DAFTAR HARGA DASAR SATUAN UPAH No.



URAIAN



SATUAN



HARGA SATUAN ( Rp.)



1.



Pekerja



Jam



10,783.00



2.



Tukang



Jam



13,375.00



3.



Mandor



Jam



15,533.00



4.



Operator



Jam



15,967.00



5.



Pembantu Operator



Jam



14,667.00



6.



Sopir / Driver



Jam



14,667.00



7.



Pembantu Sopir / Driver



Jam



12,508.00



8.



Mekanik



Jam



15,967.00



9.



Pembantu Mekanik



Jam



12,508.00



12.



File : 527059994.xls



KETERANGAN ( hari )



DAFTAR HARGA DASAR SATUAN BAHAN No.



URAIAN



SATUAN



HARGA SATUAN ( Rp.)



1.



Tanah urugan Biasa



M3



29,600.00



2.



Tanah urugan pilihan



M3



29,600.00



3.



Pasir Beton



M3



130,300.00



4.



Pasir urug



M3



130,300.00



5.



Sirtu



M3



0.00



6.



Batu pecah ukuran 10,0 - 15,0 cm



M3



147,600.00



7.



Batu pecah ukuran 5,0 - 7,0 cm



M3



175,000.00



8.



Batu pecah ukuran 4,0 - 6,0 cm



M3



185,000.00



9.



Batu pecah ukuran 3,0 - 5,0 cm



M3



200,000.00



10.



Batu pecah ukuran 2,0 - 3,0 cm



M3



250,000.00



11.



Batu pecah ukuran 1,0 - 2,0 cm



M3



275,000.00



12.



Batu pecah ukuran 0,50 - 1,0 cm



M3



300,000.00



13.



Debu batu



M3



350,000.00



KETERANGAN



Berlanjut ke halaman berikut



File : 527059994.xls



DAFTAR HARGA DASAR SATUAN BAHAN Lanjutan



No.



14



15



16



17



18



19



20



21



22



23



24



25



26



URAIAN



SATUAN



HARGA SATUAN ( Rp.)



Agregat untuk Pondasi Klas A : - Agregat Kasar - Agregat Halus



M3 M3



541,660.00 372,428.00



Agregat untuk Pondasi Klas B : - Agregat Kasar - Agregat Halus



M3 M3



519,713.00 114,177.00



Agregat untuk Pondasi Klas S : - Agregat Kasar - Agregat Halus



M3 M3



558,229.00 114,651.00



Agregat untuk Pondasi Klas C (Pengkkrikilan) : - Agregat Kasar - Agregat Halus



M3 M3



72,457.00 107,188.00



Agregat untuk Pondasi Agregat semen : - Agregat Kasar - Agregat Halus



M3 M3



520,727.00 119,825.00



Agregat untuk HRSS Klas B : - Agregat ukuran 0,50 - 2,00 Mm - Agregat ukuran 0,00 - 0,50 Mm - Pasir halus - Filler



M3 M3 M3 M3



440,010.00 470,000.00 119,825.00 1,012.00



Agregat untuk Lapen Permukaan : - Agregat Pokok - Agregat Pengunci - Agregat Penutup



M3 M3 M3



511,100.00 555,025.00 588,850.00



Agregat Lapen Pondasi : - Agregat Kasar - Agregat Halus



M3 M3



472,625.00 555,025.00



Agregat untuk HRS-Wearing Course : - Agregat ukuran 0,50 - 2,00 Mm - Agregat ukuran 0,00 - 0,50 Mm - Pasir halus - Filler



M3 M3 M3 M3



429,000.00 470,000.00 119,825.00 1,012.00



Agregat untuk HRS-Base Course : - Agregat ukuran 0,50 - 2,00 Mm - Agregat ukuran 0,00 - 0,50 Mm - Pasir halus - Filler



M3 M3 M3 M3



429,000.00 470,000.00 119,825.00 1,012.00



Agregat untuk Beton (uk. Max. 3,50 cm) - Agregat Kasar - Agregat Halus



M3 M3



516,109.00 119,825.00



Agregat untuk Beton (uk. Max. 2,50 cm) - Agregat Kasar - Agregat Halus



M3 M3



566,425.00 119,825.00



Agregat untuk Beton (uk. Max. 19,00 cm) - Agregat Kasar - Agregat Halus



M3 M3



566,425.00 119,825.00



KETERANGAN



Berlanjut ke halaman berikut



File : 527059994.xls



DAFTAR HARGA DASAR SATUAN BAHAN Lanjutan



No.



URAIAN



SATUAN



HARGA SATUAN ( Rp.)



KETERANGAN



27



Beton K-400 Beton K-350 Beton K-300 Beton K-250 Beton K-225 Beton K-175 Beton Siklop K-175 Beton K-150 Beton K-125 Beton B0



M3 M3 M3 M3 M3 M3 M3 M3 M3 M3



1,826,355.20 Lokasi Pekerjaan 1,773,609.20 -sda'-sda'1,670,217.20 -sda'-sda'-sda'-sda'-sda'-sda'1,400,013.00 -sda'-



28



Baja Tulangan u-22 Baja Tulangan u-24 Baja Tulangan u-32 Baja Tulangan u-39 Baja Tulangan u-48



Kg Kg



14,500.00 Lokasi Pekerjaan 21,500.00 Lokasi Pekerjaan



29 30



Kawat beton (Bindrat) Strand Kawat Beronjong



Kg Kg Kg



15,000.00 Lokasi Pekerjaan 45,000.00 Lokasi Pekerjaan 40,000.00 Lokasi Pekerjaan



31



Rambu Lalu-lintas (termasuk tiang)



Bh



Base Camp



32



Pipa galvanis dia. 1.0" Pipa galvanis dia. 2.0" Pipa galvanis dia. 4.0"



M' M' M'



25,000.00 Base Camp 45,000.00 80,000.00



-sda'-sda'-



Road Paint/Serbuk Thermoplastic Tinner Road Paint Glass Bit



Kg



75,000.00 Base Camp 25,000.00 45,000.00



-sda'-sda'-



34



Guard Rall (rel Pengaman)



M'



35



Aspal Panas I (aspal drum)



Drum Kg



36



Aspal Panas II (aspal curah)



Kg



37



Solar



Ltr



8,000.00 Base Camp



38



Bensin



Ltr



8,500.00 Base Camp



39



Minyak Tanah



Ltr



12,033.00 Base Camp



40



Minyak Pelumas



Ltr



31,333.00 Base Camp



41



Semen



Zak Kg



103,658 Base Camp 2,073.16



42



Kayu Bekisting



Dos



75,000.00 Lokasi Pekerjaan



43



Kayu Klas II : - Balok Kayu Klas II : - Papan



M3 M3



2,950,000.00 Pelabuhan terdekat 1,867,000.00



44



Kayu Belian : - Balok Kayu Klas II : - Papan



M3 M3



6,200,000.00 Base Camp 6,200,000.00



33



Base Camp 1,402,149.75 Base Camp 9,347.67 12,395.00 Lokasi Pencampuran Aspal



Berlanjut ke halaman berikut



File : 527059994.xls



DAFTAR HARGA DASAR SATUAN BAHAN Lanjutan



No.



URAIAN



SATUAN



HARGA SATUAN ( Rp.)



KETERANGAN



45



Cerucuk dia. 10-12 cm panj. 400 Cm Cerucuk dia. 15-20 cm panj. 400 Cm



Btg Btg



17,400.00 Lokasi Pekerjaan Lokasi Pekerjaan



46



Kayu Bakar



M3



91,500.00 Base Camp



47



Geotextile



M3



Base Camp



48



Pipa porous untuk sub drain



M'



Lokasi Pekerjaan



49



Pipa Baja dia. 100 cm Pipa Baja dia. 80 cm Pipa Baja dia. 60 cm Pipa Baja dia. 40 cm Baja Profil



M' M' M' M' M'



50



Baja dgn tegangan leleh 100 Kg/cm2



Kg



51



Bout



Btg



4,000 Base Camp



52



Beugel



Btg



27,500 Base Camp



53



Paku biasa



Kg



15,000.00 Base Camp



54



Paku belian



Kg



Base Camp



55



Cat kilat



Kg



40,000.00 Base Camp



56



Tinner



Ltr



17,500.00



-sda'-



57



Cat dinding



Kg



25,000.00



-sda'-



58



Air



Ltr



50.00 Lokasi Pekerjaan



59



Bahan tambahan (addetive) beton



Ltr



25,000.00 Lokasi Pekerjaan



60



Baja tegangan leleh 3200 Kg/Cm2



Kg



61



Bahan2 untuk perkerasan beton : a. Sealer b. Curring compound c. Crack inducer (kayu klas II 3x6x380 cm) d. Kap tie-bar/dowel (Pipa PVC panj. 50 cm) e. Plastik penyekat f. Cat Anti Karat



Kg Kg Kg Btg M2 Kg



Bahan Cat : *) Kilat Bahan Cat : *) Dinding Bahan Cat : *) Weathernound emultion Bahan Cat : *) Tinner Bahan Cat : *) Anti Karat (aluminium epxy mast



Kg Kg Kg Ltr Kg



62



File : 527059994.xls



22,750,000 26,000,000 33,750,000 54,350,000 140,000.000



Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan



Lokasi pekerjaan Lokasi pekerjaan Lokasi pekerjaan Lokasi pekerjaan Lokasi pekerjaan Lokasi pekerjaan Base Camp 65,000.00



-sda'-sda'-sda'-sda'-



Formulir Penentuan Harga Bahan Bahan : Semen No



Uraian Kegiatan



1 Harga di Pontianak



2 Handling



Biaya Jumlah Kombinasi Rp/satuan Jumlah (Rp) (Rp) Rp/ton



-



###



-



1,140,000.00



-



3 Transport ke proyek



Rp/ton



300,000.00



300,000.00



4 Pembongkaran, gudang



Rp/ton



1,250.00



1,250.00



5 Waste 5%



Rp/ton



57,000.00



57,000.00



subtotal



Rp/ton



1,498,250.00



6 Keuntungan & Overhead Rp/ton 5 % (hanya utk pekerjaan harian)



74,912.50



total jumlah



Rp/ton Rp/zak



1,573,162.50 78,658.13



7 Harga Netto 8 Harga setelah ditambah



Rp/zak Rp/zak



25,000.00 103,658.13



Bahan : Aspal No



Uraian Kegiatan



Biaya Jumlah Kombinasi Rp/satuan Jumlah (Rp) (Rp)



1 Harga di pelabuhan dari Jakarta



Rp/ton



###



6,666,666.67



2 Handling



Rp/ton



1,500.00



1,500.00



3 Transport ke proyek



Rp/ton



466,666.67



466,666.67



4 Pembongkaran, gudang



Rp/ton



1,500.00



1,500.00



5 Waste 2%



Rp/ton



4,300.00



4,300.00



subtotal



Rp/ton



7,140,633.33



6 Keuntungan & Overhead Rp/ton 5 % (hanya utk pekerjaan harian)



357,031.67



total jumlah



Rp/ton Rp/kg



7,497,665.00 7,497.67



7 Harga Netto 8 Harga setelah ditambah



Rp/kg Rp/kg



1,850.00 9,347.67