11 0 228 KB
ANALISA TEKNIS PEKERJAAN
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Urugan dan Pemadatan Tanah untuk Sub Grade (M3) (Asumsi Jarak Angkut 5 Km) 6001
201
Pekerja
OH
0.0087
6001
206
Mandor
OH
0.0022
6001
651
Water Tank
Jam
0.0070
6001
709
Excavator (/Hari)
Hari
0.0087
6001
621
Dump Truck 5 Ton
Jam
0.1839
6001
637
Motor Grader
Jam
0.0020
6001
649
Vibrator Roller
Jam
0.0543
6001
1264
Tanah Urug
M3
1.2000
Pekerjaan Sirtu untuk Sub Base (M3) CBR >25% (Asumsi Jarak Angkut 5 Km) 6002
201
Pekerja
OH
0.0225
6002
206
Mandor
OH
0.1160
6002
651
Water Tank
Jam
0.0104
6002
637
Motor Grader
Jam
0.0090
6002
643
Tandem Roller
Jam
0.0428
6002
709
Excavator (/Hari)
Hari
0.0080
6002
621
Dump Truck 5 Ton
Jam
0.3014
6002
1260
Sirtu
M3
1.1000
Pekerjaan Batu Pecah untuk Sub Base (M3) CBR >80% (Asumsi Jarak Angkut 5 Km) 6003
206
Mandor
OH
0.0117
6003
201
Pekerja
OH
0.0225
6003
621
Dump Truck 5 Ton
Jam
0.3091
6003
709
Excavator (/Hari)
Hari
0.0080
6003
637
Motor Grader
Jam
0.0090
6003
651
Water Tank
Jam
0.0141
6003
643
Tandem Roller
Jam
0.1071
6003
1205
Agregat Pecah Mesin 20-30 mm
M3
1.1000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lean Concrete (M3) 6004
206
Mandor
OH
0.0201
6004
201
Pekerja
OH
0.1205
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6004
202
Tukang
Jam
0.0201
6004
652
Wheel Loader
Jam
0.0400
6004
636
Mixer Truck
Jam
0.2400
6004
609
Concrete Pan Mixer (Batching Plant)
Jam
0.0400
6004
626
Generator Set
Jam
0.0400
6004
1102
Semen PC
Kg
400.0000
6004
1205
Agregat Pecah Mesin 20-30 mm
M3
0.8900
6004
1249
Pasir Beton
M3
0.5400
6004
7005
Additive
Ltr
1.0500
6004
7007
Air (Kapal)
M3
0.2000
Beton Semen Bertulang Mutu K-350, Fr= 45 kg/cm3 untuk Lapisan Atas APron , Run 6005
243
Tukang Batu
OH
0.0200
6005
201
Pekerja
OH
0.0140
6005
206
Mandor
OH
0.0207
6005
671
Slip Form Paver
Jam
0.0007
6005
652
Wheel Loader
Jam
0.1200
6005
651
Water Tank
Jam
0.1200
6005
636
Mixer Truck
Jam
0.2400
6005
609
Concrete Pan Mixer (Batching Plant)
Jam
0.1400
6005
626
Generator Set
Jam
0.0400
6005
1102
Semen PC
Kg
750.0000
6005
1205
Agregat Pecah Mesin 20-30 mm
M3
0.8200
6005
1249
Pasir Beton
M3
0.4700
6005
2617
Wire Mesh
M3
25.0000
6005
7005
Additive
Ltr
1.0500
6005
7007
Air ( Kapal)
M3
0.2000
6005
7142
Joint Sealant
M1
3.5000
Sirtu Padat CBR > 25% (Sub Base) tebal = 30 cm (M2) 6006
201
Pekerja
OH
0.0680
6006
206
Mandor
OH
0.0035
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6006
606
Buldozer
Jam
0.0309
6006
637
Motor Grader
Jam
0.0309
6006
643
Tandem Roller
Jam
0.0009
6006
651
Water Tank
Jam
0.0309
6006
1266
Sirtu
M3
0.3000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lapisan Agregat Base Padat CBR > 80% tebal = 25 cm (M2) 6007
201
Pekerja
OH
0.0056
6007
206
Mandor
OH
0.0291
6007
621
Dump Truck 5 Ton
Jam
0.0258
6007
637
Motor Grader
Jam
0.0258
6007
649
Vibrator Roller
Jam
0.0234
6007
651
Water Tank
Jam
0.0258
6007
1205
Agregat Pecah Mesin 20-30 mm
M3
0.3000
Lapisan Agregat Base Padat CBR > 80% tebal = 35 cm (M2) 6008
201
Pekerja
OH
0.0079
6008
206
Mandor
OH
0.0408
6008
621
Dump Truck 5 Ton
Jam
0.0361
6008
637
Motor Grader
Jam
0.0361
6008
649
Vibrator Roller
Jam
0.0328
6008
651
Water Tank
Jam
0.0361
6008
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.3500
Lapisan/ Overlay Aspal Penetrasi Tebal 7,5 cm Padat (M2) 6009
206
Mandor
OH
0.0233
6009
201
Pekerja
OH
0.3513
6009
643
Tandem Roller
Jam
0.0060
6009
802
Alat Bantu
Ls
0.0030
6009
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
8.0000
6009
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.1000
6009
1249
Pasir Beton
M3
0.0020
6009
621
Dump Truck 5 Ton
Jam
0.1390
6009
6019
Kayu Bakar
M3
0.0020
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lapisan/ Overlay Aspal kolakan Tebal 7,5 cm Padat (M2) 6010
201
Pekerja
OH
0.1513
6010
206
Mandor
OH
0.0233
6010
645
Tire Roller
Jam
0.0070
6010
802
Alat Bantu
Ls
0.0030
6010
643
Tandem Roller
Jam
0.0070
6010
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
10.0000
6010
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.1000
6010
1248
Pasir Aspal/ Abu Batu/ Screening
M3
0.0100
6010
1249
Pasir Beton
M3
0.0100
6010
621
Dump Truck 5 Ton
Jam
0.1390
6010
7026
Minyak Tanah
Ltr
0.2000
6010
6019
Kayu Bakar
M3
0.0400
Lapisan/ Overlay Aspal Beton (AC)Tebal 7,5 cm Padat (M2) 6011
201
Pekerja
OH
0.1875
6011
206
Mandor
OH
0.0259
6011
643
Tandem Roller
Jam
0.0033
6011
652
Wheel Loader
Jam
0.0050
6011
645
Tire Roller
Jam
0.0048
6011
621
Dump Truck 5 Ton
Jam
0.1550
6011
603
Asphalt Finisher
Jam
0.0050
6011
601
AMP
Jam
0.0082
6011
626
Generator Set
Jam
0.0042
6011
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
11.9000
6011
1205
Agregat Pecah Mesin 10-20 mm
M3
0.0509
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6011
1206
Agregat Pecah Mesin 5-10 mm
M3
0.0518
6011
1248
Pasir Aspal/ Abu Batu/ Screening
M3
0.0518
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lapisan/ Overlay Aspal Penetrasi Tebal 5 cm Padat (M2) 6012
201
Pekerja
OH
0.1009
6012
206
Mandor
OH
0.0155
6012
643
Tandem Roller
Jam
0.0020
6012
802
Alat Bantu
Ls
0.0020
6012
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
5.0000
6012
621
Dump Truck 5 Ton
Jam
0.0950
6012
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.0667
6012
1249
Pasir Beton
M3
0.0013
6012
6019
Kayu Bakar
M3
0.0013
Lapisan / Overlay Aspal Kolakan 5 cm Padat (M2) 6013
201
Pekerja
OH
0.1009
6013
206
Mandor
OH
0.0155
6013
643
Tandem Roller
Jam
0.0020
6013
645
Tire Roller
Jam
0.0020
6013
802
Alat Bantu
Ls
0.0020
6013
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
6.6667
6013
1249
Pasir Beton
M3
0.0667
6013
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.0667
6013
621
Dump Truck 5 Ton
Jam
0.0927
6013
1248
Pasir Aspal / Abu Batu / Screening
M3
0.0067
6013
6019
Kayu Bakar
M3
0.0267
Lapisan / Overlay Aspal Beton (AC) 5 cm Padat (M2) 6014
201
Pekerja
OH
0.1250
6014
206
Mandor
OH
0.0173
6014
643
Tandem Roller
Jam
0.0022
6014
652
Wheel Loader
Jam
0.0033
6014
645
Tire Roller
Jam
0.0032
6014
621
Dump Truck 5 Ton
Jam
0.1033
6014
603
Asphalt Finisher
Jam
0.0033
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6014
601
AMP
Jam
0.0033
6014
626
Generator Set
Jam
0.0028
6014
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
7.9333
6014
1205
Agregat Pecah Mesin 10-20 mm
M3
0.0339
6014
1206
Agregat Pecah Mesin 5-10 mm
M3
0.0345
6014
1248
Pasir Aspal / Abu Batu / Screening
M3
0.0345
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lapisan Cement Treated Base Course (CTBC) (M3) 6015
201
Pekerja
OH
0.3797
6015
206
Mandor
OH
0.0543
6015
649
Vibrator Roller
Jam
0.0330
6015
621
Dump Truck 5 Ton
Jam
0.1073
6015
645
Tire Roller
Jam
0.2300
6015
609
Concrete Pan Mixer (Batching Plant)
Jam
0.0590
6015
651
Water Tank
Jam
0.0160
6015
652
Wheel Loader
Jam
0.0313
6015
603
Asphalt Finisher
Jam
0.0400
6015
1102
Semen PC
Kg
256.0000
6015
1205
Agregat Pecah Mesin 20 - 30 mm
M3
1.2000
Lapisan Cement Treated Base Course Tebal 25 cm (M2) 6016
201
Pekerja
OH
1.5625
6016
206
Mandor
OH
0.1953
6016
637
Motor Grader
Jam
0.3045
6016
645
Tire Roller
Jam
0.0243
6016
649
Vibrator Roller
Jam
0.0004
6016
651
Water Tank
Jam
0.0243
6016
652
Wheel Loader
Jam
0.0021
6016
1102
Semen PC
Kg
25.2000
6016
1205
Agregat Pecah Mesin 10-20 mm
M3
0.0127
6016
1206
Agregat Pecah Mesin 5-10 mm
M3
0.0130
Lapisan Asphalt Treated Base (ATB) Tebal 7,5 cm (M2) 6017
201
Pekerja
OH
0.1875
6017
206
Mandor
OH
0.0259
6017
643
Tandem Roller
Jam
0.0033
6017
652
Wheel Loader
Jam
0.0050
6017
645
Tire Roller
Jam
0.0048
6017
621
Dump Truck 5 Ton
Jam
0.1550
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6017
603
Asphalt Finisher
Jam
0.0050
6017
601
AMP
Jam
0.0082
AnisID
ResID
6017
626
6017
Nama Bahan/Alat/Upah
Satuan
Koef.
Generator Set
Jam
0.0042
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
9.1402
6017
1248
Pasir Aspal/ Abu Batu/ Screening
M3
0.0023
6017
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.0676
6017
1206
Agregat Pecah Mesin 5-10 mm
M3
0.0475
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Lapisan Asphalt Treated Base (ATB) Tebal 5 cm (M2) 6018
201
Pekerja
OH
0.1250
6018
206
Mandor
OH
0.0173
6018
643
Tandem Roller
Jam
0.0022
6018
652
Wheel Loader
Jam
0.0033
6018
645
Tire Roller
Jam
0.0032
6018
621
Dump Truck 5 Ton
Jam
0.1033
6018
603
Asphalt Finisher
Jam
0.0033
6018
601
AMP
Jam
0.0055
6018
626
Generator Set
Jam
0.0028
6018
1024
Aspal AC 60-70 (ex. Shell Drum)
Kg
6.0935
6018
1248
Pasir Aspal/ Abu Batu/ Screening
M3
0.0015
6018
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.0451
6018
1206
Agregat Pecah Mesin 5-10 mm
M3
0.0317
Bekisting (M2) 6019
206
Mandor
OH
0.1000
6019
214
Kepala Tukang Kayu
OH
0.5000
6019
252
Tukang Kayu
OH
5.0000
6019
201
Pekerja
OH
2.0000
6019
2201
Paku
Kg
4.0000
6019
6033
Kayu Papan Kelas III
M3
0.4000
6019
6084
Triplek t= 6 mm
Lbr
1.7000
Lean Concrete > K100 tebal 20 cm 6020
201
Pekerja
OH
0.0241
6020
202
Tukang
OH
0.0040
6020
206
Mandor
OH
0.0040
6020
609
Concrete Pan Mixer (Batching Plant)
Jam
0.0080
6020
652
Wheel Loader
Jam
0.0080
6020
636
Mixer Truck
Jam
0.0480
AnisID
ResID
6020
626
6020
Nama Bahan/Alat/Upah
Satuan
Koef.
Generator Set
Jam
0.0080
1102
Semen PC
Kg
80.0000
6020
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.1780
6020
1249
Pasir Beton
M3
0.1080
6020
7005
Additive
Ltr
0.2100
6020
7007
Air ( Kapal)
M3
0.0400
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Dowel Bar D= 25 mm 6021
2021
Dowel Bar D = 25 mm
Bh
1.0000
Slab Beton mutu K 350, tebal = 35 cm (M2) 6022
201
Pekerja
OH
0.0800
6022
202
Tukang
OH
0.0070
6022
206
Mandor
OH
0.0072
6022
609
Concrete Pan Mixer (Batching Plant)
Jam
0.0240
6022
671
Slip Form Paver
Jam
0.0070
6022
652
Wheel Loader
Jam
0.0420
6022
651
Water Tanker
Jam
0.0420
6022
626
Generator Set
Jam
0.0140
6022
636
Mixer Truck
Jam
0.0840
6022
1102
Semen PC
Kg
262.5000
6022
1205
Agregat Pecah Mesin 20 - 30 mm
M3
0.2870
6022
1249
Pasir Beton
M3
0.1645
6022
2617
Wire Mesh
Kg
8.7500
6022
7005
Additive
Ltr
0.3675
6022
7007
Air ( Kapal)
M3
0.0700
6022
7142
Joint Sealant
M'
1.2250
Prime Coating 2,5 Kg/m2 6023
201
Pekerja
OH
0.0018
6023
206
Mandor
OH
0.0013
6023
604
Asphalt Sprayer
Jam
0.2640
6023
607
Compressor
Jam
0.0320
6023
7026
Minyak Tanah
Ltr
0.3166
6023
1024
Aspal AC 60-70 (Ex. Shell Drum)
Kg
2.4000
Take Coating 1,5 Kg/m2
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6024
201
Pekerja
OH
0.0113
6024
206
Mandor
OH
0.0009
6024
604
Asphalt Sprayer
Jam
0.2400
6024
607
Compressor
Jam
0.0320
6024
1024
Aspal AC 60-70 (Ex. Shell Drum)
Kg
1.2000
6024
7026
Minyak Tanah
Ltr
0.1166
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengecatan / Marking (m2) 6025
201
Pekerja
OH
0.1000
6025
206
Mandor
OH
0.0220
6025
640
Sprayer Cat
Jam
0.0480
6025
813
Alat Bantu Pengecatan
Ls
1.0000
6025
7045
Thinner
Ltr
0.2100
6025
7118
Cat Marka
Kg
1.0500
Pengukuran (m2) 6026
201
Pekerja
OH
0.0050
6026
209
Juru Gambar
OH
0.0020
6026
272
Mandor (Pengukuran)
OH
0.0140
6026
666
Theodolite
Jam
0.0240
6026
667
Waterpass
Jam
0.0240
6026
674
Mistar Ukur
Jam
0.0480
Begisting Slab Beton (Plat Besi) (m2) 6027
206
Mandor
OH
0.0667
6027
202
Tukang
OH
0.2000
6027
201
Pekerja
OH
0.8000
6027
624
Flatbed Truck 3,5 Ton
Jam
0.0386
6027
802
Alat Bantu
Ls
1.0000
6027
827
Pabrikasi
Ls
1.0000
6027
2012
Besi Plat
Kg
0.3240
6027
2214
Besi Siku
Kg
2.6790
6027
2999
Material Bantu Bekisting Plat Besi
Ls
1.0000
OH
0.1050
Baja Tulangan Dowel/Tie Bar Support (U-40 Ulir) (Kg) 6028
201
Pekerja
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6028
202
Tukang
OH
0.0350
6028
205
Kepala Tukang
OH
0.0350
6028
2020
Dowel and Tie Bar
Kg
1.0500
6028
2303
Kawat Beton
Kg
0.0200
6028
802
Alat Bantu
Ls
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Peralatan Utama CCTV (Alt-1) 6101
9308
Coaxial Cable
M'
1.0000
6101
9309
Control Cable 2 Pair
M'
1.0000
6101
9349
Supply Cable
M'
1.0000
6101
9827
Pan / Tilt Head
BH
1.0000
6101
9861
CCD Camera
Buah
1.0000
6101
9862
Infra Red Camera
Buah
1.0000
6101
9863
Monitor 14"
Buah
1.0000
6101
9864
Monitor 9"
Buah
1.0000
6101
9866
Remote Control PAN/TILS
Buah
1.0000
6101
9867
Sequantial Switcher 10:1
Buah
1.0000
6101
9868
Sequantial Switcher 3:1
Buah
1.0000
6101
9869
Video Distributor Amplifier
Buah
1.0000
6101
9870
Zoom Lensa 6:1
Buah
1.0000
Pengadaan Peralatan Utama CCTV (Alt-2) 6102
9308
Coaxial Cable
M'
1.0000
6102
9309
Control Cable 2 Pair
M'
1.0000
6102
9349
Supply Cable
M'
1.0000
6102
9827
Pan / Tilt Head
BH
1.0000
6102
9861
CCD Camera
Buah
1.0000
6102
9862
Infra Red Camera
Buah
1.0000
6102
9863
Monitor 14"
Buah
1.0000
6102
9864
Monitor 9"
Buah
1.0000
6102
9866
Remote Control PAN/TILS
Buah
1.0000
6102
9867
Sequantial Switcher 10:1
Buah
1.0000
6102
9868
Sequantial Switcher 3:1
Buah
1.0000
6102
9870
Zoom Lensa 6:1
Buah
1.0000
Unit
1.0000
Pengadaan Peralatan Walktrough Metal Detector 6103
35124
UPS 1 KVA Tipe On Line
AnisID
ResID
6103
35127
Nama Bahan/Alat/Upah Walk Trough Metal Detector
Satuan Unit
Koef. 1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Peralatan Multiview X-Ray Cabin 6104
35117
Peralatan X-Ray (Cabin)
Unit
1.0000
6104
35126
UPS 3 KVA Tipe Online
Unit
1.0000
Pengadaan Peralatan Multiview X-Ray Bagasi 6105
35116
Peralatan X-Ray Bagasi
Unit
1.0000
6105
35128
UPS 5 KVA Tipe Online
Unit
1.0000
Pengadaan Peralatan Multiview X-Ray Cargo 6106
35116
Peralatan X-Ray Cargo
Unit
1.0000
6106
35129
UPS 10 KVA Tipe Online
Unit
1.0000
Unit
1.0000
Unit
1.0000
Unit
1.0000
Unit
1.0000
Unit
1.0000
Unit
1.0000
Pengadaan Peralatan Multiview X-Ray Cabin dengan TIP 6107
35120
6107
35126
Peralatan X-Ray (Cabin) dengan Threat Image Protection (TIP) UPS 3 KVA Tipe Online
Pengadaan Peralatan Multiview X-Ray Bagasi dengan TIP 6108
35119
6108
35126
Peralatan X-Ray (Bagasi) dengan Threat Image Protection (TIP) UPS 3 KVA Tipe Online
Pengadaan Peralatan Multiview X-Ray Cargo dengan TIP 6109
35121
6109
35128
Peralatan X-Ray (Cargo) dengan Threat Image Protection (TIP) UPS 5 KVA Tipe Online
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pemasangan Remote Control 6112
201
Pekerja
OH
1.5000
6112
206
Mandor
OH
0.4000
6112
267
Ahli Line Up / Set Up System
OH
0.5000
6112
268
Ahli Muda Line / Set Up System
OH
1.0000
Pemasangan Unit Camera 6113
201
Pekerja
OH
3.2000
6113
206
Mandor
OH
0.9000
6113
267
Ahli Line Up / Set Up System
OH
2.0000
6113
268
Ahli Muda Line / Set Up System
OH
4.0000
Line Up / Set Up System (OH) 6114
267
Ahli Line Up / Set Up System
OH
1.0000
6114
268
Ahli Muda Line / Set Up System
OH
1.0000
6114
237
Teknisi Line Up / Set Up System
OH
1.0000
Uji Coba System (OH) 6115
267
Ahli Line Up / Set Up System
OH
1.0000
6115
268
Ahli Muda Line / Set Up System
OH
1.0000
6115
237
Teknisi Line Up / Set Up System
OH
1.0000
OH
1.0000
Akomodasi Pemasangan CCTV (OH) 6116
237
Teknisi Line Up / Set Up System
Pemasangan Peralatan Utama Ke Dalam Console (OH)
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6117
201
Pekerja
OH
3.2000
6117
267
Ahli Line Up / Set Up System
OH
1.0500
6117
268
Ahli Muda Line / Set Up System
OH
1.0500
6117
237
Teknisi Line Up / Set Up System
OH
0.0900
Pemasangan / Instalasi Software 6118
267
Ahli Line Up / Set Up System
OH
0.5000
6118
237
Teknisi Line Up / Set Up System
OH
1.0800
Pemasangan Bracket 6119
201
Pekerja
OH
2.0000
6119
237
Teknisi Line Up / Set Up System
OH
1.0000
6119
2303
Kawat Beton
Kg
1.0000
Pemasangan Bracket 6120
540
Pemasangan Cable Audio / Video / Antenna
Unit
1.0000
6120
541
M
1.0000
6120
9871
Pemasangan Cable Power / Penyambungan dari Panel Audio Cable
BH
1.0000
6120
9872
Power Cable
BH
1.0000
6120
9873
Video Cable
BH
1.0000
6120
11045
Btg
1.0000
Pengadaan Bahan Instalasi Cable Tray / Protective Cable
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan dan Pemasangan Karpet (M2) 6121
542
Pengadaan / Pemasangan Karpet
M2
1.0000
Pengadaan Peralatan FIDS 6122
34002
Perangkat Sofware FIDS
Unit
1.0000
6122
34003
Komputer FIDS
Set
1.0000
6122
34003
LCD Monitor 17"
Unit
3.0000
6122
34005
LCD Monitor 29"
Unit
7.0000
6122
9943
BH
7.0000
6122
34006
Printer Dot Matrix
Unit
1.0000
6122
34007
Perangkat Jaringan FIDS
LOT
1.0000
6122
9308
6122
Bracket TV
Coaxial Cable
M'
700.0000
32861
Power Cable NYY 3x16 Sqmm/1kV
M
150.0000
6122
32401
AC 1 PK
Unit
1.0000
6122
35124
UPS 1 KVA Tipe Online
Unit
1.0000
Pengadaan Pemasangan Coaxial Cable (m') 6123
201
Pekerja
OH
0.3200
6123
206
Mander
OH
0.1600
6123
2323
Tyreb (Pengikat Cable)
BH
1.0000
6123
9308
Coaxial Cable
M'
1.0000
Site Acceptant Tes (Ls/Hr) 6124
267
Ahli Line Up / Set Up System
OH
1.0000
6124
268
Ahli Muda Line/ Set Up System
OH
1.0000
Site Training Untuk 1 Teknisi dan 1 Operator (Ls/Hr)
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6125
229
Pengajar
OH
1.0000
6125
543
Uang Saku untuk Pelatihan Teknisi/Operator
OH
2.0000
Site Training Untuk 2 Teknisi + 2 Operator (Ls/Hr) + 1 Personil Dit. Teknis 6126
229
Pengajar
OH
1.0000
6126
543
Uang Saku untuk Pelatihan Teknisi/Operator
OH
5.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Peralatan Penunjang FIDS (Set) 6127
9319
Junction Cable Switch
BH
1.0000
6127
9923
Meja Operator
BH
1.0000
6127
9942
Antena TV
BH
1.0000
6127
9943
Bracket TV
BH
1.0000
6127
9944
Kursi Operator
BH
1.0000
6127
9945
Meja Printer
BH
1.0000
6127
11045
Pengadaan Bahan Instalasi Cable Tray / Protective Cable
Btg
1.0000
Galian Tanah Untuk Gelar Kabel /M3 6128
205
Kepala Tukang
OH
0.3714
6128
201
Pekerja
OH
0.4000
Urugan Tanah Untuk Gear Kabel /M3 6129
205
Kepala Tukang
OH
0.3000
6129
201
Pekerja
OH
0.1643
BH
1.0000
Bata Pengaman Kabel 6130
1214
Bata Merah Press Mesin
1.0000
Pengelaran Series Kabel, Control, BC dan Power (M) 6131
216
Kepala Tukang Listrik
OH
0.0020
6131
206
Mandor
OH
0.0010
6131
255
Tukang Listrik
OH
0.0050
6131
201
Pekerja
OH
0.0230
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pembutan Bak Trafo Size 1 : Runway Light, Apron Dan PAPI 6132
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
1.0000
6132
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.5000
6132
90193
M3
0.0550
6132
90141
M2
0.9000
M3
2.0000
M3
1.0000
M3
0.2850
M2
2.7900
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3) Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
Pembutan Bak Trafo Size 2: Threshold 6133
90023
6133
90033
6133
90193
6133
90141
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01) Menggurug Pasir Urug (M3) (SNI 2835-2008-11) Beton Campuran 1Pc : 2 Ps : 3 Kr(M3) Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pondasi Base Plate Runway, Threshold dan Apron Light/Unit 6134
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
0.7000
6134
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.1000
6134
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
1.7000
6134
90193
M3
0.1500
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Pondasi Taxi Guidance Sign Information/ Unit 6135
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
0.9500
6135
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.3550
6135
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
2.4000
6135
90193
M3
0.2500
6136
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
1.8550
6136
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.7650
6136
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
4.4800
6136
90193
M3
0.6200
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Pondasi Runway Threshold Identification Light (RTIL)/ Unit 6137
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
0.6250
6137
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.2550
6137
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
2.4000
6137
90193
M3
0.2500
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pondasi Wind Direction Indicator (WDI) /unit 6138
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
2.7000
6138
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
1.2000
6138
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
15.0000
6138
90193
M3
3.2500
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pondasi PAPI / unit M3
1.2000
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.5000
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
3.5000
M3
0.4000
6139
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
6139
90033
6139
90141
6139
90193
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Pondasi PAPI 3x30 Meter/ Unit 6140
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
3.5600
6140
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
1.2250
6140
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
19.2000
6140
90193
M3
3.2500
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Pondasi Ground Check PAPI 6141
90023
Galian Tanah Biasa Sedalam 1 M(M3) (SNI 2835-2008-01)
M3
0.2500
6141
90033
Menggurug Pasir Urug (M3) (SNI 2835-200811)
M3
0.0080
6141
90141
Pasang Bekisting Untuk Pondasi (M2) (SNI 7394-2008-20)
M2
0.9000
6141
90193
M3
0.0550
Beton Campuran 1Pc : 2 Ps : 3 Kr(M3)
Pengukuran Tempat-Tempat Kedudukan Runaway Light, PAPI dengan Theodolite 6142
210
Juru Ukur
OH
8.0000
6142
209
Juru Gambar
OH
4.0000
6142
239
Tenaga Ahli
OH
6.0000
6142
666
Theodolite
Jam
8.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengukuran Tempat-Tempat Kedudukan RTIL 6143
209
Juru Gambar
OH
2.0000
6143
210
Juru Ukur
OH
5.0000
6143
239
Tenaga Ahli
OH
0.2000
6143
817
Alat Bantu Pengukuran
Ls
1.0000
Pembuatan gambar design lokasi PAPI 6144
209
Juru Gambar
OH
1.0000
6144
210
Juru Ukur
OH
1.0000
6144
239
Tenaga Ahli
OH
0.5000
Pemasangan Base Plate Anchor Stake PAPI, RTIL Pada Pondasi/ Pcs 6145
201
pekerja
OH
1.5000
6145
206
Mandor
OH
0.2000
6145
238
Teknisi
OH
0.8500
Pemasangan dan penyetelan Runway Light, TXA & TEX, Turning Area dan RTIL/unit 6146
666
6146
9946
6146
210
Theodolite
Jam
5.0000
Patok
Lot
0.2000
Juru Ukur
OH
2.0000
Pemasangan Penyambung dan Instalasi Konektor Kit dan Two Pole Plug 6147
201
pekerja
OH
1.5000
6147
206
Mandor
OH
0.2000
6147
238
Teknisi
OH
0.8500
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pemasangan Dan Penyetelan Montage Box PAPI/ Unit 6148
201
pekerja
OH
1.5000
6148
206
Mandor
OH
0.2000
6148
238
Teknisi
OH
0.8500
Pemasangan dan Instalasi Isolating Transformer/unit 6149
201
pekerja
OH
1.5000
6149
206
Mandor
OH
0.2000
6149
238
Teknisi
OH
0.8500
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
pekerjaan Pemasangan, Penyambungan Dan Instalasi Series Kabel, Power Kabel dan 6150
201
pekerja
OH
0.0230
6150
239
Tenaga Ahli
OH
0.0010
6150
255
Tukang Listrik
OH
0.0050
6150
216
Kepala Tukang Listrik
OH
0.0040
Instalasi CCR termasuk instalasi kabel power dari MVSB ke CCR dan kabel control da 6151
263
Tenaga Ahli Khusus
OH
10.0000
6151
239
Tenaga Ahli
OH
20.0000
6151
255
Tukang Listrik
OH
20.0000
6151
262
Pembantu Tukang Listrik
OH
20.0000
6151
201
pekerja
OH
10.0000
6151
826
Alat Bantu Instalasi Kabel Power
Lot
1.0000
Instalasi WDI / Rotating Beacon 6152
206
Mandor
OH
0.5500
6152
238
Teknisi
OH
2.0000
6152
826
Alat Bantu Instalasi Kabel Power
Lot
1.0000
6152
201
pekerja
OH
3.5100
Instalasi Rotating Beacon 6153
201
Pekerja
OH
3.5100
6153
206
Mandor
OH
0.5500
6153
238
Teknisi
OH
2.0000
6153
826
Alat Bantu Instalasi Kabel Power
Lot
1.0000
Pekerja
OH
3.5100
Instalasi WDI 6154
201
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6154
206
Mandor
OH
0.5500
6154
238
Teknisi
OH
2.0000
6154
826
Alat Bantu Instalasi Kabel Power
Lot
1.0000
Instalasi Remot Control Desk 6155
209
Juru Gambar
OH
4.0000
6155
238
Teknisi
OH
10.0000
6155
239
Tenaga Ahli
OH
10.0000
6155
206
OH
10.0000
6155
206
Mandor Alat Bantu Pemasangan Remote Control Desk
Ls
1.0000
Pemasangan Taxiway Guidance Sign 6156
206
Mandor
OH
1.0000
6156
255
Tukang Listrik
OH
3.0000
6156
262
Pembantu Tukang Listrik
OH
2.5000
6156
201
pekerja
OH
5.0000
6156
216
Kepala Tukang Listrik
OH
2.5000
Bimbingan Teknis Peralatan 6157
238
Teknisi
OH
10.0000
6157
268
Ahli Muda Line/Set Up System
OH
6.0000
6157
267
OH
3.0000
6157
270
OH
1.0000
6157
271
Ahli Line Up/ Set Up System Tenaga Ahli Pusat (Termasuk Tiket+hotel+Akomodasi) (Disesuaikan Tenaga Agen (Termasuk Tiket) (Disesuaikan Dengan Lokasi Kegiatan) Dengan Lokasi Kegiatan)
OH
1.0000
OH
10.0000
OH
6.0000
Evaluasi Teknis Peralatan 6158
238
6158
268
Teknisi Ahli Muda Line/Set Up System
AnisID
ResID
6158
267
6158
270
6158
271
Nama Bahan/Alat/Upah Ahli Line Up/ Set Up System Tenaga Ahli Pusat (Termasuk Tiket+hotel+Akomodasi) (Disesuaikan Tenaga Agen (Termasuk Tiket) (Disesuaikan Dengan Lokasi Kegiatan) Dengan Lokasi Kegiatan)
Satuan
Koef.
OH
3.0000
OH
1.0000
OH
1.0000
M'
1.0000
Drilling Taxiway dan Jalan Untuk Jalur Kabel Pada Pipa 6182
547
Drilling Taxiway dan Jalan Untuk Jalur Kabel d
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Runway Edge Light Type 1 (R/W.2500x45 PA) 6201
32802
High Intensity Elevated Light Complete clear150 W;6.6a High Intensity Elevated Light Complete clear/yelow 150 W;6.6a High Intensity Elevated Light Complete yelow 150 W;6.6a Isolating Transformer 150 W; 6.6/6.6 A.
Unit
42.0000
6201
32803
Unit
20.0000
6201
32804
Unit
2.0000
6201
32831
Pcs
82.0000
6201
32849
Set
82.0000
32850
Connector Kit Terdiri Dari FAA- Plug dan socket single pole. two pole plug Connector kit.
6201
pcs
82.0000
6201
32856
Series cable FL2XCY 1x6 Sqmm. 3/6 kV
M
6201
32852
Base Plate
6201
32861
6201 6201
14000.0000
Pcs
82.0000
Power cable NYY 3x16 Sqmm/1kv
M
20.0000
32860
Control Cable 2x10x0.8 sqmm. 1kv
M
20.0000
32840
CCR 20 KVA/KW
Pcs
2.0000
Pengadaan Runway Edge Light Type 1 (R/W 1.850 x 30) taxi LED 6205
32802
High intensity Elevated Light Complete clear 150 W;6.6A. High intensity Elevated Light Complete clear/yelow 150 W;6.6A. High intensity Elevated Light Complete yelow/clear 150 W;6.6A. Isolating transformer 150 W;6.6/6.6 A.
Unit
20.0000
6205
32803
Unit
20.0000
6205
32804
Unit
20.0000
6205
32831
Pcs
60.0000
6205
32849
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
60.0000
6205
32850
Pcs
60.0000
6205
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6205
32852
Base plate.
6205
32861
6205 6205
M
12000.0000
Pcs
60.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32839
CCR 15 KVA/KW
Pcs
2.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Runway Edge Light Type 1 (R/W 1.850 x 30) 6206
32802
High intensity Elevated Light Complete clear 150 W;6.6A. High intensity Elevated Light Complete clear/yelow 150 W;6.6A. High intensity Elevated Light Complete yelow/clear 150 W;6.6A. Isolating transformer 150 W;6.6/6.6 A.
Unit
20.0000
6206
32803
Unit
20.0000
6206
32804
Unit
20.0000
6206
32831
Pcs
60.0000
6206
32849
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
60.0000
6206
32850
Pcs
60.0000
6206
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6206
32852
Base plate.
6206
32861
6206 6206
M
12000.0000
Pcs
60.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32839
CCR 15 KVA/KW
Pcs
2.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Runway Edge Light Type 1 (R/W 1.400 x 30) 6207
32802
High intensity Elevated Light Complete clear 150 W;6.6A. High intensity Elevated Light Complete clear/yelow 150 W;6.6A. High intensity Elevated Light Complete yelow/clear 150 W;6.6A. Isolating transformer 150 W;6.6/6.6 A.
Unit
26.0000
6207
32803
Unit
10.0000
6207
32804
Unit
10.0000
6207
32831
Pcs
46.0000
6207
32849
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
46.0000
6207
32850
Pcs
46.0000
6207
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6207
32852
Base plate.
6207
32861
6207 6207
M
10000.0000
Pcs
46.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32839
CCR 15 KVA/KW
Pcs
2.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Runway Edge Light Type 1 (R/W 1.400 x 30) taxi LED 6208
32802
High intensity Elevated Light Complete clear 150 W;6.6A. High intensity Elevated Light Complete clear/yelow 150 W;6.6A. High intensity Elevated Light Complete yelow/clear 150 W;6.6A. Isolating transformer 150 W;6.6/6.6 A.
Unit
26.0000
6208
32803
Unit
10.0000
6208
32804
Unit
10.0000
6208
32831
Pcs
46.0000
6208
32849
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
46.0000
6208
32850
Pcs
46.0000
6208
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6208
32852
Base plate.
6208
32861
6208 6208
M
10000.0000
Pcs
46.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32839
CCR 15 KVA/KW
Pcs
2.0000
Omnidirectional Elevated Light Complete Blue LED 8-11W;6.6A. Omnidirectional Elevated Light Complete Red LED 8-11W;6.6A. Isolating transformer 30/45 W;6.6/6.6 A.
Unit
18.0000
Unit
6.0000
Pcs
24.0000
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
24.0000
Pcs
24.0000
Pengadaan Taxiway Edge Light dan Apron Light (LED) 6209
32815
6209
32816
6209
32828
6209
32849
6209
32850
6209
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6209
32852
Base plate.
6209
32861
6209 6209
M
3000.0000
Pcs
24.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32837
CCR 7.5 KVA/KW
Pcs
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Taxiway Edge Light dan Apron Light (Blub) 6210
32813
Omnidirectional Elevated Light Complete Blue 30/45W;6.6A. Omnidirectional Elevated Light Complete Red 30/45W;6.6A. Isolating transformer 30/45 W;6.6/6.6 A.
Unit
18.0000
6210
32814
Unit
6.0000
6210
32829
Pcs
24.0000
6210
32849
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
24.0000
6210
32850
Pcs
24.0000
6210
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV.
6210
32852
Base plate.
6210
32861
6210 6210
M
3000.0000
Pcs
24.0000
Power cable NYY 3x16 Sqmm/1kV
M
20.0000
32860
Control cable 2 x 10 x 0.8 sqmm. 1 kv
M
20.0000
32837
CCR 7.5 KVA/KW
Pcs
1.0000
Pengadaan Threshold Light (R/W 2500x45 PA dan R/W 1850x45 PA) 6211
32809
Unit
3.0000
Unit
4.0000
32831
High Intensity Inset Threshold light complete. Green/red 3x105 W;6.6 A High Intensity Inset Threshold light complete. Green/blank 2x105 W;6.6 A Isolating transformer 150 W;6.6/6.6 A.
6211
32810
6211
Pcs
54.0000
6211
32833
Isolating transformer 300 W;6.6/6.6 A.
Pcs
7.0000
6211
32849
Set
8.0000
6211
32850
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Pcs
61.0000
6211
32852
Pcs
54.0000
6211
32808
Unit
10.0000
6211
32807
Unit
28.0000
6211
32874
Unit
16.0000
6211
32851
High Intesity Undirectional threshold light complete red 150 W;6.6A High Intesity Undirectional threshold light complete green 150 W;6.6A High Intesity Undirectional wing bar threshold light complete green 150 W;6.6A Colfor 200 + hardener + groot/primer
Pcs
7.0000
6211
32858
Pcs
54.0000
6211
32383
Pipa PVC 5/8" pelindung kabel NYHY 2 x 4 Sqmm Secondary Cable NYHY 2 x 4 Sqmm
Base plate.
M
600.0000
Pengadaan Threshold Light (R/W 1850x30) 6212
32831
Isolating transformer 150 W;6.6/6.6 A.
Pcs
44.0000
6212
32849
Set
8.0000
6212
32850
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Pcs
44.0000
6212
32852
Pcs
44.0000
Base plate.
AnisID
ResID
6212
32808
6212
32807
6212
32858
6212
32383
Nama Bahan/Alat/Upah High Intesity Undirectional threshold light complete red 150 W;6.6A High Intesity Undirectional threshold light complete green 150 W;6.6A Pipa PVC 5/8" pelindung kabel NYHY 2 x 4 Sqmm Secondary Cable NYHY 2 x 4 Sqmm
Satuan
Koef.
Unit
16.0000
Unit
28.0000
Pcs
44.0000
M
600.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Threshold Light (R/W 1850x45 NPA) 6213
32383
6213
32807
6213
32808
6213
32831
6213
32849
6213
32850
6213
32852
6213
32858
Secondary Cable NYHY 2 x 4 Sqmm
M
500.0000
High Intesity Undirectional threshold light complete green 150 W;6.6A High Intesity Undirectional threshold light complete red 150 W;6.6A Isolating transformer 150 W;6.6/6.6 A.
Unit
20.0000
Unit
12.0000
Pcs
32.0000
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
8.0000
Pcs
32.0000
Pcs
32.0000
Pcs
32.0000
Omnidirectional Elevated Light Complete Blue 100W;6.6A. Isolating transformer 100 W;6.6/6.6 A.
Unit
10.0000
Pcs
10.0000
Connector kit terdiri dari FAA-plug dan socket single pole. Two pole plug connector kit.
Set
10.0000
Pcs
10.0000
Pcs
10.0000
Base plate. Pipa PVC 5/8" pelindung kabel NYHY 2 x 4 Sqmm
Pengadaan Turning Area Light (R/W 1850x30) 6214
32875
6214
32830
6214
32849
6214
32850
6214
32852
Base plate.
Pengadaan WDI (RW 2500m') 6215
32846
Wind Directional Indicator (WDI)
Pcs
1.0000
6215
32384
Power Cable NYFGBY 3 x 16 Sqmm/1 kV
M'
2500.0000
Pengadaan WDI (RW 1850m') 6216
32846
Wind Directional Indicator (WDI)
Pcs
1.0000
6216
32384
Power Cable NYFGBY 3 x 16 Sqmm/1 kV
M'
1300.0000
Pengadaan WDI (RW 1400m') 6217
32846
Wind Directional Indicator (WDI)
Pcs
1.0000
6217
32384
Power Cable NYFGBY 3 x 16 Sqmm/1 kV
M'
1000.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Rotating Beacon 6218
32847
Rotating Beacon
Pcs
1.0000
6218
32861
Power Cable NYY 3x16 Sqmm/1 kV
M'
100.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Runway Thershold Identification Light (RTIL) 6219
32821
Runway Thershold Identification Light (RTIL)
Unit
2.0000
6219
32384
Power Cable NYFGBY 3 x 16 Sqmm/1 kV
M'
1500.0000
6219
32860
Control Cable 2 x 10 x 0,8 Sqmm. 1 kV
M
100.0000
6219
32872
Flexsibel Conduit
Set
30.0000
Pengadaan PAPI 1 (satu) Ujung 1 (satu) Sisi 6220
32822
Precission Approach Path Indicator (PAPI)
Unit
4.0000
6220
32832
Isolating Transformer 200 W; 6.6/6.6 A.
Pcs
8.0000
6220
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV
M
3000.0000
6220
32861
Power Cable NYY 3x16 Sqmm/1 kV
M
20.0000
6220
32860
Control Cable 2 x 10 x 0,8 Sqmm. 1 kV
M
20.0000
6220
32849
Set
4.0000
6220
32850
Connector kit terdiri dari FAA-plug dan Socket Single Pole Two Pole Plug Connector Kit
Pcs
8.0000
6220
32859
Joint Sleeve FL2XCY 1x6 Sqmm 3/6 kV
Set
3.0000
6220
32824
Clinometer
Unit
1.0000
6220
32836
CCR 4 KVA/KW berikut selector switch
Pcs
1.0000
Pengadaan PAPI 2 (dua) Ujung 1 (satu) Sisi 6220
32822
Precission Approach Path Indicator (PAPI)
Unit
8.0000
6220
32832
Isolating Transformer 200 W; 6.6/6.6 A.
Pcs
16.0000
6220
32856
Series Cable FL2XCY 1x6 Sqmm. 3/6 kV
M
7000.0000
6220
32861
Power Cable NYY 3x16 Sqmm/1 kV
M
20.0000
6220
32860
Control Cable 2 x 10 x 0,8 Sqmm. 1 kV
M
20.0000
6220
32849
Set
8.0000
6220
32850
Connector kit terdiri dari FAA-plug dan Socket Single Pole Two Pole Plug Connector Kit
Pcs
16.0000
6220
32859
Joint Sleeve FL2XCY 1x6 Sqmm 3/6 kV
Set
7.0000
6220
32824
Clinometer
Unit
1.0000
6220
32836
CCR 4 KVA/KW berikut selector switch
Pcs
2.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Medium Approach Light System (MALS) 420 M 6222
32801
Unidirectional Approach Light Complete Clear 150 W;6.6 A. Isolating Transformer 150 W; 6.6/6.6 A.
Unit
45.0000
6222
32831
Pcs
45.0000
6222
32849
Set
18.0000
82850
Connector kit terdiri dari FAA-plug dan Socket Single Pole Two Pole Plug Connector Kit
6222
Pcs
45.0000
6222
32856
Series Cable FL2XCY 1x6 Sqmm 3/6 kV
M
6222
32859
Joint Sleeve FL2XCY 1x6 Sqmm 3/6 kV
Set
6222
32861
Power Cable NYY 3x16 Sqmm/1 kV
M
20.0000
6222
32857
Secondary Cable NYYHY 2 x 4 Sqmm
M
500.0000
6222
32860
Control Cable 2 x 10 x 0,8 sqmm. 1 kV
M
20.0000
6222
32953
Tiang Konstruksi MALS (Infrangible)
Set
8.0000
6222
32852
Base Plate
Pcs
5.0000
6222
32838
CCR 10 KVA/KW
Pcs
2.0000
Unidirectional Approach Light Complete Clear 150 W;6.6 A. Isolating Transformer 150 W; 6.6/6.6 A.
Unit
166.0000
Pcs
166.0000
Set
34.0000
Pcs
166.0000
9000.0000 9.0000
Pengadaan Medium Approach Light System (PALS) 900 M 6223
32801
6223
32831
6223
32849
6223
82850
Connector kit terdiri dari FAA-plug dan Socket Single Pole Two Pole Plug Connector Kit
6223
32856
Series Cable FL2XCY 1x6 Sqmm 3/6 kV
M
6223
32859
Joint Sleeve FL2XCY 1x6 Sqmm 3/6 kV
Set
10.0000
6223
32861
Power Cable NYY 3x16 Sqmm/1 kV
M
20.0000
12000.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6223
32857
Secondary Cable NYYHY 2 x 4 Sqmm
M
800.0000
6223
32860
Control Cable 2 x 10 x 0,8 sqmm. 1 kV
M
20.0000
6223
32953
Tiang Konstruksi PALS wing bar
Set
2.0000
6223
32955
Tiang Konstruksi PALS
Set
18.0000
6223
32956
Tiang Konstruksi PALS (Infrangible)
Set
10.0000
6223
32852
Base Plate
Pcs
10.0000
6223
32841
CCR 25 KVA/KW
Pcs
2.0000
Unit
10.0000
Unit
156.0000
Pcs
10.0000
Pengadaan Precission Approach Light System (Inset Light) 6224
32809
6224
32801
6224
32833
High Intensity Inset Threshold Light Complete. Green/Red 3x105 W;6.6 A Unidirectional Approach Light Complete Clear 150 W;6.6A. Isolating Transformer 300 W; 6.6/6.6A.
6224
32831
Isolating Transformer 150 W; 6.6/6.6A.
Pcs
156.0000
6224
32849
Set
34.0000
6224
32850
Connector kit terdiri dari FAA-plug dan Socket Single Pole Two Pole Plug Connector Kit
Pcs
166.0000
6224
32856
Series Cable FL2XCY 1x6 Sqmm 3/6 kV
M
6224
32859
Joint Sleeve FL2XCY 1x6 Sqmm 3/6 kV
Set
10.0000
6224
32861
Power Cable NYY 3x16 Sqmm/1 kV
M
20.0000
6224
32851
Colfor 200 + Hardener + Groot/Primer
Pcs
10.0000
6224
32857
Secondary Cable NYYHY 2 x 4 Sqmm
M
800.0000
6224
32860
Control Cable 2 x 10 x 0,8 sqmm. 1 kV
M
20.0000
6224
32954
Tiang Konstruksi PALS wing bar
Set
2.0000
6224
32955
Tiang Konstruksi PALS
Set
23.0000
6224
32956
Tiang Konstruksi PALS (Infrangible)
Set
5.0000
6224
32852
Base Plate
Pcs
5.0000
6224
32841
CCR 25 KVA/KW
Pcs
2.0000
1.0000
12000.0000
Pengadaan Power dan Control System AFL 6225
32825
Remote Control Desk
Unit
6225
32374
NYFGBY 4 x 35 mm2
M
50.0000
6225
32385
Cable Control 60 x 2 x 0,8 Sqmm
M'
300.0000
6225
32870
Marshalling Cabinet
Unit
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
6225
32302
Panel Medium Voltage Switch Board (MVSB)
Unit
Koef. 1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Power dan Control System PAPI 6226
32032
Panel Medium Voltage Switch Board (MVSB)
6226
32374
NYFGBY 4 x 35 mm2
Unit
1.0000
M
50.0000
Pengadaan Grounding untuk AFL (RW 2500m') 6227
32862
BC 50
M
6500.0000
6227
32863
BC 16
M
900.0000
6227
32864
Kabel Grounding 6 Sqmm
M
400.0000
6227
32386
Copper Rod
Pcs
22.0000
Pengadaan Grounding untuk AFL (RW 1850m') 6228
32862
BC 50
M
5500.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
6228
32863
BC 16
M
900.0000
6228
32864
Kabel Grounding 6 Sqmm
M
300.0000
6228
32386
Copper Rod
Pcs
Koef.
16.0000
Pengadaan Grounding untuk AFL (RW 1400m') 6229
32862
BC 50
M
5000.0000
6229
32863
BC 16
M
600.0000
6229
32864
Kabel Grounding 6 Sqmm
M
200.0000
6229
32386
Copper Rod
6229
32862
BC 50
M
3000.0000
6229
32863
BC 16
M
20.0000
6229
32864
Kabel Grounding 6 Sqmm
M
20.0000
6229
32386
Copper Rod
Pcs
Pcs
14.0000
8.0000
Pengadaan Grounding untuk REH dan TXE 6230
32862
BC 50
M
1500.0000
6230
32863
BC 16
M
20.0000
6230
32864
Kabel Grounding 6 Sqmm
M
20.0000
6230
32386
Copper Rod
Pcs
6.0000
Pengadaan Grounding untuk PAPI 6231
32862
BC 50
M
3000.0000
6231
32863
BC 16
M
20.0000
6231
32864
Kabel Grounding 6 Sqmm
M
20.0000
6231
32386
Copper Rod
Pcs
8.0000
Pengadaan Grounding untuk MALS 6232
32862
BC 50
M
2000.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
6232
32863
BC 16
M
500.0000
6232
32864
Kabel Grounding 6 Sqmm
M
50.0000
6232
32386
Copper Rod
6232
32862
BC 50
M
2500.0000
6232
32863
BC 16
M
800.0000
6232
32864
Kabel Grounding 6 Sqmm
M
100.0000
6232
32386
Copper Rod
Pcs
Pcs
Koef.
4.0000
8.0000
Pengadaan Grounding Untuk PALS (Insert Light) 6234
32862
BC 50
M
2500.0000
6234
32863
BC 15
M
600.0000
6234
32864
Kabel Grounding 6 sqrmm
M
100.0000
6234
32386
Copper Rod
Psc
8.0000
Pengadan Squence Flashing Light 6235
32817
Flash Light Unidirectional (SFL)
Unit
30.0000
6235
32819
Individual Control Unit Lengkap (UCC) (SFL)
Unit
30.0000
6235
32820
Master Control Unit (UCC) (SFL)
Unit
1.0000
6235
32372
6235
32871
6235 6235
NYFGBY 4 x 16 mm²
M
2500.0000
Control Kabel 12 x 1,5 Sqmm/ 1 kV
Pcs
2500.0000
32873
Juction Box Berikut Flexibel Condiut
Set
30.0000
32957
Tiang Tunggal SQFL
Set
30.0000
Pengadaan Sequence Flashing Light (Insert Light) 6236
32818
Flash Light Insert (SFL)
Unit
1.0000
6236
32817
Flash Light Unidirectional (SFL)
Unit
29.0000
6236
32819
Individual Control Unit Lengkap (UCC) (SFL)
Unit
29.0000
6236
32820
Master Control Unit (UCC) (SFL)
Unit
1.0000
6236
32372
6236
32871
NYFGBY 4 x 16 mm² Control Kabel 12 x 1,5 Sqmm/ 1 kV
m
2500.0000
Pcs
2500.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6236
32873
Juction Box Berikut Flexibel Condiut
Set
30.0000
6236
32957
Tiang Tunggal SQFL
Set
29.0000
Pemasangan Garbarata Unit 6301
264
Tenaga Ahli Garbarata
OH
20.0000
6301
265
Teknisi Garbarata
OH
24.0000
6301
266
Pembantu Teknisi Garbarata
OH
24.0000
6301
740
Trailer
Hari
3.0000
6301
744
Truk
Hari
1.0000
6301
738
Crane Telescopic 45 Ton
Jam
48.0000
6301
739
Forklift
Hari
2.0000
6301
741
Genset Mesin, Las, Dll
Set
1.0000
6301
742
Toolkit Untuk Pemasangan Garbarata
Set
1.0000
6301
743
Scafolding, Tangga, Lampu Penerangan, Dll
Set
1.0000
Pemasangan Fix Walkway (20 m) 6302
264
Pemasangan Fix Walkway (20 Meter)
OH
2.0000
6302
265
Teknisi Garbarata
OH
4.0000
6302
266
Pembantu Teknisi Garbarata
OH
6.0000
6302
740
Trailer
Hari
1.0000
6302
744
Truk
Hari
1.0000
6302
738
Crane Telescopic 45 Ton
Jam
1.0000
6302
739
Forklift
Hari
1.0000
6302
741
Genset, Mesin Las, Dll
Set
1.0000
6302
742
Toolkit Untuk Pemasangan Garbarata
Set
1.0000
6302
743
Scafolding, Tangga, Lampu Penerangan, Dll
Set
1.0000
Set
1.0000
Pemasangan Garbarata 2 Tunnel 6303
32601
Avio Bridge (Garbarata) 2 Tunnel
AnisID
ResID
6303
32603
Nama Bahan/Alat/Upah Material Fix Walkway, Type Single Glass Wall, Panjang 20 m dan Lebar 2,1 m
Satuan
Koef.
Set
1.0000
Set
1.0000
Set
1.0000
Pemasangan Garbarata 3 Tunnel 6304
32602
6304
32603
Avio Bridge (Garbarata) 3 Tunnel Material Fix Walkway, Type Single Glass Wall, Panjang 20 m dan Lebar 2,1 m
Pengadaan Peralatan Utama PIDS 6159
34018
Dual View PTZ Thermal Camera
Unit
1.0000
6159
34019
Infrared (IR)
Unit
1.0000
6159
34021
LCD Monitor 42"
Unit
1.0000
6159
34022
Storage 2U, 19" Rackmount Chasis 3 TB
Unit
1.0000
6159
34023
Rack Mount
Unit
1.0000
6159
34024
Gigabit Switch 24 Port
Unit
1.0000
6159
34025
Komputer All In One
Unit
1.0000
6159
34026
Meja + Kursi
Unit
1.0000
6159
34017
Handy Talky (HT)
Unit
1.0000
6159
35126
UPS 3 KVA Tipe One Line
Unit
1.0000
M
1.0000
Pengadaan Peralatan Penunjang PIDS 6160
34030
Fiber Optic Cable
6160
34031
Enclosure DataHub High Backbone
Pcs
1.0000
6160
34032
Folding Pole for Camera
Pcs
1.0000
6160
34033
Standalone Surge Protector
Pcs
1.0000
6160
34034
Plastic Counduit
Pcs
1.0000
6160
34035
Plastic Cable Pull Boxes
Pcs
1.0000
Pengadaan Peralatan Utama CCTV Closed Circuit Television (CCT) 6161
34036
IP Speed Dome + Bracket
Unit
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
6161
34037
HD IP Speed Dome + Bracket
Unit
1.0000
6161
34038
Day/Night Infrared IP Camera
Unit
1.0000
6161
34039
Day/Night IP Camera Full HD
Unit
1.0000
6161
34040
Varifocal Lense
Unit
1.0000
6161
34041
Power Supply Camera POE
Unit
1.0000
6161
34042
Unit
1.0000
6161
34043
6161
34044
Outdoor Housing Camera
Unit
1.0000
6161
34045
Mount Ceiling Feed Bracket
Unit
1.0000
6161
34046
Decoder Video Streaming 8 Channel
Unit
1.0000
6161
34047
Pan/Tilt Drive Unit
Unit
1.0000
6161
34048
Pan/Tilt & Zoom Lens Controller
Unit
1.0000
6161
34049
8 Ch Standalone Hybrid Recorder (8 Analog + 8 IP)
Unit
6161
34050
8 Ch Five Independent Multi Streaming 3G Server
Unit
6161
34051
Video Client Software 8 Channel
Unit
1.0000
6161
34052
Video Client Software 16 Channel
Unit
1.0000
6161
34027
Decoder Video Streaming 16 Channel
Unit
1.0000
6161
34053
16 Ch standalone Hybrid Recorder (16 Analog + 16 IP)
Unit
6161
34054
16 Ch Five Independent Multi Streaming 3G Server
Unit
Multiplexer Digital Recording 8 Channel (DVD 8 Channel) Multiplexer Digital Recording 16 Channel (DVD 16 Channel)
Satuan
Unit
Koef.
1.0000
1.0000 1.0000
1.0000 1.0000
Pengadaan Peralatan Pendukung CCTV Closed Circuit Television (CCT) 6162
34025
Komputer All In One
Unit
1.0000
6162
34021
LCD Monitor 42"
Unit
1.0000
6162
34055
Mounting Rack Double Door 19"/12U
Unit
1.0000
6162
34026
Meja + Kursi
Unit
1.0000
6162
35125
UPS 2 KVA Tipe One Line
Unit
1.0000
6162
34056
Gigabit Switch 8 Port
Unit
1.0000
6162
34024
Gigabit Switch 24 Port
Unit
1.0000
6162
9362
Cable Coaxial Belden
M
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
6162
9363
Cable Data
M
1.0000
6162
9874
Cable Power 2 x 1,5
M
1.0000
6162
9875
Box Panel CCTV
Buah
1.0000
6162
9876
Pipa Plastik 1/2"
Buah
1.0000
6162
9877
Cable Duct
Buah
1.0000
6162
9878
Klem Pipa
Buah
1.0000
Pengadaan Peralatan Utama Access Door 6163
9947
Door Temper Glass
Unit
1.0000
6163
9948
Access Door Reader Control
Unit
1.0000
6163
9949
Access Modular Controller
Unit
1.0000
6163
9950
Electro Magnetic Lock
Unit
1.0000
6163
35125
UPS 2 KVA Tipe On Line
Unit
1.0000
6163
9951
Access Card
Unit
1.0000
6163
9952
PC Access Door Recorder
Unit
1.0000
6163
9953
Management Sotware Access
Unit
1.0000
Pengadaan PeralatanPendukung Access Door 6164
9954
Door Closer Handle
Unit
1.0000
6164
9955
Push Button Exit
Unit
1.0000
6164
9956
Braket Temper Glass
Unit
1.0000
6164
9957
Floor Hinge
Unit
1.0000
6164
9958
Door Sensor
Unit
1.0000
Pengadaan Walk Through Metal Detector (WTMD) 6165
35127
Walk Trough Metal Detector (WTMD)
Unit
1.0000
6165
35124
UPS 1 KVA Tipe On Line
Unit
1.0000
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
Pengadaan Hand Held Metal Detector (HHMD) 6165
34001
Hand Held Metal Detector
Unit
1.0000
Unit
1.0000
Set
1.0000
Set
1.0000
Pengadaan Explosive Detector 6167
34016
Explosive Detector
Pengadaan Consumables Part 6168
34028
Consumables Part
Pengadaan Liquid Detector 6169
34029
Liquid Detector
Clearing dan Grubbing (M2) 6029
201
Pekerja
OH
0.0589
6029
206
Mandor
OH
0.0132
6029
606
Bulldozer
Jam
0.0098
6029
621
Dump Truck 5 Ton
Jam
0.0080
6029
623
Excavator
Jam
0.0138
Stripping Top Soil t = 20 cm (M2) 6030
201
Pekerja
OH
0.0045
6030
206
Mandor
OH
0.0330
6030
606
Bulldozer
Jam
0.0416
6030
621
Dump Truck 5 Ton
Jam
0.0090
6030
623
Excavator
Jam
0.0107
AnisID
ResID
Nama Bahan/Alat/Upah
Satuan
Koef.
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
PEKERJAAN BOWPLANK 1. Pengukuran dan Pemasangan Bowplank (m1) (SNI 03-235-2002-01) 4
201
4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5
206 214 252 2201 6090 6087 201 206 214 252 1102 1205 1249 2201 6030 8015 6011
Pekerja
OH
0.1000
Mandor Kepala Tukang Kayu Tukang Kayu Paku Papan (3x20) cm (Borneo) Usuk : 5/7 (Borneo) Pekerja Mandor Kepala Tukang Kayu Tukang Kayu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Paku Kayu Kelas III Atap Seng Gelombang Dolken Kayu Dia 8 cm
OH OH OH Kg M3 M3 OH OH OH OH Kg M3 M3 Kg M3 Lbr Btg
0.0050 0.0100 0.1000 0.0200 0.0070 0.0120 1.0000 0.0500 0.3000 2.0000 10.5000 0.0500 0.0300 0.3000 0.2100 1.5000 1.7000
2. Papan Nama Proyek 80x120 cm (bh) 20
6030
Kayu Kelas III
M3
0.0350
20
2131
Plat Seng Tebal 0,050 cm Lebar 0,90 m
M'
1.4000
20 20 20 20 20 20 20 20 20 20
2201 7115 1102 1249 1246 243 252 248 201 206
Paku Cat Kayu Semen PC Pasir Beton Koral/Krikil Tukang Batu Tukang Kayu Tukang Cat Pekerja Mandor
Kg Kg Kg M3 M3 OH OH OH OH OH
0.6000 1.5000 16.8000 0.0270 0.0405 0.0175 1.0000 1.0000 2.1000 1.0050
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
PEKERJAAN GALIAN TANAH 1. Galian Tanah Biasa Sedalam 1 m (m3) (SNI 2835-2008-01) 23
201
Pekerja
OH
0.7500
23
206
Mandor
OH
0.0250
2. Urugan Sirtu (m3) (SNI 2835-2008-15) 37
201
Pekerja
OH
0.2500
37 37
206 1260
Mandor Sirtu
OH M3
0.0250 1.2000
3. Galian Tanah Biasa Diangkut > 1 m Dibuang (m3) 38
201
Pekerja
OH
0.9500
38
206
Mandor
OH
0.0350
4. Cut and Fill (m3) 40
201
Pekerja
OH
0.0255
40 40 40 40 40 40 40 40
206 214 252 623 637 649 651 652
Mandor Kepala Tukang Kayu Tukang Kayu Excavator Motor Grader Vibrator Roller Water Tanker Wheel Loader
OH OH OH Jam Jam Jam Jam Jam
0.0101 0.0000 0.0000 0.0126 0.0059 0.0064 0.0005 0.0075
PEKERJAAN GALIAN BATU 1. Pasang pondasi batu kosong (anstamping) (M3) (SNI 2836-2008-09) 41
201
41 41 41 41
206 211 243 1220
Pekerja.
OH
0.7800
Mandor. Kepala Tukang Batu. Tukang Batu Batu belah 15/20
OH OH OH M3
0.0390 0.0390 0.3900 1.2000
No. AnlsID 41
ResID 1255
Nama Bahan / Upah /Alat Pasir urug
Sat M3
Koef. 0.4320
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
ang pondasi 2. batu kali 1 Pc : 1 Ps (M3) 42
201
42 42 42 42 42 42
206 211 243 1102 1222 1252
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0600 0.6000 392.0000 1.1000 0.3140
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0600 0.6000 267.0000 1.1000 0.4270
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0750 0.7500 202.0000 1.2000 0.4850
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali
OH OH OH Kg M3
0.0750 0.0750 0.7500 163.0000 1.2000
3. Pasang pondasi batu kali 1 Pc : 2 Ps (M3) 43
201
43 43 43 43 43 43
206 211 243 1102 1222 1252
4. Pasang pondasi batu kali 1 Pc : 3 Ps (M3) (SNI 2836-2008-01) 44
201
44 44 44 44 44 44
206 211 243 1102 1222 1252
5. Pasang pondasi batu kali 1 Pc : 4 Ps (M3) (SNI 2836-2008-02) 45
201
45 45 45 45 45
206 211 243 1102 1222
No. AnlsID 45
ResID 1252
Nama Bahan / Upah /Alat Pasir pasang
Sat M3
Koef. 0.5200
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
6. Pasang pondasi batu kali 1 Pc : 5 Ps (M3) (SNI 2836-2008-03) 46
201
46 46 46 46 46 46
206 211 243 1102 1222 1252
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0750 0.7500 136.0000 1.2000 0.5440
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0750 0.7500 217.0000 1.1000 0.3140
Pekerja.
OH
1.5000
Mandor. Kepala Tukang Batu. Tukang Batu Semen PC Batu Gunung/kali Pasir pasang
OH OH OH Kg M3 M3
0.0750 0.0750 0.7500 117.0000 1.2000 0.5610
Mandor
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC
OH OH Oh Kg
0.01500 0.01500 0.1500 15.5040
7. Pasang pondasi batu kali 1 Pc : 2.5 Ps (M3) 47
201
47 47 47 47 47 47
206 211 243 1102 1222 1252
6. Pasang pondasi batu kali 1 Pc : 5 Ps (M3) (SNI 2836-2008-04) 48
201
48 48 48 48 48 48
206 211 243 1102 1222 1252
PEKERJAAN PLESTERAN 1. Plesteran 1 Pc : 1 Ps tebal 15 mm(m2) (SNI 2837:2008-01) 88
201
88 88 88 88
206 211 243 1102
No. AnlsID 88
ResID 1252
Nama Bahan / Upah /Alat Pasir Pasang
Sat
Koef.
M3
0.0160
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 10.2240 0.0200
2. Plesteran 1 Pc : 2 Ps tebal 15 mm(m2) (SNI 2837:2008-02) 89
201
89 89 89 89 89
206 211 243 1102 1252
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
3. Plesteran 1 Pc : 3 Ps tebal 15 mm(m2) (SNI 2837:2008-03) 90
201
90 90 90 90 90
206 211 243 1102 1252
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 7.7760 0.0230
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 6.2400 0.0240
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 5.1840 0.0260
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 4.4160 0.0270
4. Plesteran 1 Pc : 4 Ps tebal 15 mm(m2) (SNI 2837:2008-04) 91
201
91 91 91 91 91
206 211 243 1102 1252
5. Plesteran 1 Pc : 5 Ps tebal 15 mm(m2) (SNI 2837:2008-05) 92
201
92 92 92 92 92
206 211 243 1102 1252
6. Plesteran 1 Pc : 6 Ps tebal 15 mm(m2) (SNI 2837:2008-06) 92
201
92 92 92 92 92
206 211 243 1102 1252
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
7. Plesteran 1 Pc : 8 Ps tebal 15 mm(m2) (SNI 2837:2008-08) 94
201
94 94 94 94 94
206 211 243 1102 1252
Pekerja
OH
0.3000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Pasir Pasang
OH OH Oh Kg M3
0.0150 0.0150 0.1500 3.4560 0.0290
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
PEKERJAAN BETON BERTULANG 1. Beton bertulang 1:2:3 k.100 (M3) (SNI 7394-2008-01) f'c = 7,4 Mpa Slump (12 ± 2 ) 130
201
130 130 130 130 130 130 130
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 247.0000 0.5550 0.6207 0.2150
2. Beton bertulang 1:2:3 k.125 (M3) (SNI 7394-2008-02) f'c = 9,8 Mpa Slump (12 ± 2 ) 131
201
131 131 131 131 131 131 131
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 276.0000 0.5622 0.5914 0.2150
3. Beton bertulang 1:2:3 k.150 (M3) (SNI 7394-2008-03) f'c = 12,2 Mpa Slump (12 ± 2 132
201
132 132 132 132 132 132 132
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 299.0000 0.5650 0.5707 0.2150
4. Beton bertulang 1:2:3 k.175 (M3) (SNI 7394-2008-05) f'c = 14,5 Mpa Slump (12 ± 2 133
201
Pekerja
OH
1.6500
133
206
Mandor
OH
0.0830
No. AnlsID 133 133 133 133 133 133
ResID 211 243 1102 1205 1249 7007
Nama Bahan / Upah /Alat Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
Sat OH OH Kg M3 M3 M3
Koef. 0.0280 0.2750 326.0000 0.5717 0.5429 0.2150
5. Beton bertulang 1:2:3 k.200 (M3) (SNI 7394-2008-06) f'c = 16,9 Mpa Slump (12 ± 2 134
201
134 134 134 134 134 134 134
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 352.0000 0.5728 0.5221 0.2150
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
6. Beton bertulang 1:2:3 k.225 (M3) (SNI 7394-2008-07) f'c = 19,3 Mpa Slump (12 ± 2 135
201
135 135 135 135 135 135 135
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 371.0000 0.5817 0.4986 0.2150
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 384.0000 0.5772 0.4943 0.2150
) (SNI 7394-2008-08) 7. f'c = 21,7 Mpa Slump (12 ± 2 ) cm w/c=0,56 136
201
136 136 136 136 136 136 136
206 211 243 1102 1205 1249 7007
8. Beton bertulang 1:2:3 k.275 (M3) (SNI 7394-2008-09) f'c = 24,0 Mpa Slump (12 ± 2 137
201
137 137 137 137 137 137 137
206 211 243 1102 1205 1249 7007
Pekerja
OH
1.6500
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.0830 0.0280 0.2750 406.0000 0.5700 0.4886 0.2150
9. Beton bertulang 1:2:3 k.300 (M3) (SNI 7394-2008-10) f'c = 26,4 Mpa Slump (12 ± 2 138
201
Pekerja
OH
1.6500
138 138
206 211
Mandor Kepala Tukang Batu
OH OH
0.0830 0.0280
No. AnlsID 138 138 138 138 138
ResID 243 1102 1205 1249 7007
Nama Bahan / Upah /Alat Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
Sat OH Kg M3 M3 M3
Koef. 0.2750 413.0000 0.5672 0.4864 0.2150
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
10. Beton bertulang 1:2:3 k.325 (M3) (SNI 7394-2008-11) f'c = 28,8 Mpa Slump (12 ± 2 139
201
Pekerja
OH
2.1000
139 139 139 139 139 139
206 211 243 1102 1205 1249
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton
OH OH OH Kg M3 M3
0.1050 0.0350 0.3500 439.0000 0.5589 0.4786
139
7007
Air (Kapal)
M3
0.2150
11. Beton bertulang 1:2:3 k.350 (M3) (SNI 7394-2008-12) f'c = 31,2 Mpa Slump (12 ± 2 140
201
140 140 140 140 140 140 140
206 211 243 1102 1205 1249 7007
Pekerja
OH
2.1000
Mandor Kepala Tukang Batu Tukang Batu Semen PC Agregat Pecah Mesin 20-30 mm Pasir Beton Air (Kapal)
OH OH OH Kg M3 M3 M3
0.1050 0.0350 0.3500 448.0000 0.5556 0.4764 0.2150
Pekerja
OH
0.5200
Mandor Kepala Tukang Kayu Tukang Kayu Paku Kayu Kelas III Minyak Bekisting
OH OH OH Kg M3 Ltr
0.0260 0.0260 0.2600 0.3000 0.0400 0.1000
PEKERJAAN BEKISTING 1. Pasang Bekesting untuk pondasi (m2) (SNI 7394-2008-20) 141
201
141 141 141 141 141 141
206 214 252 2201 6030 7022
2. Pasang Bekesting untuk sloof (m2) (SNI 7394-2008-21) 142
201
Pekerja
OH
0.5200
142 142 142
206 214 252
Mandor Kepala Tukang Kayu Tukang Kayu
OH OH OH
0.0260 0.0260 0.2600
No. AnlsID 142 142 142
ResID 2201 6030 7022
Nama Bahan / Upah /Alat Paku Kayu Kelas III Minyak Bekisting
Sat Kg M3 Ltr
Koef. 0.3000 0.0450 0.1000
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
3. Pasang Bekesting untuk kolom (m2) (SNI 7394-2008-22) 143
201
143 143 143 143 143 143 143 143 143
206 214 252 6030 2201 7022 6021 6059 6011
Pekerja
OH
0.6600
Mandor Kepala Tukang Kayu Tukang Kayu Kayu Kelas III Paku Minyak Bekisting Kayu Balok Kelas II Plywood (t=9 mm) Dolken Kayu Dia 8 Cm
OH OH OH M3 Kg Ltr M3 Lbr Btg
0.0330 0.0330 0.3300 0.0400 0.4000 0.2000 0.0150 0.3500 2.0000
Pekerja
OH
0.6600
Mandor Kepala Tukang Kayu Tukang Kayu Kayu Kelas III Paku Minyak Bekisting Kayu Balok Kelas II Plywood (t=9 mm) Dolken Kayu Dia 8 Cm
OH OH OH M3 Kg Ltr M3 Lbr Btg
0.0330 0.0330 0.3300 0.0400 0.4000 0.2000 0.0180 0.3500 2.0000
Pekerja
OH
0.6600
Mandor Kepala Tukang Kayu Tukang Kayu Kayu Kelas III Paku Minyak Bekisting Kayu Balok Kelas II Plywood (t=9 mm) Dolken Kayu Dia 8 Cm
OH OH OH M3 Kg Ltr M3 Lbr Btg
0.0330 0.0330 0.3300 0.0400 0.4000 0.2000 0.0150 0.3500 6.0000
4. Pasang Bekesting untuk balok (m2) (SNI 7394-2008-23) 144
201
144 144 144 144 144 144 144 144 144
206 214 252 6030 2201 7022 6021 6059 6011
5. Pasang Bekesting untuk plat lantai (m2) (SNI 7394-2008-24) 145
201
145 145 145 145 145 145 145 145 145
206 214 252 6030 2201 7022 6021 6059 6011
No. AnlsID
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
6. Pasang Bekesting untuk Tangga (m2) (SNI 7394-2008-26) 146
201
146 146 146 146 146 146 146 146 146
206 214 252 6030 2201 7022 6021 6059 6011
Pekerja
OH
0.6600
Mandor Kepala Tukang Kayu Tukang Kayu Kayu Kelas III Paku Minyak Bekisting Kayu Balok Kelas II Plywood (t=9 mm) Dolken Kayu Dia 8 Cm
OH OH OH M3 Kg Ltr M3 Lbr Btg
0.0330 0.0330 0.3300 0.0300 0.4000 0.1500 0.0150 0.3500 2.0000
Pekerja
OH
0.6600
Mandor Kepala Tukang Kayu Tukang Kayu Kayu Kelas III Paku Minyak Bekisting Kayu Balok Kelas II Plywood (t=9 mm) Dolken Kayu Dia 8 Cm
OH OH OH M3 Kg Ltr M3 Lbr Btg
0.0330 0.0330 0.3300 0.0300 0.4000 0.2000 0.0200 0.3500 3.0000
Pekerja
OH
0.0070
Mandor Kepala Tukang Batu Tukang Batu Besi Beton Polos Kawat Beton/Bendrat RRT
OH OH OH Kg Kg
0.0003 0.0007 0.0070 1.0500 0.0150
7. Pasang Bekesting untuk Dinding (m2) (SNI 7394-2008-25) 147
201
147 147 147 147 147 147 147 147 147
206 214 252 6030 2201 7022 6021 6059 6011
PEKERJAAN PEMBESIAN 1
2
Pembesian dengan besi polos (Kg) 148
201
148 148 148 148 148
206 211 243 2005 2304
Pembesian dengan besi ulir (Kg)
No. AnlsID
3
ResID
149
201
149 149 149 149 149
206 211 243 2006 2304
Nama Bahan / Upah /Alat
Sat
Koef.
Pekerja
OH
0.0050
Mandor Kepala Tukang Batu Tukang Batu Besi Beton Ulir Kawat Beton/Bendrat RRT
OH OH OH Kg Kg
0.0003 0.0005 0.0050 1.0500 0.0150
Pembesian Dengan Besi Polos atau Besi Ulir (10 Kg) (SNI 7394-2008-17) 150
201
150 150 150 150 150
206 212 244 2005 2302
Pekerja
OH
0.0700
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0040 0.0070 0.0700 10.5000 0.1500
No. AnlsID
4
5
6
7
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
Pembesian Dengan Besi Ulir (10 Kg) (SNI - DT 91-0008-2007-21) 151
201
151 151 151 151 151
206 212 244 2005 2302
Pekerja
OH
0.0700
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0040 0.0070 0.0700 10.5000 0.1500
Pembesian Dengan Besi Polos (110 Kg) (SNI DT 91-0008-2007-22) 152
201
152 152 152 152 152
206 212 244 2005 2302
Pekerja
OH
0.7700
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0440 0.0770 0.7700 115.5000 1.6500
Pembesian Dengan Besi Polos (120 Kg) (SNI DT 91-0008-2007-23) 153
201
153 153 153 153 153
206 212 244 2005 2302
Pekerja
OH
0.8400
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0480 0.0840 0.8400 126.0000 1.8000
Pembesian Dengan Besi Polos (130 Kg) (SNI DT 91-0008-2007-24) 154
201
154 154 154 154 154
206 212 244 2005 2302
Pekerja
OH
0.9100
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0520 0.0910 0.9100 136.5000 1.9500
No. AnlsID 8
ResID
Nama Bahan / Upah /Alat
Sat
Koef.
Pembesian Dengan Besi Polos (140 Kg) (SNI DT 91-0008-2007-25) 155
201
155 155 155 155 155
206 212 244 2005 2302
Pekerja
OH
0.9800
Mandor Kepala Tukang Besi Tukang Besi Besi Beton Polos Kawat Baja/Bindraad
OH OH OH Kg Kg
0.0560 0.0980 0.9800 147.0000 2.1000
) (SNI 7394-2008-01) f'c = 7,4 Mpa Slump (12 ± 2 ) cm w/c=0,87
) (SNI 7394-2008-02) f'c = 9,8 Mpa Slump (12 ± 2 ) cm w/c=0,78
) (SNI 7394-2008-03) f'c = 12,2 Mpa Slump (12 ± 2 ) cm w/c=0,72
) (SNI 7394-2008-05) f'c = 14,5 Mpa Slump (12 ± 2 ) cm w/c=0,66
) (SNI 7394-2008-06) f'c = 16,9 Mpa Slump (12 ± 2 ) cm w/c=0,61
) (SNI 7394-2008-07) f'c = 19,3 Mpa Slump (12 ± 2 ) cm w/c=0,58
) (SNI 7394-2008-09) f'c = 24,0 Mpa Slump (12 ± 2 ) cm w/c=0,53
) (SNI 7394-2008-10) f'c = 26,4 Mpa Slump (12 ± 2 ) cm w/c=0,52
) (SNI 7394-2008-11) f'c = 28,8 Mpa Slump (12 ± 2 ) cm w/c=0,49
) (SNI 7394-2008-12) f'c = 31,2 Mpa Slump (12 ± 2 ) cm w/c=0,48