Teknik Pertambangan - Universitas Lambung Mangkurat



X. Pemilihan Metode Penambangan



Dengan mempelajari setiap metode, kita dapat menentukan kondisi geologi umum, spasial (sebaran endapan), dan kondisi alam yang tepat untuk penggunaan metode-metode penambangan bahan galian tersebut. Pemilihan metode baik untuk tambang terbuka dan tambang bawah tanah, kondisi yang dipertimbangkan yaitu : a. Kekuatan Bijih b. Kekuatan Batuan c. Bentuk Endapan d. Kemiringan Endapan e. Ukuran Endapan f. Kadar Bijih g. Keseragaman Bijih h. Kedalaman Semua faktor kondisi endapan memberikan pengaruh penting, tetapi dalam pemilihan antara tambang bawah tanah atau tambang terbuka yang paling berpengaruh adalah kadar bijih dan kedalaman. Jika endapan berkadar rendah, maka tambang terbuka lebih cocok diterapkan, namun jika berada pada kedalaman tertentu, hanya tambang bawah tanah yang layak.



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-1



Teknik Pertambangan - Universitas Lambung Mangkurat



Kelebihan dan kekurangan tambang terbuka dan tambang bawah tanah yaitu : a. Biaya penambangan, lebih murah tambang terbuka b. Tingkat produksi c. Produktivitas d. Modal/Investasi e. Kecepatan Pembangunan f. Batas Kedalaman g. Pemilihan h. Perolehan i. Dilusi j. Fleksibilitas k. Kestabilan Bukaan Tambang l. Risiko Lingkungan m. Disposal n. Kesehatan & Keselamatan (K3) Dari semua ciri-ciri metode yang disebutkan di atas, faktor paling penting dalam tambang terbuka adalah biaya, tingkat produksi, produktivitas, perolehan, dan K3. Sedangkan pertimbangan yang mendukung tambang bawah tanah adalah toleransi kedalaman, pemilihan, dilusi, risiko lingkungan, dan waste disposal.



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-2



Teknik Pertambangan - Universitas Lambung Mangkurat



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-3



Teknik Pertambangan - Universitas Lambung Mangkurat



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-4



Teknik Pertambangan - Universitas Lambung Mangkurat



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-5



Teknik Pertambangan - Universitas Lambung Mangkurat



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-6



Teknik Pertambangan - Universitas Lambung Mangkurat



Pemilihan Metode Penambangan --- Numerical Scheme by Nicholas, 1981 Procedural steps : 1. To identify the best candidate methods, the deposit is described in terms of geometry, grade distribution, and geotechnical properties. Using the parameter, the relevant mining methods are rank-ordered numerically to determine which two or three are most promising 2. Mining and capital cost as well as production rate, recovery, labor supply, and environmental factors are introduced 3. The most likely candidate methods are costed out, cutoff grades and reserves are calculated, and economic comparisons are completed to determine the most feasible mining method and overall plan of exploitation To elaborate on the methodology of stage 1, three or four factors each are selected that are descriptive of 1. Deposit geometry and grade distribution : shape, thickness, dip, depth, and grade uniformity 2. Geotechnical properties : rock strenght, fracture spacing, and fracture shear strength Next, each mining method is rated numerically as to its suitability for each category of factors. Four ranks are used : preferred, probable, unlikely, and unsuitable (eliminated). Numerical values are assigned to each rank, for instance : 1. Preferred 3–4 2. Probable 1–2 3. Unlikely 0 4. Unsuitable - 49



Nicholas provides a numerical example of stage 1, in which 10 mining methods are analyzed for suitability with a given mineral deposit. The deposit is tabular, flat, very thick, and 425 ft (130 m) deep with uniform grade distribution.



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-7



Teknik Pertambangan - Universitas Lambung Mangkurat The geometry/grade value for the open pit method is 2 + 4 + 3 + 3 = 12.



Based on the ratings in the grand colum in table, the result indicate that most favorable method is open pit mining with 40 points, followed by block caving and top slicing with 34 point each. Eliminated are longwall mining (-18 points) and stope and pillar mining (-20 points). Having narrowed the preferred choices of methods to two or three, each is now examined in stage 2 for technological, economic, and environmental consideration. Tugas Minggu Ini : Buat resume studi kasus tambang yang menggunakan minimal 5 metode. Kerjakan dalam format Ms. Powerpoint, setiap studi kasus metode penambangan minimal mencakup  Jenis bahan galian  Lokasi  Owner/Contractor  Kondisi geologi umum endapan : bentuk dan arah sebaran, ketebalan, kualitas dan jumlah cadangan)  Kegiatan penambangan : cara, produksi, peralatan (jenis dan kapasitas)  Milling/processing plant : prinsip, produksi, peralatan (jenis & kapasitas) Jangan lupa cantumkan sumber pustaka…



Sari Melati, Bahan Kuliah Perencanaan & Permodelan Tambang  2011 ~ Halaman 10-8