,000
Rp Rp Rp Rp Rp
13,333 4,722 1,854,056 46,351 1,900,407
Rp Rp
9,500,000 190,000
Rp Rp Rp Rp Rp
13,333 4,722 9,708,056 242,701 9,950,757
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
26,667 9,444 4,320,111 108,003 4,428,114
Rp Rp
6,240,000 124,800
Rp Rp Rp Rp Rp
26,667 9,444 6,400,911 160,023 6,560,934
Rp Rp
7,380,000 147,600
Rp Rp Rp Rp
26,667 9,444 7,563,711 189,093
TOTAL HARGA Rp
8,905,257
Rp
3,677,757
Rp
3,677,757
Rp
3,677,757
Rp
3,677,757
Rp
614,442
Rp
1,900,407
Rp
9,950,757
Rp
4,428,114
Rp
6,560,934
Rp
7,752,804
Analisa Harga Satuan Mekanikal dan Plumbing - page 238 of 280
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 7,752,804
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
7,920,000 158,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,800,000 216,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,400,000 288,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
24,000,000 480,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,200,000 744,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,200,000 864,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
57,600,000 1,152,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 72,000,000 1,440,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
96,000,000 1,920,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
144,000,000 2,880,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
7,920,000 158,400
Rp Rp Rp Rp Rp
26,667 9,444 8,114,511 202,863 8,317,374
Rp Rp
10,800,000 216,000
Rp Rp Rp Rp Rp
26,667 9,444 11,052,111 276,303 11,328,414
Rp Rp
14,400,000 288,000
Rp Rp Rp Rp Rp
26,667 9,444 14,724,111 368,103 15,092,214
Rp Rp
24,000,000 480,000
Rp Rp Rp Rp Rp
26,667 9,444 24,516,111 612,903 25,129,014
Rp Rp
30,000,000 600,000
Rp Rp Rp Rp Rp
26,667 9,444 30,636,111 765,903 31,402,014
Rp Rp
37,200,000 744,000
Rp Rp Rp Rp Rp
26,667 9,444 37,980,111 949,503 38,929,614
Rp Rp
43,200,000 864,000
Rp Rp Rp Rp Rp
26,667 9,444 44,100,111 1,102,503 45,202,614
Rp Rp
57,600,000 1,152,000
Rp Rp Rp Rp Rp
26,667 9,444 58,788,111 1,469,703 60,257,814
Rp Rp
72,000,000 1,440,000
Rp Rp Rp Rp Rp
26,667 9,444 73,476,111 1,836,903 75,313,014
Rp Rp
96,000,000 1,920,000
Rp Rp Rp Rp Rp
26,667 9,444 97,956,111 2,448,903 100,405,014
Rp Rp
144,000,000 2,880,000
Rp Rp Rp Rp Rp
26,667 9,444 146,916,111 3,672,903 150,589,014
TOTAL HARGA Rp
8,317,374
Rp
11,328,414
Rp
15,092,214
Rp
25,129,014
Rp
31,402,014
Rp
38,929,614
Rp
45,202,614
Rp
60,257,814
Rp
75,313,014
Rp
100,405,014
Rp
150,589,014
Analisa Harga Satuan Mekanikal dan Plumbing - page 239 of 280
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 800 CFM / Wall Type Exhaust Fan , Kapasitas : 800 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Wall Type 1 Exhaust Fan , Kapasitas : 850 CFM / Wall Type
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.33 0.11
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
1.00
Rp
unit
1,150,000 23,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,725,000 34,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,300,000 46,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,875,000 57,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,450,000 69,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,025,000 80,500
402,500 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,600,000 92,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,175,000 103,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,750,000 115,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,900,000 138,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,200,000 184,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,775,000
JUMLAH HARGA Rp Rp
1,150,000 23,000
Rp Rp Rp Rp Rp
26,667 9,444 1,209,111 30,228 1,239,339
Rp Rp
1,725,000 34,500
Rp Rp Rp Rp Rp
26,667 9,444 1,795,611 44,890 1,840,501
Rp Rp
2,300,000 46,000
Rp Rp Rp Rp Rp
26,667 9,444 2,382,111 59,553 2,441,664
Rp Rp
2,875,000 57,500
Rp Rp Rp Rp Rp
26,667 9,444 2,968,611 74,215 3,042,826
Rp Rp
3,450,000 69,000
Rp Rp Rp Rp Rp
26,667 9,444 3,555,111 88,878 3,643,989
Rp Rp
4,025,000 80,500
Rp Rp Rp Rp Rp Rp
402,500 26,667 9,444 4,544,111 113,603 4,657,714
Rp Rp
4,600,000 92,000
Rp Rp Rp Rp Rp
26,667 9,444 4,728,111 118,203 4,846,314
Rp Rp
5,175,000 103,500
Rp Rp Rp Rp Rp
26,667 9,444 5,314,611 132,865 5,447,476
Rp Rp
5,750,000 115,000
Rp Rp Rp Rp Rp
26,667 9,444 5,901,111 147,528 6,048,639
Rp Rp
6,900,000 138,000
Rp Rp Rp Rp Rp
26,667 9,444 7,074,111 176,853 7,250,964
Rp Rp
9,200,000 184,000
Rp Rp Rp Rp Rp
26,667 9,444 9,420,111 235,503 9,655,614
Rp
9,775,000
Rp
TOTAL HARGA 1,239,339
Rp
1,840,501
Rp
2,441,664
Rp
3,042,826
Rp
3,643,989
Rp
4,657,714
Rp
4,846,314
Rp
5,447,476
Rp
6,048,639
Rp
7,250,964
Rp
9,655,614
Rp
10,256,776
Analisa Harga Satuan Mekanikal dan Plumbing - page 240 of 280
URAIAN
NO. 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 950 CFM / Wall Type Exhaust Fan , Kapasitas : 950 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
1 UNIT Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 1 Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 2 Instalasi Tukang Kepala Tukang AC
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang
SAT lot
INDEK 1.00
Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp
JUMLAH HARGA 195,500
Rp Rp Rp Rp Rp
26,667 9,444 10,006,611 250,165 10,256,776
Rp Rp
10,925,000 218,500
Rp Rp Rp Rp Rp
26,667 9,444 11,179,611 279,490 11,459,101
Rp Rp
13,800,000 276,000
Rp Rp Rp Rp Rp
26,667 9,444 14,112,111 352,803 14,464,914
Rp Rp
55,000,000 1,100,000
Rp Rp Rp Rp Rp
26,667 9,444 56,136,111 1,403,403 57,539,514
Rp Rp
33,000,000 660,000
Rp Rp Rp Rp Rp
26,667 9,444 33,696,111 842,403 34,538,514
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
26,667 9,444 29,208,111 730,203 29,938,314
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
26,667 9,444 29,208,111 730,203 29,938,314
Rp Rp
22,000,000 440,000
Rp Rp Rp Rp Rp
26,667 9,444 22,476,111 561,903 23,038,014
Rp Rp
55,000,000 1,100,000
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 56,136,111 1,403,403 57,539,514
1.00 1.00 0.33 0.11
Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
31,900,000 638,000 26,667 9,444 32,574,111 814,353 33,388,464
unit lot
1.00 1.00
Rp Rp
Rp Rp
30,800,000 616,000
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 31,452,111 786,303 32,238,414
unit lot
1.00 1.00
Rp Rp
Rp Rp
27,500,000 550,000
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 28,086,111 702,153 28,788,264
unit lot
1.00 1.00
Rp Rp
26,400,000 528,000
Rp Rp
26,400,000 528,000
hari
0.33
Rp
80,000
Rp
26,667
unit lot hari hari
HARGA SATUAN 195,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,925,000 218,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,800,000 276,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 55,000,000 1,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 33,000,000 660,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 22,000,000 440,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 55,000,000 1,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 31,900,000 638,000 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,800,000 616,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,500,000 550,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
11,459,101
Rp
14,464,914
Rp
57,539,514
Rp
34,538,514
Rp
29,938,314
Rp
29,938,314
Rp
23,038,014
Rp
57,539,514
Rp
33,388,464
Rp
32,238,414
Rp
28,788,264
Rp
27,638,214
Analisa Harga Satuan Mekanikal dan Plumbing - page 241 of 280
URAIAN
NO. Kepala Tukang AC
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT hari
INDEK 0.11
Rp
HARGA SATUAN 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.33 0.11
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp
JUMLAH HARGA 9,444 26,964,111 674,103 27,638,214
Rp Rp
25,300,000 506,000
Rp Rp Rp Rp Rp
26,667 9,444 25,842,111 646,053 26,488,164
Rp Rp
24,200,000 484,000
Rp Rp Rp Rp Rp
26,667 9,444 24,720,111 618,003 25,338,114
Rp Rp
23,100,000 462,000
Rp Rp Rp Rp Rp
26,667 9,444 23,598,111 589,953 24,188,064
Rp Rp
20,900,000 418,000
Rp Rp Rp Rp Rp
26,667 9,444 21,354,111 533,853 21,887,964
Rp Rp
19,800,000 396,000
Rp Rp Rp Rp Rp
26,667 9,444 20,232,111 505,803 20,737,914
Rp Rp
18,700,000 374,000
Rp Rp Rp Rp Rp
26,667 9,444 19,110,111 477,753 19,587,864
Rp Rp
17,600,000 352,000
Rp Rp Rp Rp Rp
26,667 9,444 17,988,111 449,703 18,437,814
Rp Rp
16,500,000 330,000
Rp Rp Rp Rp Rp
26,667 9,444 16,866,111 421,653 17,287,764
Rp Rp
15,400,000 308,000
Rp Rp Rp Rp Rp
26,667 9,444 15,744,111 393,603 16,137,714
Rp Rp
12,100,000 242,000
Rp Rp Rp Rp Rp
26,667 9,444 12,378,111 309,453 12,687,564
Rp Rp
12,100,000 242,000
Rp Rp Rp Rp Rp Rp
605,000 26,667 9,444 12,983,111 324,578 13,307,689
12,100,000 242,000
Rp Rp
12,100,000 242,000
80,000 85,000
Rp Rp
26,667 9,444
25,300,000 506,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 24,200,000 484,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,100,000 462,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,900,000 418,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 19,800,000 396,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 18,700,000 374,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,600,000 352,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,500,000 330,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 15,400,000 308,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,100,000 242,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,100,000 242,000
605,000 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
26,488,164
Rp
25,338,114
Rp
24,188,064
Rp
21,887,964
Rp
20,737,914
Rp
19,587,864
Rp
18,437,814
Rp
17,287,764
Rp
16,137,714
Rp
12,687,564
Rp
13,307,689
Rp
12,687,564
Analisa Harga Satuan Mekanikal dan Plumbing - page 242 of 280
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 950 CFM / Inline Type Exhaust Fan , Kapasitas : 950 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 900 CFM / Inline Type Exhaust Fan , Kapasitas : 900 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 850 CFM / Inline Type Exhaust Fan , Kapasitas : 850 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 800 CFM / Inline Type Unit Fan Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 750 CFM / Inline Type Unit Fan Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 700 CFM / Inline Type Exhaust Fan , Kapasitas : 700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 650 CFM / Inline Type Exhaust Fan , Kapasitas : 650 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 600 CFM / Inline Type Exhaust Fan , Kapasitas : 600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 550 CFM / Inline Type Exhaust Fan , Kapasitas : 550 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 500 CFM / Inline Type Exhaust Fan , Kapasitas : 500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 450 CFM / Inline Type Exhaust Fan , Kapasitas : 450 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN JUMLAH HARGA Jumlah Rp 12,378,111 Keuntungan 2,5% Rp 309,453 Total = Jumlah+(Keuntungan 2,5%) Rp 12,687,564
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,450,000 209,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,900,000 198,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,350,000 187,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,800,000 176,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,250,000 165,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,700,000 154,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,150,000 143,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,600,000 132,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,050,000 121,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,950,000 99,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
20,000 7,083 11,247,083 281,177 11,528,260
Rp Rp
10,450,000 209,000
Rp Rp Rp Rp Rp
20,000 7,083 10,686,083 267,152 10,953,235
Rp Rp
9,900,000 198,000
Rp Rp Rp Rp Rp
20,000 7,083 10,125,083 253,127 10,378,210
Rp Rp
9,350,000 187,000
Rp Rp Rp Rp Rp
20,000 7,083 9,564,083 239,102 9,803,185
Rp Rp
8,800,000 176,000
Rp Rp Rp Rp Rp
20,000 7,083 9,003,083 225,077 9,228,160
Rp Rp
8,250,000 165,000
Rp Rp Rp Rp Rp
20,000 7,083 8,442,083 211,052 8,653,135
Rp Rp
7,700,000 154,000
Rp Rp Rp Rp Rp
20,000 7,083 7,881,083 197,027 8,078,110
Rp Rp
7,150,000 143,000
Rp Rp Rp Rp Rp
20,000 7,083 7,320,083 183,002 7,503,085
Rp Rp
6,600,000 132,000
Rp Rp Rp Rp Rp
20,000 7,083 6,759,083 168,977 6,928,060
Rp Rp
6,050,000 121,000
Rp Rp Rp Rp Rp
20,000 7,083 6,198,083 154,952 6,353,035
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
20,000 7,083 5,637,083 140,927 5,778,010
Rp Rp
4,950,000 99,000
Rp Rp Rp Rp
20,000 7,083 5,076,083 126,902
TOTAL HARGA
Rp
11,528,260
Rp
10,953,235
Rp
10,378,210
Rp
9,803,185
Rp
9,228,160
Rp
8,653,135
Rp
8,078,110
Rp
7,503,085
Rp
6,928,060
Rp
6,353,035
Rp
5,778,010
Rp
5,202,985
Analisa Harga Satuan Mekanikal dan Plumbing - page 243 of 280
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 400 CFM / Inline Type Exhaust Fan , Kapasitas : 400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 350 CFM / Inline Type Exhaust Fan , Kapasitas : 350 CFM / Inline Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 300 CFM / Inline Type Exhaust Fan , Kapasitas : 300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 250 CFM / Inline Type Exhaust Fan , Kapasitas : 250 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 200 CFM / Inline Type Exhaust Fan , Kapasitas : 200 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 150 CFM / Inline Type Exhaust Fan , Kapasitas : 150 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 100 CFM / Inline Type Exhaust Fan , Kapasitas : 100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 70 CFM / Inline Type Exhaust Fan , Kapasitas : 70 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 5,202,985
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.25 0.08
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
4,400,000 88,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,850,000 77,000
192,500 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,300,000 66,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,750,000 55,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,200,000 44,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,650,000 33,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,100,000 22,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
770,000 15,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
21,000,000 420,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,500,000 590,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,500,000 590,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
4,400,000 88,000
Rp Rp Rp Rp Rp
20,000 7,083 4,515,083 112,877 4,627,960
Rp Rp
3,850,000 77,000
Rp Rp Rp Rp Rp Rp
192,500 20,000 7,083 4,146,583 103,665 4,250,248
Rp Rp
3,300,000 66,000
Rp Rp Rp Rp Rp
20,000 7,083 3,393,083 84,827 3,477,910
Rp Rp
2,750,000 55,000
Rp Rp Rp Rp Rp
20,000 7,083 2,832,083 70,802 2,902,885
Rp Rp
2,200,000 44,000
Rp Rp Rp Rp Rp
20,000 7,083 2,271,083 56,777 2,327,860
Rp Rp
1,650,000 33,000
Rp Rp Rp Rp Rp
20,000 7,083 1,710,083 42,752 1,752,835
Rp Rp
1,100,000 22,000
Rp Rp Rp Rp Rp
20,000 7,083 1,149,083 28,727 1,177,810
Rp Rp
770,000 15,400
Rp Rp Rp Rp Rp
20,000 7,083 812,483 20,312 832,795
Rp Rp
21,000,000 420,000
Rp Rp Rp Rp Rp
26,667 9,444 21,456,111 536,403 21,992,514
Rp Rp
29,500,000 590,000
Rp Rp Rp Rp Rp
26,667 9,444 30,126,111 753,153 30,879,264
Rp Rp
29,500,000 590,000
Rp Rp Rp Rp Rp
26,667 9,444 30,126,111 753,153 30,879,264
TOTAL HARGA Rp
4,627,960
Rp
4,250,248
Rp
3,477,910
Rp
2,902,885
Rp
2,327,860
Rp
1,752,835
Rp
1,177,810
Rp
832,795
Rp
21,992,514
Rp
30,879,264
Rp
30,879,264
Analisa Harga Satuan Mekanikal dan Plumbing - page 244 of 280
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 TTK 1 2 3 4
URAIAN Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting HOOD SUS - 304 Ducting HOOD SUS - 304 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
TITIK INSTALASI OUTDOOR UNIT AC Kabel NYY 4x35 mm2 Way Delta A Isolasi Ban Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1 TTK TITIK INSTALASI KRITIKAL UNIT AC 1 Kabel NYY 4x10 mm2 2 Isolasi Ban 3 Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1 TTK TITIK INSTALASI INDOOR UNIT AC 1 Kabel NYY 4x10 mm2 2 Isolasi Ban 3 Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1M 1 2 3
1 BH 1 2
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 M' 1 2 3
1 M'
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
m' bh bh
10.00 1.00 1.00
Rp Rp Rp
hari hari
0.50 0.17
Rp Rp
m' bh
10.00 1.00
Rp Rp
hari hari
0.50 0.17
Rp Rp
m' bh
10.00 1.00
Rp Rp
hari hari
0.50 0.17
Rp Rp
60,000,000 1,200,000
Rp Rp Rp Rp Rp
26,667 9,444 61,236,111 1,530,903 62,767,014
Rp Rp
5,040,000 100,800
Rp Rp Rp Rp Rp
20,000 7,083 5,167,883 129,197 5,297,080
Rp Rp Rp
2,500,000 1,260,261 2,000
Rp Rp Rp Rp Rp
40,000 14,167 3,816,427 95,411 3,911,838
Rp Rp
656,198 2,000
Rp Rp Rp Rp Rp
40,000 14,167 712,365 17,809 730,174
Rp Rp
656,198 2,000
Rp Rp Rp Rp Rp
40,000 14,167 712,365 17,809 730,174
Rp Rp
383,000 7,660
Rp Rp Rp Rp Rp
14,167 6,667 411,493 10,287 421,781
Rp Rp
1,189,300 23,786
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,213,086 30,327 1,243,413
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
65,620 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
hari hari
0.17 0.08
Rp Rp
FIRE EXTINGUISHER 6 KG FIRE EXTINGUISHER 6 KG Instalasi
bh lot
1.00 1.00
Rp Rp
Pipa Stainless Steel 304 Sch.10 ( 65 mm )
65,620 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
Pipa Stainless Steel 304 Sch.10 ( 100 mm ) Pipa Stainless Steel 304 Sch.10 ( 100 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
250,000 1,260,261 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1.00 1.00
Membran Filter Lengkap dengan accessories Harga Unit Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
5,040,000 100,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m' lot
Stronge Tank SS304, Volume 2000 Litter Stronge Tank SS304, Volume 2000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
JUMLAH HARGA Rp Rp
KABEL LEADER (Kabel Indoor to Outdoor) KABEL LEADER (Kabel Indoor to Outdoor) Instalasi Tenaga Kerja : Kepala Tukang Listrik Tukang
Pompa tekan RO ( Stainless Steel ), lengkap accesories Harga Unit Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
60,000,000 1,200,000
383,000 7,660
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.27
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.27
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
1,189,300 23,786
26,000,000 520,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
30,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
330,000 6,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
26,000,000 520,000
Rp Rp Rp Rp Rp
53,333 22,667 26,596,000 664,900 27,260,900
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
36,000 15,300 11,271,300 281,783 11,553,083
Rp Rp
30,000,000 600,000
Rp Rp Rp Rp Rp
53,333 22,667 30,676,000 766,900 31,442,900
Rp Rp
330,000 6,600
Rp Rp Rp Rp Rp
8,000 3,400 348,000 8,700 356,700
Rp
TOTAL HARGA 62,767,014
Rp
5,297,080
Rp
3,911,838
Rp
730,174
Rp
730,174
Rp
421,781
Rp
1,243,413
Rp
27,260,900
Rp
11,553,083
Rp
31,442,900
Rp
356,700
Rp
229,499
Analisa Harga Satuan Mekanikal dan Plumbing - page 245 of 280
NO. 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Pipa Stainless Steel 304 Sch.10 ( 65 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 32 mm ) Pipa Stainless Steel 304 Sch.10 ( 32 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 50 mm ) Pipa Stainless Steel 304 Sch.10 ( 50 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 40 mm ) Pipa Stainless Steel 304 Sch.10 ( 40 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 20 mm ) Pipa Stainless Steel 304 Sch.10 ( 20 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
High Pressure Pump High Pressure Pump Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Membrane 4" x 40" - 1500 GPD Membrane 4" x 40" - 1500 GPD Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Housing FRP Housing FRP Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Permeate & Concentrate Rotameter Permeate & Concentrate Rotameter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
System Pressure Gauge System Pressure Gauge Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Recyle Valve Recyle Valve Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 UNIT Low Pressure Switch
SAT M' lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.12 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.12 0.05
Rp Rp
HARGA SATUAN 208,335 4,167
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
108,333 2,167
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
153,450 3,069
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
123,000 2,460
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 1,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,500,000 250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
17,300,000 346,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,500,000 250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,000,000 140,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
700,000 14,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,100,000 22,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 208,335 4,167
Rp Rp Rp Rp Rp
8,000 3,400 223,902 5,598 229,499
Rp Rp
108,333 2,167
Rp Rp Rp Rp Rp
6,667 2,833 120,000 3,000 123,000
Rp Rp
153,450 3,069
Rp Rp Rp Rp Rp
8,000 3,400 167,919 4,198 172,117
Rp Rp
123,000 2,460
Rp Rp Rp Rp Rp
6,667 2,833 134,960 3,374 138,334
Rp Rp
50,000 1,000
Rp Rp Rp Rp Rp
6,667 2,833 60,500 1,512 62,012
Rp Rp
12,500,000 250,000
Rp Rp Rp Rp Rp
6,667 2,833 12,759,500 318,988 13,078,488
Rp Rp
17,300,000 346,000
Rp Rp Rp Rp Rp
6,667 2,833 17,655,500 441,388 18,096,888
Rp Rp
12,500,000 250,000
Rp Rp Rp Rp Rp
6,667 2,833 12,759,500 318,988 13,078,488
Rp Rp
7,000,000 140,000
Rp Rp Rp Rp Rp
6,667 2,833 7,149,500 178,738 7,328,238
Rp Rp
700,000 14,000
Rp Rp Rp Rp Rp
9,333 3,967 727,300 18,183 745,483
Rp Rp
1,100,000 22,000
Rp Rp Rp Rp Rp
9,333 3,967 1,135,300 28,383 1,163,683
TOTAL HARGA
Rp
123,000
Rp
172,117
Rp
138,334
Rp
62,012
Rp
13,078,488
Rp
18,096,888
Rp
13,078,488
Rp
7,328,238
Rp
745,483
Rp
1,163,683
Rp
2,937,138
Analisa Harga Satuan Mekanikal dan Plumbing - page 246 of 280
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 LOT 1 2 3
1 LOT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Low Pressure Switch Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Solenoid Valve 3/4" Solenoid Valve 3/4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
TDS Monitor TDS Monitor Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Cartridge Filter Cartridge Filter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Piping & Interconnecting Piping & Interconnecting Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Frame Frame Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Aksesoris Aksesoris Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Stronge Tank SS304, Volume 1000 Litter Stronge Tank SS304, Volume 1000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Stronge Tank SS304, Volume 2000 Litter Stronge Tank SS304, Volume 2000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pompa Distribusi Kap. 10 Lpm, Head 32 m Pompa Distribusi Kap. 10 Lpm, Head 32 m Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pompa Isap Kap. 10 Lpm, Head 32 m Pompa Isap Kap. 10 Lpm, Head 32 m Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 UNIT Housing Catridge 10", in/out 3/4"
SAT unit lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
HARGA SATUAN 2,800,000 56,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,800,000 36,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
31,500,000 630,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,800,000 276,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,000,000 140,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,000,000 40,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,400,000 168,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,400,000 168,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 2,800,000 56,000
Rp Rp Rp Rp Rp
6,667 2,833 2,865,500 71,638 2,937,138
Rp Rp
1,800,000 36,000
Rp Rp Rp Rp Rp
6,667 2,833 1,845,500 46,138 1,891,638
Rp Rp
31,500,000 630,000
Rp Rp Rp Rp Rp
6,667 2,833 32,139,500 803,488 32,942,988
Rp Rp
13,800,000 276,000
Rp Rp Rp Rp Rp
6,667 2,833 14,085,500 352,138 14,437,638
Rp Rp
7,000,000 140,000
Rp Rp Rp Rp Rp
5,333 2,267 7,147,600 178,690 7,326,290
Rp Rp
2,000,000 40,000
Rp Rp Rp Rp Rp
5,333 2,267 2,047,600 51,190 2,098,790
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
4,000 1,700 4,289,700 107,243 4,396,943
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
36,000 15,300 5,661,300 141,533 5,802,833
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
36,000 15,300 11,271,300 281,783 11,553,083
Rp Rp
8,400,000 168,000
Rp Rp Rp Rp Rp
26,667 11,333 8,606,000 215,150 8,821,150
Rp Rp
8,400,000 168,000
Rp Rp Rp Rp Rp
26,667 11,333 8,606,000 215,150 8,821,150
TOTAL HARGA
Rp
1,891,638
Rp
32,942,988
Rp
14,437,638
Rp
7,326,290
Rp
2,098,790
Rp
4,396,943
Rp
5,802,833
Rp
11,553,083
Rp
8,821,150
Rp
8,821,150
Rp
13,074,593
Analisa Harga Satuan Mekanikal dan Plumbing - page 247 of 280
NO. 1 2 3
1 UNIT 1 2 3
1 LOT 1 2 3
1 UNIT 1 2 3
1 SET 1 2 3
1 LOT 1 2 3
URAIAN Housing Catridge 10", in/out 3/4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Housing Catridge 10", in/out 4" Housing Catridge 10", in/out 4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Granular Resin Mixed Bed Granular Resin Mixed Bed Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Ultra Voilet Sterlight 5 GPM, 30 Watt Ultra Voilet Sterlight 5 GPM, 30 Watt Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Control Panel Indoor Control Panel Indoor Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Cabling Cabling Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
1 LOT Installation 1 Installation 2 Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 LOT Test Run & Commisioning 1 Test Run & Commisioning 2 Tenaga Kerja : Mandor
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
Sentral Oxygen Automatic System Kap. 2x10 cyl Sentral Oxygen Automatic System Kap. 2x10 cyl Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Sentral N2O Automatic System Kap. 2x2 cyl Sentral N2O Automatic System Kap. 2x2 cyl Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Oil Free Air Compressor - Duplex Oil Free Air Compressor - Duplex Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Vacuum Pump Duplex System Vacuum Pump Duplex System Instalasi Tenaga Kerja : Tukang pipa
SAT unit lot
INDEK 1.00 1.00
Rp Rp
HARGA SATUAN 12,500,000 250,000
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.50 0.20
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
lot
1.00
Rp
hari hari
0.33 0.13
Rp Rp
lot
1.00
Rp
hari
0.04
Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
432,580,000 8,651,600
hari
0.20
Rp
80,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,200,000 124,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,700,000 54,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,600,000 112,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,400,000 188,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
500,000 10,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,000,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,000,000
90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,936,000 5,758,720
Rp Rp
JUMLAH HARGA 12,500,000 250,000
Rp Rp Rp Rp Rp
4,000 1,700 12,755,700 318,893 13,074,593
Rp Rp
6,200,000 124,000
Rp Rp Rp Rp Rp
4,000 1,700 6,329,700 158,243 6,487,943
Rp Rp
2,700,000 54,000
Rp Rp Rp Rp Rp
4,000 1,700 2,759,700 68,993 2,828,693
Rp Rp
5,600,000 112,000
Rp Rp Rp Rp Rp
26,667 11,333 5,750,000 143,750 5,893,750
Rp Rp
9,400,000 188,000
Rp Rp Rp Rp Rp
40,000 17,000 9,645,000 241,125 9,886,125
Rp Rp
500,000 10,000
Rp Rp Rp Rp Rp
36,000 15,300 561,300 14,033 575,333
Rp
6,000,000
Rp Rp Rp Rp Rp
26,667 11,333 6,038,000 150,950 6,188,950
Rp
2,000,000
Rp Rp Rp Rp
3,861 2,003,861 50,097 2,053,958
Rp
287,936,000 SUDAH TERMASUK
TOTAL HARGA
Rp
6,487,943
Rp
2,828,693
Rp
5,893,750
Rp
9,886,125
Rp
575,333
Rp
6,188,950
Rp
2,053,958
Rp
295,134,400
Rp
266,705,000
Rp
815,769,210
Rp
443,394,500
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 287,936,000 Keuntungan 2,5% Rp 7,198,400 Total = Jumlah+(Keuntungan 2,5%) Rp 295,134,400 260,200,000 5,204,000
Rp
260,200,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 260,200,000 Keuntungan 2,5% Rp 6,505,000 Total = Jumlah+(Keuntungan 2,5%) Rp 266,705,000 795,872,400 15,917,448
Rp
795,872,400 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 795,872,400 Keuntungan 2,5% Rp 19,896,810 Total = Jumlah+(Keuntungan 2,5%) Rp 815,769,210 Rp
432,580,000 SUDAH TERMASUK SUDAH TERMASUK Analisa Harga Satuan Mekanikal dan Plumbing - page 248 of 280
URAIAN
NO. Kepala tukang pipa
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 BH 1 2 3
Master Alarm 10 function Master Alarm 10 function Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Alarm System for 4 Gases Alarm System for 4 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 4 gases Zone Valve for 4 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 3 Gases Alarm System for 3 Gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Zone Valve for 3 gases Zone Valve for 3 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 2 Gases Alarm System for 2 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 2 gases Zone Valve for 2 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 1 Gases Alarm System for 1 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 1 gases Zone Valve for 1 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Gas Medis For Oxygen Gas Medis For Oxygen Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Valve Gas Medis For Valve Instalasi Tenaga Kerja : Tukang pipa
SAT hari
INDEK 0.12
Rp
HARGA SATUAN JUMLAH HARGA 85,000 SUDAH TERMASUK Jumlah Rp 432,580,000 Keuntungan 2,5% Rp 10,814,500 Total = Jumlah+(Keuntungan 2,5%) Rp 443,394,500
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
bh lot
1.00 1.00
Rp Rp
1,278,800 25,576
hari
0.17
Rp
80,000
54,810,000 1,096,200
Rp
TOTAL HARGA
Rp
56,180,250
Rp
32,800,000
Rp
20,787,000
Rp
27,347,000
Rp
15,580,000
Rp
19,147,000
Rp
10,455,000
Rp
10,947,000
Rp
5,494,000
Rp
1,310,770
Rp
1,310,770
54,810,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 54,810,000 Keuntungan 2,5% Rp 1,370,250 Total = Jumlah+(Keuntungan 2,5%) Rp 56,180,250 32,000,000 640,000
Rp
32,000,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 32,000,000 Keuntungan 2,5% Rp 800,000 Total = Jumlah+(Keuntungan 2,5%) Rp 32,800,000 20,280,000 405,600
Rp
20,280,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 20,280,000 Keuntungan 2,5% Rp 507,000 Total = Jumlah+(Keuntungan 2,5%) Rp 20,787,000 26,680,000 533,600
Rp
26,680,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 26,680,000 Keuntungan 2,5% Rp 667,000 Total = Jumlah+(Keuntungan 2,5%) Rp 27,347,000 15,200,000 304,000
Rp
15,200,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 15,200,000 Keuntungan 2,5% Rp 380,000 Total = Jumlah+(Keuntungan 2,5%) Rp 15,580,000 18,680,000 373,600
Rp
18,680,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 18,680,000 Keuntungan 2,5% Rp 467,000 Total = Jumlah+(Keuntungan 2,5%) Rp 19,147,000 10,200,000 204,000
Rp
10,200,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 10,200,000 Keuntungan 2,5% Rp 255,000 Total = Jumlah+(Keuntungan 2,5%) Rp 10,455,000 10,680,000 213,600
Rp
10,680,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 10,680,000 Keuntungan 2,5% Rp 267,000 Total = Jumlah+(Keuntungan 2,5%) Rp 10,947,000 5,360,000 107,200
Rp
5,360,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 5,360,000 Keuntungan 2,5% Rp 134,000 Total = Jumlah+(Keuntungan 2,5%) Rp 5,494,000 1,278,800 25,576
Rp
1,278,800 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770 Rp
1,278,800 SUDAH TERMASUK SUDAH TERMASUK Analisa Harga Satuan Mekanikal dan Plumbing - page 249 of 280
URAIAN
NO. Kepala tukang pipa
1 BH 1 2 3
Gas Medis For Gas Medis Wall Outlet Gas Medis For Gas Medis Wall Outlet Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT hari
INDEK 0.08
Rp
HARGA SATUAN JUMLAH HARGA 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770
bh lot
1.00 1.00
Rp Rp
1,278,800 25,576
hari hari
0.17 0.08
Rp Rp
80,000 85,000 Jumlah
TOTAL HARGA
Rp Rp
Rp
1,310,770
1,278,800 SUDAH TERMASUK SUDAH TERMASUK SUDAH TERMASUK 1,278,800
Analisa Harga Satuan Mekanikal dan Plumbing - page 250 of 280
URAIAN
NO.
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 M' 1 2 3
Gas Medis For Oxygen DISS Gas Medis For Oxygen DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For N2O DISS Gas Medis For N2O DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Air DISS Gas Medis For Air DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for VACUM DISS Gas Medis for VACUM DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for CO2 DISS Gas Medis for CO2 DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for N20 Gas Medis for N20 Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Vacum Gas Medis For Vacum Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For AGSS Gas Medis For AGSS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Compress Air Gas Medis For Compress Air Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2⅛" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
1,480,000 29,600
Rp
TOTAL HARGA
Rp
1,517,000
Rp
1,517,000
Rp
1,517,000
Rp
1,517,000
Rp
1,517,000
Rp
1,310,770
Rp
1,310,770
Rp
1,310,770
Rp
1,310,770
Rp
902,000
Rp
856,900
1,480,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,480,000 Keuntungan 2,5% Rp 37,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,517,000 1,480,000 29,600
Rp
1,480,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,480,000 Keuntungan 2,5% Rp 37,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,517,000 1,480,000 29,600
Rp
1,480,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,480,000 Keuntungan 2,5% Rp 37,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,517,000 1,480,000 29,600
Rp
1,480,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,480,000 Keuntungan 2,5% Rp 37,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,517,000 1,480,000 29,600
Rp
1,480,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,480,000 Keuntungan 2,5% Rp 37,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,517,000 1,278,800 25,576
Rp
1,278,800 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770 1,278,800 25,576
Rp
1,278,800 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770 1,278,800 25,576
Rp
1,278,800 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770 1,278,800 25,576
Rp
1,278,800 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,278,800 Keuntungan 2,5% Rp 31,970 Total = Jumlah+(Keuntungan 2,5%) Rp 1,310,770 880,000 17,600
Rp
880,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 880,000 Keuntungan 2,5% Rp 22,000 Total = Jumlah+(Keuntungan 2,5%) Rp 902,000 836,000 16,720
Rp
836,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 836,000 Keuntungan 2,5% Rp 20,900 Analisa Harga Satuan Mekanikal dan Plumbing - page 251 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 1" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ⅜" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 856,900
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
1.00 1.00
Rp Rp
0.08 0.04
Rp Rp
1.00 1.00
Rp Rp
0.08 0.04
Rp Rp
337,960 6,759
Rp
TOTAL HARGA Rp
346,409
Rp
346,409
Rp
346,409
Rp
229,067
Rp
179,580
Rp
127,100
Rp
90,461
Rp
484,000
Rp
451,000
Rp
615,000
Rp
615,000
337,960 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 337,960 Keuntungan 2,5% Rp 8,449 Total = Jumlah+(Keuntungan 2,5%) Rp 346,409 337,960 6,759
Rp
337,960 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 337,960 Keuntungan 2,5% Rp 8,449 Total = Jumlah+(Keuntungan 2,5%) Rp 346,409 337,960 6,759
Rp
337,960 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 337,960 Keuntungan 2,5% Rp 8,449 Total = Jumlah+(Keuntungan 2,5%) Rp 346,409 223,480 4,470
Rp
223,480 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 223,480 Keuntungan 2,5% Rp 5,587 Total = Jumlah+(Keuntungan 2,5%) Rp 229,067 175,200 3,504
Rp
175,200 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 175,200 Keuntungan 2,5% Rp 4,380 Total = Jumlah+(Keuntungan 2,5%) Rp 179,580 124,000 2,480
Rp
124,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 124,000 Keuntungan 2,5% Rp 3,100 Total = Jumlah+(Keuntungan 2,5%) Rp 127,100 82,238 1,645
Rp
82,238 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 82,238 Keuntungan 2,5% Rp 8,224 Total = Jumlah+(Keuntungan 2,5%) Rp 90,461 440,000 8,800
Rp
440,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 440,000 Keuntungan 2,5% Rp 44,000 Total = Jumlah+(Keuntungan 2,5%) Rp 484,000 440,000 8,800
Rp
440,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 440,000 Keuntungan 2,5% Rp 11,000 Total = Jumlah+(Keuntungan 2,5%) Rp 451,000
Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² m' Instalasi lot Tenaga Kerja : Tukang pipa hari Kepala tukang pipa hari
600,000 12,000
Rp
600,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 600,000 Keuntungan 2,5% Rp 15,000 Total = Jumlah+(Keuntungan 2,5%) Rp 615,000
1 M' 1 2 3
Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² m' Instalasi lot Tenaga Kerja : Tukang pipa hari Kepala tukang pipa hari
600,000 12,000
Rp
600,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 600,000 Keuntungan 2,5% Rp 15,000 Analisa Harga Satuan Mekanikal dan Plumbing - page 252 of 280
URAIAN
NO. 1 M' 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 M' 1 2 3
1 SET 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Area Alarm Instalasi Area Alarm Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Zone Valve Instalasi Zone Valve Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Gas Medis Wall Outlet Instalasi Gas Medis Wall Outlet Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Pipa Gas Instalasi Pipa Gas Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 615,000
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
440,000 8,800
Rp
TOTAL HARGA Rp
451,000
Rp
1,435,000
Rp
1,230,000
Rp
287,000
Rp
61,500
Rp
29,929,060
Rp
2,392,368
Rp
6,202,045
Rp
8,414,892
Rp
10,318,234
Rp
12,376,329
440,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 440,000 Keuntungan 2,5% Rp 11,000 Total = Jumlah+(Keuntungan 2,5%) Rp 451,000 1,400,000 28,000
Rp
1,400,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,400,000 Keuntungan 2,5% Rp 35,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,435,000 1,200,000 24,000
Rp
1,200,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,200,000 Keuntungan 2,5% Rp 30,000 Total = Jumlah+(Keuntungan 2,5%) Rp 1,230,000 280,000 5,600
Rp
280,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 280,000 Keuntungan 2,5% Rp 7,000 Total = Jumlah+(Keuntungan 2,5%) Rp 287,000 60,000 1,200
Rp
60,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 60,000 Keuntungan 2,5% Rp 1,500 Total = Jumlah+(Keuntungan 2,5%) Rp 61,500 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,261,700 45,234
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,905,580 118,112
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,022,125 160,442
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,842,634 196,853
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,811,161 236,223 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
20,000 7,083 29,199,083 729,977 29,929,060
Rp Rp
2,261,700 45,234
Rp Rp Rp Rp Rp
20,000 7,083 2,334,017 58,350 2,392,368
Rp Rp
5,905,580 118,112
Rp Rp Rp Rp Rp
20,000 7,083 6,050,775 151,269 6,202,045
Rp Rp
8,022,125 160,442
Rp Rp Rp Rp Rp
20,000 7,083 8,209,651 205,241 8,414,892
Rp Rp
9,842,634 196,853
Rp Rp Rp Rp Rp
20,000 7,083 10,066,570 251,664 10,318,234
Rp Rp
11,811,161 236,223
Rp Rp Rp Rp
20,000 7,083 12,074,467 301,862 Analisa Harga Satuan Mekanikal dan Plumbing - page 253 of 280
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 SET 1 2 3 4
5 6 7
1 SET 1 2 3 4
5 6 7
1 SET 1 2 3 4
5 6 7
1 M' 1 2 3
Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 12,376,329
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
13,779,688 275,594
Rp Rp
13,779,688 275,594
Rp Rp Rp Rp Rp
20,000 7,083 14,082,365 352,059 14,434,424
Rp Rp
20,055,312 401,106
Rp Rp Rp Rp Rp
20,000 7,083 20,483,502 512,088 20,995,589
Rp Rp
29,084,913 581,698
Rp Rp Rp Rp Rp
20,000 7,083 29,693,695 742,342 30,436,037
Rp Rp
38,034,117 760,682
Rp Rp Rp Rp Rp
20,000 7,083 38,821,883 970,547 39,792,430
Rp Rp
43,740,000 874,800
Rp Rp Rp Rp Rp
20,000 7,083 44,641,883 1,116,047 45,757,930
#REF! 72,000,000 Rp 5,905,580 Rp
#REF! 72,000,000 5,905,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
20,055,312 401,106
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,084,913 581,698
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
38,034,117 760,682
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,740,000 874,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA Rp
14,434,424
Rp
20,995,589
Rp
30,436,037
Rp
39,792,430
Rp
45,757,930
#REF!
#REF! #REF!
Air Filter (On Ceilling Room) Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper #REF! Instalasi
#REF! #REF! Air Filter (On Ceilling Room) OK Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper kapasitas : 363 100 BTU/h - OU #REF! Instalasi
#REF! #REF! Air Filter (On Ceilling Room) Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper kapasitas : 515 900 BTU/h - OU #REF! Instalasi
Supply Air Diffuser 44" x 38" 44" x 38" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF! 5,000,000
Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
#REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,000,000 #REF! #REF! #REF! #REF! #REF! #REF!
bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp
#REF! #REF! 20,055,312 Rp
Rp Rp Rp
Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF! Rp 5,000,000 Rp 199,867,500 #REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
#REF! #REF! 20,055,312 1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
5,000,000 199,867,500 #REF! #REF! #REF! #REF! #REF!
Rp Rp
#REF! 72,000,000 Rp 38,034,117 Rp
#REF! 72,000,000 38,034,117
Rp Rp Rp
#REF! bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
1,500,000 1,500,000 1,650,000 #REF! Rp 5,000,000 Rp 287,894,250 #REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
5,000,000 287,894,250 #REF! #REF! #REF! #REF! #REF!
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 254 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 44" x 36" 44" x 36" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 40" x 34" 40" x 34" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 36" x 34" 36" x 34 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 34" x 30" 34" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 30" x 30" 30" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 30" x 24" 30" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 28" 28" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 24" 28" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 22" 28" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 20" 28" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 255 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 2
1 M' 1 2 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 26" x 26" 26" x 26" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 26" x 24" 26" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 26" x 16" 26" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 24" x 24" 24" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 22" 22" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 20" 22" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 18" 22" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 20" 20" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 12" 20" x 12 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 256 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 18" x 18" 18" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 14" 18" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 12" 18" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 14" 16" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 12" 16" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 10" 16" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 257 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 12" x 10" 12" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 12" x 8" 12" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 6" x 6" 6" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 36" 40" x 36 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 34" 40" x 34" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 32" 40" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 34" x 32" 34" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 258 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 32" x 34" 32" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 36" x 32" 36" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 34" x 30" 34" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 30" x 24" 30" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 28" x 28" 28" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 28" x 24" 28" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 26" x 26" 26" x 26" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 24" 24" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 22" 24" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 259 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 24" x 16" 24" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 22" 22" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 20" 22" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 18" 22" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 20" 20" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 16" 20" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 18" 18" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 14" 18" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 260 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 16" x 14" 16" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 16" x 12" 16" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 15" x 10" 15" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 14" 14" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 10" 12" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 8" 12" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 261 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 6" x 6" 6" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 22" x 14" 22" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 20" x 16" 20" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 14" x 14" 14" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
780,000 39,000
Rp Rp
780,000 39,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 833,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Analisa Harga Satuan Mekanikal dan Plumbing - page 262 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Fresh Air Louvre 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 14" x 14" VD 14" X 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 12" x 12" VD 12" X 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 10" x 10" VD 10" X 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 8" x 8" VD 8" X 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 20,836 Total = Jumlah+(Keuntungan 2,5%) Rp 854,281
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
780,000 39,000
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
695,200 34,760
Rp Rp Rp Rp Rp
10,667 3,778 744,404 18,610 763,015
Rp Rp
596,000 29,800
Rp Rp Rp Rp Rp
10,667 3,778 640,244 16,006 656,251
Rp Rp
413,600 20,680
Rp Rp Rp Rp Rp
10,667 3,778 448,724 11,218 459,943
264,800 13,240
Rp Rp
264,800 13,240
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 292,484
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
695,200 34,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
596,000 29,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
413,600 20,680
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
763,015
Rp
656,251
Rp
459,943
Rp
299,797
Analisa Harga Satuan Mekanikal dan Plumbing - page 263 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Ducting 6'' x 4'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 6'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 3'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 7'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 10'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 4'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 7,312 Total = Jumlah+(Keuntungan 2,5%) Rp 299,797
m' ls
0.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.30 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.70 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
Rp Rp
72,760 9,095
Rp Rp Rp Rp Rp
10,667 3,778 96,299 2,407 98,707
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
54,570 9,095
Rp Rp Rp Rp Rp
10,667 3,778 78,109 1,953 80,062
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
127,330 9,095
Rp Rp Rp Rp Rp
10,667 3,778 150,869 3,772 154,641
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
181,900 9,095
Rp Rp Rp Rp Rp
10,667 3,778 205,439 5,136 210,575
Rp Rp
72,760 9,095
Rp Rp Rp Rp Rp
10,667 3,778 96,299 2,407 98,707
181,900 9,095
Rp Rp
109,140 9,095
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 132,679
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
98,707
Rp
135,996
Rp
80,062
Rp
135,996
Rp
173,286
Rp
135,996
Rp
154,641
Rp
173,286
Rp
210,575
Rp
98,707
Rp
135,996
Analisa Harga Satuan Mekanikal dan Plumbing - page 264 of 280
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
Ducting 12'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 10'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 3,317 Total = Jumlah+(Keuntungan 2,5%) Rp 135,996
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
181,900 9,095
Rp Rp Rp Rp Rp
10,667 3,778 205,439 5,136 210,575
TOTAL HARGA
Rp
173,286
Rp
210,575
Analisa Harga Satuan Mekanikal dan Plumbing - page 265 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Ducting 12'' x 12'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 10'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 10'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 16'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 16'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
218,280 9,095
Rp Rp Rp Rp Rp
10,667 3,778 241,819 6,045 247,865
Rp Rp
208,900 10,445
Rp Rp Rp Rp Rp
10,667 3,778 233,789 5,845 239,634
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
334,240 10,445
Rp Rp Rp Rp Rp
10,667 3,778 359,129 8,978 368,108
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
334,240 10,445
Rp Rp Rp Rp Rp
10,667 3,778 359,129 8,978 368,108
TOTAL HARGA Rp
247,865
Rp
239,634
Rp
282,459
Rp
325,283
Rp
282,459
Rp
282,459
Rp
325,283
Rp
368,108
Rp
325,283
Rp
325,283
Rp
368,108
Analisa Harga Satuan Mekanikal dan Plumbing - page 266 of 280
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2
1 M' 1 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M'
Ducting 18'' x 18'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 20'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 14'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 16'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 18'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 16'' BJLS 80 Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 18'' BJLS 80 Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 24''
SAT
INDEK
HARGA SATUAN
m' ls
1.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m'
1.60
Rp
hari hari
0.13 0.04
Rp Rp
m'
1.80
Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
376,020 10,445
Rp Rp Rp Rp Rp
10,667 3,778 400,909 10,023 410,932
Rp Rp
471,400 11,785
Rp Rp Rp Rp Rp
10,667 3,778 497,629 12,441 510,070
Rp Rp
329,980 11,785
Rp Rp Rp Rp Rp
10,667 3,778 356,209 8,905 365,115
Rp Rp
377,120 11,785
Rp Rp Rp Rp Rp
10,667 3,778 403,349 10,084 413,433
Rp Rp
424,260 11,785
Rp Rp Rp Rp Rp
10,667 3,778 450,489 11,262 461,752
Rp
377,120
Rp Rp Rp Rp Rp
10,667 3,778 391,564 9,789 401,354
Rp
424,260
Rp Rp Rp Rp Rp
10,667 3,778 438,704 10,968 449,672
Rp Rp
575,200 14,380
Rp Rp Rp Rp Rp
10,667 3,778 604,024 15,101 619,125
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
690,240 14,380
Rp Rp Rp Rp Rp
10,667 3,778 719,064 17,977 737,041
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
TOTAL HARGA Rp
410,932
Rp
510,070
Rp
365,115
Rp
413,433
Rp
461,752
Rp
401,354
Rp
449,672
Rp
619,125
Rp
678,083
Rp
737,041
Rp
678,083
Rp
737,041
Analisa Harga Satuan Mekanikal dan Plumbing - page 267 of 280
URAIAN
NO. 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3 4
1 UNIT 1 2 3
1 UNIT 1 2 3
BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 26'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 16'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 28'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 30'' x 30'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 40' x 28'' BJLS 90 Penggantung Peralatan Bantu/Penunjang Tenaga Kerja : Tukang Kepala Tukang AC
GENSET 1600 KvA, 50 Hz, 220/380 Volt Unit Genset type silent, Kapasitas : 1600 KVA Stanby Operation Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Pemindahan Genset ke Pondasi Pemindahan Genset ke Pondasi Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
SAT m' ls
INDEK 2.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
3.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls ls
2.80 1.00 1.00
Rp Rp Rp
hari hari
0.13 0.04
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
HARGA SATUAN 287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 45,000 29,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,225,044,874 104,500,897
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,500,000 125,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 690,240 14,380
Rp Rp Rp Rp Rp
10,667 3,778 719,064 17,977 737,041
Rp Rp
575,200 14,380
Rp Rp Rp Rp Rp
10,667 3,778 604,024 15,101 619,125
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
747,760 14,380
Rp Rp Rp Rp Rp
10,667 3,778 776,584 19,415 795,999
Rp Rp
460,160 14,380
Rp Rp Rp Rp Rp
10,667 3,778 488,984 12,225 501,209
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
805,280 14,380
Rp Rp Rp Rp Rp
10,667 3,778 834,104 20,853 854,957
Rp Rp
862,800 14,380
Rp Rp Rp Rp Rp
10,667 3,778 891,624 22,291 913,915
Rp Rp Rp
805,280 45,000 29,760
Rp Rp Rp Rp Rp
10,667 3,778 894,484 22,362 916,846
Rp Rp
5,225,044,874 104,500,897
Rp Rp Rp Rp Rp
10,667 4,533 5,329,560,971 133,239,024 5,462,799,996
Rp Rp
2,500,000 125,000
Rp Rp Rp Rp Rp
10,667 4,533 2,640,200 66,005 2,706,205
TOTAL HARGA
Rp
619,125
Rp
678,083
Rp
795,999
Rp
501,209
Rp
678,083
Rp
854,957
Rp
913,915
Rp
916,846
Rp
5,462,799,996
Rp
2,706,205
Analisa Harga Satuan Mekanikal dan Plumbing - page 268 of 280
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Radiator Ducting dan Flexible connection Radiator Ducting dan Flexible connection Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
SAT
INDEK
HARGA SATUAN
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
6,500,000 325,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan TerpasangUnit Diatas Pondasi1.00 Rp Instalasi ls 1.00 Rp Tenaga Kerja : Tukang Listrik hari 0.13 Rp Kepala Tukang Listrik hari 0.05 Rp
95,000,000 4,750,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25Unit Lpm 1.00 Instalasi ls 1.00 Tenaga Kerja : Tukang Listrik hari 0.13 Kepala Tukang Listrik hari 0.05
Rp Rp
45,000,000 2,250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Hand Pump 15 lpm Hand Pump 15 lpm Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Intake Attenuator Intake Attenuator Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Discharge Attenuator Discharge Attenuator Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Drop KIT CT-1000A Drop KIT CT-1000A Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
6,342,000 317,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,000,000 900,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
16,992,000 849,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
6,500,000 325,000
Rp Rp Rp Rp Rp
10,667 4,533 6,840,200 171,005 7,011,205
Rp Rp
95,000,000 4,750,000
Rp Rp Rp Rp Rp
10,667 4,533 99,765,200 2,494,130 102,259,330
Rp Rp
45,000,000 2,250,000
Rp Rp Rp Rp Rp
10,667 4,533 47,265,200 1,181,630 48,446,830
Rp Rp
6,342,000 317,100
Rp Rp Rp Rp Rp
10,667 4,533 6,674,300 166,858 6,841,158
Rp Rp
12,000,000 600,000
Rp Rp Rp Rp Rp
10,667 4,533 12,615,200 315,380 12,930,580
Rp Rp
18,000,000 900,000
Rp Rp Rp Rp Rp
10,667 4,533 18,915,200 472,880 19,388,080
Rp Rp
16,992,000 849,600
Rp Rp Rp Rp Rp
10,667 4,533 17,856,800 446,420 18,303,220
Rp
TOTAL HARGA 7,011,205
Rp
102,259,330
Rp
48,446,830
Rp
6,841,158
Rp
12,930,580
Rp
19,388,080
Rp
18,303,220
Analisa Harga Satuan Mekanikal dan Plumbing - page 269 of 280
HARGA SATUAN MEKANIKAL DAN PLUMBING PEKERJAAN PERENCANAAN NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 19 20 21 22 23 24 25 26 27 28 29 30 31
SATUAN URAIAN PEKERJAAN PLUMBING 1 UNIT Package Pompa Booster, Kapasitas : 200 Lpm 1 UNIT Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m 1 UNIT Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m 1 UNIT Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m 1 UNIT Package Pompa Submersible, Kapasitas : 150 Lpm 1 UNIT Package Pompa Submersible, kapasitas : 300 Lpm 1 UNIT Package Sewage Pump Kapasitas : 300 Lpm 1 UNIT Package Sewage Pump Kapasitas : 200 Lpm 1 UNIT Elektrik Water Heater (EWH) 1 UNIT Heat Pump Water Heater, kap. 25.5 kW 1 UNIT Heat Pump Water Heater, kap. 43 kW 1 UNIT Package Treatment Pump 150 Lpm 1 UNIT Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m 1 UNIT Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m 1 UNIT Pompa Return, kap. 3,1 M3/h - Head. 20,61 m 1 UNIT Pompa Return, kap. 5 M3/h - Head. 20 m 1 UNIT WTP (Water Treatment Plant) Include All 1 UNIT PANEL KONTROL POMPA 1 UNIT SAND FILTER 1 UNIT CARBON FILTER 1 BH Keran Taman Putar 1 BH Keran Taman Biasa 1 BH Keran Air Bersih & Air Panas (stailess) 1 UNIT Chemical Tank + Dosing Pump 1 UNIT GROUND TANK KAP. 120 m3 1 UNIT PRESSURE TANK KAP. 500 m3 1 UNIT PRESSURE TANK KAP. 1000 m3 1 UNIT PRESSURE TANK KAP. 1500 m3 1 UNIT PRESSURE TANK KAP. 2000 m3 1 UNIT PRESSURE TANK KAP. 3000 m3 1 BH FLOATING VALVE DIA. 20 MM (1/2") 1 BH FLOATING VALVE DIA. 25 MM (3/4") 1 BH FLOATING VALVE DIA. 32 MM (1") 1 BH FLOATING VALVE DIA. 50 MM (1 1/2") 1 BH FLOATING VALVE DIA. 63 MM (2") 1 BH Vent Out (VO) 1 SET WATER LEVEL CONTROL 1 BH FLEXIBLE JOINT DIA.80 MM' 1 BH FLEXIBLE JOINT DIA.65 MM' 1 BH FLEXIBLE JOINT DIA.50 MM' 1 BH FLEXIBLE JOINT DIA.32 MM' 1 BH STRAINER DIA.150 MM' 1 BH STRAINER DIA.100 MM' 1 BH STRAINER DIA.65 MM' 1 BH STRAINER DIA.40 MM' 1 BH STRAINER DIA.32 MM' 1 BH CHECK VALVE DIA.80 MM' 1 BH CHECK VALVE DIA.65 MM' 1 BH CHECK VALVE DIA.50 MM' 1 BH CHECK VALVE DIA.32 MM' 1 BH GATE VALVE DIA.20 MM /10 Kg 1 BH GATE VALVE DIA.32 MM /10 Kg 1 BH GATE VALVE DIA.50 MM /10 Kg 1 BH GATE VALVE DIA.65 MM /10 Kg 1 BH GATE VALVE DIA.80 MM /10 Kg 1 BH FLOOR CLEAN OUT DIA. 150 mm 1 BH FLOOR CLEAN OUT DIA. 100 mm 1 BH FLOOR CLEAN OUT DIA. 80 mm 1 BH FLOOR CLEAN OUT DIA. 65 mm 1 BH FLOOR CLEAN OUT DIA. 50 mm 1 UNIT TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM 1 UNIT TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM 1 UNIT TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,101,925 177,755,756 164,425,631 151,095,506 41,661,401 49,342,219 17,794,256 12,639,500 3,534,197 183,665,483 358,483,538 4,059,038 19,218,788 14,095,838 8,136,488 14,095,838 373,427,757 8,917,884 24,814,789 25,158,298 105,486 36,483 491,275 3,684,363 20,920,378 15,692,878 31,385,756 41,840,756 62,750,756 125,480,756 259,238 305,240 385,743 503,780 1,313,102 267,602 2,671,520 1,017,195 791,367 648,149 488,187 11,156,408 5,288,016 3,139,529 1,033,892 790,290 4,655,489 3,868,227 2,888,609 589,554 298,857 497,502 3,224,010 3,759,306 4,705,483 440,161 325,156 267,653 238,902 180,354 875,731,813 420,416,563 262,807,438
Harga Satuan MP - page 270 of 280
NO. 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
SATUAN 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH 1 BH 1 BH 1 BH 1 UNIT 1 BH 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT
URAIAN TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM TANKI AIR KAP.20 M3, PANEL FRV SYSTEM TANKI AIR KAP.18 M3, PANEL FRV SYSTEM TANKI AIR KAP.16 M3, PANEL FRV SYSTEM TANKI AIR KAP.15 M3, PANEL FRV SYSTEM TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM Roof Drain dia. 150 mm Roof Drain dia. 100 mm Roof Drain dia. 80 mm Roof Drain dia. 65 mm BAK KONTROL AAV SEPTIK TANK BIOLOGICAL SISTEM 50 m3 SEPTIK TANK BIOLOGICAL SISTEM 40 m3 SEPTIK TANK BIOLOGICAL SISTEM 20 m3 GREASE TRAP Water Hammer Water Meter Blower Aersai IPAL
PEKERJAAN FIRE FIGHTING 1 UNIT Package Diesel Fire Pump, Kapasitas : 1250 USGpm 1 UNIT Package Electric Fire Pump, Kapasitas 1250 USGpm 1 UNIT Package Jockey Fire Pump, Kapasitas : 50 Gpm 1 UNIT DIAPRAGHMA TANK Kap. 300 L 1 UNIT Bak Netralisasi 1 UNIT Bak Kontrol / Bak Sumpit 1 BH HORN BUZZER 1 UNIT DAILY TANK 200 LITER 1 UNIT HAND PUMP 1 BH NOZZLE PEMADAM KEBAKARAN dia.38 mm 1 BH NOZZLE PEMADAM KEBAKARAN dia.65 mm 1 BH FOOT VALVE dia. 65 mm 1 BH FOOT VALVE dia. 100 mm 1 BH FOOT VALVE dia. 150 mm 1 BH GATE VALVE DIA.25 MM / 20 K 1 BH GATE VALVE DIA.32MM / 20 K 1 BH GATE VALVE DIA.50 MM / 20 K 1 BH GATE VALVE DIA.65 MM / 20 K 1 BH GATE VALVE DIA.80 MM / 20 K 1 BH GATE VALVE DIA.100 MM / 20 K 1 BH GATE VALVE DIA.150 MM / 20 K 1 BH GATE VALVE DIA.200 MM / 20 K 1 BH Test Valve 100 mm 1 BH DRAIN VALVE 100 mm 1 BH FLASHING VALVE 100 mm 1 BH INDICATING VALVE 100 MM 1 BH LANDING VALVE/ KSSK dia. 150 MM 1 BH LANDING VALVE/ KSSK dia. 100 MM 1 BH SELENOID VALVE DIA.150 MM 1 BH SELENOID VALVE DIA.50 MM 1 BH PRESSURE GAUGE 1 BH PRESSURE SWITCH 1 BH SAFETY VALVE dia. 150 mm 1 BH SAFETY VALVE dia. 100 mm 1 BH SAFETY VALVE dia. 80 mm 1 BH SAFETY VALVE dia. 65 mm 1 BH PELAT ORIFICE 100 MM 1 BH FLOW SWITCH 1 BH SIGHTGLASS 1 BH PILLAR HYDRANT 1 BH SIAMISE CONNECTION 1 SET FIRE HOUSE CABINET / FHC ( INDOOR ) 1 SET FIRE HOUSE CABINET / FHC ( OUTDOOR ) 1 BH FIRE EXTINGUISHER 6KG 1 BH HEAD SPRINKLER 1 BH Alarm Heat Detector (HD)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 105,198,313 70,174,063 63,169,213 56,164,363 52,661,938 21,140,113 14,135,263 192,375 129,645 108,735 56,460 415,341 1,617,423 188,432,413 146,612,413 58,790,413 4,516,296 1,337,341 1,916,436 28,416,844
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
658,678,069 423,440,569 84,698,569 26,211,312 7,854,319 2,248,059 5,860,037 3,262,063 4,188,910 466,093 769,288 3,460,614 8,479,014 10,988,214 2,696,144 3,805,629 4,428,128 5,678,023 6,723,523 9,815,798 14,843,102 22,243,726 4,506,114 4,506,114 4,506,114 950,473 7,773,301 5,760,714 4,401,564 2,310,564 2,673,873 1,314,723 30,800,481 30,800,481 19,195,431 9,785,931 621,347 2,909,006 2,991,914 5,614,341 8,177,986 3,816,118 7,789,018 1,285,267 128,108 1,127,083
Harga Satuan MP - page 271 of 280
NO. 47 48 49 50 51 52 53 54 55 56 57 58 59 60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
SATUAN 1 BH 1 Unit 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH
URAIAN Head Springkler Supression (HS) Tabung Silinder Kap. 150 Kg (Fire Supression) FLEXIBLE JOINT DIA.150 MM' FLEXIBLE JOINT DIA.100 MM' FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.50 MM' CHECK VALVE DIA.50 MM' / 20 Kg CHECK VALVE DIA.65 MM' / 20 Kg CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 150 MM / 20K BRANCH CONTROL VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 100 mm
PEKERJAAN PIPA PPR, PVC, & BSP 1 M' PIPA PVC Dia. 2” (63mm) 1 M' PIPA PVC Dia. 2 1/2” (75mm) 1 M' PIPA PVC Dia. 3” (90mm) 1 M' PIPA PVC Dia. 4” (110mm) 1 M' PIPA PVC Dia. 6” (160mm) 1 M' PIPA PVC Dia. 8” (200mm) 1 M' PIPA PVC Dia. 10” (250mm) 1 M' PIPA BSP SCH.40 DIA. 1" (32mm) 1 M' PIPA BSP SCH.40 DIA. 1 1/4" (40mm) 1 M' PIPA BSP SCH.40 DIA. 2" (63mm) 1 M' PIPA BSP SCH.40 DIA. 2 1/2" (70mm) 1 M' PIPA BSP SCH.40 DIA. 3" (90mm) 1 M' PIPA BSP SCH.40 DIA. 4" (110mm) 1 M' PIPA BSP SCH.40 DIA. 6" (160mm) 1 M' PIPA BSP SCH.40 DIA. 8" (200mm) 1 M' PPR PN-10 Ø 20 mm ( 1/2") 1 M' PPR PN-10 Ø 25 mm ( 3/4") 1 M' PPR PN-10 Ø 32 mm ( 1") 1 M' PPR PN-10 Ø 40 mm (1 1/4") 1 M' PPR PN-10 Ø 50 mm (1 1/2") 1 M' PPR PN-10 Ø 63 mm (2") 1 M' PPR PN-10 Ø 75 mm (2 1/2") 1 M' PPR PN-10 Ø 90 mm (3") 1 M' PPR PN-10 Ø 110 mm (4") 1 M' PPR PN-10 Ø 125 mm (5") 1 M' PPR PN-10 Ø 160 mm (6") 1 M' PPR PN-20 Ø 20 mm ( 1/2") 1 M' PPR PN-20 Ø 25 mm ( 3/4") 1 M' PPR PN-20 Ø 32 mm ( 1") 1 M' PPR PN-20 Ø 40 mm (1 1/4") 1 M' PPR PN-20 Ø 50 mm (1 1/2") 1 M' PPR PN-20 Ø 63 mm (2") 1 M' PPR PN-20 Ø 75 mm (2 1/2") 1 M' PPR PN-20 Ø 90 mm (3") 1 M' PPR PN-20 Ø 110 mm (4") 1 M' PPR PN-20 Ø 125 mm (5") 1 M' PPR PN-20 Ø 160 mm (6") 1 BH PIPA HEADER Dia. 150 mm 1 BH PIPA HEADER Dia. 100 mm 1 BH PIPA HEADER Dia. 90 mm 1 BH PIPA HEADER Dia. 80 mm 1 BH PIPA HEADER Dia. 63 mm 1 BH PIPA HEADER Dia. 32 mm 1M PN 10 Diameter 10" (250 mm) + RRJ Power Lock 1M PN 10 Diameter 8" (200 mm) + RRJ Power Lock 1M PN 10 Diameter 6" (160 mm) + RRJ Power Lock 1M PN 10 Diameter 4" (110 mm) + RRJ Power Lock 1M PN 10 Diameter 3" (90 mm) + RRJ Power Lock 1M PN 10 Diameter 2" (63 mm) + RRJ Power Lock
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 467,913 51,608,814 2,240,541 1,152,175 819,706 802,978 641,971 3,940,524 4,149,624 4,537,504 5,792,104 4,432,954 5,687,554 8,196,754
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
37,395 49,755 65,820 100,093 214,300 352,537 539,405 57,016 75,466 118,148 183,415 238,552 334,953 577,801 877,614 13,697 19,159 28,966 42,694 64,473 101,736 154,041 219,423 330,573 1,200,694 778,441 20,008 29,490 44,859 69,044 101,736 163,849 245,576 363,264 526,720 522,559 1,245,924 6,642,091 3,232,915 1,333,543 936,680 664,067 189,255 1,361,976 1,209,012 1,012,007 845,761 649,784 367,876
PEKERJAAN TATA UDARA INDOOR (WALL MOUNTED - VRV) Harga Satuan MP - page 272 of 280
NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SATUAN URAIAN 1 UNIT kapasitas : 5 460 BTU/h - Wall Mounted 1 UNIT kapasitas : 7 510 BTU/h - Wall Mounted 1 UNIT kapasitas : 9 550 BTU/h - Wall Mounted 1 UNIT kapasitas : 12 280 BTU/h - Wall Mounted 1 UNIT kapasitas : 15 350 BTU/h - Wall Mounted 1 UNIT kapasitas : 19 110 BTU/h - Wall Mounted 1 UNIT kapasitas : 24 230 BTU/h - Wall Mounted INDOOR (CEILLING MOUNTED - VRV) 1 UNIT kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 2 Way Cassette Type 1 UNIT kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit 1 UNIT kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit INDOOR (WALL SPLIT - INVERTER) 1 UNIT kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) INDOOR (AHU[AIR HANDLING UNIT]) 1 UNIT Kapasitas : 85 000 BTU/h - AHU 1 UNIT Kapasitas : 95 000 BTU/h - AHU 1 UNIT Kapasitas : 114 000 BTU/h - AHU 1 UNIT Kapasitas : 125 000 BTU/h - AHU INDOOR (CEILING CONCEALED) 1 UNIT Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct OUTDOOR VRV 1 UNIT kapasitas : 95 500 BTU/h - OU 1 UNIT kapasitas : 114 600 BTU/h - OU 1 UNIT kapasitas : 133 800 BTU/h - OU 1 UNIT kapasitas : 152 900 BTU/h - OU 1 UNIT kapasitas : 229 200 BTU/h - OU 1 UNIT kapasitas : 248 400 BTU/h - OU 1 UNIT kapasitas : 267 500 BTU/h - OU 1 UNIT kapasitas : 286 600 BTU/h - OU 1 UNIT kapasitas : 305 700 BTU/h - OU 1 UNIT kapasitas : 363 100 BTU/h - OU 1 UNIT kapasitas : 382 200 BTU/h - OU 1 UNIT kapasitas : 401 300 BTU/h - OU 1 UNIT kapasitas : 420 400 BTU/h - OU 1 UNIT kapasitas : 496 800 BTU/h - OU 1 UNIT kapasitas : 515 900 BTU/h - OU 1 UNIT kapasitas : 535 000 BTU/h - OU 1 UNIT kapasitas : 592 400 BTU/h - OU 1 UNIT kapasitas : 763 000 BTU/h - OU 1 UNIT kapasitas : 821 700 BTU/h - OU 1 UNIT kapasitas : 859 900 BTU/h - OU AKSESORIS PENDUKUNG AC 1 BH Y - Branch 1M PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI 1M PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI
Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 5,638,581 5,728,373 5,903,875 6,083,458 6,169,168 7,760,926 8,201,722
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,273,264 28,175,790 29,534,540 21,527,732 14,501,188 14,850,378 15,199,567 15,843,526 17,740,637 17,740,638 17,844,940 18,325,643 28,967,602 19,024,021 19,844,843 20,933,225
Rp Rp Rp Rp Rp
5,780,831 5,923,357 5,923,357 8,061,251 11,144,319
Rp Rp Rp Rp
99,736,339 108,669,600 116,486,202 129,949,901
Rp Rp Rp Rp Rp Rp Rp
8,046,627 8,205,803 8,769,041 10,613,849 11,997,455 25,584,547 26,564,091
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
59,746,146 70,521,130 79,051,326 204,892,503 141,007,487 149,537,683 158,516,837 400,343,501 430,654,083 211,044,886 220,024,040 233,492,771 246,512,544 290,510,397 303,979,128 737,940,678 798,561,843 1,045,227,273 1,105,848,438 1,158,108,063
Rp Rp Rp
2,208,160 278,272 278,272
Harga Satuan MP - page 273 of 280
NO. 61 62 63 64 65 66 67 68 69 70 71 72 73 74 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1
SATUAN 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1 SET 1 SET 1 BH 1 BH 1 BH 1 M' 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 UNIT 1 UNIT 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 TTK 1 TTK 1 TTK 1M 1 UNIT 1 UNIT
URAIAN PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 1/2 INCH Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 41 PIPA DRAIN (AC) AC MANAGER 5 ACP 5 AHU Comm. Kit EEV Kit 4-10HP EEV Kit 12-20HP TVX Kit for 18-26 HP TVX Kit for 28-36 HP Standard 3 Wired Remocon Wireless Remocon DIFFUSER SUPPLY GRILLE ALUMUNIUM DIFFUSER RETURN GRILLE ALUMUNIUM DIFFUSER FRESH AIR GRILLE ALUMUNIUM DIFFUSER EXHAUST GRILLE ALUMUNIUM BOX DIFFUSER PERPORATE STAINLESS STEEL LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL DAMPER RETURN DAMPER FRESH AIR DAMPER EXHAUST DAMPER SUPPLY Pre-Filter (G-4) Medium filter (F-9) HEPA filter ( H-13) TITIK INSTALASI INDOOR UNIT AC TITIK INSTALASI OUTDOOR UNIT AC TITIK INSTALASI KRITIKAL UNIT AC KABEL LEADER (Kabel Indoor to Outdoor) AC Smart 5 AC EZ Touch
PEKERJAAN EXHAUST Axial Fan Inline 1 UNIT Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Wall Fan Type 1 UNIT Exhaust Fan , Kapasitas : 100 CFM/ Wall Type
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 193,586 193,586 193,586 193,586 315,910 324,274 315,910 315,910 426,733 410,005 410,005 477,962 410,005 410,005 181,040 697,601 922,384 1,842,809 2,346,687 5,624,016 114,253 60,496,517 43,868,519 7,767,091 4,342,332 6,551,854 16,968,170 20,731,970 1,863,357 1,139,604 1,020,985 1,020,985 1,011,732 1,011,732 96,881,007 8,905,257 3,677,757 3,677,757 3,677,757 3,677,757 614,442 1,900,407 9,950,757 730,174 3,911,838 730,174 421,781 29,670,995 17,518,626
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,428,114 6,560,934 7,752,804 8,317,374 11,328,414 15,092,214 25,129,014 31,402,014 38,929,614 45,202,614 60,257,814 75,313,014 100,405,014 150,589,014
Rp
1,239,339
Harga Satuan MP - page 274 of 280
NO. 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1 2 3 4 1 2 3 4 5 6 7
SATUAN URAIAN 1 UNIT Exhaust Fan , Kapasitas : 150 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 200 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 250 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 300 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 350 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 400 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 450 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 500 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 600 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 800 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 950 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Inline Fan Type 1 UNIT Exhaust Fan , Kapasitas : 5000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 3000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 950 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 750 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 650 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 550 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 450 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 350 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 250 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 150 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 70 CFM / Inline Type ERV 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Booster Fan 1 UNIT Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 1,840,501 2,441,664 3,042,826 3,643,989 4,657,714 4,846,314 5,447,476 6,048,639 7,250,964 9,655,614 10,256,776 11,459,101 14,464,914
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
57,539,514 34,538,514 33,388,464 32,238,414 29,938,314 29,938,314 28,788,264 27,638,214 26,488,164 25,338,114 24,188,064 23,038,014 21,887,964 20,737,914 19,587,864 18,437,814 17,287,764 16,137,714 12,687,564 13,307,689 12,687,564 11,528,260 10,953,235 10,378,210 9,803,185 9,228,160 8,653,135 8,078,110 7,503,085 6,928,060 6,353,035 5,778,010 5,202,985 4,627,960 4,250,248 3,477,910 2,902,885 2,327,860 1,752,835 1,177,810 832,795
Rp Rp Rp Rp
21,992,514 30,879,264 30,879,264 62,767,014
Rp Rp Rp Rp Rp Rp Rp
2,392,368 6,202,045 8,414,892 10,318,234 12,376,329 14,434,424 20,995,589
Harga Satuan MP - page 275 of 280
NO. 8 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SATUAN URAIAN 1 UNIT Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer DUCTING c/w OBD (Finishing Cat Powder Coating) [Terisolasi] DUCTING BJLS SUPPLY Supply Air Diffuser 44" x 38" 1 M' Supply Air Diffuser 44" x 36" 1 M' Supply Air Diffuser 40" x 34" 1 M' Supply Air Diffuser 36" x 34" 1 M' Supply Air Diffuser 34" x 30" 1 M' Supply Air Diffuser 32" x 28" 1 M' 1 M' Supply Air Diffuser 30" x 30" 1 M' Supply Air Diffuser 30" x 24" 1 M' Supply Air Diffuser 28" x 28" 1 M' Supply Air Diffuser 28" x 24" 1 M' Supply Air Diffuser 28" x 22" 1 M' Supply Air Diffuser 28" x 20" 1 M' Supply Air Diffuser 26" x 26" 1 M' Supply Air Diffuser 26" x 24" 1 M' Supply Air Diffuser 26" x 16" 1 M' Supply Air Diffuser 24" x 24" 1 M' Supply Air Diffuser 24" x 20" 1 M' Supply Air Diffuser 22" x 22" 1 M' Supply Air Diffuser 22" x 20" 1 M' Supply Air Diffuser 22" x 18" 1 M' Supply Air Diffuser 20" x 20" 1 M' Supply Air Diffuser 20" x 18" 1 M' Supply Air Diffuser 20" x 12" 1 M' Supply Air Diffuser 18" x 18" 1 M' Supply Air Diffuser 18" x 16" 1 M' Supply Air Diffuser 18" x 14" 1 M' Supply Air Diffuser 18" x 12" 1 M' Supply Air Diffuser 16" x 16" 1 M' Supply Air Diffuser 16" x 14" 1 M' Supply Air Diffuser 16" x 12" 1 M' Supply Air Diffuser 16" x 10" 1 M' Supply Air Diffuser 14" x 12" 1 M' Supply Air Diffuser 14" x 10" 1 M' Supply Air Diffuser 12" x 12" 1 M' Supply Air Diffuser 12" x 10" 1 M' Supply Air Diffuser 12" x 8" 1 M' Supply Air Diffuser 10" x 10" 1 M' Supply Air Diffuser 10" x 8" 1 M' Supply Air Diffuser 8" x 8" 1 M' Supply Air Diffuser 8" x 6" 1 M' Supply Air Diffuser 6" x 6" DUCTING BJLS RETURN 1 M' Return Air Grille 40" x 36" 1 M' Return Air Grille 40" x 34" 1 M' Return Air Grille 40" x 32" 1 M' Return Air Grille 34" x 32" 1 M' Return Air Grille 32" x 34" 1 M' Return Air Grille 24" x 20" 1 M' Return Air Grille 36" x 32" 1 M' Return Air Grille 34" x 30" 1 M' Return Air Grille 32" x 28" 1 M' Return Air Grille 30" x 24" 1 M' Return Air Grille 28" x 28" 1 M' Return Air Grille 28" x 24" 1 M' Return Air Grille 26" x 26" 1 M' Return Air Grille 24" x 24" 1 M' Return Air Grille 24" x 22" 1 M' Return Air Grille 24" x 16" 1 M' Return Air Grille 22" x 22" 1 M' Return Air Grille 22" x 20" 1 M' Return Air Grille 22" x 18" 1 M' Return Air Grille 20" x 20" 1 M' Return Air Grille 20" x 18"
Rp Rp
HARGA SATUAN 30,436,037 39,792,430
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843
Harga Satuan MP - page 276 of 280
NO. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1 2 3 4
SATUAN 1 M' Return Air Grille 20" x 16" 1 M' Return Air Grille 18" x 18" 1 M' Return Air Grille 18" x 16" 1 M' Return Air Grille 18" x 14" 1 M' Return Air Grille 16" x 16" 1 M' Return Air Grille 16" x 14" 1 M' Return Air Grille 16" x 12" 1 M' Return Air Grille 15" x 10" 1 M' Return Air Grille 14" x 14" 1 M' Return Air Grille 14" x 12" 1 M' Return Air Grille 14" x 10" 1 M' Return Air Grille 12" x 12" 1 M' Return Air Grille 12" x 10" 1 M' Return Air Grille 12" x 8" 1 M' Return Air Grille 10" x 10" 1 M' Return Air Grille 10" x 8" 1 M' Return Air Grille 8" x 8" 1 M' Return Air Grille 8" x 6" 1 M' Return Air Grille 6" x 6" DUCTING BJLS FRESH AIR 1 M' Fresh Air Louvre 32" x 28" 1 M' Fresh Air Louvre 24" x 20" 1 M' Fresh Air Louvre 22" x 14" 1 M' Fresh Air Louvre 20" x 18" 1 M' Fresh Air Louvre 20" x 16" 1 M' Fresh Air Louvre 18" x 16" 1 M' Fresh Air Louvre 16" x 16" 1 M' Fresh Air Louvre 14" x 14" 1 M' Fresh Air Louvre 14" x 12" 1 M' Fresh Air Louvre 14" x 10" 1 M' Fresh Air Louvre 12" x 12" 1 M' Fresh Air Louvre 10" x 10" 1 M' Fresh Air Louvre 10" x 8" 1 M' Fresh Air Louvre 8" x 8" 1 M' Fresh Air Louvre 8" x 6" VOLUME DAMPER 1 M' Volume Damper 14" x 14" 1 M' Volume Damper 12" x 12" 1 M' Volume Damper 10" x 10" 1 M' Volume Damper 8" x 8"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DUCTING EXHAUST BJLS 1 M' Ducting 6'' x 4'' 1 M' Ducting 6'' x 6'' 1 M' Ducting 8'' x 3'' 1 M' Ducting 8'' x 6'' 1 M' Ducting 8'' x 8'' 1 M' Ducting 10'' x 6'' 1 M' Ducting 10'' x 7'' 1 M' Ducting 10'' x 8'' 1 M' Ducting 10'' x 10'' 1 M' Ducting 12'' x 4'' 1 M' Ducting 12'' x 6'' 1 M' Ducting 12'' x 8'' 1 M' Ducting 12'' x 10'' 1 M' Ducting 12'' x 12'' 1 M' Ducting 14'' x 10'' 1 M' Ducting 14'' x 12'' 1 M' Ducting 14'' x 14'' 1 M' Ducting 16'' x 10'' 1 M' Ducting 16'' x 12'' 1 M' Ducting 16'' x 14'' 1 M' Ducting 16'' x 16'' 1 M' Ducting 18'' x 12'' 1 M' Ducting 18'' x 14'' 1 M' Ducting 18'' x 16'' 1 M' Ducting 18'' x 18'' 1 M' Ducting 20'' x 14''
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
URAIAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281
Rp Rp Rp Rp
763,015 656,251 459,943 299,797
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
98,707 135,996 80,062 135,996 173,286 135,996 154,641 173,286 210,575 98,707 135,996 173,286 210,575 247,865 239,634 282,459 325,283 282,459 282,459 325,283 368,108 325,283 325,283 368,108 410,932 365,115
Harga Satuan MP - page 277 of 280
NO. 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
SATUAN 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 UNIT
Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting
20'' x 16'' 20'' x 18'' 20'' x 20'' 22'' x 16'' 22'' x 18'' 22'' x 20'' 22'' x 22'' 24'' x 20'' 24'' x 22'' 24'' x 24'' 26'' x 20'' 26'' x 22'' 26'' x 26'' 28'' x 16'' 28'' x 22'' 28'' x 28'' 30'' x 30'' 40' x 28'' HOOD SUS - 304
URAIAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 413,433 461,752 510,070 401,354 449,672 619,125 678,083 737,041 678,083 737,041 619,125 678,083 795,999 501,209 678,083 854,957 913,915 916,846 5,297,080
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 30 31 32
Reverse Osmosis (RO) 1 UNIT Pompa tekan RO ( Stainless Steel ), lengkap accesories 1 UNIT Stronge Tank SS304, Volume 2000 Litter 1 UNIT Membran Filter Lengkap dengan accessories Pipa Stainless Steel 304 Sch.10 ( 20 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 32 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 40 mm ) 1 M' 1 M' Pipa Stainless Steel 304 Sch.10 ( 50 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 65 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 100 mm ) 1 UNIT High Pressure Pump 1 UNIT Membrane 4" x 40" - 1500 GPD 1 UNIT Housing FRP 1 UNIT Permeate & Concentrate Rotameter 1 UNIT System Pressure Gauge 1 UNIT Recyle Valve 1 UNIT Low Pressure Switch 1 UNIT Solenoid Valve 3/4" 1 UNIT TDS Monitor 1 UNIT Cartridge Filter 1 UNIT Piping & Interconnecting 1 LOT Frame 1 LOT Aksesoris 1 UNIT Stronge Tank SS304, Volume 1000 Litter 1 UNIT Stronge Tank SS304, Volume 2000 Litter 1 UNIT Pompa Distribusi Kap. 10 Lpm, Head 32 m 1 UNIT Pompa Isap Kap. 10 Lpm, Head 32 m 1 UNIT Housing Catridge 10", in/out 3/4" 1 UNIT Housing Catridge 10", in/out 4" 1 LOT Granular Resin Mixed Bed 1 UNIT Ultra Voilet Sterlight 5 GPM, 30 Watt 1 SET Control Panel Indoor 1 LOT Cabling 1 LOT Installation 1 LOT Test Run & Commisioning
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
27,260,900 11,553,083 31,442,900 62,012 123,000 138,334 172,117 229,499 356,700 13,078,488 18,096,888 13,078,488 7,328,238 745,483 1,163,683 2,937,138 1,891,638 32,942,988 14,437,638 7,326,290 2,098,790 4,396,943 5,802,833 11,553,083 8,821,150 8,821,150 13,074,593 6,487,943 2,828,693 5,893,750 9,886,125 575,333 6,188,950 2,053,958
1 2 3 4 5 6 7 8 9 10 11
GAS MEDIS 1 SET Sentral Oxygen Automatic System Kap. 2x10 cyl 1 SET Sentral N2O Automatic System Kap. 2x2 cyl 1 SET Oil Free Air Compressor - Duplex 1 SET Vacuum Pump Duplex System 1 SET Master Alarm 10 function 1 SET Alarm System for 4 Gases 1 SET Zone Valve for 4 gases 1 SET Alarm System for 3 Gases 1 SET Zone Valve for 3 gases 1 SET Alarm System for 2 Gases 1 SET Zone Valve for 2 gases
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
295,134,400 266,705,000 815,769,210 443,394,500 56,180,250 32,800,000 20,787,000 27,347,000 15,580,000 19,147,000 10,455,000
Harga Satuan MP - page 278 of 280
NO. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
SATUAN 1 SET 1 SET 1 SET 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 SET 1 SET 1 SET 1 M'
URAIAN Alarm System for 1 Gases Zone Valve for 1 gases Gas Medis For Oxygen Gas Medis For Valve Gas Medis For Gas Medis Wall Outlet Gas Medis For Oxygen DISS Gas Medis For N2O DISS Gas Medis For Air DISS Gas Medis for VACUM DISS Gas Medis for CO2 DISS Gas Medis for N20 Gas Medis For Vacum Gas Medis For AGSS Gas Medis For Compress Air Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Area Alarm Instalasi Zone Valve Instalasi Gas Medis Wall Outlet Instalasi Pipa Gas
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 10,947,000 5,494,000 1,310,770 1,310,770 1,310,770 1,517,000 1,517,000 1,517,000 1,517,000 1,517,000 1,310,770 1,310,770 1,310,770 1,310,770 902,000 856,900 346,409 346,409 346,409 229,067 179,580 127,100 90,461 484,000 451,000 615,000 615,000 451,000 1,435,000 1,230,000 287,000 61,500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
PNEUMATIC TUBE 1 SET Blower Rp 192,660,486 1 LOT Skyrail V1 Software license package 10 units Rp 32,298,801 1 PCS Bus Converter Rp 17,241,551 1 PCS Power Pack 230V - 36VDC Rp 12,175,488 1 UNIT PC Win. 10, 64 Bit Rp 14,873,801 1 UNIT LG LED Monitor 19" Rp 8,467,551 1 UNIT UPS c/w Battery Back-up Rp 18,768,801 1 UNIT 3-way Diverter NW110 Rp 38,038,801 1 UNIT 3-way Diverter NW110 (Transfer Unnit) Rp 38,038,801 1 UNIT Optical tube switch Rp 2,199,676 1 UNIT Compact Station NW110 with PCB - 10" Touch Screen Display Rp 51,158,801 1 UNIT Topload (Through) Station NW110 with PCB - 10" Touch Screen Display Rp 55,120,426 1 UNIT Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display Rp 158,881,176 1 UNIT Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display Rp 65,298,676 1 UNIT V-piece with valve Rp 2,025,426 1 UNIT Arrival signal Rp 2,271,426 1 UNIT Carrier rack up to NW110 Rp 1,395,051 1 UNIT Receiving basket up to NW110 Rp 2,456,951 1 UNIT Upholstery for carrier basket Rp 1,313,051 1 UNIT Carrier NW110, 330 x 76 - red/blue/green/yellow Rp 1,651,301 1 UNIT Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test Rp tube (1 pcs/station) 2,112,551 1M Forwarding Tube PVC 110 x 2.3 - light grey Rp 160,438 1 PCS Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey Rp 612,028 1 PCS Sleeve PVC 110 x 2.3 L=110 - light grey Rp 56,503 1M PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Rp 1,554,541 1 LOT Material support Rp 85,094,142 1M Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC Rp HI 20mm 262,528 1 PCS Wall chasing, sparing, and finishing Rp 781,819 1 PCS Floor coring Rp 1,806,819
1 2 3
ELEVATOR 1 UNIT BED ELEVATOR 1 UNIT BED ELEVATOR 1 UNIT PASSENGER ELEVATOR
Rp Rp Rp
873,458,875 629,406,375 800,868,375
Harga Satuan MP - page 279 of 280
NO. 4 5 6 7 8 1 2 3 4 5 6 7 8 9
SATUAN 1 UNIT 1 UNIT 1 UNIT 1 LS 1 SET
DUMB WAITER 200 DUMB WAITER 50 ESCALATOR Earthquake device Mimic Panel ( Supervisory Panel )
URAIAN
GENSET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT
GENSET 1600 KvA, 50 Hz, 220/380 Volt Rp 5,462,799,996 Radiator Ducting dan Flexible connection Rp 7,011,205 Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Rp Pondasi 102,259,330 Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Rp 48,446,830 Hand Pump 15 lpm Rp 6,841,158 Intake Attenuator Rp 12,930,580 Discharge Attenuator Rp 19,388,080 Pemindahan Genset ke Pondasi Rp 2,706,205 Drop KIT CT-1000A Rp 18,303,220
Rp Rp Rp Rp Rp
HARGA SATUAN 160,643,125 135,274,375 567,055,625 13,936,361 5,136,736
Harga Satuan MP - page 280 of 280
Jumlah
JUMLAH REKAPITULASI PEKERJAAN UTILITAS RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO. A.
URAIAN PEKERJAAN
JUMLAH HARGA
PEKERJAAN UTILITAS PEKERJAAN MEKANIKAL PLUMBING I.
PERALATAN UTAMA AIR BERSIH DAN PEMIPAAN SITE
Rp
2,113,634,567.21
II.
PEKERJAAN AIR KOTOR, AIR BEKAS & VENT
Rp
562,556,486.15
III.
PIPA BUANGAN AIR HUJAN
Rp
47,422,128.96
IV.
PEKERJAAN SUMUR (DEEP WELL)
Rp
302,315,550.00
V.
PERALATAN UTAMA POMPA KEBAKARAN DAN INSTALASI HYDRANT
Rp
3,000,017,774.38
VI.
SENTRAL GAS MEDIS
Rp
2,589,409,017.50
Rp
8,615,355,524.20
JUMLAH A.PEKERJAAN MEKANIKAL PLUMBING B.
PEKERJAAN SUMBER DAYA LISTRIK DAN KABEL UTAMA I.
PEKERJAAN DAYA LISTRIK DAN KABEL
Rp
2,114,329,174.52
II.
PEKERJAAN GENSET
Rp
4,357,444,330.00
III.
PEKERJAAN PENERANGAN SITE
Rp
JUMLAH B.PEKERJAAN SUMBER DAYA LISTRIK DAN KABEL UTAMA
-
Rp
6,471,773,504.52
JUMLAH PEKERJAAN NON STANDAR Rp
15,087,129,028.72
Rekapitulasi Pekerjaan Site Development Dan Utilitas
PEKERJAAN UTILITAS RINCIAN RENCANA ANGGARAN BIAYA RSUD KOTA PROBOLINGGO TAHUN ANGGARAN 2021
NO.
URAIAN PEKERJAAN
1. 2. A. PEKERJAAN MEKANIKAL PLUMBING I. PERALATAN UTAMA AIR BERSIH DAN PEMIPAAN SITE 1. SISTEM AIR BERSIH a. RESERVOIR / GWT - Reservoir + Dudukan kapasitas : 250 M3 Material : Fibre Type : Panel Gate valve dia. 50 mm (Dari Reservoir RWT ke Reservoir GWT) - Gate valve dia. 65 mm (Dari Reservoir ke Header) - Gate valve dia. 65 mm (Dari Header ke Pompa Air Bersih) - Gate valve dia. 80 mm (Dari Reservoir ke Pipa Kuras) - Check valve diameter 65 mm (Dari Header ke Pompa Air Bersih) - Strainer dia. 65 mm (Dari Header ke Pompa Air Bersih) - Water Meter (Dari Deep Well ke Reservoir) - Header dimeter 100 mm - Water Level Control ( WLC ) - Pipa Kuras dia. 80 mm b. RESERVOIR / RWT - Reservoir + Dudukan kapasitas : 18 M3 Material : Fibre Type : Panel Gate valve dia. 50 mm (Dari Deep Well ke Reservoir) - Gate valve dia. 65 mm (Dari Reservoir ke Header) - Gate valve dia. 65 mm (Dari Header ke Pompa Air Bersih) - Gate valve dia. 80 mm (Dari Reservoir ke Pipa Kuras) - Check valve diameter 65 mm (Dari Header ke Pompa Air Bersih) - Strainer dia. 65 mm (Dari Header ke Pompa Air Bersih) - Water Meter (Dari Deep Well ke Reservoir) - Header dimeter 100 mm - Water Level Control ( WLC ) - Pipa Kuras dia. 80 mm c. POMPA TRANSFER POMPA RWT TO GWT - Packaged Pompa Air Bersih (1 Unit Operasi / 1 Stand By) Kapasitas : 300 l/menit Head : 40 meter Putaran : 1500 Rpm Type : Centrifugal end Suction Gate valve dia. 65 mm - Strainer dia. 65 mm Check valve dia. 65 mm Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) POMPA GWT TO GEDUNG D1, F1, dan D2 - Packaged Pompa Air Bersih (1 Unit Operasi / 1 Stand By) Kapasitas : 300 l/menit Head : 120 meter Putaran : 1500 Rpm Type : Centrifugal end Suction Gate valve dia. 65 mm - Strainer dia. 65 mm Check valve dia. 65 mm Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) POMPA GWT TO GEDUNG C1 - Packaged Pompa Air Bersih (1 Unit Operasi / 1 Stand By) Kapasitas : 300 l/menit Head : 75 meter Putaran : 1500 Rpm Type : Centrifugal end Suction Gate valve dia. 65 mm - Strainer dia. 65 mm Check valve dia. 65 mm Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) POMPA GWT TO GEDUNG B - Packaged Pompa Air Bersih (1 Unit Operasi / 1 Stand By) Kapasitas : 300 l/menit Head : 75 meter Putaran : 1500 Rpm Type : Centrifugal end Suction Gate valve dia. 65 mm - Strainer dia. 65 mm Check valve dia. 65 mm Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel) POMPA GWT TO GEDUNG C2 - Packaged Pompa Air Bersih (1 Unit Operasi / 1 Stand By) Kapasitas : 300 l/menit Head : 75 meter Putaran : 1500 Rpm Type : Centrifugal end Suction Gate valve dia. 65 mm - Strainer dia. 65 mm Check valve dia. 65 mm Fleksible valve dia. 65 mm - Header dimeter 100 mm - Instalasi Daya Listrik Pompa (Electric Control Panel)
SATUAN
VOLUME
3.
4.
HARGA SATUAN
JUMLAH HARGA
(Rp) 5.
(Rp) 6 = (4. X 5.)
unit
1.00
867,147,437.50
867,147,437.50
bh bh bh bh bh bh bh bh set m'
2.00 1.00 2.00 1.00 2.00 2.00 1.00 1.00 1.00 30.00
3,224,009.94 3,759,305.94 3,759,305.94 4,705,483.44 3,868,227.00 3,139,528.88 1,916,435.67 3,589,821.11 2,671,520.03 154,041.27
6,448,019.89 3,759,305.94 7,518,611.89 4,705,483.44 7,736,454.00 6,279,057.75 1,916,435.67 3,589,821.11 2,671,520.03 4,621,238.13
unit
1.00
63,169,212.50
63,169,212.50
bh bh bh bh bh bh bh bh set m'
2.00 1.00 2.00 1.00 2.00 2.00 1.00 1.00 1.00 30.00
3,224,009.94 3,759,305.94 3,759,305.94 4,705,483.44 3,868,227.00 3,139,528.88 1,916,435.67 3,589,821.11 2,671,520.03 154,041.27
6,448,019.89 3,759,305.94 7,518,611.89 4,705,483.44 7,736,454.00 6,279,057.75 1,916,435.67 3,589,821.11 2,671,520.03 4,621,238.13
unit
1.00
159,982,256.25
159,982,256.25
bh bh bh bh bh ttk
2.00 1.00 1.00 2.00 1.00 1.00
3,759,305.94 3,139,528.88 3,868,227.00 802,978.17 3,589,821.11 8,917,884.38
7,518,611.89 3,139,528.88 3,868,227.00 1,605,956.33 3,589,821.11 8,917,884.38
unit
1.00
188,210,756.25
188,210,756.25
bh bh bh bh bh ttk
2.00 1.00 1.00 2.00 1.00 1.00
3,759,305.94 3,139,528.88 3,868,227.00 802,978.17 3,589,821.11 8,917,884.38
7,518,611.89 3,139,528.88 3,868,227.00 1,605,956.33 3,589,821.11 8,917,884.38
unit
1.00
174,096,506.25
174,096,506.25
bh bh bh bh bh ttk
2.00 1.00 1.00 2.00 1.00 1.00
3,759,305.94 3,139,528.88 3,868,227.00 802,978.17 3,589,821.11 8,917,884.38
7,518,611.89 3,139,528.88 3,868,227.00 1,605,956.33 3,589,821.11 8,917,884.38
unit
2.00
174,096,506.25
Tidak Dikerjakan
bh bh bh bh bh ttk
4.00 2.00 2.00 4.00 1.00 2.00
3,759,305.94 3,139,528.88 3,868,227.00 802,978.17 3,589,821.11 8,917,884.38
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
unit
2.00
174,096,506.25
Tidak Dikerjakan
bh bh bh bh bh ttk
4.00 2.00 2.00 4.00 1.00 2.00
3,759,305.94 3,139,528.88 3,868,227.00 802,978.17 3,589,821.11 8,917,884.38
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
Pek. Site Development Dan Utilitas - page 2 of 211
NO.
URAIAN PEKERJAAN d.
SATUAN
VOLUME
HARGA SATUAN (Rp) 395,389,028.73
WATER TREATMENT PLANT ( WTP ) set 1.00 Include : - Filter Pump - Sand Filter - Carbon Filter - Dosing Pump - Valve - Header - Instalasi & Penunjang POMPA TREATMENT - Pompa WTP (Water Treatment Plant) x2 (1 Stand By, 1 Operasi) Head : 30 meter Kapasitas : 150 l/menit Type : Centrifugal End Suction Putaran : 2950 Rpm - Instalasi Daya Listrik Pompa (Electric Control Panel) f. Pemipaan Polypropelyne PN-10 - Pipa Distribusi Dari Deep Well ke WTP, PPR dia. 65 mm m' 20.00 101,735.52 - Pipa Distribusi Dari WTP ke RWT, PPR dia. 65 mm m' 25.00 101,735.52 - Pipa Distribusi Dari RWT ke Header Pompa, PPR dia. 65 mm m' 15.00 101,735.52 - Pipa Distribusi Dari Header Pompa ke GWT, PPR dia. 65 mm m' 30.00 101,735.52 - Pipa Distribusi Dari Pompa ke Gedung D1, F1 dan D2, PPR dia. 80 mm m' 200.00 154,041.27 - Pipa Distribusi Dari Pompa ke Gedung C1, PPR dia. 50 mm m' 80.00 64,473.33 - Pipa Distribusi Dari Pompa ke Gedung B, PPR dia. 50 mm m' 80.00 64,473.33 - Pipa Distribusi Dari Pompa ke Gedung C2, PPR dia. 50 mm m' 80.00 64,473.33 - Pipa Distribusi Dari Pompa ke Gedung F2, F3, PPR dia. 50 mm m' 200.00 64,473.33 - Pipa Distribusi Dari Pompa ke Gedung F5, F4, dan G3, PPR dia. 50 mm m' 200.00 64,473.33 JUMLAH I.PERALATAN UTAMA AIR BERSIH DAN PEMIPAAN SITE II. PEKERJAAN AIR KOTOR, AIR BEKAS & VENT 1. Packaged Septick Tack Biotech - (Belum Termasuk IPLC (Izin Pembuangan Limbah Cair)) unit 1.00 188,432,412.50 Bahan : FRP (Fibreglass) Tank Kapasitas : 200m3 - (36m3), 4 Segmen Include : - Inlet + Outlet Pipe - Ventilation Pipe - Mainholes + Cover - Disinfectant Feeder - Honeycomb PVC 2. Bak Kontrol/Sewage - Kapasitas 8m3 (Dari Pipa Per-Gedung ke Septick Tank) unit 2.00 2,248,059.23 - Kapasitas 12m3 (Dari Pipa Gedung D1,D2 dan F1 ke Arah Septick Tank) unit 1.00 4,496,118.47 3. Sewage Pump Kap. 300 Lpm unit 6.00 18,839,756.25 4. Rumah Blower unit 1.00 PEK.SIPIL 5. Blower IPAL unit 2.00 28,416,843.75 6. Gate valve diameter 150 mm / 20 K bh 4.00 14,843,102.22 7. Gate valve diameter 100 mm / 20 K bh 5.00 9,815,798.38 8. Pemipaan Air kotor Padat PVC Kelas 10 kg/cm2 : - Dari Gedung D1,D2 dan F1 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 150.00 236,948.82 - Dari Gedung C1 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 100.00 236,948.82 - Dari Gedung B ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 80.00 236,948.82 - Dari Gedung C2 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 65.00 236,948.82 - Dari Gedung F2, F3 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 65.00 236,948.82 - Dari Gedung F5 dan G3 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 150 mm m' 30.00 236,948.82 9. Pemipaan Air kotor bekas PVC Kelas 10 kg/cm2 : - Dari Gedung D1,D2 dan F1 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 150.00 110,284.02 - Dari Gedung C1 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 100.00 110,284.02 - Dari Gedung B ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 80.00 110,284.02 - Dari Gedung C2 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 65.00 110,284.02 - Dari Gedung F2, F3 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 65.00 110,284.02 - Dari Gedung F5 dan G3 ke Bak Kontrol (Sistem Biofiltration (IPAL)) Diameter 100 mm m' 30.00 110,284.02 JUMLAH II.PEKERJAAN AIR KOTOR, AIR BEKAS & VENT III. PIPA BUANGAN AIR HUJAN 1. Pipa buangan air hujan ke Saluran - PVC AW Diameter 100 mm (Dari Gedung D1, D2 dan F ke Saluran) m' 300.00 110,284.02 - PVC AW Diameter 100 mm (Dari Gedung C1 ke Saluran) m' 130.00 110,284.02 - PVC AW Diameter 100 mm (Dari Gudang B ke Saluran) m' 130.00 110,284.02 - PVC AW Diameter 100 mm (Dari Gudang C2 ke Saluran) m' 130.00 110,284.02 - PVC AW Diameter 100 mm (Dari Gudang F2, F3 ke Saluran) m' 120.00 110,284.02 - PVC AW Diameter 100 mm (Dari Gudang F5, F4, G3 dan G2 ke Saluran) m' 100.00 110,284.02 JUMLAH III.PIPA BUANGAN AIR HUJAN IV. PEKERJAAN SUMUR (DEEP WELL) 1. Sumur Dalam (Deep well) ls 302,315,550.00 1.00 JASA PENGEBORAN a. Persiapan Lapangan Mobilisasi & Demobilisasi Peralatan Pembuatan Spull bak / Bak sirkulasi b. Jasa Kontruksi Jasa Bor pilot hole dia 8" Reaming Bor Hole dia. 12" Tenaga kerja ( 5 orang x 60 hari ) Solar/olie/bensin/bahan las Air Kerja Buang Lumpur Bor Electrical Logging Spolling ( Pemberesihan sumur ) c. Lain - Lain Pumping Test ( 3 hari x 8 jam ) Analisa Air Bersih Foto dan Laporan Pemasangan pompa MATERIAL a. Pompa Deepwell Kapasitas : 150 ltr/mnt - Head : 150 m b. Pipa GIP Medium,dia. 6 " c. Pipa GIP Medium,dia. 3 " d. Screen Stainless Steel, dia. 3 " e. Dop dia. 3 " f. Reducer 6 " x 3 " g. Gravel h. Tutup Sumur i. Semen j. Pasir
JUMLAH HARGA (Rp) 395,389,028.73
2,034,710.42 2,543,388.02 1,526,032.81 3,052,065.63 30,808,254.17 5,157,866.78 5,157,866.78 5,157,866.78 12,894,666.95 12,894,666.95 2,113,634,567.21 188,432,412.50
4,496,118.47 4,496,118.47 113,038,537.50 PEK.SIPIL 56,833,687.50 59,372,408.87 49,078,991.92 35,542,323.44 23,694,882.29
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
16,542,603.13 11,028,402.08
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
562,556,486.15 33,085,206.25 14,336,922.71
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
47,422,128.96 302,315,550.00
Pek. Site Development Dan Utilitas - page 3 of 211
NO.
URAIAN PEKERJAAN
SATUAN
ACCESSORIES POMPA a. Panel dan Accesoriesnya b. Kabel Power, NYY 3 x 4 mm - dari DW ke Panel c. Kabel WLC, NYMHY 3 x 1,5 mm2 - dari DW ke Panel d. Electroda e. Sock / Connector f. Pipa Hisap GIP Medium dia. 2 " g. Bak Kontrol h. Accessories Bak Control ( Manometer, Check valve ) PERIZINAN a. Izin Sumur dari BPLHD b. Meter Air 2 " + Tera & segel V.
PERALATAN UTAMA POMPA KEBAKARAN DAN INSTALASI HYDRANT 1. Diesel Fire Pump Type : Horizontal Split Case Kapasitas : 1250 USGPM Total Head : 120 meter Standart : NFPA 20 Lengkap Panel Control NFPA-20 Standard 2. Electric Fire Pump Type : Horizontal Split Case Kapasitas : 1250 USGPM Total Head : 120 meter Standart : NFPA 20 Lengkap Panel Control NFPA-20 Standard 3. Jockey Fire Pump Type : Vertical Multi Stage Kapasitas : 50 Gpm Total Head : 120 meter Lengkap Panel Control NFPA-20 Standard 4. Ground Tank - Tanki. kapasitas : 250 M3 - Water Level Control ( WLC ) - Gate valve dia. 80 mm - Gate valve dia. 65 mm - Flexible joint diameter 65 mm - Pipa Kuras, PPR dia.80 mm - Vent Out 5. Diaphragm Tank, Kapasitas : 300 Lt 6. Horn / Buzzer 7. Water Level Control ( WLC ) 8. Hidder - Diameter 150 mm - Diameter 100 mm 9. Flexible Joint : - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 10. Check Valve : - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 11. Gate Valve: - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 12. Safety Valve : - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 13. Foot Valve Valve - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 14. Branch Control Valve - Diameter 100 mm 15. Strainer - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 16. Pressure Gauge 17. Pressure Switch 18. Pemipaan BSP Schedule 40 di ruang Pompa - Diameter 150 mm - Diameter 100 mm - Diameter 65 mm 19. Komponen Hydrant - Fire Hose Cabinet ( FHC ) (Outdoor) - Pillar Hydrant - Siamise Connection - Nozzle Pemadam Kebakaran dia. 65 mm - Gate valve dia. 150 mm - Check valve dia. 150 mm - Strainer diameter 150 mm - Meter Air 20. Pemipaan BSP Schedule 40 ke Pillar Hydrant & Siamise - Pemipaan ke Siamise Connection, BSP Sch.40, dia.150 mm - Pipa ke Pilar Hydrant, dia. 150 mm
VI. SENTRAL GAS MEDIS a. Sentral Oxygen Automatic System Kap. 2x10 cyl Semi Automatic Switch Over Manifold O2 Include : - Automatic Change Over Manifold - Power 220 V For Medium and High Flow - 20 x Header - 20 x Pigtail - Cylider Rack - Audio and Light Alarm (Without Cylinder) - Safety Valve Low Preasure - Preasure Gauge Low Preassure
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH IV.PEKERJAAN SUMUR (DEEP WELL)
302,315,550.00
Unit
1.00
658,678,068.75
Tidak Dikerjakan
Unit
1.00
423,440,568.75
Tidak Dikerjakan
Unit
1.00
84,698,568.75
Tidak Dikerjakan
unit set bh bh bh m' bh Unit Unit Unit
1.00 1.00 1.00 2.00 2.00 12.00 1.00 1.00 11.00 3.00
867,147,437.50 2,671,520.03 4,705,483.44 3,759,305.94 802,978.17 29,489.62 267,601.88 26,211,312.30 5,860,036.73 2,671,520.03
867,147,437.50 2,671,520.03 4,705,483.44 7,518,611.89 1,605,956.33 353,875.43 267,601.88 26,211,312.30 64,460,403.98 8,014,560.08
bh bh
1.00 1.00
7,377,795.23 3,589,821.11
7,377,795.23 3,589,821.11
bh bh bh
4.00 2.00 2.00
2,240,540.67 1,152,175.17 802,978.17
8,962,162.67 2,304,350.33 1,605,956.33
bh bh bh
4.00 2.00 2.00
5,792,104.17 4,537,504.17 4,149,623.67
23,168,416.67 9,075,008.33 8,299,247.33
bh bh bh
4.00 2.00 2.00
14,843,102.22 9,815,798.38 5,678,023.03
59,372,408.87 19,631,596.77 11,356,046.07
bh bh bh
2.00 1.00 1.00
30,800,481.25 30,800,481.25 9,785,931.25
61,600,962.50 30,800,481.25 9,785,931.25
bh bh bh
2.00 1.00 1.00
10,988,213.54 8,479,013.54 3,460,613.54
21,976,427.08 8,479,013.54 3,460,613.54
bh
1.00
8,196,754.17
8,196,754.17
bh bh bh bh bh
2.00 1.00 1.00 3.00 3.00
11,156,407.50 5,288,016.00 3,139,528.88 2,673,872.66 1,314,722.66
22,312,815.00 5,288,016.00 3,139,528.88 8,021,617.97 3,944,167.97
m' m' m'
40.00 25.00 15.00
577,801.04 334,952.92 183,415.21
23,112,041.67 8,373,822.92 2,751,228.13
set bh bh bh bh bh bh bh
10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
7,789,017.71 5,614,341.41 8,177,986.42 769,288.13 14,843,102.22 5,792,104.17 11,156,407.50 1,916,435.67
77,890,177.08 56,143,414.06 81,779,864.17 7,692,881.25 148,431,022.17 57,921,041.67 111,564,075.00 19,164,356.67
m' m'
935.00 935.00
577,801.04 577,801.04
540,243,973.96 540,243,973.96
JUMLAH V.PERALATAN UTAMA POMPA KEBAKARAN DAN INSTALASI HYDRANT
3,000,017,774.38
set
1.00
313,580,300.00
313,580,300.00
Pek. Site Development Dan Utilitas - page 4 of 211
NO.
URAIAN PEKERJAAN b. Sentral N2O Automatic System Kap. 2x2 cyl Semi Automatic Switch Over Manifold O2 Include : - Automatic Change Over Manifold - Power 220 V For Medium and High Flow - 20 x Header - 20 x Pigtail - Cylider Rack - Audio and Light Alarm (Without Cylinder) - Safety Valve Low Preasure - Preasure Gauge Low Preassure c. Oil Free Air Compressor - Duplex d. Vacuum Pump Duplex System e. Master Alarm 10 function f. Pemipaan Gas Medis L- ASTM B 819 Type L: • Copper Tube ø 2⅛" - Length 5,8mtr • Copper Tube ø 2" - Length 5,8mtr • Copper Tube ø 1½" - Length 5,8mtr • Fitting & Accessories
B. PEKERJAAN SUMBER DAYA LISTRIK DAN KABEL UTAMA I. PEKERJAAN DAYA LISTRIK DAN KABEL 1 PANEL MVMDP + Standart Accessories ( operatig handle 1pcs, End plate 1 set / 2pcs) - MVMDP, terdiri dari: - Arrester (1 unit), Direct Busbar Cubicle + LA Cubicle lengkap dengan : - 1 set Bushing Unit 500 - 3 phase Busbar 630A - 1 Unit Neon Indicator - 1 Unit Anti Condensation Heater 230 Vac - 1 set Lightning Arrester, MWD 20 - 1 unit, Cubicle Incoming LBS Switchgear - 20kV, 630A, 16 kA-1s Cubicle lengkap dengan : - Switchgear SDC - SF6 LBS 24kV 630A - 3 position LBS - Operating mechanism w/ mechanical position indicator - 3 phase busbar 630A - 1 Unit Neon Indicator - Earthing Switch - 1 unit Anti condensation Heater 230 Vac - 1 unit, Cubicle Metering Type SFV Cubicle lengkap dengan : - SF6 LBS 24kV 630A - 3 position LBS, TU 1-SPRING 500 - Operating mechanism w/ mechanical position indicator - 3 phase Busbar 630A - 1 Unit Neon Indicator - Earthing Switch - 3 Unit VT 20 / √ 3 kV; 110/√3 V, 25VA, Class 0.5 w/ Primary Fuse - 1 Unit Analog Voltmeter + Vss - 1 Unit Anti Condensation Heater 230 Vac - Fuse for VT's Protection - 3 unit, Cubicle Outgoing, Type SFC Cubicle lengkap dengan : - SF6 LBS 24kV 630A - 3 position LBS - Operating mechanism w/ mechanical position indicator - Shunt Release - 3 phase Busbar 630A - 1 Unit Neon Indicator - Earthing Switch - 1 Unit Anti Condensation Heater 230 Vac - MV Fuse - Relay kontrol dan modul komunikasi utk telecontrol dan telemetering - PLC untuk koneksi ke BAS 2 Transformator Dry Type + ANAF (Air Natural Air Force), Step Down dan Step Up - Transformator Dry Type 1600 Kva CU - CU, 20 kV - 380 Volt, 50 Hz (MVMDP ke LVMDP) Include : - Peralatan bantu dan accessories - Peralatan bantu dan accessories - Proteksi Digital Thermometer - Enclosure IP-20 Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan - Fans 3
Active Harmonic Filter Active Harmonic Filter, Kapasitas AHF 1026.19 A, SVG 470.70 KVAR (G.D1) Dengan konfirgurasi - AHF Accusine PCS+ 300A IP00 - Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 - MCCB NSX 400A 3P - MCCB NSX 300A 3P - Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) - Testing Commisioning Active Harmonic Filter, Kapasitas AHF 454.82 A, SVG 205.61 KVAR (G.D2) Dengan konfirgurasi - AHF Accusine PCS+ 300A IP00 x 2 - Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 - MCCB NSX 400A 3P x 2 - Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) - Testing Commisioning Active Harmonic Filter, Kapasitas AHF 274.95 A, SVG 126.02 KVAR (G.B & G.C2) Dengan konfirgurasi - AHF Accusine PCS+ 200A IP00 - AHF Accusine PCS+ 120A IP00 - Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 - MCCB NSX 300A 3P - MCCB NSX 160A 3P - Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) - Testing Commisioning
SATUAN
VOLUME
HARGA SATUAN
JUMLAH HARGA
set
1.00
(Rp) 283,374,062.50
set set set
1.00 1.00 1.00
866,754,785.63 471,106,656.25 59,691,515.63
866,754,785.63 471,106,656.25 59,691,515.63
250.00 958,375.00 250.00 910,456.25 200.00 368,059.56 1.00 54,081,972.50 JUMLAH VI.SENTRAL GAS MEDIS
239,593,750.00 227,614,062.50 73,611,912.50 54,081,972.50 2,589,409,017.50
m' m' m' ls
(Rp) 283,374,062.50
set
1.00
340,013,023.90
340,013,023.90
Unit
2.00
368,563,185.99
737,126,371.98
unit
1.00
2,542,424,362.20
Tidak Dikerjakan
unit
1.00
1,675,819,075.23
Tidak Dikerjakan
unit
2.00
1,253,452,730.61
Tidak Dikerjakan
Pek. Site Development Dan Utilitas - page 5 of 211
NO.
URAIAN PEKERJAAN
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Active Harmonic Filter, Kapasitas AHF 250 A, SVG 160 KVAR (PP-ALKES, G.D1) Dengan konfirgurasi - AHF Accusine PCS+ 300A IP00 - Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 - MCCB NSX 400A 3P - Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) - Testing Commisioning Active Harmonic Filter, Kapasitas AHF 245.21 A, SVG 112.08 KVAR (G.C1) Dengan konfirgurasi - AHF Accusine PCS+ 300A IP00 - Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 - MCCB NSX 400A 3P - Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) - Testing Commisioning Pentanahan Neutral pada Ruang Panel, dll Panel LVMDP-1 Panel LVMDP-2 Kabel dari GARDU PLN ke MVMDP , N2XSEbY 3 x 120 mm2 + Grounding Kabel dari MVMDP ke TRAFO 1600 Kva, N2XSY 3 x 1 x 120 mm2 + Grounding Kabel dari TRAFO 1600 Kva ke LVMDP.1, Bustduct AL 2500 A IP 54 Kabel dari LVMDP.1 ke PANEL AMF GENSET, Bustduct AL 2500 A IP 54 Kabel dari MVMDP ke TRAFO 1600 Kva, N2XSY 3 x 1 x 120 mm2 + Grounding Kabel dari TRAFO 1600 Kva ke LVMDP.2, Bustduct AL 2500 A IP 54 Kabel dari LVMDP.2 ke PANEL AMF GENSET, Bustduct AL 2500 A IP 54 Kabel dari LVMDP ke MDP - D1, NYFGbY 7 x (4 x 300) mm2 + Grounding Kabel dari LVMDP ke PP - ALKES , NYFGbY 2 x (4 x 185) mm2 + Grounding Kabel dari LVMDP ke MDP - D2, NYFGbY 3 x (4 x 300) mm2 + Grounding Kabel dari LVMDP ke MDP - RANAP.B, NYFGbY 3 x (4 x 185) mm2 + Grounding Kabel dari LVMDP ke MDP - RANAP.C1, NYFGbY 3 x (4 x 185) mm2 + Grounding Kabel dari LVMDP ke MDP - RANAP.C2 , NYFGbY 3 x (4 x 185) mm2 + Grounding Kabel dari LVMDP ke MDP - F2.F3, NYFGbY 4 x 185 mm2 + Grounding Kabel dari LVMDP ke PP/LP - F4, NYFGbY 4 x 6 mm2 + Grounding Kabel dari LVMDP ke SDP - F5, NYFGbY 4 x 120 mm2 + Grounding Kabel dari MDP - D2 ke PP/LP - MASJID, NYFGbY 4 x 10 mm2 + Grounding
SATUAN
HARGA SATUAN
JUMLAH HARGA
unit
1.00
(Rp) 847,474,787.40
unit
1.00
847,474,787.40
Tidak Dikerjakan
lot 1.00 10,000,000.00 unit 1.00 67,495,530.87 unit 1.00 67,495,530.87 m' 20.00 20,927.08 m' 10.00 385,791.40 lot 1.00 141,326,648.17 lot 1.00 175,144,296.49 m' 15.00 385,791.40 lot 1.00 141,326,648.17 lot 1.00 175,144,296.49 m' 855,535.49 130.00 m' 247,428.30 140.00 m' 369,049.73 200.00 m' 369,049.73 80.00 m' 369,049.73 80.00 m' 369,049.73 80.00 m' 132,084.98 80.00 m' 132,084.98 50.00 m' 132,084.98 70.00 m' 132,084.98 120.00 JUMLAH I.PEKERJAAN DAYA LISTRIK DAN KABEL
10,000,000.00 67,495,530.87 67,495,530.87 418,541.67 3,857,914.01 141,326,648.17 175,144,296.49 5,786,871.02 141,326,648.17 175,144,296.49 111,219,613.90 34,639,961.33 73,809,946.90
II. PEKERJAAN GENSET 1. Unit Utama Genset 1600. KvA - Pengadaan & Pemasangan Lengkap, Type Silent Capacity 1600 Kva Prime Model SILENT Type, Voltage 380/220 Volt, 3 Phase Starting System, Electric, Cooling System, Radiator,, Frek. 50 HZ Altenator and Intalation Duc Radiator + Sound Atenuator, Ready for Pararel System overnor, Electric + Tanky Harian - 1 Unit Residential Silencer + Exhaust Gas + Compensator Stainless Steel - 1 unit Stronge Battery 200 AH + Their Cable - Deepsea 7320 / DC Panel Kontrol - Certivicate of origin (C.O.D) Engine and Altenator From Origin Manufacture Sertifikat TNK1915MI - Daily Tank, Kapasitas : 5.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi - Standart Toolkit 2. Sistem Bahan Bakar - Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi - Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm - Fuel Flow meter 3. Fire Extinguisher 6 kG 4. Sistem Elektrikal PANEL AMF + Syncronizing Kabel dari Genset ke Panel AMF SYNCRON., NYY 3 x (4 x 300) mm2 Kabel Kontrol untuk Syncronizing 2 Genset, NYY 3 x (4 x 300) mm2 5. Grounding - Pit ( < 2 Ohm) 6. Testing & commisioning (Lengkap sertivikat perijinan Depnaker) III. PEKERJAAN PENERANGAN SITE A. Panel Listrik dan Fixture Lampu 1 Panel LP/PL 2. Lampu Jalan (LP/PL) 1 ZONA 1 - Lampu Jalan 2 x 20 W 2 ZONA 2 - Lampu Jalan 2 x 20 W 3 ZONA 3 - Lampu Jalan 2 x 20 W 4 ZONA 4 - Lampu Jalan 2 x 20 W 5 Installasi - Titik Instalasi Penerangan Luar, NYY 3 x 2,5 mm2
VOLUME
(Rp)
Tidak Dikerjakan
Tidak Dikerjakan
29,523,978.76
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
2,114,329,174.52
unit
1.00
4,357,444,330.00
4,357,444,330.00
unit unit unit bh
1.00 1.00 1.00 1.00
102,259,330.00 48,446,830.00 5,112,966.50 128,107.92
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
set m' m' ls ls
1.00 5.00 5.00 1.00 1.00
151,292,986.32 4,185.42 4,185.42 10,000,000.00 15,000,000.00
Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan Tidak Dikerjakan
JUMLAH II.PEKERJAAN GENSET
4,357,444,330.00
Unit
1.00
6,227,062.65
Tidak Dikerjakan
bh
20.00
27,623,513.70
Tidak Dikerjakan
bh
20.00
27,623,513.70
Tidak Dikerjakan
bh
20.00
27,623,513.70
Tidak Dikerjakan
bh
20.00
27,623,513.70
Tidak Dikerjakan
ttk 80.00 111,089.52 JUMLAH III.PEKERJAAN PENERANGAN SITE
Tidak Dikerjakan -
Pek. Site Development Dan Utilitas - page 6 of 211
DAFTAR HARGA BAHAN DAN UPAH ELEKTRIKAL PEKERJAAN PERENCANA NO
URAIAN
A. 1 2 3 4 B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14
15
16
17
18
19
20 21 22 23 24 25 26 27 28 29 C. 1
DAFTAR UPAH Pekerja Tukang listrik Kepala tukang listrik Mandor PEKERJAAN ELEKTRIKAL MVMDP, PQCR & TRAFO Lightning Arrester Cubicle Incoming Cubicle with Surge Arrester Incoming Cubicle; LBS Switchgear - 20kV, 630A, 16kA-1s Incoming Cubicle IM ATS Cubicle Metering Cubicle CM Metering Cubicle, LBS Switchgear - 20kV, 630A, 16kA-1S + VT Outgoing Circuit Breaker Cubicle Outgoing Cubicle SFC, LBS + Fuse Switchgear - 20kV, 630A, 16kA-1S Lightning Arrester Cubicle Arrester, Direct Busbar Cubicle - 20kV, 630A + LA TM Accesoris : - Operating handle - 1 pcs - End Plate - 1 set (2 Pcs) Accessories : Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-31 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-31 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator Dry Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-20 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Include : Proteksi Digital Thermometer Housing IP-20 (1 Unit) Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Fans Transformator Oil Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt, Plug-in Bushing Include : Proteksi Digital Thermometer Wireless smart sensor utk monitoring thermal/suhu secara berkelanjutan 1 Set PLC untuk Interface monitoring oleh BAS Interlock Module IP 30, FROM 1, BOTTOM INCOMING H.600 x W.600 x D.250 mm, Indoor ATS Interlock Module AHF Accusine PCS+ 300A IP00 AHF Accusine PCS+ 200A IP00 AHF Accusine PCS+ 120A IP00 Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 x 800 x 800 MCCB NSX 400A 3P MCCB NSX 300A 3P MCCB NSX 160A 3P Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) FAN (AF) ANAF Enclosure (Case) IP 20 PEKERJAAN PANEL LVMDP (SMART PANEL IP 30, Form 3B, Bottom Incoming) a. H.2200 x W.900 x D.600 mm, Indoor Form 3B Non Type Test b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
HARGA SATUAN Rp Rp Rp Rp
70,000 80,000 85,000 90,000
hari hari hari hari
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
41,745,008 247,314,905 38,239,560 45,870,969 544,464,935 83,247,313 81,513,601 240,438,304 53,203,042 36,890,938 45,277,154 6,982,581 202,252,948 448,411,774 557,490,025 303,379,422 1,520,942,167 269,670,597 58,550,880 786,016,723 786,016,723 376,663,714 14,966,718 7,157,327 7,157,327 4,445,610 18,663,902 24,270,354 28,315,413 179,780 8,634 8,634 8,634 10,544
bh bh unit bh bh bh unit bh Unit bh unit unit set bh
bh
unit
unit
unit
unit
unit unit unit unit unit unit unit set unit unit
unit unit unit unit unit unit
Bahan Elektikal - page 7 of 211
NO
URAIAN e. f. g.
Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT 4000/5 30VA Cls.1 INCOMING a. PREMIUM ACB FIXED 4P 4000 A 100KA b. MOTOR OPERATOR 230V A.C./D.C. c. CLOSING COIL 230V A.C./D.C. d. UVR 230V A.C./D.C. e. Fuse Housing f. Miniatute Fuse Link 10x38 2A g. Emergency Stop latching turn to reset 2 N/C (Red) i. Pilot Lamp 220VAC "R" (Red) j. Pilot Lamp 220VAC "G" (Green) k. Push Button (Green) 1 N/O l. Push Button (Red) 1 N/C m. Timer 220 VAC + Socket n. Relay 220 VAC + Socket o. Selector Switch A-O-M 2 Pole ARRESTER a. MCCB MT 50A 4P 20KA b. Arrester SPD T1+T2 12,5KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET 2
3
4
5
MDP (IP 30, Form 1, Bottom Incoming) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA INCOMING a. MCCB AUX CONTACTS b. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET SDP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS PP (IP 30, Form 1, Bottom Incoming)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,757 5,791,135 1,258,463 152,813,338 7,191,216 1,618,024 1,977,584 10,544 1,757 42,894 31,462 31,462 19,667 19,667 222,508 55,145 57,305 1,618,024 4,756,989 2,220,288 14,770,758 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 7,191,216 1,273,295 536,644 10,544 1,757 1,533,527 2,442,317 14,770,758 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 314,616 -
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 8 of 211
NO
URAIAN a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS 6
7
8
9
PP-AC (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-AC.OU (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP-PL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 50/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-BP (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
179,780 8,634 8,634 8,634 10,544 1,757 314,616 179,780 8,634 8,634 8,634 10,544 1,757 51,237 314,616 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 607,029
unit unit unit unit unit unit unit unit
unit unit unit unit unit unit unit unit unit unit unit unit unit
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 9 of 211
NO
URAIAN c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A
10
11
12
13
14
PP-AB (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-LF (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC b. Time Switch, 24 hours / 220VAC, Analog c. Fuse Housing d. Miniatute Fuse Link 10x38 2A e. MCCB SHUNT TRIP 200-277 VAC/DC PP-EWH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC b. Time Switch, 24 hours / 220VAC, Analog c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP-SOLAR PANEL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PP/LP-PH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,544 1,757 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 607,029 10,544 1,757 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 332,594 701,144 10,544 1,757 607,029 179,780 8,634 8,634 8,634 10,544 1,757 332,594 701,144 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 10 of 211
NO
URAIAN c. d. e. f. g. a. b. c. d. a. b. c. d.
15
16
17
18
Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING MCCB AUX CONTACTS MCCB SHUNT TRIP 200-277 VAC/DC Fuse Housing Miniatute Fuse Link 10x38 2A PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A
PP-FH (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A LP-PL (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS LP/PL-PENUNJANG (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB AUX CONTACTS PP-CRANE (IP 30, Form 1, Bottom Incoming) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCCB AUX CONTACTS b. MCCB SHUNT TRIP 200-277 VAC/DC c. Fuse Housing d. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,634 10,544 1,757 5,791,135 51,237 314,616 607,029 10,544 1,757 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 607,029 10,544 1,757 1,273,295 736,650 10,544 1,757 179,780 8,634 8,634 8,634 10,544 1,757 314,616 179,780 8,634 8,634 8,634 10,544 1,757 314,616 179,780 8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 314,616 607,029 10,544 1,757 1,273,295 736,650 10,544
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 11 of 211
NO
URAIAN d. Miniatute Fuse Link 10x38 2A
19
PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
20
PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
21
PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,757 284,534,616 276,893,949 246,331,281 -
unit unit
unit
unit
Bahan Elektikal - page 12 of 211
NO
URAIAN
-
- Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris
22
PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
23
PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
24
PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
261,612,615 211,948,280 206,217,780 -
unit
unit
unit
Bahan Elektikal - page 13 of 211
NO
URAIAN -
-
25
PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar INCLUDE : - Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) - Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring - Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm - Other - CU Busbar - Wiring Aksesoris
20 a. b. c. d. e. f. g. h. i. j. k. l. m. n. D. 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris
Modul ACOS Interlock (IP 30, Form 1, Bottom Incoming) H.600 x W.600 x D.250 mm, Indoor Cu-Busbar Automatic Mains Failure Module Fuse RT-18-1PL ref. 3OZFHR8L Miniatute Fuse Link 10x38 2A ref. 3OZM3802 MCB 1P C6 6kA Emergency Stop latching turn to reset 2 N/C (Red) SIREN 100dB 24VDC Timer H3CR-A8 220 VAC + Socket Relay MY-4GS 220 VAC + Socket Relay MY-4GS 24 VDC + Socket Relay LY-4GS 24VDC + Socket Terminal PTU-20 22A Jasa Sinkronisasi LV MV
PEKERJAAN KABEL kabel ITC 0.6 mm Kabel FRC 2 x 2.5 mm2 Kabel FRC 3 x 2.5 mm2 Kabel FRC 3 x 4 mm2 Kabel FRC 4 x 10 mm2 Kabel FRC 4 x 16 mm2 Kabel FRC 4 x 35 mm2 Kabel FRC 4 x 50 mm2 Kabel FRC 4 x 70 mm2 Kabel FRC 4 x 150 mm2 Kabel FRC 4 x 185 mm2 Kabel FRC 4 x 240 mm3 Kabel FRC 4 x 300 mm3 Kabel FRC 1 x 300 mm3 Kabel FRC 1 x 185 mm3 Kabel N2XSEbY 3 x 25 mm2 Kabel N2XSEbY 3 x 35 mm2 Kabel N2XSEbY 3 x 50 mm2 Kabel N2XSEbY 3 x 70 mm2 Kabel N2XSEbY 3 x 95 mm2 Kabel N2XSEbY 3 x 120 mm2 Kabel N2XSEbY 3 x 150 mm2 Kabel N2XSEbY 3 x 185 mm2 Kabel N2XSEbY 3 x 240 mm2
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
229,483,611 16,230,937 179,780 10,247,483 10,544 1,757 51,912 42,894 269,671 222,508 55,145 55,145 118,902 4,193 22,472,550 84,227 306,256 1,002,684 -
unit
unit unit unit unit unit unit unit unit unit unit unit unit unit lot m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹
Bahan Elektikal - page 14 of 211
NO 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111
Kabel N2XSY 1 x 35 mm2 Kabel N2XSY 1 x 50 mm2 Kabel N2XSY 1 x 70 mm2 Kabel N2XSY 1 x 95 mm2 Kabel N2XSY 1 x 120 mm2 Kabel N2XSY 1 x 120 mm2 Kabel N2XSY 1 x 150 mm2 Kabel N2XSY 1 x 185 mm2 Kabel N2XSY 1 x 240 mm2 Kabel N2XSY 1 x 300 mm2 Kabel N2XSY 1 x 400 mm2 Kabel N2XSY 1 x 500 mm2 Kabel N2XSY 1 x 630 mm2 Kabel N2XSY 1 x 300 mm2 Kabel NYFGbY 4 x 4 mm2 Kabel NYFGbY 4 x 6 mm2 Kabel NYFGbY 4 x 16 mm2 Kabel NYFGbY 4 x 35 mm2 Kabel NYFGbY 4 x 70 mm2 Kabel NYFGbY 4 x 95 mm2 Kabel NYFGbY 4 x 120 mm2 Kabel NYFGbY 4 x 150 mm2 Kabel NYFGbY 4 x 185 mm2 Kabel NYFGbY 4 x 240 mm2 Kabel NYFGbY 4 x 300 mm2 Kabel NYAF 1 x 150 mm2 Kabel NYA 1 x 2,5 mm2 Kabel NYA 1 x 6 mm2 Kabel NYA 1 x 10 mm2 Kabel NYA 1 x 16 mm2 Kabel NYA 1 x 25 mm2 Kabel NYA 1 x 35 mm2 Kabel NYA 1 x 50 mm2 Kabel NYA 1 x 70 mm2 Kabel NYA 1 x 95 mm2 Kabel NYA 1 x 120 mm2 Kabel NYM 3 x 2,5 mm2 Kabel NYM 4 x 4 mm2 Kabel NYY 2 x 2,5 mm2 Kabel NYY 4 x 2,5 mm2 Kabel NYY 1 x 150 mm2 Kabel NYY 1 x 300 mm2 Kabel NYY 3 x 50 mm3 Kabel NYY 4 x 300 mm2 Kabel NYY 4 x 10 mm2 Kabel NYY 4 x 16 mm2 Kabel NYY 4 x 25 mm2 Kabel NYY 4 x 35 mm2 Kabel NYY 4 x 4 mm2 Kabel NYY 4 x 50 mm2 Kabel NYY 4 x 6 mm2 Kabel NYY 4 x 70 mm2 Kabel NYY 4 x 95 mm2 Kabel NYY 4 x 120 mm2 Kabel NYY 4 x 150 mm2 Kabel NYY 1 x 185 mm2 Kabel NYY 4 x 185 mm2 Kabel NYY 4 x 240 mm2 Kabel NYY 4 x 300 mm3 Kabel NYY 1 x 240 mm2 Kabel NYMHY 3 x 2,5 mm2 Kabel Tray lebar 20 cm (200 -100) Kabel Tray lebar 40 cm (400 -100) Kabel Tray lebar 80 cm (800 -100) Jointing / Connector Tray c/w bolt & Nut H100 Galian, urugan & pelindung kabel Busduct 1000A / AL IP54 - 1000A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - Class B 130 C Insullation (hanger) - IEC Standard - Couple Bar - Flexible Box - Hanger 112 Busduct 2500A / AL IP54 - 2500A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - Class B 130 C Insullation (hanger)
URAIAN
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
737,999 1,075,986 2,151,971 33,619 118,655 5,278,802 5,265,858 5,678,454 6,339,416 230,568 9,586,790 5,784,434 230,568 11,730,671 5,265,858 5,678,454 6,339,416 230,568
m¹ m' m¹ m¹ m' m' m¹ m¹ m¹ m' m¹ m¹ m¹ m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m unit unit unit unit bh bh bh m unit unit unit unit
Bahan Elektikal - page 15 of 211
NO
URAIAN
- IEC Standard - Couple Bar - Flexible Box - Hanger 113 Busduct 1600A / AL IP54 - 1600A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - IEC Standard - Couple Bar - Flexible Box - Hanger 114 Busduct 3200A / AL IP54 - 3200A, 3P4W+50% Al IGB, 600V - Indoor, Sandwich, IP54 - Cooper Conductor - Class B 130 C Insullation - IEC Standard - Couple Bar - Flexible Box - Hanger E. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
PEKERJAAN PENERANGAN Lampu Down Light LED 4 W Lampu Down Light LED 5 W Lampu Down Light LED 6 W Lampu Down Light LED 7 W Lampu Down Light LED 9 W Lampu Down Light LED 10 W Lampu Down Light LED 13 W Lampu Down Light LED 16 W Lampu Down Light LED 30 W + Driver + Armature Lampu LED Down Light Spot 23 W Lampu Panel LED 60 x 60 20 W Lampu LED Spot Light 15 W Lampu LED Spot Light 23 W Lampu Dinding 5 W Lampu Strip 5 W / meter + Driver + Diffuser Lampu Indicator Lampu LED Panel 36 W Lampu LED Panel 26 W Lampu LED Batten 36 W + Inter Cable Lampu LED Batten 20 W + Inter Cable Lampu LED Prismatic 36 W Lampu LED Prismatic 20 W Lampu Panel LED Dust Proof 40 W Lampu Panel LED Dust Proof 26 W Lampu TL LED Louvre M7 20 W Lampu TLT5 1x12 W (BALK) Lampu TLT5 1x28 W (BALK) Lampu TLT5 2x28 W (BALK) Lampu TLT5 1x28 W (DF) Lampu TLT5 1x28 W (Louvre M6) Lampu TLT5 2x28 W (Acrilic Putih susu) Lampu TLT5 2x28 W (Louvre M6) Lampu LED Plat 12 W + baterai Lampu LED RMO 12 W Lampu Jalan LED ( 2 x 20 W ) Lampu Jalan LED ( 1 x 20 W ) Lampu Taman Essential 18 W Lampu Taman Essential 28 W Tube Line (True Line Slim Balance) LED 20 W Lampu Exit 5 W + Baterai Lampu Up Light 5 W Lampu Track Spot 15 W Lampu LED Down Light Outbow 12 W Lampu Tree Light 10 W Lampu Bollard Light 18 W Tiang Lampu Jalan (P : 7 m) Tool Kit Emergency (Lampu)
1 2 3 4 5 6 7 8 9
PEKERJAAN STOP KONTAK & SAKLAR Saklar Ganda 10 A Saklar Putar 10 A Saklar Tunggal 10 A Stop kontak daya 10/16 A - 1 Phase (Partisi) Stop kontak daya 10/16 A - 1 Phase Stop kontak daya 10/16 A - 3 Phase Socket Pipa Tee Doos Pipa Conduit
F.
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
9,586,790 5,784,434 230,568 5,278,802 6,202,693 6,464,004 8,457,409 11,597,184 5,574,091 230,568 14,663,339 6,202,693 6,464,004 8,457,409 11,597,184 5,574,091 230,568 168,994 168,994 168,994 194,163 237,310 237,310 237,310 305,627 916,880 341,439 810,810 1,315,993 1,315,993 179,780 631,389 156,049 895,306 895,306 693,952 586,084 835,619 538,622 835,619 538,622 886,677 251,693 369,045 463,923 665,682 374,887 504,374 504,374 302,031 192,365 24,126,529 12,063,265 1,869,716 2,711,088 1,689,936 699,705 898,902 583,208 147,420 2,566,545 2,678,728 2,286,807 363,876 25,686 23,664 19,517 153,389 94,169 283,478 4,495 3,596 5,393
bh bh bh m unit unit unit bh bh bh m unit unit unit bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m'
Bahan Elektikal - page 16 of 211
NO
URAIAN
10 11 12 13 14 G. 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1
Las Doop Klem Pipa Fhiser Isolasi Ban Sensor System PEKERJAAN ACB, MCB, MCCB MCB 1P 4,5 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 4,5 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 6 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 2P 6 KA MCB 6 A/2 Phasa MCB 3P 6 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 10 KA MCB 4 A/1 Phasa MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 10 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 15 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 15 KA MCB 6 A/3 Phasa
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,798 4,495 1,798 1,798 2,869,295 203,395 -
bh bh bh bh bh
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Elektikal - page 17 of 211
NO
URAIAN 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4
1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4
MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 25 - 30 KA MCB 6 A/1 Phasa MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 3P 25 - 30 KA MCB 6 A/3 Phasa MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 1P 50 KA MCB 10 A/1 Phasa MCB 16 A/1 Phasa MCB 20 A/1 Phasa MCB 25 A/1 Phasa MCB 32 A/1 Phasa MCB 40 A/1 Phasa MCB 50 A/1 Phasa MCB 63 A/1 Phasa MCB 80 A/1 Phasa MCB 3P 50 KA MCB 10 A/3 Phasa MCB 16 A/3 Phasa MCB 20 A/3 Phasa MCB 25 A/3 Phasa MCB 32 A/3 Phasa MCB 40 A/3 Phasa MCB 50 A/3 Phasa MCB 63 A/3 Phasa MCB 80 A/3 Phasa MCCB 3P 25 KA NON-ADJUSTABLE MCCB 32 A/3 Phasa MCCB 40 A/3 Phasa MCCB 63 A/3 Phasa MCCB 50 A/3 Phasa MCCB 3P 35 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 65-70 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 25 KA ADJUSTABLE MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,240,485 1,240,485 1,402,287 1,294,419 2,373,101 1,941,628 1,402,287 1,402,287
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Elektikal - page 18 of 211
NO
URAIAN
1 2 3 4 5 6 7 8 9 10
MCCB 3P 50-55 KA ADJUSTABLE MCCB 630-800 A/3 Phasa MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 300-400 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCCB 140-200 A/3 Phasa MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 70 KA ADJUSTABLE MCCB 125-160 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa MCCB 63-80 A/3 Phasa MCCB 3P 50 KA NON ADJUSTABLE MCCB 800 A/3 Phasa ACB 50 KA ACB 800 A, 3P, 50KA ACB 1000 A, 3P, 50KA ACB 1250 A, 3P, 50KA ACB 1600 A, 3P, 50KA ACB 2000 A, 3P, 50KA ACB 2500 A, 3P, 50KA ACB 3200 A, 3P, 50KA ACB 4000 A, 3P, 50KA ACB 65 KA ACB 800 A, 3P, 50KA ACB 1000 A, 3P, 50KA ACB 1250 A, 3P, 50KA ACB 1600 A, 3P, 50KA ACB 2000 A, 3P, 50KA ACB 2500 A, 3P, 50KA ACB 3200 A, 3P, 50KA ACB 4000 A, 3P, 50KA ACB 70 KA ACB 800 A, 3P, 70KA ACB 1000 A, 3P, 70KA ACB 1250 A, 3P, 70KA ACB 1600 A, 3P, 70KA ACB 2000 A, 3P, 70KA ACB 2500 A, 3P, 70KA ACB 3200 A, 3P, 100KA ACB 4000 A, 3P, 100KA ACB 100 KA ACB 800 A, 3P, 100KA ACB 1000 A, 3P, 100KA ACB 1250 A, 3P, 100KA ACB 1600 A, 3P, 100KA ACB 2000 A, 3P, 100KA ACB 2500 A, 3P, 100KA ACB 3200 A, 3P, 100KA ACB 4000 A, 3P, 100KA ACB 5000 A, 3P, 100KA ACB 6000 A, 3P, 100KA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
AKSESORIS PANEL (Box Panel, Shun Trip, dst) Contactor Lighting Power Meter Arrester Ampere Meter 800/5A EC 96 Fuse & Indicator Selector Switch M-O-A 2P Volt Meter 0-500V EC 96 Occu Swtich (Sensor Penerangan) Pilot Lamp Pilot Lamp 220VAC "R" (Red) Auxilarry Contact Shun trip Way Delta A Way Delta B Auxilarry Contact + Alarm Switch Shun trip Interlock Contactor Type Test Box Panel - Form 3B H.2200 x W.900 x D.600 mm, Indoor (Include Indikator, Metering) Box Panel ( 220 x 100 x 100 ) cm + Analog Meter & Pilot Lamp Box Panel ( 200 x 100 x 60 ) cm Box Panel ( 180 x 80 x 60 ) cm
1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
H.
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,611,709 153,982 92,407 104,722 154,521 1,226,439 22,562 31,462 149,218 1,779,826 1,260,261 729,639 184,275 381,134 3,856,290 3,319,915 187,984,901 301,982,528 12,257,754 11,331,109 10,684,174
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh unit unit bh bh unit unit unit unit Unit unit bh bh bh
Bahan Elektikal - page 19 of 211
NO
URAIAN
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
43 44 45 46 47 48 49 I. 1 2 3 4 5 6 7 8 9 10 11 J.
Box Panel ( 100 x 90 x 25 ) cm Box Panel ( 80 x 60 x 25 ) cm Box Panel ( 43 x 33 x 20 ) cm Box Panel ( 60 x 60 x 40 ) cm Box Panel ( 30 x 20 x 15 ) cm Grounding BC 240 mm2 Grounding BC 185 mm2 Grounding BC 120 mm2 Grounding BC 95 mm2 Grounding BC 70 mm2 Grounding BC 50 mm2 Grounding BC 35 mm2 Grounding BC 25 mm2 Grounding BC 16 mm2 Grounding BC 6-10 mm2 Premium Capasitor 80kVAR/3p/400V/50Hz/In = 1,7 Capasitor Regulator, Type : RM 2112 (20 step) Capasitor Regulator, Type : RM 2112 (10 step) Capacitor Bank - Contractor CTX 65 3P 50A Control 230V ac-Screw Terminal - MCCB DPX 160 16kA 3P 40A Magnetic - ACB DMX 1600N 3P 1250 50kA Fixed - DMX 1600 T0 Protection Unit LCD MP4 - DMX 1600 T0 External Auxiliary Power 24V DC - Motor Operator DMX T0 220-250V ac/dc - Clossing Coil 220-250V ac/dc - Shunt trip ET 220-250V ac/dc Toogle Switch Busbar Tembaga SolidStandard NEMA (300x100x10) CU BUSBAR Genset Synchronizer kit KWH Meter 1 Phase KWH Meter 3 Phase Change Over Switch 4 Pole 1600 Ampere COS Ohm Saklar Manual UPS UNIT UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase - Include Battery Cabinet UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet and Battery UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase - Include Battery Cabinet and Battery Installation, commissionin and testing
8
PENANGKAL PETIR Air Terminal - Radiuas 20 M Obstruction Lamp Coaxial Cable 2 x 35 mm Connecting Sleeve lengkap surge Arrester Lightning Arrester 10KA Lightening Flash counter Grounding sistem - Copper road - Pentanahan & pipa GIP dia. 1 1/2 " - Bak kontrol ( 40x40) cm lengkap tutup - Kawat BCC dia. 70 mm Testing/pengukuran pentanahan
1 2 3 4 5 6 7 8 9
PEKERJAAN SOUND SISTEM Flight Case 16U Driver Unit 60 W w/ Horn Dual Power Amplifier 1250 W Power Amplifier 480 W Digital Amplifier 480 W w/Selector Power Amplifier 240 W Mixer Amplifier 60 W (Monitor) Slim Array Speaker F-Series Box Speaker
1 2 3 4 5 6 7
K.
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,132,673 5,233,857 2,398,864 5,730,500 1,046,771 3,242,398 2,401,776 2,401,776 1,779,826 1,662,969 1,384,848 1,033,737 853,957 674,176 620,782 10,738,823 15,393,697 14,366,431 87,900,533 764,067 4,442,643 179,780 22,472,550 1,231,496 2,565,646 9,887,922 4,746,203 24,797,596 81,673,785 192,868,411 163,347,571 203,053,869 297,093,400 607,956,181 631,506,514 841,323,722 106,969,337 1,685,441 1,928,145 376,190 674,176 707,885 4,415,946 3,884,155 584,556 7,331,265 1,296,037 10,488,029 7,921,034 5,613,733 3,811,255 1,963,795 6,666,257 1,380,174
bh bh bh bh bh LS LS LS LS LS LS LS LS LS LS bh bh bh Unit
bh bh kg bh bh bh bh unit unit unit unit unit unit unit unit unit unit ls bh bh m' Set bh Set Set
titik unit bh bh bh set bh bh bh bh
Bahan Elektikal - page 20 of 211
NO 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 53 L. 1 2 3 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 16 17
18
URAIAN Power Amplifier 120 W CD/MMC/USB Player With FM Tunner Mixer Amplifier 60 W (Monitor) Speaker Selector 10 ch Gooseneck Microphone (Mimbar) Voice Alarm System Amplifier 360 W w/Zone Selector Digital Matrix Mixer w/ Equalizer Program Pagging Microphone w/Android Base Remote Microphone Dynamic Microphone w/ Stand (Muadzin) Emergency Microphone Firedome Speaker w/Metal Box Inlet Microphone Emergency Message Panel Wireless Set (Dual Wireless Lavalier and Handheld) Ceiling Speaker 3 W Ceiling Speaker 3 W + Pagging Box Speaker 6 W Box Speaker 15 W Box Speaker 30 W Attenuator Kabel NYMHY 2 x 1,5 mm2 Kabel NYMHY 3 x 1,5 mm2 Kabel NYMHY 3 x 2,5 mm2 Cabinet Rack with Accecories Set Top Box MDF / CTB Testing & Commisioning Factory Acceptance Test (FAT) Kabel STP 18 AWG 1 Pair 16-Channel Mixing Console Hand Held Wireless Microphone w/ Receiver Undirectional Lavaliere Wireless Microphone w/ Receiver Wireless Antena Dynamic Microphone Floor Stand Mic. Digital Speaker Processor w/ Equalizer Multi Channel Power Amplifier Dual Power Amplifier Speaker System Subwofer System Monitor Speaker HX-Series Speaker Yamaha Mixer Paging Microphone w/RU-2002 (Car Call) PEKERJAAN TV MATV Active Combiner 2 x 8 DVBS/T to IP Penerima Channel FTA Power Devider Digital A/V Encoder Antena Parabola 32 feet Antena Yagi VHF 22 Element Digital Satelite Receiver & Modulator Spliter 4 way Socket TV Terminal Box 1:12 + Booster signal Terminal Box 1:8 + Booster signal Terminal Box 1:4 + Booster signal Kabel Coaxial RG11( 0,6 mm2 ) Kabel Coaxial RG8 ( 0,6 mm2 ) Kabel Coaxial 5C-2V UTP Cat 6 Tiang / Dudukan Demodulator Parabola Tv Berbayar Coupler 19” Rack Mounting Bracket(Option) Reciver Satellite Parabola - Fully compliant with the DVD-S2 digital tv - H.264 decoding - Support 576i / 576p / 720 p / 1080i, 1080p 50/60Hz - Convenient auto search funtion - Inteligent GUI - Capacity for storing up to 2000 transponder dan 4000 channels - Support DVB - S/ S2 digital tv signal modulated in QPSK / 8PSK - Input frequency range 950 MHz-2150 MHz - Support DiseqC 1.0 / DiseqC 1.2 - Fast channel selection - Favourite channel edit Active Combiner
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,552,513 4,853,262 1,963,795 3,640,553 1,057,378 33,713,139 23,688,674 34,383,001 5,452,739 1,614,788 8,786,677 774,224 339,785 8,786,677 198,208 136,723 438,484 198,208 801,731 1,603,461 137,532 7,551 11,326 16,180 14,904,020 1,577,573 2,966,646 3,236,047 161,802,358 10,297 5,582,181 11,462,888 11,339,918 1,967,517 991,848 622,939 32,281,188 17,411,552 6,887,117 24,062,438 12,927,199 2,634,142 6,628,234 23,461,342 5,136,416 3,951,034 3,078,739 3,078,739 7,335,040 16,419,973 2,873,520 4,884,903 242,434 67,418 3,883,257 3,106,605 1,553,303 12,944 5,483 10,337 40,451 646,580 2,471,980 584,286 134,835 8,539,569 988,792 3,146,157
set bh bh bh bh bh set bh bh bh bh bh bh bh bh bh bh bh bh bh bh m' m' m' set bh bh ls ls m' bh set set bh bh bh set bh set bh bh bh bh bh bh
bh bh bh bh bh bh bh bh bh bh bh bh m' m' m' m' unit unit set bh set unit
set
Bahan Elektikal - page 21 of 211
NO
URAIAN
19 20 21 22 23 24 25 26 27 1 2 3 4 5 6 M. 1 2 3 4 5 N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
HARGA SATUAN
Booster Amplifiere Parabola Antenne lengkap dengan tiang dan aksesories Instalasi Kabel dari Antena ke Sentral unit Splitter Titik Instalasi TV Setting Programing Commisioning Documentation PEKERJAAN IPTV Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Antena Parabola + Kabel Coaxial + Pekerjaan Sipil 8 CH HD Encoder 8 CH DVBS to IP Middleware & VoD Server c/w IPTV Application Multicast Switch 24G
Rp 5,842,863 set Rp 2,247,255 set Rp 11,865,506 lot Rp 314,616 unit Rp 314,616 titik Rp 1,797,804 lot Rp 1,078,682 lot Rp 1,438,243 lot Rp 1,078,682 lot Rp Rp 20,629,801 unit Rp 9,352,176 unit Rp 64,720,943 unit Rp 36,405,531 unit Rp 242,703,537 unit Rp 16,503,841 unit Rp PEKERJAAN CCTV Rp Dome Camera : 4MP IR Ball Camera Rp 7,595,115 bh Eyeball Fixed Lens IP Camera Rp 7,595,115 bh Bullet Camera : 4 MP Bullet Camera Rp 7,928,223 bh Rack CCTV Rp 3,591,833 unit UTP Cable Cat 6 in PVC HI Conduit 20 mm for CCTV, DATA, WIFI Rp 1,221,985 titik Rp PEKERJAAN DATA Rp HUB Un Managable Path Panel 1 x 12 port Rp 2,137,948 bh HUB Un Managable Path Panel 1 x 24 port Rp 3,998,676 bh HUB Un Managable Path Panel 1 x 48 port Rp 8,551,794 bh Path Panel 1 x 12 port Rp 2,137,948 bh Path Panel 1 x 24 port Rp 3,591,833 bh Path Panel 1 x 32 port Rp 6,734,214 bh Path Panel 1 x 48 port Rp 7,183,665 bh Path Panel 1 x 64 port Rp 13,468,428 bh Data Outlet ( RG-45 ) Rp 54,873 bh Floor Outlet Data Rp 292,143 bh Set Top Box ICT Rp 1,123,627 bh Proyektor Rp 16,659,171 bh Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Rp 11,816,362 bh Fiber Optic 8 core Rp 80,901 m' Panel I/O Rp 2,509,965 unit SISTEM ICT EPON Rp 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door Rp 20,764,663 unit Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories Rp 39,473,061 unit MMF - Patch Cord OM3, 3m Rp 214,307 pcs MMF - 12F MC DJ Trunk MPO Pol B 5M Rp 2,320,084 pcs Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Port to Rp PSU air flow 244,621,866 unit Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fans Rp 608,304,962 unit Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD, Rp 314,223,998 unit Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, 2 AC PSU Rp 30,120,771 unit 300W QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF Rp 54,608,296 unit SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF Rp 15,775,730 unit 1U Wiring Management Rp 234,371 unit NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB Rp 34,227,676 unit WLAN Controller Rp 154,526,041 unit UPS 10KVA Rp 44,900,154 unit UPS 2KVA Rp 4,611,367 unit 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door Rp 11,110,483 unit 19" Wallmounted Rack 15U Depth 600 mm Double Door Rp 3,775,415 unit Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories Rp 4,252,166 unit Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant Rp fans, front-to-back 75,482,645 airflow, unit 2 AC PSU Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, airflow, 2 AC Rpfront-to-back 39,725,424 unitPSU 300W UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager Rp 1,527,172 unit UTP Cat 6 Patchcord Blue 2m Rp 58,087 pcs UTP Cat 6 Patchcord Blue 3m Rp 74,186 pcs SISTEM ICT GPON Rp Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Rp 20,629,801 unit POS ( Passive Optical Splitter) 2 :8 c/w accessories Rp 750,431 unit POS ( Passive Optical Splitter) 2 :16 c/w accessories Rp 1,500,861 unit Wiring Management 1U Rp 206,298 unit UTP Cat 6 Patch Panel 24 Port Loaded Rp 1,937,951 unit UTP Cat 6 Patch Cord, 3m Rp 50,011 set Optical Line Terminal ( OLT ) 4 PON Rp 63,311,483 unit Farm Switch 24 Gb, L3 Rp 28,257,326 unit Network Management System Rp 55,012,802 unit Router Fire Wall for Internet Rp 38,612,204 unit UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 175,628,370 unit UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 24,480,697 unit Grounding Sistem Rp 68,766,002 lot Sistem Pengkabelan Perangkat Utama Data Rp 8,090,118 lot A/P Controller license max 50 A/P Rp 223,515,387 lot Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Rp 3,271,073 unit Patch Panel F.O 12 Core Rp 1,694,628 pcs Bahan Elektikal - page 22 of 211
NO
URAIAN
18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 2 3 4 5 6 O. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 P. 1 2 3 4
Patch Panel F.O 24 Core Patch Cord F.O SC to LC, 3 meter Patch Panel UTP 24 Port, Cat 6 Loaded Patch Cord UTP Cat 6, 1 meter ONU 24G PoE ONU 48G PoE POS ( Passive Optical Splitter) 1:4 c/w accessories POS ( Passive Optical Splitter) 2:4 c/w accessories Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Terminasi Kabel FO Kabel FO 12 Core, SM, Outdoor INSTALASI ICT EPON & GPON MMF - 12core OM3 SLT STA in PVC HI Conduit Seting and Configure Core, Router, Firewall & Access Switch. Seting and Configure Wireless Access Point Seting and Configure IP CCTV Documentation SISTEM ICT PON Distribution Switch 16 Port SFP+ Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. Transceiver, SFP+, 1GbE, LR, SMF Third Party Support AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit Patch Panel Category 6 SL Kapasitas24 Port 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) BS Shuttered Faceplate - 2 Port BS Shuttered Faceplate - 1 Port 19"Wallmounted 12 RU Double door Optic Terminal Box 8 Port Patch Cords SM SC-LC Duplex INSTALASI ICT PON Instalasi Rack Instalasi ,Penarikan Kabel Wifi Instalasi ,Penarikan Kabel Data Instalasi ,Penarikan HRVGA Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses FO SM 4 Core (Vertical Cabling System) Instalasi dan Splicing Kabel FO dari Top Of Rack Switch ke Akses FO SM 24 Core
HARGA SATUAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp PEKERJAAN FIRE ALARM Rp MDFA (60 x 80 x 20) Rp Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels require a 24 VdcRp supply. Module for Pressurized Fan (Kontrol) Rp Module for AC Rp Leicense Key Rp Module for PABX (Autodial) Rp Module for Sound System Rp Module for Genset Panel Rp Isolated USB Upload/Download Lead Rp PANEL DXc1-S SINGLE LOOP REGION 2 Rp Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) Rp Panel Dxc4-M Four Loop Region 5 Rp Battery 12 V 17 AH Rp Terminal Box Fire Rp Av Phase Ii S/Strobe Non Iso Rp Rate Of Rise Heat Detector Rp Fixed Temperature Heat Detector Rp Breakglass Call point w/phone jack Rp Optical Smoke Detector Rp End of Line Rp Mias 200 Series Advance Base Rp Isolator Module Rp Reflektor Rp TBFA Rp Manual Call Point Backbox Rp Outside Screw & Yoke Supervisory Switch W/2 Spdt. Rp Waterflow Detector 2.5" Rp Conventional Zone Module, Mias, In. For Integrasi and M400K/t Rp Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Rp Output Module, Mias, In. For Integrasi Rp Rp PEKERJAAN TELEPHONE Rp PABX 16 Line / 160 Extention Rp PABX 8 Line / 80 Extention Rp PABX 2 Line / 12 Extension Rp MDF 160 Pairs Rp
3,127,805 pcs 133,681 pcs 1,937,951 unit 50,011 pcs 7,467,988 unit 14,935,976 unit 464,793 unit 929,555 unit 34,324 m 137,532 lot 129,139 m 81,530 m 299,818,421 lot 268,322,244 lot 6,741,765 lot 4,494,510 lot 248,224,809 unit 11,865,506 unit 3,415,828 unit 119,050,580 unit 67,831,144 unit 75,148,206 unit 51,417,194 unit 2,516,926 unit 2,121,409 unit 20,010,997 unit 539,341 unit 1,621,619 unit 93,486 pcs 70,474 pcs 49,619 pcs 47,462 pcs 3,768,197 unit 1,294,419 unit 226,523 unit 158,566 unit 738,718 titik 738,718 titik 738,718 titik 50,698 m 50,698 m 4,805,530 unit 24 42,722,192 Vdc supply and unit an RS485 1,177,112 unit 1,177,112 unit 7,573,642 unit 1,177,112 unit 1,177,112 unit 1,177,112 unit 7,244,701 unit 42,115,051 unit 56,563,293 unit 106,678,975 unit 1,922,212 unit 1,213,518 unit 4,621,921 bh 1,124,238 bh 1,124,238 bh 624,521 bh 1,174,226 bh 26,697 m' 161,942 bh 673,907 bh 1,419,816 bh 1,922,212 unit 159,896 unit 3,885,009 bh 3,422,701 bh 3,397,872 unit 2,148,664 unit 2,348,451 unit 215,511,752 unit 121,540,538 unit 7,066,269 unit 3,591,833 bh
Bahan Elektikal - page 23 of 211
NO
URAIAN
5 6 7 8 9 10 11 12 13 14 15 16 17 18 18 19
20 21 22
23 24
25 26 27 28 29 Q. 1
2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
HARGA SATUAN
MDF 80 Pairs Pesawat Telephone Single Line Faximile Socket Telephone Floor Socket Telephone HANDSET TELEPON (SIP) / TB 10 Pair HANDSET TELEPON (SIP) / TB 20 Pair HANDSET TELEPON (SIP) / TB 30 Pair Kabel ITC 2 x 2 x 2 x 0,6 mm2 Kabel ITC 10 x 2 x 2 x 0,6 mm2 Kabel ITC 20 x 2 x 2 x 0,6 mm2 Kabel ITC 30 x 2 x 2 x 0,6 mm2 Kabel ITC 80 x 2 x 2 x 0,6 mm2 IP PHONE SERIES SENTRAL UNIT PABX SIP PBX 20/200 PABX 6 Co line/100 Ext - Starter Package System Unit, 12 CO Lines + 36 (6 D+30 SLT) Extensions - 1 unit eMG800-MPB - 200 ports System License - 1 unit eMG800-BKSU - 30 ports IP Extension License - 1 unit eMG800-PSU - 5 copies UCS Std Desktop License - 1 unit eMG800-LCOB12 - 5 copies UCS Mobile License - 1 unit eMG800-SLIB24 24 ports Single Line Interface Board Proffesional Digital Proprietary Phone Single Line Telephone with CID (white grey/black) - CID Type 1 & DTMF • LCD Display - Monitoring (On Hook Dial) - Storage incoming call(199) 19” Rack Mounting Bracket(Option) Terminal Box PABX 1 Set : - Terminal Box 200 Pair 1 buah - Terminal LSA Highband 2 Dus ( 20 buah) - Breket LSA 11 way 4 bua Instalasi Telephone Setting Programing Commisioning Documentation
Rp 1,909,717 bh Rp 674,176 bh Rp 1,512,852 bh Rp 1,221,985 unit Rp 369,880 bh Rp 1,444,086 unit Rp 2,888,172 unit Rp 4,332,258 unit Rp 4,315 m' Rp 23,731 m' Rp 32,360 m' Rp 44,226 m' Rp 96,003 m' Rp 2,842,688 unit Rp Rp 412,596,013 lot Rp 53,295,899 set Rp Rp Rp Rp Rp Rp Rp 13,526,677 unit Rp 5,208,957 unit Rp 866,182 unit Rp Rp Rp Rp 8,539,569 unit Rp 1,752,859 set Rp Rp Rp Rp 138,227 titik Rp 2,516,926 lot Rp 3,272,003 lot Rp 3,595,608 lot Rp 1,078,682 lot Rp BUILDING AUTOMATION SYSTEM (BAS) Rp Data Center Rp Web Controller 12 IO Rp 66,855,836 unit RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB Rp Controller with 4 DALI Interface Rp Gateway Modbus OR BACnet Rp Fast Ethernet: 2 x 10/100 BaseT (RJ45) Rp Web Controller Onboard Ios DI8DO12 & AI8AO4 Rp 26,742,334 unit RAM memory: 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered: 2 MB Rp Controller with 4 DALI Interface Rp Gateway Modbus OR BACnet Rp Fast Ethernet: 2 x 10/100 BaseT (RJ45) Rp Capacitive Monitor Touch Screen minimum 10" Rp 23,304,034 unit LCD Display Nurse Station Operating Management Rp 6,112,534 unit - 32" complete with Mini PC for Control & monitoring AHU, Temperature, Humidity Sensor, Pressure,Stopwatch Rp& Digital Clock Software Management : OPENweb basic Rp 114,610,004 lot package for up to 1000 physical data points, 250 Modbus data points and 500 BACnet Objects Rp Hospital Automation System (HAS) Rp 20,629,801 unit '- Capacitive Monitor Touch Screen minimum 21,5" complete with Mini PC, for Control & monitoring AHU, Temperature, Rp Humidity Sensor, Pressure, Stop BAS Main PC Core i7, 52" Display Rp 30,562,668 unit IO Module DI8DO8T CPU : ARM7 Architecture Rp 9,168,800 unit IO Module DI16 CPU : ARM7 Architecture Rp 6,876,600 unit IO Module AI8AO4 CPU : ARM7 Architecture Rp 12,225,067 unit IO Module AO4 CPU : ARM7 Architecture Rp 6,494,567 unit Bridge bus connector Rp 114,610 unit Coupler module integrated bus terminating resistor Rp 1,031,490 unit Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Rp 764,067 pcs Instalation, Cable Cat6 to LAN Rp 668,558 ttk Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Rp 4,966,433 unit Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Rp 687,660 ttk Installation, cable STP 18 AWG for data communication between panel Rp 764,067 ttk Installation, cable STP 18 AWG Modbus for CO2 Transmitter Rp 534,847 ttk Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Rp 649,457 ttk Installation, cable NYM 3 x 1,5mm for power supply Rp 496,643 ttk Installation, Cable ITC 2 x 0.6mm for analog and digital point Rp 573,050 ttk Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift & Generator Rp Set 649,457 ttk Battery starting genset sensor voltage Rp 1,107,897 pcs Duct Temperature Sensor Rp 458,440 pcs Differential Pressure Transmitter Rp 1,910,167 pcs System Integration with AC System (BACNet) Rp 6,494,567 pcs System integration with Fire Alarm (ModBus) Rp 6,494,567 unit Differential Pressure Switch Rp 955,083 unit Bahan Elektikal - page 24 of 211
NO
URAIAN
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 R 1 2 3 4 5 6 7 8 40 41 42 43 44 45 46 47 S. 1 2 3 4 5 6 7
Mini Inverter to Control Exhaust Fan (Tangga Darurat) Rp Temperature Sensor PT 1000 Rp Room Temperature Sensor & Humidity Sensor Rp Pipe Temperature Rp Static Pressure Transmitter Rp Outside Temperature & Humidity Rp Control 0-100% Exhaust Fan Rp Slim Relay Rp Damper Modulating 10Nm Rp Damper Konstan 10Nm Rp Outdoor Temperature (PT1000) Rp Outdoor Humidity Sensor Rp Fuel Level Sensor Genset Rp Motion Sensor Rp Water Level Transmitter Rp Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Rp Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Rp Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Rp Rp DALI Interface Rp Web Controller DALI Rp RAM memory: 128 MB, NV-RAM battery buffered: 2 MB Rp Fast Ethernet: 2 x 10/100 BaseT (RJ45) Rp Controller with 4 DALI Interface Rp On/Off Module DALI to control lighting 1 channel Rp Touch Screen Glass On/Off DALI 1 Group Rp On/Off Module DALI to control lighting 2 channel Rp Touch Screen Glass On/Off DALI 2 Group Rp On/Off Module DALI to control lighting 6 channel Rp Touch Screen Glass On/Off DALI 6 Group Rp Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Rp Dimmable Module DALI to control lighting 1 channel Rp Touch Screen Glass Dimmable DALI 1 Group Rp Dimmable Module DALI to control lighting 2 channel Rp Touch Screen Glass Dimmable DALI 2 Group Rp RGB Module DALI to control lighting 6 channel Rp Saklar LCD control RGB DALI 6 group Rp Testing Comissioning dan Training Rp Testing and Commissioning Rp Training operator 2 person 2 days Rp Rp INFRASTRUCTURE ICT Rp Data Center : Rp Patchpanel UTP Cat6 24 port Loaded Rp Patchpanel UTP Cat6 48 port Loaded Rp Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT Rp Core Switch Layer 3 Rp Core Firewall + Router + IPS Rp Hdd PC WD CCTV PURPLE 4TB Rp IPPABX Headend Support Up to 400 Lines Rp IPPABX Headend Support Up to 200 Lines Rp Monitor 40" + Bracket Rp Monitor 32"+ PC for System Rp IPTV Management System ( Server + Software ) Rp IPTV Headend Rp Patch Cord 1 mtr Cat6 UTP Rp OTB (Optical Terminal Box) Rp UTP Cat 6 dalam conduit Rp Access Point (Wi-Fi) Rp Rp PEKERJAAN SOLAR PANEL Rp JSKYE 200 Wp Solar Panel Rp SMA Sunny Boy 1.5kW Rp SMA Sunny Island 4.4 Rp NS VRLA 12v 100 Ah Rp Panel Combiner Box Rp Cabling & accs Rp Solar Mounting Rp
HARGA SATUAN 955,083 1,795,557 1,604,540 534,847 1,031,490 1,528,133 573,050 152,813 1,528,133 1,222,507 1,795,557 981,826 2,215,793 687,660 2,865,250 2,903,453 2,941,657 2,139,387 44,697,901 878,677 1,069,693 955,083 1,146,100 1,222,507 1,528,133 458,440 916,880 687,660 880,205 782,404 3,820,333 3,224,361 35,956,080 8,989,020 3,221,665 6,443,329 781,757 289,446,441 341,582,756 1,589,101 289,356,551 144,678,275 5,982,642 26,612,443 332,234,176 159,824,774 130,341 2,182,714 786,539 5,707,578 1,618,024 13,483,530 43,147,296 2,516,926 9,887,922 4,943,961 4,045,059
unit unit unit unit unit unit unit unit unit unit pcs pcs pcs pcs unit unit unit unit unit
unit unit unit unit unit unit ttk unit unit unit unit unit unit lot lot
unit unit unit unit unit unit unit unit unit unit unit unit unit unit m' bh bh bh bh bh set lot set
Bahan Elektikal - page 25 of 211
NO
URAIAN 8 9
10 11 12 13 14
15 16
T. 1
2 3 4 5 6 7 8 9 10 11 12 U. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 V. 1
Battery Rack & Accs Inverter Hybrid san Solar Panel Charge Controller - Hybrid Inverter - Perlengkapan Proteksi - Box Panel Sistribusi - Grounding System Solar Cable 6mm2 MC4 Connector Female MC4 Connector Male Cable Trenching Prewiring and Components - Cable Tray 100x50 + Cover + Accessories - Cable Conduit Metal 3/4 '' @1roll 50m - HDPE Pipe 2" - Conduit Pipe 2" - Schoen Cable Grounding System Instalasi & Test Commisioning - Pekerjaan Pondasi & Pemasangan Bracket - Set Up Solar Panel System - Test & Commisioning
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp PEKERJAAN MASTER CLOCK Rp NTP Time Server Master Clock Rp - NTP V4 (fully V3 compatible), RFC 1305 (port 123) Rp - ax. number of NTP and SNTP requests per second: typically 250 Rp - 10BaseT / 100BaseTX (IEEE 802.3) Rp - Operation via LAN: Telnet or SSH, web interface or operation via SNMP Rp - Synchronized with GPS ± 10 µs to UTC Rp - GPS (DCF input) to NTP server typically < ± 0.5 m Rp - Power Supply AC input: 100 - 240 VAC / 50-60 Hz / max. 12 W Rp GPS Antenna Receiver Rp Converter Rp Teak Wood Clock Rp Installation Slave Clock Rp NTP to Signal Time Covert Module Rp Junction Box Master Clock (SERVER) Rp Analog Clock Lingkaran Dia.500mm,HH:MM Rp Analog Clock Lingkaran Dia.400mm,HH:MM Rp Junction Box Master Clock Rp TESTING & COMMISSIONING AND TRANING Rp Testing and Commissioning Rp Training operator 5 person 1 days Rp Rp PEKERJAAN NURSE CALL Rp Ruang Kontrol Rp Master Controller IP-Ark 1 + Data Report License Rp Desktop Touch Screen Nurse Station 18" Rp Event Management Module Rack + Interface License Rp IntelPage IP Paging Module Rack + Dipole Antenna Rp Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS Rp IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] Rp PSU 24 VDC Rp Over Bed Indicator Led Single Color Rp Patient Call Pendant, Momentary Action, Green Button, 2m Rp IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] Rp IP Net Room Controller Rp Flashing Over Door Light, 1 LED, Red, British Plate Rp IP Over Door Lamp 4 RGB Programmable Rp IP Corridor Digital Display, 12 Characters, 50mm Rp Panel Elektrikal lengkap dengan aksesorisnya Rp IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] Rp INSTALASI Rp Rp Instalasi UTP Data Cable CAT5e dalam conduit PVC HI 20 mm Rp Instalasi Central AC Power 3x2.5mm & DC Power 2x1.5mm Rp Instalasi Aksesoris Konektor, Plug, dan pendukung lain Rp Programming & Testing Commissioning Rp Training User & Maintenance (1x) Rp Instalasi Data Cable UTP Cat5e dalam conduit PVC HI 20 mm Rp Instalasi DC Power Cable 2x1.5mm dalam conduit PVC HI 20mm Rp Instalasi Looped AC Power Cable 3x2.5mm dalam conduit PVC HI 20mm Rp PEKERJAAN BED HEAD (SINGLE UNIT) Rp Bedhead Panel Medical Service (Material : Aluminum Extruded Powdercoat Finished ) Rp Dimensi : 1200mm x 220mm x 80mm Rp Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] Rp Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] Rp Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] Rp Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] Rp Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] Rp Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] Rp Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] Rp Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] Rp
HARGA SATUAN 16,180,236 49,439,609 49,080 6,427 6,427 67,418 30,738,178 24,270,354 26,967,060 30,337,942 19,011,777 7,968,766 13,348,695 404,506 8,090,118 485,407 5,663,083 10,395,802 485,407 22,472,550 8,989,020 105,020,967 54,634,589 99,099,450 56,697,569 28,652,501 3,392,456 5,730,500 1,705,855 1,107,897 2,530,589 11,285,265 1,581,618 2,425,912 22,904,198 3,820,333 2,303,661 859,575 5,730,500 38,203,335 13,371,167 5,730,500 859,575 573,050 3,820,333 2,177,590 76,162,168 38,081,084 27,200,774 21,760,619 21,775,901 17,229,704 16,320,465 10,880,310
lot lot
m pcs pcs m set
set lot
unit
unit unit unit titik unit unit unit unit unit lot lot
set set set set set set bh bh bh bh bh bh bh bh bh bh ls ls ls ls ls titik titik titik
unit unit unit unit unit unit unit unit unit
Bahan Elektikal - page 26 of 211
NO
URAIAN Dimensi Dimensi Dimensi Dimensi Dimensi 2 3 4 5 6 7 8 9 9
: : : : :
7100mm 6000mm 5900mm 5700mm 4700mm
x x x x x
220mm 220mm 220mm 220mm 220mm
x x x x x
80mm 80mm 80mm 80mm 80mm
[3 [2 [2 [2 [2
Bed Bed Bed Bed Bed
Patients] Patients] Patients] Patients] Patients]
Accessories : 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 x Universal Socket 16A 250V - Vivase Schneider 1 x Single Switch 16A 250V - Vivase Schneider 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 x Patient Name Tag Provision Access for Medical Gas Outlet Provision Access for Nurse Call Outlet Pengadaan Bedhead Panel Service Wall to Wall Biaya Instalasi Bedhead Panel Medical Service
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
13,600,387 10,880,310 10,880,310 10,336,294 9,069,472 177,646 86,722 106,969 61,507 238,771 28,653 9,551 9,551 202,253
unit unit unit unit unit bh bh bh bh bh bh ttk ttk unit
Bahan Elektikal - page 27 of 211
ANALISA HARGA SATUAN ELEKTRIKAL PEKERJAAN PERENCANA URAIAN
NO. 1 M' 1 2 3 4
Kabel TM N2XSY 3 x ( 1 x 50 mm2) Kabel N2XSY 1 x 50 mm2 Galian, urugan & pelindung kabel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (1 x 120 mm2) + Grounding Kabel N2XSY 1 x 120 mm2 Galian, urugan & pelindung kabel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (4 X 300) mm2 + Grounding Kabel N2XSY 1 x 300 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding Kabel N2XSEbY 3 x 120 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSEbY 7 x (4 x 300) mm2 + Grounding Kabel N2XSEbY 3 x 240 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
Kabel TM N2XSY 3 x (1 x 120) mm2 + Grounding Kabel N2XSY 1 x 120 mm2 NYA 1 x 120 mm2 (grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR NYM 3 x 2,5 mm2 + Grounding Kabel NYM 3 x 2,5 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR NYMHY 3 x 2,5 mm2 + Grounding KABEL TR NYMHY 3 x 2,5 mm2 + Grounding Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x 50 mm2 + Grounding Kabel NYY 3 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 4 mm2 + Grounding Kabel NYY 4 x 4 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
HARGA SATUAN
JUMLAH HARGA
118,655 -
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
118,655 -
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
12.00 Rp 12.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
7.00 Rp 7.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
16,180 324
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
85,000 80,000 Jumlah Keuntungan 5%
TOTAL HARGA
Rp Rp Rp
355,965 -
Rp Rp Rp Rp Rp
7,083 13,333 376,382 9,410 385,791
Rp Rp Rp
355,965 -
Rp Rp Rp Rp Rp
7,083 13,333 376,382 9,410 385,791
Rp Rp Rp
-
Rp Rp Rp Rp Rp
7,083 13,333 20,417 510 20,927
Rp Rp Rp
-
Rp Rp Rp Rp Rp
7,083 13,333 20,417 510 20,927
Rp Rp Rp
-
Rp Rp Rp Rp Rp
7,083 13,333 20,417 510 20,927
Rp Rp Rp
-
Rp Rp Rp Rp Rp
7,083 13,333 20,417 510 20,927
Rp Rp Rp
-
Rp Rp Rp Rp Rp
5,667 10,667 16,333 408 16,742
Rp Rp Rp
16,180 324
Rp Rp Rp Rp Rp
5,667 10,667 32,837 821 33,658
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp
1,771 3,333 5,104 128
Rp
385,791
Rp
385,791
Rp
20,927
Rp
20,927
Rp
20,927
Rp
20,927
Rp
16,742
Rp
33,658
Rp
5,232
Rp
5,232
Analisa Harga Satuan Elektrikal - page 28 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Total = Jumlah+(Keuntungan 5%) Rp 1 M' 1 2 3 4
KABEL TR, NYY 4 x 6 mm2 + Grounding Kabel NYY 4x6 mm2 Kabel NYA 1 x 2,5 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 10 mm2 + Grounding Kabel NYY 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 (4 x 10 mm2 ) + Grounding Kabel NYY 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 16 mm2 + Grounding Kabel NYY 4 x 16 mm2 Kabel NYA 1 x 10 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 25 mm2 + Grounding Kabel NYY 4 x 25 mm2 Kabel NYA 1 x 10 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 35 mm2 + Grounding Kabel NYY 4 x 35 mm2 Kabel NYA 1 x 16 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 50 mm2 + Grounding Kabel NYY 4 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 70 mm2 + Grounding Kabel NYY 4 x 70 mm2 Kabel NYA 1 x 35 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 95 mm2 + Grounding Kabel NYY 4 x 95 mm2 Kabel NYA 1 x 50 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 120 mm2 + Grounding Kabel NYY 4 x 120 mm2 Kabel NYA 1 x 70 mm2 Instalasi Tenaga Kerja :
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
2.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' lot
-
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp 1.00 Rp
-
TOTAL HARGA
5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,771 3,333 5,104 128 5,232
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp
5,232
Rp
5,232
Rp
5,232
Rp
5,232
Rp
5,232
Rp
5,232
Rp
5,232
Rp
5,232
Rp
6,278
Rp
6,278
Analisa Harga Satuan Elektrikal - page 29 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
JUMLAH HARGA
0.03 Rp 0.05 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 M' 1 2 3 4
KABEL TR, NYY 4 x 150 mm2 + Grounding Kabel NYY 4 x 150 mm2 Kabel NYA 1 x 70 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 185 mm2 + Grounding Kabel NYY 4x185 mm2 Kabel NYA 1 x 95 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 240 mm2 + Grounding Kabel NYY 4 x 240 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x 300 mm2 + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x (4 x 150 mm2) + Grounding Kabel NYY 4 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x (4 x 300 mm2) + Grounding Kabel NYY 4 x 300 mm3 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x (4 x 300 mm2) + Grounding Kabel NYY 4 x 300 mm3 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding Kabel NYY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding Kabel NYY 1 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
M' M' lot
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
1 M' 1 2 3
KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding Kabel NYY 1 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi
M' M' lot
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) -
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 12.00 Rp 12.00 Rp 1.00 Rp
-
TOTAL HARGA
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Analisa Harga Satuan Elektrikal - page 30 of 211
URAIAN
NO. 4
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
1 M' 1 2 3 4
KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding Kabel NYY 1 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 16 x (1 x 240) mm2 + Grounding Kabel NYY 1 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x 4 ( 1 X 300 mm2 ) + Grounding Kabel NYY 1 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 ( 1 X 300 mm2 ) + Grounding Kabel NYY 1 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 4 x ( 3 x 300 mm2 ) + Grounding Kabel NYY 3 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR FRC 3 x 4 mm2 + Grounding Kabel FRC 3 x 4 mm2 Kabel NYA 1 x 10 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR FRC 2 x 2,5 mm2 + Grounding KABEL TR FRC 2 x 2,5 mm2 + Grounding Kabel NYA 1 x 10 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 (Grounding) M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 7 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 (Grounding) M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
INDEK
HARGA SATUAN
JUMLAH HARGA
0.03 Rp 0.05 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
16.00 Rp 16.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
12.00 Rp 12.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
4.00 Rp 4.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 2.00 2.00 1.00 2.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 7.00 7.00 1.00 7.00
Rp Rp Rp Rp
0.02 Rp 0.03 Rp
118,655
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp Rp
237,310
Rp Rp Rp Rp Rp
1,417 2,667 241,393 6,035 247,428
Rp Rp Rp Rp
830,585
Rp Rp Rp Rp Rp
1,417 2,667 834,669 20,867 855,535
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
6,278
Rp
4,185
Rp
4,185
Rp
247,428
Rp
855,535
Analisa Harga Satuan Elektrikal - page 31 of 211
URAIAN
NO.
SAT
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x ( 4 X 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 300 mm2 + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 3 x (4 X 300 mm2 ) + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 6 x (4 X 300 mm2 ) + Grounding Kabel NYY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, NYY 2 x 4 (1 x 185) mm2 + Grounding Kabel NYY 1 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x ( 1 X 150 mm2 ) + Grounding Kabel NYFGbY 4 x 150 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x ( 4 X 150 mm2 ) + Grounding Kabel NYFGbY 4 x 150 mm2 M' Kabel NYA 1 x 120 mm2 (Grounding) M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 185 mm2 + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x (4 x 185 mm2) + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
INDEK 4.00 4.00 1.00 4.00
HARGA SATUAN Rp Rp Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
hari orang hari orang
0.02 Rp 0.03 Rp
6.00 Rp 6.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
8.00 Rp 8.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
M' M' lot M' hari orang hari orang
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
hari orang hari orang
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
M' M' lot M'
118,655
0.02 Rp 0.03 Rp
3.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
118,655
0.02 Rp 0.03 Rp
M' M' lot
M' M' lot M'
JUMLAH HARGA
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 4.00 4.00 1.00 4.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 2.00 2.00 1.00 2.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 2.00 2.00 1.00 2.00
Rp Rp Rp Rp
0.02 Rp 0.03 Rp
118,655
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
474,620
Rp Rp Rp Rp Rp
1,417 2,667 478,704 11,968 490,671
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
1,417 2,667 122,738 3,068 125,807
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp Rp
474,620
Rp Rp Rp Rp Rp
1,417 2,667 478,704 11,968 490,671
Rp Rp Rp Rp
237,310
Rp Rp Rp Rp Rp
1,417 2,667 241,393 6,035 247,428
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
1,417 2,667 122,738 3,068 125,807
Rp Rp Rp Rp
237,310
Rp Rp Rp Rp Rp
1,417 2,667 241,393 6,035 247,428
Rp
490,671
Rp
125,807
Rp
4,185
Rp
4,185
Rp
4,185
Rp
490,671
Rp
247,428
Rp
125,807
Rp
247,428
Analisa Harga Satuan Elektrikal - page 32 of 211
URAIAN
NO. 1 M' 1 2 3 4 5
KABEL TR, NYFGbY 3 x (4 x 185 mm2) + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 240 mm2 + Grounding Kabel NYFGbY 4 x 240 mm2 Kabel NYA 1 x 120 mm2 (Grounding) Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGby 3 x (4 x 300 mm2) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 x (1 X 240 mm2) + Grounding Kabel FRC 4 x 240 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 2 x (4 X 300 mm2) + Grounding Kabel FRC 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 x (1 x 185 mm2) + Grounding Kabel FRC 1 x 185 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 2 x 4 X 150 mm2 + Grounding Kabel FRC 4 x 150 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 150 mm2 + Grounding Kabel FRC 4 x 150 mm2 Kabel NYA 1 x 120 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 70 mm2 + Grounding Kabel FRC 4 x 70 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 50 mm2 + Grounding Kabel FRC 4 x 50 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik
SAT
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
INDEK
3.00 3.00 1.00 3.00
HARGA SATUAN
Rp Rp Rp Rp
JUMLAH HARGA
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 3.00 3.00 1.00 3.00
Rp Rp Rp Rp
118,655
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
1,002,684 20,054
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
4.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
2.00 Rp 2.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
355,965
Rp Rp Rp Rp Rp
1,417 2,667 360,049 9,001 369,050
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
1,417 2,667 122,738 3,068 125,807
Rp Rp Rp Rp
355,965
Rp Rp Rp Rp Rp
1,417 2,667 360,049 9,001 369,050
Rp Rp Rp
1,002,684 20,054
Rp Rp Rp Rp Rp
1,417 2,667 1,026,821 25,671 1,052,492
Rp Rp Rp
-
Rp Rp Rp Rp Rp
1,417 2,667 4,083 102 4,185
Rp Rp Rp
-
Rp Rp Rp Rp Rp
2,125 4,000 6,125 153 6,278
Rp Rp Rp
-
Rp Rp Rp Rp Rp
3,542 6,667 10,208 255 10,464
Rp Rp Rp
-
Rp Rp Rp Rp Rp
3,542 6,667 10,208 255 10,464
Rp Rp Rp
-
Rp Rp Rp Rp Rp
3,542 6,667 10,208 255 10,464
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
-
Rp Rp Rp
-
hari orang
0.04 Rp
85,000
Rp
3,542
Rp
369,050
Rp
125,807
Rp
369,050
Rp
1,052,492
Rp
4,185
Rp
6,278
Rp
10,464
Rp
10,464
Rp
10,464
Rp
10,464
Analisa Harga Satuan Elektrikal - page 33 of 211
URAIAN
NO. Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 35 mm2 + Grounding Kabel FRC 4 x 35 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 16 mm2 + Grounding Kabel FRC 4 x 16 mm2 Kabel NYA 1 x 25 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4
KABEL TR, FRC 4 X 10 mm2 + Grounding Kabel FRC 4 x 10 mm2 Kabel NYA 1 x 6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 6 mm2 + Grounding Kabel NYFGbY 4 x 6 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 4 mm2 + Grounding Kabel NYFGbY 4 x 4 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 16 mm2 + Grounding Kabel NYFGbY 4 x 16 mm2 Kabel NYA 1 x 6 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 35 mm2 + Grounding Kabel NYFGbY 4 x 35 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 70 mm2 + Grounding Kabel NYFGbY 4 x 70 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 4 x 95 mm2 + Grounding Kabel NYFGbY 4 x 95 mm2 Kabel NYA 1 x 95 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2
KABEL TR, NYFGbY 4 x 120 mm2 + Grounding Kabel NYFGbY 4 x 120 mm2 Kabel NYA 1 x 95 mm2
SAT hari orang
INDEK
HARGA SATUAN
80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
M' M' lot M' hari orang hari orang
M' M'
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
hari orang hari orang
-
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' M' lot
M' M' lot M'
JUMLAH HARGA
0.08 Rp
306,256 6,125
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
-
TOTAL HARGA
Rp Rp Rp Rp
6,667 10,208 255 10,464
Rp Rp Rp
-
Rp Rp Rp Rp Rp
3,542 6,667 10,208 255 10,464
Rp Rp Rp
-
Rp Rp Rp Rp Rp
3,542 6,667 10,208 255 10,464
Rp Rp Rp
306,256 6,125
Rp Rp Rp Rp Rp
3,542 6,667 322,589 8,065 330,654
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp
-
Rp
10,464
Rp
10,464
Rp
330,654
Rp
132,085
Rp
132,085
Rp
132,085
Rp
132,085
Rp
132,085
Rp
132,085
Rp
132,085
Analisa Harga Satuan Elektrikal - page 34 of 211
URAIAN
NO. 3 4 5
1 M' 1 2 3 4 5
Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
KABEL TR, NYFGbY 4 x 185 mm2 + Grounding Kabel NYFGbY 4 x 185 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
lot M'
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
M' M' lot M' hari orang hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 5 x 4 (1 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 3 x (4 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 Kabel NYA 1 x 120 mm2 Instalasi Galian, urugan & pelindung kabel Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3 4 5
KABEL TR, NYFGbY 2 x 4 (1 x 300 mm2 ) + Grounding Kabel NYFGbY 4 x 300 mm2 M' Kabel NYA 1 x 120 mm2 M' Instalasi lot Galian, urugan & pelindung kabel M' Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 M' 1 2 3
Kabel ITC 2 x 2 x 2 x 0,6 mm2 Kabel ITC 2 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 10 x 2 x 2 x 0,6 mm2 Kabel ITC 10 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 20 x 2 x 2 x 0,6 mm2 Kabel ITC 20 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel ITC 30 x 2 x 2 x 0,6 mm2 Kabel ITC 30 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Mandor Kepala Tukang listrik Tukang
1 M' 1 2 3
Kabel ITC 80 x 2 x 2 x 0,6 mm2 Kabel ITC 80 x 2 x 2 x 0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel STP 18 AWG 1 Pair Kabel STP 18 AWG 1 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
M' M' lot M' hari orang hari orang
118,655
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 1.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 5.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 3.00 3.00 1.00 3.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 2.00 2.00 1.00 2.00
Rp Rp Rp Rp
118,655
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
4,315 86
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
23,731 475
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
32,360 647
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang hari orang
0.08 Rp 0.08 Rp 0.08 Rp
44,226 885
90,000 85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
96,003 1,920
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp Rp Rp
118,655
Rp Rp Rp Rp Rp
3,542 6,667 128,863 3,222 132,085
Rp Rp Rp Rp
593,275
Rp Rp Rp Rp Rp
3,542 6,667 603,484 15,087 618,571
Rp Rp Rp Rp
355,965
Rp Rp Rp Rp Rp
3,542 6,667 366,174 9,154 375,328
Rp Rp Rp Rp
237,310
Rp Rp Rp Rp Rp
3,542 6,667 247,518 6,188 253,706
Rp Rp
4,315 86
Rp Rp Rp Rp Rp
1,417 2,667 8,484 212 8,696
Rp Rp
23,731 475
Rp Rp Rp Rp Rp
1,417 2,667 28,289 707 28,996
Rp Rp
32,360 647
Rp Rp Rp Rp Rp
1,417 2,667 37,091 927 38,018
Rp Rp
44,226 885
Rp Rp Rp Rp Rp Rp
7,500 7,083 6,667 66,360 1,659 68,020
Rp Rp
96,003 1,920
Rp Rp Rp Rp Rp
1,417 2,667 102,006 2,550 104,556
M' lot
1.00 Rp 1.00 Rp
10,297 206
Rp Rp
10,297 206
hari orang hari orang
0.02 Rp 0.03 Rp
85,000 80,000 Jumlah
Rp Rp Rp
1,417 2,667 14,586
TOTAL HARGA
Rp
132,085
Rp
618,571
Rp
375,328
Rp
253,706
Rp
8,696
Rp
28,996
Rp
38,018
Rp
68,020
Rp
104,556
Rp
14,950
Analisa Harga Satuan Elektrikal - page 35 of 211
URAIAN
NO.
1 BTG 1 2 3
KABEL TRAY LEBAR 20 CM 1BTG > 4M Kabel Tray lebar 20 cm (200 x100 mm) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BTG 1 2 3
KABEL TRAY LEBAR 40 CM - 1BTG > 4M Kabel Tray lebar 40 cm (400 x 100 mm) Instalasi Tenaga Kerja : Mandor Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TRAY LEBAR 80 CM 1BTG > 4M Kabel Tray lebar 80 cm (800 x 100 mm) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
btg lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
737,999 14,760
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
btg lot
1.00 Rp 1.00 Rp
hari orang hari orang hari orang
0.06 Rp 0.06 Rp 0.12 Rp
1,075,986 21,520
90,000 85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
2,151,971 43,039
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Jointing / Connector Tray c/w bolt & Nut H100 Jointing / Connector Tray c/w bolt & Nut H100 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Exit 5 W + Baterai Lampu Exit 5 W + Baterai Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Tube Line (True Line Slim Balance) LED 20 W + Gantungan Tube Line (True Line Slim Balance) LED 20 W + Gantungan bh Gantungan lot Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2
Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Tool Kit Emergency Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Toolbh Kit Emergency 1.00 Rp Gantungan lot 1.00 Rp Tool Kit Emergency (Lampu) bh 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Rp Tukang Listrik hari orang 0.07 Rp
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.06 Rp 0.12 Rp
33,619 672
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
699,705 13,994
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp 1.00 Rp
1,689,936 84,497 33,799
0.03 Rp 0.07 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1,689,936 84,497 363,876 33,799
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 BH 1 2 3
Lampu LED Panel 36 W Lampu LED Panel 36 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Panel 26 W Lampu LED Panel 26 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Batten 36 W + Inter Cable Lampu LED Batten 36 W + Inter Cable Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
JUMLAH HARGA
Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
1 PCS 1 2 3
3 4
HARGA SATUAN
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
895,306 17,906
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
895,306 17,906
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
693,952 13,879
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
365 14,950
Rp Rp
737,999 14,760
Rp Rp Rp Rp Rp
4,958 9,333 767,050 19,176 786,226
Rp Rp
1,075,986 21,520
Rp Rp Rp Rp Rp Rp
5,250 4,958 9,333 1,117,047 27,926 1,144,973
Rp Rp
2,151,971 43,039
Rp Rp Rp Rp Rp
4,958 9,333 2,209,302 55,233 2,264,535
Rp Rp
33,619 672
Rp Rp Rp Rp Rp
4,958 9,333 48,583 1,215 49,798
Rp Rp
699,705 13,994
Rp Rp Rp Rp Rp
2,833 5,333 721,866 18,047 739,913
Rp Rp Rp
1,689,936 84,497 33,799
Rp Rp Rp Rp Rp
2,833 5,333 1,816,398 45,410 1,861,808
Rp Rp Rp Rp
1,689,936 84,497 363,876 33,799
Rp Rp Rp Rp Rp
2,833 5,333 2,180,273 54,507 2,234,780
Rp Rp
895,306 17,906
Rp Rp Rp Rp Rp
2,833 5,333 921,379 23,034 944,414
Rp Rp
895,306 17,906
Rp Rp Rp Rp Rp
2,833 5,333 921,379 23,034 944,414
Rp Rp
693,952 13,879
Rp Rp Rp Rp Rp
2,833 5,333 715,998 17,900 733,898
TOTAL HARGA
Rp
786,226
Rp
1,144,973
Rp
2,264,535
Rp
49,798
Rp
739,913
Rp
1,861,808
Rp
2,234,780
Rp
944,414
Rp
944,414
Rp
733,898
Analisa Harga Satuan Elektrikal - page 36 of 211
URAIAN
NO. 1 BH 1 2 3
Lampu LED Batten 20 W + Inter Cable Lampu LED Batten 20 W + Inter Cable Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Prismatic 36 W Lampu LED Prismatic 36 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Prismatic 20 W Lampu LED Prismatic 20 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Panel LED Dust Proof 40 W Lampu Panel LED Dust Proof 40 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Panel LED Dust Proof 26 W Lampu Panel LED Dust Proof 26 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu TLT5 1x12 W (BALK) Lampu TLT5 1x12 W (BALK) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light Spot 23 W Lampu LED Down Light Spot 23 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Spot Light 15 W Lampu LED Spot Light 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Spot Light 23 W Lampu LED Spot Light 23 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 4 W Lampu LED Down Light 4 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 5 W Lampu Down Light LED 5 W Instalasi Tenaga Kerja :
SAT
INDEK
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
586,084 11,722
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
835,619 16,712
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
538,622 10,772
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
835,619 16,712
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
538,622 10,772
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
251,693 5,034
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
341,439 6,829
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
1,315,993 26,320
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
1,315,993 26,320
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
bh lot
HARGA SATUAN
168,994 3,380
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
168,994 3,380
JUMLAH HARGA
Rp Rp
586,084 11,722
Rp Rp Rp Rp Rp
2,833 5,333 605,972 15,149 621,122
Rp Rp
835,619 16,712
Rp Rp Rp Rp Rp
2,833 5,333 860,498 21,512 882,011
Rp Rp
538,622 10,772
Rp Rp Rp Rp Rp
2,833 5,333 557,561 13,939 571,500
Rp Rp
835,619 16,712
Rp Rp Rp Rp Rp
2,833 5,333 860,498 21,512 882,011
Rp Rp
538,622 10,772
Rp Rp Rp Rp Rp
2,833 5,333 557,561 13,939 571,500
Rp Rp
251,693 5,034
Rp Rp Rp Rp Rp
2,833 5,333 264,893 6,622 271,515
Rp Rp
341,439 6,829
Rp Rp Rp Rp Rp
2,833 5,333 356,434 8,911 365,345
Rp Rp
1,315,993 26,320
Rp Rp Rp Rp Rp
2,833 5,333 1,350,479 33,762 1,384,241
Rp Rp
1,315,993 26,320
Rp Rp Rp Rp Rp
2,833 5,333 1,350,479 33,762 1,384,241
Rp Rp
168,994 3,380
Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
168,994 3,380
TOTAL HARGA Rp
621,122
Rp
882,011
Rp
571,500
Rp
882,011
Rp
571,500
Rp
271,515
Rp
365,345
Rp
1,384,241
Rp
1,384,241
Rp
185,054
Rp
185,054
Analisa Harga Satuan Elektrikal - page 37 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 6 W Lampu LED Down Light 6 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 7 W Lampu LED Down Light 7 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 9 W Lampu LED Down Light 9 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 10 W Lampu LED Down Light 10 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 13 W Lampu LED Down Light 13 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 16 W Lampu LED Down Light 16 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light 30 W Lampu LED Down Light 30 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Down Light Outbow 12 W Lampu LED Down Light Outbow 12 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu LED Down Light 9 W + Tool Kit Emergency Lampu LED Down Light 9 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu LED Down Light 13 W + Tool Kit Emergency Lampu LED Down Light 13 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.03 Rp 0.07 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
168,994 3,380
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
194,163 3,883
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
237,310 4,746
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
237,310 4,746
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
237,310 4,746
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
305,627 6,113
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
916,880 18,338
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
147,420 2,948
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
237,310 363,876 4,746
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
237,310 363,876 4,746
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
168,994 3,380
Rp Rp Rp Rp Rp
2,833 5,333 180,540 4,514 185,054
Rp Rp
194,163 3,883
Rp Rp Rp Rp Rp
2,833 5,333 206,213 5,155 211,368
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
237,310 4,746
Rp Rp Rp Rp Rp
2,833 5,333 250,223 6,256 256,479
Rp Rp
305,627 6,113
Rp Rp Rp Rp Rp
2,833 5,333 319,906 7,998 327,904
Rp Rp
916,880 18,338
Rp Rp Rp Rp Rp
2,833 5,333 943,384 23,585 966,969
Rp Rp
147,420 2,948
Rp Rp Rp Rp Rp
2,833 5,333 158,535 3,963 162,498
Rp Rp Rp
237,310 363,876 4,746
Rp Rp Rp Rp Rp
2,833 5,333 614,099 15,352 629,451
Rp Rp Rp
237,310 363,876 4,746
Rp Rp Rp Rp Rp
2,833 5,333 614,099 15,352 629,451
TOTAL HARGA
Rp
185,054
Rp
211,368
Rp
256,479
Rp
256,479
Rp
256,479
Rp
327,904
Rp
966,969
Rp
162,498
Rp
629,451
Rp
629,451
Analisa Harga Satuan Elektrikal - page 38 of 211
URAIAN
NO. 1 BH 1 2 3 4
Lampu LED Down Light 16 W + Tool Kit Emergency Lampu LED Down Light 16 W + Tool Kit Emergency Tool Kit Emergency (Lampu) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED 60 x 60 20 W Lampu LED 60 x 60 20 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Lampu Strip 5 W / meter + Driver + Diffuser Lampu Strip 5 W / meter + Driver + Diffuser Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Dinding 5 W Lampu LED Dinding 5 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Sensor Lampu Sensor Lampu Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Jalan LED (2 x 20 )W + TIANG Lampu Jalan LED ( 2 x 20 W ) Tiang Lampu Jalan (P : 7 m) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Jalan LED (1 x 20 )W + TIANG Lampu Jalan LED ( 1 x 20 W ) Tiang Lampu Jalan (P : 7 m) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED Plat 12 W + baterai Lampu LED Plat 12 W + baterai Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu LED RMO 12 W Lampu LED RMO 12 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Tiang Lampu Jalan (P : 8 m) Tiang Lampu Galvanised tinggi 8 M Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Tree Light 10 W Lampu Tree Light 10 W Instalasi Tenaga Kerja : Kepala Tukang listrik
SAT
INDEK
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
HARGA SATUAN
305,627 363,876 6,113
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
810,810 16,216
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
631,389 12,628
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
179,780 3,596
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
1,226,439 24,529
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
24,126,529 2,286,807 528,267
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
12,063,265 2,286,807 287,001
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
302,031 6,041
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
192,365 3,847
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
2,286,807 200,000 49,736
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA
Rp Rp Rp
305,627 363,876 6,113
Rp Rp Rp Rp Rp
2,833 5,333 683,781 17,095 700,876
Rp Rp
810,810 16,216
Rp Rp Rp Rp Rp
2,833 5,333 835,192 20,880 856,072
Rp Rp
631,389 12,628
Rp Rp Rp Rp Rp
2,833 5,333 652,183 16,305 668,488
Rp Rp
179,780 3,596
Rp Rp Rp Rp Rp
2,833 5,333 191,543 4,789 196,331
Rp Rp
1,226,439 24,529
Rp Rp Rp Rp Rp
2,833 5,333 1,259,135 31,478 1,290,613
Rp Rp Rp
24,126,529 2,286,807 528,267
Rp Rp Rp Rp Rp
2,833 5,333 26,949,769 673,744 27,623,514
Rp Rp Rp
12,063,265 2,286,807 287,001
Rp Rp Rp Rp Rp
2,833 5,333 14,645,239 366,131 15,011,370
Rp Rp
302,031 6,041
Rp Rp Rp Rp Rp
2,833 5,333 316,238 7,906 324,144
Rp Rp
192,365 3,847
Rp Rp Rp Rp Rp
2,833 5,333 204,379 5,109 209,488
Rp Rp Rp
2,286,807 200,000 49,736
Rp Rp Rp Rp Rp
2,833 5,333 2,544,709 63,618 2,608,327
bh lot
1.00 Rp 1.00 Rp
2,566,545 51,331
Rp Rp
2,566,545 51,331
hari orang
0.03 Rp
85,000
Rp
2,833
TOTAL HARGA Rp
700,876
Rp
856,072
Rp
668,488
Rp
196,331
Rp
1,290,613
Rp
27,623,514
Rp
15,011,370
Rp
324,144
Rp
209,488
Rp
2,608,327
Rp
2,691,694
Analisa Harga Satuan Elektrikal - page 39 of 211
URAIAN
NO. Tukang Listrik
1 BH 1 2 3
Lampu Bollard Light 18 W Lampu Bollard Light 18 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Taman Essential 18 W Lampu Taman Essential 18 W Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3 4
Lampu Taman Essential 28 W Lampu Taman Essential 28 W Pondasi tiang Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Up Light 5 W Lampu Up Light 5 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Lampu Track Spot 15 W Lampu Track Spot 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SENSOR SYSTEM SENSOR SYSTEM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SAKLAR TUNGGAL 10A SAKLAR TUNGGAL 10A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SAKLAR GANDA 10A SAKLAR GANDA 10A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SAKLAR PUTAR 10A SAKLAR PUTAR 10A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 1 Phase (Partisi) Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 1 Phase Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik
SAT hari orang
INDEK
HARGA SATUAN
0.07 Rp
80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
2,678,728 53,575
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
1,869,716 200,000 41,394
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
2,711,088 200,000 58,222
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
898,902 17,978
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.07 Rp
583,208 11,664
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
2,869,295 57,386
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
19,517 390
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
25,686 514
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
23,664 473
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
153,389 3,068
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp
5,333 2,626,043 65,651 2,691,694
Rp Rp
2,678,728 53,575
Rp Rp Rp Rp Rp
2,833 5,333 2,740,469 68,512 2,808,981
Rp Rp Rp
1,869,716 200,000 41,394
Rp Rp Rp Rp Rp
2,833 5,333 2,119,277 52,982 2,172,259
Rp Rp Rp
2,711,088 200,000 58,222
Rp Rp Rp Rp Rp
2,833 5,333 2,977,477 74,437 3,051,914
Rp Rp
898,902 17,978
Rp Rp Rp Rp Rp
2,833 5,333 925,047 23,126 948,173
Rp Rp
583,208 11,664
Rp Rp Rp Rp Rp
2,833 5,333 603,038 15,076 618,114
Rp Rp
2,869,295 57,386
Rp Rp Rp Rp Rp
2,125 4,000 2,932,806 73,320 3,006,126
Rp Rp
19,517 390
Rp Rp Rp Rp Rp
2,125 4,000 26,033 651 26,684
Rp Rp
25,686 514
Rp Rp Rp Rp Rp
2,125 4,000 32,325 808 33,133
Rp Rp
23,664 473
Rp Rp Rp Rp Rp
2,125 4,000 30,262 757 31,018
Rp Rp
153,389 3,068
Rp Rp Rp Rp Rp
2,125 4,000 162,581 4,065 166,646
bh lot
1.00 Rp 1.00 Rp
94,169 1,883
Rp Rp
94,169 1,883
hari orang
0.03 Rp
85,000
Rp
2,125
TOTAL HARGA
Rp
2,808,981
Rp
2,172,259
Rp
3,051,914
Rp
948,173
Rp
618,114
Rp
3,006,126
Rp
26,684
Rp
33,133
Rp
31,018
Rp
166,646
Rp
104,732
Analisa Harga Satuan Elektrikal - page 40 of 211
URAIAN
NO. Tukang Listrik
1 BH 1 2 3
STOP KONTAK DAYA / 3 Phase Stop kontak daya 10/16 A Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN EMERGENCY Kabel FRC 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI PENERANGAN LUAR Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI STOP KONTAK Kabel NYM 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3
TITIK INSTALASI DAYA AC INDOOR Kabel NYY 4 x 10 mm2 Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3
TITIK INSTALASI DAYA AC OUTDOOR Kabel NYY 4 x 25 mm2 Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK TITIK INSTALASI TELEPHONE 1 Instalasi Telephone Include : - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser
SAT hari orang
INDEK
HARGA SATUAN
0.05 Rp
80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
M' M' bh bh bh bh bh bh hari orang hari orang
M' M' bh bh bh bh bh bh hari orang hari orang
M' M' bh bh bh bh bh bh hari orang hari orang
M' M' bh bh bh bh bh bh hari orang hari orang
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
5,393 4,495 3,596 4,495 1,798 1,798 1,798
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
84,227 5,393 4,495 3,596 4,495 1,798 1,798 1,798
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 7.00 7.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
5,393 4,495 3,596 4,495 1,798 1,798 1,798
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
5,393 4,495 3,596 4,495 1,798 1,798 1,798
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' bh
5.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
1,798
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' bh
5.00 Rp 1.00 Rp
hari orang hari orang
0.23 Rp 0.47 Rp
titik
283,478 5,670
1,798
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp
138,227
JUMLAH HARGA Rp Rp Rp Rp
4,000 102,177 2,554 104,732
Rp Rp
283,478 5,670
Rp Rp Rp Rp Rp
2,125 4,000 295,272 7,382 302,654
Rp Rp Rp Rp Rp Rp Rp Rp
26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 97,593 2,440 100,033
Rp Rp Rp Rp Rp Rp Rp Rp
421,136 26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 518,729 12,968 531,697
Rp Rp Rp Rp Rp Rp Rp Rp
37,754 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 108,380 2,710 111,090
Rp Rp Rp Rp Rp Rp Rp Rp
26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
10,625 20,000 97,593 2,440 100,033
Rp Rp
1,798
Rp Rp Rp Rp Rp
10,625 20,000 32,423 811 33,233
Rp Rp
1,798
Rp Rp Rp Rp Rp
19,833 37,333 58,964 1,474 60,439
Rp
138,227
TOTAL HARGA
Rp
302,654
Rp
100,033
Rp
531,697
Rp
111,090
Rp
100,033
Rp
33,233
Rp
60,439
Rp
158,424
Analisa Harga Satuan Elektrikal - page 41 of 211
URAIAN
NO.
2
- Las Doop - Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI SPEAKER EMERGENCY Kabel FRC 2 x 2.5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6 7 8 9
TITIK INSTALASI SPEAKER Kabel NYMHY 3 x 2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Fhiser Las Doop Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3 4 5 6
TITIK INSTALASI FIRE ALARM Kabel NYMHY 2 x 1,5 mm2 Pipa Conduit Socket Pipa Tee Doos Isolasi ban Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK TITIK INSTALASI IPTV 1 Titik Instalasi TV Include: - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser - Las Doop - Isolasi ban 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
hari orang hari orang
M' M' bh bh bh bh bh bh hari orang hari orang
M' M' bh bh bh bh bh bh hari orang hari orang
M' M' bh bh bh hari orang hari orang
INDEK
HARGA SATUAN
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 3.00 6.00 2.00 0.25
Rp Rp Rp Rp Rp Rp Rp Rp
5,393 4,495 3,596 4,495 1,798 1,798 1,798
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 5.00 5.00 1.00 2.00 0.25
Rp Rp Rp Rp Rp
7,551 5,393 4,495 3,596 1,798
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
titik
1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
1 TITIK TITIK INSTALASI CCTV, WIFI, DATA 1 UTP Cable Cat 6 in PVC HI Conduit 20 mm for CCTV, DATA, WIFI titik Include: - Pipa Conduit - Socket Pipa - Tee Doos - Klem Pipa - Fhiser - Las Doop - Isolasi ban 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
5,393 4,495 3,596 4,495 1,798 1,798 1,798
1,221,985
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp
0.07 Rp 0.13 Rp
1,221,985
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 TTK TTK INST.DAYA U/ MOTOR LISTRIK/POMPA-MOTOR DI BAWAH 5 HP 1 Kabel, NYY 4 x 2,5 mm2 M' 5.00 Rp 2 Pipa Conduit M' 5.00 Rp 5,393 3 Socket Pipa bh 1.00 Rp 4,495 4 Tee Doos bh 2.00 Rp 3,596 5 Klem Pipa bh 3.00 Rp 4,495 6 Fhiser bh 6.00 Rp 1,798 7 Las Doop bh 2.00 Rp 1,798 8 Isolasi ban bh 0.25 Rp 1,798 9 Tenaga Kerja : Kepala Tukang listrik hari orang 0.25 Rp 85,000 Tukang Listrik hari orang 0.50 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 BH Set Top Box ICT 1 Set Top Box ICT bh 1.00 Rp 1,123,627 2 Instalasi lot 1.00 Rp 22,473 3 Tenaga Kerja :
JUMLAH HARGA
Rp Rp Rp Rp Rp
5,667 10,667 154,560 3,864 158,424
Rp Rp Rp Rp Rp Rp Rp Rp
26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
5,667 10,667 83,302 2,083 85,384
Rp Rp Rp Rp Rp Rp Rp Rp
26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
5,667 10,667 83,302 2,083 85,384
Rp Rp Rp Rp Rp
37,754 26,967 4,495 7,191 449
Rp Rp Rp Rp Rp
5,667 10,667 93,189 2,330 95,519
Rp
1,221,985
Rp Rp Rp Rp Rp
5,667 10,667 1,238,319 30,958 1,269,277
Rp
1,221,985
Rp Rp Rp Rp Rp
5,667 10,667 1,238,319 30,958 1,269,277
Rp Rp Rp Rp Rp Rp Rp Rp
26,967 4,495 7,191 13,484 10,787 3,596 449
Rp Rp Rp Rp Rp
21,250 40,000 128,218 3,205 131,424
Rp Rp
1,123,627 22,473
TOTAL HARGA
Rp
85,384
Rp
85,384
Rp
95,519
Rp
1,269,277
Rp
1,269,277
Rp
131,424
Rp
1,216,607
Analisa Harga Satuan Elektrikal - page 42 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HUB Un Managable Path Panel 1 x 48 port HUB Un Managable Path Panel 1 x 48 port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HUB Un Managable Path Panel 1 x 24 port HUB Un Managable Path Panel 1 x 24 port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Web Controller 12 IO Web Controller 12 IO Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Web Controller Onboard Ios DI8DO12 & AI8AO4 Web Controller Onboard Ios DI8DO12 & AI8AO4 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Capacitive Monitor Touch Screen minimum 10" Capacitive Monitor Touch Screen minimum 10" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
LCD Display Nurse Station Operating Management LCD Display Nurse Station Operating Management Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Software Management : OPENweb basic Software Management : OPENweb basic Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
BAS Main PC Core i7, 52" Display BAS Main PC Core i7, 52" Display Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module DI8DO8T CPU : ARM7 Architecture IO Module DI8DO8T CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module DI16 CPU : ARM7 Architecture IO Module DI16 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
8,551,794 171,036
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
3,998,676 79,974
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
66,855,836 1,337,117
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
26,742,334 534,847
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
23,304,034 466,081
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
6,112,534 122,251
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
114,610,004 2,292,200
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
30,562,668 611,253
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
9,168,800 183,376
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
6,876,600 137,532
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
14,167 26,667 1,186,933 29,673 1,216,607
Rp Rp
8,551,794 171,036
Rp Rp Rp Rp Rp
14,167 26,667 8,763,663 219,092 8,982,755
Rp Rp
3,998,676 79,974
Rp Rp Rp Rp Rp
14,167 26,667 4,119,482 102,987 4,222,470
Rp Rp
66,855,836 1,337,117
Rp Rp Rp Rp Rp
14,167 26,667 68,233,786 1,705,845 69,939,630
Rp Rp
26,742,334 534,847
Rp Rp Rp Rp Rp
14,167 26,667 27,318,014 682,950 28,000,965
Rp Rp
23,304,034 466,081
Rp Rp Rp Rp Rp
14,167 26,667 23,810,948 595,274 24,406,222
Rp Rp
6,112,534 122,251
Rp Rp Rp Rp Rp
14,167 26,667 6,275,618 156,890 6,432,508
Rp Rp
114,610,004 2,292,200
Rp Rp Rp Rp Rp
14,167 26,667 116,943,037 2,923,576 119,866,613
Rp Rp
30,562,668 611,253
Rp Rp Rp Rp Rp
14,167 26,667 31,214,754 780,369 31,995,123
Rp Rp
9,168,800 183,376
Rp Rp Rp Rp Rp
14,167 26,667 9,393,010 234,825 9,627,835
Rp Rp
6,876,600 137,532
Rp Rp Rp Rp Rp
14,167 26,667 7,054,966 176,374 7,231,340
TOTAL HARGA
Rp
8,982,755
Rp
4,222,470
Rp
69,939,630
Rp
28,000,965
Rp
24,406,222
Rp
6,432,508
Rp
119,866,613
Rp
31,995,123
Rp
9,627,835
Rp
7,231,340
Analisa Harga Satuan Elektrikal - page 43 of 211
URAIAN
NO. 1 UNIT 1 2 3
IO Module AI8AO4 CPU : ARM7 Architecture IO Module AI8AO4 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IO Module AO4 CPU : ARM7 Architecture IO Module AO4 CPU : ARM7 Architecture Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Bridge bus connector Bridge bus connector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Coupler module integrated bus terminating resistor Coupler module integrated bus terminating resistor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24bh V DC Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 Unit 1 2 3
12,225,067 244,501
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 BH 1 2 3
1 TITIK 1 2 3
HARGA SATUAN
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
114,610 2,292
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
1,031,490 20,630
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
764,067 15,281
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Instalation, Cable Cat6 to LAN Instalation, Cable Cat6 to LAN Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
0.08 Rp 0.17 Rp
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
668,558 13,371
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Box Panel I/O Module, with Electronic Terminal Block clamp type, Unit label cable, wiring1.00 & accessories Rp 4,966,433 Instalasi lot 1.00 Rp 99,329 Tenaga Kerja : Kepala Tukang listrik hari orang 0.17 Rp 85,000 Tukang Listrik hari orang 0.33 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 TITIK 1 2 3
Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Installation, cable STP 18 AWG & Integration data point Modbus Power ttk Meter 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Tukang Listrik hari orang 0.17
1 TITIK 1 2 3
Installation, cable STP 18 AWG for data communication between panel Installation, cable STP 18 AWG for data communication between panel ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable STP 18 AWG Modbus for CO2 Transmitter Installation, cable STP 18 AWG Modbus for CO2 Transmitter ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between ttk panel 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja :
Rp Rp
687,660 13,753
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
764,067 15,281
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
534,847 10,697
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 649,457 12,989
JUMLAH HARGA
Rp Rp
12,225,067 244,501
Rp Rp Rp Rp Rp
14,167 26,667 12,510,402 312,760 12,823,162
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
14,167 26,667 6,665,292 166,632 6,831,924
Rp Rp
114,610 2,292
Rp Rp Rp Rp Rp
14,167 26,667 157,736 3,943 161,679
Rp Rp
1,031,490 20,630
Rp Rp Rp Rp Rp
14,167 26,667 1,092,953 27,324 1,120,277
Rp Rp
764,067 15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
Rp Rp
668,558 13,371
Rp Rp Rp Rp Rp
7,083 13,333 702,346 17,559 719,905
Rp Rp
4,966,433 99,329
Rp Rp Rp Rp Rp
14,167 26,667 5,106,595 127,665 5,234,260
Rp Rp
687,660 13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp Rp
764,067 15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
Rp Rp
534,847 10,697
Rp Rp Rp Rp Rp
7,083 13,333 565,960 14,149 580,109
Rp Rp
649,457 12,989
TOTAL HARGA Rp
12,823,162
Rp
6,831,924
Rp
161,679
Rp
1,120,277
Rp
819,759
Rp
719,905
Rp
5,234,260
Rp
739,876
Rp
819,759
Rp
580,109
Rp
699,934
Analisa Harga Satuan Elektrikal - page 44 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Room Temperature & Humidity Transmitter Installation, cable NYM 3X1,5mm for power supply Room Temperature ttk & Humidity Transmitter 1.00 Rp 496,643 Instalasi lot 1.00 Rp 9,933 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Air Quality CO2 & CO Transmitter Installation, cable NYM 3X1,5mm for power supply Air Quality CO2ttk & CO Transmitter1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Motorized Damper Installation, cable NYM 3X1,5mm for power supply Motorized Damper ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter ttk 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Tukang Listrik hari orang 0.17
1 TITIK 1 2 3
Installation, Cable ITC 2 x 0.6mm for analog and digital point Installation, Cable ITC 2 x 0.6mm for analog and digital point ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 TITIK 1 2 3
JUMLAH HARGA Rp Rp Rp Rp Rp
7,083 13,333 682,862 17,072 699,934
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
496,643 9,933
Rp Rp Rp Rp Rp
7,083 13,333 526,993 13,175 540,168
Rp Rp
764,067 15,281
Rp Rp Rp Rp Rp
7,083 13,333 799,765 19,994 819,759
TOTAL HARGA
Rp
540,168
Rp
540,168
Rp
540,168
Rp
540,168
Rp
819,759
Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift & Generator Set Installation, cable STP 18 AWG & Integration data point Modbus Fire ttk Alarm, Server 1.00 AccessRp Control Lift & Generator 649,457 Set Rp 649,457 Instalasi lot 1.00 Rp 12,989 Rp 12,989 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 682,862 Keuntungan 5% Rp 17,072 Total = Jumlah+(Keuntungan 5%) Rp 699,934
Rp
699,934
1 PCS 1 2 3
Battery starting genset sensor voltage Battery starting genset sensor voltage Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
1,179,233
1 PCS 1 2 3
Duct Temperature Sensor Duct Temperature Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
510,690
1 PCS 1 2 3
Differential Pressure Transmitter Differential Pressure Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
2,028,470
1 PCS 1 2 3
System Integration with AC System (BACNet) System Integration with AC System (BACNet) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Rp
6,821,460
496,643 9,933
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
496,643 9,933
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
496,643 9,933
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
764,067 15,281
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,107,897 22,158
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
458,440 9,169
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
1,910,167 38,203
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp Rp
1,107,897 22,158
Rp Rp Rp Rp Rp
7,083 13,333 1,150,471 28,762 1,179,233
Rp Rp
458,440 9,169
Rp Rp Rp Rp Rp
10,625 20,000 498,234 12,456 510,690
Rp Rp
1,910,167 38,203
Rp Rp Rp Rp Rp
10,625 20,000 1,978,995 49,475 2,028,470
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
10,625 20,000 6,655,083 166,377 6,821,460 Analisa Harga Satuan Elektrikal - page 45 of 211
URAIAN
NO. 1 PCS 1 2 3
System integration with Fire Alarm (ModBus) System integration with Fire Alarm (ModBus) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
ttk lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
1 UNIT 1 2 3
Differential Pressure Switch Differential Pressure Switch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Mini Inverter to Control Exhaust Fan (Tangga Darurat) Mini Inverter to Control Exhaust Fan (Tangga Darurat) unit Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Temperature Sensor PT 1000 Temperature Sensor PT 1000 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Room Temperature Sensor & Humidity Sensor Room Temperature Sensor & Humidity Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Pipe Temperature Pipe Temperature Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Static Pressure Transmitter Static Pressure Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Outside Temperature & Humidity Outside Temperature & Humidity Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Control 0-100% Exhaust Fan Control 0-100% Exhaust Fan Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Slim Relay Slim Relay Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Damper Modulating 10Nm Damper Modulating 10Nm Instalasi Tenaga Kerja :
6,494,567 129,891
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
955,083 19,102
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
955,083 19,102
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,795,557 35,911
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,604,540 32,091
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
534,847 10,697
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,031,490 20,630
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,528,133 30,563
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
573,050 11,461
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
pcs lot
HARGA SATUAN
152,813 3,056
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
1,528,133 30,563
JUMLAH HARGA
Rp Rp
6,494,567 129,891
Rp Rp Rp Rp Rp
10,625 20,000 6,655,083 166,377 6,821,460
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
1,795,557 35,911
Rp Rp Rp Rp Rp
7,083 13,333 1,851,885 46,297 1,898,182
Rp Rp
1,604,540 32,091
Rp Rp Rp Rp Rp
7,083 13,333 1,657,048 41,426 1,698,474
Rp Rp
534,847 10,697
Rp Rp Rp Rp Rp
7,083 13,333 565,960 14,149 580,109
Rp Rp
1,031,490 20,630
Rp Rp Rp Rp Rp
7,083 13,333 1,072,537 26,813 1,099,350
Rp Rp
1,528,133 30,563
Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp Rp
573,050 11,461
Rp Rp Rp Rp Rp
7,083 13,333 604,928 15,123 620,051
Rp Rp
152,813 3,056
Rp Rp Rp Rp Rp
7,083 13,333 176,286 4,407 180,693
Rp Rp
1,528,133 30,563
TOTAL HARGA Rp
6,821,460
Rp
1,019,467
Rp
1,019,467
Rp
1,898,182
Rp
1,698,474
Rp
580,109
Rp
1,099,350
Rp
1,618,591
Rp
620,051
Rp
180,693
Rp
1,618,591
Analisa Harga Satuan Elektrikal - page 46 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Damper Konstan 10Nm Damper Konstan 10Nm Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Outdoor Temperature (PT1000) Outdoor Temperature (PT1000) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Outdoor Humidity Sensor Outdoor Humidity Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Fuel Level Sensor Genset Fuel Level Sensor Genset Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Motion Sensor Motion Sensor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,222,507 24,450
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,795,557 35,911
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
981,826 19,637
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.27 Rp
2,215,793 44,316
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
687,660 13,753
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp Rp
1,222,507 24,450
Rp Rp Rp Rp Rp
7,083 13,333 1,267,374 31,684 1,299,058
Rp Rp
1,795,557 35,911
Rp Rp Rp Rp Rp
7,083 13,333 1,851,885 46,297 1,898,182
Rp Rp
981,826 19,637
Rp Rp Rp Rp Rp
7,083 13,333 1,021,879 25,547 1,047,426
Rp Rp
2,215,793 44,316
Rp Rp Rp Rp Rp
11,333 21,333 2,292,776 57,319 2,350,095
Rp Rp
687,660 13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp Rp
2,865,250 57,305
Rp Rp Rp Rp Rp
7,083 13,333 2,942,972 73,574 3,016,546
1 UNIT 1 2 3
Water Level Transmitter Water Level Transmitter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, unit Accuracy1.00 40 ppm Rp + 3% reading 2,903,453 Rp Instalasi lot 1.00 Rp 58,069 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp Tukang Listrik hari orang 0.17 Rp 80,000 Rp Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
1 UNIT 1 2 3
Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ unit 0-50°C 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
1 UNIT 1 2 3
Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V unit Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Web Controller DALI Web Controller DALI Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
2,865,250 57,305
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
2,941,657 58,833
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
2,139,387 42,788
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
44,697,901 893,958
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
2,903,453 58,069
TOTAL HARGA
Rp
1,299,058
Rp
1,898,182
Rp
1,047,426
Rp
2,350,095
Rp
739,876
Rp
3,016,546
Rp
3,056,488
Rp
3,096,429
Rp
2,257,656
Rp
46,752,583
7,083 13,333 2,981,939 74,548 3,056,488
Rp Rp
2,941,657 58,833
Rp Rp Rp Rp Rp
7,083 13,333 3,020,907 75,523 3,096,429
Rp Rp
2,139,387 42,788
Rp Rp Rp Rp Rp
7,083 13,333 2,202,591 55,065 2,257,656
Rp Rp
44,697,901 893,958
Rp Rp Rp Rp Rp
7,083 13,333 45,612,276 1,140,307 46,752,583 Analisa Harga Satuan Elektrikal - page 47 of 211
URAIAN
NO.
SAT
INDEK
1 UNIT 1 2 3
On/Off Module DALI to control lighting 1 channel On/Off Module DALI to control lighting 1 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass On/Off DALI 1 Group Touch Screen Glass On/Off DALI 1 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
On/Off Module DALI to control lighting 2 channel On/Off Module DALI to control lighting 2 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 Unit 1 2 3
Touch Screen Glass On/Off DALI 2 Group Touch Screen Glass On/Off DALI 2 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
On/Off Module DALI to control lighting 6 channel On/Off Module DALI to control lighting 6 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass On/Off DALI 6 Group Touch Screen Glass On/Off DALI 6 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TITIK 1 2 3
Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Installation, cable STP 18 AWG Digital Switch DALI & Module DALI ttk Instalasi lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimmable Module DALI to control lighting 1 channel Dimmable Module DALI to control lighting 1 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass Dimmable DALI 1 Group Touch Screen Glass Dimmable DALI 1 Group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Dimmable Module DALI to control lighting 2 channel Dimmable Module DALI to control lighting 2 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Touch Screen Glass Dimmable DALI 2 Group Touch Screen Glass Dimmable DALI 2 Group Instalasi Tenaga Kerja :
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
HARGA SATUAN
878,677 17,574
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,069,693 21,394
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
955,083 19,102
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,146,100 22,922
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,222,507 24,450
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,528,133 30,563
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
458,440 9,169
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
687,660 13,753
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
Unit lot
916,880 18,338
880,205 17,604
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
782,404 15,648
JUMLAH HARGA
Rp Rp
878,677 17,574
Rp Rp Rp Rp Rp
7,083 13,333 916,667 22,917 939,584
Rp Rp
1,069,693 21,394
Rp Rp Rp Rp Rp
7,083 13,333 1,111,504 27,788 1,139,291
Rp Rp
955,083 19,102
Rp Rp Rp Rp Rp
7,083 13,333 994,602 24,865 1,019,467
Rp Rp
1,146,100 22,922
Rp Rp Rp Rp Rp
7,083 13,333 1,189,439 29,736 1,219,175
Rp Rp
1,222,507 24,450
Rp Rp Rp Rp Rp
7,083 13,333 1,267,374 31,684 1,299,058
Rp Rp
1,528,133 30,563
Rp Rp Rp Rp Rp
7,083 13,333 1,579,113 39,478 1,618,591
Rp Rp
458,440 9,169
Rp Rp Rp Rp Rp
5,667 10,667 483,942 12,099 496,041
Rp Rp
916,880 18,338
Rp Rp Rp Rp Rp
7,083 13,333 955,634 23,891 979,525
Rp Rp
687,660 13,753
Rp Rp Rp Rp Rp
7,083 13,333 721,830 18,046 739,876
Rp Rp
880,205 17,604
Rp Rp Rp Rp Rp
7,083 13,333 918,226 22,956 941,181
Rp Rp
782,404 15,648
TOTAL HARGA Rp
939,584
Rp
1,139,291
Rp
1,019,467
Rp
1,219,175
Rp
1,299,058
Rp
1,618,591
Rp
496,041
Rp
979,525
Rp
739,876
Rp
941,181
Rp
838,931
Analisa Harga Satuan Elektrikal - page 48 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
1 Unit 1 2 3
RGB Module DALI to control lighting 6 channel RGB Module DALI to control lighting 6 channel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Saklar LCD control RGB DALI 6 group Saklar LCD control RGB DALI 6 group Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4 5
PANEL MVMDP Incoming Cubicle; LBS Switchgear - 20kV, 630A, 16kA-1s unit Arrester, Direct Busbar Cubicle - 20kV, 630A + LA unit Metering Cubicle, LBS Switchgear - 20kV, 630A, 16kA-1S + VT unit Outgoing Cubicle SFC, LBS + Fuse Switchgear - 20kV, 630A, 16kA-1S unit Accessories : unit - Operating handle - 1 pcs - End Plate - 1 set (2 Pcs) Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
6
INDEK
HARGA SATUAN
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Unit lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1 UNIT 1 2 3
PANEL MVMDP (NEW) Outgoing Circuit Breaker Cubicle Accessories : Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-A) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories : Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-B) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories : Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4
PANEL MVMDP (SS-C) Incoming Cubicle with Surge Arrester Outgoing Circuit Breaker Cubicle Accessories : Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3 4 5 6
PANEL AMF + Syncronizing Box Panel ( 220 x 100 x 100 ) cm + Analog Meter & Pilot Lamp bh ACB 2500 A, 3P, 70KA bh CU Busbar kg Genset Synchronizer kit bh Alat Bantu lot Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3 4 5
PANEL KONTROL GENSET Incoming Cubicle with Surge Arrester bh Outgoing Cubicle SFC, LBS + Fuse Switchgear - 20kV, 630A, 16kA-1S bh Accessories : lot Upah Pasang Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
3,820,333 76,407
3,224,361 64,487
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 1.00 1.00 3.00 1.00
Rp Rp Rp Rp Rp
38,239,560 45,277,154 81,513,601 53,203,042 6,982,581
0.40 Rp 0.80 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
2.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
240,438,304 9,617,532
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh bh lot
1.00 Rp 3.00 Rp 1.00 Rp
hari orang hari orang
0.40 Rp 0.80 Rp
247,314,905 240,438,304 19,372,596
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 4.00 4.00 20.00 4.00 1.00
Rp Rp Rp Rp Rp
12,257,754 179,780 22,472,550 4,988,089
0.40 Rp 0.80 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
7,083 13,333 818,469 20,462 838,931
Rp Rp
3,820,333 76,407
Rp Rp Rp Rp Rp
7,083 13,333 3,917,157 97,929 4,015,086
Rp Rp
3,224,361 64,487
Rp Rp Rp Rp Rp
7,083 13,333 3,309,265 82,732 3,391,997
Rp Rp Rp Rp Rp
38,239,560 45,277,154 81,513,601 159,609,127 6,982,581
Rp Rp Rp Rp Rp
34,000 64,000 331,720,023 8,293,001 340,013,024
Rp Rp
480,876,609 9,617,532
Rp Rp Rp Rp Rp
34,000 64,000 490,592,141 12,264,804 502,856,944
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
Rp Rp Rp
247,314,905 721,314,913 19,372,596
Rp Rp Rp Rp Rp
34,000 64,000 740,785,509 18,519,638 759,305,147
Rp Rp Rp Rp Rp
49,031,018 3,595,608 89,890,199 4,988,089
Rp Rp Rp Rp Rp
34,000 64,000 147,602,913 3,690,073 151,292,986
1.00 Rp 1.00 Rp 1.00 Rp
247,314,905 53,203,042 30,051,795
Rp Rp Rp
247,314,905 53,203,042 30,051,795
0.20 Rp 0.40 Rp
85,000 80,000
Rp Rp
17,000 32,000
TOTAL HARGA
Rp
4,015,086
Rp
3,391,997
Rp
340,013,024
Rp
502,856,944
Rp
759,305,147
Rp
759,305,147
Rp
759,305,147
Rp
151,292,986
Rp
338,884,210
Analisa Harga Satuan Elektrikal - page 49 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 1 UNIT 1 2 3 4 5 6 7
PQCR/PQS/HARMONIC FILTER, Kapasitas 1000 A AHF Accusine PCS+ 300A IP00 unit 3.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 3.00 Rp MCCB NSX 400A 3P unit 2.00 Rp MCCB NSX 300A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 3.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 600 A AHF Accusine PCS+ 300A IP00 unit 2.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 2.00 Rp MCCB NSX 400A 3P unit 2.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6 7 8
PQCR/PQS/HARMONIC FILTER, Kapasitas 320 A AHF Accusine PCS+ 200A IP00 unit 1.00 Rp AHF Accusine PCS+ 120A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 2.00 Rp MCCB NSX 300A 3P unit 1.00 Rp MCCB NSX 160A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 250-300 A AHF Accusine PCS+ 300A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 1.00 Rp MCCB NSX 400A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3 4 5 6
PQCR/PQS/HARMONIC FILTER, Kapasitas 200 A AHF Accusine PCS+ 200A IP00 unit 1.00 Rp Panel Circuit Breaker and Panel for AHF (Prisma Panel) Dimensi : 2200 unit x 800 x 800 1.00 Rp MCCB NSX 300A 3P unit 1.00 Rp Current Transformer : 400Hz Calss 1 Clamp On (3x Phase) set 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.50 Rp Tukang Listrik hari orang 0.88 Rp
1 UNIT 1 2 3
Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, unit 20 kV - 380 Volt 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
1 UNIT 1 2 3
Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz,unit 20 kV - 380 Volt1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
786,016,723 14,966,718 7,157,327 7,157,327 18,663,902 49,608,280
Rp Rp Rp Rp Rp
2,358,050,169 44,900,154 14,314,655 7,157,327 55,991,706 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
OPTIONAL OPTIONAL 2,480,414,012 62,010,350 2,542,424,362
786,016,723 14,966,718 7,157,327 18,663,902 32,698,909
Rp Rp Rp Rp
1,572,033,446 29,933,436 14,314,655 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
OPTIONAL OPTIONAL 1,634,945,439 40,873,636 1,675,819,075
786,016,723 376,663,714 14,966,718 7,157,327 4,445,610 18,663,902 15,720,334
85,000 80,000 Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 786,016,723 14,966,718 7,157,327 18,663,902 15,720,334
786,016,723 376,663,714 29,933,436 7,157,327 4,445,610 18,663,902 OPTIONAL OPTIONAL OPTIONAL 1,222,880,713 30,572,018 1,253,452,731
Rp Rp Rp Rp
786,016,723 14,966,718 7,157,327 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
OPTIONAL OPTIONAL 826,804,671 20,670,117 847,474,787
786,016,723 14,966,718 7,157,327 18,663,902 15,720,334
Rp Rp Rp Rp
786,016,723 14,966,718 7,157,327 18,663,902 OPTIONAL
85,000 80,000 Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
OPTIONAL OPTIONAL 826,804,671 20,670,117 847,474,787
448,411,774 8,968,235
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 557,490,025 11,149,801
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3 4 5
Rp Rp Rp Rp Rp Rp
Transformator Dry Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Transformator Dry Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz,unit 20 kV - 380 Volt1.00 Rp FAN (AF) ANAF unit 1.00 Rp Enclosure (Case) IP 20 unit 1.00 Rp Instalasi lot 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp Tukang Listrik hari orang 0.40 Rp
303,379,422 24,270,354 28,315,413 3,559,652
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt
TOTAL HARGA
330,618,742 8,265,469 338,884,210
Rp Rp
448,411,774 8,968,235
Rp Rp Rp Rp Rp
17,000 32,000 457,429,010 11,435,725 468,864,735
Rp Rp
557,490,025 11,149,801
Rp Rp Rp Rp Rp
17,000 32,000 568,688,826 14,217,221 582,906,046
Rp Rp Rp Rp
303,379,422 24,270,354 28,315,413 3,559,652
Rp Rp Rp Rp Rp
17,000 32,000 359,573,840 8,989,346 368,563,186
Rp
2,542,424,362
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
1,675,819,075
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
1,253,452,731
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
847,474,787
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
847,474,787
HARGA TERPASANG HARGA TERPASANG HARGA TERPASANG
Rp
468,864,735
Rp
582,906,046
Rp
368,563,186
Rp
1,590,145,036
Analisa Harga Satuan Elektrikal - page 50 of 211
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
1 LOT 1 2 3 4 5
6 7
Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
BUSDUCT 2500 / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
BUSDUCT 1600A / AL IP 54 1600A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
BUSDUCT 3200A / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
TOTAL HARGA
1.00 Rp
1,520,942,167
Rp
1,520,942,167
lot
1.00 Rp
30,418,843
Rp
30,418,843
hari orang hari orang
0.20 Rp 0.40 Rp
Rp Rp Rp Rp Rp
17,000 32,000 1,551,361,011 38,784,025 1,590,145,036
Rp Rp
269,670,597 5,393,412
Rp Rp Rp Rp Rp
17,000 32,000 275,113,009 6,877,825 281,990,834
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Transformator Oil Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt, Plug-in Bushing Transformator Oil Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz,unit 20 kV - 380 Volt,1.00 Plug-in RpBushing 269,670,597 Instalasi lot 1.00 Rp 5,393,412 Tenaga Kerja : Kepala Tukang listrik hari orang 0.20 Rp 85,000 Tukang Listrik hari orang 0.40 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) BUSDUCT 1000A / AL IP 54 1000A, 3P4W+50% Al IGB, 600V Indoor, Sandwich, IP54 Cooper Conductor Class B 130 C Insullation IEC Standard - Couple Bar - Flexible Box - Hanger Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
JUMLAH HARGA
unit
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
5,278,802 5,265,858 5,678,454 6,339,416
Rp Rp Rp Rp
42,230,415 10,531,715 17,035,361 6,339,416
bh bh bh lot
1.00 1.00 4.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 1,848,608
Rp Rp Rp Rp
9,586,790 5,784,434 922,273 1,848,608
Rp Rp Rp Rp Rp
7,650 8,000 94,294,664 2,357,367 96,652,031
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m unit unit unit
8.00 2.00 4.00 35.00
Rp Rp Rp Rp
11,730,671 5,265,858 5,678,454 230,568
Rp Rp Rp Rp
93,845,368 10,531,715 22,713,815 8,069,893
bh bh bh lot
1.00 1.00 35.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 2,703,216
Rp
2,703,216
Rp Rp Rp Rp Rp
7,650 8,000 137,879,657 3,446,991 141,326,648
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
5,278,802 6,202,693 6,464,004 8,457,409
Rp Rp Rp Rp
42,230,415 12,405,387 19,392,013 8,457,409
bh bh bh lot
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
11,597,184 5,574,091 230,568 1,997,741
Rp Rp Rp Rp
11,597,184 5,574,091 230,568 1,997,741
Rp Rp Rp Rp Rp
7,650 8,000 101,900,459 2,547,511 104,447,971
hari orang hari orang
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m unit unit unit
8.00 2.00 3.00 1.00
Rp Rp Rp Rp
14,663,339 5,265,858 5,678,454 6,339,416
Rp Rp Rp Rp
117,306,710 10,531,715 17,035,361 6,339,416
bh bh bh lot
1.00 1.00 4.00 1.00
Rp Rp Rp Rp
9,586,790 5,784,434 230,568 3,350,134
Rp Rp Rp Rp
9,586,790 5,784,434 922,273 3,350,134
Rp Rp Rp Rp Rp
7,650 8,000 170,872,484 4,271,812 175,144,296
hari orang hari orang
1 UNIT LVMDP, (IP 30 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor Form 3B Non Type Test bh b. Cu-Busbar kg METERING a. Pilot Lamp 220VAC "R" (Red) bh b. Pilot Lamp 220VAC "Y" (Yellow) bh c. Pilot Lamp 220VAC "G" (Green) bh d. Fuse Housing bh e. Miniatute Fuse Link 10x38 2A bh f. DIGITAL MULTI METER bh g. CT 4000/5 30VA Cls.1 bh h. KWH Meter 3 Phase bh i. Change Over Switch 4 Pole 1600 Ampere COS Ohm Saklar Manual bh INCOMING a. ACB 2500 A, 3P, 100KA bh b. MOTOR OPERATOR 230V A.C./D.C. bh c. CLOSING COIL 230V A.C./D.C. bh
0.09 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 70.00 Rp
179,780
Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 1,258,463 2,565,646 9,887,922
Rp Rp Rp Rp Rp Rp Rp Rp Rp
17,268 17,268 17,268 31,632 10,544 5,791,135 3,775,388 2,565,646 9,887,922
1.00 Rp 1.00 Rp 1.00 Rp
7,191,216 1,618,024
Rp Rp Rp
7,191,216 1,618,024
2.00 2.00 2.00 3.00 6.00 1.00 3.00 1.00 1.00
INCLUDE BOX
-
Rp
281,990,834
Rp
96,652,031
Rp
141,326,648
Rp
104,447,971
Rp
175,144,296
Rp
67,495,531
Analisa Harga Satuan Elektrikal - page 51 of 211
NO. d. e. f. g. h i j k l m a. b. c. d. e. f. a. a. b. a. b.
URAIAN
SAT
UVR 230V A.C./D.C. Emergency Stop latching turn to reset 2 N/C (Red) Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "G" (Green) Push Button (Green) 1 N/O Push Button (Red) 1 N/C Timer 220 VAC + Socket Relay 220 VAC + Socket Selector Switch A-O-M 2 Pole Interlock OUTGOING ACB 1000 A, 3P, 70KA MCCB 400-630 A/3 Phasa MCCB 350-500 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 175-250 A/3 Phasa MCB 20 A/3 Phasa ARRESTER Arrester SPD T1+T2 12,5KA 3P+N SMART PANEL MODBUS INTERFACE GATEWAY RS485/ETHERNET PEMASANGAN Biaya Transport Biaya Handling
bh bh bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,977,584 42,894 31,462 31,462 19,667 19,667 222,508 55,145 57,305 3,856,290
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,977,584 42,894 31,462 31,462 19,667 19,667 222,508 55,145 57,305 3,856,290
bh bh bh bh bh bh
1.00 1.00 1.00 5.00 7.00 1.00
Rp Rp Rp Rp Rp Rp
-
Rp Rp Rp Rp Rp Rp
-
1 UNIT MDP-D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 2500 A, 3P, 100KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. ACB 1250 A, 3P, 50KA b. MCCB 400-630 A/3 Phasa c. MCCB 250-350 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 1000 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 400-630 A/3 Phasa b. MCCB 175-250 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh
1.00 Rp
4,756,989
Rp
4,756,989
unit unit
2.00 Rp 1.00 Rp
2,220,288 14,770,758
Rp Rp
4,440,576 14,770,758
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 65,849,298 1,646,232 67,495,531
179,780
Rp Rp
3,236,047
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 18.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
314,616 7,191,216
Rp Rp Rp
314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
2.00 1.00 2.00 6.00
Rp Rp Rp Rp
-
Rp Rp Rp Rp
-
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
Rp Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 41,834,978 1,045,874 42,880,852
179,780
Rp Rp
3,236,047
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 18.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
314,616 7,191,216
Rp Rp Rp
314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
2.00 1.00 4.00 1.00
Rp Rp Rp Rp
1,402,287
Rp Rp Rp Rp
1,402,287
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
Rp Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 43,237,265 1,080,932 44,318,197
Rp Rp
3,236,047
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 18.00 Rp
179,780
Rp
42,880,852
Rp
44,318,197
Rp
28,112,140
Analisa Harga Satuan Elektrikal - page 52 of 211
URAIAN
NO. a. b. c. d. e. f. g. h. a. b. c. a. b. c. d. a. b. c. d. a. a. b. a. b.
METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 200/5A Class 1 Burden 5 VA KWH Meter 3 Phase INCOMING ACB 800 A, 3P, 70KA MCCB AUX CONTACTS MOTOR OPERATOR 230V A.C./D.C. PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 350-500 A/3 Phasa MCCB 250-350 A/3 Phasa MCCB 100-125 A/3 Phasa MCCB 80-100 A/3 Phasa ARRESTER Arrester SPD T2 40KA 3P+N SMART PANEL MODBUS INTERFACE GATEWAY RS485/ETHERNET PEMASANGAN Biaya Transport Biaya Handling
1 UNIT MDP-RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 800 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCCB 250-350 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT MDP-RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 200/5A Class 1 Burden 5 VA h. KWH Meter 3 Phase INCOMING a. ACB 800 A, 3P, 70KA b. MCCB AUX CONTACTS c. MOTOR OPERATOR 230V A.C./D.C. PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCCB 250-350 A/3 Phasa c. MCCB 100-125 A/3 Phasa d. MCCB 80-100 A/3 Phasa ARRESTER a. Arrester SPD T2 40KA 3P+N SMART PANEL a. MODBUS INTERFACE b. GATEWAY RS485/ETHERNET PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
314,616 7,191,216
Rp Rp Rp
314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
1,402,287
Rp Rp Rp Rp
2,804,574
bh
1.00 Rp
1,533,527
Rp
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 18.00 Rp
1,533,527 OPTIONAL OPTIONAL
Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,426,478 685,662 28,112,140
179,780
Rp Rp
3,236,047
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
314,616 7,191,216
Rp Rp Rp
314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
1,402,287
Rp Rp Rp Rp
2,804,574
bh
1.00 Rp
1,533,527
Rp
1,533,527
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 18.00 Rp
TOTAL HARGA
Rp
28,112,140
Rp
28,112,140
OPTIONAL OPTIONAL Rp Rp Rp Rp Rp
1,652,400 2,991,282 27,426,478 685,662 28,112,140
179,780
Rp Rp
3,236,047
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 2,565,646
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 OPTIONAL
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
314,616 7,191,216
Rp Rp Rp
314,616 7,191,216
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
Rp Rp Rp Rp
1,273,295 536,644 10,544 1,757
bh bh bh bh
1.00 1.00 5.00 2.00
Rp Rp Rp Rp
1,402,287
Rp Rp Rp Rp
2,804,574
bh
1.00 Rp
1,533,527
Rp
bh bh
1.00 Rp 1.00 Rp
2,442,317 14,770,758
ls ls
1.00 Rp 1.00 Rp
1,652,400 2,991,282
1,533,527 OPTIONAL OPTIONAL
Rp Rp
1,652,400 2,991,282 Analisa Harga Satuan Elektrikal - page 53 of 211
NO.
URAIAN
1 UNIT SDP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 63 A/1 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
TOTAL HARGA
27,426,478 685,662 28,112,140
179,780
Rp Rp
1,438,243
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 -
Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 -
Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,273,295 736,650 10,544
Rp Rp Rp
1,273,295 736,650 10,544
Rp
17,531,535
Rp
17,531,535
Rp
14,656,847
Rp
17,531,535
Analisa Harga Satuan Elektrikal - page 54 of 211
URAIAN
NO. d. a. b. c. d. a. b.
Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 40 A/3 Phasa MCB 25 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - AC.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. ACB 1250 A, 3P, 50KA b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. ACB 800 A, 3P, 50KA b. MCCB 125-160 A/3 Phasa c. MCB 32 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - UPS (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 140-200 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - KHS (IP 30 FORM 1 BOTTOM INCOMING) a. H.2200 x W.900 x D.600 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 140-200 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 40 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
SAT
INDEK
HARGA SATUAN
bh
1.00 Rp
bh bh bh bh
2.00 1.00 1.00 1.00
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
JUMLAH HARGA
TOTAL HARGA
1,757
Rp
1,757
1,402,287 -
Rp Rp Rp Rp
2,804,574 -
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 3.00 3.00 4.00
Rp Rp Rp Rp
-
Rp Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
3.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
40.00 Rp 8.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
8,634 8,634 8,634 10,544
Rp Rp Rp Rp
8,634 8,634 8,634 10,544
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
Rp
14,656,847
Rp
14,656,847
Rp
14,656,847
Rp
17,531,535
Analisa Harga Satuan Elektrikal - page 55 of 211
URAIAN
NO. e. f. g. a. b. a. b. c. d. a. b. c. d. a. b.
Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 175-250 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 140-200 A/3 Phasa MCCB 80-100 A/3 Phasa MCB 40 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 40 A/3 Phasa c. MCB 25 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
1,757 5,791,135 51,237
Rp Rp Rp
1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 2.00 2.00 1.00
Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 2.00 Rp
1,402,287 -
Rp Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
1,402,287 -
Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 2.00 1.00 1.00
Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp
2,804,574 -
ls
1.00 Rp
1,652,400
Rp
1,652,400
TOTAL HARGA
Rp
17,531,535
Rp
17,531,535
Rp
17,531,535
Analisa Harga Satuan Elektrikal - page 56 of 211
URAIAN
NO. b.
Biaya Handling
1 UNIT SDP - AC.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 350-500 A/3 Phasa b. MCB 32 A/3 Phasa c. MCB 25 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa
SAT ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
1.00 1.00 2.00 3.00
Rp Rp Rp Rp
-
Rp Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
3,304,800 5,982,563 18,943,044 473,576 19,416,621
179,780
Rp Rp
1,438,243
3,304,800 5,982,563 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh
1.00 Rp
-
Rp
-
Rp
19,416,621
Rp
14,656,847
Rp
14,656,847
Rp
14,656,847
Analisa Harga Satuan Elektrikal - page 57 of 211
URAIAN
NO. b. a. b. c. d. a. b. c. a. b.
MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 50 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 40 A/3 Phasa d. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - AC.RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 350-500 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 250-350 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor
SAT
INDEK
HARGA SATUAN
bh
1.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
JUMLAH HARGA
TOTAL HARGA
314,616
Rp
314,616
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 2.00 1.00 1.00
Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
Rp
-
bh
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp
-
Rp
17,531,535
Rp
14,656,847
Rp
14,656,847
Rp
14,656,847
Analisa Harga Satuan Elektrikal - page 58 of 211
URAIAN
NO. b. a. b. c. d. e. f. g. a. b. a. b. c. d. a. b. a. b.
Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING MCCB 100-125 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 63-80 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 40 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - AC.RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 250-350 A/3 Phasa b. MCB 20 A/3 Phasa
SAT
INDEK
HARGA SATUAN
kg
8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
TOTAL HARGA
179,780
Rp
1,438,243
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
2.00 Rp 2.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 1.00 Rp 2.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
-
Rp Rp
-
Rp
14,656,847
Rp
14,656,847
Rp
19,416,621
Analisa Harga Satuan Elektrikal - page 59 of 211
URAIAN
NO. a. b.
PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 100-125 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING
SAT ls ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp 1.00 Rp
3,304,800 5,982,563 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp Rp
3,304,800 5,982,563 18,943,044 473,576 19,416,621
179,780
Rp Rp
1,438,243
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
2.00 Rp 2.00 Rp 1.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
Rp
14,656,847
Rp
14,656,847
Rp
14,656,847
Rp
17,531,535
Analisa Harga Satuan Elektrikal - page 60 of 211
URAIAN
NO. a. b. a. b. c. d. a. b. c. d. a. b.
MCCB 100-125 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 80 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 80-100 A/3 Phasa MCB 50 A/3 Phasa MCB 40 A/3 Phasa MCB 20 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT SDP - AC.RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 350-500 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 250-350 A/3 Phasa b. MCB 20 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - F2-F3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 175-250 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 63 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 40 A/3 Phasa e. MCB 20 A/3 Phasa f. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT SDP - F5 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 400/5A Class 1 Burden 5 VA INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 80 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa b. MCB 50 A/3 Phasa c. MCB 40 A/3 Phasa d. MCB 20 A/3 Phasa e. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
bh bh
1.00 Rp 1.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
bh bh bh bh
2.00 2.00 1.00 1.00
ls ls
1.00 Rp 1.00 Rp
JUMLAH HARGA
TOTAL HARGA
314,616
Rp Rp
314,616
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp
2,804,574 -
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 5.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,299,363 357,484 14,656,847
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh bh bh
2.00 1.00 2.00 2.00 3.00 2.00
Rp Rp Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp Rp Rp
2,804,574 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 17,103,937 427,598 17,531,535
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh bh
1.00 2.00 1.00 5.00 2.00
Rp Rp Rp Rp Rp
1,402,287 -
Rp Rp Rp Rp Rp
1,402,287 -
ls
1.00 Rp
1,652,400
Rp
1,652,400
Rp
14,656,847
Rp
17,531,535
Rp
16,094,191
Analisa Harga Satuan Elektrikal - page 61 of 211
URAIAN
NO. b.
Biaya Handling
1 UNIT LP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING)
SAT ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
2,991,282 15,701,650 392,541 16,094,191
179,780
Rp Rp
1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
22.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
26.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
22.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
20.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
22.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 62 of 211
URAIAN
NO. a. b. a. b. c. d. e. a. b. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 16 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow)
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
TOTAL HARGA
179,780
Rp Rp
1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
26.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
22.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
20.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
15.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh
1.00 Rp 1.00 Rp
8,634 8,634
Rp Rp
8,634 8,634
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 63 of 211
URAIAN
NO. c. d. e. a. b. a. a. b.
Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 10 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
8,634 10,544 1,757
Rp Rp Rp
8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
15.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh
1.00 Rp
-
Rp
-
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
1,467,289
Analisa Harga Satuan Elektrikal - page 64 of 211
URAIAN
NO. b. a. a. b.
MCCB AUX CONTACTS OUTGOING MCB 6 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh
1.00 Rp
314,616
Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,431,501 35,788 1,467,289
179,780
Rp Rp
1,078,682
Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
15.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,431,501 35,788 1,467,289
179,780
Rp Rp
1,078,682
Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls
1.00 Rp
1,652,400
Rp
1,652,400
Rp
6,227,063
Rp
6,227,063
Rp
1,467,289
Rp
6,227,063
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 65 of 211
URAIAN
NO. b.
Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 25 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - F4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP - PH (IP 30 FORM 1 BOTTOM INCOMING)
SAT ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,431,501 35,788 1,467,289
179,780
Rp Rp
1,078,682
Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
3,304,800 5,982,563 10,718,865 267,972 10,986,836
179,780
Rp Rp
1,078,682
3,304,800 5,982,563 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
18.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
7.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
1,467,289
Rp
10,986,836
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 66 of 211
URAIAN
NO. a. b. a. b. c. d. e. a. b. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 16 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP/LP - G3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 50 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
TOTAL HARGA
179,780
Rp Rp
1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
7.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
5.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
23.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
22.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
6.00 Rp 22.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh
1.00 Rp
8,634
Rp
8,634
Rp
6,227,063
Rp
7,664,407
Rp
7,664,407
Rp
6,227,063
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 67 of 211
URAIAN
NO. b. c. d. e. a. b. a. b. a. b.
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 50 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 16 A/3 Phasa MCB 10 A/1 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - BP.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - ALKES (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 140-200 A/3 Phasa b. MCCB 100-125 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - CSSD (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Toogle Switch INCOMING a. MCCB 400-630 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 125-160 A/3 Phasa b. MCB 25 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
3.00 Rp 22.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
9.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
2.00 5.00 1.00 1.00
-
Rp Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 764,067
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 9,168,800
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh
4.00 Rp 3.00 Rp 7.00 Rp
2,373,101 -
Rp Rp Rp
9,492,405 -
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 24,736,388 618,410 25,354,798
bh kg bh bh bh bh bh bh
Rp Rp Rp Rp
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 6.00 Rp 1.00 1.00 1.00 1.00 1.00 12.00
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
6,227,063
Rp
7,664,407
Rp
6,227,063
Rp
25,354,798
Rp
8,659,491
Analisa Harga Satuan Elektrikal - page 68 of 211
URAIAN
NO. a. b. a. b. c. d. e. a. b. a. a. b.
H.600 x W.600 x D.250 mm, Indoor Cu-Busbar METERING Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCCB 125-160 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING
SAT
INDEK
HARGA SATUAN
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
JUMLAH HARGA
TOTAL HARGA
179,780
Rp Rp
1,078,682
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
2,373,101 314,616
Rp Rp
2,373,101 314,616
bh
45.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,448,284 211,207 8,659,491
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
28.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
29.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
31.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
Rp Rp
1,078,682
bh kg
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 6.00 Rp
179,780
Rp
7,664,407
Rp
7,664,407
Rp
7,664,407
Rp
6,617,725
Rp
8,055,070
Analisa Harga Satuan Elektrikal - page 69 of 211
URAIAN
NO. a. b. c. d. e. f. a. b. a. b. c. a. b.
Pilot Lamp 220VAC "R" (Red) Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A Shun trip INCOMING MCCB 80-100 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 32 A/3 Phasa MCB 20 A/3 Phasa MCB 16 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - LAB.D2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - SERVER (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,858,605 196,465 8,055,070
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
7.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
4.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh
1.00 Rp
8,634
Rp
8,634
Rp
6,227,063
Rp
6,617,725
Rp
7,664,407
Rp
7,664,407
Rp
7,664,407
Analisa Harga Satuan Elektrikal - page 70 of 211
URAIAN
NO. b. c. d. e. a. b. a. a. b.
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCCB 80-100 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
31.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,858,605 196,465 8,055,070
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
28.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh
1.00 Rp
8,634
Rp
8,634
Rp
7,664,407
Rp
6,617,725
Rp
8,055,070
Rp
7,664,407
Rp
7,664,407
Analisa Harga Satuan Elektrikal - page 71 of 211
URAIAN
NO. b. c. d. e. a. b. a. a. b.
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCCB 63-80 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 32 A/3 Phasa b. MCB 20 A/3 Phasa c. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
31.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,858,605 196,465 8,055,070
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh
1.00 Rp
8,634
Rp
8,634
Rp
7,664,407
Rp
7,664,407
Rp
6,617,725
Rp
8,055,070
Rp
7,664,407
Analisa Harga Satuan Elektrikal - page 72 of 211
URAIAN
NO. b. c. d. e. a. b. a. a. b.
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCCB 80-100 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 80-100 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
Rp Rp Rp Rp
8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
30.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,477,470 186,937 7,664,407
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh
31.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
2,833,789 70,845 2,904,633
Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
179,780
Rp Rp
1,078,682
8,634 8,634 8,634 10,544
Rp Rp Rp Rp
8,634 8,634 8,634 10,544
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
Rp
7,664,407
Rp
7,664,407
Rp
2,904,633
Rp
6,617,725
Rp
8,055,070
Analisa Harga Satuan Elektrikal - page 73 of 211
URAIAN
NO. e. f. a. b. a. b. c. a. b.
Miniatute Fuse Link 10x38 2A Shun trip INCOMING MCCB 80-100 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 32 A/3 Phasa MCB 20 A/3 Phasa MCB 16 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 40 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - PERALATAN (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 50 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh
1.00 Rp 1.00 Rp
1,757 381,134
Rp Rp
1,757 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh
3.00 Rp 2.00 Rp 3.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 7,858,605 196,465 8,055,070
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
17.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
12.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
10.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh
1.00 Rp 1.00 Rp 1.00 Rp
8,634 8,634 8,634
Rp Rp Rp
8,634 8,634 8,634
Rp
6,227,063
Rp
6,227,063
Rp
6,617,725
Rp
6,617,725
Rp
6,227,063
Analisa Harga Satuan Elektrikal - page 74 of 211
URAIAN
NO. d. e. a. b. a. a. b.
Fuse Housing Miniatute Fuse Link 10x38 2A INCOMING MCB 16 A/3 Phasa MCCB AUX CONTACTS OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. Shun trip INCOMING a. MCB 32 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 25 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 25 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh
1.00 Rp 1.00 Rp
10,544 1,757
Rp Rp
10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
17.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
12.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,075,183 151,880 6,227,063
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
2.00 Rp 7.00 Rp
-
Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 6,456,318 161,408 6,617,725
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
25.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
18.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah
Rp Rp Rp
1,652,400 2,991,282 8,148,667
Rp
6,227,063
Rp
6,617,725
Rp
8,352,383
Rp
8,352,383
Analisa Harga Satuan Elektrikal - page 75 of 211
NO.
URAIAN
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.OK.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A h. Shun trip OUTGOING a. MCB 20 A/3 Phasa b. MCB 16 A/3 Phasa c. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.OK.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 20 A/3 Phasa b. MCB 16 A/3 Phasa MCB 10 A/3 Phasa
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
TOTAL HARGA
203,717 8,352,383
179,780
Rp Rp
1,078,682
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
19.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
14.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757 381,134
Rp Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757 381,134
bh bh bh
3.00 Rp 5.00 Rp 5.00 Rp
-
Rp Rp Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
3.00 Rp 5.00 Rp 5.00 Rp
-
Rp Rp Rp
-
Rp
8,352,383
Rp
8,352,383
Rp
8,743,046
Rp
8,352,383
Analisa Harga Satuan Elektrikal - page 76 of 211
URAIAN
NO. a. b.
PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 25 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN
SAT ls ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
17.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
12.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
12.00 Rp
-
Rp
-
bh
Rp
8,352,383
Rp
8,352,383
Rp
8,352,383
Rp
8,352,383
Analisa Harga Satuan Elektrikal - page 77 of 211
URAIAN
NO. a. b.
Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT ls ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
16.00 Rp 8.00 1.00 Rp 1.00 Rp
-
Rp
-
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
bh ls ls
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,148,667 203,717 8,352,383
179,780
Rp Rp
1,078,682
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls
1.00 Rp
1,652,400
Rp
1,652,400
Rp Rp Rp Rp
Rp
8,352,383
Rp
8,352,383
Rp
8,352,383
Rp
8,352,383
Analisa Harga Satuan Elektrikal - page 78 of 211
URAIAN
NO. b.
Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING
SAT ls
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
2,991,282 8,148,667 203,717 8,352,383
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
16.00 Rp 8.00 1.00 Rp 1.00 Rp
-
Rp
-
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
bh ls ls
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Analisa Harga Satuan Elektrikal - page 79 of 211
URAIAN
NO. a. a. b.
MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter
SAT
INDEK
HARGA SATUAN
bh
8.00 Rp
ls ls
1.00 Rp 1.00 Rp
JUMLAH HARGA -
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp
-
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
16.00 Rp 8.00 1.00 Rp 1.00 Rp
-
Rp
-
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
bh ls ls
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh
1.00 Rp 1.00 Rp
1,273,295 736,650
Rp Rp
1,273,295 736,650
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Analisa Harga Satuan Elektrikal - page 80 of 211
URAIAN
NO. f. g. a. a. b.
Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 16 A/3 Phasa b. MCCB AUX CONTACTS
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh
1.00 Rp 1.00 Rp
10,544 1,757
Rp Rp
10,544 1,757
bh
8.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
9.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
16.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Rp
8,743,046
Analisa Harga Satuan Elektrikal - page 81 of 211
URAIAN
NO. c. d. e. f. g. a. a. b.
PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 10 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC.MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. CT Window Ratio 500/5A Class 1 Burden 10 VA g. Shun trip INCOMING a. MCB 6 A/3 Phasa b. MCCB AUX CONTACTS c. PROTEKSI d. Earth Leakage Relay 50/60Hz e. Normal Core ZCT - 60 mm inner diameter f. Fuse Housing g. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. ACB 800 A, 3P, 50KA b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 80-100 A/3 Phasa b. MCCB 63-80 A/3 Phasa c. MCB 50 A/3 Phasa d. MCB 40 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU.OK.D1 (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 125-160 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 25 A/3 Phasa b. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red)
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
bh
9.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1,273,295 736,650 10,544 1,757
bh kg
1.00 Rp 6.00 Rp
179,780
Rp Rp
1,078,682
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
13.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 8,529,801 213,245 8,743,046
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh bh
2.00 5.00 4.00 2.00
Rp Rp Rp Rp
1,402,287 1,402,287 -
Rp Rp Rp Rp
2,804,574 7,011,436 -
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 24,496,507 612,413 25,108,920
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
3.00 Rp 6.00 Rp
-
Rp Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,680,497 367,012 15,047,510
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
179,780
Rp Rp
1,438,243
bh
1.00 Rp
8,634
Rp
8,634
Rp
8,743,046
Rp
25,108,920
Rp
15,047,510
Rp
20,796,887
Analisa Harga Satuan Elektrikal - page 82 of 211
URAIAN
NO. b. c. d. e. f. g. h. a. b. a. b. c. d. a. b. c. a. b.
Pilot Lamp 220VAC "Y" (Yellow) Pilot Lamp 220VAC "G" (Green) Fuse Housing Miniatute Fuse Link 10x38 2A DIGITAL MULTI METER CT Window Ratio 500/5A Class 1 Burden 10 VA Shun trip INCOMING MCCB 350-500 A/3 Phasa MCCB AUX CONTACTS PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCCB 63-80 A/3 Phasa MCB 50 A/3 Phasa MCB 40 A/3 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCCB 63-80 A/3 Phasa PEMASANGAN a. Biaya Transport
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
4.00 Rp 6.00 Rp 4.00 Rp
1,402,287 -
Rp Rp Rp
5,609,148 -
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 20,289,646 507,241 20,796,887
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 20,289,646 507,241 20,796,887
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 20,289,646 507,241 20,796,887
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
4.00 Rp
1,402,287
Rp
5,609,148
LS
1.00 Rp
1,652,400
Rp
1,652,400
TOTAL HARGA
Rp
20,796,887
Rp
20,796,887
Rp
20,796,887
Analisa Harga Satuan Elektrikal - page 83 of 211
URAIAN
NO. b.
Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCCB 63-80 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 32 A/3 Phasa b. MCB 25 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCB 50 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 32 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AC-OU.MASJID (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 500/5A Class 1 Burden 10 VA h. Shun trip INCOMING a. MCB 6 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 32 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
SAT LS
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp
2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp
2,991,282 20,289,646 507,241 20,796,887
179,780
Rp Rp
1,438,243
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
1,402,287 314,616
Rp Rp
1,402,287 314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
1.00 Rp 2.00 Rp
-
Rp Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 16,082,784 402,070 16,484,854
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
-
Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,680,497 367,012 15,047,510
179,780
Rp Rp
1,438,243
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 8.00 Rp
bh bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
Rp Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237 381,134
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
2.00 Rp
-
Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
1,652,400 2,991,282 14,680,497 367,012 15,047,510
Rp
284,534,616
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar Include : unit 1.00 Rp 284,534,616 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI
Rp
16,484,854
Rp
15,047,510
Rp
15,047,510
Rp
296,407,755
Analisa Harga Satuan Elektrikal - page 84 of 211
URAIAN
NO.
a. b.
SAT
- Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport LS Biaya Handling LS
INDEK
1.00 Rp 1.00 Rp
HARGA SATUAN
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar Include : unit 1.00 Rp 276,893,949 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar Include : unit 1.00 Rp 246,331,281 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar Include : unit 1.00 Rp 261,612,615 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA
JUMLAH HARGA
Rp Rp Rp Rp Rp
1,652,400 2,991,282 289,178,297 7,229,457 296,407,755
Rp
276,893,949
Rp Rp Rp Rp Rp
1,652,400 2,991,282 281,537,630 7,038,441 288,576,071
Rp
246,331,281
Rp Rp Rp Rp Rp
1,652,400 2,991,282 250,974,963 6,274,374 257,249,337
Rp
261,612,615
TOTAL HARGA
Rp
288,576,071
Rp
257,249,337
Rp
272,912,704
Analisa Harga Satuan Elektrikal - page 85 of 211
URAIAN
NO.
a. b.
SAT
- MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport LS Biaya Handling LS
INDEK
1.00 Rp 1.00 Rp
HARGA SATUAN
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar Include : unit 1.00 Rp 211,948,280 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar Include : unit 1.00 Rp 206,217,780 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port - Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN a. Biaya Transport LS 1.00 Rp 1,652,400 b. Biaya Handling LS 1.00 Rp 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar Include : unit 1.00 Rp 229,483,611 Panel Box (Sistem Prisma M) - Dimensi : 2200 x 1200 x 600mm - Family : Prisma M (Free Standing) Power Incomer and TN Earting Zone - LBS 4P 63A - Quick Device Feeder, Multiclip Busbar, 80A - MCB Multi 9, iC60L, C-Curve, 2P, 16A, isc 16kA - MCB Multi 9, iC60L, C-Curve, 2P, 2A, isc 16kA - Residual Current Disconnector, iC60, 2P, 25A - Universal Power Supply 150W, 24 VDC - Terminal Block 24 mm - Terminal Block 10 mm - Pilot Lamp 230/250 V - STI - Tabung Sektring Isolated earting system - Current Transformer for 10 KVA - MCB MULTI 9, IC60N, 2 Poles, 16A, C Curve - Isolation Transformer with temperatur set Point - Insulation Monitoring IMD Vigilohm IM20-H w/ Modbus RS485 Port
JUMLAH HARGA
Rp Rp Rp Rp Rp
1,652,400 2,991,282 266,256,297 6,656,407 272,912,704
Rp
211,948,280
Rp Rp Rp Rp Rp
1,652,400 2,991,282 216,591,962 5,414,799 222,006,761
Rp
206,217,780
Rp Rp Rp Rp Rp
1,652,400 2,991,282 210,861,461 5,271,537 216,132,998
Rp
229,483,611
TOTAL HARGA
Rp
222,006,761
Rp
216,132,998
Rp
239,980,474
Analisa Harga Satuan Elektrikal - page 86 of 211
URAIAN
NO.
a. b.
- Vigilohm Display HRP - Fault ocator Vigilohm System with Separate Sensor - Sensor Vigilohm Other - CU Busbar - Wiring Aksesoris PEMASANGAN Biaya Transport Biaya Handling
1 UNIT LP-PL (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 50/5A Class 1 Burden 2.5 VA INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING ZONE 1 a. MCB 10 A/3 Phasa ZONE 2 a. MCB 10 A/3 Phasa ZONE 3 a. MCB 10 A/3 Phasa ZONE 4 a. MCB 10 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-BP (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 10 A/3 Phasa b. MCCB AUX CONTACTS c. MCCB SHUNT TRIP 200-277 VAC/DC d. Fuse Housing e. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 6 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-LF (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Miniatute Fuse Link 10x38 2A INCOMING a. MCB 20 A/3 Phasa b. CONTACTOR - 3P 40A AC1 18A AC3 (1NO+1NC) 230V AC c. Time Switch, 24 hours / 220VAC, Analog d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. MCCB SHUNT TRIP 200-277 VAC/DC OUTGOING a. MCB 16 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP-AB (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCB 40 A/3 Phasa
SAT
LS LS
INDEK
HARGA SATUAN
JUMLAH HARGA
1.00 Rp 1.00 Rp
1,652,400 2,991,282 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA
Rp Rp Rp Rp Rp
1,652,400 2,991,282 234,127,292 5,853,182 239,980,474
179,780
Rp Rp
1,078,682
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 2.00 2.00 1.00 2.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 21,088 3,515 5,791,135 102,475
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh
17.00 Rp
-
Rp
-
bh
16.00 Rp
-
Rp
-
bh
16.00 Rp
-
Rp
-
bh
8.00 Rp
-
Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
459,000 2,695,360 12,514,019 312,850 12,826,870
179,780
Rp Rp
1,078,682
459,000 2,695,360 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 2.00 4.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 21,088 7,029
bh bh bh bh bh
1.00 1.00 1.00 1.00 2.00
Rp Rp Rp Rp Rp
314,616 607,029 10,544 1,757
Rp Rp Rp Rp Rp
314,616 607,029 10,544 3,515
bh
3.00 Rp
-
Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
459,000 2,695,360 5,222,765 130,569 5,353,334
179,780
Rp Rp
1,078,682
459,000 2,695,360 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh
1.00 1.00 2.00 2.00
Rp Rp Rp Rp
8,634 8,634 8,634 1,757
Rp Rp Rp Rp
8,634 8,634 17,268 3,515
bh bh bh bh bh bh
1.00 2.00 2.00 2.00 2.00 1.00
Rp Rp Rp Rp Rp Rp
332,594 701,144 10,544 1,757 607,029
Rp Rp Rp Rp Rp Rp
665,187 1,402,287 21,088 3,515 607,029
bh
2.00 Rp
-
Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
OPTIONAL 2,695,360 6,511,199 162,780 6,673,979
179,780
Rp Rp
1,078,682
459,000 2,695,360 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 OPTIONAL 51,237
bh
1.00 Rp
-
Rp
-
Rp
12,826,870
Rp
5,353,334
Rp
6,673,979
Rp
6,990,167
Analisa Harga Satuan Elektrikal - page 87 of 211
URAIAN
NO. b. c. d. e. a. b. c. d. a. b. a. b.
MCCB AUX CONTACTS MCCB SHUNT TRIP 200-277 VAC/DC Fuse Housing Miniatute Fuse Link 10x38 2A PROTEKSI Earth Leakage Relay 50/60Hz Normal Core ZCT - 60 mm inner diameter Fuse Housing Miniatute Fuse Link 10x38 2A OUTGOING MCB 16 A/3 Phasa MCB 6 A/1 Phasa PEMASANGAN Biaya Transport Biaya Handling
1 UNIT PP - FH (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A INCOMING a. MCCB 250-350 A/3 Phasa b. MCCB AUX CONTACTS OUTGOING a. MCCB 140-200 A/3 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 UNIT PP/LP-PH (IP 30 FORM 1 BOTTOM INCOMING) a. H.600 x W.600 x D.250 mm, Indoor b. Cu-Busbar METERING a. Pilot Lamp 220VAC "R" (Red) b. Pilot Lamp 220VAC "Y" (Yellow) c. Pilot Lamp 220VAC "G" (Green) d. Fuse Housing e. Miniatute Fuse Link 10x38 2A f. DIGITAL MULTI METER g. CT Window Ratio 100/5A Class 1 Burden 2.5 VA INCOMING a. MCB 20 A/3 Phasa b. MCCB AUX CONTACTS c. MCCB SHUNT TRIP 200-277 VAC/DC d. Fuse Housing e. Miniatute Fuse Link 10x38 2A PROTEKSI a. Earth Leakage Relay 50/60Hz b. Normal Core ZCT - 60 mm inner diameter c. Fuse Housing d. Miniatute Fuse Link 10x38 2A OUTGOING a. MCB 16 A/3 Phasa b. MCB 10 A/3 Phasa c. MCB 6 A/1 Phasa PEMASANGAN a. Biaya Transport b. Biaya Handling
1 BH 1 2 3
PESAWAT TELEPON SINGLE LINE Pesawat Telephone Single Line Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Faximile Faximile Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SOCKET TELEPON Socket Telephone RJ-45 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
FLOOR SOCKET TELEPON Floor Socket Telephone Instalasi Tenaga Kerja : Kepala Tukang listrik
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
TOTAL HARGA
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
Rp Rp Rp Rp
314,616 607,029 10,544 1,757
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh
3.00 Rp 3.00 Rp
-
Rp Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
OPTIONAL 2,695,360 6,819,675 170,492 6,990,167
179,780
Rp Rp
1,078,682
459,000 2,695,360 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757
bh bh
1.00 Rp 1.00 Rp
314,616
Rp Rp
314,616
bh
4.00 Rp
-
Rp
-
ls ls
1.00 Rp 1.00 Rp
Rp Rp Rp Rp Rp
9,914,400 17,947,690 29,293,591 732,340 30,025,931
179,780
Rp Rp
1,078,682
9,914,400 17,947,690 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh kg
1.00 Rp 6.00 Rp
bh bh bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 5,791,135 51,237
Rp Rp Rp Rp Rp Rp
8,634 8,634 8,634 10,544 1,757 OPTIONAL 51,237
bh bh bh bh bh
1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp
314,616 607,029 10,544 1,757
Rp Rp Rp Rp Rp
314,616 607,029 10,544 1,757
bh bh bh bh
1.00 1.00 1.00 1.00
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
Rp Rp Rp Rp
1,273,295 736,650 10,544 1,757
bh bh bh
1.00 Rp 5.00 Rp 28.00 Rp
-
Rp Rp Rp
-
LS LS
1.00 Rp 1.00 Rp
Rp Rp Rp Rp
OPTIONAL 2,695,360 6,819,675 170,492 6,990,167
Rp Rp
674,176 13,484
Rp Rp Rp Rp Rp
1,771 3,333 692,764 17,319 710,083
Rp Rp
1,512,852 30,257
Rp Rp Rp Rp Rp
1,771 3,333 1,548,213 38,705 1,586,919
Rp Rp
1,221,985 24,440
Rp Rp Rp Rp Rp
1,771 3,333 1,251,529 31,288 1,282,817
459,000 2,695,360 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
674,176 13,484
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
1,512,852 30,257
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
1,221,985 24,440
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
369,880 7,398
Rp Rp
369,880 7,398
hari orang
0.02 Rp
85,000
Rp
1,771
Rp
30,025,931
Rp
6,990,167
Rp
710,083
Rp
1,586,919
Rp
1,282,817
Rp
391,942
Analisa Harga Satuan Elektrikal - page 88 of 211
URAIAN
NO. Tukang Listrik
1 BH 1 2 3
IP PHONE SERIES IP PHONE SERIES Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 10 Pair HANDSET TELEPON (SIP) / TB 10 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 20 Pair Terminal Box 20 Pairs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HANDSET TELEPON (SIP) / TB 30 Pair HANDSET TELEPON (SIP) / TB 30 Pair Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 2 / 12 Extention PABX 2 Line / 12 Extension Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 16 / 160 Extention PABX 16 Line / 160 Extention Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
P A B X 8 / 80 Extention PABX 8 Line / 80 Extention Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
MDF 160 PAIRS MDF 160 PAIRS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
MDF 80 PAIRS MDF 80 PAIRS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TELEPON 10 PAIRS Kabel ITC 10x4x0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
KABEL TELEPON 20 PAIRS Kabel ITC 20x4x0,6 mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang
INDEK
HARGA SATUAN
0.04 Rp
80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.04 Rp
2,842,688 56,854
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
1,444,086 28,882
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
2,888,172 57,763
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
4,332,258 86,645
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
7,066,269 141,325
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
215,511,752 4,310,235
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
121,540,538 2,430,811
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
3,591,833 71,837
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.15 Rp 0.30 Rp
1,909,717 38,194
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
23,731 475
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp
3,333 382,382 9,560 391,942
Rp Rp
2,842,688 56,854
Rp Rp Rp Rp Rp
1,771 3,333 2,904,646 72,616 2,977,262
Rp Rp
1,444,086 28,882
Rp Rp Rp Rp Rp
12,750 24,000 1,509,718 37,743 1,547,461
Rp Rp
2,888,172 57,763
Rp Rp Rp Rp Rp
12,750 24,000 2,982,686 74,567 3,057,253
Rp Rp
4,332,258 86,645
Rp Rp Rp Rp Rp
12,750 24,000 4,455,653 111,391 4,567,045
Rp Rp
7,066,269 141,325
Rp Rp Rp Rp Rp
12,750 24,000 7,244,344 181,109 7,425,453
Rp Rp
215,511,752 4,310,235
Rp Rp Rp Rp Rp
12,750 24,000 219,858,737 5,496,468 225,355,206
Rp Rp
121,540,538 2,430,811
Rp Rp Rp Rp Rp
12,750 24,000 124,008,099 3,100,202 127,108,301
Rp Rp
3,591,833 71,837
Rp Rp Rp Rp Rp
12,750 24,000 3,700,419 92,510 3,792,930
Rp Rp
1,909,717 38,194
Rp Rp Rp Rp Rp
12,750 24,000 1,984,662 49,617 2,034,278
Rp Rp
23,731 475
Rp Rp Rp Rp Rp
708 1,333 26,247 656 26,903
M' lot
1.00 Rp 1.00 Rp
32,360 647
Rp Rp
32,360 647
hari orang hari orang
0.01 Rp 0.02 Rp
85,000 80,000 Jumlah
Rp Rp Rp
708 1,333 35,049
TOTAL HARGA
Rp
2,977,262
Rp
1,547,461
Rp
3,057,253
Rp
4,567,045
Rp
7,425,453
Rp
225,355,206
Rp
127,108,301
Rp
3,792,930
Rp
2,034,278
Rp
26,903
Rp
35,926
Analisa Harga Satuan Elektrikal - page 89 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 1 M' 1 2 3
Kabel UTP Cat 5E,-0,6 mm2 Kabel Coaxial RG11( 0,6 mm2 ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Kabel UTP Cat 6 UTP Cat 6 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2 3
Fiber Optic 8 core Fiber Optic 8 core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
12,944 259
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.01 Rp 0.02 Rp
40,451 809
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
M' lot
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.03 Rp
80,901 1,618
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 1 Kva, back up 15 menit, Incoming 1 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase UPS kapasitas 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase UPS kapasitas 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing unit1 Phase 1.00 Instalasi lot 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase UPS kapasitas 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 1 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
1 UNIT 1 2 3
UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Tukang Listrik hari orang 0.07
Rp Rp
4,746,203 94,924
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
24,797,596 495,952
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
81,673,785 1,633,476
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
192,868,411 3,857,368
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
163,347,571 3,266,951
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
203,053,869 4,061,077
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
297,093,400 5,941,868
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 1 UPS kapasitas 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Rp
607,956,181
TOTAL HARGA
876 35,926
Rp Rp
12,944 259
Rp Rp Rp Rp Rp
708 1,333 15,245 381 15,626
Rp Rp
40,451 809
Rp Rp Rp Rp Rp
708 1,333 43,301 1,083 44,384
Rp Rp
80,901 1,618
Rp Rp Rp Rp Rp
1,417 2,667 86,603 2,165 88,768
Rp Rp
4,746,203 94,924
Rp Rp Rp Rp Rp
2,833 5,333 4,849,293 121,232 4,970,526
Rp Rp
24,797,596 495,952
Rp Rp Rp Rp Rp
2,833 5,333 25,301,715 632,543 25,934,258
Rp Rp
81,673,785 1,633,476
Rp Rp Rp Rp Rp
2,833 5,333 83,315,428 2,082,886 85,398,313
Rp Rp
192,868,411 3,857,368
Rp Rp Rp Rp Rp
2,833 5,333 196,733,946 4,918,349 201,652,295
Rp Rp
163,347,571 3,266,951
Rp Rp Rp Rp Rp
2,833 5,333 166,622,689 4,165,567 170,788,256
Rp Rp
203,053,869 4,061,077
Rp Rp Rp Rp Rp
2,833 5,333 207,123,114 5,178,078 212,301,191
Rp Rp
297,093,400 5,941,868
Rp Rp Rp Rp Rp
2,833 5,333 303,043,435 7,576,086 310,619,521
Rp
607,956,181
Rp
15,626
Rp
44,384
Rp
88,768
Rp
4,970,526
Rp
25,934,258
Rp
85,398,313
Rp
201,652,295
Rp
170,788,256
Rp
212,301,191
Rp
310,619,521
Rp
635,634,929
Analisa Harga Satuan Elektrikal - page 90 of 211
URAIAN
NO. 2 3
Installation, commissionin and testing Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
ls
1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
12,159,124
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3 4
UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Panel I / O unit 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Tukang Listrik hari orang 0.13
1 UNIT 1 2 3 4
UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase UPS kapasitas 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing unit 3 Phase 1.00 Installation, commissionin and testing ls 1.00 Panel I / O unit 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Tukang Listrik hari orang 0.13
Rp Rp
631,506,514 12,630,130
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) Rp Rp
841,323,722 16,826,474
Rp Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 BH 1 2 3
Data Outlet ( RG-45 ) Data Outlet ( RG-45 ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
FLOOR SOCKET DATA Floor Outlet Data Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Proyektor Proyektor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac bh Wave 2)1.00 Rp Instalasi ls 1.00 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.03 Rp Tukang Listrik hari orang 0.05 Rp
1 BH 1 2 3
PATH PANEL 1 X 32 PORT PATH PANEL 1 X 32 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 24 PORT PATH PANEL 1 X 24 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 12 PORT PATH PANEL 1 X 12 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
PATH PANEL 1 X 48 PORT PATH PANEL 1 X 48 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
54,873 1,097
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
292,143 5,843
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
16,659,171 333,183
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 11,816,362 236,327
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
6,734,214 134,684
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
3,591,833 71,837
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
2,137,948 42,759
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp
12,159,124
Rp Rp Rp Rp Rp
5,667 10,667 620,131,638 15,503,291 635,634,929
Rp Rp Rp
631,506,514 12,630,130 -
Rp Rp Rp Rp Rp
5,667 10,667 644,152,978 16,103,824 660,256,802
Rp Rp Rp
841,323,722 16,826,474 -
Rp Rp Rp Rp Rp
5,667 10,667 858,166,530 21,454,163 879,620,693
Rp Rp
54,873 1,097
Rp Rp Rp Rp Rp
2,125 4,000 62,096 1,552 63,648
Rp Rp
292,143 5,843
Rp Rp Rp Rp Rp
2,125 4,000 304,111 7,603 311,714
Rp Rp
16,659,171 333,183
Rp Rp Rp Rp Rp
2,125 4,000 16,998,479 424,962 17,423,441
Rp Rp
11,816,362 236,327
Rp Rp Rp Rp Rp
2,125 4,000 12,058,814 301,470 12,360,284
Rp Rp
6,734,214 134,684
Rp Rp Rp Rp Rp
2,125 4,000 6,875,023 171,876 7,046,899
Rp Rp
3,591,833 71,837
Rp Rp Rp Rp Rp
2,125 4,000 3,669,794 91,745 3,761,539
Rp Rp
2,137,948 42,759
Rp Rp Rp Rp Rp
2,125 4,000 2,186,832 54,671 2,241,503
bh ls
1.00 Rp 1.00 Rp
7,183,665 143,673
Rp Rp
7,183,665 143,673
hari orang hari orang
0.03 Rp 0.05 Rp
85,000 80,000 Jumlah
Rp Rp Rp
2,125 4,000 7,333,463
TOTAL HARGA
Rp
660,256,802
Rp
879,620,693
Rp
63,648
Rp
311,714
Rp
17,423,441
Rp
12,360,284
Rp
7,046,899
Rp
3,761,539
Rp
2,241,503
Rp
7,516,800
Analisa Harga Satuan Elektrikal - page 91 of 211
URAIAN
NO.
1 BH 1 2 3
PATH PANEL 1 X 64 PORT PATH PANEL 1 X 64 PORT Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SMOKE DETECTOR Smoke Detector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Rate Of Rise Heat Detector Rate Of Rise Heat Detector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Fixed Temperature Heat Detector Fixed Temperature Heat Detector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Breakglass Call point w/phone jack Manual Breack glass Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Av Phase Ii S/Strobe Non Iso Av Phase Ii S/Strobe Non Iso Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
INDICATOR LAMP Lampu Indicator Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
MDFA (60 x 80 x 20) MDFA (60 x 80 x 20) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Isolated USB Upload/Download Lead Isolated USB Upload/Download Lead Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
PANEL DXc1-S SINGLE LOOP REGION 2 PANEL DXc1-S SINGLE LOOP REGION 2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.05 Rp
13,468,428 269,369
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
1,174,226 23,485
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
1,124,238 22,485
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
1,124,238 22,485
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
624,521 12,490
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
4,621,921 92,438
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
156,049 3,121
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
4,805,530 96,111
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
7,244,701 144,894
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
42,115,051 842,301
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) 1 Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device unit / loop ) 1.00 Rp 56,563,293 2 Instalasi ls 1.00 Rp 1,131,266 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.10 Rp 85,000 Tukang Listrik hari orang 0.20 Rp 80,000
183,337 7,516,800
Rp Rp
13,468,428 269,369
Rp Rp Rp Rp Rp
2,125 4,000 13,743,922 343,598 14,087,520
Rp Rp
1,174,226 23,485
Rp Rp Rp Rp Rp
5,667 10,667 1,214,043 30,351 1,244,395
Rp Rp
1,124,238 22,485
Rp Rp Rp Rp Rp
5,667 10,667 1,163,056 29,076 1,192,132
Rp Rp
1,124,238 22,485
Rp Rp Rp Rp Rp
5,667 10,667 1,163,056 29,076 1,192,132
Rp Rp
624,521 12,490
Rp Rp Rp Rp Rp
5,667 10,667 653,344 16,334 669,678
Rp Rp
4,621,921 92,438
Rp Rp Rp Rp Rp
5,667 10,667 4,730,693 118,267 4,848,960
Rp Rp
156,049 3,121
Rp Rp Rp Rp Rp
5,667 10,667 175,504 4,388 179,891
Rp Rp
4,805,530 96,111
Rp Rp Rp Rp Rp
5,667 10,667 4,917,974 122,949 5,040,923
Rp Rp
7,244,701 144,894
Rp Rp Rp Rp Rp
8,500 16,000 7,414,095 185,352 7,599,447
Rp Rp
42,115,051 842,301
Rp Rp Rp Rp Rp
8,500 16,000 42,981,852 1,074,546 44,056,399
Rp Rp
56,563,293 1,131,266
Rp Rp
8,500 16,000
TOTAL HARGA
Rp
14,087,520
Rp
1,244,395
Rp
1,192,132
Rp
1,192,132
Rp
669,678
Rp
4,848,960
Rp
179,891
Rp
5,040,923
Rp
7,599,447
Rp
44,056,399
Rp
59,162,035
Analisa Harga Satuan Elektrikal - page 92 of 211
URAIAN
NO.
1 UNIT 1 2 3
Panel Dxc4-M Four Loop Region 5 Panel Dxc4-M Four Loop Region 5 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
106,678,975 2,133,580
Rp Rp
57,719,059 1,442,976 59,162,035 106,678,975 2,133,580
TOTAL HARGA
Rp
85,000 Rp 8,500 80,000 Rp 16,000 Jumlah Rp 108,837,055 Keuntungan 5% Rp 2,720,926 Total = Jumlah+(Keuntungan 5%) Rp 111,557,981 1 UNIT Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels require a 24 Vdc supply. 24 Vdc supp Rp 1 Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test unit Controls.DX control 1.00 panels Rp require a42,722,192 24 Vdc supply. Rp24 Vdc supply 42,722,192 and an RS485 2 Instalasi ls 1.00 Rp 854,444 Rp 854,444 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.10 Rp 85,000 Rp 8,500 Tukang Listrik hari orang 0.20 Rp 80,000 Rp 16,000 Jumlah Rp 43,601,136 Keuntungan 5% Rp 1,090,028 Total = Jumlah+(Keuntungan 5%) Rp 44,691,164 1 UNIT 1 2 3
Module for Pressurized Fan (Kontrol) Module for Pressurized Fan (Kontrol) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for AC Module for AC Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for PABX (Autodial) Module for PABX (Autodial) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for Sound System Module for Sound System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Module for Genset Panel Module for Genset Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Mias 200 Series Advance Base Mias 200 Series Advance Base Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Isolator Module Isolator Module Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
TBFA (20 x 30 x 20) TBFA (20 x 30 x 20) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Battery 12 V 17 AH Battery 12 V 17 AH Instalasi Tenaga Kerja :
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
1,177,112 23,542
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
161,942 3,239
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.10 Rp 0.20 Rp
673,907 13,478
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
1,177,112 23,542
1,922,212 38,444
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
1,922,212 38,444
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
1,177,112 23,542
Rp Rp Rp Rp Rp
8,500 16,000 1,225,154 30,629 1,255,783
Rp Rp
161,942 3,239
Rp Rp Rp Rp Rp
8,500 16,000 189,680 4,742 194,422
Rp Rp
673,907 13,478
Rp Rp Rp Rp Rp
8,500 16,000 711,885 17,797 729,682
Rp Rp
1,922,212 38,444
Rp Rp Rp Rp Rp
14,167 26,667 2,001,490 50,037 2,051,527
Rp Rp
1,922,212 38,444
111,557,981
44,691,164
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
1,255,783
Rp
194,422
Rp
729,682
Rp
2,051,527
Rp
1,981,073
Analisa Harga Satuan Elektrikal - page 93 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
End of Line End of Line Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Manual Call Point Backbox Manual Call Point Backbox Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Outside Screw & Yoke Supervisory Switch W/2 Spdt. Outside Screw & Yoke Supervisory Switch W/2 Spdt. Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Waterflow Detector 2.5" Waterflow Detector 2.5" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
26,697 534
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
159,896 3,198
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
3,885,009 77,700
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
3,422,701 68,454
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
Conventional Zone Module, Mias, In. For Integrasi and M400K/t Conventional Zone Module, Mias, In. For Integrasi and M400K/t bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasibh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Output Module, Mias, In. For Integrasi Output Module, Mias, In. For Integrasi Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Antena Parabola + Kabel Coaxial + Pekerjaan Sipil Antena Parabola + Kabel Coaxial + Pekerjaan Sipil Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
8 CH HD Encoder 8 CH HD Encoder Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1.00 Rp 1.00 Rp
3,397,872 67,957
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
2,148,664 42,973
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
2,348,451 46,969
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
20,629,801 412,596
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
9,352,176 187,044
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
64,720,943 1,294,419
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
7,083 13,333 1,981,073 49,527 2,030,600
Rp Rp
26,697 534
Rp Rp Rp Rp Rp
7,083 13,333 47,648 1,191 48,839
Rp Rp
159,896 3,198
Rp Rp Rp Rp Rp
7,083 13,333 183,510 4,588 188,098
Rp Rp
3,885,009 77,700
Rp Rp Rp Rp Rp
3,542 6,667 3,972,917 99,323 4,072,240
Rp Rp
3,422,701 68,454
Rp Rp Rp Rp Rp
3,542 6,667 3,501,363 87,534 3,588,897
Rp Rp
3,397,872 67,957
Rp Rp Rp Rp Rp
3,542 6,667 3,476,038 86,901 3,562,939
Rp Rp
2,148,664 42,973
Rp Rp Rp Rp Rp
3,542 6,667 2,201,846 55,046 2,256,892
Rp Rp
2,348,451 46,969
Rp Rp Rp Rp Rp
3,542 6,667 2,405,629 60,141 2,465,769
Rp Rp
20,629,801 412,596
Rp Rp Rp Rp Rp
3,542 6,667 21,052,605 526,315 21,578,920
Rp Rp
9,352,176 187,044
Rp Rp Rp Rp Rp
3,542 6,667 9,549,428 238,736 9,788,164
Rp Rp
64,720,943 1,294,419
Rp Rp Rp Rp Rp
3,542 6,667 66,025,570 1,650,639 67,676,210
TOTAL HARGA
Rp
48,839
Rp
188,098
Rp
4,072,240
Rp
3,588,897
Rp
3,562,939
Rp
2,256,892
Rp
2,465,769
Rp
21,578,920
Rp
9,788,164
Rp
67,676,210
Analisa Harga Satuan Elektrikal - page 94 of 211
URAIAN
NO. 1 UNIT 1 2 3
8 CH DVBS to IP 8 CH DVBS to IP Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Middleware & VoD Server c/w IPTV Application Middleware & VoD Server c/w IPTV Application Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Multicast Switch 24G Multicast Switch 24G Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
SIP PBX 20/200 SIP PBX 20/200 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Access Point (Wi-Fi) Access Point (Wi-Fi) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET PABX 6 Co line/100 Ext 1 PABX 6 Co line/100 Ext 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 24 ports Single Line Interface Board 1 24 ports Single Line Interface Board 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Proffesional Digital Proprietary Phone 1 Proffesional Digital Proprietary Phone 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Single Line Telephone with CID (white grey/black) 1 Single Line Telephone with CID (white grey/black) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 19” Rack Mounting Bracket(Option) 1 19” Rack Mounting Bracket(Option) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Terminal Box PABX 1 Set : 1 Terminal Box PABX 1 Set : 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
HARGA SATUAN
36,405,531 728,111
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
242,703,537 4,854,071
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
16,503,841 330,077
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
412,596,013 8,251,920
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,707,578 114,152
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
53,295,899
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
13,526,677
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,208,957
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
866,182
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
8,539,569
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1,752,859
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA
Rp Rp
36,405,531 728,111
Rp Rp Rp Rp Rp
3,542 6,667 37,143,850 928,596 38,072,446
Rp Rp
242,703,537 4,854,071
Rp Rp Rp Rp Rp
3,542 6,667 247,567,816 6,189,195 253,757,012
Rp Rp
16,503,841 330,077
Rp Rp Rp Rp Rp
3,542 6,667 16,844,126 421,103 17,265,229
Rp Rp
412,596,013 8,251,920
Rp Rp Rp Rp Rp
3,542 6,667 420,858,142 10,521,454 431,379,596
Rp Rp
5,707,578 114,152
Rp Rp Rp Rp Rp
3,542 6,667 5,831,938 145,798 5,977,737
Rp
53,295,899
Rp Rp Rp Rp Rp
3,542 6,667 53,306,107 1,332,653 54,638,760
Rp
13,526,677
Rp Rp Rp Rp Rp
3,542 6,667 13,536,885 338,422 13,875,308
Rp
5,208,957
Rp Rp Rp Rp Rp
3,542 6,667 5,219,166 130,479 5,349,645
Rp
866,182
Rp Rp Rp Rp Rp
3,542 6,667 876,390 21,910 898,300
Rp
8,539,569
Rp Rp Rp Rp Rp
3,542 6,667 8,549,777 213,744 8,763,522
Rp
1,752,859
Rp Rp Rp Rp Rp
3,542 6,667 1,763,067 44,077 1,807,144
TOTAL HARGA Rp
38,072,446
Rp
253,757,012
Rp
17,265,229
Rp
431,379,596
Rp
5,977,737
Rp
54,638,760
Rp
13,875,308
Rp
5,349,645
Rp
898,300
Rp
8,763,522
Rp
1,807,144
Analisa Harga Satuan Elektrikal - page 95 of 211
URAIAN
NO.
1 SET 19” Rack Mounting Bracket(Option) 1 19” Rack Mounting Bracket(Option) 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Reciver Satellite Parabola 1 Reciver Satellite Parabola 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Active Combiner 1 Active Combiner 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT Booster Amplifiere 1 Booster Amplifiere 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT set
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1 UNIT Instalasi Kabel dari Antena ke Sentral unit 1 Instalasi Kabel dari Antena ke Sentral unit 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
2 x 8 DVBS/T to IP Penerima Channel FTA 2 x 8 DVBS/T to IP Penerima Channel FTA Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
TBS (Terminal Box Speaker) TBS (Terminal Box Speaker) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
CD/MMC/USB Player With FM Tunner CD/MMC/USB Player With FM Tunner Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Remote Microphone Remote Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2
Voice Alarm System Amplifier 360 W w/Zone Selector Voice Alarm System Amplifier 360 W w/Zone Selector Instalasi
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
8,539,569
988,792
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
3,146,157
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,842,863
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp
2,247,255
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
314,616
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
11,865,506
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
3,078,739 61,575
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1,213,518 24,270
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
4,853,262 97,065
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh ls
HARGA SATUAN
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1 UNIT Parabola Antenne lengkap dengan tiang dan aksesories 1 Parabola Antenne lengkap dengan tiang dan aksesories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT Splitter 1 Splitter 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
INDEK
5,452,739 109,055
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
33,713,139 674,263
JUMLAH HARGA Rp
8,539,569
Rp Rp Rp Rp Rp
3,542 6,667 8,549,777 213,744 8,763,522
Rp
988,792
Rp Rp Rp Rp Rp
3,542 6,667 999,001 24,975 1,023,976
Rp
3,146,157
Rp Rp Rp Rp Rp
3,542 6,667 3,156,365 78,909 3,235,274
Rp
5,842,863
Rp Rp Rp Rp Rp
3,542 6,667 5,853,071 146,327 5,999,398
Rp
2,247,255
Rp Rp Rp Rp Rp
3,542 6,667 2,257,463 56,437 2,313,900
Rp
314,616
Rp Rp Rp Rp Rp
3,542 6,667 324,824 8,121 332,945
Rp
11,865,506
Rp Rp Rp Rp Rp
3,542 6,667 11,875,715 296,893 12,172,607
Rp Rp
3,078,739 61,575
Rp Rp Rp Rp Rp
3,542 6,667 3,150,522 78,763 3,229,285
Rp Rp
1,213,518 24,270
Rp Rp Rp Rp Rp
3,542 6,667 1,247,996 31,200 1,279,196
Rp Rp
4,853,262 97,065
Rp Rp Rp Rp Rp
7,083 13,333 4,970,744 124,269 5,095,012
Rp Rp
5,452,739 109,055
Rp Rp Rp Rp Rp
7,083 13,333 5,582,211 139,555 5,721,766
Rp Rp
33,713,139 674,263
TOTAL HARGA Rp
8,763,522
Rp
1,023,976
Rp
3,235,274
Rp
5,999,398
Rp
2,313,900
Rp
332,945
Rp
12,172,607
Rp
3,229,285
Rp
1,279,196
Rp
5,095,012
Rp
5,721,766
Rp
35,288,941
Analisa Harga Satuan Elektrikal - page 96 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SPEAKER SELECTOR 1x10 Channel Speaker Selector 10 ch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SPEAKER SELECTOR 2x10 Channel Speaker Selector 10 ch Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Digital Matrix Mixer w/ Equalizer Program Digital Matrix Mixer w/ Equalizer Program Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Flight Case 16U Flight Case 16U Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Firedome Speaker w/Metal Box Firedome Speaker w/Metal Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Wireless Set (Dual Wireless Lavalier and Handheld) Wireless Set (Dual Wireless Lavalier and Handheld) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Power Amplifier 120 W Power Amplifier 120 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Amplifier 480 W Power Amplifier 480 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Power Amplifier 240 W Power Amplifier 240 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Slim Array Speaker Slim Array Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1
F-Series Box Speaker F-Series Box Speaker
SAT hari orang hari orang
INDEK 0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
3,640,553 72,811
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
2.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
3,640,553 72,811
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.19 Rp 0.38 Rp
23,688,674 473,773
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
7,331,265 146,625
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
774,224 15,484
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
198,208 3,964
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
2,552,513 51,050
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
7,921,034 158,421
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
3,811,255 76,225
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
bh
HARGA SATUAN
6,666,257 133,325
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp
1,380,174
JUMLAH HARGA Rp Rp Rp Rp Rp
14,167 26,667 34,428,235 860,706 35,288,941
Rp Rp
3,640,553 72,811
Rp Rp Rp Rp Rp
7,083 13,333 3,733,781 93,345 3,827,125
Rp Rp
7,281,106 72,811
Rp Rp Rp Rp Rp
7,083 13,333 7,374,334 184,358 7,558,692
Rp Rp
23,688,674 473,773
Rp Rp Rp Rp Rp
16,292 30,667 24,209,406 605,235 24,814,641
Rp Rp
7,331,265 146,625
Rp Rp Rp Rp Rp
7,083 13,333 7,498,307 187,458 7,685,764
Rp Rp
774,224 15,484
Rp Rp Rp Rp Rp
7,083 13,333 810,125 20,253 830,379
Rp Rp
198,208 3,964
Rp Rp Rp Rp Rp
7,083 13,333 222,589 5,565 228,153
Rp Rp
2,552,513 51,050
Rp Rp Rp Rp Rp
7,083 13,333 2,623,980 65,600 2,689,580
Rp Rp
7,921,034 158,421
Rp Rp Rp Rp Rp
7,083 13,333 8,099,872 202,497 8,302,369
Rp Rp
3,811,255 76,225
Rp Rp Rp Rp Rp
7,083 13,333 3,907,896 97,697 4,005,594
Rp Rp
6,666,257 133,325
Rp Rp Rp Rp Rp
7,083 13,333 6,819,999 170,500 6,990,499
Rp
1,380,174
TOTAL HARGA
Rp
3,827,125
Rp
7,558,692
Rp
24,814,641
Rp
7,685,764
Rp
830,379
Rp
228,153
Rp
2,689,580
Rp
8,302,369
Rp
4,005,594
Rp
6,990,499
Rp
1,463,899
Analisa Harga Satuan Elektrikal - page 97 of 211
URAIAN
NO. 2 3
Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Ceiling Speaker 3 W Ceiling Speaker 3 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Emergency Message Panel Emergency Message Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Ceiling Speaker 3 W + Pagging Ceiling Speaker 3 W + Pagging Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 6 W Box Speaker 6 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 15 W Box Speaker 15 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Box Speaker 30 W Box Speaker 30 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Set Top Box Set Top Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Cabinet Rack with Accecories Cabinet Rack with Accecories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Attenuator Attenuator Instalasi Tenaga Kerja : Kepala Tukang listrik Pekerja
1 BH 1 2 3
Dynamic Microphone w/ Stand (Muadzin) Dynamic Microphone w/ Stand (Muadzin) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
ls
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
HARGA SATUAN 27,603
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
136,723 2,734
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
8,786,677 175,734
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
438,484 8,770
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
198,208 3,964
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
801,731 16,035
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1,603,461 32,069
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1,577,573 31,551
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.20 Rp 0.50 Rp
14,904,020 298,080
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
137,532 2,751
85,000 70,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp
27,603
Rp Rp Rp Rp Rp
7,083 13,333 1,428,194 35,705 1,463,899
Rp Rp
136,723 2,734
Rp Rp Rp Rp Rp
7,083 13,333 159,874 3,997 163,871
Rp Rp
8,786,677 175,734
Rp Rp Rp Rp Rp
3,542 6,667 8,972,619 224,315 9,196,934
Rp Rp
438,484 8,770
Rp Rp Rp Rp Rp
3,542 6,667 457,462 11,437 468,899
Rp Rp
198,208 3,964
Rp Rp Rp Rp Rp
3,542 6,667 212,380 5,310 217,690
Rp Rp
801,731 16,035
Rp Rp Rp Rp Rp
3,542 6,667 827,974 20,699 848,673
Rp Rp
1,603,461 32,069
Rp Rp Rp Rp Rp
3,542 6,667 1,645,739 41,143 1,686,882
Rp Rp
1,577,573 31,551
Rp Rp Rp Rp Rp
3,542 6,667 1,619,333 40,483 1,659,816
Rp Rp
14,904,020 298,080
Rp Rp Rp Rp Rp
17,000 40,000 15,259,100 381,478 15,640,578
Rp Rp
137,532 2,751
Rp Rp Rp Rp Rp
3,542 5,833 149,658 3,741 153,399
bh ls
1.00 Rp 1.00 Rp
1,614,788 32,296
Rp Rp
1,614,788 32,296
hari orang hari orang
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah
Rp Rp Rp
3,542 6,667 1,657,292
TOTAL HARGA
Rp
163,871
Rp
9,196,934
Rp
468,899
Rp
217,690
Rp
848,673
Rp
1,686,882
Rp
1,659,816
Rp
15,640,578
Rp
153,399
Rp
1,698,724
Analisa Harga Satuan Elektrikal - page 98 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 1 BH 1 2 3
MDF / CTB MDF / CTB Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
16-Channel Mixing Console 16-Channel Mixing Console Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Hand Held Wireless Microphone w/ Receiver Hand Held Wireless Microphone w/ Receiver Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Undirectional Lavaliere Wireless Microphone w/ Receiver Undirectional Lavaliere Wireless Microphone w/ Receiver set Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
Wireless Antena Wireless Antena Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dynamic Microphone Dynamic Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Floor Stand Mic. Floor Stand Mic. Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Digital Speaker Processor w/ Equalizer Digital Speaker Processor w/ Equalizer Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Multi Channel Power Amplifier Multi Channel Power Amplifier Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Dual Power Amplifier Dual Power Amplifier Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Speaker System Speaker System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1 BH 1 2
Subwofer System Subwofer System Instalasi
bh ls
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
2,966,646 59,333
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,582,181 111,644
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
11,462,888 229,258
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
11,339,918 226,798
0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
1,967,517 39,350
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
991,848 19,837
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
622,939 12,459
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
32,281,188 645,624
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
17,411,552 348,231
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
6,887,117 137,742
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 24,062,438 481,249
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
12,927,199 258,544
TOTAL HARGA
41,432 1,698,724
Rp Rp
2,966,646 59,333
Rp Rp Rp Rp Rp
3,542 6,667 3,036,187 75,905 3,112,092
Rp Rp
5,582,181 111,644
Rp Rp Rp Rp Rp
3,542 6,667 5,704,033 142,601 5,846,634
Rp Rp
11,462,888 229,258
Rp Rp Rp Rp Rp
3,542 6,667 11,702,354 292,559 11,994,913
Rp Rp
11,339,918 226,798
Rp Rp Rp Rp Rp
3,542 6,667 11,576,925 289,423 11,866,348
Rp Rp
1,967,517 39,350
Rp Rp Rp Rp Rp
3,542 6,667 2,017,075 50,427 2,067,502
Rp Rp
991,848 19,837
Rp Rp Rp Rp Rp
3,542 6,667 1,021,894 25,547 1,047,441
Rp Rp
622,939 12,459
Rp Rp Rp Rp Rp
3,542 6,667 645,606 16,140 661,746
Rp Rp
32,281,188 645,624
Rp Rp Rp Rp Rp
3,542 6,667 32,937,021 823,426 33,760,446
Rp Rp
17,411,552 348,231
Rp Rp Rp Rp Rp
3,542 6,667 17,769,991 444,250 18,214,241
Rp Rp
6,887,117 137,742
Rp Rp Rp Rp Rp
3,542 6,667 7,035,068 175,877 7,210,945
Rp Rp
24,062,438 481,249
Rp Rp Rp Rp Rp
3,542 6,667 24,553,895 613,847 25,167,742
Rp Rp
12,927,199 258,544
Rp
3,112,092
Rp
5,846,634
Rp
11,994,913
Rp
11,866,348
Rp
2,067,502
Rp
1,047,441
Rp
661,746
Rp
33,760,446
Rp
18,214,241
Rp
7,210,945
Rp
25,167,742
Rp
13,525,851
Analisa Harga Satuan Elektrikal - page 99 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Monitor Speaker Monitor Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
HX-Series Speaker HX-Series Speaker Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Yamaha Mixer Yamaha Mixer Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Paging Microphone w/RU-2002 (Car Call) Paging Microphone w/RU-2002 (Car Call) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ANTENA PARABOLA 32 Feet Antena Parabola 32 Feet Instalasi Tenaga Kerja : Tiang/Dudukan Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ANTENA YAGI VHF 22 ELEMENT Antena Yagi VHF 22 Element Instalasi Tenaga Kerja : Tiang/Dudukan Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
TERMINAL BOX + BOOSTER Terminal Box + Booster signal & P.supply Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
ACTIVE COMBINER Active Filter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
POWER DEVIDER Power DeviderActive Filter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Digital A/V Encoder Digital A/V Encoder Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2
DEMODULATOR Demodulator Instalasi
SAT hari orang hari orang
INDEK 0.04 Rp 0.08 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
2,634,142 52,683
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
6,628,234 132,565
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
23,461,342 469,227
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,136,416 102,728
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
Ls hari orang hari orang
1.00 Rp 0.17 Rp 0.33 Rp
16,419,973 328,399
1,500,000 85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
Ls hari orang hari orang
1.00 Rp 0.17 Rp 0.33 Rp
2,873,520 57,470
646,580 85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
3,883,257 77,665
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
3,951,034 79,021
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
3,078,739 61,575
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
bh ls
HARGA SATUAN
7,335,040 146,701
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
2,471,980 49,440
JUMLAH HARGA Rp Rp Rp Rp Rp
3,542 6,667 13,195,952 329,899 13,525,851
Rp Rp
2,634,142 52,683
Rp Rp Rp Rp Rp
3,542 6,667 2,697,034 67,426 2,764,459
Rp Rp
6,628,234 132,565
Rp Rp Rp Rp Rp
3,542 6,667 6,771,007 169,275 6,940,282
Rp Rp
23,461,342 469,227
Rp Rp Rp Rp Rp
3,542 6,667 23,940,777 598,519 24,539,297
Rp Rp
5,136,416 102,728
Rp Rp Rp Rp Rp
3,542 6,667 5,249,353 131,234 5,380,586
Rp Rp
16,419,973 328,399
Rp Rp Rp Rp Rp Rp
1,500,000 14,167 26,667 18,289,206 457,230 18,746,436
Rp Rp
2,873,520 57,470
Rp Rp Rp Rp Rp Rp
646,580 14,167 26,667 3,618,404 90,460 3,708,864
Rp Rp
3,883,257 77,665
Rp Rp Rp Rp Rp
10,625 20,000 3,991,547 99,789 4,091,335
Rp Rp
3,951,034 79,021
Rp Rp Rp Rp Rp
10,625 20,000 4,060,679 101,517 4,162,196
Rp Rp
3,078,739 61,575
Rp Rp Rp Rp Rp
10,625 20,000 3,170,939 79,273 3,250,213
Rp Rp
7,335,040 146,701
Rp Rp Rp Rp Rp
10,625 20,000 7,512,366 187,809 7,700,175
Rp Rp
2,471,980 49,440
TOTAL HARGA
Rp
2,764,459
Rp
6,940,282
Rp
24,539,297
Rp
5,380,586
Rp
18,746,436
Rp
3,708,864
Rp
4,091,335
Rp
4,162,196
Rp
3,250,213
Rp
7,700,175
Rp
2,615,846
Analisa Harga Satuan Elektrikal - page 100 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
JSKYE 200 Wp Solar Panel JSKYE 200 Wp Solar Panel Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SMA Sunny Boy 1.5kW SMA Sunny Boy 1.5kW Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SMA Sunny Island 4.4 SMA Sunny Island 4.4 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
NS VRLA 12v 100 Ah NS VRLA 12v 100 Ah Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Panel Combiner Box Panel Combiner Box Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Cabling & accs Cabling & accs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Solar Mounting Solar Mounting Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Battery Rack & Accs Battery Rack & Accs Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Inverter Hybrid san Solar Panel Charge Controller Inverter Hybrid san Solar Panel Charge Controller Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
Solar Cable 6mm2 Solar Cable 6mm2 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
1,618,024 32,360
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
13,483,530 269,671
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
43,147,296 862,946
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.33 Rp 0.67 Rp
2,516,926 50,339
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
9,887,922 197,758
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
4,943,961 98,879
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
4,045,059 80,901
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
16,180,236 323,605
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
49,439,609 988,792
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
49,080 982
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
10,625 20,000 2,552,045 63,801 2,615,846
Rp Rp
1,618,024 32,360
Rp Rp Rp Rp Rp
28,333 53,333 1,732,051 43,301 1,775,352
Rp Rp
13,483,530 269,671
Rp Rp Rp Rp Rp
28,333 53,333 13,834,867 345,872 14,180,739
Rp Rp
43,147,296 862,946
Rp Rp Rp Rp Rp
28,333 53,333 44,091,908 1,102,298 45,194,206
Rp Rp
2,516,926 50,339
Rp Rp Rp Rp Rp
28,333 53,333 2,648,931 66,223 2,715,154
Rp Rp
9,887,922 197,758
Rp Rp Rp Rp Rp
14,167 26,667 10,126,514 253,163 10,379,677
Rp Rp
4,943,961 98,879
Rp Rp Rp Rp Rp
14,167 26,667 5,083,673 127,092 5,210,765
Rp Rp
4,045,059 80,901
Rp Rp Rp Rp Rp
14,167 26,667 4,166,793 104,170 4,270,963
Rp Rp
16,180,236 323,605
Rp Rp Rp Rp Rp
14,167 26,667 16,544,674 413,617 16,958,291
Rp Rp
49,439,609 988,792
Rp Rp Rp Rp Rp
14,167 26,667 50,469,235 1,261,731 51,730,966
Rp Rp
49,080 982
Rp Rp Rp Rp Rp
2,550 6,400 59,012 1,475 60,487
TOTAL HARGA
Rp
1,775,352
Rp
14,180,739
Rp
45,194,206
Rp
2,715,154
Rp
10,379,677
Rp
5,210,765
Rp
4,270,963
Rp
16,958,291
Rp
51,730,966
Rp
60,487
Analisa Harga Satuan Elektrikal - page 101 of 211
URAIAN
NO. 1 PCS 1 2 3
MC4 Connector Female MC4 Connector Female Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
MC4 Connector Male MC4 Connector Male Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
Cable Trenching Cable Trenching Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Prewiring and Components Prewiring and Components Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Grounding System Grounding System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH
Instalasi & Test Commisioning Instalasi & Test Commisioning
1 BH 1 2 3
DIGITAL SATELITE RECEIVER & MODULATOR Digital Satelite Receiver & Modulator Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Parabola Tv Berbayar Parabola Tv Berbayar Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SPLITER Spliter 4 way Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
COUPLER Coupler Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
SOCKET TV SOCKET TV Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
HARGA SATUAN
6,427 129
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
6,427 129
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.03 Rp 0.08 Rp
67,418 1,348
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
30,738,178 614,764
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
24,270,354 485,407
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA
Rp Rp
6,427 129
Rp Rp Rp Rp Rp
2,550 6,400 15,506 388 15,893
Rp Rp
6,427 129
Rp Rp Rp Rp Rp
2,550 6,400 15,506 388 15,893
Rp Rp
67,418 1,348
Rp Rp Rp Rp Rp
2,550 6,400 77,716 1,943 79,659
Rp Rp
30,738,178 614,764
Rp Rp Rp Rp Rp
14,167 26,667 31,393,775 784,844 32,178,620
Rp Rp
24,270,354 485,407
Rp Rp Rp Rp Rp
14,167 26,667 24,796,594 619,915 25,416,509
bh
1.00 Rp
26,967,060 Jumlah
Rp Rp
26,967,060 26,967,060
bh ls
1.00 Rp 1.00 Rp
4,884,903 97,698
Rp Rp
4,884,903 97,698
hari orang hari orang
0.17 Rp 0.33 Rp
Rp Rp Rp Rp Rp
14,167 26,667 5,023,434 125,586 5,149,020
Rp Rp
584,286 11,686
Rp Rp Rp Rp Rp
14,167 26,667 636,805 15,920 652,725
Rp Rp
242,434 4,849
Rp Rp Rp Rp Rp
7,083 13,333 267,699 6,692 274,392
Rp Rp
134,835 2,697
Rp Rp Rp Rp Rp
7,083 13,333 157,949 3,949 161,897
Rp Rp
67,418 1,348
Rp Rp Rp Rp Rp
3,542 6,667 78,974 1,974 80,949
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
584,286 11,686
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
242,434 4,849
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
134,835 2,697
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
67,418 1,348
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
TOTAL HARGA Rp
15,893
Rp
15,893
Rp
79,659
Rp
32,178,620
Rp
25,416,509
Rp
26,967,060
Rp
5,149,020
Rp
652,725
Rp
274,392
Rp
161,897
Rp
80,949
Analisa Harga Satuan Elektrikal - page 102 of 211
URAIAN
NO. 1 SET 1 2 3
Mixer Amplifier 60 W (Monitor) Mixer Amplifier 60 W (Monitor) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Gooseneck Microphone (Mimbar) Gooseneck Microphone (Mimbar) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dynamic Microphone w/ Stand (Muadzin) Dynamic Microphone w/ Stand (Muadzin) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dome Camera : 4MP IR Ball Camera Dome Camera : 4MP IR Ball Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Eyeball Fixed Lens IP Camera Eyeball Fixed Lens IP Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Bullet Camera : 4 MP Bullet Camera Bullet Camera : 4 MP Bullet Camera Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Driver Unit 60 W w/ Horn Driver Unit 60 W w/ Horn Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Dual Power Amplifier 1250 W Dual Power Amplifier 1250 W Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1SET 1 2 3
Digital Amplifier 480 W w/Selector Digital Amplifier 480 W w/Selector Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Terminal Box 1:12 + Booster signal Terminal Box 1:12 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Terminal Box 1:8 + Booster signal Terminal Box 1:8 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
HARGA SATUAN 1,963,795 39,276
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
1,057,378 21,148
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.25 Rp 0.50 Rp
1,614,788 32,296
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
7,595,115 151,902
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
7,595,115 151,902
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
7,928,223 158,564
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
1,296,037 25,921
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
10,488,029 209,761
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.21 Rp 0.42 Rp
5,613,733 112,275
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
3,883,257 77,665
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
3,106,605 62,132
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp
1,963,795 39,276
Rp Rp Rp Rp Rp
3,542 6,667 2,013,279 50,332 2,063,611
Rp Rp
1,057,378 21,148
Rp Rp Rp Rp Rp
7,083 13,333 1,098,943 27,474 1,126,416
Rp Rp
1,614,788 32,296
Rp Rp Rp Rp Rp
21,250 40,000 1,708,333 42,708 1,751,042
Rp Rp
7,595,115 151,902
Rp Rp Rp Rp Rp
14,167 26,667 7,787,851 194,696 7,982,547
Rp Rp
7,595,115 151,902
Rp Rp Rp Rp Rp
14,167 26,667 7,787,851 194,696 7,982,547
Rp Rp
7,928,223 158,564
Rp Rp Rp Rp Rp
14,167 26,667 8,127,621 203,191 8,330,811
Rp Rp
1,296,037 25,921
Rp Rp Rp Rp Rp
17,708 33,333 1,372,999 34,325 1,407,324
Rp Rp
10,488,029 209,761
Rp Rp Rp Rp Rp
17,708 33,333 10,748,831 268,721 11,017,552
Rp Rp
5,613,733 112,275
Rp Rp Rp Rp Rp
17,708 33,333 5,777,049 144,426 5,921,475
Rp Rp
3,883,257 77,665
Rp Rp Rp Rp Rp
14,167 26,667 4,001,755 100,044 4,101,799
Rp Rp
3,106,605 62,132
Rp Rp Rp Rp Rp
14,167 26,667 3,209,571 80,239 3,289,810
TOTAL HARGA Rp
2,063,611
Rp
1,126,416
Rp
1,751,042
Rp
7,982,547
Rp
7,982,547
Rp
8,330,811
Rp
1,407,324
Rp
11,017,552
Rp
5,921,475
Rp
4,101,799
Rp
3,289,810
Analisa Harga Satuan Elektrikal - page 103 of 211
URAIAN
NO. 1 BH 1 2 3
Terminal Box 1:4 + Booster signal Terminal Box 1:4 + Booster signal Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
1 UNIT 1 2 3
Patchpanel UTP Cat6 24 port Loaded Patchpanel UTP Cat6 24 port Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
OTB (Optical Terminal Box) OTB (Optical Terminal Box) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patchpanel UTP Cat6 48 port Loaded Patchpanel UTP Cat6 48 port Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Core Switch Layer 3 Core Switch Layer 3 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Core Firewall + Router + IPS Core Firewall + Router + IPS Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Hdd PC WD CCTV PURPLE 4TB Hdd PC WD CCTV PURPLE 4TB Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPPABX Headend Support Up to 400 Lines IPPABX Headend Support Up to 400 Lines Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPPABX Headend Support Up to 200 Lines IPPABX Headend Support Up to 400 Lines Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPTV Management System ( Server + Software ) IPTV Management System ( Server + Software ) Instalasi Tenaga Kerja :
1,553,303 31,066
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
3,221,665 64,433
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
2,182,714 43,654
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
6,443,329 128,867
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
781,757 15,635
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
289,446,441 5,788,929
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
341,582,756 6,831,655
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.14 Rp 0.28 Rp
1,589,101 31,782
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
289,356,551 5,787,131
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.17 Rp 0.33 Rp
unit ls
HARGA SATUAN
144,678,275 2,893,566
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
332,234,176 6,644,684
JUMLAH HARGA
Rp Rp
1,553,303 31,066
Rp Rp Rp Rp Rp
14,167 26,667 1,625,202 40,630 1,665,832
Rp Rp
3,221,665 64,433
Rp Rp Rp Rp Rp
14,167 26,667 3,326,931 83,173 3,410,105
Rp Rp
2,182,714 43,654
Rp Rp Rp Rp Rp
14,167 26,667 2,267,201 56,680 2,323,881
Rp Rp
6,443,329 128,867
Rp Rp Rp Rp Rp
14,167 26,667 6,613,029 165,326 6,778,355
Rp Rp
781,757 15,635
Rp Rp Rp Rp Rp
14,167 26,667 838,226 20,956 859,181
Rp Rp
289,446,441 5,788,929
Rp Rp Rp Rp Rp
7,083 13,333 295,255,786 7,381,395 302,637,181
Rp Rp
341,582,756 6,831,655
Rp Rp Rp Rp Rp
14,167 26,667 348,455,245 8,711,381 357,166,626
Rp Rp
1,589,101 31,782
Rp Rp Rp Rp Rp
12,042 22,667 1,655,592 41,390 1,696,982
Rp Rp
289,356,551 5,787,131
Rp Rp Rp Rp Rp
14,167 26,667 295,184,515 7,379,613 302,564,128
Rp Rp
144,678,275 2,893,566
Rp Rp Rp Rp Rp
14,167 26,667 147,612,674 3,690,317 151,302,991
Rp Rp
332,234,176 6,644,684
TOTAL HARGA Rp
1,665,832
Rp
3,410,105
Rp
2,323,881
Rp
6,778,355
Rp
859,181
Rp
302,637,181
Rp
357,166,626
Rp
1,696,982
Rp
302,564,128
Rp
151,302,991
Rp
347,392,685
Analisa Harga Satuan Elektrikal - page 104 of 211
URAIAN
NO.
Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
IPTV Headend IPTV Headend Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Monitor 32"+ PC for System Monitor 32"+ PC for System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Inlet Microphone Inlet Microphone Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Patch Cord 1 mtr Cat6 UTP Patch Cord 1 mtr Cat6 UTP Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.17 Rp 0.33 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
14,167 26,667 338,919,692 8,472,992 347,392,685
Rp Rp
159,824,774 3,196,495
Rp Rp Rp Rp Rp
10,625 20,000 163,051,894 4,076,297 167,128,192
Rp Rp
26,612,443 532,249
Rp Rp Rp Rp Rp
7,083 13,333 27,165,108 679,128 27,844,236
Rp Rp
339,785 6,796
Rp Rp Rp Rp Rp
7,083 13,333 366,997 9,175 376,172
Rp Rp
130,341 2,607
Rp Rp Rp Rp Rp
7,083 13,333 153,364 3,834 157,198
Rp
20,764,663
Rp Rp Rp Rp Rp
7,083 13,333 20,785,080 519,627 21,304,707
Rp
39,473,061
Rp Rp Rp Rp Rp
7,083 13,333 39,493,477 987,337 40,480,814
Rp
214,307
Rp Rp Rp Rp Rp
7,083 13,333 234,724 5,868 240,592
Rp
2,320,084
Rp Rp Rp Rp Rp
7,083 13,333 2,340,501 58,513 2,399,013
TOTAL HARGA
Rp
167,128,192
Rp
27,844,236
Rp
376,172
Rp
157,198
Rp
21,304,707
Rp
40,480,814
Rp
240,592
Rp
2,399,013
1 UNIT Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Port to PSU air flow 1 Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, unit redundant power 1.00 supplies, Rp Built in 244,621,866 Port to PSU airRp flow 244,621,866 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 244,642,283 Keuntungan 5% Rp 6,116,057 Total = Jumlah+(Keuntungan 5%) Rp 250,758,340
Rp
250,758,340
1 UNIT Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fans 1 Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy unit Power 1.00 supplies Rpand fans608,304,962 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
623,533,513
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
159,824,774 3,196,495
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
26,612,443 532,249
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
339,785 6,796
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
130,341 2,607
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door 1 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front unitdoor 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
20,764,663
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories 1 Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 PCS MMF - Patch Cord OM3, 3m 1 MMF - Patch Cord OM3, 3m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS MMF - 12F MC DJ Trunk MPO Pol B 5M 1 MMF - 12F MC DJ Trunk MPO Pol B 5M 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1.00 Rp
39,473,061
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
214,307
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
2,320,084
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
608,304,962
Rp Rp Rp Rp Rp
7,083 13,333 608,325,379 15,208,134 623,533,513
1 UNIT Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD,AC PSU, cable and RMK) and Software Rp 322,100,525 Base (Firewall, NAT, IPSec, Ro 1 Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G unit RAM, 16G Flash,1.00 100GRp SSD,AC PSU, 314,223,998 cable and RMK) Rp and Software 314,223,998 Base (Firewall, NAT, IPSec, Routing, MPLS and Swi 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Analisa Harga Satuan Elektrikal - page 105 of 211
NO.
URAIAN
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
TOTAL HARGA
314,244,415 7,856,110 322,100,525
1 UNIT Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, Rp 2 AC PSU 30,894,717 300W 1 Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, unit 2 x 40G QSFP+, 1.00 Rp redundant 30,120,771 fans, front-to-back Rp airflow,30,120,771 2 AC PSU 300W 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 30,141,188 Keuntungan 5% Rp 753,530 Total = Jumlah+(Keuntungan 5%) Rp 30,894,717 1 UNIT QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF 1 QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission unit on MMF 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
54,608,296
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF 1 SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m unit Transmission 1.00 on MMF Rp 15,775,730 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Tukang Listrik hari orang 0.17 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1 UNIT 1U Wiring Management 1 1U Wiring Management 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
234,371
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB 1 NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDDunit up to 32TB 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
34,227,676
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT WLAN Controller 1 WLAN Controller 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT UPS 10KVA 1 UPS 10KVA 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT UPS 2KVA 1 UPS 2KVA 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
154,526,041
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
44,900,154
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
4,611,367
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door 1 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front unitdoor 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
11,110,483
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 19" Wallmounted Rack 15U Depth 600 mm Double Door 1 19" Wallmounted Rack 15U Depth 600 mm Double Door unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories 1 Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories unit 2 Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1.00 Rp
3,775,415
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 0.08 Rp 0.17 Rp
4,252,166
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Rp
54,608,296
Rp Rp Rp Rp Rp
7,083 13,333 54,628,713 1,365,718 55,994,430
Rp
15,775,730
Rp Rp Rp Rp Rp
7,083 13,333 15,796,147 394,904 16,191,050
Rp
234,371
Rp Rp Rp Rp Rp
7,083 13,333 254,787 6,370 261,157
Rp
34,227,676
Rp Rp Rp Rp Rp
7,083 13,333 34,248,092 856,202 35,104,295
Rp
154,526,041
Rp Rp Rp Rp Rp
7,083 13,333 154,546,458 3,863,661 158,410,120
Rp
44,900,154
Rp Rp Rp Rp Rp
7,083 13,333 44,920,571 1,123,014 46,043,585
Rp
4,611,367
Rp Rp Rp Rp Rp
7,083 13,333 4,631,784 115,795 4,747,578
Rp
11,110,483
Rp Rp Rp Rp Rp
7,083 13,333 11,130,899 278,272 11,409,172
Rp
3,775,415
Rp Rp Rp Rp Rp
7,083 13,333 3,795,832 94,896 3,890,728
Rp
4,252,166
Rp Rp Rp Rp Rp
7,083 13,333 4,272,583 106,815 4,379,397
Rp
55,994,430
Rp
16,191,050
Rp
261,157
Rp
35,104,295
Rp
158,410,120
Rp
46,043,585
Rp
4,747,578
Rp
11,409,172
Rp
3,890,728
Rp
4,379,397
1 UNIT Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back Rp airflow, 77,390,638 2 AC PSU 1840W 1 Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4unit x 1/10G SFP/SFP+, 1.00 2 x Rp 40G QSFP+,75,482,645 redundant fans, Rp front-to-back 75,482,645 airflow, 2 AC PSU 1840W Analisa Harga Satuan Elektrikal - page 106 of 211
URAIAN
NO. 2
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
TOTAL HARGA
7,083 13,333 75,503,061 1,887,577 77,390,638
1 UNIT Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant fans, front-to-back airflow, Rp 2 40,739,486 AC PSU 300W 1 Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10Gunit SFP/SFP+, 2 x 40G 1.00 QSFP+, Rp redundant 39,725,424 fans, front-to-back Rp airflow, 39,725,424 2 AC PSU 300W 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp 85,000 Rp 7,083 Tukang Listrik hari orang 0.17 Rp 80,000 Rp 13,333 Jumlah Rp 39,745,840 Keuntungan 5% Rp 993,646 Total = Jumlah+(Keuntungan 5%) Rp 40,739,486 1 UNIT UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager 1 UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loadedunit with cable Manager 1.00 Rp 2 Tenaga Kerja : Kepala Tukang listrik hari orang 0.08 Rp Tukang Listrik hari orang 0.17 Rp
1,527,172
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 PCS UTP Cat 6 Patchcord Blue 2m 1 UTP Cat 6 Patchcord Blue 2m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS UTP Cat 6 Patchcord Blue 3m 1 UTP Cat 6 Patchcord Blue 3m 2 Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 M' 1 2
MMF - 12core OM3 SLT STA in PVC HI Conduit MMF - 12core OM3 SLT STA in PVC HI Conduit Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
74,186
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
meter
1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
81,530
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2 :8 c/w accessories POS ( Passive Optical Splitter) 2 :8 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2 :16 c/w accessories POS ( Passive Optical Splitter) 2 :16 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Wiring Management 1U Wiring Management 1U Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
58,087
1.00 Rp 1.00 Rp
20,629,801 412,596
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
UTP Cat 6 Patch Panel 24 Port Loaded UTP Cat 6 Patch Panel 24 Port Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET UTP Cat 6 Patch Cord, 3m 1 UTP Cat 6 Patch Cord, 3m 2 Instalasi
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
1,500,861 30,017
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
206,298 4,126
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
set ls
750,431 15,009
1,937,951 38,759
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
50,011 1,000
Rp
1,527,172
Rp Rp Rp Rp Rp
7,083 13,333 1,547,588 38,690 1,586,278
Rp
58,087
Rp Rp Rp Rp Rp
7,083 13,333 78,504 1,963 80,466
Rp
74,186
Rp Rp Rp Rp Rp
7,083 13,333 94,603 2,365 96,968
Rp
81,530
Rp Rp Rp Rp Rp
7,083 13,333 101,947 2,549 104,496
Rp Rp
20,629,801 412,596
Rp Rp Rp Rp Rp
1,700 8,000 21,052,097 526,302 21,578,399
Rp Rp
750,431 15,009
Rp Rp Rp Rp Rp
1,700 8,000 775,139 19,378 794,518
Rp Rp
1,500,861 30,017
Rp Rp Rp Rp Rp
1,700 8,000 1,540,578 38,514 1,579,093
Rp Rp
206,298 4,126
Rp Rp Rp Rp Rp
1,700 8,000 220,124 5,503 225,627
Rp Rp
1,937,951 38,759
Rp Rp Rp Rp Rp
1,700 8,000 1,986,410 49,660 2,036,071
Rp Rp
50,011 1,000
Rp
1,586,278
Rp
80,466
Rp
96,968
Rp
104,496
Rp
21,578,399
Rp
794,518
Rp
1,579,093
Rp
225,627
Rp
2,036,071
Rp
62,230
Analisa Harga Satuan Elektrikal - page 107 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
Optical Line Terminal ( OLT ) 4 PON Optical Line Terminal ( OLT ) 4 PON Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Farm Switch 24 Gb, L3 Farm Switch 24 Gb, L3 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Network Management System Network Management System Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Router Fire Wall for Internet Router Fire Wall for Internet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan unit utama diruang 1.00 Server Rp 175,628,370 Instalasi ls 1.00 Rp 3,512,567 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan unit utama diruang 1.00Server Rp 24,480,697 Instalasi ls 1.00 Rp 489,614 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 LOT 1 2 3
Grounding Sistem Grounding Sistem Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
Sistem Pengkabelan Perangkat Utama Data Sistem Pengkabelan Perangkat Utama Data Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT 1 2 3
A/P Controller license max 50 A/P A/P Controller license max 50 A/P Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
63,311,483 1,266,230
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
28,257,326 565,147
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
55,012,802 1,100,256
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
38,612,204 772,244
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
68,766,002 1,375,320
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
8,090,118 161,802
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
lot ls
1.00 Rp Rp
hari orang hari orang
0.02 Rp 0.10 Rp
223,515,387 4,470,308
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap unit terpasang 1.00 Instalasi ls 1.00 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Tukang Listrik hari orang 0.10
Rp Rp Rp Rp
3,271,073 65,421 85,000 80,000 Jumlah Keuntungan 5%
JUMLAH HARGA Rp Rp Rp Rp Rp
1,700 8,000 60,712 1,518 62,230
Rp Rp
63,311,483 1,266,230
Rp Rp Rp Rp Rp
1,700 8,000 64,587,413 1,614,685 66,202,098
Rp Rp
28,257,326 565,147
Rp Rp Rp Rp Rp
1,700 8,000 28,832,172 720,804 29,552,976
Rp Rp
55,012,802 1,100,256
Rp Rp Rp Rp Rp
1,700 8,000 56,122,758 1,403,069 57,525,827
Rp Rp
38,612,204 772,244
Rp Rp Rp Rp Rp
1,700 8,000 39,394,148 984,854 40,379,002
Rp Rp
175,628,370 3,512,567
Rp Rp Rp Rp Rp
1,700 8,000 179,150,637 4,478,766 183,629,403
Rp Rp
24,480,697 489,614
Rp Rp Rp Rp Rp
1,700 8,000 24,980,011 624,500 25,604,511
Rp Rp
68,766,002 -
Rp Rp Rp Rp Rp
1,700 8,000 68,775,702 1,719,393 70,495,095
Rp Rp
8,090,118 -
Rp Rp Rp Rp Rp
1,700 8,000 8,099,818 202,495 8,302,313
Rp Rp
223,515,387 -
Rp Rp Rp Rp Rp
1,700 8,000 223,525,087 5,588,127 229,113,214
Rp Rp
3,271,073 65,421
Rp Rp Rp Rp
1,700 8,000 3,346,195 83,655
TOTAL HARGA
Rp
66,202,098
Rp
29,552,976
Rp
57,525,827
Rp
40,379,002
Rp
183,629,403
Rp
25,604,511
Rp
70,495,095
Rp
8,302,313
Rp
229,113,214
Rp
3,429,850
Analisa Harga Satuan Elektrikal - page 108 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Total = Jumlah+(Keuntungan 5%) Rp 1 PCS 1 2 3
Patch Panel F.O 12 Core Patch Panel F.O 12 Core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Patch Panel F.O 24 Core Patch Panel F.O 24 Core Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Patch Cord F.O SC to LC, 3 meter Patch Cord F.O SC to LC, 3 meter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
1 PCS 1 2 3
Patch Panel UTP 24 Port, Cat 6 Loaded Patch Panel UTP 24 Port, Cat 6 Loaded Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Patch Cord UTP Cat 6, 1 meter Patch Cord UTP Cat 6, 1 meter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
ONU 24G PoE ONU 24G PoE Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
ONU 48G PoE ONU 48G PoE Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 1:4 c/w accessories POS ( Passive Optical Splitter) 1:4 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
POS ( Passive Optical Splitter) 2:4 c/w accessories POS ( Passive Optical Splitter) 2:4 c/w accessories Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1M 1 2 3
Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 LOT Terminasi Kabel FO 1 Terminasi Kabel FO 2 Instalasi
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
3,127,805 62,556
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
133,681 2,674
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
1,937,951 38,759
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
50,011 1,000
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
7,467,988 149,360
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
14,935,976 298,720
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
464,793 9,296
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
929,555 18,591
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
lot ls
1,694,628 33,893
34,324 686
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
137,532 2,751
TOTAL HARGA
3,429,850
Rp Rp
1,694,628 33,893
Rp Rp Rp Rp Rp
1,700 8,000 1,738,221 43,456 1,781,676
Rp Rp
3,127,805 62,556
Rp Rp Rp Rp Rp
1,700 8,000 3,200,062 80,002 3,280,063
Rp Rp
133,681 2,674
Rp Rp Rp Rp Rp
1,700 8,000 146,055 3,651 149,706
Rp Rp
1,937,951 38,759
Rp Rp Rp Rp Rp
1,700 8,000 1,986,410 49,660 2,036,071
Rp Rp
50,011 1,000
Rp Rp Rp Rp Rp
1,700 8,000 60,712 1,518 62,230
Rp Rp
7,467,988 149,360
Rp Rp Rp Rp Rp
1,700 8,000 7,627,048 190,676 7,817,724
Rp Rp
14,935,976 298,720
Rp Rp Rp Rp Rp
1,700 8,000 15,244,395 381,110 15,625,505
Rp Rp
464,793 9,296
Rp Rp Rp Rp Rp
1,700 8,000 483,789 12,095 495,884
Rp Rp
929,555 18,591
Rp Rp Rp Rp Rp
1,700 8,000 957,846 23,946 981,792
Rp Rp
34,324 686
Rp Rp Rp Rp Rp
1,700 8,000 44,710 1,118 45,828
Rp Rp
137,532 2,751
Rp
1,781,676
Rp
3,280,063
Rp
149,706
Rp
2,036,071
Rp
62,230
Rp
7,817,724
Rp
15,625,505
Rp
495,884
Rp
981,792
Rp
45,828
Rp
153,732
Analisa Harga Satuan Elektrikal - page 109 of 211
URAIAN
NO. 3
1M 1 2 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
Kabel FO 12 Core, SM, Outdoor Kabel FO 12 Core, SM, Outdoor Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
m ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
129,139 2,583
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
JUMLAH HARGA Rp Rp Rp Rp Rp
1,700 8,000 149,983 3,750 153,732
Rp Rp
129,139 2,583
Rp Rp Rp Rp Rp
1,700 8,000 141,421 3,536 144,957
Rp Rp
248,224,809 4,964,496
Rp Rp Rp Rp Rp
1,700 8,000 253,199,005 6,329,975 259,528,980
Rp Rp
11,865,506 237,310
Rp Rp Rp Rp Rp
1,700 8,000 12,112,516 302,813 12,415,329
Rp Rp
3,415,828 68,317
Rp Rp Rp Rp Rp
1,700 8,000 3,493,844 87,346 3,581,190
Rp Rp
119,050,580 2,381,012
Rp Rp Rp Rp Rp
1,700 8,000 121,441,291 3,036,032 124,477,323
Rp Rp
67,831,144 1,356,623
Rp Rp Rp Rp Rp
1,700 8,000 69,197,467 1,729,937 70,927,404
Rp Rp
75,148,206 1,502,964
Rp Rp Rp Rp Rp
1,700 8,000 76,660,871 1,916,522 78,577,392
Rp Rp
51,417,194 1,028,344
Rp Rp Rp Rp Rp
1,700 8,000 52,455,238 1,311,381 53,766,619
1 UNIT 1 2 3
Distribution Switch 16 Port SFP+ Distribution Switch 16 Port SFP+ Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Transceiver, SFP+, 10GbE, LR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Transceiver, SFP+, 10GbE, SR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). unit (EU1.00 power Rpcord). 119,050,580 Instalasi ls 1.00 Rp 2,381,012 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). unit (EU1.00 power Rpcord). 67,831,144 Instalasi ls 1.00 Rp 1,356,623 Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Tukang Listrik hari orang 0.10 Rp 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 UNIT 1 2 3
Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party unit Support with Acess 1.00 series Rp switches.2,516,926 Rp Instalasi ls 1.00 Rp 50,339 Rp Tenaga Kerja : Kepala Tukang listrik hari orang 0.02 Rp 85,000 Rp Tukang Listrik hari orang 0.10 Rp 80,000 Rp Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
1 UNIT 1 2 3
Transceiver, SFP+, 1GbE, LR, SMF Third Party Support Transceiver, SFP+, 1GbE, LR, SMF Third Party Support unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
248,224,809 4,964,496
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
11,865,506 237,310
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
3,415,828 68,317
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1.00 Rp 1.00 Rp
75,148,206 1,502,964
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
51,417,194 1,028,344
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1.00 Rp 1.00 Rp 0.02 Rp 0.10 Rp
2,121,409 42,428 85,000 80,000 Jumlah Keuntungan 5%
2,516,926 50,339
TOTAL HARGA
Rp
144,957
Rp
259,528,980
Rp
12,415,329
Rp
3,581,190
Rp
124,477,323
Rp
70,927,404
Rp
78,577,392
Rp
53,766,619
Rp
2,641,388
Rp
2,227,875
1,700 8,000 2,576,964 64,424 2,641,388
Rp Rp
2,121,409 42,428
Rp Rp Rp Rp
1,700 8,000 2,173,537 54,338 Analisa Harga Satuan Elektrikal - page 110 of 211
URAIAN
NO.
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Total = Jumlah+(Keuntungan 5%) Rp 1 UNIT 1 2 3
AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kitunit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Patch Panel Category 6 SL Kapasitas24 Port Patch Panel Category 6 SL Kapasitas24 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
20,010,997 400,220
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
539,341 10,787
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
1 PCS 1 2 3
4 Pair, Category 6 SL Series Modular Jack ( Blue ) 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
BS Shuttered Faceplate - 2 Port BS Shuttered Faceplate - 2 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 PCS 1 2 3
BS Shuttered Faceplate - 1 Port BS Shuttered Faceplate - 1 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
19"Wallmounted 12 RU Double door 19"Wallmounted 12 RU Double door Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Optic Terminal Box 8 Port Optic Terminal Box 8 Port Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
1.00 Rp 1.00 Rp
Patch Cords SM SC-LC Duplex Patch Cords SM SC-LC Duplex Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT NTP Time Server Master Clock 1 NTP Time Server Master Clock 2 Instalasi
0.02 Rp 0.10 Rp
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
93,486 1,870
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
70,474 1,409
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
49,619 992
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
pcs ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
47,462 949
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
3,768,197 75,364
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
1,294,419 25,888
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.02 Rp 0.10 Rp
unit ls
1,621,619 32,432
226,523 4,530
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
30,337,942 606,759
TOTAL HARGA
2,227,875
Rp Rp
20,010,997 400,220
Rp Rp Rp Rp Rp
1,700 8,000 20,420,916 510,523 20,931,439
Rp Rp
539,341 10,787
Rp Rp Rp Rp Rp
1,700 8,000 559,828 13,996 573,824
Rp Rp
1,621,619 32,432
Rp Rp Rp Rp Rp
1,700 8,000 1,663,752 41,594 1,705,345
Rp Rp
93,486 1,870
Rp Rp Rp Rp Rp
1,700 8,000 105,056 2,626 107,682
Rp Rp
70,474 1,409
Rp Rp Rp Rp Rp
1,700 8,000 81,583 2,040 83,623
Rp Rp
49,619 992
Rp Rp Rp Rp Rp
1,700 8,000 60,312 1,508 61,820
Rp Rp
47,462 949
Rp Rp Rp Rp Rp
1,700 8,000 58,111 1,453 59,564
Rp Rp
3,768,197 75,364
Rp Rp Rp Rp Rp
1,700 8,000 3,853,261 96,332 3,949,593
Rp Rp
1,294,419 25,888
Rp Rp Rp Rp Rp
1,700 8,000 1,330,007 33,250 1,363,257
Rp Rp
226,523 4,530
Rp Rp Rp Rp Rp
1,700 8,000 240,754 6,019 246,773
Rp Rp
30,337,942 606,759
Rp
20,931,439
Rp
573,824
Rp
1,705,345
Rp
107,682
Rp
83,623
Rp
61,820
Rp
59,564
Rp
3,949,593
Rp
1,363,257
Rp
246,773
Rp
31,749,709
Analisa Harga Satuan Elektrikal - page 111 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
GPS Antenna Receiver GPS Antenna Receiver Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Converter Converter Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Teak Wood Clock Teak Wood Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 TTK 1 2 3
Installation Slave Clock Installation Slave Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
NTP to Signal Time Covert Module NTP to Signal Time Covert Module Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Junction Box Master Clock (SERVER) Junction Box Master Clock (SERVER) Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Analog Clock Lingkaran Dia.500mm,HH:MM Analog Clock Lingkaran Dia.500mm,HH:MM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Analog Clock Lingkaran Dia.400mm,HH:MM Analog Clock Lingkaran Dia.400mm,HH:MM Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 UNIT 1 2 3
Junction Box Master Clock Junction Box Master Clock Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Master Controller IP-Ark 1 + Data Report License Master Controller IP-Ark 1 + Data Report License Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
Desktop Touch Screen Nurse Station 18" Desktop Touch Screen Nurse Station 18" Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
INDEK
HARGA SATUAN
0.13 Rp 0.25 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
19,011,777 380,236
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
7,968,766 159,375
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
13,348,695 266,974
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
titik ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.13 Rp 0.25 Rp
404,506 8,090
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
8,090,118 161,802
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
485,407 9,708
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
5,663,083 113,262
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.04 Rp 0.08 Rp
10,395,802 207,916
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
unit ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.08 Rp 0.17 Rp
485,407 9,708
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%)
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
105,020,967 2,100,419
JUMLAH HARGA Rp Rp Rp Rp Rp
10,625 20,000 30,975,326 774,383 31,749,709
Rp Rp
19,011,777 380,236
Rp Rp Rp Rp Rp
10,625 20,000 19,422,638 485,566 19,908,204
Rp Rp
7,968,766 159,375
Rp Rp Rp Rp Rp
10,625 20,000 8,158,766 203,969 8,362,736
Rp Rp
13,348,695 266,974
Rp Rp Rp Rp Rp
10,625 20,000 13,646,293 341,157 13,987,451
Rp Rp
404,506 8,090
Rp Rp Rp Rp Rp
10,625 20,000 443,221 11,081 454,302
Rp Rp
8,090,118 161,802
Rp Rp Rp Rp Rp
7,083 13,333 8,272,337 206,808 8,479,145
Rp Rp
485,407 9,708
Rp Rp Rp Rp Rp
7,083 13,333 515,532 12,888 528,420
Rp Rp
5,663,083 113,262
Rp Rp Rp Rp Rp
3,542 6,667 5,786,553 144,664 5,931,216
Rp Rp
10,395,802 207,916
Rp Rp Rp Rp Rp
3,542 6,667 10,613,926 265,348 10,879,274
Rp Rp
485,407 9,708
Rp Rp Rp Rp Rp
7,083 13,333 515,532 12,888 528,420
Rp
105,020,967 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 105,020,967 Keuntungan 5% Rp 2,625,524 Total = Jumlah+(Keuntungan 5%) Rp 107,646,491
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
54,634,589 1,092,692
Rp
54,634,589 SUDAH TERMASUK
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp
TOTAL HARGA
Rp
19,908,204
Rp
8,362,736
Rp
13,987,451
Rp
454,302
Rp
8,479,145
Rp
528,420
Rp
5,931,216
Rp
10,879,274
Rp
528,420
Rp
107,646,491
Rp
56,000,454
TERMASUK TERMASUK 54,634,589 1,365,865 56,000,454 Analisa Harga Satuan Elektrikal - page 112 of 211
URAIAN
NO. 1 SET 1 2 3
Event Management Module Rack + Interface License Event Management Module Rack + Interface License Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 SET 1 2 3
IntelPage IP Paging Module Rack + Dipole Antenna IntelPage IP Paging Module Rack + Dipole Antenna Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
HARGA SATUAN 99,099,450 1,981,989
JUMLAH HARGA Rp
99,099,450 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 99,099,450 Keuntungan 5% Rp 2,477,486 Total = Jumlah+(Keuntungan 5%) Rp 101,576,936
set ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
56,697,569 1,133,951
Rp
56,697,569 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 56,697,569 Keuntungan 5% Rp 1,417,439 Total = Jumlah+(Keuntungan 5%) Rp 58,115,008 1 SET Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS 1 Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, setdan UPS 1.00 Rp 28,652,501 Rp 28,652,501 2 Instalasi ls 1.00 Rp 573,050 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 28,652,501 Keuntungan 5% Rp 716,313 Total = Jumlah+(Keuntungan 5%) Rp 29,368,813 1 SET IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] 1 IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for set Emergency & Code 1.00 Blue Rp functions]3,392,456 Rp 3,392,456 2 Instalasi ls 1.00 Rp 67,849 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 3,392,456 Keuntungan 5% Rp 84,811 Total = Jumlah+(Keuntungan 5%) Rp 3,477,268 1 BH PSU 24 VDC 1 PSU 24 VDC bh 1.00 Rp 5,730,500 Rp 5,730,500 2 Instalasi ls 1.00 Rp 114,610 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 5,730,500 Keuntungan 5% Rp 143,263 Total = Jumlah+(Keuntungan 5%) Rp 5,873,763 1 BH Over Bed Indicator Led Single Color 1 Over Bed Indicator Led Single Color bh 1.00 Rp 1,705,855 Rp 1,705,855 2 Instalasi ls 1.00 Rp 34,117 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,705,855 Keuntungan 5% Rp 42,646 Total = Jumlah+(Keuntungan 5%) Rp 1,748,502 1 BH Patient Call Pendant, Momentary Action, Green Button, 2m 1 Patient Call Pendant, Momentary Action, Green Button, 2m bh 1.00 Rp 1,107,897 Rp 1,107,897 2 Instalasi ls 1.00 Rp 22,158 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,107,897 Keuntungan 5% Rp 27,697 Total = Jumlah+(Keuntungan 5%) Rp 1,135,594 1 BH IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code Blue function] 1 IP Callpoint, General with Pendant Socket, British Plate - Emergency bhIcon [upgrade call 1.00forRp Code Blue function] 2,530,589 Rp 2,530,589 2 Instalasi ls 1.00 Rp 50,612 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 2,530,589 Keuntungan 5% Rp 63,265 Total = Jumlah+(Keuntungan 5%) Rp 2,593,854 1 BH IP Net Room Controller 1 IP Net Room Controller bh 1.00 Rp 11,285,265 Rp 11,285,265 2 Instalasi ls 1.00 Rp 225,705 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 11,285,265 Keuntungan 5% Rp 282,132 Total = Jumlah+(Keuntungan 5%) Rp 11,567,397 1 BH Flashing Over Door Light, 1 LED, Red, British Plate 1 Flashing Over Door Light, 1 LED, Red, British Plate bh 1.00 Rp 1,581,618 Rp 1,581,618 2 Instalasi ls 1.00 Rp 31,632 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 1,581,618 Keuntungan 5% Rp 39,540 Total = Jumlah+(Keuntungan 5%) Rp 1,621,159 1 BH IP Over Door Lamp 4 RGB Programmable 1 IP Over Door Lamp 4 RGB Programmable bh 1.00 Rp 2,425,912 Rp 2,425,912 2 Instalasi ls 1.00 Rp 48,518 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK Jumlah Rp 2,425,912 Keuntungan 5% Rp 60,648 Total = Jumlah+(Keuntungan 5%) Rp 2,486,560 1 BH IP Corridor Digital Display, 12 Characters, 50mm 1 IP Corridor Digital Display, 12 Characters, 50mm bh 1.00 Rp 22,904,198 Rp 22,904,198 2 Instalasi ls 1.00 Rp 458,084 SUDAH TERMASUK 3 Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH TERMASUK Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH TERMASUK
TOTAL HARGA Rp
101,576,936
Rp
58,115,008
Rp
29,368,813
Rp
3,477,268
Rp
5,873,763
Rp
1,748,502
Rp
1,135,594
Rp
2,593,854
Rp
11,567,397
Rp
1,621,159
Rp
2,486,560
Rp
23,476,803
Analisa Harga Satuan Elektrikal - page 113 of 211
URAIAN
NO.
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2
Panel Elektrikal lengkap dengan aksesorisnya Panel Elektrikal lengkap dengan aksesorisnya Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
3,820,333 76,407
Rp
22,904,198 572,605 23,476,803
3,820,333 SUDAH TERMASUK
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] IP Callpoint, General, British Plate - Staff Presence Icon [upgrade bh call for Emergency/Code 1.00 RpBlue function] 2,303,661 Rp Instalasi ls 1.00 Rp 46,073 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 1200mm x 220mm x 80mm Dimensi : 1200mm x 220mm x 80mm unit 1.00 Rp 2,177,590 Rp Instalasi ls 1.00 Rp 43,552 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] unit 1.00 Rp 76,162,168 Rp Instalasi ls 1.00 Rp 1,523,243 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] bh 1.00 Rp 38,081,084 Rp Instalasi ls 1.00 Rp 761,622 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] bh 1.00 Rp 27,200,774 Rp Instalasi ls 1.00 Rp 544,015 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 21,760,619 Rp Instalasi ls 1.00 Rp 435,212 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 21,775,901 Rp Instalasi ls 1.00 Rp 435,518 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] bh 1.00 Rp 17,229,704 Rp Instalasi ls 1.00 Rp 344,594 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] bh 1.00 Rp 16,320,465 Rp Instalasi ls 1.00 Rp 326,409 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] unit 1.00 Rp 10,880,310 Rp Instalasi ls 1.00 Rp 217,606 SUDAH Tenaga Kerja : Kepala Tukang listrik hari orang 0.07 Rp 85,000 SUDAH Tukang Listrik hari orang 0.13 Rp 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] unit 1.00 Rp 13,600,387 Rp Instalasi ls 1.00 Rp 272,008 SUDAH
TERMASUK TERMASUK 3,820,333 95,508 3,915,842 2,303,661 TERMASUK TERMASUK TERMASUK 2,303,661 57,592 2,361,253 2,177,590 TERMASUK TERMASUK TERMASUK 2,177,590 54,440 2,232,030 76,162,168 TERMASUK TERMASUK TERMASUK 76,162,168 1,904,054 78,066,222 38,081,084 TERMASUK TERMASUK TERMASUK 38,081,084 952,027 39,033,111 27,200,774 TERMASUK TERMASUK TERMASUK 27,200,774 680,019 27,880,794 21,760,619 TERMASUK TERMASUK TERMASUK 21,760,619 544,015 22,304,635 21,775,901 TERMASUK TERMASUK TERMASUK 21,775,901 544,398 22,320,298 17,229,704 TERMASUK TERMASUK TERMASUK 17,229,704 430,743 17,660,446 16,320,465 TERMASUK TERMASUK TERMASUK 16,320,465 408,012 16,728,476 10,880,310 TERMASUK TERMASUK TERMASUK 10,880,310 272,008 11,152,317 13,600,387 TERMASUK
TOTAL HARGA
Rp
3,915,842
Rp
2,361,253
Rp
2,232,030
Rp
78,066,222
Rp
39,033,111
Rp
27,880,794
Rp
22,304,635
Rp
22,320,298
Rp
17,660,446
Rp
16,728,476
Rp
11,152,317
Rp
13,940,397
Analisa Harga Satuan Elektrikal - page 114 of 211
URAIAN
NO. 3
Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT hari orang hari orang
1 UNIT 1 2 3
Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 UNIT 1 2 3
Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] unit Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Universal Socket 16A 250V - Vivase Schneider 1 x Universal Socket 16A 250V - Vivase Schneider Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
1 x Single Switch 16A 250V - Vivase Schneider 1 x Single Switch 16A 250V - Vivase Schneider Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover bh Instalasi ls Tenaga Kerja : Kepala Tukang listrik hari orang Tukang Listrik hari orang
1 BH 1 2 3
1 x Patient Name Tag 1 x Patient Name Tag Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
1 BH 1 2 3
Provision Access for Medical Gas Outlet Provision Access for Medical Gas Outlet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
INDEK
HARGA SATUAN
JUMLAH HARGA
0.07 Rp 0.13 Rp
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 1.00 Rp 1.00 Rp
10,880,310 217,606
Rp
10,880,310 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 1.00 Rp 1.00 Rp
10,880,310 217,606
Rp
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 10,336,294 206,726
Rp
85,000 SUDAH 80,000 SUDAH Jumlah Rp Keuntungan 5% Rp Total = Jumlah+(Keuntungan 5%) Rp 9,069,472 181,389
0.07 Rp 0.13 Rp
85,000 80,000 Jumlah Keuntungan 5% Total = Jumlah+(Keuntungan 5%) 1.00 Rp 1.00 Rp
177,646 3,553
TERMASUK TERMASUK 10,880,310 272,008 11,152,317
10,336,294 SUDAH TERMASUK
0.07 Rp 0.13 Rp
1.00 Rp 1.00 Rp
TERMASUK TERMASUK 10,880,310 272,008 11,152,317
10,880,310 SUDAH TERMASUK
0.07 Rp 0.13 Rp
1.00 Rp 1.00 Rp
TERMASUK TERMASUK 13,600,387 340,010 13,940,397
TERMASUK TERMASUK 10,336,294 258,407 10,594,702
Rp
9,069,472
Rp Rp Rp Rp Rp
5,667 10,667 9,085,805 227,145 9,312,950
Rp
177,646 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 177,646 Keuntungan 5% Rp 4,441 Total = Jumlah+(Keuntungan 5%) Rp 182,087
TOTAL HARGA
Rp
11,152,317
Rp
11,152,317
Rp
10,594,702
Rp
9,312,950
Rp
182,087
Rp
88,890
Rp
109,644
Rp
63,045
Rp
244,740
Rp
29,369
Rp
9,790
0.07 Rp 0.13 Rp
1.00 Rp 1.00 Rp
86,722 1,734
Rp
86,722 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 86,722 Keuntungan 5% Rp 2,168 Total = Jumlah+(Keuntungan 5%) Rp 88,890
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
106,969 2,139
Rp
106,969 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 106,969 Keuntungan 5% Rp 2,674 Total = Jumlah+(Keuntungan 5%) Rp 109,644
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
61,507 1,230
Rp
61,507 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 61,507 Keuntungan 5% Rp 1,538 Total = Jumlah+(Keuntungan 5%) Rp 63,045 1.00 Rp 1.00 Rp
238,771 4,775
Rp
238,771 SUDAH TERMASUK
0.07 Rp 0.13 Rp
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 238,771 Keuntungan 5% Rp 5,969 Total = Jumlah+(Keuntungan 5%) Rp 244,740
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
28,653 573
Rp
28,653 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 28,653 Keuntungan 5% Rp 716 Total = Jumlah+(Keuntungan 5%) Rp 29,369
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
9,551 191
Rp
9,551 SUDAH TERMASUK
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 9,551 Keuntungan 5% Rp 239 Total = Jumlah+(Keuntungan 5%) Rp 9,790 Analisa Harga Satuan Elektrikal - page 115 of 211
URAIAN
NO. 1 BH 1 2 3
Provision Access for Nurse Call Outlet Provision Access for Nurse Call Outlet Instalasi Tenaga Kerja : Kepala Tukang listrik Tukang Listrik
SAT
INDEK
bh ls
1.00 Rp 1.00 Rp
hari orang hari orang
0.07 Rp 0.13 Rp
HARGA SATUAN 9,551 191
JUMLAH HARGA Rp
9,551 SUDAH TERMASUK
TOTAL HARGA Rp
9,790
85,000 SUDAH TERMASUK 80,000 SUDAH TERMASUK Jumlah Rp 9,551 Keuntungan 5% Rp 239 Total = Jumlah+(Keuntungan 5%) Rp 9,790
Analisa Harga Satuan Elektrikal - page 116 of 211
HARGA SATUAN PEKERJAAN ELEKTRIKAL PEKERJAAN PERENCANA NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77
SATUAN
URAIAN
PEKERJAAN KABEL 1 M' Kabel TM N2XSY 3 x ( 1 x 50 mm2) 1 M' Kabel TM N2XSY 3 x (1 x 120 mm2) + Grounding 1 M' Kabel TM N2XSY 3 x (4 X 300) mm2 + Grounding 1 M' Kabel TM N2XSY 3 x (1 x 120) mm2 + Grounding 1 M' Kabel TM N2XSEbY 3 x 1 x 120 mm2 + Grounding 1 M' Kabel TM N2XSEbY 7 x (4 x 300) mm2 + Grounding 1 M' KABEL TR NYM 3 x 2,5 mm2 + Grounding 1 M' KABEL TR NYMHY 3 x 2,5 mm2 + Grounding 1 M' KABEL TR, NYY 3 x 50 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 4 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 6 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 10 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 16 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 25 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 35 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 50 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 70 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 95 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 120 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 150 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 240 mm2 + Grounding 1 M' KABEL TR, NYY 4 x 300 mm2 + Grounding 1 M' KABEL TR, NYY 4 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYY 2 x (4 x 150 mm2) + Grounding 1 M' KABEL TR, NYY 4 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYY 2 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYY 16 x (1 x 240) mm2 + Grounding 1 M' KABEL TR, NYY 4 x (1 x 240) mm2 + Grounding 1 M' KABEL TR, NYY 12 x (1 x 150) mm2 + Grounding 1 M' KABEL TR, NYY 2 x 4 (1 x 150 mm2) + Grounding 1 M' KABEL TR, NYY 3 x 4 ( 1 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 2 x 4 ( 1 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 4 x ( 3 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 3 x (4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 6 x (4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYY 2 x 4 (1 x 185) mm2 + Grounding 1 M' KABEL TR FRC 2 x 2,5 mm2 + Grounding 1 M' KABEL TR FRC 3 x 4 mm2 + Grounding 1 M' KABEL TR, FRC 4 x (1 X 240 mm2) + Grounding 1 M' KABEL TR, FRC 2 x (4 X 300 mm2) + Grounding 1 M' KABEL TR, FRC 4 x (1 x 185 mm2) + Grounding 1 M' KABEL TR, FRC 2 x 4 X 150 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 150 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 10 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 16 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 35 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 50 mm2 + Grounding 1 M' KABEL TR, FRC 4 X 70 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 6 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 4 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 16 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 35 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 70 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 95 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 120 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 240 mm2 + Grounding 1 M' KABEL TR, NYFGbY 4 x 300 mm2 + Grounding 1 M' KABEL TR, NYFGbY 5 x 4 (1 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 3 x (4 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 2 x 4 (1 x 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x ( 4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x ( 1 X 150 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 4 x 185 mm2 + Grounding 1 M' KABEL TR, NYFGbY 2 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYFGbY 3 x (4 x 185 mm2) + Grounding 1 M' KABEL TR, NYFGby 3 x (4 x 300 mm2) + Grounding 1 M' KABEL TR, NYFGbY 2 x ( 4 X 150 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 2 x ( 4 X 300 mm2 ) + Grounding 1 M' KABEL TR, NYFGbY 7 x ( 4 X 300 mm2 ) + Grounding 1 M' Kabel ITC 2 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 10 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 20 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 30 x 2 x 2 x 0,6 mm2 1 M' Kabel ITC 80 x 2 x 2 x 0,6 mm2 1 M' Kabel UTP Cat 5E,-0,6 mm2
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
385,791.40 385,791.40 20,927.08 20,927.08 20,927.08 20,927.08 16,741.67 33,658.10 5,231.77 5,231.77 5,231.77 5,231.77 5,231.77 5,231.77 5,231.77 5,231.77 5,231.77 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 6,278.13 4,185.42 4,185.42 4,185.42 4,185.42 4,185.42 1,052,491.86 4,185.42 6,278.13 10,463.54 10,463.54 330,654.09 10,463.54 10,463.54 10,463.54 10,463.54 132,084.98 132,084.98 132,084.98 132,084.98 132,084.98 132,084.98 132,084.98 132,084.98 125,806.86 125,806.86 618,570.74 375,327.86 253,706.42 490,671.17 490,671.17 125,806.86 247,428.30 369,049.73 369,049.73 247,428.30 247,428.30 855,535.49 8,696.47 28,996.19 38,018.29 68,019.51 104,556.27 15,625.86
Harga Satuan Pekerjaan Elektrikal - page 117 of 211
NO.
SATUAN
78 79 80 81 82 83 84 85 86 87 88
1 M' 1 M' 1 M' 1 BTG 1 BTG 1 M' 1 PCS 1 LOT 1 LOT 1 LOT 1 LOT
URAIAN
HARGA SATUAN
Kabel UTP Cat 6 Fiber Optic 8 core Kabel STP 18 AWG 1 Pair KABEL TRAY LEBAR 20 CM 1BTG > 4M KABEL TRAY LEBAR 40 CM - 1BTG > 4M KABEL TRAY LEBAR 80 CM 1BTG > 4M Jointing / Connector Tray c/w bolt & Nut H100 BUSDUCT 2500 / AL IP 54 BUSDUCT 1000A / AL IP 54 BUSDUCT 1600A / AL IP 54 BUSDUCT 3200A / AL IP 54
1 2 3 4 5 6 7 8 9 10 11 12
PEKERJAAN PENERANGAN 1 BH Lampu LED Panel 36 W 1 BH Lampu LED Panel 26 W 1 BH Lampu LED Batten 36 W + Inter Cable 1 BH Lampu LED Batten 20 W + Inter Cable 1 BH Lampu LED Prismatic 36 W 1 BH Lampu LED Prismatic 20 W 1 BH Lampu Panel LED Dust Proof 40 W 1 BH Lampu Panel LED Dust Proof 26 W 1 BH Lampu LED Down Light 4 W 1 BH Lampu LED Down Light 5 W 1 BH Lampu LED Down Light 6 W 1 BH Lampu LED Down Light 7 W 1 BH Lampu LED Down Light 9 W 1 BH Lampu LED Down Light 10 W 1 BH Lampu LED Down Light 13 W 1 BH Lampu LED Down Light 16 W 1 BH Lampu LED Down Light 30 W 1 BH Lampu LED Down Light Spot 23 W 1 BH Lampu LED Down Light Outbow 12 W 1 BH Lampu LED Down Light 9 W + Tool Kit Emergency 1 BH Lampu LED Down Light 13 W + Tool Kit Emergency 1 BH Lampu LED Down Light 16 W + Tool Kit Emergency 1 BH Lampu LED 60 x 60 20 W 1 M' Lampu Strip 5 W / meter + Driver + Diffuser 1 BH Lampu LED Dinding 5 W 1 BH Lampu Exit 5 W + Baterai 1 BH Sensor Lampu 1 BH Lampu LED Spot Light 15 W 1 BH Lampu LED Spot Light 23 W 1 BH Lampu Jalan LED (2 x 20 )W + TIANG 1 BH Lampu Jalan LED (1 x 20 )W + TIANG 1 BH Lampu LED Plat 12 W + baterai 1 BH Lampu LED RMO 12 W 1 BH Tube Line (True Line Slim Balance) LED 20 W + Gantungan 1 BH Tube Line (True Line Slim Balance) LED 20 W + Gantungan + Tool Kit Emergency 1 BH Tiang Lampu Jalan (P : 8 m) 1 BH Lampu Tree Light 10 W 1 BH Lampu Bollard Light 18 W 1 BH Lampu Taman Essential 18 W 1 BH Lampu Taman Essential 28 W 1 BH Lampu Up Light 5 W 1 BH Lampu Track Spot 15 W PEKERJAAN STOP KONTAK DAN SAKLAR 1 BH SAKLAR TUNGGAL 10A 1 BH SAKLAR GANDA 10A 1 BH SAKLAR PUTAR 10A 1 BH SENSOR SYSTEM 1 BH STOP KONTAK DAYA / 1 Phase (Partisi) 1 BH STOP KONTAK DAYA / 1 Phase 1 BH STOP KONTAK DAYA / 3 Phase PEKERJAAN TITIK INSTALASI 1 TITIK TITIK INSTALASI PENERANGAN 1 TITIK TITIK INSTALASI PENERANGAN EMERGENCY 1 TITIK TITIK INSTALASI PENERANGAN LUAR 1 TITIK TITIK INSTALASI STOP KONTAK 1 TITIK TITIK INSTALASI DAYA AC INDOOR 1 TITIK TITIK INSTALASI DAYA AC OUTDOOR 1 TITIK TITIK INSTALASI TELEPHONE 1 TITIK TITIK INSTALASI SPEAKER EMERGENCY 1 TITIK TITIK INSTALASI SPEAKER 1 TITIK TITIK INSTALASI FIRE ALARM 1 TITIK TITIK INSTALASI IPTV 1 TITIK TITIK INSTALASI CCTV, WIFI, DATA
1 2 3
PEKERJAAN PANEL POWER HOUSE/UTILITAS/KHUSUS 1 UNIT PANEL MVMDP 1 UNIT PANEL KONTROL GENSET 1 UNIT PANEL AMF + Syncronizing
85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 1 2 3 4 5 6 7
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
44,383.80 88,767.60 14,950.42 786,226.43 1,144,973.24 2,264,535.02 49,797.55 141,326,648.17 96,652,030.88 104,447,970.67 175,144,296.49
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
944,413.66 944,413.66 733,898.00 621,121.76 882,010.80 571,500.21 882,010.80 571,500.21 185,053.62 185,053.62 185,053.62 211,368.07 256,478.57 256,478.57 256,478.57 327,903.52 966,968.90 365,345.24 162,498.37 629,450.98 629,450.98 700,875.94 856,072.27 668,487.78 196,331.24 739,912.73 1,290,613.23 1,384,241.01 1,384,241.01 27,623,513.70 15,011,370.45 324,144.32 209,488.47 1,861,807.86 2,234,780.27 2,608,327.20 2,691,693.59 2,808,980.88 2,172,259.06 3,051,913.76 948,172.86 618,114.39
Rp Rp Rp Rp Rp Rp Rp
26,683.58 33,132.97 31,018.41 3,006,126.21 166,645.94 104,731.79 302,654.09
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
100,033.03 531,697.00 111,089.52 100,033.03 33,233.37 60,438.58 158,424.19 85,384.07 85,384.07 95,519.19 1,269,276.64 1,269,276.64
Rp Rp Rp
340,013,023.90 338,884,210.22 151,292,986.32
Harga Satuan Pekerjaan Elektrikal - page 118 of 211
NO. 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SATUAN
URAIAN
1 UNIT LVMDP, (IP 30 BOTTOM INCOMING) 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (80 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (72 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (40 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (56 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (24 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 10 KVA, with fault locator (18 MCB), Type Test Standar 1 UNIT PP OT 1 Phase, 5 KVA, with fault locator (40 MCB), Type Test Standar PANEL GEDUNG D1 1 UNIT MDP-D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - UPS (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - KHS (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - D.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - ALKES (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - CSSD (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.OK.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.OK.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU.OK.D1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-LF (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG D2-F1 1 UNIT MDP-D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - D.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LAB.D2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - SERVER (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG B (RANAP) 1 UNIT MDP-RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.B (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp
67,495,530.87 296,407,754.72 288,576,071.13 257,249,336.77 272,912,703.95 222,006,760.62 216,132,997.93 239,980,474.46
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
42,880,852.48 17,531,535.45 17,531,535.45 14,656,846.89 17,531,535.45 14,656,846.89 14,656,846.89 14,656,846.89 6,227,062.65 6,227,062.65 6,227,062.65 6,227,062.65 7,664,406.93 7,664,406.93 6,227,062.65 6,227,062.65 6,227,062.65 7,664,406.93 6,227,062.65 25,354,798.10 8,352,383.48 8,352,383.48 8,352,383.48 8,352,383.48 8,743,046.28 8,352,383.48 25,108,919.67 15,047,509.69 5,353,334.12 6,673,978.97
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
44,318,196.76 17,531,535.45 17,531,535.45 17,531,535.45 17,531,535.45 19,416,620.58 6,227,062.65 6,227,062.65 6,227,062.65 6,227,062.65 8,659,491.43 7,664,406.93 7,664,406.93 7,664,406.93 6,617,725.45 8,055,069.73 6,227,062.65 8,352,383.48 8,352,383.48 8,352,383.48 8,352,383.48 20,796,886.82 6,617,725.45
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
28,112,139.98 14,656,846.89 14,656,846.89 14,656,846.89 17,531,535.45 14,656,846.89 6,227,062.65 6,227,062.65 6,227,062.65 6,227,062.65 7,664,406.93 7,664,406.93 7,664,406.93 7,664,406.93 6,617,725.45 8,055,069.73 8,352,383.48 8,352,383.48
Harga Satuan Pekerjaan Elektrikal - page 119 of 211
NO. 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1 2 3 1 1 1 1 2 3
SATUAN
URAIAN
1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG C1 (RANAP) 1 UNIT MDP-RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.C1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG C2 (RANAP) 1 UNIT MDP-RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT SDP - AC.RANAP.C2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - LF (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.4 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG F2-F3 1 UNIT SDP - F2-F3 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - PERALATAN (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL GEDUNG F5 1 UNIT SDP - F5 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - 2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - BP (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.1 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.2 (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN MASJID 1 UNIT PP/LP - MASJID (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC.MASJID (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP-AC-OU.MASJID (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN MASJID 1 UNIT PP/LP - F4 (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN POWER HOUSE 1 UNIT PP/LP - PH (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN SENTRAL MEDIS 1 UNIT PP/LP - G3 (IP 30 FORM 1 BOTTOM INCOMING) PANEL BANGUNAN RUANG POMPA 1 UNIT PP-AB (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT PP - FH (IP 30 FORM 1 BOTTOM INCOMING) 1 UNIT LP-PL (IP 30 FORM 1 BOTTOM INCOMING)
HARGA SATUAN Rp Rp Rp
8,352,383.48 8,352,383.48 20,796,886.82
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
28,112,139.98 14,656,846.89 14,656,846.89 14,656,846.89 14,656,846.89 19,416,620.58 6,227,062.65 6,227,062.65 6,227,062.65 1,467,288.95 7,664,406.93 7,664,406.93 7,664,406.93 7,664,406.93 6,617,725.45 8,055,069.73 8,743,046.28 8,743,046.28 8,743,046.28 8,743,046.28 20,796,886.82
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
28,112,139.98 14,656,846.89 14,656,846.89 14,656,846.89 17,531,535.45 14,656,846.89 6,227,062.65 6,227,062.65 1,467,288.95 6,227,062.65 7,664,406.93 7,664,406.93 7,664,406.93 2,904,633.24 6,617,725.45 8,055,069.73 8,743,046.28 8,743,046.28 8,743,046.28 8,743,046.28 20,796,886.82
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
17,531,535.45 6,227,062.65 1,467,288.95 6,227,062.65 6,227,062.65 6,617,725.45 6,617,725.45 8,743,046.28 8,743,046.28 16,484,853.97
Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,094,191.17 10,986,836.34 6,227,062.65 6,227,062.65 6,227,062.65 6,617,725.45 8,743,046.28 8,743,046.28 15,047,509.69
Rp Rp Rp
6,227,062.65 8,743,046.28 15,047,509.69
Rp
6,227,062.65
Rp
6,227,062.65
Rp
6,227,062.65
Rp Rp Rp
6,990,167.07 30,025,931.10 12,826,869.79
Harga Satuan Pekerjaan Elektrikal - page 120 of 211
NO.
SATUAN
URAIAN
HARGA SATUAN
1 2 3 4 5 6 7 8 9 10
PEKERJAAN TRAFO DAN PQCR 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 1000 A Rp 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 600 A Rp 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 320 A Rp 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 250-300 A Rp 1 UNIT PQCR/PQS/HARMONIC FILTER, Kapasitas 200 A Rp 1 UNIT Transformator Dry Type 630 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Rp 1 UNIT Transformator Dry Type 1000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Rp 1 UNIT Transformator Dry Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Rp 1 UNIT Transformator Dry Type 4000 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt Rp 1 UNIT Transformator Oil Type 1600 kVA, Step Down CU-CU, Dyn5/50Hz, 20 kV - 380 Volt, Plug-in Bushing Rp
1 2 3 4 5 6 7 8 9 10
PEKERJAAN UPS 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas 1 UNIT UPS kapasitas
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
PEKERJAAN ARUS LEMAH PEKERJAAN FA, TELP, MATV 1 BH PESAWAT TELEPON SINGLE LINE Rp 710,083.29 1 BH Faximile Rp 1,586,918.59 1 BH SOCKET TELEPON Rp 1,282,817.45 1 BH FLOOR SOCKET TELEPON Rp 391,941.51 1 BH IP PHONE SERIES Rp 2,977,261.71 1 BH HANDSET TELEPON (SIP) / TB 10 Pair Rp 1,547,460.71 1 BH HANDSET TELEPON (SIP) / TB 20 Pair Rp 3,057,252.67 1 BH HANDSET TELEPON (SIP) / TB 30 Pair Rp 4,567,044.64 1 BH MDF 160 PAIRS Rp 3,792,929.70 1 BH MDF 80 PAIRS Rp 2,034,278.16 1 BH P A B X 2 / 12 Extention Rp 7,425,452.51 1 BH P A B X 16 / 160 Extention Rp 225,355,205.62 1 BH P A B X 8 / 80 Extention Rp 127,108,301.32 1 M' KABEL TELEPON 10 PAIRS Rp 26,903.48 1 M' KABEL TELEPON 20 PAIRS Rp 35,925.58 1 BH Data Outlet ( RG-45 ) Rp 63,648.34 1 BH FLOOR SOCKET DATA Rp 311,713.78 1 BH Proyektor Rp 17,423,441.20 1 BH Wireless Access Point, 3x3:3 streams, dual-band 802.11abgn/ac (802.11ac Wave 2) Rp 12,360,284.07 1 BH PATH PANEL 1 X 64 PORT Rp 14,087,519.91 1 BH PATH PANEL 1 X 48 PORT Rp 7,516,800.03 1 BH PATH PANEL 1 X 32 PORT Rp 7,046,899.02 1 BH PATH PANEL 1 X 24 PORT Rp 3,761,539.08 1 BH PATH PANEL 1 X 12 PORT Rp 2,241,503.27 1 BH HUB Un Managable Path Panel 1 x 48 port Rp 8,982,754.77 1 BH HUB Un Managable Path Panel 1 x 24 port Rp 4,222,469.52 1 BH SMOKE DETECTOR Rp 1,244,394.53 1 BH Rate Of Rise Heat Detector Rp 1,192,132.05 1 BH Fixed Temperature Heat Detector Rp 1,192,132.05 1 BH Breakglass Call point w/phone jack Rp 669,678.06 1 BH Av Phase Ii S/Strobe Non Iso Rp 4,848,959.83 1 BH INDICATOR LAMP Rp 179,891.30 1 UNIT MDFA (60 x 80 x 20) Rp 5,040,923.32 1 UNIT PANEL DXc1-S SINGLE LOOP REGION 2 Rp 44,056,398.56 1 UNIT Panel Dxc2-M Two Loop Region 5 198 address (99 module + 99 device / loop ) Rp 59,162,035.46 1 UNIT Panel Dxc4-M Four Loop Region 5 Rp 111,557,980.90 1 UNIT Isolated USB Upload/Download Lead Rp 7,599,446.97 1 UNIT Active Repeater. Silence, Mute, Reset, Accept, Evacuate and Test Controls.DX control panels requireRp a 24 Vdc supply. 44,691,164.16 24 Vdc supp 1 UNIT Module for Pressurized Fan (Kontrol) Rp 1,255,783.26 1 UNIT Module for AC Rp 1,255,783.26 1 UNIT Module for Sound System Rp 1,255,783.26 1 BH Mias 200 Series Advance Base Rp 194,422.35 1 BH Isolator Module Rp 729,682.08 1 UNIT Module for PABX (Autodial) Rp 1,255,783.26 1 UNIT Module for Sound System Rp 1,255,783.26 1 UNIT Module for Genset Panel Rp 1,255,783.26 1 UNIT Battery 12 V 17 AH Rp 1,981,072.92 1 UNIT End of Line Rp 48,839.20 1 UNIT TBFA (20 x 30 x 20) Rp 2,051,526.83 1 UNIT Manual Call Point Backbox Rp 188,097.85 1 BH Outside Screw & Yoke Supervisory Switch W/2 Spdt. Rp 4,072,240.36 1 BH Waterflow Detector 2.5" Rp 3,588,897.17 1 SET SIP PBX 20/200 Rp 431,379,595.65 1 SET PABX 6 Co line/100 Ext Rp 54,638,760.01 1 UNIT 24 ports Single Line Interface Board Rp 13,875,307.62
1 Kva, back up 15 menit, Incoming 1 Phase Outgoing 1 Phase 2 Kva, back up 10 menit, Incoming 1 Phase Outgoing 1 Phase 5 Kva, back up 10 menit, Incoming 3 Phase Outgoing 1 Phase 10 Kva, back up 15 menit, Incoming 3 Phase Outgoing 1 Phase 10 Kva, back up 10 menit, Incoming 3 Phase Outgoing 3 Phase 15 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 30 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 75 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 100 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase 120 Kva, back up 15 menit, Incoming 3 Phase Outgoing 3 Phase
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,542,424,362.20 1,675,819,075.23 1,253,452,730.61 847,474,787.40 847,474,787.40 468,864,735.24 582,906,046.44 368,563,185.99 1,590,145,035.99 281,990,834.22 4,970,525.56 25,934,257.90 85,398,313.44 201,652,294.55 170,788,256.06 212,301,191.36 310,619,520.60 635,634,928.71 660,256,802.12 879,620,693.12
Harga Satuan Pekerjaan Elektrikal - page 121 of 211
NO.
SATUAN
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 SET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
URAIAN Proffesional Digital Proprietary Phone Single Line Telephone with CID (white grey/black) 19” Rack Mounting Bracket(Option) Terminal Box PABX 1 Set : 19” Rack Mounting Bracket(Option) Reciver Satellite Parabola Active Combiner Booster Amplifiere Parabola Antenne lengkap dengan tiang dan aksesories Splitter Instalasi Kabel dari Antena ke Sentral unit 2 x 8 DVBS/T to IP Penerima Channel FTA Conventional Zone Module, Mias, In. For Integrasi and M400K/t Input Module Single, Mias, In. For WFD25 and OSY 2 plus integrasi Output Module, Mias, In. For Integrasi Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Antena Parabola + Kabel Coaxial + Pekerjaan Sipil 8 CH HD Encoder 8 CH DVBS to IP Middleware & VoD Server c/w IPTV Application Multicast Switch 24G Access Point (Wi-Fi)
PEKERJAAN SOUND SYSTEM 1 UNIT TBS (Terminal Box Speaker) 1 BH SPEAKER SELECTOR 1x10 Channel 1 BH SPEAKER SELECTOR 2x10 Channel 1 BH CD/MMC/USB Player With FM Tunner 1 BH Remote Microphone 1 BH Voice Alarm System Amplifier 360 W w/Zone Selector 1 BH Digital Matrix Mixer w/ Equalizer Program 1 BH Flight Case 16U 1 BH Wireless Set (Dual Wireless Lavalier and Handheld) 1 SET Power Amplifier 120 W 1 BH Power Amplifier 240 W 1 BH Power Amplifier 480 W 1 BH Slim Array Speaker 1 BH F-Series Box Speaker 1 BH Ceiling Speaker 3 W 1 BH Emergency Message Panel 1 BH Ceiling Speaker 3 W + Pagging 1 BH Box Speaker 6 W 1 BH Box Speaker 15 W 1 BH Box Speaker 30 W 1 BH Dynamic Microphone w/ Stand (Muadzin) 1 BH Firedome Speaker w/Metal Box 1 BH Set Top Box 1 BH MDF / CTB 1 BH ANTENA PARABOLA 32 Feet 1 BH ANTENA YAGI VHF 22 ELEMENT 1 SET Parabola Tv Berbayar 1 BH TERMINAL BOX + BOOSTER 1 BH Attenuator 1 BH Cabinet Rack with Accecories 1 BH ACTIVE COMBINER 1 BH POWER DEVIDER 1 BH Digital A/V Encoder 1 BH DEMODULATOR 1 BH DIGITAL SATELITE RECEIVER & MODULATOR 1 BH SPLITER 1 BH COUPLER 1 BH SOCKET TV 1 SET Mixer Amplifier 60 W (Monitor) 1 BH Gooseneck Microphone (Mimbar) 1 BH Dynamic Microphone w/ Stand (Muadzin) 1 BH Dome Camera : 4MP IR Ball Camera 1 UNIT Eyeball Fixed Lens IP Camera 1 UNIT Bullet Camera : 4 MP Bullet Camera 1 BH Driver Unit 60 W w/ Horn 1 BH Dual Power Amplifier 1250 W 1SET Digital Amplifier 480 W w/Selector 1 UNIT Inlet Microphone 1 BH Terminal Box 1:12 + Booster signal 1 BH Terminal Box 1:8 + Booster signal 1 BH Terminal Box 1:4 + Booster signal 1 BH Set Top Box ICT 1 BH 16-Channel Mixing Console 1 SET Hand Held Wireless Microphone w/ Receiver 1 SET Undirectional Lavaliere Wireless Microphone w/ Receiver 1 BH Wireless Antena 1 BH Dynamic Microphone 1 BH Floor Stand Mic.
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
5,349,644.73 898,300.05 8,763,521.67 1,807,143.89 8,763,521.67 1,023,975.54 3,235,274.43 5,999,398.05 2,313,899.89 332,944.63 12,172,607.47 3,229,285.50 3,562,938.90 2,256,891.88 2,465,769.28 21,578,920.15 9,788,163.87 67,676,209.75 38,072,445.79 253,757,011.84 17,265,228.83 5,977,736.54
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,279,196.28 3,827,125.31 7,558,692.19 5,095,012.23 5,721,766.20 35,288,941.37 24,814,641.23 7,685,764.49 228,153.43 2,689,579.53 4,005,593.71 8,302,368.60 6,990,498.94 1,463,899.12 163,870.97 9,196,934.41 468,898.97 217,689.89 848,672.97 1,686,882.40 1,698,723.91 830,378.57 1,659,816.11 3,112,092.18 18,746,435.92 3,708,864.02 652,725.49 4,091,335.40 153,399.09 15,640,577.62 4,162,196.47 3,250,212.58 7,700,175.20 2,615,846.21 5,149,020.34 274,391.69 161,897.39 80,948.69 2,063,611.45 1,126,416.21 1,751,041.62 7,982,546.77 7,982,546.77 8,330,811.09 1,407,324.28 11,017,551.88 5,921,475.37 376,172.25 4,101,798.94 3,289,809.98 1,665,832.08 1,216,606.71 5,846,634.15 11,994,913.02 11,866,348.10 2,067,502.23 1,047,441.10 661,746.35
Harga Satuan Pekerjaan Elektrikal - page 122 of 211
NO.
SATUAN
59 60 61 62 63 64 65 66 67
1 SET 1 BH 1 SET 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH
URAIAN Digital Speaker Processor w/ Equalizer Multi Channel Power Amplifier Dual Power Amplifier Speaker System Subwofer System Monitor Speaker HX-Series Speaker Yamaha Mixer Paging Microphone w/RU-2002 (Car Call)
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp
33,760,446.11 18,214,240.92 7,210,944.76 25,167,742.16 13,525,850.53 2,764,459.41 6,940,281.78 24,539,296.54 5,380,586.33
47 48 49 50 51 52 53 54 55 56 57 58 59 60
PERKERJAAN BAS (BUILDING AUTOMATIC SYSTEM) 1 Unit Web Controller 12 IO Rp 69,939,630.20 1 Unit Web Controller Onboard Ios DI8DO12 & AI8AO4 Rp 28,000,964.58 1 UNIT Capacitive Monitor Touch Screen minimum 10" Rp 24,406,221.81 1 UNIT LCD Display Nurse Station Operating Management Rp 6,432,507.98 1 UNIT Software Management : OPENweb basic Rp 119,866,613.08 1 UNIT BAS Main PC Core i7, 52" Display Rp 31,995,123.21 1 UNIT IO Module DI8DO8T CPU : ARM7 Architecture Rp 9,627,834.88 1 UNIT IO Module DI16 CPU : ARM7 Architecture Rp 7,231,339.70 1 UNIT IO Module AI8AO4 CPU : ARM7 Architecture Rp 12,823,161.78 1 UNIT IO Module AO4 CPU : ARM7 Architecture Rp 6,831,923.84 1 BH Bridge bus connector Rp 161,678.93 1 BH Coupler module integrated bus terminating resistor Rp 1,120,277.00 1 BH Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC Rp 819,758.81 1 TITIK Instalation, Cable Cat6 to LAN Rp 719,904.84 1 Unit Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & accessories Rp 5,234,260.39 1 TITIK Installation, cable STP 18 AWG & Integration data point Modbus Power Meter Rp 739,875.64 1 TITIK Installation, cable STP 18 AWG for data communication between panel Rp 819,758.81 1 TITIK Installation, cable STP 18 AWG Modbus for CO2 Transmitter Rp 580,109.29 1 TITIK Installation, cable NYM 3 x 1.5 & 3 x 2,5 mm for power supply between panel Rp 699,934.05 1 TITIK Installation, cable NYM 3X1,5mm for power supply Room Temperature & Humidity Transmitter Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Air Quality CO2 & CO Transmitter Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Motorized Damper Rp 540,167.71 1 TITIK Installation, cable NYM 3X1,5mm for power supply Water Level Transmitter Rp 540,167.71 1 TITIK Installation, Cable ITC 2 x 0.6mm for analog and digital point Rp 819,758.81 1 TITIK Installation, cable STP 18 AWG & Integration data point Modbus Fire Alarm, Server Access Control Lift Rp& Generator Set 699,934.05 1 PCS Battery starting genset sensor voltage Rp 1,179,233.09 1 PCS Duct Temperature Sensor Rp 510,689.66 1 PCS Differential Pressure Transmitter Rp 2,028,469.94 1 PCS System Integration with AC System (BACNet) Rp 6,821,460.30 1 PCS System integration with Fire Alarm (ModBus) Rp 6,821,460.30 1 UNIT Differential Pressure Switch Rp 1,019,466.74 1 UNIT Mini Inverter to Control Exhaust Fan (Tangga Darurat) Rp 1,019,466.74 1 UNIT Temperature Sensor PT 1000 Rp 1,898,181.64 1 UNIT Room Temperature Sensor & Humidity Sensor Rp 1,698,473.71 1 UNIT Pipe Temperature Rp 580,109.29 1 UNIT Static Pressure Transmitter Rp 1,099,349.91 1 UNIT Outside Temperature & Humidity Rp 1,618,590.54 1 UNIT Control 0-100% Exhaust Fan Rp 620,050.88 1 UNIT Slim Relay Rp 180,693.43 1 UNIT Damper Modulating 10Nm Rp 1,618,590.54 1 UNIT Damper Konstan 10Nm Rp 1,299,057.85 1 PCS Outdoor Temperature (PT1000) Rp 1,898,181.64 1 PCS Outdoor Humidity Sensor Rp 1,047,425.85 1 PCS Fuel Level Sensor Genset Rp 2,350,095.34 1 PCS Motion Sensor Rp 739,875.64 1 UNIT Water Level Transmitter Rp 3,016,546.06 1 UNIT Air Quality CO2 Transmitter, RS 485/Modbus, measure range 0~2000ppm, Accuracy 40 ppm + 3% reading Rp 3,056,487.64 1 UNIT Air Quality CO Transmitter, RS 485/Modbus, measure range 0 ~ 400ppm/ 0-50°C Rp 3,096,429.23 1 UNIT Motorized for Damper, Voltage 24VDC, Torque 10Nm, Signal 0-10V Rp 2,257,655.92 PEKERJAAN DALI System BAS 1 UNIT Web Controller DALI Rp 46,752,583.06 1 UNIT On/Off Module DALI to control lighting 1 channel Rp 939,583.57 1 UNIT Touch Screen Glass On/Off DALI 1 Group Rp 1,139,291.50 1 UNIT On/Off Module DALI to control lighting 2 channel Rp 1,019,466.74 1 Unit Touch Screen Glass On/Off DALI 2 Group Rp 1,219,174.67 1 UNIT On/Off Module DALI to control lighting 6 channel Rp 1,299,057.85 1 UNIT Touch Screen Glass On/Off DALI 6 Group Rp 1,618,590.54 1 TITIK Installation, cable STP 18 AWG Digital Switch DALI & Module DALI Rp 496,040.70 1 UNIT Dimmable Module DALI to control lighting 1 channel Rp 979,525.15 1 UNIT Touch Screen Glass Dimmable DALI 1 Group Rp 739,875.64 1 UNIT Dimmable Module DALI to control lighting 2 channel Rp 941,181.23 1 UNIT Touch Screen Glass Dimmable DALI 2 Group Rp 838,930.77 1 Unit RGB Module DALI to control lighting 6 channel Rp 4,015,085.71 1 UNIT Saklar LCD control RGB DALI 6 group Rp 3,391,996.97
1 2 3
PEKERJAAN DATA CENTER 1 UNIT Patchpanel UTP Cat6 24 port Loaded 1 UNIT Patchpanel UTP Cat6 48 port Loaded 1 UNIT Patch cord 3 meter Duplex, (LC/PC To LC/PC) L2 - OLT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Rp Rp Rp
3,410,104.64 6,778,355.12 859,181.20
Harga Satuan Pekerjaan Elektrikal - page 123 of 211
NO.
SATUAN
URAIAN
HARGA SATUAN
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 M' 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 SET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 LOT 1 LOT 1 LOT 1 UNIT 1 PCS 1 PCS 1 PCS 1 UNIT 1 PCS 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1M 1 LOT 1M
Core Switch Layer 3 Rp 302,637,180.98 Core Firewall + Router + IPS Rp 357,166,625.84 Hdd PC WD CCTV PURPLE 4TB Rp 1,696,981.57 IPPABX Headend Support Up to 200 Lines Rp 151,302,991.01 IPPABX Headend Support Up to 400 Lines Rp 302,564,127.86 IPTV Management System ( Server + Software ) Rp 347,392,684.72 IPTV Headend Rp 167,128,191.69 Monitor 32"+ PC for System Rp 27,844,236.10 OTB (Optical Terminal Box) Rp 2,323,881.46 Patch Cord 1 mtr Cat6 UTP Rp 157,198.38 19" Closed Rack 42U Depth 1100 mm W = 800 mm Perforated front door Rp 21,304,706.60 Rackmount Patch Panel MMF 4RU - 144Core; c/w Accessories Rp 40,480,814.21 MMF - Patch Cord OM3, 3m Rp 240,591.99 MMF - 12F MC DJ Trunk MPO Pol B 5M Rp 2,399,013.20 Cores Switch : 48 SFP+/SFP ports, 6 QSFP ports, redundant fans, redundant power supplies, Built in Rp Port to PSU 250,758,339.84 air flow Router : Fixed 1 RU System, 800 Gbps, 32GB 2x100 GB 8core, Redundancy Power supplies and fansRp 623,533,513.12 Firewall : Services Gateway includes hardware (16GE, 4x10GE, 16G RAM, 16G Flash, 100G SSD,AC PSU, Rp cable and 322,100,525.26 RMK) and Software Base (F Access Switch 24 port : 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundantRpfans, front-to-back 30,894,717.40 airflow, 2 AC PSU 300 QSFP+ 40GBase-eSR4 40 Gigabit Optics, 850nm for up to 300m Transmission on MMF Rp 55,994,430.38 SFP+ 10GBase-SR 10 Gigabit Ethernet Optics, 850nm for up to 300m Transmission on MMF Rp 16,191,050.26 1U Wiring Management Rp 261,157.07 NVR Card Kap. 32 Channel : 1.5U, 32CH, 16POE, 4 Slot Sata HDD up to 32TB Rp 35,104,294.69 WLAN Controller Rp 158,410,119.58 UPS 10KVA Rp 46,043,585.35 UPS 2KVA Rp 4,747,578.47 19" Closed Rack 20U Depth 970 mm W = 600 mm Perforated front door Rp 11,409,171.68 19" Wallmounted Rack 15U Depth 600 mm Double Door Rp 3,890,727.79 Rackmount Patch Panel MMF 1RU - 12Core; c/w Accessories Rp 4,379,397.21 Access Switch 48 port PoE : - 48-port 10/100/1000BaseT PoE+, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, Rpredundant77,390,637.86 fans, front-to-back airflow, 2 Access Switch 24 port PoE: 24-port 10/100/1000BaseT, 4 x 1/10G SFP/SFP+, 2 x 40G QSFP+, redundant Rp fans, front-to-back 40,739,486.43 airflow, 2 AC PSU UTP Patch Panel 1U 4x6, 24 port Flat Keystone Patch Panel loaded with cable Manager Rp 1,586,277.93 UTP Cat 6 Patchcord Blue 2m Rp 80,466.31 UTP Cat 6 Patchcord Blue 3m Rp 96,968.12 MMF - 12core OM3 SLT STA in PVC HI Conduit Rp 104,495.75 Standing Close Rack 19", 42U c/w Accessories & 24 port power outlet Rp 21,578,399.11 POS ( Passive Optical Splitter) 2 :8 c/w accessories Rp 794,517.69 POS ( Passive Optical Splitter) 2 :16 c/w accessories Rp 1,579,092.88 Wiring Management 1U Rp 225,627.07 UTP Cat 6 Patch Panel 24 Port Loaded Rp 2,036,070.63 UTP Cat 6 Patch Cord, 3m Rp 62,229.51 Optical Line Terminal ( OLT ) 4 PON Rp 66,202,097.92 Farm Switch 24 Gb, L3 Rp 29,552,976.46 Network Management System Rp 57,525,826.78 Router Fire Wall for Internet Rp 40,379,001.89 UPS 10 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 183,629,403.07 UPS 2 Kva back up battery 30 menit c/w Surge Arester untuk peralatan utama diruang Server Rp 25,604,511.00 Grounding Sistem Rp 70,495,094.80 Sistem Pengkabelan Perangkat Utama Data Rp 8,302,313.36 A/P Controller license max 50 A/P Rp 229,113,213.96 Wall Mounted Close Rack 19" 12U c/w Accessories & Fan lengkap terpasang Rp 3,429,849.67 Patch Panel F.O 12 Core Rp 1,781,676.18 Patch Panel F.O 24 Core Rp 3,280,063.08 Patch Cord F.O SC to LC, 3 meter Rp 149,706.10 Patch Panel UTP 24 Port, Cat 6 Loaded Rp 2,036,070.63 Patch Cord UTP Cat 6, 1 meter Rp 62,229.51 ONU 24G PoE Rp 7,817,723.79 ONU 48G PoE Rp 15,625,505.08 POS ( Passive Optical Splitter) 1:4 c/w accessories Rp 495,884.06 POS ( Passive Optical Splitter) 2:4 c/w accessories Rp 981,791.78 Instalasi Kabel FO 4 Core SM ke Ruang Panel L1 Rp 45,828.18 Terminasi Kabel FO Rp 153,732.21 Kabel FO 12 Core, SM, Outdoor Rp 144,956.81
66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 PCS 1 PCS 1 PCS 1 PCS 1 UNIT 1 UNIT 1 UNIT
Distribution Switch 16 Port SFP+ Rp Transceiver, SFP+, 10GbE, LR, SMF Third Party Support Rp Transceiver, SFP+, 10GbE, SR, SMF Third Party Support Rp Ethernet Routing Switch 48 GigE PoE 740W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Rp Ethernet Routing Switch 24 GigE PoE 370W, 4 x 10 G SFP, LAN Basecompliant). (EU power cord). Rp Ethernet Routing Switch 48 GigE, 4 x 10 G SFP, LAN Base Rp Ethernet Routing Switch 24 GigE, 4 x 10 G SFP, LAN Base Rp SSC Stack Cable, 1.5m (5ft) for Ethernet Routing Switch Third Party Support with Acess series switches. Rp Transceiver, SFP+, 1GbE, LR, SMF Third Party Support Rp AP 802.11ac W2 AP w/CA; 4x4:3; Mod; Int Ant; mGig F Domain Rp AP-Flat Surface Wall/Ceiling Black AP Basic Flat Surface Mount Kit Rp Patch Panel Category 6 SL Kapasitas24 Port Rp 4 Pair, Category 6 SL Series Modular Jack ( Blue ) Rp Category 6 UTP Patch Cords, Stranded, 4ft ( Blue ) Rp BS Shuttered Faceplate - 2 Port Rp BS Shuttered Faceplate - 1 Port Rp 19"Wallmounted 12 RU Double door Rp Optic Terminal Box 8 Port Rp Patch Cords SM SC-LC Duplex Rp
259,528,980.42 12,415,329.31 3,581,190.22 124,477,323.45 70,927,403.74 78,577,392.27 53,766,618.66 2,641,388.19 2,227,875.29 20,931,439.39 573,823.72 1,705,345.36 107,681.91 83,622.98 61,819.57 59,564.05 3,949,592.61 1,363,257.42 246,772.61
Harga Satuan Pekerjaan Elektrikal - page 124 of 211
NO.
SATUAN
URAIAN
HARGA SATUAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PEKERJAAN SOLAR PANEL 1 BH JSKYE 200 Wp Solar Panel 1 BH SMA Sunny Boy 1.5kW 1 BH SMA Sunny Island 4.4 1 BH NS VRLA 12v 100 Ah 1 SET Panel Combiner Box 1 LOT Cabling & accs 1 LOT Solar Mounting 1 LOT Battery Rack & Accs 1 BH Inverter Hybrid san Solar Panel Charge Controller 1M Solar Cable 6mm2 1 PCS MC4 Connector Female 1 PCS MC4 Connector Male 1M Cable Trenching 1 SET Prewiring and Components 1 SET Grounding System 1 BH Instalasi & Test Commisioning
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,775,351.99 14,180,738.79 45,194,205.81 2,715,154.02 10,379,676.50 5,210,765.34 4,270,963.30 16,958,290.72 51,730,965.86 60,486.94 15,893.33 15,893.33 79,658.90 32,178,619.56 25,416,509.00 26,967,059.71
1 2 3 4 5 6 7 8 9 10
PEKERJAAN MASTER CLOCK 1 UNIT NTP Time Server Master Clock 1 UNIT GPS Antenna Receiver 1 UNIT Converter 1 UNIT Teak Wood Clock 1 TTK Installation Slave Clock 1 UNIT NTP to Signal Time Covert Module 1 UNIT Junction Box Master Clock (SERVER) 1 UNIT Analog Clock Lingkaran Dia.500mm,HH:MM 1 UNIT Analog Clock Lingkaran Dia.400mm,HH:MM 1 UNIT Junction Box Master Clock
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
31,749,709.16 19,908,203.57 8,362,735.63 13,987,450.78 454,301.54 8,479,145.36 528,420.18 5,931,216.34 10,879,274.03 528,420.18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PEKERJAAN NURSE CALL 1 SET Master Controller IP-Ark 1 + Data Report License Rp 107,646,490.94 1 SET Desktop Touch Screen Nurse Station 18" Rp 56,000,453.51 1 SET Event Management Module Rack + Interface License Rp 101,576,936.15 1 SET IntelPage IP Paging Module Rack + Dipole Antenna Rp 58,115,008.08 1 SET Wallmount 19" 8U Rack lengkap dengan Network Switch, PSU, PDU, dan UPS Rp 29,368,813.46 1 SET IP Callpoint Pull Cord 3m, Red Fly Lead,British Plate [upgrade call for Emergency & Code Blue functions] Rp 3,477,267.51 1 BH PSU 24 VDC Rp 5,873,762.69 1 BH Over Bed Indicator Led Single Color Rp 1,748,501.68 1 BH Patient Call Pendant, Momentary Action, Green Button, 2m Rp 1,135,594.12 1 BH IP Callpoint, General with Pendant Socket, British Plate - Emergency Icon [upgrade call for Code BlueRpfunction] 2,593,853.60 1 BH IP Net Room Controller Rp 11,567,396.66 1 BH Flashing Over Door Light, 1 LED, Red, British Plate Rp 1,621,158.50 1 BH IP Over Door Lamp 4 RGB Programmable Rp 2,486,559.54 1 BH IP Corridor Digital Display, 12 Characters, 50mm Rp 23,476,802.95 1 BH Panel Elektrikal lengkap dengan aksesorisnya Rp 3,915,841.79 1 BH IP Callpoint, General, British Plate - Staff Presence Icon [upgrade call for Emergency/Code Blue function] Rp 2,361,252.60
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PERKERJAAN BED HEAD 1 UNIT Dimensi : 1200mm x 220mm x 80mm 1 UNIT Dimensi : 41900mm x 220mm x 80mm [14 Bed Patients] 1 UNIT Dimensi : 20900mm x 220mm x 80mm [7 Bed Patients] 1 UNIT Dimensi : 14900mm x 220mm x 80mm [5 Bed Patients] 1 UNIT Dimensi : 11900mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 11700mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 9500mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 8770mm x 220mm x 80mm [3 Bed Patients] 1 UNIT Dimensi : 6000mm x 220mm x 80mm [4 Bed Patients] 1 UNIT Dimensi : 7100mm x 220mm x 80mm [3 Bed Patients] 1 UNIT Dimensi : 6000mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 5900mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 5700mm x 220mm x 80mm [2 Bed Patients] 1 UNIT Dimensi : 4700mm x 220mm x 80mm [2 Bed Patients] 1 BH 1 x Twin gang Schuko Socket 16A 250V - Vivase Schneider 1 BH 1 x Single gang Schuko Socket 16A 250V - Vivase Schneider 1 BH 1 x Universal Socket 16A 250V - Vivase Schneider 1 BH 1 x Single Switch 16A 250V - Vivase Schneider 1 BH 1 x Lampu LED T5 8 watt c/w fitting, reflector & cover 1 BH 1 x Patient Name Tag 1 BH Provision Access for Medical Gas Outlet 1 BH Provision Access for Nurse Call Outlet
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,232,029.82 78,066,222.02 39,033,111.01 27,880,793.58 22,304,634.86 22,320,298.23 17,660,446.49 16,728,476.15 11,152,317.43 13,940,396.79 11,152,317.43 11,152,317.43 10,594,701.56 9,312,950.09 182,086.64 88,889.61 109,643.57 63,045.05 244,740.11 29,368.81 9,789.60 9,789.60
Harga Satuan Pekerjaan Elektrikal - page 125 of 211
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL & PLUMBING PEKERJAAN PERENCANAAN NO
TIPE
A. 1 2 3 4 5 6 7 8 B. 1 2 3 4 5 6 7 8 9 10 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
DAFTAR UPAH Pekerja Tukang pipa Tukang listrik Tukang AC Kepala tukang AC Kepala tukang listrik Kepala tukang pipa Mandor PEKERJAAN EXHAUST : Axial Fan Inline Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Wall Fan Type Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Exhaust Fan , Kapasitas : 800 CFM / Wall Type Exhaust Fan , Kapasitas : 850 CFM / Wall Type Exhaust Fan , Kapasitas : 950 CFM / Wall Type Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Inline Fan Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Exhaust Fan , Kapasitas : 2900 CFM / Inline Type Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Exhaust Fan , Kapasitas : 950 CFM / Inline Type Exhaust Fan , Kapasitas : 900 CFM / Inline Type Exhaust Fan , Kapasitas : 850 CFM / Inline Type Exhaust Fan , Kapasitas : 800 CFM / Inline Type Exhaust Fan , Kapasitas : 750 CFM / Inline Type Exhaust Fan , Kapasitas : 700 CFM / Inline Type Exhaust Fan , Kapasitas : 650 CFM / Inline Type Exhaust Fan , Kapasitas : 600 CFM / Inline Type Exhaust Fan , Kapasitas : 550 CFM / Inline Type Exhaust Fan , Kapasitas : 500 CFM / Inline Type
PRICE Rp Rp Rp Rp Rp Rp Rp Rp
70,000 80,000 80,000 80,000 85,000 85,000 85,000 90,000
hari hari hari hari hari hari hari hari
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,200,000 6,240,000 7,380,000 7,920,000 10,800,000 14,400,000 24,000,000 30,000,000 37,200,000 43,200,000 57,600,000 72,000,000 96,000,000 144,000,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,150,000 1,725,000 2,300,000 2,875,000 3,450,000 4,025,000 4,600,000 5,175,000 5,750,000 6,900,000 9,200,000 9,775,000 10,925,000 13,800,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
55,000,000 33,000,000 31,900,000 30,800,000 28,600,000 28,600,000 27,500,000 26,400,000 25,300,000 24,200,000 23,100,000 22,000,000 20,900,000 19,800,000 18,700,000 17,600,000 16,500,000 15,400,000 14,300,000 13,200,000 12,100,000 11,000,000 10,450,000 9,900,000 9,350,000 8,800,000 8,250,000 7,700,000 7,150,000 6,600,000 6,050,000 5,500,000
unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 126 of 211
NO 33 34 35 36 37 38 39 40 41
1 2 3 4 5 6 7 8 9 10
TIPE Exhaust Fan , Kapasitas : 450 CFM / Inline Type Exhaust Fan , Kapasitas : 400 CFM / Inline Type Exhaust Fan , Kapasitas : 350 CFM / Inline Type Exhaust Fan , Kapasitas : 300 CFM / Inline Type Exhaust Fan , Kapasitas : 250 CFM / Inline Type Exhaust Fan , Kapasitas : 200 CFM / Inline Type Exhaust Fan , Kapasitas : 150 CFM / Inline Type Exhaust Fan , Kapasitas : 100 CFM / Inline Type Exhaust Fan , Kapasitas : 70 CFM / Inline Type ERV Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Booster Fan Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer
1 2 3 4 5 6
DUCTING SENG BJLS BJLS 60 ( untuk ukuran ducting s/d 12“ ) BJLS 70 ( untuk ukuran ducting s/d 18 “) BJLS 80 ( untuk ukuran ducting s/d 30 “ ) BJLS 90 ( untuk ukuran ducting s/d 40 “ ) BJLS 100 (untuk ukuran ducting > 40 “ ) Penggantung Ducting
Rp Rp Rp Rp Rp Rp
181,900 208,900 235,700 287,600 341,000 45,000
m' m' m' m' m' Set
DUCTING TERISOLASI - Supply Air c/w OBD (Finishing Cat Powder Coating) 44" x 38" 44" x 36" 40" x 34" 36" x 34 34" x 30" 32" x 28" 30" x 30" 30" x 24" 28" x 28" 28" x 24" 28" x 22" 28" x 20" 26" x 26" 26" x 24" 26" x 16" 24" x 24" 24" x 20" 22" x 22" 22" x 20" 22" x 18" 20" x 20" 20" x 18" 20" x 12 18" x 18" 18" x 16" 18" x 14" 18" x 12" 16" x 16" 16" x 14" 16" x 12" 16" x 10" 14" x 12" 14" x 10" 12" x 12" 12" x 10" 12" x 8" 10" x 10" 10" x 8" 8" x 8" 8" x 6" 6" x 6"
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000 680,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
1 2 3 4
C.
1
Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 4,950,000 4,400,000 3,850,000 3,300,000 2,750,000 2,200,000 1,650,000 1,100,000 770,000
unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp
21,000,000 29,500,000 29,500,000 60,000,000
unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,261,700 5,905,580 8,022,125 9,842,634 11,811,161 13,779,688 20,055,312 29,084,913 38,034,117 43,740,000
unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 127 of 211
NO 2
3
4 D. 1
TIPE Return Air c/w OBD (Finishing Cat Powder Coating) 40" x 36 40" x 34" 40" x 32" 34" x 32" 32" x 24" 24" x 20" 36" x 32" 34" x 30" 32" x 28" 30" x 24" 28" x 28" 28" x 24" 26" x 26" 24" x 24" 24" x 22" 24" x 16" 22" x 22" 22" x 20" 22" x 18" 20" x 20" 20" x 18" 20" x 16" 18" x 18" 18" x 16" 18" x 14" 16" x 16" 16" x 14" 16" x 12" 15" x 10" 14" x 14" 14" x 12" 14" x 10" 12" x 12" 12" x 10" 12" x 8" 10" x 10" 10" x 8" 8" x 8" 8" x 6" 6" x 6" - Fresh Air Louvre (Finishing Cat Powder Coating) 32" x 28" 24" x 20" 22" x 14" 20" x 18" 20" x 16" 18" x 16" 16" x 16" 14" x 14" 14" x 12" 14" x 10" 12" x 12" 10" x 10" 10" x 8" 8" x 8" 8" x 6" - Volume Damper (Painted) VD 14" X 14" VD 12" X 12" VD 10" X 10" VD 8" X 8" Ducting HOOD SUS - 304
PRICE
-
PEKERJAAN AIR CONDITIONING Outdoor Unit Air Conditioning kapasitas : 95 500 BTU/h - OU kapasitas : 114 600 BTU/h - OU kapasitas : 133 800 BTU/h - OU kapasitas : 152 900 BTU/h - OU kapasitas : 229 200 BTU/h - OU kapasitas : 248 400 BTU/h - OU kapasitas : 267 500 BTU/h - OU kapasitas : 286 600 BTU/h - OU kapasitas : 305 700 BTU/h - OU kapasitas : 363 100 BTU/h - OU kapasitas : 382 200 BTU/h - OU kapasitas : 401 300 BTU/h - OU
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000 630,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000 780,000
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp
695,200 596,000 413,600 264,800 5,040,000
bh bh bh bh unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,558,250 66,764,250 74,844,000 194,040,000 133,528,500 141,608,250 150,113,250 379,170,000 407,880,000 199,867,500 208,372,500 221,130,000
unit unit unit unit unit unit unit unit unit unit unit unit
Bahan Mekanikal dan Plumbing - page 128 of 211
NO
2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
TIPE kapasitas : 420 400 BTU/h - OU kapasitas : 496 800 BTU/h - OU kapasitas : 515 900 BTU/h - OU kapasitas : 535 000 BTU/h - OU kapasitas : 592 400 BTU/h - OU kapasitas : 763 000 BTU/h - OU kapasitas : 821 700 BTU/h - OU kapasitas : 859 900 BTU/h - OU Indoor Unit Air Conditioning Wall Mounted Type - VRV kapasitas : 5 460 BTU/h - Wall Mounted kapasitas : 7 510 BTU/h - Wall Mounted kapasitas : 9 550 BTU/h - Wall Mounted kapasitas : 12 280 BTU/h - Wall Mounted kapasitas : 15 350 BTU/h - Wall Mounted kapasitas : 19 110 BTU/h - Wall Mounted kapasitas : 24 230 BTU/h - Wall Mounted Ceilling Mounted Type - VRV 1 Way Ceilling Cassette kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Way Ceilling Cassette kapasitas : 19 100 BTU/h - 2 Way Cassette Type 4 Way Ceilling Cassette kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit Wall Split Type - Inverter kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) AHU (Air Handling Unit) Kapasitas : 85 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 95 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 114 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Kapasitas : 125 000 BTU/h - AHU Include : Fan, Medium Filter, Pre-Filter, Coil, dst Ceiling Concealed Duct (Mid / High) Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 1/2 INCH
Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 233,462,250 275,136,750 287,894,250 698,940,000 756,360,000 990,000,000 1,047,420,000 1,096,920,000
unit unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp
5,307,893 5,392,943 5,559,178 5,729,278 5,810,461 7,318,166 7,735,685
unit unit unit unit unit unit unit
Rp Rp Rp
15,381,000 26,655,000 27,942,000
unit unit unit
Rp
20,358,000
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
13,702,501 14,033,251 14,364,001 14,973,955 16,770,887 16,770,888 16,869,682 17,325,001 27,405,000 17,986,501 18,763,978 19,794,887
unit unit unit unit unit unit unit unit unit unit unit unit
Rp Rp Rp Rp
5,442,631 5,577,631 7,602,631 10,522,895
unit unit unit unit
Rp
94,436,719
unit
Rp
102,898,249
unit
Rp
110,302,088
unit
Rp
123,054,822
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
7,588,779 7,739,550 8,273,046 10,020,436 11,330,979 24,200,591 25,128,410 252,000 252,000 171,000 171,000 171,000 171,000 288,000 296,000 288,000 288,000 394,000 378,000 378,000 443,000 378,000 378,000 159,000 646,000 861,000
unit unit unit unit unit unit unit m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' set set
Bahan Mekanikal dan Plumbing - page 129 of 211
NO 22 23 24 25 26 27 28 29 30 31 32 33 34 34 35 36
TIPE KABEL LEADER (Kabel Indoor to Outdoor) PIPA DRAIN Y BRANCH AC MANAGER 5 ACP 5 Standard 3 Wired Remocon Wireless Remocon Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 41 AHU Comm. Kit EEV Kit 4-10HP EEV Kit 12-20HP TVX Kit for 18-26 HP TVX Kit for 28-36 HP Terminal Udara - DIFFUSER SUPPLY GRILLE ALUMUNIUM - DIFFUSER RETURN GRILLE ALUMUNIUM - DIFFUSER FRESH AIR GRILLE ALUMUNIUM - DIFFUSER EXHAUST GRILLE ALUMUNIUM - BOX DIFFUSER PERPORATE STAINLESS STEEL - LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL - DAMPER RETURN - DAMPER FRESH AIR - DAMPER EXHAUST - DAMPER SUPPLY 37 Filter Udara - Pre-Filter (G-4) - Medium filter (F-9) - HEPA filter ( H-13) 38 Air Filter (On Ceilling Room) 39 Deferential Pressure Switch (detection pressure drop for Medium Filter) 40 Deferential Pressure Switch (detection pressure drop for Hepa Filter) 41 Analoge Deferential Pressure Gauge (Detection Room Pressure) 42 Mixing Box untuk Fresh air dan Return Air 43 IRIS Damper 44 AC Smart 5 45 AC EZ Touch
E. 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
PEKERJAAN FIRE HYDRANT Fire House Cabinet (Indoor ) Fire House Cabinet (Outdoor) PILLAR HYDRANT SIAMESE CONNECTION Fire Extinguisher ( Dry Chemical ) Kap. 6 Kg Dudukan Fire Extinguisher Package Diesel Fire Pump, Kapasitas : 1250 USGpm Package Electric Fire Pump, Kapasitas 1250 USGpm Package Jockey Fire Pump, Kapasitas : 50 Gpm Diapraghma Tank Kap. 300 liter DAILY TANK 200 LITER HORN BUZZER HAND PUMP NOZZLE PEMADAM KEBAKARAN dia.38 mm NOZZLE PEMADAM KEBAKARAN dia.65 mm FLEXIBLE JOINT DIA 150 MM FLEXIBLE JOINT DIA 100 MM FLEXIBLE JOINT DIA 80 MM FLEXIBLE JOINT DIA 65 MM FLEXIBLE JOINT DIA 50 MM CHECK VALVE DIA 50 MM / 20 K CHECK VALVE DIA 65 MM / 20 K CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 150 MM / 20K CONTROL VALVE DIA. 65 MM / 20 K GATE VALVE DIA. 200 MM / 20 K GATE VALVE DIA. 150 MM / 20 K GATE VALVE DIA.25 MM / 20 K GATE VALVE DIA.32 MM / 20 K GATE VALVE DIA.50 MM / 20 K GATE VALVE DIA.65 MM / 20 K GATE VALVE DIA.80 MM / 20 K GATE VALVE DIA.100 MM / 20 K FOOT VALVE dia. 65 mm FOOT VALVE dia. 100 mm FOOT VALVE dia. 150 mm INDOCATING VALVE 100 mm LANDING VALVE / KSSK dia. 150 mm
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 383,000 90,000 2,097,900 57,834,000 41,929,650 1,752,546 1,060,290 1,729,350 2,211,300 5,346,000 7,399,350 4,123,636 6,237,000 16,200,000 19,800,000
m' m' bh bh unit unit unit bh bh bh unit unit unit unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
950,000 950,000 950,000 950,000 90,000,000 8,500,000 3,500,000 3,500,000 3,500,000 3,500,000
bh bh bh bh unit unit pcs pcs pcs pcs
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
570,000 1,800,000 9,500,000 72,000,000 1,500,000 1,500,000 1,650,000 13,972,000 5,000,000 28,350,000 16,726,500
pcs pcs pcs set set set set set set unit unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,600,000 7,400,000 5,362,500 7,722,000 1,189,300 114,200 630,000,000 405,000,000 81,000,000 25,058,100 3,000,000 5,594,200 3,995,800 435,000 725,000 2,103,000 1,062,000 744,000 728,000 574,000 3,729,000 3,929,000 4,300,000 5,500,000 5,410,900 21,235,650 14,157,100 2,568,800 3,630,000 4,215,400 5,410,900 6,410,900 9,368,600 3,300,000 8,100,000 10,500,000 899,100 7,425,000
set set bh bh bh bh unit unit unit unit unit bh unit bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Mekanikal dan Plumbing - page 130 of 211
NO 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 F. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
LANDING VALVE / KSSK dia. 100 mm TEST VAVE 100 mm DRAIN VALVE 100 mm FLASHING VALVE 100 mm Plat Orifice 100 mm SIGHT GLASS WATER FLOW SWITCH SAFETY VALVE dia. 150 mm SAFETY VALVE dia. 100 mm SAFETY VALVE dia. 80 mm SAFETY VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 100 mm BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 65 mm PRESSURE GAUGE PRESSURE SWITCH AAV HEAD SPRINKLER PIPA BSP SCH.40 Dia. 1” PIPA BSP SCH.40 Dia. 1 1/4” PIPA BSP SCH.40 Dia. 2” PIPA BSP SCH. 40 Dia. 2 1/2” PIPA BSP SCH. 40 Dia. 3” PIPA BSP SCH.40 Dia. 4” PIPA BSP SCH. Dia. 6” PIPA BSP SCH.40 Dia. 8”
TIPE Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 5,500,000 4,300,000 4,300,000 4,300,000 586,800 2,854,200 2,774,900 29,400,000 29,400,000 18,300,000 9,300,000 7,800,000 5,400,000 4,200,000 2,550,000 1,250,000 1,507,000 82,500 36,667 50,000 79,333 126,500 164,833 234,500 410,000 626,667
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹
PEKERJAAN PLUMBING Package Pompa Booster, Kapasitas : 200 Lpm Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m Package Pompa Submersible, Kapasitas : 150 Lpm Package Pompa Submersible, kapasitas : 300 Lpm Package Sewage Pump, Kapasitas : 300 Lpm Package Sewage Pump, Kapasitas : 200 Lpm WTP (Water Treatment Plant) Include All Panel Kontrol Pompa Sand Filter Carbon Filter Keran Taman Putar Keran Taman Biasa Keran Air Bersih & Air Panas (stailess) Chemical Tank + Dosing Pump Ground Water Tank kap. 120 m3 Pressure tank kap. 500 m3 Pressure tank kap. 1000 m3 Pressure tank kap. 1500 m3 Pressure tank kap. 2000 m3 Pressure tank kap. 3000 m3 Tangki Air, FRP Modul Sistem kapasitas : 250 M3 Tangki Air, FRP Modul Sistem kapasitas : 120 M3 Tangki Air, FRP Modul Sistem kapasitas : 75 M3 Tangki Air, FRP Modul Sistem kapasitas : 30 M3 Tangki Air, FRP Modul Sistem kapasitas : 20 M3 Tangki Air, FRP Modul Sistem kapasitas : 18 M3 Tangki Air, FRP Modul Sistem kapasitas : 16 M3 Tangki Air, FRP Modul Sistem kapasitas : 15 M3 Tangki Air, FRP Modul Sistem kapasitas : 6 M3 Tangki Air, FRP Modul Sistem kapasitas : 4 M3 Dudukan Roof Tank Water Level Control ( WLC ) Vent Out (VO) GATE VALVE DIA.20 MM / 10 Kg GATE VALVE DIA.32 MM / 10 Kg GATE VALVE DIA.50 MM / 10 Kg GATE VALVE DIA.65 MM / 10 Kg GATE VALVE DIA.80 MM / 10 Kg SELENOID VALVE DIA.150 MM SELENOID VALVE DIA.50 MM FLEXIBLE JOINT DIA.80 MM/ 10 KG FLEXIBLE JOINT DIA.65 MM/ 10 KG FLEXIBLE JOINT DIA.50 MM/ 10 KG FLEXIBLE JOINT DIA.32 MM/ 10 KG STRAINER DIA.150 MM STRAINER DIA.100 MM STRAINER DIA.65 MM STRAINER DIA.40 MM
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
56,795,850 180,000,000 166,500,000 153,000,000 42,171,300 49,950,000 18,000,000 13,383,000 378,099,369 8,500,000 23,715,000 24,043,560 98,000 32,000 467,000 3,500,000 20,000,000 15,000,000 30,000,000 40,000,000 60,000,000 120,000,000 837,500,000 402,000,000 251,250,000 100,500,000 67,000,000 60,300,000 53,600,000 50,250,000 20,100,000 13,400,000 2,500,000 2,549,300 250,000 277,000 467,000 3,066,000 3,578,000 4,483,000 4,200,000 2,200,000 963,000 747,000 612,000 459,000 10,655,000 5,042,000 2,989,000 975,000
unit set set set unit unit unit unit unit set unit unit bh bh bh bh unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit Set bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Bahan Mekanikal dan Plumbing - page 131 of 211
NO 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 G. 1 2 3 4 5 6 7 8 9 10 11 12 13 10 H. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
TIPE STRAINER DIA.32 MM CHECK VALVE DIA. 80 MM CHECK VALVE DIA. 65 MM CHECK VALVE DIA. 50 MM CHECK VALVE DIA. 32 MM Floor Clean Out + Cover dia. 32-50 mm Floor Clean Out + Cover dia. 65 mm Floor Clean Out + Cover dia. 80 mm Floor Clean Out + Cover dia. 100 mm Floor Clean Out + Cover dia. 150 mm Roof Drain diameter 150 mm Roof Drain diameter 100 mm Roof Drain diameter 80 mm Roof Drain diameter 65 mm Bak Kontrol PIPA PVC Dia. 2 1/2” PIPA PVC Dia. 2” PIPA PVC Dia. 3” PIPA PVC Dia. 4” PIPA PVC Dia. 6” PIPA PVC Dia. 8” PIPA PVC Dia. 10” SEPTIK TANK BIOLOGICAL SISTEM KAP. 20 M3 SEPTIK TANK BIOLOGICAL SISTEM KAP. 40 M3 SEPTIK TANK BIOLOGICAL SISTEM KAP. 50 M3 Grease Trap portable kapasitas 5 liter Floating valve dia 20 mm (1/2") Floating valve dia 25 mm (3/4") Floating valve dia 32 mm (1") Floating valve dia 50 mm (1 1/2") Floating valve dia 63 mm (2") Packaged Bio. Spetic, Kap. 100 m3 Bak Netralisasi Bak Kontrol / Bak Sumpit Water Meter Blower Aersai IPAL
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PRICE 742,000 4,437,000 3,684,000 2,749,000 550,000 166,500 222,500 250,000 305,000 415,000 180,000 120,000 100,000 50,000 317,200 31,550 21,625 44,450 73,650 163,675 274,675 424,725 56,000,000 140,000,000 180,000,000 4,139,600 242,000 286,000 363,000 475,900 1,250,000 15,000,000 7,500,000 2,030,126 1,793,000 27,000,000
bh bh bh bh bh bh bh bh bh bh bh bh bh bh unit m¹ m¹ m¹ m¹ m¹ m¹ m¹ unit unit unit unit bh bh bh bh bh unit unit unit bh unit
HEAT PUMP Heat Pump Water Heater, kap. 25.5 kW Heat Pump Water Heater, kap. 43 kW Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Pompa Return, kap. 5 M3/h - Head. 20 m Water Softenner Electric Water Heater, kap. 50 liter Electric Water Heater, kap. 30 liter Package Treatment Pump 150 Lpm Pompa tekan RO ( Stainless Steel ), lengkap accesories Tangki stainless steel kap. 2000 liter lengkap accessories Membran Filter Lengkap dengan accessories Electric Water Heather
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
175,590,000 342,800,000 18,300,000 13,400,000 7,700,000 13,400,000 36,000,000 3,650,000 2,350,000 3,800,000 26,000,000 19,980,000 30,000,000 3,298,000
unit unit unit unit unit unit unit unit unit Unit unit unit unit unit
12,500,000.00 17,300,000.00 12,500,000.00 7,000,000.00 700,000.00 1,100,000.00 2,800,000.00 1,800,000.00 31,500,000.00 13,800,000.00 7,000,000.00 2,000,000.00 4,200,000.00 5,500,000.00 11,000,000.00 8,400,000.00 8,400,000.00 12,500,000.00 6,200,000.00 2,700,000.00 5,600,000.00 9,400,000.00 500,000.00 6,000,000.00
unit unit unit unit unit unit unit unit unit unit unit lot lot unit unit unit unit unit unit lot unit set lot lot
PEKERJAAN RO (REVERSE OSMOSIS)) High Pressure Pump Membrane 4" x 40" - 1500 GPD Housing FRP Permeate & Concentrate Rotameter System Pressure Gauge Recyle Valve Low Pressure Switch Solenoid Valve 3/4" TDS Monitor Cartridge Filter Piping & Interconnecting Frame Aksesoris Stronge Tank SS304, Volume 1000 Litter Stronge Tank SS304, Volume 2000 Litter Pompa Distribusi Kap. 10 Lpm, Head 32 m Pompa Isap Kap. 10 Lpm, Head 32 m Housing Catridge 10", in/out 3/4" Housing Catridge 10", in/out 4" Granular Resin Mixed Bed Ultra Voilet Sterlight 5 GPM, 30 Watt Control Panel Indoor Cabling Installation
Bahan Mekanikal dan Plumbing - page 132 of 211
NO
TIPE
PRICE 2,000,000.00
lot
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,386 11,577 18,665 28,585 43,947 70,875 108,675 155,925 236,250 865,064 559,913
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
11,813 18,665 29,772 47,250 70,875 115,763 174,825 259,875 378,000 374,993 897,750 5,316,740 2,579,270 1,054,130 735,460 516,560 135,300 1,354,545
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ unit unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp
969,265 858,721 716,351 596,209 454,582 250,855
m m m m m m
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
39,180.00 49,999.95 83,340.00 108,333.30 123,000.00 153,450.00 208,335.00 250,005.00 330,000.00 500,010.00 600,000.00 866,670.00 1,291,800.00 934,200.00 44,391,937.50 410,850.00
m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ bh unit bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
187,950,000 31,500,000 16,810,000 11,867,500 14,500,000 8,250,000 18,300,000 37,100,000 37,100,000 2,135,000 49,900,000 53,765,000 154,995,000 63,695,000
set ls pcs pcs unit unit unit unit unit unit unit unit unit unit
Rp
1,965,000
unit
25 Test Run & Commisioning I. 1
2
3 4 5 6 7 8 9 10
11
12 13 14 J. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PIPA AIR BERSIH PIPA POLIPROFELINE - PN 10 - PPR PN-10 Ø 20 mm ( 1/2") - PPR PN-10 Ø 25 mm ( 3/4") - PPR PN-10 Ø 32 mm ( 1") - PPR PN-10 Ø 40 mm (1 1/4") - PPR PN-10 Ø 50 mm (1 1/2") - PPR PN-10 Ø 63 mm (2") - PPR PN-10 Ø 75 mm (2 1/2") - PPR PN-10 Ø 90 mm (3") - PPR PN-10 Ø 110 mm (4") - PPR PN-10 Ø 125 mm (5") - PPR PN-10 Ø 160 mm (6") PIPA POLIPROFELINE - PN 20 - PPR PN-20 Ø 20 mm ( 1/2") - PPR PN-20 Ø 25 mm ( 3/4") - PPR PN-20 Ø 32 mm ( 1") - PPR PN-20 Ø 40 mm (1 1/4") - PPR PN-20 Ø 50 mm (1 1/2") - PPR PN-20 Ø 63 mm (2") - PPR PN-20 Ø 75 mm (2 1/2") - PPR PN-20 Ø 90 mm (3") - PPR PN-20 Ø 110 mm (4") - PPR PN-20 Ø 125 mm (5") - PPR PN-20 Ø 160 mm (6") PIPA HEADER Dia. 150 mm PIPA HEADER Dia. 100 mm PIPA HEADER Dia. 90 mm PIPA HEADER Dia. 80 mm PIPA HEADER Dia. 63 mm PIPA HEADER Dia. 32 mm Water Hammer PIPA PVC-O - PN 10 - PN 10 Diameter 10" (250 mm) + RRJ Power Lock - PN 10 Diameter 8" (200 mm) + RRJ Power Lock - PN 10 Diameter 6" (160 mm) + RRJ Power Lock - PN 10 Diameter 4" (110 mm) + RRJ Power Lock - PN 10 Diameter 3" (90 mm) + RRJ Power Lock - PN 10 Diameter 2" (63 mm) + RRJ Power Lock STAINLESS STEEL 304 SCHEDULE.10 WELDED - Diameter 1/2" ( 15 mm ) - Diameter 3/4" ( 20 mm ) - Diameter 1" ( 25 mm ) - Diameter 1 1/4" ( 32 mm ) - Diameter 1 1/2" ( 40 mm ) - Diameter 2" ( 50 mm ) - Diameter 2 1/2" ( 65 mm ) - Diameter 3" ( 80 mm ) - Diameter 4" ( 100 mm ) - Diameter 5" ( 125 mm ) - Diameter 6" ( 150 mm ) - Diameter 8" ( 200 mm ) - Diameter 10 ( 250 mm ) Alarm Heat Detector (HD) Tabung Silinder Kap. 150 Kg (Fire Supression) Head Springkler Supression (HS) PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG ) CENTRAL CONTROL UNIT Blower Skyrail V1 Software license package 10 units Bus Converter Power Pack 230V - 36VDC PC Win. 10, 64 Bit LG LED Monitor 19" UPS c/w Battery Back-up 3-way Diverter NW110 3-way Diverter NW110 (Transfer Unnit) Optical tube switch Compact Station NW110 with PCB - 10" Touch Screen Display Topload (Through) Station NW110 with PCB - 10" Touch Screen Display Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display INSTALLATION & MATERIAL SUPPORT V-piece with valve
Bahan Mekanikal dan Plumbing - page 133 of 211
NO 16 17 18 19 20 21 22 23 24 25 26 27 28 29 K. D1
1
2 3 D2
1
2 3 1
PRICE 2,205,000 1,350,000 2,386,000 1,270,000 1,600,000 2,050,000 145,500 597,100 49,000 1,510,500 83,012,550 250,000 750,000 1,750,000
unit unit unit unit unit unit m psc psc m ls m pcs pcs
Rp
801,930,000
unit
Rp Rp
15,000,000 35,000,000
unit unit
Rp
563,830,000
unit
Rp Rp
15,000,000 35,000,000
unit unit
Rp
755,110,000
unit
Rp Rp
5,000,000 21,000,000
unit unit
Rp Rp Rp
134,000,000 20,000,000 2,500,000
unit unit unit
- DW 50 - 24 - 2/2 Floor Type Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek
Rp Rp Rp
109,250,000 20,000,000 2,500,000
unit unit unit
ESCALATOR - Kapasitas : 9000 passanger / hour - Kecepatan : 30 MPM - Lintasan : 2 Lantai Inklinasi : 30-35 derajad - Kelengkapan : ARD Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
Rp
513,000,000
unit
Rp Rp
15,000,000 25,000,000
ls ls
Rp Rp
13,585,000 5,000,000
ls set
PEKERJAAN DALAM GEDUNG BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 19500 mm - Service Floors : - Control Mode : Duplex full Collective Selective VVVF Close Loop - Door : 1200*2100*2500 ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker BED ELEVATOR Spesifikasi : - Tipe : Hospital Bed Elevator - Kapasitas : 1000 Kg - Kecepatan : 1 m/s - Traveling Height : 23000 mm - Service Floors : - Control Mode : Duplex full Collective Selective VVVF Close Loop - Door : 900*2100 ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
2 3
PASSENGER ELEVATOR Spesifikasi : - Tipe : Passenger Elevator - Kapasitas : 1600 Kg - Kecepatan : 1 m/s - Traveling Height : 19500 mm - Service Floors : - Control Mode : Simplex full Collective Selective VVVF Close Loop - Door : 1200*2100 SO ( Center Opening) - ARD : Yes Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker
1
DUMB WAITER
2 3
- DW 200 - 24 - 4/4 Floor Type Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek
1
DUMB WAITER
2 3 1
2 3 1 2 L.
TIPE Arrival signal Rp Carrier rack up to NW110 Rp Receiving basket up to NW110 Rp Upholstery for carrier basket Rp Carrier NW110, 330 x 76 - red/blue/green/yellow Rp Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) Rp Forwarding Tube PVC 110 x 2.3 - light grey Rp Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey Rp Sleeve PVC 110 x 2.3 L=110 - light grey Rp PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Rp Material support Rp Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm Rp Wall chasing, sparing, and finishing Rp Floor coring Rp
Earthquake device Mimic Panel ( Supervisory Panel ) GENSET
Bahan Mekanikal dan Plumbing - page 134 of 211
NO 1
2 3 4 5 6 7 8 9 10 M. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 N. 1
TIPE Unit Genset type silent, Kapasitas : 1600 KVA Stanby Operation - Pengadaan & Pemasangan Lengkap, Type Silent Capacity 1600 Kva Prime Model SILENT Type, Voltage 380/220 Volt, 3 Phase Starting System, Electric, Cooling System, Radiator (Germany), Frek. 50 HZ Altenator and Intalation Duc Radiator + Sound Atenuator, Ready for Pararel System overnor, Electric + Tanky Harian - 2 Unit Residential Silencer + Exhaust Gas + Compensator Stainless Steel - 2 unit Stronge Battery 200 AH + Their Cable - DC Engine Panel - Certivicate of origin (C.O.D) Engine and Altenator From Origin Manufacture
PRICE 4,230,000,000
unit
2,500,000 6,500,000 95,000,000 45,000,000 6,342,000 12,000,000 18,000,000 1,850,000
unit unit unit unit unit unit unit Ls
16,992,000
unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
305,932,000 276,462,500 845,614,425 459,616,250 58,235,625 34,000,000 21,547,500 28,347,500 16,150,000 19,847,500 10,837,500 11,347,500 5,695,000 1,358,725 1,358,725 1,358,725 1,572,500 1,572,500 1,572,500 1,572,500 1,572,500 1,358,725 1,358,725 1,358,725 1,358,725
set set set set set set set set set set set set set bh bh bh bh bh bh bh bh bh bh bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp
935,000 888,250 359,083 359,083 359,083 237,448 186,150 131,750 82,238
m' m' m' m' m' m' m' m' m'
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
467,500 467,500 637,500 637,500 467,500 1,487,500 1,275,000 297,500 63,750 11,281,519 75,000,000
m' m' m' m' m' set set set m' ls ls
Rp Rp Rp Rp
102,000,000 170,000,000 550,000 4,800,000
lot lot hari btg
Rp
Pemindahan Genset ke Pondasi Rp Radiator Ducting dan Flexible connection Rp Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi Rp Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Rp Hand Pump 15 lpm Rp Intake Attenuator Rp Discharge Attenuator Rp Grounding body genset Rp - Melapis ruang genset dengan rockwool density - 80 KG/M3 , tebal 2 ", glas clot dan kawat ayam Drop KIT CT-1000A Rp GAS MEDIS Sentral Oxygen Automatic System Kap. 2x10 cyl Sentral N2O Automatic System Kap. 2x2 cyl Oil Free Air Compressor - Duplex Vacuum Pump Duplex System Master Alarm 10 function Alarm System for 4 Gases Zone Valve for 4 gases Alarm System for 3 Gases Zone Valve for 3 gases Alarm System for 2 Gases Zone Valve for 2 gases Alarm System for 1 Gases Zone Valve for 1 gases Gas Medis For Oxygen Gas Medis For Valve Gas Medis For Gas Medis Wall Outlet Gas Medis For Oxygen DISS Gas Medis For N2O DISS Gas Medis For Air DISS Gas Medis for VACUM DISS Gas Medis for CO2 DISS Gas Medis for N20 Gas Medis For Vacum Gas Medis For AGSS Gas Medis For Compress Air Pemipaan Gas Medis (Seamless Copper Tube) Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Area Alarm Instalasi Zone Valve Instalasi Gas Medis Wall Outlet Instalasi Pipa Gas Fitting & Accessories Testing & Commisioning PERALATAN UTAMA DEEP WELL Sumur Dalam 120m Sewa Alat dan Mesin Bor Pekerja Bor 5 Orang (1 Deep Well) Cassing 4"
Bahan Mekanikal dan Plumbing - page 135 of 211
NO 2
TIPE Mobillisasi Demobilisasi Mesin Bor Sumur Imbuhan Pekerjaan Persiapan - Mobilisasi dan Demobilisasi Peralatan - Pembersihan Lokasi, Setting Mesin, dll - Pengadaan Lumpur Pengeboran dan Air Sirkulasi - Pengadaan Tempat Tinggal Pekerjaan Pengeboran - Pembuatan Pilot Hole 6" Sampai Kedalaman 130 m - Well Logging untuk Menentukan letak saringan 130 m - Konstruksi Sumur Meliputi Pemasangan Pipa, Casing, dll - Pembersihan Sumur dengan Air Jetting - Reaming (pembesaran Lubang Bor) 130 m - Pumping Test Pengadaian Material - Pipa Casting PVC Rucika AW 6" - Pembuatan Saringan PVC - Sock 6" - Pembuatan Piezometer dengan PVC 3/4 inch - Gravel Pack 4mm - Semen - Lem Paralaon - Alat Pantau Muka Air Tanah (AWLR) - Planes 8" Pembuatan Bak Saringan Ukuran 6000 x 3000 x 2000 mm - Galian Tanah - Pembuangan Galian tanah - pasang Bigesting, Sloof & pengecoran - Pipa 6" - Pipa 4" - Saringan, Gravel - Meter Air - Aksesoris - Pekerjaan Finishing
PRICE 40,000,000
lot
12,000,000.00
lot
Rp
68,230,000
lot
Rp
57,150,000
lot
Rp
85,650,000
lot
Rp
Bahan Mekanikal dan Plumbing - page 136 of 211
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN PERENCANAAN URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT I. A. 1 2 B. 1 2 3 4 5 6 7 8 C. 1 2 3 4 II. 1
Package Pompa Booster, Kapasitas : 200 Lpm Harga Unit Pompa Booster Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Submersible, Kapasitas : 150 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Pompa Submersible, kapasitas : 300 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Sewage Pump Kapasitas : 300 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Sewage Pump Kapasitas : 200 Lpm Harga Unit Pompa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PEKERJAAN DEEPWELL JASA PENGEBORAN Persiapan Lapangan Mobilisasi & Demobilisasi Peralatan Pembuatan Spull bak / Bak sirkulasi Jasa Kontruksi Jasa Bor pilot hole dia 8" Reaming Bor Hole dia. 12" Tenaga kerja ( 5 orang x 60 hari ) Solar/olie/bensin/bahan las Air Kerja Buang Lumpur Bor Electrical Logging Spolling ( Pemberesihan sumur ) Lain - Lain Pumping Test ( 3 hari x 8 jam ) Analisa Air Bersih Foto dan Laporan Pemasangan pompa MATERIAL Pompa Deepwell Kapasitas : 150 ltr/mnt - Head : 150 m 2 Pipa GIP Medium,dia. 6 " 3 Pipa GIP Medium,dia. 3 " 4 Screen Stainless Steel, dia. 3 "
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
56,795,850 1,135,917
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
180,000,000 3,600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
166,500,000 3,330,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
153,000,000 3,060,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
42,171,300 843,426
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,950,000 999,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,000,000 360,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,383,000 267,660
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
56,795,850 1,135,917
Rp Rp Rp Rp Rp
16,000 4,250 57,952,017 1,448,800 59,400,817
Rp Rp
180,000,000 3,600,000
Rp Rp Rp Rp Rp
16,000 4,250 183,620,250 4,590,506 188,210,756
Rp Rp
166,500,000 3,330,000
Rp Rp Rp Rp Rp
16,000 4,250 169,850,250 4,246,256 174,096,506
Rp Rp
153,000,000 3,060,000
Rp Rp Rp Rp Rp
16,000 4,250 156,080,250 3,902,006 159,982,256
Rp Rp
42,171,300 843,426
Rp Rp Rp Rp Rp
16,000 4,250 43,034,976 1,075,874 44,110,850
Rp Rp
49,950,000 999,000
Rp Rp Rp Rp Rp
16,000 4,250 50,969,250 1,274,231 52,243,481
Rp Rp
18,000,000 360,000
Rp Rp Rp Rp Rp
16,000 4,250 18,380,250 459,506 18,839,756
Rp Rp
13,383,000 267,660
Rp Rp Rp Rp Rp
16,000 4,250 13,670,910 341,773 14,012,683
ls Unit
1.000 1.000
Rp Rp
5,000,000 2,000,000
Rp Rp
5,000,000 2,000,000
M' M' Hari Ls Ls Ls St Ls
200.000 77.000 300.000 1.000 1.000 1.000 1.000 1.000
Rp Rp Rp Rp Rp Rp Rp Rp
450,000 250,000 80,000 5,000,000 3,000,000 3,000,000 1,800,000 2,400,000
Rp Rp Rp Rp Rp Rp Rp Rp
90,000,000 19,250,000 24,000,000 5,000,000 3,000,000 3,000,000 1,800,000 2,400,000
Hari Set Set Ls
3.000 1.000 1.000 1.000
Rp Rp Rp Rp
200,000 1,500,000 600,000 1,200,000
Rp Rp Rp Rp
600,000 1,500,000 600,000 1,200,000
Unit
1.000
Rp
35,000,000
Rp
35,000,000
72.000 113.000 15.000
Rp Rp Rp
444,000 216,000 600,000
Rp Rp Rp
31,968,000 24,408,000 9,000,000
M' M' M'
TOTAL HARGA Rp
59,400,817
Rp
188,210,756
Rp
174,096,506
Rp
159,982,256
Rp
44,110,850
Rp
52,243,481
Rp
18,839,756
Rp
14,012,683
Rp
302,315,550
Analisa Harga Satuan Mekanikal dan Plumbing - page 137 of 211
NO. 5 6 7 8 9 10 III. 1 2 3 4 5 6 7 8 IV. 1 2
1 m³
1 m³
1 m³
1 m³
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Dop dia. 3 " Reducer 6 " x 3 " Gravel Tutup Sumur Semen Pasir ACCESSORIES POMPA Panel dan Accesoriesnya Kabel Power, NYY 3 x 4 mm - dari DW ke Panel Kabel WLC, NYMHY 3 x 1,5 mm2 - dari DW ke Panel Electroda Sock / Connector Pipa Hisap GIP Medium dia. 2 " Bak Kontrol Accessories Bak Control ( Manometer, Check valve ) PERIZINAN Izin Sumur dari BPLHD Meter Air 2 " + Tera & segel
Menggali Tanah Sedalam 1 meter Tenaga Kerja: 1. Pekerja 2. Mandor
SAT Bh Pcs M3 Pcs Zak M3
INDEK 1.000 1.000 5.000 1.000 5.000 5.000
Rp Rp Rp Rp Rp Rp
HARGA SATUAN 360,000 360,000 900,000 420,000 72,000 30,000
Rp Rp Rp Rp Rp Rp
JUMLAH HARGA 360,000 360,000 4,500,000 420,000 360,000 150,000
Unit M' M' Pcs Ls M' Unit Ls
1.000 100.000 100.000 6.000 1.000 66.000 1.000 1.000
Rp Rp Rp Rp Rp Rp Rp Rp
3,000,000 42,000 30,000 120,000 600,000 156,000 750,000 1,500,000
Rp Rp Rp Rp Rp Rp Rp Rp
3,000,000 4,200,000 3,000,000 720,000 600,000 10,296,000 750,000 1,500,000
Rp Include
5,000,000
Rp Rp Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,000,000 294,942,000 7,373,550 302,315,550
Ls Ls
hari hari
Menggali Tanah Sedalam 2 meter Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
Menggali Tanah Sedalam 3 meter Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
Mengurug Kembali Galian Tenaga Kerja: 1. Pekerja 2. Mandor
hari hari
SAND FILTER Harga Unit Sand Filter Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CARBON FILTER Harga Unit Carbon Filter Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Chemical Tank + Dosing Pump Chemical Tank + Dosing Pump Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GROUND TANK KAP. 120 m3 GROUND TANK KAP. 120 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 500 m3 PRESSURE TANK KAP. 500 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 1000 m3 PRESSURE TANK KAP. 1000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1.000 1.000
0.7500 0.0250
Rp Rp
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp
Rp Rp
Rp Rp Rp Rp Rp
63,000 4,050 67,050 1,676 68,726
1.0500 0.0670
Rp Rp
Rp Rp Rp Rp Rp
73,500 6,030 79,530 1,988 81,518
0.2500 0.0083
Rp Rp
Rp Rp Rp Rp Rp
17,500 750 18,250 456 18,706
unit lot
1.00 1.00
Rp Rp
Rp Rp
23,715,000 474,300
hari hari
0.20 0.05
Rp Rp
Rp Rp Rp Rp Rp
16,000 4,250 24,209,550 605,239 24,814,789
unit lot
1.00 1.00
Rp Rp
Rp Rp
24,043,560 480,871
hari hari
0.20 0.05
Rp Rp
Rp Rp Rp Rp Rp
16,000 4,250 24,544,681 613,617 25,158,298
unit lot
1.00 1.00
Rp Rp
Rp Rp
3,500,000 70,000
hari hari
0.20 0.10
Rp Rp
Rp Rp Rp Rp Rp
16,000 8,500 3,594,500 89,863 3,684,363
unit lot
1.00 1.00
Rp Rp
Rp Rp
20,000,000 400,000
hari hari
0.10 0.03
Rp Rp
Rp Rp Rp Rp Rp
8,000 2,125 20,410,125 510,253 20,920,378
unit lot
1.00 1.00
Rp Rp
Rp Rp
15,000,000 300,000
hari hari
0.10 0.03
Rp Rp
Rp Rp Rp Rp Rp
8,000 2,125 15,310,125 382,753 15,692,878
unit lot
1.00 1.00
Rp Rp
30,000,000 600,000
Rp Rp
30,000,000 600,000
hari hari
0.20 0.05
Rp Rp
80,000 85,000 Jumlah
Rp Rp Rp
16,000 4,250 30,620,250
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
23,715,000 474,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
24,043,560 480,871
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
20,000,000 400,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
15,000,000 300,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp
56,119
Rp
68,726
Rp
81,518
Rp
18,706
Rp
24,814,789
Rp
25,158,298
Rp
3,684,363
Rp
20,920,378
Rp
15,692,878
Rp
31,385,756
52,500 2,250 54,750 1,369 56,119
0.9000 0.0450
70,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Analisa Harga Satuan Mekanikal dan Plumbing - page 138 of 211
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 SET 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
PRESSURE TANK KAP. 1500 m3 PRESSURE TANK KAP. 1500 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 2000 m3 PRESSURE TANK KAP. 2000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE TANK KAP. 3000 m3 PRESSURE TANK KAP. 3000 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 20 MM (1/2") FLOATING VALVE DIA. 20 MM (1/2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 25 MM (3/4") FLOATING VALVE DIA. 25 MM (3/4") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 32 MM (1") FLOATING VALVE DIA. 32 MM (1") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 50 MM (1 1/2") FLOATING VALVE DIA. 50 MM (1 1/2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOATING VALVE DIA. 63 MM (2") FLOATING VALVE DIA. 63 MM (2") Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
WATER LEVEL CONTROL WATER LEVEL CONTROL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Vent Out (VO) Vent Out (VO) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Elektrik Water Heater (EWH) Elektrik Water Heater (EWH) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 765,506 Total = Jumlah+(Keuntungan 2,5%) Rp 31,385,756
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
40,000,000 800,000
Rp Rp
40,000,000 800,000
Rp Rp Rp Rp Rp
16,000 4,250 40,820,250 1,020,506 41,840,756
Rp Rp
60,000,000 1,200,000
Rp Rp Rp Rp Rp
16,000 4,250 61,220,250 1,530,506 62,750,756
Rp Rp
120,000,000 2,400,000
Rp Rp Rp Rp Rp
16,000 4,250 122,420,250 3,060,506 125,480,756
Rp Rp
242,000 4,840
Rp Rp Rp Rp Rp
4,800 1,275 252,915 6,323 259,238
Rp Rp
286,000 5,720
Rp Rp Rp Rp Rp
4,800 1,275 297,795 7,445 305,240
Rp Rp
363,000 7,260
Rp Rp Rp Rp Rp
4,800 1,275 376,335 9,408 385,743
Rp Rp
475,900 9,518
Rp Rp Rp Rp Rp
4,800 1,275 491,493 12,287 503,780
Rp Rp
1,250,000 25,000
Rp Rp Rp Rp Rp
4,800 1,275 1,281,075 32,027 1,313,102
Rp Rp
2,549,300 50,986
Rp Rp Rp Rp Rp
4,800 1,275 2,606,361 65,159 2,671,520
Rp Rp
250,000 5,000
Rp Rp Rp Rp Rp
4,800 1,275 261,075 6,527 267,602
3,298,000 65,960
Rp Rp
3,298,000 65,960
80,000 85,000 Jumlah
Rp Rp Rp
66,400 17,638 3,447,998
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
60,000,000 1,200,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
120,000,000 2,400,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
242,000 4,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
286,000 5,720
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
363,000 7,260
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
475,900 9,518
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,250,000 25,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,549,300 50,986
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,000 5,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
41,840,756
Rp
62,750,756
Rp
125,480,756
Rp
259,238
Rp
305,240
Rp
385,743
Rp
503,780
Rp
1,313,102
Rp
2,671,520
Rp
267,602
Rp
3,534,197
Analisa Harga Satuan Mekanikal dan Plumbing - page 139 of 211
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
Heat Pump Water Heater, kap. 25.5 kW Heat Pump Water Heater, kap. 25.5 kW Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Heat Pump Water Heater, kap. 43 kW Heat Pump Water Heater, kap. 43 kW Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Pompa Return, kap. 5 M3/h - Head. 20 m Pompa Return, kap. 5 M3/h - Head. 20 m Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Package Treatment Pump 150 Lpm Package Treatment Pump 150 Lpm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
WTP (Water Treatment Plant) Include All WTP (Water Treatment Plant) Include All Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.50 MM' FLEXIBLE JOINT DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 86,200 Total = Jumlah+(Keuntungan 2,5%) Rp 3,534,197
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.83 0.21
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.10 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.10 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.02
Rp Rp
175,590,000 3,511,800
Rp Rp
175,590,000 3,511,800
Rp Rp Rp Rp Rp
66,400 17,638 179,185,838 4,479,646 183,665,483
Rp Rp
342,800,000 6,856,000
Rp Rp Rp Rp Rp
66,400 17,638 349,740,038 8,743,501 358,483,538
Rp Rp
18,300,000 366,000
Rp Rp Rp Rp Rp
66,400 17,638 18,750,038 468,751 19,218,788
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
66,400 17,638 13,752,038 343,801 14,095,838
Rp Rp
7,700,000 154,000
Rp Rp Rp Rp Rp
66,400 17,638 7,938,038 198,451 8,136,488
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
66,400 17,638 13,752,038 343,801 14,095,838
Rp Rp
3,800,000 76,000
Rp Rp Rp Rp Rp
66,400 17,638 3,960,038 99,001 4,059,038
Rp Rp
378,099,369 7,561,987
Rp Rp Rp Rp Rp
66,400 17,638 385,745,394 9,643,635 395,389,029
Rp Rp
963,000 19,260
Rp Rp Rp Rp Rp
8,000 2,125 992,385 24,810 1,017,195
Rp Rp
747,000 14,940
Rp Rp Rp Rp Rp
8,000 2,125 772,065 19,302 791,367
612,000 12,240
Rp Rp
612,000 12,240
80,000 85,000 Jumlah
Rp Rp Rp
6,400 1,700 632,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
342,800,000 6,856,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000 366,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,700,000 154,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,800,000 76,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,099,369 7,561,987
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
963,000 19,260
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
747,000 14,940
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
183,665,483
Rp
358,483,538
Rp
19,218,788
Rp
14,095,838
Rp
8,136,488
Rp
14,095,838
Rp
4,059,038
Rp
395,389,029
Rp
1,017,195
Rp
791,367
Rp
648,149
Analisa Harga Satuan Mekanikal dan Plumbing - page 140 of 211
URAIAN
NO.
1 BH 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
FLEXIBLE JOINT DIA.32 MM' FLEXIBLE JOINT DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PANEL KONTROL POMPA PANEL KONTROL POMPA Instalasi Upah Pasang : Tukang Listrik Kepala tukang Listrik
STRAINER DIA.150 MM' STRAINER DIA.150 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.100 MM' STRAINER DIA.100 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.65 MM' STRAINER DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.40 MM' STRAINER DIA.40 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
STRAINER DIA.32 MM' STRAINER DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.80 MM' CHECK VALVE DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.65 MM' CHECK VALVE DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.50 MM' CHECK VALVE DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.32 MM' CHECK VALVE DIA.32 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 15,809 Total = Jumlah+(Keuntungan 2,5%) Rp 648,149
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.30 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.16 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.14 0.04
Rp Rp
459,000 9,180
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,500,000 170,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,655,000 213,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,042,000 100,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,989,000 59,780
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
975,000 19,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
742,000 14,840
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,437,000 88,740
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,684,000 73,680
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,749,000 54,980
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 550,000 11,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
459,000 9,180
Rp Rp Rp Rp Rp
6,400 1,700 476,280 11,907 488,187
Rp Rp
8,500,000 170,000
Rp Rp Rp Rp Rp
24,000 6,375 8,700,375 217,509 8,917,884
Rp Rp
10,655,000 213,100
Rp Rp Rp Rp Rp
12,800 3,400 10,884,300 272,108 11,156,408
Rp Rp
5,042,000 100,840
Rp Rp Rp Rp Rp
12,800 3,400 5,159,040 128,976 5,288,016
Rp Rp
2,989,000 59,780
Rp Rp Rp Rp Rp
11,200 2,975 3,062,955 76,574 3,139,529
Rp Rp
975,000 19,500
Rp Rp Rp Rp Rp
11,200 2,975 1,008,675 25,217 1,033,892
Rp Rp
742,000 14,840
Rp Rp Rp Rp Rp
11,200 2,975 771,015 19,275 790,290
Rp Rp
4,437,000 88,740
Rp Rp Rp Rp Rp
12,800 3,400 4,541,940 113,549 4,655,489
Rp Rp
3,684,000 73,680
Rp Rp Rp Rp Rp
12,800 3,400 3,773,880 94,347 3,868,227
Rp Rp
2,749,000 54,980
Rp Rp Rp Rp Rp
11,200 2,975 2,818,155 70,454 2,888,609
Rp Rp
550,000 11,000
Rp Rp Rp Rp
11,200 2,975 575,175 14,379
TOTAL HARGA
Rp
488,187
Rp
8,917,884
Rp
11,156,408
Rp
5,288,016
Rp
3,139,529
Rp
1,033,892
Rp
790,290
Rp
4,655,489
Rp
3,868,227
Rp
2,888,609
Rp
589,554
Analisa Harga Satuan Mekanikal dan Plumbing - page 141 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PIPA PVC Dia. 2” (63mm) PIPA PVC Dia. 2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 2 1/2” (75mm) PIPA PVC Dia. 2 1/2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 3” (90mm) PIPA PVC Dia. 3” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 4” (110mm) PIPA PVC Dia. 4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 6” (160mm) PIPA PVC Dia. 6” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 8” (200mm) PIPA PVC Dia. 8” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA PVC Dia. 10” (250mm) PIPA PVC Dia. 10” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 1" (32mm) PIPA BSP SCH.40 Dia. 1” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 1 1/4" (40mm) PIPA BSP SCH.40 Dia. 1 1/4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 2" (63mm) PIPA BSP SCH.40 Dia. 2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 2 1/2" (70mm) PIPA BSP SCH. 40 Dia. 2 1/2” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 589,554
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
21,625 7,569
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
31,550 11,043
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
44,450 15,558
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
73,650 25,778
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
163,675 57,286
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
274,675 96,136
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
424,725 148,654
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
36,667 12,833
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 17,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
79,333 27,767
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
126,500 44,275
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
21,625 7,569
Rp Rp Rp Rp Rp
6,667 3,542 39,402 985 40,387
Rp Rp
31,550 11,043
Rp Rp Rp Rp Rp
6,667 3,542 52,801 1,320 54,121
Rp Rp
44,450 15,558
Rp Rp Rp Rp Rp
6,667 3,542 70,216 1,755 71,971
Rp Rp
73,650 25,778
Rp Rp Rp Rp Rp
5,333 2,833 107,594 2,690 110,284
Rp Rp
163,675 57,286
Rp Rp Rp Rp Rp
6,667 3,542 231,170 5,779 236,949
Rp Rp
274,675 96,136
Rp Rp Rp Rp Rp
6,667 3,542 381,020 9,525 390,545
Rp Rp
424,725 148,654
Rp Rp Rp Rp Rp
6,667 3,542 583,587 14,590 598,177
Rp Rp
36,667 12,833
Rp Rp Rp Rp Rp
4,000 2,125 55,625 1,391 57,016
Rp Rp
50,000 17,500
Rp Rp Rp Rp Rp
4,000 2,125 73,625 1,841 75,466
Rp Rp
79,333 27,767
Rp Rp Rp Rp Rp
5,333 2,833 115,267 2,882 118,148
Rp Rp
126,500 44,275
Rp Rp Rp Rp Rp
5,333 2,833 178,942 4,474 183,415
TOTAL HARGA Rp
40,387
Rp
54,121
Rp
71,971
Rp
110,284
Rp
236,949
Rp
390,545
Rp
598,177
Rp
57,016
Rp
75,466
Rp
118,148
Rp
183,415
Analisa Harga Satuan Mekanikal dan Plumbing - page 142 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PIPA BSP SCH.40 DIA. 3" (90mm) PIPA BSP SCH. 40 Dia. 3” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 4" (110mm) PIPA BSP SCH.40 Dia. 4” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 6" (160mm) PIPA BSP SCH. Dia. 6” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA BSP SCH.40 DIA. 8" (200mm) PIPA BSP SCH.40 Dia. 8” Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 20 mm ( 1/2") PPR PN-10 Ø 20 mm ( 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 25 mm ( 3/4") PPR PN-10 Ø 25 mm ( 3/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 32 mm ( 1") PPR PN-10 Ø 32 mm ( 1") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 40 mm (1 1/4") PPR PN-10 Ø 40 mm (1 1/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 50 mm (1 1/2") PPR PN-10 Ø 50 mm (1 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 63 mm (2") PPR PN-10 Ø 63 mm (2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 75 mm (2 1/2") PPR PN-10 Ø 75 mm (2 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.02 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
164,833 57,692
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
234,500 82,075
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
410,000 143,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
626,667 219,333
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,386 2,935
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,577 4,052
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,665 6,533
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
28,585 10,005
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,947 15,381
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,875 24,806
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
108,675 38,036
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
164,833 57,692
Rp Rp Rp Rp Rp
6,667 3,542 232,733 5,818 238,552
Rp Rp
234,500 82,075
Rp Rp Rp Rp Rp
6,667 3,542 326,783 8,170 334,953
Rp Rp
410,000 143,500
Rp Rp Rp Rp Rp
6,667 3,542 563,708 14,093 577,801
Rp Rp
626,667 219,333
Rp Rp Rp Rp Rp
6,667 3,542 856,208 21,405 877,614
Rp Rp
8,386 2,935
Rp Rp Rp Rp Rp
1,333 708 13,363 334 13,697
Rp Rp
11,577 4,052
Rp Rp Rp Rp Rp
2,000 1,063 18,692 467 19,159
Rp Rp
18,665 6,533
Rp Rp Rp Rp Rp
2,000 1,063 28,260 706 28,966
Rp Rp
28,585 10,005
Rp Rp Rp Rp Rp
2,000 1,063 41,653 1,041 42,694
Rp Rp
43,947 15,381
Rp Rp Rp Rp Rp
2,333 1,240 62,901 1,573 64,473
Rp Rp
70,875 24,806
Rp Rp Rp Rp Rp
2,333 1,240 99,254 2,481 101,736
Rp Rp
108,675 38,036
Rp Rp Rp Rp Rp
2,333 1,240 150,284 3,757 154,041
TOTAL HARGA Rp
238,552
Rp
334,953
Rp
577,801
Rp
877,614
Rp
13,697
Rp
19,159
Rp
28,966
Rp
42,694
Rp
64,473
Rp
101,736
Rp
154,041
Analisa Harga Satuan Mekanikal dan Plumbing - page 143 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
PPR PN-10 Ø 90 mm (3") PPR PN-10 Ø 90 mm (3") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 110 mm (4") PPR PN-10 Ø 110 mm (4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 125 mm (5") PPR PN-10 Ø 125 mm (5") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-10 Ø 160 mm (6") PPR PN-10 Ø 160 mm (6") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 20 mm ( 1/2") PPR PN-20 Ø 20 mm ( 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 25 mm ( 3/4") PPR PN-20 Ø 25 mm ( 3/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 32 mm ( 1") PPR PN-20 Ø 32 mm ( 1") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 40 mm (1 1/4") PPR PN-20 Ø 40 mm (1 1/4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 50 mm (1 1/2") PPR PN-20 Ø 50 mm (1 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 63 mm (2") PPR PN-20 Ø 63 mm (2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 75 mm (2 1/2") PPR PN-20 Ø 75 mm (2 1/2") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
155,925 54,574
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
236,250 82,688
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
865,064 302,772
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
559,913 195,969
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,813 4,134
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,665 6,533
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,772 10,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
47,250 16,538
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
70,875 24,806
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
115,763 40,517
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
174,825 61,189
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
155,925 54,574
Rp Rp Rp Rp Rp
2,333 1,240 214,072 5,352 219,423
Rp Rp
236,250 82,688
Rp Rp Rp Rp Rp
2,333 1,240 322,510 8,063 330,573
Rp Rp
865,064 302,772
Rp Rp Rp Rp Rp
2,333 1,240 1,171,409 29,285 1,200,694
Rp Rp
559,913 195,969
Rp Rp Rp Rp Rp
2,333 1,240 759,455 18,986 778,441
Rp Rp
11,813 4,134
Rp Rp Rp Rp Rp
2,333 1,240 19,520 488 20,008
Rp Rp
18,665 6,533
Rp Rp Rp Rp Rp
2,333 1,240 28,770 719 29,490
Rp Rp
29,772 10,420
Rp Rp Rp Rp Rp
2,333 1,240 43,765 1,094 44,859
Rp Rp
47,250 16,538
Rp Rp Rp Rp Rp
2,333 1,240 67,360 1,684 69,044
Rp Rp
70,875 24,806
Rp Rp Rp Rp Rp
2,333 1,240 99,254 2,481 101,736
Rp Rp
115,763 40,517
Rp Rp Rp Rp Rp
2,333 1,240 159,852 3,996 163,849
Rp Rp
174,825 61,189
Rp Rp Rp Rp Rp
2,333 1,240 239,587 5,990 245,576
TOTAL HARGA Rp
219,423
Rp
330,573
Rp
1,200,694
Rp
778,441
Rp
20,008
Rp
29,490
Rp
44,859
Rp
69,044
Rp
101,736
Rp
163,849
Rp
245,576
Analisa Harga Satuan Mekanikal dan Plumbing - page 144 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1M 1 2 3
PPR PN-20 Ø 90 mm (3") PPR PN-20 Ø 90 mm (3") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 110 mm (4") PPR PN-20 Ø 110 mm (4") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 125 mm (5") PPR PN-20 Ø 125 mm (5") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PPR PN-20 Ø 160 mm (6") PPR PN-20 Ø 160 mm (6") Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 150 mm PIPA HEADER Dia. 150 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 100 mm PIPA HEADER Dia. 100 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 90 mm PIPA HEADER Dia. 90 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 80 mm PIPA HEADER Dia. 80 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 63 mm PIPA HEADER Dia. 63 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PIPA HEADER Dia. 32 mm PIPA HEADER Dia. 32 mm Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 10" (250 mm) + RRJ Power Lock PN 10 Diameter 10" (250 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
Meter ls
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
259,875 90,956
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 132,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
374,993 131,248
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
897,750 314,213
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,316,740 1,860,859
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,579,270 902,745
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,054,130 368,946
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
735,460 257,411
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
516,560 180,796
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
135,300 47,355
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
969,265 339,243
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
259,875 90,956
Rp Rp Rp Rp Rp
2,333 1,240 354,404 8,860 363,264
Rp Rp
378,000 132,300
Rp Rp Rp Rp Rp
2,333 1,240 513,873 12,847 526,720
Rp Rp
374,993 131,248
Rp Rp Rp Rp Rp
2,333 1,240 509,814 12,745 522,559
Rp Rp
897,750 314,213
Rp Rp Rp Rp Rp
2,333 1,240 1,215,535 30,388 1,245,924
Rp Rp
5,316,740 1,860,859
Rp Rp Rp Rp Rp
16,000 4,250 7,197,849 179,946 7,377,795
Rp Rp
2,579,270 902,745
Rp Rp Rp Rp Rp
16,000 4,250 3,502,265 87,557 3,589,821
Rp Rp
1,054,130 368,946
Rp Rp Rp Rp Rp
16,000 4,250 1,443,326 36,083 1,479,409
Rp Rp
735,460 257,411
Rp Rp Rp Rp Rp
16,000 4,250 1,013,121 25,328 1,038,449
Rp Rp
516,560 180,796
Rp Rp Rp Rp Rp
16,000 4,250 717,606 17,940 735,546
Rp Rp
135,300 47,355
Rp Rp Rp Rp Rp
16,000 4,250 202,905 5,073 207,978
Rp Rp
969,265 339,243
Rp Rp Rp Rp Rp
16,000 4,250 1,328,758 33,219 1,361,976
TOTAL HARGA Rp
363,264
Rp
526,720
Rp
522,559
Rp
1,245,924
Rp
7,377,795
Rp
3,589,821
Rp
1,479,409
Rp
1,038,449
Rp
735,546
Rp
207,978
Rp
1,361,976
Analisa Harga Satuan Mekanikal dan Plumbing - page 145 of 211
URAIAN
NO. 1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
PN 10 Diameter 8" (200 mm) + RRJ Power Lock PN 10 Diameter 8" (200 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 6" (160 mm) + RRJ Power Lock PN 10 Diameter 6" (160 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 4" (110 mm) + RRJ Power Lock PN 10 Diameter 4" (110 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 3" (90 mm) + RRJ Power Lock PN 10 Diameter 3" (90 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
PN 10 Diameter 2" (63 mm) + RRJ Power Lock PN 10 Diameter 2" (63 mm) + RRJ Power Lock Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Taman Putar Keran Taman Putar Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Taman Biasa Keran Taman Biasa Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Keran Air Bersih & Air Panas (stailess) Keran Air Bersih & Air Panas (stailess) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.20 MM /10 Kg GATE VALVE DIA.20 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.32 MM /10 Kg GATE VALVE DIA.32 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.50 MM /10 Kg GATE VALVE DIA.50 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAT
INDEK
HARGA SATUAN
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
m ls
1.00 1.00
Rp Rp
hari hari
0.20 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.01
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
858,721 300,552
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
716,351 250,723
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
596,209 208,673
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
454,582 159,104
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,855 87,799
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
98,000 1,960
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
32,000 640
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
467,000 9,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
277,000 5,540
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
467,000 9,340
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,066,000 61,320
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
858,721 300,552
Rp Rp Rp Rp Rp
16,000 4,250 1,179,523 29,488 1,209,012
Rp Rp
716,351 250,723
Rp Rp Rp Rp Rp
16,000 4,250 987,324 24,683 1,012,007
Rp Rp
596,209 208,673
Rp Rp Rp Rp Rp
16,000 4,250 825,132 20,628 845,761
Rp Rp
454,582 159,104
Rp Rp Rp Rp Rp
16,000 4,250 633,935 15,848 649,784
Rp Rp
250,855 87,799
Rp Rp Rp Rp Rp
16,000 4,250 358,904 8,973 367,876
Rp Rp
98,000 1,960
Rp Rp Rp Rp Rp
2,333 620 102,913 2,573 105,486
Rp Rp
32,000 640
Rp Rp Rp Rp Rp
2,333 620 35,593 890 36,483
Rp Rp
467,000 9,340
Rp Rp Rp Rp Rp
2,333 620 479,293 11,982 491,275
Rp Rp
277,000 5,540
Rp Rp Rp Rp Rp
6,667 2,361 291,568 7,289 298,857
Rp Rp
467,000 9,340
Rp Rp Rp Rp Rp
6,667 2,361 485,368 12,134 497,502
Rp Rp
3,066,000 61,320
Rp Rp Rp Rp Rp
13,333 4,722 3,145,376 78,634 3,224,010
TOTAL HARGA Rp
1,209,012
Rp
1,012,007
Rp
845,761
Rp
649,784
Rp
367,876
Rp
105,486
Rp
36,483
Rp
491,275
Rp
298,857
Rp
497,502
Rp
3,224,010
Analisa Harga Satuan Mekanikal dan Plumbing - page 146 of 211
URAIAN
NO. 1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
GATE VALVE DIA.65 MM /10 Kg GATE VALVE DIA.65 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.80 MM /10 Kg GATE VALVE DIA.80 MM / 10 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Water Hammer Water Hammer Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 150 mm FLOOR CLEAN OUT DIA. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 100 mm FLOOR CLEAN OUT DIA. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 80 mm FLOOR CLEAN OUT DIA. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 65 mm FLOOR CLEAN OUT DIA. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOOR CLEAN OUT DIA. 50 mm FLOOR CLEAN OUT DIA. 50 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM Instalasi Upah Pasang :
SAT
INDEK
HARGA SATUAN
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
1.00 1.00
Rp Rp
Unit Ls
3,578,000 71,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,483,000 89,660
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,354,545 27,091
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 415,000 8,300
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 305,000 6,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
250,000 5,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
222,500 4,450
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
166,500 3,330
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
837,500,000 8,375,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 402,000,000 4,020,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 251,250,000 2,512,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 100,500,000 2,010,000
JUMLAH HARGA Rp Rp
3,578,000 71,560
Rp Rp Rp Rp Rp
13,333 4,722 3,667,616 91,690 3,759,306
Rp Rp
4,483,000 89,660
Rp Rp Rp Rp Rp
13,333 4,722 4,590,716 114,768 4,705,483
Rp Rp
1,354,545 27,091
Rp Rp Rp Rp Rp
40,000 21,250 1,442,886 36,072 1,478,959
Rp Rp
415,000 8,300
Rp Rp Rp Rp Rp
4,000 2,125 429,425 10,736 440,161
Rp Rp
305,000 6,100
Rp Rp Rp Rp Rp
4,000 2,125 317,225 7,931 325,156
Rp Rp
250,000 5,000
Rp Rp Rp Rp Rp
4,000 2,125 261,125 6,528 267,653
Rp Rp
222,500 4,450
Rp Rp Rp Rp Rp
4,000 2,125 233,075 5,827 238,902
Rp Rp
166,500 3,330
Rp Rp Rp Rp Rp
4,000 2,125 175,955 4,399 180,354
Rp Rp
837,500,000 8,375,000
Rp Rp Rp Rp Rp
80,000 42,500 845,997,500 21,149,938 867,147,438
Rp Rp
402,000,000 4,020,000
Rp Rp Rp Rp Rp
80,000 42,500 406,142,500 10,153,563 416,296,063
Rp Rp
251,250,000 2,512,500
Rp Rp Rp Rp Rp
80,000 42,500 253,885,000 6,347,125 260,232,125
Rp Rp
100,500,000 2,010,000
TOTAL HARGA Rp
3,759,306
Rp
4,705,483
Rp
1,478,959
Rp
440,161
Rp
325,156
Rp
267,653
Rp
238,902
Rp
180,354
Rp
867,147,438
Rp
416,296,063
Rp
260,232,125
Rp
105,198,313
Analisa Harga Satuan Mekanikal dan Plumbing - page 147 of 211
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
TANKI AIR KAP.20 M3, PANEL FRV SYSTEM TANKI AIR KAP.20 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.18 M3, PANEL FRV SYSTEM TANKI AIR KAP.18 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.16 M3, PANEL FRV SYSTEM TANKI AIR KAP.16 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP.15 M3, PANEL FRV SYSTEM TANKI AIR KAP.15 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 150 mm Roof Drain dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 100 mm Roof Drain dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 80 mm Roof Drain dia. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Roof Drain dia. 65 mm Roof Drain dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BAK KONTROL BAK KONTROL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Water Meter 1 Water Meter
SAT hari hari
INDEK 1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
Unit Ls
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.03 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.33
Rp Rp
1.00
Rp
unit
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 67,000,000 1,340,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 60,300,000 1,206,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 53,600,000 1,072,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 50,250,000 1,005,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,100,000 402,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,400,000 268,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 180,000 3,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
120,000 2,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
100,000 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 1,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
317,200 6,344
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,793,000
Rp Rp Rp Rp Rp
JUMLAH HARGA 80,000 42,500 102,632,500 2,565,813 105,198,313
Rp Rp
67,000,000 1,340,000
Rp Rp Rp Rp Rp
80,000 42,500 68,462,500 1,711,563 70,174,063
Rp Rp
60,300,000 1,206,000
Rp Rp Rp Rp Rp
80,000 42,500 61,628,500 1,540,713 63,169,213
Rp Rp
53,600,000 1,072,000
Rp Rp Rp Rp Rp
80,000 42,500 54,794,500 1,369,863 56,164,363
Rp Rp
50,250,000 1,005,000
Rp Rp Rp Rp Rp
80,000 42,500 51,377,500 1,284,438 52,661,938
Rp Rp
20,100,000 402,000
Rp Rp Rp Rp Rp
80,000 42,500 20,624,500 515,613 21,140,113
Rp Rp
13,400,000 268,000
Rp Rp Rp Rp Rp
80,000 42,500 13,790,500 344,763 14,135,263
Rp Rp
180,000 3,600
Rp Rp Rp Rp Rp
2,667 1,417 187,683 4,692 192,375
Rp Rp
120,000 2,400
Rp Rp Rp Rp Rp
2,667 1,417 126,483 3,162 129,645
Rp Rp
100,000 2,000
Rp Rp Rp Rp Rp
2,667 1,417 106,083 2,652 108,735
Rp Rp
50,000 1,000
Rp Rp Rp Rp Rp
2,667 1,417 55,083 1,377 56,460
Rp Rp
317,200 6,344
Rp Rp Rp Rp Rp
53,333 28,333 405,211 10,130 415,341
Rp
1,793,000
TOTAL HARGA
Rp
70,174,063
Rp
63,169,213
Rp
56,164,363
Rp
52,661,938
Rp
21,140,113
Rp
14,135,263
Rp
192,375
Rp
129,645
Rp
108,735
Rp
56,460
Rp
415,341
Rp
1,916,436
Analisa Harga Satuan Mekanikal dan Plumbing - page 148 of 211
URAIAN
NO. 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
1 UNIT 1 2 3 4
Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
AAV AAV Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 20 m3 SEPTIK TANK BIOLOGICAL SISTEM 20 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 40 m3 SEPTIK TANK BIOLOGICAL SISTEM 40 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SEPTIK TANK BIOLOGICAL SISTEM 50 m3 SEPTIK TANK BIOLOGICAL SISTEM 50 m3 Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GREASE TRAP GREASE TRAP Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Blower Aersai IPAL Blower Aersai IPAL Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BED ELEVATOR BED ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
BED ELEVATOR BED ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
PASSENGER ELEVATOR PASSENGER ELEVATOR Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
ESCALATOR ESCALATOR Biaya pasang & Disnaker Biaya Pengiriman unit Escalator ke lokasi proyek Upah Pasang : Pekerja Kepala Tukang Listrik
1 UNIT DUMB WAITER 200 1 DW 200 - 24 - 4/4 Floor Type 2 Biaya pasang & Disnaker
SAT lot
INDEK 1.00
Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
2.00 0.90
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
1.50 0.75
Rp Rp
Unit lot
1.00 1.00
Rp Rp
hari hari
1.50 0.75
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
1.00 1.00
Rp Rp
Unit Unit
HARGA SATUAN 35,860
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,507,000 30,140
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 56,000,000 1,120,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 140,000,000 2,800,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 180,000,000 3,600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,139,600 82,792
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
27,000,000 540,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
801,930,000 15,000,000 35,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
563,830,000 15,000,000 35,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
755,110,000 5,000,000 21,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
513,000,000 25,000,000 15,000,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
134,000,000 20,000,000
Rp
JUMLAH HARGA 35,860
Rp Rp Rp Rp Rp
26,667 14,167 1,869,693 46,742 1,916,436
Rp Rp
1,507,000 30,140
Rp Rp Rp Rp Rp
26,667 14,167 1,577,973 39,449 1,617,423
Rp Rp
56,000,000 1,120,000
Rp Rp Rp Rp Rp
160,000 76,500 57,356,500 1,433,913 58,790,413
Rp Rp
140,000,000 2,800,000
Rp Rp Rp Rp Rp
160,000 76,500 143,036,500 3,575,913 146,612,413
Rp Rp
180,000,000 3,600,000
Rp Rp Rp Rp Rp
160,000 76,500 183,836,500 4,595,913 188,432,413
Rp Rp
4,139,600 82,792
Rp Rp Rp Rp Rp
120,000 63,750 4,406,142 110,154 4,516,296
Rp Rp
27,000,000 540,000
Rp Rp Rp Rp Rp
120,000 63,750 27,723,750 693,094 28,416,844
Rp Rp Rp
801,930,000 15,000,000 35,000,000
Rp Rp Rp Rp Rp
140,000 85,000 852,155,000 21,303,875 873,458,875
Rp Rp Rp
563,830,000 15,000,000 35,000,000
Rp Rp Rp Rp Rp
140,000 85,000 614,055,000 15,351,375 629,406,375
Rp Rp Rp
755,110,000 5,000,000 21,000,000
Rp Rp Rp Rp Rp
140,000 85,000 781,335,000 19,533,375 800,868,375
Rp Rp Rp
513,000,000 25,000,000 15,000,000
Rp Rp Rp Rp Rp
140,000 85,000 553,225,000 13,830,625 567,055,625
Rp Rp
134,000,000 20,000,000
TOTAL HARGA
Rp
1,617,423
Rp
58,790,413
Rp
146,612,413
Rp
188,432,413
Rp
4,516,296
Rp
28,416,844
Rp
873,458,875
Rp
629,406,375
Rp
800,868,375
Rp
567,055,625
Rp
160,643,125
Analisa Harga Satuan Mekanikal dan Plumbing - page 149 of 211
NO. 3 4
1 UNIT 1 2 3 4
1 LS 1 2
1 SET 1 2
1 SET 1 2
URAIAN Biaya Pengiriman unit Escalator ke lokasi proyek Upah Pasang : Pekerja Kepala Tukang Listrik
DUMB WAITER 50 DW 50 - 24 - 2/2 Floor Type Biaya Pengiriman unit Escalator ke lokasi proyek Biaya pasang & Disnaker Upah Pasang : Pekerja Kepala Tukang Listrik
Earthquake device Earthquake device Upah Pasang : Tukang pipa Kepala tukang pipa
Mimic Panel ( Supervisory Panel ) Mimic Panel ( Supervisory Panel ) Upah Pasang : Tukang pipa Kepala tukang pipa
Blower Blower Upah Pasang : Tukang pipa Kepala tukang pipa
1 LOT Skyrail V1 Software license package 10 units 1 Skyrail V1 Software license package 10 units 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Bus Converter 1 Bus Converter 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Power Pack 230V - 36VDC 1 Power Pack 230V - 36VDC 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT PC Win. 10, 64 Bit 1 PC Win. 10, 64 Bit 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT LG LED Monitor 19" 1 LG LED Monitor 19" 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT UPS c/w Battery Back-up 1 UPS c/w Battery Back-up 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT 3-way Diverter NW110 1 3-way Diverter NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT 3-way Diverter NW110 (Transfer Unnit) 1 3-way Diverter NW110 (Transfer Unnit)
SAT Unit
INDEK 1.00
Rp
hari hari
2.00 1.00
Rp Rp
Unit Unit Unit
1.00 1.00 1.00
Rp Rp Rp
hari hari
2.00 1.00
Rp Rp
ls
1.00
Rp
hari hari
0.09 0.05
Rp Rp
ls
1.00
Rp
hari hari
0.09 0.05
Rp Rp
set
1.00
Rp
hari hari
0.09 0.05
Rp Rp
lot
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1.00
Rp
unit
HARGA SATUAN 2,500,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
109,250,000 20,000,000 2,500,000
70,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,585,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,000,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
187,950,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
31,500,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
16,810,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 11,867,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,500,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,100,000
Rp
JUMLAH HARGA 2,500,000
Rp Rp Rp Rp Rp
140,000 85,000 156,725,000 3,918,125 160,643,125
Rp Rp Rp
109,250,000 20,000,000 2,500,000
Rp Rp Rp Rp Rp
140,000 85,000 131,975,000 3,299,375 135,274,375
Rp
13,585,000
Rp Rp Rp Rp Rp
7,200 4,250 13,596,450 339,911 13,936,361
Rp
5,000,000
Rp Rp Rp Rp Rp
7,200 4,250 5,011,450 125,286 5,136,736
Rp
187,950,000
Rp Rp Rp Rp Rp
7,200 4,250 187,961,450 4,699,036 192,660,486
Rp
31,500,000
Rp Rp Rp Rp Rp
7,200 3,825 31,511,025 787,776 32,298,801
Rp
16,810,000
Rp Rp Rp Rp Rp
7,200 3,825 16,821,025 420,526 17,241,551
Rp
11,867,500
Rp Rp Rp Rp Rp
7,200 3,825 11,878,525 296,963 12,175,488
Rp
14,500,000
Rp Rp Rp Rp Rp
7,200 3,825 14,511,025 362,776 14,873,801
Rp
8,250,000
Rp Rp Rp Rp Rp
7,200 3,825 8,261,025 206,526 8,467,551
Rp
18,300,000
Rp Rp Rp Rp Rp
7,200 3,825 18,311,025 457,776 18,768,801
Rp
37,100,000
Rp Rp Rp Rp Rp
7,200 3,825 37,111,025 927,776 38,038,801
Rp
37,100,000
TOTAL HARGA
Rp
135,274,375
Rp
13,936,361
Rp
5,136,736
Rp
192,660,486
Rp
32,298,801
Rp
17,241,551
Rp
12,175,488
Rp
14,873,801
Rp
8,467,551
Rp
18,768,801
Rp
38,038,801
Rp
38,038,801
Analisa Harga Satuan Mekanikal dan Plumbing - page 150 of 211
URAIAN
NO. 2
Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Optical tube switch 1 Optical tube switch 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Compact Station NW110 with PCB - 10" Touch Screen Display 1 Compact Station NW110 with PCB - 10" Touch Screen Display 2 Upah Pasang : Tukang pipa Kepala tukang pipa
SAT hari hari
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
1.00
Rp
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
unit
1.00
Rp
hari hari
0.09 0.05
Rp Rp
1 UNIT Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display 1 Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display 1 Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT Arrival signal 1 Arrival signal 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Carrier rack up to NW110 1 Carrier rack up to NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Receiving basket up to NW110 1 Receiving basket up to NW110 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Upholstery for carrier basket 1 Upholstery for carrier basket 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT Carrier NW110, 330 x 76 - red/blue/green/yellow 1 Carrier NW110, 330 x 76 - red/blue/green/yellow 2 Upah Pasang : Tukang pipa Kepala tukang pipa
HARGA SATUAN
0.09 0.05
1 UNIT Topload (Through) Station NW110 with PCB - 10" Touch Screen Display 1 Topload (Through) Station NW110 with PCB - 10" Touch Screen Display unit 2 Upah Pasang : Tukang pipa hari Kepala tukang pipa hari
1 UNIT V-piece with valve 1 V-piece with valve 2 Upah Pasang : Tukang pipa Kepala tukang pipa
INDEK
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,135,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,900,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
53,765,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
154,995,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
63,695,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,965,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,205,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,350,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,386,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,270,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test tube (1 pcs/station) 1 Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6unit test tube (1 pcs/station) 1.00 Rp 2,050,000 2 Upah Pasang : Tukang pipa hari 0.09 Rp 80,000
JUMLAH HARGA Rp Rp Rp Rp Rp
7,200 3,825 37,111,025 927,776 38,038,801
Rp
2,135,000
Rp Rp Rp Rp Rp
7,200 3,825 2,146,025 53,651 2,199,676
Rp
49,900,000
Rp Rp Rp Rp Rp
7,200 3,825 49,911,025 1,247,776 51,158,801
Rp
53,765,000
Rp Rp Rp Rp Rp
7,200 3,825 53,776,025 1,344,401 55,120,426
Rp
154,995,000
Rp Rp Rp Rp Rp
7,200 3,825 155,006,025 3,875,151 158,881,176
Rp
63,695,000
Rp Rp Rp Rp Rp
7,200 3,825 63,706,025 1,592,651 65,298,676
Rp
1,965,000
Rp Rp Rp Rp Rp
7,200 3,825 1,976,025 49,401 2,025,426
Rp
2,205,000
Rp Rp Rp Rp Rp
7,200 3,825 2,216,025 55,401 2,271,426
Rp
1,350,000
Rp Rp Rp Rp Rp
7,200 3,825 1,361,025 34,026 1,395,051
Rp
2,386,000
Rp Rp Rp Rp Rp
7,200 3,825 2,397,025 59,926 2,456,951
Rp
1,270,000
Rp Rp Rp Rp Rp
7,200 3,825 1,281,025 32,026 1,313,051
Rp
1,600,000
Rp Rp Rp Rp Rp
7,200 3,825 1,611,025 40,276 1,651,301
Rp
2,050,000
Rp
7,200
TOTAL HARGA
Rp
2,199,676
Rp
51,158,801
Rp
55,120,426
Rp
158,881,176
Rp
65,298,676
Rp
2,025,426
Rp
2,271,426
Rp
1,395,051
Rp
2,456,951
Rp
1,313,051
Rp
1,651,301
Rp
2,112,551
Analisa Harga Satuan Mekanikal dan Plumbing - page 151 of 211
URAIAN
NO. Kepala tukang pipa
1M 1 2
Forwarding Tube PVC 110 x 2.3 - light grey Forwarding Tube PVC 110 x 2.3 - light grey Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey 1 Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey 2 Upah Pasang : Tukang pipa Kepala tukang pipa
1 PCS Sleeve PVC 110 x 2.3 L=110 - light grey 1 Sleeve PVC 110 x 2.3 L=110 - light grey 2 Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1M 1 2
PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1 LOT Material support 1 Material support 2 Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1M 1 2
SAT hari
INDEK 0.05
Rp
HARGA SATUAN 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.09 0.05
Rp Rp
pcs
1.00
Rp
hari hari
0.05 0.03
Rp Rp
m'
1.00
Rp
hari hari
0.05 0.03
Rp Rp
lot
1.00
Rp
hari hari
0.05 0.03
Rp Rp
145,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
597,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
49,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,510,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
83,012,550
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC HI 20mm Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit m' PVC HI 20mm 1.00 Rp Upah Pasang : Tukang Listrik hari 0.05 Rp Kepala Tukang Listrik hari 0.03 Rp
250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 PCS 1 2 3
1 PCS 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Wall chasing, sparing, and finishing Wall chasing, sparing, and finishing Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Floor coring Floor coring Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Diesel Fire Pump, Kapasitas : 1250 USGpm Package Diesel Fire Pump, Kapasitas : 1250 USGpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Electric Fire Pump, Kapasitas 1250 USGpm Package Electric Fire Pump, Kapasitas 1250 USGpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Package Jockey Fire Pump, Kapasitas : 50 Gpm Package Jockey Fire Pump, Kapasitas : 50 Gpm Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
1 UNIT DIAPRAGHMA TANK Kap. 300 L
pcs lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
750,000 15,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,750,000 35,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000,000 12,600,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
405,000,000 8,100,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
81,000,000 1,620,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp
JUMLAH HARGA 3,825 2,061,025 51,526 2,112,551
Rp
145,500
Rp Rp Rp Rp Rp
7,200 3,825 156,525 3,913 160,438
Rp
597,100
Rp Rp Rp Rp Rp
7,200 3,825 597,100 14,928 612,028
Rp
49,000
Rp Rp Rp Rp Rp
4,000 2,125 55,125 1,378 56,503
Rp
1,510,500
Rp Rp Rp Rp Rp
4,000 2,125 1,516,625 37,916 1,554,541
Rp
83,012,550
Rp Rp Rp Rp Rp
4,000 2,125 83,018,675 2,075,467 85,094,142
Rp
250,000
Rp Rp Rp Rp Rp
4,000 2,125 256,125 6,403 262,528
Rp
750,000
Rp Rp Rp Rp Rp
8,250 4,500 762,750 19,069 781,819
Rp
1,750,000
Rp Rp Rp Rp Rp
8,250 4,500 1,762,750 44,069 1,806,819
Rp Rp
630,000,000 12,600,000
Rp Rp Rp Rp Rp
8,250 4,500 642,612,750 16,065,319 658,678,069
Rp Rp
405,000,000 8,100,000
Rp Rp Rp Rp Rp
8,250 4,500 413,112,750 10,327,819 423,440,569
Rp Rp
81,000,000 1,620,000
Rp Rp Rp Rp Rp
8,250 4,500 82,632,750 2,065,819 84,698,569
TOTAL HARGA
Rp
160,438
Rp
612,028
Rp
56,503
Rp
1,554,541
Rp
85,094,142
Rp
262,528
Rp
781,819
Rp
1,806,819
Rp
658,678,069
Rp
423,440,569
Rp
84,698,569
Rp
26,211,312
Analisa Harga Satuan Mekanikal dan Plumbing - page 152 of 211
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
Harga Unit Diapraghma Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Bak Netralisasi Bak Netralisasi Instalasi Upah Pasang : Tukang Listrik Kepala Tukang Listrik
Bak Kontrol / Bak Sumpit Bak Kontrol / Bak Sumpit Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HORN BUZZER HORN BUZZER Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
DAILY TANK 200 LITER DAILY TANK 200 LITER Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HAND PUMP HAND PUMP Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
NOZZLE PEMADAM KEBAKARAN dia.38 mm NOZZLE PEMADAM KEBAKARAN dia.38 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
NOZZLE PEMADAM KEBAKARAN dia.65 mm NOZZLE PEMADAM KEBAKARAN dia.65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 65 mm FOOT VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 100 mm FOOT VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FOOT VALVE dia. 150 mm FOOT VALVE dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.25 MM / 20 K
SAT unit lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
1.00 0.50
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.09 0.05
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
HARGA SATUAN 25,058,100 501,162
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,500,000 150,000
165,000 180,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,030,126 40,603
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,594,200 111,884
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,000,000 60,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,995,800 79,916
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
435,000 8,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
725,000 14,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,300,000 66,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,100,000 162,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,500,000 210,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 25,058,100 501,162
Rp Rp Rp Rp Rp
8,250 4,500 25,572,012 639,300 26,211,312
Rp Rp
7,500,000 150,000
Rp Rp Rp Rp Rp
8,250 4,500 7,662,750 191,569 7,854,319
Rp Rp
2,030,126 40,603
Rp Rp Rp Rp Rp
80,000 42,500 2,193,229 54,831 2,248,059
Rp Rp
5,594,200 111,884
Rp Rp Rp Rp Rp
7,200 3,825 5,717,109 142,928 5,860,037
Rp Rp
3,000,000 60,000
Rp Rp Rp Rp Rp
80,000 42,500 3,182,500 79,563 3,262,063
Rp Rp
3,995,800 79,916
Rp Rp Rp Rp Rp
7,200 3,825 4,086,741 102,169 4,188,910
Rp Rp
435,000 8,700
Rp Rp Rp Rp Rp
7,200 3,825 454,725 11,368 466,093
Rp Rp
725,000 14,500
Rp Rp Rp Rp Rp
7,200 3,825 750,525 18,763 769,288
Rp Rp
3,300,000 66,000
Rp Rp Rp Rp Rp
6,667 3,542 3,376,208 84,405 3,460,614
Rp Rp
8,100,000 162,000
Rp Rp Rp Rp Rp
6,667 3,542 8,272,208 206,805 8,479,014
Rp Rp
10,500,000 210,000
Rp Rp Rp Rp Rp
6,667 3,542 10,720,208 268,005 10,988,214
TOTAL HARGA
Rp
7,854,319
Rp
2,248,059
Rp
5,860,037
Rp
3,262,063
Rp
4,188,910
Rp
466,093
Rp
769,288
Rp
3,460,614
Rp
8,479,014
Rp
10,988,214
Rp
2,696,144
Analisa Harga Satuan Mekanikal dan Plumbing - page 153 of 211
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
URAIAN GATE VALVE DIA.25 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.32MM / 20 K GATE VALVE DIA.32 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.50 MM / 20 K GATE VALVE DIA.50 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.65 MM / 20 K GATE VALVE DIA.65 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.80 MM / 20 K GATE VALVE DIA.80 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.100 MM / 20 K GATE VALVE DIA. 100 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.150 MM / 20 K GATE VALVE DIA. 150 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
GATE VALVE DIA.200 MM / 20 K GATE VALVE DIA. 200 MM / 20 K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
INDICATING VALVE 100 MM INDICATING VALVE 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
LANDING VALVE/ KSSK dia. 150 MM LANDING VALVE/ KSSK dia. 150 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
LANDING VALVE/ KSSK dia. 100 MM LANDING VALVE/ KSSK dia. 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Test Valve 100 mm
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
HARGA SATUAN 2,568,800 51,376
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,630,000 72,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,215,400 84,308
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,410,900 108,218
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,410,900 128,218
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,368,600 187,372
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,157,100 283,142
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
21,235,650 424,713
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
899,100 17,982
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,425,000 148,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 2,568,800 51,376
Rp Rp Rp Rp Rp
6,667 3,542 2,630,384 65,760 2,696,144
Rp Rp
3,630,000 72,600
Rp Rp Rp Rp Rp
6,667 3,542 3,712,808 92,820 3,805,629
Rp Rp
4,215,400 84,308
Rp Rp Rp Rp Rp
13,333 7,083 4,320,125 108,003 4,428,128
Rp Rp
5,410,900 108,218
Rp Rp Rp Rp Rp
13,333 7,083 5,539,535 138,488 5,678,023
Rp Rp
6,410,900 128,218
Rp Rp Rp Rp Rp
13,333 7,083 6,559,535 163,988 6,723,523
Rp Rp
9,368,600 187,372
Rp Rp Rp Rp Rp
13,333 7,083 9,576,389 239,410 9,815,798
Rp Rp
14,157,100 283,142
Rp Rp Rp Rp Rp
26,667 14,167 14,481,075 362,027 14,843,102
Rp Rp
21,235,650 424,713
Rp Rp Rp Rp Rp
26,667 14,167 21,701,196 542,530 22,243,726
Rp Rp
899,100 17,982
Rp Rp Rp Rp Rp
6,667 3,542 927,290 23,182 950,473
Rp Rp
7,425,000 148,500
Rp Rp Rp Rp Rp
6,667 3,542 7,583,708 189,593 7,773,301
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
6,667 3,542 5,620,208 140,505 5,760,714
TOTAL HARGA
Rp
3,805,629
Rp
4,428,128
Rp
5,678,023
Rp
6,723,523
Rp
9,815,798
Rp
14,843,102
Rp
22,243,726
Rp
950,473
Rp
7,773,301
Rp
5,760,714
Rp
4,506,114
Analisa Harga Satuan Mekanikal dan Plumbing - page 154 of 211
URAIAN
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH
Test Valve 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
DRAIN VALVE 100 mm DRAIN VALVE 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLASHING VALVE 100 mm FLASHING VALVE 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SELENOID VALVE DIA.150 MM SELENOID VALVE DIA.150 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SELENOID VALVE DIA.50 MM SELENOID VALVE DIA.50 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE GAUGE PRESSURE GAUGE Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PRESSURE SWITCH PRESSURE SWITCH Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 150 mm SAFETY VALVE dia. 150 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 100 mm SAFETY VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 80 mm SAFETY VALVE dia. 80 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SAFETY VALVE dia. 65 mm SAFETY VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PELAT ORIFICE 100 MM
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.50 0.25
Rp Rp
HARGA SATUAN 4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,200,000 44,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,550,000 51,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,250,000 25,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,400,000 588,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,400,000 588,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,300,000 366,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,300,000 186,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
6,667 3,542 4,396,208 109,905 4,506,114
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
6,667 3,542 4,294,208 107,355 4,401,564
Rp Rp
2,200,000 44,000
Rp Rp Rp Rp Rp
6,667 3,542 2,254,208 56,355 2,310,564
Rp Rp
2,550,000 51,000
Rp Rp Rp Rp Rp
5,000 2,656 2,608,656 65,216 2,673,873
Rp Rp
1,250,000 25,000
Rp Rp Rp Rp Rp
5,000 2,656 1,282,656 32,066 1,314,723
Rp Rp
29,400,000 588,000
Rp Rp Rp Rp Rp
40,000 21,250 30,049,250 751,231 30,800,481
Rp Rp
29,400,000 588,000
Rp Rp Rp Rp Rp
40,000 21,250 30,049,250 751,231 30,800,481
Rp Rp
18,300,000 366,000
Rp Rp Rp Rp Rp
40,000 21,250 18,727,250 468,181 19,195,431
Rp Rp
9,300,000 186,000
Rp Rp Rp Rp Rp
40,000 21,250 9,547,250 238,681 9,785,931
TOTAL HARGA
Rp
4,506,114
Rp
4,506,114
Rp
4,401,564
Rp
2,310,564
Rp
2,673,873
Rp
1,314,723
Rp
30,800,481
Rp
30,800,481
Rp
19,195,431
Rp
9,785,931
Rp
621,347
Analisa Harga Satuan Mekanikal dan Plumbing - page 155 of 211
URAIAN
NO. 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 Unit 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
PELAT ORIFICE 100 MM Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLOW SWITCH FLOW SWITCH Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SIGHTGLASS SIGHTGLASS Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
PILLAR HYDRANT PILLAR HYDRANT Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
SIAMISE CONNECTION SIAMISE CONNECTION Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Tabung Silinder Kap. 150 Kg (Fire Supression) Tabung Silinder Kap. 150 Kg (Fire Supression) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE HOUSE CABINET / FHC ( INDOOR ) Fire House Cabinet ( Indoor ) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE HOUSE CABINET / FHC ( OUTDOOR ) Fire House Cabinet ( OUTDOOR ) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FIRE EXTINGUISHER 6KG Fire Extinguisher 6 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
HEAD SPRINKLER Head Sprinkler Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Alarm Heat Detector (HD) Alarm Heat Detector (HD) Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
Head Springkler Supression (HS) Head Springkler Supression (HS) Instalasi Upah Pasang :
SAT bh lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.06 0.03
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.83 0.42
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.32 0.16
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.42 0.21
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.42 0.21
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
1.00 1.00
Rp Rp
bh lot
HARGA SATUAN 586,800 11,736
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,774,900 55,498
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,854,200 57,084
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,362,500 107,250
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,722,000 154,440
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
44,391,938 887,839
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,600,000 72,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,400,000 148,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,189,300 23,786
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
82,500 1,650
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
934,200 18,684
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
410,850 8,217
Rp Rp
JUMLAH HARGA 586,800 11,736
Rp Rp Rp Rp Rp
5,000 2,656 606,192 15,155 621,347
Rp Rp
2,774,900 55,498
Rp Rp Rp Rp Rp
5,000 2,656 2,838,054 70,951 2,909,006
Rp Rp
2,854,200 57,084
Rp Rp Rp Rp Rp
5,000 2,656 2,918,940 72,974 2,991,914
Rp Rp
5,362,500 107,250
Rp Rp Rp Rp Rp
5,000 2,656 5,477,406 136,935 5,614,341
Rp Rp
7,722,000 154,440
Rp Rp Rp Rp Rp
66,667 35,417 7,978,523 199,463 8,177,986
Rp Rp
44,391,938 887,839
Rp Rp Rp Rp Rp
25,600 13,600 45,318,976 1,132,974 46,451,951
Rp Rp
3,600,000 72,000
Rp Rp Rp Rp Rp
33,333 17,708 3,723,042 93,076 3,816,118
Rp Rp
7,400,000 148,000
Rp Rp Rp Rp Rp
33,333 17,708 7,599,042 189,976 7,789,018
Rp Rp
1,189,300 23,786
Rp Rp Rp Rp Rp
26,667 14,167 1,253,919 31,348 1,285,267
Rp Rp
82,500 1,650
Rp Rp Rp Rp Rp
26,667 14,167 124,983 3,125 128,108
Rp Rp
934,200 18,684
Rp Rp Rp Rp Rp
26,667 14,167 993,717 24,843 1,018,560
Rp Rp
410,850 8,217
TOTAL HARGA
Rp
2,909,006
Rp
2,991,914
Rp
5,614,341
Rp
8,177,986
Rp
46,451,951
Rp
3,816,118
Rp
7,789,018
Rp
1,285,267
Rp
128,108
Rp
1,018,560
Rp
421,121
Analisa Harga Satuan Mekanikal dan Plumbing - page 156 of 211
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
FLEXIBLE JOINT DIA.150 MM' FLEXIBLE JOINT DIA.150 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.100 MM' FLEXIBLE JOINT DIA.100 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.80 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.65 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
FLEXIBLE JOINT DIA.50 MM' FLEXIBLE JOINT DIA.50 MM' Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.50 MM' / 20 Kg CHECK VALVE DIA.50 MM' / 20 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA.65 MM' / 20 Kg CHECK VALVE DIA.65 MM' / 20 Kg Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 100 MM / 20K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
CHECK VALVE DIA 150 MM / 20K CHECK VALVE DIA 150 MM / 20K Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BRANCH CONTROL VALVE dia. 100 mm BRANCH CONTROL VALVE dia. 100 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 80 mm Instalasi Upah Pasang :
SAT hari hari
INDEK 0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.33 0.17
Rp Rp
1.00 1.00
Rp Rp
bh lot
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,103,000 42,060
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,062,000 21,240
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
744,000 14,880
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
728,000 14,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
574,000 11,480
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,729,000 74,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,929,000 78,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,300,000 86,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,800,000 156,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,400,000 108,000
Rp Rp Rp Rp Rp
JUMLAH HARGA 26,667 14,167 410,850 10,271 421,121
Rp Rp
2,103,000 42,060
Rp Rp Rp Rp Rp
26,667 14,167 2,185,893 54,647 2,240,541
Rp Rp
1,062,000 21,240
Rp Rp Rp Rp Rp
26,667 14,167 1,124,073 28,102 1,152,175
Rp Rp
744,000 14,880
Rp Rp Rp Rp Rp
26,667 14,167 799,713 19,993 819,706
Rp Rp
728,000 14,560
Rp Rp Rp Rp Rp
26,667 14,167 783,393 19,585 802,978
Rp Rp
574,000 11,480
Rp Rp Rp Rp Rp
26,667 14,167 626,313 15,658 641,971
Rp Rp
3,729,000 74,580
Rp Rp Rp Rp Rp
26,667 14,167 3,844,413 96,110 3,940,524
Rp Rp
3,929,000 78,580
Rp Rp Rp Rp Rp
26,667 14,167 4,048,413 101,210 4,149,624
Rp Rp
4,300,000 86,000
Rp Rp Rp Rp Rp
26,667 14,167 4,426,833 110,671 4,537,504
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
26,667 14,167 5,650,833 141,271 5,792,104
Rp Rp
7,800,000 156,000
Rp Rp Rp Rp Rp
26,667 14,167 7,996,833 199,921 8,196,754
Rp Rp
5,400,000 108,000
TOTAL HARGA
Rp
2,240,541
Rp
1,152,175
Rp
819,706
Rp
802,978
Rp
641,971
Rp
3,940,524
Rp
4,149,624
Rp
4,537,504
Rp
5,792,104
Rp
8,196,754
Rp
5,687,554
Analisa Harga Satuan Mekanikal dan Plumbing - page 157 of 211
URAIAN
NO. Tukang pipa Kepala tukang pipa
1 BH 1 2 3
BRANCH CONTROL VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 65 mm Instalasi Upah Pasang : Tukang pipa Kepala tukang pipa
1 UNIT kapasitas : 5 460 BTU/h - Wall Mounted 1 kapasitas : 5 460 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 7 510 BTU/h - Wall Mounted 1 kapasitas : 7 510 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 9 550 BTU/h - Wall Mounted 1 kapasitas : 9 550 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 280 BTU/h - Wall Mounted 1 kapasitas : 12 280 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 15 350 BTU/h - Wall Mounted 1 kapasitas : 15 350 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 110 BTU/h - Wall Mounted 1 kapasitas : 19 110 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 24 230 BTU/h - Wall Mounted 1 kapasitas : 24 230 BTU/h - Wall Mounted 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT hari hari
INDEK 0.33 0.17
Rp Rp
HARGA SATUAN 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp Rp Rp Rp
JUMLAH HARGA 26,667 14,167 5,548,833 138,721 5,687,554
bh lot
1.00 1.00
Rp Rp
Rp Rp
4,200,000 84,000
hari hari
0.33 0.17
Rp Rp
Rp Rp Rp Rp Rp
26,667 14,167 4,324,833 108,121 4,432,954
unit ls
1.00 1.00
Rp Rp
5,307,893 159,237
Rp Rp
5,307,893 159,237
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,501,055 137,526 5,638,581
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit ls
1.00 1.00
Rp Rp
5,392,943 161,788
Rp Rp
5,392,943 161,788
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,588,656 139,716 5,728,373
unit ls
1.00 1.00
Rp Rp
5,559,178 166,775
Rp Rp
5,559,178 166,775
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,759,878 143,997 5,903,875
unit ls
1.00 1.00
Rp Rp
5,729,278 171,878
Rp Rp
5,729,278 171,878
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,935,081 148,377 6,083,458
unit ls
1.00 1.00
Rp Rp
5,810,461 174,314
Rp Rp
5,810,461 174,314
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
6,018,700 150,468 6,169,168
unit ls
1.00 1.00
Rp Rp
7,318,166 219,545
Rp Rp
7,318,166 219,545
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,571,635 189,291 7,760,926
unit ls
1.00 1.00
Rp Rp
7,735,685 232,071
Rp Rp
7,735,685 232,071
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
TOTAL HARGA
Rp
4,432,954
Rp
5,638,581
Rp
5,728,373
Rp
5,903,875
Rp
6,083,458
Rp
6,169,168
Rp
7,760,926
Rp
8,201,722
Analisa Harga Satuan Mekanikal dan Plumbing - page 158 of 211
NO.
URAIAN
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp 1 UNIT kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 1 kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 2 Way Cassette Type 1 kapasitas : 19 100 BTU/h - 2 Way Cassette Type 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit
unit ls
1.00 1.00
Rp Rp
15,381,000 461,430
Rp Rp
15,381,000 461,430
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
15,876,355 396,909 16,273,264
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
26,655,000 799,650
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,942,000 838,260
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,358,000 610,740
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,702,501 411,075
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,033,251 420,998
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,364,001 430,920
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 14,973,955 449,219
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
8,001,680 200,042 8,201,722
Rp Rp
26,655,000 799,650
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 27,488,575 687,214 28,175,790
Rp Rp
27,942,000 838,260
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 28,814,185 720,355 29,534,540
Rp Rp
20,358,000 610,740
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 21,002,665 525,067 21,527,732
Rp Rp
13,702,501 411,075
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,147,501 353,688 14,501,188
Rp Rp
14,033,251 420,998
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,488,173 362,204 14,850,378
Rp Rp
14,364,001 430,920
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 14,828,846 370,721 15,199,567
Rp Rp
14,973,955 449,219
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 15,457,098 386,427 15,843,526
Rp
16,273,264
Rp
28,175,790
Rp
29,534,540
Rp
21,527,732
Rp
14,501,188
Rp
14,850,378
Rp
15,199,567
Rp
15,843,526
Rp
17,740,637
Analisa Harga Satuan Mekanikal dan Plumbing - page 159 of 211
NO. 1 2
3
URAIAN kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT unit ls
INDEK 1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
1.00 1.00
Rp Rp
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
1.00 1.00
Rp Rp
1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit 1 kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit unit 2 Material Instalasi : ls - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor hari Tukang AC hari Pembantu tukang AC hari
1 UNIT kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja :
unit ls
HARGA SATUAN 16,770,887 503,127
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,770,888 503,127
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,869,682 506,090
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,325,001 519,750
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,405,000 822,150
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,986,501 539,595
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 18,763,978 562,919
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 19,794,887 593,847
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,442,631 163,279
Rp Rp
JUMLAH HARGA 16,770,887 503,127
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,307,938 432,698 17,740,637
Rp Rp
16,770,888 503,127
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,307,939 432,698 17,740,638
Rp Rp
16,869,682 506,090
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,409,697 435,242 17,844,940
Rp Rp
17,325,001 519,750
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 17,878,676 446,967 18,325,643
Rp Rp
27,405,000 822,150
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 28,261,075 706,527 28,967,602
Rp Rp
17,986,501 539,595
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 18,560,021 464,001 19,024,021
Rp Rp
18,763,978 562,919
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 19,360,822 484,021 19,844,843
Rp Rp
19,794,887 593,847
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 20,422,658 510,566 20,933,225
Rp Rp
5,442,631 163,279
TOTAL HARGA
Rp
17,740,638
Rp
17,844,940
Rp
18,325,643
Rp
28,967,602
Rp
19,024,021
Rp
19,844,843
Rp
20,933,225
Rp
5,780,831
Analisa Harga Satuan Mekanikal dan Plumbing - page 160 of 211
URAIAN
NO. Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) 1 kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 85 000 BTU/h - AHU 1 Kapasitas : 85 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 95 000 BTU/h - AHU 1 Kapasitas : 95 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 114 000 BTU/h - AHU 1 Kapasitas : 114 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 125 000 BTU/h - AHU 1 Kapasitas : 125 000 BTU/h - AHU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU
SAT hari hari hari
INDEK 0.06 0.23 0.12
Rp Rp Rp
JUMLAH HARGA 5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,639,835 140,996 5,780,831
Rp Rp Rp
HARGA SATUAN 90,000 85,000 80,000
unit ls
1.00 1.00
Rp Rp
5,577,631 167,329
Rp Rp
5,577,631 167,329
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
5,778,885 144,472 5,923,357
unit ls
1.00 1.00
Rp Rp
7,602,631 228,079
Rp Rp
7,602,631 228,079
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,864,635 196,616 8,061,251
unit ls
1.00 1.00
Rp Rp
10,522,895 315,687
Rp Rp
10,522,895 315,687
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
10,872,506 271,813 11,144,319
unit ls
1.00 1.00
Rp Rp
94,436,719 2,833,102
Rp Rp
94,436,719 2,833,102
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
97,303,746 2,432,594 99,736,339
unit ls
1.00 1.00
Rp Rp
102,898,249 3,086,947
Rp Rp
102,898,249 3,086,947
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
106,019,122 2,650,478 108,669,600
unit ls
1.00 1.00
Rp Rp
110,302,088 3,309,063
Rp Rp
110,302,088 3,309,063
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
113,645,075 2,841,127 116,486,202
unit ls
1.00 1.00
Rp Rp
123,054,822 3,691,645
Rp Rp
123,054,822 3,691,645
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
126,780,392 3,169,510 129,949,901
unit ls
1.00 1.00
Rp Rp
7,588,779 227,663
Rp Rp
TOTAL HARGA
Rp
5,923,357
Rp
8,061,251
Rp
11,144,319
Rp
99,736,339
Rp
108,669,600
Rp
116,486,202
Rp
129,949,901
Rp
8,046,627
7,588,779 227,663
Analisa Harga Satuan Mekanikal dan Plumbing - page 161 of 211
URAIAN
NO. 3
- Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct 1 Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 95 500 BTU/h - OU 1 kapasitas : 95 500 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 114 600 BTU/h - OU 1 kapasitas : 114 600 BTU/h - OU 2 Material Instalasi :
SAT hari hari hari
INDEK 0.06 0.23 0.12
HARGA SATUAN Rp Rp Rp
90,000 85,000 80,000
JUMLAH HARGA Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
7,850,368 196,259 8,046,627
unit ls
1.00 1.00
Rp Rp
7,739,550 232,187
Rp Rp
7,739,550 232,187
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
8,005,662 200,142 8,205,803
unit ls
1.00 1.00
Rp Rp
8,273,046 248,191
Rp Rp
8,273,046 248,191
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
8,555,162 213,879 8,769,041
unit ls
1.00 1.00
Rp Rp
10,020,436 300,613
Rp Rp
10,020,436 300,613
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
10,354,974 258,874 10,613,849
unit ls
1.00 1.00
Rp Rp
11,330,979 339,929
Rp Rp
11,330,979 339,929
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
11,704,834 292,621 11,997,455
unit ls
1.00 1.00
Rp Rp
24,200,591 726,018
Rp Rp
24,200,591 726,018
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
24,960,533 624,013 25,584,547
unit ls
1.00 1.00
Rp Rp
25,128,410 753,852
Rp Rp
25,128,410 753,852
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
25,916,187 647,905 26,564,091
unit ls
1.00 1.00
Rp Rp
56,558,250 1,696,748
Rp Rp
56,558,250 1,696,748
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
58,288,923 1,457,223 59,746,146
unit ls
1.00 1.00
Rp Rp
66,764,250 2,002,928
Rp Rp
TOTAL HARGA
Rp
8,205,803
Rp
8,769,041
Rp
10,613,849
Rp
11,997,455
Rp
25,584,547
Rp
26,564,091
Rp
59,746,146
Rp
70,521,130
66,764,250 2,002,928 Analisa Harga Satuan Mekanikal dan Plumbing - page 162 of 211
URAIAN
NO.
3
- Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 133 800 BTU/h - OU 1 kapasitas : 133 800 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 152 900 BTU/h - OU 1 kapasitas : 152 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 229 200 BTU/h - OU 1 kapasitas : 229 200 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 248 400 BTU/h - OU 1 kapasitas : 248 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 267 500 BTU/h - OU 1 kapasitas : 267 500 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 286 600 BTU/h - OU 1 kapasitas : 286 600 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 305 700 BTU/h - OU 1 kapasitas : 305 700 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 363 100 BTU/h - OU
SAT
hari hari hari
INDEK
0.06 0.23 0.12
HARGA SATUAN
Rp Rp Rp
90,000 85,000 80,000
JUMLAH HARGA
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
68,801,103 1,720,028 70,521,130
unit ls
1.00 1.00
Rp Rp
74,844,000 2,245,320
Rp Rp
74,844,000 2,245,320
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
77,123,245 1,928,081 79,051,326
unit ls
1.00 1.00
Rp Rp
194,040,000 5,821,200
Rp Rp
194,040,000 5,821,200
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
199,895,125 4,997,378 204,892,503
unit ls
1.00 1.00
Rp Rp
133,528,500 4,005,855
Rp Rp
133,528,500 4,005,855
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
137,568,280 3,439,207 141,007,487
unit ls
1.00 1.00
Rp Rp
141,608,250 4,248,248
Rp Rp
141,608,250 4,248,248
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
145,890,423 3,647,261 149,537,683
unit ls
1.00 1.00
Rp Rp
150,113,250 4,503,398
Rp Rp
150,113,250 4,503,398
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
154,650,573 3,866,264 158,516,837
unit ls
1.00 1.00
Rp Rp
379,170,000 11,375,100
Rp Rp
379,170,000 11,375,100
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
390,579,025 9,764,476 400,343,501
unit ls
1.00 1.00
Rp Rp
407,880,000 12,236,400
Rp Rp
407,880,000 12,236,400
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
420,150,325 10,503,758 430,654,083
TOTAL HARGA
Rp
79,051,326
Rp
204,892,503
Rp
141,007,487
Rp
149,537,683
Rp
158,516,837
Rp
400,343,501
Rp
430,654,083
Rp
211,044,886
Analisa Harga Satuan Mekanikal dan Plumbing - page 163 of 211
NO. 1 2
3
URAIAN kapasitas : 363 100 BTU/h - OU Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 382 200 BTU/h - OU 1 kapasitas : 382 200 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 401 300 BTU/h - OU 1 kapasitas : 401 300 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 420 400 BTU/h - OU 1 kapasitas : 420 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 496 800 BTU/h - OU 1 kapasitas : 496 800 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 515 900 BTU/h - OU 1 kapasitas : 515 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 535 000 BTU/h - OU 1 kapasitas : 535 000 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 592 400 BTU/h - OU 1 kapasitas : 592 400 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
SAT unit ls
INDEK 1.00 1.00
Rp Rp
HARGA SATUAN 199,867,500 5,996,025
Rp Rp
JUMLAH HARGA 199,867,500 5,996,025
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
205,897,450 5,147,436 211,044,886
unit ls
1.00 1.00
Rp Rp
208,372,500 6,251,175
Rp Rp
208,372,500 6,251,175
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
214,657,600 5,366,440 220,024,040
unit ls
1.00 1.00
Rp Rp
221,130,000 6,633,900
Rp Rp
221,130,000 6,633,900
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
227,797,825 5,694,946 233,492,771
unit ls
1.00 1.00
Rp Rp
233,462,250 7,003,868
Rp Rp
233,462,250 7,003,868
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
240,500,043 6,012,501 246,512,544
unit ls
1.00 1.00
Rp Rp
275,136,750 8,254,103
Rp Rp
275,136,750 8,254,103
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
283,424,778 7,085,619 290,510,397
unit ls
1.00 1.00
Rp Rp
287,894,250 8,636,828
Rp Rp
287,894,250 8,636,828
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
296,565,003 7,414,125 303,979,128
unit ls
1.00 1.00
Rp Rp
698,940,000 20,968,200
Rp Rp
698,940,000 20,968,200
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
719,942,125 17,998,553 737,940,678
unit ls
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
756,360,000 22,690,800
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
756,360,000 22,690,800
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 779,084,725 19,477,118 798,561,843
TOTAL HARGA
Rp
220,024,040
Rp
233,492,771
Rp
246,512,544
Rp
290,510,397
Rp
303,979,128
Rp
737,940,678
Rp
798,561,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 164 of 211
NO.
URAIAN 1 UNIT kapasitas : 763 000 BTU/h - OU 1 kapasitas : 763 000 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 821 700 BTU/h - OU 1 kapasitas : 821 700 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 UNIT kapasitas : 859 900 BTU/h - OU 1 kapasitas : 859 900 BTU/h - OU 2 Material Instalasi : - Freon - Kabel Transmisi IU-OU - Fitting dan Acsesoris 3 Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
1 M' 1 2 3
1 BH 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
PIPA DRAIN (AC) PIPA DRAIN (AC) Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Y - Branch Y - Branch Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN
JUMLAH HARGA
unit ls
1.00 1.00
Rp Rp
990,000,000 29,700,000
Rp Rp
990,000,000 29,700,000
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,019,733,925 25,493,348 1,045,227,273
unit ls
1.00 1.00
Rp Rp
1,047,420,000 31,422,600
Rp Rp
1,047,420,000 31,422,600
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,078,876,525 26,971,913 1,105,848,438
unit ls
1.00 1.00
Rp Rp
1,096,920,000 32,907,600
Rp Rp
1,096,920,000 32,907,600
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
90,000 85,000 80,000
Rp Rp Rp
5,175 19,550 9,200
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,129,861,525 28,246,538 1,158,108,063
m' lot
1.00 1.00
Rp Rp
hari hari hari
0.03 0.13 0.07
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
90,000 1,800
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,097,900 41,958
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
252,000 5,040
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
252,000 5,040
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
171,000 3,420 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
90,000 1,800
Rp Rp Rp Rp Rp Rp
3,000 11,333 5,333 111,467 2,787 114,253
Rp Rp
2,097,900 41,958
Rp Rp Rp Rp Rp
10,667 3,778 2,154,302 53,858 2,208,160
Rp Rp
252,000 5,040
Rp Rp Rp Rp Rp
10,667 3,778 271,484 6,787 278,272
Rp Rp
252,000 5,040
Rp Rp Rp Rp Rp
10,667 3,778 271,484 6,787 278,272
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
171,000 3,420
Rp Rp Rp Rp
10,667 3,778 188,864 4,722
Rp
TOTAL HARGA 1,045,227,273
Rp
1,105,848,438
Rp
1,158,108,063
Rp
114,253
Rp
2,208,160
Rp
278,272
Rp
278,272
Rp
193,586
Rp
193,586
Rp
193,586
Analisa Harga Satuan Mekanikal dan Plumbing - page 165 of 211
URAIAN
NO. 1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
1M 1 2 3
PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 193,586
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
171,000 3,420
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
296,000 5,920
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
288,000 5,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
394,000 7,880
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
443,000 8,860
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
378,000 7,560 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
171,000 3,420
Rp Rp Rp Rp Rp
10,667 3,778 188,864 4,722 193,586
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
296,000 5,920
Rp Rp Rp Rp Rp
10,667 3,778 316,364 7,909 324,274
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
288,000 5,760
Rp Rp Rp Rp Rp
10,667 3,778 308,204 7,705 315,910
Rp Rp
394,000 7,880
Rp Rp Rp Rp Rp
10,667 3,778 416,324 10,408 426,733
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
443,000 8,860
Rp Rp Rp Rp Rp
10,667 3,778 466,304 11,658 477,962
Rp Rp
378,000 7,560
Rp Rp Rp Rp Rp
10,667 3,778 400,004 10,000 410,005
Rp Rp
378,000 7,560
Rp Rp Rp Rp
10,667 3,778 400,004 10,000
TOTAL HARGA Rp
193,586
Rp
315,910
Rp
324,274
Rp
315,910
Rp
315,910
Rp
426,733
Rp
410,005
Rp
410,005
Rp
477,962
Rp
410,005
Rp
410,005
Analisa Harga Satuan Mekanikal dan Plumbing - page 166 of 211
URAIAN
NO. 1M 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 3/8 INCH Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HAND VALVE DIAMETER : 1/2 INCH HAND VALVE DIAMETER : 1/2 INCH Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
AC MANAGER 5 AC MANAGER 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
ACP 5 ACP 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AC Smart 5 AC Smart 5 Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AC EZ Touch AC EZ Touch Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
AHU Comm. Kit AHU Comm. Kit Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
EEV Kit 4-10HP EEV Kit 4-10HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
EEV Kit 12-20HP EEV Kit 12-20HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
TVX Kit for 18-26 HP TVX Kit for 18-26 HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 410,005
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.07
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
159,000 3,180
Rp Rp
159,000 3,180
Rp Rp Rp Rp Rp
10,667 3,778 176,624 4,416 181,040
Rp Rp
646,000 12,920
Rp Rp Rp Rp Rp
16,000 5,667 680,587 17,015 697,601
Rp Rp
861,000 17,220
Rp Rp Rp Rp Rp
16,000 5,667 899,887 22,497 922,384
Rp Rp
57,834,000 1,156,680
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 59,020,993 1,475,525 60,496,517
Rp Rp
41,929,650 838,593
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 42,798,556 1,069,964 43,868,519
Rp Rp
28,350,000 567,000
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 28,947,313 723,683 29,670,995
Rp Rp
16,726,500 334,530
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 17,091,343 427,284 17,518,626
Rp Rp
7,399,350 147,987
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 7,577,650 189,441 7,767,091
Rp Rp
4,123,636 82,473
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 4,236,421 105,911 4,342,332
Rp Rp
6,237,000 124,740
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 6,392,053 159,801 6,551,854
16,200,000 324,000
Rp Rp
16,200,000 324,000
70,000 80,000 90,000 Jumlah
Rp Rp Rp Rp
17,500 10,000 2,813 16,554,313
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
646,000 12,920
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
861,000 17,220
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
57,834,000 1,156,680
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 41,929,650 838,593
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,350,000 567,000
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,726,500 334,530
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,399,350 147,987
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,123,636 82,473
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,237,000 124,740
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA Rp
181,040
Rp
697,601
Rp
922,384
Rp
60,496,517
Rp
43,868,519
Rp
29,670,995
Rp
17,518,626
Rp
7,767,091
Rp
4,342,332
Rp
6,551,854
Rp
16,968,170
Analisa Harga Satuan Mekanikal dan Plumbing - page 167 of 211
URAIAN
NO. 1 UNIT 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 UNIT 1 2 3
TVX Kit for 28-36 HP TVX Kit for 28-36 HP Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Standard 3 Wired Remocon Standard 3 Wired Remocon Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Wireless Remocon Wireless Remocon Instalasi Tenaga Kerja : Pembantu tukang AC Tukang AC Mandor
Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 21 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 31 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
Outdoor Pipe Connection - 41 Outdoor Pipe Connection - 41 Instalasi Tenaga Kerja : Mandor Tukang AC Pembantu tukang AC
DIFFUSER SUPPLY GRILLE ALUMUNIUM DIFFUSER SUPPLY GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER RETURN GRILLE ALUMUNIUM DIFFUSER RETURN GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER FRESH AIR GRILLE ALUMUNIUM DIFFUSER FRESH AIR GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DIFFUSER EXHAUST GRILLE ALUMUNIUM DIFFUSER EXHAUST GRILLE ALUMUNIUM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
BOX DIFFUSER PERPORATE STAINLESS STEEL BOX DIFFUSER PERPORATE STAINLESS STEEL Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 413,858 Total = Jumlah+(Keuntungan 2,5%) Rp 16,968,170
unit lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.25 0.13 0.03
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari hari
0.06 0.23 0.12
Rp Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit ls
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
19,800,000 396,000
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,752,546 35,051
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,060,290 21,206
70,000 80,000 90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 1,729,350 34,587
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 2,211,300 44,226
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,346,000 106,920
90,000 85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
950,000 19,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
90,000,000 4,500,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
19,800,000 396,000
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 20,226,313 505,658 20,731,970
Rp Rp
1,752,546 35,051
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 1,817,909 45,448 1,863,357
Rp Rp
1,060,290 21,206
Rp Rp Rp Rp Rp Rp
17,500 10,000 2,813 1,111,808 27,795 1,139,604
Rp Rp
1,729,350 34,587
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 1,797,862 44,947 1,842,809
Rp Rp
2,211,300 44,226
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 2,289,451 57,236 2,346,687
Rp Rp
5,346,000 106,920
Rp Rp Rp Rp Rp Rp
5,175 19,550 9,200 5,486,845 137,171 5,624,016
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
20,000 7,083 996,083 24,902 1,020,985
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
20,000 7,083 996,083 24,902 1,020,985
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
13,333 4,722 987,056 24,676 1,011,732
Rp Rp
950,000 19,000
Rp Rp Rp Rp Rp
13,333 4,722 987,056 24,676 1,011,732
Rp Rp
90,000,000 4,500,000
Rp Rp Rp Rp
13,333 4,722 94,518,056 2,362,951
TOTAL HARGA Rp
20,731,970
Rp
1,863,357
Rp
1,139,604
Rp
1,842,809
Rp
2,346,687
Rp
5,624,016
Rp
1,020,985
Rp
1,020,985
Rp
1,011,732
Rp
1,011,732
Rp
96,881,007
Analisa Harga Satuan Mekanikal dan Plumbing - page 168 of 211
URAIAN
NO. 1 UNIT 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 PCS 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER RETURN DAMPER RETURN Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER FRESH AIR DAMPER FRESH AIR Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER EXHAUST DAMPER EXHAUST Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
DAMPER SUPPLY DAMPER SUPPLY Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Pre-Filter (G-4) Pre-Filter (G-4) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Medium filter (F-9) Medium filter (F-9) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
HEPA filter ( H-13) HEPA filter ( H-13) Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 96,881,007
unit lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
pcs lot
1.00 1.00
Rp Rp
hari hari
0.17 0.06
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
8,500,000 170,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,500,000 70,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
570,000 11,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,800,000 36,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,500,000 190,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,240,000 124,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,380,000 147,600 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
8,500,000 170,000
Rp Rp Rp Rp Rp
13,333 4,722 8,688,056 217,201 8,905,257
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
3,500,000 70,000
Rp Rp Rp Rp Rp
13,333 4,722 3,588,056 89,701 3,677,757
Rp Rp
570,000 11,400
Rp Rp Rp Rp Rp
13,333 4,722 599,456 14,986 614,442
Rp Rp
1,800,000 36,000
Rp Rp Rp Rp Rp
13,333 4,722 1,854,056 46,351 1,900,407
Rp Rp
9,500,000 190,000
Rp Rp Rp Rp Rp
13,333 4,722 9,708,056 242,701 9,950,757
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
26,667 9,444 4,320,111 108,003 4,428,114
Rp Rp
6,240,000 124,800
Rp Rp Rp Rp Rp
26,667 9,444 6,400,911 160,023 6,560,934
Rp Rp
7,380,000 147,600
Rp Rp Rp Rp
26,667 9,444 7,563,711 189,093
TOTAL HARGA Rp
8,905,257
Rp
3,677,757
Rp
3,677,757
Rp
3,677,757
Rp
3,677,757
Rp
614,442
Rp
1,900,407
Rp
9,950,757
Rp
4,428,114
Rp
6,560,934
Rp
7,752,804
Analisa Harga Satuan Mekanikal dan Plumbing - page 169 of 211
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 7,752,804
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
7,920,000 158,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
10,800,000 216,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
14,400,000 288,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
24,000,000 480,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
37,200,000 744,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,200,000 864,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
57,600,000 1,152,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 72,000,000 1,440,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
96,000,000 1,920,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
144,000,000 2,880,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
7,920,000 158,400
Rp Rp Rp Rp Rp
26,667 9,444 8,114,511 202,863 8,317,374
Rp Rp
10,800,000 216,000
Rp Rp Rp Rp Rp
26,667 9,444 11,052,111 276,303 11,328,414
Rp Rp
14,400,000 288,000
Rp Rp Rp Rp Rp
26,667 9,444 14,724,111 368,103 15,092,214
Rp Rp
24,000,000 480,000
Rp Rp Rp Rp Rp
26,667 9,444 24,516,111 612,903 25,129,014
Rp Rp
30,000,000 600,000
Rp Rp Rp Rp Rp
26,667 9,444 30,636,111 765,903 31,402,014
Rp Rp
37,200,000 744,000
Rp Rp Rp Rp Rp
26,667 9,444 37,980,111 949,503 38,929,614
Rp Rp
43,200,000 864,000
Rp Rp Rp Rp Rp
26,667 9,444 44,100,111 1,102,503 45,202,614
Rp Rp
57,600,000 1,152,000
Rp Rp Rp Rp Rp
26,667 9,444 58,788,111 1,469,703 60,257,814
Rp Rp
72,000,000 1,440,000
Rp Rp Rp Rp Rp
26,667 9,444 73,476,111 1,836,903 75,313,014
Rp Rp
96,000,000 1,920,000
Rp Rp Rp Rp Rp
26,667 9,444 97,956,111 2,448,903 100,405,014
Rp Rp
144,000,000 2,880,000
Rp Rp Rp Rp Rp
26,667 9,444 146,916,111 3,672,903 150,589,014
TOTAL HARGA Rp
8,317,374
Rp
11,328,414
Rp
15,092,214
Rp
25,129,014
Rp
31,402,014
Rp
38,929,614
Rp
45,202,614
Rp
60,257,814
Rp
75,313,014
Rp
100,405,014
Rp
150,589,014
Analisa Harga Satuan Mekanikal dan Plumbing - page 170 of 211
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Exhaust Fan , Kapasitas : 100 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Exhaust Fan , Kapasitas : 150 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Exhaust Fan , Kapasitas : 200 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Exhaust Fan , Kapasitas : 350 CFM/ Wall Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Exhaust Fan , Kapasitas : 450 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Exhaust Fan , Kapasitas : 500 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Exhaust Fan , Kapasitas : 600 CFM/ Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 800 CFM / Wall Type Exhaust Fan , Kapasitas : 800 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Wall Type 1 Exhaust Fan , Kapasitas : 850 CFM / Wall Type
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.33 0.11
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
1.00
Rp
unit
1,150,000 23,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,725,000 34,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,300,000 46,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,875,000 57,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
3,450,000 69,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,025,000 80,500
402,500 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,600,000 92,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,175,000 103,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,750,000 115,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,900,000 138,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,200,000 184,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,775,000
JUMLAH HARGA Rp Rp
1,150,000 23,000
Rp Rp Rp Rp Rp
26,667 9,444 1,209,111 30,228 1,239,339
Rp Rp
1,725,000 34,500
Rp Rp Rp Rp Rp
26,667 9,444 1,795,611 44,890 1,840,501
Rp Rp
2,300,000 46,000
Rp Rp Rp Rp Rp
26,667 9,444 2,382,111 59,553 2,441,664
Rp Rp
2,875,000 57,500
Rp Rp Rp Rp Rp
26,667 9,444 2,968,611 74,215 3,042,826
Rp Rp
3,450,000 69,000
Rp Rp Rp Rp Rp
26,667 9,444 3,555,111 88,878 3,643,989
Rp Rp
4,025,000 80,500
Rp Rp Rp Rp Rp Rp
402,500 26,667 9,444 4,544,111 113,603 4,657,714
Rp Rp
4,600,000 92,000
Rp Rp Rp Rp Rp
26,667 9,444 4,728,111 118,203 4,846,314
Rp Rp
5,175,000 103,500
Rp Rp Rp Rp Rp
26,667 9,444 5,314,611 132,865 5,447,476
Rp Rp
5,750,000 115,000
Rp Rp Rp Rp Rp
26,667 9,444 5,901,111 147,528 6,048,639
Rp Rp
6,900,000 138,000
Rp Rp Rp Rp Rp
26,667 9,444 7,074,111 176,853 7,250,964
Rp Rp
9,200,000 184,000
Rp Rp Rp Rp Rp
26,667 9,444 9,420,111 235,503 9,655,614
Rp
9,775,000
Rp
TOTAL HARGA 1,239,339
Rp
1,840,501
Rp
2,441,664
Rp
3,042,826
Rp
3,643,989
Rp
4,657,714
Rp
4,846,314
Rp
5,447,476
Rp
6,048,639
Rp
7,250,964
Rp
9,655,614
Rp
10,256,776
Analisa Harga Satuan Mekanikal dan Plumbing - page 171 of 211
URAIAN
NO. 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 950 CFM / Wall Type Exhaust Fan , Kapasitas : 950 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Exhaust Fan , Kapasitas : 3000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Exhaust Fan , Kapasitas : 2700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Exhaust Fan , Kapasitas : 2000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Exhaust Fan , Kapasitas : 5000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
1 UNIT Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 1 Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 2 Instalasi Tukang Kepala Tukang AC
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Exhaust Fan , Kapasitas : 2800 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Exhaust Fan , Kapasitas : 2500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Exhaust Fan , Kapasitas : 2400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang
SAT lot
INDEK 1.00
Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp
JUMLAH HARGA 195,500
Rp Rp Rp Rp Rp
26,667 9,444 10,006,611 250,165 10,256,776
Rp Rp
10,925,000 218,500
Rp Rp Rp Rp Rp
26,667 9,444 11,179,611 279,490 11,459,101
Rp Rp
13,800,000 276,000
Rp Rp Rp Rp Rp
26,667 9,444 14,112,111 352,803 14,464,914
Rp Rp
55,000,000 1,100,000
Rp Rp Rp Rp Rp
26,667 9,444 56,136,111 1,403,403 57,539,514
Rp Rp
33,000,000 660,000
Rp Rp Rp Rp Rp
26,667 9,444 33,696,111 842,403 34,538,514
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
26,667 9,444 29,208,111 730,203 29,938,314
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
26,667 9,444 29,208,111 730,203 29,938,314
Rp Rp
22,000,000 440,000
Rp Rp Rp Rp Rp
26,667 9,444 22,476,111 561,903 23,038,014
Rp Rp
55,000,000 1,100,000
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 56,136,111 1,403,403 57,539,514
1.00 1.00 0.33 0.11
Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
31,900,000 638,000 26,667 9,444 32,574,111 814,353 33,388,464
unit lot
1.00 1.00
Rp Rp
Rp Rp
30,800,000 616,000
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 31,452,111 786,303 32,238,414
unit lot
1.00 1.00
Rp Rp
Rp Rp
27,500,000 550,000
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp Rp
26,667 9,444 28,086,111 702,153 28,788,264
unit lot
1.00 1.00
Rp Rp
26,400,000 528,000
Rp Rp
26,400,000 528,000
hari
0.33
Rp
80,000
Rp
26,667
unit lot hari hari
HARGA SATUAN 195,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,925,000 218,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 13,800,000 276,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 55,000,000 1,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 33,000,000 660,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 22,000,000 440,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 55,000,000 1,100,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 31,900,000 638,000 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 30,800,000 616,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 27,500,000 550,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
11,459,101
Rp
14,464,914
Rp
57,539,514
Rp
34,538,514
Rp
29,938,314
Rp
29,938,314
Rp
23,038,014
Rp
57,539,514
Rp
33,388,464
Rp
32,238,414
Rp
28,788,264
Rp
27,638,214
Analisa Harga Satuan Mekanikal dan Plumbing - page 172 of 211
URAIAN
NO. Kepala Tukang AC
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Exhaust Fan , Kapasitas : 2300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Exhaust Fan , Kapasitas : 2200 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Exhaust Fan , Kapasitas : 2100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Exhaust Fan , Kapasitas : 1900 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Exhaust Fan , Kapasitas : 1800 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Exhaust Fan , Kapasitas : 1700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Exhaust Fan , Kapasitas : 1600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Exhaust Fan , Kapasitas : 1500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Exhaust Fan , Kapasitas : 1400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Exhaust Fan , Kapasitas : 1300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Exhaust Fan , Kapasitas : 1200 CFM / Inline Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Exhaust Fan , Kapasitas : 1100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT hari
INDEK 0.11
Rp
HARGA SATUAN 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.33 0.11
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
Rp Rp Rp Rp
JUMLAH HARGA 9,444 26,964,111 674,103 27,638,214
Rp Rp
25,300,000 506,000
Rp Rp Rp Rp Rp
26,667 9,444 25,842,111 646,053 26,488,164
Rp Rp
24,200,000 484,000
Rp Rp Rp Rp Rp
26,667 9,444 24,720,111 618,003 25,338,114
Rp Rp
23,100,000 462,000
Rp Rp Rp Rp Rp
26,667 9,444 23,598,111 589,953 24,188,064
Rp Rp
20,900,000 418,000
Rp Rp Rp Rp Rp
26,667 9,444 21,354,111 533,853 21,887,964
Rp Rp
19,800,000 396,000
Rp Rp Rp Rp Rp
26,667 9,444 20,232,111 505,803 20,737,914
Rp Rp
18,700,000 374,000
Rp Rp Rp Rp Rp
26,667 9,444 19,110,111 477,753 19,587,864
Rp Rp
17,600,000 352,000
Rp Rp Rp Rp Rp
26,667 9,444 17,988,111 449,703 18,437,814
Rp Rp
16,500,000 330,000
Rp Rp Rp Rp Rp
26,667 9,444 16,866,111 421,653 17,287,764
Rp Rp
15,400,000 308,000
Rp Rp Rp Rp Rp
26,667 9,444 15,744,111 393,603 16,137,714
Rp Rp
12,100,000 242,000
Rp Rp Rp Rp Rp
26,667 9,444 12,378,111 309,453 12,687,564
Rp Rp
12,100,000 242,000
Rp Rp Rp Rp Rp Rp
605,000 26,667 9,444 12,983,111 324,578 13,307,689
12,100,000 242,000
Rp Rp
12,100,000 242,000
80,000 85,000
Rp Rp
26,667 9,444
25,300,000 506,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 24,200,000 484,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 23,100,000 462,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 20,900,000 418,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 19,800,000 396,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 18,700,000 374,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 17,600,000 352,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 16,500,000 330,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 15,400,000 308,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,100,000 242,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 12,100,000 242,000
605,000 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
26,488,164
Rp
25,338,114
Rp
24,188,064
Rp
21,887,964
Rp
20,737,914
Rp
19,587,864
Rp
18,437,814
Rp
17,287,764
Rp
16,137,714
Rp
12,687,564
Rp
13,307,689
Rp
12,687,564
Analisa Harga Satuan Mekanikal dan Plumbing - page 173 of 211
URAIAN
NO.
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Exhaust Fan , Kapasitas : 1000 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 950 CFM / Inline Type Exhaust Fan , Kapasitas : 950 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 900 CFM / Inline Type Exhaust Fan , Kapasitas : 900 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 850 CFM / Inline Type Exhaust Fan , Kapasitas : 850 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 800 CFM / Inline Type Unit Fan Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 750 CFM / Inline Type Unit Fan Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 700 CFM / Inline Type Exhaust Fan , Kapasitas : 700 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 650 CFM / Inline Type Exhaust Fan , Kapasitas : 650 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 600 CFM / Inline Type Exhaust Fan , Kapasitas : 600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 550 CFM / Inline Type Exhaust Fan , Kapasitas : 550 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 500 CFM / Inline Type Exhaust Fan , Kapasitas : 500 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 450 CFM / Inline Type Exhaust Fan , Kapasitas : 450 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN JUMLAH HARGA Jumlah Rp 12,378,111 Keuntungan 2,5% Rp 309,453 Total = Jumlah+(Keuntungan 2,5%) Rp 12,687,564
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 10,450,000 209,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,900,000 198,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 9,350,000 187,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,800,000 176,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 8,250,000 165,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,700,000 154,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 7,150,000 143,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,600,000 132,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 6,050,000 121,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 4,950,000 99,000 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
20,000 7,083 11,247,083 281,177 11,528,260
Rp Rp
10,450,000 209,000
Rp Rp Rp Rp Rp
20,000 7,083 10,686,083 267,152 10,953,235
Rp Rp
9,900,000 198,000
Rp Rp Rp Rp Rp
20,000 7,083 10,125,083 253,127 10,378,210
Rp Rp
9,350,000 187,000
Rp Rp Rp Rp Rp
20,000 7,083 9,564,083 239,102 9,803,185
Rp Rp
8,800,000 176,000
Rp Rp Rp Rp Rp
20,000 7,083 9,003,083 225,077 9,228,160
Rp Rp
8,250,000 165,000
Rp Rp Rp Rp Rp
20,000 7,083 8,442,083 211,052 8,653,135
Rp Rp
7,700,000 154,000
Rp Rp Rp Rp Rp
20,000 7,083 7,881,083 197,027 8,078,110
Rp Rp
7,150,000 143,000
Rp Rp Rp Rp Rp
20,000 7,083 7,320,083 183,002 7,503,085
Rp Rp
6,600,000 132,000
Rp Rp Rp Rp Rp
20,000 7,083 6,759,083 168,977 6,928,060
Rp Rp
6,050,000 121,000
Rp Rp Rp Rp Rp
20,000 7,083 6,198,083 154,952 6,353,035
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
20,000 7,083 5,637,083 140,927 5,778,010
Rp Rp
4,950,000 99,000
Rp Rp Rp Rp
20,000 7,083 5,076,083 126,902
TOTAL HARGA
Rp
11,528,260
Rp
10,953,235
Rp
10,378,210
Rp
9,803,185
Rp
9,228,160
Rp
8,653,135
Rp
8,078,110
Rp
7,503,085
Rp
6,928,060
Rp
6,353,035
Rp
5,778,010
Rp
5,202,985
Analisa Harga Satuan Mekanikal dan Plumbing - page 174 of 211
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Exhaust Fan , Kapasitas : 400 CFM / Inline Type Exhaust Fan , Kapasitas : 400 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 350 CFM / Inline Type Exhaust Fan , Kapasitas : 350 CFM / Inline Type Instalasi Tenaga Kerja : Alat bantu Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 300 CFM / Inline Type Exhaust Fan , Kapasitas : 300 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 250 CFM / Inline Type Exhaust Fan , Kapasitas : 250 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 200 CFM / Inline Type Exhaust Fan , Kapasitas : 200 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 150 CFM / Inline Type Exhaust Fan , Kapasitas : 150 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 100 CFM / Inline Type Exhaust Fan , Kapasitas : 100 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan , Kapasitas : 70 CFM / Inline Type Exhaust Fan , Kapasitas : 70 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 5,202,985
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
Set hari hari
1.00 0.25 0.08
Rp Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
4,400,000 88,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,850,000 77,000
192,500 80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%) 3,300,000 66,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,750,000 55,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,200,000 44,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,650,000 33,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,100,000 22,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
770,000 15,400
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
21,000,000 420,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,500,000 590,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,500,000 590,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
4,400,000 88,000
Rp Rp Rp Rp Rp
20,000 7,083 4,515,083 112,877 4,627,960
Rp Rp
3,850,000 77,000
Rp Rp Rp Rp Rp Rp
192,500 20,000 7,083 4,146,583 103,665 4,250,248
Rp Rp
3,300,000 66,000
Rp Rp Rp Rp Rp
20,000 7,083 3,393,083 84,827 3,477,910
Rp Rp
2,750,000 55,000
Rp Rp Rp Rp Rp
20,000 7,083 2,832,083 70,802 2,902,885
Rp Rp
2,200,000 44,000
Rp Rp Rp Rp Rp
20,000 7,083 2,271,083 56,777 2,327,860
Rp Rp
1,650,000 33,000
Rp Rp Rp Rp Rp
20,000 7,083 1,710,083 42,752 1,752,835
Rp Rp
1,100,000 22,000
Rp Rp Rp Rp Rp
20,000 7,083 1,149,083 28,727 1,177,810
Rp Rp
770,000 15,400
Rp Rp Rp Rp Rp
20,000 7,083 812,483 20,312 832,795
Rp Rp
21,000,000 420,000
Rp Rp Rp Rp Rp
26,667 9,444 21,456,111 536,403 21,992,514
Rp Rp
29,500,000 590,000
Rp Rp Rp Rp Rp
26,667 9,444 30,126,111 753,153 30,879,264
Rp Rp
29,500,000 590,000
Rp Rp Rp Rp Rp
26,667 9,444 30,126,111 753,153 30,879,264
TOTAL HARGA Rp
4,627,960
Rp
4,250,248
Rp
3,477,910
Rp
2,902,885
Rp
2,327,860
Rp
1,752,835
Rp
1,177,810
Rp
832,795
Rp
21,992,514
Rp
30,879,264
Rp
30,879,264
Analisa Harga Satuan Mekanikal dan Plumbing - page 175 of 211
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 TTK 1 2 3 4
URAIAN Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting HOOD SUS - 304 Ducting HOOD SUS - 304 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
TITIK INSTALASI OUTDOOR UNIT AC Kabel NYY 4x35 mm2 Way Delta A Isolasi Ban Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1 TTK TITIK INSTALASI KRITIKAL UNIT AC 1 Kabel NYY 4x10 mm2 2 Isolasi Ban 3 Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1 TTK TITIK INSTALASI INDOOR UNIT AC 1 Kabel NYY 4x10 mm2 2 Isolasi Ban 3 Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
1M 1 2 3
1 BH 1 2
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 M' 1 2 3
1 M'
SAT
INDEK
HARGA SATUAN
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.11
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
m' bh bh
10.00 1.00 1.00
Rp Rp Rp
hari hari
0.50 0.17
Rp Rp
m' bh
10.00 1.00
Rp Rp
hari hari
0.50 0.17
Rp Rp
m' bh
10.00 1.00
Rp Rp
hari hari
0.50 0.17
Rp Rp
60,000,000 1,200,000
Rp Rp Rp Rp Rp
26,667 9,444 61,236,111 1,530,903 62,767,014
Rp Rp
5,040,000 100,800
Rp Rp Rp Rp Rp
20,000 7,083 5,167,883 129,197 5,297,080
Rp Rp Rp
2,500,000 1,260,261 2,000
Rp Rp Rp Rp Rp
40,000 14,167 3,816,427 95,411 3,911,838
Rp Rp
2,000
Rp Rp Rp Rp Rp
40,000 14,167 56,167 1,404 57,571
Rp Rp
2,000
Rp Rp Rp Rp Rp
40,000 14,167 56,167 1,404 57,571
Rp Rp
383,000 7,660
Rp Rp Rp Rp Rp
14,167 6,667 411,493 10,287 421,781
Rp Rp
1,189,300 23,786
Jumlah Rp Keuntungan 2,5% Rp Total = Jumlah+(Keuntungan 2,5%) Rp
1,213,086 30,327 1,243,413
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
hari hari
0.17 0.08
Rp Rp
FIRE EXTINGUISHER 6 KG FIRE EXTINGUISHER 6 KG Instalasi
bh lot
1.00 1.00
Rp Rp
Pipa Stainless Steel 304 Sch.10 ( 65 mm )
2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
Pipa Stainless Steel 304 Sch.10 ( 100 mm ) Pipa Stainless Steel 304 Sch.10 ( 100 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
250,000 1,260,261 2,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1.00 1.00
Membran Filter Lengkap dengan accessories Harga Unit Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
5,040,000 100,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
m' lot
Stronge Tank SS304, Volume 2000 Litter Stronge Tank SS304, Volume 2000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
JUMLAH HARGA Rp Rp
KABEL LEADER (Kabel Indoor to Outdoor) KABEL LEADER (Kabel Indoor to Outdoor) Instalasi Tenaga Kerja : Kepala Tukang Listrik Tukang
Pompa tekan RO ( Stainless Steel ), lengkap accesories Harga Unit Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
60,000,000 1,200,000
383,000 7,660
85,000 80,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.27
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.67 0.27
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
1,189,300 23,786
26,000,000 520,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
30,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
330,000 6,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
26,000,000 520,000
Rp Rp Rp Rp Rp
53,333 22,667 26,596,000 664,900 27,260,900
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
36,000 15,300 11,271,300 281,783 11,553,083
Rp Rp
30,000,000 600,000
Rp Rp Rp Rp Rp
53,333 22,667 30,676,000 766,900 31,442,900
Rp Rp
330,000 6,600
Rp Rp Rp Rp Rp
8,000 3,400 348,000 8,700 356,700
Rp
TOTAL HARGA 62,767,014
Rp
5,297,080
Rp
3,911,838
Rp
57,571
Rp
57,571
Rp
421,781
Rp
1,243,413
Rp
27,260,900
Rp
11,553,083
Rp
31,442,900
Rp
356,700
Rp
229,499
Analisa Harga Satuan Mekanikal dan Plumbing - page 176 of 211
NO. 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Pipa Stainless Steel 304 Sch.10 ( 65 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 32 mm ) Pipa Stainless Steel 304 Sch.10 ( 32 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 50 mm ) Pipa Stainless Steel 304 Sch.10 ( 50 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 40 mm ) Pipa Stainless Steel 304 Sch.10 ( 40 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pipa Stainless Steel 304 Sch.10 ( 20 mm ) Pipa Stainless Steel 304 Sch.10 ( 20 mm ) Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
High Pressure Pump High Pressure Pump Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Membrane 4" x 40" - 1500 GPD Membrane 4" x 40" - 1500 GPD Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Housing FRP Housing FRP Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Permeate & Concentrate Rotameter Permeate & Concentrate Rotameter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
System Pressure Gauge System Pressure Gauge Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Recyle Valve Recyle Valve Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 UNIT Low Pressure Switch
SAT M' lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.10 0.04
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
M' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.12 0.05
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.12 0.05
Rp Rp
HARGA SATUAN 208,335 4,167
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
108,333 2,167
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
153,450 3,069
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
123,000 2,460
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
50,000 1,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,500,000 250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
17,300,000 346,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,500,000 250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,000,000 140,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
700,000 14,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,100,000 22,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 208,335 4,167
Rp Rp Rp Rp Rp
8,000 3,400 223,902 5,598 229,499
Rp Rp
108,333 2,167
Rp Rp Rp Rp Rp
6,667 2,833 120,000 3,000 123,000
Rp Rp
153,450 3,069
Rp Rp Rp Rp Rp
8,000 3,400 167,919 4,198 172,117
Rp Rp
123,000 2,460
Rp Rp Rp Rp Rp
6,667 2,833 134,960 3,374 138,334
Rp Rp
50,000 1,000
Rp Rp Rp Rp Rp
6,667 2,833 60,500 1,512 62,012
Rp Rp
12,500,000 250,000
Rp Rp Rp Rp Rp
6,667 2,833 12,759,500 318,988 13,078,488
Rp Rp
17,300,000 346,000
Rp Rp Rp Rp Rp
6,667 2,833 17,655,500 441,388 18,096,888
Rp Rp
12,500,000 250,000
Rp Rp Rp Rp Rp
6,667 2,833 12,759,500 318,988 13,078,488
Rp Rp
7,000,000 140,000
Rp Rp Rp Rp Rp
6,667 2,833 7,149,500 178,738 7,328,238
Rp Rp
700,000 14,000
Rp Rp Rp Rp Rp
9,333 3,967 727,300 18,183 745,483
Rp Rp
1,100,000 22,000
Rp Rp Rp Rp Rp
9,333 3,967 1,135,300 28,383 1,163,683
TOTAL HARGA
Rp
123,000
Rp
172,117
Rp
138,334
Rp
62,012
Rp
13,078,488
Rp
18,096,888
Rp
13,078,488
Rp
7,328,238
Rp
745,483
Rp
1,163,683
Rp
2,937,138
Analisa Harga Satuan Mekanikal dan Plumbing - page 177 of 211
URAIAN
NO. 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 LOT 1 2 3
1 LOT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Low Pressure Switch Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Solenoid Valve 3/4" Solenoid Valve 3/4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
TDS Monitor TDS Monitor Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Cartridge Filter Cartridge Filter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Piping & Interconnecting Piping & Interconnecting Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Frame Frame Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Aksesoris Aksesoris Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Stronge Tank SS304, Volume 1000 Litter Stronge Tank SS304, Volume 1000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Stronge Tank SS304, Volume 2000 Litter Stronge Tank SS304, Volume 2000 Litter Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pompa Distribusi Kap. 10 Lpm, Head 32 m Pompa Distribusi Kap. 10 Lpm, Head 32 m Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Pompa Isap Kap. 10 Lpm, Head 32 m Pompa Isap Kap. 10 Lpm, Head 32 m Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 UNIT Housing Catridge 10", in/out 3/4"
SAT unit lot
INDEK 1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.08 0.03
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.07 0.03
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
HARGA SATUAN 2,800,000 56,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,800,000 36,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
31,500,000 630,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
13,800,000 276,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
7,000,000 140,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,000,000 40,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,200,000 84,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,500,000 110,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,000,000 220,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,400,000 168,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,400,000 168,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 2,800,000 56,000
Rp Rp Rp Rp Rp
6,667 2,833 2,865,500 71,638 2,937,138
Rp Rp
1,800,000 36,000
Rp Rp Rp Rp Rp
6,667 2,833 1,845,500 46,138 1,891,638
Rp Rp
31,500,000 630,000
Rp Rp Rp Rp Rp
6,667 2,833 32,139,500 803,488 32,942,988
Rp Rp
13,800,000 276,000
Rp Rp Rp Rp Rp
6,667 2,833 14,085,500 352,138 14,437,638
Rp Rp
7,000,000 140,000
Rp Rp Rp Rp Rp
5,333 2,267 7,147,600 178,690 7,326,290
Rp Rp
2,000,000 40,000
Rp Rp Rp Rp Rp
5,333 2,267 2,047,600 51,190 2,098,790
Rp Rp
4,200,000 84,000
Rp Rp Rp Rp Rp
4,000 1,700 4,289,700 107,243 4,396,943
Rp Rp
5,500,000 110,000
Rp Rp Rp Rp Rp
36,000 15,300 5,661,300 141,533 5,802,833
Rp Rp
11,000,000 220,000
Rp Rp Rp Rp Rp
36,000 15,300 11,271,300 281,783 11,553,083
Rp Rp
8,400,000 168,000
Rp Rp Rp Rp Rp
26,667 11,333 8,606,000 215,150 8,821,150
Rp Rp
8,400,000 168,000
Rp Rp Rp Rp Rp
26,667 11,333 8,606,000 215,150 8,821,150
TOTAL HARGA
Rp
1,891,638
Rp
32,942,988
Rp
14,437,638
Rp
7,326,290
Rp
2,098,790
Rp
4,396,943
Rp
5,802,833
Rp
11,553,083
Rp
8,821,150
Rp
8,821,150
Rp
13,074,593
Analisa Harga Satuan Mekanikal dan Plumbing - page 178 of 211
NO. 1 2 3
1 UNIT 1 2 3
1 LOT 1 2 3
1 UNIT 1 2 3
1 SET 1 2 3
1 LOT 1 2 3
URAIAN Housing Catridge 10", in/out 3/4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Housing Catridge 10", in/out 4" Housing Catridge 10", in/out 4" Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Granular Resin Mixed Bed Granular Resin Mixed Bed Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Ultra Voilet Sterlight 5 GPM, 30 Watt Ultra Voilet Sterlight 5 GPM, 30 Watt Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Control Panel Indoor Control Panel Indoor Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Cabling Cabling Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
1 LOT Installation 1 Installation 2 Tenaga Kerja : Tukang pipa Kepala tukang pipa
1 LOT Test Run & Commisioning 1 Test Run & Commisioning 2 Tenaga Kerja : Mandor
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
Sentral Oxygen Automatic System Kap. 2x10 cyl Sentral Oxygen Automatic System Kap. 2x10 cyl Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Sentral N2O Automatic System Kap. 2x2 cyl Sentral N2O Automatic System Kap. 2x2 cyl Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Oil Free Air Compressor - Duplex Oil Free Air Compressor - Duplex Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Vacuum Pump Duplex System Vacuum Pump Duplex System Instalasi Tenaga Kerja : Tukang pipa
SAT unit lot
INDEK 1.00 1.00
Rp Rp
HARGA SATUAN 12,500,000 250,000
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.05 0.02
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.33 0.13
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.50 0.20
Rp Rp
lot lot
1.00 1.00
Rp Rp
hari hari
0.45 0.18
Rp Rp
lot
1.00
Rp
hari hari
0.33 0.13
Rp Rp
lot
1.00
Rp
hari
0.04
Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
459,616,250 9,192,325
hari
0.20
Rp
80,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,200,000 124,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,700,000 54,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,600,000 112,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,400,000 188,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
500,000 10,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
6,000,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,000,000
90,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
305,932,000 6,118,640
Rp Rp
JUMLAH HARGA 12,500,000 250,000
Rp Rp Rp Rp Rp
4,000 1,700 12,755,700 318,893 13,074,593
Rp Rp
6,200,000 124,000
Rp Rp Rp Rp Rp
4,000 1,700 6,329,700 158,243 6,487,943
Rp Rp
2,700,000 54,000
Rp Rp Rp Rp Rp
4,000 1,700 2,759,700 68,993 2,828,693
Rp Rp
5,600,000 112,000
Rp Rp Rp Rp Rp
26,667 11,333 5,750,000 143,750 5,893,750
Rp Rp
9,400,000 188,000
Rp Rp Rp Rp Rp
40,000 17,000 9,645,000 241,125 9,886,125
Rp Rp
500,000 10,000
Rp Rp Rp Rp Rp
36,000 15,300 561,300 14,033 575,333
Rp
6,000,000
Rp Rp Rp Rp Rp
26,667 11,333 6,038,000 150,950 6,188,950
Rp
2,000,000
Rp Rp Rp Rp
3,861 2,003,861 50,097 2,053,958
Rp
305,932,000 SUDAH TERMASUK
TOTAL HARGA
Rp
6,487,943
Rp
2,828,693
Rp
5,893,750
Rp
9,886,125
Rp
575,333
Rp
6,188,950
Rp
2,053,958
Rp
313,580,300
Rp
283,374,063
Rp
866,754,786
Rp
471,106,656
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 305,932,000 Keuntungan 2,5% Rp 7,648,300 Total = Jumlah+(Keuntungan 2,5%) Rp 313,580,300 276,462,500 5,529,250
Rp
276,462,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 276,462,500 Keuntungan 2,5% Rp 6,911,563 Total = Jumlah+(Keuntungan 2,5%) Rp 283,374,063 845,614,425 16,912,289
Rp
845,614,425 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 845,614,425 Keuntungan 2,5% Rp 21,140,361 Total = Jumlah+(Keuntungan 2,5%) Rp 866,754,786 Rp
459,616,250 SUDAH TERMASUK SUDAH TERMASUK Analisa Harga Satuan Mekanikal dan Plumbing - page 179 of 211
URAIAN
NO. Kepala tukang pipa
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 BH 1 2 3
Master Alarm 10 function Master Alarm 10 function Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Alarm System for 4 Gases Alarm System for 4 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 4 gases Zone Valve for 4 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 3 Gases Alarm System for 3 Gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Zone Valve for 3 gases Zone Valve for 3 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 2 Gases Alarm System for 2 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 2 gases Zone Valve for 2 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Alarm System for 1 Gases Alarm System for 1 Gases Instalasi Tenaga Kerja : Tukang Listrik Kepala tukang Listrik
Zone Valve for 1 gases Zone Valve for 1 gases Instalasi Tenaga Kerja : Tukang Pipa Kepala tukang Pipa
Gas Medis For Oxygen Gas Medis For Oxygen Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Valve Gas Medis For Valve Instalasi Tenaga Kerja : Tukang pipa
SAT hari
INDEK 0.12
Rp
HARGA SATUAN JUMLAH HARGA 85,000 SUDAH TERMASUK Jumlah Rp 459,616,250 Keuntungan 2,5% Rp 11,490,406 Total = Jumlah+(Keuntungan 2,5%) Rp 471,106,656
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.12 0.07
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.20 0.12
Rp Rp
bh lot
1.00 1.00
Rp Rp
1,358,725 27,175
hari
0.17
Rp
80,000
58,235,625 1,164,713
Rp
TOTAL HARGA
Rp
59,691,516
Rp
34,850,000
Rp
22,086,188
Rp
29,056,188
Rp
16,553,750
Rp
20,343,688
Rp
11,108,438
Rp
11,631,188
Rp
5,837,375
Rp
1,392,693
Rp
1,392,693
58,235,625 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 58,235,625 Keuntungan 2,5% Rp 1,455,891 Total = Jumlah+(Keuntungan 2,5%) Rp 59,691,516 34,000,000 680,000
Rp
34,000,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 34,000,000 Keuntungan 2,5% Rp 850,000 Total = Jumlah+(Keuntungan 2,5%) Rp 34,850,000 21,547,500 430,950
Rp
21,547,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 21,547,500 Keuntungan 2,5% Rp 538,688 Total = Jumlah+(Keuntungan 2,5%) Rp 22,086,188 28,347,500 566,950
Rp
28,347,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 28,347,500 Keuntungan 2,5% Rp 708,688 Total = Jumlah+(Keuntungan 2,5%) Rp 29,056,188 16,150,000 323,000
Rp
16,150,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 16,150,000 Keuntungan 2,5% Rp 403,750 Total = Jumlah+(Keuntungan 2,5%) Rp 16,553,750 19,847,500 396,950
Rp
19,847,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 19,847,500 Keuntungan 2,5% Rp 496,188 Total = Jumlah+(Keuntungan 2,5%) Rp 20,343,688 10,837,500 216,750
Rp
10,837,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 10,837,500 Keuntungan 2,5% Rp 270,938 Total = Jumlah+(Keuntungan 2,5%) Rp 11,108,438 11,347,500 226,950
Rp
11,347,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 11,347,500 Keuntungan 2,5% Rp 283,688 Total = Jumlah+(Keuntungan 2,5%) Rp 11,631,188 5,695,000 113,900
Rp
5,695,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 5,695,000 Keuntungan 2,5% Rp 142,375 Total = Jumlah+(Keuntungan 2,5%) Rp 5,837,375 1,358,725 27,175
Rp
1,358,725 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693 Rp
1,358,725 SUDAH TERMASUK SUDAH TERMASUK Analisa Harga Satuan Mekanikal dan Plumbing - page 180 of 211
URAIAN
NO. Kepala tukang pipa
1 BH 1 2 3
Gas Medis For Gas Medis Wall Outlet Gas Medis For Gas Medis Wall Outlet Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT hari
INDEK 0.08
Rp
HARGA SATUAN JUMLAH HARGA 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693
bh lot
1.00 1.00
Rp Rp
1,358,725 27,175
hari hari
0.17 0.08
Rp Rp
80,000 85,000 Jumlah
TOTAL HARGA
Rp Rp
Rp
1,392,693
1,358,725 SUDAH TERMASUK SUDAH TERMASUK SUDAH TERMASUK 1,358,725
Analisa Harga Satuan Mekanikal dan Plumbing - page 181 of 211
URAIAN
NO.
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 BH 1 2 3
1 M' 1 2 3
Gas Medis For Oxygen DISS Gas Medis For Oxygen DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For N2O DISS Gas Medis For N2O DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Air DISS Gas Medis For Air DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for VACUM DISS Gas Medis for VACUM DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for CO2 DISS Gas Medis for CO2 DISS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis for N20 Gas Medis for N20 Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Vacum Gas Medis For Vacum Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For AGSS Gas Medis For AGSS Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Gas Medis For Compress Air Gas Medis For Compress Air Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2⅛" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
bh lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
1,572,500 31,450
Rp
TOTAL HARGA
Rp
1,611,813
Rp
1,611,813
Rp
1,611,813
Rp
1,611,813
Rp
1,611,813
Rp
1,392,693
Rp
1,392,693
Rp
1,392,693
Rp
1,392,693
Rp
958,375
Rp
910,456
1,572,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,572,500 Keuntungan 2,5% Rp 39,313 Total = Jumlah+(Keuntungan 2,5%) Rp 1,611,813 1,572,500 31,450
Rp
1,572,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,572,500 Keuntungan 2,5% Rp 39,313 Total = Jumlah+(Keuntungan 2,5%) Rp 1,611,813 1,572,500 31,450
Rp
1,572,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,572,500 Keuntungan 2,5% Rp 39,313 Total = Jumlah+(Keuntungan 2,5%) Rp 1,611,813 1,572,500 31,450
Rp
1,572,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,572,500 Keuntungan 2,5% Rp 39,313 Total = Jumlah+(Keuntungan 2,5%) Rp 1,611,813 1,572,500 31,450
Rp
1,572,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,572,500 Keuntungan 2,5% Rp 39,313 Total = Jumlah+(Keuntungan 2,5%) Rp 1,611,813 1,358,725 27,175
Rp
1,358,725 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693 1,358,725 27,175
Rp
1,358,725 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693 1,358,725 27,175
Rp
1,358,725 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693 1,358,725 27,175
Rp
1,358,725 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,358,725 Keuntungan 2,5% Rp 33,968 Total = Jumlah+(Keuntungan 2,5%) Rp 1,392,693 935,000 18,700
Rp
935,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 935,000 Keuntungan 2,5% Rp 23,375 Total = Jumlah+(Keuntungan 2,5%) Rp 958,375 888,250 17,765
Rp
888,250 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 888,250 Keuntungan 2,5% Rp 22,206 Analisa Harga Satuan Mekanikal dan Plumbing - page 182 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø 1" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Copper Tube ø ⅜" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 910,456
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.17 0.08
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
1.00 1.00
Rp Rp
0.08 0.04
Rp Rp
1.00 1.00
Rp Rp
0.08 0.04
Rp Rp
359,083 7,182
Rp
TOTAL HARGA Rp
368,060
Rp
368,060
Rp
368,060
Rp
243,384
Rp
190,804
Rp
135,044
Rp
90,461
Rp
514,250
Rp
479,188
Rp
653,438
Rp
653,438
359,083 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 359,083 Keuntungan 2,5% Rp 8,977 Total = Jumlah+(Keuntungan 2,5%) Rp 368,060 359,083 7,182
Rp
359,083 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 359,083 Keuntungan 2,5% Rp 8,977 Total = Jumlah+(Keuntungan 2,5%) Rp 368,060 359,083 7,182
Rp
359,083 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 359,083 Keuntungan 2,5% Rp 8,977 Total = Jumlah+(Keuntungan 2,5%) Rp 368,060 237,448 4,749
Rp
237,448 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 237,448 Keuntungan 2,5% Rp 5,936 Total = Jumlah+(Keuntungan 2,5%) Rp 243,384 186,150 3,723
Rp
186,150 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 186,150 Keuntungan 2,5% Rp 4,654 Total = Jumlah+(Keuntungan 2,5%) Rp 190,804 131,750 2,635
Rp
131,750 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 131,750 Keuntungan 2,5% Rp 3,294 Total = Jumlah+(Keuntungan 2,5%) Rp 135,044 82,238 1,645
Rp
82,238 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 82,238 Keuntungan 2,5% Rp 8,224 Total = Jumlah+(Keuntungan 2,5%) Rp 90,461 467,500 9,350
Rp
467,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 467,500 Keuntungan 2,5% Rp 46,750 Total = Jumlah+(Keuntungan 2,5%) Rp 514,250 467,500 9,350
Rp
467,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 467,500 Keuntungan 2,5% Rp 11,688 Total = Jumlah+(Keuntungan 2,5%) Rp 479,188
Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² m' Instalasi lot Tenaga Kerja : Tukang pipa hari Kepala tukang pipa hari
637,500 12,750
Rp
637,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 637,500 Keuntungan 2,5% Rp 15,938 Total = Jumlah+(Keuntungan 2,5%) Rp 653,438
1 M' 1 2 3
Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² m' Instalasi lot Tenaga Kerja : Tukang pipa hari Kepala tukang pipa hari
637,500 12,750
Rp
637,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 637,500 Keuntungan 2,5% Rp 15,938 Analisa Harga Satuan Mekanikal dan Plumbing - page 183 of 211
URAIAN
NO. 1 M' 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 SET 1 2 3
1 M' 1 2 3
1 SET 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Area Alarm Instalasi Area Alarm Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Zone Valve Instalasi Zone Valve Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Gas Medis Wall Outlet Instalasi Gas Medis Wall Outlet Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Instalasi Pipa Gas Instalasi Pipa Gas Instalasi Tenaga Kerja : Tukang pipa Kepala tukang pipa
Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Exhaust Fan , Kapasitas : 2600 CFM / Inline Type Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 653,438
m' lot
1.00 1.00
Rp Rp
hari hari
0.08 0.04
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
m' lot
1.00 1.00
Rp Rp
hari hari
0.13 0.06
Rp Rp
set lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
467,500 9,350
Rp
TOTAL HARGA Rp
479,188
Rp
1,524,688
Rp
1,306,875
Rp
304,938
Rp
65,344
Rp
29,929,060
Rp
2,392,368
Rp
6,202,045
Rp
8,414,892
Rp
10,318,234
Rp
12,376,329
467,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 467,500 Keuntungan 2,5% Rp 11,688 Total = Jumlah+(Keuntungan 2,5%) Rp 479,188 1,487,500 29,750
Rp
1,487,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,487,500 Keuntungan 2,5% Rp 37,188 Total = Jumlah+(Keuntungan 2,5%) Rp 1,524,688 1,275,000 25,500
Rp
1,275,000 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 1,275,000 Keuntungan 2,5% Rp 31,875 Total = Jumlah+(Keuntungan 2,5%) Rp 1,306,875 297,500 5,950
Rp
297,500 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 297,500 Keuntungan 2,5% Rp 7,438 Total = Jumlah+(Keuntungan 2,5%) Rp 304,938 63,750 1,275
Rp
63,750 SUDAH TERMASUK
80,000 SUDAH TERMASUK 85,000 SUDAH TERMASUK Jumlah Rp 63,750 Keuntungan 2,5% Rp 1,594 Total = Jumlah+(Keuntungan 2,5%) Rp 65,344 28,600,000 572,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,261,700 45,234
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,905,580 118,112
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
8,022,125 160,442
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
9,842,634 196,853
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
11,811,161 236,223 80,000 85,000 Jumlah Keuntungan 2,5%
Rp Rp
28,600,000 572,000
Rp Rp Rp Rp Rp
20,000 7,083 29,199,083 729,977 29,929,060
Rp Rp
2,261,700 45,234
Rp Rp Rp Rp Rp
20,000 7,083 2,334,017 58,350 2,392,368
Rp Rp
5,905,580 118,112
Rp Rp Rp Rp Rp
20,000 7,083 6,050,775 151,269 6,202,045
Rp Rp
8,022,125 160,442
Rp Rp Rp Rp Rp
20,000 7,083 8,209,651 205,241 8,414,892
Rp Rp
9,842,634 196,853
Rp Rp Rp Rp Rp
20,000 7,083 10,066,570 251,664 10,318,234
Rp Rp
11,811,161 236,223
Rp Rp Rp Rp
20,000 7,083 12,074,467 301,862 Analisa Harga Satuan Mekanikal dan Plumbing - page 184 of 211
URAIAN
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 SET 1 2 3 4
5 6 7
1 SET 1 2 3 4
5 6 7
1 SET 1 2 3 4
5 6 7
1 M' 1 2 3
Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer Exhaust Fan Axial Inline Type Kap. 12000 CFM + Silencer Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Total = Jumlah+(Keuntungan 2,5%) Rp 12,376,329
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
unit lot
1.00 1.00
Rp Rp
hari hari
0.25 0.08
Rp Rp
13,779,688 275,594
Rp Rp
13,779,688 275,594
Rp Rp Rp Rp Rp
20,000 7,083 14,082,365 352,059 14,434,424
Rp Rp
20,055,312 401,106
Rp Rp Rp Rp Rp
20,000 7,083 20,483,502 512,088 20,995,589
Rp Rp
29,084,913 581,698
Rp Rp Rp Rp Rp
20,000 7,083 29,693,695 742,342 30,436,037
Rp Rp
38,034,117 760,682
Rp Rp Rp Rp Rp
20,000 7,083 38,821,883 970,547 39,792,430
Rp Rp
43,740,000 874,800
Rp Rp Rp Rp Rp
20,000 7,083 44,641,883 1,116,047 45,757,930
#REF! 72,000,000 Rp 5,905,580 Rp
#REF! 72,000,000 5,905,580
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
20,055,312 401,106
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
29,084,913 581,698
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
38,034,117 760,682
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
43,740,000 874,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA Rp
14,434,424
Rp
20,995,589
Rp
30,436,037
Rp
39,792,430
Rp
45,757,930
#REF!
#REF! #REF!
Air Filter (On Ceilling Room) Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper #REF! Instalasi
#REF! #REF! Air Filter (On Ceilling Room) OK Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper kapasitas : 363 100 BTU/h - OU #REF! Instalasi
#REF! #REF! Air Filter (On Ceilling Room) Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer Aksesoris AHU - Deferensial Pressure Switch (Medium Filter) - Deferensial Pressure Switch (Hepa Filter) -Analoge Deferential Pressure Gauge (Detection Room Pressure) -Mixing Box untuk Fresh air dan Return Air -Iris Damper kapasitas : 515 900 BTU/h - OU #REF! Instalasi
Supply Air Diffuser 44" x 38" 44" x 38" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF! 5,000,000
Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
#REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
5,000,000 #REF! #REF! #REF! #REF! #REF! #REF!
bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp
#REF! #REF! 20,055,312 Rp
Rp Rp Rp
Rp Rp Rp
1,500,000 1,500,000 1,650,000 #REF! Rp 5,000,000 Rp 199,867,500 #REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
#REF! #REF! 20,055,312 1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
5,000,000 199,867,500 #REF! #REF! #REF! #REF! #REF!
Rp Rp
#REF! 72,000,000 Rp 38,034,117 Rp
#REF! 72,000,000 38,034,117
Rp Rp Rp
#REF! bh set bh
1.00 1.00 1.00
set set set set set unit ls ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Rp Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
1,500,000 1,500,000 1,650,000 #REF! Rp 5,000,000 Rp 287,894,250 #REF! #REF! Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1,500,000 1,500,000 1,650,000 #REF!
Rp Rp
5,000,000 287,894,250 #REF! #REF! #REF! #REF! #REF!
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 185 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 44" x 36" 44" x 36" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 40" x 34" 40" x 34" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 36" x 34" 36" x 34 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 34" x 30" 34" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 30" x 30" 30" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 30" x 24" 30" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 28" 28" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 24" 28" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 22" 28" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 28" x 20" 28" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 186 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 2
1 M' 1 2 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 26" x 26" 26" x 26" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 26" x 24" 26" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 26" x 16" 26" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 24" x 24" 24" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 22" 22" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 20" 22" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 22" x 18" 22" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 20" 20" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 20" x 12" 20" x 12 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 187 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 18" x 18" 18" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 14" 18" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 18" x 12" 18" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 14" 16" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 12" 16" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 16" x 10" 16" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
680,000 34,000
Rp Rp
680,000 34,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 728,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Analisa Harga Satuan Mekanikal dan Plumbing - page 188 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Supply Air Diffuser 12" x 10" 12" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 12" x 8" 12" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Supply Air Diffuser 6" x 6" 6" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 36" 40" x 36 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 34" 40" x 34" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 40" x 32" 40" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 34" x 32" 34" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 18,211 Total = Jumlah+(Keuntungan 2,5%) Rp 746,656
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
680,000 34,000
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
680,000 34,000
Rp Rp Rp Rp Rp
10,667 3,778 728,444 18,211 746,656
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
680,000 34,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
746,656
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 189 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 32" x 34" 32" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 36" x 32" 36" x 32" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 34" x 30" 34" x 30" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 30" x 24" 30" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 28" x 28" 28" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 28" x 24" 28" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 26" x 26" 26" x 26" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 24" 24" x 24" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 24" x 22" 24" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 190 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 24" x 16" 24" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 22" 22" x 22" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 20" 22" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 22" x 18" 22" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 20" 20" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 20" x 16" 20" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 18" 18" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 18" x 14" 18" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 191 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 16" x 14" 16" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 16" x 12" 16" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 15" x 10" 15" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 14" 14" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 10" 12" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 12" x 8" 12" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
630,000 31,500
Rp Rp
630,000 31,500
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 675,944
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Rp
692,843
Analisa Harga Satuan Mekanikal dan Plumbing - page 192 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Return Air Grille 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Return Air Grille 6" x 6" 6" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 32" x 28" 32" x 28" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 24" x 20" 24" x 20" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 22" x 14" 22" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 20" x 18" 20" x 18" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 20" x 16" 20" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 18" x 16" 18" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 16" x 16" 16" x 16" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 14" x 14" 14" x 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 16,899 Total = Jumlah+(Keuntungan 2,5%) Rp 692,843
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
630,000 31,500
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
630,000 31,500
Rp Rp Rp Rp Rp
10,667 3,778 675,944 16,899 692,843
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
780,000 39,000
Rp Rp
780,000 39,000
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 833,444
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
630,000 31,500
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
692,843
Rp
692,843
Rp
692,843
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Analisa Harga Satuan Mekanikal dan Plumbing - page 193 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Fresh Air Louvre 14" x 12" 14" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 14" x 10" 14" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 12" x 12" 12" x 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 10" x 10" 10" x 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 10" x 8" 10" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 8" x 8" 8" x 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Fresh Air Louvre 8" x 6" 8" x 6" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 14" x 14" VD 14" X 14" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 12" x 12" VD 12" X 12" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 10" x 10" VD 10" X 10" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Volume Damper 8" x 8" VD 8" X 8" Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 20,836 Total = Jumlah+(Keuntungan 2,5%) Rp 854,281
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
780,000 39,000
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
780,000 39,000
Rp Rp Rp Rp Rp
10,667 3,778 833,444 20,836 854,281
Rp Rp
695,200 34,760
Rp Rp Rp Rp Rp
10,667 3,778 744,404 18,610 763,015
Rp Rp
596,000 29,800
Rp Rp Rp Rp Rp
10,667 3,778 640,244 16,006 656,251
Rp Rp
413,600 20,680
Rp Rp Rp Rp Rp
10,667 3,778 448,724 11,218 459,943
264,800 13,240
Rp Rp
264,800 13,240
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 292,484
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
780,000 39,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
695,200 34,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
596,000 29,800
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
413,600 20,680
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
854,281
Rp
763,015
Rp
656,251
Rp
459,943
Rp
299,797
Analisa Harga Satuan Mekanikal dan Plumbing - page 194 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Ducting 6'' x 4'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 6'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 3'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 8'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 7'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 10'' x 10'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 4'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 6'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 7,312 Total = Jumlah+(Keuntungan 2,5%) Rp 299,797
m' ls
0.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.30 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.70 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
0.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
Rp Rp
72,760 9,095
Rp Rp Rp Rp Rp
10,667 3,778 96,299 2,407 98,707
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
54,570 9,095
Rp Rp Rp Rp Rp
10,667 3,778 78,109 1,953 80,062
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
109,140 9,095
Rp Rp Rp Rp Rp
10,667 3,778 132,679 3,317 135,996
Rp Rp
127,330 9,095
Rp Rp Rp Rp Rp
10,667 3,778 150,869 3,772 154,641
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
181,900 9,095
Rp Rp Rp Rp Rp
10,667 3,778 205,439 5,136 210,575
Rp Rp
72,760 9,095
Rp Rp Rp Rp Rp
10,667 3,778 96,299 2,407 98,707
181,900 9,095
Rp Rp
109,140 9,095
80,000 85,000 Jumlah
Rp Rp Rp
10,667 3,778 132,679
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
TOTAL HARGA
Rp
98,707
Rp
135,996
Rp
80,062
Rp
135,996
Rp
173,286
Rp
135,996
Rp
154,641
Rp
173,286
Rp
210,575
Rp
98,707
Rp
135,996
Analisa Harga Satuan Mekanikal dan Plumbing - page 195 of 211
URAIAN
NO.
1 M' 1 2 3
1 M' 1 2 3
Ducting 12'' x 8'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 12'' x 10'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK HARGA SATUAN JUMLAH HARGA Keuntungan 2,5% Rp 3,317 Total = Jumlah+(Keuntungan 2,5%) Rp 135,996
m' ls
0.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
145,520 9,095
Rp Rp Rp Rp Rp
10,667 3,778 169,059 4,226 173,286
Rp Rp
181,900 9,095
Rp Rp Rp Rp Rp
10,667 3,778 205,439 5,136 210,575
TOTAL HARGA
Rp
173,286
Rp
210,575
Analisa Harga Satuan Mekanikal dan Plumbing - page 196 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
Ducting 12'' x 12'' BJLS 60 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 10'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 14'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 10'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 16'' x 16'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 12'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 14'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 18'' x 16'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
SAT
INDEK
HARGA SATUAN
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
181,900 9,095
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
218,280 9,095
Rp Rp Rp Rp Rp
10,667 3,778 241,819 6,045 247,865
Rp Rp
208,900 10,445
Rp Rp Rp Rp Rp
10,667 3,778 233,789 5,845 239,634
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
250,680 10,445
Rp Rp Rp Rp Rp
10,667 3,778 275,569 6,889 282,459
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
334,240 10,445
Rp Rp Rp Rp Rp
10,667 3,778 359,129 8,978 368,108
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
292,460 10,445
Rp Rp Rp Rp Rp
10,667 3,778 317,349 7,934 325,283
Rp Rp
334,240 10,445
Rp Rp Rp Rp Rp
10,667 3,778 359,129 8,978 368,108
TOTAL HARGA Rp
247,865
Rp
239,634
Rp
282,459
Rp
325,283
Rp
282,459
Rp
282,459
Rp
325,283
Rp
368,108
Rp
325,283
Rp
325,283
Rp
368,108
Analisa Harga Satuan Mekanikal dan Plumbing - page 197 of 211
URAIAN
NO. 1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2
1 M' 1 2
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M'
Ducting 18'' x 18'' BJLS 70 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 20'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 14'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 16'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 20'' x 18'' BJLS 80 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 16'' BJLS 80 Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 18'' BJLS 80 Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 22'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 24'' x 24''
SAT
INDEK
HARGA SATUAN
m' ls
1.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m'
1.60
Rp
hari hari
0.13 0.04
Rp Rp
m'
1.80
Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
208,900 10,445
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700 11,785
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
235,700
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
376,020 10,445
Rp Rp Rp Rp Rp
10,667 3,778 400,909 10,023 410,932
Rp Rp
471,400 11,785
Rp Rp Rp Rp Rp
10,667 3,778 497,629 12,441 510,070
Rp Rp
329,980 11,785
Rp Rp Rp Rp Rp
10,667 3,778 356,209 8,905 365,115
Rp Rp
377,120 11,785
Rp Rp Rp Rp Rp
10,667 3,778 403,349 10,084 413,433
Rp Rp
424,260 11,785
Rp Rp Rp Rp Rp
10,667 3,778 450,489 11,262 461,752
Rp
377,120
Rp Rp Rp Rp Rp
10,667 3,778 391,564 9,789 401,354
Rp
424,260
Rp Rp Rp Rp Rp
10,667 3,778 438,704 10,968 449,672
Rp Rp
575,200 14,380
Rp Rp Rp Rp Rp
10,667 3,778 604,024 15,101 619,125
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
690,240 14,380
Rp Rp Rp Rp Rp
10,667 3,778 719,064 17,977 737,041
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
TOTAL HARGA Rp
410,932
Rp
510,070
Rp
365,115
Rp
413,433
Rp
461,752
Rp
401,354
Rp
449,672
Rp
619,125
Rp
678,083
Rp
737,041
Rp
678,083
Rp
737,041
Analisa Harga Satuan Mekanikal dan Plumbing - page 198 of 211
URAIAN
NO. 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3
1 M' 1 2 3 4
1 UNIT 1 2 3
1 UNIT 1 2 3
BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 20'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 26'' x 26'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 16'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 22'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 28'' x 28'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 30'' x 30'' BJLS 90 Instalasi Tenaga Kerja : Tukang Kepala Tukang AC
Ducting 40' x 28'' BJLS 90 Penggantung Peralatan Bantu/Penunjang Tenaga Kerja : Tukang Kepala Tukang AC
GENSET 1600 KvA, 50 Hz, 220/380 Volt Unit Genset type silent, Kapasitas : 1600 KVA Stanby Operation Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Pemindahan Genset ke Pondasi Pemindahan Genset ke Pondasi Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
SAT m' ls
INDEK 2.40 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
1.60 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.20 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
2.80 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls
3.00 1.00
Rp Rp
hari hari
0.13 0.04
Rp Rp
m' ls ls
2.80 1.00 1.00
Rp Rp Rp
hari hari
0.13 0.04
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
HARGA SATUAN 287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 14,380
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
287,600 45,000 29,760
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
4,230,000,000 21,150,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
2,500,000 125,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Rp Rp
JUMLAH HARGA 690,240 14,380
Rp Rp Rp Rp Rp
10,667 3,778 719,064 17,977 737,041
Rp Rp
575,200 14,380
Rp Rp Rp Rp Rp
10,667 3,778 604,024 15,101 619,125
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
747,760 14,380
Rp Rp Rp Rp Rp
10,667 3,778 776,584 19,415 795,999
Rp Rp
460,160 14,380
Rp Rp Rp Rp Rp
10,667 3,778 488,984 12,225 501,209
Rp Rp
632,720 14,380
Rp Rp Rp Rp Rp
10,667 3,778 661,544 16,539 678,083
Rp Rp
805,280 14,380
Rp Rp Rp Rp Rp
10,667 3,778 834,104 20,853 854,957
Rp Rp
862,800 14,380
Rp Rp Rp Rp Rp
10,667 3,778 891,624 22,291 913,915
Rp Rp Rp
805,280 45,000 29,760
Rp Rp Rp Rp Rp
10,667 3,778 894,484 22,362 916,846
Rp Rp
4,230,000,000 21,150,000
Rp Rp Rp Rp Rp
10,667 4,533 4,251,165,200 106,279,130 4,357,444,330
Rp Rp
2,500,000 125,000
Rp Rp Rp Rp Rp
10,667 4,533 2,640,200 66,005 2,706,205
TOTAL HARGA
Rp
619,125
Rp
678,083
Rp
795,999
Rp
501,209
Rp
678,083
Rp
854,957
Rp
913,915
Rp
916,846
Rp
4,357,444,330
Rp
2,706,205
Analisa Harga Satuan Mekanikal dan Plumbing - page 199 of 211
NO. 1 UNIT 1 2 3
1 UNIT 1 2 3
URAIAN Radiator Ducting dan Flexible connection Radiator Ducting dan Flexible connection Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
SAT
INDEK
HARGA SATUAN
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
6,500,000 325,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Pondasi Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan TerpasangUnit Diatas Pondasi1.00 Rp Instalasi ls 1.00 Rp Tenaga Kerja : Tukang Listrik hari 0.13 Rp Kepala Tukang Listrik hari 0.05 Rp
95,000,000 4,750,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25Unit Lpm 1.00 Instalasi ls 1.00 Tenaga Kerja : Tukang Listrik hari 0.13 Kepala Tukang Listrik hari 0.05
Rp Rp
45,000,000 2,250,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
1 UNIT 1 2 3
Hand Pump 15 lpm Hand Pump 15 lpm Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Intake Attenuator Intake Attenuator Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Discharge Attenuator Discharge Attenuator Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Drop KIT CT-1000A Drop KIT CT-1000A Instalasi Tenaga Kerja : Tukang Listrik Kepala Tukang Listrik
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
Unit ls
1.00 1.00
Rp Rp
hari hari
0.13 0.05
Rp Rp
6,342,000 317,100
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
12,000,000 600,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
18,000,000 900,000
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
16,992,000 849,600
80,000 85,000 Jumlah Keuntungan 2,5% Total = Jumlah+(Keuntungan 2,5%)
JUMLAH HARGA Rp Rp
6,500,000 325,000
Rp Rp Rp Rp Rp
10,667 4,533 6,840,200 171,005 7,011,205
Rp Rp
95,000,000 4,750,000
Rp Rp Rp Rp Rp
10,667 4,533 99,765,200 2,494,130 102,259,330
Rp Rp
45,000,000 2,250,000
Rp Rp Rp Rp Rp
10,667 4,533 47,265,200 1,181,630 48,446,830
Rp Rp
6,342,000 317,100
Rp Rp Rp Rp Rp
10,667 4,533 6,674,300 166,858 6,841,158
Rp Rp
12,000,000 600,000
Rp Rp Rp Rp Rp
10,667 4,533 12,615,200 315,380 12,930,580
Rp Rp
18,000,000 900,000
Rp Rp Rp Rp Rp
10,667 4,533 18,915,200 472,880 19,388,080
Rp Rp
16,992,000 849,600
Rp Rp Rp Rp Rp
10,667 4,533 17,856,800 446,420 18,303,220
Rp
TOTAL HARGA 7,011,205
Rp
102,259,330
Rp
48,446,830
Rp
6,841,158
Rp
12,930,580
Rp
19,388,080
Rp
18,303,220
Analisa Harga Satuan Mekanikal dan Plumbing - page 200 of 211
HARGA SATUAN MEKANIKAL DAN PLUMBING PEKERJAAN PERENCANAAN NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 19 20 21 22 23 24 25 26 27 28 29 30 31
SATUAN URAIAN PEKERJAAN PLUMBING 1 UNIT Package Pompa Booster, Kapasitas : 200 Lpm 1 UNIT Package Pompa Transfer, Kapasitas 330 Lpm - Head 120m 1 UNIT Package Pompa Transfer, Kapasitas 330 Lpm - Head 75m 1 UNIT Package Pompa Transfer, Kapasitas 300 Lpm - Head 40m 1 UNIT Package Pompa Submersible, Kapasitas : 150 Lpm 1 UNIT Package Pompa Submersible, kapasitas : 300 Lpm 1 UNIT Package Sewage Pump Kapasitas : 300 Lpm 1 UNIT Package Sewage Pump Kapasitas : 200 Lpm 1 UNIT Elektrik Water Heater (EWH) 1 UNIT Heat Pump Water Heater, kap. 25.5 kW 1 UNIT Heat Pump Water Heater, kap. 43 kW 1 UNIT Package Treatment Pump 150 Lpm 1 UNIT Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m 1 UNIT Pompa Sirkulasi Heat Pump, kap. 4.9 M3/h - Head. 20 m 1 UNIT Pompa Return, kap. 3,1 M3/h - Head. 20,61 m 1 UNIT Pompa Return, kap. 5 M3/h - Head. 20 m 1 UNIT WTP (Water Treatment Plant) Include All 1 UNIT PANEL KONTROL POMPA 1 UNIT SAND FILTER 1 UNIT CARBON FILTER 1 BH Keran Taman Putar 1 BH Keran Taman Biasa 1 BH Keran Air Bersih & Air Panas (stailess) 1 UNIT Chemical Tank + Dosing Pump 1 UNIT GROUND TANK KAP. 120 m3 1 UNIT PRESSURE TANK KAP. 500 m3 1 UNIT PRESSURE TANK KAP. 1000 m3 1 UNIT PRESSURE TANK KAP. 1500 m3 1 UNIT PRESSURE TANK KAP. 2000 m3 1 UNIT PRESSURE TANK KAP. 3000 m3 1 BH FLOATING VALVE DIA. 20 MM (1/2") 1 BH FLOATING VALVE DIA. 25 MM (3/4") 1 BH FLOATING VALVE DIA. 32 MM (1") 1 BH FLOATING VALVE DIA. 50 MM (1 1/2") 1 BH FLOATING VALVE DIA. 63 MM (2") 1 BH Vent Out (VO) 1 SET WATER LEVEL CONTROL 1 BH FLEXIBLE JOINT DIA.80 MM' 1 BH FLEXIBLE JOINT DIA.65 MM' 1 BH FLEXIBLE JOINT DIA.50 MM' 1 BH FLEXIBLE JOINT DIA.32 MM' 1 BH STRAINER DIA.150 MM' 1 BH STRAINER DIA.100 MM' 1 BH STRAINER DIA.65 MM' 1 BH STRAINER DIA.40 MM' 1 BH STRAINER DIA.32 MM' 1 BH CHECK VALVE DIA.80 MM' 1 BH CHECK VALVE DIA.65 MM' 1 BH CHECK VALVE DIA.50 MM' 1 BH CHECK VALVE DIA.32 MM' 1 BH GATE VALVE DIA.20 MM /10 Kg 1 BH GATE VALVE DIA.32 MM /10 Kg 1 BH GATE VALVE DIA.50 MM /10 Kg 1 BH GATE VALVE DIA.65 MM /10 Kg 1 BH GATE VALVE DIA.80 MM /10 Kg 1 BH FLOOR CLEAN OUT DIA. 150 mm 1 BH FLOOR CLEAN OUT DIA. 100 mm 1 BH FLOOR CLEAN OUT DIA. 80 mm 1 BH FLOOR CLEAN OUT DIA. 65 mm 1 BH FLOOR CLEAN OUT DIA. 50 mm 1 UNIT TANKI AIR KAP. 250 M3, PANEL FRV SYSTEM 1 UNIT TANKI AIR KAP. 120 M3, PANEL FRV SYSTEM 1 UNIT TANKI AIR KAP. 40 M3, PANEL FRV SYSTEM
HARGA SATUAN Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
59,400,817 188,210,756 174,096,506 159,982,256 44,110,850 52,243,481 18,839,756 13,383,000 3,534,197 183,665,483 358,483,538 4,059,038 19,218,788 14,095,838 8,136,488 14,095,838 395,389,029 8,917,884 24,814,789 25,158,298 105,486 36,483 491,275 3,684,363 20,920,378 15,692,878 31,385,756 41,840,756 62,750,756 125,480,756 259,238 305,240 385,743 503,780 1,313,102 267,602 2,671,520 1,017,195 791,367 648,149 488,187 11,156,408 5,288,016 3,139,529 1,033,892 790,290 4,655,489 3,868,227 2,888,609 589,554 298,857 497,502 3,224,010 3,759,306 4,705,483 440,161 325,156 267,653 238,902 180,354 867,147,438 416,296,063 260,232,125
Harga Satuan MP - page 201 of 211
NO. 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
SATUAN 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH 1 BH 1 BH 1 BH 1 UNIT 1 BH 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT
URAIAN TANKI AIR KAP. 30 M3, PANEL FRV SYSTEM TANKI AIR KAP.20 M3, PANEL FRV SYSTEM TANKI AIR KAP.18 M3, PANEL FRV SYSTEM TANKI AIR KAP.16 M3, PANEL FRV SYSTEM TANKI AIR KAP.15 M3, PANEL FRV SYSTEM TANKI AIR KAP. 6 M3, PANEL FRV SYSTEM TANKI AIR KAP. 4 M3, PANEL FRV SYSTEM Roof Drain dia. 150 mm Roof Drain dia. 100 mm Roof Drain dia. 80 mm Roof Drain dia. 65 mm BAK KONTROL AAV SEPTIK TANK BIOLOGICAL SISTEM 50 m3 SEPTIK TANK BIOLOGICAL SISTEM 40 m3 SEPTIK TANK BIOLOGICAL SISTEM 20 m3 GREASE TRAP Water Hammer Water Meter Blower Aersai IPAL
PEKERJAAN FIRE FIGHTING 1 UNIT Package Diesel Fire Pump, Kapasitas : 1250 USGpm 1 UNIT Package Electric Fire Pump, Kapasitas 1250 USGpm 1 UNIT Package Jockey Fire Pump, Kapasitas : 50 Gpm 1 UNIT DIAPRAGHMA TANK Kap. 300 L 1 UNIT Bak Netralisasi 1 UNIT Bak Kontrol / Bak Sumpit 1 BH HORN BUZZER 1 UNIT DAILY TANK 200 LITER 1 UNIT HAND PUMP 1 BH NOZZLE PEMADAM KEBAKARAN dia.38 mm 1 BH NOZZLE PEMADAM KEBAKARAN dia.65 mm 1 BH FOOT VALVE dia. 65 mm 1 BH FOOT VALVE dia. 100 mm 1 BH FOOT VALVE dia. 150 mm 1 BH GATE VALVE DIA.25 MM / 20 K 1 BH GATE VALVE DIA.32MM / 20 K 1 BH GATE VALVE DIA.50 MM / 20 K 1 BH GATE VALVE DIA.65 MM / 20 K 1 BH GATE VALVE DIA.80 MM / 20 K 1 BH GATE VALVE DIA.100 MM / 20 K 1 BH GATE VALVE DIA.150 MM / 20 K 1 BH GATE VALVE DIA.200 MM / 20 K 1 BH Test Valve 100 mm 1 BH DRAIN VALVE 100 mm 1 BH FLASHING VALVE 100 mm 1 BH INDICATING VALVE 100 MM 1 BH LANDING VALVE/ KSSK dia. 150 MM 1 BH LANDING VALVE/ KSSK dia. 100 MM 1 BH SELENOID VALVE DIA.150 MM 1 BH SELENOID VALVE DIA.50 MM 1 BH PRESSURE GAUGE 1 BH PRESSURE SWITCH 1 BH SAFETY VALVE dia. 150 mm 1 BH SAFETY VALVE dia. 100 mm 1 BH SAFETY VALVE dia. 80 mm 1 BH SAFETY VALVE dia. 65 mm 1 BH PELAT ORIFICE 100 MM 1 BH FLOW SWITCH 1 BH SIGHTGLASS 1 BH PILLAR HYDRANT 1 BH SIAMISE CONNECTION 1 SET FIRE HOUSE CABINET / FHC ( INDOOR ) 1 SET FIRE HOUSE CABINET / FHC ( OUTDOOR ) 1 BH FIRE EXTINGUISHER 6KG 1 BH HEAD SPRINKLER 1 BH Alarm Heat Detector (HD)
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 105,198,313 70,174,063 63,169,213 56,164,363 52,661,938 21,140,113 14,135,263 192,375 129,645 108,735 56,460 415,341 1,617,423 188,432,413 146,612,413 58,790,413 4,516,296 1,478,959 1,916,436 28,416,844
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
658,678,069 423,440,569 84,698,569 26,211,312 7,854,319 2,248,059 5,860,037 3,262,063 4,188,910 466,093 769,288 3,460,614 8,479,014 10,988,214 2,696,144 3,805,629 4,428,128 5,678,023 6,723,523 9,815,798 14,843,102 22,243,726 4,506,114 4,506,114 4,506,114 950,473 7,773,301 5,760,714 4,401,564 2,310,564 2,673,873 1,314,723 30,800,481 30,800,481 19,195,431 9,785,931 621,347 2,909,006 2,991,914 5,614,341 8,177,986 3,816,118 7,789,018 1,285,267 128,108 1,018,560
Harga Satuan MP - page 202 of 211
NO. 47 48 49 50 51 52 53 54 55 56 57 58 59 60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
SATUAN 1 BH 1 Unit 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH
URAIAN Head Springkler Supression (HS) Tabung Silinder Kap. 150 Kg (Fire Supression) FLEXIBLE JOINT DIA.150 MM' FLEXIBLE JOINT DIA.100 MM' FLEXIBLE JOINT DIA.80 MM' FLEXIBLE JOINT DIA.65 MM' FLEXIBLE JOINT DIA.50 MM' CHECK VALVE DIA.50 MM' / 20 Kg CHECK VALVE DIA.65 MM' / 20 Kg CHECK VALVE DIA 100 MM / 20K CHECK VALVE DIA 150 MM / 20K BRANCH CONTROL VALVE dia. 65 mm BRANCH CONTROL VALVE dia. 80 mm BRANCH CONTROL VALVE dia. 100 mm
PEKERJAAN PIPA PPR, PVC, & BSP 1 M' PIPA PVC Dia. 2” (63mm) 1 M' PIPA PVC Dia. 2 1/2” (75mm) 1 M' PIPA PVC Dia. 3” (90mm) 1 M' PIPA PVC Dia. 4” (110mm) 1 M' PIPA PVC Dia. 6” (160mm) 1 M' PIPA PVC Dia. 8” (200mm) 1 M' PIPA PVC Dia. 10” (250mm) 1 M' PIPA BSP SCH.40 DIA. 1" (32mm) 1 M' PIPA BSP SCH.40 DIA. 1 1/4" (40mm) 1 M' PIPA BSP SCH.40 DIA. 2" (63mm) 1 M' PIPA BSP SCH.40 DIA. 2 1/2" (70mm) 1 M' PIPA BSP SCH.40 DIA. 3" (90mm) 1 M' PIPA BSP SCH.40 DIA. 4" (110mm) 1 M' PIPA BSP SCH.40 DIA. 6" (160mm) 1 M' PIPA BSP SCH.40 DIA. 8" (200mm) 1 M' PPR PN-10 Ø 20 mm ( 1/2") 1 M' PPR PN-10 Ø 25 mm ( 3/4") 1 M' PPR PN-10 Ø 32 mm ( 1") 1 M' PPR PN-10 Ø 40 mm (1 1/4") 1 M' PPR PN-10 Ø 50 mm (1 1/2") 1 M' PPR PN-10 Ø 63 mm (2") 1 M' PPR PN-10 Ø 75 mm (2 1/2") 1 M' PPR PN-10 Ø 90 mm (3") 1 M' PPR PN-10 Ø 110 mm (4") 1 M' PPR PN-10 Ø 125 mm (5") 1 M' PPR PN-10 Ø 160 mm (6") 1 M' PPR PN-20 Ø 20 mm ( 1/2") 1 M' PPR PN-20 Ø 25 mm ( 3/4") 1 M' PPR PN-20 Ø 32 mm ( 1") 1 M' PPR PN-20 Ø 40 mm (1 1/4") 1 M' PPR PN-20 Ø 50 mm (1 1/2") 1 M' PPR PN-20 Ø 63 mm (2") 1 M' PPR PN-20 Ø 75 mm (2 1/2") 1 M' PPR PN-20 Ø 90 mm (3") 1 M' PPR PN-20 Ø 110 mm (4") 1 M' PPR PN-20 Ø 125 mm (5") 1 M' PPR PN-20 Ø 160 mm (6") 1 BH PIPA HEADER Dia. 150 mm 1 BH PIPA HEADER Dia. 100 mm 1 BH PIPA HEADER Dia. 90 mm 1 BH PIPA HEADER Dia. 80 mm 1 BH PIPA HEADER Dia. 63 mm 1 BH PIPA HEADER Dia. 32 mm 1M PN 10 Diameter 10" (250 mm) + RRJ Power Lock 1M PN 10 Diameter 8" (200 mm) + RRJ Power Lock 1M PN 10 Diameter 6" (160 mm) + RRJ Power Lock 1M PN 10 Diameter 4" (110 mm) + RRJ Power Lock 1M PN 10 Diameter 3" (90 mm) + RRJ Power Lock 1M PN 10 Diameter 2" (63 mm) + RRJ Power Lock
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 421,121 46,451,951 2,240,541 1,152,175 819,706 802,978 641,971 3,940,524 4,149,624 4,537,504 5,792,104 4,432,954 5,687,554 8,196,754
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
40,387 54,121 71,971 110,284 236,949 390,545 598,177 57,016 75,466 118,148 183,415 238,552 334,953 577,801 877,614 13,697 19,159 28,966 42,694 64,473 101,736 154,041 219,423 330,573 1,200,694 778,441 20,008 29,490 44,859 69,044 101,736 163,849 245,576 363,264 526,720 522,559 1,245,924 7,377,795 3,589,821 1,479,409 1,038,449 735,546 207,978 1,361,976 1,209,012 1,012,007 845,761 649,784 367,876
PEKERJAAN TATA UDARA INDOOR (WALL MOUNTED - VRV) Harga Satuan MP - page 203 of 211
NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SATUAN URAIAN 1 UNIT kapasitas : 5 460 BTU/h - Wall Mounted 1 UNIT kapasitas : 7 510 BTU/h - Wall Mounted 1 UNIT kapasitas : 9 550 BTU/h - Wall Mounted 1 UNIT kapasitas : 12 280 BTU/h - Wall Mounted 1 UNIT kapasitas : 15 350 BTU/h - Wall Mounted 1 UNIT kapasitas : 19 110 BTU/h - Wall Mounted 1 UNIT kapasitas : 24 230 BTU/h - Wall Mounted INDOOR (CEILLING MOUNTED - VRV) 1 UNIT kapasitas : 7 500 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 12 300 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 1 Way Cassette Type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 2 Way Cassette Type 1 UNIT kapasitas : 12 300 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 15 400 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 19 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 20 500 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 24 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 28 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 30 700 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 36 200 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type Dual Vane - Purifying Kit 1 UNIT kapasitas : 42 000 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 48 100 BTU/h - 4 Way Casssette type - Purifying Kit 1 UNIT kapasitas : 54 000 BTU/h - 4 Way Casssette type - Purifying Kit INDOOR (WALL SPLIT - INVERTER) 1 UNIT kapasitas : 6 000 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 9 200 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 12 000 BTU/h - Wall type (Inverter - ECO) 1 UNIT kapasitas : 18 000 BTU/h - Wall type (Inverter - ECO) INDOOR (AHU[AIR HANDLING UNIT]) 1 UNIT Kapasitas : 85 000 BTU/h - AHU 1 UNIT Kapasitas : 95 000 BTU/h - AHU 1 UNIT Kapasitas : 114 000 BTU/h - AHU 1 UNIT Kapasitas : 125 000 BTU/h - AHU INDOOR (CEILING CONCEALED) 1 UNIT Kapasitas : 15 400 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 19 100 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 24 200 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 36 200 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 42 000 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 76 400 BTU/h - Ceiling Concealed Duct 1 UNIT Kapasitas : 95 500 BTU/h - Ceiling Concealed Duct OUTDOOR VRV 1 UNIT kapasitas : 95 500 BTU/h - OU 1 UNIT kapasitas : 114 600 BTU/h - OU 1 UNIT kapasitas : 133 800 BTU/h - OU 1 UNIT kapasitas : 152 900 BTU/h - OU 1 UNIT kapasitas : 229 200 BTU/h - OU 1 UNIT kapasitas : 248 400 BTU/h - OU 1 UNIT kapasitas : 267 500 BTU/h - OU 1 UNIT kapasitas : 286 600 BTU/h - OU 1 UNIT kapasitas : 305 700 BTU/h - OU 1 UNIT kapasitas : 363 100 BTU/h - OU 1 UNIT kapasitas : 382 200 BTU/h - OU 1 UNIT kapasitas : 401 300 BTU/h - OU 1 UNIT kapasitas : 420 400 BTU/h - OU 1 UNIT kapasitas : 496 800 BTU/h - OU 1 UNIT kapasitas : 515 900 BTU/h - OU 1 UNIT kapasitas : 535 000 BTU/h - OU 1 UNIT kapasitas : 592 400 BTU/h - OU 1 UNIT kapasitas : 763 000 BTU/h - OU 1 UNIT kapasitas : 821 700 BTU/h - OU 1 UNIT kapasitas : 859 900 BTU/h - OU AKSESORIS PENDUKUNG AC 1 BH Y - Branch 1M PIPA LIQUID DIAMETER : 7/8 INCH + ISOLASI 1M PIPA LIQUID DIAMETER : 5/8 INCH + ISOLASI
Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 5,638,581 5,728,373 5,903,875 6,083,458 6,169,168 7,760,926 8,201,722
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,273,264 28,175,790 29,534,540 21,527,732 14,501,188 14,850,378 15,199,567 15,843,526 17,740,637 17,740,638 17,844,940 18,325,643 28,967,602 19,024,021 19,844,843 20,933,225
Rp Rp Rp Rp Rp
5,780,831 5,923,357 5,923,357 8,061,251 11,144,319
Rp Rp Rp Rp
99,736,339 108,669,600 116,486,202 129,949,901
Rp Rp Rp Rp Rp Rp Rp
8,046,627 8,205,803 8,769,041 10,613,849 11,997,455 25,584,547 26,564,091
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
59,746,146 70,521,130 79,051,326 204,892,503 141,007,487 149,537,683 158,516,837 400,343,501 430,654,083 211,044,886 220,024,040 233,492,771 246,512,544 290,510,397 303,979,128 737,940,678 798,561,843 1,045,227,273 1,105,848,438 1,158,108,063
Rp Rp Rp
2,208,160 278,272 278,272
Harga Satuan MP - page 204 of 211
NO. 61 62 63 64 65 66 67 68 69 70 71 72 73 74 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1
SATUAN 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1 SET 1 SET 1 BH 1 BH 1 BH 1 M' 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 UNIT 1 UNIT 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 PCS 1 TTK 1 TTK 1 TTK 1M 1 UNIT 1 UNIT
URAIAN PIPA LIQUID DIAMETER : 3/8 INCH + ISOLASI PIPA LIQUID DIAMETER : 3/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/4 INCH + ISOLASI PIPA LIQUID DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 3/4 INCH + ISOLASI PIPA GAS DIAMETER : 5/8 INCH + ISOLASI PIPA GAS DIAMETER : 7/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/2 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/4 INCH + ISOLASI PIPA GAS DIAMETER : 1 1/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 3/8 INCH + ISOLASI PIPA GAS DIAMETER : 1 5/8 INCH + ISOLASI PIPA HOT GAS DIAMETER : 3/8 INCH + ISOLASI HAND VALVE DIAMETER : 3/8 INCH HAND VALVE DIAMETER : 1/2 INCH Outdoor Pipe Connection - 21 Outdoor Pipe Connection - 31 Outdoor Pipe Connection - 41 PIPA DRAIN (AC) AC MANAGER 5 ACP 5 AHU Comm. Kit EEV Kit 4-10HP EEV Kit 12-20HP TVX Kit for 18-26 HP TVX Kit for 28-36 HP Standard 3 Wired Remocon Wireless Remocon DIFFUSER SUPPLY GRILLE ALUMUNIUM DIFFUSER RETURN GRILLE ALUMUNIUM DIFFUSER FRESH AIR GRILLE ALUMUNIUM DIFFUSER EXHAUST GRILLE ALUMUNIUM BOX DIFFUSER PERPORATE STAINLESS STEEL LOW RETURN DIFFUSER PERPORATE STAINLESS STEEL DAMPER RETURN DAMPER FRESH AIR DAMPER EXHAUST DAMPER SUPPLY Pre-Filter (G-4) Medium filter (F-9) HEPA filter ( H-13) TITIK INSTALASI INDOOR UNIT AC TITIK INSTALASI OUTDOOR UNIT AC TITIK INSTALASI KRITIKAL UNIT AC KABEL LEADER (Kabel Indoor to Outdoor) AC Smart 5 AC EZ Touch
PEKERJAAN EXHAUST Axial Fan Inline 1 UNIT Exhaust Fan Axial Inline Type Kap. 350 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 520 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 615 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 660 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 900 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 1200 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 2000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 2500 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 3100 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 3600 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 4800 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 6000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 8000 CFM + Box Peredam 1 UNIT Exhaust Fan Axial Inline Type Kap. 12000 CFM + Box Peredam Wall Fan Type 1 UNIT Exhaust Fan , Kapasitas : 100 CFM/ Wall Type
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 193,586 193,586 193,586 193,586 315,910 324,274 315,910 315,910 426,733 410,005 410,005 477,962 410,005 410,005 181,040 697,601 922,384 1,842,809 2,346,687 5,624,016 114,253 60,496,517 43,868,519 7,767,091 4,342,332 6,551,854 16,968,170 20,731,970 1,863,357 1,139,604 1,020,985 1,020,985 1,011,732 1,011,732 96,881,007 8,905,257 3,677,757 3,677,757 3,677,757 3,677,757 614,442 1,900,407 9,950,757 57,571 3,911,838 57,571 421,781 29,670,995 17,518,626
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,428,114 6,560,934 7,752,804 8,317,374 11,328,414 15,092,214 25,129,014 31,402,014 38,929,614 45,202,614 60,257,814 75,313,014 100,405,014 150,589,014
Rp
1,239,339
Harga Satuan MP - page 205 of 211
NO. 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1 2 3 4 1 2 3 4 5 6 7
SATUAN URAIAN 1 UNIT Exhaust Fan , Kapasitas : 150 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 200 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 250 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 300 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 350 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 400 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 450 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 500 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 600 CFM/ Wall Type 1 UNIT Exhaust Fan , Kapasitas : 800 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 950 CFM / Wall Type 1 UNIT Exhaust Fan , Kapasitas : 1200 CFM / Wall Type Inline Fan Type 1 UNIT Exhaust Fan , Kapasitas : 5000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 3000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 2000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 1000 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 950 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 900 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 850 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 800 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 750 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 700 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 650 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 600 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 550 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 500 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 450 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 400 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 350 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 300 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 250 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 200 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 150 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 100 CFM / Inline Type 1 UNIT Exhaust Fan , Kapasitas : 70 CFM / Inline Type ERV 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 450 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 580 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 771 CFM 1 UNIT Fan Recovery Ventilator (ERV), Kapasitas : 1586 CFM Booster Fan 1 UNIT Booster Fan, Kapasitas 600 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 3000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 4500 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 6000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 7500 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 9000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 12000 CFM, Inline Type + Silencer
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 1,840,501 2,441,664 3,042,826 3,643,989 4,657,714 4,846,314 5,447,476 6,048,639 7,250,964 9,655,614 10,256,776 11,459,101 14,464,914
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
57,539,514 34,538,514 33,388,464 32,238,414 29,938,314 29,938,314 28,788,264 27,638,214 26,488,164 25,338,114 24,188,064 23,038,014 21,887,964 20,737,914 19,587,864 18,437,814 17,287,764 16,137,714 12,687,564 13,307,689 12,687,564 11,528,260 10,953,235 10,378,210 9,803,185 9,228,160 8,653,135 8,078,110 7,503,085 6,928,060 6,353,035 5,778,010 5,202,985 4,627,960 4,250,248 3,477,910 2,902,885 2,327,860 1,752,835 1,177,810 832,795
Rp Rp Rp Rp
21,992,514 30,879,264 30,879,264 62,767,014
Rp Rp Rp Rp Rp Rp Rp
2,392,368 6,202,045 8,414,892 10,318,234 12,376,329 14,434,424 20,995,589
Harga Satuan MP - page 206 of 211
NO. 8 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SATUAN URAIAN 1 UNIT Booster Fan, Kapasitas 15000 CFM, Inline Type + Silencer 1 UNIT Booster Fan, Kapasitas 20000 CFM, Inline Type + Silencer DUCTING c/w OBD (Finishing Cat Powder Coating) [Terisolasi] DUCTING BJLS SUPPLY Supply Air Diffuser 44" x 38" 1 M' Supply Air Diffuser 44" x 36" 1 M' Supply Air Diffuser 40" x 34" 1 M' Supply Air Diffuser 36" x 34" 1 M' Supply Air Diffuser 34" x 30" 1 M' Supply Air Diffuser 32" x 28" 1 M' 1 M' Supply Air Diffuser 30" x 30" 1 M' Supply Air Diffuser 30" x 24" 1 M' Supply Air Diffuser 28" x 28" 1 M' Supply Air Diffuser 28" x 24" 1 M' Supply Air Diffuser 28" x 22" 1 M' Supply Air Diffuser 28" x 20" 1 M' Supply Air Diffuser 26" x 26" 1 M' Supply Air Diffuser 26" x 24" 1 M' Supply Air Diffuser 26" x 16" 1 M' Supply Air Diffuser 24" x 24" 1 M' Supply Air Diffuser 24" x 20" 1 M' Supply Air Diffuser 22" x 22" 1 M' Supply Air Diffuser 22" x 20" 1 M' Supply Air Diffuser 22" x 18" 1 M' Supply Air Diffuser 20" x 20" 1 M' Supply Air Diffuser 20" x 18" 1 M' Supply Air Diffuser 20" x 12" 1 M' Supply Air Diffuser 18" x 18" 1 M' Supply Air Diffuser 18" x 16" 1 M' Supply Air Diffuser 18" x 14" 1 M' Supply Air Diffuser 18" x 12" 1 M' Supply Air Diffuser 16" x 16" 1 M' Supply Air Diffuser 16" x 14" 1 M' Supply Air Diffuser 16" x 12" 1 M' Supply Air Diffuser 16" x 10" 1 M' Supply Air Diffuser 14" x 12" 1 M' Supply Air Diffuser 14" x 10" 1 M' Supply Air Diffuser 12" x 12" 1 M' Supply Air Diffuser 12" x 10" 1 M' Supply Air Diffuser 12" x 8" 1 M' Supply Air Diffuser 10" x 10" 1 M' Supply Air Diffuser 10" x 8" 1 M' Supply Air Diffuser 8" x 8" 1 M' Supply Air Diffuser 8" x 6" 1 M' Supply Air Diffuser 6" x 6" DUCTING BJLS RETURN 1 M' Return Air Grille 40" x 36" 1 M' Return Air Grille 40" x 34" 1 M' Return Air Grille 40" x 32" 1 M' Return Air Grille 34" x 32" 1 M' Return Air Grille 32" x 34" 1 M' Return Air Grille 24" x 20" 1 M' Return Air Grille 36" x 32" 1 M' Return Air Grille 34" x 30" 1 M' Return Air Grille 32" x 28" 1 M' Return Air Grille 30" x 24" 1 M' Return Air Grille 28" x 28" 1 M' Return Air Grille 28" x 24" 1 M' Return Air Grille 26" x 26" 1 M' Return Air Grille 24" x 24" 1 M' Return Air Grille 24" x 22" 1 M' Return Air Grille 24" x 16" 1 M' Return Air Grille 22" x 22" 1 M' Return Air Grille 22" x 20" 1 M' Return Air Grille 22" x 18" 1 M' Return Air Grille 20" x 20" 1 M' Return Air Grille 20" x 18"
Rp Rp
HARGA SATUAN 30,436,037 39,792,430
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656 746,656
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843
Harga Satuan MP - page 207 of 211
NO. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1 2 3 4
SATUAN 1 M' Return Air Grille 20" x 16" 1 M' Return Air Grille 18" x 18" 1 M' Return Air Grille 18" x 16" 1 M' Return Air Grille 18" x 14" 1 M' Return Air Grille 16" x 16" 1 M' Return Air Grille 16" x 14" 1 M' Return Air Grille 16" x 12" 1 M' Return Air Grille 15" x 10" 1 M' Return Air Grille 14" x 14" 1 M' Return Air Grille 14" x 12" 1 M' Return Air Grille 14" x 10" 1 M' Return Air Grille 12" x 12" 1 M' Return Air Grille 12" x 10" 1 M' Return Air Grille 12" x 8" 1 M' Return Air Grille 10" x 10" 1 M' Return Air Grille 10" x 8" 1 M' Return Air Grille 8" x 8" 1 M' Return Air Grille 8" x 6" 1 M' Return Air Grille 6" x 6" DUCTING BJLS FRESH AIR 1 M' Fresh Air Louvre 32" x 28" 1 M' Fresh Air Louvre 24" x 20" 1 M' Fresh Air Louvre 22" x 14" 1 M' Fresh Air Louvre 20" x 18" 1 M' Fresh Air Louvre 20" x 16" 1 M' Fresh Air Louvre 18" x 16" 1 M' Fresh Air Louvre 16" x 16" 1 M' Fresh Air Louvre 14" x 14" 1 M' Fresh Air Louvre 14" x 12" 1 M' Fresh Air Louvre 14" x 10" 1 M' Fresh Air Louvre 12" x 12" 1 M' Fresh Air Louvre 10" x 10" 1 M' Fresh Air Louvre 10" x 8" 1 M' Fresh Air Louvre 8" x 8" 1 M' Fresh Air Louvre 8" x 6" VOLUME DAMPER 1 M' Volume Damper 14" x 14" 1 M' Volume Damper 12" x 12" 1 M' Volume Damper 10" x 10" 1 M' Volume Damper 8" x 8"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DUCTING EXHAUST BJLS 1 M' Ducting 6'' x 4'' 1 M' Ducting 6'' x 6'' 1 M' Ducting 8'' x 3'' 1 M' Ducting 8'' x 6'' 1 M' Ducting 8'' x 8'' 1 M' Ducting 10'' x 6'' 1 M' Ducting 10'' x 7'' 1 M' Ducting 10'' x 8'' 1 M' Ducting 10'' x 10'' 1 M' Ducting 12'' x 4'' 1 M' Ducting 12'' x 6'' 1 M' Ducting 12'' x 8'' 1 M' Ducting 12'' x 10'' 1 M' Ducting 12'' x 12'' 1 M' Ducting 14'' x 10'' 1 M' Ducting 14'' x 12'' 1 M' Ducting 14'' x 14'' 1 M' Ducting 16'' x 10'' 1 M' Ducting 16'' x 12'' 1 M' Ducting 16'' x 14'' 1 M' Ducting 16'' x 16'' 1 M' Ducting 18'' x 12'' 1 M' Ducting 18'' x 14'' 1 M' Ducting 18'' x 16'' 1 M' Ducting 18'' x 18'' 1 M' Ducting 20'' x 14''
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
URAIAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843 692,843
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281 854,281
Rp Rp Rp Rp
763,015 656,251 459,943 299,797
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
98,707 135,996 80,062 135,996 173,286 135,996 154,641 173,286 210,575 98,707 135,996 173,286 210,575 247,865 239,634 282,459 325,283 282,459 282,459 325,283 368,108 325,283 325,283 368,108 410,932 365,115
Harga Satuan MP - page 208 of 211
NO. 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
SATUAN 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 UNIT
Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting Ducting
20'' x 16'' 20'' x 18'' 20'' x 20'' 22'' x 16'' 22'' x 18'' 22'' x 20'' 22'' x 22'' 24'' x 20'' 24'' x 22'' 24'' x 24'' 26'' x 20'' 26'' x 22'' 26'' x 26'' 28'' x 16'' 28'' x 22'' 28'' x 28'' 30'' x 30'' 40' x 28'' HOOD SUS - 304
URAIAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 413,433 461,752 510,070 401,354 449,672 619,125 678,083 737,041 678,083 737,041 619,125 678,083 795,999 501,209 678,083 854,957 913,915 916,846 5,297,080
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 30 31 32
Reverse Osmosis (RO) 1 UNIT Pompa tekan RO ( Stainless Steel ), lengkap accesories 1 UNIT Stronge Tank SS304, Volume 2000 Litter 1 UNIT Membran Filter Lengkap dengan accessories Pipa Stainless Steel 304 Sch.10 ( 20 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 32 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 40 mm ) 1 M' 1 M' Pipa Stainless Steel 304 Sch.10 ( 50 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 65 mm ) 1 M' Pipa Stainless Steel 304 Sch.10 ( 100 mm ) 1 UNIT High Pressure Pump 1 UNIT Membrane 4" x 40" - 1500 GPD 1 UNIT Housing FRP 1 UNIT Permeate & Concentrate Rotameter 1 UNIT System Pressure Gauge 1 UNIT Recyle Valve 1 UNIT Low Pressure Switch 1 UNIT Solenoid Valve 3/4" 1 UNIT TDS Monitor 1 UNIT Cartridge Filter 1 UNIT Piping & Interconnecting 1 LOT Frame 1 LOT Aksesoris 1 UNIT Stronge Tank SS304, Volume 1000 Litter 1 UNIT Stronge Tank SS304, Volume 2000 Litter 1 UNIT Pompa Distribusi Kap. 10 Lpm, Head 32 m 1 UNIT Pompa Isap Kap. 10 Lpm, Head 32 m 1 UNIT Housing Catridge 10", in/out 3/4" 1 UNIT Housing Catridge 10", in/out 4" 1 LOT Granular Resin Mixed Bed 1 UNIT Ultra Voilet Sterlight 5 GPM, 30 Watt 1 SET Control Panel Indoor 1 LOT Cabling 1 LOT Installation 1 LOT Test Run & Commisioning
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
27,260,900 11,553,083 31,442,900 62,012 123,000 138,334 172,117 229,499 356,700 13,078,488 18,096,888 13,078,488 7,328,238 745,483 1,163,683 2,937,138 1,891,638 32,942,988 14,437,638 7,326,290 2,098,790 4,396,943 5,802,833 11,553,083 8,821,150 8,821,150 13,074,593 6,487,943 2,828,693 5,893,750 9,886,125 575,333 6,188,950 2,053,958
1 2 3 4 5 6 7 8 9 10 11
GAS MEDIS 1 SET Sentral Oxygen Automatic System Kap. 2x10 cyl 1 SET Sentral N2O Automatic System Kap. 2x2 cyl 1 SET Oil Free Air Compressor - Duplex 1 SET Vacuum Pump Duplex System 1 SET Master Alarm 10 function 1 SET Alarm System for 4 Gases 1 SET Zone Valve for 4 gases 1 SET Alarm System for 3 Gases 1 SET Zone Valve for 3 gases 1 SET Alarm System for 2 Gases 1 SET Zone Valve for 2 gases
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
313,580,300 283,374,063 866,754,786 471,106,656 59,691,516 34,850,000 22,086,188 29,056,188 16,553,750 20,343,688 11,108,438
Harga Satuan MP - page 209 of 211
NO. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
SATUAN 1 SET 1 SET 1 SET 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 SET 1 SET 1 SET 1 M'
URAIAN Alarm System for 1 Gases Zone Valve for 1 gases Gas Medis For Oxygen Gas Medis For Valve Gas Medis For Gas Medis Wall Outlet Gas Medis For Oxygen DISS Gas Medis For N2O DISS Gas Medis For Air DISS Gas Medis for VACUM DISS Gas Medis for CO2 DISS Gas Medis for N20 Gas Medis For Vacum Gas Medis For AGSS Gas Medis For Compress Air Copper Tube ø 2⅛" - Length 5,8mtr Copper Tube ø 2" - Length 5,8mtr Copper Tube ø 1⅛" - Length 5,8mtr Copper Tube ø 1½" - Length 5,8mtr Copper Tube ø 1" - Length 5,8mtr Copper Tube ø ¾" - Length 5,8mtr Copper Tube ø ⅝" - Length 5,8mtr Copper Tube ø ½" - Length 5,8mtr Copper Tube ø ⅜" - Length 5,8mtr Instalasi Manifold O2, NYM 3 x 2,5 mm² Instalasi Manifold N2O, NYM 3 x 2,5 mm² Instalasi Sentral Gas Vacuum, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Sentral Gas Air, NYM 4 x 4 mm² & NYA Grounding 1 x 2,5 mm² Instalasi Master Alarm, NYM 3 x 2,5 mm² Instalasi Area Alarm Instalasi Zone Valve Instalasi Gas Medis Wall Outlet Instalasi Pipa Gas
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
HARGA SATUAN 11,631,188 5,837,375 1,392,693 1,392,693 1,392,693 1,611,813 1,611,813 1,611,813 1,611,813 1,611,813 1,392,693 1,392,693 1,392,693 1,392,693 958,375 910,456 368,060 368,060 368,060 243,384 190,804 135,044 90,461 514,250 479,188 653,438 653,438 479,188 1,524,688 1,306,875 304,938 65,344
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
PNEUMATIC TUBE 1 SET Blower Rp 192,660,486 1 LOT Skyrail V1 Software license package 10 units Rp 32,298,801 1 PCS Bus Converter Rp 17,241,551 1 PCS Power Pack 230V - 36VDC Rp 12,175,488 1 UNIT PC Win. 10, 64 Bit Rp 14,873,801 1 UNIT LG LED Monitor 19" Rp 8,467,551 1 UNIT UPS c/w Battery Back-up Rp 18,768,801 1 UNIT 3-way Diverter NW110 Rp 38,038,801 1 UNIT 3-way Diverter NW110 (Transfer Unnit) Rp 38,038,801 1 UNIT Optical tube switch Rp 2,199,676 1 UNIT Compact Station NW110 with PCB - 10" Touch Screen Display Rp 51,158,801 1 UNIT Topload (Through) Station NW110 with PCB - 10" Touch Screen Display Rp 55,120,426 1 UNIT Laboratory Receiving Station NW110 with PCB - 10" Touch Screen Display Rp 158,881,176 1 UNIT Multi Send Station 3-ports NW110 with PCB - 10" Touch Screen Display Rp 65,298,676 1 UNIT V-piece with valve Rp 2,025,426 1 UNIT Arrival signal Rp 2,271,426 1 UNIT Carrier rack up to NW110 Rp 1,395,051 1 UNIT Receiving basket up to NW110 Rp 2,456,951 1 UNIT Upholstery for carrier basket Rp 1,313,051 1 UNIT Carrier NW110, 330 x 76 - red/blue/green/yellow Rp 1,651,301 1 UNIT Carrier NW110, 220 x 86 - red/blue/green/yellow c/w foam rubber insert for 6 test Rp tube (1 pcs/station) 2,112,551 1M Forwarding Tube PVC 110 x 2.3 - light grey Rp 160,438 1 PCS Forwarding Bend 90° PVC 110 x 2.3 R=650 - light grey Rp 612,028 1 PCS Sleeve PVC 110 x 2.3 L=110 - light grey Rp 56,503 1M PMMA Forwarding Tube 110 x 2.3 - PLEXIGLASS Rp 1,554,541 1 LOT Material support Rp 85,094,142 1M Instalasi PTS, UTP Cable 4 Pairs (2xCat5e) + NYM 3 x 1,5mm² dalam conduit PVC Rp HI 20mm 262,528 1 PCS Wall chasing, sparing, and finishing Rp 781,819 1 PCS Floor coring Rp 1,806,819
1 2 3
ELEVATOR 1 UNIT BED ELEVATOR 1 UNIT BED ELEVATOR 1 UNIT PASSENGER ELEVATOR
Rp Rp Rp
873,458,875 629,406,375 800,868,375
Harga Satuan MP - page 210 of 211
NO. 4 5 6 7 8 1 2 3 4 5 6 7 8 9
SATUAN 1 UNIT 1 UNIT 1 UNIT 1 LS 1 SET
DUMB WAITER 200 DUMB WAITER 50 ESCALATOR Earthquake device Mimic Panel ( Supervisory Panel )
URAIAN
GENSET 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT 1 UNIT
GENSET 1600 KvA, 50 Hz, 220/380 Volt Rp 4,357,444,330 Radiator Ducting dan Flexible connection Rp 7,011,205 Storage Tank, Kapasitas : 10.000 Liter Lengkap Dengan Pemipaan Terpasang Diatas Rp Pondasi 102,259,330 Panel Gear Pump, Power Cable, Hand Pump & Pompa Gear Pump Kap.20 - 25 Lpm Rp 48,446,830 Hand Pump 15 lpm Rp 6,841,158 Intake Attenuator Rp 12,930,580 Discharge Attenuator Rp 19,388,080 Pemindahan Genset ke Pondasi Rp 2,706,205 Drop KIT CT-1000A Rp 18,303,220
Rp Rp Rp Rp Rp
HARGA SATUAN 160,643,125 135,274,375 567,055,625 13,936,361 5,136,736
Harga Satuan MP - page 211 of 211