Sheet :



1



Project : Perencanaan Percepatan DED, EIA, dan LARP Ruas Mamasa-Bts. Sulsel, Provinsi Sulawesi Barat, Tahun 2022



DAILY REPORT OF DRILLING (LAPORAN HARIAN PEMBORAN)



Core



Depth (Kedalaman) Core



Recovered



Bit



: Bahri Sada (Tim Bor-01) : -



Core



Drilling



Recovery



Type



Dia



Barrel



Method



(m)



(% )



(M/D)*1



(mm)



(S/D/T)*2



(D / W / SPT / UDS)*3



1.20



1.20



100



M



73



S



2.00



0.80



0.80



2.45 3.00



3.00 3.50



0.55 0.50



0.55 0.50



10:30



3.50



4.00



0.50



0.50



10:40 11:15



11:10 11:30



4.45 5.00



5.00 5.35



0.55 0.35



0.55 0.35



11:35



12:00



5.35



6.00



0.65



0.65



12:00 13:00 13:35 14:05 14:40



13:00 13:30 14:00 14:35 15:25



6.45 6.75 7.05 7.40



6.75 7.05 7.40 7.50



0.30 0.30 0.35 0.10



0.30 0.30 0.35 0.10



15:30



16:00



7.50



8.00



0.50



0.50



16:10 16:50



16:45 17:20



8.45 9.00



9.00 9.40



0.55 0.40



0.55 0.40



17:25



17:55



9.40



10.00



0.60



0.60



From



To



From



To



(hh:mm)



(hh:mm)



(m)



(m)



(m)



7:00



7:45



0.00



1.20



8:00



8:30



1.20



8:40 9:25



9:20 10:00



10:05



M M



73 73



S S



100 100



M M



73 73



S S



M M M M



73 73 73 73 73



M M



73 73



3



6 30.00



3



6



11



15.00 15.00 15.00



17 30.00



15



30



44



15.00 15.00 15.00



74 30.00



Depth



Dia.



(m) 18



(mm) 89



18



89



18 18



89 89



18



89



18 18



89 89



18



89



18 18 18 18



89 89 89 89



18



89



18 18



89 89



18



89



Kind of Rock



REMARKS (Keterangan)



SPT-N > 60



Istirahat S S S S



D D D D SPT



100 100



3



D D SPT



100 100 100 100



3



15.00 15.00 15.00



D D SPT



: Ir. H.A. Muh. Idhil Maming, MT : TOHO MZ-1



Standard Penetration Test (SPT) Cashing Pipe



D SPT



100 100



Geodetic Eng. (in the morning) Machine



Numb. of Blows (Blow/cm) =N2+N3



OPERATOR GWL



N.3 (Blows/cm)



: BH-01 : STA. 0+00



N.2 (Blows/cm)



Time (Waktu)



HOLE NO LOCATION



: Selasa : 8 Feb. 2022



N.1 (Blows/cm)



DAY (Hari) DATE (Tanggal)



S S



35



47



82 30.00



D D SPT



*1 M:METAL, D:DIAMOND



24



15.00 15.00 15.00



34



60



15.00 13.00



> 60



SPT-N > 60 pasir kasar sedikit lempung sangat keras



SPT-N > 60 pasir kasar sangat padat & keras



*2 S:SINGLE, D:DOBLE, T:TRIPLE 3* D:Dry, W:Wet, SPT:Standart Penetration Test, UDS:Undisturbed Sample (water loss,spring, cavty, artesian water, machine troble, jamming, etc, should be recorded)



Submited By (dilaporkan Oleh)



Checkid By (diperiksa Oleh)



Ir. H.A. Muh. Idhil Maming, MT



………………………………….