DAFTAR HARGA UPAH PEMBUATAN TALUD BATU KALI DI CHANNEL 600 BANDARA SOEKARNO - HATTA
No.
JENIS PEKERJA
SATUAN
HARGA
1
Pekerja
Oh
Rp.
130,200.00
2
Tukang kayu
Oh
Rp.
149,730.00
3
Tukang batu
Oh
Rp.
149,730.00
4
Tukang besi
Oh
Rp.
149,730.00
5
Tukang las
Oh
Rp.
149,730.00
6
Tukang Cat
Oh
Rp.
149,730.00
7
Kepala tukang kayu
Oh
Rp.
164,052.00
8
Kepala tukang batu
Oh
Rp.
164,052.00
9
Mandor
Oh
Rp.
174,468.00
10
Sopir
Oh
Rp.
95,000.00
11
Surveyor
Oh
Rp.
174,468.00
12
Pembantu surveyor
Oh
Rp.
95,000.00
DAFTAR HARGA BAHAN/MATERIAL PEMBUATAN TALUD BATU KALI DI CHANNEL 600 BANDARA SOEKARNO - HATTA
No.
JENIS BAHAN/MATERIAL
SATUAN
HARGA
1
Dolken kayu Ø 8- 10/400 cm
btg
Rp.
32,000.00
2
Kayu Terentang
m3
Rp.
3,228,000.00
3
Paku
kg
Rp.
24,600.00
4
Kayu 5/7
m3
Rp.
1,550,000.00
5
Kayu Papan 3/20
m3
Rp.
2,000,000.00
6
Kayu Meranti
btg
Rp.
5,231,000.00
7
Besi strip
kg
Rp.
9,800.00
8
Seng gelombang 180 x 90 x 0.5
lbr
Rp.
62,000.00
9
Pipa PVC (AW) : 2"
btg
Rp.
96,500.00
10 Jendela dan kaca polos
m2
Rp.
388,162.67
unit
Rp.
130,600.00
12 Plywood 4 mm
lbr
Rp.
55,000.00
13 Multipleks 9 mm
lbr
Rp.
188,000.00
14 BBM (pertalite)
ltr
Rp.
7,500.00
15 Air kerja
ltr
Rp.
50.00
11 Kunci tanam standard
16 Batu Belah/Kali
m3
Rp.
250,000.00
17 Semen Pc Tiga Roda 50 kg
kg
Rp.
1,460.00
18 Pasir pasang
m3
Rp.
214,000.00
19 Pasir beton
m3
Rp.
251,000.00
20 Kerikil
m3
Rp.
220,000.00
21 Minyak bekisting
ltr
Rp.
20,000.00
22 Besi beton polos
kg
Rp.
10,800.00
23 Kawat Beton
kg
Rp.
25,000.00
24 Meteran roll 100 m
unit
Rp.
48,000.00
25 Meni Besi
kg
Rp.
30,000.00
26 Cat Kayu
kg
Rp.
55,000.00
bh
Rp.
330,000.00
27 Theodolit
hr
Rp.
150,000.00
28 Kawat tiger (kawat duri spiral type natto)
m'
Rp.
29 Kawat Ikat Ø 2 mm Galvanized
m'
Rp.
3,000.00
30 Kawat Las
kg
Rp.
40,000.00
31 Panel BRC pagar type 60 lengkap dengan mur baut
pnl
Rp.
32 Square pipe 50 x 50 x T.2 Support Post
m
Rp.
33 Square pipe 50 x 50 x T.2 Standard Post
bh
Rp.
34 Panel Bave Mesh PAS 150 dia. 4 mm (150 x 250 Cm)
pnl
Rp.
680,000.00
35 Panel Bave Mesh PAS 200 dia. 4 mm (200 x 250 Cm)
pnl
Rp.
735,000.00
36 Panel Bave Mesh PAS 100 dia. 4 mm (100 x 250 Cm)
pnl
Rp.
37 BM Tension Wire dia. 4 mm (tying wire)
m'
Rp.
38 BM Tension Wire dia. 2 mm (tying wire)
m'
Rp.
39 Kawat duri BM Razor M series dia. 980 mm
roll
Rp.
1,000,000.00
40 Geotextile non woven 250 gr/m2
m2
Rp.
9,100.00
Beton Pracetak 30x30x120, tebal 5cm
314,685.31
No
SAT
URAIAN PEKERJAAN
I. 1 2 3 4 5 6 7 II. 1 2 III. 1 IV. 1 2 3 4 5 V. 1 2 VI. 1 2
PEKERJAAN PERSIAPAN Administrasi proyek dan perizinan Mobilisasi dan Demobilisasi Pembersihan Lahan Direksi keet Pemasangan Pagar Sementara dari Seng Gelombang tinggi 2 m Memasang Bouwplank Memasang Papan Nama Proyek PEKERJAAN TANAH Galian tanah Timbunan PEKERJAAN GEOCELL Pekerjaan GEOCELL PEKERJAAN DINDING TALUD Pekerjaan Pasir Urug Pekerjaan Lantai Kerja Pasang batu belah, camp 1 Pc : 4 Pp Pasang pipa resapan air Pasang lapisan geotextile non woven PEKERJAAN FINISHING Finishing siar pasangan batu kali adukan 1 PC : 2 Psr Acian sloof atas talud batu kali PEKERJAAN LAIN-LAIN Normalisasi inlet Penambahan pagar pembatas di saluran
778.55 100 80 120 260 40 1378.55
Ls Ls m² m² m¹ m¹ Bh m3 m3 m2 m3 m3 m3 m1 m2 m3 m2 bh m2
-284.45
VOLUME VOLUME Stasioning Panjang Saluran Panjang Terminal 3 Panjang Saluran Rencana
VOLUME 1.000 1.000 16896.080 20.000 400.000 957.000 2.000 4065.980 17695.660
1440 660 11092.21 22184.42 11092.21 #REF!
1109.221 997.800 13.000 21.000
2000 m 337 m 1663 m
67.4
8448.040 166.300 332.600 10445.303 11092.210
= = =
280 2000 1720
0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
1 1 1 1 1 1 1 1 2 2 2 2
+ + + + + + + + + + + +
Stasioning 900 920 940 960 980 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 620 640 660 680 700 720 740 760 780 800 820
VOLUME GALIAN TANAH VOLUME GALIAN TANAH Volume (m3) Galian Timbunan 32.46 130.88 8.48 269.46 44.68 98.62 24.72 275.14 24.52 185.74 180.64 246.38 23.72 291.46 46.24 700.76 31.68 1007.48 33.6 905.54 10.4 327.34 137.48 182.58 7.76 392.9 37.86 361.24 20.54 293.82 42.74 322.14 22.68 443 42.44 731.6 32.26 697.94 32.04 743.24 1012.54 19.82 894.16 22.1 745.48 15.58 513.84 11.2 503.44 7.56 607.34 18.32 498.06 47.62 733.7 39 134.76 535.52 47.08 32.74 42.6 82.54 304.48 4.68 174.18 27.94 572.34 17 273.52 30.16 121.4 49.66 80.62 120.6 16.74 176.9 116.28 33.8 43.54 47.12 63.06 68.96 113.18 158.96 11.38 50.04 28.76 19.36 120.28 56.12 347.36
840 860 880 900 920 940 960 980 0 20 40 60
#DIV/0!
69.7 37.86 20.7 128.26 147.7 79 41.76 231.5 154.72 251.4 186.52 104.14 4065.98
28.78 27.88 73.22 50.34 4.48 7.42 57.02 101.36 61.9 213.92 424.44 17695.66
ANALISA HARGA SATUAN PEMBUATAN TALUD BATU KALI DI CHANNEL 600 BANDARA SOEKARNO - HATTA Harga
Upah
Harga
Koef
Satuan
Satuan
3
4
(Rp) 5
Pekerja (Rp) 6
Bahan (Rp) 7
450 30 30
ltr hr hr
7,500.00 95,000.00 130,200.00 Sub Total Over Head 10% Jumlah
2,850,000.000 3,906,000.000 6,756,000.000 675,600.000 7,431,600.00
Pembersihan Lahan (m²) Pekerja Mandor
0.100 0.050
oh oh
130,200.00 174,468.00 Sub Total Over Head 10% Jumlah
13,020.00 8,723.40 21,743.40 2,174.34 23,917.74
Direksi keet (m²) Dolken kayu Ø 8-10/400 cm Kayu terentang Paku Besi strip Seng gelombang 180 x 90 x 0.50 Jendela dan kaca polos Kunci tanam standard Plywood 4 mm Pekerja Tukang kayu Kepala Tukang Kayu Mandor
1.250 0.180 0.850 1.100 0.250 0.080 0.150 0.060 1.000 2.000 0.200 0.050
btg m3 kg kg lbr m2 Unit lbr oh oh oh oh
32,000.00 3,228,000.00 24,600.00 9,800.00 62,000.00 388,162.67 130,600.00 55,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
No
Uraian Pekerjaan
1 A. PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi BBm (bensin) Sopir Pekerja/knek
2
3
4
5
6
2
Pemasangan Pagar Sementara dari Seng Gelombang tinggi 2 m (m¹) Dolken kayu Ø 8-10/400 cm 1.250 Semen Pc 2.500 Seng gelombang 1.200 Pasir Beton 0.005 Kerikil 0.009 Kayu 5/7 0.072 Paku 0.060 Meni Besi 0.450 Pekerja 0.200 Tukang kayu 0.400 Kepala Tukang 0.020 Mandor 0.020
Memasang Bouwplank (m¹) Kayu Balok 5/7 Paku Kayu Papan 3/20 Pekerja Tukang kayu Kepala Tukang Mandor
Memasang Papan Nama Proyek 80x120 cm (Bh) Kayu Meranti Paku Seng Cat kayu Semen Portland Pasir Beton Kerikil Pekerja Tukang Batu Tukang Cat Tukang Kayu Mandor
B. PEKERJAAN TANAH 1 Galian Tanah Sedalam 1 meter Pekerja Mandor
2
Urugan Tanah Tanah Urug Pekerja Mandor
C. PEKERJAAN GEOCELL 1 Pekerjaan Geocell Geocell Angkur Peralatan Bantu Pekerja Mandor
2
3
3
4
Pasang batu belah, camp 1 Pc : 3 Pp (m²) Batu Belah/Kali Semen Pc Pasir Pasang Pekerja Tukang Batu Kepala tukang batu Mandor
Pasang batu belah, camp 1 Pc : 4 Pp (m²) Batu Belah/Kali Semen Pc Pasir Pasang Pekerja Tukang Batu Kepala tukang batu Mandor
Memasang pipa PVC tipe AW Ø 2" (m¹) Pipa PVC Pekerja Tukang Batu Kepala tukang batu Mandor
E. PEKERJAAN FINISHING 1 Finishing siar pasangan batu kali adukan 1 PC : 2 Psr Semen Pc Pasir Pasang Pekerja Tukang Batu Kepala Tukang Batu Mandor
2
Plesteran 1Pc:3Ps (m²) tebal 15 mm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Batu Mandor
MAINTENANCE EXECUTIVE MANAGER
FAHROJI
130,200.00 299,460.00 32,810.40 8,723.40 471,193.80 47,119.38 518,313.18
26,040.00 59,892.00 3,281.04 3,489.36 92,702.40 9,270.24 101,972.64
0.035 0.600 1.400 1.500 16.800 0.027 0.041 2.100 0.018 1.000 1.000 1.005
Btg Kg Lbr Kg Kg M³ M³ oh oh oh oh oh
5,231,000.00 24,600.00 62,000.00 55,000.00 1,460.00 251,000.00 220,000.00 130,200.00 149,730.00 149,730.00 149,730.00 174,468.00 Sub Total Over Head 10% Jumlah
273,420.00 2,695.14 149,730.00 149,730.00 175,340.34 750,915.48 75,091.55 826,007.03
13,020.00 14,973.00 1,640.52 872.34 30,505.86 3,050.59 33,556.45
130,200.00 174,468.00 Sub Total Over Head 10% Jumlah
97,650.00 4,361.70 102,011.70 10,201.17 112,212.87
1.000 0.500 0.050
m3 oh oh
208,000.00 130,200.00 174,468.00 Sub Total Over Head 10% Jumlah
65,100.00 8,723.40 73,823.40 7,382.34 81,205.74
1,302.000 872.340 2,174.340 217.434 2,391.77
214,000.00 130,200.00 174,468.00 Sub Total Over Head 10% Jumlah
39,060.00 1,744.68 40,804.68 4,080.47 44,885.15
78,100.00 251,000.00 220,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
1.200 202.000 0.485 1.500 0.750 0.075 0.075
m3 kg m3 oh oh oh oh
250,000.00 1,460.00 214,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
1.200 163.000 0.520 1.500 0.750 0.075 0.075
m3 kg m3 oh oh oh oh
30,000.00 1,460.00 330,000.00 95,000.00 95,000.00 Sub Total Over Head 10% Jumlah
1.200 0.054 0.090 0.009 0.003
M1 oh oh oh oh
96,500.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
6.340 0.012 0.300 0.150 0.015 0.015
7.776 0.023 0.300 0.150 0.015 0.015
kg m3 oh oh oh oh
Kg M3 oh oh oh oh
1,460.00 214,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah 1,460.00 214,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
1,312,703.49
247,861.00 24,786.10 272,647.10
374,619.74
200,492.00 20,049.20 220,541.20
254,097.65
407,470.00 40,747.00 448,217.00
1,274,224.03
112,212.87 208,000.00
13,000.00 5,000.00 500.00 130,200.00 174,468.00 Sub Total Over Head 10% Jumlah
Zak m3 m3 oh oh oh oh
722,173.01 72,217.30 794,390.31
183,085.00 14,760.00 86,800.00 82,500.00 24,528.00 6,777.00 9,020.00
oh oh
2.680 0.548 0.940 1.650 0.275 0.028 0.083
23,917.74
186,000.00 492.00 14,000.00
0.750 0.025
m³ oh oh
11,144,100.00
40,000.00 3,650.00 74,400.00 1,255.00 1,980.00 111,600.00 1,476.00 13,500.00
1,550,000.00 24,600.00 2,000,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
m Ls Ls oh oh
3,375,000.00 337,500.00 3,712,500.00
40,000.00 581,040.00 20,910.00 10,780.00 15,500.00 31,053.01 19,590.00 3,300.00
m3 kg m3 oh oh oh oh
1.000 0.300 0.010
Pekerjaan Lantai Kerja Semen Pc Pasir Beton Kerikil Pekerja Tukang batu Kepala tukang batu Mandor
32,000.00 1,460.00 62,000.00 251,000.00 220,000.00 1,550,000.00 24,600.00 30,000.00 130,200.00 149,730.00 164,052.00 174,468.00 Sub Total Over Head 10% Jumlah
(Rp) 8
3,375,000.00
0.120 0.020 0.007 0.100 0.100 0.010 0.005
1.000 1.000 1.000 0.010 0.005
D. PEKERJAAN DINDING TALUD 1 Pekerjaan Pasir Urug Pasir Pasang Pekerja Mandor
btg kg Lbr m3 m3 m3 kg Ltr oh oh oh oh
Jumlah
208,000.00 20,800.00 228,800.00
310,005.74
13,000.00 5,000.00 500.00
18,500.00 1,850.000 20,350.00
22,741.77
214,000.00
214,000.00 21,400.00 235,400.00
280,285.15
209,308.00 137,548.00 206,800.00 214,830.00 41,175.75 4,593.46 14,480.84 275,080.05 27,508.01 302,588.06
553,656.00 55,365.60 609,021.60
911,609.66
300,000.00 294,920.00 103,790.00 195,300.00 112,297.50 12,303.90 13,085.10 332,986.50 33,298.65 366,285.15
698,710.00 69,871.00 768,581.00
1,134,866.15
36,000.00 237,980.00 171,600.00 142,500.00 71,250.00 213,750.00 21,375.00 235,125.00
445,580.00 44,558.00 490,138.00
725,263.00
7,030.80 13,475.70 1,476.47 523.40 22,506.37 2,250.64 24,757.01
152,137.01
115,800.00
115,800.00 11,580.00 127,380.00
9,256.400 2,568.000 39,060.00 22,459.50 2,460.78 2,617.02 66,597.30 6,659.73 73,257.03
11,824.400 1,182.44 13,006.84
86,263.87
11,352.96 4,922.00 39,060.00 22,459.50 2,460.78 2,617.02 66,597.30 6,659.73 73,257.03
16,274.96 1,627.50 17,902.46
91,159.49
INFRASTRUCTURE
RENCANA
ANGGARAN
BIAYA
PEMBUATAN TALUD BATU KALI DI CHANNEL 600 BANDARA SOEKARNO - HATTA NO.
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
1
Administrasi proyek dan pelaporan
2
Mobilisasi dan Demobilisasi
3
Pembersihan Lahan
4
Direksi keet
5
Pemasangan Pagar Sementara dari Seng Gelombang tinggi 2 m
6 7
Pengukuran Lapangan & Memasang Bouwplank Memasang Papan Nama Proyek
II.
PEKERJAAN TANAH
1
Galian tanah
2
Urugan tanah Termaksud Pemadatan
HARGA SATUAN ( Rp. )
VOLUME
SAT
1.00
Ls
4,000,000.00
1
1.00
Ls
44,576,400.00
44,576,400.00
m²
23,917.74
404,116,048.46
20.00
m²
1,312,703.49
26,254,069.90
410.00
m¹
374,619.74
153,594,093.40
957.00
m¹
254,097.65
243,171,447.22
2.00
Bh
1,274,224.03
2,548,448.06
JUMLAH I :
878,260,507.04
4065.98
m³
117,300.00
476,939,454.00
13629.68
m³
210,300.00
2,866,321,704.00 3,343,261,158.00
PEKERJAAN GEOCELL Pekerjaan Geocell
8448.04
m²
22,741.77 JUMLAH III :
IV.
4,000,000.00
16896.08
JUMLAH II : III.
JUMLAH HARGA ( Rp. )
192,123,416.42 192,123,416.42
PEKERJAAN DINDING TALUD
1
Pekerjaan Pasir Urug
166.3
m³
336,700.00
55,993,210.00
2
Pekerjaan Lantai Kerja
332.6
m³
911,609.66
303,201,371.25
10445.30
m³
11092.21
m¹
3 4
Pasang batu belah, camp 1 Pc : 4 Pp Pasang pipa resapan air
725,263.00 152,137.01 JUMLAH IV :
V.
7,575,591,789.69 1,687,535,654.82 9,622,322,025.76
PEKERJAAN FINISHING
1
Finishing siar Timbul pasangan batu kali adukan 1 PC : 2 Psr
1109.22
m³
86,263.87
95,685,696.15
2
Plesteran atas talud batu kali, camp 1 Pc : 3 Pp, tebal 15 mm
997.80
m²
95,600.00
95,389,680.00
JUMLAH V : VI. 1
VII. 1 2
191,075,376.15
PEKERJAAN LANDSCAPE Penanaman Rumput di atas Geocell
8448.04
m²
28,000.00
236,545,120.00
JUMLAH VI :
236,545,120.00
PEKERJAAN LAIN-LAIN Normalisasi inlet Penambahan pagar pembatas di saluran
1.00
Ls
39,000,000.00
39,000,000.00
1.00
Ls
42,000,000.00
42,000,000.00
JUMLAH VII :
81,000,000.00
Paraf ........................................
INFRASTRUCTURE
R E K A P I T U L A S I RENCANA
ANGGARAN
BIAYA
PEMBUATAN TALUD BATU KALI DI CHANNEL 600 BANDARA SOEKARNO - HATTA
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN TANAH
878,260,507.04
III.
PEKERJAAN GEOCELL
IV.
PEKERJAAN DINDING TALUD
V.
PEKERJAAN FINISHING
191,075,376.15
VI.
PEKERJAAN LANDSCAPE
236,545,120.00
VII.
PEKERJAAN LAIN-LAIN
3,343,261,158.00 192,123,416.42 9,622,322,025.76
81,000,000.00 JUMLAH I s.d VII :
14,544,587,603.37
PPN 10 % :
1,454,458,760.34
JUMLAH TOTAL :
15,999,046,363.70
PEMBULATAN :
16,000,000,000.00
Terbilang : Enam Belas Milyar Rupiah
Paraf ........................................