See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/235309659



The seven value stream mapping tools Article  in  International Journal of Operations & Production Management · January 1997 DOI: 10.1108/01443579710157989



CITATIONS



READS



520



4,685



2 authors: Peter Hines



Nick Rich



Waterford Institute of Technology



Swansea University



61 PUBLICATIONS   2,938 CITATIONS   



43 PUBLICATIONS   2,485 CITATIONS   



SEE PROFILE



SEE PROFILE



Some of the authors of this publication are also working on these related projects:



writing a new book....did work in the past in the australian pineapple industry! View project



highly reliable healthcare systems View project



All content following this page was uploaded by Peter Hines on 22 June 2017. The user has requested enhancement of the downloaded file.



International Journal of Operations & Production Management The seven value stream mapping tools Peter Hines Nick Rich



Article information: To cite this document: Peter Hines Nick Rich, (1997),"The seven value stream mapping tools", International Journal of Operations & Production Management, Vol. 17 Iss 1 pp. 46 - 64 Permanent link to this document: http://dx.doi.org/10.1108/01443579710157989



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



Downloaded on: 25 February 2016, At: 04:20 (PT) References: this document contains references to 27 other documents. To copy this document: [email protected] The fulltext of this document has been downloaded 21600 times since 2006*



Users who downloaded this article also downloaded: Anand Gurumurthy, Rambabu Kodali, (2011),"Design of lean manufacturing systems using value stream mapping with simulation: A case study", Journal of Manufacturing Technology Management, Vol. 22 Iss 4 pp. 444-473 http:// dx.doi.org/10.1108/17410381111126409 Bhim Singh, S.K. Sharma, (2009),"Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm", Measuring Business Excellence, Vol. 13 Iss 3 pp. 58-68 http:// dx.doi.org/10.1108/13683040910984338 Daniel T. Jones, Peter Hines, Nick Rich, (1997),"Lean logistics", International Journal of Physical Distribution & Logistics Management, Vol. 27 Iss 3/4 pp. 153-173 http://dx.doi.org/10.1108/09600039710170557



Access to this document was granted through an Emerald subscription provided by emerald-srm:401051 []



For Authors If you would like to write for this, or any other Emerald publication, then please use our Emerald for Authors service information about how to choose which publication to write for and submission guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information.



About Emerald www.emeraldinsight.com Emerald is a global publisher linking research and practice to the benefit of society. The company manages a portfolio of more than 290 journals and over 2,350 books and book series volumes, as well as providing an extensive range of online products and additional customer resources and services. Emerald is both COUNTER 4 and TRANSFER compliant. The organization is a partner of the Committee on Publication Ethics (COPE) and also works with Portico and the LOCKSS initiative for digital archive preservation. *Related content and download information correct at time of download.



IJOPM 17,1



The seven value stream mapping tools Peter Hines and Nick Rich



46



Lean Enterprise Research Centre, Cardiff Business School, Cardiff, UK



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



Introduction Work carried out in the first Supply Chain Development Programme (SCDP I), together with early work in the second programme (SCDP II), has shown that in order fully to understand the different value streams[1] in which the sponsors operate, it is necessary to map these intercompany and intracompany valueadding processes. These value-adding processes make the final product or service more valuable to the end consumer than otherwise it would have been. The difference between the traditional supply or value chain and the value stream is that the former includes the complete activities of all the companies involved, whereas the latter refers only to the specific parts of the firms that actually add value to the specific product or service under consideration. As such the value stream is a far more focused and contingent view of the valueadding process. At present, however, there is an ill-defined and ill-categorized toolkit with which to understand the value stream, although several workers (e.g. [2-5]) have developed individual tools. In general these authors have viewed their creations as the answer, rather than as a part of the jigsaw. Moreover, these tools derive from functional ghettos and so, on their own, do not fit well with the more crossfunctional toolbox required by today’s best companies. It is the purpose of this paper to construct a typology or total jigsaw to allow for an effective application of sub-sets of the complete suite of tools. The tools themselves can then effectively be applied, singularly or in combination, contingently to the requirements of the individual value stream. Waste removal inside companies The rationale underlying the collection and use of this suite of tools is to help researchers or practitioners to identify waste in individual value streams and, hence, find an appropriate route to removal, or at least reduction, of this waste. The use of such waste removal to drive competitive advantage inside organizations was pioneered by Toyota’s chief engineer, Taiichi Ohno, and



International Journal of Operations & Production Management, Vol. 17 No. 1, 1997, pp. 46-64. © MCB University Press, 0144-3577



The supply-chain development programme (SCDP I and II) is an industry-focused programme of research being carried out by researchers at the Cardiff Business School and the University of Bath. The work is sponsored by 18 major UK-based manufacturing, distribution and service organizations which wish to remain or become world-class in their supply chain management activities. The authors wish to express their thanks to Dr M. Naim of the Logistics Systems Dynamics Group at the University of Wales for his comments on an earlier draft of this paper.



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



sensei Shigeo Shingo[6,7] and is oriented fundamentally to productivity rather The seven value than to quality. The reason for this is that improved productivity leads to leaner stream mapping operations which help to expose further waste and quality problems in the tools system. Thus the systematic attack on waste is also a systematic assault on the factors underlying poor quality and fundamental management problems[8]. In an internal manufacturing context, there are three types of operation that 47 are undertaken according to Monden[9]. These can be categorized into: (1) non-value adding (NVA); (2) necessary but non-value adding (NNVA); and (3) value-adding (VA). The first of these is pure waste and involves unnecessary actions which should be eliminated completely. Examples would include waiting time, stacking intermediate products and double handling. Necessary but non-value adding operations may be wasteful but are necessary under the current operating procedures. Examples would include: walking long distances to pick up parts; unpacking deliveries; and transferring a tool from one hand to another. In order to eliminate these types of operation it would be necessary to make major changes to the operating system such as creating a new layout or arranging for suppliers to deliver unpacked goods. Such change may not be possible immediately. Value-adding operations involve the conversion or processing of raw materials or semi-finished products through the use of manual labour. This would involve activities such as: sub-assembly of parts, forging raw materials and painting body work. The seven wastes There are seven commonly accepted wastes in the Toyota production system (TPS): (1) overproduction; (2) waiting; (3) transport; (4) inappropriate processing; (5) unnecessary inventory; (6) unnecessary motion; (7) defects. Overproduction is regarded as the most serious waste as it discourages a smooth flow of goods or services and is likely to inhibit quality and productivity. Such overproduction also tends to lead to excessive lead and storage times. As a result defects may not be detected early, products may deteriorate and artificial pressures on work rate may be generated. In addition, overproduction leads to excessive work-in-progress stocks which result in the



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



48



physical dislocation of operations with consequent poorer communication. This state of affairs is often encouraged by bonus systems that encourage the push of unwanted goods. The pull or kanban system was employed by Toyota as a way of overcoming this problem. When time is being used ineffectively, then the waste of waiting occurs. In a factory setting, this waste occurs whenever goods are not moving or being worked on. This waste affects both goods and workers, each spending time waiting. The ideal state should be no waiting time with a consequent faster flow of goods. Waiting time for workers may be used for training, maintenance or kaizen activities and should not result in overproduction. The third waste, transport, involves goods being moved about. Taken to an extreme, any movement in the factory could be viewed as waste and so transport minimization rather than total removal is usually sought. In addition, double handling and excessive movements are likely to cause damage and deterioration with the distance of communication between processes proportional to the time it takes to feed back reports of poor quality and to take corrective action. Inappropriate processing occurs in situations where overly complex solutions are found to simple procedures such as using a large inflexible machine instead of several small flexible ones. The over-complexity generally discourages ownership and encourages the employees to overproduce to recover the large investment in the complex machines. Such an approach encourages poor layout, leading to excessive transport and poor communication. The ideal, therefore, is to have the smallest possible machine, capable of producing the required quality, located next to preceding and subsequent operations. Inappropriate processing occurs also when machines are used without sufficient safeguards, such as poke-yoke or jidoka devices, so that poor quality goods are able to be made. Unnecessary inventory tends to increase lead time, preventing rapid identification of problems and increasing space, thereby discouraging communication. Thus, problems are hidden by inventory. To correct these problems, they first have to be found. This can be achieved only by reducing inventory. In addition, unnecessary inventories create significant storage costs and, hence, lower the competitiveness of the organization or value stream wherein they exist. Unnecessary movements involve the ergonomics of production where operators have to stretch, bend and pick up when these actions could be avoided. Such waste is tiring for the employees and is likely to lead to poor productivity and, often, to quality problems. The bottom-line waste is that of defects as these are direct costs. The Toyota philosophy is that defects should be regarded as opportunities to improve rather than something to be traded off against what is ultimately poor management. Thus defects are seized on for immediate kaizen activity. In systems such as the Toyota production system, it is the continuous and iterative analysis of system improvements using the seven wastes that results



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



in a kaizen-style system. As such, the majority of improvements are of a small The seven value but incremental kind, as opposed to a radical or breakthrough type. stream mapping Waste removal inside value streams As the focus of the value stream includes the complete value adding (and nonvalue adding) process, from conception of requirement back through to raw material source and back again to the consumer’s receipt of product, there is a clear need to extend this internal waste removal to the complete supply chain. However, there are difficulties in doing this. These include lack of visibility along the value stream and lack of the tools appropriate to creating this visibility. This paper aims to help researchers and practitioners remedy such deficiencies. The waste terminology described above has been drawn from a manufacturing environment, specifically from the automotive industry, and from a Japanese perspective. As a result some translation of the general terminology will be required to adapt it to a particular part of the value stream and to particular industries in non-Japanese settings. Consequently, a contingency approach is required to some extent. Such an approach has been the subject of considerable previous work at the Lean Enterprise Research Centre. This would include the application by Hines[10] of the kyoryoku kai (supplier association) to a range of UK-based industry sectors and the introduction by Jones[11] of the Toyota production system philosophy to a warehouse environment. Jones has shown that the seven wastes required rewording to fit an after-market distribution setting. He therefore retitled the seven wastes as: (1) faster-than-necessary pace; (2) waiting; (3) conveyance; (4) processing; (5) excess stock; (6) unnecessary motion; and (7) correction of mistakes. The seven value stream mapping tools The typology of the seven new tools is presented in terms of the seven wastes already described. In addition the delineating of the overall combined value stream structure will be useful and will also be combined as shown in the lefthand column in Table I. Thus, in order to make improvements in the supply chain it is suggested here that at least an outline understanding of the particular wastes to be reduced must be gained before any mapping activity takes place. At this point it should be stressed that several of the seven mapping tools were already well-known before the writing of this paper. At least two can be regarded as new, and others will be unfamiliar to a wide range of researchers



tools 49



IJOPM 17,1



Mapping tool Process activity mapping



Supply chain response matrix



Overproduction



L



M



Waiting



H



H



Transport



H



Inappropriate processing



H



Unnecessary inventory



M



H



Unnecessary motion



H



L



Defects



L



Overall structure



L



Wastes/structure



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



50



Table I. The seven stream mapping tools



Production variety funnel



Physical Quality Demand Decision structure filter amplification point (a) volume mapping mapping analysis (b) value L



L



M



M



M



M L



M



L



M



L H



M



L



H



M



H



H L



M



L



Notes: H =High correlation and usefulness M = Medium correlation and usefulness L = Low correlation and usefulness



and practitioners. Until now, however, there has been no decision support mechanism to help choose the most appropriate tool or tools to use. The tools themselves are drawn from a variety of origins as show in Table II. These origins include engineering (tools 1 and 5), action research/logistics (tools 2 and 6) operations management (tool 3), and two that are new (tools 4 and 7). As can be seen, they are generally from specific functional ghettos and so the full range of tools will not be familiar to many researchers, although specific tools may be well-known to individual readers. Each of these is reviewed in turn before a discussion is undertaken of how they can be selected for use.



Table II. Origins of the seven value stream mapping tools



Mapping tool



Origin of mapping tool



(1) (2) (3) (4) (5) (6) (7)



Industrial engineering Time compression/logistics Operations management New tool Systems dynamics Efficient consumer response/logistics New tool



Process activity mapping Supply chain response matrix Production variety funnel Quality filter mapping Demand amplification mapping Decision point analysis Physical structure mapping



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



The tools The seven value Process activity mapping stream mapping As noted above, process activity mapping has its origins in industrial tools engineering. Industrial engineering comprises a group of techniques that can be used to eliminate from the workplace waste, inconsistencies and irrationalities, and provide high-quality goods and services easily, quickly and 51 inexpensively[12]. The technique is known by a number of names in this context, although process analysis is the most common[13]. There are five stages to this general approach: (1) the study of the flow of processes; (2) the identification of waste; (3) a consideration of whether the process can be rearranged in a more efficient sequence; (4) a consideration of a better flow pattern, involving different flow layout or transport routeing; and (5) a consideration of whether everything that is being done at each stage is really necessary and what would happen if superfluous tasks were removed. Process activity mapping involves the following simple steps: first, a preliminary analysis of the process is undertaken, followed by the detailed recording of all the items required in each process. The result of this is a map of the process under consideration (see Figure 1). As can be seen from this process industry example, each step (one-23) has been categorized in terms of a variety of activity types (operation, transport, inspection and storage). The machine or area used for each of these activities is recorded, together with the distance moved, time taken and number of people involved. A simple flow chart of the types of activity being undertaken at any one time can then be made. These are depicted by the darker shade boxes in Figure 1. Next the total distance moved, time taken and people involved can be calculated and recorded. The completed diagram (Figure 1) can then be used as the basis for further analysis and subsequent improvement. Often this is achieved through the use of techniques such as the 5W1H (asking: Why does an activity occur? Who does it? On which machine? Where? When? and How?). The basis of this approach is therefore to try to eliminate activities that are unnecessary, simplify others, combine yet others and seek sequence changes that will reduce waste. Various contingent improvement approaches can be mapped similarly before the best approach is selected for implementation. Supply chain response matrix The origin of the second tool is the time compression and logistics movement and goes under a variety of names. It was used by New[2] and by Forza et al.[3] in a textile supply chain setting. In a more wide-ranging work, Beesley[4] applied what he termed “time-based process mapping” to a range of industrial



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



52



Figure 1. Users and non-users of DFM



sectors including automotive, aerospace and construction. A similar, if slightly refined, approach was adopted by Jessop and Jones[5] in the electronics, food, clothing and automotive industries. This mapping approach, as shown in Figure 2, seeks to portray in a simple diagram the critical lead-time constraints for a particular process. In this case it is the cumulative lead time in a distribution company, its suppliers and its downstream retailer. In Figure 2 the horizontal measurements show the lead time for the product both internally and externally. The vertical plot shows the average amount of standing inventory (in days) at specific points in the supply chain. In this example the horizontal axis shows the cumulative lead time to be 42 working days. The vertical axis shows that a further 99 working days of material are held in the system. Thus a total response time in this system of 141 working days can be seen to be typical. Once this is understood, each of the individual lead times and inventory amounts can be targeted for improvement activity, as was shown with the process activity mapping approach.



The seven value stream mapping tools 53 Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



Main store



Figure 2. Supply chain response matrix – a distribution example



Production variety funnel The production variety funnel is shown in Figure 3. This approach originates in the operations management area[14] and has been applied by New[2] in the textiles industry. A similar method is IVAT analysis which views internal operations in companies as consisting of activities that conform to I, V, A or T shapes[15]: • “I” plants consist of unidirectional, unvarying production of multiple identical items such as a chemical plant. • “V” plants consist of a limited number of raw materials processed into a wide variety of finished products in a generally diverging pattern. • “V” plants are typical in textiles and metal fabrication industries. • “A” plants, in contrast, have many raw materials and a limited range of finished products with different streams of raw materials using different facilities; such plants are typical in the aerospace industry or in other major assembly industries. • “T” plants have a wide combination of products from a restricted number of components made into semi-processed parts held ready for a wide range of customer-demanded final versions; this type of site is typical in the electronics and household appliance industries. Such a delineation using the production variety funnel (Figure 3) allows the mapper to understand how the firm or the supply chain operates and the accompanying complexity that has to be managed. In addition, such a mapping process helps potential research clients to understand the similarities and differences between their industry and another that may have been more widely researched. The approach can be useful in helping to decide where to target



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



54



Figure 3. Production variety funnel – a brewing industry case



inventory reduction and making changes to the processing of products. It is also useful in gaining an overview of the company or supply chain being studied. Quality filter mapping The quality filter mapping approach is a new tool designed to identify where quality problems exist in the supply chain. The resulting map itself shows where three different types of quality defect occur in the supply chain (see Figure 4): (1) The first of these is the product defect. Product defects are defined here as defects in goods produced that are not caught by in-line or end-of-line inspections and are therefore passed on to customers. (2) The second type of quality defect is what may be termed the service defect. Service defects are problems given to a customer that are not directly related to the goods themselves, but rather are results of the accompanying level of service. The most important of these service defects are inappropriate delivery (late or early), together with incorrect paper work or documentation. In other words, such defects include any problems that customers experience which are not concerned with production faults. (3) The third type of defect is internal scrap. Internal scrap refers to defects produced in a company that have been caught by in-line or end-of-line inspection. The in-line inspection methods will vary and can consist of traditional product inspection, statistical process control or through poke-yoke devices.



The seven value stream mapping tools



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



55



Figure 4. The quality filter mapping approach – an automotive example



Each of these three types of defect are then mapped latitudinally along the supply chain. In the automotive example given (Figure 4), this supply chain is seen to consist of distributor, assembler, first-tier supplier, second-tier supplier, third-tier supplier and raw material source. This approach has clear advantages in identifying where defects are occurring and hence in identifying problems, inefficiencies and wasted effort. This information can then be used for subsequent improvement activity. Demand amplification mapping Demand amplification mapping has its roots in the systems dynamics work of Forrester[16] and Burbidge[17]. What is now known as the “Forrester effect” was first described in a Harvard Business Review article in 1958 by Forrester[16]. This effect is linked primarily to delays and poor decision making concerning information and material flow. The Burbidge effect is linked to the “law of industrial dynamics” which states: if demand is transmitted along a series of inventories using stock control ordering, then the amplification of demand variation will increase with each transfer[17].



As a result, in unmodified supply chains generally excess inventory, production, labour and capacity are found. It is then quite likely that on many day-to-day occasions manufacturers will be unable to satisfy retail demand even though on average they are able to produce more goods than are being sold. In a supply chain setting, manufacturers therefore have sought to hold – in some cases sizeable – stocks to avoid such problems. Forrester[16] likens this to



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



56



driving an automobile blindfolded with instructions being given by a passenger. The use of various mapping techniques loosely based on Forrester and Burbidge’s pioneering work is now quite common (e.g. [18]) and in at least one case the basic concept has even been developed into a game called The Beer Game[19] which looks at the systems-dynamics within a retail brewing situation[19]. The basis of the mapping tool in the supply chain setting is given in Figure 5. In this instance an FMCG food product is being mapped along its distribution through a leading UK supermarket retailer. In this simple example two curves are plotted. The first, in the lighter shading, represents the actual consumer sales as recorded by electronic point-of-sale data. The second, and darker, curve represents the orders placed to the supplier to fulfil this demand. As can be seen, the variability of consumer sales is far lower than it is for supplier orders. It is also possible subsequently to map this product further upstream. An example may be the manufacturing plant of the cleaning products company or even the demand they place on their raw material suppliers. This simple analytic tool can be used to show how demand changes along the supply chain in varying time buckets. This information then can be used as the basis for decision making and further analysis to try to redesign the value stream configuration, manage the fluctuations, reduce the fluctuation or to set Pallets 180 160 140 120 100 80 60 40 20



Source: [11]



17.12.94



19.11.94



22.10.94



24.9.94



27.8.94



02.7.94



04.6.94



30.7.94



Weeks



09.4.94



12.3.94



12.2.94



15.1.94



18.12.93



20.11.93



23.10.93



Retail sales Orders on Suppliers



07.5.94



Figure 5. Demand amplification mapping – an FMCG food product sample



25.9.93



28.8.93



0



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



up dual-mode solutions where regular demand can be managed in one way and The seven value exceptional or promotional demand can be managed in a separate way[20]. stream mapping Decision point analysis Decision point analysis is of particular use for “T” plants or for supply chains that exhibit similar features, although it may be used in other industries. The decision point is the point in the supply chain where actual demand pull gives way to forecast-driven push. In other words, it is the point at which products stop being made according to actual demand and instead are made against forecasts alone[21]. Thus, with reference to Figure 6 – an example from the FMCG industry – the decision point can be at any point from regional distribution centres to national distribution centres through to any point inside the manufacturer or indeed, at any tier in the supply chain[22].



tools 57



Stores Factory



Suppliers Purchased Goods



Work in progress



Finished Good



National Distribution Centre



Regional Distribution Centre



Make & Ship To Local Stock



THE PULL



Make & Ship To National Stock



Assemble To Order



THE PUSH



Make To Order Purchase & Make To Order Key



Supply Stream Decision Point



Forecast Driven



Customer Driven



Source: [22]



Gaining an understanding of where this point lies is useful for two reasons: (1) In terms of the present, with this knowledge it is possible to assess the processes that operate both downstream and upstream from this point. The purpose of this is to ensure that they are aligned with the relevant pull or push philosophy. (2) From the long-term perspective, it is possible to design various “what if” scenarios to view the operation of the value stream if the decision point is moved. This may allow for a better design of the value stream itself.



Figure 6. Decision point analysis – an FMCG example



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



58



Physical structure Physical structure mapping is a new tool which has been found to be useful in understanding what a particular supply chain looks like at an overview or industry level. This knowledge is helpful in appreciating what the industry looks like, understanding how it operates and, in particular, in directing attention to areas that may not be receiving sufficient developmental attention. The tool is illustrated in Figure 7 and can be seen to be split into two parts, namely: volume structure and cost structure. The first diagram (Figure 7(a)) shows the structure of the industry according to the various tiers that exist in both the supplier area and the distribution area, with the assembler located at the middle point. In this simple example, there are three supplier tiers as well as three mirrored distribution tiers. In addition, the supplier area is seen to include raw material sources and other support suppliers (such as tooling, capital equipment and consumable firms). These two sets of firms are not given a tier level as they can be seen to interact with the assembler as well as with the other supplier tiers.



Figure 7. Physical structure mapping – an automotive industry example



The distribution area in Figure 7 includes three tiers as well as a section representing the after-market (in this case for spare parts), as well as various other support organizations providing consumables and service items. This complete industry map therefore captures all the firms involved, with the area of each part of the diagram proportional to the number of firms in each set. The second diagram maps the industry in a similar way with the same sets of organizations. However, instead of linking the area of the diagram to the number of firms involved, it is directly linked to the value-adding process (or, more strictly to the cost-adding process). As can be noted in this automotive case, the major cost adding occurs in the raw material firms, the first-tier suppliers and the assembler, respectively. The distribution area is not seen to be a major cost-adding area. The basis for use of this second figure, however, is that it is then possible to analyse the value adding required in the final product as it is sold to the



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



consumer. Thus value analysis or function analysis tools employed by The seven value industrial engineers can be focused at the complete industry or supply chain stream mapping structure[23,24]. Such an approach may result in a redesign of how the industry tools itself functions. Thus, in a way similar to the application of the process activity mapping tool discussed above, attempts can be made to try to eliminate activities that are unnecessary, to simplify others, combine yet others and to 59 seek sequence changes that will reduce waste. Using the toolkit The use of this toolkit at this stage should not be confined to any particular theoretical approach to ultimate implementation. Thus the options can be left open at this stage over whether to adopt a kaizen or business process reengineering approach once the tools have been used[25,26]. It is the authors’ belief that the framework does not constrain this choice process. Value stream mapping tools The specific focusing of which tools to use in what circumstances is done using a simplified version of the value stream analysis tool (VALSAT)[27]. The first part of this process is to identify the specific value stream to be reviewed. Second, through a series of preliminary interviews with managers in the value stream, it is necessary to identify the various wastes that exist in the value stream that managers believe can and should be removed (reference should be made to the earlier discussion of the seven wastes). In addition, it is important to gain the views of these managers on the importance of understanding the complete industry structure, irrespective of which wastes are to be removed. This selection of tools is achieved by giving the interviewees a written overview of each of the wastes as well as an explanation of what is meant by the industry structure. At this stage, if necessary, descriptions of the seven wastes may be reworded in terms more appropriate to the industry under consideration. For instance, in the health-care industry the concept of overproduction may not have great value. However, to call this potential waste “doing things too early” instead may be more useful in getting the interviewees to relate the concept to their own situations. Once this has been done, the reworded seven wastes and the account of the overall structure are recorded as row eight in the VALSAT in Table I diagram, or as eight rows in area A of Figure 8. Comparison of Table I and Figure 8 will show that the former is a simplification of the latter but with sections A, B and C already completed. Thus using this VALSAT method, the different approaches to identifying how these eight variables can be mapped has already been completed by the addition of the seven value stream mapping tools (B). In addition, area C of Figure 8 has already been completed as the correlation between tools and wastes was completed within the main body of Table I. At this point it is informative to ask the firm or firms involved to identify for each of the eight wastes/structure (D) the benchmark company in their sector. In other words, by opening these discussions at this stage it forces the firm to



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



60



Figure 8. Using the VALSAT approach to select effective value stream mapping tools



think about which of their competitors is best at reducing particular wastes and managing their complete supply/distribution chain. This knowledge may then lead on to more formal benchmarking with these companies, if this is felt to be appropriate, or at least a good focus for subsequent mapping activities. The next stage (E), therefore, is to ascertain the individual importance weighting of the seven wastes and the overall industry structure. This is achieved most effectively by allocating a total of 40 points for the eight factors and asking the interviewee to apportion these on the basis of an importance rating between the factors, with the proviso that no one factor can attract more than ten points. If there is more than one interviewee, then the different scores may be aggregated and rebased to total 40 points. The last arithmetical stage of this approach is to create total weights for each tool. In effect, what is being done here is to give a rating to each tool in terms of how useful it is in identifying the various wastes designated as of most importance by the organization or organizations. This is achieved by giving each of the different correlations given in Table I a score. Thus, high correlations are equivalent to nine points; medium three points; and low, to a single point. Then, for each correlation, a total importance score is calculated. This is achieved by multiplying the weighting of each waste/structure by the correlations. Thus, referring to the correlations in Table I, if the weighting for overproduction is six points the usefulness of the tools in addressing overproduction will be:



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



• six for process activity mapping (6 × 1); The seven value stream mapping • 18 for supply chain response matrix (6 × 3); tools • zero for production variety funnel (6 × 0); • six for quality filter mapping (6 × 1); • 18 for demand amplification mapping (6 × 3); 61 • 18 for decision point analysis (6 × 3); and • zero for physical structure mapping (6 × 0). This type of calculation is then applied to each of the other rows so that scores are recorded for each individual correlation. Once this is complete the total scores for each column are then summed and recorded in the total weight section, or “F” in Figure 8. The columns which have the highest scores are those that contain the most appropriate tools. As a rule of thumb it is useful to choose more than one tool. Indeed, as a final check, the more important two or three wastes/structure should have been addressed by tools with which they are highly correlated or failing this by at least two tools with which they have a medium correlation. This will ensure that each waste/structure is covered adequately in the mapping process. This section therefore will have assisted the reader to identify which tool or tools to use. However, once the tools have been run it may be that some unexpectedly high wastes have become apparent. For instance, the demand amplification mapping tool may have been employed to identify unnecessary inventory and waiting. However, as the tool also has a medium correlation with overproduction, it will be useful in identifying such waste if it exists but was not recognized at first by the managers involved. This backflushing may therefore identify some unanticipated but potential improvement areas and, hence, lead to some breakthroughs. After this mapping process is complete, the researcher will be able to use each individual tool with its associated benefits to undertake more detailed analysis of the value stream with a view to its improvement. As stated above, it is not the purpose of this paper to convert other researchers to a kaizen or business process re-engineering approach in this subsequent work. However, the various mapping tools described will help with whichever approach is chosen. In general, the removal of non-value adding waste is best done using a kaizen approach, whereas the removal of necessary but non-value adding waste requires a more revolutionary strategy wherein the application of business process re-engineering may be more appropriate. Case example For the reader to gain a better understanding of the approach, a brief case example will be reviewed. The company involved is a highly profitable leading industrial distributor with over 60,000 products and an enviable record for customer service.



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



62



After undertaking preliminary discussions it was decided to focus on the upstream value stream to the point at which goods are available for distribution by the firm. Nine products were chosen based on a Pareto analysis from one particular value stream, namely: the lighting product range. Within this range, interviews with key cross-functional staff showed that unnecessary inventory, defects, inappropriate processing and transport were the most serious wastes in the system. In order to understand this in more detail, and using the mapping correlation matrix (Table I), it was decided to adopt five of the tools: (1) process activity mapping; (2) supply chain response matrix; (3) quality filter mapping; (4) demand amplification mapping; and (5) decision point analysis. The on-site mapping work was carried out over a three-day period and proved that each of the tools was of value in analysing the selected value streams. An example of the effective interplay of the tools was that the supply-chain response matrix suggested, as the key priority for the firm, supplier lead-time reduction. However, when the data from the quality filter mapping were added, it was found that the real issue was on-time delivery rather than lead-time reduction. Thus, if the supply-chain response matrix had been used on its own, it might have resulted in shorter lead time, but would have exacerbated the true problem of on-time delivery. The work assisted the firm to conclude that, although it did not need to change, there was plenty of room for improvement, particularly regarding the relatively unresponsive suppliers. As a result, attention has been paid to the setting-up of a cross-function-driven supplier association[10], with six key suppliers in one product group area for the purpose of supplier co-ordination and development. In this supplier association there is an awareness-raising programme, involving ongoing benchmarking, of why change is required. In addition, education and implementation are being carried out using methods such as vendor-managed inventory, due date performance, milk rounds, selfcertification, stabilized scheduling and EDI. The company has found the ongoing mapping work to be very useful, and one senior executive noted that “the combination of mapping tools has provided an effective means of mapping the [company’s] supply chain, concentrating discussion/action on key issues”. Another described the work as “not rocket science but down to earth common sense which has resulted in us setting up a follow-up project which will be the most important thing we do between now and the end of the century”. Indeed, a conservative estimate of the savings that could be reaped is in excess of £10m per year as a result of this follow-on work.



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



Conclusion The seven value This paper has outlined a new typology and decision-making process for the stream mapping mapping of the value stream or supply chain. This general process is grounded tools in a contingency approach as it allows the researcher to choose the most appropriate methods for the particular industry, people and types of problem that exist. The typology is based around the identification of the particular 63 wastes the researcher/company/value stream members wish to reduce or eliminate. As such, it allows for an extension of the effective internal wastereduction philosophy pioneered by leading companies such as Toyota. In this case, however, such an approach can be widened and so extended to a value stream setting. This extension capability lies at the heart of creating lean enterprises, with each of the value stream members working to reduce wasteful activity both inside and between their organizations. References 1. Womack, J. and Jones, D., “From lean production to the lean enterprise”, Harvard Business Review, March-April 1994, pp. 93-103. 2. New, C., “The use of throughput efficiency as a key performance measure for the new manufacturing era”, The International Journal of Logistics Management, Vol. 4 No. 2, 1993, pp. 95-104. 3. Forza, C., Vinelli, A. and Filippini, R., “Telecommunication services for quick response in the textile-apparel industry”, Proceedings of the 1st International Symposium on Logistics, The University of Nottingham, 1993, pp. 119-26. 4. Beesley, A., “A need for time-based process mapping and its application in procurement”, Proceedings of the 3rd Annual IPSERA Conference, University of Glamorgan, 1994, pp. 41-56. 5. Jessop, D. and Jones, O., “Value stream process modelling: a methodology for creating competitive advantage”, Proceedings of the 4th Annual IPSERA Conference, University of Birmingham, 1995. 6. Japan Management Association, Kanban: Just-in-Time at Toyota, Productivity Press, Cambridge, MA, 1985. 7. Shingo, S., A Study of the Toyota Production System from an Industrial Engineering Viewpoint, Productivity Press, Cambridge, MA, 1989. 8. Bicheno, J., 34 for Quality, PICSIE Books, Buckingham, 1991. 9. Monden, Y., Toyota Production System: An Integrated Approach to Just-in-Time, 2nd ed., Industrial Engineering and Management Press, Norcross, GA, 1993. 10. Hines, P., Creating World Class Suppliers: Unlocking Mutual Competitive Advantage, Pitman Publishing, London, 1994. 11. Jones, D., “Applying Toyota principles to distribution”, Supply Chain Development Programme I, Workshop #8 Workbook, Britvic Soft Drinks Ltd, Lutterworth, 6-7 July 1995. 12. Ishiwata, J., Productivity through Process Analysis, Productivity Press, Cambridge, MA, 1991. 13. Practical Management Research Group, Seven Tools for Industrial Engineering, PHP Institute, Tokyo, 1993. 14. New, C., “The production funnel: a new tool for operations analysis”, Management Decision, Vol. 12 No. 3, 1974, pp. 167-78. 15. Macbeth, D. and Ferguson, N., Partnership Sourcing: An Integrated Supply Chain Approach, Pitman Publishing, London, 1994.



IJOPM 17,1



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



64



16. Forrester, J., “Industrial dynamics: a major breakthrough for decision makers”, Harvard Business Review, July-August 1958, pp. 37-66. 17. Burbidge, J., “Automated production control with a simulation capability”, Proceedings IFIP Conference Working Group 5-7, Copenhagen, 1984. 18. Wikner, J., Towill, D. and Naim, M., “Smoothing supply chain dynamics”, International Journal of Production Economics,Vol. 22, 1991, pp. 231-48. 19. Senge, P., The Fifth Discipline: The Art and Practice of the Learning Organization, Doubleday Currency, New York, NY, 1990. 20. James, R., “Promotions update”, Supply Chain Development Programme I, Workshop #8, Britvic Soft Drinks Limited, Lutterworth, 6-7 July 1995. 21. Hoekstra, S. and Romme, S. (Eds), Towards Integral Logistics Structure – Developing Customer-Oriented Goods Flows, McGraw-Hill, New York, NY, 1992. 22. Rich, N., “Supply stream ‘responsiveness’ project”, Supply Chain Development Programme I Workshop #6, Tesco Stores Limited, Hertford, 25-26 January 1995. 23. Miles, L., Techniques of Value Analysis and Engineering, McGraw-Hill, New York, NY, 1961. 24. Akiyama, K., Function Analysis: Systematic Improvement of Quality and Performance, Productivity Press, Cambridge, MA, 1989. 25. Imai, M., Kaizen: The Key to Japan’s Competitive Success, McGraw-Hill, New York, NY, 1986. 26. Hammer, M., “Re-engineering work: don’t automate, obliterate”, Harvard Business Review, July-August 1990, pp. 104-12. 27. Hines, P., Rich, N. and Hittmeyer, M., “Competing against ignorance: advantage through knowledge”, International Journal of Physical Distribution & Logistics Management, 1996.



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



This article has been cited by: 1. Ann Elizabeth Esain, James Aitken, Sharon Jayne Williams, Maneesh Kumar. 2016. Reverse exchange: classifications for public service SCM. Supply Chain Management: An International Journal 21:2. . [Abstract] [PDF] 2. Osama Alaskari, Mohammad Ahmad, Ruben Pinedo-Cuenca. 2016. Development of a methodology to assist manufacturing SMEs in the selection of appropriate Lean tools. International Journal of Lean Six Sigma 7:1. . [Abstract] [PDF] 3. Gareth R.T. White, Svetlana Cicmil. 2016. Knowledge acquisition through process mapping. International Journal of Productivity and Performance Management 65:3, 302-323. [Abstract] [Full Text] [PDF] 4. Graham C. Stevens, Mark Johnson. 2016. Integrating the Supply Chain … 25 years on. International Journal of Physical Distribution & Logistics Management 46:1, 19-42. [Abstract] [Full Text] [PDF] 5. John Darlington, Mark Francis, Pauline Found, Andrew Thomas. 2016. Targeting lean process improvement projects for maximum financial impact. Production Planning & Control 27, 114-132. [CrossRef] 6. Shreeranga Bhat, E.V. Gijo, N. A. Jnanesh. 2016. Productivity and performance improvement in the medical records department of a hospital. International Journal of Productivity and Performance Management 65:1, 98-125. [Abstract] [Full Text] [PDF] 7. Ilias Vlachos. 2015. Applying lean thinking in the food supply chains: a case study. Production Planning & Control 26, 1351-1367. [CrossRef] 8. Thomas R. Vetter, Keith A. Jones. 2015. Perioperative Surgical Home. Anesthesiology Clinics 33, 771-784. [CrossRef] 9. Samuel Jebaraj Benjamin, M. Srikamaladevi Marathamuthu, Uthiyakumar Murugaiah. 2015. The use of 5-WHYs technique to eliminate OEE’s speed loss in a manufacturing firm. Journal of Quality in Maintenance Engineering 21:4, 419-435. [Abstract] [Full Text] [PDF] 10. Donna Samuel, Pauline Found, Sharon J. Williams. 2015. How did the publication of the book The Machine That Changed The World change management thinking? Exploring 25 years of lean literature. International Journal of Operations & Production Management 35:10, 1386-1407. [Abstract] [Full Text] [PDF] 11. Anas M. Atieh, Hazem Kaylani, Ahmad Almuhtady, Omar Al-Tamimi. 2015. A value stream mapping and simulation hybrid approach: application to glass industry. The International Journal of Advanced Manufacturing Technology . [CrossRef] 12. Shuwei Jing, Zhanwen Niu, Pei-Chann Chang. 2015. The application of VIKOR for the tool selection in lean management. Journal of Intelligent Manufacturing . [CrossRef] 13. Protik Basu, Shovan Chowdhury, Parveen Ahmed Alam. 2015. A model-based approach of flexibility and its impact on organization and employee welfare in lean environment. DECISION 42, 269-277. [CrossRef] 14. Ali Azadeh, Mansour Zarrin, Mohammad Abdollahi, Saeid Noury, Shabnam Farahmand. 2015. Leanness assessment and optimization by fuzzy cognitive map and multivariate analysis. Expert Systems with Applications 42, 6050-6064. [CrossRef] 15. R. Mohanraj, M. Sakthivel, S Vinodh, K.E.K. Vimal. 2015. A framework for VSM integrated with Fuzzy QFD. The TQM Journal 27:5, 616-632. [Abstract] [Full Text] [PDF] 16. Jose Arturo Garza-Reyes. 2015. Green lean and the need for Six Sigma. International Journal of Lean Six Sigma 6:3, 226-248. [Abstract] [Full Text] [PDF] 17. Sanjay Sharma, Bhavin Shah. 2015. A proposed hybrid storage assignment framework: a case study. International Journal of Productivity and Performance Management 64:6, 870-892. [Abstract] [Full Text] [PDF] 18. S. Vinodh, T. Selvaraj, Suresh Kumar Chintha, Vimal K E K. 2015. Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology 13:3, 380-399. [Abstract] [Full Text] [PDF] 19. Klaudia Mund, Koot Pieterse, Sheila Cameron. 2015. Lean product engineering in the South African automotive industry. Journal of Manufacturing Technology Management 26:5, 703-724. [Abstract] [Full Text] [PDF] 20. Mariagrazia Dotoli, Nicola Epicoco, Marco Falagario, Nicola Costantino, Biagio Turchiano. 2015. An integrated approach for warehouse analysis and optimization: A case study. Computers in Industry 70, 56-69. [CrossRef] 21. Farshin Salehi, Ali Yaghtin. 2015. Action Research Innovation Cycle: Lean Thinking as a Transformational System. Procedia - Social and Behavioral Sciences 181, 293-302. [CrossRef] 22. Tuuli Jylhä, Maila Elina Suvanto. 2015. Impacts of poor quality of information in the facility management field. Facilities 33:5/6, 302-319. [Abstract] [Full Text] [PDF] 23. Sui Pheng Low, Shang Gao, Kai Lin Tiong. 2015. Applying lean production principles to facilities design of ramp-up factories. Facilities 33:5/6, 280-301. [Abstract] [Full Text] [PDF] 24. Thomas Staeblein, Katsuki Aoki. 2015. Planning and scheduling in the automotive industry: A comparison of industrial practice at German and Japanese makers. International Journal of Production Economics 162, 258-272. [CrossRef]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



25. Nurulzulaiha Sa’udah @ Suhadak, Norani Amit, Mohammad Nazri Ali. 2015. Facility Layout for SME Food Industry via Value Stream Mapping and Simulation. Procedia Economics and Finance 31, 797-802. [CrossRef] 26. Geert Letens. 2015. Lean Product Development─Faster, Better … Cleaner?. Frontiers of Engineering Management 2, 52. [CrossRef] 27. Sherif Mostafa, Jantanee Dumrak. 2015. Waste Elimination for Manufacturing Sustainability. Procedia Manufacturing 2, 11-16. [CrossRef] 28. Nithia Kumar Kasava, Noordin Mohd Yusof, Alireza Khademi, Muhammad Zameri Mat Saman. 2015. Sustainable Domain Value Stream Mapping (SdVSM) Framework Application in Aircraft Maintenance: A Case Study. Procedia CIRP 26, 418-423. [CrossRef] 29. K. R. Zuting, P. Mohapatra, Y. Daultani, M. K. Tiwari. 2014. A synchronized strategy to minimize vehicle dispatching time: a real example of steel industry. Advances in Manufacturing 2, 333-343. [CrossRef] 30. Mahvish Khurum, Kai Petersen, Tony Gorschek. 2014. Extending value stream mapping through waste definition beyond customer perspective. Journal of Software: Evolution and Process 26:10.1002/smr.v26.12, 1074-1105. [CrossRef] 31. C. C. Chiou, T. W. Jhang, Y. X. Deng, J. T. Tsai, C. PerngApplying lean and TOC to improvement delivery performance for machine tool manufacturers 953-957. [CrossRef] 32. Mark Francis, Ron Fisher, Andrew Thomas, Hefin Rowlands. 2014. The meaning of ‘value’ in purchasing, logistics and operations management. International Journal of Production Research 52, 6576-6589. [CrossRef] 33. K. Agyapong-Kodua, Csaba Haraszkó, István Németh. 2014. Resource selection ontologies in support of a recipe-based factory design methodology. International Journal of Production Research 52, 6235-6253. [CrossRef] 34. D. Schmidtke, U. Heiser, O. Hinrichsen. 2014. A simulation-enhanced value stream mapping approach for optimisation of complex production environments. International Journal of Production Research 52, 6146-6160. [CrossRef] 35. Jordi Olivella, Ruben Gregorio. 2014. Organizational Practices Lean Enterprises Adopt to Focus on Value Streams. Journal of Enterprise Transformation 4, 309-328. [CrossRef] 36. Andrew J. Thomas, Kath Ringwald, Scott Parfitt, Alan Davies, Elwyn John. 2014. An empirical analysis of Lean Six Sigma implementation in SMEs – a migratory perspective. International Journal of Quality & Reliability Management 31:8, 888-905. [Abstract] [Full Text] [PDF] 37. Gareth R.T. White, Peter James. 2014. Extension of process mapping to identify “green waste”. Benchmarking: An International Journal 21:5, 835-850. [Abstract] [Full Text] [PDF] 38. Protik Basu, Pranab K. Dan. 2014. Capacity augmentation with VSM methodology for lean manufacturing. International Journal of Lean Six Sigma 5:3, 279-292. [Abstract] [Full Text] [PDF] 39. Jaiprakash Bhamu, Kuldip Singh Sangwan. 2014. Lean manufacturing: literature review and research issues. International Journal of Operations & Production Management 34:7, 876-940. [Abstract] [Full Text] [PDF] 40. Naga Vamsi Krishna Jasti, Aditya Sharma. 2014. Lean manufacturing implementation using value stream mapping as a tool. International Journal of Lean Six Sigma 5:1, 89-116. [Abstract] [Full Text] [PDF] 41. Alireza Anvari, Norzima Zulkifli, Shahryar Sorooshian, Omid Boyerhassani. 2014. An integrated design methodology based on the use of group AHP-DEA approach for measuring lean tools efficiency with undesirable output. The International Journal of Advanced Manufacturing Technology 70, 2169-2186. [CrossRef] 42. Mariagrazia Dotoli, Maria Pia Fanti, Giorgio Iacobellis, Giuliana Rotunno. 2014. An integrated technique for the internal logistics analysis and management in discrete manufacturing systems. International Journal of Computer Integrated Manufacturing 27, 165-180. [CrossRef] 43. Matthias Holweg, Petri Helo. 2014. Defining value chain architectures: Linking strategic value creation to operational supply chain design. International Journal of Production Economics 147, 230-238. [CrossRef] 44. Zulfa Fitri Ikatrinasari, Erlana Ichsan Haryanto. 2014. Implementation of Lean Service with Value Stream Mapping at Directorate Airworthiness and Aircraft Operation, Ministry of Transportation Republic of Indonesia. Journal of Service Science and Management 07, 291-301. [CrossRef] 45. Anja Schulze, Philipp Schmitt, Mareike Heinzen, Philipp Mayrl, Daniel Heller, Roman Boutellier. 2013. Exploring the 4I framework of organisational learning in product development: value stream mapping as a facilitator. International Journal of Computer Integrated Manufacturing 26, 1136-1150. [CrossRef] 46. Benjamin Kemper, Jeroen de Mast. 2013. Measurement Plans for Process Flow Improvement in Services and Health Care. Quality Engineering 25, 437-450. [CrossRef] 47. Chiarini Andrea. 2013. Waste savings in patient transportation inside large hospitals using lean thinking tools and logistic solutions. Leadership in Health Services 26:4, 356-367. [Abstract] [Full Text] [PDF] 48. S. Vinodh, M. Somanaathan, K.R. Arvind. 2013. Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology 11:2, 129-141. [Abstract] [Full Text] [PDF]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



49. Ilias Vlachos, Aleksandra Bogdanovic. 2013. Lean thinking in the European hotel industry. Tourism Management 36, 354-363. [CrossRef] 50. Bernardo Nicoletti. 2013. Lean Six Sigma and digitize procurement. International Journal of Lean Six Sigma 4:2, 184-203. [Abstract] [Full Text] [PDF] 51. Samuel Jebaraj Benjamin, Uthiyakumar Murugaiah, M. Srikamaladevi Marathamuthu. 2013. The use of SMED to eliminate small stops in a manufacturing firm. Journal of Manufacturing Technology Management 24:5, 792-807. [Abstract] [Full Text] [PDF] 52. Harwinder Singh, Amandeep Singh. 2013. Application of lean manufacturing using value stream mapping in an auto‐parts manufacturing unit. Journal of Advances in Management Research 10:1, 72-84. [Abstract] [Full Text] [PDF] 53. Alireza Anvari, Norzima Zulkifli, Rosnah Mohd Yusuff. 2013. A dynamic modeling to measure lean performance within lean attributes. The International Journal of Advanced Manufacturing Technology 66, 663-677. [CrossRef] 54. R. Murat Tabanli, Tijen Ertay. 2013. Value stream mapping and benefit–cost analysis application for value visibility of a pilot project on RFID investment integrated to a manual production control system—a case study. The International Journal of Advanced Manufacturing Technology 66, 987-1002. [CrossRef] 55. Md Al Amin, M.A. Karim. 2013. A time-based quantitative approach for selecting lean strategies for manufacturing organisations. International Journal of Production Research 51, 1146-1167. [CrossRef] 56. Ben Marriott, Jose Arturo Garza‐Reyes, Horacio Soriano‐Meier, Jiju Antony. 2013. An integrated methodology to prioritise improvement initiatives in low volume‐high integrity product manufacturing organisations. Journal of Manufacturing Technology Management 24:2, 197-217. [Abstract] [Full Text] [PDF] 57. Robert Gerth, Albert Boqvist, Marcus Bjelkemyr, Bengt Lindberg. 2013. Design for construction: utilizing production experiences in development. Construction Management and Economics 31, 135-150. [CrossRef] 58. Ricardo Pires de Souza, Hélio Roberto Hékis, Lucas Ambrósio Bezerra Oliveira, Jamerson Viegas Queiroz, Fernanda Cristina Barbosa Pereira Queiroz, Ricardo Alexsandro de Medeiros Valentim. 2013. Implementation of a Six Sigma project in a 3M division of Brazil. International Journal of Quality & Reliability Management 30:2, 129-141. [Abstract] [Full Text] [PDF] 59. Paul R. Drake, Dong Myung Lee, Matloub Hussain. 2013. The lean and agile purchasing portfolio model. Supply Chain Management: An International Journal 18:1, 3-20. [Abstract] [Full Text] [PDF] 60. P. Lewis, G. Cooke. 2013. Developing a lean measurement system to enhance process improvement. International Journal of Metrology and Quality Engineering 4, 145-151. [CrossRef] 61. T. J. Roosen, D. J. Pons. 2013. Environmentally Lean Production: The Development and Incorporation of an Environmental Impact Index into Value Stream Mapping. Journal of Industrial Engineering 2013, 1-17. [CrossRef] 62. Antony Pearce, Dirk Pons. 2013. Implementing Lean Practices: Managing the Transformation Risks. Journal of Industrial Engineering 2013, 1-19. [CrossRef] 63. Amelia Natasya Abdul Wahab, Muriati Mukhtar, Riza Sulaiman. 2013. A Conceptual Model of Lean Manufacturing Dimensions. Procedia Technology 11, 1292-1298. [CrossRef] 64. Anoma Ariyawardana, Ray Collins. 2013. Value Chain Analysis Across Borders: The Case of Australian Red Lentils to Sri Lanka. Journal of Asia-Pacific Business 14, 25-39. [CrossRef] 65. K. L. Jeyaraj, C. Muralidharan, R. Mahalingam, S. G. Deshmukh. 2013. Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study. Journal of The Institution of Engineers (India): Series C 94, 43-52. [CrossRef] 66. Ibrahim A. Nugroho, Ustica H. Riastuti, Hardianto Iridiastadi. 2012. Performance Improvement Suggestions for Ground Handling using Lean Solutions Approach. Procedia - Social and Behavioral Sciences 65, 462-467. [CrossRef] 67. Paul Martin Gibbons, Colin Kennedy, Stuart Burgess, Patrick Godfrey. 2012. The development of a value improvement model for repetitive processes (VIM). International Journal of Lean Six Sigma 3:4, 315-338. [Abstract] [Full Text] [PDF] 68. K. Agyapong-Kodua, J.O. Ajaefobi, R.H. Weston, S. Ratchev. 2012. Development of a multi-product cost and value stream modelling methodology. International Journal of Production Research 50, 6431-6456. [CrossRef] 69. K. E. K. Vimal, S. Vinodh. 2012. Leanness evaluation using IF–THEN rules. The International Journal of Advanced Manufacturing Technology 63, 407-413. [CrossRef] 70. C. F. Oduoza, P. G. SmithWeb based tool to sustain continuous improvement and productivity in manufacturing small and medium size enterprises (SMEs) 143-148. [CrossRef] 71. Andrew Fearne, Marian Garcia Martinez, Benjamin Dent. 2012. Dimensions of sustainable value chains: implications for value chain analysis. Supply Chain Management: An International Journal 17:6, 575-581. [Abstract] [Full Text] [PDF] 72. Umit Bititci, Patrizia Garengo, Viktor Dörfler, Sai Nudurupati. 2012. Performance Measurement: Challenges for Tomorrow*. International Journal of Management Reviews 14:10.1111/ijmr.2012.14.issue-3, 305-327. [CrossRef]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



73. Maximilian de Bucourt, Reinhard Busse, Felix Güttler, Thomas Reinhold, Bernd Vollnberg, Max Kentenich, Bernd Hamm, Ulf K. Teichgräber. 2012. Process mapping of PTA and stent placement in a university hospital interventional radiology department. Insights into Imaging 3, 329-336. [CrossRef] 74. Chairul Saleh, Fatma Hermining Astuti, M. Ridwan Andi Purnomo, Baba Md DerosFuzzy identification of value stream analysis tools in lean manufacturing 74-77. [CrossRef] 75. Paul M. Gibbons, Colin Kennedy, Stuart C. Burgess, Patrick Godfrey. 2012. Developing an asset management value improvement model (a‐VIM) approach for an airport operational engineering environment. International Journal of Quality & Reliability Management 29:7, 797-819. [Abstract] [Full Text] [PDF] 76. Abir Fathallah, Julie Stal- Le Cardinal, Jean-Louis Ermine, Jean-Claude Bocquet. 2012. Continuous Improvement Modeling to Support Enterprise Transformation. Journal of Enterprise Transformation 2, 177-200. [CrossRef] 77. Andrea Chiarini. 2012. Lean production: mistakes and limitations of accounting systems inside the SME sector. Journal of Manufacturing Technology Management 23:5, 681-700. [Abstract] [Full Text] [PDF] 78. Anni-Kaisa Kähkönen, Katrina Lintukangas. 2012. The underlying potential of supply management in value creation. Journal of Purchasing and Supply Management 18, 68-75. [CrossRef] 79. S. Vinodh, K. E. K. Vimal. 2012. Thirty criteria based leanness assessment using fuzzy logic approach. The International Journal of Advanced Manufacturing Technology 60, 1185-1195. [CrossRef] 80. Anni‐Kaisa Kähkönen. 2012. Value net – a new business model for the food industry?. British Food Journal 114:5, 681-701. [Abstract] [Full Text] [PDF] 81. Varun Ramesh, Rambabu Kodali. 2012. A decision framework for maximising lean manufacturing performance. International Journal of Production Research 50, 2234-2251. [CrossRef] 82. Paul M. Gibbons, Colin Kennedy, Stuart C. Burgess, Patrick Godfrey. 2012. The development of a lean resource mapping framework: introducing an 8th waste. International Journal of Lean Six Sigma 3:1, 4-27. [Abstract] [Full Text] [PDF] 83. S. Vinodh, Dino Joy. 2012. Structural Equation Modelling of lean manufacturing practices. International Journal of Production Research 50, 1598-1607. [CrossRef] 84. Pim M. A. Polesie. 2012. Reducing the use of resources in medium-sized Swedish construction enterprises: production managers’ views. Construction Management and Economics 30, 193-202. [CrossRef] 85. Sainath Gopinath, Theodor I. Freiheit. 2012. A waste relationship model and center point tracking metric for lean manufacturing systems. IIE Transactions 44, 136-154. [CrossRef] 86. L. Wang, X.G. Ming, F.B. Kong, D. Li, P.P. Wang. 2011. Focus on implementation: a framework for lean product development. Journal of Manufacturing Technology Management 23:1, 4-24. [Abstract] [Full Text] [PDF] 87. Christian Finnsgård, Carl Wänström, Lars Medbo, W. Patrick Neumann. 2011. Impact of materials exposure on assembly workstation performance. International Journal of Production Research 49, 7253-7274. [CrossRef] 88. M. A. Sanda, J. Johansson, B. JohanssonMiners' tacit knowledge: A unique resource for developing human-oriented lean mining culture in deep mines 399-404. [CrossRef] 89. Claudia Paciarotti, Valentina Ciatteo, Giancarlo Giacchetta. 2011. Value stream mapping implementation in the third sector. Operations Management Research 4, 99-110. [CrossRef] 90. Francesco Zammori, Marcello Braglia, Marco Frosolini. 2011. Stochastic overall equipment effectiveness. International Journal of Production Research 49, 6469-6490. [CrossRef] 91. Luis Maria Fraga Cabral Sacadura, Alexandra Maria Baptista Ramos TeneraIntegrating Value and Lean Management in Manufacturing Processes 1-5. [CrossRef] 92. David Asamoah, Patience Abor, Martin Opare. 2011. An examination of pharmaceutical supply chain for artemisinin‐based combination therapies in Ghana. Management Research Review 34:7, 790-809. [Abstract] [Full Text] [PDF] 93. S. Vinodh, K. R. Arvind, M. Somanaathan. 2011. Tools and techniques for enabling sustainability through lean initiatives. Clean Technologies and Environmental Policy 13, 469-479. [CrossRef] 94. Anand Gurumurthy, Rambabu Kodali. 2011. Design of lean manufacturing systems using value stream mapping with simulation. Journal of Manufacturing Technology Management 22:4, 444-473. [Abstract] [Full Text] [PDF] 95. Arnout Pool, Jacob Wijngaard, Durk-Jouke van der Zee. 2011. Lean planning in the semi-process industry, a case study. International Journal of Production Economics 131, 194-203. [CrossRef] 96. Anni-Kaisa Kähkönen, Veli Matti Virolainen. 2011. Sources of structural power in the context of value nets. Journal of Purchasing and Supply Management 17, 109-120. [CrossRef] 97. Alessio Trentin, Fabrizio Salvador, Cipriano Forza, M. Johnny Rungtusanatham. 2011. Operationalising form postponement from a decision-making perspective. International Journal of Production Research 49, 1977-1999. [CrossRef] 98. Andrew Thomas, Richard Barton. 2011. Using the Quick Scan Audit Methodology (QSAM) as a precursor towards successful Lean Six Sigma implementation. International Journal of Lean Six Sigma 2:1, 41-54. [Abstract] [Full Text] [PDF]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



99. Mark Johnson, Simon Templar. 2011. The relationships between supply chain and firm performance. International Journal of Physical Distribution & Logistics Management 41:2, 88-103. [Abstract] [Full Text] [PDF] 100. Bhim Singh, Suresh K. Garg, Surrender K. Sharma. 2011. Value stream mapping: literature review and implications for Indian industry. The International Journal of Advanced Manufacturing Technology 53, 799-809. [CrossRef] 101. Hilda C. Martínez León, Jennifer A. Farris. 2011. Lean Product Development Research: Current State and Future Directions. Engineering Management Journal 23, 29-51. [CrossRef] 102. S. Vinodh, Suresh Kumar Chintha. 2011. Leanness assessment using multi-grade fuzzy approach. International Journal of Production Research 49, 431-445. [CrossRef] 103. Andrea Bonaccorsi. 2011. Service Value Stream Management (SVSM): Developing Lean Thinking in the Service Industry. Journal of Service Science and Management 04, 428-439. [CrossRef] 104. Rajat Roy, Mike James-MooreLean Product Introduction . [CrossRef] 105. Toke Koldborg Jensen, Jette Nielsen, Erling P. Larsen, Jens Clausen. 2010. The Fish Industry—Toward Supply Chain Modeling. Journal of Aquatic Food Product Technology 19, 214-226. [CrossRef] 106. S. Vinodh, K.R. Arvind, M. Somanaathan. 2010. Application of value stream mapping in an Indian camshaft manufacturing organisation. Journal of Manufacturing Technology Management 21:7, 888-900. [Abstract] [Full Text] [PDF] 107. James H. Ford II, Meg Wise, Jennifer P. Wisdom. 2010. A Peek Inside the Box: How Information Flows Through Substance Abuse Treatment Agencies. Journal of Technology in Human Services 28, 121-143. [CrossRef] 108. Anni‐Kaisa Kähkönen, Mari Tenkanen. 2010. The impact of power on information sharing in the Finnish food industry. British Food Journal 112:8, 821-835. [Abstract] [Full Text] [PDF] 109. Li Chen, Manuel Nunez. 2010. Business Process Integration of Multiple Customer Order Review Systems. IEEE Transactions on Engineering Management 57, 502-512. [CrossRef] 110. G. Schuh, W. Boos, K. KuhlmannModelling Business Processes for Limited-Lot Producers with Aixperanto 1-4. [CrossRef] 111. Ayoegul Ozkavukcu, M. Bulent DurmusogluProduction smoothing decisions with seasonal variation through value stream 1-6. [CrossRef] 112. Bhim Singh, S.K. Garg, S.K. Sharma, Chandandeep Grewal. 2010. Lean implementation and its benefits to production industry. International Journal of Lean Six Sigma 1:2, 157-168. [Abstract] [Full Text] [PDF] 113. Paul M. Gibbons, Stuart C. Burgess. 2010. Introducing OEE as a measure of lean Six Sigma capability. International Journal of Lean Six Sigma 1:2, 134-156. [Abstract] [Full Text] [PDF] 114. K. ZokaeiValue chain analysis of the UK food sector 187-211. [CrossRef] 115. Bhim Singh, S.K. Sharma. 2009. Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm. Measuring Business Excellence 13:3, 58-68. [Abstract] [Full Text] [PDF] 116. David H. Taylor, Andrew Fearne. 2009. Demand management in fresh food value chains: a framework for analysis and improvement. Supply Chain Management: An International Journal 14:5, 379-392. [Abstract] [Full Text] [PDF] 117. Aysegul Yalcinkaya, M. Bulent DurmusogluProduction smoothing decisions with seasonal variation through value stream management 128-133. [CrossRef] 118. Tuangyot Supeekit, Kanokwan KingphadungService process redesign applying value stream analysis: The case of a patient discharging process 7-12. [CrossRef] 119. C Martin, M Metcalfe, H Harris. 2009. Developing an implementation capacity: justifications from prior research. Journal of the Operational Research Society 60, 859-868. [CrossRef] 120. K. Agyapong-Kodua, J. O. Ajaefobi, R. H. Weston. 2009. Modelling dynamic value streams in support of process design and evaluation. International Journal of Computer Integrated Manufacturing 22, 411-427. [CrossRef] 121. Catalina Perez, Rodolfo de Castro, Maria Font i Furnols. 2009. The pork industry: a supply chain perspective. British Food Journal 111:3, 257-274. [Abstract] [Full Text] [PDF] 122. Benjamin Kemper, Jeroen de Mast, Michel Mandjes. 2009. Modeling process flow using diagrams. Quality and Reliability Engineering International n/a-n/a. [CrossRef] 123. Hung-da Wan, F. Frank Chen. 2008. A leanness measure of manufacturing systems for quantifying impacts of lean initiatives. International Journal of Production Research 46, 6567-6584. [CrossRef] 124. Joakim Wikner, Ou Tang. 2008. A structural framework for closed‐loop supply chains. The International Journal of Logistics Management 19:3, 344-366. [Abstract] [Full Text] [PDF] 125. Thomas Gregory Frater, Donald James Houston. 2008. Notes on progress in structuring a research project measuring energy inputs into New Zealand apple production-combining hard and soft systems methods. Systems Research and Behavioral Science 25, 827-833. [CrossRef]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



126. Ibon Serrano, Carlos Ochoa, Rodolfo De Castro. 2008. Evaluation of value stream mapping in manufacturing system redesign. International Journal of Production Research 46, 4409-4430. [CrossRef] 127. Colin Herron, Christian Hicks. 2008. The transfer of selected lean manufacturing techniques from Japanese automotive manufacturing into general manufacturing (UK) through change agents. Robotics and Computer-Integrated Manufacturing 24, 524-531. [CrossRef] 128. P. Childerhouse, S.M. Disney, D.R. Towill. 2008. On the impact of order volatility in the European automotive sector. International Journal of Production Economics 114, 2-13. [CrossRef] 129. Jagjit Singh Srai, Mike Gregory. 2008. A supply network configuration perspective on international supply chain development. International Journal of Operations & Production Management 28:5, 386-411. [Abstract] [Full Text] [PDF] 130. Ibon Serrano Lasa, Carlos Ochoa Laburu, Rodolfo de Castro Vila. 2008. An evaluation of the value stream mapping tool. Business Process Management Journal 14:1, 39-52. [Abstract] [Full Text] [PDF] 131. Mark Francis, David Simons, Michael Bourlakis. 2008. Value chain analysis in the UK beef foodservice sector. Supply Chain Management: An International Journal 13:1, 83-91. [Abstract] [Full Text] [PDF] 132. E.D. Adamides, N. Karacapilidis, H. Pylarinou, D. Koumanakos. 2008. Supporting collaboration in the development and management of lean supply networks. Production Planning & Control 19, 35-52. [CrossRef] 133. Andreas Reichhart, Matthias Holweg. 2007. Creating the customer‐responsive supply chain: a reconciliation of concepts. International Journal of Operations & Production Management 27:11, 1144-1172. [Abstract] [Full Text] [PDF] 134. R. Darlington, S. Rahimifard. 2007. Hybrid two-stage planning for food industry overproduction waste  minimization. International Journal of Production Research 45, 4273-4288. [CrossRef] 135. Andreas Reichhart, Matthias Holweg. 2007. L ean distribution: concepts, contributions, conflicts. International Journal of Production Research 45, 3699-3722. [CrossRef] 136. B.J. Hicks. 2007. Lean information management: Understanding and eliminating waste. International Journal of Information Management 27, 233-249. [CrossRef] 137. Rajesh Krishnamurthy, Charlene A. Yauch. 2007. Leagile manufacturing: a proposed corporate infrastructure. International Journal of Operations & Production Management 27:6, 588-604. [Abstract] [Full Text] [PDF] 138. Keivan Zokaei, Peter Hines. 2007. Achieving consumer focus in supply chains. International Journal of Physical Distribution & Logistics Management 37:3, 223-247. [Abstract] [Full Text] [PDF] 139. Andrew Potter, Chandra Lalwani. 2007. Developing a methodology to analyse despatch bay performance. International Journal of Production Economics 106, 82-91. [CrossRef] 140. Abdulsalam A. Al‐Sudairi. 2007. Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation 7:1, 99-121. [Abstract] [Full Text] [PDF] 141. R. Darlington, S. Rahimifard. 2006. A responsive demand management framework for the minimization of waste in convenience food manufacture. International Journal of Computer Integrated Manufacturing 19, 751-761. [CrossRef] 142. Peter Hines, Mark Francis, Pauline Found. 2006. Towards lean product lifecycle management. Journal of Manufacturing Technology Management 17:7, 866-887. [Abstract] [Full Text] [PDF] 143. M. Braglia, G. Carmignani, F. Zammori. 2006. A new value stream mapping approach for complex production systems. International Journal of Production Research 44, 3929-3952. [CrossRef] 144. Jagadeesh Raj. 2006. Exploration into the quality septet. The TQM Magazine 18:5, 433-439. [Abstract] [Full Text] [PDF] 145. David H. Taylor, Andrew Fearne. 2006. Towards a framework for improvement in the management of demand in agri‐food supply chains. Supply Chain Management: An International Journal 11:5, 379-384. [Abstract] [Full Text] [PDF] 146. S.C.L. Koh, K.H. Tan. 2006. Operational intelligence discovery and knowledge‐mapping approach in a supply network with uncertainty. Journal of Manufacturing Technology Management 17:6, 687-699. [Abstract] [Full Text] [PDF] 147. Peter Hines, Mark Francis, Kate Bailey. 2006. Quality‐based pricing: a catalyst for collaboration and sustainable change in the agrifood industry?. The International Journal of Logistics Management 17:2, 240-259. [Abstract] [Full Text] [PDF] 148. David H. Taylor. 2006. Demand management in agri‐food supply chains. The International Journal of Logistics Management 17:2, 163-186. [Abstract] [Full Text] [PDF] 149. A. Keivan Zokaei, David W. Simons. 2006. Value chain analysis in consumer focus improvement. The International Journal of Logistics Management 17:2, 141-162. [Abstract] [Full Text] [PDF] 150. R. K. Singh, S. Kumar, A. K. Choudhury, M. K. Tiwari. 2006. Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic. International Journal of Production Research 44, 1399-1429. [CrossRef] 151. Ann Esain, Lynn Massey. 2006. Value relationships and effectiveness – pilot study in health. International Journal of Productivity and Performance Management 55:2, 143-154. [Abstract] [Full Text] [PDF]



Downloaded by WATERFORD INSTITUTE OF TECHNOLOGY At 04:20 25 February 2016 (PT)



152. R K Singh, A K Choudhury, M K Tiwari, R S Maull. 2006. An integrated fuzzy-based decision support system for the selection of lean tools: a case study from the steel industry. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220, 1735-1749. [CrossRef] 153. Ibrahim A. Rawabdeh. 2005. A model for the assessment of waste in job shop environments. International Journal of Operations & Production Management 25:8, 800-822. [Abstract] [Full Text] [PDF] 154. Lawrence E. Whitman, Don E. Malzahn, Barbara S. Chaparro, Mark Russell, Rebecca Langrall, Beth A. Mohler. 2005. A Comparison of Group Processes, Performance, and Satisfaction in Face-to-Face Versus Computer-Mediated Engineering Student Design Teams. Journal of Engineering Education 94:10.1002/jee.2005.94.issue-3, 327-337. [CrossRef] 155. David Simons, Keivan Zokaei. 2005. Application of lean paradigm in red meat processing. British Food Journal 107:4, 192-211. [Abstract] [Full Text] [PDF] 156. Dinesh Seth *, Vaibhav Gupta. 2005. Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Production Planning & Control 16, 44-59. [CrossRef] 157. Peter Hines, Matthias Holweg, Nick Rich. 2004. Learning to evolve. International Journal of Operations & Production Management 24:10, 994-1011. [Abstract] [Full Text] [PDF] 158. Trevor Turner, Veronica Martinez, Umit Bititci. 2004. Managing the value delivery process. International Journal of Physical Distribution & Logistics Management 34:3/4, 302-318. [Abstract] [Full Text] [PDF] 159. Badr Haque, Mike James-moore. 2004. Applying lean thinking to new product introduction. Journal of Engineering Design 15, 1-31. [CrossRef] 160. B Haque. 2003. Lean engineering in the aerospace industry. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 217, 1409-1420. [CrossRef] 161. Peter Hines, Riccardo Silvi, Monica Bartolini. 2002. Demand chain management: an integrative approach in automotive retailing. Journal of Operations Management 20, 707-728. [CrossRef] 162. Jack G.A.J. van der Vorst, Adrie J.M. Beulens. 2002. Identifying sources of uncertainty to generate supply chain redesign strategies. International Journal of Physical Distribution & Logistics Management 32:6, 409-430. [Abstract] [Full Text] [PDF] 163. Peter McCullen, Denis Towill. 2002. Diagnosis and reduction of bullwhip in supply chains. Supply Chain Management: An International Journal 7:3, 164-179. [Abstract] [Full Text] [PDF] 164. Matthias Holweg, John Bicheno. 2002. Supply chain simulation – a tool for education, enhancement and endeavour. International Journal of Production Economics 78, 163-175. [CrossRef] 165. M.M. Naim, P. Childerhouse, S.M. Disney, D.R. Towill. 2002. A supply chain diagnostic methodology: determining the vector of change. Computers & Industrial Engineering 43, 135-157. [CrossRef] 166. William G. Sullivan, Thomas N. McDonald, Eileen M. Van Aken. 2002. Equipment replacement decisions and lean manufacturing. Robotics and Computer-Integrated Manufacturing 18, 255-265. [CrossRef] 167. John Bicheno, Matthias Holweg, Jens Niessmann. 2001. Constraint batch sizing in a lean environment. International Journal of Production Economics 73, 41-49. [CrossRef] 168. Christine Harland, Louise KnightSupply strategy: A corporate social capital perspective 151-183. [Citation] [Enhanced Abstract] [PDF] [PDF] 169. Peter Hines, Matthias Holweg, James Sullivan. 2000. Waves, beaches, breakwaters and rip currents – A three‐dimensional view of supply chain dynamics. International Journal of Physical Distribution & Logistics Management 30:10, 827-846. [Abstract] [Full Text] [PDF] 170. R. Barker, S. Hong-Minh, M.M. Naim. 2000. The terrain scanning methodology, Assessing and improving construction supply chains. European Journal of Purchasing & Supply Management 6, 179-193. [CrossRef] 171. Simon Croom, Pietro Romano, Mihalis Giannakis. 2000. Supply chain management: an analytical framework for critical literature review. European Journal of Purchasing & Supply Management 6, 67-83. [CrossRef] 172. Donna Samuel, Peter Hines. 1999. Designing a supply chain change process: a food distribution case. International Journal of Retail & Distribution Management 27:10, 409-420. [Abstract] [Full Text] [PDF] 173. Peter Hines, Nick Rich, Ann Esain. 1999. Value stream mapping. Benchmarking: An International Journal 6:1, 60-77. [Abstract] [Full Text] [PDF] 174. Peter Hines. 1998. Benchmarking Toyota's supply chain: Japan vs U.K. Long Range Planning 31, 911-918. [CrossRef] 175. Peter Hines, Nick Rich. 1998. Outsourcing competitive advantage: the use of supplier associations. International Journal of Physical Distribution & Logistics Management 28:7, 524-546. [Abstract] [Full Text] [PDF] 176. MARK FRANCIS. 1998. Lean Information and Supply Chain Effectiveness. International Journal of Logistics Research and Applications 1, 93-108. [CrossRef] 177. John S. Kiff. 1997. Supply and stocking systems in the UK car market. International Journal of Physical Distribution & Logistics Management 27:3/4, 226-243. [Abstract] [Full Text] [PDF]