PERHITUNGAN VOLUME PEKERJAAN - ANALISA PEKERJAAN DAN KEBUTUHAN BAHAN, UPAH & ALAT
Kecamatan: : Desa : Lokasi
MAJA SINDANGKERT 3 BLOK
Tanggal :
Lapis Permukaan Aspal LATASIR (SANDSHEET) - K.638
PERHITUNGAN VOLUME PEKERJAAN DAN KEBUTUHAN BAHAN, UPAH DAN AL A. PEKERJAAN JALAN Panjang Jalan Rencana Lebar Jalan Luas Jalan
: : :
2,600 Meter 2.5 Meter 2600 x 2.5
=
TOTAL LUAS PENGASPALAN =
6,500 m2 6,500
1. Lapis Permukaan Aspal LATASIR (SANDSHEET) ------->Kode Pekerjaan K.638 Volume Jalan
=
=
6,500
m2
* Bahan
- Campuran LATASIR = - Aspal Bitumen = - Satu drum aspal beratnya 155= - Minyak Bakar = -
0.044 0.400 2600 0.100
x x / x
6500 6500 155 6500
= = = =
286.00 2600.00 16.77 650.00
~ ~ = ~
* Alat
- Mesin Gilas Tandem 6 - 10 T - Mesin Gilas Roda Karet 6 - 15 - Penyemprot Aspal 350 Lt - Compresor 150 m3/jam
= = = =
0.003 0.003 0.003 0.003
x x x x
6500 6500 6500 6500
= = = =
19.50 19.50 19.50 19.50
~ ~ ~ ~
* Upah
- Mandor - Operator Terlatih - Pekerja - Tukang
= = = =
0.001 0.003 0.006 0.005
x x x x
6500 6500 6500 6500
= = = =
6.50 19.50 39.00 32.50
~ ~ ~ ~
Kebutuhan Bahan, Upah dan Alat :
Total Kebutuhan Bahan, Upah dan Alat untuk Pekerjaan Jalan * BAHAN
- Campuran LATASIR - Aspal Bitumen - Minyak Bakar -
= = =
* ALAT
- Mesin Gilas Tandem 6 - 10 T - Mesin Gilas Roda Karet 6 - 15 - Penyemprot Aspal 350 Lt - Compresor 150 m3/jam
= = = =
- Mobilisasi Alat Berat
=
1.0 Ls
- Mandor - Operator Terlatih - Pekerja
= = =
7.0 hok 20.0 hok 39.0 hok
* UPAH
286.0 Ton 17.0 drum 650.0 Lt
20.0 20.0 20.0 20.0
Hari Hari Hari Hari
- Tukang
Tanggal Survey :
=
33.0 hok
Referensi : Analisa Harga Satuan Pekerjaan Wllayah III ( Ciamis )
Dibuat Oleh : FT, PL, KPMD dan TPKD AJAT SUDRAJAT
SINDANGKERTA Tanggal :
JAAN DAN KEBUTUHAN BAHAN, UPAH DAN ALAT
286.0 Ton ### Kg 17.0 drum 650.0 Lt
20.0 Hari 20.0 Hari 20.0 Hari 20.0 Hari 7.0 Hari 20.0 Hari 39.0 Hari 33.0 Hari
Dibuat Oleh : FT, PL, KPMD dan TPKD AJAT SUDRAJAT
RENCANA ANGGARAN BIAYA (RAB) DESA SINDANGKERTA KECAMATAN MAJA TAHUN ANGGARAN 2020 No.RAB Bidang Kegiatan Waktu Pelaksanaan Lokasi Volume Panjang
No. 1 1
….. / 2019 Pelaksanaan Pemb. Desa Penghamparan Lapis Permukaan Aspal LATASIR (SANDSHEET) 20 Hari kerja Desa Sindangkerta 2,600 m' Lebar 2,5meter
URAIAN
Volume
Satuan
2
3
4
Harga Satuan
Jumlah Total Rp
Rp
5
6=5x4
Format Kebutuhan Bahan Alat Upah Untuk RAB
No.
Uraian/Bahan
Volume
Satuan
Belanja Upah 1 2 3 4 5
Honor Panitia Pelaksana Mandor Operator Terlatih Pekerja Tukang
1.0 7.0 20.0 39.0 33.0
Ls hok hok hok hok
Rp Rp Rp Rp Rp
9,000,000 150,000 120,000 85,000 105,000 Sub Total (1)
Rp Rp Rp Rp Rp Rp
9,000,000 1,050,000 2,400,000 3,315,000 3,465,000 19,230,000
1 2 3 4 5
Belanja Modal Bahan Baku Campuran LATASIR Aspal Bitumen Minyak Bakar Prasasti Kegiatan Papan Proyek
286.0 17.0 650.0 1.0 1.0
Ton drum Lt Bh Bh
Rp Rp Rp Rp Rp
1,350,000 2,000,000 17,000 800,000 250,000 Sub Total (2)
Rp Rp Rp Rp Rp Rp
386,100,000 34,000,000 11,050,000 800,000 250,000 432,200,000
Belanja Sewa Alat 1 Mesin Gilas Tandem 6-10 T
20.0
Hari
Rp
480,000 Rp
9,600,000
2
3
: : : : : :
1 2 3 4 5 6 7 8 9 10 11
Campuran LATASIR Aspal Bitumen Minyak Bakar Mesin Gilas Tandem 6 - 10 T Mesin Gilas Roda Karet 6 - 15 T Penyemprot Aspal 350 Lt Compresor 150 m3/jam Mobilisasi Alat Berat
Jumlah PPN + PPH Yang Harus dibayar
286.0 17.0 650.0
Ton drum Lt
20.0 20.0 20.0 20.0 1.0
Hari Hari Hari Hari LS
2 3 4 5
Mesin Gilas Roda karet 6-15 T Penyemprot Aspal 350 ltr Compressor 150 m3/jam mobilisasi alat
20.0 20.0 20.0 1.0 TOTAL RAB
Hari Hari Hari LS
Rp Rp Rp Rp
640,000 400,000 400,000 2,500,000 Sub Total (3 )
Rp Rp Rp Rp Rp
12,800,000 8,000,000 8,000,000 2,500,000 40,900,000
Rp
492,330,000
Disetujui/mengesahkan : Kepala Desa
Sindangkerta.,Tanggal September 2019 Dibuat Oleh : Pelaksana Kegiatan
(ZULIYANTO)
(AJAT SUDRAJAT)
Mengetahui : Kepala UPTD BMCK Wilayah Maja
Diverifikasi Oleh :
( ASEP SAEPULLAH , ST. )
( JUHARI, S.Sos. )
NIP. 19751006 200901 1 003
NIP. 19620803 198603 1 006
Harga Sat 1,350,000 2,000,000 17,000 480,000 640,000 400,000 400,000 2,500,000
Jumlah Harga 386,100,000 34,000,000 11,050,000 9,600,000 12,800,000 8,000,000 8,000,000 2,500,000 -
PPN 35,100,000 3,090,909 1,004,545 872,727 1,163,636 727,273 727,273 227,273 42,913,636
PPH
Jumlah Harga + PPN+PPH Pembulatan Harga Sat PPN+PPH 5,265,000 426,465,000 141,136 141,100 463,636 37,554,545 209,091 209,000 150,682 12,205,227 1,777 1,700 130,909 10,603,636 50,182 50,100 174,545 14,138,182 66,909 66,900 109,091 8,836,364 41,818 41,800 160,000 8,887,273 48,000 48,000 34,091 2,761,364 261,364 261,300 6,487,955
Harga Sat RAB 1,491,100 2,209,000 18,700 530,100 706,900 441,800 448,000 2,761,300 -