Tugas Yogi Mulyadi [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

NAMA : YOGI MULYADI NO BP : 1710003433012 KELAS : D



TUGAS BAHASA INGGRIS TASK 1.



B: What is being described ? Choose from the words on the opposite page. 1. This stucture is built across a river to hold back the water to produce power,improve navigation or control flooding. (DAM) 2. This structure is built along the banks of a river or along the coast to hold back water and prevent flooding. (DIKE) 3. This carries a road or railway a cross water. (CLAPPER BRIDGE) 4. This carries water (canal or river) a cross land usually over a valley. (SUSPENSION BRIDGE) 5. The section of canal where the water level changes to raise boats from one level to the next. (PIER) 6. These allow water to flow in or out in order to change the water level in a canal. (WEIR) 7. A deep hole in in the ground where people can get water. (WELL) 8. These are dug underground for roads and railways. (CULVERT) 9. This is the prosess of removing salt from sea water. (EARTHMOVER) 10. This large powerful vechile uses a large blade blade to move earth and rocks. (EXCAVATOR) 11. This machine or ship is used for removing send and mud from the bottom of a river or a harbour. (DREDGER) 12. This machine is used for rolling tarmae or asphalt flat a road suface. (ROAD ROLLER)



C. A Civil engineer is showing an international visitor xaround. Complete the text with words from roads from the opposite page. Here we are on one of our town streets . As you cansee the road is not flate. It has a (A)..... (Drainage) .This is to allow rain water to run off the surface and into the drains at the outside. The highest part of the road is the (B)..... (Macadam) in the centre. A (C)... (Manhole) . carrying waste water runs below the surface of the road. At certain points along the road youll find large (D)..... (Soft Shouther) Which alow engineers to go down and inspact electricity and telephone cable which also run below the road . On either side of the road there is a raised (E).... (Pavement) .for pedestrians which is edged with (F).... (Tarsac) . siones. The black suface we use nowadays is a variaty of (G)..... (Asphalt) . It was invented by a man of that name whose company was later called Tarmac . As you can see this road needs to be resurfaced. There are a number of (H)..... (Sewer) Following the heavy rain we had last month. Now here we are on a (I)...... (Main) road out of twon. There are no pavementens here. Grass is allowed to grow along the edges and provides a (J).... (Kerb) Over there you can see a (K)..... (Culvert) carrying a small stream under the road .



TASK 2



1.match the following words and pahraseswith their defanitions. Answer: 1.Feasibility study 2.Site investigation 3.Maintenance 4.Soil mechanics



= Investigation to assess both financial and engineering aspects of a project. = Building or installation which is built, supplied,or installed complate and ready to operate. = Activities carried out after the project to ensure problems are solved. = Exstensive investigation to evaluate the load bearing qualities and stability of the ground.



5.Specifications



= Dimention and measurenmens



6.Technical drawings



= to order a plan to be carried out.



7.Commission a project



= Study of the proposed location to assess geology of the area



8.Costing system



= Procedure to monitor the costof a project so that management can get information on development.



9.Tender



= Offer of a bid for engineering contract.



10.Turnkey project



=Deatailed plan of proposed sructures.



2. Put the following taks into the appropriate phase of construction. Anwer: Phase Before construction During construction After construction



Tasks -Consulting engineer communication with client - Employdment of consulting engineer. -Feasibility study -Prelinary site investigation. -Extensive site investigation consulting engineer with contractors -Detailed design maintenance



3.The following extract is from a latter written by a qualified civil engineer in response to a job advertisement. Complete the extract by unscrambling the latters in brackets. I am writing in connection with the job advertisement for a civil (A).... Engineer (Renigeen). Which appreared in todays civil engineering. I have a degree in (B)..... difficult (rnlutiasid) engineering. After Graduation. I worked for four years at locke Engineers in the fild of (C)....... Constructions (onscorutiton) consulting. During my time there . I specialized in (D)..... difficult (ilamse) preparation and construction (E)......... difficult (ehdnsgulic). I am particulary interested in the opportunities to further develop my skills ,especially in the followingareas:   



Davelopment of (F)... Draft (tdfar) work plans. (G)....... Site (etis) investigation. Preparation of (H)........ difficult (nictel) communications.