10 0 233 KB
PAKET
KONSULTASI DAN PERENCANAAN PEMBUATAN JALAN BARU SUGIHMANIK - DAPLANG
PT. SEMEN GROBOGAN
PROVINSI
-
NO. LINK
J:\SEMEN\logo-undip-bw-256x300.jpg
KABUPATEN GROBOGAN
LOKASI
TEAM LEADER
KONSULTAN PERENCANA
JAWA TENGAH
JUDUL GAMBAR :
DRAFTMAN
NO. GAMBAR :
DETAIL RIGID Ir. MUHROZI, MT.
A 500.0000
HIGHWAY ENGINEER
FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO Ir. SUPRIYONO, MT.
100
75
SKALA :
75
100 50
6-10
500.0000
50.0000 50.0000 45
45
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000 5.0000
7.5
65 125.0000
350
700
300.0000 50.0000
100.0000
Batang Tie bar Ø19 - 600
150.0000
7.5
7.5
150.0000
B
@
Jarak @ = 30 Cm
B
5.0000
5.0000 60
50
Wire mesh M7-SNI (Ø7 - 150x150)
@
Jarak @ = 30 Cm
50.0000
350
Batang Dowel Ø36 - 300 7.5
5.0000 22.5
22.5
300
22.5
300
22.5 7 x 60 Cm
7 x 60 Cm
500.0000
500.0000
600
Potongan A - A Tanpa Skala (Satuan mm)
A Denah Penulangan Perkerasan Jalan Beton Pada Main road Skala 1 : 100
6-10 100
75
50 50.0000 0.9860
C 65
150.0000
125.0000
300.0000 100.0000 150.0000
10
225 500.0000
225
500.0000
C Denah Perkerasan Jalan Beton Pada Frontage road Skala 1 : 100
Potongan B - B Tanpa Skala (Satuan mm)
Profil L 3.3.0,3 Profil siku L 4.4.0,4 Sambungan di las
Papan Kamper 250
Permukaan Eksisting
225 200.0000
180
10
200
Patok
200
Potongan C - C Tanpa Skala (Satuan mm)
Detail dudukan wiremesh Tanpa Skala (Satuan mm)
14 / 01
H = 1 : 100 V = 1 : 100
TOFA KRISTI
50
200 - 300
C:\Users\seven\Downloads\Logo SGB.jpg
Bekisting Tepi Tanpa Skala (Satuan mm)