LAPORAN AKHIR
BAPAK ADRIN
PEKERJAAN PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM. MODERNHILL, BLOK EI/16, PONDOK CABE UDIK – TANGERANG SELATAN
AGUSTUS 2014
PT. BAHANA TEHNIK RAYA Topography-Hydrography-Soil Investigation-Drilling- Bore PileGeologi Mapping-Engineering-Construction Telp.84312336, Fax.84309580 Email. [email protected]
DAFTAR ISI PENGANTAR
1
BAB I PENYELIDIKAN TANAH
2
1.1
Program Penyelidikan Tanah di Lapangan
2
1.2
Pengujian Sondir/DCPT
2
1.3
Pengamatan Muka Air Tanah
3
BAB II KONDISI LAPISAN TANAH
4
2.1
Berdasarkan Pengujian Sondir
4
2.2
Muka air Tanah
4
BAB III REKOMENDASI GEOTEKNIK
5
3.1
Daya Dukung Ijin Pondasi Dangkal
5
3.2
Daya Dukung Ijin Pondasi Dalam
5
3.3
Saran dan Analisa
6
LAMPIRAN I. GRAFIK SONDIR/DCPT LAMPIRAN II. SKETSA LOKASI TITIK PENYELIDIKAN TANAH LAMPIRAN III. DOKUMENTASI
1
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN PENGANTAR Laporan ini memaparkan hasil akhir penyelidikan tanah proyek Rumah Tinggal di Perum Modern Hill Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan. Penyelidikan tanah ini dilakukan untuk mendapatkan data teknis/parameter tanah yang dapat mewakili kondisi tanah setempat untuk digunakan didalam perencanaan pondasi.
Ruang lingkup pekerjaan penyelidikan tanah untuk memenuhi tujuan tersebut adalah sebagai berikut : 1. Melakukan pengujian Dutch Cone Penetrometer Test (DCPT)/Sondir dengan kapasitas 2.5 ton sebanyak 3 (tiga) titik. Percobaan dihentikan bila tahanan konus telah mencapai 200 kg/cm² atau kedalaman pengujian telah mencapai 25.0 meter. 2. Pengamatan muka air tanah pada seluruh titik uji lapangan. 3. Menyusun laporan untuk menyajikan hasil penyelidikan tanah serta diskusi kondisi tanah. 4. Melakukan analisa dan rekomendasi daya dukung ijin pondasi.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
2
BAB I. PENYELIDIKAN TANAH 1.1
Program Penyelidikan Tanah di Lapangan
Program penyelidikan tanah yang telah dilakukan meliputi pekerjaan-pekerjaan sebagai berikut : Melakukan pengujian sondir di 3 (tiga) titik, yaitu : S-1, S-2, dan S-3. Memonitor muka air tanah pada setiap titik sondir.
Seluruh pekerjaan dimulai dan selesai pada tanggal 13 Agustus 2014, dengan ringkasan sebagai berikut:
Titik Sondir
Tanggal Pelaksanaan
Kedalaman Maksimum (meter)
S-1
13 Agustus 2014
15.8
S-2
13 Agustus 2014
22.4
S-3
13 Agustus 2014
21.6
1.2
Pengujian Sondir/Dutch Cone Penetration Test
Percobaan ini menggunakan alat sondir tipe Dutch Cone Penetrometer yang dilengkapi dengan bikonus, dan dipasang diujung pipa sondir. Selama percobaan sondir, alat dipertahankan vertikal dengan memasang angkur dikaki sondir. Konus kemudian ditekan masuk ke dalam tanah dengan kecepatan konstan tidak lebih dari 2 cm/dtk.
Konus mempunyai sudut 60 derajat dan luas conenya 10 cm². Pembacaan tekanan konus dilakukan dengan interval 20 cm yaitu pembacaan tekanan konus dan tekanan total + friksi dari selimut konus.
Percobaan ini dihentikan jika tahanan konus telah mencapai 200 kg/cm² atau mencapai kedalaman 25.0 meter. Hasil percobaan dipresentasikan dalam grafik hubungan antara kedalaman terhadap tahanan konus, tahanan total, dan friction ratio. LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
3 1.3
Pengamatan Muka Air Tanah
Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan. Kedalaman muka air tanah yang diperoleh pada waktu penyelidikan lapangan diperoleh dalam waktu yang singkat atau hanya dilakukan pada saat pekerjaan lapangan dilaksanakan, sehingga perlu dilakukan pengujian lapangan lainnya untuk mendapatkan kedalaman muka air tanah yang lebih pasti dan stabil.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
4
BAB II. KONDISI LAPISAN TANAH 2.1
Berdasarkan Pengujian Sondir
Pengujian sondir dilakukan pada 3 (tiga) titik. Berdasarkan hasil pengujian DCPT / sondir yang diplot dalam grafik hubungan antara qc (tahanan konus) dan fr (friction ratio) terhadap kedalaman pengujian, diperoleh data sebagai:
Titik Sondir
Kedalaman Pengujian Sondir 15.8
S-1
2.2
Nilai Tahanan Konus (qc) 250 kg/cm²
S-2
22.4
250 kg/cm²
S-3
21.6
250 kg/cm²
Muka Air Tanah
Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan. Untuk mendapatkan muka air tanah yang lebih pasti disarankan untuk melakukan pengujian lapangan lainnya. Adapun hasil pengamatan dan pengukuran selama pekerjaan lapangan dirangkum sebagai berikut:
Titik Sondir
Kedalaman Muka Air Tanah
S-1
3.0m
S-2
3.0m
S-3
2.0m
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
5
BAB III. REKOMENDASI GEOTEKNIK 3.1
Daya Dukung Ijin Pondasi Dangkal
Pondasi dangkal dapat digunakan untuk memikul beban rencana struktur ringan. Daya dukung ijin pondasi dangkal dihitung berdasarkan nilai tanahan konus dengan menggunakan formula Skempton. Daya dukung ijin pondasi dangkal pada beberapa kedalaman berdasarkan nilai qc adalah sebagai berikut:
3.2
Kedalaman Pondasi Dangkal
Daya Dukung Ijin
1.0m
0.20 kg/cm²
2.0m
0.22 kg/cm²
3.0m
0.25 kg/cm²
Daya Dukung Ijin Pondasi Dalam
Pondasi dalam digunakan jika pondasi dangkal tidak mampu memikul beban struktur yang telah direncanakan. Pemilihan jenis pondasi dalam yang digunakan tergantung dari faktor lingkungan di sekitar lokasi proyek, kondisi tanah, dan faktor ekonomis. Berikut daya dukung ijin pondasi dalam pada masing-masing titik uji sondir.
a. Daya dukung ijin pondasi dalam pada titik S-1 yang ditempatkan hingga kedalaman 16.0m. Dimensi Pondasi Dalam
Daya Dukung Ijin (ton)
Tiang Pancang Segiempat 20cmx20cm
31
Tiang Pancang Segiempat 25cmx25cm
40
Tiang Pancang Segitiga 28cm
32
Tiang Pancang Segitiga 32cm
37
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
6 Dimensi Pondasi Dalam
Daya Dukung Ijin (ton)
Tiang Bor Diameter 30cm
36
Tiang Bor Diameter 40cm
51
Tiang Bor Diameter 50cm
68
Tiang Bor Diameter 60cm
85
b. Daya dukung ijin pondasi dalam pada titik S-2 dan S-3 yang ditempatkan hingga kedalaman 22.0m.
3.3
Dimensi Pondasi Dalam
Daya Dukung Ijin (ton)
Tiang Pancang Segiempat 20cmx20cm
50
Tiang Pancang Segiempat 25cmx25cm
63
Tiang Pancang Segitiga 28cm
51
Tiang Pancang Segitiga 32cm
59
Dimensi Pondasi Dalam
Daya Dukung Ijin (ton)
Tiang Bor Diameter 30cm
56
Tiang Bor Diameter 40cm
78
Tiang Bor Diameter 50cm
100
Tiang Bor Diameter 60cm
125
Saran dan Analisa •
Pada pelaksanaan pekerjaan pondasi dalam disarankan untuk melakukan pengujian beban statis (static loading test) atau uji beban lainnya dengan beban uji 2x beban rencana. Pengujian ini akan menghasilkan daya dukung tiang tunggal yang lebih optimal dan besarnya penurunan yang terjadi akibat uji pembebanan.
•
Permasalahan yang timbul dalam pelaksanaan konstruksi pondasi dalam baik tiang pancang sangat mempengaruhi perilaku pondasi tiang dalam dan daya dukung ijinnya, sehingga perlu dilakukan Quality Control yang baik.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
7 •
Pengujian sondir yang dilakukan pada lokasi ini, hanya dapat memperkirakan kedalaman lapisan tanah keras sesuai dengan kapasitas dan kemampuan alat sondir. Sedangkan untuk ketebalan lapisan tanah keras yang dianggap cukup untuk memikul beban yang direncanakan tidak dapat diperoleh melalui pengujian sondir. Untuk mendapatkan hasil dan gambaran profil tanah yang lebih baik dan pasti maka disarankan untuk melakukan pengeboran dalam (deep boring) dan pengujian Standard Penetration Test (SPT).
Demikian laporan akhir penyelidikan tanah ini disampaikan. Atas kerjasama dan kepercayaan yang telah diberikan, kami ucapkan terima kasih. Grafik, gambar, dan tabel melengkapi laporan ini.
Jakarta, 15 Agustus 2014 Hormat Kami, PT. BAHANA TEHNIK RAYA
Darmawan (Direktur)
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
SKETSA TITIK SONDIR
S2
10 M 10 M
10 M S3
10 M
S1
LAMPIRAN I. GRAFIK SONDIR/DCPT
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Project
RUMAH TINGGAL
Operator
Lasimin
Location Date Test No.
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan
Checked By GWL
DRM 3.0
13-Aug-14 S-1
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter
kg/cm² 0 15 18 16 20 15 25 16 8 10 5 4 8 12 15 5 14 8 18 14 10 4 8 8 12 8 15 18 20 14 10 5 8 12 30 20 15 30 40 30 60 40 40 45 70 50 40 25 50 30 40
kg/cm² 0 20 22 18 25 20 30 18 14 15 10 8 12 16 20 10 16 12 27 18 15 8 12 12 16 12 30 22 25 18 15 10 12 16 40 30 30 40 50 40 70 50 50 65 80 60 50 30 60 45 50
kg/cm² 0 5 4 2 5 5 5 2 6 5 5 4 4 4 5 5 2 4 9 4 5 4 4 4 4 4 15 4 5 4 5 5 4 4 10 10 15 10 10 10 10 10 10 20 10 10 10 5 10 15 10
kg/cm² 0 0.42 0.33 0.17 0.42 0.42 0.42 0.17 0.50 0.42 0.42 0.33 0.33 0.33 0.42 0.42 0.17 0.33 0.75 0.33 0.42 0.33 0.33 0.33 0.33 0.33 1.25 0.33 0.42 0.33 0.42 0.42 0.33 0.33 0.83 0.83 1.25 0.83 0.83 0.83 0.83 0.83 0.83 1.67 0.83 0.83 0.83 0.42 0.83 1.25 0.83
kg/cm 0 8.3 15.0 18.3 26.7 35.0 43.3 46.7 56.7 65.0 73.3 80.0 86.7 93.3 101.7 110.0 113.3 120.0 135.0 141.7 150.0 156.7 163.3 170.0 176.7 183.3 208.3 215.0 223.3 230.0 238.3 246.7 253.3 260.0 276.7 293.3 318.3 335.0 351.7 368.3 385.0 401.7 418.3 451.7 468.3 485.0 501.7 510.0 526.7 551.7 568.3
% 0 0.00 1.85 1.04 2.08 2.78 1.67 1.04 6.25 4.17 8.33 8.33 4.17 2.78 2.78 8.33 1.19 4.17 4.17 2.38 4.17 8.33 4.17 4.17 2.78 4.17 8.33 1.85 2.08 2.38 4.17 8.33 4.17 2.78 2.78 4.17 8.33 2.78 2.08 2.78 1.39 2.08 2.08 3.70 1.19 1.67 2.08 1.67 1.67 4.17 2.08
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00 5.20 5.40 5.60 5.80 6.00 6.20 6.40 6.60 6.80 7.00 7.20 7.40 7.60 7.80 8.00 8.20 8.40 8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00
Keterangan
Page 1 from 2
meter
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Proyek Lokasi Tanggal Titik No.
RUMAH TINGGAL
Operator Checked By MAT
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan 13-Aug-14 S-1
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter 10.00 10.20 10.40 10.60 10.80 11.00 11.20 11.40 11.60 11.80 12.00 12.20 12.40 12.60 12.80 13.00 13.20 13.40 13.60 13.80 14.00 14.20 14.40 14.60 14.80 15.00 15.20 15.40 15.60 15.80
kg/cm² 40 60 57 30 60 80 70 70 45 80 105 90 120 135 140 140 150 155 140 130 130 135 130 120 150 160 170 195 210 250
kg/cm² 50 70 65 40 75 90 80 80 65 90 120 110 130 145 150 150 160 165 150 140 140 145 140 130 160 170 180 205 235 250
kg/cm² 10 10 8 10 15 10 10 10 20 10 15 20 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 25 0
kg/cm² 0.83 0.83 0.67 0.83 1.25 0.83 0.83 0.83 1.67 0.83 1.25 1.67 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 2.08 0.00
kg/cm 568.3 601.7 615.0 631.7 656.7 673.3 690.0 706.7 740.0 756.7 781.7 815.0 831.7 848.3 865.0 881.7 898.3 915.0 931.7 948.3 965.0 981.7 998.3 1015.0 1031.7 1048.3 1065.0 1081.7 1123.3 1123.3
% 2.08 1.39 1.17 2.78 2.08 1.04 1.19 1.19 3.70 1.04 1.19 1.85 0.69 0.62 0.60 0.60 0.56 0.54 0.60 0.64 0.64 0.62 0.64 0.69 0.56 0.52 0.49 0.43 0.99 0.00
Lasimin DRM 3.0
Keterangan
Page 2 from 2
meter
PT. BAHANA TEHNIK RAYA
DUTCH CONE PENETROMETER TEST/SONDIR Project Location Date Operator Checked By
S-1
: RUMAH TINGGAL X : : Perum. Modernhill, Blok E.1/16, Pondok Y Cabe Udik, Tangerang : Selatan : 13-Aug-14 Z : : Lasimin Capacity : 2.5 tonf : DRM GWL : 3.0
qc (kg/cm²)
meter
tf/10 (kg/cm)
FR (%)
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
Depth (meter)
Depth (meter)
Test No.
12 13 14
12
13
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
0
50
100
150
200
250
300
0
2
4
6
8
10
12
LAMPIRAN II. SKETSA LOKASI TITIK PENYELIDIKAN TANAH
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Project
RUMAH TINGGAL
Operator
Lasimin
Location Date Test No.
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan
Checked By GWL
DRM 3.0
13-Aug-14 S-2
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter
kg/cm² 0 5 4 16 18 4 4 10 15 14 5 2 2 5 4 5 12 5 10 10 4 18 14 4 4 12 25 23 18 20 20 50 30 20 25 10 40 30 22 25 40 25 20 35 50 50 60 50 45 70 40
kg/cm² 0 10 8 18 22 8 8 15 20 18 10 4 4 10 8 10 16 10 15 15 8 22 16 8 8 16 30 26 22 25 25 60 40 25 30 15 50 40 26 30 50 35 25 45 60 60 70 60 65 80 50
kg/cm² 0 5 4 2 4 4 4 5 5 4 5 2 2 5 4 5 4 5 5 5 4 4 2 4 4 4 5 3 4 5 5 10 10 5 5 5 10 10 4 5 10 10 5 10 10 10 10 10 20 10 10
kg/cm² 0 0.42 0.33 0.17 0.33 0.33 0.33 0.42 0.42 0.33 0.42 0.17 0.17 0.42 0.33 0.42 0.33 0.42 0.42 0.42 0.33 0.33 0.17 0.33 0.33 0.33 0.42 0.25 0.33 0.42 0.42 0.83 0.83 0.42 0.42 0.42 0.83 0.83 0.33 0.42 0.83 0.83 0.42 0.83 0.83 0.83 0.83 0.83 1.67 0.83 0.83
kg/cm 0 8.3 15.0 18.3 25.0 31.7 38.3 46.7 55.0 61.7 70.0 73.3 76.7 85.0 91.7 100.0 106.7 115.0 123.3 131.7 138.3 145.0 148.3 155.0 161.7 168.3 176.7 181.7 188.3 196.7 205.0 221.7 238.3 246.7 255.0 263.3 280.0 296.7 303.3 311.7 328.3 345.0 353.3 370.0 386.7 403.3 420.0 436.7 470.0 486.7 503.3
% 0 0.00 8.33 1.04 1.85 8.33 8.33 4.17 2.78 2.38 8.33 8.33 8.33 8.33 8.33 8.33 2.78 8.33 4.17 4.17 8.33 1.85 1.19 8.33 8.33 2.78 1.67 1.09 1.85 2.08 2.08 1.67 2.78 2.08 1.67 4.17 2.08 2.78 1.52 1.67 2.08 3.33 2.08 2.38 1.67 1.67 1.39 1.67 3.70 1.19 2.08
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00 5.20 5.40 5.60 5.80 6.00 6.20 6.40 6.60 6.80 7.00 7.20 7.40 7.60 7.80 8.00 8.20 8.40 8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00
Keterangan
Page 1 from 3
meter
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Proyek Lokasi Tanggal Titik No.
RUMAH TINGGAL
Operator Checked By MAT
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan 13-Aug-14 S-2
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter 10.00 10.20 10.40 10.60 10.80 11.00 11.20 11.40 11.60 11.80 12.00 12.20 12.40 12.60 12.80 13.00 13.20 13.40 13.60 13.80 14.00 14.20 14.40 14.60 14.80 15.00 15.20 15.40 15.60 15.80 16.00 16.20 16.40 16.60 16.80 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 18.60 18.80 19.00 19.20 19.40 19.60 19.80 20.00
kg/cm² 40 40 35 50 30 50 55 80 60 50 60 50 25 45 70 65 40 30 35 60 45 70 50 35 60 60 55 65 45 60 65 70 100 60 80 105 130 90 80 115 80 120 120 130 105 105 90 105 125 105 130
kg/cm² 50 50 45 60 40 60 75 90 70 60 70 60 40 65 80 75 50 40 55 70 65 80 60 55 70 70 75 80 65 70 85 80 110 70 90 120 140 110 105 125 90 130 130 145 120 120 105 120 145 120 140
kg/cm² 10 10 10 10 10 10 20 10 10 10 10 10 15 20 10 10 10 10 20 10 20 10 10 20 10 10 20 15 20 10 20 10 10 10 10 15 10 20 25 10 10 10 10 15 15 15 15 15 20 15 10
kg/cm² 0.83 0.83 0.83 0.83 0.83 0.83 1.67 0.83 0.83 0.83 0.83 0.83 1.25 1.67 0.83 0.83 0.83 0.83 1.67 0.83 1.67 0.83 0.83 1.67 0.83 0.83 1.67 1.25 1.67 0.83 1.67 0.83 0.83 0.83 0.83 1.25 0.83 1.67 2.08 0.83 0.83 0.83 0.83 1.25 1.25 1.25 1.25 1.25 1.67 1.25 0.83
kg/cm 503.3 536.7 553.3 570.0 586.7 603.3 636.7 653.3 670.0 686.7 703.3 720.0 745.0 778.3 795.0 811.7 828.3 845.0 878.3 895.0 928.3 945.0 961.7 995.0 1011.7 1028.3 1061.7 1086.7 1120.0 1136.7 1170.0 1186.7 1203.3 1220.0 1236.7 1261.7 1278.3 1311.7 1353.3 1370.0 1386.7 1403.3 1420.0 1445.0 1470.0 1495.0 1520.0 1545.0 1578.3 1603.3 1620.0
% 2.08 2.08 2.38 1.67 2.78 1.67 3.03 1.04 1.39 1.67 1.39 1.67 5.00 3.70 1.19 1.28 2.08 2.78 4.76 1.39 3.70 1.19 1.67 4.76 1.39 1.39 3.03 1.92 3.70 1.39 2.56 1.19 0.83 1.39 1.04 1.19 0.64 1.85 2.60 0.72 1.04 0.69 0.69 0.96 1.19 1.19 1.39 1.19 1.33 1.19 0.64
Lasimin DRM 3.0
Keterangan
Page 2 from 3
meter
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Project Location Date Test No.
RUMAH TINGGAL
Operator Checked By GWL
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan 13-Aug-14 S-2
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter 20.00 20.20 20.40 20.60 20.80 21.00 21.20 21.40 21.60 21.80 22.00 22.20 22.40
kg/cm² 130 105 95 115 105 115 130 150 160 175 195 230 250
kg/cm² 140 115 105 135 120 135 145 165 180 200 215 245 250
kg/cm² 10 10 10 20 15 20 15 15 20 25 20 15 0
kg/cm² 0.83 0.83 0.83 1.67 1.25 1.67 1.25 1.25 1.67 2.08 1.67 1.25 0.00
kg/cm 1,620.0 1653.3 1670.0 1703.3 1728.3 1761.7 1786.7 1811.7 1845.0 1886.7 1920.0 1945.0 1945.0
% 0.64 0.79 0.88 1.45 1.19 1.45 0.96 0.83 1.04 1.19 0.85 0.54 0.00
Lasimin DRM 3.0
meter
Keterangan
Halaman 3 dari 3
PT. BAHANA TEHNIK RAYA
DUTCH CONE PENETROMETER TEST/SONDIR Project Location Date Operator Checked By
S-2
: RUMAH TINGGAL X : : Perum. Modernhill, Blok E.1/16, Pondok Y Cabe Udik, Tangerang : Selatan : 13-Aug-14 Z : : Lasimin Capacity : 2.5 tonf : DRM GWL : 3.0
qc (kg/cm²)
meter
tf/10 (kg/cm)
FR (%)
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
Depth (meter)
Depth (meter)
Test No.
12 13 14
12
13
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
0
50
100
150
200
250
300
0
2
4
6
8
10
12
LAMPIRAN III. DOKUMENTASI
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Project
RUMAH TINGGAL
Operator
Lasimin
Location Date Test No.
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan
Checked By GWL
DRM 2.0
13-Aug-14 S-3
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter
kg/cm² 0 5 3 3 4 8 10 5 5 16 8 3 2 8 4 5 10 16 8 5 10 15 10 8 16 10 18 10 10 15 25 40 25 20 16 10 60 40 25 15 30 40 25 40 60 30 50 35 60 40 30
kg/cm² 0 10 6 6 8 12 15 10 10 18 12 6 6 12 8 10 15 18 12 10 15 20 15 12 18 15 22 15 15 20 30 50 30 25 18 15 70 50 35 20 40 50 35 50 70 40 60 45 70 50 40
kg/cm² 0 5 3 3 4 4 5 5 5 2 4 3 4 4 4 5 5 2 4 5 5 5 5 4 2 5 4 5 5 5 5 10 5 5 2 5 10 10 10 5 10 10 10 10 10 10 10 10 10 10 10
kg/cm² 0 0.42 0.25 0.25 0.33 0.33 0.42 0.42 0.42 0.17 0.33 0.25 0.33 0.33 0.33 0.42 0.42 0.17 0.33 0.42 0.42 0.42 0.42 0.33 0.17 0.42 0.33 0.42 0.42 0.42 0.42 0.83 0.42 0.42 0.17 0.42 0.83 0.83 0.83 0.42 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83
kg/cm 0 8.3 13.3 18.3 25.0 31.7 40.0 48.3 56.7 60.0 66.7 71.7 78.3 85.0 91.7 100.0 108.3 111.7 118.3 126.7 135.0 143.3 151.7 158.3 161.7 170.0 176.7 185.0 193.3 201.7 210.0 226.7 235.0 243.3 246.7 255.0 271.7 288.3 305.0 313.3 330.0 346.7 363.3 380.0 396.7 413.3 430.0 446.7 463.3 480.0 496.7
% 0 0.00 8.33 8.33 8.33 4.17 4.17 8.33 8.33 1.04 4.17 8.33 16.67 4.17 8.33 8.33 4.17 1.04 4.17 8.33 4.17 2.78 4.17 4.17 1.04 4.17 1.85 4.17 4.17 2.78 1.67 2.08 1.67 2.08 1.04 4.17 1.39 2.08 3.33 2.78 2.78 2.08 3.33 2.08 1.39 2.78 1.67 2.38 1.39 2.08 2.78
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00 5.20 5.40 5.60 5.80 6.00 6.20 6.40 6.60 6.80 7.00 7.20 7.40 7.60 7.80 8.00 8.20 8.40 8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00
Keterangan
Page 1 from 3
meter
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Proyek Lokasi Tanggal Titik No.
RUMAH TINGGAL
Operator Checked By MAT
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan 13-Aug-14 S-3
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter 10.00 10.20 10.40 10.60 10.80 11.00 11.20 11.40 11.60 11.80 12.00 12.20 12.40 12.60 12.80 13.00 13.20 13.40 13.60 13.80 14.00 14.20 14.40 14.60 14.80 15.00 15.20 15.40 15.60 15.80 16.00 16.20 16.40 16.60 16.80 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 18.60 18.80 19.00 19.20 19.40 19.60 19.80 20.00
kg/cm² 30 30 25 40 40 60 80 55 50 65 50 30 45 40 55 40 60 50 25 55 65 50 25 70 70 50 65 50 25 60 50 65 85 70 45 80 90 120 105 90 85 100 100 110 105 130 105 85 115 130 120
kg/cm² 40 40 35 50 50 70 90 65 60 85 60 40 65 50 75 50 75 60 45 70 85 60 45 80 80 60 85 60 45 70 60 85 105 80 65 100 115 130 120 105 100 115 115 130 125 140 120 105 125 140 130
kg/cm² 10 10 10 10 10 10 10 10 10 20 10 10 20 10 20 10 15 10 20 15 20 10 20 10 10 10 20 10 20 10 10 20 20 10 20 20 25 10 15 15 15 15 15 20 20 10 15 20 10 10 10
kg/cm² 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 1.67 0.83 0.83 1.67 0.83 1.67 0.83 1.25 0.83 1.67 1.25 1.67 0.83 1.67 0.83 0.83 0.83 1.67 0.83 1.67 0.83 0.83 1.67 1.67 0.83 1.67 1.67 2.08 0.83 1.25 1.25 1.25 1.25 1.25 1.67 1.67 0.83 1.25 1.67 0.83 0.83 0.83
kg/cm 496.7 530.0 546.7 563.3 580.0 596.7 613.3 630.0 646.7 680.0 696.7 713.3 746.7 763.3 796.7 813.3 838.3 855.0 888.3 913.3 946.7 963.3 996.7 1013.3 1030.0 1046.7 1080.0 1096.7 1130.0 1146.7 1163.3 1196.7 1230.0 1246.7 1280.0 1313.3 1355.0 1371.7 1396.7 1421.7 1446.7 1471.7 1496.7 1530.0 1563.3 1580.0 1605.0 1638.3 1655.0 1671.7 1688.3
% 2.78 2.78 3.33 2.08 2.08 1.39 1.04 1.52 1.67 2.56 1.67 2.78 3.70 2.08 3.03 2.08 2.08 1.67 6.67 2.27 2.56 1.67 6.67 1.19 1.19 1.67 2.56 1.67 6.67 1.39 1.67 2.56 1.96 1.19 3.70 2.08 2.31 0.69 1.19 1.39 1.47 1.25 1.25 1.52 1.59 0.64 1.19 1.96 0.72 0.64 0.69
Lasimin DRM 2.0
Keterangan
Page 2 from 3
meter
DATA PENYELIDIKAN LAPANGAN PENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR Project Location Date Test No.
RUMAH TINGGAL
Operator Checked By GWL
Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan 13-Aug-14 S-3
Kedalaman
Pembacaan Konus (R1)
Jumlah Perlawanan (R2)
Perlawanan Gesek
Lokal Friksi
Total Friksi
Friksi Ratio
meter 20.00 20.20 20.40 20.60 20.80 21.00 21.20 21.40 21.60
kg/cm² 120 105 95 120 145 165 180 215 250
kg/cm² 130 120 110 130 160 190 200 240 250
kg/cm² 10 15 15 10 15 25 20 25 0
kg/cm² 0.83 1.25 1.25 0.83 1.25 2.08 1.67 2.08 0.00
kg/cm 1,688.3 1730.0 1755.0 1771.7 1796.7 1838.3 1871.7 1913.3 1913.3
% 0.69 1.19 1.32 0.69 0.86 1.26 0.93 0.97 0.00
Lasimin DRM 2.0
meter
Keterangan
Halaman 3 dari 3
PT. BAHANA TEHNIK RAYA
DUTCH CONE PENETROMETER TEST/SONDIR Project Location Date Operator Checked By
S-3
: RUMAH TINGGAL X : : Perum. Modernhill, Blok E.1/16, Pondok Y Cabe Udik, Tangerang : Selatan : 13-Aug-14 Z : : Lasimin Capacity : 2.5 tonf : DRM GWL : 2.0
qc (kg/cm²)
meter
tf/10 (kg/cm)
FR (%)
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
Depth (meter)
Depth (meter)
Test No.
12 13 14
12
13
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
0
50
100
150
200
250
300
0
2
4
6
8
10
12
PHOTO KEGIATAN SONDIR (S1)
PHOTO KEGIATAN SONDIR (S2)
PHOTO KEGIATAN SONDIR (S3)