RENCANA ANGGARAN BIAYA ( R.A.B ) KEGIATAN PAKET KEGIATAN LOKASI SUMBER DANA TAHUN ANGGARAN



: : : : :



REHABILITAS/PEMELIHARAAN JALAN DAN JEMBATAN I PEMELIHARAAN RUTIN JALAN DALAM KOTA ( TERSEBAR ) KOTA TARAKAN APBD 2015



No.



URAIAN PEKERJAAN



SATUAN



VOLUME



a



b



c



d



I



PEKERJAAN PENDAHULUAN - Mobilisasi dan Demobilisasi



ls



1.00 JUMLAH I



II



PEMELIHARAAN JALAN KELUAR TERMINAL BOOM PANJANG A



PEKERJAAN PERKERASAN ASPAL - Lapis Pengikat ( Prime Coat ) - Lapis Pengikat Aspal Beton (AC-BC)



ltr Ton



108.30 22.74 JUMLAH II.a



REKAPITULASI RENCANA ANGGARAN BIAYA KEGIATAN PAKET KEGIATAN LOKASI TAHUN ANGGARAN



: : : :



REHABILITAS/PEMELIHARAAN JALAN DAN JEMBATAN I PEMELIHARAAN RUTIN JALAN DALAM KOTA ( TERSEBAR ) KOTA TARAKAN 2015



No. a



URAIAN PEKERJAAN b



I



PEKERJAAN PENDAHULUAN



II



PEMELIHARAAN JALAN KELUAR TERMINAL BOOM PANJANG



a. Jumlah Total b. Jumlah Total + PPN 10% c. Dibulatkan



Terbilang : DELAPAN PULUH EMPAT JUTA TIGA RATUS LIMA PULUH EMPAT RIBU RUPIAH



BIAYA



HARGA SATUAN ( Rp. )



JUMLAH HARGA ( Rp. )



e



f



6,100,000.00 JUMLAH I



6,100,000.00 6,100,000.00



16,266.13 3,026,159.05 JUMLAH II.a



1,761,622.32 68,823,935.23 70,585,557.54



BIAYA



JUMLAH HARGA c Rp.



6,100,000.00



Rp.



70,585,557.54



Rp. Rp. Rp.



76,685,557.54 84,354,113.30 84,354,000.00



PAT RIBU RUPIAH



ITEM PEMBAYARAN NO.: 1.2 JENIS PEKERJAAN : MOBILISASI



No.



U RAIAN



A



B 1



C



SATUAN



VOL.



PERALATAN Periksa lembar 1.2-2



ls



1



MOBILISASI LAINNYA Dokumentasi



ls



1



DEMOBILISASI



ls



1



Total Biaya Mobilisasi Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya. ITEM PEMBAYARAN NO.: 1.2 JENIS PEKERJAAN : MOBILISASI



No.



JENIS ALAT



A



KODE ALAT



SATUAN



E02 E15 E15 E16 E19



Unit Unit Unit Unit Unit



VOL.



PERALATAN 1 2 3 4 5



ASPHALT FINISHER MOTOR GREDER > 100 HP TANDEM ROLLER 6-8 T. PNEUMATIC TIRE ROLLER WATER TANKER 3000-4500 L.



Total untuk Item B pada Lembar 1



1 1 1 1 1



HARGA SATUAN (Rp.)



Lembar 1.2-1 JUMLAH HARGA (Rp.)



3,000,000.00



3,000,000.00



100,000.00



100,000.00



3,000,000.00



3,000,000.00



6,100,000.00



asuk over-head dan laba



HARGA SATUAN (Rp.)



600,000.00 600,000.00 600,000.00 600,000.00 600,000.00



Lembar 1.2-2 JUMLAH HARGA (Rp.)



600,000.00 600,000.00 600,000.00 600,000.00 600,000.00



3,000,000.00



VOLUME PEKERJAAN PEMELIHARAAN JALAN KELUAR TERMINAL BOOM PANJANG Lapis Resap Lebar Panjang Kebutuhan /m2 Volume Lapis Resap Lebar 1



Panjang Kebutuhan /m2 Volume Lapis Resap Lebar Panjang Kebutuhan /m2 Volume Volume AC-BC Lebar Panjang Tebal Berat Jenis Volume AC-BC Lebar Panjang Tebal Berat Jenis Volume



2



AC-BC Lebar Panjang Tebal Berat Jenis Volume



M PANJANG 4.300 m1 13.000 m1 0.750 m1 41.925 ltr



6.000 m1 14.000 m1 0.750 m1 63.000 ltr 1.500 m1 3.000 m1



Volume



0.750 m1 3.375 m1 108.300 ltr 4.300 m' 13.000 m' 0.070 m' 2.250 ton/m3 8.804 Ton



6.000 m' 14.000 m' 0.070 m' 2.250 ton/m3 13.230 Ton 1.500 m' 3.000 m' 0.070 m' 2.250 ton/m3 0.709 Ton



22.743 Ton



ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



No.



U RAIAN



I. 1 2 3 4 5 6



7



8



II. 1 2 3 4



III. 1.



: 6.1 (2) : Lapis Perekat : LITER



KODE



ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan Komposisi campuran (Spesifikasi) : - Aspal AC-10 atau AC-20 - Minyak Flux / Pencair Berat jenis bahan : - Aspal AC-10 atau AC-20 - Kerosene Bahan dasar (aspal & minyak pencair) semuanya diterima di lokasi pekerjaan



As K D1 D2



URUTAN KERJA Aspal dan Minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dengan Air Compressor Campuran aspal cair disemprotkan dengan Asphalt Sprayer ke atas permukaan yang akan dilapis. Angkutan Aspal & Minyak Flux menggunakan Dump Truck PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Untuk mendapatkan 1 liter Lapis Resap Pengikat diperlukan : ( 1 liter x Fh )



1.a. 1.b.



Aspal Kerosene



2. 2.a.



ALAT ASPHALT SPRAYER Kapasitas alat Faktor efisiensi alat Waktu Siklus (termasuk proses pemanasan)



= As x PC x D1 = K x PC



Kap. Prod. / jam = Koefisien Alat / Ltr 2.b.



L Tk Fh



(M10) (M11)



(E03) V Fa Ts V x Fa Ts



= 1 : Q1



Q1 (E03)



AIR COMPRESSOR Kapasitas alat ----->> diambil Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Kap. Prod. / jam =



PC



( V x Ap )



(E05) V Ap Q2



File : 347760421.xlsx



Koefisien Alat / Ltr



= 1 : Q2



(E05)



Analisa EI-612 URAIAN ANALISA HARGA SATUAN



KOEF.



SATUAN



10.0 7.00 1.10 77 23



KETERANGAN



KM Jam % %



1.05 0.80



Kg / liter Kg / liter



1.10



liter



0.8894 0.2530



Kg liter



800.00 0.83 2.00



liter Jam



332.00



liter



0.0030



Jam



400.00 0.40



M2 / Jam liter / M2



160.00



liter



100 bagian 30 bagian



campuran



File : 347760421.xlsx



0.0063



Jam Berlanjut ke hal. berikut.



FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN



PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN



NO.



: : : : : 6.1 (2) : Lapis Perekat : LITER



KOMPONEN



A.



TENAGA



1. 2.



Pekerja Mandor



SATUAN



(L01) (L03)



Jam Jam



PERKIRAAN KUANTITAS



0.0301 0.0060



HARGA SATUAN (Rp.)



12,885.71 17,285.71



JUMLAH HARGA TENAGA B.



BAHAN



1. 2.



Aspal Kerosene



(M10) (M11)



Kg liter



0.8894 0.2530



9,395.50 6,500.00



JUMLAH HARGA BAHAN C.



PERALATAN



1. 2. 3.



Asp. Sprayer Compressor Dump Truck



(E03) (E05) (E08)



Jam Jam Jam



0.0030 0.0063 0.0030



101,599.74 256,441.71 578,688.52



JUMLAH HARGA PERALATAN D. E. F. Note: 1



JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukura berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nom mata pembayaran. File : 347760421.xlsx 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PP yang dibayar dari kontrak) dan biaya-biaya lainnya.



Analisa EI-612



NTUK NG HARGA SATUAN



JUMLAH HARGA (Rp.)



388.12 104.13



492.25



8,355.89 1,644.50



10,000.39



306.02 1,602.76 1,743.04



3,651.82 14,144.46 2,121.67 16,266.13



alatan, volume dan/atau ukuran



atu satuan pekerjaan dari nomor File : 347760421.xlsx



pakai dan operator. tan (tetapi tidak termasuk PPN



DAFTAR HARGA SATUAN DASAR ( BASIC PRICE ) BAHAN BANGUNAN, UPAH DAN PERALATAN Propinsi Tahun Anggaran Kota / Kabupaten Instansi Periode



: : : : :



KALIMANTAN UTARA 2014 TARAKAN DINAS PEKERJAAN UMUM DAN TATA RUANG 2014 JENIS



BAHAN, UPAH, SEWA ALAT DAN



No.



SATUAN



PERALATAN LABORATORIUM (1)



(2)



(3)



I



UPAH



1



Pekerja



Hari



2



Tukang



Hari



3



Mandor



Hari



4



Kepala Tukang



Hari



II



BAHAN



1 2 3 4 5 6 7 8 9 10 11 12 14 15 15 16 17 18 19 20 21 22 23 24 25 25 26 27 28 29 30 31 32 33 34 35 36 38 39



Pasir Pasir Urug Batu Kali/gunung Agregat Kasar/batu pecah Agregat Halus Filler S i r t u / Kerikil Aspal Kerosen / Minyak Tanah Cat Marka (Non Thermoplas) Cat Marka (Thermoplastic) Pancang Beton 10/10-2 m Besi Siku 5 mm Besi Plat Strip 5 mm Besi Plat Strip 4 mm Semen (50kg) Besi beton polos Besi beton ulir Kawat Ikat Paku Biasa Paku Seng Paku Ulin Cat Kilap Avian Cat Air Dulux ( ici ) Tear Oil Blass Bit Minyak Cat A Meni Dempul / plamir Amplas Plitur Kayu Perancah Kayu Meranti Kuas Kayu Kapur / Bengkirai / Lembasung Kayu Ulin ( Balok ) Kayu Ulin ( Papan ) Pipa PVC 1/2 " AW Pipa PVC 3/4 " AW



M3 M3 M3 M3 M3 Kg M3 kg liter Kg Kg Btg m' m' m' Zak Kg Kg / Kg / Kg / Kg / Kg / Kg / Ltr / Kg / Kg / Kg / Kg / Kg / Lbr / Kg / M3 / M3 bh / M3 / M3 / M3 / Btg / Btg



40 41 42 43 44 45 46 47 48 49 50 50



Pipa PVC 1 " AW Pipa PVC 2 " AW Dinabolt 3/8 " Kran Air Pipa Galvanis 1/2 " Pipa Galvanis 3/4 " Pipa Galvanis 1 " Pipa Galvanis 1,5 " Pipa Galvanis 2 " Pipa Galvanis 3 " Pipa Galvanis 4 " Kerb Beton Cetak



/ Btg / Btg / Bh / Bh / Btg / Btg / Btg / Btg / Btg / Btg / Btg / buah



III



PERALATAN ( sdh termasuk bahan bakar)



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 30 31 38



ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 DUMP TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER CONCRETE PUMP PILE DRIVER + HAMMER CRANE ON TRACK 35 TON MESIN LAS



JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE



AR HARGA SATUAN DASAR ( BASIC PRICE ) NGUNAN, UPAH DAN PERALATAN



HARGA SATUAN



KETERANGAN



( Tidak termasuk Ppn 10 %) (4)



(5)



90,200.00



12,885.71 Per Jam



101,200.00



14,457.14 Per Jam



121,000.00



17,285.71 Per Jam



105,000.00



15,000.00 Per Jam



146,300.00 100,320.00 574,750.00 558,643.70 527,992.52 862.13 292,777.65 9,395.50 6,500.00 45,980.00 57,475.00 294,500.00 63,333.33 37,525.00 28,357.50 88,350.00 17,765.00 22,990.00 29,260.00 22,990.00 29,260.00 40,232.50 57,475.00 38,566.20 20,900.00 27,265.00 28,450.60 56,900.25 53,106.90 12,644.50 10,450.00 3,448,500.00 3,448,500.00 4,750.00 4,598,000.00 7,471,750.00 6,897,000.00 48,174.50 61,968.50



9,395,500.00 /Ton



1,767.00 Per Kg



298,870 /btg



74,038.25 125,191.00 6,437.20 52,250.00 125,400.00 156,750.00 188,100.00 296,048.50 410,998.50 652,393.50 905,283.50 42,750.00



6,718,318.55 272,719.87 101,599.74 831,249.55 256,441.71 85,850.82 824,008.89 412,519.27 578,688.52 KHUSUS ASPAL 608,860.08 309,507.89 508,504.46 721,963.14 402,432.92 629,157.62 217,452.47 TANDEM ROLLER 222,110.99 433,181.73 330,252.51 72,520.79 873,252.01 62,242.38 308,292.58 100,688.52 59,150.21 88,740.26 313,858.05 215,628.96 628,104.39 32,738.86



DAFTAR HARGA SATUAN DASAR ( BASIC PRICE ) BAHAN BANGUNAN, UPAH DAN PERALATAN Propinsi Tahun Anggaran Kota / Kabupaten Instansi Periode



: : : : :



KALIMANTAN UTARA 2014 TARAKAN DINAS PEKERJAAN UMUM DAN TATA RUANG 2014 JENIS



BAHAN, UPAH, SEWA ALAT DAN



No.



SATUAN



PERALATAN LABORATORIUM (1)



(2)



(3)



I



UPAH



1.



Pekerja



Hari



2.



Tukang



Hari



3.



Mandor



Hari



10.



Kepala Tukang



Hari



II



BAHAN



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39



Pasir Pasir Urug Tanah biasa Tanah pilihan Batu Kali/gunung Agregat Kasar/batu pecah Agregat Halus Filler Batu Belah Gravel S i r t u / Kerikil Kapur Chipping Aspal Cement Kerosen / Minyak Tanah Kawat Bronjong Cat Marka (Non Thermoplas) Cat Marka (Thermoplastic) Pipa Porus Geotextile Aspal Emulsi Gebalan Rumput Glass Bead Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Rel Pengaman Pemantul Cahaya (Reflector) Arbocell Baja Bergelombang Baja Struktur Tiang Pancang Baja T. Pancang Beton Pratekan Kawat Las Pipa Baja Minyak Fluks Bunker Oil Asbuton Halus Baja Prategang PCI Girder L=17m



M3 M3 M3 M3 M3 M3 M3 Kg M3 M3 M3 M3 M3 KG LITER Kg Kg Kg M' M2 Kg M2 Kg BH BH M' Bh. Kg. Kg Kg M' M3 Dos Kg Liter Liter Ton Kg Buah



40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81



PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m PCI Girder L=36m PCI Girder L=41m Semen (50kg) Semen Putih Besi beton polos Besi beton ulir Kawat Ikat Plywood 3 mm Plywood 4 mm Gypsum Board Plywood 18 mm Seng BJLS 20 Seng BJLS 30 Multi Colour Surya Colour Sakura Colour Paku Multi Colour Paku Surya Colour Paku Sakura Colour Bubungan Multi Colour Bubungan Surya Colour Bubungan Sakura Colour Seng Plat BJLS 30 Seng Plat BJLS 20 Seng Profil Paku Biasa Paku Seng Paku Ulin Tegel keramik ( 40 x 40 ) Tegel keramik ( 30 x 30 ) Tegel Keramik ( 20 x 20 ) Tegel I Granito Tegel Maestro Tegel mozaik ( 20 x 20 ) Batu Tempel Cat Kilap Avian Cat Air Paragon Cat Air Metrolite Cat Air Dulux ( ici )



Buah Buah Buah Buah Buah Zak / Zak Kg Kg / Kg / Lbr / Lbr / Lbr / Lbr / Lbr / Lbr / Lbr / Lbr / Lbr / Bh / Bh / Bh / Lbr / Lbr / Lbr / Lbr / Lbr / Lbr / Kg / Kg / Kg / M2 / M2 / M2 / M2 / M2 / M2 / M2 / Kg / Kg / Kg / Ltr



82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123



Tear Oil Minyak Cat A Cat Atap ( Khusus ) Meni Dempul / plamir Amplas Plitur Batu Pecah Batu Gunung Kerikil Pasir Pasangan Tanah Urug / Pasir urug Batu Bata Bata Pres Roster ( K ) Roster ( B ) Paving Bujur sangkar ( t = 8 cm ) Paving Bujur sangkar ( t = 10 cm ) Paving Segi enam ( B ) Paving Segi enam ( K ) Batako ( 20 x 30 ) Bata Lubang Batako ( 20 x 40 ) Bata Lubang Kayu Perancah Kayu Meranti Kayu Kruing Kayu Kapur / Bengkirai / Lembasung Kayu Ulin ( Papan ) Kayu Ulin ( Balok ) Kaca Polos T. 5 mm Kaca Buram T. 5 mm Kaca Riben T. 5 mm Glass Box Kunci Tanam Union Kunci Tanam Yale Espagnolet Engsel Kupu-kupu 4" Engsel Kupu-kupu 3" Engsel Kupu-kupu 2" Hak Angin Grendel Kawat Duri Kawat Harmonika 4 x 4



/ Kg / Kg / Kg / Kg / Kg / Lbr / Kg / M3 / M3 / M3 / M3 / M3 / Bh / Bh / Bh / Bh / Bh / Bh / Bh / Bh / Bh / Bh / M3 / M3 / M3 / M3 / M3 / M3 / M2 / M2 / M2 / Bh / Bh / Bh / Bh / Psg / Psg / Psg / Bh / Bh / Rol / M2



124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153



Kawat Ayam Kawat nyamuk hitam Kawat nyamuk putih Kawat BRC Pas. Stainlist Kusen Alumunium Coklat Kusen Alumunium Silver Closed Jongkok Non Polos Closed Duduk Non Polos Wastafel Porslint lengkap Bak Cuci alumunium satu lubang Urinoir Porslint Urinoir Monoblok Profil 1100 Lt Profil 2200 Lt Pipa PVC 1/2 " AW Pipa PVC 3/4 " AW Pipa PVC 1 " AW Pipa PVC 2 " AW Elbow 1/2 " - 4 " AW Kran Air Pipa Galvanis 1/2 " Pipa Galvanis 3/4 " Pipa Galvanis 1 " Pipa Galvanis 1,5 " Pipa Galvanis 2 " Pipa Galvanis 3 " Pipa Galvanis 4 " Hollow Galvalum 2 x 4,t = 0,3 p = 4 m Hollow Galvalum 2 x 4,t = 0,3 p = 4 m



/ M2 / M2 / M2 / M2 / M2 / M1 / M1 / Bh / Bh / Bh / Bh / Bh / Bh / Bh / Bh / Btg / Btg / Btg / Btg / Bh / Bh / Btg / Btg / Btg / Btg / Btg / Btg / Btg / Btg / Btg



154 155 156 157 158 159 160 161 162 163 164



Hollow Besi 2 x 4, t = 1.7 mm p = 6 m Hollow Besi 4 x 4, t = 1.7 mm p = 6 m Pipa Buis Beton dia 30 cm Pipa Buis Beton dia 50 cm Pipa Buis Beton dia 75 cm C-75, 0.8 C-75, 0.55 Reng 0.43 Baut ( screw driver ) Dynabolt Talang jural



III



PERALATAN ( sdh termasuk bahan bakar)



1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28



ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 DUMP TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP



/ Btg / Btg / M1 / M1 / M1 / M1 / M1 / M1 Buah Buah / M1



JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE JE



29 30 31 32 33 34 35 36 37 38



TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRAILLER 15 TON COLD MILLING ROCK DRILL BREAKER MESIN LAS



JE JE JE JE JE JE JE JE JE JE



39



EXCAVATOR MINI



JE



HARGA SATUAN DASAR BASIC PRICE ) UNAN, UPAH DAN PERALATAN



HARGA SATUAN



KETERANGAN



( Tidak termasuk Ppn 10 %) (4)



(5)



82,500



11,785.71 Per Jam



88,000



12,571.43 Per Jam



99,000



14,142.86 Per Jam



88,000



12,571.43 Per Jam



90,790 104,280 88,880 104,280 492,140 534,586 505,256 825 495,000 387,640 280,170 22,000 505,256 16,000 4,070 18,150 44,000 55,000 20,240 66,000 9,900 5,050 33,000 165,000 330,000 770,000 7,700 33,000 15,400 20,900 4,500,915 1,641,750 60,500 15,400 4,400 4,400 346,500 31,900 25,025,000



9,900,000



28,600,000 37,125,000 59,785,000 69,795,000 90,750,000 80,000 125,400 17,600 22,000 22,000 60,500 84,700 90,750 266,200 54,450 70,180 96,800 66,550 54,450 242 242 242 71,390 48,399 43,560 84,700 78,650 65,340 24,200 30,250 42,350 145,200 106,480 106,480 465,850 126,445 199,650 379,335 59,895 26,620 33,275 40,596



1,600 Per Kg 2,508 Per Kg



19,965 29,948 39,930 59,895 55,902 13,310 6,655 580,533 598,950 326,894 121,121 117,261 1,664 1,331 36,300 48,400 2,420 3,025 3,025 2,420 3,025 3,630 3,630,000 3,630,000 3,872,000 4,840,000 7,260,000 7,865,000 151,250 211,750 242,000 30,250 275,000 176,000 148,500 66,000 49,500 27,500 22,000 27,500 49,500 49,500



16,500 27,500 25,300 550,000 797,500 198,000 159,500 313,500 2,255,000 1,100,000 550,000 1,097,250 2,695,000 2,035,000 3,135,000 41,800 55,000 66,550 115,500 4.400 - 55.000 27.500 - 55.000 99,000 71,500 99,000 275,000 385,000 616,000 858,000 36,300 42,350



169,400 223,850 54,450 102,245 151,250 27,427 24,523 13,552 678 6,776 92,928



6,296,456 255,595 95,220 779,053 160,339 80,460 772,267 386,616 542,351 395,074 290,073 476,574 676,629 377,163 519,651 203,798 208,164 305,981 309,515 67,967 818,418 58,334 288,934 94,366 55,436 83,168 216,403 154,150



610,523 202,089 588,664 128,344 1,020,634 51,380 438,513 618,080 84,110 30,684 142,873