Analisa EI-SS7104 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: : : : : SS. 7(10)4 : Shotcrete : M2
KOMPONEN
A.
TENAGA
1. 2. 3.
Pekerja Tukang Mandor
B. 1 2 3 4
BAHAN Beton Shotcrete Additive Wiremesh Geotekstile
SATUAN
(L01) (L02) (L03)
jam jam jam
PERKIRAAN KUANTITAS
3.9157 0.9789 0.4895
PERKIRAAN VOL. PEK.
:
TOTAL HARGA (Rp.)
:
% THD. BIAYA PROYEK
:
HARGA SATUAN (Rp.)
16,764.15 20,815.49 20,396.39
JUMLAH HARGA TENAGA M3 Ltr M2 M'
0.0825 5.7102 1.1000 0.3600
1,964,621.73 45,167.88 95,000.00 15,000.00
JUMLAH HARGA BAHAN C.
PERALATAN
1 2 3 4 5 6
Concrete Mixer Gouting Water Tanker Genset Compresor Shotmachine Alat Bantu
(E06) (E23) (E20)
jam jam jam jam jam Ls
0.0979 1.4815 0.0979 0.0979 0.2447 1.0000
100,168.23 131,467.37 230,331.53 82,035.29 90,000.00 0.00
JUMLAH HARGA PERALATAN D. E. F. Note: 1 2
3 4
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
file:///conversion/tmp/scratch/424108856.xls
0.00 0.00 0.0000
JUMLAH HARGA (Rp.)
65,642.76 20,376.61 9,983.17 96,002.54 162,081.29 257,918.00 104,500.00 5,400.00
529,899.29
9,805.63 194,766.47 22,547.51 8,030.56 22,025.60 0.00
257,175.77 883,077.61 132,461.64 1,015,539.25
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
No.
I. 1 2 3 4 5 6 7 9 10 11
12
II.
: SS. 7(10)3 : Soil Nailing : M'
URAIAN ANALISA HARGA SATUAN
URAIAN
ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Bahan dasar diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor pengembangan bahan Kadar Semen Minimum (Spesifikasi) Ukuran Agregat Maksimum Volume 1 m' Perbandingan Air/Semen Maksimum (Spesifikasi) Perbandingan Camp. : Semen : Pasir : Agregat Kasar Berat Isi : - Beton - Semen - Pasir - Agregat Kasar
KODE
KOEF.
SATUAN
L Tk Fk Ks Ag t Wcr Sm Ps Kr
8.7 7.00 1.20 340 19 0.0345 0.50 410.0 670.0 992.0
D1 D2 D3 D4
2.40 1.25 1.30 1.40
KETERANGAN
KM jam Kg/M3 mm M3 Kg/M3 Kg/M3 Kg/M3
Berdasarkan JMF & sesuai dgn Spesifikasi
T/M3 T/M3 T/M3 T/M3
URUTAN KERJA 1
Pekerjaan persiapan / Regreding Lereng yang akan dikerjakan soil nailing dibersihkan dan diratakan sesuai kemiringan rencana menggunakan alat bantu
2
Penentuan titik lubang soil nailing berdasarkan gambar kerja, selanjutnya dilakukan pengeboran dengan cara bor miring, yaitu tegak lurus pada bidang permukaan. Lereng casing dimasukkan ke dalam lubang hasil bor, untuk menjaga keruntuhan atau perubahan lubang. Alat yang digunakan drilling machine yang ringan dan mudah dipindah-pindah, tempat kedudukan drilling machine menggunakan penyangga / perancah yang kuat dan aman.
3
Besi tendon (baja tulangan ulir) dimasukkan pada lubang dan diupayakan pada posisi tengah - tengah lubang bor dengan bantuan centralizer sehingga tulangan tidak menempel pada dinding lubang bor
4
Bahan campuran sesuai proporsi (agregat halus, agregat kasar, semen dan additive) dicampur kering menggunakan concrete mixer
5
Bahan campuran kering dimasukkan ke corong pengaduk, yang sebelumnya telah diisi air dari water tank sesuai kebutuhan campuran kering kemudian diaduk merata menjadi bahan grouting
6
Campuran atau bahan grouting masuk melalui pipa ke pompa grouting, selanjutnya dipompa keluar melalui selang penghantar
7
Bahan grouting dari selang penghantar, dimasukkan ke dalam lubang soil nailing melalui tremy pipa, supaya tidak terjadi segregasi dan lubang terisi penuh / padat dengan materila grouting
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN Beton K-250 Baja Tulangan Additive
2. 2.a.
ALAT Concrete Mixer Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : - Memuat - Mengaduk - Menuang - Tunggu, dll.
Koefisien Alat / M'
V x Fa x 60 1000 x Ts x t
= 1 : Q1
M3 Kg Ltr
500.00 0.75
liter -
10.00 10.00 10.00 10.00 40.00
menit menit menit menit menit
Q1
16.285
M'/jam
(E39)
0.0614
jam
(E39) V Fa Ts T1 T2 T3 T4 Ts
(T1 + T2 + T3 + T4)
Kap. Prod. / jam =
0.2189 15.2160 0.6000
gambar gambar gambar
Berlanjut ke hal. berikut.
FILE:OE-LINGKAR
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: SS. 7(10)3 : Soil Nailing : M'
URAIAN ANALISA HARGA SATUAN Lanjutan
No.
2.b.
URAIAN
Water Tank Truck Volume Tanki Air Kebutuhan air / M3 beton Faktor Efisiensi Alat Pengisian Tanki / jam Kap. Prod. / jam =
Koefisien Alat / M' 2.c.
V x Fa x n Wc x t = 1 : Q2
Driiling Machine
Koefisien Alat / M'
= 1 : Q3
Koef. Alat / M'
= 1 : Q4
Generatorset (Genset) Kap.Prod. / Jam Koefisien Alat/M'
2.f.
= 1 : Q5
Koef. Alat / M'
= 1 : Q6
4.0 0.187 0.83 0.50
M3 M3 kali
Q2
0.30
M'
3.2827
jam
(E23)
Q3
24.000
M'/hari
(E20)
0.0417
jam
Q4
16.285
M'/jam
(E05)
0.0614
Jam
(E12) Q5
16.285
M'/jam
(E12)
0.0614
Jam
Q6
8.143
M'/jam
(E05)
0.1228
Jam
Q7
16.285
M'/jam
0.0614
Jam
16.285
M'/jam
0.0614
Jam
Casing
Kap. Prod. / Jam = Koef. Alat / M' 2.h.
(E23) V Wc Fa n
KETERANGAN
PENGEBORAN Grouting Pump/Shot Machine Kap. Prod. / Jam =
2.g.
SATUAN
Compressor Kap. Prod. / Jam =
2.e.
KOEF.
(E20)
Kap. Prod. / jam =
2.d.
KODE
= 1 : Q7
Tremy Pipe
Kap. Prod. / Jam = Koef. Alat / M'
Q8 = 1 : Q8
Berlanjut ke hal. berikut.
FILE:OE-LINGKAR
ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: SS. 7(10)3 : Soil Nailing : M'
URAIAN ANALISA HARGA SATUAN Lanjutan
No.
3.
URAIAN
KODE
TENAGA ( untuk Concrete mixer, water tank truck, drilling machine, ) ( compresor,genset ) Produksi dalam 1 hari = Tk x Q1 Kebutuhan tenaga :
- Mandor - Tukang - Pekerja
Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja
= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.
1,376,100.00 / M
6.
MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : 0.00 bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M
FILE:OE-LINGKAR
KOEF.
SATUAN
Qt
114.00
M'/hari
M Tb P
2.00 4.00 16.00
orang orang orang
(L03) (L02) (L01)
0.1228 0.2456 0.9825
jam jam jam
KETERANGAN
Analisa EI-SS7103 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PAKET No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: : : : : SS. 7(10)3 : Soil Nailing : M'
KOMPONEN
A.
TENAGA
1. 2. 3.
Pekerja Tukang Mandor
B. 1 2 3
BAHAN Beton K-250 Baja Tulangan Additive
SATUAN
(L01) (L02) (L03)
jam jam jam
PERKIRAAN KUANTITAS
0.9825 0.2456 0.1228
PERKIRAAN VOL. PEK.
:
TOTAL HARGA (Rp.)
:
% THD. BIAYA PROYEK
:
HARGA SATUAN (Rp.)
12,674.60 14,246.03 15,103.17
JUMLAH HARGA TENAGA M3 Kg Ltr
0.2189 15.2160 0.6000
1,876,000.00 16,400.00 50,000.00
JUMLAH HARGA BAHAN C.
PERALATAN
1 2 3 4 5 6 7 8 9
Concrete Mixer Water Tank Truck Driiling Machine Compressor Generatorset (Genset) Grouting Pump/Shot Machine Casing Tremy Pipe Alat Bantu
jam jam jam jam jam jam jam jam Ls
0.0000 3.2827 0.0417 0.0614 0.0614 0.1228 0.0614 0.0614 1.0000
131,467.37 200,000.00 82,035.29 230,331.53 177,941.83 64,816.10 60,021.99 0.00
JUMLAH HARGA PERALATAN D. E. F. Note: 1 2
3 4
FILE:OE-LINGKAR
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.00 0.00 -
JUMLAH HARGA (Rp.)
12,452.43 3,499.08 1,854.80 17,806.31 410,656.40 249,542.40 30,000.00
690,198.80
0.00 431,571.09 8,333.33 5,037.33 14,143.38 21,852.84 3,980.00 3,685.62 0.00 488,603.58 1,196,608.70 179,491.30 1,376,100.00