ERBIL COMBINED CYCLE POWER PROJECT TEST PACK COVER SHEET UNIT
SYSTEM
SUB-SYSTEM
AREA NO:
SYSTEM DESCRIPTION
TEST PACK NUMBER
LOCATION:
MAP NO:
TABLE OF CONTENTS
REV
S.NO 1
DESCRIPTION TEST PACK STATUS CONTROL SHEET
2
PRESSURE TEST CONFIRMATION RECORD
3
PIPING PRESSURE TEST RELEASE REPORT
4
REINFORCING PAD - PNEUMATIC REST REPORT
5
ISOMETRIC CONTROL SHEET FROM WELD HISTORY
6
PRE - TEST CHECKLIST
7
PRE - TEST PUNCH LIST
8
POST TEST & REINSTATEMENT CHECKLIST
9
RELIEF VALVE CALIBRATION CERTIFICATE
10
PRESSURE RECORDER CALIBRATION CERTIFICATE (IF REQUIRED)
11
PRESSURE GAUGE CALIBRATION CERTIFICATE
12
LINE LIST
13
LOCATION MAP (IF REQUIRED)
14
ISOMETRIC DRAWINGS (WELDING MAP)
15
TEST BLOCK DIAGRAM
16
PIPE CLEANING RECORD
17
TEST MANIFOLD PRESSURE TEST SUMMARY SHEET
18
TEST BLIND THICKNESS SHEET
19
BOLT TORQUE / TENSIONING RECORD (IF REQUIRED)
20
WATER ANALYSIS
21
NCR, SCR, CAR, TQ's (SPECIFIC TO THE SYSTEM)
DATE
ENKA
DATE
MGH
INCLUDED
DATE
AI
REMARKS
TEST PACK NUMBER
MAP NO:
REMARKS
ERBIL COMBINED CYCLE POWER PROJECT TEST PACK COVER SHEET Area 1
HYDROTEST
Area 2
PNEUMATIC TEST
CONSTRUCTION WORKS
Area 3
VISUAL TEST SERVİCE TEST
Test Package Status Control Sheet Map No. System No.
Test Package No. Unit No.
Sub. System No. Confirmed By Item No
Activity
ENKA Piping
1
Test Package Reviewed and Approved
2
Precommissioning Gr. Review (Test Limit, location of permanent gasket, torquing)
3
Construction Line Checked and Punch List
4
Construction Punch "A" Cleared
5
QC Document Check (NDE, PMI, PWHT, Visual Inspection...)
6
Precommissioning Gr. Review (Review Punch Item Category)
7
Final Confirmation for Testing (Return to Subcontractor for Testing)
8
Test Completed / Released for Paint / Insulation
9
Punch "B" Cleared
10
Confirmed Punch "B" Cleared & Test Package Closed / Released for Precomissioning
MGH QC
Piping
Note () : work step (p) : When test completed , send copy of this sheet to Paint / Insulation as release notice (t) : When test pack is closed, send copy of this sheet to Precom. as release notice Remarks:
QC
HYDROTEST PNEUMATIC TEST VISUAL TEST SERVİCE TEST
med By AI
ERBIL COMBINED CYCLE POWER PROJECT PRESSURE TEST CONFIRMATION RECORD
MAP NO:
DRAWING NO:
(Mechanical Acceptance Package)
TEST PACK NO:
TEST MEDIUM:
Barg.
TEST PRESSURE:
Barg.
TEST DATE: TEST PACK NO
DESCRIPTION AND CHECK STATUS OF EACH ACTIVITIES
1
TEST PACK REVIEWED AND APPROVED
2
PIPING - RELEASE FOR PRESSURE TEST / ISO / P&ID's WITH TEST LIMITS MARKED
3
PRE TEST PUNCH LIST FOR PIPING WORK
4
SPOOL CONTROL SHEET
5
LINE CLEANED
6
TEST COMPLETED / ACCEPTED
7
POST TEST & REINSTATEMENT CHECK LIST
REMARKS:
ENKA
MGH PIPING QC
CERTIFIED THAT THE ABOVE DOCUMENTS ARE INCLUDED ENKA
MGH
AI
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
AI
AI
ERBIL COMBINED CYCLE POWER PROJECT PIPING PRESSURE TEST RELEASE & ACCEPTANCE REPORT
TEST PACK NO:
SHEET NO: 1 OF 1
TEST MEDIUM:
DATE OF TEST:
TIME START:
TIME END:
ANALYSIS REPORT NO:
TEST DURATION:
DESIGN PRESSURE:
TEST PRESSURE:
ACTUAL PRESSURE:
1.SR. NO: PRESSURE GAUGE NO: SR NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
ISO DRAWING NO
TİME (min) Pressure (Barg) (*) Temp. (*)
2.SR. NO: 3.SR. NO:
PRV. NO:
SH NO REV NO
5
10
SPOOL NO
15
Note: (*) Pressure and Temperature @ approx. 5 mins intervall shall be recorded for all hydrotests.
RUN OF LINE FROM
20
25
THE ABOVE LINES ARE INSTALLED AS PER ABOVE LISTED ISOMETRIC DRAWINGS AND RELEASED FOR TEST ENKA
MGH
AI
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
COMPLETED TEST WITNESSED & ACCEPTED BY ENKA
MGH
AI
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
ROJECT
CE REPORT
1
RE:
V. NO: RUN OF LINE TO
30
REMARKS
35
40
RAWINGS AND RELEASED FOR TEST AI
ME:
TE:
N:
ED BY
ME:
TE:
N:
AI
ERBIL COMBINED CYCLE POWER PROJECT REINFORCING PAD - PNEUMATIC TEST REPORT TEST PACK NO: DATE: SHEET NO:
ISOMETRIC NO: SPPOL NO: REINFORCING PAD NO:
JOINT NO
PRESSURE GAUGE NO/UNIT: PRESSURE GAUGE RANGE:
BAR
TESTING PRESSURE:
BAR
INSPECTION DETAILS:
REMARKS:
ENKA-CONST. NAME SIGNATURE DATE
ENKA - QC
MGH
ROJECT
PORT
REV NO:
MGH
AI (IF REQUIRED)
ERBIL COMBINED CYCLE POWER PROJECT PIPING PRE TEST CHECK LIST
SYSTEM NO. UNIT NO. ITEM NO
TEST PACK NO: MAP NO: DESCRIPTION
1
Confirm all lines installed are vertical / level / slope as per ISO
2
Valves - confirm valves are open / half - open as required
3
location and type of permanent supports, guides and anchors etc. To be verified (including clearence for expansion)
4
Confirm flange alignment, parallelism, bolt torquing and tensioning (including at pumps and equipment) where applicable
5
tion of correct permanent gaskets confirmed
6
Check that all instruments, orifice plates, control valves, PSV, expansion joints and strainer mesh are removed
7
Temporary spools are recorded in Test pack
1
Check that all lines have adequate supports (if required)
2
Check that pack piping system equipped with vents at highest and drain at lowest points
3
Check that all temporary blind flanges / spades in correct wall thickness and their location
4
Check that all delicate components as instruments,orifice plates, control valves, ... Are excluded from pressure test
5
Check flow direction of all non-return valves
REMARKS:
Y
N
N/A
ENKA PIPING ENG.
ENKA QC
MGH
AI
NAME:
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
SIGN:
COMMENTS
AI NAME: DATE: SIGN:
ERBIL COMBINED CYCLE POWER PROJECT PRE TEST PUNCH LIST FOR PIPING WORK
TEST PACK NO: MAP NO: SYSTEM: SYSTEM DESCRIPTION: DATE: JOB NUMBER:
NO 1 2 3 4 5 6 7 8 9 10
ISOMETRIC DRAWING NUMBER
CATEGORY: "A" -ITEMS THAT SHOULD BE DONE PRIOR "B" - ITEMS THAT CAN BE DO AFTER PRES "C" - ITEMS THAT CAN BE DONE AFTER PR PUNCH)
PUNCH ITEM DESCRIPTION
ITEM CATEGORY
ORIGINATOR NAME
CO.
CLEARED & CONFIRMED BY ENKA MGH SIGN DATE SIGN DATE
11 12 13 14 15 16 17 18 19 20
Y: MS THAT SHOULD BE DONE PRIOR TO PRESSURE TEST MS THAT CAN BE DO AFTER PRESSURE TEST AND BEFORE PRE-COMMISIONING MS THAT CAN BE DONE AFTER PRE-COMMISIONING (TO BE SHIFTED TO TURN OVER
CONFIRMED BY AI SIGN
REMARKS DATE
ERBIL COMBINED CYCLE POWER PROJECT POST TEST PRE - INSTATEMENT CHECK LIST
SYSTEM UNIT NO.
TEST PACK NO: MAP NO:
ITEM NO
DESCRIPTION
1
Temporary blind / temporary supports / spades / components / dummy spools / blinds / are removed. Correct permanent blinds and positioned correctly.
2
Instruments / control valves / PSV / stariners wire mesh are reinstated.
3
At test limits all temporary gasket replaced
4
Test medium depressurized / Drained
5
All open drains and vents are checked closed and seal welded where applicable after test and ENKA approval
6
Bolt torquing / tensioning to be confirmed aq re - instated flange connections.
7
REMARKS:
Y
N
N/A
ENKA PIPING ENG. NAME:
ENKA QC
MGH
AI
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
SIGN:
T
COMMENTS
AI NAME: DATE: SIGN:
ERBIL COMBINED CYCLE POWER PROJECT PIPING PRESSURE TEST RELEASE & ACCEPTANCE REPORT
TEST PACK NO: SR NO
ISO DRAWING NO
SH NO REV NO
SPOOL NO
RUN OF LINE FROM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 CLEANING MEDIA
PRESSURE MAX
CLEANING OBSERVATIONS
ENKA PIPING ENG.
ENKA QC
MGH
NAME:
NAME:
NAME:
DATE:
DATE:
DATE:
SIGN:
SIGN:
SIGN:
OJECT
REPORT
DATE: RUN OF LINE
SURE MAX
TO
REMARKS
MGH
AI NAME: DATE: SIGN:
ERBIL COMBINED CYCLE POWER PROJECT BOLT TORQUING RECORD
BOLT TORQUING RECORD
IM & TE NO: QCME AREA:
TEST PACK NO:
MAP SYSTEM NO: FLANGE
NO 1 2 3 4 5 6 7 8 9 10 11 12 13
LINE
ISO NO & SHEET NO
SR#
SIZE
NO. OF BOLTS
BOLT SIZE
DATE
REQD TORQUE VALUE N.M
14 15 16 17 18 19 20
ROJECT
SR. NO: MAP SYSTEM NO: ACTUAL TORQUE VALUE N.M
BEFORE TEST / AFTER PMC ACCEPT /REJECT
TORQUING ENKA
CLIENT
AI
TAG SR. NO