11 0 135 KB
Document No. IND.DF.CS.IPM.F11.00
AIR BLOWER CHECKLIST Client:
Issue Date : 12-09-2016
Site :
Contract Ref :
DETAILS OF BLOWER Manufacturer : Actual Work Area : Sr. No
Machine Serial No Frequency
CHECKLIST
YES
1
Double Insulated plastic body
2
Machine body without Cracks / Cut / Damage
3
Switch physical conditions is good
4
“ON” & “OFF” switch functioning
5
Screws of body frame are in place
6
Double insulated cable
7
Cable free from Cracks / Cut / Damage
8
Cable of appropriate rating
9
Cable is joints free within 3 meter distance
10
Iron clad type electric pin
11
Normal machine sound during operation
12
Cable Sleeve availability near machine entry
13
Cable Sleeve availability near electric pin entry
14
Safe cable extension joints
15
“ON / OFF” switch lock available
16
Switch lock is sound and working
17
Machine is inspected from Maintenance dept.
18
Inspection label available & pasted
19
Expiry of inspection date mentioned on label
INSPECTION TEAM Inspection Authority : Acceptance Criteria SIEMENS Maintenance Rep
:
SIEMENS Safety Rep
:
NO
Name Tools Or machine should be approved, Only, if all aspects are verified as YES in checklist.
: : N/A
Date
Monthly REMARKS
Signature
Note: If the machine / tool is found to be “Not Safe for Use” – please identify, by putting a Red tag and remove from workplace. Next Due Date of Inspection:______________________ Digital Factory – Customer Services
Page 1 of 1
IN DF CS IPM