TIME SCHEDULE PIPING PROJECT FOR PRODUCTION FACILITY PONDOK MAKMUR 2014
KEGIATAN No RESPONSIBL BY
W1
SEPTEMBER W2 W3 W4
W1
OCTOBER W2 W3 W4
W1
NOVEMBER W2 W3 W4
ADMINISTRATION KONTRAK ADDENDUM REPORTING SYSTEM ENGINEERING WORKS ISOMETRIC DRAWING (APP) SHOP DRAWING MATERIAL (MTO) LIST - REQUIREMENT LOGGISTIC & TRANSPORTATION PENGADAAN MATERIAL TRUCKING FABRICATED MATERIAL TO SITE INVENTORY CONTROL
RPE KSO MTO 2 & 3
KSO KSO
SHOP FABRICATION - MARUNDA WORK SHOP FABRIKASI SAND BLASTING / PRIMER PAINTING
KSO KSO
QUALITY CONTROL QC - XRAY INSPECTION INSPECTION TESTING
KSO KSO KSO
FIELD CONSTRUCTION - PDK MAKMUR INSTALLATION - UNDER GROUND
KSO
WRAPPING ( POLIKEIN TAPE) INSTALLATION - ABOVE GROUND HEADER MANIFOLD VESSEL AND TANK AREA QUALITY CONTROL QC - XRAY INSPECTION INSPECTION
KSO
KSO KSO
VALVES DELIVERY - 800 EA
W1
DECEMBER W2 W3 W4
W1
JANUARY W2 W3 W4
W1
FEBRUARY W2 W3 W4
2014
KEGIATAN No HYDRO TESTING PURGING FINISHING - PAINTING (COLOR CODE)
RESPONSIBL KSO KSO
OTHER INTERFACE PROJECTS CIVIL CONSRUCTION GROUND PREPARATION SATELITE - PIPE SUPPORT MAIN PIPING - STEEL SUPPORT ETC
KSO KSO KSO KSO
PIPE SUPPORT - STRUCTURE GROUND / SOIL WORKS ELECTRICAL INSTALLATION PRECOM, INSPECTION MECHANICAL COMPL COMMISIONING AND START UP READY FOR ON STREAM
KSO KSO KSO KSO
SUPPORT - OTHERS SITE WORK FLOOR YARD PREPARATION
KSO
PIPE RACKS MOBILISASI / TRANSPORT ALAT KE SITE WELDING EQUIPMENT
KSO KSO
ALAT BERAT POWER GENERATOR LIGHTING - WORK SITE KENDARAAN KARYAWAN - LIGHT VEHICLE HSSE HSSE EQUIPMENT HSSE SURVEILANCE / CONTROL HOUSE KEEPING - CLEANING PERSONNEL
KSO
SEPTEMBER W1 W2 W3 W4
W1
OCTOBER W2 W3 W4
NOVEMBER W1 W2 W3 W4
W1
DECEMBER W2 W3 W4
W1
JANUARY W2 W3 W4
W1
FEBRUARY W2 W3 W4
2014
KEGIATAN No RESPONSIBL MAN POWER STRUCTURE MOBILISASI KARYAWAN KE PDK MAKMUR
KSO
PERSIAPAN RUMAH TINGGAL
KSO
16 SEPTEMBER 2014 FGHS
SEPTEMBER W1 W2 W3 W4
W1
OCTOBER W2 W3 W4
NOVEMBER W1 W2 W3 W4
W1
DECEMBER W2 W3 W4
W1
JANUARY W2 W3 W4
W1
FEBRUARY W2 W3 W4