14 0 170 KB
RENCANA ANGGARAN BIAYA - TWP PEKERJAAN PEMBANGUNAN RUMAH TYPE 30/72
NO.
URAIAN PEKERJAAN
VOLUME
SAT.
HARGA SAT
JUMLAH
1
2
3
4
Rp. 5
Rp. 6
I.
BOBOT PER ITEM 7
BOBOT TOTAL 8
PEKERJAAN PERSIAPAN 1
Pembersihan lokasi
72.0000
m2
740.00
53,280.00
19.68%
2
Pemasangan bouwplank & pengukuran
29.0000
m1
7,500.00
217,500.00 270,780.00
80.32% 100.00%
8.70%
Sub total
II
1.09%
PEKERJAAN TANAH DAN PONDASI 1
Pek. Galian Tanah 85 cm
14.1750
m3
15,000.00
212,625.00
2
Pek. Rucuk Bambu
16.8000
m2
6,000.00
100,800.00
4.12%
3
Pas. Pondasi batu kali 1:5
6.7270
m3
305,000.00
2,051,735.00
83.94%
4
Pek. Pondasi Conblok Rabat Beton
1.4400
m2
30,000.00
43,200.00
1.77%
5
Pek. Urugan tanah Kembali
4.7250
m3
7,600.00
35,910.00 2,444,270.00
1.47% 100.00%
Sub total
III
9.86%
PEKERJAAN BETON 1
Pek. Beton Sloof 15/20
1.0470
m3
1,200,000.00
1,256,400.00
28.98%
2
Pek. Beton kolom praktis 15/15
1.0920
m3
1,200,000.00
1,310,400.00
30.22%
3
Pek. Beton ringbalk 15/15
1.1500
m3
1,200,000.00
1,380,000.00
31.83%
4
Pek. Beton Variasi Depan
0.2240
m3
1,200,000.00
268,800.00
6.20%
5
Pek. Meja Dapur Beton
0.0720
m3
700,000.00
50,400.00
1.16%
6
Pek. Inrit Beton
0.1000
m3
700,000.00
70,000.00 4,336,000.00
Sub total
IV
1.61% 100.00%
17.48%
PEKERJAAN KUSEN DAN PINTU 1
Pek Kusen Pintu, Jendela& Bouvenlicht
0.3400
m3
2,000,000.00
680,000.00
37.86%
2
Pek Daun Pintu Double Triplek(1.6 m2)
4.0000
bh
150,000.00
600,000.00
33.41%
3
Kusen & Pintu PVC + kunci
1.0000
bh
125,000.00
125,000.00
6.96%
4
Pek. Daun Jendela (2.6416m2)
4.0000
bh
35,000.00
140,000.00
5
Pas. Rouster Kayu (lubang angin) 20 x 20
10.0000
bh
25,100.00
251,000.00 1,796,000.00
13.98% 100.00%
Sub total
V
7.80% 7.24%
PEKERJAAN DINDING 1
Pas. Dinding conblok 1:5
103.5380
m2
33,500.00
3,468,523.00
58.02%
2
Pek. Plester & acian 1: 5
146.0000
m2
14,500.00
2,117,000.00
35.41%
3
Pas. keramik dinding meja dapur 20 x 20
3.9300
m2
33,000.00
129,690.00
2.17%
4
Pas. Keramik dinding kamar mandi 20 x 25
7.0000
m2
37,500.00
262,500.00 5,977,713.00
4.39% 100.00%
24.10%
430,000.00 45,000.00 1,848,000.00 1,056,000.00 180,000.00 180,000.00 3,739,000.00
11.50% 1.20% 49.42% 28.24% 4.81% 4.81% 100.00%
15.08%
887,100.00 248,388.00 86,850.00 1,222,338.00
72.57% 20.32% 7.11% 100.00%
4.93%
Sub total VI 1 2 3 4 5 6
VII 1 2 3
PEKERJAAN ATAP Pek. Kuda-kuda + gording kayu Borneo Super Papan Ruiter, sejenis Borneo 2/15 Pek. Rangka atap Pas. Genteng beton pelat Pek. Lisplank 3/20 + tumpang sari , borneo / sejenis Pek. Bubungan Sub total PEKERJAAN PLAFOND Pek. Rangka plafond 4/6 kayu Borneo/ sejenis Pas. Plafond Eternit 1x 0.5 m 4,5mm Pas. List Plafond 3 cm
0.3440 6.0000 52.8000 52.8000 12.0000 6.0000
35.4840 35.4840 57.9000 Sub total
m3 m1 m2 m2 m1 m1
m2 m2 m1
1,250,000.00 7,500.00 35,000.00 20,000.00 15,000.00 30,000.00
25,000.00 7,000.00 1,500.00
1
2
VIII
3
4
5
1
Pek. Perataan tanah/pemadatan
2
Pek. Rabat Beton
3
Pas. keramik 30 x 30
4
Pas. keramik 20 x20 / sejenis, lantai km/WC
1 2 3
X 1 2 3
1 2 3 4 5
m2
3,500.00
105,000.00
m3
250,000.00
33,750.00
3.21%
28.6800
m2
30,000.00
860,400.00
81.81%
1.5000
m2
35,000.00
52,500.00 1,051,650.00
4.99% 100.00%
4.24%
PEKERJAAN INSTALASI AIR BERSIH - KOTOR Pek. Instalasi Air Bersih Pek. Instalasi Air Kotor PIPA PVC 4" Pek. Instalasi Air Kotor PIPA PVC 3" Sub total
10,000.00 58,500.00 50,000.00 118,500.00
8.44% 49.37% 42.19% 100.00%
0.48%
PEKERJAAN INSTALASI LISTRIK Pas. Instalasi Ttk lampu + kabel NYM Pas. Instalasi Stop kontak Pas. Box Sekering
350,000.00 250,000.00 50,000.00
53.85% 38.46% 7.69%
650,000.00
100.00%
2.62%
100,000.00 20,000.00 125,000.00 75,000.00 300,000.00 620,000.00
16.13% 3.23% 20.16% 12.10% 48.39% 100.00%
2.50%
102,510.00 45,000.00 90,000.00 45,000.00 37,500.00 25,000.00 345,010.00
29.71% 13.04% 26.09% 13.04% 10.87% 7.25% 100.00%
1.39%
1,022,000.00 311,688.00 212,904.00 1,546,592.00
66.08% 20.15% 13.77% 100.00%
6.24%
182,200.00 500,000.00 682,200.00
26.71% 73.29% 100.00%
2.75%
4.0000 9.0000 10.0000
7.0000 5.0000 1.0000
m1 m1 m1
ttk ttk bh
2,500.00 6,500.00 5,000.00
50,000.00 50,000.00 50,000.00
PEKERJAAN SANITAIR Pas. Kloset jongkok Pas. Kran 1/2 Pas. Bak Fiber Ekspos Kitchen sink Septictank + rembesan
1.0000 2.0000 1.0000 1.0000 1.0000
bh bh bh unit Unit
100,000.00 10,000.00 125,000.00 75,000.00 300,000.00
Sub total XII 1 2 3 4 5 6
PEKERJAAN GANTUNGAN Pemasangan Kaca T = 3 mm Pas. Kunci Pintu Depan Pas. Kunci Pintu Kamar & Ruang Dalam Lainnya Pas. Engsel pintu Pas. Slot & Hak angin Pas. Engsel jendela, standar
2.2780 1.0000 3.0000 6.0000 5.0000 5.0000
m2 bh bh psg set set
45,000.00 45,000.00 30,000.00 7,500.00 7,500.00 5,000.00
Sub total XIII 1 2 3
PEKERJAAN FINISHING & PENGECATAN Pek. Cat Tembok Pek. Cat Kusen/daun pintu/ jendela Pek. Cat plafond
146.0000 31.1688 35.4840
m2 m2 m2
7,000.00 10,000.00 6,000.00
Sub total XIV 1 2
8
0.1350
Sub total XI
7
30.0000
Sub total IX
6
PEKERJAAN LANTAI
PEKERJAAN TAMBAHAN Pas. Tempat sampah Pompa sumur pantek
1.0000 1.0000
bh ls
182,200.00 500,000.00
Sub total
TOTAL
24,800,053.00
(dibulatkan)
24,800,000.00
9.98%
100%
REKAPITULASI - TWP PEKERJAAN PEMBANGUNAN RUMAH TYPE 30/72 NO
URAIAN PEKERJAAN
JUMLAH
BOBOT
I
PEKERJAAN PERSIAPAN
II
PEKERJAAN TANAH DAN PONDASI
2,444,270.00
270,780.00
1.09% 9.86%
III
PEKERJAAN BETON
4,336,000.00
17.48%
IV
PEKERJAAN KUSEN DAN PINTU
1,796,000.00
7.24%
V
PEKERJAAN DINDING
5,977,713.00
24.10%
VI
PEKERJAAN ATAP
3,739,000.00
15.08%
VII
PEKERJAAN PLAFOND
1,222,338.00
4.93%
VIII
PEKERJAAN LANTAI
1,051,650.00
4.24%
IX
PEKERJAAN INSTALASI AIR BERSIH - KOTOR
118,500.00
0.48%
XI
PEKERJAAN INSTALASI LISTRIK
650,000.00
2.62%
X
PEKERJAAN SANITAIR
620,000.00
2.50%
XI
PEKERJAAN GANTUNGAN
345,010.00
1.39%
XII
PEKERJAAN FINISHING & PENGECATAN
1,546,592.00
6.24%
XIII
PEKERJAAN TAMBAHAN
682,200.00 24,800,053.00 24,800,000.00
2.75%
JUMLAH DIBULATKAN
100.00%
HARGA JUAL TYPE 30 / 72 HARGA BANGUNAN HARGA TANAH 72 m2 x Rp 525000
24,800,000.00
TOTAL HARGA JUAL TYPE 30 / 72
62,600,000.00
TERBILANG : Enam Puluh Dua Juta Enam Ratus Ribu Rupiah