LAPORAN HARIAN PEMBORAN DAILY REPORT OF CORE DRILLING Nama Proyek Project Name
:
Rencana Kedalaman Approx Depth.
:
Tanggal Date
:
Lokasi Location
:
Muka Air Tanah Water Level
:
Lubang Bor Bor Hole
:
Elevasi Elevation
:
Cuaca Weather
:
Lembar Ke. Sheet
:
Dari From (m)
Sampai To (m)
Spesifikasi Pengeboran Drill Specification
Kemajuan Progress (m)
Diameter ( cm )
Panjang Inti Core Length (m)
Persentase Percentage (%)
UJI PENETRASI STANDAR / STANDART PENETRATION TEST KEDALAMAN DEPTH.
N1/15
N2/15
N3/15
N2 + N3
PEMASANGAN PIPA LINDUNG CASING PIPE KONDISI TANAH SOIL CONDITIONS
KETERANGAN REMARKS
Dari From ( m )
Sampai To ( m )
JURU BOR / DRILL MASTER DISIAPKAN OLEH PREPARED BY DIPERIKSA OLEH CHECKED BY DISETUJUI OLEH APPROVED BY
Pipa Lindung yang Dipakai Casing Pipe Specification Diameter ( cm )
No. Seri Series No.