BILL OFF QUANTITY (BOQ) REKAPITULASI RENCANA ANGGARAN BIAYA KONSTRUKSI PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN : PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
URAIAN PEKERJAAN
I
PEKERJAAN PERSIAPAN
II
GEDUNG INSTALASI RAWAT INAP NON BEDAH A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR C. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
III
SARANA PENGHUBUNG ( RAMP, KORIDOR, TANGGA DAN LIFT) A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR C. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
IV
POWER HOUSE A. PEKERJAAN STRUKTUR B. PEKERJAAN ARSITEKTUR PENYELENGGARAAN SMK3 KONSTRUKSI
VI
HARGA
JUMLAH HARGA
( Rp. )
( Rp. )
JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN Terbilang :
Nol Rupiah
Kupang,……………..,………………,2021 PT...................................................
................................................................ Direktur
BOQ PEKERJAAN PERSIAPAN PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN : PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
I 1 2 3 4 5 6 7 8 9
URAIAN PEKERJAAN
VOLUME
PEKERJAAN PERSIAPAN Pekerjaan Pembersihan Lokasi Proyek Pekerjaan Pengukuran dan Pemasangan Bouwplank Pekerjaan Pemasangan Papan Nama Proyek Pekerjaan Pemasangan Pagar Sementara T. 2m Pekerjaan Sewa Direksikeet Mobilisasi dan Demobilisasi Pengurusan IMB Biaya Penelitian Tanah (Boring/Sondir) Biaya Uji Material Besi dan Biaya Tes Beton
8,165.00 1,210.78 2.00 386.25 48.00 1.00 1.00 1.00 1.00
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
m² m' ls m' m² ls ls ls ls
JUMLAH TOTAL PEKERJAAN PERSIAPAN
PEK. PERSIAPAN
Page 2 of 99
BOQ PEKERJAAN STRUKTUR GEDUNG RAWAT INAP NON BEDAH PAKET PEKERJAAN
: BELANJA MODAL BANGUNAN KESEHATAN : PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG
LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
II II.1 a. b. c. d.
URAIAN PEKERJAAN
PEKERJAAN STRUKTUR PEKERJAAN TANAH Galian Tanah Urugan Tanah Baru Peninggian + 600mm Pasir Urug Bawah Pondasi dan Lantai t.10 cm Lantai Kerja Bawah Pondasi dan Lantai t.5 cm
VOLUME
2,035.60 1,248.00 116.23 58.12
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
m3 m3 m3 m3 Jumlah Pek. Tanah
II.2 A. 1
2
3
4
5
6
7
PEKERJAAN STRUKTUR BAWAH PEKERJAAN PILECAP DAN SLOOF Footplat Type FP1 (2,500x2,500x650) - Besi D 22 - Besi D 16 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa Footplat Type FP2 (5,500x2,500x650) - Besi D 22 - Besi D 16 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa Footplat Type FP3 (1,500x1,500x650) - Besi D 22 - Besi D 16 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa Footplat Type FP4 - Besi D 19 - Besi D 16 - Besi D 10 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB1 (400x700) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB2 (300x500) - Besi D 16 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB3 (400x1500) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa
STR-GED RAWAT INAP NON BEDAH
4,880.10 2,581.21 84.50 52.81
Kg Kg m2 m3
5,987.18 3,166.77 83.20 71.50
Kg Kg m2 m3
629.91 271.54 15.60 5.85
Kg Kg m2 m3
8,088.99 3,947.81 101.12 85.02 102.21
Kg Kg Kg m2 m3
8,413.15 4,132.98 376.60 75.32
Kg Kg m2 m3
4,467.95 2,899.31 278.20 41.73
Kg Kg m2 m3
2,330.82 1,778.68 77.43 20.64
Kg Kg m2 m3
Page 3 of 99
NO.
8
URAIAN PEKERJAAN
BALOK PENGIKAT (BP) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa
VOLUME
932.10 325.00 36.77 7.35
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Kg Kg m2 m3 Jumlah Pek. Struktur Bawah
II.3 A. 1
2
3
4
5
6
PEKERJAAN STRUKTUR ATAAS LANTAI 1 (SATU) Plat Lantai Type Sb (t=130mm) - Besi P10 Dobel Layer - Beton Ready Mix f'c= 25 Mpa Plat Tritisan (t=100mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Kolom Type K1 (700x700) - Besi D 19 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Kolom Type K2 (400x700) - Besi D 19 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Tangga Darurat (2 Unit) - Besi D 16 (Dobel Layer) Plat - Besi D 16 (Dobel Layer) Bordes - Besi P10 Anak Tangga - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Bordes Type BB (300x500) - Besi D 19 - Besi D 13 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
14,811.70 78.00
Kg m3
1,822.98 100.80 12.48
Kg m2 m3
11,231.55 3,083.27 708.94 421.20 63.18
Kg Kg Kg m2 m3
658.10 201.98 25.01 26.00 3.25
Kg Kg Kg m2 m3
1,997.98 802.11 462.87 85.15 10.95
Kg Kg Kg m2 m3
186.96 21.88 89.80 10.40 1.20
Kg Kg Kg m2 m3
Jumlah Pek. Struktur Atas Lt. 1 B. 1
2
3
LANTAI 2 (DUA) Balok Type B2 (350x700) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Type B3 (350X600) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Type B4 (200x400) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex
STR-GED RAWAT INAP NON BEDAH
10,664.94 2,909.64 441.18 61.76
Kg Kg m2 m3
684.30 235.07 32.55 4.41
Kg Kg m2 m3
1,874.93 796.34 130.90
Kg Kg m2
Page 4 of 99
NO.
4
5
6
7
8
9
URAIAN PEKERJAAN
- Beton Ready Mix f'c= 25 Mpa Balok Type BA2 (300x400) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Type BK1 (300x500) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Plat Lantai Type Sb (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Plat Tritisan (t=100mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Kolom Type K2 (500x500) - Besi D 19 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Kolom Type K3 (300x300) - Besi D 19 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
VOLUME
SAT
10.47
m3
438.65 140.87 20.35 2.22
Kg Kg m2 m3
2,390.67 697.50 128.70 14.85
Kg Kg m2 m3
12,889.98 712.74 88.24
Kg m2 m3
1,822.98 100.80 12.48
Kg m2 m3
6,360.34 920.09 590.78 216.00 27.00
Kg Kg Kg m2 m3
342.13 41.95 15.00 9.60 0.72
Kg Kg Kg m2 m3
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Jumlah Pek. Struktur Atas Lt. 2 C. 1
2
3
4
LANTAI DAK ATAP Balok Type BA1 (300x500) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Type BA2 (300x400) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok Type BA3 (200x300) - Besi D 22 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Plat Lantai Type Sb (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
4,108.94 1,214.87 181.61 20.96
Kg Kg m2 m3
2,729.06 866.74 58.30 6.36
Kg Kg m2 m3
2,306.07 774.77 128.00 9.60
Kg Kg m2 m3
4,420.72 232.80 30.26
Kg m2 m3
Jumlah Pek. Struktur Atas Lt. Dak
STR-GED RAWAT INAP NON BEDAH
Page 5 of 99
NO.
D. 1
2
URAIAN PEKERJAAN
LANTAI ATAP Kuda-Kuda KK1 - Kolom WF 250X125X6X9 - Rafter WF 250X125X6X9 - Base Plate (t=22mm) - End plate (t=12mm) - Plat Pengaku (t=6mm) - Baut A 325 Ø22mm - Baut Angkur Ø22mm Gording - Lipped Channel 150x65x20x2,3 - Cleat Plate 130x130x9 - Baut A 325 Ø13mm - Sagrod Ø10mm - Reng C75 Baja ringan dan usuk baja ringan
VOLUME
SAT
1,074.48 7,163.20 417.93 234.44 284.96 352.00 88.00
Kg Kg Kg Kg Kg bh bh
3,388.00 154.00 616.00 195.32 484.00
Kg bh bh Kg m2
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Jumlah Pek. Struktur Atas Lt. Atap JUMLAH TOTAL PEKERJAAN STRUKTUR
STR-GED RAWAT INAP NON BEDAH
Page 6 of 99
BOQ PEKERJAAN ARSITEKTUR GEDUNG RAWAT INAP NON BEDAH PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG
LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
A. I 1 2 3 4 5
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN (Rp.)
LANTAI SATU PEKERJAAN PASANGAN 118.68 Pasangan Dinding bata ringan t. 10 cm m3 3.85 Kolom Praktis 10 x 10 m3 1.23 Balok Latei 10 x 15 m3 Pasangan Dinding Partisi Double Kalsiboard T. 8 mm + Rangka15.36 Hollow 40.40.0,5 m2 4.80 Pek. Dudukan Dinding Partisi m1 Jumlah Pek. Pasangan
II 1 2 3 4
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
2,373.64 202.80 2,373.64 797.64
m² m² m² m' Jumlah Pek. Plesteran
III 1 2 3 4 5 6 7 8 9 10 11 12 13 14
PEKERJAAN KOSEN & KACA Pintu Type P-1 Pintu Type P-2 Pintu Type P-3 Pintu Type P-4 Pintu Type P-5 Pintu Type P-6 Pintu Type P-7 Pintu Type P-8 Jendela Type J1 Jendela Type J2 Jendela Type J3 Jendela Type SHF Bouven Type BV1 Bouven Type BV2
10.00 9.00 13.00 2.00 1.00 1.00 2.00 1.00 3.00 9.00 5.00 8.00 14.00 1.00
unit unit unit unit unit unit unit unit unit unit unit unit unit unit Jumlah Pek. Kosen & Kaca
ARS-GED RAWAT INAP NON BEDAH
Page 7 of 99
JUMLAH HARGA (Rp.)
NO.
URAIAN PEKERJAAN
VOLUME
IV 1
PEKERJAAN RAILING Pekerjaan Railing Tangga Darurat - Tiang Tangga Hollow Stailess Steel 40x20x2 - Hand Railing Tangga Hollow Stailess Steel 40x40x2 - Railing Tangga Hollow Stailess Steel 40x20x2
2
SAT
17.92
m'
Pekerjaan Hand Railing Tangga Darurat - Hand Railing Tangga Hollow Stailess Steel 40x40x2
31.72
m'
3
Pekerjaan Hand Railing Pembatas Curtain Wall - Hand Railing Tangga Hollow Stailess Steel 40x40x2
8.88
m'
4 5
Pekerjaan Bumper Guard Pekerjaan Railing Guard
97.90 41.60
m' m'
HARGA SATUAN (Rp.)
Jumlah Pek. Railing V 1 2 3 4 5 6 7 8
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Hemogeneous Tile 60 x 60 ( HT - 1P ) Pelapis Lantai Tangga Hemogeneous Tile 60 x 60 ( HT - 1UP ) Pelapis Lantai Keramik Toilet Uk. 20 x 20 ( CT 1UP ) Pelapis Dinding Keramik Toilet Uk. 20 x 33 Pasang Border Dinding Keramik Toilet Uk. 10 x 20 Pasang Stepnoosing Tangga Uk. 10 x 60 Pasang Plin Dinding Homogeneus Tile Uk. 10 x 60 Pasang Hospital plin 5 x 20
696.63 43.56
m2 m2
63.80
m2
345.10 115.43 84.00 245.55 192.38
m2 m' m' m' m'
Jumlah Pek. Pelapis Dinding & Lantai VI 1 2 3 4
PEKERJAAN LANGIT - LANGIT Beton Expose Plafond Gypsum Board Wet Area 1200 x 2400 mm T. 9 mm + Rangka Metal Furring (GP) Plafond Kalsiboar Board T. 6 mm 1200 x 2400 + Rangka Metal Furring (GRC) List Plafond
44.58 646.45
m2 m2
52.34
m2
626.45
m' Jumlah Pek. Langit - Langit
VII 1 2 3
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 ) Cat Plafond Majestic Paint ( P-1 )
1,305.67 350.50 698.79
m2 m2 m2 Jumlah Pek. Pengecatan
ARS-GED RAWAT INAP NON BEDAH
Page 8 of 99
JUMLAH HARGA (Rp.)
NO.
VIII 1 2
URAIAN PEKERJAAN
VOLUME
3 4 5 6 7 8 9 10 11 12
PEKERJAAN SANITAIR Klosed Duduk CW702J-SW784JP (lengkap) Single Level Shower Set TX438SEM-TX405SDN (Lengkap) Spoel Hoek SK33 (lengkap) Wastefel LW 523 NJ (lengkap) Wastefel LW 236 CJ (lengkap) Shower Spray TB 19 CS MCR (lengkap) Floor Drain TX1BV1N Kran Zink T30ARQ13N Kran Air T23B13V7NB Tissu Holder AW360J Shoap Holder S156N Kaca Cermin bevel + Frame stainlees steel uk. 60 x 80
13
Kaca Cermin bevel + Frame stainlees steel uk. 90 x 80
14 15 16
Kitchen Zink 1 Lubang Stainless Steel 304 Hand Railing Stainless Panjang 1 m Cor Meja Wastafel + Pelapis Meja Granite Alam ( Termasuk Pingul )
17
Cor Meja Pantry + Pelapis Meja Homogenues Tile 60 x 60 dan Dinding T. 60 cm
HARGA SATUAN (Rp.)
SAT
15.00 11.00
bh bh
1.00 2.00 11.00 13.00 20.00 1.00 5.00 16.00 16.00 11.00
bh bh bh bh bh bh bh bh bh bh
2.00
bh
1.00 11.00 2.40
bh bh m'
3.18
m'
Jumlah Pek. Sanitair IX 1
PEKERJAAN FURNITURE 4.53 m' Pekerjaan Nurse Station - Meja Nurse Staion Multiplek 18 mm lapis HPL + Pelapis Meja Granite Alam - Back Drop Gypsum Board 9mm Finish Cat Majestic Jumlah Pek. Furniture Jumlah Lantai Satu
B. I 1 2 3 4 5
LANTAI DUA PEKERJAAN PASANGAN 125.16 Pasangan Dinding bata ringan t. 10 cm m3 4.10 Kolom Praktis 10 x 10 m3 1.78 Balok Latei 10 x 15 m3 Pasangan Dinding Partisi Double Kalsiboard T. 8 mm + Rangka15.36 Hollow 40.40.0,5 m2 4.80 Pek. Dudukan Dinding Partisi m1 Jumlah Pek. Pasangan
II 1 2 3 4
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
2,503.19 154.13 2,503.19 883.01
m² m² m² m' Jumlah Pek. Plesteran
ARS-GED RAWAT INAP NON BEDAH
Page 9 of 99
JUMLAH HARGA (Rp.)
NO.
III 1 2 3 4 5 6 7 8 9 10 11 12 13
URAIAN PEKERJAAN
PEKERJAAN KOSEN & KACA Pintu Type P-1 Pintu Type P-2 Pintu Type P-3 Pintu Type P-4 Pintu Type P-6 Pintu Type P-7 Pintu Type P-8 Jendela Type J1 Jendela Type J2 Jendela Type J3 Jendela Type SHF Bouven Type BV1 Bouven Type BV2
VOLUME
SAT
11.00 13.00 17.00 2.00 1.00 2.00 1.00 3.00 13.00 5.00 8.00 18.00 1.00
unit unit unit unit unit unit unit unit unit unit unit unit unit
HARGA SATUAN (Rp.)
Jumlah Pek. Kosen & Kaca IV 1
2 3
PEKERJAAN RAILING Pekerjaan Hand Railing Pembatas Curtain Wall - Hand Railing Pipa BSP SC 20 Ø2,5" Finish Cat Duco Pekerjaan Bumper Guard Pekerjaan Railing Guard
4.17
m'
55.55 33.05
m' m' Jumlah Pek. Railing
V 1 2 3 4 5 6 7
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Hemogeneous Tile 60 x 60 ( HT - 1P ) Pelapis Lantai Keramik Toilet Uk. 20 x 20 ( CT 1UP ) Pelapis Dinding Keramik Toilet Uk. 20 x 33 Pasang Border Dinding Keramik Toilet Uk. 10 x 20 Pasang Plin Dinding Homogeneus Tile Uk. 10 x 60 Pasang Hospital plin 5 x 20 Pek. Waterproofing Lantai Toilet
629.11 66.53
m2 m2
364.53 127.16 243.97 243.87 66.53
m2 m' m' m' m2
Jumlah Pek. Pelapis Dinding & Lantai VI 1 2 3 4
PEKERJAAN LANGIT - LANGIT Beton Expose Plafond Gypsum Board Wet Area 1200 x 2400 mm T. 9 mm + Rangka Metal Furring (GP) Plafond Kalsiboar Board T. 6 mm 1200 x 2400 + Rangka Metal Furring (GRC) List Plafond
2.27 670.47
m2 m2
64.95
m2
724.50
m' Jumlah Pek. Langit - Langit
VII 1 2 3
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 ) Cat Plafond Majestic Paint ( P-1 )
1,478.74 352.69 735.42
m2 m2 m2 Jumlah Pek. Pengecatan
ARS-GED RAWAT INAP NON BEDAH
Page 10 of 99
JUMLAH HARGA (Rp.)
NO.
VIII 1 2
URAIAN PEKERJAAN
VOLUME
SAT
3 4 5 6 7 8 9 10 11 12
PEKERJAAN SANITAIR Klosed Duduk CW702J-SW784JP (lengkap) Single Level Shower Set TX438SEM-TX405SDN (Lengkap) Spoel Hoek SK33 (lengkap) Wastefel LW 523 NJ (lengkap) Wastefel LW 236 CJ (lengkap) Shower Spray TB 19 CS MCR (lengkap) Floor Drain TX1BV1N Kran Zink T30ARQ13N Kran Air T23B13V7NB Tissu Holder AW360J Shoap Holder S156N Kaca Cermin bevel + Frame stainlees steel uk. 60 x 80
13
Kaca Cermin bevel + Frame stainlees steel uk. 90 x 80
2.00
bh
14 15 16
Kitchen Zink 1 Lubang Stainless Steel 304 Hand Railing Stainless Panjang 1 m Cor Meja Wastafel + Pelapis Meja Granite Alam ( Termasuk Pingul )
1.00 9.00 2.40
bh bh m'
17
Cor Meja Pantry + Pelapis Meja Homogenues Tile 60 x 60 dan Dinding T. 60 cm
3.18
m'
13.00 9.00
bh bh
1.00 2.00 9.00 11.00 18.00 1.00 5.00 14.00 14.00 9.00
bh bh bh bh bh bh bh bh bh bh
HARGA SATUAN (Rp.)
Jumlah Pek. Sanitair IX 1
PEKERJAAN FURNITURE 4.53 m' Pekerjaan Nurse Station - Meja Nurse Staion Multiplek 18 mm lapis HPL + Pelapis Meja Granite Alam - Back Drop Gypsum Board 9mm Finish Cat Majestic Jumlah Pek. Furniture Jumlah Lantai Dua
C. I 1 2 3
LANTAI ATAP PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Kolom Praktis 10 x 10 Ring Balok 10 x 15
32.22 0.54 3.28
m3 m3 m3 Jumlah Pek. Pasangan
II 1 2
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Acian Semen instant
644.40 322.20
m² m² Jumlah Pek. Plesteran
III 1 2 3
PEKERJAAN PELAPIS LANTAI DAN INSTALASI AIR HUJAN 200.70 Pek. Waterproofing atap + Screed MU T = 3 cm 17.00 Pek. Pemasangan roof drain Ø 4" 66.00 Pek. Pemasangan talang pipa air hujan PVC 4" type D
ARS-GED RAWAT INAP NON BEDAH
Page 11 of 99
m² bh m'
JUMLAH HARGA (Rp.)
NO.
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN (Rp.)
Jumlah Pek. Pelapis Dinding & Lantai III 1 2 3 4 5
PEKERJAAN PENUTUP ATAP Pek. Rangka Penutup Atap Baja Ringan Galvalum Pek. Penutup Atap Genteng Zincalum Pek. Penutup Atap Nok Zincalum Pek. Pemasangan Lisplank Kalsiplank Pek. Pemasangan Penutup Dinding Gewel Kalsiplank L. 30 cm + Rangka
682.99 682.99 38.50 112.48 255.00
m² m² m' m' m'
Jumlah Pek. Penutup Atap Jumlah Lantai Atap C. I 1
FACADE PEKERJAAN FACADE 580.23 Pasang Alumunium Composite Panel Untuk Facade m2 - Alumunium Alloy Grade 5005 + Polyetherlene 4 mm + Skin Alm. 0.4 mm - Rangka Hollow Allumunium 40x40, Besi Siku 40.40.2 & Silicon Silent PU
2
Pasang Alumunium Composite Panel Untuk Façade 21.59 m2 Artistik - Alumunium Alloy Grade 5005 + Polyetherlene 4 mm + Skin Alm. 0.4 mm - Rangka Hollow Allumunium 40x40, Besi Siku 40.40.2 & Silicon Silent PU
3
78.49 Pasang Curtainwall Podwer Coating + Kaca Panasap 8 mm Type 1
m2
4
46.25 Pasang Curtainwall Podwer Coating + Kaca Panasap 8 mm Type 2
m2 Jumlah Pek. Façade
JUMLAH TOTAL PEKERJAAN ARSITEKTUR
ARS-GED RAWAT INAP NON BEDAH
Page 12 of 99
JUMLAH HARGA (Rp.)
BOQ REKAPITULASI RENCANA ANGGARAN BIAYA KONSTRUKSI SARANA PENGHUBUNG (RAMP, TANGGA DAN LIFT) PAKET
: PEMBANGUNAN RUMAH SAKIT SK. LERIK
PEKERJAAN LOKASI
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG : RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
I
URAIAN PEKERJAAN
KORIDOR PENGHUBUNG GEDUNG RAWAT INAP A. LANTAI SATU I
PEKERJAAN PLESTERAN
II
PEKERJAAN KOSEN & KACA
III PEKERJAAN PELAPIS DINDING DAN LANTAI IV PEKERJAAN LANGIT - LANGIT V PEKERJAAN PENGECATAN B.
LANTAI DUA I
PEKERJAAN PASANGAN
II
PEKERJAAN PLESTERAN
III PEKERJAAN KOSEN & KACA IV PEKERJAAN PELAPIS DINDING DAN LANTAI V PEKERJAAN LANGIT - LANGIT VI PEKERJAAN PENGECATAN C.
LANTAI TIGA I
II
PEKERJAAN PELAPIS LANTAI DAN INSTALASI AIR HUJAN
TANGGA DAN LIFT A. LANTAI SATU I
PEKERJAAN PASANGAN
II
PEKERJAAN PLESTERAN
III PEKERJAAN KOSEN & KACA IV PEKERJAAN PELAPIS DINDING DAN LANTAI V PEKERJAAN PENGECATAN B.
LANTAI DUA I
PEKERJAAN PASANGAN
II
PEKERJAAN PLESTERAN
III PEKERJAAN KOSEN & KACA IV PEKERJAAN PELAPIS DINDING DAN LANTAI V PEKERJAAN LANGIT - LANGIT VI PEKERJAAN PENGECATAN III
RAMP A. LANTAI SATU I
PEKERJAAN PASANGAN
II
PEKERJAAN PLESTERAN
III PEKERJAAN PELAPIS DINDING DAN LANTAI IV PEKERJAAN PENGECATAN
JUMLAH HARGA ( Rp. )
NO.
B.
URAIAN PEKERJAAN
LANTAI DUA I
PEKERJAAN PASANGAN
II
PEKERJAAN PLESTERAN
III PEKERJAAN KOSEN & KACA IV PEKERJAAN PELAPIS DINDING DAN LANTAI V PEKERJAAN LANGIT - LANGIT VI PEKERJAAN PENGECATAN C.
LANTAI ATAP I
PEKERJAAN PELAPIS LANTAI DAN INSTALASI AIR HUJAN
JUMLAH TOTAL
JUMLAH HARGA ( Rp. )
BOQ PEKERJAAN STRUKTUR SARANA PENGHUBUNG (RAMP, TANGGA DAN LIFT) PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG
LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
II II.1 a. b. c. d.
URAIAN PEKERJAAN
PEKERJAAN STRUKTUR SELASAR PEKERJAAN STRUKTUR PEKERJAAN TANAH Galian Tanah Urugan Tanah Baru Peninggian + 600mm Pasir Urug Bawah Pondasi dan Lantai t.10 cm Lantai Kerja Bawah Pondasi dan Lantai t.5 cm
VOLUME
427.65 312.00 58.12 29.06
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
m3 m3 m3 m3 Jumlah Pek. Tanah
II.2 A. 1
2
3
PEKERJAAN STRUKTUR BAWAH PEKERJAAN PILECAP DAN SLOOF Footplat Type FP1 (1,500x1,500x500) - Besi D 22 - Besi D 16 - Besi D 13 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB1 (300x500) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB2 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa
5,299.66 2,803.13 693.94 111.00 41.63
Kg Kg Kg m2 m3
2,869.82 1,043.85 102.40 15.36
Kg Kg m2 m3
2,002.33 882.29 111.00 41.63
Kg Kg m2 m3 Jumlah Pek. Struktur Bawah
II.3 A. 1
2
3
STR-SARAN
PEKERJAAN STRUKTUR ATAS LANTAI 1 (SATU) Plat Lantai Type Sb (t=130mm) - Besi P10 Dobel Layer - Rabat beton Kolom Type K1 (400x400) - Besi D 22 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Tangga Darurat (1 Unit) - Besi D 16 (Dobel Layer) Plat - Besi D 16 (Dobel Layer) Bordes - Besi P10 Anak Tangga - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
2,008.12 27.50
Kg m3
8,903.43 2,701.84 370.10 355.20 35.52
Kg Kg Kg m2 m3
731.01 293.50 169.12 42.58 5.48
Kg Kg Kg m2 m3
Page 15 of 99
NO.
4
URAIAN PEKERJAAN
Balok Bordes Type BB (300x500) - Besi D 19 - Besi D 13 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
VOLUME
65.44 7.66 33.02 5.20 0.60
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Kg Kg Kg m2 m3
Jumlah Pek. Struktur Atas Lt. 1 B. 1
2
3
4
5
6
LANTAI 2 (DUA) Balok Type B1 (300x500) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type B2 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type BA1 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type BA2 (250x300) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Kolom Type K2 (300x300) - Besi D 22 - Besi D 16 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Plat Lantai Type Sa (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa
860.01 317.13 43.16 4.98
Kg Kg m2 m3
2,499.41 994.58 126.95 12.09
Kg Kg m2 m3
213.83 95.10 13.55 1.29
Kg Kg m2 m3
33.65 17.76 2.38 0.21
Kg Kg m2 m3
5,981.99 3,164.03 776.06 277.58 177.60 13.32
Kg Kg Kg Kg m2 m3
4,016.25 222.08 27.50
Kg m2 m3
Jumlah Pek. Struktur Atas Lt. 2 C. 1
2
3
STR-SARAN
LANTAI DAK Balok Type B2 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type B3 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type BA3 (250x300) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa
2,606.91 1,037.36 132.41 12.61
Kg Kg m2 m3
532.83 210.07 29.40 2.80
Kg Kg m2 m3
215.00 79.30 10.88 0.96
Kg Kg m2 m3
Page 16 of 99
NO.
4
URAIAN PEKERJAAN
Plat Lantai Type Sa (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa
VOLUME
5,032.18 278.25 34.45
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Kg m2 m3
Jumlah Pek. Struktur Atas Lt. Dak JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR PEKERJAAN STRUKTUR RAMP
II II.1 a. b. c. d.
PEKERJAAN STANDAR PEKERJAAN STRUKTUR PEKERJAAN TANAH Galian Tanah Urugan Tanah Baru Peninggian + 600mm Pasir Urug Bawah Pondasi dan Lantai t.10 cm Lantai Kerja Bawah Pondasi dan Lantai t.5 cm
191.05 100.80 7.24 3.62
m3 m3 m3 m3 Jumlah Pek. Tanah
II.2 A. 1
2
PEKERJAAN STRUKTUR BAWAH PEKERJAAN PILECAP DAN SLOOF Footplat Type FP1 (1,500x1,500x500) - Besi D 22 - Besi D 16 - Besi D 13 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa SLOOF TB1 (300x500) - Besi D 19 - Besi D10 Sengkang - Begisting Batako - Beton Ready Mix f'c= 25 Mpa
2,578.21 1,363.68 337.59 54.00 20.25
Kg Kg Kg m2 m3
2,692.21 1,034.75 106.20 15.93
Kg Kg m2 m3 Jumlah Pek. Struktur Bawah
II.3 A. 1
2
3
4
STR-SARAN
PEKERJAAN STRUKTUR ATAS LANTAI 1 RAMP Kolom Type K2 (300x300) - Besi D 22 - Besi D 16 - Besi D10 Sengkang - Besi D13 Joint Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type B2 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type BA1 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Plat Lantai Type Sa (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa
6,970.84 3,687.06 805.42 135.04 172.80 12.96
Kg Kg Kg Kg m2 m3
2,227.15 993.06 135.03 12.86
Kg Kg m2 m3
430.01 171.11 23.52 2.24
Kg Kg m2 m3
2,734.47 144.00 18.72
Kg m2 m3
Page 17 of 99
NO.
URAIAN PEKERJAAN
VOLUME
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Jumlah Pek. Struktur Atas Lt. Ramp
STR-SARAN
Page 18 of 99
NO.
B. 1
2
3
URAIAN PEKERJAAN
LANTAI DAK Balok Type B3 (250x400) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Balok Type BA3 (250x300) - Besi D 19 - Besi D10 Sengkang - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa Plat Lantai Type Sa (t=130mm) - Besi P10 Dobel Layer - Begisting Multiplex - Beton Ready Mix f'c= 30 Mpa
VOLUME
SAT
2,459.44 909.03 123.27 11.74
Kg Kg m2 m3
411.31 142.11 19.04 1.68
Kg Kg m2 m3
3,076.28 170.10 21.06
Kg m2 m3
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Jumlah Pek. Struktur Atas Lt. Dak JUMLAH TOTAL PEKERJAAN STRUKTUR RAMP JUMLAH TOTAL PEKERJAAN STRUKTUR SARANA PENGHUBUNG
STR-SARAN
Page 19 of 99
BOQ PEKERJAAN ARSITEKTUR SARANA PENGHUBUNG (RAMP, TANGGA DAN LIFT) PAKET PEKERJAAN LOKASI
NO.
: BELANJA MODAL BANGUNAN KESEHATAN : PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG : RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN (Rp.)
KORIDOR PENGHUBUNG GEDUNG RAWAT INAP NON BEDAH A. I 1 2 3
LANTAI SATU PEKERJAAN PLESTERAN Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
277.27 284.67 217.52
m² m² m' Jumlah Pek. Plesteran
II 1 2
PEKERJAAN KOSEN & KACA Kisi - Kisi 1 Panjang 2,7 m Kisi - Kisi 2 Panjang 1,7 m
70.00 1.68
unit unit
Jumlah Pek. Kosen & Kaca III 1 2 3
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Ceramic Tile 40 x 40 Unpolish (CT - 3 UP) Pelapis Lantai Ceramic Tile 40 x 40 Polish ( CT - 3 P ) Pelapis Kolom Ceramic Tile Rustic 30 x 30 ( CT - 4 )
225.50 27.16 84.32
m2 m2 m2
Jumlah Pek. Pelapis Dinding & Lantai IV 1
PEKERJAAN LANGIT - LANGIT Acian Beton Ekspose
252.45
m2
Jumlah Pek. Langit - Langit V 1 2
PEKERJAAN PENGECATAN Cat Kolom Majestic Paint ( P-1 ) Cat Plafond Majestic Paint ( P-1 )
140.54 259.18
m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Satu
B. I 1 2
LANTAI DUA PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Balok Latei 10 x 15
9.50 0.88
m3 m3 Jumlah Pek. Pasangan
ARS-SARANA
Page 20 of 99
JUMLAH HARGA (Rp.)
NO.
II 1 2 3 4
URAIAN PEKERJAAN
VOLUME
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
189.95 151.23 189.95 217.52
SAT
HARGA SATUAN (Rp.)
m² m² m² m' Jumlah Pek. Plesteran
III 1 2 3
PEKERJAAN KOSEN & KACA Kisi - Kisi 1 Panjang 2,7 m Kisi - Kisi 2 Panjang 1,7 m Pekerjaan Hand Railing - Hand Railing Pipa BSP SC 20 Ø2,5" Finish Cat Duco
70.00 2.00 251.10
unit unit m1
Jumlah Pek. Kosen & Kaca
IV 1 2 3
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Ceramic Tile 40 x 40 Unpolish ( CT - 3 UP ) Pelapis Lantai Ceramic Tile 40 x 40 Polish ( CT - 3 P ) Pelapis Kolom dan Dinding Ceramic Tile Rustic 30 x 30 (CT - 4)
225.50 27.16 164.86
m2 m2 m'
Jumlah Pek. Pelapis Dinding & Lantai V 1
PEKERJAAN LANGIT - LANGIT Acian Beton Ekspose
252.45
m2
Jumlah Pek. Langit - Langit VI 1 2 3
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 ) Cat Plafond Majestic Paint ( P-1 )
316.55 140.54 259.18
m2 m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Dua
C. I 1 2 3
LANTAI DAK PEKERJAAN PELAPIS LANTAI DAN INSTALASI AIR HUJAN 351.75 Pek. Waterproofing atap + Screed MU T = 3 cm 36.00 Pek. Pemasangan roof drain Ø 4" 60.30 Pek. Pemasangan talang pipa air hujan PVC 4" type D
m2 bh m'
Jumlah Pek. Pelapis Dinding & Lantai Jumlah Lantai Dak JUMLAH TOTAL PEKERJAAN ARSITEKTUR KORIDOR TANGGA DAN LIFT A. I 1 2
LANTAI SATU PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Kolom Praktis 10 x 10
6.64 0.23
m3 m3 Jumlah Pek. Pasangan
ARS-SARANA
Page 21 of 99
JUMLAH HARGA (Rp.)
NO.
II 1 2 3 4
URAIAN PEKERJAAN
VOLUME
PEKERJAAN PLESTERAN Plesteran Dinding Semen instant Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
132.71 17.53 132.71 6.98
SAT
HARGA SATUAN (Rp.)
m² m² m² m' Jumlah Pek. Plesteran
III 1 2
PEKERJAAN KOSEN & KACA Pintu Type P1-B Pekerjaan Railing Tangga - Tiang Tangga Hollow Stailess Steel 40x20x2 - Hand Railing Tangga Hollow Stailess Steel 40x40x2 - Railing Tangga Hollow Stailess Steel 40x20x2
1.00 23.97
unit m1
Jumlah Pek. Kosen & Kaca IV 1 2 3
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Ceramic Tile 40 x 40 Unpolish (CT - 3 UP) Stepnosining Tangga Uk. 10 x 40 Pelapis Dinding Lift Granit Alam
32.15 42.49 7.41
m2 m1 m2
Jumlah Pek. Pelapis Dinding & Lantai VI 1 2
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 )
72.98 80.18
m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Satu
B. I 1 2
LANTAI DUA PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Kolom Praktis 10 x 10
66.36 0.23
m3 m3 Jumlah Pek. Pasangan
II 1 2 3 4
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Plesteran Beton Semen instant Acian Semen instant Benangan & Tali Air Semen instant
132.71 17.53 132.71 6.98
m² m² m² m' Jumlah Pek. Plesteran
III 1
PEKERJAAN KOSEN & KACA Pintu Type P1-B
1.00
unit
Jumlah Pek. Kosen & Kaca
IV 1 2
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Ceramic Tile 40 x 40 Unpolish ( CT - 3 UP ) Pelapis Dinding Lift Granit Alam
4.62 7.41
m2 m2
Jumlah Pek. Pelapis Dinding & Lantai
ARS-SARANA
Page 22 of 99
JUMLAH HARGA (Rp.)
NO.
V 1
URAIAN PEKERJAAN
VOLUME
PEKERJAAN LANGIT - LANGIT Acian Beton Ekspose
24.42
SAT
HARGA SATUAN (Rp.)
m2
Jumlah Pek. Langit - Langit VI 1 2 3
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 ) Cat Plafond Majestic Paint ( P-1 )
72.98 80.18 25.07
m2 m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Dua
JUMLAH TOTAL PEKERJAAN ARSITEKTUR TANGGA DAN LIFT RAMP A. I 1 2
LANTAI SATU PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Balok Latei 10 x 15
9.24 1.21
m3 m3 Jumlah Pek. Pasangan
II 1 2 3
PEKERJAAN PLESTERAN Plesteran Dinding Semen instant Plesteran Beton Semen instant Acian Semen instant
184.76 46.03 184.76
m² m² m² Jumlah Pek. Plesteran
IV 1
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Beton Finsihing Floor hardener
99.20
m2
Jumlah Pek. Pelapis Dinding & Lantai VI 1 2
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 )
84.65 113.29
m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Satu
B. I 1 2
LANTAI DUA PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Balok Latei 10 x 15
9.24 1.21
m3 m3 Jumlah Pek. Pasangan
II 1 2 3
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Plesteran Beton Semen instant Acian Semen instant
184.76 47.25 184.76
m² m² m² Jumlah Pek. Plesteran
ARS-SARANA
Page 23 of 99
JUMLAH HARGA (Rp.)
NO.
III 1 2
URAIAN PEKERJAAN
VOLUME
SAT
8.00 4.00
unit unit
PEKERJAAN KOSEN & KACA Kisi - Kisi 1 Panjang 5,65 Kisi - Kisi 2 Panjang 2,65
HARGA SATUAN (Rp.)
Jumlah Pek. Kosen & Kaca
IV 1
PEKERJAAN PELAPIS DINDING DAN LANTAI Pelapis Lantai Beton Finsihing Floor hardener
99.20
m2
Jumlah Pek. Pelapis Dinding & Lantai V 1
PEKERJAAN LANGIT - LANGIT Acian Beton Ekspose
100.52
m2
Jumlah Pek. Langit - Langit VI 1 2 3
PEKERJAAN PENGECATAN Cat Dinding Majestic Paint ( P-1 ) Cat Dinding Wheater Shield ( P-7 ) Cat Plafond Majestic Paint ( P-1 )
84.65 113.29 101.84
m2 m2 m2 Jumlah Pek. Pengecatan Jumlah Lantai Dua
C. I 1 2 3
LANTAI DAK PEKERJAAN PELAPIS LANTAI DAN INSTALASI AIR HUJAN 154.30 Water Proofing Area Basah ( WP ) 12.00 Pek. Pemasangan roof drain Ø 4" 84.14 Pek. Pemasangan talang pipa air hujan PVC 4" type D
m2 bh m'
Jumlah Pek. Pelapis Lantai & Instalsi Air Hujan Jumlah Lantai Dak JUMLAH TOTAL PEKERJAAN ARSITEKTUR RAMP
ARS-SARANA
Page 24 of 99
JUMLAH HARGA (Rp.)
BOQ PEKERJAAN STRUKTUR POWER HOUSE PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG
LOKASI
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
II II.1 1 2 3 4 5 6
URAIAN PEKERJAAN
VOLUME
PEKERJAAN STRUKTUR PEKERJAAN TANAH Galian Tanah Pondasi Urugan Pasir Padat Bawah Pondasi Urugan Kembali Pondasi Galian Tanah Pondasi Rollag (R1) Urugan Pasir Padat Bawah Lantai Urugan Peninggian Lantai
54.42 5.00 17.00 14.58 8.50 43.79
SAT
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
m3 m3 m3 m3 m3 m3 Jumlah Pek. Tanah
II.2 1 2 3 4 5
6
7
PEKERJAAN STRUKTUR BAWAH PEKERJAAN PONDASI Pondasi batu kali 1:3 Pas. Batu kosong Pondasi Rollag (R1) Rabatan Beton Pondasi Plat setempat - Besi U 40 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa Sloof (TB1) - Besi U 40 - Besi U 24 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa Sloof (TB2) - Besi U 40 - Besi U 24 - Begisting Batako - Beton Ready Mix f'c= 25 Mpa
35.75 7.50 4.85 14.48
m3 m3 m3 m3
17.53 1.08 0.86
kg m2 m3
103.58 27.51 12.50 6.24
kg kg m2 m3
88.78 29.16 13.33 0.24
kg kg m2 m3 Jumlah Pek. Struktur Bawah
II.3 A. 1
2
3
PEKERJAAN STRUKTUR ATAS LANTAI 1 (SATU) Kolom (K1) - Besi U 40 - Besi U 24 - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok (B1) - Besi U 40 - Besi U 24 - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa Balok (B2) - Besi U 40 - Besi U 24 - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
STR-POWER HOUSE
147.97 23.80 11.67 3.33
kg kg m3 m3
73.98 29.16 13.33 2.86
kg kg m3 m3
59.19 33.87 16.67 0.36
kg kg m3 m3
Page 25 of 99
NO.
4
5
6 7
URAIAN PEKERJAAN
VOLUME
SAT
Plat atap B - Besi U 24 - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
145.66 5.22 12.79
kg m2 m3
Plat lantai A - Besi U 24 - Begisting Multiplex - Beton Ready Mix f'c= 25 Mpa
132.96 4.35 8.16
kg m2 m3
9.96 0.56
m3 m3
Lisplang beton Kanopi beton
HARGA
JUMLAH
SATUAN
HARGA
(Rp.)
(Rp.)
Jumlah Pek. Struktur Atas JUMLAH TOTAL PEKERJAAN STRUKTUR SARANA PENGHUBUNG
STR-POWER HOUSE
Page 26 of 99
BOQ PEKERJAAN ARSITEKTUR POWER HOUSE PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN LOKASI
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG : RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
NO.
A. I 1 2 3
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SATUAN (Rp.)
LANTAI SATU PEKERJAAN PASANGAN Pasangan Dinding bata ringan t. 10 cm Kolom Praktis 10 x 10 Balok Latei 10 x 15
23.52 0.36 0.09
m3 m3 m3 Jumlah Pek. Pasangan
II 1 2 3
PEKERJAAN PLESTERAN Plesteran Dinding Sement Instant Acian Semen instant Benangan & Tali Air Semen instant
259.80 420.28 138.12
m² m² m' Jumlah Pek. Plesteran
III 1 2 3 4 5
PEKERJAAN KOSEN & KACA Pekerjaan pintu type PG Jalusi (Kisi-kisi) Pagar BRC Dinding rangka holoow Pintu holoow
2.00 8.00 5.71 28.88 6.13
bh bh m1 m² m² Jumlah Pek. Kosen & Kaca
IV 1 2 3
PEKERJAAN PELAPIS DINDING DAN LANTAI Rabatan Beton keliling gedung T. 10 cm Pelapis Lantai Ceramic Tile 30 x 30 Unpolish ( CT - 2 ) Plat bordes rangka besi siku 50x50
2.70 29.80 8.24
m2 m2 m2
Jumlah Pek. Pelapis Dinding & Lantai VI 1
PEKERJAAN LANGIT - LANGIT List Plafond
100.00
m' Jumlah Pek. Langit - Langit
VII 1 2
PEKERJAAN PENGECATAN Cat Dinding Wheater Shield ( P-7 ) Pek. Waterproofing atap + Screed MU T = 3 cm
304.20 71.47
m2 m² Jumlah Pek. Pengecatan
VIII 1 2
PEKERJAAN UTILITAS Pek. Pemasangan roof drain Ø 4" Pek. Pemasangan talang pipa air hujan PVC 4" type D
4.00 5.36
bh m' Jumlah Pek. Utilitas Jumlah Lantai Satu
JUMLAH TOTAL PEKERJAAN ARSITEKTUR
ARS-POWER HOUSE
Page 27 of 99
JUMLAH HARGA (Rp.)
BOQ PENYELENGGARAAN SMK3 KONSTRUKSI PAKET
: BELANJA MODAL BANGUNAN KESEHATAN
PEKERJAAN
: PEMBANGUNAN GEDUNG RAWAT INAP NON BEDAH DAN SELASAR PENGHUBUNG
#REF!
: RSUD S.K. LERIK JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
No.
Uraian Pekerjaan
Volume
Satuan
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
PENYELENGGARAAN SMK3 KONSTRUKSI I
PENYIAPAN RK3
1
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan Formulir
2
Pembuatan Kartu Identitas Pekerja (KIP)
1.00
set
100.00
org Sub Jumlah I
II
SOSIALISASI DAN PROMOSI K3
1
Induksi K3 (Safety Induction)
2
Pelatihan K3 ; - Bekerja di Ketinggian - K3 Peralatan Konstruksi & Penggunaan Bahan Kimia (MSDS) - Analysis Keselamatan Pekerjaan
100.00
org
20.00
org
5.00
org
10.00
org
- Perilaku Berbasis Keselamatan (Budaya K3)
100.00
org
3
Simulasi K3
100.00
org
4
Spanduk (Banner)
15.00
lb
5
Poster
15.00
lb
6
Papan Informasi K3
6.00
bh Sub Jumlah II
III ALAT PELINDUNG KERJA 1
Jaring Pengaman (Safety Net)
2.00
ls
2
Tali Keselamatan (Safety Line)
4.00
ls
3
Penahan Jatuh (Safety Deck)
2.00
ls Sub Jumlah III
IV ALAT PELINDUNG DIRI 1
Topi Pelindung (Safety Helmet)
50.00
bh
2
Pelindung Mata (Goggles, Spectacles)
50.00
psg
3
Tameng Muka (Face Shield)
10.00
bh
4
Pelindung Telinga (Ear Plug, Ear Muff)
10.00
psg
5
Pelindung Pernafasan Dan Mulut (Masker)
50.00
bh
6
Sarung Tangan (Safety Gloves)
50.00
psg
7
Sepatu Keselamatan (Safety Shoes); Untuk Staf
10.00
psg
8
Sepatu Keselamatan (Rubber Safety Shoes_and Toe Cap)
50.00
psg
9
Penunjang Seluruh Tubuh (Full Body Harness)
5.00
bh
10 Rompi Keselamatan (Safety Vest)
50.00
bh
11 Celemek (Apron/Coveralls)
20.00
bh
12 Pelindung Jatuh (Fall Arrester)
10.00
bh Sub Jumlah IV
V
ASURANSI DAN PERIJINAN
1
BPJS Ketenagakerjaan dan Kesehatan Kerja
1.00
ls
(Berdasarkan KEPMENAKER NOMOR : KEP-196/MEN/1999, Tenaga harian Proyek) 2
Surat Ijin Kelaikan Alat
3
Surat Ijin Pengesahan Panitia Pembina Keselamatan dan Kesehatan Kerja (P2K3)
10.00
alat
1.00
ls Sub Jumlah V
VI PERSONIL K3 1
Ahli K3
8.00
ob
2
Petugas K3
8.00
ob Sub Jumlah VI
VII FASILITAS SARANA KESEHATAN 1
Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll)
1.00
2
Ruang P3K (Tempat Tidur Pasien)
1.00
ls
3
Peralatan Pengasapan (Fogging)
1.00
bh
4
Obat Pengasapan
4.00
kali
ls
Sub Jumlah VII VIII RAMBU - RAMBU 1
Rambu Petunjuk
12.00
bh
2
Rambu Larangan
12.00
bh
3
Rambu Peringatan
12.00
bh
4
Rambu Kewajiban
12.00
bh
5
Rambu Informasi
12.00
bh Sub Jumlah VIII
IX LAIN - LAIN TERKAIT DENGAN PENGENDALIAN RESIKO 1
Alat Pemadam Api Ringan (APAR); 10Kg
10.00
bh
2
Sirine
2.00
bh
3
Bendera K3
2.00
bh
4
Jalur Evakuasi (Escape Route)
1.00
ls
5
Lampu Darurat (Emergency Lamp)
4.00
bh Sub Jumlah IX Sub Total C
ANALISA HARGA SATUAN BAHAN DAN UPAH PEKERJAAN STRUKTUR PEKERJAAN LOKASI
: BELANJA MODAL BANGUNAN KESEHATAN : JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
PEKERJAAN PERSIAPAN 1 1 M2 Pekerjaan Pembersihan Lahan Uraian Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
0.100 0.050
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 2 1 M' Pekerjaan Pengukuran dan Pemasangan Bouwplank Uraian
Sat
Indeks
Bahan : Kayu balok 5/7 klas III Paku biasa 2" - 5 " Kayu papan klas III
m3 kg m3
0.012 0.020 0.007
Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
OH OH OH OH
0.100 0.100 0.010 0.005
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 3 1 M' Pekerjaan Pemasangan Pagar Sementara T. 2m Uraian
Sat
Indeks
Bahan : Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m Semen (PC) Seng Gelombang Pasir Pasang Stenslag 1/2 cm Kayu balok 5/7 klas III Paku biasa 2" - 5 " Residu
btg kg lbr m³ m³ m³ kg ltr
1.250 2.500 1.200 0.005 0.009 0.072 0.060 0.400
Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
OH OH OH OH
0.200 0.400 0.020 0.020
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 30 of 99
Jumlah Harga Total (Rp)
PEKERJAAN TANAH DAN PONDASI 1 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter Uraian Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
0.750 0.025
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 Meter Uraian Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
0.900 0.045
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 Meter Uraian Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
1.050 0.067
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 4 1M3 Pekerjaan galian tanah menggunakan alat berat Uraian
Sat
Indeks
Alat : Sewa Escavator Sewa Dump Truck 6 T
jam jam
0.007 0.256
Tenaga Kerja : Pekerja Mandor
OH OH
0.109 0.054
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 1 1M3 Pekerjaan galian batu Uraian
Sat
Indeks
Alat : Excavator Rock Drill Breaker Dump Truck Alat Bantu
jam jam jam jam
0.200 0.200 0.306 1.000
Tenaga Kerja : Pekerja Mandor
OH OH
0.171 0.029
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 31 of 99
Jumlah Harga Total (Rp)
5 1M3 Mengurug kembali galian Uraian
Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
0.250 0.008
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 6 1M3 Memadatkan tanah 1 m2 tanah per 20 cm Uraian
Tenaga Kerja : Pekerja Mandor
Sat
Indeks
OH OH
0.300 0.050
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 7 1M3 Membuang Tanah Keluar Site Uraian
Sat
Indeks
Alat : Sewa Dump Truck 6 T Alat bantu
jam ls
0.077 1.000
Tenaga Kerja : Pekerja Mandor
OH OH
0.154 0.015
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 8 1m3 Membuang Tanah di Dalam Site Proyek Uraian
Sat
Indeks
Alat : Sewa Dump Truck 6 T Alat bantu
jam ls
0.045 1.000
Tenaga Kerja : Pekerja Mandor
OH OH
0.154 0.015
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 32 of 99
Jumlah Harga Total (Rp)
9 1m3 Pekerjaan timbunan tanah + pemadatan dengan alat berat Uraian
Sat
Indeks
Bahan : Tanah Urug
m3
1.200
Tenaga Kerja : Pekerja Mandor
OH OH
0.005 0.001
Alat : Sewa Escavator Sewa Dump Truck 6 T Sewa Motor Grade 125-150 Pk ( min 5 jam) Sewa Vibrator Roller ( min 5 jam ) Sewa Truck Tangki Air ( min 5 jam )
jam jam jam jam jam
0.008 0.485 0.004 0.004 0.007
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 10 1 M3 Mengurug Pasir Urug Uraian
Sat
Indeks
Bahan : Pasir Urug
m3
1.200
Tenaga Kerja : Pekerja Mandor
OH OH
0.330 0.010
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 11 1 M3 Memasang Lantai Kerja Uraian
Sat
Indeks
Bahan : Semen (PC) Pasir Cor Stenslag 1/2 cm
kg m3 m3
230.000 0.638 0.761
Tenaga Kerja : Pekerja Tukang batu Kepala Tukang Batu Mandor
OH OH OH OH
1.200 0.200 0.020 0.060
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 12 1 M3 Memasang batu kosong Uraian
Sat
Indeks
Bahan : batu belah 15cm/20cm pasir urug
m3 m3
1.200 0.432
Tenaga Kerja : Pekerja Tukang batu Kepala Tukang Batu Mandor
OH OH OH OH
0.014 0.014 0.001 0.001
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 33 of 99
Jumlah Harga Total (Rp)
13 1M3 Memasang pondasi batu belah campuran 1 PC : 4 PP Uraian
Sat
Indeks
Bahan : batu belah 15cm/20cm Semen (PC) Pasir Pasang
m3 kg m3
1.200 163.000 0.520
Tenaga Kerja : Pekerja Tukang batu Kepala Tukang Batu Mandor
OH OH OH OH
1.500 0.750 0.075 0.075
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 14 1m2 Membuat Screed Beton + kawat ayam Uraian
Sat
Indeks
Bahan : Semen (PC) Pasir Pasang Kawat ayam
kg m3 m3
7.776 0.023 1.050
Tenaga Kerja : Pekerja Tukang batu Kepala Tukang Batu Mandor
OH OH OH OH
0.300 0.150 0.015 0.015
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan PEKERJAAN STRUKTUR BETON 1 1 Kg Memasang Besi Beton U-24 Uraian
Sat
Indeks
Bahan : Besi beton BJTP 24 Kawat beton
kg m3
1.050 0.015
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.007 0.007 0.007 0.000
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 2 1 Kg Memasang Besi Beton U-40 Uraian
Sat
Indeks
Bahan : Besi beton BJTP 40 Kawat beton
kg m3
1.050 0.015
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.007 0.007 0.007 0.000
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 34 of 99
Jumlah Harga Total (Rp)
3 1M2 Memasang bekisting untuk kolom (2 X Pakai) Uraian
Sat
Indeks
Bahan : Kayu Kelas III. Paku biasa 2" - 5 " Minyak Begesting Balok Kayu Kelas II. Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m
m³ kg ltr m³ lbr btg
0.020 0.400 0.200 0.008 0.175 1.000
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.660 0.330 0.033 0.033
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 4 1M2 Memasang bekisting untuk balok (2 X Pakai) Uraian
Sat
Indeks
Bahan : Kayu Kelas III. Paku biasa 2" - 5 " Minyak Begesting Balok Kayu Kelas II. Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m
m³ kg ltr m³ lbr btg
0.020 0.400 0.200 0.009 0.175 1.000
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.660 0.330 0.033 0.033
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 5 1M2 Memasang bekisting untuk dinding (2 X Pakai) Uraian
Sat
Indeks
Bahan : Kayu Kelas III. Paku biasa 2" - 5 " Minyak Begesting Balok Kayu Kelas II. Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m Formite/penjaga jarak bekisting/spacer
m³ kg ltr m³ lbr btg bh
0.015 0.400 0.200 0.010 0.175 1.500 2.000
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.660 0.330 0.033 0.033
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 35 of 99
Jumlah Harga Total (Rp)
6 1M2 Memasang bekisting untuk plat lantai (2 X Pakai) Uraian
Sat
Indeks
Bahan : Kayu Kelas III. Paku biasa 2" - 5 " Minyak Begesting Balok Kayu Kelas II. Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m
m³ kg ltr m³ lbr btg
0.020 0.400 0.200 0.008 0.175 3.000
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.660 0.330 0.033 0.033
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 7 1M2 Memasang bekisting untuk tangga (2 X Pakai) Uraian
Sat
Indeks
Bahan : Kayu Kelas III. Paku biasa 2" - 5 " Minyak Begesting Balok Kayu Kelas II. Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m
m³ kg ltr m³ lbr btg
0.030 0.400 0.150 0.015 0.350 2.000
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.660 0.330 0.033 0.033
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 8 1M2 Memasang bekisting batako Uraian
Sat
Indeks
Bahan : Batako Semen (PC) Pasir pasang
bh kg m³
23.333 14.370 0.040
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.300 0.100 0.010 0.015
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 36 of 99
Jumlah Harga Total (Rp)
9 1m3 Beton Ready mix f'c=30 Mpa Uraian
Sat
Indeks
Bahan : Ready mix f'c=30 Mpa Peralatan (pompa beton, vibrator dll)
m³ hari
1.020 0.120
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
1.000 0.250 0.025 0.100
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 10 1M2 Pasang bekisting stelldeck NC-900 untuk lantai Uraian
Sat
Indeks
Bahan : Stelldeck NC-900 (BMT =1mm) Paku biasa 2" - 5 " Balok Kayu Kelas II. Scaffolding
m² kg m³ m²
1.100 0.100 0.005 0.500
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.070 0.070 0.007 0.004
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 11 1M2 Pembesian Wiremesh M8 Uraian
Sat
Indeks
Bahan : Wiremesh M8
lbr
0.088
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.070 0.070 0.007 0.004
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan 12 1 Kg Memasang besi kontruksi Uraian
Sat
Indeks
Bahan : Besi Baja IWF /HB Sewa Alat
kg jam
1.100 0.147
Tenaga Kerja : Pekerja Tukang besi Kepala Tukang Besi Mandor
OH OH OH OH
0.014 0.014 0.001 0.001
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Overhead & Profit….. % Harga Per Satuan Pekerjaan Dibulatkan
AN STR
Page 37 of 99
Jumlah Harga Total (Rp)
ANALISA HARGA SATUAN BAHAN DAN UPAH PEKERJAAN ARSITEKTUR PEKERJAAN LOKASI
: BELANJA MODAL BANGUNAN KESEHATAN : JL. TIMOR RAYA PASIR NO. 134 PASIR PANJANG KEC. KOTA LAMA, KOTA KUPANG NUSA TENGGARA TIMUR
PEKERJAAN PASANGAN DINDING 1 M³ Dinding Bata Ringan Tebal 10 cm, Spesi tebal 1cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Bahan : Bata Ringan uk 60x20x t. 10 cm Semen instant MU 380 (40 kg) Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bj sak
87.497 1.000
OH OH OH OH
1.500 0.750 0.075 0.075 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² diding Double Partisi Kalsipart t. 8 mm +Rangka Hollow 40x40x0,5 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Rangka Hollow Galvalume 40x40x0,5 Kalsipart 8 mm Skrup Joint Kalsiboard
m¹ m² bh kg
8.000 2.100 36.000 0.400
Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
oh oh oh oh
0.070 0.800 0.070 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M³ Beton Mutu f'c = 19.3 Mpa (K225), slump (12 ± 2) cm, w/c = 0.58 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Semen (PC) Pasir Cor Stenslag 1/2 cm Air Kerja Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg m³ m³ m³
371.000 0.499 0.776 0.215
OH OH OH OH
1.650 0.275 0.028 0.083 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 38 of 99
1 M³ Beton Mutu f'c = 21.7 Mpa (K250), slump (12 ± 2) cm, w/c = 0.56 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Beton Readymix Mutu K250 Concrete Pump Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m³ m³
1.000 1.000
OH OH OH OH
0.550 0.092 0.009 0.028 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Per 1 kg Ulir Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Besi Tulangan Ulir Kawat bendrat Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
kg m³
1.050 0.015
OH OH OH OH
0.007 0.007 0.001 0.000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Per 1 kg Polos Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Besi Tulangan Polos Kawat bendrat Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
kg m³
1.050 0.015
OH OH OH OH
0.007 0.007 0.001 0.000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Per 1 m² bekisting untuk Kolom untuk 2x Pakai Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kayu Meranti Begesting Paku uk. 5 - 12 cm Minyak Begesting Kayu balok 5/7 klas III Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m³ kg ltr m³ lbr btg
0.020 0.400 0.200 0.008 0.175 1.000
OH OH OH OH
0.660 0.330 0.026 0.026 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 39 of 99
Per 1 m² bekisting untuk Plat Lantai untuk 2 x pakai Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kayu Meranti Begesting Paku uk. 5 - 12 cm Kayu balok 5/7 klas III Multiplek 4" x 8" x 9 mm Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m
m³ kg m³ m² btg
0.011 0.400 0.011 0.175 1.000
Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
OH OH OH OH
0.660 0.330 0.033 0.033 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M³ Kolom Praktis 10x10 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Bahan : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
1.000 297.727 20.000
Tenaga Kerja : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
1.000 297.727 20.000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan 1 M³ Balok Praktis 10x15 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Bahan : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
1.000 209.831 20.000
Tenaga Kerja : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
1.000 209.831 20.000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 40 of 99
1 M' Dudukan Partisi 10x15 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah Harga Total (Rp)
Bahan : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
0.015 2.999 0.300
Tenaga Kerja : Beton K-225 Besi Polos Begesting Kolom
m3 Kg m2
0.015 2.999 0.300
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan PEKERJAAN PLESTERAN DINDING & ACIAN 1 M² Plesteran Dinding Semen Instant tebal 10 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Semen Plester Instant Fm - 800 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg
16.660
OH OH OH OH
0.150 0.100 0.010 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M² Acian Semen Instant Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Semen Acian Instant Fm - 900 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg
3.250
OH OH OH OH
0.150 0.100 0.010 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M' Benangan Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Semen Acian Instant Fm - 900 Tenaga Kerja : Tukang Batu
kg
1.500
OH
0.120 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN KUSEN PINTU & JENDELA
AN ARS
Page 41 of 99
Memasang 1 m' kusen pintu / jendela kaca mati aluminium Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm m' Skrup Fixer bh Sealent tube Pipa Hollow Aluminium (1 x 3 cm) m¹ Paku Skrup 1" bh Tenaga Kerja : Pekerja oh Tukang Besi oh Kepala Tukang Besi oh Mandor oh
1.100 2.000 0.060 1.100 4.000 0.043 0.043 0.004 0.002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² Rangka Aluminium Curtain Wall (Lengkap Assesoris) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Curtain Wall Powder Coating Ex. Ykk Kaca Panasap T. 8mm Skrup Fixer Sealent Paku Skrup 1" Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
m' m2 bh tube bh
1.840 1.050 6.000 0.750 12.000
oh oh oh oh
0.250 0.500 0.050 0.025 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m' Frame Pintu Aluminium Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Frame Pintu Aluminium Powder Coating Sealent Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
m' tube
1.050 0.150
oh oh oh oh
0.020 0.200 0.002 0.002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m' Frame Jendela Aluminium Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Frame Jendela Aluminium Powder Coating Sealent Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
m' tube
1.050 0.150
oh oh oh oh
0.020 0.200 0.002 0.002 Jumlah Harga Overhead & Profit ………..%
AN ARS
Page 42 of 99
Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 m² kaca tebal 3 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Bening 3 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca tebal 5 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Bening 5 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca tebal 6 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Bening 6 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca tebal 8 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Bening 8 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 43 of 99
Memasang 1 m² kaca Panasap tebal 6 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Panasap T. 6mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca Panasap tebal 8 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Panasap T. 8mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.160 0.160 0.016 0.008 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca bening Tempered tebal 10 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Tempered 10 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.480 0.480 0.048 0.024 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² kaca bening Tempered tebal 12 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Tempered 12 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.480 0.480 0.048 0.024 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 44 of 99
Memasang 1 m² Kaca Polos Tempered 8 mm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Polos Tempered 8 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.100
oh oh oh oh
0.480 0.480 0.048 0.024 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Per 1 m² Memasang Sticker Sandblast Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Sticker Sandblast Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.050
OH OH OH OH
0.040 0.200 0.100 0.004 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1m² Alumunium Composit Panel Coating PVDF t. 0,5 mm (ACP) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium composite panel Coating PVDF t. 0,5 mm Gread 5005 Rangka Hollow Galvalume 40x40x0,5 Besi Siku 40x40x4 Sealent Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.050
m¹ kg tb
13.300 9.680 0.500
oh oh oh oh
0.100 1.100 0.100 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1m² Alumunium Composit Panel (ACP) Artistik Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium composite panel Coating PVDF t. 0,5 mm Gread 5005 Rangka Hollow Galvalume 40x40x0,5 Besi Siku 40x40x4 Sealent Ongkos Cutting Alluminium composite panel Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.050
m¹ kg tb m²
13.300 9.680 0.500 1.000
oh oh oh oh
0.100 1.100 0.100 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 45 of 99
Memasang 1m² Alumunium Composit Panel (ACP) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium composite panel Coating PVDF t. 0,5 mm Gread 5005 Sealent Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m²
1.050
tb
0.500
oh oh oh oh
0.050 0.550 0.050 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Casement Handle Jendela Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Casement Handle CH 420 BK R/H Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0069 0.1000 0.0100 0.0002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Engsel Jendela Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Friction Stay FS HD S250 10" Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0138 0.2000 0.0200 0.0004 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Engsel Jendela Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Friction Stay FS HD S250 16'' Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0138 0.2000 0.0200 0.0004 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 46 of 99
Memasang 1 bh Engsel Pintu Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Hinge ESS DL 4x3x3MM 2BB SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0069 0.1000 0.0100 0.0002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Engsel Pintu Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Hinge ESS DL 4.5x4x3MM 2BB SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0069 0.1000 0.0100 0.0002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Engsel Pintu Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Hinge ESS DL 4x3x2MM 2BB SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0069 0.1000 0.0100 0.0002 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Kunci Tanam Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Mortise MTS IL DL8585 SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
set
1.000
oh oh oh oh
0.0100 0.6000 0.0600 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 47 of 99
Memasang 1 bh Kunci Tanam Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Mortise MTS RL DL84030 SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
set
1.000
oh oh oh oh
0.0100 0.6000 0.0600 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Pull Handle Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Pull Handle PH DL802 38X600X400 PSS+SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0100 0.6000 0.0600 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Lever handle Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Handle LHTR 0016 22MM SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0100 0.6000 0.0600 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Clinder Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cylinder CYL BK DL60MM Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0150 0.1250 0.0130 0.0075 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 48 of 99
Memasang 1 bh Clinder Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cylinder CYL DC DL65MM SN Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0150 0.1250 0.0130 0.0075 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Escutheon Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Escutheon 855 SSS/PSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0150 0.1250 0.0130 0.0075 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 psg Escutheon Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Escutheon 84030 SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0150 0.1250 0.0130 0.0075 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Door Closer Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Door Closer DCL 300 NHO NA Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0050 0.3000 0.0300 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 49 of 99
Memasang 1 bh Door Closer Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Door Closer DCL 529 NHO NA Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0050 0.3000 0.0300 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Door Closer Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Door Closer DCL 105 NHO NA Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0050 0.3000 0.0300 0.0050 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Flush Bolt Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Flush Bolt FB 508 NA Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0050 0.2000 0.0200 0.0100 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Flush Bolt Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Flush Bolt FB 040 8" SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0050 0.2000 0.0200 0.0100 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 50 of 99
Memasang 1 bh Flush Bolt Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Flush Bolt FB 040 12" SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
psg
1.000
oh oh oh oh
0.0050 0.2000 0.0200 0.0100 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 bh Dust Proof Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Dust Proof DP 003 SSS Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
bh
1.000
oh oh oh oh
0.0050 0.2000 0.0200 0.0100 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 unit Pintu Type P-1 Uk. 99 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 900 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS
m'
5.2800
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm m' Daun Pintu Kayu Wood Pannel Enggineering unit Finish Duco Uk. 900 x 2145 mm Kaca Bening 5 mm m2 Hinge ESS DL 4x3x3MM 2BB SSS bh Mortise MTS IL DL8585 SSS bh Cylinder CYL BK DL60MM bh Escutheon 855 SSS/PSS psg Handle LHTR 0016 22MM SSS psg
5.2800 1.0000 0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 51 of 99
Memasang 1 unit Pintu Type P-1B Uk. 99 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 900 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 900 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS
m'
5.2800
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
m'
5.2800
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 52 of 99
Memasang 1 unit Pintu Type P-2 Uk. 130 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm
m'
5.5900
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 805 x 2145 mm
unit
1.0000
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 405 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB SQ501-270MM ZC Flush Bolt FB SQ501-370MM ZC
unit
1.0000
m2 bh bh bh psg psg bh bh bh
0.1511 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm m' Daun Pintu Kayu Wood Pannel Enggineering unit Finish Duco Uk. 805 x 2145 mm
5.5900 1.0000
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 405 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB SQ501-270MM ZC Flush Bolt FB SQ501-370MM ZC
unit
1.0000
m2 bh bh bh psg psg bh bh bh
0.1511 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 53 of 99
Memasang 1 unit Pintu Type P-2B Uk. 130 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm
m'
5.5900
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 805 x 2145 mm
unit
1.0000
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 405 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB SQ501-270MM ZC Flush Bolt FB SQ501-370MM ZC
unit
1.0000
m2 bh bh bh psg psg bh bh bh
0.1511 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
m'
5.5900
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 805 x 2145 mm
unit
1.0000
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 405 x 2145 mm Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB SQ501-270MM ZC Flush Bolt FB SQ501-370MM ZC
unit
1.0000
m2 bh bh bh psg psg bh bh bh
0.1511 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Type P-3 Uk. 89 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm m' Daun Pintu Kayu Wood Pannel Enggineering unit Finish Duco Uk. 800 x 2145 mm With Louvre Kaca Bening 5 mm m2 Hinge ESS DL 4x3x3MM 2BB SSS bh Mortise MTS IL DL8585 SSS bh Cylinder CYL BK DL60MM bh Escutheon 855 SSS/PSS psg Handle LHTR 0016 22MM SSS psg Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm m' Daun Pintu Kayu Wood Pannel Enggineering unit Finish Duco Uk. 800 x 2145 mm With Louvre Kaca Bening 5 mm m2 Hinge ESS DL 4x3x3MM 2BB SSS bh Mortise MTS IL DL8585 SSS bh Cylinder CYL BK DL60MM bh Escutheon 855 SSS/PSS psg Handle LHTR 0016 22MM SSS psg
5.1800 1.0000 0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
5.1800 1.0000 0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..%
AN ARS
Page 54 of 99
Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Type P-1C Uk. 89 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 800 x 2145 mm With Louvre Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 800 x 2145 mm With Louvre Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS
m'
5.1800
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
m'
5.1800
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Type P-4 Uk. 100 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 910 x 2145 mm With Louvre Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 910 x 2145 mm With Louvre Kaca Bening 5 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS
m'
5.2900
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
m'
5.2900
unit
1.0000
m2 bh bh bh psg psg
0.1190 3.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 55 of 99
Memasang 1 unit Pintu Type P-5 Uk. 89 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA
m'
5.1900
m' m' m2 tube bh bh bh psg psg
5.3820 5.3820 1.0859 0.2932 3.0000 1.0000 1.0000 1.0000 1.0000
bh
1.0000
m'
5.1900
m' m' m2 tube bh bh bh psg psg
5.3820 5.3820 1.0859 0.2932 3.0000 1.0000 1.0000 1.0000 1.0000
bh
1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 56 of 99
Memasang 1 unit Pintu Type P-1E Uk. 89 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA
m'
5.1900
m' m' m2 tube bh bh bh psg psg
5.3820 5.3820 1.0859 0.2932 3.0000 1.0000 1.0000 1.0000 1.0000
bh
1.0000
m'
5.1900
m' m' m2 tube bh bh bh psg psg
5.3820 5.3820 1.0859 0.2932 3.0000 1.0000 1.0000 1.0000 1.0000
bh
1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 57 of 99
Memasang 1 unit Pintu Type P-6 Uk. 237 x 250 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS
m'
7.8500
m' 12.4400 m' 11.6400 m2 4.0629 tube 1.0970 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 2.0000 bh bh bh
2.0000 2.0000 1.0000
m'
7.8500
m' 12.4400 m' 11.6400 m2 4.0629 tube 1.0970 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 2.0000 bh bh bh
2.0000 2.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 58 of 99
Memasang 1 unit Pintu Type P-2E Uk. 237 x 250 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 6 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS
m'
7.8500
m' 12.4400 m' 11.6400 m2 4.0629 tube 1.0970 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 2.0000 bh bh bh
2.0000 2.0000 1.0000
m'
7.8500
m' 12.4400 m' 11.6400 m2 4.0629 tube 1.0970 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 2.0000 bh bh bh
2.0000 2.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 59 of 99
Memasang 1 unit Pintu Type P-7 Uk. 180 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 8 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 8 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS
m'
6.1900
unit
2.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 1.3120 6.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000 1.0000
m'
6.1900
unit
2.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 1.3120 6.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 60 of 99
Memasang 1 unit Pintu Type P-1M Uk. 99 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 6 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 6 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS
m'
5.3800
unit
1.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 0.5100 3.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
m'
5.3800
unit
1.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 0.5100 3.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 61 of 99
Memasang 1 unit Pintu Type P-2M Uk. 180 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 6 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm Sealent Kaca Bening 6 mm Hinge ESS DL 4x3x3MM 2BB SSS Mortise MTS IL DL8585 SSS Cylinder CYL BK DL60MM Escutheon 855 SSS/PSS Handle LHTR 0016 22MM SSS Door Closer DCL 529 NHO NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS
m'
6.1900
unit
2.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 1.3120 6.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000 1.0000
m'
6.1900
unit
2.0000
tube m2 bh bh bh psg psg bh bh bh
0.3542 1.3120 6.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Shaft Type P-8 Uk. 129 x 139 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kusen Plat Besi / Metal Finish Cat Duco Pintu Besi Finish Cat Duco Uk. 60 x 130 cm Hinge ESS DL 4.5x4x3MM 2BB SSS Window Bolt WB with KEY SSS Pull Plate PP 009 SSS
m' unit bh set bh
5.1800 2.0000 4.0000 1.0000 1.0000
Upah Pasang : Kusen Plat Besi / Metal Finish Cat Duco Pintu Besi Finish Cat Duco Uk. 60 x 130 cm Hinge ESS DL 4.5x4x3MM 2BB SSS Window Bolt WB with KEY SSS Pull Plate PP 009 SSS
m' unit bh set bh
5.1800 2.0000 4.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 62 of 99
Memasang 1 unit Pintu Shaft Type SHF2 Uk. 129 x 139 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kusen Plat Besi / Metal Finish Cat Duco Pintu Besi Finish Cat Duco Uk. 60 x 130 cm Hinge ESS DL 4.5x4x3MM 2BB SSS Window Bolt WB with KEY SSS Pull Plate PP 009 SSS
m' unit bh set bh
5.1800 2.0000 4.0000 1.0000 1.0000
Upah Pasang : Kusen Plat Besi / Metal Finish Cat Duco Pintu Besi Finish Cat Duco Uk. 60 x 130 cm Hinge ESS DL 4.5x4x3MM 2BB SSS Window Bolt WB with KEY SSS Pull Plate PP 009 SSS
m' unit bh set bh
5.1800 2.0000 4.0000 1.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Utama Type PUT GEDUNG VIP Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca tempered 12 mm Alumunium Composite Panel Gread 5005 Floor Hinge FH 84 SIZE 4 BD SS Patch Fitting PT 24 PSS Patch Fitting FT 20, PT 10, US 10 + CYL PSS Pull Handle PH DL802 38X600X400 PSS+SSS Upah Pasang : Kaca tempered 12 mm Alumunium Composite Panel Gread 5005 Floor Hinge FH 84 SIZE 4 BD SS Patch Fitting PT 24 PSS Patch Fitting FT 20, PT 10, US 10 + CYL PSS Pull Handle PH DL802 38X600X400 PSS+SSS
m2 m2 set bh set
19.2100 8.2800 2.0000 2.0000 2.0000
set
2.0000
m2 m2 set bh set
19.2100 8.2800 2.0000 2.0000 2.0000
set
2.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 63 of 99
Memasang 1 unit Pintu Utama Type PUT GEDUNG MANAGEMEN Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca tempered 12 mm Alumunium Composite Panel Gread 5005 Floor Hinge FH 84 SIZE 4 BD SS Patch Fitting PT 24 PSS Patch Fitting FT 20, PT 10, US 10 + CYL PSS Pull Handle PH DL802 38X600X400 PSS+SSS Upah Pasang : Kaca tempered 12 mm Alumunium Composite Panel Gread 5005 Floor Hinge FH 84 SIZE 4 BD SS Patch Fitting PT 24 PSS Patch Fitting FT 20, PT 10, US 10 + CYL PSS Pull Handle PH DL802 38X600X400 PSS+SSS
m2 m2 set bh set
18.4500 8.2800 2.0000 2.0000 2.0000
set
2.0000
m2 m2 set bh set
18.4500 8.2800 2.0000 2.0000 2.0000
set
2.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Type P-2E' Uk. 129 x 219 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS
m'
8.5500
m' m' m2 m2 tube bh bh bh psg psg bh bh bh
5.5000 9.2000 4.0629 1.2530 2.4936 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000
m'
8.5500
m' m' m2 m2 tube bh bh bh psg psg bh bh bh
5.5000 9.2000 4.0629 1.2530 2.4936 6.0000 1.0000 1.0000 1.0000 1.0000 1.0000 2.0000 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 64 of 99
Memasang 1 unit Pintu Type P-1EJ Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
14.3850
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 2.6515 tube 2.2526 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
m'
14.3850
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 2.6515 tube 2.2526 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 65 of 99
Memasang 1 unit Pintu Type P-2E'J1 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
14.3850
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 2.6515 tube 2.2526 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
m'
14.3850
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 2.6515 tube 2.2526 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 66 of 99
Memasang 1 unit Pintu Type P-2E'J2 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
11.5480
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 1.7753 tube 1.7794 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
m'
11.5480
m' 10.2000 m' 4.3120 m' 9.2000 m2 4.0629 m2 1.7753 tube 1.7794 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 67 of 99
Memasang 1 unit Pintu Type P-2E'J3 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
11.0940
m' 10.2000 m' 4.0560 m' 9.2000 m2 4.0629 m2 1.5541 tube 1.6600 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
m'
11.0940
m' 10.2000 m' 4.0560 m' 9.2000 m2 4.0629 m2 1.5541 tube 1.6600 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 68 of 99
Memasang 1 unit Pintu Type P-2E'J4 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
11.1900
m' 10.2000 m' 4.0600 m' 9.2000 m2 4.0629 m2 1.6193 tube 1.6952 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
m'
11.1900
m' 10.2000 m' 4.0600 m' 9.2000 m2 4.0629 m2 1.6193 tube 1.6952 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 1.0000 bh 1.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 69 of 99
Memasang 1 unit Pintu Type P-2E'J6 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
Upah Pasang : Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Profil Kaca Kaca Bening 8 mm Kaca Bening 5 mm Sealent Hinge ESS DL 4x3x2MM 2BB SSS Mortise MTS RL DL84030 SSS Cylinder CYL DC DL65MM SN Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Door Closer DCL 300 NHO NA Flush Bolt FB 508 NA Dust Proof DP 003 SSS Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
17.7300
m' 10.2000 m' 8.7600 m' 9.2000 m2 4.0629 m2 3.7335 tube 2.8369 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 2.0000 bh 2.0000
m'
17.7300
m' 10.2000 m' 8.7600 m' 9.2000 m2 4.0629 m2 3.7335 tube 2.8369 bh 6.0000 bh 1.0000 bh 1.0000 psg 1.0000 psg 1.0000 bh 1.0000 bh 2.0000 bh 1.0000 psg 2.0000 bh 2.0000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Pintu Type P1-STR Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Pintu Besi Finish Cat Duco Uk. 109 x 215 cm Hinge ESS DL 4.5x4x3MM 2BB SSS Panic Exit Device IDEA SINGLE POINT 941111334A Handle & Key 94011003T Door Closer DCL 105 NHO NA Upah Pasang :
unit
1.0000
bh set
3.0000 1.0000
bh bh
1.0000 1.0000
Ls
0.1000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 70 of 99
Memasang 1 unit Pintu Type PAM ( Hermatic Door ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Pintu Sliding Hermatic Automatic Single Door unit 1.0000 ( Pintu Type POK-1) - Automatic door drive - Stainless Steel door panel C/W Double Glass Windows, Seal for Air Presure Level ( 4 Sides ) - Stainless Steel Emergency Handle - Foot Switch - Safety Beam Sensor Upah Pasang :
Ls
0.0500
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Jendela Aluminium , Isian Kaca Bening T.8 mm Uk. 77 x 185 cm ( Jendela Type J1 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 8 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 8 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
5.2440
m' m2 tube psg bh
4.6240 0.8832 0.2385 1.0000 1.0000
m'
5.2440
m' m2 tube psg bh
4.6240 0.8832 0.2385 1.0000 1.0000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 unit Jendela Aluminium , Isian Kaca Bening T.8 mm Uk. 150 x 185 cm ( Jendela Type J2 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 8 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 8 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
8.2780
m' m2 tube psg bh
9.1680 1.7130 0.4625 2.0000 2.0000
m'
8.2780
m' m2 tube psg bh
9.1680 1.7130 0.4625 2.0000 2.0000 Jumlah Harga Overhead & Profit ………..%
AN ARS
Page 71 of 99
Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Jendela Aluminium Kaca Mati, Isian Kaca Bening T.8 mm Uk. 60 x 220 cm ( Jendela Type J3 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Kaca Bening 8 mm Sealent
Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Kaca Bening 8 mm Sealent
m'
5.4400
m2 tube
1.0761 0.3043
m'
5.4400
m2 tube
1.0761 0.3043 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 unit Jendela Aluminium , Isian Louvre Uk. 58 x 185 cm ( Jendela Type SHF ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Louvre T. 2mm Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Louvre T. 2mm
m'
4.8600
m'
23.2000
m'
4.8600
m'
23.2000
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Bouven Aluminium , Isian Kaca Bening T.5 mm Uk. 77 x 60 cm ( Bouven Type BV1 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay FS HD S250 10" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay FS HD S250 10" Casement Handle CH 420 BK R/H
m'
2.5640
m' m2 tube psg bh
2.1240 0.1827 0.0493 1.0000 1.0000
m'
2.5640
m' m2 tube psg bh
2.1240 0.1827 0.0493 1.0000 1.0000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 72 of 99
Memasang 1 unit Bouven Aluminium Kaca Mati, Isian Kaca Bening T.5 mm Uk. 150 x 60 cm ( Bouven Type BV2 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Kaca Bening 5 mm Sealent Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Kaca Bening 5 mm Sealent
m'
4.8000
m2 tube
0.6956 0.1878
m'
4.8000
m2 tube
0.6956 0.1878
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan Memasang 1 unit Jendela Aluminium , Isian Kaca Bening T.5 mm ( Jendela Type J1 ) G. MANAGEMEN Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
42.4000
m' 12.0000 m2 9.5790 tube 2.5863 psg 3.0000 bh 3.0000
m'
42.4000
m' 12.0000 m2 9.5790 tube 2.5863 psg 3.0000 bh 3.0000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 unit Jendela Aluminium , Isian Kaca Bening T.5 mm ( Jendela Type J2 ) G. MANAGEMEN Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
20.0000
m' m2 tube psg bh
4.0000 5.1749 1.3972 1.0000 1.0000
m'
20.0000
m' m2 tube psg bh
4.0000 5.1749 1.3972 1.0000 1.0000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 73 of 99
Memasang 1 unit Jendela Aluminium , Isian Kaca Bening T.5 mm ( Jendela Type J5 ) G. MANAGEMEN Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H Upah Aluminium Finish Powder Coating 4" t. 1,35 mm Frame Jendela Aluminium Powder Coating Kaca Bening 5 mm Sealent Friction Stay Duluxe FS HD S250 16" Casement Handle CH 420 BK R/H
m'
5.0000
m' m2 tube psg bh
3.7300 0.7308 0.1973 1.0000 1.0000
m'
5.0000
m' m2 tube psg bh
3.7300 0.7308 0.1973 1.0000 1.0000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN PENGECATAN Mengecat 1 m² Cat Dinding Majestic Paint ( P-1 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Majestic Paint Cat Dasar Alkali Ph9 Ampelas (Kertas Gosok) Kuas 4" Kape
kg kg lb bh bh
0.260 0.100 0.200 0.010 0.050
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Mengecat 1 m² Cat Dinding Epoxy Paint ( P-2 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Epoxy Paint Cat Dasar Alkali Ph9 Ampelas (Kertas Gosok) Kuas 4" Kape
kg kg lb bh bh
0.260 0.100 0.200 0.010 0.050
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 74 of 99
Mengecat 1 m² Cat Dinding Wheater Shield ( P-7 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Luar Weatherbond Cat Dasar Alkali sealer Ampelas (Kertas Gosok) Kuas 4"
kg kg lb bh
0.260 0.100 0.200 0.010
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Mengecat 1 m² Cat Plafond Majestic Paint ( P-1 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Majestic Paint Cat Dasar Alkali Ph9 Ampelas (Kertas Gosok) Kuas 4" Kape
kg kg lb bh bh
0.260 0.100 0.200 0.010 0.050
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Mengecat 1 m² Cat Plafond Epoxy Paint ( P-2 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Epoxy Paint Cat Dasar Alkali Ph9 Ampelas (Kertas Gosok) Kuas 4" Kape
kg kg lb bh bh
0.260 0.100 0.200 0.010 0.050
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 75 of 99
Mengecat 1 m² Cat Plafond Wheater Shield ( P-7 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Cat Dinding Luar Weatherbond Cat Dasar Alkali sealer Ampelas (Kertas Gosok) Kuas 4"
kg kg lb bh
0.260 0.100 0.200 0.010
Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Cat Mandor
oh oh oh oh
0.020 0.063 0.006 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN PLAFOND Memasang 1 m² langit - langit Plafond Kalsiboard T. 6 mm ( Rangka Metal Furring ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Easy Frame TCR Easy Bottom Wall Angel Clip Road Kalsiboard t 6 mm Skrup Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m' m' m' bh btg m² bh
3.000 3.000 0.400 9.000 4.000 1.000 20.000
oh oh oh oh
0.030 0.150 0.010 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang 1 m² langit - langit Plafond Gypum Board T. 9 mm ( Rangka Metal Furring ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Easy Frame TCR Easy Bottom Wall Angel Clip Road Gypsum 120 x 240 x 9 cm Skrup Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m' m' m' bh btg m² bh
3.000 3.000 0.400 9.000 4.000 1.000 20.000
oh oh oh oh
0.030 0.150 0.010 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 76 of 99
Memasang 1 m' List Plafond Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : List Profil Gypsum l = 9 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m'
1.050
oh oh oh oh
0.040 0.040 0.002 0.003 0.085 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN PELAPIS LANTAI & DINDING Memasang per 1 m² Pelapis Lantai Hemogeneous Tile 60 x 60 ( HT - 1P ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Homogenuis Tile 60x60 Marble Serpegiante Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m²
1.0500
kg m³ kg
8.190 0.045 1.620
oh oh oh oh
0.240 0.120 0.012 0.012 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Hemogeneous Tile 60 x 60 ( HT - 1UP ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Homogenuis Tile 60x60 Rustic Stone Terrazzo Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m²
1.0500
kg m³ kg
8.190 0.045 1.620
oh oh oh oh
0.240 0.120 0.012 0.012 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 77 of 99
Memasang per 1 m² Pelapis Lantai Hemogeneous Tile 60 x 60 ( HT - 3P ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Homogenuis Tile 60x60 Marble Serpegiante Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m²
1.0500
kg m³ kg
8.190 0.045 1.620
oh oh oh oh
0.240 0.120 0.012 0.012 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Ceramic 20 x 20 ( CT - 1 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 20 x 20 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.250 0.120 0.012 0.013 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Ceramic 20 x 20 ( CT - 2 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 20 x 20 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.250 0.120 0.012 0.013 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 78 of 99
Memasang per 1 m² Pelapis Lantai Ceramic 30 x 30 ( CT - 3 ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 30 x 30 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.250 0.120 0.012 0.013 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Ceramic 40 x 40 ( CT - 4P ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 40 x 40 Polish Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.250 0.120 0.012 0.013 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Ceramic 40 x 40 ( CT - 4UP ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 40 x 40 Unpolish Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.250 0.120 0.012 0.013 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 79 of 99
Memasang per 1 m² Pelapis Dinding Ceramic 20 x 33 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 20 x 33 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.230 0.200 0.020 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Dinding Ceramic 30 x 60 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 30 x 60 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg m³ kg
1.050 10.400 0.045 1.620
oh oh oh oh
0.230 0.200 0.020 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m' Pelapis Dinding Border 10 x 20 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 10 x 20 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh kg m³ kg
5.250 10.400 0.045 0.162
oh oh oh oh
0.230 0.200 0.020 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 80 of 99
Memasang per 1 m' Pelapis Dinding Border 10 x 30 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Ceramic uk. 10 x 30 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh kg m³ kg
3.500 10.400 0.045 0.162
oh oh oh oh
0.230 0.200 0.020 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m' Stepnoosing Tangga Uk. 10 x 60 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Step Nossing Homogeous Tile 10 x 60 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh kg m³ kg
1.750 2.280 0.006 0.200
oh oh oh oh
0.180 0.180 0.018 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m' Stepnossing Homogeous ukuran 30 x 60 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Step Nossing Homogeous Tile 30 x 60 Cutting Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m'
1.0500
kg m³ kg
8.190 0.045 1.620
oh oh oh oh
0.700 0.350 0.035 0.035 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 81 of 99
Memasang per 1 m' Plint lantai Homogeous ukuran 10 x 60 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Plint Lantai Homogenuis Tile 10x60 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh kg m³ kg
1.750 2.280 0.006 0.200
oh oh oh oh
0.180 0.180 0.018 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m' Hospital Plint Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Hospital Plint 5 x 20 Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh kg m³ kg
5.250 2.280 0.006 0.200
oh oh oh oh
0.180 0.180 0.018 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Dinding Lift Granit Alam Travertine Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Granite Travertine Semen Perekat Instant Marmer/Granit Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg
1.100 16.750
oh oh oh oh
4.500 2.250 0.225 0.225 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M² Screed MU T = 3 cm Perata Lantai Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Semen Perata Lantai Expose Instant 40 kg MU - 445 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg
37.5000
oh oh oh oh
0.200 0.150 0.015 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 82 of 99
AN ARS
Page 83 of 99
Memasang per 1 m² Lantai Vinyl Sheet Type 1 ( VS ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Lantai Vynil Forbo Sarlon 15dB Lem/adhesive Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg
1.050 0.250
oh oh oh oh
0.700 0.350 0.035 0.035 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m' Plint Vinyl Sheet (VS) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Lantai Vynil Forbo Sarlon 15dB Allumunium T. 1mm Radius 50 mm Lem/adhesive Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m' lbr kg
1.050 0.288 0.025
oh oh oh oh
0.090 0.090 0.035 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Pelapis Lantai Beton Finsihing Floor hardener Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Floorhardeneer MU 700 Alat Poles Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg ls
7.700 1.000
oh oh oh oh
0.150 0.300 0.050 0.025 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
Memasang per 1 m² Dinding Lift Granit Alam Travertine Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Granite Travertine Semen Perekat Instant Marmer/Granit Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
m² kg
1.100 16.750
oh oh oh oh
4.500 2.250 0.225 0.225 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 84 of 99
Memasang per 1 m² Pelapis Meja Granit Alam Paris Brown Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Granite Paris Brown Semen (PC) Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor Biaya Poles
m² kg m³ kg
1.050 8.190 0.045 1.620
oh oh oh oh m²
0.700 0.350 0.035 0.035 1.000 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M² Water proofing Lantai Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Waterproofing Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg
0.600
oh oh oh oh
0.077 0.100 0.010 0.004 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 M² Waterproofing atap + Screed MU T = 3 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Waterproofing Semen Perata Lantai Expose Instant 40 kg MU - 445 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
kg kg
0.600 37.5000
oh oh oh oh
0.200 0.150 0.015 0.010 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN SANITAIR 1 bh Pemasangan Klosed Duduk Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Klosed Duduk CW702J-SW784JP (lengkap)
bh
1.0000
Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
oh oh oh oh
3.300 1.100 0.010 0.160 Jumlah Harga
AN ARS
Page 85 of 99
Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan 1 bh Pemasangan Shower Spray Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Shower Spray TB 19 CS MCR (lengkap) Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Spoel Hoek Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Spoel Hoek SK33 (lengkap) Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
3.300 1.100 0.010 0.160 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Wastefel LW 523 NJ (lengkap) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Wastefel LW 523 NJ Kran Wastefel TX116LEJBR TX809L THX1A-6N TX277S Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh bh set set set
1.000 1.000 1.000 1.000 1.000
oh oh oh oh
1.200 1.450 0.150 0.060 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Wastefel LW 236 CJ / LW 239 FJ (lengkap) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Wastefel LW 236 CJ / LW 239 FJ Kran Wastefel TX101LB TL510ER THX1A-3N TX277S Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh bh set set set
1.000 1.000 1.000 1.000 1.000
oh oh oh oh
1.200 1.450 0.150 0.060 Jumlah Harga Overhead & Profit ………..%
AN ARS
Page 86 of 99
Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 87 of 99
1 bh Pemasangan Zink Stainless Steel 1 Lobang Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Zink Stainless Steel 1 Lobang Lengkap Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.030 0.300 0.030 0.015 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Floor Drain Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Floor Drain TX1BN Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.100 0.010 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Kran Air Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kran Air T23B13V7NB Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Kran Zink Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kran Zink T30ARQ13N Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 88 of 99
1 bh Pemasangan Tissue holder Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Tissu Holder AW360J Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Tempat Sabun Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Shoap Holder S156N Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Kaca Cermin bevel + Frame stainlees steel uk. 60 x 80 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Cermin bevel + Frame stainlees steel uk. 60 x 80 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.0000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 bh Pemasangan Kaca Cermin bevel + Frame stainlees steel uk. 90 x 80 Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kaca Cermin bevel + Frame stainlees steel uk. 90 x 80 Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh
1.0000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 89 of 99
1 bh Pemasangan Single Level Shower Set Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Fix Shower Head TX438SEM Single Level Shower Mixer TX405SDN Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Batu Mandor
bh bh
1.000 1.000
oh oh oh oh
0.010 0.400 0.040 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 m¹ Cor Meja Pantry + Pelapis Lantai Homogenous tile 60x60 cm Dan Dinding T. 60 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Beton K225 Besi Beton Polos Begesting Pelapis Homogenous Tile 60 x 60 Tenaga Kerja : Beton K225 Besi Beton Polos Begesting Pelapis Homogenous Tile 60 x 60
m3 kg m2 m2
0.063 18.993 0.700 1.300
m3 kg m2 m2
0.063 18.993 0.700 1.300
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan 1 m¹ Cor Meja Wastafel + Pelapis Meja Granite Alam ( Termasuk Pingul ) Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Beton K225 Besi Beton Polos Begesting Granite Alam Paris Brown Tenaga Kerja : Beton K225 Besi Beton Polos Begesting Granite Alam Paris Brown
m3 kg m2 m2
0.063 18.993 0.700 0.700
m3 kg m2 m2
0.063 18.993 0.700 0.700
Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan 1 Unit Hand Railing Stainlees Steel Dia. 2" Panjang 100 cm Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Hand Railling Pipa Stainless steel Ø 2" Material Bantu 5 % Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
m'
1.000 0.050
oh oh oh oh
0.270 0.405 0.014 0.014 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 90 of 99
1 bh Roof Drain Ø 4 " Stainless steel Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Roof Drain Ø 4 " Stainless steel Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
bh
1.000
oh oh oh oh
0.010 0.100 0.010 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 m' Pek. Pemasangan talang pipa air hujan PVC 4" type D Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Pipa PVC Ø 4 " AW Perlengakapan Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Besi Mandor
m'
1.100 0.500
oh oh oh oh
0.010 0.100 0.010 0.005 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
PEKERJAAN PENUTUP ATAP 1 m2 Pek. Pemasangan Pemasangan Usuk + Reng Galvalum Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Usuk baja ringan uk. 40x40 mm Reng baja ringan profile Ω - 40 mm Material Bantu Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m' m'
2.500 3.000 0.500
oh oh oh oh
0.200 0.050 0.005 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 m2 Pek. Pemasangan Penutup Atap Zincalum Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Genteng Metal Pasir Type 2x4 Material Bantu Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
lbr
0.617 0.500
oh oh oh oh
0.075 0.030 0.030 0.004 Jumlah Harga Overhead & Profit ………..%
AN ARS
Page 91 of 99
Harga Per Satuan Pekerjaan Dibulatkan 1 m' Pek. Pemasangan Nok Atap Zincalum Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Nok Atap Zincalum Material Bantu Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
m'
1.050 0.500
oh oh oh oh
0.075 0.030 0.030 0.004 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 m' Pek. Pemasangan Lisplank Motif Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kalsiplank Motif Paku biasa 2" - 5 "
m' kg
1.050 0.100
Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
oh oh oh oh
0.050 0.100 0.010 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
1 m' Pek. Pemasangan Penutup Dinding Gewel Kalsiplank L. 30 cm + Rangka Uraian
Sat
Indeks
Harga Satuan
Jumlah Harga Satuan
Jumlah lantai 1 Total (Rp)
Bahan : Kalsiplank Motif Paku biasa 2" - 5 " Holow 2x4
m' kg m'
1.050 0.100 2.500
Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Kayu Mandor
oh oh oh oh
0.050 0.100 0.010 0.003 Jumlah Harga Overhead & Profit ………..% Harga Per Satuan Pekerjaan Dibulatkan
AN ARS
Page 92 of 99
HARGA SATUAN BAHAN No.
Jenis Material
1
Satuan
2
3
Harga Bahan (Rp) 4
Keterangan 5
BAHAN PASANGAN
Bahan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Bata Ringan uk 60x20x t. 10 cm Batako batu belah 15cm/20cm Semen (PC) 40 kg Semen (PC) Semen Warna Pasir Cor Pasir Pasang Pasir Urug Tanah Urug Stenslag 1/2 cm Air Kerja Semen instant MU 380 (40 kg) Semen instant MU 380 Semen instant MU 480 Semen Plester Instant 40 kg Fm - 800 Semen Plester Instant Fm - 800 Semen Acian Instant 40 kg Fm - 900 Semen Acian Instant Fm - 900 Semen Perata Lantai Expose Instant 40 kg MU - 445 Semen Perekat Instant Marmer/Granit Floorhardeneer MU 700 (25 kg) Floorhardeneer MU 700 Ready mix f'c=30 Mpa Beton Readymix Mutu K250
bj bj m³ sak kg kg m³ m³ m³ m³ m³ m³ sak kg kg sak kg sak kg sak kg sak kg m³ m³
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
BAHAN BESI Kawat bendrat Besi Tulangan Ulir Besi Tulangan Polos Besi beton BJTP 24 Besi beton BJTP 40 Wiremesh M8 Besi Baja IWF /HB Pipa Hollow Aluminium (1 x 3 cm) Paku Skrup 1" Hand Railling Pipa Stainless steel Ø 2" Rangka Hollow Galvalume 40x40x0,5 Besi Siku 40x40x4 Paku uk. 5 - 12 cm Paku biasa 2" - 5 " Kawat beton Stelldeck NC-900 (BMT =1mm) Baut A 325 Ø22mm Baut A 325 Ø13mm Baut Angkur Ø22mm Cleat Plate 130x130x9 Reng C75 Baja ringan dan usuk baja ringan
kg kg kg kg kg lbr kg m¹ bh m¹ m' kg kg kg kg m2 bh bh bh bh m2
Page 93 of 99
FastCon, Setara Lokal Semen Gresik Semen Gresik AM, Setara
FastMortar, Setara FastMortar, Setara FastMortar, Setara FastMortar, Setara Mortar Utama, Setara Mortar Utama, Setara
Gunung Garuda,Setara
No.
Jenis Material
1
Satuan
2
3
Harga Bahan (Rp) 4
Keterangan 5
BAHAN CAT 1 2 3 4 5 6 7 8 9 10
Cat Dinding Luar Weatherbond Cat Dinding Majestic Paint Cat Dinding Epoxy Paint Cat Dasar Alkali sealer Cat Dasar Alkali Ph9 Ampelas (Kertas Gosok) Kuas 4" Kape Waterproofing Minyak Begesting
kg kg kg kg kg lbr bh bh m² ltr
Nippon Paint Nippon Paint Nippon Paint Nippon Paint Nippon Paint
YKK YKK YKK YKK
AM, Setara
BAHAN PINTU & JENDELA DAUN PINTU 1 2 3 4 5 6
Aluminium Finish Powder Coating 4" t. 1,35 mm Curtain Wall Powder Coating Ex. Ykk Frame Pintu Aluminium Powder Coating Frame Jendela Aluminium Powder Coating Louvre Allumunium Finish Powder Coating Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 40 x 210 cm
m' m' m' m' m' unit
7
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 75 x 210 cm
unit
8
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 80 x 210 cm
unit
9
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 90 x 210 cm
unit
10
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 100 x 210 cm
unit
11
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 405 x 2145 mm
unit
12
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 800 x 2145 mm With Louvre
unit
13
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 805 x 2145 mm
unit
14
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 854 x 2150 mm
unit
15
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 900 x 2145 mm
unit
16
Daun Pintu Kayu Wood Pannel Enggineering Finish Duco Uk. 910 x 2145 mm With Louvre Pintu Besi Finish Cat Duco Uk. 60 x 130 cm Pintu Besi Finish Cat Duco Uk. 109 x 215 cm Pintu Sliding Hermatic Automatic Single Door ( Pintu Type POK-1)
unit
17 18 19
unit unit unit
Tormax, setara
bh bh bh
Dekson, Setara Dekson, Setara Dekson, Setara
HARDWARE 1 2 3 Bahan
Hinge ESS DL 4x3x3MM 2BB SSS Hinge ESS DL 4x3x2MM 2BB SSS Hinge ESS DL 4.5x4x3MM 2BB SSS Page 94 of 99
No.
Jenis Material
1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Satuan
2
3
Patch Fitting PT 24 PSS Patch Fitting FT 20, PT 10, US 10 + CYL PSS Floor Hinge FH 84 SIZE 4 BD SS Mortise MTS IL DL8585 SSS Mortise MTS RL DL84030 SSS Cylinder CYL BK DL60MM Cylinder CYL DC DL65MM SN Escutheon 855 SSS/PSS Escutheon 84030 SSS Handle LHTR 0016 22MM SSS Pull Handle PH DL802 38X600X400 PSS+SSS Door Closer DCL 300 NHO NA Door Closer DCL 529 NHO NA Door Closer DCL 105 NHO NA Friction Stay FS HD S250 16'' Friction Stay FS HD S250 10" Casement Handle CH 420 BK R/H Flush Bolt FB 508 NA Flush Bolt FB 040 8" SSS Flush Bolt FB 040 12" SSS Flush Bolt FB SQ501-270MM ZC Flush Bolt FB SQ501-370MM ZC Dust Proof DP 003 SSS Window Bolt WB with KEY SSS Pull Plate PP 009 SSS Panic Exit Device IDEA SINGLE POINT 941111334A Handle & Key 94011003T
Harga Bahan (Rp) 4
Keterangan 5
Bh Set Set set set set set psg psg psg psg bh bh bh psg psg bh bh bh bh bh bh bh set bh set set
Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara Dekson, Setara ISEO, Setara ISEO, Setara
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Toto, Setara Modena, Setara
BAHAN SANITAIR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Bahan
Wastefel LW 523 NJ Wastefel LW 236 CJ / LW 239 FJ Klosed Duduk CW702J-SW784JP (lengkap) Spoel Hoek SK33 (lengkap) Shower Spray TB 19 CS MCR (lengkap) Fix Shower Head TX438SEM Single Level Shower Mixer TX405SDN Kran Air T23B13V7NB Kran Zink T30ARQ13N Kran Wastefel TX116LEJBR Kran Wastefel TX101LB Shoap Holder S156N Tissu Holder AW360J Floor Drain TX1BN Zink Stainless Steel 1 Lobang Lengkap Kaca Cermin bevel + Frame stainlees steel uk. 60 x 80 Kaca Cermin bevel + Frame stainlees steel uk. 90 x 80
Page 95 of 99
No.
Jenis Material
1
Satuan
2
3
Harga Bahan (Rp) 4
Keterangan 5
BAHAN KACA 1 2 3 4 5 6 7 8 9 10 11
Kaca Tempered 10 mm Kaca Tempered 12 mm Kaca Polos Tempered 8 mm Kaca Panasap T. 8mm Kaca Panasap T. 6mm Kaca Bening 8 mm Kaca Bening 6 mm Kaca Bening 5 mm Kaca Bening 3 mm Profil Kaca Sticker Sandblast
m² m² m² m² m² m² m² m² m² m¹ m²
Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara Asahi, Setara
BAHAN KAYU 1 2 3 4 5 6 7 8 9 10 11
Dolken Kayu Gelam Ø (5-7) cm, panjang 4 m Kayu Kelas III. Kayu balok 5/7 klas III Balok Kayu Kelas II. Kayu papan klas III Kayu Meranti Begesting Multiplek 4" x 8" x 9 mm Multiplek 4" x 8" x 12 mm Triplek 4" x 8" x 4 mm Teakwood 4" x 8" x 4 mm Formite/penjaga jarak bekisting/spacer
btg m³ m³ m³ m³ m³ lbr lbr lbr lbr bh
BAHAN PELAPIS LANTAI & DINDING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Bahan
Ceramic uk. 10 x 20 Ceramic uk. 10 x 30 Ceramic uk. 20 x 20 Ceramic uk. 20 x 33 Ceramic uk. 30 x 30 Ceramic uk. 40 x 40 Polish Ceramic uk. 40 x 40 Unpolish Ceramic uk. 30 x 60 Homogenuis Tile 60x60 Marble Serpegiante Homogenuis Tile 60x60 Rustic Stone Terrazzo Step Nossing Homogeous Tile 10 x 60 Step Nossing Homogeous Tile 30 x 60 Cutting Plint Lantai Homogenuis Tile 10x60 Hospital Plint 5 x 20 Homogenuis Tile 60x60 Pallazo Granite Alam Serpegiente Granite Paris Brown Granite Travertine Lantai Vynil Amtrong Medintone Lantai Vynil Forbo Sarlon 15dB
bh bh m² m² m² m² m² m² m² m² bh bh bh bh m² m² m² m² m² m²
Page 96 of 99
Platinum, Roman Platinum, Roman Platinum, Roman Platinum, Roman Platinum, Roman Platinum, Roman Platinum, Roman Platinum, Roman Venus, Monalisa, Niro Venus, Monalisa, Niro Venus, Monalisa, Niro Venus, Monalisa, Niro Venus, Monalisa, Niro Roman, Granito Venus, Monalisa, Niro Quantum, Setara Quantum, Setara Quantum, Setara Amtrong, Forbo Amtrong, Forbo
No.
Jenis Material
1
Satuan
2
3
Harga Bahan (Rp) 4
Keterangan 5
BAHAN ATAP 1 2 3 4
Genteng Metal Pasir Type 2x4 Nok Atap Zincalum Kalsiplank Motif Seng Gelombang
Lbr bh m' Lbr
BAHAN PLAFOND / PARTISI 1 2 3 4 5 6 7 8 9 10 11 12
Easy Frame TCR Easy Bottom Wall Angel Clip Road Gypsum 120 x 240 x 9 cm Kalsiboard t 6 mm Kalsipart 8 mm List Profil Gypsum l = 9 cm Joint Kalsiboard Skrup Fixer Skrup
m' m' m' bh btg m² m² m² m' kg bh bh
Kalsi, Setara
BAHAN PIPA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Bahan
Pipa PVC ø 2" AW Pipa PVC Ø 3 " AW Pipa PVC Ø 4 " AW Pipa PVC Ø 6 " AW Pipa PVC Ø 3/4 " AW Pipa PVC Ø 1 " AW Pipa Hitam Ø 5 " t. 5 mm Pipa Hitam Ø 6 " t. 6 mm Pipa Hitam Ø 3 " t. 3,2 mm Pipa Hitam Ø 4 " t. 4,5 mm Pipa Hitam Ø 2 " t. 2,3 mm Pipa Hitam Ø 2,5 " t. 2,3 mm Pipa Hitam Ø 2,5 " t. 2,3 mm Pipa Galvanis Ø 1/2" Medium A Pipa Galvanis Ø 3/4" Medium A Pipa Galvanis Ø 1" Medium A Pipa Galvanis Ø 1 1/4" Medium A Pipa Galvanis Ø 1 1/2" Medium A Pipa Galvanis Ø 2" Medium A Pipa Galvanis Ø 2 1/2" Medium A Pipa Galvanis Ø 3" Medium A Pipa Galvanis Ø 4" Medium A Pipa Galvanis Ø 5" Medium A Pipa Galvanis Ø 6" Medium A
m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
Page 97 of 99
Wavin Wavin Wavin Wavin Wavin Wavin Spindo,Setara Spindo,Setara Spindo,Setara Spindo,Setara Spindo,Setara Spindo,Setara Spindo,Setara
No.
Jenis Material
1
Satuan
2
3
Harga Bahan (Rp) 4
Keterangan 5
BAHAN FACADE 1
Aluminium composite panel Coating PVDF t. 0,5 mm Gread 5005
m²
Seven, Larson, Alocoil
2
Aluminium Composite Panel Coating PVDF t. 0,3 mm Gread 3003 Sealent
m²
Seven, Larson, Alocoil
3
tb
BAHAN BAHAN LAIN 1 2 3 4 5 6 7 8 9 10
U Gutter 40x50 t. 6 cm CHU 40 U Gutter 60x60 t. 12 cm CHU 60 Roof Drain Ø 4 " Stainless steel Tanaman Perdu Pupuk Kandang Rumput Gajah Mini Lem/adhesive Railing Tangga Darurat Hollow 40x40 & 40x20 Finish Stailess Steel
m' m' m' m' bh m² m³ m² kg m'
11
Hand Railing Tangga Darurat Hollow 40x40 Finish Stailess Steel Hand Railing Pipa BSP SC 20 Ø2,5" Finish Cat Duco Railing Guard - Hand Railing BR - 500 - 1 - 1/2" D x 5 - 1/2" H / Med - Heavy Bumper Guard - Wall Guard WG - 6C - Pelindung dinding dengan allumunium dan vynil Residu Peralatan (pompa beton, vibrator dll) Scaffolding Kawat ayam
m'
12 13
14
15 16 17 18
Bahan
Page 98 of 99
m' m'
m'
ltr hr m2 m2
Calvari, Setara Calvari, Setara Calvari, Setara Calvari, Setara Toto, Setara
HARGA UPAH DAN PERALATAN
No.
URAIAN
Sat
Harga Rp.
Keterangan
1
2
3
4
5
I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
UPAH KERJA Mandor Kepala tukang Gali Tanah Kepala Tukang Batu Kepala Tukang Kayu Kepala Tukang Besi Kepala Tukang cat Kepala Tukang Listrik Kepala Tukang Pipa Kepala TukangTaman Tukang Gali Tanah Tukang batu Tukang Kayu Tukang Besi Tukang Cat Tukang Aspal Tukang Plitur Tukang Listrik Tukang Pipa Tukang Taman Pekerja Pekerja Tukang Batu Sopir Truk / Operator Alat Konstruksi Operator Pembantu Operator
Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr Org/hr
II SEWA PERALATAN 1 Sewa Pneumatic Tire Roller ( min 5 jam) 2 Sewa Dump Truck 6 T 3 Sewa Escavator 4 Rock Drill Breaker 5 Sewa Motor Grade 125-150 Pk ( min 5 jam) 6 Sewa Truck Tangki Air ( min 5 jam ) 7 Sewa Vibrator Roller ( min 5 jam ) 8 Sewa Alat Bantu 9 Sewa crane 10 Sewa Alat Pancang Injeksi 11 Sewa Alat Las Diesel 16 Pk 12 Concrete Pump 13 Stamper
jam jam jam jam jam jam jam jam jam jam jam m³ jam