TIME SCHEDULE PIPING PROJECT FOR PRODUCTION FACILITY PONDOK MAKMUR 2014



KEGIATAN No RESPONSIBL BY



W1



SEPTEMBER W2 W3 W4



W1



OCTOBER W2 W3 W4



W1



NOVEMBER W2 W3 W4



ADMINISTRATION KONTRAK ADDENDUM REPORTING SYSTEM ENGINEERING WORKS ISOMETRIC DRAWING (APP) SHOP DRAWING MATERIAL (MTO) LIST - REQUIREMENT LOGGISTIC & TRANSPORTATION PENGADAAN MATERIAL TRUCKING FABRICATED MATERIAL TO SITE INVENTORY CONTROL



RPE KSO MTO 2 & 3



KSO KSO



SHOP FABRICATION - MARUNDA WORK SHOP FABRIKASI SAND BLASTING / PRIMER PAINTING



KSO KSO



QUALITY CONTROL QC - XRAY INSPECTION INSPECTION TESTING



KSO KSO KSO



FIELD CONSTRUCTION - PDK MAKMUR INSTALLATION - UNDER GROUND



KSO



WRAPPING ( POLIKEIN TAPE) INSTALLATION - ABOVE GROUND HEADER MANIFOLD VESSEL AND TANK AREA QUALITY CONTROL QC - XRAY INSPECTION INSPECTION



KSO



KSO KSO



VALVES DELIVERY - 800 EA



W1



DECEMBER W2 W3 W4



W1



JANUARY W2 W3 W4



W1



FEBRUARY W2 W3 W4



2014



KEGIATAN No HYDRO TESTING PURGING FINISHING - PAINTING (COLOR CODE)



RESPONSIBL KSO KSO



OTHER INTERFACE PROJECTS CIVIL CONSRUCTION GROUND PREPARATION SATELITE - PIPE SUPPORT MAIN PIPING - STEEL SUPPORT ETC



KSO KSO KSO KSO



PIPE SUPPORT - STRUCTURE GROUND / SOIL WORKS ELECTRICAL INSTALLATION PRECOM, INSPECTION MECHANICAL COMPL COMMISIONING AND START UP READY FOR ON STREAM



KSO KSO KSO KSO



SUPPORT - OTHERS SITE WORK FLOOR YARD PREPARATION



KSO



PIPE RACKS MOBILISASI / TRANSPORT ALAT KE SITE WELDING EQUIPMENT



KSO KSO



ALAT BERAT POWER GENERATOR LIGHTING - WORK SITE KENDARAAN KARYAWAN - LIGHT VEHICLE HSSE HSSE EQUIPMENT HSSE SURVEILANCE / CONTROL HOUSE KEEPING - CLEANING PERSONNEL



KSO



SEPTEMBER W1 W2 W3 W4



W1



OCTOBER W2 W3 W4



NOVEMBER W1 W2 W3 W4



W1



DECEMBER W2 W3 W4



W1



JANUARY W2 W3 W4



W1



FEBRUARY W2 W3 W4



2014



KEGIATAN No RESPONSIBL MAN POWER STRUCTURE MOBILISASI KARYAWAN KE PDK MAKMUR



KSO



PERSIAPAN RUMAH TINGGAL



KSO



16 SEPTEMBER 2014 FGHS



SEPTEMBER W1 W2 W3 W4



W1



OCTOBER W2 W3 W4



NOVEMBER W1 W2 W3 W4



W1



DECEMBER W2 W3 W4



W1



JANUARY W2 W3 W4



W1



FEBRUARY W2 W3 W4