24 0 274 KB
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE REKAPITULASI TOTAL
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
REKAPITULASI ANGGARAN BIAYA (RAB) KEGIATAN PEKERJAAN LOKASI TAHUN
: RELOKASI PUSKESMAS CANGKURAWOK : PEMATANGAN LAHAN PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022
NO
URAIAN PEKERJAAN
JUMLAH HARGA (Rp.)
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN TANAH
551,549,513.40
III.
PEKERJAAN RETAINING WALL
403,602,804.20
JUMLAH
51,271,645.84
Rp.
PPN 10%
1,006,423,963.44 100,642,396.34
TOTAL
1,107,066,359.78
TERBILANG :
Satu milyar seratus tujuh juta enam puluh enam ribu tiga ratus lima puluh sembilan rupiah tujuh puluh delapan sen. Jakarta, Mei 2020 Dibuat Oleh: Konsultan Perencana PT. 4CIPTA KONSULTAN
001 ### ### ### satu
satu mily
tujuh pu
Ir. LAMBOK PANJAITAN, MSi.P Direktur Utama
satu milya
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE RINCIAN ANGGARAN BIAYA PEKERJAAN
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
RINCIAN ANGGARAN BIAYA (RAB) KEGIATAN PEKERJAAN LOKASI TAHUN
NO I.
URAIAN PEKERJAAN
SATUAN
PEKERJAAN PERSIAPAN 1 Administrasi dan dokumentasi 2 Papan nama kegiatan, Uk. 120 x 85 cm (bahan Flexi 280 gr + Digital print + tiang kayu) 3 Pek. Pengadaan alat keselamatan kerja (K3) → Alat Pelindung diri (APD) : a. Topi Pelindung (Safety Helmet) b. Sepatu Keselamatan (Safety Shoes); untuk Staf c. Sepatu Keselamatan (Rubber Safety Shoes and toe cap) d. Rompi Keselamatan (Safety Vest)
II.
III.
VOLUME
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
TKDN (%)
HARGA KDN
HARGA LDN
KETERANGAN
Ls Unit
1.00 1.00
1,500,000.00 350,000.00
1,500,000.00 350,000.00
100.00 100.00
1,500,000.00 350,000.00
-
Bh Psg Psg Bh
35.00 5.00 30.00 35.00
75,000.00 200,000.00 120,000.00 25,000.00
2,625,000.00 1,000,000.00 3,600,000.00 875,000.00
71.12 69.52 30.70 -
1,866,900.00 695,200.00 1,105,200.00 -
758,100.00 304,800.00 2,494,800.00 875,000.00
Ls
1.00
2,500,000.00
2,500,000.00
100.00
2,500,000.00
→ Rambu- Rambu terdiri atas : a. Rambu Petunjuk b. Rambu Larangan c. Rambu Peringatan d. Rambu Kewajiban e Rambu Informasi
Bh Bh Bh Bh Bh
2.00 2.00 2.00 2.00 2.00
75,000.00 75,000.00 75,000.00 75,000.00 75,000.00
150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
100.00 100.00 100.00 100.00 100.00
150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
-
Ls
1.00
5,000,000.00
5,000,000.00
100.00
5,000,000.00
-
Pek. Kantor Direksikeet Pengadaan air dan listrik kerja Pek. Pagar Depan pengaman proyek (bahan Kain Flexi + Digital print, rangka kayu) Pek. Uitzet / Pengukuran dan pasangan bouwplank
PEKERJAAN TANAH 1 Pekerjaan Stripping tanah 2 Pekerjaan Urugan Tanah padat pilihan
### ### ### ### ###
### ### ### ### ###
→ Asuransi Dan Perijinan terdiri atas : BPJS Ketenagakerjaan Dan Kesehatan Kerja; (Berdasarkan KEPMENAKER NO: KEP-196/MEN/1999, untuk Tenaga harian Proyek)
→ Penyemprotan cairan disinfektan, Masker, Wastafel, Hand Sanitizer, untuk mensterilisasikan area proyek terhadap dampak covid-19, (berdasarkan Surat Edaran LKPP No. 3 Tahun 2020 Tentang Penjelasan Atas Pelaksanaan Pengadaan Barang/Jasa, Dalam Rangka Penanganan Corona Virus Disease 2019 (Covid-19) 4 5 6 7
###
: RELOKASI PUSKESMAS CANGKURAWOK : PEMATANGAN LAHAN PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022
###
m2 20.00 831,380.00 Ls 1.00 2,753,475.84 m' 35.00 210,290.00 m' 54.00 117,230.00 JUMLAH PEKERJAAN PERSIAPAN
m2 1,994.38 m3 1,708.80 JUMLAH PEKERJAAN TANAH
16,627,600.00 2,753,475.84 7,360,150.00 6,330,420.00 51,271,645.84
57.17
9,505,635.43 920,992.16 5,924,745.68 30,118,673.27
6,439,157.84 405,674.32 18,399,496.73
11,130.00 309,780.00
22,197,449.40 529,352,064.00 551,549,513.40
98.46 99.74
21,855,838.42 527,984,617.95 549,840,456.37
341,610.98 1,367,446.05 1,709,057.03
12.51 93.59
Luas pemadatan ta Level -4,95 Layer 2 Level -5,35 Level -3,80
7,121,964.57
PEKERJAAN RETAINING WALL 1 Pekerjaan Retaining wall type RW-1a → Pekerjaan galian tanah pondasi → Pekerjaan Urugan pasir Urug tbl. padat 5 cm → Pekerjaan lantai kerja Beton tumbuk tbl. 5 cm → Pekerjaan Bekisting pondasi, pas. Batako 1:5 → Pekerjaan Bekisting Dinding beton → Pekerjaan Pembesian BJTS 420 B → Pekerjaan Cor beton Fc 21 Mpa → Pek. Urugan kembali tanah disamping pondasi dan perataan tanah sisa urugan
m3 m3 m3 m2 m2 Kg m3 m3
132.17 4.62 4.62 66.46 295.36 4,471.81 101.53 132.17
156,060.00 359,420.00 1,016,650.00 93,990.00 184,970.00 15,510.00 1,325,500.00 111,370.00
87.63 71.72 98.87 93.96 61.53 50.87 96.05 88.44
2 Pekerjaan Retaining wall type RW-1b → Pekerjaan galian tanah pondasi → Pekerjaan Urugan pasir Urug tbl. padat 5 cm → Pekerjaan lantai kerja Beton tumbuk tbl. 5 cm → Pekerjaan Bekisting pondasi, pas. Batako 1:5 → Pekerjaan Bekisting Dinding beton → Pekerjaan Pembesian BJTS 420 B → Pekerjaan Cor beton Fc 21 Mpa → Pek. Urugan kembali tanah disamping pondasi dan perataan tanah sisa urugan
20,626,450.20 1,660,520.40 4,696,923.00 6,246,575.40 54,632,739.20 69,357,773.10 134,578,015.00 14,719,772.90 306,518,769.20
18,074,404.03 1,190,999.14 4,643,826.88 5,869,329.12 33,618,094.37 35,285,221.23 129,260,561.42 13,018,457.91 240,960,894.10
2,552,046.17 469,521.26 53,096.12 377,246.28 21,014,644.83 34,072,551.87 5,317,453.58 1,701,314.99 65,557,875.10
m3 m3 m3 m2 m2 Kg m3 m3
71.57 1.33 1.33 19.17 85.20 1,289.95 29.08 71.57
156,060.00 359,420.00 1,016,650.00 93,990.00 184,970.00 15,510.00 1,325,500.00 111,370.00
11,169,214.20 478,028.60 1,352,144.50 1,801,788.30 15,759,444.00 20,007,124.50 38,545,540.00 7,970,750.90 97,084,035.00 403,602,804.20
87.63 71.72 98.87 93.96 61.53 50.87 96.05 88.44
9,787,282.26 342,863.39 1,336,859.25 1,692,973.81 9,697,527.22 10,178,467.14 37,022,526.60 7,049,489.54 77,107,989.22 318,068,883.32
1,381,931.94 135,165.21 15,285.25 108,814.49 6,061,916.78 9,828,657.36 1,523,013.40 921,261.36 19,976,045.78 85,533,920.88
898,028,012.95
105,642,474.65
89.47
10.53
### ### ###
Layer 2 Layer 3 Layer 4 Level -0,20
###
JUMLAH PEKERJAAN RETAINING WALL JUMLAH TOTAL JUMLAH KOMPONEN
1,006,423,963.44
36.92 m'
10.65 m'
panjang pasangan lebar atas lebar bawah lebar pondasi Lebar SK Tinggi prisma Tebal Pondasi Tinggi SK Luas Galian tebal pasir / LC panjang pasangan lebar atas lebar bawah lebar pondasi Lebar SK Tinggi prisma Tebal Pondasi Tinggi SK Luas Galian tebal pasir / LC
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN PEKERJAAN
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
DAFTAR HARGA SATUAN PEKERJAAN PEKERJAAN LOKASI TAHUN
: RELOKASI PUSKESMAS CANGKURAWOK : Jl. Alternatif IPB, Cangkurawok, Kabupaten Bogor : 2022
NO
URAIAN PEKERJAAN
KODE ANL
HARGA
A.
PEKERJAAN PERSIAPAN
1
1 M' Pagar Sementara bahan roll banner Tinggi 2 m
A-1
Rp.
270,310.00
2
1 Bh Papan nama proyek, Uk. 120 x 85 cm
A-1
Rp.
367,550.00
3 4
1 M' Pengukuran Dan Pasang Bouwplank 1 M2 Kantor Sementara Lantai plester
A-1 A-2
Rp. Rp.
117,230.00 831,380.00
B.
PEKERJAAN TANAH
1
1 M3 Galian Tanah Biasa sedalam 1 m
B-1
Rp.
156,060.00
2
1 M3 Urugan Kembali
B-2
Rp.
3
###
#NAME?
111,370.00 #NAME?
4
1 M3 Urugaan Pasir
B-3
Rp.
359,420.00
5
1 M2 Pengerjaan stripping tanah
B-4
Rp.
11,130.00
6
1 m3 Mengurug Sirtu dipadatkan
B-5
Rp.
404,250.00
7
1 m3 Mengurug Tanah Urug Pilihan (Padat)
A-5
Rp.
309,780.00
C.
PEKERJAAN PONDASI
1
1 M3 Membuat pondasi batu belah campuran 1SP : 5PP
C-1
Rp.
978,250.00
2
1 M2 Membuat finishing siar pasangan batu kali, campuran 1SP : 2PP
C-2
Rp.
140,680.00
D.
PEKERJAAN BETON
1
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
D-1
Rp.
1,016,650.00
2
1 M3 Membuat Beton Fc. 14,525 Mpa (K.175)
D-2
Rp.
3
###
#NAME?
1,153,870.00 #NAME?
4
1 Kg Pembesian TS 280
#REF!
Rp.
14,120.00
5
1 Kg Pembesian BJTS 420 B
D-2
Rp.
15,510.00
6
1 M2 Pasang Bekesting Untuk Kolom, Dinding beton, Material 3x pakai
D-3
Rp.
184,970.00
7
1 M3 Cor Readymix Beton Fc. 21 Mpa (K-250)
D-4
Rp.
1,325,500.00
8
###
D-5
#NAME?
9
###
D-6
#NAME?
E.
PEKERJAAN PASANGAN DINDING
1
1 M2 Pasang Bekisting Batako Tebal 1/2 Bata, 1pc : 5ps
E-1
Rp.
93,990.00
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN No.
URAIAN
A-1 1 M' Pengukuran Dan Pasang Bouwplank - Kayu kaso terentang 5/7 - Paku Biasa 2" - 5" - Kayu papan Albasiah 3/20 - Pekerja - Tukang Kayu - Kepala Tukang - Mandor - Palu Jumlah Profit Jumlah Total Dibulatkan KOMPONEN A-2 1 M2 Kantor Sementara Lantai plester - Kayu Balok Albasiah - Paku biasa - Semen Portland - Pasir pasang - Pasir beton - Koral beton - Bata merah - Asbes Gelombang kecil 92 x 250 cm - Paku Asbes pancing 6 x 23 - Jendela naco 6 Klips - Kunci tanam biasa - Engsel Pintu biasa - Plywood 4mm - Pekerja - Tukang kayu - Tukang batu - Kepala tukang - Mandor Cangkul Sendok Semen Jumlah Profit Jumlah Total Dibulatkan KOMPONEN
SATUANKOEFESIEN
Spesifikasi
Brand/Merk
TKDN
No. Sertifikat
HARGA SATUAN (Rp)
HARGA (Rp)
VOLUME PEKERJAAN
M3 Kg M3 Oh Oh Oh Oh bh
0.0120 0.0200 0.0070 0.1000 0.1000 0.0100 0.0050 0.1000
100% 0.00% 100% 100% 100% 100% 100% 0%
4,000,000.00 16,500.00 3,000,000.00 130,000.00 150,000.00 175,000.00 200,000.00 65,000.00
48,000.00 330.00 21,000.00 13,000.00 15,000.00 1,750.00 1,000.00 6,500.00 106,580.00 10,658.00 117,238.00 117,230.00
m3 Kg Kg m3 m3 m3 Bh Lbr Kg Bh Bh set Lbr OH OH OH OH OH Bh bh
0.0420 0.5000 25.3220 0.0520 0.0365 0.0603 35.7000 0.8000 0.2500 0.1500 0.0500 0.0500 0.8000 0.5000 0.3000 0.1500 0.1000 0.0500 0.5000 0.0010
100%
3,000,000.00 16,500.00 1,300.00 309,000.00 325,000.00 300,000.00 1,100.00 150,000.00 48,000.00 352,000.00 94,600.00 75,000.00 125,000.00 130,000.00 150,000.00 150,000.00 175,000.00 200,000.00 100,000.00 30,000.00
126,000.00 8,250.00 32,918.60 16,074.18 11,875.50 18,102.00 39,270.00 120,000.00 12,000.00 52,800.00 4,730.00 3,750.00 100,000.00 65,000.00 45,000.00 22,500.00 17,500.00 10,000.00 50,000.00 30.00
PT. INDOCEMENT TUNGGAL PRAKASA
PT. Indobaja Primamurni
96.17% 100% 100% 100% 100%
100% 100% 100% 100% 100% 58.19% 0%
4024/SJ-IND.8/TKDN/8/2022
2203/SJ-IND.8/TKDN/12/2020
755,800.28 75,580.03 831,380.31 831,380.00
54.00
20.00
JUMLAH HARGA PEKERJAAN
BIAYA RUPIAH KDN
KLN
2,592,000.00 17,820.00 1,134,000.00 702,000.00 810,000.00 94,500.00 54,000.00 351,000.00 5,755,320.00
2,592,000.00 1,134,000.00 702,000.00 810,000.00 94,500.00 54,000.00 5,386,500.00
17,820.00 351,000.00 368,820.00
93.59
6.41
2,520,000.00 165,000.00 658,372.00 321,483.60 237,510.00 362,040.00 785,400.00 2,400,000.00 240,000.00 1,056,000.00 94,600.00 75,000.00 2,000,000.00 1,300,000.00 900,000.00 450,000.00 350,000.00 200,000.00 1,000,000.00 600.00
2,520,000.00 633,156.35 321,483.60 237,510.00 362,040.00 785,400.00 1,300,000.00 900,000.00 450,000.00 350,000.00 200,000.00 581,900.00 -
165,000.00 25,215.65 2,400,000.00 240,000.00 1,056,000.00 94,600.00 75,000.00 2,000,000.00 418,100.00 600.00
15,116,005.60
8,641,489.95
6,474,515.65
57.17
42.83
B. ANALISA HARGA SATUAN PEKERJAAN TANAH No.
URAIAN
SATUAN KOEFESIEN Spesifikasi
B-1 1 M3 Galian Tanah Biasa sedalam 1 m - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-2 1 M3 Urugan Kembali - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-3 1 M3 Urugaan Pasir - Pasir Urug M3 - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-4 1 M2 Pengerjaan stripping tanah - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN B-5 1 m3 Mengurug Tanah Urug Pilihan (Padat) - Tanah Urug Pilihan M3 - Pekerja Oh - Mandor Oh - Alat - Cangkul Bh - Pengki Bh Jumlah Profit Jumlah Total Dibulatkan KOMPONEN
Brand/Merk
TKDN
PT. Indobaja Primamurni
58.19% 0%
0.7500 0.0250 0.3750 0.3750
100% 100%
0.5000 0.0500 0.2500 0.2500
PT. Indobaja Primamurni
PT. Indobaja Primamurni
2203/SJ-IND.8/TKDN/12/2020
58.19% 0%
2203/SJ-IND.8/TKDN/12/2020
100% 100% PT. Indobaja Primamurni
1.2000 0.2500 0.0250 0.1250 0.1250
58.19% 0%
100% 100% 100%
0.0500 0.0050 0.0250 0.0250
2203/SJ-IND.8/TKDN/12/2020
100% 100%
1.2000 0.3000 0.0100 0.1500 0.1500
No. Sertifikat
58.19% 0%
2203/SJ-IND.8/TKDN/12/2020
100% 100% 100% PT. Indobaja Primamurni
58.19% 0%
2203/SJ-IND.8/TKDN/12/2020
HARGA SATUAN (Rp)
HARGA (Rp)
130,000.00 200,000.00
97,500.00 5,000.00
100,000.00 5,000.00
37,500.00 1,875.00 141,875.00 14,187.50 156,062.50 156,060.00
130,000.00 200,000.00
65,000.00 10,000.00
100,000.00 5,000.00
25,000.00 1,250.00 101,250.00 10,125.00 111,375.00 111,370.00
225,000.00 130,000.00 200,000.00
270,000.00 39,000.00 2,000.00
100,000.00 5,000.00
15,000.00 750.00 326,750.00 32,675.00 359,425.00 359,420.00
130,000.00 200,000.00
6,500.00 1,000.00
100,000.00 5,000.00
VOLUME PEKERJAAN
JUMLAH HARGA PEKERJAAN
BIAYA RUPIAH KDN
KLN
19,864,650.00 1,018,700.00
19,864,650.00 1,018,700.00
-
7,640,250.00 382,012.50 28,905,612.50
4,445,861.48 25,329,211.48
3,194,388.53 382,012.50 3,576,401.03
87.63
12.37
13,243,100.00 2,037,400.00
13,243,100.00 2,037,400.00
-
5,093,500.00 254,675.00 20,628,675.00
2,963,907.65 18,244,407.65
2,129,592.35 254,675.00 2,384,267.35
88.44
11.56
1,606,500.00 232,050.00 11,900.00
1,606,500.00 232,050.00 11,900.00
-
3,056,100.00 152,805.00 5,059,355.00
1,778,344.59 3,628,794.59
1,277,755.41 152,805.00 1,430,560.41
71.72
28.28
12,963,470.00 1,994,380.00
12,963,470.00 1,994,380.00
-
2,500.00 125.00 10,125.00 1,012.50 11,137.50 11,130.00
509,350.00 25,467.50 15,492,667.50
296,390.77 15,254,240.77
212,959.24 25,467.50 238,426.74
98.46
1.54
192,500.00 130,000.00 200,000.00
231,000.00 32,500.00 5,000.00
394,732,800.00 55,536,000.00 8,544,000.00
394,732,800.00 55,536,000.00 8,544,000.00
-
100,000.00 5,000.00
12,500.00 625.00 281,625.00 28,162.50 309,787.50 309,780.00
2,546,750.00 127,337.50 461,486,887.50
1,481,953.83 460,294,753.83
1,064,796.18 127,337.50 1,192,133.68
99.74
0.26
203.74
203.74
5.95
1,994.38
1,708.80
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI No. C-1
C-2
URAIAN
SATUAN
KOEFESIEN
1 M3 Membuat pondasi batu belah campuran 1SP : 5PP -
Batu belah
M3
1.200
-
Semen Portland
Kg
136.000
-
Pasir pasang
M3
0.544
- Pekerja
Oh
1.500
- Tukang Batu
Oh
0.750
- Kepala Tukang
Oh
0.075
- Mandor
Oh
0.075
Jumlah Profit Jumlah Total Dibulatkan 1 M2 Membuat finishing siar pasangan batu kali, campuran 1SP : 2PP - Semen Portland Kg - Pasir pasang M3 - Pekerja Oh - Tukang Batu Oh - Kepala Tukang Oh - Mandor Oh Jumlah Profit Jumlah Total Dibulatkan
6.340 0.012 0.300 0.150 0.015 0.015
Spesifikasi
Brand/Merk
KERJAAN PONDASI BIAYA RUPIAH TKDN
No. Sertifikat
HARGA SATUAN (Rp)
HARGA (Rp)
VOLUME PEKERJAAN
174,000.00
208,800.00
1,300.00
176,800.00
309,000.00
168,096.00
130,000.00
195,000.00
150,000.00
112,500.00
175,000.00
13,125.00
200,000.00
15,000.00 889,321.00 88,932.10 978,253.10 978,250.00
9,000.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00
57,060.00 3,708.00 39,000.00 22,500.00 2,625.00 3,000.00 127,893.00 12,789.30 140,682.30 140,680.00
JUMLAH HARGA PEKERJAAN
KDN
BIAYA RUPIAH KLN
D. ANALISA HARGA SATUAN PEKERJAAN BETON BIAYA RUPIAH
No. D-1
D-2
URAIAN
Spesifikasi
Brand/Merk
TKDN
No. Sertifikat
HARGA SATUAN
HARGA
(Rp)
(Rp)
VOLUME PEKERJAAN
JUMLAH HARGA PEKERJAAN
KDN
KLN
- Semen Portland
Kg
200.0000
1,300.00
260,000.00
1,547,000.00
1,487,749.90
59,250.10
- Pasir Beton
M3
0.5220
100%
325,000.00
169,650.00
1,009,417.50
1,009,417.50
-
- Batu Pecah Mesin 2/3
M3
0.8620
100%
300,000.00
258,600.00
1,538,670.00
1,538,670.00
-
- Pekerja
Oh
1.3200
100%
130,000.00
171,600.00
1,021,020.00
1,021,020.00
-
- Tukang Batu
Oh
0.2200
100%
150,000.00
33,000.00
196,350.00
196,350.00
-
- Kepala Tukang
Oh
0.0220
100%
175,000.00
3,850.00
22,907.50
22,907.50
- Mandor
Oh
0.1320
100%
200,000.00
26,400.00
157,080.00
157,080.00
-
Sendok Semen
bh
0.0010
0%
30,000.00
30.00
178.50
-
178.50
Cangkul
Bh
0.0110
100,000.00
1,100.00
6,545.00
3,808.54
2,736.46
PT. INDOCEMENT TUNGGAL PRAKASA
924,230.00 92,423.00 1,016,653.00 1,016,650.00
5,499,168.50
5,437,003.44
62,165.06
98.87
1.13
11,550.00
66,548,328.00
32,468,929.23
34,079,398.77
2,247,086.40
-
2,247,086.40
5,243,201.60
5,243,201.60
-
6,049,848.00
6,049,848.00
-
PT. Indobaja Primamurni
96.17%
58.19%
4024/SJ-IND.8/TKDN/8/2022
2203/SJ-IND.8/TKDN/12/2020
Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 Kg Pembesian BJTS 420 B 11,000.00
-
KgBESI BETON DP 1.0500 BjTS 420B, BjTS 520 (Material Lokal) PT DELCOPRIMA 16mm PASIFIC
- Kawat Beton
Kg
0.0150
0%
26,000.00
- Pekerja
Oh
0.0070
100%
130,000.00
910.00
- Tukang Besi
Oh
0.0070
100%
150,000.00
1,050.00
- Kepala Tukang
Oh
0.0007
100%
175,000.00
122.50
705,815.60
705,815.60
- Mandor
Oh
0.0004
100%
200,000.00
80.00
460,940.80
460,940.80
-
bh
0.0070
0%
175,000.00
1,225.00
7,058,156.00
-
7,058,156.00
14,102.50 1,410.25 15,512.75 15,510.00
88,313,376.40
44,928,735.23
43,384,641.17
48.79%
936/SJ-IND.8/TKDN/10/2020
5.95
- Besi Beton BJTS 420 B
Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 M2 Pasang Bekesting Untuk Kolom, Dinding beton, Material 3x pakai
390.00 5,761.76
-
50.87
49.13
Kg
0.4000
0.00%
16,500.00
6,600.00
2,511,696.00
-
2,511,696.00
- Kayu balok terentang
M3
0.0050
100%
4,000,000.00
20,000.00
7,611,200.00
7,611,200.00
-
- MultiPlek 12 mm 120 x 240
Lbr
0.1167
0%
185,000.00
21,583.33
8,213,753.33
-
8,213,753.33
- Dolken
Btg
1.0000
0%
24,500.00
24,500.00
9,323,720.00
-
9,323,720.00
- Pekerja
Oh
0.3000
100%
130,000.00
39,000.00
14,841,840.00
14,841,840.00
-
- Tukang Kayu
Oh
0.3300
100%
150,000.00
49,500.00
18,837,720.00
18,837,720.00
-
- Kepala Tukang
Oh
0.0330
100%
175,000.00
5,775.00
2,197,734.00
2,197,734.00
- Mandor
Oh
0.0060
100%
200,000.00
1,200.00
456,672.00
456,672.00
-
Palu
bh
0.3000
0%
65,000.00
19,500.00
7,420,920.00
-
7,420,920.00
168,158.33 16,815.83 184,974.17 184,970.00
71,415,255.33
43,945,166.00
27,470,089.33
61.53
38.47
950,000.00
997,500.00
130,283,475.00
124,134,094.98
6,149,380.02
20,375,160.00
- Paku Biasa 2" - 5"
D-4
KOEFESIEN
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
Bolt Cutter
D-3
SATUAN
Jumlah Profit Jumlah Total Dibulatkan KOMPONEN 1 M3 Cor Readymix Beton Fc. 21 Mpa (K-250) PT. Solusi Bangun Beton
95.28%
4267/SJ-IND.8/TKDN/7/2021
380.56
-
- Beton Ready Mix Fc 21 Mpa
m3
1.0500 K-125 s.d K-500
- Pekerja
Oh
1.2000
100%
130,000.00
156,000.00
20,375,160.00
-
- Tukang Batu
Oh
0.2000
100%
150,000.00
30,000.00
3,918,300.00
3,918,300.00
-
- Kepala Tukang
Oh
0.0280
100%
175,000.00
4,900.00
639,989.00
639,989.00
-
- Mandor
Oh
0.0830
100%
200,000.00
16,600.00
2,168,126.00
2,168,126.00
-
Bh
0.0140
100,000.00
1,400.00
182,854.00
106,402.74
76,451.26
1,205,000.00 120,500.00 1,325,500.00 1,325,500.00
157,567,904.00
151,342,072.72
6,225,831.28
96.05
3.95
130.61
Alat - Cangkul Jumlah Profit Jumlah Total Dibulatkan KOMPONEN
PT. Indobaja Primamurni
58.19%
2203/SJ-IND.8/TKDN/12/2020
E. ANALISA HARGA SATUAN PEKERJAAN DINDING No. E-1
URAIAN
SATUAN
KOEFESIEN
Spesifikasi
Brand/Merk
1 M2 Pasang Bekisting Batako Tebal 1/2 Bata, 1pc : 5ps - Batako Besar 8 x 20 x 30 cm Bh 12.5000 8 x 20 x 30 cm PT. ALAM DAYA SAKTI - Semen Portland Kg 4.8400 PT. INDOCEMENT TUNGGAL PRAKAS - Pasir Pasang M3 0.0225 - Pekerja Oh 0.1600 - Tukang Batu Oh 0.0500 - Kepala Tukang Oh 0.0050 - Mandor Oh 0.0075 Sendok Semen bh 0.0010 Cangkul Bh 0.0025 PT. Indobaja Primamurni Jumlah Profit Jumlah Total Dibulatkan KOMPONEN
TKDN
No. Sertifikat
88% 96% 100% 100% 100% 100% 100% 0% 58.19%
11224/SJ-IND.8/TKDN/12/2021 4024/SJ-IND.8/TKDN/8/2022
2203/SJ-IND.8/TKDN/12/2020
JUMLAH HARGA SATUANJUMLAH HARGA VOLUME PEKERJAAN HARGA (Rp) (Rp) PEKERJAAN 3,300.00 1,300.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00 30,000.00 100,000.00
41,250.00 6,292.00 6,952.50 20,800.00 7,500.00 875.00 1,500.00 30.00 250.00 85,449.50 8,544.95 93,994.45 93,990.00
85.63
3,532,237.50 538,783.96 595,342.58 1,781,104.00 642,225.00 74,926.25 128,445.00 2,568.90 21,407.50 7,317,040.69
BIAYA RUPIAH KDN (%)
KLN (%)
3,122,497.95 518,148.53 595,342.58 1,781,104.00 642,225.00 74,926.25 128,445.00 12,457.02 6,875,146.33
409,739.55 20,635.43 2,568.90 8,950.48 441,894.35
93.96
6.04
M. ANALISA HARGA SATUAN PEKERJAAN JALAN No. M-1
URAIAN 1 M1 Pasang Kansteen Jalan Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Profit Jumlah Total Dibulatkan
SATUAN Err:509
Bh Kg M3 Oh Oh Oh Oh
VOLUME 2.5000 0.9680 0.0225 0.1500 0.1000 0.0100 0.0150
HARGA SATUAN (Rp) Err:509 1,300.00 309,000.00 130,000.00 150,000.00 175,000.00 200,000.00
HARGA (Rp) Err:509 1,258.40 6,952.50 19,500.00 15,000.00 1,750.00 3,000.00 Err:509 Err:509 Err:509 Err:509
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN MATERIAL
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
DAFTAR HARGA SATUAN BAHAN BANGUNAN NO
MATERIAL
SAT
HARGA (KONTRAKTUAL)
A.
AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA
1
Pasir Urug / teras
m3
Rp.
225,000.00
2
Pasir Pasang Kali
m3
Rp.
309,000.00
3
Pasir Beton
m3
Rp.
325,000.00
Pasir Beton
Kg
Rp.
232.14
4
Sirtu
m3
Rp.
275,000.00
5
Tanah Urug Pilihan
m3
Rp.
192,500.00
6
Batu Pecah Mesin 1/2
m3
Rp.
300,000.00
Batu Pecah Mesin 1/2
Kg
Rp.
166.67
7
Batu belah pondasi
m3
Rp.
174,000.00
8
Batako Besar 8 x 20 x 30 cm
bh
Rp.
3,300.00
9
Bata Merah bakar
bh
Rp.
1,100.00
10
Bata ringan Uk. 20x60x10 cm
bh
Rp.
11,000.00
11
MU 301, 40 Kg
zak
Rp.
107,800.00
12
MU 200, 40 Kg
zak
Rp.
193,600.00
13
MU 380, 40 Kg
zak
Rp.
161,700.00
14
Beton ready Mix Fc. 21 Mpa
m3
Rp.
950,000.00
15
Panel Uk. 40x5x240 cm
Lbr
Rp.
226,000.00
16
Tiang Precast Profil H tinggi 280 cm
bh
Rp.
372,000.00
17
Jasa Concrete Pump
m3
Rp.
50,000.00
18
Semen PC /50 kg
zak
Rp.
65,000.00
19
Semen Warna
kg
Rp.
28,600.00
B
BAHAN KAYU BERIKUT BAHAN JADINYA
1
Kayu Balok Begisting / Terentang
m3
Rp.
4,000,000.00
2
kayu Papan Begisting / Terentang
m3
Rp.
4,000,000.00
3
Kayu Balok / papan Albasiah
m3
Rp.
3,000,000.00
4
Dolken d.8-10 cm
bt
Rp.
24,500.00
C
BAHAN KAYU LAPIS
1
Multiplek 9 mm 120 x 240
lbr
Rp.
128,000.00
2
Multiplek 12 mm 120 x 240
Lbr
Rp.
185,000.00
3
Plywood 4 mm 120 x 240
Lbr
Rp.
125,000.00
NO
MATERIAL
SAT
HARGA (KONTRAKTUAL)
G
BAHAN LOGAM DAN BAHAN JADINYA
1
Besi Beton TS 280 Rata-rata
kg
Rp.
9,800.00
2
Besi Beton BJTS 420 B Rata-rata
kg
Rp.
11,000.00
3
Kawat Beton
kg
Rp.
26,000.00
H
BAHAN PAKU DAN MUR BAUT
1
Paku 1 cm s/d 3 cm
kg
Rp.
16,500.00
2
Paku 4 cm s/d 7 cm
kg
Rp.
16,500.00
3
Paku Asbes pancing 6 x 23
Kg
Rp.
48,000.00
I
BAHAN ATAP
1
Asbes Gelombang kecil 92 x 250 cm
lbr
Rp.
150,000.00
J
BAHAN BAKAR DAN PELUMAS
1
Minyak Bekisting
ltr
Rp.
59,840.00
DINAS KESEHATAN KABUPATEN BOGOR Jl. Tegar Beriman, Cibinong, Bogor, Jawa Barat 16914
RENCANA ANGGARAN BIAYA (RAB) ENGINEER ESTIMATE / EE DAFTAR HARGA SATUAN UPAH
KEGIATAN :
RELOKASI PUSKESMAS CANGKURAWOK
TAHUN ANGGARAN
--- 2020 ---
DAFTAR HARGA SATUAN UPAH NO
URAIAN
SATUAN
UPAH (KONTRAKTUAL)
1
Mandor
Org/hr
Rp
200,000.00
2
Kepala Tukang Batu
Org/hr
Rp
175,000.00
3
Kepala Tukang Kayu
Org/hr
Rp
175,000.00
4
Kepala Tukang Besi
Org/hr
Rp
175,000.00
5
Kepala Tukang Cat
Org/hr
Rp
175,000.00
6
Kepala Tukang Listrik
Org/hr
Rp
175,000.00
7
Kepala Tukang Las
Org/hr
Rp
175,000.00
8
Tukang Batu
Org/hr
Rp
150,000.00
9
Tukang Kayu
Org/hr
Rp
150,000.00
10
Tukang Besi/Baja
Org/hr
Rp
150,000.00
11
Tukang Cat
Org/hr
Rp
150,000.00
12
Tukang Listrik
Org/hr
Rp
150,000.00
13
Tukang Pipa
Org/hr
Rp
150,000.00
14
Tukang Plitur
Org/hr
Rp
150,000.00
15
Tukang Gali
Org/hr
Rp
150,000.00
16
Tukang Taman
Org/hr
Rp
150,000.00
17
Tukang Las
Org/hr
Rp
150,000.00
18
Pembantu Tukang
Org/hr
Rp
130,000.00
19
Pekerja Biasa
Org/hr
Rp
130,000.00
KETERANGAN
DAFTAR HARGA SATUAN UPAH & BAHAN PEMBANGUNAN GUDANG UMUM ASRAMA HAJI INDRAMAYU TAHAP I TAHUN ANGGARAN 2020 UPAH TENAGA KERJA NO.
TENAGA KERJA
A 1 2 3 4 5 6 7 8 9 10 J 1 2 3 4 5 6 7
UPAH Mandor Kepala tukang Tukang Kayu Tukang Besi Beton Tukang Besi / IWF Tukang Batu Tukang Cat Tukang Pipa Tukang Listrik Pekerja BAHAN MINYAK Alat - alat bantu Sewa alat untuk pengelasan Sewa molen Sewa kuali termasuk angkutan Meni besi Nat Minyak bekisting
K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALAT BERAT Buldoser 100 - 150 hp Concrete mixer 0,3 - 0,6 m3 Crane 10 - 15 ton Dump truck 3-4 m3 Dump truck 10 Ton Mesin Bor Dia. 60 cm Excavator 80 - 140 HP Generator set Concrete vibrator Water pump 70 - 100 mm Wheel Loader 1,0 - 1,6 m3 Pile Driver + hammer Tower Crane Welding set Water tanker 3000-4500 L Motor grader Vibrator roller Tandem roller Mixer truck Concrete pump P. Tyre Roller Air compresor Cold milling 3-Wheel Roller
Harga Satuan Bahan Pekerjaan Pembangunan Gudang Umum Asrama Haji Indramayu Tahap I
SATUAN
HARGA SATUAN (Rp.)
org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr org/hr
200,000.00 175,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 130,000.00
ls jam set set kg kg ltr
60,000.00 68,800.00 165,000.00 89,700.00 27,500.00 15,500.00 50,100.00
jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam
311,624.00 31,804.00 455,099.00 212,812.00 286,302.00 450,000.00 253,964.00 380,410.00 55,727.00 3,306,052.00 279,287.00 475,000.00 629,095.00 171,000.00 155,193.00 327,468.00 316,831.00 123,074.00 809,712.00 356,250.00 524,758.00 279,436.00 811,730.00 131,089.00
7