Risk Assessment - Air Conditioning Installation of a New Air Conditioning System
Tick those that apply
Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Confirm
2
__ ,, __
Exposure to dust/debris
__ ,, __
Cuts, abrasions, eye injuries and breathing difficulties __ ,, __
Installation of Air Conditioning Plant
Tick those that apply
Activity
Hazard
Worst Case
Those in the immediate vicinity of ducting outlet
Med / Low
__ ,, __
Persons at Risk
Med / Low
Dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during commissioning
Negligi ble
Ducting system cleaned on a regular basis during installation and immediately prior to commissioning
Warning signs to be placed around duct outlets during system commissioning
Negligi ble
Risk before any controls in place
Control Measures that should be already in place
5 Installing plant at height 6
__ ,, __
7 Lifting plant with mechanical equipment
Sharp or jagged edges
Cuts/abrasions
Fall of Person
Death or serious injury Persons doing the work
Unintended falls of material/tools/debris
Fall of material/equipment/tools
Persons doing the work __ ,, __
Med / Low
Med / High
Confirm
Manual Handling assessment carried out
Med / Low
M
__ ,, __
Muscular skeletal injuries
Appropriate gloves suitable for the task provided
Low Low
Refer to risk assessment for specific access equipment used
Low
Serious injuries possibly life threatening
Anyone passing below
Medium
Refer to risk assessment for specific lifting equipment used
Low
Serious injuries possibly life threatening
Operatives and those passing below
Medium
Refer to risk assessment for specific lifting equipment used
Low
SA
4
Poor handling technique
Residual Risk
Additional Control Measures Needed
Confirm
3 Handling plant
Confirm
Persons not required to be in the vicinity of the duct outlets will be kept out of the area
PL E
1 Commissioning System
Residual Risk
Additional Control Measures Needed
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Risk Assessment - Air Conditioning Installation of Air Conditioning Ductwork
Tick those that apply
Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Additional Control Measures Needed Confirm
Contact with sealants
9 Installing ductwork at height Fall of Person __ ,, __
11
__ ,, __
12
__ ,, __
__ ,, __ Unintended falls of material/tools/debris __ ,, __
Air Conditioning -
Persons doing the work and those in the immediate area
Med / Low
Death or serious injury Persons doing the work
Med / High
Refer to risk assessment for specific access equipment used
Low
Med / High
Only competent persons will carry out these works
Low
Long term health problems - fatal
__ ,, __ Serious injuries possibly life threatening __ ,, __
Record comments and variations here.
__ ,, __
Anyone passing below
__ ,, __
Medium
Barriers and signage will be positioned to exclude persons from the area below the works
Negligi ble
Medium
Refer to risk assessment for specific lifting equipment used
Loose materials and equipment will be cleared regularly
Position .........................................................................
SA
Name ........................................................................................... ..........................
Refer to COSHH assessment for use of sealants
M
10
Confirm
PL E
8 Installing ductwork
Residual Risk
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Low
Low
Date
Risk Assessment - Extract/Supply Installation of a New Supply/Extract System
Tick those that apply
Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Confirm
14
__ ,, __
Exposure to dust/debris
Cuts, abrasions, eye injuries and breathing difficulties
__ ,, __
__ ,, __
Installation of Extract/Supply Plant
Tick those that apply
Activity
Hazard
Worst Case
Those in the immediate vicinity of ducting outlet
Med / Low
__ ,, __
Persons at Risk
Med / Low
Dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during commissioning
Negligi ble
Ducting system cleaned on a regular basis during installation and immediately prior to commissioning
Warning signs to be placed around duct outlets during system commissioning
Low / Neg
Risk before any controls in place
Control Measures that should be already in place
16
__ ,, __
Poor handling technique
Muscular skeletal injuries
Sharp or jagged edges
Cuts/abrasions
Hazard
17 Installing ductwork
Contact with sealants
18 Installing ductwork at height Fall of Person 19
__ ,, __
20
__ ,, __
21
__ ,, __
Worst Case
Long term health problems - fatal
Persons at Risk
Persons doing the work and those in the immediate area
SA
Activity
__ ,, __
__ ,, __
Unintended falls of material/tools/debris __ ,, __
Med / Low
Death or serious injury Persons doing the work __ ,, __
Serious injuries possibly life threatening __ ,, __
__ ,, __
Anyone passing below
__ ,, __
Confirm
Manual Handling assessment carried out
Med / Low
M
Installation of Supply/Extraction Ductwork
Tick those that apply
Persons doing the work
Residual Risk
Additional Control Measures Needed
Confirm
15 Handling plant
Confirm
Persons not required to be in the vicinity of the duct outlets will be kept out of the area
PL E
13 Commissioning System
Residual Risk
Additional Control Measures Needed
Low
Appropriate gloves suitable for the task provided
Risk before any controls in place
Control Measures that should be already in place
Additional Control Measures Needed Confirm
Low
Residual Risk Confirm
Med / Low
Refer to COSHH assessment for use of sealants
Negligi ble
Med / High
Refer to risk assessment for specific access equipment used
Low
Med / High
Only competent persons will carry out these works
Low
Medium
Refer to risk assessment for specific lifting equipment used
Low
Medium
Barriers and signage will be positioned to exclude persons from the area below the works
Loose materials and equipment will be cleared regularly
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Low
Risk Assessment - Extract/Supply Extract/Supply -
Record comments and variations here.
Name ...........................................................................................
Position .........................................................................
SA
M
PL E
..........................
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Date
Risk Assessment - Tower Scaffolds Using Mobile towers
Tick those that apply
Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Additional Control Measures Needed Confirm
Collapse due to incorrectly erected tower
Death or serious injury All persons in the work area
Med / Low
23 Moving the tower
Fall of material/equipment/tools
Serious injuries possibly life threatening
Persons working on tower and those below
Overturning of tower
Overturning/collapse of tower
__ ,, __
25 Using tower exceeding recommended least base to height ratio
26 Working on a tower scaffold Collapse of tower through overloading __ ,, __
Fall of material/equipment/tools
28
__ ,, __
Fall of Person
29
__ ,, __
Fall of person due to unintended movement of tower
30
__ ,, __
Overturning of tower
Tower Scaffolds -
Low / Neg
Med / Low
Materials and equipment not to be left on the tower whilst it is being moved
No Risk
Death or serious injury Any person on tower while it is being moved and those below
Medium
Persons not allowed to travel on the tower while it is being moved
Negligi ble
Death or serious injury All persons in the work area
Med / High
Tower tied to structure ensuring stability
Low / Neg
Death or serious injury All persons in the work area
Low
The safe working load will not be exceeded
Negligi ble
Serious injuries possibly life threatening
Anyone passing below
Death or serious injury Persons working on tower and those below __ ,, __
__ ,, __
SA
27
Erection of tower must be supervised by a competent person. Manufacturers assembly instructions must be made available and followed.
M
24
__ ,, __
All persons in the work area
Medium
Toeboards and guardrails fixed in place
Loose materials and equipment to be cleared regularly and not thrown from the platform
Low / Neg
Med / High
Guardrails and toeboards fitted where operatives can fall more than 2 metres
Additional fall protection e.g. safety harness provided where guardrails/toeboards impractical
Low / Neg
Medium
Wheel or caster brakes applied when tower is in use
Low / Neg
Med / Low
Only trained persons will use the tower
Low / Neg
Record comments and variations here.
Name ........................................................................................... ..........................
Confirm
PL E
22 Erecting a tower
Residual Risk
Position .........................................................................
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Date
Risk Assessment - Power Tools Using Abrasive Wheels Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
32
__ ,, __
33
__ ,, __
34
__ ,, __
Contact with the disc during use
Death or serious injury Persons doing the work
Disc shattering due to incorrect mounting
__ ,, __
__ ,, __
__ ,, __
Flying debris during a grinding process
Death/Permanent Disability
Using Hand Tools
Tick those that apply
Activity
Hazard
Worst Case
Med / High
Confirm
Fully trained and experienced operatives only carry out this work
A check of equipment guards, etc, is carried out before work starts
Low
PL E
31 Using an abrasive wheel
__ ,, __
Medium
The correct abrasive wheel is selected for the particular application
Disc speed is always greater than the tool speed
Low / Neg
__ ,, __
Medium
Only fully trained and experienced persons change the disc
Carry out a check of equipment before work starts
Low / Neg
__ ,, __
Medium
Only competent, trained persons to carry out this work.
PPE including eye protection must be worn
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Using Electrically Powered Hand Tools
Tick those that apply
Activity 36 Operating electrically powered hand tools 37
__ ,, __
Power Tools -
Hazard Electric shock
Major cuts/bruises, etc Persons doing the work
Worst Case
Persons at Risk
Major - life threatening Person using tool and anyone in the immediate area
__ ,, __
__ ,, __
__ ,, __
Only trained persons to use the equipment
Risk before any controls in place
Residual Risk
Control Measures that should be already in place
Confirm
The correct tool for the job is used, tools are maintained regularly, damaged tools are not used
Additional Control Measures Needed Confirm
Medium
Hand tools must be inspected prior to each use.
Damaged tools are not to be used
Medium
Reduced voltage equipment used where practicable (110v)
Extension, trailing leads kept to a minimum, tool unplugged when not in use.
Position .........................................................................
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Low / Neg
Residual Risk Confirm
Record comments and variations here.
Name ........................................................................................... ..........................
Medium
M
Damaged or inappropriate tool
Low
Additional Control Measures Needed
Confirm
35 General use
Residual Risk
Additional Control Measures Needed Confirm
SA
Tick those that apply
Date
Low
Low / Neg
Risk Assessment - The Site Site adjacent to an Occupied Building
Tick those that apply
Activity
Hazard
Worst Case
Persons at Risk
Risk before any controls in place
Control Measures that should be already in place
Additional Control Measures Needed Confirm
Dust and Fumes
Stress/anxiety
39
__ ,, __
Fire as a result of work activities/nature of materials
Death/severe burns
40
__ ,, __
Noise
Stress/anxiety
The Site -
Record comments and variations here.
Occupants of adjacent building __ ,, __
Med / Low
__ ,, __
Low
Confirm
Controls already in place for activity creating the dust/fumes
Works programmed to reduce the number of people exposed
Site fire plan includes co-ordination with building occupants and allows for alterations changes to their existing emergency procedures
Sufficient numbers of appropriate fire extinguishers.
Noise Assessment carried out
Works programmed to reduce the number of people exposed
Position .........................................................................
SA
M
Name ........................................................................................... ..........................
Low
PL E
38 Working adjacent to an occupied building
Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project
Residual Risk
Date
Negligi ble Low
Negligi ble