Harga Perhitungan Sendiri (HPS) DAFTAR HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY : PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG
INSTANSI LOKASI TAHUN
: BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD) : PALEMBANG - SUMATERA SELATAN : 2016
NO
URAIAN
SATUAN
1 2 3 4 5 6 7
Kepala Tukang Tukang Mandor Pekerja Tidak Terlatih Pekerja Terlatih Tukang las Instalasi Listrik
Oh Oh Oh Oh Oh Oh titik
B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
BAHAN AC Split Duct 36.000 BTU ( 4 PK ) AC Split Duct 42.000 BTU ( 4,5 PK ) AC Split Duct 48.000 BTU ( 6 PK ) Alumunium tape Bayonet + plain Besi Hollow Galvanis 2 x 4 Box Plenum Duct + Peredam suara Box R.A.G 100 X 30 Cm Box R.A.G 100 X 50 Cm Box R.A.G 30 X 20 Cm Box R.A.G 30 X 25 Cm Box R.A.G 35 X 20 Cm Box R.A.G 45 X 20 Cm Box R.A.G 50 X 20Cm Box R.A.G 50 X 25 Cm Box R.A.G 55 X 25 Cm Box R.A.G 85 X 25 Cm Box R.A.G 90 X 30 Cm Box R.A.G 95 X 30 Cm Box S.A.D 25 X 25 Cm
unit unit unit roll m2 Btg Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
21 Box S.A.G 75 X 8 Cm 22 Box S.A.G 85 X 8 Cm 23 Breaket indoor + outdoor
Bh Bh set
Page 1 of 30
NO 24 25 26 27 28 29
URAIAN Cat dasar Cat Tembok mutu B, Anti Lumut dan Jamur Conduit Pipa dia.20 Cornes (bubuk Semen putih utk gypsum) Downlight 1.5 inch Downlight 5 inch
Page 2 of 30
SATUAN Kg kg Btg kg bh bh
NO 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 65 66 67 68 69 70 71 72 73 74 75 76
URAIAN Drainpen 75 x 180 cm + pipa pvc isolasi Filter filedown Filter Filedown R.Koridoor Fitting plafond listrik Flesibel Duct Gantungan siku long drat Grill main hole maintenance 0,8 m x 1,5 m Gypsum Board ( 120 x 240 x 9 ) mm Isolasi pipa tembaga Jasa Pemasangan Unit AC R Koridoor Kabel Control 3 x 2,5 mm Kabel Control 4x2,5mm Kabel NYM 2 X 2,5 mm Kabel Termostrart Kawat las perak L Bow Lampu SL 18 Watt Lampu SL 8 Watt Lampu TLED Lem TD Duct Lem Vynil Mangkok Material Bantu Material Pemasangan unit MCB MCB Box isi 4 grup Mounting Outdoor Indoor Nut 12" Paku Biasa bermacam ukuran 2" - 5" Paku Gypsum Paku Sekrup 3,5" Penambahan Freon R 410 Penampang Drain Pipa Drain + Isolasi Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal ) Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal ) R.A.G 100 X 50 Cm R.A.G 30 X 20 Cm R.A.G 30 X 25 Cm R.A.G 35 X 20 Cm R.A.G 35 X 20 Cm R.A.G 45 X 20 Cm R.A.G 50 X 20 Cm R.A.G 50 X 25 Cm R.A.G 55 X 25 Cm R.A.G 85 X 25 Cm
Page 3 of 30
SATUAN unit bh bh bh m2 Ls lbr roll Ls m m m m btg bh bh bh bh kaleng kg bh lot unit bh bh bh buah kg kg ls unit m m m Bh
Bh Bh Bh Bh Bh
NO
URAIAN
77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
R.A.G 90 X 30 Cm R.A.G 95 X 30 Cm Running Start Up ( Test Comesioning ) S. A. G (Suply Air Gril) 100 x 10 cm S.A.D 25 X 25 Cm S.A.G 100 X 30 Cm S.A.G 20 X 20 Cm S.A.G 75 X 8 Cm S.A.G 85 X 8 Cm Saklar Sealant Suppot Indoor Outdoor T Duss TD Duct Panel embossed + embossed Textil Tape Tray Besi siku dan galvalum Wallpaper
Page 4 of 30
SATUAN
unit unit Bh Bh unit Bh Bh bh buah unit bh m2 roll unit m2
TAR HARGA SATUAN BAHAN DAN UPAH
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY DAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG EX BP 7. PALEMBANG
PEKERJAAN
PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD) LOKASI TAHUN HRG SATUAN N O (RUPIAH) (RUPIAH) A ### ### ### ### ### ###
###
Page 5 of 30
HRG SATUAN N O (RUPIAH) (RUPIAH) ###
###
Page 6 of 30
HRG SATUAN N O (RUPIAH) (RUPIAH) ### ### ### ###
###
###
hpl
Page 7 of 30
HRG SATUAN N O (RUPIAH) (RUPIAH)
Page 8 of 30
Harga Perhitungan Sendiri (HPS) ANALISA HARGA SATUAN PEKERJAAN KEGIATAN PEKERJAAN INSTANSI LOKASI TAHUN
: : : : :
PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD E BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD) PALEMBANG - SUMATERA SELATAN 2016
NO. URAIAN PEKERJAAN ANALISA 1 10 M2 Bongkaran Plafond + Rangka 0.6 Oh Tukang 0.06 Oh Kepala Tukang 2 Oh Pekerja terlatih Jumlah per 10m2 Jumlah per 1m2 2
3
4
1 m² Langit-Langit Gypsumboard, tebal 9 mm + Rangka Besi Hollow 0.364 lbr Gypsum Board ( 120 x 240 x 9 ) mm 0.11 kg Paku Sekrup 3,5" 2.5 btg Besi Hollow Galvanis 2 x 4 0.06 kg Paku Biasa bermacam ukuran 2" - 5" 0.04 kg Paku Gypsum 0.3 kg Cornes (bubuk Semen putih utk gypsum) 0.025 roll Textil Tape 0.26 Oh Pekerja terlatih 0.4 Oh Tukang 0.04 Oh Kepala tukang 0.013 Oh Mandor 1 m² Mengecat Plafond 0.1 kg Cat dasar 0.28 kg Cat Tembok mutu B, Anti Lumut dan Jamur 0.1 kg Cornes (bubuk Semen putih utk gypsum) 0.02 Oh Pekerja terlatih 0.063 Oh Tukang 0.0063 Oh Kepala tukang 0.0025 Oh Mandor PEKERJAAN DUCTING Untuk 1 m² membutuhkan material dan upah sebagai berikut 0.400 Oh Kepala tukang 0.400 Oh Mandor 0.300 Oh tukang Pekerja Terlatih 0.300 Oh TD Duct Panel embossed + embossed 1.338 m2 Bayonet + plain 0.439 m2 0.7 roll Alumunium tape 0.2 kaleng Lem TD Duct
Page 9 of 30
HARGA SATUAN (Rp BAHAN
-
-
-
NO. ANALISA
URAIAN PEKERJAAN 0.2 buah 0.5 m2 0.5 buah
Sealant Gantungan siku long drat Nut 12"
5
PEKERJAAN PEMASANGAN UNIT AC SPLIT DUCTING 1.000 Oh Kepala tukang 0.680 Oh Mandor 0.500 Oh tukang Pekerja Terlatih 0.300 Oh Material Pemasangan unit 1.000 Ls
6
PEKERJAAN ACCESSORIES 0.400 Oh Kepala tukang 0.200 Oh Mandor 0.200 Oh tukang Pekerja Terlatih 0.200 Oh 9.000 buah Nut 12" 1.000 roll Isolasi pipa tembaga 1.000 ls Grill main hole maintenance 0,8 m x 1,5 m
Page 10 of 30
HARGA SATUAN (Rp BAHAN -
O W N E R
LISA HARGA SATUAN PEKERJAAN
TA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG
HARGA SATUAN (Rp) UPAH
E SLOKASI T TAHUN I M A T E
JUMLAH SATUAN
TOTAL
( - O E - ) -
TOTAL
-
-
-
TOTAL
-
Page 11 of 30
### Untuk 10 m² membongkar lantai diper -
HARGA SATUAN (Rp) UPAH
JUMLAH SATUAN -
TOTAL
TOTAL
TOTAL
Page 12 of 30
### -
-
Harga Perhitungan Sendiri (HPS) RENCANA ANGGARAN BIAYA
KEGIATAN PEKERJAAN INSTANSI LOKASI TAHUN
: : : : :
PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PA BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD) PALEMBANG - SUMATERA SELATAN 2016
NO. A 1 2 3
URAIAN PEKERJAAN
VOLUME SATUAN
PEKERJAAN PERSIAPAN Survey dan Pengukuran Pembersihan Lokasi Mobilisasi dan Demobilisasi
1.0 1.0 1.0
Ls Ls Ls
23.0 10.0 18.0 22.0 3.0 20.0 8.0 30.0 8.0 26.0 25.0 19.0 6.0 22.0 1.0 1.0 2.0 1.0 6.0 1.0 1.0 1.0 6.0 24.0
M² M² M² M² M² M² M² M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
SUB TOTAL A B B1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DUCT PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1 Ducting Dimensi 30" X 12" Ducting Dimensi 26" X 12" Ducting Dimensi 24" X 12" Ducting Dimensi 24" x 10" Ducting Dimensi 22" x 10" Ducting Dimensi 20" X 10" Ducting Dimensi 16" X 12" Ducting Dimensi 16" X 10" Ducting Dimensi 14" X 10" Ducting Dimensi 12" X 10" Ducting Dimensi 10" X 8" Ducting Dimensi 10" X 10" Box S.A.D 25 X 25 Cm Box S.A.G 75 X 8 Cm Box R.A.G 95 X 30 Cm Box R.A.G 90 X 30 Cm Box R.A.G 55 X 25 Cm Box R.A.G 50 X 25 Cm Box R.A.G 35 X 20 Cm Box R.A.G 30 X 25 Cm Box R.A.G 30 X 20 Cm Box R.A.G 100 X 50 Cm Box Plenum Duct + Peredam suara S.A.G 75 X 8 Cm
Page 13 of 30
NO. 25 26 27 28 29 30 31 32 33
URAIAN PEKERJAAN S.A.D 25 X 25 Cm R.A.G 100 X 50 Cm R.A.G 95 X 30 Cm R.A.G 90 X 30 Cm R.A.G 50 X 25 Cm R.A.G 30 X 25 Cm R.A.G 35 X 20 Cm R.A.G 30 X 20 Cm Flesibel Duct
VOLUME SATUAN 7.0 1.0 1.0 1.0 1.0 1.0 6.0 1.0 80.0
Bh Bh Bh Bh Bh Bh Bh Bh M
35.0 5.0 2.0 12.0 3.0 10.0 4.0 11.0 12.0 5.0 29.0 17.0 18.0 20.0 1.0 1.0 1.0 11.0 14.0 1.0 3.0 3.0 1.0 3.0 6.0 1.0 11.0 14.0 1.0 1.0 1.0 3.0 3.0
M² M² M² M² M² M² M² M² M² M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
SUB TOTAL B1 B2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2 Ducting Dimensi 30" X 12" Ducting Dimensi 26" X 12" Ducting Dimensi 24" X 12" Ducting Dimensi 24" x 10" Ducting Dimensi 22" x 12" Ducting Dimensi 22" x 10" Ducting Dimensi 20" X 12" Ducting Dimensi 20" X 10" Ducting Dimensi 18" X 10" Ducting Dimensi 16" X 10" Ducting Dimensi 14" X 10" Ducting Dimensi 12" X 10" Ducting Dimensi 10" X 8" Ducting Dimensi 10" X 10" Box S.A.D 25 X 25 Cm Box R.A.G 100 X 50 Cm Box R.A.G 100 X 30 Cm Box S.A.G 85 X 8 Cm Box S.A.G 75 X 8 Cm Box R.A.G 85 X 25 Cm Box R.A.G 55 X 25 Cm Box R.A.G 50 X 20Cm Box R.A.G 45 X 20 Cm Box R.A.G 35 X 20 Cm Box Plenum Duct + Peredam suara S.A.G 100 X 30 Cm S.A.G 85 X 8 Cm S.A.G 75 X 8 Cm S.A.D 25 X 25 Cm R.A.G 100 X 50 Cm R.A.G 85 X 25 Cm R.A.G 55 X 25 Cm R.A.G 50 X 20 Cm Page 14 of 30
NO.
URAIAN PEKERJAAN
34 R.A.G 45 X 20 Cm 35 R.A.G 35 X 20 Cm 36 Flesibel Duct
VOLUME SATUAN 1.0 3.0 72.0
Bh Bh M
SUB TOTAL B2 C 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17
PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2 Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal ) Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal ) Pipa Drain + Isolasi Kabel Control 4x2,5mm Penambahan Freon R 410 Penampang Drain Kabel Termostrart Filter Filedown Suppot Indoor Outdoor Tray Besi siku dan galvalum Jasa Pemasangan Unit AC Running Start Up ( Test Comesioning ) Material Bantu AC Split Duct 48.000 BTU ( 6 PK ) AC Split Duct 42.000 BTU ( 4,5 PK ) AC Split Duct 36.000 BTU ( 4 PK )
178.0 178.0 205.0 215.0 12.0 12.0 125.0 12.0 12.0 1.0 12.0 12.0 12.0 6.0 3.0 3.0
M M M M Unit M M Bh Unit Ls Unit Unit Unit Unit Unit Unit
SUB TOTAL C D 1 2 3
PEKERJAAN LAIN LAIN Administarsi dan Dokumentasi Pembuatan Shop Drawing & Asbult Drawing Pembersihan Akhir SUB TOTAL D
Page 15 of 30
1.0 1.0 1.0
Ls Ls Ls
ANGGARAN BIAYA
RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG
: : :
HARGA
JUMLAH
SATUAN
HARGA A. ### ### ###
SUB TOTAL A
Rp
B RUANG TAMU GUBERNUR ### ### ### ### ###
TOILET ### ###
Page 16 of 30
HARGA
JUMLAH
SATUAN
HARGA
Rp
RUANG TAMU GUBERNUR ### ### ###
SNI. 1.14 SUB TOTAL D
Page 17 of 30
HARGA
JUMLAH
SATUAN
HARGA
JUMLAH PPN (10%) TOTAL PEMBULATAN
Rp
-
Rp
-
Rp
-
Rp Rp Rp Rp
-
Page 18 of 30
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PEKERJAAN INSTANSI LOKASI TAHUN
: : : : :
PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPK BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD) PALEMBANG - SUMATERA SELATAN 2016
NO A
URAIAN PEKERJAAN PEKERJAAN PERSIAPAN
B PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DUCT B1 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1 B2 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2 C
PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2
D
PEKERJAAN LAIN LAIN
JUMLAH PPN (10%) TOTAL PEMBULATAN Terbilang :
Diperiksa Oleh, Asisten Teknis PU Cipta Karya Provinsi Sumsel
Ir. Imam Santoso Nip.19631002199502100
Menyetujui, Pejabat Pelaksana Teknis Kegiatan (PPTK ) Page 19 of 30
BPKAD Prvinsi Sumsel
Lamuda Marbun, SE, Msi Nip.196709151991031006
Page 20 of 30
REKAPITULASI RENCANA ANGGARAN BIAYA
UTIN/BERKALA AREA JAKABARING SPORT CITY LASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG A KEUANGAN DAN ASET DAERAH (BPKAD)
URAIAN PEKERJAAN
### ###
JUMLAH Rp
-
EMASANGAN PREIHSULATED ALUMINIUM DUCT Y DAN DUCTING RETURN LANTAI 1
B Rp
-
Y DAN DUCTING RETURN LANTAI 2
Rp
-
Rp
-
Rp
-
Rp Rp Rp Rp
-
###
Dibuat oleh Konsultan Perencana CV Multibina Konsultan
Dibuat Oleh, Konsultan Perencana
Muhtazili, ST Direktur
Muhtazili, ST Direktur
Mengetahui, Mengetahui, Kuasa Hukum Pengguna Anggaran Kuasa(KPA) Hukum Pengguna Anggaran (KPA) Page 21 of 30
BPKAD Prvinsi Sumsel
BPKAD Provinsi Sumsel
Laonma Pasindak lbn Tobing, Laonma SE Pasindak lbn Tobing, SE Nip.196310121984031002 Nip. 196310121984031002
Page 22 of 30
PROGRAM TERBILANG
Bilangan Yang Dimaksud Trilyun Ratus Milyar Puluhan Milyar Ratus Juta Puluhan Juta Ratus Ribu Puluhan Ribu Ratusan Puluhan #N/A Rupiah Sen
-
Masukkan nilai angka yang dimaksud (akan - dalam huruf) diterjemahkan
-
Cek Bilangan Terbilang:
Hasil (akan keluar otomatis).
-
NG
sukkan nilai angka yang aksud (akan rjemahkan dalam huruf)
ok!