DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE REKAPITULASI TOTAL



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



REKAPITULASI ANGGARAN BIAYA (RAB) KEGIATAN PEKERJAAN LOKASI TAHUN



: RELOKASI PUSKESMAS CANGKURAWOK : PEMATANGAN LAHAN PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022



NO



URAIAN PEKERJAAN



JUMLAH HARGA (Rp.)



I.



PEKERJAAN PERSIAPAN



II.



PEKERJAAN TANAH



551,549,513.40



III.



PEKERJAAN RETAINING WALL



403,602,804.20



JUMLAH



51,271,645.84



Rp.



PPN 10%



1,006,423,963.44 100,642,396.34



TOTAL



1,107,066,359.78



TERBILANG :



Satu milyar seratus tujuh juta enam puluh enam ribu tiga ratus lima puluh sembilan rupiah tujuh puluh delapan sen. Jakarta, Mei 2020 Dibuat Oleh: Konsultan Perencana PT. 4CIPTA KONSULTAN



001 ### ### ### satu



satu mily



tujuh pu



Ir. LAMBOK PANJAITAN, MSi.P Direktur Utama



satu milya



DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE RINCIAN ANGGARAN BIAYA PEKERJAAN



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



RINCIAN ANGGARAN BIAYA (RAB) KEGIATAN PEKERJAAN LOKASI TAHUN



NO I.



URAIAN PEKERJAAN



SATUAN



PEKERJAAN PERSIAPAN 1 Administrasi dan dokumentasi 2 Papan nama kegiatan, Uk. 120 x 85 cm (bahan Flexi 280 gr + Digital print + tiang kayu) 3 Pek. Pengadaan alat keselamatan kerja (K3) → Alat Pelindung diri (APD) : a. Topi Pelindung (Safety Helmet) b. Sepatu Keselamatan (Safety Shoes); untuk Staf c. Sepatu Keselamatan (Rubber Safety Shoes and toe cap) d. Rompi Keselamatan (Safety Vest)



II.



III.



VOLUME



HARGA SATUAN (Rp.)



JUMLAH HARGA (Rp.)



TKDN (%)



HARGA KDN



HARGA LDN



KETERANGAN



Ls Unit



1.00 1.00



1,500,000.00 350,000.00



1,500,000.00 350,000.00



100.00 100.00



1,500,000.00 350,000.00



-



Bh Psg Psg Bh



35.00 5.00 30.00 35.00



75,000.00 200,000.00 120,000.00 25,000.00



2,625,000.00 1,000,000.00 3,600,000.00 875,000.00



71.12 69.52 30.70 -



1,866,900.00 695,200.00 1,105,200.00 -



758,100.00 304,800.00 2,494,800.00 875,000.00



Ls



1.00



2,500,000.00



2,500,000.00



100.00



2,500,000.00



→ Rambu- Rambu terdiri atas : a. Rambu Petunjuk b. Rambu Larangan c. Rambu Peringatan d. Rambu Kewajiban e Rambu Informasi



Bh Bh Bh Bh Bh



2.00 2.00 2.00 2.00 2.00



75,000.00 75,000.00 75,000.00 75,000.00 75,000.00



150,000.00 150,000.00 150,000.00 150,000.00 150,000.00



100.00 100.00 100.00 100.00 100.00



150,000.00 150,000.00 150,000.00 150,000.00 150,000.00



-



Ls



1.00



5,000,000.00



5,000,000.00



100.00



5,000,000.00



-



Pek. Kantor Direksikeet Pengadaan air dan listrik kerja Pek. Pagar Depan pengaman proyek (bahan Kain Flexi + Digital print, rangka kayu) Pek. Uitzet / Pengukuran dan pasangan bouwplank



PEKERJAAN TANAH 1 Pekerjaan Stripping tanah 2 Pekerjaan Urugan Tanah padat pilihan



### ### ### ### ###



### ### ### ### ###



→ Asuransi Dan Perijinan terdiri atas : BPJS Ketenagakerjaan Dan Kesehatan Kerja; (Berdasarkan KEPMENAKER NO: KEP-196/MEN/1999, untuk Tenaga harian Proyek)



→ Penyemprotan cairan disinfektan, Masker, Wastafel, Hand Sanitizer, untuk mensterilisasikan area proyek terhadap dampak covid-19, (berdasarkan Surat Edaran LKPP No. 3 Tahun 2020 Tentang Penjelasan Atas Pelaksanaan Pengadaan Barang/Jasa, Dalam Rangka Penanganan Corona Virus Disease 2019 (Covid-19) 4 5 6 7



###



: RELOKASI PUSKESMAS CANGKURAWOK : PEMATANGAN LAHAN PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022



###



m2 20.00 831,380.00 Ls 1.00 2,753,475.84 m' 35.00 210,290.00 m' 54.00 117,230.00 JUMLAH PEKERJAAN PERSIAPAN



m2 1,994.38 m3 1,708.80 JUMLAH PEKERJAAN TANAH



16,627,600.00 2,753,475.84 7,360,150.00 6,330,420.00 51,271,645.84



57.17



9,505,635.43 920,992.16 5,924,745.68 30,118,673.27



6,439,157.84 405,674.32 18,399,496.73



11,130.00 309,780.00



22,197,449.40 529,352,064.00 551,549,513.40



98.46 99.74



21,855,838.42 527,984,617.95 549,840,456.37



341,610.98 1,367,446.05 1,709,057.03



12.51 93.59



Luas pemadatan ta Level -4,95 Layer 2 Level -5,35 Level -3,80



7,121,964.57



PEKERJAAN RETAINING WALL 1 Pekerjaan Retaining wall type RW-1a → Pekerjaan galian tanah pondasi → Pekerjaan Urugan pasir Urug tbl. padat 5 cm → Pekerjaan lantai kerja Beton tumbuk tbl. 5 cm → Pekerjaan Bekisting pondasi, pas. Batako 1:5 → Pekerjaan Bekisting Dinding beton → Pekerjaan Pembesian BJTS 420 B → Pekerjaan Cor beton Fc 21 Mpa → Pek. Urugan kembali tanah disamping pondasi dan perataan tanah sisa urugan



m3 m3 m3 m2 m2 Kg m3 m3



132.17 4.62 4.62 66.46 295.36 4,471.81 101.53 132.17



156,060.00 359,420.00 1,016,650.00 93,990.00 184,970.00 15,510.00 1,325,500.00 111,370.00



87.63 71.72 98.87 93.96 61.53 50.87 96.05 88.44



2 Pekerjaan Retaining wall type RW-1b → Pekerjaan galian tanah pondasi → Pekerjaan Urugan pasir Urug tbl. padat 5 cm → Pekerjaan lantai kerja Beton tumbuk tbl. 5 cm → Pekerjaan Bekisting pondasi, pas. Batako 1:5 → Pekerjaan Bekisting Dinding beton → Pekerjaan Pembesian BJTS 420 B → Pekerjaan Cor beton Fc 21 Mpa → Pek. Urugan kembali tanah disamping pondasi dan perataan tanah sisa urugan



20,626,450.20 1,660,520.40 4,696,923.00 6,246,575.40 54,632,739.20 69,357,773.10 134,578,015.00 14,719,772.90 306,518,769.20



18,074,404.03 1,190,999.14 4,643,826.88 5,869,329.12 33,618,094.37 35,285,221.23 129,260,561.42 13,018,457.91 240,960,894.10



2,552,046.17 469,521.26 53,096.12 377,246.28 21,014,644.83 34,072,551.87 5,317,453.58 1,701,314.99 65,557,875.10



m3 m3 m3 m2 m2 Kg m3 m3



71.57 1.33 1.33 19.17 85.20 1,289.95 29.08 71.57



156,060.00 359,420.00 1,016,650.00 93,990.00 184,970.00 15,510.00 1,325,500.00 111,370.00



11,169,214.20 478,028.60 1,352,144.50 1,801,788.30 15,759,444.00 20,007,124.50 38,545,540.00 7,970,750.90 97,084,035.00 403,602,804.20



87.63 71.72 98.87 93.96 61.53 50.87 96.05 88.44



9,787,282.26 342,863.39 1,336,859.25 1,692,973.81 9,697,527.22 10,178,467.14 37,022,526.60 7,049,489.54 77,107,989.22 318,068,883.32



1,381,931.94 135,165.21 15,285.25 108,814.49 6,061,916.78 9,828,657.36 1,523,013.40 921,261.36 19,976,045.78 85,533,920.88



898,028,012.95



105,642,474.65



89.47



10.53



### ### ###



Layer 2 Layer 3 Layer 4 Level -0,20



###



JUMLAH PEKERJAAN RETAINING WALL JUMLAH TOTAL JUMLAH KOMPONEN



1,006,423,963.44



36.92 m'



10.65 m'



panjang pasangan lebar atas lebar bawah lebar pondasi Lebar SK Tinggi prisma Tebal Pondasi Tinggi SK Luas Galian tebal pasir / LC panjang pasangan lebar atas lebar bawah lebar pondasi Lebar SK Tinggi prisma Tebal Pondasi Tinggi SK Luas Galian tebal pasir / LC



DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN PEKERJAAN



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



DAFTAR HARGA SATUAN PEKERJAAN PEKERJAAN LOKASI TAHUN



: RELOKASI PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022



NO



URAIAN PEKERJAAN



KODE ANL



HARGA



A.



PEKERJAAN PERSIAPAN



1



1 M' Pagar Sementara bahan roll banner Tinggi 2 m



A-1



Rp.



270,310.00



2



1 Bh Papan nama proyek, Uk. 120 x 85 cm



A-1



Rp.



367,550.00



3 4



1 M' Pengukuran Dan Pasang Bouwplank 1 M2 Kantor Sementara Lantai plester



A-1 A-2



Rp. Rp.



117,230.00 831,380.00



B.



PEKERJAAN TANAH



1



1 M3 Galian Tanah Biasa sedalam 1 m



B-1



Rp.



156,060.00



2



1 M3 Urugan Kembali



B-2



Rp.



3



###



#NAME?



111,370.00 #NAME?



4



1 M3 Urugaan Pasir



B-3



Rp.



359,420.00



5



1 M2 Pengerjaan stripping tanah



B-4



Rp.



11,130.00



6



1 m3 Mengurug Sirtu dipadatkan



B-5



Rp.



404,250.00



7



1 m3 Mengurug Tanah Urug Pilihan (Padat)



A-5



Rp.



309,780.00



C.



PEKERJAAN PONDASI



1



1 M3 Membuat pondasi batu belah campuran 1SP : 5PP



C-1



Rp.



978,250.00



2



1 M2 Membuat finishing siar pasangan batu kali, campuran 1SP : 2PP



C-2



Rp.



140,680.00



D.



PEKERJAAN BETON



1



1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr



D-1



Rp.



1,016,650.00



2



1 M3 Membuat Beton Fc. 14,525 Mpa (K.175)



D-2



Rp.



3



###



#NAME?



1,153,870.00 #NAME?



4



1 Kg Pembesian TS 280



#REF!



Rp.



14,120.00



5



1 Kg Pembesian BJTS 420 B



D-2



Rp.



15,510.00



6



1 M2 Pasang Bekesting Untuk Kolom, Dinding beton, Material 3x pakai



D-3



Rp.



184,970.00



7



1 M3 Cor Readymix Beton Fc. 21 Mpa (K-250)



D-4



Rp.



1,325,500.00



8



###



D-5



#NAME?



9



###



D-6



#NAME?



E.



PEKERJAAN PASANGAN DINDING



1



1 M2 Pasang Bekisting Batako Tebal 1/2 Bata, 1pc : 5ps



E-1



Rp.



93,990.00



DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE ANALISA HARGA SATUAN PEKERJAAN



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN No.



URAIAN



A-1 1 M' Pengukuran Dan Pasang Bouwplank - Kayu kaso terentang 5/7 - Paku Biasa 2" - 5" - Kayu papan Albasiah 3/20 - Pekerja - Tukang Kayu - Kepala Tukang - Mandor - Palu Jumlah Profit Jumlah Total Dibulatkan KOMPONEN A-2 1 M2 Kantor Sementara Lantai plester - Kayu Balok Albasiah - Paku biasa - Semen Portland - Pasir pasang - Pasir beton - Koral beton - Bata merah - Asbes Gelombang kecil 92 x 250 cm - Paku Asbes pancing 6 x 23 - Jendela naco 6 Klips - Kunci tanam biasa - Engsel Pintu biasa - Plywood 4mm - Pekerja - Tukang kayu - Tukang batu - Kepala tukang - Mandor Cangkul Sendok Semen Jumlah Profit Jumlah Total Dibulatkan KOMPONEN



SATUANKOEFESIEN



Spesifikasi



Brand/Merk



TKDN



No. Sertifikat



HARGA SATUAN (Rp)



HARGA (Rp)



VOLUME PEKERJAAN



M3 Kg M3 Oh Oh Oh Oh bh



0.0120 0.0200 0.0070 0.1000 0.1000 0.0100 0.0050 0.1000



100% 0.00% 100% 100% 100% 100% 100% 0%



4,000,000.00 16,500.00 3,000,000.00 130,000.00 150,000.00 175,000.00 200,000.00 65,000.00



48,000.00 330.00 21,000.00 13,000.00 15,000.00 1,750.00 1,000.00 6,500.00 106,580.00 10,658.00 117,238.00 117,230.00



m3 Kg Kg m3 m3 m3 Bh Lbr Kg Bh Bh set Lbr OH OH OH OH OH Bh bh



0.0420 0.5000 25.3220 0.0520 0.0365 0.0603 35.7000 0.8000 0.2500 0.1500 0.0500 0.0500 0.8000 0.5000 0.3000 0.1500 0.1000 0.0500 0.5000 0.0010



100%



3,000,000.00 16,500.00 1,300.00 309,000.00 325,000.00 300,000.00 1,100.00 150,000.00 48,000.00 352,000.00 94,600.00 75,000.00 125,000.00 130,000.00 150,000.00 150,000.00 175,000.00 200,000.00 100,000.00 30,000.00



126,000.00 8,250.00 32,918.60 16,074.18 11,875.50 18,102.00 39,270.00 120,000.00 12,000.00 52,800.00 4,730.00 3,750.00 100,000.00 65,000.00 45,000.00 22,500.00 17,500.00 10,000.00 50,000.00 30.00



PT. INDOCEMENT TUNGGAL PRAKASA



PT. Indobaja Primamurni



96.17% 100% 100% 100% 100%



100% 100% 100% 100% 100% 58.19% 0%



4024/SJ-IND.8/TKDN/8/2022



2203/SJ-IND.8/TKDN/12/2020



755,800.28 75,580.03 831,380.31 831,380.00



54.00



20.00



JUMLAH HARGA PEKERJAAN



BIAYA RUPIAH KDN



KLN



2,592,000.00 17,820.00 1,134,000.00 702,000.00 810,000.00 94,500.00 54,000.00 351,000.00 5,755,320.00



2,592,000.00 1,134,000.00 702,000.00 810,000.00 94,500.00 54,000.00 5,386,500.00



17,820.00 351,000.00 368,820.00



93.59



6.41



2,520,000.00 165,000.00 658,372.00 321,483.60 237,510.00 362,040.00 785,400.00 2,400,000.00 240,000.00 1,056,000.00 94,600.00 75,000.00 2,000,000.00 1,300,000.00 900,000.00 450,000.00 350,000.00 200,000.00 1,000,000.00 600.00



2,520,000.00 633,156.35 321,483.60 237,510.00 362,040.00 785,400.00 1,300,000.00 900,000.00 450,000.00 350,000.00 200,000.00 581,900.00 -



165,000.00 25,215.65 2,400,000.00 240,000.00 1,056,000.00 94,600.00 75,000.00 2,000,000.00 418,100.00 600.00



15,116,005.60



8,641,489.95



6,474,515.65



57.17



42.83



B. ANALISA HARGA SATUAN PEKERJAAN TANAH No.



URAIAN



SATUAN KOEFESIEN Spesifikasi



B-1 1 M3 Galian Tanah Biasa sedalam 1 m - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-2 1 M3 Urugan Kembali - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-3 1 M3 Urugaan Pasir - Pasir Urug M3 - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-4 1 M2 Pengerjaan stripping tanah - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-5 1 m3 Mengurug Tanah Urug Pilihan (Padat) - Tanah Urug Pilihan M3 - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN



Brand/Merk



TKDN



PT. Indobaja Primamurni



58.19% 0%



0.7500 0.0250 0.3750 0.3750



100% 100%



0.5000 0.0500 0.2500 0.2500



PT. Indobaja Primamurni



PT. Indobaja Primamurni



2203/SJ-IND.8/TKDN/12/2020



58.19% 0%



2203/SJ-IND.8/TKDN/12/2020



100% 100% PT. Indobaja Primamurni



1.2000 0.2500 0.0250 0.1250 0.1250



58.19% 0%



100% 100% 100%



0.0500 0.0050 0.0250 0.0250



2203/SJ-IND.8/TKDN/12/2020



100% 100%



1.2000 0.3000 0.0100 0.1500 0.1500



No. Sertifikat



58.19% 0%



2203/SJ-IND.8/TKDN/12/2020



100% 100% 100% PT. Indobaja Primamurni



58.19% 0%



2203/SJ-IND.8/TKDN/12/2020



HARGA SATUAN (Rp)



HARGA (Rp)



130,000.00 200,000.00



97,500.00 5,000.00



100,000.00 5,000.00



37,500.00 1,875.00 141,875.00 14,187.50 156,062.50 156,060.00



130,000.00 200,000.00



65,000.00 10,000.00



100,000.00 5,000.00



25,000.00 1,250.00 101,250.00 10,125.00 111,375.00 111,370.00



225,000.00 130,000.00 200,000.00



270,000.00 39,000.00 2,000.00



100,000.00 5,000.00



15,000.00 750.00 326,750.00 32,675.00 359,425.00 359,420.00



130,000.00 200,000.00



6,500.00 1,000.00



100,000.00 5,000.00



VOLUME PEKERJAAN



JUMLAH HARGA PEKERJAAN



BIAYA RUPIAH KDN



KLN



19,864,650.00 1,018,700.00



19,864,650.00 1,018,700.00



-



7,640,250.00 382,012.50 28,905,612.50



4,445,861.48 25,329,211.48



3,194,388.53 382,012.50 3,576,401.03



87.63



12.37



13,243,100.00 2,037,400.00



13,243,100.00 2,037,400.00



-



5,093,500.00 254,675.00 20,628,675.00



2,963,907.65 18,244,407.65



2,129,592.35 254,675.00 2,384,267.35



88.44



11.56



1,606,500.00 232,050.00 11,900.00



1,606,500.00 232,050.00 11,900.00



-



3,056,100.00 152,805.00 5,059,355.00



1,778,344.59 3,628,794.59



1,277,755.41 152,805.00 1,430,560.41



71.72



28.28



12,963,470.00 1,994,380.00



12,963,470.00 1,994,380.00



-



2,500.00 125.00 10,125.00 1,012.50 11,137.50 11,130.00



509,350.00 25,467.50 15,492,667.50



296,390.77 15,254,240.77



212,959.24 25,467.50 238,426.74



98.46



1.54



192,500.00 130,000.00 200,000.00



231,000.00 32,500.00 5,000.00



394,732,800.00 55,536,000.00 8,544,000.00



394,732,800.00 55,536,000.00 8,544,000.00



-



100,000.00 5,000.00



12,500.00 625.00 281,625.00 28,162.50 309,787.50 309,780.00



2,546,750.00 127,337.50 461,486,887.50



1,481,953.83 460,294,753.83



1,064,796.18 127,337.50 1,192,133.68



99.74



0.26



203.74



203.74



5.95



1,994.38



1,708.80



C. ANALISA HARGA SATUAN PEKERJAAN PONDASI No. C-1



C-2



URAIAN



SATUAN



KOEFESIEN



1 M3 Membuat pondasi batu belah campuran 1SP : 5PP -



Batu belah



M3



1.200



-



Semen Portland



Kg



136.000



-



Pasir pasang



M3



0.544



- Pekerja



Oh



1.500



- Tukang Batu



Oh



0.750



- Kepala Tukang



Oh



0.075



- Mandor



Oh



0.075



Jumlah Profit Jumlah Total Dibulatkan 1 M2 Membuat finishing siar pasangan batu kali, campuran 1SP : 2PP - Semen Portland Kg - Pasir pasang M3 - Pekerja Oh - Tukang Batu Oh - Kepala Tukang Oh - Mandor Oh Jumlah Profit Jumlah Total Dibulatkan



6.340 0.012 0.300 0.150 0.015 0.015



Spesifikasi



Brand/Merk



KERJAAN PONDASI BIAYA RUPIAH TKDN



No. Sertifikat



HARGA SATUAN (Rp)



HARGA (Rp)



VOLUME PEKERJAAN



174,000.00



208,800.00



1,300.00



176,800.00



309,000.00



168,096.00



130,000.00



195,000.00



150,000.00



112,500.00



175,000.00



13,125.00



200,000.00



15,000.00 889,321.00 88,932.10 978,253.10 978,250.00



9,000.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00



57,060.00 3,708.00 39,000.00 22,500.00 2,625.00 3,000.00 127,893.00 12,789.30 140,682.30 140,680.00



JUMLAH HARGA PEKERJAAN



KDN



BIAYA RUPIAH KLN



D. ANALISA HARGA SATUAN PEKERJAAN BETON BIAYA RUPIAH



No. D-1



D-2



URAIAN



Spesifikasi



Brand/Merk



TKDN



No. Sertifikat



HARGA SATUAN



HARGA



(Rp)



(Rp)



VOLUME PEKERJAAN



JUMLAH HARGA PEKERJAAN



KDN



KLN



- Semen Portland



Kg



200.0000



1,300.00



260,000.00



1,547,000.00



1,487,749.90



59,250.10



- Pasir Beton



M3



0.5220



100%



325,000.00



169,650.00



1,009,417.50



1,009,417.50



-



- Batu Pecah Mesin 2/3



M3



0.8620



100%



300,000.00



258,600.00



1,538,670.00



1,538,670.00



-



- Pekerja



Oh



1.3200



100%



130,000.00



171,600.00



1,021,020.00



1,021,020.00



-



- Tukang Batu



Oh



0.2200



100%



150,000.00



33,000.00



196,350.00



196,350.00



-



- Kepala Tukang



Oh



0.0220



100%



175,000.00



3,850.00



22,907.50



22,907.50



- Mandor



Oh



0.1320



100%



200,000.00



26,400.00



157,080.00



157,080.00



-



Sendok Semen



bh



0.0010



0%



30,000.00



30.00



178.50



-



178.50



Cangkul



Bh



0.0110



100,000.00



1,100.00



6,545.00



3,808.54



2,736.46



PT. INDOCEMENT TUNGGAL PRAKASA



924,230.00 92,423.00 1,016,653.00 1,016,650.00



5,499,168.50



5,437,003.44



62,165.06



98.87



1.13



11,550.00



66,548,328.00



32,468,929.23



34,079,398.77



2,247,086.40



-



2,247,086.40



5,243,201.60



5,243,201.60



-



6,049,848.00



6,049,848.00



-



PT. Indobaja Primamurni



96.17%



58.19%



4024/SJ-IND.8/TKDN/8/2022



2203/SJ-IND.8/TKDN/12/2020



Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 Kg Pembesian BJTS 420 B 11,000.00



-



KgBESI BETON DP 1.0500 BjTS 420B, BjTS 520 (Material Lokal) PT DELCOPRIMA 16mm PASIFIC



- Kawat Beton



Kg



0.0150



0%



26,000.00



- Pekerja



Oh



0.0070



100%



130,000.00



910.00



- Tukang Besi



Oh



0.0070



100%



150,000.00



1,050.00



- Kepala Tukang



Oh



0.0007



100%



175,000.00



122.50



705,815.60



705,815.60



- Mandor



Oh



0.0004



100%



200,000.00



80.00



460,940.80



460,940.80



-



bh



0.0070



0%



175,000.00



1,225.00



7,058,156.00



-



7,058,156.00



14,102.50 1,410.25 15,512.75 15,510.00



88,313,376.40



44,928,735.23



43,384,641.17



48.79%



936/SJ-IND.8/TKDN/10/2020



5.95



- Besi Beton BJTS 420 B



Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 M2 Pasang Bekesting Untuk Kolom, Dinding beton, Material 3x pakai



390.00 5,761.76



-



50.87



49.13



Kg



0.4000



0.00%



16,500.00



6,600.00



2,511,696.00



-



2,511,696.00



- Kayu balok terentang



M3



0.0050



100%



4,000,000.00



20,000.00



7,611,200.00



7,611,200.00



-



- MultiPlek 12 mm 120 x 240



Lbr



0.1167



0%



185,000.00



21,583.33



8,213,753.33



-



8,213,753.33



- Dolken



Btg



1.0000



0%



24,500.00



24,500.00



9,323,720.00



-



9,323,720.00



- Pekerja



Oh



0.3000



100%



130,000.00



39,000.00



14,841,840.00



14,841,840.00



-



- Tukang Kayu



Oh



0.3300



100%



150,000.00



49,500.00



18,837,720.00



18,837,720.00



-



- Kepala Tukang



Oh



0.0330



100%



175,000.00



5,775.00



2,197,734.00



2,197,734.00



- Mandor



Oh



0.0060



100%



200,000.00



1,200.00



456,672.00



456,672.00



-



Palu



bh



0.3000



0%



65,000.00



19,500.00



7,420,920.00



-



7,420,920.00



168,158.33 16,815.83 184,974.17 184,970.00



71,415,255.33



43,945,166.00



27,470,089.33



61.53



38.47



950,000.00



997,500.00



130,283,475.00



124,134,094.98



6,149,380.02



20,375,160.00



- Paku Biasa 2" - 5"



D-4



KOEFESIEN



1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr



Bolt Cutter



D-3



SATUAN



Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 M3 Cor Readymix Beton Fc. 21 Mpa (K-250) PT. Solusi Bangun Beton



95.28%



4267/SJ-IND.8/TKDN/7/2021



380.56



-



- Beton Ready Mix Fc 21 Mpa



m3



1.0500 K-125 s.d K-500



- Pekerja



Oh



1.2000



100%



130,000.00



156,000.00



20,375,160.00



-



- Tukang Batu



Oh



0.2000



100%



150,000.00



30,000.00



3,918,300.00



3,918,300.00



-



- Kepala Tukang



Oh



0.0280



100%



175,000.00



4,900.00



639,989.00



639,989.00



-



- Mandor



Oh



0.0830



100%



200,000.00



16,600.00



2,168,126.00



2,168,126.00



-



Bh



0.0140



100,000.00



1,400.00



182,854.00



106,402.74



76,451.26



1,205,000.00 120,500.00 1,325,500.00 1,325,500.00



157,567,904.00



151,342,072.72



6,225,831.28



96.05



3.95



130.61



Alat - Cangkul Jumlah Profit Jumlah Total Dibulatkan KOMPONEN



PT. Indobaja Primamurni



58.19%



2203/SJ-IND.8/TKDN/12/2020



E. ANALISA HARGA SATUAN PEKERJAAN DINDING No. E-1



URAIAN



SATUAN



KOEFESIEN



Spesifikasi



Brand/Merk



1 M2 Pasang Bekisting Batako Tebal 1/2 Bata, 1pc : 5ps - Batako Besar 8 x 20 x 30 cm Bh 12.5000 8 x 20 x 30 cm PT. ALAM DAYA SAKTI - Semen Portland Kg 4.8400 PT. INDOCEMENT TUNGGAL PRAKAS - Pasir Pasang M3 0.0225 - Pekerja Oh 0.1600 - Tukang Batu Oh 0.0500 - Kepala Tukang Oh 0.0050 - Mandor Oh 0.0075 Sendok Semen bh 0.0010 Cangkul Bh 0.0025 PT. Indobaja Primamurni Jumlah Profit Jumlah Total Dibulatkan KOMPONEN



TKDN



No. Sertifikat



88% 96% 100% 100% 100% 100% 100% 0% 58.19%



11224/SJ-IND.8/TKDN/12/2021 4024/SJ-IND.8/TKDN/8/2022



2203/SJ-IND.8/TKDN/12/2020



JUMLAH HARGA SATUANJUMLAH HARGA VOLUME PEKERJAAN HARGA (Rp) (Rp) PEKERJAAN 3,300.00 1,300.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00 30,000.00 100,000.00



41,250.00 6,292.00 6,952.50 20,800.00 7,500.00 875.00 1,500.00 30.00 250.00 85,449.50 8,544.95 93,994.45 93,990.00



85.63



3,532,237.50 538,783.96 595,342.58 1,781,104.00 642,225.00 74,926.25 128,445.00 2,568.90 21,407.50 7,317,040.69



BIAYA RUPIAH KDN (%)



KLN (%)



3,122,497.95 518,148.53 595,342.58 1,781,104.00 642,225.00 74,926.25 128,445.00 12,457.02 6,875,146.33



409,739.55 20,635.43 2,568.90 8,950.48 441,894.35



93.96



6.04



M. ANALISA HARGA SATUAN PEKERJAAN JALAN No. M-1



URAIAN 1 M1 Pasang Kansteen Jalan Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Profit Jumlah Total Dibulatkan



SATUAN Err:509



Bh Kg M3 Oh Oh Oh Oh



VOLUME 2.5000 0.9680 0.0225 0.1500 0.1000 0.0100 0.0150



HARGA SATUAN (Rp) Err:509 1,300.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00



HARGA (Rp) Err:509 1,258.40 6,952.50 19,500.00 15,000.00 1,750.00 3,000.00 Err:509 Err:509 Err:509 Err:509



DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN MATERIAL



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



DAFTAR HARGA SATUAN BAHAN BANGUNAN NO



MATERIAL



SAT



HARGA (KONTRAKTUAL)



A.



AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA



1



Pasir Urug / teras



m3



Rp.



225,000.00



2



Pasir Pasang Kali



m3



Rp.



309,000.00



3



Pasir Beton



m3



Rp.



325,000.00



Pasir Beton



Kg



Rp.



232.14



4



Sirtu



m3



Rp.



275,000.00



5



Tanah Urug Pilihan



m3



Rp.



192,500.00



6



Batu Pecah Mesin 1/2



m3



Rp.



300,000.00



Batu Pecah Mesin 1/2



Kg



Rp.



166.67



7



Batu belah pondasi



m3



Rp.



174,000.00



8



Batako Besar 8 x 20 x 30 cm



bh



Rp.



3,300.00



9



Bata Merah bakar



bh



Rp.



1,100.00



10



Bata ringan Uk. 20x60x10 cm



bh



Rp.



11,000.00



11



MU 301, 40 Kg



zak



Rp.



107,800.00



12



MU 200, 40 Kg



zak



Rp.



193,600.00



13



MU 380, 40 Kg



zak



Rp.



161,700.00



14



Beton ready Mix Fc. 21 Mpa



m3



Rp.



950,000.00



15



Panel Uk. 40x5x240 cm



Lbr



Rp.



226,000.00



16



Tiang Precast Profil H tinggi 280 cm



bh



Rp.



372,000.00



17



Jasa Concrete Pump



m3



Rp.



50,000.00



18



Semen PC /50 kg



zak



Rp.



65,000.00



19



Semen Warna



kg



Rp.



28,600.00



B



BAHAN KAYU BERIKUT BAHAN JADINYA



1



Kayu Balok Begisting / Terentang



m3



Rp.



4,000,000.00



2



kayu Papan Begisting / Terentang



m3



Rp.



4,000,000.00



3



Kayu Balok / papan Albasiah



m3



Rp.



3,000,000.00



4



Dolken d.8-10 cm



bt



Rp.



24,500.00



C



BAHAN KAYU LAPIS



1



Multiplek 9 mm 120 x 240



lbr



Rp.



128,000.00



2



Multiplek 12 mm 120 x 240



Lbr



Rp.



185,000.00



3



Plywood 4 mm 120 x 240



Lbr



Rp.



125,000.00



NO



MATERIAL



SAT



HARGA (KONTRAKTUAL)



G



BAHAN LOGAM DAN BAHAN JADINYA



1



Besi Beton TS 280 Rata-rata



kg



Rp.



9,800.00



2



Besi Beton BJTS 420 B Rata-rata



kg



Rp.



11,000.00



3



Kawat Beton



kg



Rp.



26,000.00



H



BAHAN PAKU DAN MUR BAUT



1



Paku 1 cm s/d 3 cm



kg



Rp.



16,500.00



2



Paku 4 cm s/d 7 cm



kg



Rp.



16,500.00



3



Paku Asbes pancing 6 x 23



Kg



Rp.



48,000.00



I



BAHAN ATAP



1



Asbes Gelombang kecil 92 x 250 cm



lbr



Rp.



150,000.00



J



BAHAN BAKAR DAN PELUMAS



1



Minyak Bekisting



ltr



Rp.



59,840.00



DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914



RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN UPAH



KEGIATAN :



RELOKASI PUSKESMAS CANGKURAWOK



TAHUN ANGGARAN



--- 2020 ---



DAFTAR HARGA SATUAN UPAH NO



URAIAN



SATUAN



UPAH (KONTRAKTUAL)



1



Mandor



Org/hr



Rp



200,000.00



2



Kepala Tukang Batu



Org/hr



Rp



175,000.00



3



Kepala Tukang Kayu



Org/hr



Rp



175,000.00



4



Kepala Tukang Besi



Org/hr



Rp



175,000.00



5



Kepala Tukang Cat



Org/hr



Rp



175,000.00



6



Kepala Tukang Listrik



Org/hr



Rp



175,000.00



7



Kepala Tukang Las



Org/hr



Rp



175,000.00



8



Tukang Batu



Org/hr



Rp



150,000.00



9



Tukang Kayu



Org/hr



Rp



150,000.00



10



Tukang Besi/Baja



Org/hr



Rp



150,000.00



11



Tukang Cat



Org/hr



Rp



150,000.00



12



Tukang Listrik



Org/hr



Rp



150,000.00



13



Tukang Pipa



Org/hr



Rp



150,000.00



14



Tukang Plitur



Org/hr



Rp



150,000.00



15



Tukang Gali



Org/hr



Rp



150,000.00



16



Tukang Taman



Org/hr



Rp



150,000.00



17



Tukang Las



Org/hr



Rp



150,000.00



18



Pembantu Tukang



Org/hr



Rp



130,000.00



19



Pekerja Biasa



Org/hr



Rp



130,000.00



KETERANGAN



DAFTAR HARGA SATUAN UPAH & BAHAN PEMBANGUNAN GUDANG UMUM ASRAMA HAJI INDRAMAYU TAHAP I TAHUN ANGGARAN 2020 UPAH TENAGA KERJA NO.



TENAGA KERJA



A 1 2 3 4 5 6 7 8 9 10 J 1 2 3 4 5 6 7



UPAH Mandor Kepala tukang Tukang Kayu Tukang Besi Beton Tukang Besi / IWF Tukang Batu Tukang Cat Tukang Pipa Tukang Listrik Pekerja BAHAN MINYAK Alat - alat bantu Sewa alat untuk pengelasan Sewa molen Sewa kuali termasuk angkutan Meni besi Nat Minyak bekisting



K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24



ALAT BERAT Buldoser 100 - 150 hp Concrete mixer 0,3 - 0,6 m3 Crane 10 - 15 ton Dump truck 3-4 m3 Dump truck 10 Ton Mesin Bor Dia. 60 cm Excavator 80 - 140 HP Generator set Concrete vibrator Water pump 70 - 100 mm Wheel Loader 1,0 - 1,6 m3 Pile Driver + hammer Tower Crane Welding set Water tanker 3000-4500 L Motor grader Vibrator roller Tandem roller Mixer truck Concrete pump P. Tyre Roller Air compresor Cold milling 3-Wheel Roller



Harga Satuan Bahan Pekerjaan Pembangunan Gudang Umum Asrama Haji Indramayu Tahap I



SATUAN



HARGA SATUAN (Rp.)



org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr



200,000.00 175,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 130,000.00



ls jam set set kg kg ltr



60,000.00 68,800.00 165,000.00 89,700.00 27,500.00 15,500.00 50,100.00



jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam



311,624.00 31,804.00 455,099.00 212,812.00 286,302.00 450,000.00 253,964.00 380,410.00 55,727.00 3,306,052.00 279,287.00 475,000.00 629,095.00 171,000.00 155,193.00 327,468.00 316,831.00 123,074.00 809,712.00 356,250.00 524,758.00 279,436.00 811,730.00 131,089.00



7