Analisa EI-SS7104 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: WINRIP : : Manggopoh - Padang Sawah : : SS. 7(10)4 : Shotcrete : M2
KOMPONEN
A.
TENAGA
1. 2. 3.
Pekerja Tukang Mandor
B. 1 2 3 4
BAHAN Beton Shotcrete Additive Wiremesh Geotekstile
SATUAN
(L01) (L02) (L03)
jam jam jam
PERKIRAAN KUANTITAS
3,7037 0,7407 0,3704
HARGA SATUAN (Rp.)
10.825,18 14.289,24 18.186,30
JUMLAH HARGA TENAGA
C.
PERALATAN
1 2 3 4 5 6
Concrete Mixer Gouting Water Tanker Genset Compresor Shotmachine Alat Bantu
M3 Ltr M2 M'
(E06) (E23) (E20)
jam jam jam jam jam Ls
0,1000 0,2700 1,1000 0,0000
907.000,00 65.000,00 95.000,00 35.000,00
2
3 4
40.093,25 10.584,62 6.735,67 57.413,54 90.700,00 17.550,00 104.500,00 0,00
JUMLAH HARGA BAHAN
212.750,00
0,0741 1,3600 0,0741 0,0741 0,1852 1,0000
4.686,57 326.682,44 27.454,19 12.466,31 27.777,78 1.000,00
63.268,71 240.207,68 370.631,62 168.295,18 150.000,00 1.000,00
JUMLAH HARGA PERALATAN D. E. F. Note: 1
JUMLAH HARGA (Rp.)
400.067,30
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 670.230,85 OVERHEAD & PROFIT 10,0 % x D 67.023,08 HARGA SATUAN PEKERJAAN ( D + E ) 737.253,93 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
C:\Users\ASUS PC\Desktop\Usulan Penambahan Dana\AHS