BILL OF QUANTITY PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) REKAPITULASI



No. Kontrak Pelaksana



: :



SESUAI KONTRAK NO



URAIAN PEKERJAAN



KETERANGAN TOTAL HARGA



VI



PEKERJAAN TAPPING TRANSMISI ( Pemasangan ) 1 PEKERJAAN SIPIL



550,554,000



2 PEKERJAAN ELEKTROMEKANIKAL



JUMLAH TOTAL



Page 1 of 7



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



URAIAN PEKERJAAN SATUAN



VI 1 1.1 1.1.1 1.1.1.1



PEKERJAAN TAPPING TRANSMISI PEKERJAAN SIPIL PEKERJAAN PEMBERSIHAN JALUR & PERSIAPAN CHECK SURVEY & RE- ROUTE Check survey to provide tower schedule



1.1.1.2



Re-Route complete final survey including checking of profiles and drawing, pegging of tower positions, diagonal profiles, etc.



1.1.1.3



Soil investigation in tower location a. Dutch Cone Penetration Test (Sondir) including report b. Boring including Geotechnical Soil Lab Test and report



VOLUME



HARGA SATUAN



titik



1.00



-



Ls Ls Ls Ls



1.00 1.00 1.00 1.00



M2



5828.00



-



JUMLAH 1.1.1 1.1.2 PREPARETION WORK 1.1.2.1 Project name board as specified 1.1.2.2 Site Project Office (10 x 6 m2) complete with furniture 1.1.2.3 Outdoor warehouse with roof 1.1.2.4 Outdoor warehouse without roof 1.1.2.5 Cut and Fill 1.1.2.6 Site Clearing Tapak Tower JUMLAH 1.1.2 TOTAL 1.1



Page 2 of 7



TOTAL HARGA



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



URAIAN PEKERJAAN SATUAN



1.2 1.2.1 1.2.1.1 1.2.1.1.1 1.2.1.1.2 1.2.1.1.3 1.2.1.1.4 1.2.1.1.5 1.2.1.1.6 1.2.1.1.7



VOLUME



HARGA SATUAN



TOWER & ACCESSORIES SYSTEM TERMASUK PEMERIKSAAN AKHIR TOWER LATTICE STANDARD ( PENGADAAN TOWER TERPUSAT ) 150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS : AA2.-03. AA2.+00. AA2.+03. AA2.+06. AA2.+09. AA2.+12. AA2.+15.



sets tower sets tower sets tower



1.00 10.00 2.00



23,100,000 26,850,000 26,250,000



JUMLAH 1.2.1.1 1.2.1.2 1.2.1.2.1 1.2.1.2.2 1.2.1.2.3 1.2.1.2.4 1.2.1.2.5 1.2.1.2.6 1.2.1.2.7



23,100,000 268,500,000 52,500,000



344,100,000



150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS : BB2.-03. BB2.+00. BB2.+03. BB2.+06. BB2.+09. BB2.+12. BB2.+15.



sets tower



2.00



26,950,000



JUMLAH 1.2.1.2 1.2.1.5



TOTAL HARGA



53,900,000



53,900,000



150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :



1.2.1.5.1 1.2.1.5,2 1.2.1.5.2 1.2.1.5,3 1.2.1.5,4 1.2.1.5,5 1.2.1.5,6



DDR2.-03. DDR2.+00. DDR2.+03. DDR2.+06. DDR2.+09. DDR2.+12. DDR2.+15.



1.2.1.7 I.2.1.7.1 I.2.1.7.1.1 I.2.1.7.1.2 I.2.1.7.1.3 I.2.1.7.2 I.2.1.7.2.1 I.2.1.7.2.2 I.2.1.7.2.3 I.2.1.7.3 I.2.1.7.3.1 I.2.1.7.3.2 I.2.1.7.3.3



TRANSPORTASI MATERIAL TOWER ( BIAYA LANSIR KE LOKASI TITIK TOWER ) Transportation Distance up to 500m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu) Transportation Distance to 500 - 1000m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu, dll) Transportation Distance up to > 1000m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu, dll)



sets tower sets tower



1.00 1.00



38,150,000 45,250,000



JUMLAH 1.2.1.5



83,400,000



Kg



JUMLAH 1.2.1.7



Page 3 of 7



38,150,000 45,250,000



130,385.00



400.00



52,154,000



52,154,000



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



URAIAN PEKERJAAN SATUAN



VOLUME



HARGA SATUAN



I.2.2 I.2.2.1 I.2.2.2 I.2.2.3



TOWER ACCESSORIES Danger Plate with fixing facilities Number Plate & Phase Plate with fixing facilities Anti climbing guards



sets sets sets



17.00 17.00 17.00



I.2.2.4



Earthing angle compraising of galvanized steel angle, lead wire, including all clams (1 set per leg tower)



sets



17.00



I.2.2.5



Continuous or cross-connected counterpoise cable, 50 m length, 450 mm depth, including galvanized steel angle 1000 mm length, all joints and clams (1 set per leg tower, if any)



I.2.2.6 I.2.2.7 I.2.2.8



Extra to items I.2.2.5 for laying in rock, 450 mm depth Extra to items I.2.2.5 for installing at 1000 mm depth Extra to items I.2.2.5 for 2 m earthing rod, including joints JUMLAH 1.2.2 JUMLAH 1.2



I.3 1.3.1 I.3.1.1



I.3.1.1.5



Class 7 Pad and Chimney Foundations with Bouyancy (150.AA2.+6.250.7.a ; 150.AA2.+6.250.7.b ; 150.AA2.+6.250.7.c ; 150.AA2.+6.250.7.d ; 150.AA2.+6.250.7.e ; 150.AA2.+6.250.7.f)



17,000,000 550,554,000



sets



10.00



JUMLAH 1.3.11



-



-



Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and extended BB2 +6 type towers (refer to attached drawings and foundation code number) (typical for tower with body extension +6)



I.3.1.2.1 I.3.1.2.2 I.3.1.2.3 I.3.1.2.4



Class 1 Pad and Chimney (150.BB2.+6.250.1.a ; 150.BB2.+6.250.1.b) Class 2 Pad and Chimney (150.BB2.+6.250.2.a ; 150.BB2.+6.250.2.b) Class 3 Pad and Chimney ( (150.BB2.+6.250.3.a ; 150.BB2.+6.250.3.b) Class 4a Pad and Chimney Foundations (Rock) (150.BB2.+6.250.4a.a ; 150.BB2.+6.250.4a.b)



I.3.1.2.5



Class 7 Pad and Chimney Foundations with Bouyancy (150.BB2.+6.250.7.a ; 150.BB2.+6.250.7.b ; 150.BB2.+6.250.7.c ; 150.BB2.+6.250.7.d ; 150.BB2.+6.250.7.e ; 150.BB2.+6.250.7.f)



sets



2.00



JUMLAH 1.3.1.2



I.3.1.6.1 I.3.1.6.2 I.3.1.6.3



-



Complete Suspension Tower Foundation (including stubs, cleats and setting) for standard and extended AA2 +6 type towers (refer to attached drawings and foundation code number) (typical for tower with body extension +6) Class 1 Pad and Chimney (150.AA2.+6.250.1.a ; 150.AA2.+6.250.1.b) Class 2 Pad and Chimney (150.AA2.+6.250.2.a ; 150.AA2.+6.250.2.b) Class 3 Pad and Chimney ( (150.AA2.+6.250.3.a ; 150.AA2.+6.250.3.b) Class 4a Pad and Chimney Foundations (Rock) (150.AA2.+6.250.4a.a ; 150.AA2.+6.250.4a.b)



I.3.1.6



5,100,000 5,100,000 6,800,000



PEKERJAAN PONDASI TERMASUK PEMERIKSAAN AKHIR A. Standard Foundation Foundation of Tower (Lattice Tower)



I.3.1.1.1 I.3.1.1.2 I.3.1.1.3 I.3.1.1.4



I.3.1.2



300,000 300,000 400,000



TOTAL HARGA



-



-



Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and extended DDR2 +6 type towers (refer to attached drawings and foundation code number) (typical for tower with body extension +6) Class 1 Pad and Chimney (150.DDR2.+6.250.1.a ; 150.DDR2.+6.250.1.b) Class 2 Pad and Chimney (150.DDR2.+6.250.2.a ; 150.DDR2.+6.250.2.b) Class 3 Pad and Chimney ( (150.DDR2.+6.250.3.a ; 150.DDR2.+6.250.3.b)



sets



Page 4 of 7



2.00



-



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



URAIAN PEKERJAAN SATUAN



I.3.1.6.4



Class 4a Pad and Chimney Foundations (Rock) (150.DDR2.+6.250.4a.a ; 150.DDR2.+6.250.4a.b)



I.3.1.6.5



Class 7 Pad and Chimney Foundations with Bouyancy (150.DDR2.+6.250.7.a ; 150.DDR2.+6.250.7.b ; 150.DDR2.+6.250.7.c ; 150.DDR2.+6.250.7.d ; 150.DDR2.+6.250.7.e ; 150.DDR2.+6.250.7.f)



VOLUME



HARGA SATUAN



JUMLAH 1.3.1.6 I.3.1.7.1 I.3.1.7.1.1 I.3.1.7.1.2 I.3.1.7.1.3 I.3.1.7.1.4 I.3.1.7.1.5



B. Non-Standard Foundation Tower type AA Tower type BB Tower type CC Tower type DD Tower type DDR



I.3.1.8 I.3.1.8.1 I.3.1.8.1.1 I.3.1.8.1.2 I.3.1.8.1.3 I.3.1.8.2 I.3.1.8.2.1 I.3.1.8.2.2 I.3.1.8.2.3 I.3.1.8.3 I.3.1.8.3.1 I.3.1.8.3.2 I.3.1.8.3.3



Transportasi Material foundation (Biaya Lansir ke lokasi titik tower) Transportation Distance up to 500m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu) Transportation Distance to 500 - 1000m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu, dll) Transportation Distance up to > 1000m Medan datar Medan berbukit Membutuhkan alat transportasi lainnya (perahu, dll)



sets



3.00



-



JUMLAH 1.3.1.7.1



-



kg



1,541,030.00



-



JUMLAH 1.3.1.8 JUMLAH 1.3



-



JUMLAH TOTAL PEKERJAAN TAPPING TRANSMISI ( I. PEKERJAAN SIPIL ) VI II II.1 II.1.1 II.1.2 II.2 II.2.1 II.2.2 II.2.3 II.3 II.3.1 II.3.2 II.3.3 II.5 II.5.1 II.5.1.1 II.5.1.1.1 II.5.1.1.2 II.5.1.1.3 II.5.1.1.4



PEKERJAAN TAPPING TRANSMISI PEKERJAAN ELEKTROMEKANIKAL ( PEMASANGAN ) CONDUCTORS, INCLUDING DOWNLEADS TO SUBSTATION GANTRY Six Single conductors ACSR 340 Six Single conductors ACSR 340/30



550,554,000



Kmr



5.98



115,000,000



OPTICAL GROUND WIRE (OPGW), INCLUDING DOWNLEADS TO SUBSTATION GANTRY (refer to the related TPG) Set of single OPGW 90,4 kN conductors Set of Joint boxes of OPGW Set of Gantry Boxes (GB) complete, installed on substation gantry



TOTAL HARGA



687,841,508 -



kmr Sets Sets



5.98 6.00 2.00



20,000,000 6,000,000 7,500,000



ALUMINIUM-CLAD STEEL (AS), INCLUDING DOWNLEADS TO SUBSTATION GANTRY (refer to the related TPG)



119,624,610 36,000,000 15,000,000 -



One earth conductor, AS 70 Armour Rod for earthwire AS 70 Mind spand joint GSW/AS INSULATOR SETS SYSTEM INSULATOR STRING SETS COMPLETE WITH ALL FITTINGS (refer to the related drawing and TPG) Medium Pollution Tension set single string (U 210 B) Tension set double string (U 120 B) Suspension set single string (U 120 B) Suspension set double string



Sets Sets Sets Sets Page 5 of 7



36.00 12.00 54.00 24.00



500,000 600,000 450,000 500,000



18,000,000 7,200,000 24,300,000 12,000,000



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



URAIAN PEKERJAAN



II.5.1.1.5 Inverted Single string (U 120 B) II.5.1.1.6 Inverted Double string (U 120 B)



Page 6 of 7



SATUAN



VOLUME



Sets Sets



6.00



HARGA SATUAN 500,000



TOTAL HARGA 3,000,000



BILL OF QUANTYTI PEKERJAAN SIPIL PROYEK PEMBANGUNAN GARDU INDUK 150 KV BATI - BATI + INCOMER SUTT 150 KV ( CEMPAKA - PELAIHARI ) SIPIL DAN PEMASANGAN ELMEK



SESUAI KONTRAK NO



II.5.1.1.7 II.6 II.6.1 II.6.1.1 II.6.1.2 II.6.1.3 II.6.2 II.6.2.1 II.6.2.2 II.6.3 II.6.3.1 II.6.3.2 II.6.4 II.6.4.1 II.6.4.2 II.6.4.3



URAIAN PEKERJAAN



II.7.2 II.7.2.1 II.7.2.2 II.8 II.8.1 II.8.1.1 II.8.2 II.8.2.1 II.8.2.2 II.10 II.10.1 II.10.2



Jumper Suspension Set Single String ( U 120 B) CONDUCTOR FITTING AND ACCESSORIES SYSTEM VIBRATION DAMPERS AND CONDUCTOR SPACERS Line conductor spacer dampers Line span vibration damper for Zebra Line span vibration damper for ACSR 340/30 CONDUCTOR SPACER Line conductor spacers (span) 400 mm Line conductor spacers (jumper) 200 mm JOINT Mid span joint Repair sleeves ACCESSORIES Armour Rod for conductor ACSR 340/30 Counterweight per 100 kg Aircraft warning system (if neccessary) Total II.6 OPTICAL GROUND WIRE (OPGW) FITTING AND ACCESSORIES SYSTEM GROUND WIRE DAMPERS Ground Wire OPGW vibration dampers Total II.7 FITTINGS Ground wire suspension set (OPGW 90,4 kN) including armour rod Ground wire tension set (OPGW 90,4 kN) including armour rod ALUMINIUM-CLAD STEEL (AS) FITTING AND ACCESSORIES SYSTEM GROUND WIRE DAMPERS Ground Wire AS vibration dampers FITTINGS Ground wire suspension clamp (AS 70) Ground wire tension clamp (AS 70) SUPPORTING STRINGING WORKS Bush Clearing Pemasangan Stegger termasuk backstay (if any)



III III.1 III.1.1 III.1.2.1 III.1.3.1 III.1.4.1



PEKERJAAN KOMISIONING PEKERJAAN KOMISIONING Test and Commisioning (until RLB Certificate issued) Pengujian Pentanahan Pengujian Tahanan Isolasi Pengujian OTDR



II.7 II.7.1 II.7.1.1



SATUAN



VOLUME



HARGA SATUAN



Sets



12.00



500,000



6,000,000



Sets



12.00



250,000



3,000,000



Sets



70.00



150,000



10,500,000



Sets Sets



24.00 22.00



250,000 250,000



6,000,000 5,500,000



Ls Ls



1.00 1.00



25,000,000



25,000,000 978,966,118



Set Ls Ls



130.00 1.00 1.00



TOTAL II



TOTAL III TOTAL PEKERJAAN TAPPING TRANSMISI (II.III,IV PEKERJAAN ELMEK ) PEMASANGAN JUMLAH TOTAL



Page 7 of 7



7,500,000



TOTAL HARGA