RENCANA ANGGARAN DAN BIAYA
PROYEK : PEMBANGUNAN KAMPUS ISI SURAKARTA LOKASI : MOJOSONGO, SURAKARTA PEKERJAAN : INFRA STRUKTUR No
Uraian Pekerjaan
I
Volume
Harga Satuan
Jumlah Harga
18,200.00 3,117.00 3,117.00 935.00
2,000.00 21,000.00 19,000.00 10,000.00
36,400,000.00 65,457,000.00 59,223,000.00 9,350,000.00
m3
676.00
531,000.00
358,956,000.00
1 2 3 4 5
Pekerjaan Jalan, Parkir Area, Pedestrian Pekerjaan Jalan Jalan lebar = 6.00 m Lapisan Asphalt Sand sheet = 2 cm Lapisan Asphalt Treated Base (ATB) = 5 cm Lapisan Base course Kls A ; Tebal 30 cm Pemadatan Cansteen 30 x 40 x 100
m2 m2 m2 m2 m'
4,240.00 4,240.00 4,240.00 4,240.00 1,380.00
51,800.00 54,500.00 70,000.00 95,750.00 45,000.00
219,632,000.00 231,080,000.00 296,800,000.00 405,980,000.00 62,100,000.00
1 2 3 4
Pekerjaan Parkir Area Lapisan Paving Block tebal 8 cm Lapisan Base course Kls A ; Tebal 30 cm Pemadatan Cansteen 15 x 25 x 40
m2 m2 m2 m'
3,190.00 3,190.00 3,190.00 480.00
96,500.00 60,000.00 95,750.00 45,000.00
307,835,000.00 191,400,000.00 305,442,500.00 21,600,000.00
1 2 3 4
Pekerjaan Drof Area Lapisan Paving Block tebal 8 cm Lapisan Base course Kls A ;Tebal 30 cm Pemadatan Cansteen 15 x 25 x 40
m2 m2 m2 m'
1,040.00 1,040.00 1,040.00 240.00
96,500.00 60,000.00 95,750.00 45,000.00
100,360,000.00 62,400,000.00 99,580,000.00 10,800,000.00
1 2 3 4 5
Pedestrian Penghubung antar gedung; lebar = 2.50 m Lapisan Paving Block tebal 8 cm Lapisan Base course Kls A ; Tebal 15 cm Pemadatan Cansteen 15 x 25 x 40 Atap termasuk rangka dan pelaspis kolom batu alam
m2 m2 m2 m' m2
450.00 450.00 450.00 360.00 630.00
96,500.00 39,000.00 95,750.00 45,000.00 622,500.00
43,425,000.00 17,550,000.00 43,087,500.00 16,200,000.00 392,175,000.00
1 2 3 4
Pedestrian Penghubung parkir ke gedung; lebar = 1.50 m Lapisan Paving Block tebal 8 cm Lapisan Base course Kls A ; Tebal 15 cm Pemadatan Cansteen 15 x 25 x 40
m2 m2 m2 m'
1,690.00 1,690.00 1,690.00 1,010.00
96,500.00 39,000.00 95,750.00 45,000.00
163,085,000.00 65,910,000.00 161,817,500.00 45,450,000.00
20,000.00 531,000.00
40,800,000.00 1,083,240,000.00
20,000.00 210,000.00 350,000.00 698,000.00
62,100,000.00 28,980,000.00 48,300,000.00 963,240,000.00
20,000.00 210,000.00 350,000.00 375,000.00 490,000.00
2,560,000.00 10,752,000.00 19,712,000.00 192,000,000.00 250,880,000.00
Pekerjaan Turap 1 Pasangan Turap Batu Kali + Siaran batu muka pada masa bangunan
III A
B
C
D
E
Total Harga
170,430,000.00 m2 m3 m3 m3
1 2 3 4 II
Pekerjaan Cut & fill dan Perbaikan Tanah Pekerjaan Stripping & leveling Cutting Timbunan tanah Angkutan tanah lokal proyek (landscape)
Sat
358,956,000.00
1,215,592,000.00
826,277,500.00
273,140,000.00
512,437,500.00
436,262,500.00
. IV A.
m' m3 m3 m' m3 m3 m3 m' m' m3 m3 m3 m' m'
510.00 2,040.00 2,040.00 1,380.00 3,105.00 138.00 138.00 1,380.00 512.00 128.00 51.20 56.32 512.00 512.00
1 2 3 4
Pekerjaan Saluran Saluran Utama (Main Drainase) Sungai lebar = 2 m Galian tanah Turap Saluran Secunder (Saluran di tepi Jalan) Galian tanah Urugan pasir tebal 10 cm Lantai kerja beton B 'O' tebal 10 cm Saluran Beton 'U' Saluran Tersiar (Saluran pada Masa Bangunan) Galian tanah Urugan pasir tebal 10 cm Lantai kerja beton B 'O' tebal 10 cm Saluran 1/2 Buis 50 + Pasangan 1/2 bata di plester + acian Grill Besi Penutup Saluran tersier Bak Kontrol Saluran Utama (Main Drainase) Saluran Secunder (Saluran di tepi Jalan) Saluran Tersiar (Saluran pada Masa Bangunan) Grill Besi Penutup Bak kontro Saluran tersier
Unit Unit Unit Unit
35.00 20.00 20.00
2,500,000.00 1,500,000.00 850,000.00 625,000.00
52,500,000.00 17,000,000.00 12,500,000.00
1 2 3 4 5 6
Pekerjaan Landscape Bak tanaman Pengadaan tanah merah untuk bak tanaman Rumput Gajah Pohon untuk bak tanaman Pohon sekitar parkir Pohon sepanjang jalan
m2 m3 m2 m' m' bh
400.00 320.00 400.00 400.00 320.00 138.00
300,000.00 68,000.00 20,000.00 95,000.00 70,000.00 250,000.00
120,000,000.00 21,760,000.00 8,000,000.00 38,000,000.00 22,400,000.00 34,500,000.00
1 2 B. 1 2 3 4 C. 1 2 3 4 5 D.
V
1,124,040,000.00
1,102,620,000.00
475,904,000.00
82,000,000.00
244,660,000.00
TOTAL
7,026,204,500.00
JALAN GEDUNG 2 GEDUNG 10 GEDUNG 3 GEDUNG 4 GEDUNG 5
PARKIR 794.25 295.928 775.750 647.938 675.752 3189.618
PEDESTRIAN
DOORLOP