Risk Assessment - Air Conditioning Installation of a New Air Conditioning System



Tick those that apply



Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Confirm



2



__ ,, __



Exposure to dust/debris



__ ,, __



Cuts, abrasions, eye injuries and breathing difficulties __ ,, __



Installation of Air Conditioning Plant



Tick those that apply



Activity



Hazard



Worst Case



Those in the immediate vicinity of ducting outlet



Med / Low



__ ,, __



Persons at Risk



Med / Low



Dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during commissioning



Negligi ble



Ducting system cleaned on a regular basis during installation and immediately prior to commissioning



Warning signs to be placed around duct outlets during system commissioning



Negligi ble



Risk before any controls in place



Control Measures that should be already in place



5 Installing plant at height 6



__ ,, __



7 Lifting plant with mechanical equipment



Sharp or jagged edges



Cuts/abrasions



Fall of Person



Death or serious injury Persons doing the work



Unintended falls of material/tools/debris



Fall of material/equipment/tools



Persons doing the work __ ,, __



Med / Low



Med / High



Confirm



Manual Handling assessment carried out



Med / Low



M



__ ,, __



Muscular skeletal injuries



Appropriate gloves suitable for the task provided



Low Low



Refer to risk assessment for specific access equipment used



Low



Serious injuries possibly life threatening



Anyone passing below



Medium



Refer to risk assessment for specific lifting equipment used



Low



Serious injuries possibly life threatening



Operatives and those passing below



Medium



Refer to risk assessment for specific lifting equipment used



Low



SA



4



Poor handling technique



Residual Risk



Additional Control Measures Needed



Confirm



3 Handling plant



Confirm



Persons not required to be in the vicinity of the duct outlets will be kept out of the area



PL E



1 Commissioning System



Residual Risk



Additional Control Measures Needed



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Risk Assessment - Air Conditioning Installation of Air Conditioning Ductwork



Tick those that apply



Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Additional Control Measures Needed Confirm



Contact with sealants



9 Installing ductwork at height Fall of Person __ ,, __



11



__ ,, __



12



__ ,, __



__ ,, __ Unintended falls of material/tools/debris __ ,, __



Air Conditioning -



Persons doing the work and those in the immediate area



Med / Low



Death or serious injury Persons doing the work



Med / High



Refer to risk assessment for specific access equipment used



Low



Med / High



Only competent persons will carry out these works



Low



Long term health problems - fatal



__ ,, __ Serious injuries possibly life threatening __ ,, __



Record comments and variations here.



__ ,, __



Anyone passing below



__ ,, __



Medium



Barriers and signage will be positioned to exclude persons from the area below the works



Negligi ble



Medium



Refer to risk assessment for specific lifting equipment used



Loose materials and equipment will be cleared regularly



Position .........................................................................



SA



Name ........................................................................................... ..........................



Refer to COSHH assessment for use of sealants



M



10



Confirm



PL E



8 Installing ductwork



Residual Risk



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Low



Low



Date



Risk Assessment - Extract/Supply Installation of a New Supply/Extract System



Tick those that apply



Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Confirm



14



__ ,, __



Exposure to dust/debris



Cuts, abrasions, eye injuries and breathing difficulties



__ ,, __



__ ,, __



Installation of Extract/Supply Plant



Tick those that apply



Activity



Hazard



Worst Case



Those in the immediate vicinity of ducting outlet



Med / Low



__ ,, __



Persons at Risk



Med / Low



Dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during commissioning



Negligi ble



Ducting system cleaned on a regular basis during installation and immediately prior to commissioning



Warning signs to be placed around duct outlets during system commissioning



Low / Neg



Risk before any controls in place



Control Measures that should be already in place



16



__ ,, __



Poor handling technique



Muscular skeletal injuries



Sharp or jagged edges



Cuts/abrasions



Hazard



17 Installing ductwork



Contact with sealants



18 Installing ductwork at height Fall of Person 19



__ ,, __



20



__ ,, __



21



__ ,, __



Worst Case



Long term health problems - fatal



Persons at Risk



Persons doing the work and those in the immediate area



SA



Activity



__ ,, __



__ ,, __



Unintended falls of material/tools/debris __ ,, __



Med / Low



Death or serious injury Persons doing the work __ ,, __



Serious injuries possibly life threatening __ ,, __



__ ,, __



Anyone passing below



__ ,, __



Confirm



Manual Handling assessment carried out



Med / Low



M



Installation of Supply/Extraction Ductwork



Tick those that apply



Persons doing the work



Residual Risk



Additional Control Measures Needed



Confirm



15 Handling plant



Confirm



Persons not required to be in the vicinity of the duct outlets will be kept out of the area



PL E



13 Commissioning System



Residual Risk



Additional Control Measures Needed



Low



Appropriate gloves suitable for the task provided



Risk before any controls in place



Control Measures that should be already in place



Additional Control Measures Needed Confirm



Low



Residual Risk Confirm



Med / Low



Refer to COSHH assessment for use of sealants



Negligi ble



Med / High



Refer to risk assessment for specific access equipment used



Low



Med / High



Only competent persons will carry out these works



Low



Medium



Refer to risk assessment for specific lifting equipment used



Low



Medium



Barriers and signage will be positioned to exclude persons from the area below the works



Loose materials and equipment will be cleared regularly



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Low



Risk Assessment - Extract/Supply Extract/Supply -



Record comments and variations here.



Name ...........................................................................................



Position .........................................................................



SA



M



PL E



..........................



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Date



Risk Assessment - Tower Scaffolds Using Mobile towers



Tick those that apply



Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Additional Control Measures Needed Confirm



Collapse due to incorrectly erected tower



Death or serious injury All persons in the work area



Med / Low



23 Moving the tower



Fall of material/equipment/tools



Serious injuries possibly life threatening



Persons working on tower and those below



Overturning of tower



Overturning/collapse of tower



__ ,, __



25 Using tower exceeding recommended least base to height ratio



26 Working on a tower scaffold Collapse of tower through overloading __ ,, __



Fall of material/equipment/tools



28



__ ,, __



Fall of Person



29



__ ,, __



Fall of person due to unintended movement of tower



30



__ ,, __



Overturning of tower



Tower Scaffolds -



Low / Neg



Med / Low



Materials and equipment not to be left on the tower whilst it is being moved



No Risk



Death or serious injury Any person on tower while it is being moved and those below



Medium



Persons not allowed to travel on the tower while it is being moved



Negligi ble



Death or serious injury All persons in the work area



Med / High



Tower tied to structure ensuring stability



Low / Neg



Death or serious injury All persons in the work area



Low



The safe working load will not be exceeded



Negligi ble



Serious injuries possibly life threatening



Anyone passing below



Death or serious injury Persons working on tower and those below __ ,, __



__ ,, __



SA



27



Erection of tower must be supervised by a competent person. Manufacturers assembly instructions must be made available and followed.



M



24



__ ,, __



All persons in the work area



Medium



Toeboards and guardrails fixed in place



Loose materials and equipment to be cleared regularly and not thrown from the platform



Low / Neg



Med / High



Guardrails and toeboards fitted where operatives can fall more than 2 metres



Additional fall protection e.g. safety harness provided where guardrails/toeboards impractical



Low / Neg



Medium



Wheel or caster brakes applied when tower is in use



Low / Neg



Med / Low



Only trained persons will use the tower



Low / Neg



Record comments and variations here.



Name ........................................................................................... ..........................



Confirm



PL E



22 Erecting a tower



Residual Risk



Position .........................................................................



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Date



Risk Assessment - Power Tools Using Abrasive Wheels Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



32



__ ,, __



33



__ ,, __



34



__ ,, __



Contact with the disc during use



Death or serious injury Persons doing the work



Disc shattering due to incorrect mounting



__ ,, __



__ ,, __



__ ,, __



Flying debris during a grinding process



Death/Permanent Disability



Using Hand Tools



Tick those that apply



Activity



Hazard



Worst Case



Med / High



Confirm



Fully trained and experienced operatives only carry out this work



A check of equipment guards, etc, is carried out before work starts



Low



PL E



31 Using an abrasive wheel



__ ,, __



Medium



The correct abrasive wheel is selected for the particular application



Disc speed is always greater than the tool speed



Low / Neg



__ ,, __



Medium



Only fully trained and experienced persons change the disc



Carry out a check of equipment before work starts



Low / Neg



__ ,, __



Medium



Only competent, trained persons to carry out this work.



PPE including eye protection must be worn



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Using Electrically Powered Hand Tools



Tick those that apply



Activity 36 Operating electrically powered hand tools 37



__ ,, __



Power Tools -



Hazard Electric shock



Major cuts/bruises, etc Persons doing the work



Worst Case



Persons at Risk



Major - life threatening Person using tool and anyone in the immediate area



__ ,, __



__ ,, __



__ ,, __



Only trained persons to use the equipment



Risk before any controls in place



Residual Risk



Control Measures that should be already in place



Confirm



The correct tool for the job is used, tools are maintained regularly, damaged tools are not used



Additional Control Measures Needed Confirm



Medium



Hand tools must be inspected prior to each use.



Damaged tools are not to be used



Medium



Reduced voltage equipment used where practicable (110v)



Extension, trailing leads kept to a minimum, tool unplugged when not in use.



Position .........................................................................



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Low / Neg



Residual Risk Confirm



Record comments and variations here.



Name ........................................................................................... ..........................



Medium



M



Damaged or inappropriate tool



Low



Additional Control Measures Needed



Confirm



35 General use



Residual Risk



Additional Control Measures Needed Confirm



SA



Tick those that apply



Date



Low



Low / Neg



Risk Assessment - The Site Site adjacent to an Occupied Building



Tick those that apply



Activity



Hazard



Worst Case



Persons at Risk



Risk before any controls in place



Control Measures that should be already in place



Additional Control Measures Needed Confirm



Dust and Fumes



Stress/anxiety



39



__ ,, __



Fire as a result of work activities/nature of materials



Death/severe burns



40



__ ,, __



Noise



Stress/anxiety



The Site -



Record comments and variations here.



Occupants of adjacent building __ ,, __



Med / Low



__ ,, __



Low



Confirm



Controls already in place for activity creating the dust/fumes



Works programmed to reduce the number of people exposed



Site fire plan includes co-ordination with building occupants and allows for alterations changes to their existing emergency procedures



Sufficient numbers of appropriate fire extinguishers.



Noise Assessment carried out



Works programmed to reduce the number of people exposed



Position .........................................................................



SA



M



Name ........................................................................................... ..........................



Low



PL E



38 Working adjacent to an occupied building



Risk Assessments prepared by Belvoir Building Services Ltd for Sample Project - Sample Project



Residual Risk



Date



Negligi ble Low



Negligi ble