ANALISA HARGA SATUAN MATERIAL JARINGAN DAN TRAFO SESUAI HPS 2007 A. SATUAN BAHAN NO
NAMA MATERIAL
SATUAN HRG SAT MAR 2008 PPH 1.5%
ANGK. LOKAL
MATRIAL PENUNJANG 1
ANCHOOR EXPANDING 10,000 LBS
B
67,500
1,013
2,025
2
ANCHOOR EXPANDING 8,000 LBS
B
3
ANCHOOR ROD 3/4 X 8
B
56,250
844
1,688
67,500
1,013
2,025
4
ANCHOOR ROD 5/8 X 8
5
ANCHOOR SHACLE
B
56,250
844
1,688
B
11,250
169
338
6
ARMOR ROD 240
B
112,500
1,688
3,375
7 8
ARMOR ROD 70
B
52,500
788
1,575
ARMOR TAPE
M
3,750
56
113
9
BALL CLEVIS FOR SUSPENSION
48,750
731
1,463
B
6,750
101
203
Bolt Cariage 3/8X5
b
11,250
169
338
BOLT DOUBLE URMING 5/8X12
B
21,375
321
641
13
BOLT EYE 5/8X10
B
21,375
321
641
14
BOLT EYE 5/8X112
B
22,500
338
675
15
BOLT MACHINE 1/2X2
B
4,125
62
124
16
BOLT MACHINE 5/8X10
B
14,250
214
428
17
BOLT MACHINE 5/8X12
B
18,750
281
563
18
BOLT MACHINE 5/8X2
B
5,625
84
169
19
BOLT SINGLE UPSET 5/8X10
B
18,750
281
563
20
BOLT DOUBLE UPSET 5/8X10
21
BOX KWH METER TYPE KHUSUS
22
BRACE STEEL 55
B
23
BRACE STEEL 70
B
29,250
439
878
24
BRACKET HOT DIP GALVANISHED
B
247,500
3,713
7,425
25
BRACKET INSULATED SECONDARY
B
21,750
326
653
26
BUNDLED CONECTOR
B
9,750
146
293
27
CENTRE BRACKET
B
41,250
619
1,238
28
CLAMP GROUND ROD
B
9,750
146
293
29
CLEVIS SWINGING SECONDARY
B
16,800
252
504
30
COMPRESSION H-TYPE 70/70
B
40,500
608
1,215
31
COMPRESSION TERMINAL LUG 70
B
43,500
653
1,305
32
DEAD END ASSEMBLY ( J4 )
UNIT
34,125
512
1,024
33
EYE NUT 5/8
B
12,000
180
360
34
GROUND LUG + WASHER
B
9,750
146
293
35
GROUND ROD COOPERWELD
B
67,500
1,013
2,025
36
GROUND ROD GALVANISHED
B
41,250
619
1,238
37
GROUND WIRE 16
M
22,500
338
675
38
GUY ATTACHMENT
B
9,000
135
270
39
GUY WIRE 22
M
7,350
110
221
40
GUY WIRE 35
M
9,000
135
270
41
GUY WIRE 50
M
11,700
176
351
42
HOT LINE CLAMP 240
B
112,500
1,688
3,375
10
BIMETALIC CONECTOR
11 12
UNIT
B UNIT
21,000
315
630
4,875,000
73,125
146,250
24,750
371
743
43
HOT LINE CLAMP 70
B
56,250
844
1,688
44
H type Cmpression Conector 35/16
b
18,750
281
563
45
H type Cmpression Conector 70/16
b
22,500
338
675
46
H Type Compression Conector 70/70
b
33,750
506
1,013
47
H Type Compression Conector 240/70
b
56,250
844
1,688
48
INSULATING MOP 25/35 MM
UNIT
3,975,000
59,625
119,250
49
INSULATING MOP 50/70 MM
UNIT
4,425,000
66,375
132,750
50
INSULATING TAPE PVC 1,5"
B
7,500
113
225
51
JOINT SLEEVE 240
B
90,000
1,350
2,700
52
JOINT SLEEVE 70
B
30,000
450
900
53
JUMPER WIRE AAAC 70
M
13,500
203
405
54
JUMPER WIRE LVTC 2X35+N50
M
43,500
653
1,305
55
JUMPER WIRE LVTC 2X70+N50
M
59,250
889
1,778
56
JUMPER WIRE LVTC 3X35+N50
M
46,500
698
1,395
57
JUMPER WIRE LVTC 3X70+N50
M
15,750
236
473
58
LARGE ANGLE ASSEMBLY ( J3 )
B
31,500
473
945
59
LOCK NUT 5/8"
B
2,250
34
68
60
LOOP DEAD END CLAMP LC 71
B
18,750
281
563
61
NUT THIMBLE EYE
B
12,750
191
383
62
PLASTIC STRAP FOR CLAMPING
B
1,500
23
45
63
POLE BAND DR 10,5
B
47,250
709
1,418
64
POLE BAND DR 11,5
B
48,750
731
1,463
65
POLE BAND DR 6,5
B
31,500
473
945
66
POLE BAND DR 7,5
B
36,000
540
1,080
67
POLE BAND DR 8,5
B
39,750
596
1,193
68
POLE BAND DR 9,5
B
42,000
630
1,260
69
Pole band Single upset 7,5
B
41,250
619
1,238
70
Pole band Single upset 8,5
B
46,500
698
1,395
71
Pole band Double upset 7,5
B
42,750
641
1,283
72
Pole band Double upset 8,5
B
48,750
731
1,463
73
PRIMARY ANGLE CLAMP
B
37,500
563
1,125
74
PRYMARY DEAD END CLAMPCLAMP
B
37,500
563
1,125
75
Side mounting bracket
b
68,625
1,029
2,059
76
SIKU 70X70X7X1000
B
112,500
1,688
3,375
77
SIKU 70X70X7X1500
B
168,750
2,531
5,063
78
SIKU 70X70X7X2000
B
225,000
3,375
6,750
79
SIKU 70X70X7X3000
B
337,500
5,063
10,125
80
SMALL ANGLE ASSEMBLY
B
28,500
428
855
81
STAINLESS STEEL STRAP
B
8,250
124
248
82
STLEEL CROSS ARM NP 1000
B
137,250
2,059
4,118
83
STLEEL CROSS ARM NP 1500
B
205,875
3,088
6,176
84
STLEEL CROSS ARM NP 2000
B
274,500
4,118
8,235
85
STLEEL CROSS ARM NP 3000
B
411,750
6,176
12,353
86
STOPING BUCLE
B
3,300
50
99
87
THREE BOLT CLAMP
B
24,000
360
720
88
TIE WIRE
M
3,750
56
113
89
WASHER SQUARE
B
2,250
34
68
MATERIAL DISTRIBUSI UTAMA
TIANG BETON 1
C 9,100 E
BT
1,326,375
19,896
39,791
2
C 9,200E
BT
1,400,625
21,009
42,019
3
C 11,200 E
BT
1,818,450
27,277
54,554
4
C 11,350 E
BT
2,075,625
31,134
62,269
5
C 12,200 E
BT
2,531,250
37,969
75,938
6
C 12,350 E
BT
2,801,250
42,019
84,038
7
ARESTER 18 KV/10 KA
B
708,750.00
10,631
21,263
8
FUSE CUT OUT 20 kv
UNIT
911,250.00
13,669
27,338
9
FUSE LINK 6-25A
B
37,800.00
567
1,134
10
INSULATOR TUMPU 20 kv
B
175,000.00
2,100
5,250
11
INSULATOR TARIK 20 KV
SET
206,250.00
2,475
6,188
12
INSULATOR M 53-4
B
22,500.00
270
675
13
INSULATOR M 53-2
B
15,625.00
188
469
14
KWH METER TERPADU 1 PH 220V 20/5A
UNIT
237,500.00
3,563
7,125
15
KWH METER 3 PH 380V 20/5 A
UNIT
2,500,000.00
37,500
75,000
16
KWH METER 3 PH 380V 40/20 A
UNIT
3,437,500.00
51,563
103,125
17
KWH METER 3 PH 100V/5A ANALOG
UNIT
4,062,500.00
60,938
121,875
18
KWH METER DIGITAL 100V/5A + MODEM GSM
UNIT
24,687,500.00
370,313
740,625
337,500
KONDUKTOR 1
1 X AAAC 70
KM'S
11,250,000
168,750
2
2 X AAAC 70
KM'S
22,500,000
337,500
675,000
3
3 X AAAC 70 + 1 X AAAC 70
KM'S
45,000,000
675,000
1,350,000
4
LVTC 2X35+N50
KM'S
26,250,000
393,750
787,500
5
LVTC 3X35+N50
KM'S
36,250,000
543,750
1,087,500
6
LVTC 2X70+N50
KM'S
38,750,000
581,250
1,162,500
7
LVTC 3X70+N50
KM'S
49,375,000
740,625
1,481,250
8
N2XSY 1X35
M
168,750
2,531
5,063
9
N2XSY 1X50
M
212,500
3,188
6,375
10
N2XSY 1X70
M
281,250
4,219
8,438
11
NYY 1X50
M
65,625
788
1,969
12
NYY 1X70
M
91,250
1,095
2,738
13
NYY 1X95
M
121,594
1,459
3,648
14
NYY 1X120
M
156,375
1,877
4,691
15
NYY 1X150
M
207,500
2,490
6,225
16
NYY 1X185
M
237,500
2,850
7,125
17
NYY 1X240
M
310,125
3,722
9,304
18
NYY 1X300
M
410,000
4,920
12,300
19
NYY 1X400
M
535,625
6,428
16,069
20
NYY 4X25
M
141,250
1,695
4,238
21
NYY 4X35
M
190,125
2,282
5,704
22
NYY 4X50
M
250,000
3,000
7,500
23
NYY 4X70
M
345,000
4,140
10,350
24
NYY 4X95
M
481,250
5,775
14,438
25
NYY 4X120
26
NYY 4X150
27
NYY 4X185
28
NYY 4X240
29
NYY 4X300
TRANSFORMATOR 1
TRAFO CSP 1 PH 25 KVA
UNIT
23,400,000
351,000
702,000
2
TRAFO CSP 1 PH 50 KVA
UNIT
25,800,000
387,000
774,000
3
TRAFO 3 PH 50 KVA
UNIT
35,700,000
535,500
1,071,000
4
TRAFO 3 PH 100 KVA
UNIT
41,400,000
621,000
1,242,000
5
TRAFO 3 PH 160 KVA
UNIT
57,000,000
855,000
1,710,000
6
TRAFO 3 PH 200 KVA
UNIT
7
TRAFO 3 PH 250 KVA
UNIT
8
TRAFO 3 PH 315 KVA
UNIT
9
TRAFO 3 PH 400 KVA
UNIT
126,720,000.00
1,900,800
3,801,600
10
TRAFO 3 PH 630 KVA
UNIT
147,840,000.00
2,217,600
4,435,200
11
TRAFO 3 PH 1000 KVA
UNIT
200,956,800.00
3,014,352
6,028,704
12
OUT FIT 10/20/5-20000V/100V
UNIT
25,300,000.00
379,500
759,000
13
Trafo Arus 10 A
9,625,000.00
144,375
288,750
14
Trafo Arus 20 A
10,175,000.00
152,625
305,250
15
Trafo Tegangan 20 Kv/100V
9,625,000.00
144,375
288,750
MATRIAL INSTALASI TENAGADAN PENERANGAN BOX PANEL 1
40X60X20
UNIT
675,000.00
10,125
20,250
2
50X70X20
UNIT
607,500.00
9,113
18,225
3
60X80X20
UNIT
810,000.00
12,150
24,300
4
60X100X30
UNIT
1,282,500.00
19,238
38,475
5
80X120X40
UNIT
1,822,500.00
27,338
54,675
6
180X120X60
UNIT
5,197,500.00
77,963
155,925
7
180X170X80
UNIT
7,425,000.00
111,375
222,750
8
180X200X80
UNIT
8,775,000.00
131,625
263,250
PEMBATAS/PENGAMAN TEG RENDAH 1
MCB 1PH 2 S/D 32A
B
40,000.00
600
1,200
2
MCCB 25A
B
200,000.00
3,000
6,000
3
NFB 30A
B
250,000.00
3,750
7,500
4
MCCB 50A
B
437,500.00
6,563
13,125
5
MCCB 63A
B
468,750.00
7,031
14,063
6
MCCB 80A
B
500,000.00
7,500
15,000
7
MCCB 100A
B
512,500.00
7,688
15,375
8
MCCB 150A
B
571,875.00
8,578
17,156
9
MCCB 200A
B
812,500.00
12,188
24,375
10
MCCB 250A
B
1,045,000.00
15,675
31,350
11
MCCB 300A
B
1,756,250.00
26,344
52,688
12
MCCB 400A
B
1,781,250.00
26,719
53,438
13
MCCB 600A
B
3,437,500.00
51,563
103,125
14
MCCB 1000A
B
8,375,000.00
125,625
251,250
15
COS 125A 4 POLE
B
1,562,500.00
23,438
46,875
16
COS 200A 4 POLE
B
2,812,500.00
42,188
84,375
17
COS 250A
B
3,437,500.00
51,563
103,125
18
COS 600A
B
6,187,500.00
92,813
185,625
19
COS 800A
B
9,062,500.00
135,938
271,875
20
COS 1000A
B
10,315,000.00
154,725
309,450
21
COS 1600A
B
18,562,500.00
278,438
556,875
22
COS 2500A
B
32,000,000.00
480,000
960,000
23
LOW VOLTAGE CIRCUIT BREAKER 2 JURUSAN 400A
UNIT
8,812,500.00
132,188
264,375
KONTAKTOR DAN RELAY 1
SN 25 MITSUBISHI
B
338,750.00
5,081
10,163
2
SN 35 MITSUBISHI
B
406,250.00
6,094
12,188
3
SN 50 MITSUBISHI
B
593,750.00
8,906
17,813
4
MK2P1 8 PIN OMRON
B
62,500.00
938
1,875
5
TELE 2NO+2NC
B
281,250.00
4,219
8,438
REGULATOR CAPASITOR 1
CIRCUTOR 6E
B
2,656,250.00
39,844
79,688
2
CIRCUTOR 12E
B
4,062,500.00
60,938
121,875
4
CIRCUTOR 7D
B
4,062,500.00
60,938
121,875
8
CIRCUTOR 14D
B
4,687,500.00
70,313
140,625
750,000.00
11,250
22,500
CAPASITOR TABUNG 1
CAPASITOR 5 KVAR/400V
B
2
CAPASITOR 10 KVAR / 400V
B
937,500.00
14,063
28,125
3
CAPASITOR 15 KVAR / 400V
B
1,375,000.00
20,625
41,250
PANEL PENGUKURAN 1
AMPERMETER 100A + CT
SET
100,000.00
1,500
3,000
2
AMPERMETER 150A + CT
SET
100,000.00
1,500
3,000
3
AMPERMETER 200A + CT
SET
406,250.00
6,094
12,188
4
AMPERMETER 250A + CT
SET
406,250.00
6,094
12,188
5
AMPERMETER 300A + CT
SET
406,250.00
6,094
12,188
6
AMPERMETER 400A + CT
SET
406,250.00
6,094
12,188
7
AMPERMETER 600A + CT
SET
406,250.00
6,094
12,188
8
AMPERMETER 800A + CT
SET
656,250.00
9,844
19,688
9
AMPERMETER 1000A + CT
SET
656,250.00
9,844
19,688
10
AMPERMETER 1500A + CT
SET
656,250.00
9,844
19,688
11
COSPHI METEER GAE
SET
2,000,000.00
30,000
60,000
12
VOLT METER 500V + SELECTOR
SET
387,500.00
5,813
11,625
13
SELECTOR AUTO/MANUAL
B
162,500.00
2,438
4,875
14
FREQWENSI METER GAE DIGITAL
B
1,812,500.00
27,188
54,375
15
PILOT LAMP SANHO
B
43,750.00
656
1,313
16
PUSH BOTTON DNG LMP CONTROL SANHO
B
56,250.00
844
1,688
PERLENGKAPAN WIRING & ASSESORIS NYAF 1,5 MM2
M
2,187.50
33
66
NYAF 2,5 MM2
M
3,125.00
47
94
NYAF 4 MM2
M
5,312.50
80
159
NYAF 10 mm2
m
16,250.00
244
488
NYAF / NYY 16
m
23,600.00
354
708
SKUN GARPU 1,5 MM2
B
250.00
4
8
SKUN GARPU 2,5 MM2
B
312.50
5
9
SKUN GARPU 4 MM2
B
375.00
6
11
SKUN LANCIP 1,5 MM2
B
1,250.00
19
38
SKUN LANCIP 2,5 MM2
B
1,562.50
23
47
SKUN LANCIP 4 MM2
B
1,875.00
28
56
62.50
1
2
TIE CABLE 10 CM
100 PCS
TIE CABLE 15 CM
101 PCS
93.75
1
3
TIE CABLE 20 CM
102 PCS
125.00
2
4
TIE CABLE 25 CM
103 PCS
187.50
3
6
TIE CABLE 30 CM
104 PCS
250.00
4
8
SATUAN UPAH PEMASANGAN NO
KONSTRUKSI
SAT
HRG SAT
ASTEK
PPH 1,5%
1
Penanaman tiang beton C 9,100
BT
187,500
5,625
2,813
2
Penanaman tiang beton C 9,200
BT
187,500
5,625
2,813
3
Penanaman Tiang beton C 11,200
BT
262,500
7,875
3,938
4
Penanaman Tiang beton C 11,350
BT
262,500
7,875
3,938
5
Penanaman Tiang beton C 12,200
BT
375,000
11,250
5,625
6
Penanaman Tiang beton C 12,350
BT
375,000
11,250
5,625
7
CA 1
UNIT
30,000
900
450
8
CA 1P
UNIT
30,000
900
450
9
CA 2
UNIT
37,500
1,125
563
10
CA 3
UNIT
41,250
1,238
619
11
CA 4
UNIT
67,500
2,025
1,013
12
CA 5/CA5-1/CA5-2
UNIT
37,500
1,125
563
13
CA 6
UNIT
67,500
2,025
1,013
14
CA 5-1
UNIT
37,500
1,125
563
15
CA 5-2
UNIT
37,500
1,125
563
16
CC 1
UNIT
56,250
1,688
844
17
CC 1A
UNIT
71,250
2,138
1,069
18
CC 2
UNIT
123,750
3,713
1,856
19
CC 3
UNIT
106,500
3,195
1,598
20
CC 7
UNIT
111,750
3,353
1,676
21
CC 8
UNIT
141,750
4,253
2,126
22
CC 8A
UNIT
202,500
6,075
3,038
23
J5 T ( J2 )
UNIT
30,000
900
450
24
J7 t ( J3 )
UNIT
37,500
1,125
563
25
J6 T ( J4 )
UNIT
30,000
900
450
26
MJ6T ( J4A )
UNIT
30,000
900
450
27
J5
UNIT
26,250
788
394
28
J6
UNIT
37,500
1,125
563
29
J7
UNIT
37,500
1,125
563
30
J 10
UNIT
37,500
1,125
563
31
J 6X
UNIT
37,500
1,125
563
32
CM 2-12
UNIT
18,750
563
281
33
CM 2-12A
UNIT
18,750
563
281
34
CM 2-11
UNIT
52,500
1,575
788
35
CM 5-2
UNIT
26,250
788
394
36
CM 5-3
UNIT
13,500
405
203
37
CM 5-4
UNIT
13,500
405
203
38
CM 5-5
UNIT
13,500
405
203
39
CM 5-9
UNIT
93,750
2,813
1,406
40
CM 5-16
UNIT
63,750
1,913
956
41
CM 5-20
UNIT
37,500
1,125
563
42
CM E -C8
UNIT
1,125,000
33,750
16,875
43
SE/SE 1-1
UNIT
18,000
540
270
44
CE/SE 2-1
UNIT
37,620
1,129
564
45
CE 1-2
UNIT
18,750
563
281
46
CE 2-2
UNIT
37,500
1,125
563
47
F 1-2
UNIT
41,250
1,238
619
48
F 1-3
UNIT
48,750
1,463
731
49
CG 105/106/136 25 kva
UNIT
525,000
15,750
7,875
50
CG 105/106/136 50 kva
UNIT
600,000
18,000
9,000
51
CG 312A/312B
UNIT
1,575,000
47,250
23,625
52
CG 313
UNIT
1,875,000
56,250
28,125
53
SRINGING 1XAAAC70
PER 50M
117,000
3,510
1,755
54
SRINGING 2XAAAC70
PER 50M
234,000
7,020
3,510
55
STRINGING 3 X AAAC 70
PER 50M
351,000
10,530
5,265
56
STRINGING 3 X AAAC 70 + 1 X AAAC 70
PER 50M
468,000
14,040
7,020
57
STRINGING LVTC 2X35+N50
KM'S
1,125,000
33,750
16,875
58
STRINGING LVTC 3X35+N50
KM'S
1,425,000
42,750
21,375
59
STRINGING LVTC 2X70+N50
KM'S
1,425,000
42,750
21,375
60
STRINGING LVTC 3X70+N50
KM'S
1,875,000
56,250
28,125
61
PERAKITAN U/ 100A
UNIT
375,000
11,250
5,625
62
PERAKITAN 100 - 250A
UNIT
787,500
23,625
11,813
63
PERAKITAN 300 - 600 A
UNIT
1,875,000
56,250
28,125
64
PERAKITAN 630 - 1000A
UNIT
3,750,000
112,500
56,250
65
PANEL CAPASITOR 6 STAP & SETTING
UNIT
2,250,000
67,500
33,750
66
PANEL CAPASITOR 12 STAP & SETTING
UNIT
3,750,000
112,500
56,250
67
PANEL CAPASITOR 14 STAP & SETTING
UNIT
4,125,000
123,750
61,875
AFO
jml hrg
jml dibulatkan
70,537.50
70,530
58,781.25
58,780
70,537.50
70,530
58,781.25
58,780
11,756.25
11,750
117,562.50
117,560
54,862.50
54,860
3,918.75
3,910
50,943.75
50,940
7,053.75
7,050
11,756.25
11,750
22,336.88
22,330
22,336.88
22,330
23,512.50
23,510
4,310.63
4,310
14,891.25
14,890
19,593.75
19,590
5,878.13
5,870
19,593.75
19,590
21,945.00
21,940
5,094,375.00
5,094,370
25,863.75
25,860
30,566.25
30,560
258,637.50
258,630
22,728.75
22,720
10,188.75
10,180
43,106.25
43,100
10,188.75
10,180
17,556.00
17,550
42,322.50
42,320
45,457.50
45,450
35,660.63
35,660
12,540.00
12,540
10,188.75
10,180
70,537.50
70,530
43,106.25
43,100
23,512.50
23,510
9,405.00
9,400
7,680.75
7,680
9,405.00
9,400
12,226.50
12,220
117,562.50
117,560
58,781.25
58,780
19,593.75
19,590
23,512.50
23,510
35,268.75
35,260
58,781.25
58,780
4,153,875.00
4,153,870
4,624,125.00
4,624,120
7,837.50
7,830
94,050.00
94,050
31,350.00
31,350
14,107.50
14,100
45,457.50
45,450
61,916.25
61,910
48,592.50
48,590
16,458.75
16,450
32,917.50
32,910
2,351.25
2,350
19,593.75
19,590
13,323.75
13,320
1,567.50
1,560
49,376.25
49,370
50,943.75
50,940
32,917.50
32,910
37,620.00
37,620
41,538.75
41,530
43,890.00
43,890
43,106.25
43,100
48,592.50
48,590
44,673.75
44,670
50,943.75
50,940
39,187.50
39,180
39,187.50
39,180
71,713.13
71,710
117,562.50
117,560
176,343.75
176,340
235,125.00
235,120
352,687.50
352,680
29,782.50
29,780
8,621.25
8,620
143,426.25
143,420
215,139.38
215,130
286,852.50
286,850
430,278.75
430,270
3,448.50
3,440
25,080.00
25,080
3,918.75
3,910
2,351.25
2,350
1,386,061.88
1,386,060
1,463,653.13
1,463,650
1,900,280.25
1,900,280
2,169,028.13
2,169,020
2,645,156.25
2,645,150
2,927,306.25
2,927,300
740,643.75
740,640
952,256.25
952,250
39,501.00
39,500
182,350.00
182,350
214,912.50
214,910
23,445.00
23,440
16,281.25
16,280
248,187.50
248,180
2,612,500.00
2,612,500
3,592,187.50
3,592,180
4,245,312.50
4,245,310
25,798,437.50
25,798,430
11,756,250.00
11,756,250
23,512,500.00
23,512,500
47,025,000.00
47,025,000
27,431,250.00
27,431,250
37,881,250.00
37,881,250
40,493,750.00
40,493,750
51,596,875.00
51,596,870
176,343.75
176,340
222,062.50
222,060
293,906.25
293,900
68,381.25
68,380
95,082.50
95,080
126,700.69
126,700
162,942.75
162,940
216,215.00
216,210
247,475.00
247,470
323,150.25
323,150
427,220.00
427,220
558,121.25
558,120
147,182.50
147,180
198,110.25
198,110
260,500.00
260,500
359,490.00
359,490
501,462.50
501,460
24,453,000.00
24,453,000
26,961,000.00
26,961,000
37,306,500.00
37,306,500
43,263,000.00
43,263,000
59,565,000
59,565,000
132,422,400.00
132,422,400
154,492,800.00
154,492,800
209,999,856.00
209,999,850
26,438,500.00
26,438,500
10,058,125.00
10,058,120
10,632,875.00
10,632,870
10,058,125.00
10,058,120
705,375.00
705,370
634,837.50
634,830
846,450.00
846,450
1,340,212.50
1,340,210
1,904,512.50
1,904,510
5,431,387.50
5,431,380
7,759,125.00
7,759,120
9,169,875.00
9,169,870
41,800.00
41,800
209,000.00
209,000
261,250.00
261,250
457,187.50
457,180
489,843.75
489,840
522,500.00
522,500
535,562.50
535,560
597,609.38
597,600
849,062.50
849,060
1,092,025.00
1,092,020
1,835,281.25
1,835,280
1,861,406.25
1,861,400
3,592,187.50
3,592,180
8,751,875.00
8,751,870
1,632,812.50
1,632,810
2,939,062.50
2,939,060
3,592,187.50
3,592,180
6,465,937.50
6,465,930
9,470,312.50
9,470,310
10,779,175.00
10,779,170
19,397,812.50
19,397,810
33,440,000.00
33,440,000
9,209,062.50
9,209,060
353,993.75
353,990
424,531.25
424,530
620,468.75
620,460
65,312.50
65,310
293,906.25
293,900
2,775,781.25
2,775,780
4,245,312.50
4,245,310
4,245,312.50
4,245,310
4,898,437.50
4,898,430
783,750.00
783,750
979,687.50
979,680
1,436,875.00
1,436,870
104,500.00
104,500
104,500.00
104,500
424,531.25
424,530
424,531.25
424,530
424,531.25
424,530
424,531.25
424,530
424,531.25
424,530
685,781.25
685,780
685,781.25
685,780
685,781.25
685,780
2,090,000.00
2,090,000
404,937.50
404,930
169,812.50
169,810
1,894,062.50
1,894,060
45,718.75
45,710
58,781.25
58,780
2,285.94
2,285
3,265.63
3,265
5,551.56
5,550
16,981.25
16,980
24,662.00
24,660
261.25
260
326.56
325
391.88
390
1,306.25
1,305
1,632.81
1,630
1,959.38
1,955
65.31
65
97.97
95
130.63
130
195.94
195
261.25
260
JMLH 195,938
195,935
195,938
195,935
274,313
274,310
274,313
274,310
391,875
391,875
391,875
391,875
31,350
31,350
31,350
31,350
39,188
39,185
43,106
43,105
70,538
70,535
39,188
39,185
70,538
70,535
39,188
39,185
39,188
39,185
58,781
58,780
74,456
74,455
129,319
129,315
111,293
111,290
116,779
116,775
148,129
148,125
211,613
211,610
31,350
31,350
39,188
39,185
31,350
31,350
31,350
31,350
27,431
27,430
39,188
39,185
39,188
39,185
39,188
39,185
39,188
39,185
19,594
19,590
19,594
19,590
54,863
54,860
27,431
27,430
14,108
14,105
14,108
14,105
14,108
14,105
97,969
97,965
66,619
66,615
39,188
39,185
1,175,625
1,175,625
18,810
18,810
39,313
39,310
19,594
19,590
39,188
39,185
43,106
43,105
50,944
50,940
548,625
548,625
627,000
627,000
1,645,875
1,645,875
1,959,375
1,959,375
122,265
122,265
244,530
244,530
366,795
366,795
489,060
489,060
1,175,625
1,175,625
1,489,125
1,489,125
1,489,125
1,489,125
1,959,375
1,959,375
391,875
391,875
822,938
822,935
1,959,375
1,959,375
3,918,750
3,918,750
2,351,250
2,351,250
3,918,750
3,918,750
4,310,625
4,310,625
ANALISA KONSTRUKSI JTM 1PH, JTM 3 PH,JTR DAN TRAFO DISTRIBUSI SESUAI HRG PASAR MATERIAL DAN STANDAR UPAH PLN DIST. JATENG 2007 A. JTM 1 PHASA NO
1
MATERIAL
SAT
QTY
HRG SAT
Insulator post type ( shor/long shunk )
b
1
182,350.00
182,350.00
Bolt macine 5/8x10
b
2
22,330.00
44,660.00
Pole top Bracket/Centre Bracket NJ
b
1
43,100.00
43,100.00
Bolt Single Upset 5/8X10
b
1
14,890.00
14,890.00
Lock nut 5/8
b
3
2,350.00
7,050.00
Washer Square
b
3
2,350.00
7,050.00
Spool Insulator ANSI 53-2
b
1
16,280.00
16,280.00
Alumunium bonding ( tie wire )
m
3
25,080.00
75,240.00 31,350.00
JUMLAH
421,970.00
Insulator post type ( shor/long shunk )
b
1
182,350.0
182,350.00
Bolt macine 5/8x10
b
2
22,330.0
44,660.00
Pole top Bracket/Centre Bracket NJ
b
1
43,100.0
43,100.00
Lock nut 5/8
b
2
2,350.0
4,700.00
Washer Square
b
2
2,350.0
4,700.00
Alumunium bonding ( tie wire )
m
1.5
3,910.0
5,865.00 31,350.00
JUMLAH
316,725.00
316,720
A2 Insulator post type ( shor/long shunk )
b
2
182,350.00
364,700.00
Bolt macine 5/8x10
b
3
22,330.00
66,990.00
Pole top Bracket/Centre Bracket NJ
b
2
43,100.00
86,200.00
Lock nut 5/8
b
3
2,350.00
7,050.00
Washer Square
b
1
2,350.00
2,350.00
BRACKET INSULATED
b
1
25,860.00
25,860.00
16,280.00
16,280.00
3,910.00
17,595.00
Spool Insulator ANSI M53-2
b
1
Alumunium bonding ( tie wire )
m
4.5
upah pemasangan
39,185.00
JUMLAH 4
421,970
A 1'
UPAH PEMASANGAN
3
jml dibulatkan
A1
UPAH PEMASANGAN
2
JML HRG
626,210.00
626,210
A 2' Insulator post type ( shor/long shunk )
b
2
182,350.00
364,700.00
Bolt macine 5/8x10
b
3
22,330.00
66,990.00
Pole top Bracket/Centre Bracket NJ
b
2
43,100.00
86,200.00
Lock nut 5/8
b
3
2,350.00
7,050.00
Washer Square
b
1
2,350.00
2,350.00
Alumunium bonding ( tie wire )
m
4.5
3,910.00
17,595.00
upah pemasangan JUMLAH
39,185.00 584,070.00
584,070
NO 5
MATERIAL
SAT
QTY
HRG SAT
set
1
214,910.00
214,910.00
angle assembly primary
B
1
43,890.00
43,890.00
bolt eye 5/8x10
B
1
23,510.00
23,510.00
Ball Clevis
B
1
50,940.00
50,940.00
double rack poleband 7,5"
B
1
13,320.00
13,320.00
anchoor shacle
B
1
3,910.00
3,910.00
lock nut
B
1
2,350.00
2,350.00
washer square
B
1
2,350.00
2,350.00
oval eye nut
B
1
10,180.00
10,180.00
clevis swinging insulated
B
1
17,550.00
17,550.00
spool insulator ANSI M 53-4
B
1
23,440.00
23,440.00
armor rod
B
2
58,780.00
117,560.00
upah pemasangan
43,105.00
Jumlah
567,015.00
set
1
214,910.00
214,910.00
angle assembly primary
B
1
43,890.00
43,890.00
Ball Clevis
B
1
50,940.00
50,940.00
double rack poleband 7,5"
B
1
37,620.00
37,620.00
anchoor shacle
B
1
11,750.00
11,750.00
lock nut
B
1
2,350.00
2,350.00
washer square
B
1
2,350.00
oval eye nut
B
1
armor rod
B
1
12540 54,860.00
upah pemasangan
2,350.00 12,540.00 54,860.00 43,105.00
Jumlah
474,315.00
474,310
A4 Insulator tarik /suspension insulator
SET
2
214,910.00
429,820.00
Dead End assembly primary
B
2
39,180.00
78,360.00
bolt eye 5/8x10
B
2
22,330.00
44,660.00
Ball Clevis
B
2
50,940.00
101,880.00
double rack poleband 7,5"
B
2
37,620.00
75,240.00
anchoor shacle
B
2
11,750.00
23,500.00
lock nut
B
2
2,350.00
4,700.00
washer square
B
2
2,350.00
4,700.00
oval eye nut
B
2
12,540.00
25,080.00
clevis swinging insulated
B
2
17,550.00
35,100.00
spool insulator ANSI M 53-4
B
2
23,440.00
46,880.00
Dead End Clamp Loop LC 71B
B
4
19,590.00
78,360.00
Upah pemasangan
70,535.00
JUMLAH
8
567,010
A 3' Insulator tarik /suspension insulator
7
jml dibulatkan
A3 Insulator tarik /suspension insulator
6
JML HRG
1,018,815.00
A4' Insulator tarik /suspension insulator
SET
2
214,910.00
429,820.00
Dead End assembly primary
B
2
39,180.00
78,360.00
Ball Clevis
B
2
50,940.00
101,880.00
1,018,810
NO
MATERIAL
SAT
QTY
HRG SAT
double rack poleband 7,5"
B
2
37,620.00
75,240.00
anchoor shacle
B
2
11,750.00
23,500.00
lock nut
B
2
2,350.00
4,700.00
oval eye nut
B
2
12,540.00
25,080.00
Upah pemasangan
809,115.00
SET
1
214,910.00
214,910.00
Dead End assembly primary
B
1
39,180.00
39,180.00
bolt eye 5/8x10
B
2
22,330.00
44,660.00
Ball Clevis
B
1
50,940.00
50,940.00
anchoor shacle
B
1
11,750.00
11,750.00
lock nut
B
2
2,350.00
4,700.00
washer square
B
1
2,350.00
2,350.00
clevis swinging insulated
B
1
17,550.00
17,550.00
spool insulator ANSI M 53-4
B
1
23,440.00
23,440.00
Dead End Clamp Loop LC 71B
B
2
19,590.00
39,180.00
Upah pemasangan
39,185.00
JUMLAH
487,845.00
487,840
A5' Insulator tarik /suspension insulator
SET
1
214,910.00
214,910.00
Dead End assembly primary
B
1
39,180.00
39,180.00
bolt eye 5/8x10
B
1
22,330.00
22,330.00
Ball Clevis
B
1
50,940.00
50,940.00
anchoor shacle
B
1
11,750.00
11,750.00
lock nut
B
1
2,350.00
2,350.00
washer square
B
1
2,350.00
Upah pemasangan
2,350.00 39,185.00
JUMLAH
11
809,110
A5 Insulator tarik /suspension insulator
10
jml dibulatkan
70,535.00
Jumlah
9
JML HRG
382,995.00
382,990
A 5-1 Insulator tarik /suspension insulator
SET
1
214,910.00
214,910.00
Dead End assembly primary
B
1
39,180.00
39,180.00
bolt eye 5/8x10
B
1
22,330.00
22,330.00
Ball Clevis
B
1
50,940.00
50,940.00
anchoor shacle
B
1
11,750.00
11,750.00
lock nut
B
1
2,350.00
2,350.00
washer square
B
1
2,350.00
2,350.00
Pole band single rack 7,5
B
1
37,620.00
37,620.00
eye nut 5/8
b
1
12,540.00
12,540.00
jumper wire
M
1
14,100.00
14,100.00
h Type Compression conector
b
4
35,260.00
141,040.00
clevis swinging insulated
B
1
17,550.00
17,550.00
spool insulator ANSI M 53-4
B
1
23,440.00
23,440.00
Dead End Clamp Loop LC 71B
B
2
19,590.00
39,180.00
Upah pemasangan jumlah
39,185.00 668,465.00
668,460
NO
12
MATERIAL
SAT
QTY
HRG SAT
jml dibulatkan
A 5-2 Insulator tarik /suspension insulator
SET
1
214,910.00
214,910.00
Dead End assembly primary
B
1
39,180.00
39,180.00
bolt eye 5/8x10
B
2
22,330.00
44,660.00
Ball Clevis
B
1
50,940.00
50,940.00
anchoor shacle
B
2
11,750.00
23,500.00
lock nut
B
1
2,350.00
2,350.00
washer square
B
1
2,350.00
2,350.00
Pole band single rack 7,5
B
1
37,620.00
37,620.00
eye nut 5/8
b
2
12,540.00
25,080.00
jumper wire
M
1
14,100.00
14,100.00
h Type Compression conector
b
4
35,260.00
141,040.00
clevis swinging insulated
B
1
17,550.00
17,550.00
spool insulator ANSI M 53-4
B
1
23,440.00
23,440.00
Dead End Clamp Loop LC 71B
B
2
19,590.00
39,180.00
Upah pemasangan
39,185.00
JUMLAH 13
JML HRG
715,085.00
715,080
CA 6 Insulator tarik 20 KV
SET
2
214,910.00
429,820.00
Insulator tumpu 20 KV
B
1
182,350.00
182,350.00
Center bracket
B
1
43,100.00
43,100.00
Bolt machine 5/8X10
B
2
14,890.00
29,780.00
Oval Eye bolt
B
1
22,330.00
22,330.00
Oval Eye nut 5/8
B
3
12,540.00
37,620.00
Ball Clevis
SET
2
50,940.00
101,880.00
Pole band Double Rack 7,5
B
1
37,620.00
37,620.00
Dead End prymary Clamp
B
2
39,180.00
78,360.00
Clevis swinging secondary
B
2
17,550.00
35,100.00
Insulator m 53-4
B
2
23,440.00
46,880.00
Loop Dead End Clamp LC 71
B
4
19,590.00
78,360.00
H Type compression conector
B
4
35,260.00
141,040.00
Jumper wire
M
2
14,100.00
28,200.00
Armor tape
M
4
3,910.00
15,640.00
washer square
B
3
2,350.00
pemasangan
U
7,050.00 70,535.00
JUMLAH
1,385,665.00
1,385,660
JTM 3 PHASA NO 1
MATERIAL
SAT
QTY
HRG SAT
JML HRG
Insulator tumpu 20 kv
B
3.00
182,350.00
Center Bracket/Pole top bracket
B
1.00
43,100.00
43,100.00
Steel Cross arm np 1500
B
1.00
215,130.00
215,130.00
Brace steel 55
B
2.00
25,860.00
51,720.00
Bolt machine 5/8x10
B
3.00
14,890.00
44,670.00
CC1- A 547,050.00
jml dibulatkan
NO
MATERIAL
SAT
QTY
HRG SAT
Bolt machine 5/8x2
B
2.00
5,870.00
11,740.00
Bolt Single upset 5/8x10
B
1.00
19,590.00
19,590.00
lock nut 5/8
B
6.00
2,350.00
14,100.00
Pole band dr 7,5
B
1.00
37,620.00
37,620.00
Insulator M53-2
B
1.00
16,280.00
16,280.00
Tie wire
M
6.00
3,910.00
23,460.00
Washer square
B
4.00
2,350.00
pemasangan
U
1,108,310
CC 1 Insulator tumpu 20 kv
B
3
182,350.00
547,050.00
Center Bracket/Pole top bracket
B
1
43,100.00
43,100.00
Side Mounting Bracket
B
2
71,710.00
143,420.00
Bolt machine 5/8x10
B
4
19,590.00
78,360.00
Lock nut 5/8
B
5
2,350.00
11,750.00
Bolt Single upset 5/8x10
B
1
19,590.00
19,590.00
Insulator M53-2
B
1
16,280.00
16,280.00
Tie wire
M
6
3,910.00
23,460.00
Washer square
B
3
2,350.00
7,050.00 58,780.00
JUMLAH
948,840.00
948,840
CC 2-A Insulator tumpu 20 kv
B
6.00
182,350.00
1,094,100.00
Center Bracket/Pole top bracket
B
2.00
43,100.00
86,200.00
Steel Cross arm NP 1500
B
2.00
215,130.00
430,260.00
Brace steel 55
B
4.00
25,860.00
103,440.00
Bolt machine 5/8x10
B
4.00
14,890.00
59,560.00
Bolt machine 5/8x2
B
4.00
5,870.00
23,480.00
Bolt Double arming 5/8x12
B
2.00
22,330.00
44,660.00
Bracket Insulated Secondary
B
1.00
22,720.00
22,720.00
lock nut 5/8
B
9.00
2,350.00
21,150.00
Pole band dr 7,5
B
1.00
37,620.00
37,620.00
Insulator M53-2
B
1.00
16,280.00
16,280.00
Tie wire
M
6.00
3,910.00
23,460.00
Washer square
B
4.00
2,350.00
9,400.00
pemasangan
129,315.00
JUMLAH 4
9,400.00 1,108,315.00
pemasangan
3
jml dibulatkan
74,455.00
JUMLAH 2
JML HRG
2,101,645.00
CC 2 Insulator tumpu 20 kv
B
3
182,350.00
547,050.00
Center Bracket/Pole top bracket
B
1
43,100.00
43,100.00
Side Mounting Bracket
B
2
71,710.00
143,420.00
Bolt machine 5/8x10
B
5
14,890.00
74,450.00
Lock nut 5/8
B
5
2,350.00
11,750.00
Bracket Insulated Secondary
B
1
22,720.00
22,720.00
Insulator M53-2
B
1
16,280.00
16,280.00
Tie wire
M
6
3,910.00
23,460.00
Washer square
B
3
2,350.00
7,050.00
2,101,640
NO
MATERIAL
SAT
QTY
HRG SAT
1,018,595.00
JUMLAH
insulator tarik 20 kv
SET
3
214,910.00
644,730.00
Ball Clevis for Suspension
SET
3
50,940.00
152,820.00
anglle prymary clamp
B
3
39,180.00
117,540.00
Shackle anchoor
B
3
11,750.00
35,250.00
Eye nut 5/8"
B
4
12,540.00
50,160.00
Pole band Double Rack 7,5
B
2
37,620.00
75,240.00
Pole band Double Rack 8,5
B
2
41,530.00
83,060.00
Clevis swinging secondary
B
1
17,550.00
17,550.00
insulator M 53-4
B
1
23,440.00
23,440.00
Rmor rod 70
B
4
54,860.00
219,440.00
tie wire
B
1.5
3,910.00
5,865.00 111,290.00
JUMLAH
1,536,385.00
1,536,380
CC 8 Insulator tarik 20 kv Insulator tumpu 20 kv dead end prymary clamp Center Bracket steel cross arm np 2000 brace steel 770 pole band dr 7,5 bolt double urming 5/8x12 Ball Clevis Shacle anchoor Bolt machine 5/8x10 Oval eye nut Bolt eye 5/8x10 Clevis swinging secondary Loop dead end clamp LC 71B Tie wirre Square washer
B SET B B B B B B B B B B B B B M B
6.00
214,910.00
1,289,460.00
3.00
182,350.00
547,050.00
6.00
39,180.00
235,080.00
1.00
43,100.00
43,100.00
2.00
235,120.00
470,240.00
4.00
30,560.00
122,240.00
2.00
37,620.00
75,240.00
2.00
22,330.00
44,660.00
6.00
50,940.00
305,640.00
6.00
11,750.00
70,500.00
2.00
22,330.00
44,660.00
8.00
12,540.00
100,320.00
1.00
22,330.00
22,330.00
2.00
17,550.00
35,100.00
4.00
19,590.00
78,360.00
4.50
3,910.00
17,595.00
3.00
2,350.00
Pemasangan
7,050.00 148,125.00 3,656,750.00
7
1,018,590
CC 3
Pemasangan
6
jml dibulatkan
129,315.00
pemasangan
5
JML HRG
CC 8A Insulator tarik 20 kv
B
6.00
214,910.00
1,289,460.00
SET
2.00
182,350.00
364,700.00
dead end prymary clamp
B
6.00
39,180.00
235,080.00
Center Bracket
B
1.00
43,100.00
43,100.00
steel cross arm np 2000
B
4.00
286,850.00
1,147,400.00
brace steel 770
B
8.00
30,560.00
244,480.00
pole band dr 7,5
B
4.00
37,620.00
150,480.00
bolt double urming 5/8x12
B
6.00
22,330.00
133,980.00
Ball Clevis
B
6.00
50,940.00
305,640.00
Shacle anchoor
B
6.00
11,750.00
70,500.00
Insulator tumpu 20 kv
3,656,750
NO
MATERIAL
SAT
QTY
HRG SAT
Bolt machine 5/8x10
B
2.00
14,890.00
29,780.00
Oval eye nut
B
6.00
12,540.00
75,240.00
Bolt eye 5/8x10
B
1.00
22,330.00
22,330.00
Clevis swinging secondary
B
2.00
17,550.00
35,100.00
Loop dead end clamp LC 71B
B
4.00
19,590.00
78,360.00
Tie wirre
M
4.50
3,910.00
17,595.00
Armor tape
M
2.00
3,910.00
7,820.00
Square washer
B
3.00
2,350.00
7,050.00
Pemasangan
JML HRG
211,610.00 4,469,705.00
8
jml dibulatkan
4,469,700
CC 7A Insulator tarik 20 kv
SET
3.00
214,910.00
644,730.00
dead end prymary clamp
B
steel cross arm np 2000
B
3.00
39,180.00
117,540.00
2.00
286,850.00
brace steel 770
573,700.00
B
4.00
30,560.00
122,240.00
pole band dr 7,5
B
1.00
37,620.00
37,620.00
bolt double urming 5/8x12
B
3.00
22,330.00
66,990.00
Ball Clevis
SET
3.00
50,940.00
152,820.00
Shacle anchoor
B
3.00
11,750.00
35,250.00
Oval eye nut
B
3.00
12,540.00
37,620.00
Bolt eye 5/8x10
B
1.00
22,330.00
22,330.00
Clevis swinging secondary
B
1.00
17,550.00
17,550.00
Armor tape
M
1.00
3,910.00
3,910.00
Loop Dead Eand Clamp Lc 71b
B
2.00
19,590.00
39,180.00
Square washer
B
1.00
2,350.00
2,350.00
Pemasangan
116,775.00 1,990,605.00
1,990,600
JTR ONLY, JTR UB NO
1
MATERIAL
HRG SAT
JML HRG
Bolt Single upset 5/8X10
1
19,590.00
19,590.00
Spool Insulator ANSI 53-2
1
16,280.00
16,280.00
1.5
3,910.00
5,865.00
Washer square
1
2,350.00
2,350.00
Lock nut 5/8
1
2,350.00
2,350.00
Pemasangan
27,430.00
Jumlah
73,865.00
jml dibulatkan
73,860
SJ 8 Pole band Single Upset Spool Insulator ANSI 53-2 Tie wire
3
QTY
J8
Tie wire
2
SAT
1
43,100.00
43,100.00
1
16,280.00
16,280.00
1.5
3,910.00
5,865.00
Pemasangan
27,430.00
Jumlah
92,675.00
J5
92,670
NO
MATERIAL
21,940.00
21,940.00
1
16,280.00
16,280.00
1.5
3,910.00
5,865.00
Washer square
1
2,350.00
2,350.00
Lock nut 5/8
1
2,350.00
2,350.00
Pemasangan
27,430.00
Jumlah
76,215.00
1
44,670.00
44,670.00
1
16,280.00
16,280.00
1.5
3,910.00
27,430.00
Jumlah
94,245.00
94,240
J5-T ( J2 ) Small Angle Asembly
1
29,780.00
29,780.00
Stainless steel strap
1.2
8,620.00
10,344.00
Stoping buckle
2
3,440.00
6,880.00
Plastic strap for clamping
2
1,560.00
3,120.00
Pemasangan
31,350.00
Jumlah
81,474.00
81,470
J 10 Bolt Machine 5/8X10
1
14,890.00
14,890.00
Bracket Insulated Secondary
1
22,720.00
22,720.00
1
16,280.00
16,280.00
1.5
3,910.00
5,865.00
Washer Square
1
2,350.00
2,350.00
Lock nut 5/8
1
2,350.00
Tie Wire
Pemasangan
2,350.00 39,185.00
Jumlah
103,640.00
103,640
SJ 10 Pole Band DR 7,5
1
44,670.00
44,670.00
Bracket Insulated Secondary
1
22,720.00
22,720.00
Spool Insulator M 53-2
1
16,280.00
16,280.00
Tie Wire
1.5
3,910.00
Pemasangan
5,865.00 39,185.00
Jumlah
128,720.00
128,720
J 7T ( J3 ) Large Angle Assembly
32,910.00
32,910.00
1.5
8,620.00
12,930.00
Stoping buckle
2
3,440.00
6,880.00
Plastic strap for clamping
2
1,560.00
Stainless steel strap
9
76,210
5,865.00
Pemasangan
Spool Insulator M 53-2
8
jml dibulatkan
SJ 5
Tie wire
7
JML HRG
1
Spool Insulator ANSI 53-2
6
HRG SAT
Spool Insulator ANSI 53-2
Pole band Double Upset
5
QTY
Bolt Double Upset 5/8X10 Tie wire
4
SAT
1
3,120.00
Pemasangan
39,185.00
Jumlah
95,025.00
J 17
95,020
NO
MATERIAL
SAT
QTY
HRG SAT
Bolt Eye 5/8X10
1
22,330.00
22,330.00
Clevis Swinging Secondary
1
17,550.00
17,550.00
Spool Insulator Ansi M 53-4
1
23,440.00
23,440.00
Armor Rod
1
54,860.00
54,860.00
Washer square
1
2,350.00
2,350.00
lock nut
1
2,350.00
2,350.00
Tie wire
1.5
3,910.00
5,865.00
Pemasangan
167,930.00
Pole band DR 7,5
1
37,620.00
37,620.00
Clevis Swinging Secondary
1
17,550.00
17,550.00
Spool Insulator Ansi M 53-4
1
23,440.00
23,440.00
Armor Rod
1
54,860.00
54,860.00
3,910.00
5,865.00
1.5
Pemasangan
39,185.00
Jumlah
178,520.00
Bolt Eye 5/8X10
1
22,330.00
22,330.00
Clevis Swinging Secondary
1
17,550.00
17,550.00
Spool Insulator Ansi M 53-4
1
23,440.00
23,440.00
Loop Dead End Clamp LC 71B
2
19,590.00
39,180.00
Washer square
1
2,350.00
2,350.00
lock nut
1
2,350.00
2,350.00
Armor tape
1
3,910.00
150,295.00
150,290
SJ 6 Pole band Dr 7,5
1
37,620.00
37,620.00
Clevis Swinging Secondary
1
17,550.00
17,550.00
Eye nut 5/8
1
12,540.00
12,540.00
Spool Insulator Ansi M 53-4
1
23,440.00
23,440.00
Loop Dead End Clamp LC 71B
2
19,590.00
39,180.00
Armor tape
1
3,910.00
3,910.00
Pemasangan
39,185.00
Jumlah
173,425.00
173,420
J 6T ( J 4 ) Dead End Asembly Stainless steel strap
14
3,910.00 39,185.00
Jumlah
13
178,520
J6
Pemasangan
12
167,930
SJ 10
Tie wire
11
jml dibulatkan
39,185
Jumlah 10
JML HRG
1
35,660.00
35,660.00
1.5
8,620.00
12,930.00
Stoping buckle
2
3,440.00
6,880.00
Plastic strap for clamping
2
1,560.00
3,120.00
Pemasangan
31,350.00
Jumlah
89,940.00
MJ 6 T ( J 4A ) Insulating type PVC 1'5"
1
7,830.00
7,830.00
89,940
NO
MATERIAL
SAT
Stainless steel strap Stoping buckle
QTY
HRG SAT
JML HRG
1.5
8,620.00
12,930.00
2
3,440.00
6,880.00
Pemasangan
31,350.00
Jumlah
58,990.00
jml dibulatkan
58,990
ANCHOOR JUMPER DAN FUSE DAN GROUNDING
NO
1
MATERIAL
SAT
QTY
HRG SAT
Anchoor Expanding 8,000 lbs
1
58,780.00
58,780.00
Anchoor Rod 5/8 X8
1
58,780.00
58,780.00 43,105.00
Jumlah
160,665.00
Anchoor Expanding 10,000 Lbs
1
70,530.00
70,530.00
Anchoor rod 3/4 X 8
1
70,530.00
70,530.00 50,940.00
Jumlah
192,000.00
Guy Attachment / Guy Hook
1
9,400.00
9,400.00
Pole band DR
1
37,620.00
37,620.00
Guy Wire 22
11
7,680.00
84,480.00
25,080.00
50,160.00
2
Pemasangan
18,810.00
Jumlah
200,470.00
Guy Attachment / Guy Hook
1
9,400.00
9,400.00
Pole band DR
1
37,620.00
37,620.00
9,400.00
103,400.00
25,080.00
50,160.00
Guy Wire 35 - 50
11
Three Bolt Clamp
2
19,590.00
Jumlah
220,170.00
220,170
SE/CE 2-1 Nut Thimble eye 5/8
2
13,320.00
26,640.00
Pole band Dr
2
37,620.00
75,240.00
Guy wire 22
20
7,680.00
153,600.00
25,080.00
50,160.00
Three bolt Clamp
2
Pemasangan
39,310.00
Jumlah 6
200,470
SE 1-2
Pemasangan
5
192,000
SE 1-1
Three Bolt Clamp
4
160,660
F 1-3
Pemasangan
3
jml dibulatkan
F 1-2
Pemasangan
2
JML HRG
344,950.00
SE / CE 2-2 Nut Thimble eye 5/8
2
13,320.00
26,640.00
Pole band Dr
2
37,620.00
75,240.00
Guy wire 35
20
9,400.00
188,000.00
344,950
NO
MATERIAL Three bolt Clamp
SAT
QTY 2
HRG SAT 25,080.00
Pemasangan
Ground wire 16 CCO tap conector 50/16
379,225.00
1
10,180.00
10,180.00
0.5
23,510.00
11,755.00
1
23,510.00
23,510.00
Pemasangan
19,590.00
Jumlah
65,035.00
Ground wire 16 CCO TAP CONECTOR 16/35
1
10,180.00
10,180.00
0.5
23,510.00
11,755.00
1
19,590.00
19,590.00
Pemasangan
19,590.00
Jumlah
61,115.00
Ground Lug + Washer
1
10,180.00
10,180.00
Ground wire 16
1
23,510.00
23,510.00
Ground rod Cooper weld
1
70,530.00
70,530.00
ClampGround rod
1
10,180.00
10,180.00 169,260.00
Insulator tumpu 20 KV
1
182,350.00
182,350.00
Center bracket
1
43,100.00
43,100.00
Bolt Machine 5/8X10
2
14,890.00
29,780.00
Washer square
2
2,350.00
4,700.00
Lock nut 5/8
2
2,350.00
4,700.00
1.5
3,910.00
Pemasangan
5,865.00 27,430.00
Jumlah
297,925.00
297,920
CM 5/3 Pole band DR 7,5
1
37,620.00
37,620.00
Pemasangan
14,105.00
Jumlah
51,725.00
51,720
CM 5-4 Insulator tumpu 20 KV Tie wire
1 1.5
182,350.00 3,910.00
Pemasangan
182,350.00 5,865.00 14,105.00
Jumlah 12
169,260
CM 5-2
Tie wire
11
61,110
54,860.00
Jumlah
10
65,030
CM 2 - 11
Pemasangan
9
379,220
CM 2-12A Ground Lug + Washer
9
50,160.00
CM 2-12 Ground Lug + Washer
8
jml dibulatkan
39,185.00
Jumlah 7
JML HRG
202,320.00
CM 5-5 Insulator tumpu 20 KV Long Shunk type Tie wire
1 1.5
182,350.00
182,350.00
3,910.00
5,865.00
202,320
NO
MATERIAL
SAT
QTY
HRG SAT
Pemasangan
JML HRG
jml dibulatkan
14,105.00
Jumlah
202,320.00
202,320
KONSTRUKSI GARDU DISTRIBUSI NO
1
MATERIAL
SAT
QTY
HRG SAT
set
1
258,630.00
258,630.00
hot line clamp 70
b
1
58,780.00
58,780.00
Armor rod
b
1
54,860.00
54,860.00
CCO conector 70/70
b
3
42,320.00
126,960.00
Compression terminal Lug
b
4
45,450.00
181,800.00
Jumper wire AAAC 70
m
2
11,800.00
23,600.00
Jumper wire LVTC 2X70+N50
M
1
40,500.00
40,500.00
Jasa Pemasangan
548,625.00
JUMLAH
1,293,755.00
set
2
258,630.00
517,260.00
hot line clamp 70
b
1
58,780.00
58,780.00
Armor rod
b
1
54,860.00
54,860.00
CCO conector 70/70
b
3
42,320.00
126,960.00
Compression terminal Lug
b
4
45,450.00
181,800.00
Jumper wire AAAC 70
m
2
11,800.00
23,600.00
Jumper wire LVTC 2X70+N50
M
1
40,500.00
40,500.00
Jasa Pemasangan
627,000.00
JUMLAH
1,630,760.00
1,630,760
CG 312A / CG 312B Steel cross Arm NP 2000
bt
3
286,850.00
860,550.00
Steel cross Arm NP 1000
bt
4
143,420.00
573,680.00
Siku 70X70X3000
bt
2
352,680.00
705,360.00
Steel brace 770
bh
2
30,560.00
61,120.00
Steel brace 550
bh
2
25,860.00
51,720.00
pole band dr 8,5
bh
1
41,530.00
41,530.00
pole band dr 9,5
bh
1
43,890.00
43,890.00
pole band dr 10,5
bh
1
49,370.00
49,370.00
Bolt Machine 5/8X2
bh
24
5,870.00
140,880.00
Bracket hot Dip Galvanished
set
1
258,630.00
258,630.00
Fuse Cut out 20 KV/50 kA
unit
3
952,250.00
2,856,750.00
Arester 18 KV/50 kA
unit
3
740,640.00
2,221,920.00
Compression terminal lug 70
bh
12
45,450.00
545,400.00
Jumper wire AAAC 70
m
9
11,760.00
105,840.00
Hot line Clamp 70
bh
3
58,780.00
176,340.00
Jasa pemasangan
1,645,875.00 10,338,855.00
4
1,293,750
CG 105/106/136 50 KVA Bracket Hot dip Galvanished
3
JML DIBULATKAN
CG 105/106/136 25 KVA Bracket Hot dip Galvanished
2
JML HRG
CG 313 Steel Cross Arm NP 3000
bt
5
430,270.00
2,151,350.00
10,338,850
NO
MATERIAL
SAT
QTY
HRG SAT
Steel Cross Arm NP 1000
bt
4
143,420.00
573,680.00
Brace Steel 550
bh
4
25,860.00
103,440.00
Bolt Machine 5/8X2
bh
24
5,870.00
140,880.00
Pole Band Dr 8,5
bh
2
41,530.00
83,060.00
Pole Band Dr 9,5
bh
4
43,890.00
175,560.00
Fuse Cut out 20 KV/50 kA
unit
3
952,250.00
2,856,750.00
Arester 18 KV/50 kA
unit
3
740,640.00
2,221,920.00
Compression terminal lug 70
bh
12
45,450.00
545,400.00
Hot line Clamp 70
bh
3
58,780.00
176,340.00
Jumper wire AAAC 70
m
9
11,760.00
105,840.00
Jasa Pemasangan
JML HRG
jml dibulatkan
1,959,375.00
Jumlah
11,093,595.00
11,093,590
PERALATAN NO
1
MATERIAL
SAT
QTY
u
1
Gaspipa galvanis 2"
bt
3
Pole band DR 3"
bh
6
Pole band DR 10,5
bh
8
Kanal U NP 10/3000
bt
2
Bolt Machine 5/8X2
bh
4
unit
1
LOW VOLTAGE CIRCUIT BREAKER 400 A/ 2 JURUSAN Kotak LVCB out dor lengkap dengan MCCB 400A
Jasa pemasangan Jumlah 2
HRG SAT
JML HRG
JML DIBULATKAN
DIBULATKAN
DIBULATKAN